  • DYWIDAG Geotechnical Product Range

  • 3Contents

    DYWIDAG Threadbar AnchorsDYWIDAG Threadbar Anchors...................................................................................4Removable Threadbar Anchors .................................................................................5DYWIDAG Threadbar Anchors Equipment .............................................................6Applications for DYWIDAG Threadbar Anchors ........................................................7

    DYWIDAG Strand Anchor SystemDYWIDAG Strand Anchor System...........................................................................10DYWIDAG Strand Anchors ......................................................................................11Temporary Strand Anchors ......................................................................................12DYWIDAG Strand Anchors Equipment.................................................................13Applications for DYWIDAG Strand Anchor System.................................................14

    DYWIDAG Soil NailsDYWIDAG Soil Nails ................................................................................................17Applications for DYWIDAG Soil Nails ......................................................................18

    DYWIDAG Rock BoltsDYWIDAG Rock Bolts..............................................................................................20DYWIDAG Rock Bolts Anchorages ......................................................................22DYWIDAG Rock Bolts Accessories ......................................................................23DYWIDAG Rock Bolts Installation and Stressing Equipment...............................24Applications for DYWIDAG Rock Bolts ...................................................................25

    DYWI Drill Hollow Bar SystemDYWI Drill Hollow Bar System...............................................................................28Applications for DYWI Drill Hollow Bar System ....................................................30

    GEWI PileGEWI Pile ...............................................................................................................32GEWI Pile Equipment..........................................................................................33Applications for GEWI Pile.....................................................................................34

    DYWIDAG Ductile Iron PilesDYWIDAG Ductile Iron Piles ....................................................................................36Applications for DYWIDAG Ductile Iron Piles ..........................................................38

    DYWIDAG Threadbar Anchors _page 4

    DYWIDAG Multistrand Anchors _page 11

    GEWI Pile _page 33

  • 4DYWIDAG Threadbar Anchors

    Advantages and Characteristics Easy system handling

    Simple restressing and destressingthrough threaded anchorage

    Permanent corrosion protectionpossible

    Easy removal of temporary anchorsthrough threaded sleeves

    Flexibility in transport lengths byusing couplers

    High shear bonding between THREADBAR and cement grout

    High stiffness when installedoverhead

    Adjustment of angle through wedgewasher and bearing plates

    Quality assurance through internaland external supervision ofproduction

    plastic nut

    plastic nut

    plastic cap

    anchor plate

    corrosion protection compound

    threadbar

    cement grout

    smooth sheathing

    corrugated sheathing

    spacer

    grout cap

    domed anchor nut

    Temporary Anchor

    Permanent (DCP) Anchor

    domed anchor nut

    plastic cap

    anchor plate

    smooth sheathing

    threadbar

    spacer

    Approval Z-20.1-17see: www.dywidag-systems.com(downloads approvals Germany

    Geotechnical Systems)

    Adjustment ofangle throughbearing and

    wedge washer

    Anchor headconcrete or

    steel support

    Anchor head for electrically isolated bar anchors

  • 5Removable Threadbar Anchors

    Permanent and Temporary Anchor

    type of bar nominal diameter steel grade load at yield ultimate load

    mm N/mm2 kN kN

    26.5 950/1050WR 525 580

    THREADBAR with 32 950/1050WR 760 850

    right-hand thread 36 950/1050WR 960 1,070

    40 950/1050WR 1,190 1,320

    47 950/1050WR 1,648 1,822

    30 670/800 474 565

    35 670/800 645 770GEWIPlus bar

    43 670/800 973 1,162with right-hand thread

    57.5 670/800 1,740 2,077

    63.5 670/800 2,122 2,534

    40 500/550 628 691GEWI bar

    50 500/550 982 1,080with left-hand thread

    63.5 555/700 1,758 2,217

    Threadbar Anchor Type WG (partially removable)

    Threadbar Anchor Type CCB(completely removable)

    domed anchor nut

    anchor plate

    sheathing

    threadbar

    coupler

    heat shrink sleeve

    grout

    spacerdomed anchor nut

    anchor plate

    sheathing

    threadbar

    grout

    spacer

    anchor footcast compression bodies

  • 6DYWIDAG Threadbar Anchors Equipment

    DYWIDAG Threadbar Jacks

    Jack 600kN Series 04, 1,100kN Series 03

    Technical Data

    D

    L

    jack type length L diameter D stroke piston area weight

    mm mm mm cm2 kg

    600 kN Series 04 401 190 50 132.5 36

    600 kN Series 05 456 190 100 132.5 44

    1,100 kN Series 01 494 267 50 235.6 46

    1,100 kN Series 03 594 267 150 235.6 54

    1,500 kN Series 03 870 336 250 302.4 125

    other jacks on request

    Hydraulic pump, type 77 159 A

    Hydraulic Pumps

    Technical Data

    pump type max. operating capacity effective weight dimensionspressure oil volume oil amount L x W x H

    bar l/min l kg mm

    77-159 A 600 3.0 10.0 50 420/380/450

    77-193 A 600 3.0 10.0 63 420/380/450

    Hydraulic Pumps are delivered without oil filling

  • 7Applications for DYWIDAG Threadbar Anchors

    DYWIDAG Systems to rebuild cruise ship pier Reconstruction of cruise ship pier in Basseterre, St. Kitts, West Indies

    Owner St. Christopher Air and Sea Ports Authority, Basseterre, St. Kitts, West Indies +++ Engineer Novaport Ltd., Halifax, Canada +++ General Contractor Island Dredging Ltd., Kingston, Jamaica +++ Piling Contractor DSI Canada,Western Division, Surrey, BC, Canada

    DSI Services Supply, drilling, installation and grouting of fully bonded DYWIDAG Micropiles 57 mm (21 pcs. vertical micropiles on approach piers and 20 pcs. battered on 3 dolphins) with a compression and tension capacity of 790 kN; Rental of equipmentand technical assistance

    i

    View of the new cruise ship pier

    Installation ofDYWIDAG Micropiles

    57 mm, between 37 and 42 m long

  • 8Applications for DYWIDAG Threadbar Anchors

    First South Korea application of DYWIDAG Pre-GroutedAnchor System to prevent slideHongchon Road No. 36, Gangwon Province, South Korea

    Owner Hongchon Road Maintenance Office, Gangwon Province, South Korea +++ Contractor Dongseo Construction Co., Ltd., Chunchon City, Gangwon Province, South Korea +++ Engineering Kukil Construction & Engineering, Hongchonkun,Gangwon Province, South Korea

    DSI Services Supply of 123 pcs. DYWIDAG Threadbar Anchors, length 10.5 and 15.5 m, bonded length 5 m, free length 5 and 10 m; Technical support

    i

    Slopes secured with DYWIDAG Threadbar Anchors

    Stressing of the anchorwith DYWIDAG Jack

    Top and right: Stabilized slopes with

    DYWIDAG Threadbar Anchors

  • 9Applications for DYWIDAG Threadbar Anchors

    DYWIDAG Permanent Threadbar Anchors secure new electronuclear acceleratorElectronuclear accelerator for the European Organisation for Nuclear Research (CERN),Geneva, Switzerland

    Owner Centre Europen pour la RechercheNuclaire (CERN), Geneva, Switzerland +++General Contractor Dragados, Spain / Seli,Italy

    DSI Services Supply of DYWIDAG Anchorsmade of steel 835/1030, 36 mm, l = 15 m; Technical job-site assistance, implementationof load tests and partial implementation ofstressing operations; Rental of stressingequipment

    i

    Cavern excavations

    DYWIDAG Threadbar Anchors preventuplift of new Copenhagen OperaConstruction of Opera House in Copenhagen, Denmark

    Location in line with Marble Church and Amalienborg Castle

    Owner A. P. Mller Foundation (Maersk), Copenhagen,Denmark, as a gift to the city of Copenhagen +++ Designer Henning Larsen, Copenhagen, Denmark +++General Contractor E. Pihl & Son A/S, Copenhagen,Denmark +++ Subcontractor Zblin SpezialtiefbauGmbH, Stuttgart, Germany +++ Engineering RambllA/S, Copenhagen, Denmark

    DSI Services Supply of 820 Double Corrosion ProtectedUplift Prevention Anchors 36 mm, ranging in length between 15-20 m; Technical support by DSI LicenceeAAGE Christensen A/S, Copenhagen, Denmark

    i

  • 10

    DYWIDAG Strand Anchor System

    Advantages and Characteristics Large transport lengths avoid splices

    Need little space during transport,storage and installation

    Sturdiness against damage ensuredthrough flexibility

    Flexibility in lengths made possiblethrough shortening of anchors

    Double corrosion protection can besupplied for permanent anchors

    Permanent testability of thecorrosion protection possiblethrough electric isolation

    Easy installation due to relatively lowweight

    Practically no limitation of theworking load due to an optionalnumber of strands

    Consistent good quality due tointernal and external supervision ofproduction

    Permanent (DCP) Anchor acc. to DIN 4125

    steel cap

    wedge plate

    anchor plate

    corrosion protection compoundor cement grout

    waxed/greased and PE sheathed

    strand

    spacer

    cement grout

    Adjustment of angle by spherical disc and steel tube

    Adjustment of angle by spherical disc and wedge plate

    Approvals Z-20.1-15 and Z-34.11-204see: www.dywidag-systems.com(downloads approvals Germany

    Geotechnical Systems)

    steel grade nominal cross-sectional load at yield* ultimate load*diameter area (Fp 0,2 k) (Fpk)

    N/mm2 mm2 kN kN

    1570/1770 0.6" 140 220 248

    1570/1770 0.62" 150 236 266

    1670/1860 0.6" 140 234 260

    1670/1860 0.62" 150 251 279

    * per strand

  • 11

    DYWIDAG Strand Anchors acc. to EN 1537

    Electrically Isolated Permanent Strand Anchor

    cap wedge plate

    anchor plate

    isolating ring

    sealing

    smooth sheathing

    corrugated sheathing

    spacer

    cement grout

    waxed/greased and PE sheathed strand

    Permanent Strand Anchor Type Twin-Corr

    2 concentric ribbed sheathings

    resin/cement grout

    cement grout

    Approvals Z-34.11-204see: www.dywidag-systems.com(downloads approvals Germany

    Geotechnical Systems)

  • wedge plate

    anchor plate

    waxed/greased and PE sheathed strand

    primary grout tube

    spacer

    cement grout

    breaking point

    Removable Strand Anchors for free length with predetermined breaking point

    12

    Temporary Strand Anchors

    steel grade number of diameter load at yield* ultimate loadstrands (Fp 0,2 k) (Fpk)

    N/mm2 kN kN

    1570/1770 3 0.62" 708 660*

    1570/1770 4 0.62" 944 880*

    1570/1770 5 0.62" 1180 1100*

    1570/1770 7 0.62" 1652 1540*

    * load at point of rupture

    Temporary Anchor

    wedge plate

    anchor plate

    waxed/greased and PE sheathed strand

    primary grout tube

    spacer

    cement grout

    steel grade nominal cross-sectional load at yield* ultimate load*diameter area (Fp 0,2 k) (Fpk)

    N/mm2 mm2 kN kN

    1570/1770 0.6" 140 220 248

    1570/1770 0.62" 150 236 266

    1670/1860 0.6" 140 234 260

    1670/1860 0.62" 150 251 279

    * per strand

  • 13

    DYWIDAG Strand Anchors Equipment

    Prestressing Jack 1500 Mp

    jack types length O. D. stroke piston capacity weightL A area

    mm mm mm cm2 kN kg

    1100 Mp 720 267 150 235.6 1200 81

    1500 Mp 870 336 250 302.4 1500 125

    2600 Mp 785 370 250 549.8 2946 330

    HOZ 3000 1200 385 250 508.9 3053 400

    HOZ 4000 1462 482 250 894.6 4200 600

    strand 0.6 and 0.62" St 1570/1770 St 1670/1860

    No. of strands 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

    1100 Mp 1500 Mp 2600 Mp HOZ 3000 HOZ 4000

    Standard Optional

    DYWIDAG Strand Anchor Jacks

    Technical Data

    Hydraulic Pump, Type 77 159 AHydraulic Pump, Type R 6.4

    pump max. operating capacity effective weight dimensionstype pressure oil volume oil amount L x W x H

    bar l/min l kg mm

    77-159 A 600 3.0 10.0 50 420/380/450

    77-193 A 600 3.0 10.0 63 420/380/450

    R 6.4 600 6.4 70.0 310 1400/700/1100

    Hydraulic Pumps are delivered without oil filling

    jacks 1100 Mp 1500 Mp 2600 Mp Hoz 3000Hoz 4000

    pumps

    77 - 159 A 77 - 193 A R 6.4

    Hydraulic Pumps

    Technical Data

  • Applications for DYWIDAG Strand Anchor System

    14

    DYWIDAG Permanent Strand Anchors for seismic upgradeof an apartment building in PeruKontiki Apartment Building, Playa Punta Hermosa, Lima, Peru

    Client The Wiese Family, Miroquesada, Lima, Peru +++ Main Contractor AugustoCnepa Ingenieros, Lima, Peru +++ Consulting Engineers Gallegos CasabonneArango Ingenieros Civiles S.A.C., Lima, Peru

    DSI Services Supply, preparation, assembly, testing and prestressing of 32 permanent DYWIDAG Strand Anchors with double corrosion protection in sizes 3 up to 12-0.6" and of 3 tendons with 12 greased, sheathed strands 0.6".

    i

    Lengthening of anchors withcouplers of type R

    Prestressing tests performedon the anchors

    Seven Mile Dam Successful completion of test anchorprogram with 90-0.6" anchors, length 98 mSeven Mile Dam, Southern BC, Canada

    Owner BC Hydro, Burnaby, BC,Canada +++ Engineer BC Hydro,Burnaby, BC, Canada +++ General Contractor Peter Kiewit &Son, Richmond, BC, Canada

    DSI Services Supply of restressableDYWIDAG 90-0.6" Strand Anchorswith Double Corrosion Protection 3 pcs. about 98 m long; Rental of2,000 t jack and technical assistancefor installation, testing and stressing

    i

  • Applications for DYWIDAG Strand Anchor System

    15

    DYWIDAG Anchors prove to be best solution for dam upgradesForth River Dams upgrades, Tasmania, Australia

    Devils Gate Dam

    Client Hydro Tasmania, Hobart, Australia +++ General Contractor Hazell Bros. Civil Contracting Pty. Ltd., Hobart, Australia +++Subcontractor Mulligan Drilling Pty. Ltd. Rockridge, Australia +++ Engineering Hydro Tasmania, Hobart, Australia +++ ConsultingEngineers Hydro Tasmania, Hobart, AustraliaDSI Services Supply of 30 t of 36 mm and 40 mm epoxy-coated DYWIDAG Threadbars and accessory for permanent passiverock bolts. Supply of 10 pcs. DYWIDAG Permanent Strand Anchors 8 x 0,6"; Rental of tensioning equipment and field supervisionduring installation and stressing

    i

    DYWIDAG Permanent Strand Anchors for seismic upgrade of a quay wallEPC marine dock for the Q-Chem project, Mesaieed, Qatar

    Owner Qatar Chemicals CompanyLtd., Doha, Qatar +++ GeneralContractor AMCON ProjectManagement, Doha, Qatar +++Subcontractor SwissboringOverseas Corp. Ltd., Dubai, U. A. E.

    DSI Services Supply of all anchorcomponents and requiredequipment for the fabrication andstressing of 100 double corrosionprotected DYWIDAG StrandAnchors, 12 x 0,62", with a lengthof 40 m each; Supervision ofanchor fabrication and installationas well as testing and stressing of the anchors

    i

    Paloona Dam

    Drilling work

    Tensioning of the DYWIDAG Multistrand Anchors

  • Applications for DYWIDAG Strand Anchor System

    16

    Use of DYWIDAG Permanent Strand Anchors onpermafrost Grossglockner in the Austrian AlpsStabilization of the Erzherzog Johann Htte at a height of 3,454 m on Mount Grossglockner

    View on the Erzherzog Johann Htte on mount Grossglockner

    Owner Austrian Alpine Club, Vienna, Austria +++ General Contractor Horst Felbermayr GesmbH, FST Spezialtiefbau, Salzburg,Austria +++ Design Consultant and Authority inviting the tender Engineering Office Bmst. Ing. Gerhard Schimek, Spittal/Drau,Austria +++ Subsoil Expert Civil engineers Garber - Dalmatiner, Graz, AustriaDSI Services Supply of DYWIDAG Permanent Strand Anchors 5 x 0.6", service load 550 kN and GEWI Piles 40 mm, incl. technical assistance

    i

    Tensioning of the DYWIDAG Strand Anchors DYWIDAG Strand Anchor after installation

  • 17

    DYWIDAG Soil Nails

    Advantages and CharacteristicsThe essential advantages of theDYWIDAG soil nails are:

    High durability through doublecorrosion protection

    Low corrodibility through robustreinforcing steel quality

    Angle compensation up to 15 through slope plate

    Supplements may be attached by means of couplers

    Flexibility in length by using couplers

    Spacers ensure mortar cover

    The accepted high standard ofquality control from production stageto installation of the soil nailsensures consistent quality

    Can be delivered galvanized

    Available in proven GEWI-gradeand new GEWIPlus-grade

    Approvals Z-20.1-106see: www.dywidag-systems.com(downloads approvals Germany

    Geotechnical Systems)

    domed plate

    domed nut

    threadbar

    cement grout

    domed nut

    domed plate

    threadbar

    cement grout

    corrugated sheathing

    spacer

    grout cap

    DYWIDAG Soil Nail

    steel grade nominal steel cross- load at ultimatediameter grade sectional area yield load

    A

    mm N/mm2 mm2 kN kN

    16 BSt 500 S 201 101 111

    20 BSt 500 S 314 157 173

    25 BSt 500 S 491 246 270

    GEWI bar 28 BSt 500 S 616 308 339

    with left-hand thread 32 BSt 500 S 804 402 442

    40 BSt 500 S 1,257 628 691

    50 BSt 500 S 1,963 982 1,080

    63.5 S 555/700 3,167 1,758 2,217

    18 S 670/800 254 170 204

    22 S 670/800 380 255 304

    25 S 670/800 491 329 393

    28 S 670/800 616 413 493GEWIPlus

    30 S 670/800 707 474 565with right-hand thread

    35 S 670/800 962 645 770

    43 S 670/800 1,452 973 1,162

    57.5 S 670/800 2,597 1,740 2,077

    63.5 S 670/800 3,167 2,122 2,534

    Standard soil nail

    DCP-soil nail

  • Applications for DYWIDAG Soil Nails

    18

    The Eden project built with DYWIDAG Soil Nails and Ground AnchorsIn the last two years a 60 m deep former china clay pit just outside St. Austell in Cornwall was transformed into a unique 21st century Biosphere

    Owner The Eden Project +++ Main contractor JV McAlpine +++ Geotechnical engineer John Grimes Partner +++ Geotechnical subcontractor Saxton Deep DrillersDSI Services Supply of 2,000 GEWI bolts and DYWI Drill anchors, 50 DSI permanent ground anchors and 40 temporary DYWIDAG Soil Nails

    i

    On the upper levels, drill platforms were mounted to hydraulic telescopic arms.

    GEWI Steel Soil Nails stabilize slopes on the Rock of GibraltarSlope stabilization for decommissioned rainwater catchment system, Gibraltar, Spain

    Owner British Ministry of Defence, London, England +++ Main Contractor Edmund Nuttall, Camberley, Surrey, England +++ Consultant Gifford and Partners, Chester,England +++ Alternative Design Donaldson Associates,Uttoxeter, England

    DSI Services Supply of 8,200 galvanized DYWIDAG Soil Nails

    i

    Drill platform in use

  • 19

    Applications for DYWIDAG Soil Nails

    Retaining walls at Dallas/Fort Worth International Airportsecured with DYWIDAG Soil Nails

    Owner Dallas/Fort Worth Airport, TX, USA +++ Contractor Craig Olden, Inc., Little Elm, TX, USA +++ Installed by Craig Olden,Inc., Little Elm, TX, USA

    DSI Services Supply of 650 DYWIDAG Soil Nails, 25 mm, total length about 5,000 m

    i

  • 20

    DYWIDAG Rock Bolts

    Advantages and Characteristics high loads with small borehole

    diameters

    continuous bar thread allows cuttingat any point, length adaptation onsite, easy to order and to store

    coarse thread, insensitive to roughhandling

    high bond along the bar length foranchoring into resin or cementmortar

    good mixing of resin cartridgesthrough the thread ribs

    restressing possible

    angle compensation through dishedplates, spherical seats or domednuts

    expansion shell enables quickload transfer

    Expansion Shell Bolt (with or without cement grout)

    dished plate

    domed nutthreadbar

    cement grout

    expansion shell

    anchor plate

    hex nut

    threadbar

    cement grout

    SN Anchor

  • 21

    DYWIDAG Rock Bolts

    Fields of Application tunnel and shaft construction

    cavern construction

    mining

    slope stabilization

    attachments, e. g. formwork

    dished plate

    threadbar

    cement grout

    calotte washer

    hex nut

    resin

    Resin Bolt

    type of bar nominal steel max. cross- load at ultimatediameter grade diameter sectional yield load

    over ribs area A

    mm N/mm2 mm mm2 kN kN

    16 500/550 18 201 101 111

    GEWI bar 20 500/550 23 314 157 173

    with left-hand thread 25 500/550 28 491 246 270

    28 500/550 32 616 308 339

    32 500/550 36 804 402 442

    18 670/800 21 254 170 204

    GEWIPlus bar 22 670/800 25 380 255 304

    with right-hand thread 25 670/800 28 491 329 393

    28 670/800 32 616 413 493

    30 670/800 34 707 474 565

    GEWI bar 16 450/700 18 207 93 145

    with right-hand thread

    15 900/1100 18 177 159 195THREADBAR with

    26.5 950/1050WR 31 552 525 580right-hand thread

    32 950/1050WR 36 804 760 850

  • 22

    Anchorage for rock bolts with steelgrade St 950/1050

    Anchorage with hexagon nut, sphericalseat and dished plate

    Anchorage with domed nut and dished plate

    steel grade nominal order No. plate order No.diameter plate dimensions nut

    N/mm2 mm mm

    450/700 16 16 W 2134 80 x 80 x 10 16 W 2014

    500/550 16 16 T 2079 120 x 120 x 5 16 T 2056

    500/550 20 20 T 2182 150 x 150 x 8 20 T 2044

    500/550 25 25 T 2182 150 x 150 x 8 25 T 2044

    500/550 28 28 T 2182 150 x 150 x 10 28 T 2044

    500/550 32 32 T 2182 180 x 180 x 12 32 T 2044

    670/800 18 18 TR 2182 150 x 150 x 10 18 TR 2001

    670/800 22 22 TR 2182 150 x 150 x 10 22 TR 2001

    670/800 25 25 TR 2182 200 x 200 x 12 25 TR 2001

    670/800 28 28 TR 2182 200 x 200 x 12 28 TR 2001

    670/800 30 30 TR 2182 200 x 200 x 12 30 TR 2001

    steel grade nominal order No. plate order No.diameter plate dimensions nut

    N/mm2 mm mm

    950/1050 26.5 26 WR 2011 150 x 150 x 35 26 WR 2001

    950/1050 32 32 WR 2011 180 x 180 x 40 32 WR 2001

    steel grade nominal order No. plate order No. order. No.

    diameter plate dimensions nut spherical

    seat

    N/mm2 mm mm

    500/550 16 16 T 2131 150 x 150 x 8 16 T 2002 16 T 2130

    500/550 20 20 T 2131 150 x 150 x 8 20 T 2002 20 T 2130

    500/550 25 25 T 2131 180 x 180 x 8 25 T 2002 25 T 2130

    500/550 28 28 T 2131 200 x 200 x 10 28 T 2002 28 T 2130

    500/550 32 32 T 2131 200 x 200 x 12 32 T 2002 32 T 2130

    900/1100 15 15 F 2131 150 x 150 x 8 15 F 2002 15 F 2130

    further plate dimensions available on request

    DYWIDAG Rock Bolts Anchorages

  • 23

    DYWIDAG Rock Bolts Accessories

    Spring loaded

    borehole type for bar sizes rock length

    diameter DSI quality of cone

    mm 15F 16T 16W 18TR 20T 20W 22TR 25T 25TR 26WR 28T 28TR 30TR 32T mm

    33/37 2128 hard 3534/38 2184 potassium 5034/38 2185 medium hard 6534/38 2135 hard 3539/46 2117 hard 5044/47 2185 potassium 8543/48 2136 hard 4750/58 2137 hard 5059/60 2221 hard 65

    Expansion shells for TR-grade bars on request only

    Selection Criteria for Rock Bolts

    underground expansion shell resin cement grout

    usable in cleft ground conditions limited limited yes

    required strength of rock 30 N/mm2 low low

    suited for wet borehole yes limited yes

    application technique

    corrosion protection yes* yes yes

    fast loading yes yes no

    stressing yes yes** no

    suited for advance through blasting limited yes yes

    sensible to deviations yes yes noof the borehole diameter

    * expansion shell anchor with cement grout injection, ** if free length is guaranteed

    Expansion Shells

    Selection criteria

    Required resin cartridge volumes

  • 24

    DYWIDAG Rock Bolts Installation and Stressing Equipment

    Impact Wrench

    Installation

    Spinning Adapter to spin the bolts into resin cartridges by electrical or air-driven drilling machines

    Tensioner suitable for electric orpneumatic impact wrenches

    Universal Stressing Setup for stressingof rock bolts whose axes do not lienormal to the rock face, a hollowcylinder jack equipped with anadjustable chair is used to ensureperfect alignment and loadtransmission.

    Technical Data of the HOZ 250/50

    dimensions mm 600 x 400 x 200

    capacity kN 250

    stroke mm 50

    pressure bar 500

    weight kg 15

    Hydraulic Jack HOZ 250/50

    Universal Stressing Setup

    Stressing

    Hydraulic Jack HOZ 250/50 forstressing and testing of rock bolts withhexagon nut and spherical seat

  • Applications for DYWIDAG Rock Bolts

    25

    Project Stabilization of the rockfall at the B99 Katschbergfederal road, Carinthia, Austria +++ Owner Authority of the Carinthian State Government, Klagenfurt, Carinthia,Austria +++ Design Engineering Office Dr. Ernst Garber Dr. Joerg Dalmatiner, Villach + Graz, Austria

    DSI Services Technical assistance and deliver of DYWIDAG rock bolts, rental of technical equipment

    i

    Project Paramatta Rail Link Tunnel inNSW, Australia +++ Owner State RailAuthority, Rail InfrastructureCorporation and NSW Government,Australia +++ Main Contractor ThiessHochtief Joint Venture, Sydney,Australia +++ Consulting EngineersGutteridge Haskins & Davey Pty Ltd.,Sydney, Australia; Parsons BrinkerhoffAustralia Pty Ltd., Sydney, Australia

    DSI Services Supply of 50,000 rockbolts, resins and accessories, Supplyof 500 steelring sets

    i

    Project Nancy Creek Tunnel, Atlanta,Georgia, USA +++ Owner City ofAtlanta, Georgia, USA +++ DesignEngineer Jordan Jones & Goulding,Atlanta, Georgia, USA +++ GeneralContractor Nancy Creek Constructors,Atlanta, Georgia, USA

    DSI Services Supply of DYWIDAGrock bolts; Pull testing and on-sitetechnical assistance

    i

  • 26

    Applications for DYWIDAG Rock Bolts

    Project Lesotho Highlands Project, Lesotho, South Africa +++ Owner Lesotho Highlands Development Authority (LHDA) +++Design Lesotho Highlands Contractors, a JV consisting of: SpieBatignolles, Balfour & Beatty Ltd., Campenon Bernard SGE, LTA Ltd. and Ed. Zblin AG

    DSI Services 320,000 pieces of hot dip galvanized rock bolts 25 mm

    Project Eastside Reservoir, RiversideCounty, CA, USA +++ Owner Metropolitan Water District ofSouthern California (MWDSC) +++ Design Ebasco Team, a JVconsisting of: Black & Veatch andWoodward-Clyde

    DSI Services 8,000 m of rock bolts 26.5 mm, prestressing and testingequipment, technical assistance on site

    Project Fort Regent Cavern, St. Helier, Jersey, UK +++ Owner Public Services Department of the States ofJersey +++ Design GEO-Engineering (Jersey)DSI Services 4,000 pieces of epoxy-coated rock bolts 25 mm GEWI and26.5 mm THREADBAR

    i

    i

    i

  • 27

    Applications for DYWIDAG Rock Bolts

    Innovative solution using DYWIDAG Rock Bolts for cavern construction in IndiaBaglihar Hydro Electric Power Station, Jammu & Kashmir, India

    Owner Jaiprakash Industries Limited, New Delhi, India +++ General Contractor Jaiprakash Industries Limited, New Delhi, India+++ Consultant Lahmeyer International GmbH, Bad Vilbel, Germany DSI Services Supply of a total of 7,720 DYWIDAG Rock Bolts in single section lengths between 6 and 10 meters; Technical support

    i

    Position of the concrete dam with foundation for cable cranesUnderground installation team; Small picture: Stressingoperation with local jacks using a stressing chair

    DYWIDAG Rock Bolts for roof support in German salt mines

    Owner Kali & Salz AG, Kassel, Germany DSI Services 1 million DYWIDAG Rock Bolts per year 16 mm, steel grade 450/700 with expansion shellsi

  • 28

    DYWI Drill Hollow Bar System

    Advantages and CharacteristicsThe main advantages of the DYWI Drill

    Hollow Bar are:

    Fast drilling and placing due todrilling, anchor installation andgrouting in a single operation

    Neither separate anchor installationnor removal of casing and drill rods

    Similar installation methods for allground conditions

    Choice of drill bits for differentground conditions

    The hollow core not only serves forflushing with air or water duringdrilling, but also for grouting theanchor tendon

    Flexibility in length by using couplers

    Ability to work with small drill rigswithout casing in restrictedheadroom conditions

    Accommodation of needs forenhanced protection againstcorrosion upon request

    The accepted high standard ofquality control from production stageto installation of the DYWI Drill

    Hollow Bar Anchors ensuresconsistent quality

    anchor nut

    anchor plate

    anchor rod

    Fields of Application soil nails

    micro piles

    temporary anchors

    Approval Z-34.13-208see: www.dywidag-systems.com(downloads approvals Germany

    Geotechnical Systems)

    Technical Data Unit R25N R32L R32N R32S R38N R51L R51N T76N T76S

    Outer diameter mm 25 32 32 32 38 51 51 76 76

    Average inner mm 14 22 18,5 15 19 36 33 51 45

    diameter

    Average cross mm2 290 340 430 520 770 890 1070 2120 2750

    sectional area

    Ultimate load *1 kN 200 220 280 360 500 550 800 1600 1900

    Yield load *1 kN 150 180 230 280 400 450 630 1200 1500

    Average tensile N/mm2 690 650 650 690 650 620 750 750 690

    strength *1

    Average yield N/mm2 520 530 530 540 520 510 590 570 550

    strength *1

    Weight kg/m 2.3 2.7 3.4 4.1 6.1 7.0 8.4 16.7 22.0

    Thread standard - ISO 10208 ISO 1720 T76 *2

    Steel grade - Acc. to. EN 10083-1

    Delivery lengths - 1 m, 2 m, 3 m, 4 m, 6 m

    *1 The ultimate load and yield load capacity are measured values. The tensile-/yield strenghts are calculated average values.*2 Internal standard

  • 29

    DYWI Drill Hollow Bar System

    cement grout

    drill bit*

    * various drill bits for differentground conditions available

    Connecting the drill bit

    Drilling with anchor rods

    Grouting through hollow core

    Stressing the anchor by torque wrenchor hollow cylinders

    coupler

  • Applications for DYWI Drill Hollow Bar System

    30

    DYWI Drill Hollow Bars used to stabilize a steep cutting on the UKs first toll roadBirmingham Northern Relief Road, West Midlands, Birmingham, England

    Client Midland Expressway Ltd.,Birmingham, England +++ GeneralContractor CAMBBA, Birmingham,England +++ Specialist InstallerSouth Western Mining & TunnellingLtd., Nanstallon, Cornwall, England+++ Consulting Engineers ArupAtkins, Birmingham, England

    DSI Services Supply of 1,000 Permanent R32 DYWI DrillHollow Bar Soil Nails (7.5 m to 9.0 mlong); Soil nail testing by specialistDSI personnel

    i

    Shotcrete excavation wall secured with DYWI Drill Hollow Bolt AnchorsBrantford General Hospital, Brantford, Ontario, Canada

    Owner Brantford General Hospital,Brantford, Ontario, Canada +++General Contractor BondfieldConstruction, Concord, Ontario,Canada +++ Consulting EngineersCarruthers & Wallace Limited, Toronto,Ontario, Canada +++ Contractor forfoundations HC Matcon Inc., Ayr,Ontario, Canada +++ Engineer forfoundations Isherwood AssociatesLtd., Mississauga, Ontario, Canada

    DSI Services Supply of 12,000 m DYWI Drill Hollow Bar Soil Nails forthe shotcrete wall

    i

  • Applications for DYWI Drill Hollow Bar System

    31

    17,000 m DYWI Drill Hollow Bar Anchors deep beneath Downtown LondonThe North Downs Tunnel is the first part of the railway tunnel which connects the British Channel with Kings Cross Station in downtown London.

    Owner Channel Tunnel Rail Link +++ Contractor Eurolink, consisting of: Miller, GTM,Dumez and Beton Monierbau +++ Operator Union Railways / UK +++ Consulting engineers Rail Link Engineering, consisting of: Ove Arup, Halcrow andBechtel +++ Engineering EurolinkDSI Services Supply of 17,000 m DYWI Drill Hollow Bar AnchorsLeasing of stressing and testing equipment

    i

    DYWI Drill Hollow Bar Anchors meet new geological and geotechnical challenges

    DSI ServicesSupply of 10,800 m DYWI Drill Hollow Bar

    Anchors type R32N 14,517 m DYWI Drill Hollow Bar

    Anchors type R32S 700 m double corrosion protected

    rock anchors 2,310 m GEWI rock bolts 3,500 m DYWI Drill Hollow Bar

    Anchors type R51N 600 m temporary strand anchors

    with 4 strands

    i

    The North Downs Tunnel portal

    The drill platforms were fixed to telescopic arms on the upper levels

    Slope stabilization with DYWI Drill Hollow Bar Anchors R51N inLefkopetra-Veria-Kouloura Tunnel

  • 32

    Advantages and CharacteristicsThe DYWIDAG GEWI Pile is a drilledmicropile with a steel core made of theGEWI Bar with hot-rolled, continuousthread deformations on both sides, theso-called coarse GEWI Thread. Thesteel core is sheathed by cement groutwhich acts both as corrosion protectionand load transfer into the soil or rock.

    Robust coarse thread remainsthreadable even when dirty ordamaged

    can be cut off and spliced at any given point

    excellent load transfer into concretestructures by means of anchoringelements

    a small drill hole diameter allowseconomic drilling equipment

    tensile, compression and alternatingloads can be transferred to the sameextent

    the coarse GEWI Threadguarantees maximum bond betweensteel and cement grout

    the stress-strain curve of the GEWI

    Bar shows high ductility

    continuing settlements can bestopped by preloaded GEWI Piles

    load transfer into the soil isoptimized by the post-groutingsystem

    Double Corrosion Protected Pilescan be used in aggressive mediasuch as seawater or water leakingfrom dump sites.

    GEWI Pile

    Approvals Z-32.1-2 and Z-32.1-9see: www.dywidag-systems.com(downloads approvals Germany

    Geotechnical Systems)

    GEWI and GEWIPlus Pile

    nom. steel grade cross yield load ultimate loaddiameter sectional area

    mm N/mm2 mm2 kN kN

    32 500/550 804 402 442

    GEWI bar 40 500/550 1,257 628 691

    with left-hand thread 50 500/550 1,963 982 1,080

    63.5 555/700 3,167 1758 2,217

    28 670/800 616 413 493

    30 670/800 707 474 565

    GEWIPlus bar 35 670/800 962 645 770

    with right-hand thread 43 670/800 1,452 973 1,162

    57.5 670/800 2,597 1,740 2,077

    63.5 670/800 3,167 2,122 2,534

    additional reinforcementfor compression pile

    end-anchorage with lock nut

    pile neck reinforcment

    spacer

    coupler

    GEWI bar

    GEWI Pile with singlecorrosion protection

  • 33

    GEWI Pile Equipment

    GEWI Pile with doublecorrosion protection

    nut with plate and lock nut

    additional reinforcement for tension pile

    corrugated sheathing

    spacer

    cement grout

    GEWI Multi Bar Pile

    diameter cross sectional area load at yield ultimate load

    mm mm2 kN kN

    3 x 32 2412 1206 1327

    1 x 40. 1 x 50 3220 1610 1771

    3 x 40 3770 1885 2074

    2 x 50 3927 1963 2160

    2 x 40. 1 x 50 4477 2238 2462

    1 x 40. 2 x 50 5184 2592 2851

    3 x 50 5890 2945 3240

    torque equipment type Standard

    torque equipment type Plarad

    Equipment

    Hydraulic pumps

    GEWI Torque Equipment

    hydraulic pump CT 2E-W-S hydraulic pump R 0.9

    Standard Plarad

    pump type

    R 0.9 CT 2 E-W-S pump

    GEWI mm 32, 40, 50 63.5

    Technical Data

    pump flow rate operating tank weight dimensionstype of oil pressure volume L x W x H

    max.

    l/min MPa l kg mm

    R 0.9 0.9 70 7 35 455/300/635

    CT 2E-W-S 1.2 70 4 26 420/320/450

  • Applications for GEWI Pile

    34

    DYWIDAG-Technology provides additional seismic eventstability for Terminal BuildingVancouver International Airport Domestic Terminal Building, Canada

    Owner Vancouver International Airport Authority, BC, Canada+++ General Contractor Ledcor Industries Ltd., Vancouver, BC,Canada +++ Structural Design Read Jones Christoffersen Ltd.,Vancouver, BC, Canada +++ Geotechnical Engineers MacleodGeotechnical Ltd., North Vancouver, BC, Canada +++ PilingContractor Kani Foundation Technologies, Richmond, BC,Canada

    DSI Services Supply of 330 GEWI Piles with double corrosion protection, total length 18 m; Technical support; Rental of testing equipment

    i

    View on the Vancouver Airport Tower, Canada

    Testing GEWI

    Piles in compression

    using adjacent GEWI Piles for

    reaction piles

    Detail view of GEWI Pile head(compression/tension)

    DYWIDAG GEWI Piles stabilize major Scottish railway realignmentEast Coast Main Line, Dolphingstone, Scotland

    Client Railtrack, UK +++ Main Contractor Edmund NuttallLtd., Camberley, England +++ Joint Venture ContractorRitches, Kilsyth, Scotland +++ Consulting EngineersDonaldson Associates, Glasgow, Scotland +++ Geological Analyst Dalgleish Associates, ScotlandDSI Services 39.000 m GEWI Pile 40 mm, incl. 6.600 couplers; Supply of a series S.03 1,100 kNHydraulic Jack and Power Pump for stressing test piles

    i

    DYWIDAG GEWI Piles after installation

    View of the 1.6 km long track section

  • Applications for GEWI Pile

    35

    GEWI Piles for foundation upgrade in Aluminum SmelterVAW Kurri Kurri Pty. Ltd. Aluminum Smelter, Kurri Kurri, NSW, Australia

    Detail view of GEWI Pile head (compression)

    Owner VAW Kurri Kurri Pty. Ltd. Aluminum Smelter, Kurri Kurri, Australia +++ General Contractor Civilbuild Pty. Ltd., Carrington, Australia +++ Engineering Lindsay & Dynan Pty. Ltd., Broadmeadow, AustraliaDSI services Supply of 54 GEWI Piles 32 mm with accessories; Technical support and training of the contractors crew; Supply of testing equipment; Performance of compression tests and rental of grouting equipment

    i

    Uplift GEWI Piles for underground parking structure

    Project Untere Stadt Parking Structure, School andSports Facility, Hall in Tyrol, Austria +++ Owner Stadtgemeinde Hall (municipality of Hall),Tyrol, Stadtwerke Hall GesmbH (municipal utilities)+++ Design Stadtbauamt (Town Planning Dept.)Hall / Teindl Geotechnik Consult

    DSI Services Supply of 800 GEWI Piles and 120 DYWIDAG Strand Anchors incl. testing ofanchors, technical assistance with respect to design and execution

    i

  • 36

    DYWIDAG Ductile Iron Piles

    Advantages and CharacteristicsThe pile system consists of driven duc-tile centrifugally cast pipes with conicalcouplers. Depending on the soil condi-tions, the ductile cast iron piles will beused as peak pressure or frictionalpiles.

    very fast and almost vibrationlesspile production

    control of load capacity throughcorrelation with driving rate

    can be used as permanent pile

    easy adaption of the pile length todifferent soil conditions

    no waste cuttings

    no reworking of the pile headsnecessary

    light and easily moveable equipmentallows pile production under limitedspace conditions

    small site equipment enables fast use

    Approval Z-34.25-202see: www.dywidag-systems.com(downloads approvals Germany

    Geotechnical Systems)

    Interior load capacity of the DYWIDAG Ductile iron pile acc. to approval by DIBt (German Institute for Structural Engineering)

    type of exterior wall cast iron concrete load capacity load capacity load capacitypile diameter thickness cross section cross section cast iron concrete B25 pile

    x s mm mm cm2* cm2 kN* kN kN

    118 x 7.5 118.00 7.50 20.55 83.32 438 69 507

    118 x 9.0 118.00 9.00 25.33 78.54 540 65 605

    118 x 10.6 118.00 10.60 30.26 73.59 646 61 707

    170 x 9.0 170.00 9.00 37.58 181.46 800 151 951

    170 x 10.6 170.00 10.60 45.14 173.90 962 144 1,106

    * considering the corrosion rate

  • 37

    DYWIDAG Ductile Iron Piles

    Pile tube 118/5000

    Pile tube 170/5000

    5000

    5000

    11

    8+

    2-

    1

    170

    +2.

    5-

    1.5

    16

    0

    218

    SS

    Strain

    GG-10

    St37

    400 N/mm2

    360 N/mm2

    100 N/mm2Rm

    Rm

    Rm

    26%>18%

    GGG-40

    Str

    ess

    Rp0.2

    ReH

    Cast Iron with Spheroidal Graphite(GGG)In the melted cast iron mass graphite isconverted from a tapered lamellarshape (gray cast iron) into a spheroidalshape (ductile cast iron). Thus the mechanical characteristics aresignificantly changed, strength isincreased and the material becomesmore ductile.

    Course of the Strain Lines:

    Cast iron with lamellar graphite (gray cast iron = GG)Cast iron with spheroidal graphite (ductile cast iron = GGG)

    Relation of the Work Lines:

    GG-ST37-GGG

    Pile ProductionThe piles are produced using-rapid per-cussion hammers. The first pipe lengthis fitted with a ram shoe and driven intothe soil. The subsequent pipe lengthsare driven into the conical couplers ofthe pile driven before.

    The final pile length will be determinedbased on the penetration resistance.

    Rm, tensile strength min. 420 N/mm2 Brinell hardness max. 230 HB

    Rp0.2, 0.2% elongation limit min. 300 N/mm2 modulus of electricity 160,000 N/mm2

    elongation at maximum load min. 10% density 7.05 g/cm3

    118

    nom. S weight

    7.5 105kg 7kg

    9.0 123kg 7kg

    10.6 142kg 7kg

    170

    nom. S weight

    9.0 186kg 10kg

    10.6 213kg 10kg

  • Applications for DYWIDAG Ductile Iron Piles

    38

    Project Sports Facility Linz, Austria +++ Client Structural analysis:Kirsch-Muchitsch & Partner +++ Owner Town of LinzDSI Services 1,200 m of 170 mm grouted DYWIDAG Ductile ironpiles; foundation of pillars 10 m.

    i

    Project Residential Building ComplexUnterrohr, Kremsmnster, Austria

    DSI Services 2,000 m of 118 mmungrouted DYWIDAG Ductile iron piles.

    i

    Project Construction Site forApproval Tests, Bischofshofen,Austria

    DSI Services ungrouted DYWIDAGDuctile iron piles

    i

    Project Budenheim near Mainz,Germany

    DSI Services Performance test forgrouted test piles 118 x 9 mm

    i

  • 40

    Addresses

    DSI Holding GmbH

    Dywidagstrasse 185609 AschheimGermanyPhone +49-89-30 90 50-200Fax +49-89-30 90 50-252E-mail: [email protected]

    RHQ Americas

    DYWIDAG-SYSTEMSINTERNATIONAL USA INC.320 Marmon DriveBolingbrook, IL 60440USAPhone +1-630-739 11 00Fax +1-630-972 96 04E-mail: [email protected]

    RHQ Europe

    DYWIDAG-SYSTEMSINTERNATIONAL GMBHSiemensstrasse 885716 UnterschleissheimGermanyPhone +49-89-30 90 50-100Fax +49-89-30 90 50-120E-mail: [email protected]

    RHQ Mining

    DYWIDAG-SYSTEMSINTERNATIONAL PTY. LTD.P.O. Box 370Charlestown NSW 2290, Australia25 Pacific HighwayBennetts Green NSW 2290Phone +61-2-49 48 90 99Fax +61-2-49 48 40 87E-mail: [email protected]

    RHQ Tunneling

    ALWAG Tunnelausbau Ges.m.b.H.Wagram 494061 PaschingAustriaPhone +43-7229-61 04 90Fax +43-7229-7 01 41E-mail: [email protected]

    Europe

    AustriaDYWIDAG-SYSTEMSINTERNATIONAL GMBHChristophorusstrasse 125061 Elsbethen/Salzburg, AustriaPhone +43-662-62 57 97Fax +43-662-62 86 72E-mail: [email protected]

    Belgium and LuxembourgDYWIDAG-SYSTEMSINTERNATIONAL N.V.Industrieweg 253190 Boortmeerbeek, BelgiumPhone +32-16-60 77 60Fax +32-16-60 77 66E-mail: [email protected]

    Croatia, Bosnia and HerzegovinaPRESS-KONObala Hrvatskognarodnog preporoda 621000 Split, CroatiaPhone +385-21-34 27 66Fax +385-21-3425 95

    Czech RepublicSM 7, A.S.Modransk 4314700 Praha 4, Czech RepublicPhone +420-2-44 46 15 40Fax +420-2-44 46 07 52E-mail: [email protected]

    DenmarkAAGE CHRISTENSEN A/SSkelmosevej 102500 Valby, DenmarkPhone +45-36-44 24 44Fax +45-36-44 20 24E-mail: [email protected]

    EstoniaSAGA GruppPeterburi tee 9011415 Tallinn, EstoniaPhone +372 601 29 34Fax +372 601 29 35E-mail: [email protected]

    FinlandTENSICON OYRattitie 17007700 Helsinki 77, FinlandPhone +358-9-35 05 99 0Fax +358-9-35 05 99 10

    FranceDYWIDAG-SYSTEMSINTERNATIONAL GMBH

    Succursale France8. rue du Grand Pr95640 Marines, FrancePhone +33-1-30 39 42 42Fax +33-1-30 39 62 72E-mail: [email protected]

    Agence de Lyon14, rue de la Prairie69100 Villeurbanne, FrancePhone +33-4-78 79 27 82Fax +33-4-78 79 01 56E-mail: [email protected]

    Agence de Marseille55, rue Louis Armand - BP 26613797 Aix-en-Provence Cedex 3,FrancePhone +33-4-42 24 56 46Fax +33-4-42 90 00 58E-mail: [email protected]

    GermanySUSPA-DSI GmbHMax-Planck-Ring 140764 Langenfeld, GermanyPhone +49-2173-79 02 0Fax +49-2173-79 02 20E-mail: [email protected]

    SUSPA-DSI GmbHGermanenstrasse 886343 Koenigsbrunn, GermanyPhone +49-8231-96 07 0Fax +49-8231-96 07 40E-mail: [email protected]

    SUSPA-DSI GmbHSchuetzenstrasse 2014641 Nauen, GermanyPhone +49-3321-44 18 32Fax +49-3321-44 18 18E-mail: [email protected]

    DYWIDAG-SYSTEMSINTERNATIONAL GMBHBusiness Unit Form Ties SystemsSchallbruch 53-5542781 Haan, GermanyPhone +49-2129-93 22 0Fax +49-2129-93 22 10E-mail: dsihaan

    @dywidag-systems.com

    United KingdomDYWIDAG-SYSTEMSINTERNATIONAL LTD.Northfield RoadSoutham, WarwickshireCV47 OFG, EnglandPhone +44-1926-81 39 80Fax +44-1926-81 38 17E-mail: [email protected]

    GreeceFor Geotechnical SystemsHELLENPLAN 18, Filolaou StreetAthens 11633, GreecePhone +30-210-752 07 53Fax +30-210-751 210 68E-mail: [email protected]

    For Post-Tensioning SystemsKostantinos Zervas 34th Sintagmatos Pezikon 5Pireas TK 18532 AthensGreecePhone +30-210-417 62 76Fax +30-210-412 21 23E-mail: [email protected]

    ItalyDYWIT SPAVia Albricci, 520122 Milano, ItalyPhone +39-02-72 00 06 77Fax +39-02-86 93 93 5E-mail: [email protected]

  • 41

    Addresses

    NetherlandsDYWIDAG-SYSTEMSINTERNATIONAL B.VVeilingweg 25301 KM ZaltbommelNetherlandsPhone +31-418-57 89 22Fax +31-418-51 30 12E-mail: [email protected]

    NorwayDYWIDAG-SYSTEMSINTERNATIONAL A/SP.O. Box 1131483 Skytta, NorwayPhone +47-67-06 15 60Fax +47-67-06 15 59E-mail: [email protected]

    PortugalDYWIDAG-SYSTEMSINTERNATIONAL GMBH (Sucursal)Alameda dos Oceanos, lote 3.15.01 DEscritrio 71990 - 197 Lisboa, PortugalPhone +351-21-892 28 90Fax +351-21-892 28 99E-mail: [email protected]

    RussiaPromstroikontrakth. 10, 3-rd Setunsky Proezd, Moscow,Russia, 119136Phone +7 095 247-90-91Fax +7 095 789-34-12E-mail: [email protected]

    SwedenSpnnProjektTallhammarsvgen 1118633 Vallentuna, SwedenPhone +46-8-51 17 51 00Fax +46-8-51 17 17 00E-mail: spannprojekt

    @beta.telenordia.se

    TurkeyDIVIGER Yapi Teknoloji A.S.Yildizposta Cd. Ayyildiz Sitesi 30/1534353 Istanbul-Gayrettepe, TurkeyPhone +90-212-234 56 12Fax +90-212-347 39 49E-mail: [email protected]

    SwitzerlandSpannStahl AGIndustriegebiet Waesseristrasse 298340 Hinwil/ZH, SwitzerlandPhone +41-1-938 97 97Fax +41-1-938 97 90E-mail: [email protected]

    SpainDYWIDAG SISTEMASCONSTRUCTIVOS, S.A.Avenida de la Industria, 4Pol. Ind. La Cantuena28947 Fuenlabrada (MADRID), SpainPhone +34-91-642 20 72Fax +34-91-642 27 10E-mail: dywidag

    @dywidag-sistemas.comwww.dywidag-sistemas.com

    Far and Middle East

    IranPADSI CO.31, Varshow St.Nejatollahi (Villa) Ave.Tehran - 15986 IranPhone +98-21-890 17 99Fax +98-21-890 53 78

    LebanonSOPREL Liban SALLiban Cable StreetHalate, LebanonPhone +961 9 44 88 60Fax +961 9 44 71 71E-mail: [email protected]

    Saudi ArabiaDYWIDAGSAUDI ARABIA CO., LTDP.O. Box 1261Jubail 31951, Kingdom of Saudi ArabiaPhone +966-3-341-63 06 / 341 63 07Fax +966-3-341-63 02E-mail: [email protected]

    United Arab Emirates, Qatar, OmanMBM23rd Street (Villa No. 28/3)Abu Dhabi - U.A.E.Phone +971-2-448 32 32Fax +971-2-448 32 36E-mail: [email protected]

    North and Central America

    USADYWIDAG-SYSTEMSINTERNATIONAL USA INC.

    Headquarter320 Marmon DriveBolingbrook, IL 60440, USAPhone +1-630-739 11 00Fax +1-630-972 96 04E-mail: [email protected]

    Business UnitPost-Tensioning & Reinforcement320 Marmon DriveBolingbrook, IL 60440, USAPhone +1-630-739 11 00Fax +1-630-972 96 04E-mail: [email protected]

    525 Wanaque AvenuePompton Lakes, NJ 07442, USAPhone +1-973-831-6560Fax +1-973-831-6503E-mail: [email protected]

    1801 N. Peyco DriveArlington, TX 76001-6704, USAPhone +1-817-465 33 33Fax +1-817-465 36 96E-mail: [email protected]

    4732 Stone Drive, Suite BTucker, GA 30084, USAPhone +1-770-491 37 90Fax +1-770-938 12 19E-mail: [email protected]

    2154 South StreetLong Beach, CA 90805, USAPhone +1-562-531 61 61Fax +1-562-531 26 67E-mail: [email protected]

    Business UnitGeotechnical Systems1263 Newark RoadToughkenamon, PA 19374, USAPhone +1-610-268-2221Fax +1-610268-3053E-mail: [email protected]

    1305 S. Central AveUnit HKent, WA 98032, USAPhone +1-253-859-9995Fax +1-253-859-9119E-mail : [email protected]

    320 Marmon DriveBolingbrook, IL 60440, USAPhone +1-630-739 11 00Fax +1-630-972 96 04E-mail: [email protected]

    525 Wanaque AvenuePompton Lakes, NJ 07442, USAPhone +1-973-831-6560Fax +1-973-831-6503E-mail: [email protected]

    1801 N. Peyco DriveArlington, TX 76001-6704, USAPhone +1-817-465 33 33Fax +1-817-465 36 96E-mail: [email protected]

    4732 Stone Drive, Suite BTucker, GA 30084, USAPhone +1-770-491 37 90Fax +1-770-938 12 19E-mail: [email protected]

    2154 South StreetLong Beach, CA 90805, USAPhone +1-562-531 61 61Fax +1-562-531 3266E-mail: [email protected]

    Business UnitMonostrand2154 South StreetLong Beach, CA 90805, USAPhone +1-562-531 61 61Fax +1-562-531 2667E-mail: [email protected]

    320 Marmon DriveBolingbrook, IL 60440, USAPhone +1-630-739 11 00Fax +1-630-972 96 04E-mail: [email protected]

    525 Wanaque AvenuePompton Lakes, NJ 07442, USAPhone +1-973-831-6560Fax +1-973-831-6503E-mail: [email protected]

    1801 N. Peyco DriveArlington, TX 76001-6704, USAPhone +1-817-465 33 33Fax +1-817-465 36 96E-mail: [email protected]

    10060 N.W. 53rd StreetSunrise, Florida 33351Phone +1-954-318-1105Fax +1-954-318-1107E-mail: [email protected]

  • 42

    Addresses

    Business UnitForm Tie Systems2154 South StreetLong Beach, CA 90805, USAPhone +1-562-531 6161Fax +1-562-531 2667E-mail: [email protected]

    CanadaDYWIDAG-SYSTEMSINTERNATIONALCANADA LTD.

    Eastern Division37 Cardico DriveGormley, ON L0H1G0CanadaPhone +1-905-888-8988 Fax +1-905-888-8987E-mail: [email protected]

    Quebec OfficeSt. BrunoQuebec, ON, J3V 6E2CanadaPhone +1-450-653-0935 Fax +1-450-653-0977E-mail: [email protected]

    Western DivisionSuite 10319433 96th Av.Surrey, BC V4N4C4CanadaPhone +1-604-888-8818 Fax +1-604-888-5008E-mail: [email protected]

    Calgary Office#204, 2816 - 21 Street N.E.Calgary, Alberta T2E 6Z2CanadaPhone +1-403-291-4414 Fax +1-403-250-5221E-mail: [email protected]

    Central America

    Headquarter525 Wanaque AvenuePompton Lakes, NJ 07442, USAPhone +1-973-831-6560Fax +1-973-831-6503E-mail: [email protected]

    Costa RicaSUPERBA S.A.Pozuelo 100M Norte y 25 OesteLa Uruca, San Jos, Costa RicaPhone +50-6-255 10 44Fax +50-6-255 11 10E-mail: [email protected]

    GuatemalaPreforzados y Construcciones S.A.5 Av.6-39zona 14 Las PlazasGuatemala 01014Phone + 50-2-631-4882/4Fax + 50-2-368-3531E-Mail: [email protected]

    HondurasLazarus & Lazarus200 Mts. Al Este de Posta de PeaieBoulevard del SurChamalecon CortesPhone + 50-4565-8882Fax + 50-4565-8624E-Mail: [email protected]

    MexicoDSI Mexico, S.A. DE C.V.Calle Tecuitapan #6Col. Las Palmas CP 62050Cuernavaca, Morelos, MexicoIndustria del Vestido # 2153Zapopan, Jalisco - Mexico 45132Phone +52-7773-12 64 96Fax +52-7773-14 14 79E-mail: [email protected]

    South America

    Argentina-Uruguay-ParaguayCompaa Sudamericana dePostensado CSP-DSI Argentina Av. Leandro N. Alem 661 7 Piso Of.171001 Buenos AiresArgentinaPhone +54-11-43 12-44 34 / 35Fax +54-11-43 12-11 43E-mail: [email protected]

    BrazilPROTENDIDOS DYWIDAG LTDA.Rua Isi, 150-cj4104542-060 - So Paulo - SPBrazilPhone +55-11-2131-3700Fax +55-11-2131-3700E-mail: [email protected]

    ChileCompaa Sudamericana dePostensadoCSP-DSI ChileAv. Apoquindo 3076 Piso 6Santiago de Chile, ChilePhone +56-2-952 0679Fax +56-2-952 0681E-mail: [email protected]

    Sr.Miguel MandryE.Marquina 3937 of.608VitacuraSantiago de Chile, ChilePhone +56-2-2074585Fax +56-45-718-336E-mail: [email protected]

    ColombiaTENSAR LTDA.Transversal 70-B No. 4-36Santa F de Bogot, ColombiaPhone +57-1-262 66 85Fax +57-1-261 28 82E-mail: [email protected]

    PeruSAMAYCA INGENIEROS S.A.C.Av. A. Benavides 245 Of.604-605Lima, PerPhone +51-1-446 33 56Fax +51-1-445 66 28E-mail: [email protected]

    VenezuelaPOSTENSADO V.N. INDUSTRIAL DEVENEZUELA S.A. (PIV)Quinta IMOLA6ta. transv., entre 2da y 3ra AV.Urb. Los Palos GrandesCaracas, VenezuelaPhone +58-212-261-8516Fax +58-212-261-2854E-mail: [email protected]

    Africa

    EgyptMISR DYWIDAG20 Haroun StreetDokki-GizaCairo, EgyptPhone +20-2-748 28 27Fax +20-2-748 62 53E-mail: [email protected]

  • 43

    Addresses

    Asia

    ChinaDYWIDAG-SYSTEMSINTERNATIONALFAR EAST LTD.Room 2306CC Wu Building302-308 Hennessy RoadWanchai, Hong KongPhone +852-2833-91 70Fax +852-2834-55 21E-mail: [email protected]

    IndonesiaPT DELTA SYSTECH INDONESIAWisma Ritra 2nd FloorJl. Wr. Buncit Raya No.6Jakarta - 12740IndonesiaPhone +62-21-797 02 89Fax +62-21-797 08 25E-mail: [email protected]

    JapanSUMITOMO ELECTRIC INDUSTRIES LTD.Special Steel Wire Division3-12 Motoakasaka1-chome Minato-kuTokyo, 107 JapanPhone +81-3-34 23 51 31Fax +81-3-34 23 50 01E-mail: [email protected]

    KoreaDYWIDAG-SYSTEMS KOREA CO.LTD.5th Floor, Spring Morning B/D249-2 Yangjae-dong Seocho-kuSeoul 137-130 KoreaPhone +82-2-34 72 01 41Fax +82-2-34 72 01 45E-mail: [email protected]

    SingaporeUTRACO STRUCTURALSYSTEMS PTE LTD7E Pioneer Sector 1Singapore 628446Phone +65-64153078Fax +65-68631928E-mail: [email protected]

    TaiwanDYWITECH Co., Ltd.13th Fl.-3, No. 163, Sec. 1, KeelungRoadTaipei 110Taiwan, R.O.C.Phone +886-2-27 48 10 76Fax +886-2-27 47 05 76E-mail: [email protected]

    ThailandD-Tech Postten Co., Ltd.1350/136-13710/F, Thairon Tower BuildingPattanakarn RoadSuan Luang DistrictSuan LuangBangkok 10250ThailandPhone +66-02-719-51 67Fax +66-02-719-53 91E-mail: [email protected]

    RHQ Mining

    AustraliaDYWIDAG-SYSTEMSINTERNATIONAL PTY. LTD.

    Eastern Australia25 Pacific HighwayBennetts Green NSW 2290AustraliaPhone +61-2-49 48 90 99Fax +61-2-49 48 43 15E-mail: [email protected]

    Western Australia170 Railway ParadeBassendean WA 6054AustraliaPhone +61-8-94 49 83 33Fax +61-8-94 49 83 25E-mail: [email protected]

    Mount Isa199 Camooweal StreetMt Isa QLD 4825AustraliaPhone +61-7-47 43 42 44Fax +61-7-47 43 27 11E-mail: [email protected]

    Emerald3 McKenzie StreetEmerald QLD 4720AustraliaPhone +61-7-49 82 06 02Fax +61-7-49 87 42 58E-mail: [email protected]

    KalgoorlieLot 15 Cunningham RoadKalgoorlie WA 6430AustraliaPhone +61-8-90 91 19 93Fax +61-8-90 91 41 72E-mail: [email protected]

    South AfricaDYWIDAG-SYSTEMSINTERNATIONAL PTY. LTDP.O. Box 60 59Homestead 141230 North Reef RoadElandsfonteinJohannesburgGauteng South AfricaPhone +27-11 878 68 00Fax +27-11 878 68 11E-mail: [email protected]

    DSI-MandirkP.O. Box 60 59Homestead 141230 North Reef RoadElandsfonteinJohannesburgGauteng South AfricaPhone +27-11 878 68 00Fax +27-11 878 68 11E-mail: [email protected]

    AmericaDSI-Thiessen Mining Division1638 Alberta AvenueSaskatoon, SK S7K 1R6Phone +1-306-244-6244Fax +1-306-931-3481E-mail: [email protected]

    DSI-Thiessen Mining Division5492 275th StreetLangley, BC V4W 3X7Phone +1-604-857-1500Fax +1-604-857-1580E-mail: [email protected]

    DSI Ground Support560 Notre Dame AvenueSudbury, ON P3C 5L2Phone +1-705-674-5844Fax +1-705-674-5867E-mail: [email protected]

    DSI Ground Control1150 Kelly Lake RoadSudbury, ON P3E 5P4, CanadaPhone +1-705-673-3020Fax +1-705-673-5946E-mail: [email protected]

    DSI-Stewart154, 14th Ave.Rouyn Noranda, PQ J9X 2J5CanadaPhone +1-819-762-0901Fax +1-819-797-1367E-mail: [email protected]

    DSI Ground Support3900 West 700 SouthSalt Lake City, UT 84104, USAPhone +1-801-973-7169Fax +1-801-973-7172E-mail: [email protected]

    DSI Ground Support214 Railroad StreetWinber, PA 15963Phone +1-814-467-7030Fax +1-814-467-7031E-mail: [email protected]

    DSI Ground Support4200 Highway 22 EastSuite 7 Bay #8Blairsville, Pa. 15717Phone +1-724-676-2000Fax +1-724-676-2100E-mail: [email protected]

    MexicoDSI Anclas Mineras S.A. de C.V.Industria del Vestido # 2153Zapopan, Jalisco - Mexico 45132Phone +52-33-3656-5588Fax +52-33-3656-5598E-mail: [email protected]

    RHQ Tunneling

    EuropeALWAG Tunnelausbau Ges.m.b.H.Wagram 494061 PaschingAustriaPhone +43-7229-61 04 90Fax +43-7229-7 01 41E-mail: [email protected]

    AmericaAMERICAN COMMERCIALINCORPORATEDCorporate Office and Bristol Plant200 Bob Morrison BoulevardBristol, VA 24201-3810USAPhone +1-276-466-2743Fax +1-276-669-0940E-mail: cswindall@

    americancommercial.comwww.americancommercial.com

    AustraliaDYWIDAG-SYSTEMS INTERNATIONAL PTY. LTD.Eastern Australia25 Pacific HighwayBennetts Green NSW 2290AustraliaPhone +61-2-49 48 90 99Fax +61-2-49 48 43 15E-mail: [email protected]

  • A R G E N T I N A

    A U S T R A L I A

    A U S T R I A

    B E L G I U M

    B O S N I A A N D H E R Z E G O V I N A

    B R A Z I L

    C A N A D A

    C H I L E

    C H I N A

    C O L O M B I A

    C O S TA R I C A

    C R O AT I A

    C Z E C H R E P U B L I C

    D E N M A R K

    E G Y P T

    E S T O N I A

    F I N L A N D

    F R A N C E

    G E R M A N Y

    G R E AT B R I TA I N

    G R E E C E

    G U AT E M A L A

    H O N D U R A S

    H O N G K O N G

    I N D O N E S I A

    I R A N

    I TA LY

    J A P A N

    K O R E A

    L E B A N O N

    L U X E M B O U R G

    M A L A Y S I A

    M E X I C O

    N E T H E R L A N D S

    N O R W A Y

    O M A N

    P A N A M A

    P A R A G U A Y

    P E R U

    P O L A N D

    P O R T U G A L

    Q ATA R

    R U S S I A

    S A U D I A R A B I A

    S I N G A P O R E

    S O U T H A F R I C A

    S P A I N

    S W E D E N

    S W I T Z E R L A N D

    TA I W A N

    T H A I L A N D

    T U R K E Y

    U N I T E D A R A B E M I R AT E S

    U R U G U A Y

    U S A

    V E N E Z U E L A

    w w w . d y w i d a g - s y s t e m s . c o m 0417

    0-1/

    11.0

    6-10

    .000

    go

    hoD

    etai

    ls, d

    imen

    sion

    s an

    d sy

    stem

    des

    igns

    are

    sub

    ject

    to

    chan

    ge w

    ithou

    t no

    tice.DSI Holding GmbH

    Dywidagstrasse 185609 AschheimGermanyPhone +49-89-30 90 50-200Fax +49-89-30 90 50-252E-mail: [email protected]

    RHQ Americas

    DYWIDAG-SYSTEMSINTERNATIONAL USA INC.320 Marmon DriveBolingbrook, IL 60440USAPhone +1-630-739 11 00Fax +1-630-972 96 04E-mail: [email protected]

    RHQ Europe

    DYWIDAG-SYSTEMSINTERNATIONAL GMBHSiemensstrasse 885716 UnterschleissheimGermanyPhone +49-89-30 90 50-100Fax +49-89-30 90 50-120E-mail: [email protected]

    RHQ Mining

    DYWIDAG-SYSTEMSINTERNATIONAL PTY. LTD.P.O. Box 370Charlestown NSW 2290, Australia25 Pacific HighwayBennetts Green NSW 2290Phone +61-2-49 48 90 99Fax +61-2-49 48 40 87E-mail: [email protected]

    RHQ Tunneling

    ALWAG Tunnelausbau Ges.m.b.H.Wagram 494061 PaschingAustriaPhone +43-7229-61 04 90Fax +43-7229-7 01 41E-mail: [email protected]

    DYWIDAG Geotechnical Product RangeContentsDYWIDAG Threadbar AnchorsRemovable Threadbar AnchorsDYWIDAG Threadbar Anchors EquipmentApplications for DYWIDAG Threadbar AnchorsDYWIDAG Strand Anchor SystemDYWIDAG Strand Anchors acc. to EN 1537Temporary Strand AnchorsDYWIDAG Strand Anchors EquipmentApplications for DYWIDAG Strand Anchor SystemDYWIDAG Soil NailsApplications for DYWIDAG Soil NailsDYWIDAG Rock BoltsDYWIDAG Rock Bolts AnchoragesDYWIDAG Rock Bolts AccessoriesDYWIDAG Rock Bolts Installation and Stressing EquipmentApplications for DYWIDAG Rock BoltsDYWI Drill Hollow Bar SystemApplications for DYWI Drill Hollow Bar SystemGEWI PileGEWI Pile - EquipmentApplications for GEWI PileDYWIDAG Ductile Iron PilesApplications for DYWIDAG Ductile Iron PilesAddresses