ELECTRICAL SAFETY INSPECTION REPORT

THE CHITTAGONG FASHION Khawaja Complex, CB-234/9, Kachukhet, Dhaka Cantt. Dhaka, Bangladesh

Factory List:

1. Overseas Apparels Ltd.2. The Chittagong Fashion

Inspected by: Luv

Report Generated by: Nezar

Inspected on April 28, 2014

Page 2: ELECTRICAL SAFETY INSPECTION REPORT - …bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdf · ELECTRICAL SAFETY INSPECTION REPORT. ... Install additional lights in

The Chittagong Fashion Page 2 of 18

SUMMARY

The Chittagong Fashion shares the 7 storied ( B+G+6), 26m high factory building with Overseas Apparels Ltd. under one the same management. The building construction completed in 2001 and the production started the same year. Presently, the factory has around 1000 employee working.

The Factory was surveyed for electrical safety by Woosun Energy and Construction Co., Ltd.

(WEC). The purpose of the survey was to identify significant electrical safety issues and to provide

recommendations for remediation based on applicable standards specified by the Accord. The

scope of this initial electrical safety inspection was limited to the review and identification of major

electrical safety issues. The inspection did not include identification of minor deficiencies, which will

be further addressed as part of follow-up inspections.

Table below summarizes the major electrical safety issues identified during the inspection.

Recommendations have been provided to address each issue.

An implementation schedule shall be developed by the factory to remediate each of the

findings. The specific timing of improvements, including any requested extensions due to

design / installation constraints, shall be submitted to the Accord for approval.

Page 3: ELECTRICAL SAFETY INSPECTION REPORT - …bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdf · ELECTRICAL SAFETY INSPECTION REPORT. ... Install additional lights in

Finding #: E- 1

There is no protection/barrier wall between transformer and surrounding area.

Category: TRANSFORMER ROOM

Finding: No protection between the transformer and surrounding area.

Recommendation: Construct a fire rated room for the transformers. Assign a qualified engineer to design a required transformer room according to BNBC, Section-2.6.3. The transformer must be installed with barrier walls between transformer and other panels. The walls must be fire resistant and should have height up to the ceiling. The wall should have the provision for necessary ventilation and fire rated door on required side.

Remediation Timeframe: 3 Months

Finding #: E- 2

No sufficient space to move around transformer inside its room.

Category: TRANSFORMER ROOM

Finding: Transformer room is congested.

Recommendation: Enlarge the transformer room as per standard (BNBC table 8.2.8) or maintain sufficient working space (preferably 1 meter) around the transformer.

Remediation Timeframe: Within 1 Month

Finding #: E- 3

Arcing horns for transformer HT Bushing not provided.

Category: TRANSFORMER ROOM

Finding:

Arcing horns on HT bushings of transformer, not installed.

Recommendation:

Arcing horns may be installed as per the transformer manufacturer's requirement. Consult with the transformer servicing company.

Remediation Timeframe: WITHIN 1 MONTH

The Chittagong Fashion Page 3 of 18

FINDINGS AND RECOMMENDATIONS

Page 4: ELECTRICAL SAFETY INSPECTION REPORT - …bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdf · ELECTRICAL SAFETY INSPECTION REPORT. ... Install additional lights in

Finding #: E- 4

HT cable exposed near wall. HT and LT cable laid together in same tray.

Category: SERVICE LINE

Finding: HT cable laid over the LT cables.

Recommendation: HT and LV cables may be laid in different trays to avoid the crossover.

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 5

HT cable at certain places not protected, cable laid on floor.

Category: SERVICE LINE

Finding: Cable laid directly on concrete floor and not protected.

Recommendation: Remove all debris, dust and lint from HT cable. Install cable duct/tray to protect the HT cables and provide covers made of non-combustible material preferably metal to protect the cables’ insulation from any physical damage as well as prevent the ingress of debris, dust and lint.

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 6

Cable drawn in conduit entering building exposed at the entry point. Cable not fully protected at the entry

point.

Category: SERVICE LINE

Finding: Cable entering electrical room, through wall & fence, is not protected.

Recommendation: Cables passing through permanent walls must be protected in steel/PVC pipes and remaining holes around the pipe must be sealed with fire rated materials.

Remediation Timeframe: WITHIN 1 MONTH

The Chittagong Fashion Page 4 of 18

Page 5: ELECTRICAL SAFETY INSPECTION REPORT - …bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdf · ELECTRICAL SAFETY INSPECTION REPORT. ... Install additional lights in

Finding #: E- 7

Protection of HT power cable above the ground is not adequate. Cable exposed from one side.

Category: SERVICE LINE

Finding: HT service cable dropping from pole is not protected near the base of the pole, above ground level.

Recommendation: HT cable dropping from HT pole must be protected in steel pipe of required size at least 2m from the ground level to protect the cable from any physical damage. The cable should be supported on covered tray or ladder throughout its length up to the HT panel base-plate (except the part of the cable laid underground at a depth of at least 1 meter).

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 8

MCCB installed directly on wall without enclosure.

Category: SWITCH BOARD & PANELS

Finding: Protective device(s) mounted on wall without enclosures.

Recommendation: Protective devices should be encased in metal casing made of 20 SWG thickness metal sheets.

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 9

Panel opens from top. Panel top not sealed.

Category: SWITCH BOARD & PANELS

Finding: Openings in the panel top cover plate.

Recommendation: Install cover plate on the top of the panel. Make circular hole at the top plate of panels and provide cable gland according to the respective cable size for cable entry and exit so that the cables are not stressed on the sharp edges of the hole of panels. Provide covers (of noncombustible material) if any additional gap remains after installing cable glands.

Remediation Timeframe: WITHIN 1 MONTH

The Chittagong Fashion Page 5 of 18

Page 6: ELECTRICAL SAFETY INSPECTION REPORT - …bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdf · ELECTRICAL SAFETY INSPECTION REPORT. ... Install additional lights in

Finding #: E- 10

Base plate for panels not installed/provided after allowing cable entry.

Category: SWITCH BOARD & PANELS

Finding: Panel base plates removed to allow cable entry.

Recommendation:

Install base plate on the bottom of the panel. Make circular hole at the base plate of panels and provide cable gland according to the respective cable size for cable entry and exit so that the cables are not stressed on the sharp edges of the hole of panels. Provide covers (of noncombustible material) if any additional gap remains after installing cable glands.

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 11

Cable terminating at MCCB Terminals without thimble/lugs.

Category: SWITCH BOARD & PANELS

Finding: Cables connected to MCCBs without lugs

Recommendation: Cables must be terminated to MCCB providing lugs of required size according to the size of the respect ive cable

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 12

Sign of cable burn at the cable terminal terminating at MCCB.

Category: SWITCH BOARD & PANELS

Finding: Burnt sign visible at terminal(s) inside panel.

Recommendation: Arrange periodic inspection & thermal scan to identify the overloading, loose connection, unbalanced load which may cause the burn and take action accordingly.

Remediation Timeframe: WITHIN 1 MONTH

The Chittagong Fashion Page 6 of 18

Page 7: ELECTRICAL SAFETY INSPECTION REPORT - …bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdf · ELECTRICAL SAFETY INSPECTION REPORT. ... Install additional lights in

Finding #: E- 13

HT and LT panels with deposit of lint and dust in excess.

Category: SWITCH BOARD & PANELS

Finding: Excessive lint deposit in Control Panel.

Recommendation: Disconnect the panel form power source and clean the interior of the panel regularly and seal the opening to protect ingress of lint and dusts. Provide covers if any additional gap remains after installing cable glands.

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 14

Multiple cable/wires terminated at MCCB

Category: SWITCH BOARD & PANELS

Finding: Multiple cables terminating to MCCB in panel.

Recommendation: Multiple cables connecting at a MCCB terminal must be removed. Individual circuit breaker must used for each load according to the respective cable-size.

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 15

TP MCCB connected to only single phase.

Category: SWITCH BOARD & PANELS

Finding: Three phase MCCB connected to control two phases or less.

Recommendation: Check and redesign the requirements to control the circuits. If three phase protective device not required, the control devices suitable for the purpose may be selected (replaced).single phase circuit breaker may be used here.

Remediation Timeframe: WITHIN 1 MONTH

The Chittagong Fashion Page 7 of 18

Page 8: ELECTRICAL SAFETY INSPECTION REPORT - …bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdf · ELECTRICAL SAFETY INSPECTION REPORT. ... Install additional lights in

Finding #: E- 16

Panel door earth bond missing.

Category: SWITCH BOARD & PANELS

Finding: Panel doors not connected with earth bond.

Recommendation: Provide earth connection for body and doors of metallic distribution boards using green cables preferably braid so that the metallic door remains at zero potential all the time.

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 17

Cables laid on floor inside generator room.

Category: GENERATOR ROOM

Finding: Cables terminating to generator output terminal box are laid on floor.

Recommendation: Cable terminating at Generator output terminal box must be supported on riser and protected. Install cable duct to protect the generator output cables and provide covers made of non-combustible material preferably metal to protect the cables’ insulation from any physical damage.

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 18

Generator frame has only one earth connection.

Category: GENERATOR ROOM

Finding:

Generator frame connected to only one earth point.

Recommendation: Generator body must have two separate and distinct earth connections with 35 sq.mm conductor.

Remediation Timeframe: WITHIN 1 MONTH

The Chittagong Fashion Page 8 of 18

Page 9: ELECTRICAL SAFETY INSPECTION REPORT - …bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdf · ELECTRICAL SAFETY INSPECTION REPORT. ... Install additional lights in

Finding #: E- 19

Raised cable duct inside control room not covered. Lint deposit on cable duct.

Category: CABLE & CABLE SUPPORTS

Finding: Cable trench without cover

Recommendation: Metallic cover (checkered plate) should be provided on cable trench to prevent the damage of cable insulation or falling of operator.

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 20

Damaged cable duct and wires/cable not closed and protected adequately.

Category: CABLE & CABLE SUPPORTS

Finding:

Damaged wiring duct installed in production floor.

Recommendation: Damaged wiring ducts must be replaced with new one to protect wires/cables in it.

Remediation Timeframe: WITHIN 6 MONTHS

Finding #: E- 21

Cable/wiring duct covered with flammable material. Wiring duct overloaded (Typical)

Category: CABLE & CABLE SUPPORTS

Finding: Cable ducts covered with combustible materials and overfilled.

Recommendation: Cable ducts covered/closed with plastics (Polythene sheets) must be removed. Install metallic (non-combustible) cable duct over the floor and provide metallic cover on it to keep it dust and vermin proof. Keep 30% free inside cable tray/channels/ducts for proper heat dissipation.

Remediation Timeframe: WITHIN 1 MONTH

The Chittagong Fashion Page 9 of 18

Page 10: ELECTRICAL SAFETY INSPECTION REPORT - …bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdf · ELECTRICAL SAFETY INSPECTION REPORT. ... Install additional lights in

Finding #: E- 22

Wiring duct open from and wiring duct with excessive deposit of lint and dust. Wires covered with lint (Typical).

Category: CABLE & CABLE SUPPORTS

Finding:

Excessive lint deposit in cable duct.

Recommendation: Disconnect the power source of the cable laid into channel and clean dust and debris of all interior components. Establish a periodic cleaning program and maintain records of the activities. Provide cover made of noncombustible material on the channel for preventing ingress of dust and debris in future.

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 23

Generator earth looped with generator neutral earthing.

Category: GENERATOR ROOM

Finding:

Generator frame earth looped.

Recommendation: Connect generator earth directly to main earth strips with proper sized earth cable (green).

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 24

Second Generator room does not have adequate illumination.

Category: GENERATOR ROOM

Finding:

Inadequate illumination in generator room.

Recommendation:

Install additional lights in generator room to provide required illumination(about 150 lux) for ease of its maintenance work and operational work.

Remediation Timeframe: WITHIN 1 MONTH

The Chittagong Fashion Page 10 of 18

Page 11: ELECTRICAL SAFETY INSPECTION REPORT - …bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdf · ELECTRICAL SAFETY INSPECTION REPORT. ... Install additional lights in

Finding #: E- 25

Gas (CNG) cylinder stored inside generator room.

Category: GENERATOR ROOM

Finding: Storage in generator room.

Recommendation: Remove the entire gas (CNG) cylinder from generator room. Any kind of combustible materials cannot be stored inside the generator room and near any electrical panel. Establish a routine cleaning program to keep the generator room neat, clean and dry.

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 26

Generator room (both) congested and not sufficient room for operator.

Category: GENERATOR ROOM

Finding: Inadequate working space around the generators.

Recommendation: Enlarge the existing generator room to provide sufficient working clearance around generator as per BNBC table 8.2.9. or keep sufficient (1 meter preferably) around the generator for ease of its maintenance.

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 27

Generator 2 located near to main enterance of factory building.

Category: GENERATOR ROOM

Finding: The generator room located near main entrance.

Recommendation: Generator room must be separated from the entrance with fire rated walls. . The walls must be fire resistant and should have height up to the ceiling or Assign a qualified engineer to design a required generator room according to BNBC, Section-2.6.4. . The wall should have the provision for necessary ventilation and fire rated door on required side.

Remediation Timeframe: WITHIN 1 MONTH

The Chittagong Fashion Page 11 of 18

Page 12: ELECTRICAL SAFETY INSPECTION REPORT - …bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdf · ELECTRICAL SAFETY INSPECTION REPORT. ... Install additional lights in

Finding #: E- 28

Excess deposit of dust and lint around control panel and transformer in electrical room.

Category: TRANSFORMER ROOM

Finding: Excessive dust and lint deposit in transformer room.

Recommendation: Establish a routine cleaning program to keep neat and clean the transformer room. Shut the power of the transformer and clean the exterior of the transformer at scheduled period.

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 29

Re-wire able fuse used in wiring duct as protections for power socket out.

Category: CABLE & CABLE SUPPORTS

Finding: Rewire able fuse (cut out fuse) used for circuit protection.

Recommendation: Replace the semi enclosed rewire-able fuse with miniature circuit breaker (MCB) and place the protection devices inside an enclosed panel made of metallic sheet of minimum 20 SWG thicknesses.

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 30

Wires in PVC conduit passing through window grills

Category: WIRINGS

Finding:

Cables passing through window grills.

Recommendation:

Cables must be protected and supported and installed through safe routes. Existing cables passing through window and ventilators must be removed immediately.

Remediation Timeframe: WITHIN 1 MONTH

The Chittagong Fashion Page 12 of 18

Page 13: ELECTRICAL SAFETY INSPECTION REPORT - …bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdf · ELECTRICAL SAFETY INSPECTION REPORT. ... Install additional lights in

Finding #: E- 31

Junction in ceiling left open exposing wires inside.

Category: WIRINGS

Finding: Junction box of concealed wiring not protected.

Recommendation:

Junction boxes of concealed wiring must be covered and protected. Wires inside junction box must be safely arranged and must avoid wire joints.

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 32

Damage PVC casing capping.

Category: WIRINGS

Finding: PVC casing capping wiring damaged.

Recommendation: Damaged PVC casing capping cover may be replaced with new one.

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 33

Wiring in damaged PVC casing capping conduit passing between wall and iron gate not proteted.

Category: WIRINGS

Finding: Wiring/cables passing through doors or gate.

Recommendation: Cables must be protected and supported and installed through safe and prescribed routes. Existing cables passing through doors/gate must be removed immediately.

Remediation Timeframe: WITHIN 1 MONTH

The Chittagong Fashion Page 13 of 18

Page 14: ELECTRICAL SAFETY INSPECTION REPORT - …bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdf · ELECTRICAL SAFETY INSPECTION REPORT. ... Install additional lights in

Finding #: E- 34

Cables terminated to MCCBs without lugs/ sockets.

Category: SWITCH BOARD & PANELS

Finding: Cables terminated to MCCBs without lugs/ sockets.

Recommendation:

Cables must be terminated to MCCB providing lugs of required size according to the size of the respect ive cable.

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 35

Wooden plank used to install ballast & socket outlet on cable tray.

Category: CABLE & CABLE SUPPORTS

Finding:

Wooden board/blocks used in wiring ducts to support ballast.

Recommendation: Wooden plank used for wiring duct/trays to support devices or cables must be removed. Install metallic (non-combustible) cable duct over the floor and provide metallic cover on it to keep it dust and vermin proof.

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 36

Cable/wires jointing in wiring duct without terminals.

Category: WIRINGS

Finding: Wires joined in wiring supports, between terminations.

Recommendation: Cable joints are must be realized through porcelain/PVC connector with PIB tape wound around.

Remediation Timeframe: WITHIN 1 MONTH

The Chittagong Fashion Page 14 of 18

Page 15: ELECTRICAL SAFETY INSPECTION REPORT - …bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdf · ELECTRICAL SAFETY INSPECTION REPORT. ... Install additional lights in

Finding #: E- 37

Cable joints/tapping inside panel is not appropiately done.

Category: SWITCH BOARD & PANELS

Finding: Cables joined inside panel.

Recommendation: Cable joints are must be realized through porcelain/PVC connector with PIB tape wound around.

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 38

Cables inside the panel not dressed proprly (Typical)

Category: SWITCH BOARD & PANELS

Finding: Cables and wires inside panel not securely fixed and not arranged.

Recommendation: Wires terminating to devices inside panel must be connected firmly and wires approaching devices must be securely fastened to avoid unintentional contact with live parts. Install slotted wiring duct to latch the cable inside the duct.

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 39

Mid-span LT cable jointing not protected.

Category: CABLE & CABLE SUPPORTS

Finding: Cables joined between terminals in trays and/or trenches.

Recommendation:

Cable joints are must be realized through porcelain/PVC connector with PIB tape wound around.

Remediation Timeframe: WITHIN 1 MONTH

The Chittagong Fashion Page 15 of 18

Page 16: ELECTRICAL SAFETY INSPECTION REPORT - …bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdf · ELECTRICAL SAFETY INSPECTION REPORT. ... Install additional lights in

Finding #: E- 40

Wires in flexible conduit not supported. Cable/wires joints at the transition of different conduit.

Category: WIRINGS

Finding: Wiring in flexible PVC conduit not supported.

Recommendation:

Wiring in flexible PVC conduit must be additionally supported and securely fixed at regular intervals. Flexible conduit must not be used for long point wiring (except for special wirings).

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 41

Wiring duct congested/crowded with wires. Wires not protected adequately (Typical in basement

Category: WIRINGS

Finding: Wiring duct overloaded with cables and wires.

Recommendation: Keep 30% free inside cable tray/channels/ducts for proper heat dissipation. The cable tray should be covered. Install another duct to accommodate all the cables

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 42

Cable entering through ceiling. Opening on ceiling not properly sealed.

Category: CABLE & CABLE SUPPORTS

Finding: Remaining gaps around the PVC conduit wiring/cable supports passing through ceiling/floors and walls are not sealed.

Recommendation: Cables/wirings passing through permanent wall must be protected installing pipes and remaining gaps must be sealed with fire resistant materials. Cable tray/raceway shall be installed for the support of the cable throughout its length.

Remediation Timeframe: WITHIN 1 MONTH

The Chittagong Fashion Page 16 of 18

Page 17: ELECTRICAL SAFETY INSPECTION REPORT - …bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdf · ELECTRICAL SAFETY INSPECTION REPORT. ... Install additional lights in

Finding #: E- 43

Wiring in PVC conduit are damaged at multiple places inside sample room. Socket out let (power extension) laid on floor without protection.

Category: WIRINGS

Finding: Damaged wiring supports.

Recommendation: Replace the damaged wiring supports with new one. The socket outlet must be fixed on wall at reachable height.

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 44

Ceiling fan and tube light connected without ceiling rose.

Category: WIRINGS

Finding: Lighting fittings and fans connected without ceiling rose or junction box.

Recommendation:

Connection to lights (Lighting fittings) and fans must be connected through ceiling rose or junction box. OR wire joints must be concealed wiring the fitting terminal box.

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 45

Wiring extended in casing capping surface conduit from wiring duct not protected fully. Casing capping not provided to full length of wiring.

Category: WIRINGS

Finding: Wirings extended from cable tray or wiring duct without protection.

Recommendation: Wiring extended from cable tray or wiring duct must be protected and should extend through proper tray jointing or junctions (accessories).

Remediation Timeframe: WITHIN 1 MONTH

The Chittagong Fashion Page 17 of 18

Page 18: ELECTRICAL SAFETY INSPECTION REPORT - …bangladeshaccord.org/wp...Electrical-Safety-Inspection-Report.pdf · ELECTRICAL SAFETY INSPECTION REPORT. ... Install additional lights in

Finding #: E- 46

Cables and wires not protected adequately inside wiring duct. Cable and wires overcrowded and stressed between duct and beam.

Category: WIRINGS

Finding:

Wires exposed and not supported between ducts.

Recommendation: Cable must be arranged and latched properly on the cable tray. Keep 30% free inside cable tray/channels/ducts for proper heat dissipation. The cable tray should be covered. Install another duct to accommodate all the cables.

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 47

Wooden plank used to install socket outlet.

Category: WIRINGS

Finding: Wooden switchboards used.

Recommendation:

Wooden switchboards must be replaced with non-combustible switchboards (Production floors).

Remediation Timeframe: WITHIN 1 MONTH

Finding #: E- 48

Cable dropping from ceiling in casing capping not supported.

Category: WIRINGS

Finding: Wiring not protected and not supported.

Recommendation: The PVC/rigid pipe used for surface wiring must be continuous through-out its length and properly supported (clamped with saddle, at regular interval of 600 mm).

Remediation Timeframe: WITHIN 1 MONTH

The Chittagong Fashion Page 18 of 18