Introduction - Marek Piatkowski Professional Background
Toyota Motor Manufacturing Canada (TMMC) - Cambridge, Ontario from 1987-1994
TPS/Lean Transformation Consulting - since 1994 Professional Affiliations
TWI Network – John Shook, Founder Lean Enterprise Institute (LEI) – Jim Womack Lean Enterprise Academy (LEA) – Daniel Jones CCM/CAINTRA – Monterrey, Mexico SME, AME, ASQ, CME
Lean Manufacturing Solutions - Toronto, Canada
http://twi-network.com
Elimination of Waste Introduction
Thinking win, Win, WIN
What is Work and what is NOT Work?
Elimination of Waste Introduction
Thinking win, Win, WIN
Types of Work
Meaningful Work - work that adds value to a product or advances a product Value Added Work - operations which increase a value of a product
from the Customer’s point of view Non-Value Added Work – Incidental Work. Work that does not have any
particular value, but it has a cost. The higher the value-added operation in your completed work, the
higher the level of production efficiency will be. When walking and looking at different operations you will find that
the actual “work” which adds value to the material is surprisingly small, while waste or an activity which doesn’t increase value of a product is remarkably large.
Elimination of Waste Introduction
Thinking win, Win, WIN
Value-added (VA) operations are those activities, which advance a product or increase the value of the product from the Customer’s point of view
This includes processing operations such as changing the shape of product, changing its quality or assembling different components into a large part. Assembling parts, cutting, stamping, soldering, forging raw materials, tempering gears, painting bodies are examples of real work or value-added operations
When walking and looking at different operations you will find that the actual “work” which adds value to the material is surprisingly small, while waste or an activity which doesn’t increase value of a product is remarkably large.
Value Added Work
Elimination of Waste Introduction
Thinking win, Win, WIN
Non-Value Added Work (NVA) – Sometimes called Essential or Incidental Work.
This work that does not have any particular value, value, but must be done to complete the job. And this work has a cost.
For example, Non-Value added work includes leaving the workplace to get parts or tools (walking time), applying labels, packing product, entering information into data base, testing, filing, unpacking product or picking up parts from a bin
If we carefully analyze each work process, the equipment and materials being used, we soon can identify waste and find ways to eliminate it.
Non-Value Added Work
Elimination of Waste Introduction
Thinking win, Win, WIN
WASTE(Muda)
Waste (Muda) - is NOT work. Waste are activities, motions, behaviors or actions that are not part of the actual work (non essential activities).
Waste refers to such things as: waiting, repairing, sorting, inspecting, verifying, checking, counting and rearranging materials unnecessarily, or handling parts that are not needed right away
Two major contributors to Waste: Unevenness - fluctuating schedules, planning and production
quantities Overload - machine or employee pushed beyond natural limits
of their capacity
Elimination of Waste Introduction
Thinking win, Win, WIN
Taiichi Ohno was a Japanese industrial engineer who became a Toyota Executive. Taiichi Ohno is considered to be the father of the
Toyota Production System.
Toyota’s ChairmanFujio Cho
“Waste is anything other than the minimum amount of equipment, materials, parts and
working time which is absolutely essential to add values to the product or service”
Elimination of Waste Introduction
Thinking win, Win, WIN
Types of Work and Activities / Motions
Value Added Work- welding bracket- cooking- assembling cover- painting frame …
Non-Value Added Work- loading parts- walking- exchanging tools- applying labels, packaging
Waste- inspecting- rearranging parts- repairing- waiting …
Waste - Muda
Value Added Work
Motion
Non-Value Added Work
Elimination of Waste Introduction
Thinking win, Win, WIN
Seven Types of Waste
Unnecessary Transportation
Unnecessary Motion Unnecessary Inventory
Unnecessary Processing
Elimination of Waste Introduction
Thinking win, Win, WIN
1. Waste of Overproduction Overproduction occurs when we produce too much or too early. By overproducing we create unnecessary inventories, which
require unplanned storage space and additional material movement.
This also often results in producing an obsolete product, a product that must be sold below its cost or it must be scrapped
Overproduction causes unplanned use of material, manpower and machinery which should have been allocated to produce other type of final product.
Elimination of Waste Introduction
Thinking win, Win, WIN
1. Waste of Overproduction Producing too much or too soon
Processing a larger amount than is necessary (producing more parts than required) Producing goods at a rate faster than they are needed (producing parts earlier than
required - right part but wrong time) Both forms of waste are undesirable, however, particular attention must be paid
to the latter since parts should not be produced earlier than necessary. One of the basic production principle of Lean is to produce to customer demand,
that is producing only what is necessary, when it is needed, and in just the amount needed.
Waste of Overproduction occurs when an operator uses a machine or a process simply because it is big, expensive, and capable of making lots of parts.
Ignoring the required production volume and producing too much is waste. Keep this in mind - producing things that do not sell or that we do not need is waste.
Overproduction creates more work and expenses which are unnecessary: when stocks of finished parts pile up, extra pallets, trays and containers are required to contain them.
Furthermore, extra expenses grow out of transport between processes and between the production lines and warehouse
Elimination of Waste Introduction
Thinking win, Win, WIN
1. What is Overproduction? The production of goods in excess of absolute consumer
requirements Manufacturing too much or too early or “just in case” Producing more than needed, producing faster than neededCharacteristics:
Inventory Stockpiles Unbalanced Material Flow Extra Part Storage racks Extra Manpower Complex Inventory Management
Causes: Just in case reward system Lack of communication Automation in the wrong places Low uptimes
Elimination of Waste Introduction
Thinking win, Win, WIN
1. Waste of Overproduction – Observations and Questions
Are we producing the right things? Are we producing them Just-in-Time or too soon? How does daily demand compare to daily output? What are the dates on the material - how long does it sit in each
location? How does each process or each station know what to process and
how much? Is there space for material even though there may not be extra
material in the location? How do the operators know if they are on schedule or not? Is there an hourly production board? Is the equipment running at the stated optimal cycle time – Takt
Time? Does anyone know what the correct cycle time is?
Elimination of Waste Introduction
Thinking win, Win, WIN
2. Waste of Unnecessary Transportation
The waste of transportation refers to any additional movement of product, beyond the necessary minimum.
It includes temporary unloading and reloading, load transfers, removal of quantities that are too small, non-direct routing and costs of expediting.
Transportation that does not add any value to the product from the Customer point of view.
Extra costs of unnecessary transportation or storage equipment, maintenance of that equipment and the unnecessary labor add up to the final costs of a manufacturing product.
Elimination of Waste Introduction
Thinking win, Win, WIN
2. Waste of Unnecessary Transportation The waste of unnecessary transportation refers to waste
encountered by unnecessary movement of parts and information. Material movement is an important element in any operation,
because it involves not just delivery of parts and material, but also the supply of information. Material and information should be moved only to the extent required to meet “Just-In-Time” operation. Any transportation that is not required for JIT operation is a form of waste.
Transportation is not something that directly contributes any added value to the products; however it is a necessary part of the operation. Both the transport of parts and information are important and they cannot be avoided. However, they must be minimized.
Waste of unnecessary transportation is also a movement of material that does not support single piece flow. For this reason, it is vital to avoid movement of material unless it is supplying items when they are needed, where they are needed and in the quantity they are needed - Just-In-Time.
Elimination of Waste Introduction
Thinking win, Win, WIN
2. What is Unnecessary Transportation?
Characteristics: Extra carts, fork lifts, dollies Multiple Storage Locations Extra Material Racks Complex Inventory Management Extra Facility Space Incorrect Inventory Counts Damaged Material
Causes: Large Lot Processing Unleveled Schedules Lack of 5 S’s Lack of Visual Controls Improper Facility Layout Large Buffers and In Process Kanbans
Elimination of Waste Introduction
Thinking win, Win, WIN
2. Waste of Unnecessary Transportation – Observations and Questions
Does material flow smoothly from one end of the factory to the other? How is material handling performed, are there dedicated routes with
dedicated material handling people? Are there partial boxes and pallets returned back to the warehouse? How heavy is the material being moved, can the movement be done
with a less expensive (lower capacity) lifts or material handling device? How do material people know when to pick up and deliver, how do they
stay on schedule? How do material handling people know where to store material and how
much? How much time do material handlers spend removing packaging (e.g.
boxes, tape) Are there a lot of marks on the walls from carts, is there any evidence of
damage to walls from material handling equipment? Any evidence of damage to the material handling equipment?
Elimination of Waste Introduction
Thinking win, Win, WIN
3. Waste of Unnecessary Inventory Inventories are measured in terms of time - from the moment the
material is received to the moment that it is shipped out as a product.
Manufacturing costs begin to accumulate whenever parts in process stop and wait at different stages of manufacturing.
Any kind of inventory results in waste, whether that includes raw materials, components, sub-assemblies, work-in-process inventory, packaging materials or information data.
Elimination of Waste Introduction
Thinking win, Win, WIN
3. Waste of Unnecessary Inventory The waste of unnecessary inventory refers to holding excessive
stock. The result of holding a greater amount of finished goods or work-
in-process inventory than necessary between processes, or from purchasing an excessive quantity of materials is waste.
When there is an excess of parts between work processes, or too many parts are delivered by outside suppliers, the situation is called waste of inventory.
Inventory is often a security measure taken in case an emergency situation arises. At the same time, however, inventory increases waste.
The greater the inventory, the greater the waste will be. It tends to hide the real causes behind the emergency or breakdown.
Serious or chronic problems go unnoticed. As a result, real causes are overlooked; improvements are not made and the recurrence of problems will not be prevented.
Elimination of Waste Introduction
Thinking win, Win, WIN
3. What is Unnecessary Inventory?Waste that consists of excess inventory over and above that which is
necessary. It increases costs and lead times Reduces quality and flexibility
Characteristics: Extra Space on Receiving Docks Material Between Processes Stagnated Material Flow LIFO instead of FIFO Extensive Rework When Problems Surface Long Lead Time for Engineering Changes
Causes: Incapable Processes Uncontrolled Bottleneck Processes Incapable Suppliers Long Change Over Times
Elimination of Waste Introduction
Thinking win, Win, WIN
3. Waste of Unnecessary Inventory – Observations and Questions
What size batches are supplies brought in, how many days/weeks/months of inventory is this?
Is there any evidence of obsolete materials, where are they stored?
How much equipment and space is dedicated to material handling and storage?
Do the material requisitions match up with the amount of material really on hand?
Is there a lot of “hidden” material in the form of unorganized storage, is the material stacked higher than eye levels?
What is the date on the material is it more than a couple of days old, when will it be used?
What is the waste associated with extra inventory in terms of space, equipment, manpower, safety, computer equipment, energy, and obsolescence?
How often is material replenished at the process?
Elimination of Waste Introduction
Thinking win, Win, WIN
4. Waste of Waiting At any time when a machine is idle (when it is needed) or an
operation is not producing, we experience a waste of valuable production time.
Delays caused by excessive start-up time, long on-line set-up times, breakdowns, unplanned repairs and maintenance.
Waiting for a delivery of a missing part or a component, collecting tools, collecting materials, waiting for an operation to finish before proceeding to the next step.
Waiting for information or instructions, reading and trying to understand instructions, searching for lost or miss-placed items.
Elimination of Waste Introduction
Thinking win, Win, WIN
4. Waste of Waiting Waiting is a form of waste. This type of waste is being “idle”
between operations An example of this waste is when an operator has to wait for a
machine to complete its automatic stage of a process. Waste of waiting can appear often on a multi-process line that is not as efficiently organized as it could be.
Another example of waste of waiting could be in an assembly process. When the amount of work is small, if one cycle of the operation is completed and the main component for the next assembly cycle have not yet been delivered to the worksite, the operator ends up wasting time waiting for it.
Sometimes it might be an unavoidable period of unproductive waiting, but constant awareness of this waste can result in ideas to improve efficiency by changing the job sequence.
Another instance may be when an entire assembly area is halted while a Line Leader or material handler searches for needed materials, schedules or supplies.
Elimination of Waste Introduction
Thinking win, Win, WIN
4. What is Unnecessary Waiting? Unnecessary waiting that results from customer orders, inventory,
or completed products waiting in queue for a process to begin. Operators waiting for work, materials, machine, instructions,
orders, etc …Characteristics:
Unbalanced Operations (Work) Unplanned Equipment Downtime
Causes due to: Inconsistent work methods Long machine change over time Low man/machine effectiveness
Results: Long lead times Wasted floor space Ineffective use of time Ineffective production planning
Elimination of Waste Introduction
Thinking win, Win, WIN
4. Waste of Waiting – Observations and Questions Are the operators standing around and waiting for something? Why do operators have to “watch” or wait on equipment? Does the equipment stop automatically if abnormal conditions
occur? Are there signals if the equipment stops, who can hear or see
these signals How do operators know when they are supposed to be at their
workstation? How are the jobs organized, who sets them, how do operators
know what to do? Are there work instructions, how much variation in work pace is
there between operators? What happens during an breakdown, what happens to the
operator? What do operators do during changeover, are they active
participants?
Elimination of Waste Introduction
Thinking win, Win, WIN
5. Waste of Unnecessary Processing When poor planning results in the purchase of equipment with
greater capacity than required Development of complicated processes and systems, additional
handling of data and information, delays caused by extensive levels of approval, lack of standards, ineffective training methods, reworking of presentation materials, generating conflicting directions, complicating issues rather than simplifying them all result in unnecessary processing
This type of waste occurs whenever manufacturing methods are poorly planned and implemented or when these methods and functions are poorly exercised
Elimination of Waste Introduction
Thinking win, Win, WIN
5. Waste of Unnecessary Processing Waste of Unnecessary Processing is an activity that adds no
further customer value. Anything which does not contribute to advancing the process, or to the accuracy of the formed part, or exceeds specification, is a waste of processing.
This type of waste has no connection with advancing the line or improving the quality or the value of the product.
There are many instances of parts being processed excessively. For example, parts which only require rough surfaces (non critical surfaces not apparent to the customer) may be excessively finished, machining operations that cut threading holes deeper than required, or machining unnecessary features on a part.
Redundant inspection or checking may also be thought of as an example of waste in processing
Elimination of Waste Introduction
Thinking win, Win, WIN
5. What is Unnecessary Processing? Effort Which Adds No Value To a Product or Service. Results from steps in production processes that do not contribute
value or create too much costCharacteristics:
Process Bottlenecks Lack of Clear Customer Specifications Endless Refinement Redundant Approvals Extra Copies/Excessive Information
Causes: Engineering Changes Without Processing Changes Decision Making at Inappropriate Levels Inefficient Policies and Procedures Lack of Customer Input Concerning Requirements
Elimination of Waste Introduction
Thinking win, Win, WIN
5. Waste of Unnecessary Processing – Observations and Questions
Are there any manual processes that could be done by a machine, with reasonable cost?
Is there any duplicity of processes? Are all quality procedures and standards available and
understood? How much of the work being done is value added to the customer? Is there a suggestion system, is it in use, what happens to
suggestions? Is there any equipment designated for reworking? Is there any extra equipment around that is not in use, why is it
there-is it contingent? How much paperwork is being generated? Is there a good understanding of the cost of energy and programs
in place to reduce consumption?
Elimination of Waste Introduction
Thinking win, Win, WIN
6. Correction - Waste of producing defects Producing defects increases an overall production costs and it is a
major contributor to all other types of waste. Producing defects is de-moralizing to the employees When you produce defects you not only waste materials and labor,
but you loose valuable production capacity and you cause unnecessary wear and tear of the equipment.
You generate additional costs of reworking, storing, processing and/or disposing of defective material.
Elimination of Waste Introduction
Thinking win, Win, WIN
6. Waste of Correction If a defective item or defective workmanship is discovered, it is
necessary to correct the defect as soon as possible. Waste of correction arises from having to inspect, correct or repair
defects. All time, material, labor and energy involved in repairs is waste. All repairs raise costs.
If a defective item or defective workmanship is discovered, it is necessary to correct the root cause of the defect as soon as possible. Correcting or repairing a defect of the materials and parts adds unnecessary costs.
Even if a defective part can be repaired, its quality is often inevitably impaired. It can also lead to quality problems further down the line and cause additional waste of labor and energy which increases costs.
Consequently, attention should be given to avoiding the waste of repair
Elimination of Waste Introduction
Thinking win, Win, WIN
6. What is Correction – Producing Defects These are products or services that do not conform to the
specification or Customer’s expectation, thus causing Customer dissatisfaction.
Research confirms that 20 to 30% of manufacturing company’s gross revenues are spent on correcting mistake. Defects cause rework, confusion and upset a synchronized set of processes.
Inspecting and quarantining defective parts takes time and costs money
Causes: Incorrect product design Machines operating out of specs Defective materials Poorly trained employees
Elimination of Waste Introduction
Thinking win, Win, WIN
6. Waste of Correction – Observations and Questions
Is there a dedicated area for defects, how many are in this area? What happens to defects and rejected products? Are the defective products analyzed and root cause problem solving
performed? How do operators know when material is out of specification, what is the
reaction or countermeasure? What kind of inspection is done on the line? What type of inspection is done off line-how often? How complicated are the processes, is there any standard work? Are there any boundary samples or on-line inspection equipment Are there examples of bad parts with explanations of why they are bad?
Elimination of Waste Introduction
Thinking win, Win, WIN
7. Waste of Unnecessary Motion Any motion or no motion (example: holding a part) of any human
movement that adds no value to the product is considered waste Poor plant or machinery layout contributes to the waste of motion.
Unnecessary walking, bending, reaching, switching between sides are results of a poor layout.
Waste of motion occurs on the production line when standard procedures are either not defined or not followed or not carried out efficiently.
It also occurs when the standard procedure itself is inefficient.
Elimination of Waste Introduction
Thinking win, Win, WIN
7. Waste of Unnecessary Motion The waste of motion refers to actions of an operator or equipment
which do not add value during the work process. Any movement of people or equipment which does not contribute
added value to the products is considered to be waste of motion. An example of this waste is when the operator has to leave his
workplace and search for the tool or part to complete his job and finds them unavailable.
Waste of motion also occurs when processes or equipment are not laid out properly – operators are positioned too far from each other or from the machines. It becomes inconvenient and a lot of time and effort is wasted in walking.
Elimination of Waste Introduction
Thinking win, Win, WIN
7. What is Unnecessary Motion?
Characteristics: Looking for Tools Excessive Reaching or Bending Material Too Far Apart (Walk Time) Equipment for Moving Parts Extra “Busy” Movements While Waiting
Causes: Equipment, Office & Plant Layout Lack of 5 S’s Lack of Visual Controls Inconsistent Work Methods (Standardized Work) Large Batch Sizes
Elimination of Waste Introduction
Thinking win, Win, WIN
7. Waste of Unnecessary Motion – Observations and Questions
Is there a lot of movement that is not adding value to the product? Do people look busy, but are not adding value to the product? Are operators engaged in searching for tools, documents, or
materials? Are there a lot of unnecessary boxes and containers around the
work station causing operator for extra motion? Are tools at the point of use, or are they at one central location? Are specialized tools at the point of use? Are a lot of people engaged in walking around? Is there a lot of pick and place, are operators tied to one machine
because of this?
Elimination of Waste Introduction
Thinking win, Win, WIN
Identification and Elimination of Waste Identification and elimination of waste is the central theme of a
lean manufacturing production system Lean manufacturing is a dynamic and constantly improving
process dependent upon understanding and involvement by all employees
Successful implementation requires that all employees must be trained to identify and eliminate waste from their work
Waste exists in all work and at all levels in the organization
Elimination of Waste Introduction
Thinking win, Win, WIN
Overproduction is the Worst
Elimination of Waste Introduction
Thinking win, Win, WIN
Overproduction / Overdeliveriesincreases Inventory - Inventory hides Waste
Elimination of Waste Introduction
Thinking win, Win, WIN
What creates Waste?
Poor Layout (distance/reaching)
Long setups, changeovers Weak processes Equipment breakdowns Poor work methods Inadequate training Poor compliance Poor parts ordering system Defective material
Inconsistent measures Ineffective production planning,
scheduling Poor workplace organization Inconsistent supplier performance Lack of discipline No standards Poor container design And many, many more!
Elimination of Waste Introduction
Thinking win, Win, WIN
Eliminating Waste Elimination of Waste is a way to effectively and efficiently increase
production without purchasing more equipment, increasing the work force, working harder, or working longer, etc
Lean Transformation does this by identifying Waste (Muda) in work and then taking steps to eliminate it.
Lean Transformation is based on an assumption that operating efficiency and cost improvements can be achieved by working efficiently at a reasonable pace, without increasing the number of workers or machines, and without increasing the working time.
Elimination of Waste Introduction
Thinking win, Win, WIN
Current Status VA NVA
TraditionalCostReduction
VA NVA
LeanFocus VA NVA
Traditional Approach to Improvement
Elimination of Waste Introduction
Thinking win, Win, WIN
Eliminating Causes of Waste Waste refers to various phenomena in the operations process
responsible for raising costs without adding value. Elimination of Waste
First step towards efficiency improvement Difficult to recognize waste Need to make waste obvious to everyone Waste must appear distinctly and clearly Must re-examine the way we think about waste
Understanding the causes of waste and eliminating them from the work sites is important to the production system. There are two other contributors to waste:
Unevenness Overburden
Elimination of Waste Introduction
Thinking win, Win, WIN
3 Ms areas – Muda, Mura, Muri
Elimination of Waste Introduction
Thinking win, Win, WIN
Unevenness Unevenness refers to the phenomena of process fluctuations that
result when production schedules or deliveries are not constant or reliable.
The greater the unevenness the more waste there is Typically what happens is that out of our fear of shutting down the
customer we keep enough parts, material, and people around to always be prepared for the maximum demand that can be placed upon us.
Unevenness can be observed, not only in the overall production volume, but also at the worksite in the amount of work done by the worker, the flow of parts in and out and the use of machines and equipment.
When the amount of work performed by each operator is different or uneven it is difficult to truly grasp where the waste, problems, or inefficiencies exist in a system.
Elimination of Waste Introduction
Thinking win, Win, WIN
Overburden Overburden happens when equipment or a worker is pushed
beyond the natural limit of their capabilities. The capacities of either people or equipment can be
overburdened. Overburdening people results in safety and quality problems.
While overburdening equipment is a direct cause of breakdowns and defects. Continuous overburdening of people and machines will increase the costs instead of minimizing problems
Obviously people have their limits, and there are differences among them which must be considered in production. If the standards are set for the specs of a skilled and experienced operator, but the actual work is being done by someone who is not yet fully trained, the work will not be completed within the standard time; the new operator will likely fall behind
We must be on the lookout for opportunities to have people rotate more in areas with strenuous processes, or make difficult jobs easier through continuous improvement
Elimination of Waste Introduction
Thinking win, Win, WIN
Awareness of Waste The intent of the Lean Transformation process is to raise
productivity and reduce costs by eliminating Waste and minimizing Non-Value Added Work.
Waste refers to various phenomena in the production process responsible for raising costs without adding value.
In fact, by definition almost anything that raises costs without adding value is defined as Waste.
Lean Transformation is based on an assumption that operating efficiency and cost improvements can be achieved by: Working efficiently at a reasonable pace without increasing the number of workers or machines and without increasing the working time
If we carefully analyze each work process, the equipment and materials being used, we soon can identify waste and find ways to eliminate it.
Elimination of Waste Introduction
Thinking win, Win, WIN
Why do we need to eliminate Waste? To reduce Lead Time To reduce operating costs To improve business performance visibility To improve “speed time to market” To exceed Customer expectations
Elimination of Waste Introduction
Thinking win, Win, WIN
Understanding Waste Waste cannot be ignored. If we are going to improve our
efficiency and lower the operating costs, we must look at the job cycle closely and look for ways to eliminate waste to increase our production efficiency.
Waste does affect people Causes physical fatigue Causes emotional fatigue Increases frustrations Increases stress Causes you to blame others Steals your time
Non Utilized People - Wasted People Potential We know what needs to be done. We tell the management, but they do not
listen to us. We have been through this sort of program before and nothing ever
changes… The biggest issue is making us see and believe that management is going
to make it happen. They do not speak to us, the new breed of managers do not
Elimination of Waste Introduction
Thinking win, Win, WIN
Methods to increase productivity Purchase more Equipment
Increasing the amount of equipment is one method to increase productivity Increasing equipment means that it is necessary to find people to operate
it. Increasing equipment is by no means cost efficient. Working Longer
Working overtime, working weekends or holidays This method of increasing production may be effective if done infrequently
for relatively short periods of time It is a poor solution in the long run
Increase the number of employees It is without doubt a way to increase production It is not a good way of generating profit
Elimination of Waste Introduction
Thinking win, Win, WIN
Changing the World. One Transformation at a timeThis presentation is an intellectual property of W3 Group Canada Inc.
No parts of this document can be copied or reproducedwithout written permission from:
Marek PiatkowskiW3 Group Canada Inc.iPhone: 416-235-2631
Cell: 248-207-0416
[email protected]://twi-network.com
Thinking win, Win, WIN
Elimination of Waste Introduction
Thinking win, Win, WIN
Presentations in this Workshop
1. Log in to: www.slideshare.net
2. Type in my name in search area:
Marek Piatkowski3. Select a
presentation you want to see
4. Learn and Enjoy