Drought Operations
Water Operations Department
August 11, 2015
Water Supply Briefing
• Current Water Supply
•WY15 Drought Operations
•Drought Operations Plan
• Future Water Supply
2
Ernst Schuetz
Current Water Supply Reservoir Storage
3
Total System Storage
365,000 acre-feet (59% of avg, 48% of capacity)
Aug 9, 2015 Average Capacity
WY15 Drought Operations Freeport Regional Water Project
• Coordinated operation – Sacramento County Water Agency
– U.S. Bureau of Reclamation
• 90 million gallons per day
• Plan to deliver 40 TAF of supplemental supply in WY15
4
• State Water Resources Control Board notice posted on April 23, 2015
• Curtailment of post-1914 appropriative right diversions from San Joaquin River watersheds
• Reduced EBMUD storage by 24,000 acre-feet
• Reduced cold water storage for fish habitat preservation
5
WY15 Drought Operations Mokelumne River Curtailment
WY15 Drought Operations Curtailment
6
24,000 AF
June 30
7
*Projected storage on September 30, 2015
WY15 Drought Operations Total System Storage Projections
Runoff
Total System Storage*
Without CVP & Transfers
With CVP & Transfers minus
Gainsharing
215 TAF 300 TAF 330 TAF
8
WY15 Drought Operations Estimated Supplemental Water Supplies
Supply
Estimated Quantity (AF)
Total Cumulative
Quantity (AF)
WY2
015 1. CVP Contract – 25% Allocation 33,250 33,250
2. Placer County Water Agency Transfer 7,000 40,250
WY2
016
3. Placer County Water Agency Transfer 5,000 45,250
4. Glenn-Colusa Irrigation District Transfer 0 45,250
5. Sycamore Mutual Water Company Transfer 5,000 50,250
6. Reclamation District 1004 Transfer 8,250 58,500
WY15 Drought Operations Supplemental Supply – Transmission
SACRAMENTO RIVER
MOKELUMNE RIVER
9
10
WY15 Drought Operations Drought Operations Constraints
• Operate water system to meet competing priorities • Manage water system for water supply • Manage water system to comply with Joint Settlement
Agreement requirements for cold water management • Manage reservoirs for water quality
• Taste and Odor Challenges
• Seasonal algae blooms in terminal reservoirs • Significant change in volume in Pardee Reservoir
• Facility issues
• Reverse flows in the Sacramento River • Maintenance and repairs
WY15 Drought Operations Supplemental Supply – Treatment & Distribution
•Deliver water to San Pablo and USL Reservoirs
•Maximize Sobrante and USL Water Treatment Plant production
•Meet all drinking water standards
11
WY15 Drought Operations Treatment Constraints
• Taste and Odor events happen more frequently and are more severe during drought
• Warm weather and poor water quality can lead to algal blooms
• Most of the time, the ozone systems at the treatment plants can handle it
• Increased geosmin levels require reductions in water treatment plant production
12
WY15 Drought Operations Supplemental Supply – Treatment & Distribution
13
0
50
100
150
200
250
300
350
400
450
500Ja
n-09
Jul-0
9
Jan-
10
Jul-1
0
Jan-
11
Jul-1
1
Jan-
12
Jul-1
2
Jan-
13
Jul-1
3
Jan-
14
Jul-1
4
Jan-
15
Jul-1
5
geos
min
, ng/
L
Raw Water Geosmin, Sobrante Water Treatment Plant
Typical ozone dose is effective up to 50 ng/L.>50 ng/L, extra measures are needed
Peroxide system added
Drought Operations Plan Taste and Odor Management
Short-term
• Ongoing monitoring program
• Adjust chemical doses at plants
• Change inlet gates
• Decrease plant production
Long-term
• Upgrading the ozone systems
• Installing Hypolimnetic Oxygenation System in San Pablo Reservoir
14
Drought Operations Plan Taste and Odor Management - Continued
As water levels get lower, options become limited
• Algae live near the surface (sunlight)
• Inlet gate changes are an option when water levels are high enough
• Two inlet gates are needed to lower Pardee Reservoir elevation
• No ozone at the Mokelumne Aqueduct treatment plants (Walnut Creek, Lafayette, Orinda)
15
Drought Operations Plan Pardee Reservoir Schematic Cross-Section
16
Unit #1 & 2 ~EL375’
Unit #3 & Sluice ~EL260’
Pardee Tower (Mokelumne Aqueduct
Intake)
EL550’ Gate
EL520’ Gate
EL490’ Gate EL460’ Gate
(Not to Scale)
Spillway Crest EL567.7’
MOKELUMNE RIVER
PARDEE DAM
PARDEE RESERVOIR
Drought Operations Plan Pardee Reservoir Schematic Cross-Section
17
Unit #1 & 2 ~EL375’
Unit #3 & Sluice ~EL260’
Pardee Tower (Mokelumne Aqueduct
Intake)
EL550’ Gate
EL520’ Gate
EL490’ Gate EL460’ Gate
(Not to Scale)
Spillway Crest EL567.7’
MOKELUMNE RIVER
PARDEE DAM
PARDEE RESERVOIR
Drought Operations Plan WY15 Drought Actions
FREEPORT
CONSERVATION RECYCLING
INTERTIES
Drought Operations Plan Water Supply Management Program (WSMP) 2040
• Identifies and recommends solutions to meet dry-year water needs
• Solution includes conservation, recycling and supplemental supply
19 Year 1 Year 2 Year 3
35 TAF
65 TAF 65 TAF
165 TAF of CVP water over three consecutive years
Drought Operations Plan Drought Stages
Stage 0 1 2 3 4
Demand Reduction
Voluntary 0-15%
Voluntary 0-15%
Mandatory up to 15%
Mandatory >=15%
Supplemental Supplies
Up to 35,000 acre feet
35,000-65,000 acre feet
> 65,000 acre feet
Rates and Charges
Normal rates
Normal rates
Normal rates
+ 8%
drought surcharge
Normal rates
+ 20%
drought surcharge
supersaver
recognition*
excessive use penalty*
Normal rates
+ 25%
drought surcharge
supersaver
recognition*
excessive use penalty*
*Supersaver recognition and excessive use penalty not subject to Prop 218 requirements. 20
Drought Operations Plan Planning for 2016 and 2017
Stage 4 Drought
• Making system improvements to bring in more supplemental supplies from transfers (increase from 65 to 100 TAF)
• Identifying options for future water transfers
• Accelerating improvements to reduce taste and odor issues
• Working collaboratively with the Bureau of Reclamation and our partners
21
Drought Operations Plan Supplemental Supply – Transmission
SACRAMENTO RIVER
MOKELUMNE RIVER
90MGD
35MGD
35MGD 20MGD
10MGD 15MGD
100MGD
22
Drought Operations Plan Supplemental Supply Rate of Diversion Improvements
Facility Rate of Diversion (MGD) (TAF)
Briones PP 15 8
Walnut Creek WTP 10 to 20 11
San Pablo WTP 20 to 25 14
Sobrante WTP 35 36
USL WTP 35 36
Total 105 23
Drought Operations Plan San Pablo WTP - Improvements
Project Cost Complete
Repair and Rehabilitate WTP $3.5M Oct. 2015
24
Drought Operations Plan New Treatment Test of FSCC Water
• Current Permit specifies conventional water treatment, consistent with plants taking supply from Sacramento river
• Special monitoring characterized FSCC water
quality in 2012, and continues through 2015 • New water treatment study at pilot scale started
in 2014 and finished in 2015 • May result in expansion of treatment plant
options and ability to take full allocation of supplemental supply
• Discussions with DDW underway
25
Drought Operations Plan Sobrante WTP - Improvements
Project Cost Complete Reason
Replace Ozone System $12M Mid- 2017 - System Upgrade - Maintain Higher Plant
Production
San Pablo Res. Hypolimnetic Oxygenation System (HOS)
$3.7M Mid- 2018 - Taste and Odor Control - Maintain Higher Plant
Production
26
Drought Operations Plan Upper San Leandro WTP
Project Cost Complete Reason
Replace Trac-Vac Solids Removal System
$2.7M Early-2017 - System Upgrade - Maintain Higher
Plant Production
Replace Ozone System $12M Mid-2018 - System Upgrade - Maintain Higher
Plant Production
Solids Handling Improvements $2.0M Early-2018 - Reduce water waste
27
Drought Operations Plan Supplemental Supply Rate of Diversion Improvements
San Pablo WTP
Walnut Creek WTP
Briones Reservoir
Existing
20-25 MGD
10-20 MGD
15 MGD
70 MGD
28
Future Water Supply 4 Year Storage Decline
29
30 TAF Encroachment
300 TAF Deficit
330 TAF (4th lowest)
25 TAF SS 15 TAF Conservation
40 TAF SS
45 TAF Conservation 155 TAF Actions
455 TAF Deficit w/o
Actions
Future Water Supply Total System Storage – as of September 30
30
630 TAF 624 TAF
571 TAF
542 TAF
404 TAF
330 TAF
311 TAF 300 TAF
31
Future Water Supply Potential for El Nino
32
Looking Forward to a Snowy Winter in Water Year 2016!
33
Making Plans for a Dry 2016