This publication was produced for review by the United States Agency for International Development. It was prepared by Training Resources Group, Inc. (TRG).
USAID Office of Education
Education Performance Improvement, Communications and Knowledge (EPIC)
Quarterly Report April 1, 2016-June 30, 2106
USAID Contract Number: GS-23F-8071H/AID-OAA-M-15-00018 Requisition/Purchase Request/Project No: REQ-EGEE-14-000090 Education Performance Improvement, Communications, and Knowledge (EPIC) Implemented by: Training Resources Group, Inc. (TRG) 4401 Wilson Boulevard, Suite 200 Arlington, VA 22203 Phone: +1 703-875-8909 Fax: +1 703-875-9409 www.trg-inc.com
- 1 -
Table of Contents Acronyms ....................................................................................................................................... 3
Project Overview .......................................................................................................................... 4
Introduction ................................................................................................................................... 5
Third Quarter at A Glance ........................................................................................................... 6
Organizational Effectiveness ........................................................................................................ 7
Implement Office Strategy, Work Plan, and MEL Processes .............................................................................. 8
Facilitate Organization Redesign.............................................................................................................................. 10
Streamline Office Processes ..................................................................................................................................... 11
Enhance the Effectiveness of Office of Education Meetings .............................................................................. 13
Conduct Management Development Program .................................................................................................... 14
Professional Development ......................................................................................................... 15
Design and Deliver Core Education Sector Trainings ....................................................................................... 16
Create Compendium & Schedule of Learning Opportunities .......................................................................... 17
Compile Menu of Learning and Training Modalities ........................................................................................... 18
Identify Other Frameworks and Methodologies that Use, But Go Beyond, Competencies as a Design Principle ......................................................................................................................................................................... 19
Pilot Learning and Knowledge Sharing Modalities ............................................................................................... 21
Develop and Deliver Short, Focused Virtual Training ....................................................................................... 22
Knowledge Management ............................................................................................................ 23
Education Toolkit Content ....................................................................................................................................... 24
Assess KM Toolkit ...................................................................................................................................................... 25
Support Production and Dissemination of Technical Documents .................................................................. 26
Curate and Annotate Program Cycle Documents .............................................................................................. 27
Provide Support to BE2 ............................................................................................................................................. 28
Develop Evidence-Based Cross Cutting Area Technical Briefs with Related Knowledge Products ...... 30
Support for Annual Mobiles for Education Alliance Symposium ..................................................................... 31
Engagement, Communication, and Partnership ...................................................................... 32
Facilitate Office ECP Strategy ................................................................................................................................... 33
- 2 -
2017 Education Summit Planning ............................................................................................................................. 34
Support the Development of ECP Monitoring Process ..................................................................................... 35
Support Share-Out of the 2011-2015 Education Strategy Results and Launch of the 2016 Education Strategy .......................................................................................................................................................................... 36
Support Development of Print and Online ECP Outreach Material .............................................................. 38
Design and Deliver Communications Training for Staff .................................................................................... 39
Summary and Analysis of Mission Programs ......................................................................................................... 40
Global Consultations for the Education Finance Commission......................................................................... 41
Global Book Alliance .................................................................................................................................................. 42
Project Management and Operations ....................................................................................... 43
Next Steps for Q4 2016 .............................................................................................................. 45
Financial Information .................................................................................................................. 46
- 3 -
Acronyms AAR After Action Review
ADS Automated Directives System
BE2 Building Evidence for Education
COR Contracting Officer’s Representative
E3 Bureau for Economic Growth, Education and Environment
ECP Engagement, Communications and Partnership
ED Office of Education
EEPM Effective Education Portfolio Management
EGRA Early Grade Reading Activity
EiCC Education in Conflict and Crisis
EOC Education Overview Course
EPIC Education Performance Improvement, Communication and Knowledge
EPP Education Policy and Planning
ESC Education Sector Council
FY Fiscal Year
KM Knowledge Management
M&E Monitoring and Evaluation
MCI Making Cents International
MEL Monitoring, Evaluation and Learning
PD Professional Development
PMMELP Performance Management, Monitoring, Evaluation and Learning Plan
POP Period of Performance
PT&E Participant Training and Exchange
QUEST Quality, Equity and Sustainability Team
SOP Standard Operating Procedures
SOTA State of the Art
SSI Social Solutions International, Inc.
TRG Training Resources Group, Inc.
USAID U.S. Agency for International Development
- 4 -
Project Overview The U.S. Agency for International Development (USAID) is a global leader in the education sector, providing innovative, cutting-edge approaches and models to expand access to education and capacity development across a broad spectrum of economic and socio-political environments. Indicative of this is USAID’s 2011-2015 Education Strategy, which further expands the frontier of USAID educational programming so that all children can learn to read, youth can be better prepared to enter the workforce, and those living in areas affected by crisis and conflict can access education.
In particular, the 2011-2015 Education Strategy identifies three goals:
1. Improved reading skills for 100 million children in primary grades by 2015.
2. Improved ability of tertiary and workforce development programs to generate workforce skills relevant to a country’s development goals.
3. Increased equitable access to education in crisis and conflict environments for 15 million learners by 2015.
The Office of Education (ED) within the Bureau for Economic Growth, Education and Environment (E3) is responsible for implementing the Education Strategy. ED fulfills this responsibility through a variety of technical, advisory, and training support services to missions and bureaus on the design, implementation, monitoring and evaluation of programs in the areas of basic education (especially early grade reading), youth workforce development, tertiary education and education in conflict and crisis environments.
To reinforce and improve upon the Office’s current efforts in support of the Education Strategy, ED conceived of and designed the Education Performance Improvement, Communications and Knowledge (EPIC) project. EPIC is a five-year activity of support services, managed by the Education Policy and Planning Division (EPP) within E3/ED. EPIC’s objective is to improve education sector programming, measurement, and management in the areas of performance improvement and organizational effectiveness; professional development and training; internal and external communications and outreach; and knowledge management uptake and brokering. EPIC consists of support services in four key areas that will be implemented simultaneously:
• Performance improvement through organizational effectiveness
• Professional development and learning
• Communications
• Knowledge management, generation and use
The EPIC contract was awarded to Training Resources Group, Inc. (TRG), along with subcontractors Forum One and Social Solutions International, Inc. (SSI), on October 1, 2015. The project period of performance (POP) includes a one-year Base Period, followed by two, two-year Option Year periods for a total POP of five years (2015 – 2020) (contingent upon the exercise of the two Option Year periods).
- 5 -
Introduction This report covers EPIC’s 3rd Quarter (Q3) of Project Year 1. It includes a summary of activities and progress that occurred between April 1 and June 30, 2016. Overall EPIC’s third quarter yielded a significant acceleration of activities across all work streams as activities were further defined and/or expanded. As EPIC deepened activities in each work stream, equally important was the leveraging of activities across work streams.
In order to provide an activity status overview, this report includes an activity dashboard for each work stream activity that rates the status of the activity’s timeline, budget, and content using a stop light color coding method. The status symbols for the dashboard ratings are outlined in Figure 1.
FIGURE 1. Status Symbols for the Dashboard
Symbol Meaning
DELAY
Significant delay in timeline, overspending or a higher burn rate than expected, or other serious implementation issues.
FEW ISSUES Activity is moving along with a few minor issues with spending, timeline, or implementation.
ON TRACK Activity is on track with no issues with spending, timeline, or implementation.
COMPLETE Activity is completed.
CANCELED Activity is permanently canceled.
- 6 -
Third Quarter at A Glance • Supported 2016 Education Strategy feedback, review, and update process
• Facilitated work planning sessions for 6 E3/ED teams
• Completed Office on-boarding materials
• Convened new staff welcome breakfast
• Finalized dates and venues for EOC and EEPM trainings
• Updated education learning opportunities
• Conducted education staff inquiry
• Recommended revised Education Toolkit navigation scheme and structure and began build out of recommendations
• Presented layout and visualization options for 2011-2015 Strategy Summative Findings report
• Supported BE2 April meeting
• Initiated planning and coordination for Mobiles for Education Symposium
• Built the communications survey for internal and external stakeholders
• Completed global consultations for Education Finance Commission and prepared findings report
• Proposed options for Books for Every Child website
• Facilitated Global Book Alliance retreat
- 7 -
Organizational Effectiveness
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Activity Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Implement Office Strategy, work plan, and MEL processes
NA NA NA NA NA Q2 Q3 Q3 Q3 Q4 Q4 Q4
Facilitate organization redesign NA NA NA NA Q2 Q2 Q3 Q3 Q3 Q4 Q4 Q4
Streamline office processes NA NA NA NA Q2 Q2 Q3 Q3 Q3 Q4 Q4 Q4
Enhance the effectiveness of Office of Education meetings
NA NA NA NA NA NA Q3 Q3 Q3 Q4 Q4 Q4
Conduct management development program NA NA NA NA NA NA Q3 Q3 Q3 Q4 Q4 Q4
The Organizational Effectiveness (OE) work stream is focused on strengthening the Office organizational structure, systems and processes to sustain the anticipated growth of E3/ED staff and to enable E3/ED to be more effective and efficient in the provision of services to the broader Office, missions and education sector. This is a clear priority for the Office because it is both a catalyst and a foundation for success in the other three work streams.
The imminent launch of the 2016 Education Sector Strategy, the addition of new staff, and the commitment of Office leadership makes for ripe conditions to achieve transformative change that is responsive to the evolving Office size and structure as well as to global changes in the education sector. Strengthening the way that the Office organizes, communicates, relates and collaborates will ensure that the sum of the Office is greater than its individual parts.
This quarter, EPIC made considerable strides in the OE work stream. Of particular importance has been the facilitation of the 2016 Education Sector Strategy feedback and draft update process; work plan facilitation for six Office teams; completion of onboarding materials; and facilitation of a new staff welcome breakfast event. Throughout all OE activities, EPIC is constantly gathering critical data and strategizing on how to address deeper issues of organizational culture and structure to effect lasting change.
- 8 -
Implement Office Strategy, Work Plan, and MEL Processes
TABLE 1. Timeline to Implement Office Strategy, Work Plan, and MEL Process
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Determine what planning and reporting occurs at various levels
NA NA NA NA NA NA Q3 Q3 Q3 Q4 NA NA
Develop and implement common template, schedule and process for work plan development and monitoring
NA NA NA NA NA NA Q3 Q3 Q3 Q4 Q4 NA
Periodically review and make changes as necessary
NA NA NA NA NA NA NA NA NA Q4 Q4 Q4
TABLE 2. Status of Implementing Office Strategy, Work Plan, and MEL Process
Timeline Budget Content Comments
ON TRACK
ON TRACK
ON TRACK
This activity is proceeding as planned and in accordance with our timeline. Additional work will continue into Q4.
2016 Education Sector Strategy: EPIC supported the revision and update process for the 2016 Education Sector Strategy in several ways. These include:
• Analyzed education sector survey results and prepared analysis report – E3/ED administered a feedback survey on Survey Monkey consisting of 24 questions. A total of 208 participants completed the survey, representing 80 different Missions, Offices or Bureaus. A qualitative and quantitative analysis was conducted of survey responses and summarized in a survey analysis report, presented to the core drafting team (including 5 representatives from the goal areas) and Education Sector Council (ESC) members.
• Facilitated week-long Strategy feedback and update process - EPIC facilitated an intensive, week-long Education Sector Strategy feedback and drafting session during the week of May 2nd. The first two days included facilitated technical discussions between the core drafting team and regional education staff, PPL/P, BRM, E3/GEWE, and others. These sessions yielded valuable input and feedback which were categorized according to what could be integrated into the
- 9 -
existing draft strategy, what could be addressed in other Agency documents and/or processes, and what needed to be discussed at a higher level of decision making. During the remainder of the week, the core drafting team synthesized feedback and worked intensively to incorporate the latest thinking into the draft. In addition to facilitating the sessions, EPIC supported this process by preparing summary notes and action items and documenting the overall Strategy update process.
• Facilitated second technical review – EPIC facilitated a second technical review meeting less than one week after the draft update was circulated in order to solicit urgent feedback that required attention prior to submission to Charles North.
EPIC submitted a process document to capture the Strategy development process along with a visual depiction of the process for use in presentations to the Agency Leadership Council (ALC) and other stakeholders. A summary deliverable document was submitted inclusive of all outputs associated with this activity.
Office Work Planning: Office work planning has been a particularly active task during Q3. An OE work planning meeting was held during which EPIC received input from staff on the categories of work planning they need to track and report on. Based on that input, EPIC drafted a template that was presented to the Office for feedback. The template was finalized based on the feedback and finalized for use in team work planning sessions. Subsequently, during the month of June, the EPIC team facilitated six team work planning sessions, including:
• June 7: Workforce Development/Higher Education Team
• June 9-10: Education in Conflict and Crisis (EiCC) Team
• June 14: Participant Training and Exchange (PT&E) Team
• June 15: Higher Education Team
• June 21: Engagement Team
• June 22: Quality, Equity and Sustainability (QUEST) Team
Work planning sessions for the Evidence and Learning Teams will take place in early July.
“…we truly enjoyed working with your team and will be back in touch with any questions. You helped us get to know each other better, build trust, have fun - and set us on the road to being more effective!”
— EiCC Team Member
- 10 -
Facilitate Organization Redesign
TABLE 3. Timeline to Facilitate Organization Redesign
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Determine roles and place in org structure of admin support and program team positions
NA NA NA NA Q2 Q2 Q3 Q3 Q3 NA NA NA
Finalize and communicate the new “operational” organizational structure
NA NA NA NA NA NA Q3 Q3 Q3 NA NA NA
Define decision-making authority of different levels of Office management
NA NA NA NA NA NA Q3 Q3 Q3 NA NA NA
Define team roles and responsibilities, including interaction with other teams
NA NA NA NA NA NA Q3 Q3 Q3 NA NA NA
Periodically review and adjust NA NA NA NA NA NA NA NA NA Q4 Q4 Q4
TABLE 4. Status of Facilitating Organization Redesign
Timeline Budget Content Comments
ON TRACK
ON TRACK
ON TRACK
This activity is on track in close collaboration with E3/ED.
Several tasks were initiated in Q3 under this activity. For example, recommendations for the placement of USAID administrative support positions was submitted. EPIC will develop recommendations for program team positions in Q4. Roles and responsibilities are being addressed through a series of management team meetings that bring together the executive team and team leaders. During these meetings participants began the process of outlining the different roles and responsibilities of team leads and the executive management team.
- 11 -
Streamline Office Processes
TABLE 5. Timeline to Streamline Office Process
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Gather input from Office on processes NA NA NA NA Q2 Q2 NA Q3 NA Q4 NA NA
Identify high-performing USAID offices NA NA NA NA NA Q2 NA Q3 NA Q4 NA NA
Develop user-friendly SOPs NA NA NA NA NA Q2 NA Q3 NA Q4 NA NA
Communicate SOPs and roles to Office NA NA NA NA NA Q2 NA Q3 NA Q4 NA NA
Periodically review/update as needed NA NA NA NA NA NA NA NA Q3 Q4 Q4 Q4
TABLE 6. Status of Streamlining Office Process
Timeline Budget Content Comments
FEW ISSUES
ON TRACK
FEW ISSUES
There has been a slight delay in moving the clearance process forward due to unexpected staff absence.
On-boarding: The Office identified on-boarding and clearance processes as pain points requiring urgent attention. As such, these were the first two processes to be prioritized for EPIC to streamline. This quarter, EPIC completed new employee onboarding materials. These included:
• A Guide to Onboarding New Employees- Supervisor’s Notebook
• Welcome: A Guide to Getting Started- New Hire Binder
• The Guide to Onboarding New Employees- Supervisor, Onboarding Coordinator, Buddy, Team Member, and New Hire Checklists
In addition, on June 22 a new staff welcome breakfast was organized and held at the North Tower. The event was facilitated by Tom Lent and Steve Yank, and had over 20 E3/ED staff participate. Not only was
- 12 -
the event a good way to gather the Office teams in one place, but it was also an effective modality to surface organization culture discussions that will inform overall OE work stream activities.
Clearance Process: EPIC is working with a clearance task team, following the same inquiry and facilitation model that was applied to the on-boarding process. At the initial meeting, the team determined that the clearance process will benefit from a standards document, sample documents, and a memo package. EPIC’s process improvement specialist began working with a point person in E3/ED to develop these templates and examples. However, due to unforeseeable circumstances, the process improvement specialist is on temporary leave. It was decided, in conjunction with the COR, to restart the clearance process upon her return, expected in late July. In the meantime, work on the travel process will also begin in July to generate accelerated momentum in this activity.
Automated Directives System (ADS): Additionally, this quarter, EPIC facilitated a meeting on two sections of the ADS. The purpose of the meeting was to review the background of USAID’s Participant Training and Exchange Visitor Program (particularly Section 252.3 of ADS Chapter 252, Visa Compliance for Exchange Visitors and Section 253.3.2 of ADS Chapter 253, Participant Trainings and Exchanges for Capacity Development), participate in the design process of the next generation of policies, and provide feedback as to the requirements of the new system so that it ensures more security, improves functionality and complementarity with other Agency system. The group also explored ways to exchange information, involve other participants, and gather and learn from other inputs and experiences.
- 13 -
Enhance the Effectiveness of Office of Education Meetings
TABLE 7. Timeline to Enhance the Effectiveness of Office of Education Meetings
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Observe ED meetings NA NA NA NA NA NA NA Q3 Q3 Q4 Q4 NA
Facilitate conversations on processes and measures to enhance the effectiveness of regular meetings
NA NA NA NA NA NA NA NA Q3 Q4 Q4 NA
Draft SOPs and guidance for conducting meetings NA NA NA NA NA NA NA NA NA Q4 Q4 NA
Communicate SOPs and guidance for conducting meetings
NA NA NA NA NA NA NA NA NA Q4 Q4 NA
Finalize SOPs and guidance for conducting meetings
NA NA NA NA NA NA NA NA NA NA NA Q4
TABLE 8. Status of Enhancing the Effectiveness of Office of Education Meetings
Timeline Budget Content Comments
FEW ISSUES
ON TRACK
FEW ISSUES
There were some delays in identifying meetings to attend. This was rectified by June.
The EPIC team began attending meetings as observers in June. Two management team meetings were observed this quarter. The team will attend additional meetings in Q4 and will initiate conversations to improve the effectiveness of meetings. The product of these observations and conversations will be a set of guiding principles and operating procedures for conducting meetings, which will be drafted, finalized and communicated to all staff by the end of Q4.
- 14 -
Conduct Management Development Program
TABLE 9. Timeline to Conduct Management Development Program
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Assess strengths, needs and wishes of team leaders and deputy office directors
NA NA NA NA NA NA Q3 Q3 Q3 Q4 NA NA
Develop management course to inculcate common language and approach to supervision and management
NA NA NA NA NA NA Q3 Q3 Q3 NA Q4 NA
Develop coaching program for interested supervisors and managers
NA NA NA NA NA NA Q3 Q3 Q3 NA Q4 NA
Conduct leadership and management coaching sessions
NA NA NA NA NA NA NA Q3 Q3 Q4 Q4 Q4
TABLE 10. Status of Conducting Management Development Program
Timeline Budget Content Comments
FEW ISSUES
ON TRACK
FEW ISSUES
This task is slightly behind as the overall strategy for the management development program is being developed with E3/ED leadership.
One E3/ED staff is already meeting with a coach to work on immediate needs as well as long-term planning. The vision for this activity is to develop a coaching program that will be mandatory for team leads and anyone in a leadership position. Requests from team members who wish to participate in the coaching program will be assessed to meet those interests, either through the EPIC contract or through USAID’s Staff Care program. Ultimately, the Office is committed to supporting the team’s professional growth. EPIC has identified additional coaching resources from TRG’s organizational development and training consultant pool. Sid Rainey, a certified coach and recent addition to TRG, will design and coordinate the overall coaching program.
- 15 -
Professional Development
TABLE 11. Professional Development Activity Overview, by Quarter
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Activity Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Design and deliver core education sector trainings
NA NA Q1 Q2 Q2 Q2 Q3 Q3 Q3 Q4 Q4 Q4
Create a compendium and schedule of education sector learning and training opportunities
NA NA NA NA NA Q2 Q3 Q3 Q3 Q4 Q4 Q4
Compile a menu of learning and training modalities
NA NA NA Q2 Q2 Q2 Q3 Q3 Q3 Q4 Q4 NA
Competency frameworks and beyond NA NA NA Q2 Q2 Q2 Q3 Q3 Q3 Q4 Q4 NA
Pilot learning and knowledge sharing modalities
NA NA NA NA NA NA NA Q3 Q3 Q4 Q4 Q4
Develop and deliver short, focused, virtual trainings
NA NA NA NA NA NA NA Q3 Q3 Q4 Q4 Q4
The Professional Development (PD) work stream will ensure that USAID education staff have the technical capacity and skills required to achieve the Agency’s education sector goals. Highlights from this quarter include the finalization of the dates and venues for the Education Overview Course (EOC) and the Effective Education Portfolio Management (EEPM) course; compilation and update of education sector learning opportunities; implementation of an education staff inquiry; and identification of the first virtual training topic.
- 16 -
Design and Deliver Core Education Sector Trainings
TABLE 12. Timeline to Design and Deliver Core Education Sector Trainings
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Design, deliver, and evaluate EOC training NA NA NA NA Q2 Q2 Q3 Q3 Q3 Q4 Q4 Q4
Design EEPM training NA NA NA NA Q2 Q2 Q3 Q3 Q3 Q4 Q4 Q4
Design a third TBD training NA NA NA NA NA NA Q3 Q3 Q3 Q4 Q4 Q4
TABLE 13. Status of Designing and Delivering Core Education Sector Trainings
Timeline Budget Content Comments
ON TRACK
ON TRACK
ON TRACK
This activity is on track.
During this reporting period, the EPIC team finalized dates and training locations for the EOC and EEPM courses. The EOC is scheduled to take place from September 12-16, while the EEPM course has been scheduled to take place from October 24-28. The team continued to work on training design and planning for the logistics and coordination of both trainings.
- 17 -
Create Compendium & Schedule of Learning Opportunities
TABLE 14. Timeline to Create Compendium & Schedule of Learning Opportunities
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Determine universe of course/training topics and sources and compendium format
NA NA NA NA NA Q2 NA NA NA NA NA NA
Gather and analyze data NA NA NA NA NA Q2 Q3 NA NA NA NA NA
1st Edition of Compendium/Sched. NA NA NA NA NA NA Q3 NA NA NA NA NA
Develop updating process NA NA NA NA NA NA Q3 NA NA NA NA NA
Update compendium monthly NA NA NA NA NA NA Q3 Q3 Q3 Q4 Q4 Q4
Communicate compendium updates to USAID Washington and field-based staff
NA NA NA NA NA NA Q3 Q3 Q3 Q4 Q4 Q4
TABLE 15. Status of Creating Compendium & Schedule of Learning Opportunities
Timeline Budget Content Comments
ON TRACK
ON TRACK
ON TRACK
This activity is on track.
The EPIC team has been compiling and updating learning opportunities periodically and submitting to USAID. A meeting was held in June with the E3/ED Knowledge Management (KM) and Learning Advisor to discuss a process and timeline for uploading this information to the Education Toolkit.
- 18 -
Compile Menu of Learning and Training Modalities
TABLE 16. Timeline to Compile Menu of Learning and Training Modalities
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Determine list of modalities, list of factors to be analyzed, document format/design/length
NA NA NA Q2 Q2 NA NA NA NA NA NA NA
Draft learning and training modality document
NA NA NA NA NA Q2 Q3 Q3 Q3 Q4 NA NA
Final learning and training modality document NA NA NA NA NA NA Q3 Q3 Q3 NA Q4 NA
TABLE 17. Status of Compiling Menu of Learning and Training Modalities
Timeline Budget Content Comments
FEW ISSUES
ON TRACK
FEW ISSUES
This process has been delayed to better fit into the PD team process.
An initial outline for the learning and training modality document has been developed. EPIC’s learning technology specialist will develop a draft document in July with the view to having a final, vetted version of the document available by August.
- 19 -
Identify Other Frameworks and Methodologies that Use, But Go Beyond, Competencies as a Design Principle
TABLE 18. Timeline to Identify Other Frameworks and Methodologies
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Define continuum of learning and competency document format, design, and length
NA NA NA Q2 Q2 NA NA NA NA NA NA NA
Compare with other USAID continuums NA NA NA NA NA Q2 NA NA NA NA NA NA
Gather and analyze data NA NA NA NA NA Q2 NA NA NA NA NA NA
Draft and finalize continuum of learning matrix
NA NA NA NA NA Q2 Q3 Q3 Q3 NA NA NA
Draft and finalize competency document NA NA NA NA NA Q2 Q3 Q3 Q3 NA NA NA
Conduct education staff inquiry NA NA NA NA NA NA Q3 Q3 NA NA NA NA
Conduct document review NA NA NA NA NA Q2 Q3 NA NA NA NA NA
Draft and finalize education staff inquiry report NA NA NA NA NA NA NA NA Q3 Q4 NA NA
TABLE 19. Status of Identifying Other Frameworks and Methodologies
Timeline Budget Content Comments
FEW ISSUES
ON TRACK
FEW ISSUES
This process has been delayed to better fit into the PD team process.
Education Staff Inquiry: In April and May, EPIC conducted one-on-one interviews and webinars with USAID staff to capture their experiences and perspectives. Participants included representatives from Africa, Asia, Latin America and the Caribbean, and USAID headquarters. Findings from the inquiry
- 20 -
process will help shape EPIC professional development products including in-person trainings, on-line learning, and beyond.
Continuum of Learning Matrix: A draft continuum of learning matrix has been developed in consultation with the ESC PD team. A narrative to support and formalize the continuum of learning matrix along with a visual is being developed.
- 21 -
Pilot Learning and Knowledge Sharing Modalities
TABLE 20. Timeline to Pilot Learning and Knowledge Sharing Modalities
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Design modality pilot NA NA NA NA NA NA NA NA Q3 NA NA Q4
Market modality pilot NA NA NA NA NA NA NA NA Q3 NA NA Q4
Launch modality pilot NA NA NA NA NA NA NA NA Q3 NA NA Q4
Draft and finalize pilot outcomes and recommendations report
NA NA NA NA NA NA NA NA NA Q4 NA Q4
TABLE 21. Status of Piloting Learning and Knowledge Sharing Modalities
Timeline Budget Content Comments
FEW ISSUES
ON TRACK
FEW ISSUES
The identification of the first modality and topic was slightly delayed.
Meredith Ferris will be coordinating this activity, slated to begin in July. The first pilot will leverage the flexible instruments virtual training (see proceeding section). In particular, the team will utilize the follow-up portion of the webinar as a modality to pilot the webinar modality for knowledge sharing and exchange.
- 22 -
Develop and Deliver Short, Focused Virtual Training
TABLE 22. Timeline to Develop and Deliver Short, Focused Virtual Training
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Identify topics of interest NA NA NA NA NA NA NA Q3 NA NA Q4 NA
Identify modality NA NA NA NA NA NA NA Q3 NA NA Q4 NA
Identify, prepare and support trainers, experts and/or facilitators
NA NA NA NA NA NA NA NA Q3 NA NA Q4
Design, deliver and evaluate sessions NA NA NA NA NA NA NA NA Q3 Q4 NA Q4
TABLE 23. Status of Developing and Delivering Short, Focused Virtual Training
Timeline Budget Content Comments
FEW ISSUES
ON TRACK
FEW ISSUES
Launch of the first virtual training is early Q4 versus Q3 as planned.
In Q3 the EPIC team identified a trainer for the first virtual training session as well as on overall activity manager. Meredith Ferris will lead and coordinate this activity. The first virtual training will be delivered by Barbara Brocker. The webinar, entitled Flexible Instruments, is scheduled for July 13 and 21st and it will be offered in three time zones.
- 23 -
Knowledge Management
TABLE 24. Knowledge Management Activity Overview, by Quarter
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Activity Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Update education toolkit content NA NA NA NA Q2 Q2 Q3 Q3 Q3 Q4 Q4 Q4
Assess KM toolkit and COP platforms NA NA NA NA NA Q2 Q3 Q3 Q3 Q4 Q4 NA
Support production and dissemination of technical documents
NA NA NA NA NA Q2 Q3 Q3 Q3 Q4 Q4 Q4
Curate and annotate program cycle documents
NA NA NA NA NA NA Q3 Q3 Q3 Q4 Q4 Q4
Provide support to BE2 NA NA NA NA NA Q2 Q3 Q3 Q3 Q4 Q4 Q4
Develop evidence-based cross cutting area technical briefs and knowledge products
NA NA NA NA NA NA Q3 Q3 Q3 Q4 Q4 Q4
Support for Annual Mobiles for Education Alliance Symposium
Q3 Q3 Q4 Q4 Q4
Through the Knowledge Management (KM) work stream activities, EPIC will broaden and deepen a knowledge management system of, by and for all education staff, and cross the spectrum of USAID education stakeholders. EPIC will establish mechanisms to mine, curate and share visually rich (user friendly) learnings, knowledge products, and program cycle and management tools. These will be linked to KM platforms and existing sites as applicable. Links will be discussed and identified with E3/ED.
Highlights of EPIC’s KM work stream activities for this quarter include: creation of technical page mock-ups for the Education Toolkit; recommendations for a revised navigation scheme and structure for the Education Toolkit and creation of a development environment to build out the proposed recommendations; layout and visualization options for the 2011-2015 Education Strategy Summative Findings Report; process document for curating and annotating program cycle documents; logistics and coordination support for the April Building Evidence in Education (BE2); and planning and coordination for the upcoming Mobiles for Education Symposium Alliance.
- 24 -
Education Toolkit Content
TABLE 25. Timeline for Education Toolkit Content
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Identify areas to update and information/ data gaps
NA NA NA NA NA NA Q3 NA NA NA NA NA
Develop toolkit updating process NA NA NA NA NA NA Q3 NA NA NA NA NA
Update toolkit content NA NA NA NA NA NA NA Q3 Q3 Q4 Q4 Q4
Develop analytics system to track toolkit uptake NA NA NA NA NA NA NA NA Q3 Q4 Q4 NA
Identify measures to advertise the toolkit widely and identify cross- leveraging opportunities
NA NA NA NA NA NA NA NA Q3 Q4 Q4 NA
TABLE 26. Status of Education Toolkit Content
Timeline Budget Content Comments
ON TRACK
ON TRACK
ON TRACK
This activity is on track.
In Q3 EPIC hired a consultant to work with the E3/ED KM and Learning Advisor to update the Education Toolkit content. The first phase of this process involves a light refresh of the Toolkit structure and content. The KM consultant is consulting with E3/ED teams to gather feedback and information on page mockups. In addition, the consultant has been working closely with the KM and Learning Advisor to think through site architecture strategies (main menu, subsections, submenus, differentiating section content, etc.). As technical page mockups are completed and finalized, the KM consultant will move to the next technical area.
- 25 -
Assess KM Toolkit
TABLE 27. Timeline to Assess KM Toolkit
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Conduct toolkit platform assessment in conjunction with KM specialist
NA NA NA NA NA Q2 Q3 NA NA NA NA NA
Draft assessment and recommendations report NA NA NA NA NA NA Q3 Q3 NA NA NA NA
Final assessment and recommendations report NA NA NA NA NA NA NA Q3 NA NA NA NA
Implement priority recommendations NA NA NA NA NA NA NA Q3 Q3 Q4 NA NA
TABLE 28. Status of Assessing KM Toolkit
Timeline Budget Content Comments
ON TRACK
ON TRACK
ON TRACK
This activity is being led by EPIC subcontractor, Forum One. Tasks are proceeding within the initial timeline and budget. The content of this work has been further defined in conjunction with the KM and Learning Advisor.
During Q3 ForumOne completed the Toolkit assessment process, drawing from several key informant interviews as well as feedback and comments received by the KM and Learning Advisor during her attendance at the AREW conference in Ethiopia. Based on these findings, ForumOne developed a recommendations memo for an updated and revised Toolkit navigation scheme and structure. After much back and forth trying to get a new shared Google account at USAID established for building out the updated version of the Toolkit, it was decided to establish a new shared ForumOne account for this purpose. ForumOne is working in this development environment (copied version of the Education Toolkit) and is actively building out the new proposed navigation and prototyping page templates. It is anticipated that the build out will be complete by the end of July.
To market the Toolkit to USAID staff, ForumOne developed a two-page document entitled, “Your Education Toolkit”. This document outlines the Toolkit’s key useful features.
- 26 -
Support Production and Dissemination of Technical Documents
TABLE 29. Timeline to Support Production/Dissemination of Technical Documents
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Define roles and responsibilities between EPIC and Evidence Team
NA NA NA NA NA NA Q3 NA NA NA NA NA
Prioritize documents for production and dissemination support
NA NA NA NA NA NA Q3 NA NA NA NA NA
Provide editing, layout, graphic design and dissemination of ED technical documents.
NA NA NA NA NA Q2 Q3 Q3 Q3 Q4 Q4 Q4
Map and prioritize key events with the Evidence Team to provide capture and synthesis support
NA NA NA NA NA NA Q3 NA NA NA NA NA
Support capture and synthesis of prioritized key events
NA NA NA NA NA NA Q3 Q3 Q3 Q4 Q4 Q4
TABLE 30. Status of Supporting Production/Dissemination of Technical Documents
Timeline Budget Content Comments
ON TRACK
ON TRACK
ON TRACK
This task is driven by requests received from the Evidence Team.
EPIC subcontractor, ForumOne, is supporting the layout and visualization of the 2011-2015 Education Sector Summative Findings Report. In June, ForumOne provided their recommendations for the report, which were well received by the Evidence Team. ForumOne will work with the team in implementing the recommendations in July, after the report content has been updated and finalized.
- 27 -
Curate and Annotate Program Cycle Documents
TABLE 31. Timeline to Curate and Annotate Program Cycle Documents
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Create prioritized list of Program Cycle documents to be curated and annotated
NA NA NA NA NA NA Q3 NA Q3 Q4 Q4 NA
Create standards for program cycle document creation and curation
NA NA NA NA NA NA Q3 NA NA NA Q4 NA
Evaluate and curate program cycle documents
NA NA NA NA NA NA Q3 Q3 Q3 Q4 Q4 Q4
Create program cycle quality assurance check-list and process document
NA NA NA NA NA NA Q3 Q3 Q3 Q4 Q4 Q4
Post documents NA NA NA NA NA NA NA Q3 Q3 Q4 Q4 Q4
TABLE 32. Status of Curating and Annotating Program Cycle Documents
Timeline Budget Content Comments
FEW ISSUES
ON TRACK
FEW ISSUES
Scheduling a time to convene a kick-off call for this activity took longer than anticipated, resulting in a slight delay in starting the curation/annotation process.
A meeting was held with the Evidence team to discuss the curation and annotation process. Following this meeting, in April, EPIC drafted and submitted a program cycle curation and annotation process and identified a resource to begin work on this activity by mid-April. Feedback on the process document was received in early June and the document was finalized on June 8th. A kick-off call has been scheduled for July 6th with Evidence Team Leader, Cynthia Chassy, Tom Lent, and Sharon Williams to move this activity forward.
- 28 -
Provide Support to BE2
TABLE 33. Timeline to Provide Support to BE2
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Support the technical planning and logistics support for BE2 April Meetings and develop knowledge capture plan
NA NA NA NA NA Q2 NA NA NA NA NA NA
Conduct post-meeting share-out of April meeting outcomes and knowledge
NA NA NA NA NA Q2 NA NA NA NA NA NA
Provide on-going support for BE2 conference calls, virtual meetings, and network functions
NA NA NA NA NA Q2 Q3 Q3 Q3 Q4 Q4 Q4
Provide planning and preparation support for the fall meeting
NA NA NA NA NA NA NA NA NA Q4 Q4 Q4
Communicate evidence from BE2 members to ED Office
NA NA NA NA NA Q2 Q3 Q3 Q3 Q4 Q4 Q4
TABLE 34. Status of Providing Support to BE2
Timeline Budget Content Comments
ON TRACK
ON TRACK
ON TRACK
This activity is proceeding on track.
From April 20 to April 22, BE2 held its Spring in-person meeting at the World Bank Group in Washington, DC. Tom Lent and Gabriela Moore, in the role of the Secretariat, helped prepare for the meeting in the preceding weeks by creating and disseminating a meeting registration page and creating meeting materials such as agendas, name tags, tent cards, and evaluations. Additionally, they identified restaurant choices for the networking dinners. During the course of the 3-day meeting the EPIC team registered the meetings 50+ attendees, handed out materials when necessary, and took meeting notes.
- 29 -
In the two weeks following the meeting, the EPIC team produced a meeting summary report and an analysis of the meeting evaluation (based on responses from 12 participants) for the Steering Committee.
On June 21st EPIC participated in a Steering Committee call which among other action items, highlighted the fact that there are three interest group calls to convene on the topic areas of EiCC, cost effectiveness, and ICT4E. The next in-person meeting is scheduled for Spring 2017 in Italy, hosted by UNICEF.
In Q4 EPIC will submit an approval request for the addition of Making Cents International, Inc. (MCI) as a subcontractor on the EPIC contract. Through MCI, EPIC will access the continued coordination and Secretariat support of Maria Brindlmayer beginning September 1, 2016 through September 30, 2017.
- 30 -
Develop Evidence-Based Cross Cutting Area Technical Briefs with Related Knowledge Products
TABLE 35. Timeline to Develop Technical Briefs
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Agree on analysis, content, structure and dissemination strategy
NA NA NA NA NA NA Q3 NA NA NA NA NA
Gather project documentation NA NA NA NA NA NA NA Q3 Q3 NA NA NA
Conduct analysis NA NA NA NA NA NA NA Q3 Q3 Q4 Q4 Q4
Draft and finalize technical briefs and knowledge products
NA NA NA NA NA NA NA NA Q3 Q4 Q4 Q4
TABLE 36. Status of Developing Technical Briefs
Timeline Budget Content Comments
FEW ISSUES
ON TRACK
FEW ISSUES
This task has benefitted from joint collaboration between the QUEST Team and the KM and Learning Advisor.
In the latter part of Q3, Tom Lent and Sharon Williams met with Patrick Collins, Heather Risley, and Tiffany Riesen to further define the set of KM products that would be produced for the QUEST team. This meeting was instrumental in outlining the types of documents to be produced, which include the following:
• Guidance Note for each subject area on the QUEST team • Landscape Review of USAID-funded activity profiles that fit under each subject area
Dissemination plans will also be developed for the above products.
- 31 -
Support for Annual Mobiles for Education Alliance Symposium
TABLE 37. Timeline for Support for Annual Mobiles for Education Alliance Symposium
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Outline master budget NA NA NA NA NA NA Q3 Q3 NA NA NA NA
Negotiate vendor contracts NA NA NA NA NA NA Q3 Q3 Q3 NA NA NA
Manage call for proposals NA NA NA NA NA NA NA Q3 Q3 Q4 NA NA
Create/send out save the date announcements NA NA NA NA NA NA NA Q3 Q3 Q4 Q4 NA
Support overall logistical and coordination efforts for Symposium
Q3 Q3 Q3 Q4 Q4 NA
TABLE 38. Status of Support for Annual Mobiles for Education Alliance Symposium
Timeline Budget Content Comments
ON TRACK
ON TRACK
ON TRACK
This activity is proceeding on track.
In April EPIC was asked to support the logistics and coordination for the Annual Mobiles for Education Alliance Symposium scheduled to take place October 18-20, 2016. To support this effort, EPIC hired an event planning consultant who has supported the Symposium planning for the past two years. During Q3, the event planning consultant:
• Outlined the master budget for the Symposium
• Secured the Symposium venue
• Set up Survey Gizmo to manage the call for proposals
• Issued the call for presentation proposals
- 32 -
Engagement, Communication, and Partnership
TABLE 39. Engagement, Communication, and Partnership Activity Overview, by Quarter
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Activity Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Facilitate development of ECP strategy NA NA NA NA NA Q2 Q3 Q3 NA NA NA NA
Coordinate the planning and logistics for the 2017 Education Summit
NA NA Q1 Q2 NA Q2 Q3 Q3 Q3 Q4 Q4 Q4
Support the development of ECP monitoring process
NA NA NA NA NA Q2 Q3 Q3 NA NA NA NA
Support a share out of the 2011-2015 Education Strategy results and the launch of the 2016 Education Strategy
NA NA NA NA NA Q2 Q3 Q3 Q3 Q4 Q4 Q4
Support the development of print and on-line ECP material
NA NA NA NA NA Q2 Q3 Q3 Q3 Q4 Q4 Q4
Design and deliver communications training for staff
NA NA NA NA Q2 NA Q3 NA Q3 NA Q4 NA
Summary and analysis of mission programs NA NA NA NA NA NA NA NA Q3 Q4 NA NA
Global consultations for the Education Finance Commission
Q3 Q3 Q3
EPIC will support the engagement team in a range of activities to rebrand and communicate their new purpose and priorities within the context of a new Education Strategy, the SDG 2030 agenda, and the Office strategy. Highlights of EPIC’s Engagement, Communication and Partnerships (ECP) work stream activities include: built the internal and external stakeholder survey; completed global consultations for the Education Finance Commission and prepared the final summary report; and submitted a proposal of development options for the Books for Every Child website.
- 33 -
Facilitate Office ECP Strategy
TABLE 40. Timeline to Facilitate Office ECP Strategy
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Provide strategic input and format strategy document. Create a strategy overview presentation
NA NA NA NA NA NA Q3 NA NA NA NA NA
Design and facilitate strategy workshops NA NA NA NA NA NA Q3 Q3 Q3 Q4 NA NA
Document workshop outcomes NA NA NA NA NA NA Q3 Q3 Q3 Q4 NA NA
TABLE 41. Status of Facilitating Office ECP Strategy
Timeline Budget Content Comments
ON TRACK
ON TRACK
ON TRACK
This ECP Strategy has been developed by the Engagement team. Support from EPIC will be further defined in Q4.
The Engagement Team has developed the ECP strategy, which was presented at the Engagement Team work planning session in June. Additional support needed from EPIC will be further defined in Q4. An example of a likely activity is the facilitation of a review process of the Engagement strategy.
- 34 -
2017 Education Summit Planning
TABLE 42. Timeline for 2017 Education Summit Planning
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Conduct After Action Review of 2015 Education Summit
NA NA Q1 Q2 NA NA NA NA NA NA NA NA
Identify steering and planning committees for 2017 Ed. Summit
NA NA NA NA NA NA Q3 NA NA NA NA NA
Facilitate key decisions by end April NA NA NA NA NA NA Q3 NA NA NA NA NA
Obtain approval for 2017 Summit NA NA NA NA NA NA NA Q3 NA NA NA NA
Develop detailed 2017 Summit planning timeline NA NA NA NA NA NA NA Q3 NA NA NA NA
Coordinate technical and logistic planning for 2017 Summit
NA NA NA NA NA NA NA Q3 Q3 Q4 Q4 Q4
Hold periodic planning meetings NA NA NA NA NA NA NA Q3 Q3 Q4 Q4 Q4
TABLE 43. Status of 2017 Education Summit Planning
Timeline Budget Content Comments
DELAY
ON TRACK
DELAY
Planning and coordination for this activity has been stalled.
In Q3 EPIC was advised that E3/ED had decided not to host the traditional Education Summit given the proximity of the Summit to the launch of the 2016 Education Sector Strategy. Instead, it is likely that the Office will seek support in the planning and implementation of a state of the art (SOTA) conference. There were two meetings scheduled to discuss this option, however, both meetings were cancelled by E3/ED. In the interim, EPIC has provided an illustrative timeline for planning a large scale event to demonstrate the timeline needed to successfully launch a SOTA.
- 35 -
Support the Development of ECP Monitoring Process
TABLE 44. Timeline to Support the Development of ECP Monitoring Process
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Design and administer 2015 stakeholder survey NA NA NA NA NA Q2 NA Q3 Q3 NA NA NA
Analyze survey results NA NA NA NA NA NA NA NA Q3 NA NA NA
Design 2016 ECP monitoring process NA NA NA NA NA NA NA NA NA Q4 Q4 NA
Present system and process NA NA NA NA NA NA NA NA NA Q4 Q4 NA
Finalize ECP monitoring process NA NA NA NA NA NA NA NA NA Q4 Q4 NA
TABLE 45. Status of Supporting the Development of ECP Monitoring Process
Timeline Budget Content Comments
FEW ISSUES
ON TRACK
FEW ISSUES
This task has been slightly delayed as clearance was obtained to administer the stakeholder survey.
The ECP team received clearance to administer an internal and external survey to Agency stakeholders in May. At that time EPIC was asked to:
• Set up the survey in Survey Monkey
• Conduct an analysis of the survey results
• Prepare a brief report on the survey findings
The external survey was sent at the end of May and the internal survey was sent in mid-June. EPIC subcontractor, SSI, set up the survey and will analyze the results and prepare the summary report by July 15th.
- 36 -
Support Share-Out of the 2011-2015 Education Strategy Results and Launch of the 2016 Education Strategy
TABLE 46. Timeline to Support Share out of the 2011-2015 Education Strategy and Support the Launch of the 2016 Education Strategy
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Facilitate a reflective learning event related to 2011-2015 Strategy
NA NA NA NA NA NA NA NA Q3 NA NA NA
Define stakeholders and share-out plan for 2011-2015 Education Strategy results
NA NA NA NA NA NA NA NA Q3 NA NA NA
Review data and narrative highlights NA NA NA NA NA NA NA NA Q3 NA NA NA
Present data visualization options NA NA NA NA NA NA Q3 NA Q3 NA NA NA
Develop mock ups for review NA NA NA NA NA NA NA NA Q3 NA NA NA
Finalize format and structure of data visualization based on feedback
NA NA NA NA NA NA NA NA NA Q4 NA NA
Implement data visualization plan NA NA NA NA NA NA NA NA NA Q4 NA NA
Link to KM platforms and identify cross leveraging opportunities
NA NA NA NA NA NA NA NA NA Q4 NA NA
Support the launch of the 2016-2020 Education Strategy.
NA NA NA NA NA NA NA Q3 Q3 Q4 Q4 Q4
- 37 -
TABLE 47. Status of Supporting Share out of the 2011-2015 Education Strategy and Supporting the Launch of the 2016 Education Strategy
Timeline Budget Content Comments
FEW ISSUES
ON TRACK
FEW ISSUES
EPIC support for the Share out of 2011-2015 Strategy results has been modified slightly from the original work plan.
2011-2015 Strategy Result Share-Out: EPIC support for this activity has been focused on the layout, design and visualization of the Summative Report of the 2011-2015 Education Sector Strategy, developed by the Evidence Team. ForumOne has reviewed the Summative Report content and made format and visualization recommendations. These recommendations will be implemented once the report content is finalized in late July.
2016 Education Sector Strategy Share-Out and Launch: EPIC facilitated a Strategy launch team meeting on June 2nd to discuss target audiences for the Strategy share out; determine what actions are needed to target those audiences; prioritize share-out activities; and brainstorm launch activities and policy documents to accompany the Strategy. The group agreed to build out a detailed timeline for the Education Strategy launch and then meet again to discuss the detailed timeline, actions, and next steps.
- 38 -
Support Development of Print and Online ECP Outreach Material
TABLE 48. Timeline to Support Development of Print and Online Material
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Identify anticipated schedule and type of material to be developed
NA NA NA NA NA NA Q3 NA NA NA NA NA
Provide editing and production support on agreed material
NA NA NA NA NA Q2 Q3 Q3 Q3 Q4 Q4 Q4
TABLE 49. Status of Supporting Development of Print and Online Material
Timeline Budget Content Comments
ON TRACK
ON TRACK
ON TRACK
This activity is on track.
In late May, the Engagement Team requested EPIC’s support for the Books for Every Child campaign of the Global Book Fund, which seeks to resolve logistical, political and other challenges associated with ensuring that books reach children in remote and poor areas. Specifically, EPIC was asked to develop a website that would serve multiple purposes including: enabling the dissemination of materials, educating key stakeholders, engaging strategic partners, showing impact and results, and branding the program to garner support. ForumOne provided a proposal and budget for various website development options on June 14th. Work on building the website is scheduled to begin in July.
- 39 -
Design and Deliver Communications Training for Staff
TABLE 50. Timeline to Design and Deliver Communications Training for Staff
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Agree on content and structure of communications training
NA NA NA NA NA NA Q3 NA NA NA NA NA
Design training NA NA NA NA NA NA Q3 NA NA NA NA NA
Pilot training sessions NA NA NA NA NA NA NA Q3 NA Q4 NA Q4
Assess training outcomes NA NA NA NA NA NA NA NA Q3 NA Q4 NA
TABLE 51. Status of Designing and Delivering Communications Training for Staff
Timeline Budget Content Comments
FEW ISSUES
ON TRACK
FEW ISSUES
This task is slightly delayed as it is linked to a finalized ECP strategy.
The topics for the communications training will be determined as the ECP strategy and Engagement team work planning is finalized.
- 40 -
Summary and Analysis of Mission Programs
TABLE 52. Timeline of Summary and Analysis of Mission Programs
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Agree on content and structure of analysis NA NA NA NA NA NA NA NA Q3 NA NA NA
Gather project documentation NA NA NA NA NA NA NA NA Q3 NA NA NA
Conduct analysis NA NA NA NA NA NA NA NA Q3 NA NA NA
Draft and finalize Mission program summary report, including visual display of long form content and data
NA NA NA NA NA NA NA NA Q3 NA NA NA
TABLE 53. Status of Summary and Analysis of Mission Programs
Timeline Budget Content Comments
CANCELLED
CANCELLED
CANCELLED
This task has replaced by the landscape review of USAID activities implemented within QUEST areas.
Collaboration between the QUEST team and the KM and Learning Advisor has resulted in a replacement for this particular activity. As further detailed under the Technical Briefs section above (Table 36), in lieu of a summary and analysis of Mission programs, EPIC will conduct a landscape review of USAID activities implemented within QUEST areas.
- 41 -
Global Consultations for the Education Finance Commission
TABLE 54. Timeline for Global Consultations for the Education Finance Commission
Quarter 1 Quarter 2 Quarter 3 Quarter 4
Task Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Design and test webinar NA NA NA NA NA NA Q3 NA NA NA NA NA
Design, deliver, and document focus group sessions, interviews, and webinars
NA NA NA NA NA NA Q3 Q3 NA NA NA NA
Develop and submit summary report for submission to the Education Finance Commission
NA NA NA NA NA NA NA Q3 NA NA NA NA
TABLE 55. Status of Global Consultations for the Education Finance Commission
Timeline Budget Content Comments
COMPLETE
COMPLETE
COMPLETE
This activity is complete.
The International Commission on Financing Global Education Opportunity requested USAID’s input into its global consultations, as they are in the process of collecting and compiling evidence which will feed into a set of findings and recommendations to be reviewed at the World Bank/IMF Annual Spring Meetings. Suezan Lee and EPIC planned and administered webinars with USAID missions and USG agencies to gather their input on five key questions related to 1) lack of investment in education; 2) obstacles to improving education quality; 3) factors that have contributed to education improvement; 4) the education sector in 2030; and 5) new sources of financing over the coming years. EPIC documented the outcomes of the consultation process and developed a summary consultation report, which was submitted to the Education Commission.
- 42 -
Global Book Alliance In June, EPIC was asked to facilitate an all-day retreat to discuss the Global Book Alliance, USAID’s role and how to propel it forward. The retreat, held on June 23, was facilitated by Tom Lent and was attended by 15 people including Charles North, Eric Postel, Evelyn Rodriguez-Perez, Robert Burch, and staff from Health and Public Financial Management. This activity was not in EPIC’s original work plan.
- 43 -
Project Management and Operations EPIC’s project management, operations and financial tracking systems are in place and operational.
Project Work Plan
EPIC’s Year 1 Work Plan and Budget were approved on May 31, 2016.
Project Management, Monitoring, Evaluation and Learning Plan (PMMELP)
In Q3, additional data was gathered through the team work planning exercises to inform the development of activity indicators. EPIC will work with SSI to integrate these indicators into the project PMMELP.
Staffing
During Q3, EPIC continued recruitment efforts for a knowledge management and communications expert. A staffing meeting with the Evidence and Engagement Teams provided further clarity on the profile and required expertise for this position. In response, EPIC updated the job description to reflect a mid-level manager profile instead of a senior level thought partner. The updated job description was reposted on recruitment websites. Simultaneously, recruitment efforts continued for a mid-level project manager.
The EPIC pool of short-term, intermittent technical consultants expanded with the addition of Kristine Powers, Sherenne Simon, Lisanne Boling, Sid Rainey, and Jonathan Hamilton.
Subcontractors
Both ForumOne and SSI were actively engaged in Q3 activities. ForumOne has been engaged in a number of initiatives including: Education Toolkit Assessment, 2011-2015 Education Strategy Results Share-out; Global Book Alliance website; EPIC logo; Office processes; and overall graphic design and format support. SSI has been engaged with the PMMELP; 2016 Strategy Survey analysis and summary report; and the ECP stakeholder survey development.
Financial Management
EPIC has been invoicing on a monthly basis and has tracked and reported on budget expenditures by activity. A summary activity sheet has been developed to accompany the overall EPIC invoice to provide additional clarity for the invoice review process.
EPIC Logo
ForumOne is working on developing a set of EPIC logo options in order to brand the EPIC contract. The goal is to have a finalized logo in the early part of Q4.
- 44 -
EPIC Newsletter
To respond to the need to share information across the Office regarding EPIC’s activities, the EPIC team, in collaboration with ForumOne, issued the first installment of the EPIC Happenings Newsletter. The objective of the newsletter is to provide broad highlights of EPIC’s work. The next newsletter will be issued in the Fall. Special issue newsletters can be issued as needed.
- 45 -
Next Steps for Q4 2016 The acceleration of activities in Q3 across all work streams will continue into Q4 as EPIC approaches the end of project year one. Q4 will be driven by achieving deeper gains and outcomes across all work stream activities, while simultaneously planning for project year two.
In the OE work stream, EPIC will: complete Office team work planning; convene and document a two-day, Office-wide retreat; streamline at least two additional office processes (clearances and travel); continue organization redesign support activities; finalize SOPs for effective Office meetings; and implement the management development program.
The PD work stream will: continue the process of planning and designing the EOC and EEPM courses; draft and finalize the menu of learning and training modalities; continue work on competencies; pilot two knowledge sharing modalities; and deliver two short, focused virtual trainings.
For the KM work stream, EPIC will: continue to support the KM and Learning Advisor in the Education Toolkit content update process; complete the build out of recommendations for the Education Toolkit platform optimization; curate and annotate the first round of program cycle documents; continue to provide Secretariat support to BE2; develop guidance notes for QUEST technical areas; produce a landscape review of USAID activity in QUEST areas; and continue logistics and coordination activities for the Mobiles for Education Symposium Alliance.
EPIC support to the ECP work stream will: assist with the ECP strategy as needed; facilitate key decisions for the planning of the 2017 SOTA conference; propose an ECP monitoring process; design the agreed upon share-out format and design for the 2011-2015 Education Strategy Summative Report; support the launch of the 2016 Education Strategy; develop the Books for Every Child website; and deliver communications training.
Operationally, EPIC will: recruit and hire up to 2 full time staff (knowledge management and communications activity manager and a project manager); continue to expand the pool of short-term technical assistance experts; submit the project PMMELP; update the Office Change Strategy document; create an EPIC logo; develop the Fall issue of EPIC Happenings; submit the Year 2 EPIC Work Plan and Operational Budget; and draft the EPIC Year 1 Annual Report
- 46 -
Financial Information
Category Q3 2016
April 1- June 30, 2016
Total labor $ 467,463.38
Copying/Printing $ 53.96
Travel, transport and per diem $ 2,108.58
Other Costs $ 12,715.30
Telephone/communications $ 543.34
Training materials and supplies $ 1,857.13
Temporary Services $ 157.07
Facilities (room rentals) $ 7,552.96
Indirect costs - (G&A) $ 5,173.59
Subcontractor ODC's $ 59.00
Total $ 497,684.31