BN LIVINGSTON 8/26/13
Page 1 of 403
Tertiary Heading Site Name & Title or Subject Date Author
13 BN/LIVINGSTON 8/26/13
13 01
13 01 01 Site Overview
13 01 01 01 Site Overview RCRA Permits
13 01 01 02 Site Overview Legal Issues
13 01 01 02 Site Overview Legal Issues Y ** Larson fax to DEQ re: Haz Waste 07/16/90 Larson
13 01 01 02 Site Overview Legal Issues Larson proposed format for Administrative Record 08/15/90 Larson
13 01 01 02 Site Overview Legal Issues Larson memo to MDHES re: Administrative record 08/15/90 Larson
13 01 01 02 Site Overview Legal Issues MDHES letter to Larson re: Administrative Record 09/18/90 DHES
13 01 01 02 Site Overview Legal Issues Y ** Larson fax to DEQ re: Draft letter to MRL/LRC 02/22/91 Larson
13 01 01 02 Site Overview Legal Issues Y ** DEQ memo re: Legal requirements 04/02/91 DEQ
13 01 01 02 Site Overview Legal Issues Y ** Response Action memo 01/02/92
13 01 01 02 Site Overview Legal Issues Y ** DHES memo re: Hazardous Waste 01/13/92 DHES
13 01 01 02 Site Overview Legal Issues 04/02/92
13 01 01 02 Site Overview Legal Issues Y ** Memo re: Attorney fees 02/15/93
13 01 01 02 Site Overview Legal Issues Y ** DEQ memo re: Attorney fees 02/22/93 DEQ
13 01 01 02 Site Overview Legal Issues Y ** DEQ internal memo re: Legal issues 08/10/94 DEQ
13 01 01 02 Site Overview Legal Issues Y ** DEQ email re: Hazardous Waste 06/17/98 DEQ
13 01 01 02 Site Overview Legal Issues Park County court papers 06/10/99 Park County
13 01 01 02 Site Overview Legal Issues DEQ Letter to BKBH re: Property Information 08/24/05 DEQ
13 01 01 02 Site Overview Legal Issues Y ** DEQ internal email re: DEQ Director meeting notes 03/09/06 DEQ
13 01 01 02 Site Overview Legal Issues Y ** DEQ internal email re: WQB-7 vs. DEQ -7 criteria 05/08/06 DEQ
Site ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Preliminary Identification & Description of Applicable Legal Requirements
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 2 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 01 02 Site Overview Legal Issues Y ** DEQ internal email re: MRL Access Agreements 06/23/06 DEQ
13 01 01 02 Site Overview Legal Issues Y 09/01/06 DEQ
13 01 01 02 Site Overview Legal Issues Y ** DEQ & BN emails re: Institutional Controls 03/05/07 DEQ
13 01 01 02 Site Overview Legal Issues Y ** DEQ internal emails re: BNLV Groundwater 04/06/07 DEQ
13 01 01 02 Site Overview Legal Issues Y ** DEQ internal email re: BN Tasks requiring legal review 12/03/07 DEQ
13 01 01 02 Site Overview Legal Issues Y 02/10/08 DEQ
13 01 01 02 Site Overview Legal Issues Y 02/12/08 DEQ
13 01 01 02 Site Overview Legal Issues Y ** DEQ & CDM emails re: Two Options for AutoCad 02/15/08 DEQ
13 01 01 02 Site Overview Legal Issues Y ** DEQ internal emails re: Consent Decree protocol 06/24/08 DEQ
13 01 01 02 Site Overview Legal Issues Y ** DEQ Memorandum 09/28/10 DEQ
13 01 01 02 Site Overview Legal Issues Y ** DEQ Memorandum 09/28/10 DEQ
13 01 01 02 Site Overview Legal Issues 10/01/10 DEQ
13 01 01 02 01 Site Overview
13 01 01 02 01 Site Overview PPA Maps
13 01 01 02 01 Site Overview DEQ/B Gregg emails re: Livingston Shops 09/08/06
13 01 01 02 01 Site Overview DEQ/B Gregg emails re: Livingston Shops 09/11/06
13 01 01 02 01 Site Overview 09/11/06
13 01 01 02 01 Site Overview DEQ/M Kaster email re: Legal contacts 09/26/06
13 01 01 02 01 Site Overview DEQ/M Kaster emails re: Livingston 9/26-9/27/06
13 01 01 02 01 Site Overview DEQ/M Kaster emails re: Livingston Map 9/26-9/28/06
13 01 01 02 01 Site Overview DEQ/B Gregg emails re: BNLSC Annual Monitoring Report 10/04/06
13 01 01 02 01 Site Overview Y ** DEQ internal email re: Potential Purchaser 10/17/06 DEQ internal
13 01 01 02 01 Site Overview DEQ/M Kaster email re: BN Livingston 10/17/06
Site-Wide Information
Site-Wide Information
** DEQ internal memo re: Draft Legal Analysis of Version of CECRA Applicable to Livingston & Mission Wye
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
** DEQ internal email re: Consent to use computer generated Information
Site-Wide Information
** DEQ internal & K/J emails re: Conference call – K/J’s claim of copyright
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ Legal/Haque-Hausrath email to B Summerville re: Jurisdiction
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
Communication Summary – DEQ/B Gregg & Judy Jackson re: ENSR and Empire Building Materials
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
BN LIVINGSTON 8/26/13
Page 3 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 01 02 01 Site Overview E Meece letter to DEQ Director re: Empire’s request 10/18/06 E Meece
13 01 01 02 01 Site Overview Y 10/26/06 DEQ internal
13 01 01 02 01 Site Overview Y ** DEQ internal email re: Prospective Purchaser Agreement 10/26/06 DEQ internal
13 01 01 02 01 Site Overview DEQ internal email re: PPA at BNLV 10/26/06 DEQ internal
13 01 01 02 01 Site Overview Y ** DEQ internal email re: BN Livingston PPA with Empire 10/30/06 DEQ internal
13 01 01 02 01 Site Overview Y 10/31/06 DEQ Legal
13 01 01 02 01 Site Overview DEQ internal email with Director’s Office letter to E Meece 10/31/06 DEQ internal
13 01 01 02 01 Site Overview Y ** DEQ internal email re: PPA 11/0/06 DEQ internal
13 01 01 02 01 Site Overview DEQ/B Gregg emails re: BN LSC wells 11/01/06
13 01 01 02 01 Site Overview DEQ Letter to E Meece re: Prospective Purchaser 11/02/06 DEQ
13 01 01 02 01 Site Overview DEQ internal email re: CDM PPA activities 11/03/06 DEQ internal
13 01 01 02 01 Site Overview DEQ fax to M Kaster – Prospective Purchaser Agreement 11/06/06 DEQ
13 01 01 02 01 Site Overview DEQ email to M Kaster re: Prospective Purchaser Agreement 11/08/06 DEQ
13 01 01 02 01 Site Overview DEQ and P Cote emails re: BN Brownfield 11/7-11/24/06
13 01 01 02 01 Site Overview DEQ & M Kaster emails re: Prospective Purchaser Agreement 11/8-12/15/06
13 01 01 02 01 Site Overview DEQ internal email re: PPA Update 10/24/07 DEQ internal
13 01 01 02 01 Site Overview DEQ & Empire emails re: Meeting 1/3-1/4/08
13 01 01 02 01 Site Overview Y ** DEQ internal meeting re: BNLV PPA meeting/notes 01/09/08 DEQ internal
13 01 01 02 01 Site Overview DEQ/MBL/Empire Meeting Notes 01/15/08
13 01 01 02 01 Site Overview 11/09/10
13 01 01 02 01 Site Overview 11/09/10 DEQ Legal/ Kirley
13 01 01 02 01 Site Overview 07/10/13 DEQ/Reynolds
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
** DEQ internal email re: Prospective Purchaser Agreement (PPA)
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
** DEQ Legal to DEQ Director Opper re: Prospective Purchaser Agreement
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
Site-Wide Information
Prospective Purchase Agreements
DEQ Legal/Haque-Hausrath internal email to Reynolds re: Phone log with B Summerville
DEQ Legal/ Haque-Hausrath
Site-Wide Information
Prospective Purchase Agreements
DEQ Legal/Kirley email to B Summerville re: Attachment – EPA Model PPA & copy of DEQ agreement with KRY
Site-Wide Information
Prospective Purchase Agreements
DEQ/Reynolds email to DEQ/Haque-Hausrath re: DEQ documentation of Karl Swanson call
BN LIVINGSTON 8/26/13
Page 4 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 01 03 Site Overview UIC Permits
13 01 01 04 Site Overview
13 01 01 05 Site Overview Air Quality Regulations
13 01 01 05 Site Overview Air Quality Regulations MDHES internal memo re: Air quality regulations 03/26/91 MDHES
13 01 01 05 Site Overview Air Quality Regulations Envirocon letter to MDHES re: Allowable air emissions 05/16/91 Envirocon
13 01 01 05 Site Overview Air Quality Regulations MDHES letter to Envirocon re: Allowable air emissions 05/28/91 MDHES
13 01 01 06 Site Overview
13 01 02
13 01 02 01 PRP Information PRP Search Reports
13 01 02 01 PRP Information PRP Search Reports 10/15/92
13 01 03
13 01 03 01 Site Investigation
13 01 03 01 Site Investigation Site History Report Livingston Montana Fueling Facility 06/01/87 ReTec
13 01 03 01 Site Investigation Monthly Progress Reports 06/09/05
13 01 03 01 Site Investigation Environmental Site Audit Report 01/01/89 Envirocom
13 01 03 01 Site Investigation Analytical Results Report BN-Livingston Shop Complex 11/10/89
13 01 03 01 Site Investigation 05/11/90
13 01 03 02
13 01 03 02 Analytical Results Report 11/01/89
13 01 03 02 10/01/91
13 01 03 02 Draft Analytical Results Report 03/18/92 URS
13 01 03 02 Draft Analytical Results Report Appendix C-Data Packages 03/18/92 URS
Site-Wide Information
Site-Wide Information
Water Use Permits/Landfarm & MPDES Permits
1158/ 07J602
Site-Wide Information
1158/ 07J602
Site-Wide Information
1158/ 07J602
Site-Wide Information
1158/ 07J602
Site-Wide Information
Site-Wide Information
Ranking sheets & Data base forms
Site-Wide Information
PRP Information
1158/ 07J602
Site-Wide Information
Site-Wide Information
Potentially Responsible Parties: Adjacent to the Livingston Rail Yard, Livingston, MT
Historical Research Associates
Site-Wide Information
Pre-Remedial Activities
999/ 45A403
Site-Wide Information
Pre-Remedial Activities
999/ 45A404
Site-Wide Information
Pre-Remedial Activities
999/ 45A405
Site-Wide Information
Pre-Remedial Activities
999/ 45A406
Site-Wide Information
Pre-Remedial Activities
999/ 45A407
Site-Wide Information
Pre-Remedial Activities
Ecology and Environment
999/ 45A408
Site-Wide Information
Pre-Remedial Activities
Final Work Plan for Burlington Northern Livingston Shop Complex
Ecology and Environment
999/ 45A409
Site-Wide Information
Pre-Remedial Activities
Sampling and Analytical Data
999/ 45A410
Site-Wide Information
Pre-Remedial Activities
Sampling and Analytical Data
Ecology and Environment
999/ 45A411
Site-Wide Information
Pre-Remedial Activities
Sampling and Analytical Data
Field Activities Report Burlington Northern-Livingston Shop Complex
Ecology and Environment
999/ 45A412
Site-Wide Information
Pre-Remedial Activities
Sampling and Analytical Data
999/ 45A413
Site-Wide Information
Pre-Remedial Activities
Sampling and Analytical Data
BN LIVINGSTON 8/26/13
Page 5 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 03 02 Analytical Results Report 04/30/92 URS
13 01 03 02 07/28/06
13 01 03 02 01/05/07
13 01 03 03 PA/SI
13 01 03 03 PA/SI CD/Order 10/11/07
13 01 03 04 Hazard Ranking System
13 01 03 05
13 01 03 05 Y ** DEQ memo re: Interview w/Alfred Jacobsen 06/17/88
13 01 04 Correspondence
13 01 04 Correspondence 5/31-6/1/2006
13 01 04 Correspondence DEQ/Talgo emails re: Manway(s) 06/06/06
13 01 04 Correspondence 06/07/06 KJ
13 01 04 Correspondence 06/07/06 KJ
13 01 04 Correspondence DEQ/MRL emails re: Meeting on 7/5/06 6/29-7/5/06
13 01 04 Correspondence Iowa DNR email to DEQ re: BNSF railroad site in Iowa 07/13/06 Iowa DNR
13 01 04 01 Correspondence
13 01 04 01 Correspondence State DEQ Director letter to BNSF 12/06/05 DEQ Director
13 01 04 01 Correspondence State DEQ Director letter to Governor 03/15/06 DEQ Director
13 01 04 01 Correspondence State DEQ internal email re: Draft Implementation letter 03/21/06 DEQ internal
13 01 04 01 Correspondence State DEQ internal email re: Draft Implementation letter 04/03/06 DEQ internal
13 01 04 01 Correspondence State 04/06/06 MT Legislature
13 01 04 01 Correspondence State DEQ Director letter to M Stehly re: DEQ approach 04/17/06 DEQ Director
999/ 45A414
Site-Wide Information
Pre-Remedial Activities
Sampling and Analytical Data
999/ 45A415
Site-Wide Information
Pre-Remedial Activities
Sampling and Analytical Data
Preliminary Analytical results – 6/06 Semiannual GW Monitoring Event
999/ 45A416
Site-Wide Information
Pre-Remedial Activities
Sampling and Analytical Data
Preliminary Analytical results – 11/06 Semiannual GW Monitoring Event
999/ 45A417
Site-Wide Information
Pre-Remedial Activities
999/ 45A418
Site-Wide Information
Pre-Remedial Activities
999/ 45A419
Site-Wide Information
Pre-Remedial Activities
1000/ 45A406
Site-Wide Information
Pre-Remedial Activities
History (4 folders, 10/86-10/91)
Site-Wide Information
Pre-Remedial Activities
Site-Wide Information
Site-Wide Information
DEQ/MRL/Talgo/CDM emails re: Meeting to discuss free product recovery and bioventing plans (
Site-Wide Information
Site-Wide Information
K/J Letter to MRL re: Notice of environmental investigation activity
Site-Wide Information
K/J Letter to Talgo re: Notice of environmental investigation activity
Site-Wide Information
Site-Wide Information
Site-Wide Information
State (Documents dated before 12/6/05 are not itemized)
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Montana Legislature Fiscal letter to Representative Sinrud re: Status Implementation Funding - Livingston
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 6 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 04 01 Correspondence State Y ** DEQ internal email re: Project Officer 04/24/06 DEQ internal
13 01 04 01 Correspondence State BN90 floppy disk
13 01 04 01 Correspondence State DEQ internal email re: RTI change of address 05/05/06 DEQ internal
13 01 04 01 Correspondence State DEQ internal email re: BN Livingston 06/15/06 DEQ internal
13 01 04 01 Correspondence State Site Summary Report 06/21/06 DEQ
13 01 04 01 Correspondence State DEQ internal email re: Governor visit 06/21/06 DEQ internal
13 01 04 01 Correspondence State Err:509 06/22/06 DEQ internal
13 01 04 01 Correspondence State 06/23/06
13 01 04 01 Correspondence State DEQ internal email re: Summary sheet 07/11/06 DEQ internal
13 01 04 01 Correspondence State 07/21/06 DEQ internal
13 01 04 01 Correspondence State DEQ Director/Project Officer emails re: Costs and schedules 7/21-7/26/06 DEQ internal
13 01 04 01 Correspondence State DEQ internal email re: Staging BN work 8/3-8/4/06 DEQ internal
13 01 04 01 Correspondence State DEQ internal email re: Staging BN work 8/3-8/12/06 DEQ internal
13 01 04 01 Correspondence State DEQ Director/BNSF emails re: BN Livingston 9/13-9/15/06
13 01 04 01 Correspondence State 09/24/06 DEQ internal
13 01 04 01 Correspondence State DEQ internal emails re: Field work and cell phone 09/25/06 DEQ internal
13 01 04 01 Correspondence State DEQ internal email re: Three issues 04/04/07 DEQ internal
13 01 04 01 Correspondence State DEQ internal email re: BNLV information 04/09/07 DEQ internal
13 01 04 01 Correspondence State DEQ internal emails re: Meeting with the Governor’s Office 04/17/07 DEQ internal
13 01 04 01 Correspondence State DEQ internal emails re: BNSF comments 06/06/07 DEQ internal
13 01 04 01 Correspondence State DEQ internal emails re: BN Livingston Public Meeting 07/31/07 DEQ internal
13 01 04 01 Correspondence State DEQ internal emails re: FYI on soil gas results and progress 8/24-8/27/07 DEQ internal
13 01 04 01 Correspondence State DEQ internal
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ Legal/ Vachowski internal email to Reynolds re: MRL Access Agreements
DEQ Legal/ Vachowski
Site-Wide Information
Site-Wide Information
DEQ internal memo: A Reynolds to Director Opper re: Costs & schedules for BN Livingston
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information DEQ Director/Project Officer emails re: Cover letter for RAWP
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ internal emails re: Governor’s visit and accomplishments list
10/15-10/16/07
BN LIVINGSTON 8/26/13
Page 7 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 04 01 Correspondence State DEQ Director/Project Officer emails re: Vapor intrusion 11/30-12/3/07 DEQ internal
13 01 04 01 Correspondence State DEQ internal emails re: BN Helena 10/17-12/4/07 DEQ internal
13 01 04 01 Correspondence State DEQ internal emails re: Vapor intrusion DEQ internal
13 01 04 01 Correspondence State DEQ internal emails re: MRL/BNSF Access Agreement 02/14/08 DEQ internal
13 01 04 01 Correspondence State 07/23/08 DEQ Director
13 01 04 01 Correspondence State DEQ internal emails re: Summary for Director Opper 01/16/09 DEQ internal
13 01 04 01 Correspondence State 06/15/09 DEQ Reinke
13 01 04 01 Correspondence State DEQ/Martin internal email re: BNSF sampling ay railyards 07/22/09 DEQ Martin
13 01 04 01 Correspondence State DEQ internal email re: Technical meetings 10/06/09 DEQ internal
13 01 04 01 Correspondence State DEQ internal email re: Public meeting feedback 10/23/09 DEQ internal
13 01 04 01 Correspondence State Y 11/09/09 DEQ/Legal internal
13 01 04 01 Correspondence State Y 11/10/09 DEQ/Legal internal
13 01 04 01 Correspondence State Y 06/17/10 DEQ/Legal internal
13 01 04 01 Correspondence State DEQ internal email re: Recent invoices and payments 6/3-6/7/10 DEQ internal
13 01 04 01 Correspondence State DEQ internal email re: Meeting schedules 08/03/10 DEQ internal
13 01 04 01 Correspondence State 09/29/10 Bob Ebinger
13 01 04 01 Correspondence State 02/29/12 DEQ/ Skibicki
13 01 04 02 Correspondence
13 01 04 02 Correspondence EPA DHES letter to EPA on proposed listing 10/19/94 MDHES
13 01 04 02 Correspondence EPA 08/24/95 MDHES
13 01 04 02 Correspondence EPA DEQ internal email re: EPA info request 11/28/01 DEQ internal
13 01 04 02 Correspondence EPA DEQ fax to Chiotti re: info request 12/18/01 DEQ
13 01 04 02 Correspondence EPA DEQ email to EPA re: Update 06/04/02 DEQ
Site-Wide Information
Site-Wide Information
Site-Wide Information
11/30-12/11/07
Site-Wide Information
Site-Wide Information
DEQ Director Letter to M Stehly/BNSF re: Response to letter of 6/11/08 w/Memo of 7/22/07 attached
Site-Wide Information
Site-Wide Information
DEQ/Reinke letter to DEQ/Reynolds re: Trichloroethylene question answers
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
** DEQ Legal/Haque-Hausrath internal email re: Railroad badge
Site-Wide Information
** DEQ Legal/Haque-Hausrath and Reynolds emails re: Railroad badge
Site-Wide Information
** DEQ Legal/Haque-Hausrath and Reynolds emails re: P&E language & Consent Order
Site-Wide Information
Site-Wide Information
Site-Wide Information
Phone Log – Representative for Livingston/Bob Ebinger to DEQ/Reynolds re: Unhappy constituents
Site-Wide Information
DEQ/Skibicki & BN/Smith emails re: BN not interested in Tracy's Chevron monitoring wells
Site-Wide Information
EPA (Documents dated before 11/28/2001 are not itemized)
Site-Wide Information
Site-Wide Information
DHES/Marsh letter to EPA/Wardell re: State input on National Priorities List Determinations
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 8 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 04 02 Correspondence EPA DEQ email to EPA re: Draft modified CD & SOWs 09/09/04 DEQ
13 01 04 02 Correspondence EPA EPA email to DEQ re: Draft modified CD & SOWs 09/09/04 EPA
13 01 04 02 Correspondence EPA EPA email to DEQ re: Draft modified CD & SOWs 09/13/04 EPA
13 01 04 02 Correspondence EPA DEQ letter to BKBH re: Property Information 08/24/05 EPA
13 01 04 02 Correspondence EPA DEQ/EPA emails re: Estimated NPL deletion dates 4/18-5/24/06
13 01 04 02 Correspondence EPA DEQ/EPA emails re: Estimated dates 4/18-5/25/06
13 01 04 02 Correspondence EPA 09/19/08 DEQ
13 01 04 02 Correspondence EPA 03/25/09
13 01 04 02 Correspondence EPA 03/25/09 DEQ internal
13 01 04 02 Correspondence EPA DEQ/Reynolds email to EPA/Hoogerheide re: BNLV status 12/07/09 DEQ/ Reynolds
13 01 04 02 Correspondence EPA 10/22/12
13 01 04 02 Correspondence EPA 10/23/12 EPA/ Hammer
13 01 04 02 Correspondence EPA 10/26/12 DEQ/ Reynolds
13 01 04 02 Correspondence EPA 03/05/13
13 01 04 02 Correspondence EPA CETCO/Jung & EPA/Hammer emails re: Info from EPA 06/21/13 CETCO/Jung
13 01 04 02 Correspondence EPA EPA/Hammer & DEQ/Reynolds emails re: Info to EPA 06/24/13 EPA/ Hammer
13 01 04 03 Correspondence
13 01 04 03 Correspondence PRPs Washington Corp letter to BN re: Liability 07/12/88 Washington Corp
13 01 04 03 Correspondence PRPs DEQ letter to Orze re: Facility Ownership 05/03/99 DEQ
13 01 04 03 Correspondence PRPs Phone Log - DEQ & McDonough/BN 06/19/00
13 01 04 03 Correspondence PRPs Phone Log - DEQ & Wadhams 06/19/00
13 01 04 03 Correspondence PRPs DEQ internal email re: BNSF address change 07/06/00 DEQ internal
13 01 04 03 Correspondence PRPs Phone Log - DEQ & BN/McDonough 07/06/00
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ email to EPA re: Superfund Long-Term Human Health Protection Worksheet
Site-Wide Information
DEQ & EPA emails re: BN Shop complex schedule for complete cleanup
Site-Wide Information
DEQ internal email re: BN Shop complex schedule for complete cleanup
Site-Wide Information
Site-Wide Information
EPA/Hammer & DEQ/Reynolds emails re: EPA needs site update
Site-Wide Information
EPA/Hammer email to DEQ/Reynolds re: BN Livingston Shop Complex history
Site-Wide Information
DEQ/Reynolds email to EPA/Hammer re: BN Livingston Shop Complex history
Site-Wide Information
DEQ/Reynolds & EPA/Hammer emails re: Follow-up on resident inquiry
Site-Wide Information
Site-Wide Information
Site-Wide Information
PRPs (Documents dated before 5/03/99 are not itemized)
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 9 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 04 03 Correspondence PRPs BN email to DEQ re: Address 11/21/00 BN
13 01 04 03 Correspondence PRPs DEQ internal email re: PAH Risk Assessment 07/13/01 DEQ internal
13 01 04 03 Correspondence PRPs DEQ internal email re: File Guide 07/13/01 DEQ internal
13 01 04 03 Correspondence PRPs DEQ internal email re: BN contacting John Wadhams 09/19/01 DEQ internal
13 01 04 03 Correspondence PRPs DEQ internal email re: Project contacts 09/19/01 DEQ internal
13 01 04 03 Correspondence PRPs DEQ letter to BN re: Project contact 09/20/01 DEQ
13 01 04 03 Correspondence PRPs BN Letter to DEQ re: BNSF Personnel 09/24/01 BN
13 01 04 03 Correspondence PRPs Emails re: Meeting agenda 02/13/02
13 01 04 03 Correspondence PRPs BN change of address 08/20/02 BN
13 01 04 03 Correspondence PRPs DEQ letter to BN re: Access to private property 08/04/04 DEQ
13 01 04 03 Correspondence PRPs Phone Log - Smith/BN 09/01/04
13 01 04 03 Correspondence PRPs Phone Log - Smith/BN 09/02/04
13 01 04 03 Correspondence PRPs 09/15/04 DEQ
13 01 04 03 Correspondence PRPs DEQ letter to Talgo re: Public Meeting 09/21/04 DEQ
13 01 04 03 Correspondence PRPs DEQ letter to BNSF re: Public Meeting 09/21/04 DEQ
13 01 04 03 Correspondence PRPs DEQ letter to MRL re: Reports 10/28/04 DEQ
13 01 04 03 Correspondence PRPs Phone Log - DEQ/Talgo LRC 10/19-11/1/04
13 01 04 03 Correspondence PRPs Phone Log - DEQ/Talgo LRC 02/10/05
13 01 04 03 Correspondence PRPs Y 12/01/05 DEQ
13 01 04 03 Correspondence PRPs DEQ email to Talco re: DEQ response to Talco Questions 03/02/06 DEQ
13 01 04 03 Correspondence PRPs BNSF letter to Director re: BN response to Governor 03/17/06 BN
13 01 04 03 Correspondence PRPs DEQ internal email re: Phone Log – BN/DEQ 03/23/06 DEQ internal
13 01 04 03 Correspondence PRPs BKBH email to DEQ re: Site Attorney 04/05/06 BKBH
13 01 04 03 Correspondence PRPs BKBH letter to DEQ re: Livingston Railyard 04/14/06 BKBH
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Phone Log - DEQ to BN re: Info needed for BN/Livingston/Mission Wye public meeting
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
** DEQ internal email re: Attorney correspondence – Livingston & Mission Wye
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 10 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 04 03 Correspondence PRPs BNSF Letter to DEQ Director 04/18/06 BN
13 01 04 03 Correspondence PRPs Great Falls Tribune article 04/28/06 GT Falls Tribune
13 01 04 03 Correspondence PRPs DEQ email to BN re: Project Officer change 04/21/06 DEQ
13 01 04 03 Correspondence PRPs DEQ/KJ/BNSF emails re: Meeting on 6/14 6/9-6/12/06
13 01 04 03 Correspondence PRPs DEQ letter to BKBH re: Contact with DEQ’s consultants 08/28/09 DEQ
13 01 04 03 Correspondence PRPs DEQ/BKBH emails re: Livingston file copies 09/04/09
13 01 04 03 Correspondence PRPs DEQ/BKBH emails re: Certified documents 9/8-9/9/09
13 01 04 03 Correspondence PRPs DEQ/BNSF emails re: Response to proposal 10/9-10/22/09
13 01 04 03 Correspondence PRPs DEQ meeting notes re: Planning meeting for 2010 12/22/09 DEQ
13 01 04 03 Correspondence PRPs DEQ/BNSF emails re: Definition of Sites in Montana 2/8-3/3/10
13 01 04 03 Correspondence PRPs DEQ/BNSF emails re: Agency oversight budget 3/5-3/17/10
13 01 04 03 Correspondence PRPs 06/10/10
13 01 04 03 Correspondence PRPs 06/30/10 BKBH
13 01 04 03 Correspondence PRPs 07/15/10 BKBH
13 01 04 03 Correspondence PRPs 10/05/10 BKBH
13 01 04 03 Correspondence PRPs 11/10/10
13 01 04 03 Correspondence PRPs 03/22/11 Geosyntec
13 01 04 03 Correspondence PRPs 03/25/11 BN/ Stegman
13 01 04 03 Correspondence PRPs 03/27/11 BN/ Stegman
13 01 04 03 Correspondence PRPs DEQ/Martin internal email re: Mike Kavanaugh Telephone log 04/25/11 DEQ internal
13 01 04 03 Correspondence PRPs 07/22/11 DEQ internal
13 01 04 03 Correspondence PRPs 05/30/12 BN/Smith
13 01 04 03 Correspondence PRPs 09/24/12 BN/Engdahl
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ Legal/Haque-Hausrath email to BKBH/Etchart re: 75-10-707 Request
DEQ Legal/ Haque-Hausrath
Site-Wide Information
BKBH letter to DEQ Legal/Haque-Hausrath re: BKBH response to DEQ 6/10/10 email – Recent BN purchased properties
Site-Wide Information
BKBH/Etchart letter to DEQ Legal/Haque-Hausrath re: Property acquisition in Livingston
Site-Wide Information
BKBH/Berry letter to DEQ Legal/Travis re: BKBH response to DEQ 9/3/10 letter
Site-Wide Information
DEQ Legal/Haque-Hausrath & BKBH/Cole emails re: Document request
DEQ Legal/ Haque-Hausrath
Site-Wide Information
Geosyntec/Kavanaugh email to DEQ/Martin re: Meeting followup
Site-Wide Information
BN/Stegman email to DEQ/Martin & Olsen re: Transparency issue
Site-Wide Information
BN/Stegman email to DEQ/Martin & Olsen re: Transparency issue
Site-Wide Information
Site-Wide Information
DEQ/Martin internal email re: BNSF (7/20/11) meeting followup
Site-Wide Information
BN letter to DEQ BN project managers re: Change of address for BN project manager/Smith
Site-Wide Information
BN/Engdahl to DEQ BN Project officers re: BN remediation manager contact change
BN LIVINGSTON 8/26/13
Page 11 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 04 03 Correspondence PRPs 01/24/13
13 01 04 03 Correspondence PRPs Y **Phone Log - DEQ/ Brooks/ Kuhl Re: Mtg Summary 06/06/13 DEQ/ Brooks
13 01 04 03 Correspondence PRPs Y **Phone Log - DEQ/ Brooks/ Kuhl 06/27/13 DEQ/ Brooks
13 01 04 03 Correspondence PRPs DEQ/Internal emails re: Kavanaugh meeting 07/22/13 DEQ/Martin
13 01 04 03 Correspondence PRPs DEQ/Rowsey
13 01 04 04 Correspondence
13 01 04 04 Correspondence Envirocon Phone Log - DEQ & Envirocon re: Info request 12/01/00
13 01 04 04 Correspondence Envirocon Envirocon fax to DEQ re: Phase II RI Work Plan 12/01/00 Envirocon
13 01 04 04 Correspondence Envirocon Envirocon transmittal to DEQ re: CAD files 07/12/01 Envirocon
13 01 04 04 Correspondence Envirocon Phone Log - DEQ/Envirocon 07/31/01
13 01 04 04 Correspondence Envirocon Phone Log - Envirocon to DEQ 08/13/01 Envirocon
13 01 04 04 Correspondence Envirocon Phone Log: Dan McCaffery to DEQ 10/22/01 Dan McCaffery
13 01 04 04 Correspondence Envirocon DEQ internal email re: Verbal communications 02/05/03 DEQ internal
13 01 04 05 Correspondence
13 01 04 05 Correspondence Governor letters to Tillet 04/27/00 Governor
13 01 04 05 Correspondence DEQ & PCEC meeting notes 06/07/01
13 01 04 05 Correspondence DEQ email to Billau 07/11/01 DEQ
13 01 04 05 Correspondence PCEC email to DEQ re: Site visit, office 07/31/01 PCEC
13 01 04 05 Correspondence PCEC email to DEQ re: ROD 'Ad" for media 11/09/01 PCEC
13 01 04 05 Correspondence PCEC letter to DEQ re: Progress 03/19/02 PCEC
13 01 04 05 Correspondence DEQ letter to PCEC re: Progress 06/02/02 DEQ
Site-Wide Information
BN/Smith & DEQ/Reynolds emails re: DEQ attachment - Progress reports for invoicec 4A1300108 & 4A1300110
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ/Rowsey, Shana DeBoer, Richard Coffy, DEQ/Blair & Martin, BNSF/Smith emails re: Invoice clarification
999/ 45A403
Site-Wide Information
Envirocon (Documents dated before 12/1/00 are not itemized)
999/ 45A403
Site-Wide Information
999/ 45A403
Site-Wide Information
999/ 45A403
Site-Wide Information
999/ 45A403
Site-Wide Information
999/ 45A403
Site-Wide Information
999/ 45A403
Site-Wide Information
999/ 45A403
Site-Wide Information
Site-Wide Information
Other/Public/ATSDR, etc/PCEC (Documents dated before 4/27/00 are not itemized)
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
BN LIVINGSTON 8/26/13
Page 12 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 04 05 Correspondence DEQ transmittal to RTI - various 06/13/02 DEQ
13 01 04 05 Correspondence PCEC letter to DEQ re: Progress 06/20/02 PCEC
13 01 04 05 Correspondence DEQ letter to PCEC re: Progress 08/12/02 DEQ
13 01 04 05 Correspondence Phone Log - Blicker/RTI 01/02/03
13 01 04 05 Correspondence Phone Log - Blicker/RTI 01/28/03
13 01 04 05 Correspondence DEQ email to RTI re: DEQ personnel changes 06/11/03 DEQ
13 01 04 05 Correspondence MDOT letter to DEQ re: Sampling for bridge replacement 07/11/03 MDOT
13 01 04 05 Correspondence DEQ letter to MDOT re: Sampling for bridge replacement 07/14/03 DEQ
13 01 04 05 Correspondence DEQ letter to RTI re: Public Meeting 09/21/04 DEQ
13 01 04 05 Correspondence DEQ letter to MRL re: Public Meeting 09/21/04 DEQ
13 01 04 05 Correspondence DEQ letter to PCEC re: Public Meeting 09/21/04 DEQ
13 01 04 05 Correspondence Phone Log - DEQ to Shelly/MRL 10/19/04 DEQ
13 01 04 05 Correspondence DEQ email to A Perez/Director of Talco 03/02/06 DEQ
13 01 04 05 Correspondence 03/20/06 RTI
13 01 04 05 Correspondence Y ** DEQ internal email re: Phone Log – DEQ/MRL Attorneys 03/20/06 DEQ
13 01 04 05 Correspondence RTI email to DEQ re: Questions about Task F 03/29/06 RTI
13 01 04 05 Correspondence DEQ internal email re: Attorney email 05/01/06 DEQ
13 01 04 05 Correspondence DEQ internal email re: Private well sampling request 05/02/06 DEQ
13 01 04 05 Correspondence DEQ email to Robin Saha re: EQC questions 05/04/06 DEQ
13 01 04 05 Correspondence 07/23/09 EPA
13 01 04 05 Correspondence DEQ email forward to PCEC: Decision letter PDF attachments 09/08/09 DEQ
13 01 04 05 Correspondence DEQ/PCEC/BNSF emails re: Community meeting October 22 10/3-10/11/09
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
RTI email to DEQ re: RTI questions about State Implementation
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
EPA/Quick email to DEQ re: TAG Grant Progress reports and Task I Livingston Railyard
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
BN LIVINGSTON 8/26/13
Page 13 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 04 05 Correspondence DEQ/PCEC emails re: Community meeting 10/23/09
13 01 04 05 Correspondence PCEC/Fee, R Billau & DEQ/Reynolds emails re: TAG grant 10/06/10 PCEC
13 01 04 05 Correspondence Thank you note from the Governor 02/05/11
13 01 04 05 Correspondence 04/18/12
13 01 04 05 Correspondence PCEC Newsletter Summer 2013 PCEC Newsletter
13 01 04 05 Correspondence 07/01/13
13 01 04 05 Correspondence 07/09/13
13 01 04 06 Correspondence ReTec Correspondence 3/87-9/88
13 01 04 07 Correspondence 5/89-5/98
13 01 04 07 Correspondence DHES letter to LIFE re: Health concerns 02/19/92
13 01 04 07 Correspondence Y ** DHES letter to LIFE re: Health concerns 02/19/92
13 01 04 08 Correspondence 5/89-4/90
13 01 04 09 Correspondence Olympus
13 01 04 10 Correspondence
13 01 04 10 Correspondence City of Livingston DEQ meeting with City & Depot Representatives 04/23/04 DEQ
13 01 04 10 Correspondence City of Livingston Meeting notes - Golnar, city manager 07/20/04
13 01 04 10 Correspondence City of Livingston DEQ internal email re: Brownfields money for Livingston 07/22/04 DEQ internal
13 01 04 10 Correspondence City of Livingston 09/21/04 DEQ
13 01 04 10 Correspondence City of Livingston DEQ letter to Golnar re: ATSDR Fact Sheets 10/08/04 DEQ
13 01 04 10 Correspondence City of Livingston Phone Log - Golnar 10/13/04
13 01 04 10 Correspondence City of Livingston 10/21/04 City of Livingston
13 01 04 10 Correspondence City of Livingston Phone Log - Golnar 11/01/04
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
DEQ/Reynolds & Livingston Current/Neill emails re: Public forum
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
PMRE/White & DEQ/Reynolds emails re: 103 E Chinook info request
Prudential MT Real Estate
Site-Wide Information
Other/Public/ATSDR, etc/PCEC
DEQ/Haque-Hausrath email to Julie McGarry re: Plume map info request
DEQ/Haque-Hausrath
999/ 45A403
Site-Wide Information
999/ 45A403
Site-Wide Information LIFE Correspondence
999/ 45A403
Site-Wide Information LIFE Correspondence
Site-Wide Information LIFE Correspondence
999/ 45A403
Site-Wide Information
GeoTrans, Inc Correspondence
Site-Wide Information
Site-Wide Information
City of Livingston (Documents dated before 4/23/04 are not itemized)
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ letter to Livingston City Commissioners re: Public Meeting
Site-Wide Information
Site-Wide Information
Site-Wide Information
City of Livingston letter to DEQ re: Well ordinance (w/copy of ordinance attached)
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 14 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 04 10 Correspondence City of Livingston Y 10/21/04 DEQ internal
13 01 04 10 City of Livingston BNLV Meeting notes 03/10/09 DEQ/ Reynolds
13 01 04 10 Correspondence City of Livingston DEQ/City Manager emails re: Public meeting 09/17/09
13 01 04 10 Correspondence City of Livingston DEQ internal emails re: Caller referral 12/01/09 DEQ internal
13 01 04 10 Correspondence City of Livingston DEQ & City Manager emails re: OSHA letter 11/20-12/2/09
13 01 04 10 Correspondence City of Livingston Ed Meece & DEQ/Reynolds emails re: MRL air quality testing 01/23/12
13 01 04 10 Correspondence City of Livingston 04/19/12
13 01 04 10 Correspondence City of Livingston City Manager/Meece conference call meeting notes 04/26/12
13 01 04 10 Correspondence City of Livingston 07/06/12
13 01 04 10 Correspondence City of Livingston 09/27/12 DEQ/ Reynolds
13 01 04 10 Correspondence City of Livingston 09/27/12
13 01 04 11 Correspondence
13 01 04 11 Correspondence Park County 09/15/04 DEQ
13 01 04 11 Correspondence Park County DEQ letter to Park Co. Commissioners re: Public Meeting 09/21/04 DEQ
13 01 04 11 Correspondence Park County Phone Log - DEQ to Taylor 11/01/04 DEQ
13 01 04 11 Correspondence Park County PCEC Newsletter 01/01/12 PCEC
13 01 04 11 Correspondence Park County PCEC Newsletter Summer 2012 PCEC
13 01 04 12 Correspondence Telephone Logs
13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/G Davis re: Ozone on hydrogen peroxide 02/22/06
13 01 04 12 Correspondence Telephone Logs 6/5-6/6/06
13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/KJ re: Status of projects 06/06/06
13 01 04 12 Correspondence Telephone Logs Memo to File TO 37 re: Former Envirocon employee 06/07/06
13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/D McCaffery re: Sampling on the SVE soils 06/12/06
Site-Wide Information
** DEQ internal email re: Proposed development on Talgo property
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
City Manager/Meece & MRL/Walsh emails re: Conference call scheduling
Site-Wide Information
City Manager/ Meece
Site-Wide Information
City Manager/Meece & DEQ/Reynolds emails re: Schedule on track
Site-Wide Information
DEQ/Reynolds email to City Manager/Meece re: Answeres to Meece's 9/26/12 questions
Site-Wide Information
City Manager/Meece email to DEQ/Reynolds re: Reply to DEQ/Reynolds 9/26/12 email
City Manager/ Meece
Site-Wide Information
Park County (Documents dated before 9/15/04 are not itemized)
Site-Wide Information
DEQ letter to Randy Taylor, Sanitarian re: Groundwater Reports
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information Phone Log DEQ/D Stordahl (CDM) re: Task Order 37 activities
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 15 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/T Tillet re: GW analysis on property 07/13/06
13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/J Norris re: Home at 111 Miles Lane 08/09/06
13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/J Norris re: BNLV 04/11/07
13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/D Smith re: BNLV 05/10/07
13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/J Norris re: Several issues 07/19/07
13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/D Krohne 08/29/07
13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/E Gytenbeek re: DW wells sampled 12/04/07
13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/E Jackson re: Property question 12/05/07
13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/S Briggs re: City water 12/05/07
13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/D Smith re: Future tasks 12/07/07
13 01 04 12 Correspondence Telephone Logs Y ** Phone Log Anonymous to DEQ re: Oozing tar pits on road 02/18/09
13 01 04 12 Correspondence Telephone Logs Voice mail log – J Norris/KJ 10/28/09
13 01 04 12 Correspondence Telephone Logs Phone log – L Novak/KJ 11/20/09
13 01 04 12 Correspondence Telephone Logs Phone log – L Novich/KJ 02/23/09
13 01 04 12 Correspondence Telephone Logs Phone log – J Norris/KJ 05/28/10
13 01 04 12 Correspondence Telephone Logs Phone log – DEQ/Reynolds internal email – legislator call 09/22/10 DEQ internal
13 01 04 12 Correspondence Telephone Logs 09/22/10
13 01 04 13 Correspondence 3/88-12/96
13 01 04 14 Correspondence Kennedy/Jenks
13 01 04 14 Correspondence Kennedy/Jenks K/J fax to DEQ re: June Activity Schedule 05/17/04 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J letter to DEQ re: Property Owners 08/27/04 KJ
13 01 04 14 Correspondence Kennedy/Jenks Phone Log - J Norris/K/J 09/01/04 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J email to DEQ re: Property boundaries 09/01/04 KJ
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Phone log – DEQ Legal/Haque-Hausrath internal email re: call with BN/Summerville requesting a meeting w/MRL re: Jurisdictional issues
DEQ legal/ Haque-Hausrath
999/ 45A403
Site-Wide Information
Ralph Hanks Correspondence
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 16 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 04 14 Correspondence Kennedy/Jenks K/J letter to DEQ re: Field Activities scheduled for Sept 2004 09/03/04 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J email to DEQ re: Well survey data 09/23/04 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J fax to DEQ re: October Activities 10/06/04 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J letter to DEQ re: October Activities 10/06/04 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J fax to DEQ re: November Activities 10/29/04 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J memo to DEQ re: November field schedule 10/29/04 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J fax to DEQ re: December Activities 11/29/04 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J letter to DEQ re: December Activities 11/29/04 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J fax to DEQ re: January Activities 01/03/05 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J fax/transmittal to DEQ re: February Activities 02/02/05 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J letter to DEQ re: March Activities 02/28/05 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J fax/transmittal to DEQ re: March Activities 03/01/05 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J Fax/transmittal re: April Activities 04/08/05 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal re: May activities 05/03/05 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal re: July activities 07/07/05 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal re: August Activities 08/05/04 KJ
13 01 04 14 Correspondence Kennedy/Jenks 3/2-3/4/05
13 01 04 14 Correspondence Kennedy/Jenks 04/26/05 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J fax to DEQ re: May Activities 05/03/05 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J letter/fax to DEQ re: June Activities 05/25/05 KJ
13 01 04 14 Correspondence Kennedy/Jenks DEQ email to K/J re: Document distribution 06/01/05 DEQ
13 01 04 14 Correspondence Kennedy/Jenks K/J letter/fax to DEQ re: September Activities 08/29/05 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J letter to DEQ re: January 2006 Activities 12/29/05 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J letter to DEQ re: February 2006 Activities 02/02/06 KJ
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ/Sivers &K/J/Norris emails re: Natural attenuation Sampling
Site-Wide Information
K/J/Norris email to DEQ/Sivers re: BN Livingston Shop Complex Well Map
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 17 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 04 14 Correspondence Kennedy/Jenks K/J fax to DEQ re: March 2006 Activities 02/03/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J Field Activities schedule March 2006 03/01/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J fax to DEQ re: April 2006 Activities 03/31/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal – April 2006 Field Activities 03/30/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J email re: Livingston weather conditions 05/01/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal – May 2006 Activities 05/04/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks 05/09/06 DEQ
13 01 04 14 Correspondence Kennedy/Jenks 05/09/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks 05/22/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks 05/23/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks DEQ email to KJ re: Task I Contacts 05/25/06 DEQ
13 01 04 14 Correspondence Kennedy/Jenks K/J email to DEQ re: Livingston Deliverables 05/30/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks 05/30/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal – June 2006 Activities 06/01/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks B Moore email to DEQ re: pedestrian underpass 06/05/06 B Moore
13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal – July 2006 Activities 06/06/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: BNLV Groundwater elevations 06/06/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks DEQ/KJ/BNSF emails re: Meeting on June 14 06/09/06
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Logs for HRO-20 through HRO-24 06/16/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ/Bartlett & West emails re: BNSF right-of-way map 6/21-6/23/06
13 01 04 14 Correspondence Kennedy/Jenks KJ/B&W emails re: Further information: BNSF r/w map 6/21-6/27/06
13 01 04 14 Correspondence Kennedy/Jenks KJ email to CDM re: Soil data attached 06/27/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ email to CDM re: Soil additional files 06/27/06 KJ
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ email to K/J re: Livingston Deliverable – Task I Addendum No.1
Site-Wide Information
KJ email to DEQ re: Revised ERCLs Appendices for Tasks F and G RAPs and Task L SIWP
Site-Wide Information
K/J transmittal cover re: updated ERCL tables for Task F, G, and L
Site-Wide Information
KJ fax to DEQ re: Livingston Deliverable and Contained-in Decision
Site-Wide Information
Site-Wide Information
Site-Wide Information
K/J transmittal – Semiannual Monitoring letters to request access – Henikensen, Watson, Steffen, and Grosvenor
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 18 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 04 14 Correspondence Kennedy/Jenks 6/21-6/28/06
13 01 04 14 Correspondence Kennedy/Jenks DEQ/KJ emails re: Rotasonic boring logs 06/29/06
13 01 04 14 Correspondence Kennedy/Jenks DEQ/KJ emails re: SVE systems 06/30/06
13 01 04 14 Correspondence Kennedy/Jenks K/J email to DEQ re: Annual Facility Inspection 07/10/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Livingston Deliverables 07/28/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J email to DEQ re: Request for a Contained-in Decision 08/11/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J email to DEQ re: Livingston Deliverable 08/17/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: KJ interim point of contact 09/21/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks 10/09/06 DEQ
13 01 04 14 Correspondence Kennedy/Jenks N Winslow email re: NW Energy schedule issues 10/27/06 N Winslow
13 01 04 14 Correspondence Kennedy/Jenks 11/01/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks 11/01/06
13 01 04 14 Correspondence Kennedy/Jenks 11/01/06
13 01 04 14 Correspondence Kennedy/Jenks DEQ/K/J emails re: Semiannual GW Monitoring – Notification 11/02/06
13 01 04 14 CD Correspondence Kennedy/Jenks 11/09/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J email to DEQ re: Quarterly Status Report – No.5 11/21/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal – December 2006 Activities 12/04/06 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal – January 2007 Activities 01/03/07 KJ
13 01 04 14 Correspondence Kennedy/Jenks 01/08/07 KJ
13 01 04 14 Correspondence Kennedy/Jenks 01/09/07 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal – February 2007 Activities 02/01/07 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal – March 2007 Activities 02/20/07 KJ
Site-Wide Information
DEQ/CDM/B&W emails re: further information: BNSF r/w map
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ email to K/J re: Groundwater sampling results for June 2006
Site-Wide Information
Site-Wide Information
K/J transmittal – Semiannual Monitoring letters to request access – Watson, Steffen, and Grosvenor – Letter of Notification of Field Activities to MRL
Site-Wide Information
DEQ/K/J emails re: Semiannual Groundwater Monitoring – Notification
Site-Wide Information
DEQ/K/J email re: Semiannual Groundwater Monitoring – Notification
Site-Wide Information
Site-Wide Information
K/J transmittal cover – CD ROM containing pdf files of the 2005 Annual Monitoring and Maintenance Report
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
K/J transmittal cover – CD of Task F Stage 1 – Part 1 Remedial Action Plan for VOC-Containing Alluvial Aquifer GW
Site-Wide Information
K/J email to DEQ re: Facility-Wide Sampling and Analysis Plan – Addendum No.1
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 19 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 04 14 Correspondence Kennedy/Jenks 02/26/07 KJ
13 01 04 14 Correspondence Kennedy/Jenks 02/27/07 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J email to DEQ re: January 2007 GW Analytical Results 03/09/07 KJ
13 01 04 14 Correspondence Kennedy/Jenks 03/15/07 KJ
13 01 04 14 Correspondence Kennedy/Jenks DEQ/K/J email re: Hydrographs 03/19/07
13 01 04 14 Correspondence Kennedy/Jenks 03/20/07 DEQ/ Meierhenry
13 01 04 14 Correspondence Kennedy/Jenks K/J email to DEQ re: DEQ Split Samples 03/20/07 KJ
13 01 04 14 Correspondence Kennedy/Jenks 03/29/07 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J email to DEQ re: Purge Water Landspread 04/02/07 KJ
13 01 04 14 Correspondence Kennedy/Jenks 04/09/07 KJ
13 01 04 14 Correspondence Kennedy/Jenks 04/19/07 KJ
13 01 04 14 Correspondence Kennedy/Jenks DEQ email to KJ re: Email communication with KJ 05/10/07 DEQ
13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal – June 2007 Activities 05/15/07 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal – June 2008 Activities 05/27/07 KJ
13 01 04 14 Correspondence Kennedy/Jenks 05/29/07
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Livingston Deliverables 05/30/07 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Drilling schedule 05/31/07 KJ
13 01 04 14 Correspondence Kennedy/Jenks 06/05/07 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Livingston Deliverable 06/05/07 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ/DEQ/CDM emails re: Schedule of upcoming activities 06/15/07
Site-Wide Information
K/J email to DEQ re: Livingston Deliverables – Spring 2005 SOW – Quarterly Status Report No.6
Site-Wide Information
K/J email to DEQ re: Livingston Deliverables – Truck Bed Silty Residue Sampling Results & Request for Contained-in Decision; Sampling and Analysis Plan for Treated Concrete and Rock Debris
Site-Wide Information
Site-Wide Information
K/J email to DEQ re: Livingston Deliverables – Task I: Mitigation Design Development Plan; Task D/E – Phase I Remedial Action 2007 – 30% Design Report
Site-Wide Information
Site-Wide Information
DEQ/Meierhenry email to DEQ re: Livingston Shop Complex Remediation Project – UST Portion
Site-Wide Information
Site-Wide Information
K/J email to DEQ re: Livingston Deliverables – 2006 Annual Monitoring and Maintenance Report
Site-Wide Information
Site-Wide Information
K/J email to DEQ re: Livingston Deliverable – Task F Stage I – Part 1 Remedial Action Plan for VOC-Containing Alluvial Aquifer GW
Site-Wide Information
K/J email to DEQ re: Livingston Deliverable – Replacement pages/inserts for: Task I: Mitigation Design Dev Plan; Task I Addendum No.2: Task D/E Phase 1; Updated Table 3
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ/KJ/CDM emails re: Planned activities and email attachments
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ transmittal – Facility-Wide SAP Addendum No 1, Revision No 1
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 20 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Task I and Task F items posted to website 07/16/07 KJ
13 01 04 14 Correspondence Kennedy/Jenks 07/26/07
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Updated laboratory analytical reports 08/30/07 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ transmittal – September Activities 09/04/07 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ/DEQ emails re: Livingston public meeting 10/29/07 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Livingston Deliverables 11/28/07 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Livingston Deliverables 01/30/08 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J email to DEQ re: Communications 02/13/08 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ fax transmittal – March Activities 02/20/08 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Livingston Deliverables 02/28/08 KJ
13 01 04 14 Correspondence Kennedy/Jenks 02/29/08
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Livingston Deliverable 03/27/08 KJ
13 01 04 14 Correspondence Kennedy/Jenks DEQ/KJ emails re: Purge water 03/20/08
13 01 04 14 Correspondence Kennedy/Jenks KJ fax transmittal – June field schedule 05/27/08 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Livingston documents transmittal 05/28/08 KJ
13 01 04 14 Correspondence Kennedy/Jenks 07/11/08 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal – September 2008 Activities 08/25/08 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J emails re: Livingston Deliverable 08/27/08 KJ
13 01 04 14 Correspondence Kennedy/Jenks DEQ email to CDM re: Items to remove from Livshare 09/15/08 DEQ
13 01 04 14 Correspondence Kennedy/Jenks Phone Log – DEQ/KJ re: K/J update 11/05/08
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: KJ SOW Quarterly Report 13 notice 11/21/08 KJ
13 01 04 14 Correspondence Kennedy/Jenks DEQ/KJ emails re: ARC GIS Map 11/26/08
13 01 04 14 Correspondence Kennedy/Jenks KJ December Activity Notice 12/01/08 KJ
Site-Wide Information
Site-Wide Information
KJ/CDM emails re: Task I and Task F items posted to website 7/16/07-7/26/07
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ/KJ emails re: Schedule of activities requiring access to MRL property
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
K/J email re: Livingston Deliverable Task F, 2 WP and D/E Bid Documents
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 21 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 04 14 Correspondence Kennedy/Jenks K/J fax/transmittal to DEQ re: March 2009 field activities 02/23/09 KJ
13 01 04 14 Correspondence Kennedy/Jenks 02/27/09 KJ
13 01 04 14 Correspondence Kennedy/Jenks 03/10/09 KJ
13 01 04 14 Correspondence Kennedy/Jenks 03/27/09 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J fax/transmittal to DEQ re: June 2009 field activities 05/18/09 KJ
13 01 04 14 Correspondence Kennedy/Jenks 05/28/09 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J emails to DEQ re: Upcoming field activities schedule 06/03/09 KJ
13 01 04 14 Correspondence Kennedy/Jenks DEQ email to K/J re: Domestic well sampling at 308 Garnier 06/04/09 DEQ
13 01 04 14 Correspondence Kennedy/Jenks DEQ email to KJ re: Document review 06/19/09 DEQ
13 01 04 14 Correspondence Kennedy/Jenks K/J email to DEQ re: Annual facility inspection notification 07/06/09 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Document deliverables 08/27/09 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ fax to DEQ – BNSF September 2009 Activities 09/02/09 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Document deliverables 11/25/09 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ fax to DEQ – BNSF December 2009 Activities 12/03/09 KJ
13 01 04 14 Correspondence Kennedy/Jenks DEQ letter to KJ re: DEQ modification of KJ documents 02/11/10 DEQ
13 01 04 14 Correspondence Kennedy/Jenks DEQ email to KJ re: DEQ modification of KJ documents 02/16/10 DEQ
13 01 04 14 Correspondence Kennedy/Jenks DEQ letter to KJ re: DEQ modification of KJ documents 02/25/10 DEQ
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Document deliverables 02/25/10 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ fax to DEQ re: BNSF March Activities 03/02/10 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: 2010 HASP 03/08/10 KJ
13 01 04 14 Correspondence Kennedy/Jenks DEQ/KJ emails re: KPRK drinking water 03/09/10
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Document deliverables 03/30/10 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Items posted to website 04/23/10 KJ
Site-Wide Information
Site-Wide Information
K/J email to DEQ re: Documents sent by UPS for delivery tomorrow
Site-Wide Information
K/J Transmittal to DEQ re: CD’s containing BNLV air & soil gas data
Site-Wide Information
K/J email to DEQ re: Documents sent by UPS for delivery tomorrow
Site-Wide Information
Site-Wide Information
K/J email to DEQ re: Documents sent by UPS for delivery tomorrow
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 22 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Document deliverables 05/28/10 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Document deliverables 06/02/10 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Points discussed to follow up on 06/07/10 KJ
13 01 04 14 Correspondence Kennedy/Jenks 06/08/10 DEQ
13 01 04 14 Correspondence Kennedy/Jenks DEQ email to KJ re: Points discussed to follow up one 06/08/10 DEQ
13 01 04 14 Correspondence Kennedy/Jenks KJ fax to DEQ – BNSF July 2010 Activities 06/30/10 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Weekly field activities staffing schedule 07/15/10 KJ
13 01 04 14 Correspondence Kennedy/Jenks DEQ/KJ emails re: Weekly field activities staffing schedule 07/27/10
13 01 04 14 Correspondence Kennedy/Jenks DEQ/KJ emails re: Analytical data 07/29/10
13 01 04 14 Correspondence Kennedy/Jenks weekly field activities staffing schedule 08/01/10 KJ
13 01 04 14 Correspondence Kennedy/Jenks KJ fax to DEQ – BNSF August 2010 field activities schedule 08/03/10 KJ
13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal to DEQ re: August 2010 Activities 08/03/10 KJ
13 01 04 14 Correspondence Kennedy/Jenks 08/04/10 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 08/12/10 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks weekly field activities staffing schedule 08/21/10 KJ
13 01 04 14 Correspondence Kennedy/Jenks 08/23/10 DEQ
13 01 04 14 Correspondence Kennedy/Jenks 08/27/10 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 08/31/10 KJ/Lee
13 01 04 14 Correspondence Kennedy/Jenks 09/15/10 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 09/15/10 KJ/ Norris
13 01 04 14 Correspondence Kennedy/Jenks 09/29/10 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 10/05/10 KJ
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ email to BNSF/KJ re: Notification of field activities and progress reporting
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
K/J/Aldersley & DEQ/Reynolds emails re: Annual facility insurance notice
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Weekly field activities staffing schedule
Site-Wide Information
Site-Wide Information
DEQ/Reynolds email to K/J re: Attachment - New DEQ data validation guidelines
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Livingston deliverables – Quarterly status report #20 & Task L Supplemental WP for Bedrock Aquifers
Site-Wide Information
K/J/Lee fax to DEQ/Reynolds re: September 2010 field activities
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Weekly field activities staffing schedule as of 9/15/10
Site-Wide Information
K/J/Norris email to DEQ/Reynolds re: Proposed conference call – Task D/E & F
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Weekly field activities staffing schedule as of 9/29/10
Site-Wide Information
K/J/Lee letter/fax to DEQ/Reynolds re: October 2010 field schedule
BN LIVINGSTON 8/26/13
Page 23 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 04 14 Correspondence Kennedy/Jenks 10/07/10 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 10/14/10 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 10/22/10 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 10/29/10 KJ
13 01 04 14 Correspondence Kennedy/Jenks 10/29/10 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 11/08/10 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 11/11/10 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 11/29/10 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 12/01/10 KJ/Lee
13 01 04 14 Correspondence Kennedy/Jenks 12/02/10 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 12/08/10 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 12/10/10 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 01/07/11 KJ/Lee
13 01 04 14 Correspondence Kennedy/Jenks 01/12/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 01/21/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 01/26/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 01/13/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 02/03/11 KJ
13 01 04 14 Correspondence Kennedy/Jenks 02/11/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 02/17/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 02/24/11 KJ/Adlersley
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Weekly field activities staffing schedule as of 10/7/10
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Weekly field activities staffing schedule as of 10/14/10
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Weekly field activities staffing schedule as of 10/22/10
Site-Wide Information
K/J/Lee letter/fax to DEQ/Reynolds re: November 2010 field schedule
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Weekly field activities staffing schedule as of 10/29/10
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Weekly field activities staffing schedule as of 11/5/10
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Respiromentry testing &Weekly field activities staffing schedule as of 11/11/10
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Livingston Deliverables – Quarterly Status Report No 21to be delivered 11/30/10 to DEQ
Site-Wide Information
K/J/Lee Letter of Transmittal & Fax to DEQ/Reynolds re: December 2010 Activities
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Weekly field activities staffing schedule as of 12/1/10
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Follow - up to weekly field activities schedule as of 12/1/10
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: No change to 12/1/10 field activities schedule
Site-Wide Information
K/J/Lee email to DEQ/Reynolds re: January 2011 Field Activities
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 1-13-11
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: No change to 1/13/11 field activities schedule
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 1/26/11
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 2/2/11
Site-Wide Information
K/J/Lee Letter/fax to DEQ/Reynolds re: February 2011 Field Activities
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 2/10/11
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Task F – Part (addendum # 2) and Task D/E posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 2/24/11
BN LIVINGSTON 8/26/13
Page 24 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 04 14 Correspondence Kennedy/Jenks 02/28/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 02/28/11 KJ/Lee
13 01 04 14 Correspondence Kennedy/Jenks 03/04/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 03/04/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 03/09/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks K/J/Norris email to DEQ re: Contacting John Norris 03/17/11 KJ Norris
13 01 04 14 Correspondence Kennedy/Jenks 04/01/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 04/04/11 KJ/ Norris
13 01 04 14 Correspondence Kennedy/Jenks 04/06/11 KJ Aldersley
13 01 04 14 Correspondence Kennedy/Jenks 04/07/11 KJ/ Norris
13 01 04 14 Correspondence Kennedy/Jenks 04/14/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks K/J/Norris email to DEQ re: Contacting John Norris 04/15/11 KJ/ Norris
13 01 04 14 Correspondence Kennedy/Jenks 04/20/11 BN/ Stegman
13 01 04 14 Correspondence Kennedy/Jenks 04/29/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks K/J/Lee transmittal to BN/Smith re: May 2011 Field schedule 05/04/11 KJ/ Lee
13 01 04 14 Correspondence Kennedy/Jenks 05/05/11 KJ/ Lee
13 01 04 14 Correspondence Kennedy/Jenks 05/11/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 05/19/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 05/20/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 05/20/11 KJ/ Lee
13 01 04 14 Correspondence Kennedy/Jenks 05/27/11 KJ/Adlersley
Site-Wide Information
K/J Aldersley email to DEQ/Reynolds re: Livingston deliverable – Quarterly Report #22 went out UPS on 2/28/11
Site-Wide Information
K/J/Lee letter/fax to DEQ/Reynolds re: March 2011 field schedule
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 3/3/11
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Attachment – Part 2 of REV – Biovent Interim Monitoring Tables
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 3/9/11
Site-Wide Information
Site-Wide Information
K/J Aldersley email to DEQ/Reynolds re: Livingston deliverable - 2010Annual Monitoring & Maintenance Report went out UPS 3/31/11
Site-Wide Information
K/J Norris email to DEQ re: Updated Indoor Air sampling schedule
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 4/6/11
Site-Wide Information K/J Norris email/fax to BN/Smith re: April 2011 Field Schedule
Site-Wide Information
K/J Aldersley email to DEQ/Reynolds re: March 2011 GW sampling results posted to DEQ website
Site-Wide Information
Site-Wide Information
DEQ/Martin internal email re: fw - email from BN/Stegman - Transparency issues
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 4/27/11
Site-Wide Information
Site-Wide Information
K/J/Lee transmittal to DEQ/Reynolds re: May 2011 Field schedule
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 5/11/11
Site-Wide Information
K/J Aldersley email to DEQ/Reynolds re: Livingston deliverable - Task I Indoor Air Mitigation Plan for Residential & Commercial Properties sent UPS 5/20/11
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Updated well map posted to website
Site-Wide Information
K/J/Lee transmittal to DEQ/Reynolds re: June 2011 Field schedule
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 5/27/11
BN LIVINGSTON 8/26/13
Page 25 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 04 14 Correspondence Kennedy/Jenks 06/09/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 06/10/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 06/16/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 06/22/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks DEQ/Reynolds & K/J Aldersley emails re: Well coordinates 06/29/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 07/01/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 07/05/11
13 01 04 14 Correspondence Kennedy/Jenks 07/06/11 KJ/Lee
13 01 04 14 Correspondence Kennedy/Jenks K/J/Lee fax to DEQ/Reynolds re: July 2011 Field activities 07/07/11 KJ/Lee
13 01 04 14 Correspondence Kennedy/Jenks 07/21/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 07/28/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 08/04/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 08/05/11 KJ/Lee
13 01 04 14 Correspondence Kennedy/Jenks 08/18/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 08/25/11
13 01 04 14 Correspondence Kennedy/Jenks 08/30/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 09/01/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 09/08/11 KJ/Lee
13 01 04 14 Correspondence Kennedy/Jenks 09/29/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 10/07/11 KJ/Lee
13 01 04 14 Correspondence Kennedy/Jenks 10/12/11 KJ/Adlersley
Site-Wide Information
K/J Aldersley email to DEQ/Reynolds re: Livingston deliverables - Revised Task F Stage I-Part 2: Soil Vapor Extraction Report
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 6/8/11
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 6/15/12
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 6/22/11
Site-Wide Information
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Notification for Task L & Task D&E Activities
Site-Wide Information
DEQ/Reynolds, K/J/Aldersley & CDM/Cohn emails re: Well coordinates
Site-Wide Information
K/J/Lee transmittal to DEQ/Reynolds re: July 2011 Field activities
Site-Wide Information
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 7/21/11
Site-Wide Information
K/J Aldersley email to DEQ/Reynolds re: Livingston deliverables -2nd Revised Bioventing Extraction/Injection Design Study & Revised Bioventing Extraction/Injection System Monitoring Plan
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 8/4/11
Site-Wide Information
K/J/Lee transmittal to DEQ/Reynolds re: August 2011 Field activities
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 8/18/11
Site-Wide Information
KJ/Aldersley & CDM/Hills emails to DEQ/Reynolds re: Field schedule as of 8/25/11
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Quarterly Status report #24 sent UPS
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 9/1/11
Site-Wide Information
K/J/Lee letter/fax to DEQ/Reynolds re: September 2011 Field activities
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 9/29/11
Site-Wide Information
K/J/Lee transmittal to DEQ/Reynolds re: October 2011 Field activities
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 10/12/11
BN LIVINGSTON 8/26/13
Page 26 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 04 14 Correspondence Kennedy/Jenks 10/21/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 10/28/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 11/02/11 KJ/Norton
13 01 04 14 Correspondence Kennedy/Jenks 11/02/11
13 01 04 14 Correspondence Kennedy/Jenks 11/18/11
13 01 04 14 Correspondence Kennedy/Jenks 11/213/11 KJ/Lee
13 01 04 14 Correspondence Kennedy/Jenks 11/29/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 12/08/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 01/06/12 KJ/Lee
13 01 04 14 Correspondence Kennedy/Jenks 01/31/12 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 01/31/12 KJ/Lee
13 01 04 14 Correspondence Kennedy/Jenks 02/10/12 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 02/16/12 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 02/28/12 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks Field activities scheduled for March 2012 03/01/12
13 01 04 14 Correspondence Kennedy/Jenks 03/30/12 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 03/30/11 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 04/06/12 KJ/Lee
13 01 04 14 Correspondence Kennedy/Jenks 04/16/12 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 04/17/12 KJ/Adlersley
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 10/21/11
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 10/28/11
Site-Wide Information
KJ/Norton email to DEQ/Reynolds re: November 2011 Field activities
Site-Wide Information
KJ/Aldersley & DEQ/Reynolds emails re: Electronic copies of SOW quarterly reports
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 11/18/11
Site-Wide Information
KJ/Lee email to DEQ/Reynolds re: December 2011 Field activities
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Quarterly Status Report # 25 sent out in mail
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 12/8/11
Site-Wide Information
KJ/Lee email to DEQ/Reynolds re: January 2012 Field Schedule
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 1/31/12
Site-Wide Information
KJ/Lee email to DEQ/Reynolds re: February 2012 Field Schedule
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Weekly Field Activities
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Weekly Field Activities as of 2/12/12
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Quarterly Status Report # 26 sent out in mail
Site-Wide Information
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: 2011 Annual Monitoring & Maintenance Report sent out for delivery
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Task M Remedial Action Plan for Asbestos-Containing Materials revision 2 sent out for delivery
Site-Wide Information
KJ/Lee Transmittal to DEQ/Reynolds re: April 2012 Field Activities
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Addendum #1 to DEQ Version of Task L Supplemental Investigation Work Plan for Bedrock Aquifers revision #1 sent out for delivery
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Replacement pages for entire Section 3 of the Addendum #1 to DEQ Version of Task L Supplemental Investigation Work Plan for Bedrock Aquifers revision #1 sent out for delivery
BN LIVINGSTON 8/26/13
Page 27 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 04 14 Correspondence Kennedy/Jenks 05/08/12 KJ/Lee
13 01 04 14 Correspondence Kennedy/Jenks 05/23/12 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 05/24/12 KJ/Lee
13 01 04 14 Correspondence Kennedy/Jenks 06/07/12 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 06/14/12 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 07/06/12 KJ/Lee
13 01 04 14 Correspondence Kennedy/Jenks 07/12/12 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 07/25/12 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 02/27/13 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 03/12/13
13 01 04 14 Correspondence Kennedy/Jenks 03/28/13 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks KJ/Aldersley email to DEQ/Reynolds re: KJ document notice 05/30/13 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks KJ/Aldersley & DEQ/Reynolds emails re: Field work notice 06/05/13 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks KJ/Aldersley email to DEQ/Reynolds re: Field schedule 06/12/13 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks 06/18/13 KJ/Fernandes
13 01 04 14 Correspondence Kennedy/Jenks KJ/Aldersley email to DEQ/Reynolds re: Field Schedule 06/18/13 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks KJ/Aldersley email to DEQ/Reynolds re: KJ Field Schedule 06/28/13 KJ/Adlersley
13 01 04 14 Correspondence Kennedy/Jenks KJ/Fernandes & DEQ/Reynolds emails re: KJ status report 07/12/13 KJ/Fernandes
13 01 04 14 Correspondence Kennedy/Jenks KJ/Fernandes email to DEQ/Reynolds re: KJ Status call 07/23/13 KJ/Fernandes
13 01 04 14 Correspondence Kennedy/Jenks KJ/Aldersley & DEQ/Reynolds emails re: KJ status report 07/25/13 KJ/Adlersley
13 01 04 15 Correspondence CDM Conflict of Interest
13 01 04 15 Correspondence CDM Conflict of Interest Meeting notes 05/15/06
13 01 04 15 Correspondence CDM Conflict of Interest DEQ internal emails re: CDM potential conflict of interest 10/17/06 DEQ internal
Site-Wide Information
KJ/Lee Transmittal to DEQ/Reynolds re: May 2012 Field Activities
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 5/23/12
Site-Wide Information
KJ/Lee Transmittal to DEQ/Reynolds re: June 2012 Field Activities
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 6/7/12
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 6/14/12
Site-Wide Information
KJ/Lee Transmittal to DEQ/Reynolds re: July 2012 Field Activities
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 7/12/12
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 7/25/12
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Quarterly status report # 30 sent out for delivery
Site-Wide Information
DEQ/Reynolds & KJ/Aldersley emails re: Water level survey data December 2012
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: 2012 Annual Monitoring & Maintenance Report sent out 3/28/13
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ/Fernandes letter to DEQ/Reynolds re: Project Contact/Manager
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 28 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 04 15 Correspondence CDM Conflict of Interest 10/17/06 CDM internal
13 01 04 15 Correspondence CDM Conflict of Interest 10/23/06 DEQ internal
13 01 04 15 Correspondence CDM Conflict of Interest DEQ internal emails re: CDM Conflict of Interest Waiver 10/30/06 DEQ internal
13 01 04 15 Correspondence CDM Conflict of Interest DEQ & CDM emails re: Conflict of Interest proposed meeting 12/20/06
13 01 04 15 Correspondence CDM Conflict of Interest 11/06/06 DEQ
13 01 04 15 Correspondence CDM Conflict of Interest CDM/DEQ Conflicts of Interest Meeting Agenda 01/05/07
13 01 04 15 Correspondence CDM Conflict of Interest DEQ Conflicts of Interest meeting notes 01/05/07 DEQ
13 01 04 15 Correspondence CDM Conflict of Interest 01/19/07 CDM
13 01 04 15 Correspondence CDM Conflict of Interest Follow-up meeting to communications training notes 05/15/07
13 01 04 15 Correspondence CDM Conflict of Interest Meeting notes 09/20/07
13 01 04 15 Correspondence CDM Conflict of Interest Meeting notes 11/05/07
13 01 04 15 Correspondence CDM Conflict of Interest Meeting notes 12/12/07
13 01 04 16 Correspondence CDM General
13 01 04 16 Correspondence CDM General DEQ email to CDM re: BNLV Work Plans 06/06/06 DEQ
13 01 04 16 Correspondence CDM General DEQ/CDM emails re: Request to add employees to invoices
13 01 04 16 Correspondence CDM General CDM email to DEQ re: Conference call 06/27/06 CDM
13 01 04 16 Correspondence CDM General
13 01 04 16 Correspondence CDM General CDM email to DEQ re: Tracking Sheet 06/18/06 CDM
13 01 04 16 Correspondence CDM General CDM/DEQ emails re: Update 08/13/07
13 01 04 16 Correspondence CDM General CDM/DEQ emails re: Task Order modifications
13 01 04 16 Correspondence CDM General CDM/DEQ emails re: Livingston Deliverables 04/24/08
13 01 04 16 Correspondence CDM General DEQ/CDM emails re: Task Status 10/02/08
Site-Wide Information
CDM internal Memo re: Followup to clarify & confirm the steps CDM will take to minimize the potential conflict of interest
Site-Wide Information
DEQ internal emails re: Waiver of conflicts (use of CDM employees for DEQ experts)
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ letter to D Stordahl/CDM re: Contract #402009 Conflict of Interest - - Identified conflicts
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM letter to DEQ Division Administrator/S Olsen re: CDM will not enter into a Master Service Agreement w/BNSF in other states
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
6/22-6/26/2006
Site-Wide Information
Site-Wide Information
Cascade Drilling/CDM/DEQ emails re: Sonic drilling techniques
6/22-6/29/2006
Site-Wide Information
Site-Wide Information
Site-Wide Information
2/14-2/15/2008
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 29 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 04 16 Correspondence CDM General CDM email to DEQ re: Quarterly reports 09/24/09 CDM
13 01 04 16 Correspondence CDM General DEQ email to CDM re: Railsafe program badges 11/16/09 DEQ
13 01 04 16 Correspondence CDM General 09/28/12
13 01 05
13 01 05 01 Enforcement History
13 01 05 01 Enforcement History 06/05/89 Envirocon
13 01 05 01 Enforcement History Y ** DEQ internal email re: Letter to BNSF 09/10/04 DEQ internal
13 01 05 01 Enforcement History 3/12-3/14/13
13 01 05 01 Enforcement History 04/03/12
13 01 05 02
13 01 05 02 Modified Partial Consent Decree and Partial Consent Decree
13 01 05 02 DEQ Memo re: Filing of confidential memo 03/03/09 DEQ
13 01 05 03
13 01 05 03 CD Financial – Annual Report Forms 10-K 1985-1987 08/16/88
13 01 05 03 MDHES letter to Leo Berry re: CD renegotiations 1017/89 MDHES
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM Smith/Sorenson email to DEQ/Reynolds re: LNAPL Meeting with BN
CDM Smith/ Sorenson
Site-Wide Information
Administrative Orders/Consent Decrees
Site-Wide Information
Administrative Orders/Consent Decrees
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Regulatory Framework Evaluation Livingston Rail Yard Remediation
Site-Wide Information
Administrative Orders/Consent Decrees
Site-Wide Information
Administrative Orders/Consent Decrees
CDM Smith/Hills email to DEQ/Reynolds - FW email from CDM/Whiting re: Complaint from Ryan Franks; DEQ/Reynolds email to Enforcement/C Anderson re: Attachment - Complaint Report
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ Enforcement/Steinweden email to DEQ/Reynolds re: Livingston complaint - Ryan Frank
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Documents (Documents dated before 1/1/02 are not itemized)
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Documents
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Documents
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
BN LIVINGSTON 8/26/13
Page 30 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 05 03 US District Court – Consent Decree Amendment 05/03/90 US District Court
13 01 05 03 BKBH letter to DHES re: Obligations to the Consent Decree 05/21/90 BKBH
13 01 05 03 DEQ meeting agenda 08/16/01 DEQ
13 01 05 03 DEQ & Tetratech emails re: SOW tasks 07/02/02
13 01 05 03 DEQ draft modified consent decree 09/07/04 DEQ
13 01 05 03 Phone Log - DEQ to BN/Smith 09/07/04 DEQ
13 01 05 03 Meeting minutes - DEQ & BNSF 09/08/04 DEQ
13 01 05 03 DEQ email to McGarry re: Draft modified CD & SOWs 09/09/04 DEQ
13 01 05 03 Certified mail return receipt - BNSF notice letter 09/09/04
13 01 05 03 DEQ letter to MRL re: Draft modified CD & SOWs 09/10/04 DEQ
13 01 05 03 DEQ letter to Talgo/LRC re: Draft CD & SOWs 09/10/04 DEQ
13 01 05 03 DEQ & RTI emails re: Public Meeting 09/14/04
13 01 05 03 09/30/04 City of Livingston
13 01 05 03 BKBH letter to DEQ's attorney re: Entering negotiations 10/04/04 BKBH
13 01 05 03 Phone Log - Erickson/WET re: Draft SOW 10/05/04 WET
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
Draft City of Livingston comments to modified consent decree & SOWs
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
BN LIVINGSTON 8/26/13
Page 31 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 05 03 DEQ letter to BKBH/Leo Berry re: Negotiations 10/06/04 DEQ
13 01 05 03 10/07/04 DEQ internal
13 01 05 03 Phone Log – DEQ to Smith/BNSF 10/07/04 DEQ
13 01 05 03 DEQ Conference call notes 10/11/04 DEQ
13 01 05 03 RTI email to DEQ re Comments to Draft CD & SOWs 10/13/04 RTI
13 01 05 03 PCEC comments to Draft CD & SOWs 10/13/04 PCEC
13 01 05 03 PCEC comments to Draft modified CD & SOWs 10/13/04 PCEC
13 01 05 03 DEQ email to RTI re: comments to Draft SOW & CD 10/14/04 DEQ
13 01 05 03 DEQ email to BNSF/K/J re: SOW in Word format 10/14/04 DEQ
13 01 05 03 DEQ internal email re: Schedule for meetings 10/14/04 DEQ internal
13 01 05 03 Y ** DEQ internal email re: Review time 10/25/04 DEQ internal
13 01 05 03 DEQ internal email re: BN Draft redline CD & SOW 11/23/04 DEQ internal
13 01 05 03 12/13/04 DEQ
13 01 05 03 12/22/04
13 01 05 03 BN Draft CD (Redline of DEQ CD 9/04) 12/22/04 BN
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
DEQ internal email to Capediville re: Meeting request response
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
Meeting notes/A Sivers re; BNSF Livingston/Mission Wye negotiations
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
BN Draft Livingston SOW (Redline version of DEQ's 9/04 SOW)
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
BN LIVINGSTON 8/26/13
Page 32 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 05 03 BKBH letter to DEQ re: Draft CD & SOW 12/22/04 BKBH
13 01 05 03 BN/Smith letter to DEQ/Olsen re: Schedule 12/30/04 BN
13 01 05 03 Y DEQ internal
13 01 05 03 RTI email to DEQ re: Progress on CD/SOW negotiations 01/13/05 RTI
13 01 05 03 DEQ email to RTI re: Progress on CD/SOW negotiations 01/13/05 DEQ
13 01 05 03 Y ** DEQ Draft Spring SOW 01/21/05 DEQ
13 01 05 03 01/24/05 DEQ
13 01 05 03 DEQ Meeting Notes 01/26/05 DEQ
13 01 05 03 DEQ Meeting Notes 02/02/05 DEQ
13 01 05 03 02/22/05 DEQ
13 01 05 03 DEQ Meeting Notes 02/28/05
13 01 05 03 DEQ Meeting Notes 03/11/05
13 01 05 03 DEQ Meeting Notes (May-June?, 2005)
13 01 05 03 BNSF/BKBH transmittal to DEQ re: Property Map 08/05/05
13 01 05 03 Y ** DEQ email to BN re: Property Info 08/08/05
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
** Draft SOW internal emails, revisions, responses & notes (12/04-1/05)
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
DEQ email to BN re: Proposed Spring SOW subtasks language
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
DEQ email to Norris, Smith, BKBH & DEQ re: Revised draft SOW w/attachments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
BN LIVINGSTON 8/26/13
Page 33 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 05 03 Y ** DEQ letter ** Meeting Minutes 09/01/05
13 01 05 03 DEQ & K/J emails re: Spring 2005 SOW effective date 09/20/05
13 01 05 03 Y ** Meeting Notes 09/21/05
13 01 05 03 Y ** DEQ internal emails re: SOW negotiations - Task J 09/23/05
13 01 05 03 DEQ & K/J emails re: Master schedule for Spring 2005 SOW 10/05/05
13 01 05 03 Y 10/09/07 DEQ internal
13 01 05 03 Y 10/10/07 DEQ internal
13 01 05 03 BNSF Letter to EPA re: Financial Test for Liability Coverage 03/24/08 BN
13 01 05 03 Y ** DEQ internal email re: Financial Assurance Documents 04/23/08 DEQ internal
13 01 05 03 BNSF Letter to EPA re: Financial Test for Liability Coverage 03/24/09 BN
13 01 05 03 BNSF Letter to DEQ re: Financial Test for Liability Coverage 02/11/10 BN
13 01 05 03 02/11/10
13 01 05 03 Financial Annual Report Forms 10-K 02/11/10
13 01 05 03 03/29/11 BN/Brown
13 01 05 03 03/23/12 BN/Brown
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
** DEQ internal email re: Stipulation and modification to Consent Decree
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
** DEQ internal email re: Copy of Order for Court to sign - draft & redline
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
Price Waterhouse Coopers letter to Board of Directors of BNSF re: Report of Independent Accountants
Price Waterhouse Coopers
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
BN/D Brown letter to DEQ/Reynolds re: Financial Test for Liability Coverage
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
BN/Brown letter to DEQ/Reynolds re: Attachments re: Financial Test for Liability Coverage
BN LIVINGSTON 8/26/13
Page 34 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 05 03 04/03/12
13 01 05 03 Financial test for liability coverage Form 10-K ending 12/31/12 03/28/13 BN
13 01 05 03 Financial Test for liability coverage MTT 310-010087 03/31/14 BN/Brown
13 01 05 04
13 01 05 05 Notice letters
13 01 05 05 Notice letters DEQ notice letter to BNSF 09/07/04 DEQ
13 01 05 06
13 01 05 07 Unilateral Judicial Action
13 01 05 08
13 01 05 08 Deposition of Donald E. Shipman 10/20/88
13 01 05 08 Deposition of Ann Muccigrosso Colpitts 11/02/88
13 01 05 08 Changes in Ann Colpitts deposition 12/19/88
13 01 05 08 11/01/00
13 01 05 09 ** Depositions Y (Non-confidential documents sent to Records Management)
13 01 05 10 Y (Non-confidential documents sent to Records Management)
1158/ 07J602
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
DEQ legal/Haque-Hausrath email to Dava Kaitala re: Financial test for liability coverage - non confidential
DEQ leagl/ Haque-Hausrath
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
Site-Wide Information
Administrative Orders/Consent Decrees
Order/Consent Decree Amendments
Site-Wide Information
Administrative Orders/Consent Decrees
104(e) Requests/Responses (empty)
1160/ 27A605
Site-Wide Information
Administrative Orders/Consent Decrees
1160/ 27A605
Site-Wide Information
Administrative Orders/Consent Decrees
Site-Wide Information
Administrative Orders/Consent Decrees Judicial Referrals (empty)
1160/ 27A605
Site-Wide Information
Administrative Orders/Consent Decrees
1160/ 27A605
Site-Wide Information
Administrative Orders/Consent Decrees
Affidavits/Depositions & Referenced Exhibits
1160/ 27A605
Site-Wide Information
Administrative Orders/Consent Decrees
Affidavits/Depositions & Referenced Exhibits
1160/ 27A605
Site-Wide Information
Administrative Orders/Consent Decrees
Affidavits/Depositions & Referenced Exhibits
1160/ 27A605
Site-Wide Information
Administrative Orders/Consent Decrees
Affidavits/Depositions & Referenced Exhibits
1160/ 27A605
Site-Wide Information
Administrative Orders/Consent Decrees
Affidavits/Depositions & Referenced Exhibits Notice of intent to continue deposition of John Wadhams, DEQ
1159/ 08D505 1160/ 27A605
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
** Cogswell & Wehrle Legal Memo's
BN LIVINGSTON 8/26/13
Page 35 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 05 11 Joint Status Reports
13 01 05 11 Joint Status Reports March 1-May 31, 2000 status report 3/1-5/30/00
13 01 05 11 Joint Status Reports June 1-August 31, 2000 status report 6/1/-8/31/00
13 01 05 11 Joint Status Reports BKBH
13 01 05 11 Joint Status Reports September 1, 2000 - March 31,2001 status report 9/1/00-3/31/01
13 01 05 11 Joint Status Reports BKBH
13 01 05 11 Joint Status Reports April 1-June 30, 2001 status report 4/1-6/30/01
13 01 05 11 Joint Status Reports DEQ internal email re: Joint Status Report 10/10/07 DEQ
13 01 05 11 Joint Status Reports Joint Status Report 10/10/07
13 01 05 12 Spring 2005 SOW
13 01 05 12 Spring 2005 SOW 10/11/04 DEQ/Martin
13 01 05 12 Spring 2005 SOW DEQ/Martin meeting notes re: Meeting with BN 10/26/04 DEQ/Martin
13 01 05 12 Spring 2005 SOW DEQ/Sivers meeting notes re: Meeting with BN 10/26/04 DEQ Sivers
13 01 05 12 Spring 2005 SOW DEQ/Sivers meeting notes 01/01/05 DEQ Sivers
13 01 05 12 Spring 2005 SOW 01/21/05 DEQ Sivers
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees BKB&H fax to DEQ re: Draft 32nd joint status report
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees BKB&H fax to DEQ re: Draft 33rd joint status report
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ/Martin meeting minutes – conference call w/BN Attorneys & Consultants
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ/Sivers email to BN/Smith & K/J/Norris re: High priority tasks
BN LIVINGSTON 8/26/13
Page 36 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 05 12 Spring 2005 SOW DEQ/Sivers meeting notes 01/26/05 DEQ Sivers
13 01 05 12 Spring 2005 SOW 01/28/05 DEQ Sivers
13 01 05 12 Spring 2005 SOW K/J email to DEQ re: Deviations language 02/01/05 KJ
13 01 05 12 Spring 2005 SOW 02/02/05 DEQ Sivers
13 01 05 12 Spring 2005 SOW 02/04/05
13 01 05 12 Spring 2005 SOW DEQ/Sivers conference call notes 02/08/05 DEQ Sivers
13 01 05 12 Spring 2005 SOW Phone Log – DEQ/Sivers & K/J Norris re: SOW/Attachment 2 02/11/05
13 01 05 12 Spring 2005 SOW K/J/Norris email to DEQ/Sivers re: Plume map language 02/14/05 KJ/ Norris
13 01 05 12 Spring 2005 SOW 02/25/05 RETEC/ Colpitts
13 01 05 12 Spring 2005 SOW 04/11/05 DEQ Sivers
13 01 05 12 Spring 2005 SOW 04/12/05 DEQ
13 01 05 12 Spring 2005 SOW 04/29/05 DEQ Sivers
13 01 05 12 Spring 2005 SOW DEQ email to BN & K/J re: Attachment – Draft Spring SOW 05/05/05 DEQ
13 01 05 12 Spring 2005 SOW DEQ/Sivers meeting notes (SOW meeting 05/05/05 DEQ Sivers
13 01 05 12 Spring 2005 SOW 05/06/05 DEQ internal
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ/Sivers email to BN/Smith & K/J/Norris re: SOW attachments
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ/Sivers email to BN/Smith & K/J/Norris re: Plume map language
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Phone Log – DEQ/Sivers & Henderson re: Fate & Transport modeling
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
RETEC/Colpitts email to DEQ/Sivers re: Action item from last week’s meeting
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ/Sivers email to BN/Smith & K/J/Norris re: SOW attachments
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ email to BN & K/J re: Attachment - DEQ Draft Spring SOW
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ/Sivers Email to BN/Smith, K/J/Norris & BKBH/Steve W re: Draft Spring SOW
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ/Capdeville & Sivers emails re: Phone Log DEQ/Sivers & BN/Smith (5/6/05)
BN LIVINGSTON 8/26/13
Page 37 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 05 12 Spring 2005 SOW BNSF proposed language for SOW 05/10/05 BNSF
13 01 05 12 Spring 2005 SOW 06/09/05 DEQ
13 01 05 12 Spring 2005 SOW 06/27/05
13 01 05 12 Spring 2005 SOW DEQ/Sivers email to K/J/Norris re: Final Spring SOW 06/30/05 DEQ Sivers
13 01 05 13 Dispute Resolution
13 01 05 13 Dispute Resolution 01/21/09 BNSF
13 01 05 13 Dispute Resolution Y ** DEQ internal email re: Dispute resolution process 01/22/09 DEQ internal
13 01 05 13 Dispute Resolution DEQ letter to Dwight Krohne re: Dispute resolution 01/26/09 DEQ
13 01 05 13 Dispute Resolution DEQ letter to Rick Keller re: Dispute resolution 01/26/09 DEQ
13 01 05 13 Dispute Resolution DEQ letter to Erlynn Harris re: Dispute resolution 01/26/09 DEQ
13 01 05 13 Dispute Resolution DEQ letter to Johnny Lee & Jackie Fox re: Dispute resolution 01/26/09 DEQ
13 01 05 13 Dispute Resolution DEQ letter to Joanna Lithfield re: Dispute resolution 01/26/09 DEQ
13 01 05 13 Dispute Resolution DEQ letter to David Burley re: Dispute resolution 01/26/09 DEQ
13 01 05 13 Dispute Resolution Y ** DEQ internal email re: Dispute resolution process 01/26/09 DEQ
13 01 05 13 Dispute Resolution Y ** DEQ internal email re: Dispute resolution process 01/26/09 DEQ internal
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ email to BN/Smith re: Attachment – DEQ Redline Final Draft Spring SOW
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ Legal/Capdeville email to BN re: Attachment - Spring SOW
DEQ legal/ Capedeville
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
BNSF letter to DEQ Director Opper re: BN request for dispute resolution
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Site-Wide Information
Administrative Orders/Consent Decrees
Site-Wide Information
Administrative Orders/Consent Decrees
BN LIVINGSTON 8/26/13
Page 38 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 05 13 Dispute Resolution 01/27/09 DEQ internal
13 01 05 13 Dispute Resolution 01/28/09 DEQ internal
13 01 05 13 Dispute Resolution 01/28/09 DEQ internal
13 01 05 13 Dispute Resolution Y ** DEQ internal email re: Mediators 01/28/09 DEQ internal
13 01 05 13 Dispute Resolution Y ** DEQ internal email re: Dispute resolution process 01/28/09 DEQ internal
13 01 05 13 Dispute Resolution Y ** DEQ internal email re: Dispute resolution process 01/28/09 DEQ internal
13 01 05 13 Dispute Resolution Y ** DEQ internal email re: Dispute resolution schedule 01/29/09 DEQ internal
13 01 05 13 Dispute Resolution 01/28/09 DEQ internal
13 01 05 13 Dispute Resolution 01/29/09 DEQ internal
13 01 05 13 Dispute Resolution 01/30/09 DEQ internal
13 01 05 13 Dispute Resolution DEQ email to Director Opper re: Dispute resolution 02/03/09 DEQ
13 01 05 13 Dispute Resolution DEQ internal email re: BNSF’s three proposed mediators 02/26/09 DEQ internal
13 01 05 13 Dispute Resolution 03/18/09 BKBH
13 01 05 13 Dispute Resolution 03/19/09 EPA
13 01 05 13 Dispute Resolution 03/30/09 DEQ internal
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ internal email re: Phone log – DEQ & Dan Hoven/BN Attorney re: Dispute resolution
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ internal email re: Phone log – DEQ voice mail to Dan Hoven/BN Attorney re: Dispute resolution
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ internal email re: Phone log – Dan Hoven/BN Attorney voice mail to DEQ re: Dispute resolution
Site-Wide Information
Administrative Orders/Consent Decrees
Site-Wide Information
Administrative Orders/Consent Decrees
Site-Wide Information
Administrative Orders/Consent Decrees
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ internal email re: Phone log – Dan Hoven/BN Attorney voice mail to DEQ re: Dispute resolution
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ internal email re: Phone log – DEQ & Dan Hoven/BN Attorney re: Mediators/30 days
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ internal email re: Phone Log - DEQ & Dan Hoven/BN Attorney re: DEQ refuses to shorten time to select mediators
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
BKBH letter to DEQ legal re: State of MT v. BN, Rejection of DEQ’s Proposed Mediator’s
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
D Strausbaugh/EPA & Sue Neurath emails re: Draft starter memo for data
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ internal email – phone log : Haque-Hausrath/DEQ legal & D Hoven/BN legal re: Mediation scheduling
BN LIVINGSTON 8/26/13
Page 39 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 05 13 Dispute Resolution DEQ meeting notes (call) 04/01/09 DEQ/Reynolds
13 01 05 13 Dispute Resolution 04/01/09 DEQ legal
13 01 05 13 Dispute Resolution 04/02/09 Taleff Law
13 01 05 13 Dispute Resolution 04/02/09 DEQ legal
13 01 05 13 Dispute Resolution 04/06/09 DEQ internal
13 01 05 13 Dispute Resolution 04/13/09 DEQ legal
13 01 05 13 Dispute Resolution DEQ legal internal email re: Phone log with Dan Hoven 04/13/09 DEQ internal
13 01 05 13 Dispute Resolution 04/13/09 DEQ Legal
13 01 05 13 Dispute Resolution 04/13/09 DEQ Legal
13 01 05 13 Dispute Resolution 04/16/09 DEQ Legal
13 01 05 13 Dispute Resolution 04/22/09 DEQ Legal
13 01 05 13 Dispute Resolution 04/23/09 DEQ Legal
13 01 05 13 Dispute Resolution 04/23/09 DEQ
13 01 05 13 Dispute Resolution 04/24/09 DEQ
13 01 05 13 Dispute Resolution DEQ legal internal email re: Phone call with Oliver Goe 04/24/09 DEQ legal
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ legal letter/fax to Mick Taleff re: Contact people for DEQ and draft of agreed-to agenda and procedures for the dispute resolution
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Taleff Law Office letter to DEQ & BKBH re: Confirmation of agreement to act as mediator
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ legal letter/fax to D Hoven/BKBH re: Agreed-to Mediation Agenda & Procedures
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ legal internal email re: Dispute Resolution, length of submittal
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ legal email to M Taleff re: DEQ concerns about state public record requirements & other potential issues
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ legal email to Dan Hoven re: Agreed-to Mediation Agenda & Procedures: Length of Submittal and Attendance
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ legal email to m Taleff re: Proposed revised mediation agreement
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ legal email to Dan Hoven re: Agreed-to Mediation Agenda & Procedures: Length of Submittal and Attendance
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ legal letter to M Taleff re: Signed Revised Mediation Agreement
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ legal letter to M Taleff re: DEQ’s Mediation Position Statement
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ’s Position Statement for BN Shop Complex Dispute Resolution
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ email to M Taleff re: DEQ has been inadvertently sending letters to M Taleff at an incorrect address
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
BN LIVINGSTON 8/26/13
Page 40 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 05 13 Dispute Resolution 04/24/09 DEQ legal
13 01 05 13 Dispute Resolution 04/24/09 BKBH
13 01 05 13 Dispute Resolution 04/24/09 BKBH
13 01 05 13 Dispute Resolution 05/11/09 DEQ
13 01 05 13 Dispute Resolution 05/11/09 DEQ legal
13 01 05 13 Dispute Resolution BN’s response to DEQ’s Proposal 05/26/09 BNSF
13 01 05 13 Dispute Resolution 06/04/09 DEQ legal
13 01 05 13 Dispute Resolution 06/08/09 DEQ
13 01 05 13 Dispute Resolution 06/08/09 DEQ
13 01 05 13 Dispute Resolution 06/08/09 DEQ legal
13 01 05 13 Dispute Resolution 06/09/09 DEQ
13 01 05 13 Dispute Resolution 06/10/09 PCEC
13 01 05 13 Dispute Resolution 06/10/09 K&L Gates
13 01 05 13 Dispute Resolution 06/12/09 DEQ legal
13 01 05 13 Dispute Resolution 06/12/09 DEQ legal
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ legal email to D Hoven re: DEQ Confirmation of people attending the mediation
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Oliver Goe/BKBH email to DEQ re: BN attendees are in letter being sent to DEQ
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
BKBH letter/CD to DEQ re: Dispute resolution of DEQ process and standards for mitigation of indoor air – BNSF’s mediation statement
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ email to M Taleff, D Hoven & C Trueblood re: DEQ’s proposal for resolving BN 1/21/09 dispute resolution request
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ legal email to C Trueblood re: DEQ’s proposal for resolving BN 1/21/09 dispute resolution request – BN counter proposal
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ legal email to C Trueblood re: DEQ’s proposal for resolving BN 1/21/09 dispute resolution request – BN counter proposal
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ email to C Trueblood, D Hoven, & P Nehring re: DEQ’s response to BN’s 5/26/09 letter to DEQ
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ letter to C Trueblood, D Hoven, & P Nehring re: DEQ’s response to BN’s rejection of DEQ’s 5/11/09 proposed resolution
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ legal letter to Director R Opper re: Request for Decision on BN’s 1/21/09 dispute resolution
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ email to Director Opper & Tom Livers re: Electronic copy of BN dispute resolution
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
PCEC’s letter to DEQ/Opper re: BN’s latest contention in avoidance of work
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
C Trueblood/K&L Gates letter to DEQ re: BN request for dispute resolution of DEQ process and standards for testing and mitigation of indoor air
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ legal & C Trueblood emails re: DEQ response to BN’s 5/25/09 letter
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ legal email to Director Opper re: Attachment - letter responding to BN’s 6/12/09 letter
BN LIVINGSTON 8/26/13
Page 41 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 05 13 Dispute Resolution 06/12/09 DEQ legal
13 01 05 13 Dispute Resolution 06/12/09 BKBH
13 01 05 13 Dispute Resolution 06/12/09 DEQ legal
13 01 05 13 Dispute Resolution 06/12/09 DEQ legal
13 01 05 13 Dispute Resolution 06/18/09 DEQ legal
13 01 05 13 Dispute Resolution 06/24/09 BKBH
13 01 05 13 Dispute Resolution 07/06/09 DEQ Director
13 01 05 13 Dispute Resolution 07/07/09 DEQ internal
13 01 05 13 Dispute Resolution 04/08/09 BNSF
13 01 05 13 Dispute Resolution 07/13/09 DEQ Director
13 01 05 13 Dispute Resolution 07/14/09
13 01 05 13 Dispute Resolution Y 07/27/09 DEQ internal
13 01 05 13 Dispute Resolution Dispute Resolution Administrative Record Files 1-5 (7/09)
13 01 05 13 Dispute Resolution 08/05/09
13 01 05 13 Dispute Resolution 08/05/09 DEQ internal
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ legal email to D Hoven, C Trueblood & P Nehring re: Attachment - letter responding to BN’s 6/12/09 letter
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
BKBH letter to DEQ Director Opper re: Request for decision on BN’s 1/21/09 dispute resolution
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ legal letter to Director Opper re: DEQ ‘s response to BN letter to Director dated 6/12/09 request to submit additional materials
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ legal letter to C Trueblood re: DEQ response to Trublood’s 6/10/09 letter & CD of first 12 reference items listed in DEQ’s 6/8/09 letter
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ legal internal email re: Director Opper email to D Hoven re: Opper ‘s response to D Hoven’s 6/12/09 letter
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
BKBH letter to DEQ Director Opper re: Response to DEQ legal 6/8/09 letter to Opper & C Trueblood
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ Director Opper’s Decision on BN’s 1/21/09 Dispute Resolution
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ/Wittenberg to DEQ re: Attachment – Director Opper’s decision on BN 1/21/09 Dispute Resolution
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
A Stegman/BN letter/email to DEQ Director Opper re: Confidentiality provisions of the mediation agreement
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ Director Opper letter to A Stegman/BN re: Dispute resolution mediation agreement
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ/Opper & A Stegman/BN emails re: BN - Whitefish newspaper article coming out
Site-Wide Information
Administrative Orders/Consent Decrees
** DEQ Legal/Haque-Hausrath internal email re: BNLV Dispute Resolution – Time for Appeal
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Court Document 147 – BN’s Petition for Review of DEQ’s Final Agency Action
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ Legal/Brooks internal email re: Notice of Electronic Court Filing of Document 147
BN LIVINGSTON 8/26/13
Page 42 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 05 13 Dispute Resolution Y 08/06/09 DEQ internal
13 01 05 13 Dispute Resolution Y 08/06/09 DEQ internal
13 01 05 13 Dispute Resolution Y 08/06/09 DEQ internal
13 01 05 13 Dispute Resolution Y 08/12/09 DEQ internal
13 01 05 13 CD Dispute Resolution 08/20/09
13 01 05 13 Dispute Resolution Y 08/24/09 DEQ internal
13 01 05 13 Dispute Resolution Court Document 152 – Court Order 08/24/09
13 01 05 13 Dispute Resolution 09/25/09
13 01 05 13 Dispute Resolution 09/25/09
13 01 05 13 Dispute Resolution Y 09/29/09 DEQ internal
13 01 05 13 Dispute Resolution Y ** Historic GW data 09/29/09
13 01 05 13 Dispute Resolution 10/09/09
13 01 05 13 Dispute Resolution Court Document 157 – Notice of Appearance 10/09/09
13 01 05 13 Dispute Resolution 10/09/09
13 01 05 13 Dispute Resolution 10/09/09
Site-Wide Information
Administrative Orders/Consent Decrees
** DEQ Legal/Haque-Hausrath and Director Opper emails re: Summary of BN’s Appeal of the Directors Written Decision in Dispute Resolution
Site-Wide Information
Administrative Orders/Consent Decrees
** DEQ Legal/Haque-Hausrath and Director Opper emails re: Summary of BN’s Appeal of the Directors Written Decision in Dispute Resolution
Site-Wide Information
Administrative Orders/Consent Decrees
** DEQ Legal/Haque-Hausrath email to Director Opper re: Options for Response to BNSF’s Petition to Federal Court
Site-Wide Information
Administrative Orders/Consent Decrees
** DEQ Legal/Haque-Hausrath email to Director Opper re: Proposal for Response to BN’s Petition to Federal Court
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Court Document 148 – Plaintiff’s Motion to Dismiss Defendants Petition Pursuant to Rule and Brief in Support of It’s Motion to Dismiss
Site-Wide Information
Administrative Orders/Consent Decrees
** DEQ Legal/Haque-Hausrath internal email re: Livingston petition, briefing schedule
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Court Document – Defendant BNSF’s Procedural Suggestions for Resolving BNSF’s Petition for review of DEQ’s Final Agency Action on Indoor Air Quality
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Court Document 153 – Defendant BNSF’s Brief on Court’s Jurisdiction to Hear BNSF’s Petition for Review of DEQ’s Final Agency Action on Indoor Air Quality
Site-Wide Information
Administrative Orders/Consent Decrees
** DEQ/Reynolds internal email re: Comments on BNSF’s Briefs
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Court Document – Plaintiff’s Reply Brief on Proposed Procedural Method for Resolving the Dispute Raised by Defendants Petition
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Court Document 160 – Plaintiff’s Reply Regarding Court’s Jurisdiction to Review the Dispute Raised by the Defendant’s Petition
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Court Document – Plaintiff’s Reply Brief on Proposed Procedural Method for Resolving the Dispute Raised by Defendant’s Petition
BN LIVINGSTON 8/26/13
Page 43 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 05 13 Dispute Resolution 10/09/09
13 01 05 13 Dispute Resolution 11/02/09
13 01 05 13 Dispute Resolution Y 11/03/09 DEQ internal
13 01 05 13 Dispute Resolution 11/13/09
13 01 05 13 Dispute Resolution 11/13/09
13 01 05 13 Dispute Resolution 11/13/09
13 01 05 13 Dispute Resolution 11/17/09
13 01 05 13 Dispute Resolution Y 12/16/09 DEQ internal
13 01 05 13 Dispute Resolution Y ** CDM memorandum to DEQ 12/22/09 CDM
13 01 05 13 Dispute Resolution 12/23/09
13 01 05 13 Dispute Resolution Y 01/11/10
13 01 05 13 Dispute Resolution 01/11/10
13 01 05 13 Dispute Resolution 01/12/10
13 01 05 13 Dispute Resolution 01/11/10
13 01 05 13 Dispute Resolution Y 01/14/10 DEQ internal
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Court Document – BNSF’s Brief in Support of it’s Petition for Review of DEQ’s Final Agency Action
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Court Document 162 – Order – Telephonic Status Conference date
Site-Wide Information
Administrative Orders/Consent Decrees
** DEQ Legal/Haque-Hausrath internal email re: Notes from Court Status Conference
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Court Document – BNSF’s Supplemental Designation of Administrative Record Materials
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Mayer-Brown/Berghoff fax/email to DEQ Legal re: Indoor Air Quality Administrative Record
Mayer-Brown/ Berghoff
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ Legal/Haque-Hausrath letter to Mayer-Brown/Berghoff re: DEQ response to Berghoff 11/13/09 fax/email
DEQ legal/ Haque-Hausrath
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Court Document 165 – Notice of Conventional Filing of Document
Site-Wide Information
Administrative Orders/Consent Decrees
** DEQ Legal/Haque-Hausrath to DEQ Director Opper re: BNSF Brief excerpts
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Court Document 167 – Plaintiff’s Response to BNSF’s Cross Motion for Summary Judgment and Reply Brief in Support of it’s Motion for Summary Judgment
Site-Wide Information
Administrative Orders/Consent Decrees
** DEQ Legal/Haque-Hausrath internal email & Allan Payne re: Motion for leave to File
DEQ legal/ Haque-Hausrath
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Court Document 168 – BNSF’s Motion for Leave to File Instanter its Reply to Brief in Support of it’s Petition for Review
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Mayer-Brown/Sostrin & DEQ Legal/Haque-Hausrath emails re: Response to request regarding motion
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Court Document 171 – Supplement to BNSF’s Motion for Leave to File Instanter it’s Reply to Brief in Support of it’s Petition for Review
Site-Wide Information
Administrative Orders/Consent Decrees
** DEQ Legal/Haque-Hausrath & Brooks emails re: BNSF bringing blown up exhibits to hearing
BN LIVINGSTON 8/26/13
Page 44 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 05 13 Dispute Resolution 01/21/10
13 01 05 13 Dispute Resolution 01/25/10
13 01 05 13 Dispute Resolution 01/27/10
13 01 05 13 Dispute Resolution Court Document 178 – Findings 7 Recommendations 02/08/10
13 01 05 13 Dispute Resolution Y 02/19/10 DEQ internal
13 01 05 13 Dispute Resolution 02/22/10
13 01 05 13 Dispute Resolution Y 02/27/10 DEQ internal
13 01 05 13 Dispute Resolution 03/04/10
13 01 05 13 Dispute Resolution Court Document 180 – Court Order – Case is Closed 03/26/10
13 01 05 13 Administrative Record 2 boxes @RM
13 01 06
13 01 06 01 FOIAs
13 01 06 01 FOIAs 07/25/91 DHES/ Andersen
13 01 06 01 FOIAs 08/01/91 DHES/ Andersen
13 01 06 01 FOIAs 11/14/08
13 01 06 01 FOIAs M Nicklin & DEQ/Reynolds emails re: ARGIS map request 11/26/08
13 01 06 01 FOIAs 04/03/09
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Court Document 175 – Plaintiff’s Supplemental Citation to the Administrative Record
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
DEQ Legal/Haque-Hausrath & Mayer-Brown/Berghoff emails re: Filing deadlines (1/14 – 1/25/10)
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Notice of Electronic Filing Court Document 176 – Transcript of Motion Hearing Proceedings
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Site-Wide Information
Administrative Orders/Consent Decrees
** DEQ Legal/Haque-Hausrath internal Memorandum re: Lessons learned from Dispute Resolution with BNSF
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Court Document 179 – BNSF’s Objections & Clarifications to the Magistrate’s Findings & Recommendations
Site-Wide Information
Administrative Orders/Consent Decrees
** DEQ Legal internal emails re: Draft response to BN Objections to Judge Strong Findings
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
Document 180 – Plaintiff’s Response to BNSF’s Objections to the Magistrate’s Findings 7 Recommendations
1161/ 33A103
Site-Wide Information
Administrative Orders/Consent Decrees
1161/ 33A103 -1162/ 34A503
Site-Wide Information
Administrative Orders/Consent Decrees
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
DHES/Andersen memo to Ray Hoffman re: BN Livingston overhead rate
Site-Wide Information
Information Requests
DHES/Andersen memo to Ray Hoffman re: BN Livingston overhead rate
Site-Wide Information
Information Requests
M Giuliano & DEQ/Reynolds emails re: 111 S K ST info request
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
DEQ PWS/Kandelin email to DEQ/Reynolds re: Livingston Shop Complex GW Model
DEQ PWS/ Kandelin
BN LIVINGSTON 8/26/13
Page 45 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 06 01 FOIAs 04/03/09 DEQ
13 01 06 01 FOIAs 05/14/09
13 01 06 01 FOIAs 5/12-5/18/09
13 01 06 01 FOIAs 06/15/09 CDM
13 01 06 01 FOIAs 06/16/09 DEQ
13 01 06 01 FOIAs 07/22/09
13 01 06 01 FOIAs 08/13/09
13 01 06 01 FOIAs 08/13/09 DEQ
13 01 06 01 FOIAs 04/27/11
13 01 06 02 Public Requests
13 01 06 02 Public Requests DHES letter to Clare Lemke re: Draft Master Plan Schedule 05/22/91 DHES/
13 01 06 02 Public Requests Small, Hatch, Doubek & Pyfer letter to DHES re: Info request 05/13/92 SHD&P
13 01 06 02 Public Requests DEQ letter to TRC re: Proposed Plan 02/20/01 DEQ
13 01 06 02 Public Requests DEQ internal email re: Rep. Lee info request 06/29/01 DEQ internal
13 01 06 02 Public Requests DEQ email to Lee re: Iron Horse Trailer Park 07/16/01 DEQ
13 01 06 02 Public Requests DEQ internal email re: IT Corporation info request 10/18/01 DEQ internal
13 01 06 02 Public Requests Phone Log: IT Corporation 10/23/01
13 01 06 02 Public Requests 12/05/01 Gregory
13 01 06 02 Public Requests DEQ letter to Gregory re: Irrigation 12/17/01 DEQ
13 01 06 02 Public Requests DEQ email to Sue Martin re: Info request 03/21/02 DEQ
13 01 06 02 Public Requests 03/25/02 S Martin
Site-Wide Information
Information Requests
DEQ/Fry & Reynolds emails to Kandelin re: GW model info request
Site-Wide Information
Information Requests
Phone Log – DEQ & David Clayton/Appraiser working for BN re: BN Shop Complex - property evaluation
Site-Wide Information
Information Requests
DEQ & Natalie Davis/Livingston teacher emails re: Info request for updated cleanup status
Site-Wide Information
Information Requests
CDM email to DEQ re: Voice message forwarded from CDM to DEQ re: Adria Pope called to ask about results of sampling at 1601 Lewis Street
Site-Wide Information
Information Requests
Phone Log – DEQ to Adria Pope re: Status of contamination at 1601 Lewis St
Site-Wide Information
Information Requests
DEQ Legal/Haque-Hausrath to Cok Wheat & Kinzler/McGarry re: Response to 1/21/09 information request
DEQ legal/ Haque-Hausrath
Site-Wide Information
Information Requests
Phone Log – DEQ & Gary Gullickson/Mystery Ranch – Back Pack Company re: MRL wants to purchase gym facility and maybe land (
Site-Wide Information
Information Requests
DEQ/Reynolds email to Gary Gullickson re: Data for the recreation center
Site-Wide Information
Information Requests
Espresso Depot/D Krohne & DEQ/Reynolds emails re: Immediate Freedom of Information Act
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Gregory email to DEQ re: Report on contaminated water use for irrigation
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Sue Martin letter to DEQ re: Former C & P Packing info request
BN LIVINGSTON 8/26/13
Page 46 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 06 02 Public Requests DEQ email to Shane Deranleau re: Info request 11/14/02 DEQ
13 01 06 02 Public Requests Phone Log - Lunden/Environmental Strategies 07/09/03
13 01 06 02 Public Requests DEQ email to Knuteson re: Cancer report 07/14/03 DEQ
13 01 06 02 Public Requests DEQ letter to Moran re: Property at 305 E. Park St 11/07/03 DEQ
13 01 06 02 Public Requests Phone Log - North Dakota Dept of Health 02/03/04
13 01 06 02 Public Requests DEQ email to Contractor re: Depot info request 01/20/05 DEQ
13 01 06 02 Public Requests DEQ & Strata Environmental emails re: Due Diligence 05/05/05
13 01 06 02 Public Requests Phone Log - Strata Environmental to DEQ re: Info request 05/05/05
13 01 06 02 Public Requests DEQ & Bauer emails re: Basement Gas 09/16/05
13 01 06 02 Public Requests Livingston email to DEQ re: Indoor Air & mailing list 09/19/05 City of Livingston
13 01 06 02 Public Requests DEQ & Livingston resident emails re: Indoor air 09/19/05
13 01 06 02 Public Requests DEQ email to Cotter re: File Guide 09/20/05 DEQ
13 01 06 02 Public Requests DEQ internal email re: C&W request for info 03/22/06 DEQ internal
13 01 06 02 Public Requests Y ** M Ross email to DEQ re: Request for air sampling 04/07/06 M Ross
13 01 06 02 Public Requests 05/01/06 DEQ internal
13 01 06 02 Public Requests DEQ internal email re: EQC 05/08/06 DEQ internal
13 01 06 02 Public Requests 05/23/06 Horizon Realty
13 01 06 02 Public Requests DEQ & Nancy MacCracken emails re: Railyard Contamination 05/24/06
13 01 06 02 Public Requests 05/24/06 Bob Moore
13 01 06 02 Public Requests 06/29/06 Don Lent
13 01 06 02 Public Requests 07/17/06 Dave Amsk
13 01 06 02 Public Requests 08/07/06 Manny Getz
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Strata Environmental
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
DEQ internal email re: Contact with attorney in Virginia re: Livingston CD
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Phone Log – Scott Pitman/Horizon Realty to DEQ re: Block 3 of the Montag Addition
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Phone Log – Bob Moore/Livingston property owner to DEQ re: Entranko Study prepared in 2002
Site-Wide Information
Information Requests
Phone Log – Don Lent/Realtor in Bozeman to DEQ re: Talgo property
Site-Wide Information
Information Requests
Phone Log – Dave Amsk/Livingston property owner to DEQ re: Vapor intrusion data
Site-Wide Information
Information Requests
Phone Log – Manny Getz/Livingston property owner to DEQ re: Opening day care
BN LIVINGSTON 8/26/13
Page 47 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 06 02 Public Requests 08/09/06 Governor's Office
13 01 06 02 Public Requests 08/09/06
13 01 06 02 Public Requests DEQ & PRIMUS emails re: Water quality in Livingston 08/10/06
13 01 06 02 Public Requests DEQ internal emails re: Water quality in Livingston 08/10/06 DEQ internal
13 01 06 02 Public Requests DEQ email to PRIMUS re: Water quality in Livingston 08/10/06 DEQ
13 01 06 02 Public Requests DEQ email to PRIMUS re: Answers to Superfund questions 08/11/06 DEQ
13 01 06 02 Public Requests DEQ internal email re: Water quality in Livingston 08/11/06 DEQ internal
13 01 06 02 Public Requests DEQ email to PRIMUS re: Water quality in Livingston 08/14/06 DEQ
13 01 06 02 Public Requests DEQ internal emails re: Water quality in Livingston 08/14/06 DEQ internal
13 01 06 02 Public Requests DEQ/Envirocouncil emails re: Isoconcentration maps 08/30/06
13 01 06 02 Public Requests 09/11/06 Saprina Bates
13 01 06 02 Public Requests 09/11/06 DEQ internal
13 01 06 02 Public Requests Phone Log – DEQ to Saprina Bates re: Relocation of residence 09/13/06 DEQ
13 01 06 02 Public Requests 10/02/06 DEQ
13 01 06 02 Public Requests 10/23/06 DEQ
13 01 06 02 Public Requests 10/23/06 DEQi
13 01 06 02 Public Requests DEQ & EPA emails re: Livingston info request – Dr Schulein 10/24/06
13 01 06 02 Public Requests DEQ & K Parkes emails re: Cost of cleanup comparisons 10/24/06
13 01 06 02 Public Requests DEQ/RTI emails re: Test wells 10/24/06
13 01 06 02 Public Requests 12/01/06
13 01 06 02 Public Requests 12/07/06
13 01 06 02 Public Requests DEQ email to M Ross re: Response to Information request 12/28/06 DEQ
Site-Wide Information
Information Requests
Phone Log – Bob/Governor Sweitzer’s office to DEQ re: Call from Jane Flye re: contamination signs in yard
Site-Wide Information
Information Requests
Phone Log – Michael Wainwright to DEQ re: Drinking water supply
Michael Wainwright
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Phone Log – Saprina Bates/Livingston resident to DEQ re: Relocation of residence
Site-Wide Information
Information Requests
DEQ internal email re: Saprina Bates/Livingston resident to DEQ re: Relocation of residence
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
DEQ email to Scott M @ Daily Chronical re: indoor Air Investigation
Site-Wide Information
Information Requests
DEQ email to C Poulet/EPA re: Dr Mark Schulein – testing for exposure to chlorinated solvents
Site-Wide Information
Information Requests
DEQ internal email re: Info request for comparison of costs of cleanup
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests DEQ & N MacCracken emails re: Attorney contact information
Site-Wide Information
Information Requests
DEQ & M Ross/Livingston resident emails re: Monitoring questions
Site-Wide Information
Information Requests
BN LIVINGSTON 8/26/13
Page 48 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 06 02 Public Requests 01/04/07 Northwest Energy
13 01 06 02 Public Requests Email re: Receipt for email sent to M Ross 02/06/07
13 01 06 02 Public Requests DEQ & Brian Goodman emails re: Work Plan 02/07/07
13 01 06 02 Public Requests 03/16/07 Dave Viers
13 01 06 02 Public Requests 03/19/07
13 01 06 02 Public Requests 03/22/07
13 01 06 02 Public Requests DEQ & James Wainwright emails re: Envirocon 04/30/07
13 01 06 02 Public Requests DEQ & N MacCracken emails re: Contamination 5/16-5/21/07
13 01 06 02 Public Requests DEQ & N MacCracken emails re: Contact information 05/24/07
13 01 06 02 Public Requests DEQ internal email re: Info request (6/5/07-6/7/07) 06/07/07 DEQ internal
13 01 06 02 Public Requests DEQ internal email re: Dewatering in Livingston 06/11/07 DEQ internal
13 01 06 02 Public Requests DEQ internal email re: RTI follow-up 06/12/07 DEQ internal
13 01 06 02 Public Requests DEQ internal email re: BN Livingston contact 06/19/07 DEQ internal
13 01 06 02 Public Requests DEQ & L Frederick Communication Log re: Well sampling 06/20/07
13 01 06 02 Public Requests 07/31/07
13 01 06 02 Public Requests DEQ & ERA Landmark emails re: DEQ website link 8/15-8/21/07
13 01 06 02 Public Requests 08/29/07 DEQ
13 01 06 02 Public Requests DEQ email to Moore re: Livingston maps 08/30/07 DEQ
13 01 06 02 Public Requests DEQ internal email re: Phone message 08/31/07 DEQ internal
13 01 06 02 Public Requests 09/04/07 BNSF
13 01 06 02 Public Requests DEQ & B Gonder emails re: Property owner questions 09/13/07
13 01 06 02 Public Requests DEQ letter to J Burgess re: Site information 10/01/07 DEQ
Site-Wide Information
Information Requests
Phone Log – Pat Asay/Northwest Energy to DEQ re: Expansion of Northwest Energy facility
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Phone Log – Dave Viers/Livingston resident to DEQ re: EX -10 well results
Site-Wide Information
Information Requests
Phone Log – Dick Murphy/Park Co Commissioner to DEQ re: Contamination in East Livingston north of railroad tracks
Park Co. Commissioner
Site-Wide Information
Information Requests
DEQ & Ed Meece/Livingston City Manager re: Livingston RR Yards
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
DEQ & ERA Landmark emails re: Livingston Plume/Realtors Meeting
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests DEQ email to Scott @yourhomeinmontana re: Livingston maps
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
BNSF letter to Bruce Lay/Coldwell Banker re: Buy-sell agreement
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
BN LIVINGSTON 8/26/13
Page 49 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 06 02 Public Requests DEQ & ERA Landmark emails re: Livingston property 10/18/07
13 01 06 02 Public Requests DEQ email to DEA Inc re: Plume map 12/05/07 DEQ
13 01 06 02 Public Requests DEQ & Gaia Tech emails re: Groundwater plume 12/06/07
13 01 06 02 Public Requests DEQ fax to BKBH re: Mailing list 12/14/07 DEQ
13 01 06 02 Public Requests DEQ & BKBH emails re: Document research 01/24/08
13 01 06 02 Public Requests 02/20/08
13 01 06 02 Public Requests KJ & DEQ emails re: BN Livingston files 02/28/08
13 01 06 02 Public Requests 3/13-3/17/08
13 01 06 02 Public Requests DEQ email to KL Gates re: Contact with DEQ staff 03/18/08 DEQ
13 01 06 02 Public Requests DEQ & Amsk email re: PVC question 03/18/08
13 01 06 02 Public Requests 4/17-4/24/08
13 01 06 02 Public Requests 4/17-4/24/08
13 01 06 02 Public Requests 02/02/09
13 01 06 02 Public Requests BKBK letter to DEQ re: Records request 07/09/10 BKBH
13 01 06 02 Public Requests 07/21/10 DEQ Legal
13 01 06 02 Public Requests 08/04/10 DEQ Legal
13 01 06 02 Public Requests 09/23/10
13 01 06 02 Public Requests DEQ/Reynolds & Valulytics/Rodi emails re: 513 North Street 10/27/10
13 01 06 02 Public Requests DEQ/Reynolds & Valulytics/Rodi emails re: 106 South I Street 11/09/10
13 01 06 02 Public Requests 12/08/10 DEQ
13 01 06 02 Public Requests 12/10/10 DEQ/ Reynolds
13 01 06 02 Public Requests 12/22/10
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
City Manager/Rep. Ebinger & DEQ emails re: Test well at Mayor’s Landing
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
KL Gates & DEQ internal emails re: Public records request (3/13/08-3/17/08)
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Water Right Solutions/DEQ/CDM emails re: BN Livingston Complex question
Site-Wide Information
Information Requests
Water Right Solutions & DEQ emails re: BN Livingston Complex
Site-Wide Information
Information Requests
DEQ & Hebbard Blesius/ERA Landmark re: Blesius request for plume information
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
DEQ Legal/Haque-Hausrath email to BKBH/John re: Records request
Site-Wide Information
Information Requests
DEQ Legal/ Haque-Hausrath Letter/email to BKBH/Dan re: DEQ response to BKBH Records request
Site-Wide Information
Information Requests DEQ/Reynolds & Valuytics/Rodi emails re: 111 North H Street
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests
DEQ/Wallis email to WET/Thomson re: Site file guide to be reviewed
Site-Wide Information
Information Requests
DEQ/Reynolds email to Earth & Water/Nicklin re: Attachment – Livingston _GW_VOC
Site-Wide Information
Information Requests
C Lawellin, DEQ/Reynolds, K/J/Norris & MT Rail/Keegan emails re: BN site remediation – signal dept cleaning up Matl. Area
BN LIVINGSTON 8/26/13
Page 50 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 06 02 Public Requests 12/22/10 DEQ/ Reynolds
13 01 06 02 Public Requests DEQ internal emails re: BKBH request for records 01/25/11 DEQ internal
13 01 06 02 Public Requests 02/11/11 DEQ/ Whittenberg
13 01 06 02 Public Requests 03/07/11
13 01 06 02 Public Requests 03/12/12 DEQ/ Reynolds
13 01 06 02 Public Requests 03/12/12 DEQ/ Reynolds
13 01 06 02 Public Requests 04/16/12
13 01 06 02 Public Requests 05/14/12
13 01 06 02 Public Requests 05/18/12 DEQ/ Reynolds
13 01 06 02 Public Requests 04/09/13 DEQ/ Reynolds
13 01 06 02 Public Requests 04/10/13
13 01 06 03
13 01 06 03 Miscellaneous EPA email to DEQ re: Info request 09/21/00 EPA
13 01 06 03 Miscellaneous Phone Log: Western States Bio Solve 10/22/01
13 01 06 03 Miscellaneous DEQ email to Ray Miline re: HiPOx treatment of groundwater 01/11/02 DEQ
13 01 06 03 Miscellaneous DEQ letter to Lee-Roark re: MDT Phase I 05/05/03 DEQ
13 01 06 03 Miscellaneous 08/14/03 DEQ
13 01 06 03 Miscellaneous DEQ email to Tetra Tech re: Retec Fate & Transport Model 12/31/03 DEQ
13 01 06 03 Miscellaneous 04/07/06 M Ross
13 01 06 03 Miscellaneous 05/22/06 DEQ
13 01 06 03 Miscellaneous 05/24/06 Rob Lober
Site-Wide Information
Information Requests
DEQ/Reynolds email to C Lawellin re: BN site remediation – signal dept cleaning up Matl. Area
Site-Wide Information
Information Requests
Site-Wide Information
Information Requests DEQ/Whittenberg letter to BKBH/Tietz re: Request for Records
Site-Wide Information
Information Requests
DEQ/Reynolds & Kurt Holm emails re: Appraisal of 615 E Gallatin
Site-Wide Information
Information Requests
DEQ/Reynolds email to Bob Farrell re: Resident concerned about vapor intrusion
Site-Wide Information
Information Requests
DEQ/Reynolds & Bob Farrell emails re: Resident concerned about vapor intrusion
Site-Wide Information
Information Requests
DEQ/Martin internal email to Reynolds re: Phone Log - Concerned citizen
DEQ/Martin internal
Site-Wide Information
Information Requests
CDM Smith/Larson email to DEQ/Reynolds re: FYI - Sent PCE & LNAPL files to Erica Hoffman at Park County
CDM Smith/ Larson
Site-Wide Information
Information Requests
DEQ/Reynolds letter to Debby Bickford re: Response to inquiry re- Conditions at BN Shop Complex
Site-Wide Information
Information Requests
DEQ/Reynolds email to Lynette Zwereman re: Response to information request
Site-Wide Information
Information Requests
Environmental Council/Kerry Fee email to DEQ/Reynolds re: Response to DEQ email about Lynette Zwerneman info request
Environmental Council/Fee
Site-Wide Information
Information Requests
Miscellaneous (Documents dated before 9/21/00 are not itemized)
1162/ 34A503
Site-Wide Information
Information Requests
1162/ 34A503
Site-Wide Information
Information Requests
1162/ 34A503
Site-Wide Information
Information Requests
1162/ 34A503
Site-Wide Information
Information Requests
1162/ 34A503
Site-Wide Information
Information Requests
DEQ email to Scott re: Superfund Redevelopment initiative info request
1162/ 34A503
Site-Wide Information
Information Requests
1162/ 34A503
Site-Wide Information
Information Requests
Resident/M Ross email to DEQ/Keck re: Request for air sampling
1162/ 34A503
Site-Wide Information
Information Requests
Phone Log – DEQ to Kennedy Jenks re: Contact directly with CDM not appropriate
1162/ 34A503
Site-Wide Information
Information Requests
Phone Log – Rob Lober voice mail to DEQ re: Acquisition of the LRC property
BN LIVINGSTON 8/26/13
Page 51 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 06 03 Miscellaneous 05/25/06 Talgo/Perez
13 01 06 03 Miscellaneous 05/30/06 Cascade Drilling
13 01 06 03 Miscellaneous DEQ & MRL emails re: Subsurface structures 06/06/06
13 01 06 03 Miscellaneous Phone Log - Brian Blicker/PCEC to DEQ re: Update 08/07/06 PCEC/Blicker
13 01 06 03 Miscellaneous 08/08/06 D Erickson
13 01 06 03 Miscellaneous CDM email to DEQ re: Isoconcentration Maps 08/09/06 CDM
13 01 06 03 Miscellaneous 09/26/06
13 01 06 03 Miscellaneous 09/28/06
13 01 06 03 Miscellaneous 10/05/06 DEQ internal
13 01 06 03 Miscellaneous DEQ email to Todd Everts re: Work Plan for Task D& E 10/06/06 DEQ
13 01 06 03 Miscellaneous CDM info request for Contract: 402009 TO 37 Status Reports 11/27/06 CDM
13 01 06 03 Miscellaneous DEQ letter to D Smith re: Monthly Progress Reports 12/05/06 DEQ
13 01 06 03 Miscellaneous 03/14/07 DEQ internal
13 01 06 03 Miscellaneous DEQ & RTI emails re: Maps of LRY plume 03/23/07
13 01 06 03 Miscellaneous 09/01/10 DEQ legal
13 01 06 03 Miscellaneous 09/03/10 DEQ legal
13 01 06 03 Miscellaneous 09/08/10 BKBH/Berry
13 01 06 03 Miscellaneous 09/08/10 BKBH/Berry
13 01 06 03 Miscellaneous DEQ/Reynolds & Signe Lahren emails re: Livingston Plume 09/16/10
13 01 07 RI/FS
13 01 07 01 RI/FS Schedules 6/90-3/93
13 01 07 02 RI/FS
1162/ 34A503
Site-Wide Information
Information Requests
Phone Log – Antonio Perez/Talgo to DEQ re: National Railway interested in purchasing some or all of Talgo property
1162/ 34A503
Site-Wide Information
Information Requests
Phone Log – Jim Pender/Cascade Drilling to DEQ re: Interested in helping with drilling
1162/ 34A503
Site-Wide Information
Information Requests
1162/ 34A503
Site-Wide Information
Information Requests
1162/ 34A503
Site-Wide Information
Information Requests
Phone Log – Dave Erickson to DEQ re: Status of tasks at facility
1162/ 34A503
Site-Wide Information
Information Requests
1162/ 34A503
Site-Wide Information
Information Requests
Phone Log – Ed Meece/City Manager, Livingston to DEQ re: Press release
City Manager/ Meece
1162/ 34A503
Site-Wide Information
Information Requests
DEQ & Ed Meece/City Manager, Livingston emails re: Press release
1162/ 34A503
Site-Wide Information
Information Requests
DEQ internal email re: EQC request –Work Plan for Task E & F
1162/ 34A503
Site-Wide Information
Information Requests
1162/ 34A503
Site-Wide Information
Information Requests
1162/ 34A503
Site-Wide Information
Information Requests
1162/ 34A503
Site-Wide Information
Information Requests
DEQ internal emails re: D Smith/BNSF requested copies of current CDM & Tetra Tech contracts
1162/ 34A503
Site-Wide Information
Information Requests
1162/ 34A503
Site-Wide Information
Information Requests
DEQ Legal/Haque-Hausrath email to BKBH/John re: Copies of time logs available
1162/ 34A503
Site-Wide Information
Information Requests
DEQ Legal/Travis letter to BKBH/Laughner re: Contaminated soils transported in uncovered rail cars
1162/ 34A503
Site-Wide Information
Information Requests
BKBH/Berry letter to DEQ Legal/S Travis re: Response to DEQ 9/3/10 letter
1162/ 34A503
Site-Wide Information
Information Requests
BKBH/Berry letter to DEQ Legal/S Travis re: Change of BKBH contact person
1162/ 34A503
Site-Wide Information
Information Requests
Site-Wide Information
1000/ 45A406
Site-Wide Information
Site-Wide Information
Contractor Selection (no file)
BN LIVINGSTON 8/26/13
Page 52 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 07 03 RI/FS 6/88-4/90
13 01 07 04 RI/FS 04/01/89
13 01 07 04 RI/FS MDHES Work Plan Comments (6/88-4/89)
13 01 07 04 RI/FS Final Interim Source Control Work Plan Sludge Isolation 11/29/89 Envirocon
13 01 07 04 RI/FS Amendments to the Interim Remedial Measures Work Plan 121/89 Envirocon
13 01 07 04 RI/FS Envirocon Fax to MPHES re: Sludge Characterization 11/01/91 Envirocon
13 01 07 04 RI/FS Phase II Remedial Investigation Work Plans 02/06/92 Envirocon
13 01 07 04 01 RI/FS 9/87-10/92
13 01 07 04 01 RI/FS February 1988 Trip Report well installation & sampling 05/01/88 ReTec
13 01 07 04 01 RI/FS April 1988 Trip Report well installation & sampling 05/01/88 ReTec
13 01 07 04 02 RI/FS
13 01 07 04 02 RI/FS Ambient Air Monitoring Report Livingston Railyard 02/28/91 Envirocon/ Bison
13 01 07 04 02 RI/FS Second Quarterly Ambient Air Monitoring Report 06/07/91 Envirocon/ Bison
1000/ 45A406
Site-Wide Information
RI/FS Scoping and Public Hearing Comments on IRMWP (MDHES response)
1001/ 45A501
Site-Wide Information
Workplan - Remedial Measures WP w/Amendments & Addendums
1001/ 45A501
Site-Wide Information
Workplan - Remedial Measures WP w/Amendments & Addendums
1001/ 45A501
Site-Wide Information
Workplan - Remedial Measures WP w/Amendments & Addendums
1001/ 45A501
Site-Wide Information
Workplan - Remedial Measures WP w/Amendments & Addendums
1001/ 45A501
Site-Wide Information
Workplan - Remedial Measures WP w/Amendments & Addendums
1001/ 45A501
Site-Wide Information
Workplan - Remedial Measures WP w/Amendments & Addendums
1001/ 45A501
Site-Wide Information
Additional Monitoring Wells/Other Drilling Activities
1001/ 45A501
Site-Wide Information
Additional Monitoring Wells/Other Drilling Activities
1001/ 45A501
Site-Wide Information
Additional Monitoring Wells/Other Drilling Activities
1163/ 34A505
Site-Wide Information
Ambient Air Monitoring Plan/14-4/includes sample data
1163/ 34A505
Site-Wide Information
Ambient Air Monitoring Plan/14-4/includes sample data
1163/ 34A505
Site-Wide Information
Ambient Air Monitoring Plan/14-4/includes sample data
BN LIVINGSTON 8/26/13
Page 53 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 07 04 02 RI/FS Third Quarterly Ambient Air Monitoring Report (Envirocon 10/11/91 Envirocon
13 01 07 04 02 RI/FS Fourth Quarterly Report Ambient Air Monitoring Report 11/21/91 Envirocon
13 01 07 04 02 RI/FS 1991 Annual Air Quality Data Summary 04/02/92 Bison
13 01 07 04 02 RI/FS Second Quarter 1992 Ambient Air Monitoring Report 08/28/92 Envirocon
13 01 07 04 02 RI/FS 01/12/93 Envirocon
13 01 07 04 RI/FS Basement Gas
13 01 07 04 03 01 RI/FS
13 01 07 04 03 02 RI/FS Phase I - Investigation
13 01 07 04 03 02 RI/FS Phase I - Investigation Envirocon letter to DEQ re: Basement Gas data 01/11/91 Envirocon
13 01 07 04 03 03 RI/FS Phase II Investigation
13 01 07 04 03 03 RI/FS Phase II Investigation 04/10/91 DHES
13 01 07 04 03 03 RI/FS Phase II Investigation Envirocon
13 01 07 04 03 03 RI/FS Phase II Investigation Revised Draft Indoor Air Quality Investigation Work Plan 01/07/92 Envirocon
13 01 07 04 03 03 RI/FS Phase II Investigation Revised Draft Indoor Air Quality Investigation Work Plan 01/27/92 Envirocon
13 01 07 04 03 03 RI/FS Phase II Investigation Livingston Rail Yard Indoor Air Quality Investigation Report 03/27/92 Envirocon
13 01 07 04 03 03 RI/FS Phase II Investigation 03/27/92 Envirocon
13 01 07 04 03 04 RI/FS
13 01 07 04 03 04 RI/FS 05/14/92 CDM
13 01 07 04 03 04 RI/FS 06/04/92 DEQ
13 01 07 04 03 04 RI/FS 69/92 CDM
1163/ 34A505
Site-Wide Information
Ambient Air Monitoring Plan/14-4/includes sample data
1163/ 34A505
Site-Wide Information
Ambient Air Monitoring Plan/14-4/includes sample data
1163/ 34A505
Site-Wide Information
Ambient Air Monitoring Plan/14-4/includes sample data
1163/ 34A505
Site-Wide Information
Ambient Air Monitoring Plan/14-4/includes sample data
1163/ 34A505
Site-Wide Information
Ambient Air Monitoring Plan/14-4/includes sample data
Livingston Rail Yard Ambient Air Monitoring Report Third Quarter 1992 and October 1991 Through September 1992 One-Year Summary
Site-Wide Information
1163/ 34A505
Site-Wide Information
Early MDHES Basement Gas Samples
1163/ 34A505
Site-Wide Information
1163/ 34A505
Site-Wide Information
1163/ 34A505
Site-Wide Information
1163/ 34A505
Site-Wide Information
DHES letter to Envirocon re: Confirmation soil gas screening - Consent Decree violation
1163/ 34A505
Site-Wide Information
Envirocon letter to DEQ re: Response to DEQ April 24, 1991 letter
1163/ 34A505
Site-Wide Information
1163/ 34A505
Site-Wide Information
1163/ 34A505
Site-Wide Information
1163/ 34A505
Site-Wide Information
Livingston Rail Yard Indoor Air Quality Investigation Report Appendices
1163/ 34A505
Site-Wide Information
Phase II Investigation Risk Assessment
1163/ 34A505
Site-Wide Information
Phase II Investigation Risk Assessment
Preliminary Assessment of the Livingston Rail yard Indoor Air Quality Investigation Report
1163/ 34A505
Site-Wide Information
Phase II Investigation Risk Assessment DEQ letter to BNSF/BKBH re: Proposed SOW - Basement Gas
1163/ 34A505
Site-Wide Information
Phase II Investigation Risk Assessment
Preliminary Assessment of the Livingston Rail yard Indoor Air Quality Investigation Report
BN LIVINGSTON 8/26/13
Page 54 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 07 04 03 05 RI/FS Phase III Investigation
13 01 07 04 03 05 RI/FS Phase III Investigation Livingston Rail Yard Indoor Air Quality Investigation Report 03/27/92 Envirocon
13 01 07 04 03 05 RI/FS Phase III Investigation DEQ Memo re: Need for additional basement gas sampling 07/21/92 DEQ
13 01 07 04 03 05 RI/FS Phase III Investigation Phase III Indoor Air Quality Investigation Report 12/07/92 Envirocon
13 01 07 04 03 05 RI/FS Phase III Investigation 04/05/93 CDM
13 01 07 04 03 05 01 RI/FS Phase IV Investigation Soil-Venting Treatability-Test Work Plan 04/02/93 Envirocon
13 01 07 04 03 06 RI/FS Test System Installation
13 01 07 04 03 RI/FS 8/89-8/92
13 01 07 04 04 RI/FS 12/89-4/90
13 01 07 04 05 RI/FS 7/88-12/90
13 01 07 04 06 RI/FS 6/87-6/95
13 01 07 04 07 01 RI/FS 3/90-6/90
13 01 07 04 07 01 RI/FS 06/12/90 MDHES
13 01 07 04 07 02 RI/FS 3/90-9/91
13 01 07 04 07 02 RI/FS Ambient Air Quality Impact Assessment Pilot Air Stripper 11/13/90 Bison/ Envirocon
13 01 07 04 07 03 RI/FS 4/91-3/92
13 01 07 04 07 03 RI/FS 14.9 Pilot-Scale Hydrocarbon Recovery System 04/15/91
13 01 07 04 07 03 RI/FS DRAFT 14.9 Pilot-Scale Hydrocarbon Recovery System 06/13/91
13 01 07 04 07 03 RI/FS DHES internal email re: Nondegradation 03/17/92 DHES
13 01 07 04 07 04 RI/FS 5/91-3/92
1163/ 34A505
Site-Wide Information
1163/ 34A505
Site-Wide Information
1163/ 34A505
Site-Wide Information
1163/ 34A505
Site-Wide Information
1163/ 34A505
Site-Wide Information
Final Assessment of the Livingston Rail Yard Indoor Air Quality Investigation Report
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1001/ 45A501
Site-Wide Information
Ground Water Monitoring Plan/5-2
1001/ 45A501
Site-Wide Information
Diesel Fuel Sheen Monitoring Plan/5-1
1001/ 45A501
Site-Wide Information
Grit Chamber Work Plan/7-1
1002/ 45A504
Site-Wide Information
Hydrocarbon Recovery (3 folders)
1002/ 45A504
Site-Wide Information
Phase I - Hydrocarbon Recovery Evaluation Test Cell 1 & 2/6-1 (Documents dated before 6/12/1990 are not itemized)
1002/ 45A504
Site-Wide Information
Phase I - Hydrocarbon Recovery Evaluation Test Cell 1 & 2/6-1
MDHES letter to KOK/Envirocon re: Comments to test cell #2 Hydrocarbon recovery WP
1002/ 45A504
Site-Wide Information
Hydrocarbon Recovery Test Cell 3/14-7
1002/ 45A504
Site-Wide Information
Hydrocarbon Recovery Test Cell 3/14-8
1002/ 45A504
Site-Wide Information
Hydrocarbon Recovery Test Cell 4/14-9
1002/ 45A504
Site-Wide Information
Hydrocarbon Recovery Test Cell 4/14-9
1002/ 45A504
Site-Wide Information
Hydrocarbon Recovery Test Cell 4/14-9
1002/ 45A504
Site-Wide Information
Hydrocarbon Recovery Test Cell 4/14-9
1002/ 45A504
Site-Wide Information
Hydrocarbon Recovery Test Cell 5
BN LIVINGSTON 8/26/13
Page 55 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 07 04 08 RI/FS
13 01 07 04 09 RI/FS 1/90-7/94
13 01 07 04 09 RI/FS BN Livingston Field Note December 1990
13 01 07 04 09 RI/FS BN Livingston Record Mission Wye 1/2/91-4/16/93
13 01 07 04 10 RI/FS Sludge Management 11/89-10/91
13 01 07 04 10 RI/FS Sludge Management Interim Source Control Work Plan Sludge Isolation 11/01/89 Envirocon
13 01 07 04 10 RI/FS Sludge Management Final Interim Source Control Work Plan Sludge Isolation 11/29/89 Envirocon
13 01 07 04 10 RI/FS Sludge Management 11/08/90 Envirocon
13 01 07 04 10 RI/FS Sludge Management DEQ Memo re: Haz Waste Regulations 07/15/91 DEQ
13 01 07 04 10 RI/FS Sludge Management Envirocon letter to DHES re: Sludge Characterization 10/14/91 Envirocon
13 01 07 04 11 RI/FS Soils Investigation/4-1 4/91-11/92
13 01 07 04 12 RI/FS 6/90-3/95
13 01 07 04 12 RI/FS DHES letter to Envirocon re: Vapor Extraction Test extension 08/05/91 DHES
13 01 07 04 12 RI/FS 11/15/91 Envirocon
13 01 07 04 12 RI/FS 02/13/92 Envirocon
13 01 07 04 12 RI/FS Monthly Soil Vapor Extraction Report 04/01/92 Envirocon
13 01 07 04 12 RI/FS March 1992 Monthly Soil Vapor Extraction Report 05/18/92 Envirocon
13 01 07 04 12 RI/FS April 1992 Soil Vapor Extraction Report 06/09/92 Envirocon
13 01 07 04 12 RI/FS May and June 1992 Soil Vapor Extraction Report 08/03/92 Envirocon
Site-Wide Information
Private Wells Survey (In File #13-01-26-07-02)
1001/ 45A501
Site-Wide Information
Miscellaneous Field Activities
1001/ 45A501
Site-Wide Information
Miscellaneous Field Activities
1001/ 45A501
Site-Wide Information
Miscellaneous Field Activities
1001/ 45A501
Site-Wide Information
1001/ 45A501
Site-Wide Information
1001/ 45A501
Site-Wide Information
1001/ 45A501
Site-Wide Information
Envirocon letter to DHES re: Comment response, Sludge Dessication Work Plan
1001/ 45A501
Site-Wide Information
1001/ 45A501
Site-Wide Information
1001/ 45A501
Site-Wide Information
1003/ 45A502
Site-Wide Information
Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)
1003/ 45A502
Site-Wide Information
Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)
1003/ 45A502
Site-Wide Information
Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)
DRAFT Removal-Action Work Plan for Soils Containing Chlorinated Volatile Organic Compounds
1003/ 45A502
Site-Wide Information
Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)
Removal-Action Work Plan for Soils Containing Chlorinated Volatile Organic Compounds
1003/ 45A502
Site-Wide Information
Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)
1003/ 45A502
Site-Wide Information
Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)
1003/ 45A502
Site-Wide Information
Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)
1003/ 45A502
Site-Wide Information
Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)
BN LIVINGSTON 8/26/13
Page 56 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 07 04 12 RI/FS Third Quarter 1992 Soil Vapor Extraction Report 11/03/92 Envirocon
13 01 07 04 12 RI/FS Fourth Quarter 1992 Soil Vapor Extraction Report 01/15/93 Envirocon
13 01 07 04 12 RI/FS 04/02/93 Envirocon
13 01 07 04 12 RI/FS 05/21/93 Envirocon
13 01 07 04 12 RI/FS First Quarter 1993 Soil Vapor Extraction Report 05/27/93 Envirocon
13 01 07 04 12 RI/FS Second Quarter 1993 Soil Vapor Extraction Report 09/07/93 Envirocon
13 01 07 04 12 RI/FS Third and Fourth Quarter 1993 Soil Vapor Extraction Report 01/24/94 Envirocon
13 01 07 04 12 RI/FS First Quarter 1994 Soil Vapor Extraction Results 04/18/94 Envirocon
13 01 07 04 12 RI/FS 1994 Annual Soil Vapor Extraction Report 09/08/94 Envirocon
13 01 07 04 13 RI/FS SPCC Plan 5/90-10/90
13 01 07 04 14 RI/FS 1/90-2/90
13 01 07 04 15 RI/FS Surficial Soils 1/87-7/92
13 01 07 04 15 RI/FS Surficial Soils Surficial-Soil Investigation Report 07/20/92 Envirocon
13 01 07 04 15 RI/FS Surficial Soils Surficial-Soil Investigation Report Appendix B 07/29/92 Envirocon
13 01 07 04 16 RI/FS Asbestos 2/91-8/08
13 01 07 04 16 RI/FS C Anderson email to C Boehm re: Asbestos complaint 08/30/07 C Anderson
13 01 07 04 16 RI/FS DEQ internal email re: Asbestos remediation in Livingston 08/22/08 DEQ internal
13 01 07 04 17 RI/FS Track Pan Installation 8/90-6/93
1003/ 45A502
Site-Wide Information
Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)
1003/ 45A502
Site-Wide Information
Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)
1003/ 45A502
Site-Wide Information
Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)
Soil-Venting Treatability-Test Work Plan for the Livingston Rail Yard
1003/ 45A502
Site-Wide Information
Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)
Soil-Venting/Air-Sparging Treatability-Test Work Plan for the Livingston Rail Yard
1003/ 45A502
Site-Wide Information
Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)
1003/ 45A502
Site-Wide Information
Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)
1003/ 45A502
Site-Wide Information
Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)
1003/ 45A502
Site-Wide Information
Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)
1003/ 45A502
Site-Wide Information
Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)
1003/ 45A502
Site-Wide Information
1003/ 45A502
Site-Wide Information
Stained Gravels Removal Plan
1003/ 45A502
Site-Wide Information
1003/ 45A502
Site-Wide Information
1003/ 45A502
Site-Wide Information
1003/ 45A502
Site-Wide Information
Site-Wide Information
Site-Wide Information
1003/ 45A502
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 57 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 07 04 17 RI/FS Track Pan Installation Soil Removal 12/14/90 Envirocon
13 01 07 04 18 RI/FS
13 01 07 04 18 01 RI/FS
13 01 07 04 18 01 RI/FS 06/12/90 MDHES
13 01 07 04 18 01 RI/FS Envirocon fax to MDHES re: Submittal of Addendum 14-6 08/31/90 Envirocon
13 01 07 04 18 02 RI/FS 5/90-9/91
13 01 07 04 19 RI/FS 5/87-1/89
13 01 07 04 19 RI/FS Soil Gas Investigation Livingston Montana Fueling Facility 01/01/89
13 01 07 04 20 RI/FS Sludge Removal 2/91-6/93
13 01 07 04 20 RI/FS Sludge Removal DHES letter to Envirocon re: Sludge Removal Plan 06/24/91 DHES
13 01 07 04 20 RI/FS Sludge Removal Y ** Transmittal to DHES from J Larson re: TCRA 03/16/92 J Larson
13 01 07 04 20 RI/FS Sludge Removal Y ** J Larson memo to DHES re: TCRA 03/24/92 J Larson
13 01 07 04 20 RI/FS Sludge Removal Sludge Removal-Action Work Plan 05/29/92 Envirocon
13 01 07 04 21 RI/FS
13 01 07 04 21 01 RI/FS
13 01 07 04 21 02 RI/FS Overhead Transparencies
13 01 07 04 21 03 RI/FS
13 01 07 04 21 04 RI/FS
13 01 07 04 21 05 RI/FS 1993-1995 Slides
13 01 07 04 21 06 RI/FS 1992 Slides
13 01 07 04 21 07 RI/FS 1991 Photos & Slides
1003/ 45A502
Site-Wide Information
Site-Wide Information
Wastewater Treatment Plan
1003/ 45A502
Site-Wide Information
Wastewater Treatment Plan/14-6 (Documents dated before 6/12/90 are not itemized)
1003/ 45A502
Site-Wide Information
Wastewater Treatment Plan/14-6
MDHES letter to KOK/Envirocon re: Sludge management Plan, WWTP
1003/ 45A502
Site-Wide Information
Wastewater Treatment Plan/14-6
1003/ 45A502
Site-Wide Information
Wastewater Treatment Plan/14-2
1003/ 45A502
Site-Wide Information
Early ReTec/BN Livingston Workplans
Site-Wide Information
Early ReTec/BN Livingston Workplans
Remediation Technologies
1004/ 45A505
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
1004/ 45A505
Site-Wide Information
Site-Wide Information
Presentations/Slides/ Photos
1004/ 45A505
Site-Wide Information Presentations (3/94-2/98)
1004/ 45A505
Site-Wide Information
Site-Wide Information
Joe's Slides 12/90 - 5/93 (in file 13-01-07-04-21-08)(not on shelf)
Site-Wide Information
RI & Removal & Remedial Action Slides 7/93 - 9/93 (file empty)
1004/ 45A505
Site-Wide Information
1004/ 45A505
Site-Wide Information
1004/ 45A505
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 58 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 07 04 21 08 RI/FS
13 01 07 04 21 09 RI/FS 1990 Slides
13 01 07 04 21 10 RI/FS 1988-89 Slides
13 01 07 04 21 11 RI/FS Slides UST 1988-89
13 01 07 04 22 RI/FS
13 01 07 04 22 01 RI/FS 4/92-6/92
13 01 07 04 22 02 RI/FS DNAPL Investigation/5.1 4/92-8/92
13 01 07 04 22 03 RI/FS 4/92-7/92
13 01 07 04 23 RI/FS Soil Gas Sampling/9-1
13 01 07 04 23 RI/FS Soil Gas Sampling/9-2 7/88-1/92 ReTec
13 01 07 04 24 RI/FS 5/90-9/91
13 01 07 04 25 RI/FS Phase II RI-Soil/3.2 5/92-6/92
13 01 07 04 26 RI/FS 10/07/94 Envirocon
13 01 07 04 26 RI/FS Confirmation Soil Sampling Work Plan 12/05/95 Envirocon
13 01 07 04 27 RI/FS
13 01 07 04 28 RI/FS Miscellaneous Maps
13 01 07 04 28 RI/FS Miscellaneous Maps Miscellaneous Maps
13 01 07 04 28 RI/FS Miscellaneous Maps Comprehensive Well Map 07/01/07 KJ
13 01 07 05 RI/FS 3/91-5/92
13 01 07 05 RI/FS 05/18/92 Envirocon
13 01 07 06 RI/FS QAPP 2/87-3/91 Envirocon
1004/ 45A505
Site-Wide Information
1990 Photos/Joe's Slides 12/90 - 5/93
1004/ 45A505
Site-Wide Information
1004/ 45A505
Site-Wide Information
1004/ 45A505
Site-Wide Information
Site-Wide Information
Miscellaneous Work Plans (not on shelf)
1004/ 45A505
Site-Wide Information
Chlorinated Hydrocarbon Column Study/4.1
1004/ 45A505
Site-Wide Information
1004/ 45A505
Site-Wide Information
Yellowstone River Underflow Investigations/5.2
1004/ 45A505
Site-Wide Information
1004/ 45A505
Site-Wide Information
Work Plan to Perform a Soil Gas Investigation Livingston MT Fueling Facility
1004/ 45A505
Site-Wide Information
Analytical Characterization Amendment/4.2
1004/ 45A505
Site-Wide Information
1005/ 45A503
Site-Wide Information
Confirmation Soil Sampling Work Plan
1005/ 45A503
Site-Wide Information
Confirmation Soil Sampling Work Plan
1005/ 45A503
Site-Wide Information
Electric Shop Work Plan June 18, 1999 (3/95-4/00)
1005/ 45A503
Site-Wide Information
1005/ 45A503
Site-Wide Information
1005/ 45A503
Site-Wide Information
1005/ 45A503
Site-Wide Information
Data Management Work Plan 9-2, 10-2
1005/ 45A503
Site-Wide Information
Data Management Work Plan 9-2, 10-3
Environmental Information Management Software Reporting Program User's Guide
1005/ 45A503
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 59 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 07 06 RI/FS QAPP 03/22/91 Envirocon
13 01 07 07 RI/FS 1989-1991
13 01 07 08 RI/FS
13 01 07 09 RI/FS
13 01 07 09 RI/FS Health & Safety Plan Site Specific H&S Plan – Railyard 01/01/98
13 01 07 09 RI/FS Health & Safety Plan DEQ Health & Safety Plan for well sampling 05/22/01 DEQ
13 01 07 10 RI/FS Review Comments 3/89-11/89
13 01 07 11 RI/FS Response to Comments 4/89-11/89
13 01 07 12 RI/FS
13 01 07 13 RI/FS
13 01 07 13 RI/FS MDHES letter to KOK/Envirocon re: Sludge Pit waste 06/12/90 MDHES
13 01 07 13 RI/FS 10/28/92 MDHES
13 01 07 13 RI/FS 11/17/92 MDHES
13 01 07 13 RI/FS 03/01/93 Envirocon
13 01 07 13 RI/FS 04/16/93 Envirocon
13 01 07 13 RI/FS Safety -Kleen manifest-400 gallons diesel fuel 08/18/93 Safety Kleen
13 01 07 13 RI/FS 09/03/93 BKBH
1005/ 45A503
Site-Wide Information
May 1989 Through May 1990 Yearly Quality Assurance/Quality Control Report
1005/ 45A503
Site-Wide Information
MDHES Sample QA/QC Information
Site-Wide Information
Site Management Plan (file empty)
1005/ 45A503
Site-Wide Information
Health & Safety Plan (Documents dated before 5/22/01 are not itemized)
1005/ 45A503
Site-Wide Information
1005/ 45A503
Site-Wide Information
1005/ 45A503
Site-Wide Information
1005/ 45A503
Site-Wide Information
Site-Wide Information Sampling Plans (file empty)
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
MDHES letter to Mills & KOK/Envirocon re: Recycling waste oil & recovered diesel fuel
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
MDHES letter to KOK/Envirocon re: Recycling of recovered free product/fuel
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Envirocon letter to MDHES re: Disposal of fuels & contaminated soils & debris
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Envirocon letter to MDHES re: Disposal of hazardous diesel fuel
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
BKBH letter to Assistant Attorney General re: Recycling of recovered fuel
BN LIVINGSTON 8/26/13
Page 60 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 07 13 RI/FS 03/30/06 KJ
13 01 07 13 RI/FS DEQ Notification No 1 – Offsite Waste Disposal 07/12/06 KJ
13 01 07 13 RI/FS 07/28/06 KJ
13 01 07 13 RI/FS 08/11/06 KJ
13 01 07 13 RI/FS 12/14/06 DEQ
13 01 07 13 RI/FS 12/15/06 DEQ
13 01 07 13 RI/FS 12/15/06 KJ
13 01 07 13 RI/FS DEQ Notification No 2 – Offsite Waste Disposal 01/25/07 KJ
13 01 07 13 RI/FS DEQ Notification No 3 – Offsite Waste Disposal 02/06/07 KJ
13 01 07 13 RI/FS DEQ Notification No 4 – Offsite Waste Disposal 05/24/07 KJ
13 01 07 13 RI/FS DEQ Notification No 5 – Offsite Waste Disposal 06/14/07 KJ
13 01 07 13 RI/FS DEQ Notification No 6 – Offsite Waste Disposal 06/25/07 KJ
13 01 07 13 RI/FS K/J email to DEQ re: Disposal Notification No 6 06/26/07 KJ
13 01 07 13 RI/FS DEQ Notification No 7 – Offsite Waste Disposal 09/05/07 KJ
13 01 07 13 RI/FS DEQ Notification No 8 – Offsite Waste Disposal 09/05/07 KJ
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Request for Contained-In Determination Investigation-Derived Residual Water – November 2005
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Request for Contained-In Determination Investigation-Derived Residual Water – June 2006
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Request for Contained-In Determination Investigation-Derived Residual Soil
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
DEQ letter to D Smith/BNSF re: Purgewater from 11/05 GW sampling event
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
DEQ letter to D Smith/BNSF re: Purgewater from 6/06 GW sampling event
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
DEQ letter to D Smith/BNSF re: Request for Contained-In Determination Investigation-Derived Residual Soil
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
BN LIVINGSTON 8/26/13
Page 61 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 07 13 RI/FS DEQ Notification No 9 – Offsite Waste Disposal 10/05/07 KJ
13 01 07 13 RI/FS K/J email to DEQ re: Disposal Notification No 9 10/08/07 KJ
13 01 07 13 RI/FS 10/18/07 KJ
13 01 07 13 RI/FS Request for Contained-in Decision – Soil 10/23/07 KJ
13 01 07 13 RI/FS 11/13/07 DEQ
13 01 07 13 RI/FS 11/13/07 DEQ
13 01 07 13 RI/FS 11/14/07 KJ
13 01 07 13 RI/FS DEQ email to K/J re: Storing used GAC 11/14/07 DEQ
13 01 07 13 RI/FS K/J email to DEQ re: Used GAC handling procedures 11/14/07 KJ
13 01 07 13 RI/FS DEQ/KJ emails re: Various Topics 11/15/07
13 01 07 13 RI/FS DEQ Notification No 10 – Offsite Waste Disposal 11/19/07 KJ
13 01 07 13 RI/FS K/J email to DEQ re: Offsite Disposal Notification No 10 11/19/07 KJ
13 01 07 13 RI/FS DEQ/KJ emails re: Soil Contained-in HRO #4 11/20/07
13 01 07 13 RI/FS DEQ letter to D Smith/BNSF re: GAC handling procedures 01/03/08 DEQ
13 01 07 13 RI/FS DEQ/KJ email re: Offsite Disposal Summary 01/09/08
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Former Wastewater Treatment Plant Sump Excavation – Soil Sampling Analytical Results and Request for Contained-in Decision
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
DEQ letter to D Smith/BNSF re: Former WWTP Sump Excavation – Soil SAR and Request for Contained-in Decision
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
DEQ letter to D Smith/BNSF re: BN Livingston Shop Complex Facility – Request for Contained-in Determination for Investigation-Derived Soil
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
K/J letter to DEQ re: Used Granular Activated Carbon Handling Procedures
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
BN LIVINGSTON 8/26/13
Page 62 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 07 13 RI/FS DEQ Notification No 11 – Offsite Waste Disposal 05/08/08 KJ
13 01 07 13 RI/FS DEQ Notification No 12 – Offsite Waste Disposal 05/15/08 KJ
13 01 07 13 RI/FS 05/30/08 DEQ internal
13 01 07 13 RI/FS DEQ/A Adersley emails re: Livingston Documents 05/30/08
13 01 07 13 RI/FS 06/13/08 KJ
13 01 07 13 RI/FS 06/24/08 DEQ
13 01 07 13 RI/FS DEQ Notification No 13 – Offsite Waste Disposal 07/25/08 KJ
13 01 07 13 RI/FS DEQ Notification No 14 – Offsite Waste Disposal 08/21/08 KJ
13 01 07 13 RI/FS DEQ Notification No 15 – Offsite Waste Disposal 08/27/08 KJ
13 01 07 13 RI/FS Request for Contained-in Decision – Soil 08/27/08 KJ
13 01 07 13 RI/FS DEQ Letter to D Smith re: Notification No 14 08/28/08 DEQ
13 01 07 13 RI/FS DEQ Notification No 16 – Offsite Waste Disposal 08/28/08 KJ
13 01 07 13 RI/FS DEQ Notification No 17 – Offsite Waste Disposal 09/04/08 KJ
13 01 07 13 RI/FS 09/15/08 DEQ
13 01 07 13 RI/FS K/J email to DEQ re: Landspread notice HRO#9 10/03/08 KJ
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
DEQ internal email re: Comment on 5/15/08 Offsite Waste Disposal
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Request for Contained-in Determination – Used Granular Activated Carbon
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
DEQ Letter to D Smith re: Request for Contained-In Determination – Used Granular Activated Carbon
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
DEQ letter to BNSF re: Request for Contained in Decision – Soil (HRO#9)
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
BN LIVINGSTON 8/26/13
Page 63 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 07 13 RI/FS 12/04/08 KJ
13 01 07 13 RI/FS 01/19/09 KJ/Adlersley
13 01 07 13 RI/FS DEQ Notification No 18 – Offsite Waste Disposal 01/21/09 KJ
13 01 07 13 RI/FS DEQ Notification No 19 – Offsite Waste Disposal 05/19/09 KJ
13 01 07 13 RI/FS 07/13/09 DEQ
13 01 07 13 RI/FS DEQ Notification No 20 – Offsite Waste Disposal 07/15/09 KJ
13 01 07 13 RI/FS 09/02/09 KJ
13 01 07 13 RI/FS Request for Contained-in Decision – Soil 03/30/10 KJ
13 01 07 13 RI/FS 04/13/10 KJ
13 01 07 13 RI/FS 05/11/10 DEQ
13 01 07 13 RI/FS KJ email to DEQ re: Request for clarification 05/19/10 KJ
13 01 07 13 RI/FS 05/21/10 KJ
13 01 07 13 RI/FS KJ email to DEQ re: Landspreading and offsite disposal 05/26/10 KJ
13 01 07 13 RI/FS HRO#17 through HRO#19 Analytical Results 06/30/10 KJ
13 01 07 13 RI/FS 07/23/10 KJ
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Request for Contained-in Decision – Task F Stage I Part 2 Soil (Drum #48)
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
K/J/Aldersley email to DEQ/Reynolds re: Drum #48 landspread notice
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
DEQ letter to D Smith re: DEQ Notification No 19 – Offsite Waste Disposal
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
KJ letter to DEQ re: Notification No 21 – Offsite Waste Disposal
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
KJ letter to DEQ re: Notification No 22 – Offsite Waste Disposal
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet DEQ letter to BNSF re: Request for contained-in decision – soil
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
KJ letter to DEQ re: Notification No 23 – Offsite Waste Disposal
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
KJ letter to DEQ re: HRO#17 through HRO#19 request for contained-out determination
BN LIVINGSTON 8/26/13
Page 64 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 07 13 RI/FS DEQ/KJ emails re: Request for contained-out determination
13 01 07 13 RI/FS DEQ/KJ emails re: Request for contained-out determination
13 01 07 13 RI/FS 07/27/10 DEQ/ Reynolds
13 01 07 13 RI/FS 07/29/10 KJ
13 01 07 13 RI/FS Request for Contained-in Decision - SVE System Condensate 05/19/11 KJ
13 01 07 13 RI/FS 05/24/11 DEQ/ Reynolds
13 01 07 13 RI/FS 08/24/11 KJ
13 01 07 13 RI/FS 09/29/11 KJ/Alderley
13 01 07 13 RI/FS 09/29/11 KJ/Norris
13 01 07 13 RI/FS 10/04/11 DEQ/ Reynolds
13 01 07 13 RI/FS 10/18/11
13 01 07 13 RI/FS 11/23/11 KJ
13 01 07 13 RI/FS 11/30/11 DEQ/ Reynolds
13 01 07 13 RI/FS 12/08/11
13 01 07 13 RI/FS 08/24/12 KJ
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
7/23-7/26/2010
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
7/23-7/27/2010
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
DEQ/Reynolds letter to BN/Smith re: HRO#17 through HRO#19 Request for Contained-out Determination – BN Shop Complex
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
KJ letter to DEQ re: Notification No 24 – Offsite Waste Disposal
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
DEQ/Reynolds letter to BN/Smith re: Request for Contained-in Decision - SVE System Condensate
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
KJ letter to DEQ re: Notification No 25 – Offsite Waste Disposal
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
KJ/Aldersley email to DEQ/Reynolds re: Letter response to DEQ's comments on IDW quantities sent UPS 9/29/11
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
KJ letter to DEQ/Reynolds re: Response to DEQ comments on Investigation-Derived Waste (IDW) Quantities
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
DEQ/Reynolds letter to BN/Smith re: DEQ response to KJ response to DEQ comments on IDW Quantities
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
DEQ/Reynolds & KJ/Alderslet emails re: Task L & waste characterization
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
HRO#20-HRO#29, HRO #31 & 32 - IDW Characterization Analytical Results & Request for contained-in decision
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
DEQ/Reynolds letter to BN/Smith re: DEQ comments to HRO#20-29, HRO#31 & 32 IDW Analytical Results & Request for Contained-out Decisions
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
DEQ/Reynolds & KJ/Aldersley emails re: Notification of landspreading in C&P Packing Pit
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
HRO#33-HRO#39 - IDW Characterization Analytical Results & Request for contained-in decision
BN LIVINGSTON 8/26/13
Page 65 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 07 13 RI/FS 08/30/12 DEQ/ Reynolds
13 01 07 13 RI/FS 09/05/12 KJ/Adlersley
13 01 07 13 RI/FS 09/25/12 DEQ/ Reynolds
13 01 07 13 RI/FS 09/25/12 M Hendrickson
13 01 07 13 RI/FS 09/25/12 KJ/Norris
13 01 07 13 RI/FS 09/26/12
13 01 07 13 RI/FS 10/8-10/9/12
13 01 07 13 RI/FS 10/09/12 KJ/Adlersley
13 01 07 13 RI/FS 11/21/12 KJ/Norris
13 01 07 13 RI/FS
13 01 07 13 RI/FS 12/14/12 KJ/Norris
13 01 07 13 RI/FS 12/14/12 KJ
13 01 07 13 RI/FS 12/14/12 KJ
13 01 07 13 RI/FS 01/02/13 DEQ/Reynolds
13 01 07 13 RI/FS 01/02/13 DEQ/Reynolds
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
DEQ/Reynolds letter to BN/Smith re: DEQ comments to HRO#33-HRO#39 IDW Analytical Results & Request for Contained-out Decisions
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
KJ/Aldersley email to DEQ/Reynolds re: Notice of landspreading
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
DEQ/Reynolds email to Ricknold Thompson re: BN roll off bin disposal
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
DEQ/WUTMB/Hendrickson email to DEQ/Reynolds & R Thompson re: BN roll off bin disposal
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
KJ/Norris email to Republic Services/Ideson re: Attachment - Liquid-Phase GAC Profile smaples
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Ricknold Thompson email to DEQ/Reynolds re: Attachment - Photos of cleanup of dumped GAC roll off bin; & FW email from Gallatin Solid Waste Management District/Martin Bey Richnold Thompson
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
KJ/Aldersley & DEQ/Reynolds emails re: Task D&E Spent Carbon
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
KJ/Aldersley email to DEQ/Reynolds re: EPH Screen will be added to the list of required analyses
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
KJ letter to DEQ re: Notification No 27 – Offsite Waste Disposal
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
DEQ/Reynolds & KJ/Aldersley emails re: Office Waste Disposal Notification No 26
11/21/-11/30/12
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
KJ letter to DEQ re: Notification No 26 – Offsite Waste Disposal
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Request for Contained-Out Decision - Soil & Weir Tank Sediment Residuals
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Request for Contained-Out Decision - Used GAC/Soil/Debris Mix
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
DEQ/Reynolds letter to BN/Smith re: DEQ approval to BN's request for a "no longer contained in" determination for GAC/Soil Debris Mix
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
DEQ/Reynolds letter to BN/Smith re: DEQ approval to BN's request for a "Contained Out" Decision for Soil & Weir Tank Sediment Residuals in roll-off bins
BN LIVINGSTON 8/26/13
Page 66 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 07 13 RI/FS 01/25/13 KJ/Alderley
13 01 07 13 RI/FS 02/15/13 KJ/Norris
13 01 07 13 RI/FS 05/29/13 KJ/Norris
13 01 07 13 RI/FS 7/2013 IDW Tracking Sheet 07/01/13
13 01 07 13 RI/FS 07/25/13 KJ/Fernandes
13 01 07 13 RI/FS 08/01/13 DEQ/Reynolds
13 01 07 13 RI/FS 09/04/13 KJ/Fernandes
13 01 07 13 RI/FS 11/20/14 BNSF/Aldersley
13 01 08 ARARs
13 01 08 01 ARARs Correspondence 6/89-12/92
13 01 08 02 ARAR Determinations 4/92-12/92
13 01 09 RI/FS Reports
13 01 09 01 RI/FS Reports
13 01 09 02 RI/FS Reports
13 01 09 03 RI/FS Reports
13 01 09 04 RI/FS Reports
13 01 09 04 RI/FS Reports Environmental Site Audit Report (1/89) Envirocon
13 01 09 04 RI/FS Reports 1998 Annual GW Sampling Report (9/98)
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
KJ/Aldersley email to DEQ/Reynolds re: Notification of landspreading in C&P Packing pit
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
KJ/letter to DEQ/Reynolds re: Notification No 28 – Offsite Waste Disposal
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
KJ/Norris letter to DEQ/Reynolds re: offsite waste disposal notification no. 29
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
KJ/Fernandes letter to DEQ/Reynolds re: ACM/Soil contained in request
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
DEQ/Reynolds letter DEQ/Smith re: Request for No Longer Contained-In Decision - Asbestos - Containing Material (ACM)/Soil in SC-RO1 and SC-RO2 related to Task M, Shop Complex Facility
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
KJ/Fernandes letter to DEQ/Reynolds re: DEQ Notification No. 30 - Offsite Waste Disposal
Site-Wide Information
Disposal of Investigation-Derived Wastes – Tracking Sheet
HRO#50 Characterization Analytical Results and Request for a No-longer Contained-in Decision
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
Site-Wide Information
Cultural Resources Report (file empty)
Site-Wide Information
Endangered Species Report (file empty)
Site-Wide Information
Floodplain and Wetlands Assessment Report (file empty)
1006/ 45A506
Site-Wide Information
Sampling and Analysis Data
1006/ 45A506
Site-Wide Information Sampling and Analysis Data
1006/ 45A506
Site-Wide Information Sampling and Analysis Data
BN LIVINGSTON 8/26/13
Page 67 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 09 05 RI/FS Reports Draft RI Report 01/08/00
13 01 09 05 RI/FS Reports Draft RI Report 09/01/91 Envirocon
13 01 09 05 RI/FS Reports Draft RI Report Responses to Draft Remedial Investigation Report Comments 04/14/92 Envirocon
13 01 09 05 RI/FS Reports Draft RI Report 11/10/92 Envirocon
13 01 09 06 RI/FS Reports
13 01 09 07 RI/FS Reports 5/91-5/92
13 01 09 07 RI/FS Reports Preliminary Screening of Alternatives 12/26/91 Envirocon
13 01 09 08 RI/FS Reports
13 01 09 09 RI/FS Reports
13 01 09 10 RI/FS Reports Institutional Controls
13 01 09 10 RI/FS Reports Institutional Controls 06/05/10
13 01 09 10 RI/FS Reports Institutional Controls 07/30/10 DEQ/ Reynolds
13 01 09 10 RI/FS Reports Institutional Controls 08/30/10 BKBH/Wade
13 01 09 10 RI/FS Reports Institutional Controls 09/29/10 BN/Smith
13 01 09 10 RI/FS Reports Institutional Controls 11/19/10
13 01 09 10 RI/FS Reports Institutional Controls 12/03/10 BKBH
13 01 09 10 RI/FS Reports Institutional Controls 12/08/10 DEQ legal/ Kirley
13 01 09 10 RI/FS Reports Institutional Controls 03/18/11
13 01 09 10 RI/FS Reports Institutional Controls 04/25/11
1006/ 45A506
Site-Wide Information
1006/ 45A506
Site-Wide Information
Livingston Rail Yard Draft Remedial Investigation Report Volume I, Volumes II-V Appendices
1006/ 45A506
Site-Wide Information
1006/ 45A506
Site-Wide Information Draft Final Livingston Rail Yard Remedial Investigation Report
Site-Wide Information
Technologies Screening Document (file empty)
1007/ 45A601
Site-Wide Information
Alternatives Screening Document
1007/ 45A601
Site-Wide Information
Alternatives Screening Document
Site-Wide Information
Treatability Work Plan (file empty)
Site-Wide Information
Treatability Report (file empty)
Site-Wide Information
Site-Wide Information
DEQ legal/Haque-Hausrath letter to BKBH/Hoven & Berry re: Disposition of Purchased properties
DEQ legal/ Haque-Hausrath
Site-Wide Information
DEQ/Reynolds letter to BN/Smith re: BN Livingston Shop Complex Facility, Section 711 Proper & Expeditious Letter requiring Institutional Controls on Cinder Pile & Certain of BNSF’s currently owned properties
Site-Wide Information
BKBH letter to DEQ/Reynolds re: Response to DEQ 7/30/10 letter - Section 711 Proper & Expeditious Letter requiring Institutional Controls on Cinder Pile & Certain of BNSF’s currently owned properties
Site-Wide Information
BN/Smith letter to DEQ/Reynolds re: BN response to DEQ 7/30/10 letter - typo found in BKBH 8/30/10 letter, corrected in this letter
Site-Wide Information
DEQ legal/Haque-Hausrath letter to BN/BKBH/Wade re: DEQ comments on BN's 9/29/10 & 8/30/10 letters
DEQ legal/ Haque-Hausrath
Site-Wide Information
BKBH/Berry letter to DEQ Legal/Haque-Hausrath re: Schedule a meeting to discuss Institutional Controls/cinder pile
Site-Wide Information
DEQ Legal/Kirley internal email re: Institutional controls for cinder pile & other properties
Site-Wide Information
BN/Smith & DEQ Legal/Haque-Hausrath emails re: Livingston IC's DEQ March 11 letter
Site-Wide Information
BN/Smith & DEQ Legal/Haque-Hausrath emails re: Livingston IC's DEQ March 11 letter
BN LIVINGSTON 8/26/13
Page 68 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 09 10 RI/FS Reports Institutional Controls 05/16/11
13 01 09 10 RI/FS Reports Institutional Controls 06/21/11
13 01 09 10 RI/FS Reports Institutional Controls 07/14/11
13 01 09 10 RI/FS Reports Institutional Controls 07/20/11 BN/ Kaitala
13 01 09 10 RI/FS Reports Institutional Controls 07/26/11
13 01 09 10 RI/FS Reports Institutional Controls DEQ meeting notes - BN, BKBH, & DEQ IC's meeting 06/21/11 DEQ/ Reynolds
13 01 09 10 RI/FS Reports Institutional Controls 76/30-7/1/11
13 01 09 10 RI/FS Reports Institutional Controls 07/14/11
13 01 09 10 RI/FS Reports Institutional Controls 08/15/11
13 01 09 10 RI/FS Reports Institutional Controls 08/24/11
13 01 09 10 RI/FS Reports Institutional Controls 08/25/11
13 01 09 10 RI/FS Reports Institutional Controls 08/25/11
13 01 09 10 RI/FS Reports Institutional Controls 08/26/11
13 01 09 10 RI/FS Reports Institutional Controls 08/26/11 BKBH/ Luther
13 01 09 10 RI/FS Reports Institutional Controls 08/29/11 BKBH/ Berry
13 01 09 10 RI/FS Reports Institutional Controls 09/01/11
13 01 09 10 RI/FS Reports Institutional Controls 09/15/11 BKBH/ Luther
13 01 09 10 RI/FS Reports Institutional Controls 09/21/11 BKBH/ Luther
13 01 09 10 RI/FS Reports Institutional Controls 09/30/11
Site-Wide Information
DEQ/Reynolds & Haque-Hausrath & BN/Smith emails re: Livingston IC's DEQ March 11 letter
Site-Wide Information
DEQ Legal Haque-Hausrath email to Dava Kaitala re: Follow-up to 6/21/11 IC's meeting
DEQ legal/ Haque-Hausrath
Site-Wide Information
DEQ Legal Haque-Hausrath email to BKBH/Berry re: DEQ approval of ICs in Document 704552
DEQ legal/ Haque-Hausrath
Site-Wide Information
BNSF/Kaitala email to DEQ legal/Haque-Hausrath re: Update – Cinder Pile & Livingston info request
Site-Wide Information
DEQ Legal Haque-Hausrath email to Dava Kaitala re: Update – Cinder Pile & Livingston info request
DEQ legal/ Haque-Hausrath
Site-Wide Information
Site-Wide Information
DEQ legal/Haque-Hausrath & BN legal/Kaitala emails re: Livingston IC's
Site-Wide Information
DEQ legal/Haque-Hausrath email letter to BKBH/Berry & BN/Kaitala re: Costs of conducting Phase I of the Task D/E Bioventing
DEQ legal/ Haque-Hausrath
Site-Wide Information
DEQ legal/Haque-Hausrath email letter to BKBH/Berry & BN/Kaitala re: Follow-up on DEQ required IC's
DEQ legal/ Haque-Hausrath
Site-Wide Information
DEQ legal/Haque-Hausrath internal email to Reynolds re: Phone log w/BN/Kaitala re: Status of IC's
DEQ legal/ Haque-Hausrath
Site-Wide Information
DEQ legal/Haque-Hausrath email to BKBH/Berry & BN/Kaitala re: Missed deadline for IC's
DEQ legal/ Haque-Hausrath
Site-Wide Information
DEQ legal/Haque-Hausrath email to DEQ Director/Opper re: BN' s Missed deadline for IC's
DEQ legal/ Haque-Hausrath
Site-Wide Information
DEQ legal/Haque-Hausrath, BN/Kaitala & BKBH/Berry emails Cinder pile boundary & IC's
DEQ legal/ Haque-Hausrath
Site-Wide Information
BKBH/Luther email to DEQ legal/Haque-Hausrath re: Attachment - Declaration of Institutional Controls on Real Property
Site-Wide Information
BKBH/Berry email to DEQ legal re: Boundary of cinder pile & IC's
Site-Wide Information
DEQ legal/Haque-Hausrath email letter to BKBH/Berry & BN/Kaitala re: Attachment - DEQ approved IC's for the cinder pile BNSF ownership & final DEQ deadline
DEQ legal/ Haque-Hausrath
Site-Wide Information
BKBH/Luther email to DEQ legal/Haque-Hausrath re: Attachment - Recorded Declaration of Institutional Controls on Real Property
Site-Wide Information
BKBH/Luther email to DEQ legal/Haque-Hausrath re: Attachment - Recorded Declaration of Institutional Controls on cinder pile
Site-Wide Information
DEQ legal/Haque-Hausrath email letter to BKBH/Berry & BN/Kaitala re: Attachment - DEQ approval of filed IC's on residences, Conditional approval of filed IC's on cinder pile & timeline for DEQ review of Cinder Pile RA Report
DEQ legal/ Haque-Hausrath
BN LIVINGSTON 8/26/13
Page 69 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 09 11 RI/FS Reports Final Draft RI/FS Report
13 01 09 11 RI/FS Reports Final Draft RI/FS Report Draft Primary-Hydrocarbon Feasibility Study Report 03/22/93 Envirocon
13 01 09 11 RI/FS Reports Final Draft RI/FS Report Final Draft Primary-Hydrocarbon Feasibility Study Report 05/08/96 Envirocon
13 01 09 11 RI/FS Reports Final Draft RI/FS Report Final Draft FS Report 09/13/96 Envirocon
13 01 09 12 RI/FS Reports
13 01 09 12 RI/FS Reports Proposed Plan MDHES transmittal - Proposed Plan 09/10/98 DEQ
13 01 09 12 01 CD RI/FS Reports 4/96-3/98
13 01 09 12 01 RI/FS Reports Free Product 04/01/96 HSI Geotrans
13 01 09 12 01 RI/FS Reports Free Product 02/11/97 HSI Geotrans
13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans memo to DEQ re: Soil Hydrocarbons 05/14/97 HSI Geotrans
13 01 09 12 01 RI/FS Reports Free Product 05/27/97 HSI Geotrans
13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans fax re: Biodegradation rates 06/25/97 HSI Geotrans
13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans memo to DEQ re: Free product removal 07/28/97 HSI Geotrans
13 01 09 12 01 RI/FS Reports Free Product John Mills letter to Utah WRL re: Hydrocarbon Plume 08/03/97 John Mills
13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans memo to DEQ re: Soil & GW alternatives 08/27/97 HSI Geotrans
13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans fax re: Cost of alternatives - present worth 09/02/97 HSI Geotrans
13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans fax to DEQ re: Free product guidance 09/22/97 HSI Geotrans
13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans memo to DEQ re: Costs for alternatives 09/24/97 HSI Geotrans
13 01 09 12 01 RI/FS Reports Free Product 09/24/97 HSI Geotrans
13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans Maps in AutoCad CD 9/15-10/14/97 HSI Geotrans
13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans fax to DEQ re: Horizontal Wells 11/04/97 HSI Geotrans
13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans memo to DEQ re: Biodegradiation rates 01/28/98 HSI Geotrans
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
Proposed Plan (9/1998) (AR) (Documents dated before 9/10/1998 are not itemized)
1164/ 34A506
Site-Wide Information
1007/ 45A601
Site-Wide Information
Free Product (CD + 31/2 floppies)
1007/ 45A601
Site-Wide Information
Evaluation of Hydrocarbon Contamination at the Livingston Railyard Final version Vol 1
1007/ 45A601
Site-Wide Information
HSI Geotrans letter to DEQ re: Preferred alternatives section (w/attached figures & digital files –word perfect)
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
HSI Geotrans memo to DEQ re: Cost estimate for preferred alternative
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
HSI Geotrans memo to DEQ re: Cost estimates for alternatives (faxed)
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 70 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans memo to DEQ re: Soil standards for TPH 01/28/98 HSI Geotrans
13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans memo to DEQ re: Possible cleanup standards 02/19/98 HSI Geotrans
13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans memo to DEQ re: TPH leaching potential 02/19/98 HSI Geotrans
13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans memo to DEQ re: Hydrocarbon remedy 03/12/98 HSI Geotrans
13 01 09 12 01 RI/FS Reports Free Product 03/16/98 HSI Geotrans
13 01 09 13 RI/FS Reports Responsiveness Summary 06/08/99
13 01 09 14 RI/FS Reports
13 01 09 14 RI/FS Reports 03/01/94 Envirocon
13 01 09 14 RI/FS Reports Livingston Rail Yard Feasibility Study Report 08/01/94 Envirocon
13 01 09 14 RI/FS Reports DEQ letter to Envirocon re: Meeting & FS Info 07/28/97 DEQ
13 01 09 14 RI/FS Reports K/Jetter to BNSF re: Free product recovery at sites in Montana 07/28/97 KJ
13 01 09 14 RI/FS Reports John Mills letter to Utah Water Research Laboratory 08/03/97 John Mills
13 01 09 14 RI/FS Reports BNSF letter to DEQ re: Free Product 08/20/97 BN
13 01 09 14 RI/FS Reports 12/18/97 DEQ
13 01 09 15 RI/FS Reports Review Comments 3/89-4/95
13 01 09 16 RI/FS Reports Response to Comments 3/89-7/89
13 01 10 ROD
13 01 10 ROD 10/06/98 J Wadhams
13 01 10 ROD Public Hearing Transcript 10/22/98
13 01 10 ROD 01/13/99 DEQ
13 01 10 ROD HSI Geotrans memo to DEQ re: Schedule 02/01/99 GeoTrans
13 01 10 ROD HSI Geotrans memo to DEQ re: Schedule 02/01/99 GeoTrans
13 01 10 ROD DEQ memo re: HSI GeoTrans re: Map 02/25/99 DEQ
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
HSI Geotrans memo to DEQ re: Hydrocarbon portion of preferred remedy
1007/ 45A601
Site-Wide Information
Site-Wide Information Final RI/FS Report
1165/ 34A601
Site-Wide Information Final RI/FS Report
Livingston Rail Yard Final Remedial Investigation Report Volume I Text, Volumes II-VII Appendices
1165/ 34A601
Site-Wide Information Final RI/FS Report
1165/ 34A601
Site-Wide Information Final RI/FS Report
1165/ 34A601
Site-Wide Information Final RI/FS Report
1165/ 34A601
Site-Wide Information Final RI/FS Report
1165/ 34A601
Site-Wide Information Final RI/FS Report
1165/ 34A601
Site-Wide Information Final RI/FS Report
DEQ letter to BNSF re: August 20th 1997 letter - Free product removal
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
Site-Wide Information
1164/ 34A506
Site-Wide Information
John Wadhams email to Mary Capdeville re: BN Livingston ERCLs
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
DEQ letter to Judy McDonough/BNSF re: Draft schedule of activities for BN Livingston Complex
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 71 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 10 ROD 03/01/99 GeoTrans
13 01 10 ROD DEQ internal email re: ROD Review 04/09/99 DEQ
13 01 10 ROD HSI Geotrans memo to DEQ re: Section 10 of ROD 04/20/99 GeoTrans
13 01 10 ROD 04/20/99 GeoTrans
13 01 10 ROD DEQ memo re: Review 06/16/99 DEQ
13 01 10 ROD DEQ letter to MRL re: Safety 07/12/99 DEQ
13 01 10 ROD Attorney letter to DEQ re: MRL Safety 07/19/99
13 01 10 ROD DEQ letter to MRL re: Safety 10/04/99 DEQ
13 01 10 ROD PCEC letter to DEQ re: ROD 11/19/99 PCEC
13 01 10 ROD DEQ letter to PCEC re: ROD 01/07/00 DEQ
13 01 10 ROD PCEC email to DEQ re: ROD 04/12/00 PCEC
13 01 10 ROD DEQ email to PCEC re: ROD 04/19/00 DEQ
13 01 10 ROD DEQ email to Raney re: NRD 05/20/00 DEQ
13 01 10 ROD Phone Log: Wieringa/Envirocon 06/14/00
13 01 10 ROD Phone Log: Wieringa/Envirocon 06/15/00
13 01 10 ROD Phone Log: RTI 06/28/00
13 01 10 ROD Phone Log: DEQ to RTI 07/06/00 DEQ
13 01 10 ROD City of Livingston fax to DEQ re: Meeting agenda 09/08/00 City of Livingston
13 01 10 ROD DEQ memo re: Cost Estimate 12/12/00 DEQ
13 01 10 ROD PCEC letter to DEQ 05/04/01 PCEC
13 01 10 ROD DEQ Briefing paper re: ROD 05/10/01 DEQ
13 01 10 ROD DEQ internal meeting minutes 05/10/01 DEQ internal
13 01 10 ROD DEQ internal email re: Meeting 05/18/01 DEQ internal
13 01 10 ROD Meeting minutes 06/07/01
1164/ 34A506
Site-Wide Information
HSI GeoTrans response to comments, Responsiveness Summary-Additional Comments
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information HSI Geotrans 2nd Draft Section X of ROD
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 72 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 10 ROD Meeting Presentation
13 01 10 ROD Meeting minutes 07/07/01
13 01 10 ROD DEQ email to BN re: Indoor Air 07/13/01 DEQ
13 01 10 ROD Phone Log: DEQ to R Billau 07/26/01 DEQ
13 01 10 ROD DEQ internal email re: Meeting 08/01/01 DEQ internal
13 01 10 ROD DEQ internal email re: Meeting 08/02/01 DEQ internal
13 01 10 ROD Phone Log: DEQ to McCaffery/Envirocon 08/08/01 DEQ
13 01 10 ROD Envirocon fax to DEQ re: Confirmation sampling 08/13/01 Envirocon
13 01 10 ROD Meeting attendance 08/16/01
13 01 10 ROD DEQ-BNSF meeting agenda 08/16/01
13 01 10 ROD Meeting Minutes 08/16/01
13 01 10 ROD Phone Log: Golnar (2001)
13 01 10 ROD Envirocon email to DEQ re: meeting minutes 08/21/01 Envirocon
13 01 10 ROD PC Planning email to DEQ re: Zoning Maps 08/29/01 PC Planning
13 01 10 ROD Phone Log: Caldwell 09/04/01
13 01 10 CD ROD HSI Geotrans CD: Figures for ROD 09/01/01 GeoTrans
13 01 10 ROD ROD report 09/01/01
13 01 10 ROD DEQ letter to BKBH re: ROD 09/11/01 DEQ
13 01 10 ROD DEQ transmittal to BN re: ROD 09/11/01 DEQ
13 01 10 ROD DEQ transmittal to Livingston Library re: ROD 09/12/01 DEQ
13 01 10 ROD DEQ transmittal to MSU re: ROD 09/12/01 DEQ
13 01 10 ROD DEQ transmittal to UM re: ROD 09/13/01 DEQ
13 01 10 ROD Phone Log: McCaffery/Envirocon 09/13/01
13 01 10 ROD Phone Log: Golnar re: ROD 09/19/01
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 73 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 10 ROD DEQ email to Petit re: ROD 09/25/01 DEQ
13 01 10 ROD DEQ email to Talgo re: ROD on line 09/20/01 DEQ
13 01 10 ROD Phone Log: Talgo LRC 09/21/01
13 01 10 ROD DEQ internal letter re: ROD 09/24/01 DEQ internal
13 01 10 ROD Phone Log - Golnar 10/30/01
13 01 10 ROD RTI fax to DEQ re: meeting 11/13/01 RTI
13 01 10 ROD Meeting sign in sheet 11/14/01
13 01 10 ROD Public meeting minutes 11/14/01
13 01 10 ROD DEQ email to PCEC re: Meeting 11/15/01 DEQ
13 01 10 ROD DEQ internal email re: Meeting 11/15/01 DEQ internal
13 01 10 ROD DEQ transmittal to RTI re: ROD 11/24/01 DEQ
13 01 10 ROD DEQ transmittal to Billau re: ROD 11/30/01 DEQ
13 01 10 ROD Phone Log - Blicker/RTI 01/31/02
13 01 10 ROD 06/25/07 EPA
13 01 10 ROD PCEC Newsletter – Fall 2007 11/20/07 PCEC
13 01 10 01 ROD
13 01 10 01 ROD Public Hearing Transcript 10/22/98
13 01 10 01 ROD DEQ email 05/25/99 DEQ
13 01 10 01 ROD Phone Log: Internal 09/01/99 DEQ internal
13 01 10 01 ROD Attorney letter to Steve Golnar re: Well Moratorium 09/17/99 DEQ legal
13 01 10 01 ROD City Memo re: Well head protection 10/14/99 City of Livingston
13 01 10 01 ROD DEQ letter to BNSF re: Free Product recovery, CGWA 10/21/99 DEQ
13 01 10 01 ROD Park CO. letter to DEQ requesting CGWA 12/28/99 Park Co.
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
D Hammer/EPA email to envirocouncil@imt FW re: TAG Award
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
BN LIVINGSTON 8/26/13
Page 74 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 10 01 ROD DEQ internal email re: CGWA 03/20/00 DEQ internal
13 01 10 01 ROD DEQ fax to Envirocon re: Plume Boundaries 04/24/00 DEQ
13 01 10 01 ROD DEQ internal email re: CGWA Application forms 08/17/00 DEQ internal
13 01 10 01 ROD City of Livingston fax to DEQ re: Meeting Agenda 09/08/00 City of Livingston
13 01 10 01 ROD Phone Log: Golnar 09/08/00
13 01 10 01 ROD DEQ internal email re: CGWA 09/12/00 DEQ internal
13 01 10 01 ROD PCEC letter to City re: CGWA 09/15/00 PCEC
13 01 10 01 ROD Phone Log: Land & Water 12/11/00
13 01 10 01 ROD Joe Meek email to DEQ re: Well Ordinance 01/25/01 Joe Meek
13 01 10 01 ROD DEQ email to Russell Levens 02/01/01 DEQ
13 01 10 01 ROD PCEC letter to DEQ re: CGWA 04/14/01 PCEC
13 01 10 01 ROD PCEC letter to DEQ 05/04/01 PCEC
13 01 10 01 ROD DEQ Briefing paper re: ROD 05/10/01 DEQ
13 01 10 01 ROD DEQ internal meeting minutes 05/10/01 DEQ internal
13 01 10 01 ROD DEQ internal email re: Meeting 05/18/01 DEQ internal
13 01 10 01 ROD Meeting minutes 06/07/01
13 01 10 01 ROD PCEC letter to DEQ re: 2000 Groundwater report 06/22/01 PCEC
13 01 10 01 ROD Meeting Presentation
13 01 10 01 ROD Phone Log: Bill Harris (2001)
13 01 10 01 ROD Meeting minutes 07/07/01
13 01 10 01 ROD DEQ internal email re: Additional hire 07/13/01 DEQ internal
13 01 10 01 ROD DEQ internal email re: Meeting 08/02/01 DEQ internal
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
BN LIVINGSTON 8/26/13
Page 75 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 10 01 ROD Meeting Attendance 08/16/01
13 01 10 01 ROD Envirocon email to DEQ re: Meeting minutes 08/21/01 Envirocon
13 01 10 01 ROD Record of Decision 09/01/01
13 01 10 01 ROD DEQ letter to BNSF re: MW Network 10/22/01 DEQ
13 01 10 01 ROD Phone Log: Golnar 10/30/01
13 01 10 01 ROD RTI fax to DEQ re: Meeting 11/13/01 RTI
13 01 10 01 ROD Meeting sign in sheet 11/14/01
13 01 10 01 ROD Public meeting minutes 11/14/01
13 01 10 01 ROD Phone Log: Miller (2002)
13 01 10 01 ROD Phone Log: Blicker/RTI 01/31/02
13 01 10 01 CD ROD DEQ letter to BNSF re: Task I Addendum # 1 03/13/06 DEQ
13 01 10 01 ROD DEQ letter to BNSF re Task I Addendum # 1 03/16/06 DEQ
13 01 10 02 ROD Free Product
13 01 10 02 ROD Free Product DEQ internal fax re: Free product recovery EPA ruling 10/09/92 DEQ internal
13 01 10 02 ROD Free Product DEQ internal email re: Phone call, McDonough 9/1097 DEQ internal
13 01 10 02 ROD Free Product Y ** DEQ internal email re: Call from Envirocon's counsel 07/17/05 DEQ internal
13 01 10 02 ROD Free Product Cole letter to DEQ re: Proposed Plan (Retyped) 10/05/98 Cole
13 01 10 02 ROD Free Product DEQ internal email re: Free Product Status Report 10/18/98 DEQ internal
13 01 10 02 ROD Free Product McGee letter to DEQ re: Proposed Plan (Retyped) 10/19/98 McGee
13 01 10 02 ROD Free Product Geotech fax to DEQ re: Passive skimmers 10/29/98 Geoteck
13 01 10 02 ROD Free Product MRL letter to DEQ re: Comments on Proposed Plan 11/05/98 MRL
13 01 10 02 ROD Free Product PCEC letter to DEQ re: Proposed Plan 11/19/98 PCEC
13 01 10 02 ROD Free Product 11/22/98 City of Livingston
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
Controlled Groundwater Area
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
City of Livingston letter to DEQ re: Comments on Proposed Plan, w/attachments (11/22/98)
BN LIVINGSTON 8/26/13
Page 76 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 10 02 ROD Free Product BKBH letter to DEQ re: BNSF comments to Proposed Plan 11/23/98 BKBH
13 01 10 02 ROD Free Product 11/24/98 DEQ
13 01 10 02 ROD Free Product HSI Geotrans memo to DEQ re: Hydrocarbon Remedy 02/12/99 Geotrans
13 01 10 02 ROD Free Product Envirocon letter to DEQ re: Pump tests 09/03/99 Envirocon
13 01 10 02 ROD Free Product Phone Log - Wieringa/Envirocon 09/07/99 Envirocon
13 01 10 02 ROD Free Product Envirocon fax to DEQ re: Well product data (page 2 only) 09/07/99 Envirocon
13 01 10 02 ROD Free Product Envirocon letter to DEQ re: Pump evaluation 09/09/99 Envirocon
13 01 10 02 ROD Free Product Envirocon fax to DEQ re: Product levels graph 09/10/99 Envirocon
13 01 10 02 ROD Free Product Envirocon fax to DEQ re: Product levels graph 09/16/99 Envirocon
13 01 10 02 ROD Free Product Internal DEQ email re: Free product removal survey results 09/21/99 DEQ internal
13 01 10 02 ROD Free Product DEQ letter to BNSF re: Diesel fuel recovery 10/21/99 DEQ
13 01 10 02 ROD Free Product Envirocon letter to DEQ re: Pump evaluation 10/27/99 Envirocon
13 01 10 02 ROD Free Product DEQ fax to Envirocon re: Hydrocarbon Pumps 11/08/99 DEQ
13 01 10 02 ROD Free Product HSI Geotrans memo to DEQ re: Hydrocarbon recovery rates 12/29/99 Geotrans
13 01 10 02 ROD Free Product 01/03/00 Envirocon
13 01 10 02 ROD Free Product DEQ internal memo re: Free product recovery 01/04/00 DEQ internal
13 01 10 02 ROD Free Product HSI Geotrans memo to DEQ re: Text for ROD 01/27/00 Geotrans
13 01 10 02 ROD Free Product Park St. well data received from Wieringa/Envirocon 02/14/00 Envirocon
13 01 10 02 ROD Free Product Phone Log - Wieringa/Envirocon 10/18/00 Envirocon
13 01 10 02 ROD Free Product DEQ internal email re: Vacuum-enhanced recovery 10/18/00 DEQ internal
13 01 10 02 01 ROD
13 01 10 02 01 ROD Land & Water letter to DEQ re: Statement of qualifications 10/15/98 Land & Water
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information DEQ Memo re: BNSF & Envirocon comments to Proposed Plan
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
Envirocon letter to DEQ re: Free product recovery equipment evaluation
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
Statement of Qualifications (Free Product Recovery)
1164/ 34A506
Site-Wide Information
Statement of Qualifications (Free Product Recovery)
BN LIVINGSTON 8/26/13
Page 77 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 10 02 01 ROD HSI Geotrans letter to DEQ re: Statement of qualifications 10/16/98 Geotrans
13 01 10 02 01 ROD 10/21/98 MSE-HKM
13 01 10 03 ROD ROD References
13 01 10 03 ROD ROD References Journal article - Bioremediation (Winter 1989)
13 01 10 03 ROD ROD References US EPA memo re: Superfund Decision Documents 02/18/92 EPA
13 01 10 03 ROD ROD References US EPA memo re: Technical Impractability 10/04/93 EPA
13 01 10 03 ROD ROD References ROD Abstract 09/28/94
13 01 10 03 ROD ROD References 09/01/96 EPA
13 01 10 03 ROD ROD References Park County Zoning Plan 01/01/97
13 01 10 03 ROD ROD References Example of ROD language re: Asbestos 06/25/97
13 01 10 03 ROD ROD References 11/23/98
13 01 10 03 ROD ROD References
13 01 10 03 ROD ROD References EPA Superfund Record of Decision: Interim Actions 09/01/99 EPA
13 01 10 03 ROD ROD References
13 01 10 03 ROD ROD References
13 01 10 03 ROD ROD References 08/01/01 DEQ
13 01 11 RD/RA
13 01 11 RD/RA General Field Notes – books 5/9-11/17/06
13 01 11 RD/RA General Field Notes – books
13 01 11 00 RD/RA Statement of Work
13 01 11 00 RD/RA Statement of Work DEQ internal email re: SOW 09/12/01 DEQ internal
13 01 11 00 RD/RA Statement of Work Phone Log - BN to DEQ 02/28/02 BN
1164/ 34A506
Site-Wide Information
Statement of Qualifications (Free Product Recovery)
1164/ 34A506
Site-Wide Information
Statement of Qualifications (Free Product Recovery)
MSE-HKM letter to DEQ re: Statement of qualifications, passive diesel fuel recovery
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
EPA Report - How to Effectively Recover Free Product at LUST Sites
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
Mass Loss from LNAPL Pools Under Fluctuating Water Table Conditions
1164/ 34A506
Site-Wide Information
Draft - Presumptive Response Strategy & Ex-Situ Treatment Technologies for Contaminated GW at CERCLA sites
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
Soil, Bedrock & GW Sampling Using Rotasonic Drilling Techniques
1164/ 34A506
Site-Wide Information
A Guide to Developing & Documenting Cost Estimates During the Feasibility Study
1164/ 34A506
Site-Wide Information
DEQ memo re: LNAPL Recovery (1/4/00) Livingston Planning/Zoning Map
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
1164/ 34A506
Site-Wide Information
11/17/06-6/19/09
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 78 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 00 RD/RA Statement of Work Tetra Tech letter to DEQ re: SOW review 04/26/02 TetraTech
13 01 11 00 RD/RA Statement of Work Tetra Tech Transmittal to DEQ re: Draft SOW 05/09/02 TetraTech
13 01 11 00 RD/RA Statement of Work Draft Statement of Work for RD/RA 05/01/02 TetraTech
13 01 11 00 RD/RA Statement of Work DEQ transmittal to BNSF re: Draft SOW 05/30/02 DEQ
13 01 11 00 RD/RA Statement of Work Draft Statement of Work for RD/RA red line version 06/01/02 TetraTech
13 01 11 00 RD/RA Statement of Work Tetra Tech Transmittal to DEQ Red Line Draft SOW 06/24/02 TetraTech
13 01 11 00 RD/RA Statement of Work BKBH letter to DEQ re: Comments to ROD 07/01/02 BKBH
13 01 11 00 RD/RA Statement of Work DEQ memo to files re: BNSF proposed changes to SOW 07/01/02 DEQ
13 01 11 00 RD/RA Statement of Work DEQ internal email re: BKBH letter of 7/1/02 07/03/02 DEQ internal
13 01 11 00 RD/RA Statement of Work Phone Log: Blicker/RTI 06/07/04
13 01 11 00 RD/RA Statement of Work Phone Log: Smith/BNSF 07/12/04
13 01 11 00 RD/RA Statement of Work Draft Statement of Work for RD/RA 09/01/04
13 01 11 00 RD/RA Statement of Work Phone Log - Smith/BN re: Livingston & Mission Wye SOWs 09/02/04
13 01 11 00 RD/RA Statement of Work DEQ email to BN re: Bedrock Aquifier data 09/08/04 DEQ
13 01 11 00 RD/RA Statement of Work Y 10/11/04 DEQ
13 01 11 00 RD/RA Statement of Work PCEC comments to Draft modified CD & SOWs 10/13/04 PCEC
13 01 11 00 RD/RA Statement of Work Y ** DEQ/BN Meeting notes - Martin 10/26/04
13 01 11 00 RD/RA Statement of Work Y ** DEQ/BN Meeting notes - Sivers 10/26/04
13 01 11 00 RD/RA Statement of Work Y ** DEQ meeting notes 01/01/05 DEQ
13 01 11 00 RD/RA Statement of Work DEQ fax to K/J re: Purge Water Policy (1/12/05) 01/12/05 DEQ
13 01 11 00 RD/RA Statement of Work K/J fax to DEQ re: Purge Water Policy 01/12/05 KJ
13 01 11 00 RD/RA Statement of Work Y ** DEQ email to BN re: High Priority Tasks M 01/21/05 DEQ
13 01 11 00 RD/RA Statement of Work DEQ internal email re: Survey Benchmarks 01/21/05 DEQ internal
13 01 11 00 RD/RA Statement of Work DEQ internal email re: Lead modeling fate & transport 01/26/05 DEQ internal
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
** DEQ meeting minutes - conference call w/BN, Attorneys & consultants
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 79 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 00 RD/RA Statement of Work Y ** Meeting notes - Sivers 01/26/05 DEQ
13 01 11 00 RD/RA Statement of Work Y ** DEQ internal email re: Defining facility boundary (1/26/05) 01/26/05 DEQ internal
13 01 11 00 RD/RA Statement of Work Y ** DEQ email to BN re: SOW Attachment 2 01/28/05 DEQ
13 01 11 00 RD/RA Statement of Work Y ** DEQ internal emails re: SOW issues 01/28/05 DEQ internal
13 01 11 00 RD/RA Statement of Work Y ** DEQ internal emails re: VPH 01/28/05 DEQ internal
13 01 11 00 RD/RA Statement of Work Y ** DEQ internal emails re: EPC calculation 01/31/05 DEQ internal
13 01 11 00 RD/RA Statement of Work Y ** K/J emailed deviations language to DEQ 02/01/05 KJ
13 01 11 00 RD/RA Statement of Work Y ** DEQ email to BN re: Plume Map language 02/02/05 DEQ
13 01 11 00 RD/RA Statement of Work Y ** Meeting notes - Sivers 02/02/05 DEQ
13 01 11 00 RD/RA Statement of Work Y 02/04/05 Henderson
13 01 11 00 RD/RA Statement of Work Conference call notes - Sivers 02/08/05 DEQ/Sivers
13 01 11 00 RD/RA Statement of Work Y ** Phone Log - Norris/K/J re: SOW Attachments 02/11/05 KJ/Norris
13 01 11 00 RD/RA Statement of Work Y ** DEQ internal email re: Risk Assessment 02/11/05 DEQ
13 01 11 00 RD/RA Statement of Work DEQ internal email re: Fate & Transport modeling 2/11/05 DEQ
13 01 11 00 RD/RA Statement of Work Y ** K/J email to DEQ re: Plume Map language 02/14/05 KJ
13 01 11 00 RD/RA Statement of Work DEQ internal emails re: VPH vs. GRO data 2/17/05 DEQ
13 01 11 00 RD/RA Statement of Work DEQ internal emails re: Protection of Groundwater 02/17/05 DEQ
13 01 11 00 RD/RA Statement of Work Phone Log - K/J to DEQ re: Spring 2005 SOW 02/23/05 DEQ
13 01 11 00 RD/RA Statement of Work Y ** DEQ internal email re: TI waivers 03/02/05 DEQ
13 01 11 00 RD/RA Statement of Work Y ** DEQ email to BN re: SOW Attachments 4/11/05 DEQ
13 01 11 00 RD/RA Statement of Work Y ** DEQ Draft Spring SOW 04/05/11 DEQ
13 01 11 00 RD/RA Statement of Work Y ** DEQ internal emails re: Screening Levels 4/11-4/18/05 DEQ
13 01 11 00 RD/RA Statement of Work Y ** DEQ email to BN re: Draft Spring SOW 04/29/05 DEQ
13 01 11 00 RD/RA Statement of Work Y ** BNSF proposed language for SOW 05/05/11 DEQ
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
** Phone Log - Henderson to DEQ re Fate & Transport Modeling
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 80 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 00 RD/RA Statement of Work Y ** DEQ email to BN re: Draft Spring SOW 5/5/05 DEQ
13 01 11 00 RD/RA Statement of Work Y ** DEQ Draft Spring SOW 05/05/05 DEQ
13 01 11 00 RD/RA Statement of Work Y ** BN Livingston SOW meeting notes 05/05/05
13 01 11 00 RD/RA Statement of Work Y ** DEQ internal email re: PAHs in Surface Soil Task 5/6/05 DEQ
13 01 11 00 RD/RA Statement of Work Y ** Phone Log - Smith/BN to DEQ 05/06/05 BN/Smith
13 01 11 00 RD/RA Statement of Work K/J email to DEQ re: Dual purpose bioventing wells 5/7/05 KJ
13 01 11 00 RD/RA Statement of Work Y ** DEQ internal email re: Vinyl Chloride GW Cleanup Level 5/9/05 DEQ
13 01 11 00 RD/RA Statement of Work Y ** BN Livingston Surface soil requirements meeting notes 5/9/05
13 01 11 00 RD/RA Statement of Work Y 06/09/05 DEQ
13 01 11 00 RD/RA Statement of Work DEQ email to J/K re: SOW attachment # 2 06/22/05 DEQ
13 01 11 00 RD/RA Statement of Work Y ** DEQ email to BN re: Spring SOW 06/27/05 DEQ
13 01 11 00 RD/RA Statement of Work Y ** DEQ email to BN/K/J re: Final Spring SOW 06/30/05 DEQ
13 01 11 00 RD/RA Statement of Work
13 01 11 00 RD/RA Statement of Work DEQ letter to Talgo-LRC re: Spring 2005 SOW 07/01/05 DEQ
13 01 11 00 RD/RA Statement of Work DEQ letter to MRL re: Spring 2005 SOW 07/01/05 DEQ
13 01 11 00 RD/RA Statement of Work DEQ letter to Park Co Sanitarian re: Spring 2005 SOW 07/01/05 DEQ
13 01 11 00 RD/RA Statement of Work 07/01/05 DEQ
13 01 11 00 RD/RA Statement of Work 07/01/05 DEQ
13 01 11 00 RD/RA Statement of Work DEQ letter to PECE re: Spring 2005 SOW 7/1/05 DEQ
13 01 11 00 RD/RA Statement of Work DEQ letter to RTI re: Spring 2005 SOW 7/1/05 DEQ
13 01 11 00 RD/RA Statement of Work DEQ/BN/KJ emails re: ERCL Tables DEQ
13 01 11 00 RD/RA Statement of Work Final Statement of Work for Spring 2005 Activities 08/09/05
13 01 11 00 RD/RA Statement of Work 08/22/05 BN
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
** DEQ email to BN - Final draft Spring SOW w/SOW attached
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Draft Spring 2005 SOW (June 2005) Out for Public Comment July 6-August 5, 2005
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ letter to Park County Commissioners re: Spring 2005 SOW
Site-Wide Information
DEQ letter to Livingston City Commissioners re: Spring 2005 SOW
Site-Wide Information
Site-Wide Information
Site-Wide Information
7/21/05-7/29/05
Site-Wide Information
Site-Wide Information
BNSF/M Stehly letter to DEQ Division Administrator/Olsen re: BN Agreement to conduct Spring SOW
BN LIVINGSTON 8/26/13
Page 81 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 00 RD/RA Statement of Work Y 08/22/05 BN/M Stehly
13 01 11 00 RD/RA Statement of Work SOW Meeting Agenda 09/01/05
13 01 11 00 RD/RA Statement of Work DEQ email to BNSF re: Effective dates of Spring SOW 09/20/05 DEQ
13 01 11 00 RD/RA Statement of Work K/J letter to DEQ re: Master Schedule for Spring SOW 10/13/05 KJ
13 01 11 00 RD/RA Statement of Work Master Schedule for Spring SOW 10/13/05
13 01 11 00 RD/RA Statement of Work DEQ letter/fax to BNSF re: Draft Master Schedule comments 10/29/05 DEQ
13 01 11 00 RD/RA Statement of Work 11/16/05 KJ
13 01 11 00 RD/RA Statement of Work DEQ letter to BNSF re: BN Contact 04/28/06 DEQ
13 01 11 00 CD RD/RA Statement of Work Task F, Task G, Task L (Rev 1) – ERCLs and Figure 05/01/06 KJ
13 01 11 00 RD/RA Statement of Work DEQ/KJ emails re: Fate and Transport 02/28/07
13 01 11 00 RD/RA Statement of Work DEQ/KJ emails re: Fate and Transport 02/28/07
13 01 11 00 RD/RA Statement of Work KJ email to DEQ re: Livingston Deliverable 8/30/07 KJ
13 01 11 00 RD/RA Statement of Work 8/30/10
13 01 11 00 01 RD/RA
13 01 11 00 01 RD/RA Envirocon Confirmation Soil Sampling Report 12/05/95 Envirocon
13 01 11 00 01 RD/RA Envirocon Data Summaries 07/01/02 Envirocon
13 01 11 00 01 RD/RA DEQ letter to RTI re: Data Summaries 07/03/02 DEQ
13 01 11 00 01 RD/RA Tetra Tech email to DEQ re: Data Summary Report 07/22/02 TetraTech
13 01 11 00 01 RD/RA Tetra Tech Comments to DEQ re: Data Summary Report 08/01/02 TetraTech
Site-Wide Information
** BNSF/M Stehly letter to DEQ Division Administrator/Olsen re: BN Agreement to conduct Spring SOW
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
K/J letter to DEQ re: Updated Master Schedule for Spring SOW plus electronic version
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Memorandum re: Determination that Statement of Work for Spring 2005 Activities Negotiations should be filed in public files
DEQ Legal/ Haque-Hausrath
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
BN LIVINGSTON 8/26/13
Page 82 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 00 01 RD/RA 11/22/05 KJ
13 01 11 00 01 RD/RA 02/01/06 KJ
13 01 11 00 01 RD/RA 03/02/06 DEQ internal
13 01 11 00 01 RD/RA 03/07/06 CDM
13 01 11 00 01 RD/RA 03/08/06 DEQ
13 01 11 00 01 RD/RA 03/08/06 B Hartman
13 01 11 00 01 RD/RA K/J email to DEQ re: Task I Addendum # 1 reference 03/09/06 KJ
13 01 11 00 01 RD/RA B Hartman email to DEQ re: Task I Addendum # 1 03/09/06 B Hartman
13 01 11 00 01 RD/RA CDM email to DEQ re: Task I Addendum #1 reference 03/10/06 CDM
13 01 11 00 01 RD/RA K/J email to DEQ re: Task I Addendum # 1 03/10/06 KJ
13 01 11 00 01 RD/RA B Hartman email to DEQ re: Task I Addendum # 1 reference 03/14/06 B Hartman
13 01 11 00 01 RD/RA Phone Log – K/J & DEQ re: Task I Addendum 03/16/06
13 01 11 00 01 RD/RA 03/16/06 DEQ
13 01 11 00 01 RD/RA K/J email to DEQ re: Task I Addendum # 1 start date 03/17/06 KJ
13 01 11 00 01 RD/RA 03/22/06 KJ
1084/ 58M102
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 SOW Quarterly status report # 1 - August thru October 2005
1084/ 58M102
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 SOW Quarterly status report # 2 - November, December 2005, January 2006
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
DEQ internal email - Phone Log – DEQ & BNSF re: Task I Addendum # 1
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
CDM letter to DEQ re: CDM comments to Task I Addendum # 1 Draft
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
DEQ email to B Hartman & K/J re: Task I Addendum # 1 reference
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
B Hartman email to DEQ & K/J re: Task I Addendum # 1 reference
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
DEQ email to BNSF, K/J, RTI, A Aldersley & L Vachowski re: Task I Addendum correction
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
K/J email to DEQ re: Implementation of Amendment #1 to Task I SI Work Plan
BN LIVINGSTON 8/26/13
Page 83 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 00 01 RD/RA DEQ internal email re: Task I Addendum # 1 start 03/27/06 DEQ internal
13 01 11 00 01 RD/RA DEQ email to K/J re: Task I start confirmation/4-5-06 03/29/06 DEQ
13 01 11 00 01 RD/RA K/J email to DEQ re: Task I schedule for 4/06 03/29/06 KJ
13 01 11 00 01 RD/RA DEQ internal email re: Task I preliminary results 05/02/06 DEQ internal
13 01 11 00 01 RD/RA 05/01/06 KJ
13 01 11 00 01 RD/RA Y ** DEQ internal email re: Status of different Task Orders 05/11/06 DEQ internal
13 01 11 00 01 RD/RA 08/01/06 KJ
13 01 11 00 01 RD/RA 11/01/06 KJ
13 01 11 00 01 RD/RA 02/01/07 KJ
13 01 11 00 01 RD/RA 05/01/07 KJ
13 01 11 00 01 RD/RA 08/01/07 KJ
13 01 11 00 01 RD/RA 11/01/07 KJ
13 01 11 00 01 RD/RA 02/01/08 KJ
13 01 11 00 01 RD/RA 05/01/08 KJ
13 01 11 00 01 RD/RA 08/01/08 KJ
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
1084/ 58M102
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 Statement of Work Quarterly Status Report # 3 (Feb, March, April 2006)
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
1084/ 58M102
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 Statement of Work Quarterly Status Report No 4 (May, June, July 2006)
1084/ 58M102
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 Statement of Work Quarterly Status Report No 5 (August, Sept, Oct 2006)
1084/ 58M102
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 Statement of Work Quarterly Status Report No 6 (Nov, Dec 2006, Jan 2007)
1084/ 58M102
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 Statement of Work Quarterly Status Report No 7 - Feb, March April 2007
1084/ 58M102
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 Statement of Work Quarterly Status Report No 8 – May, June, & July 2007
1084/ 58M102
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 Statement of Work Quarterly Status Report No 9 –August, Sept, & October 2007
1084/ 58M102
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 Statement of Work Quarterly Status Report No 10 –November, December 2007, January 2008
1085/ 48F602
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 Statement of Work Quarterly Status Report No 11 –February, March, April 2008
1085/ 48F602
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 Statement of Work – Quarterly Status Report No. 12
BN LIVINGSTON 8/26/13
Page 84 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 00 01 RD/RA 11/01/08 KJ
13 01 11 00 01 RD/RA 02/01/09 KJ
13 01 11 00 01 RD/RA 05/01/09 KJ
13 01 11 00 01 RD/RA 08/01/09 KJ
13 01 11 00 01 RD/RA 11/01/09 KJ
13 01 11 00 01 RD/RA 02/01/10 KJ
13 01 11 00 01 RD/RA 05/01/10 KJ
13 01 11 00 01 RD/RA 08/01/10 KJ
13 01 11 00 01 RD/RA 11/01/10 KJ
13 01 11 00 01 RD/RA 02/25/11 KJ
13 01 11 00 01 RD/RA 05/04/11 DEQ/ Reynolds
13 01 11 00 01 05/27/11 KJ/Adlersley
13 01 11 00 01 RD/RA 05/27/11 KJ
13 01 11 00 01 CD RD/RA 08/30/11 KJ
13 01 11 00 01 CD RD/RA 11/29/11 KJ
1085/ 48F602
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 Statement of Work Quarterly Status Report No 13 – August, September, October 2008
1085/ 48F602
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 SOW Quarterly Status Report # 14 Feb – February 2009
1085/ 48F602
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 SOW Quarterly Status Report # 15 Feb – April 2009
1085/ 48F602
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 SOW Quarterly Status Report # 16 May, June, & July 2009
1086/ 48F603
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 SOW Quarterly Status Report # 17 August, September & October 2009
1086/ 48F603
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 SOW Quarterly Status Report # 18 November, December 2009, January 2010
1086/ 48F603
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 SOW Quarterly Status Report # 19, February, March April 2010
1086/ 48F603
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 SOW Quarterly Status Report # 20, May, June, & July 2010
1086/ 48F603
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 SOW Quarterly Status Report # 21 Vol I-III, August, September & October 2010 (Vol II-III @RM)
1087/ 48F604
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 SOW Quarterly Status Report # 22 Vol I-II, November, December 2010, & January 2011 (Vol II @ RM)
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
DEQ/Reynolds letter to BN/Smith re: 2/25/11 Spring 2005 SOW Quarterly Status Report # 22
(SOW) Data Summary & Confirmation Sampling Reports
K/J/Aldersley email to DEQ/Reynolds re: Livingston Deliverables Spring 2005 SOW Quarterly Status Report # 23 Vol I-II, February, March, & April 2011 to be sent UPS
1087/ 48F604
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 SOW Quarterly Status Report # 23 Vol I-II, February, March, & April 2011 (Vol II @RM)
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 SOW Quarterly Status Report # 24 May, June, July 2011 (CD of Reports 22, 23 & 24)
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 SOW Quarterly Status Report # 25 August, September & October 2011
BN LIVINGSTON 8/26/13
Page 85 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 00 01 CD RD/RA 02/28/12 KJ
13 01 11 00 01 CD RD/RA 05/31/12 KJ
13 01 11 00 01 CD RD/RA 08/30/12 KJ
13 01 11 00 01 RD/RA 08/30/12 KJ+P2
13 01 11 00 01 CD RD/RA 11/29/12 KJ
13 01 11 00 01 CD RD/RA 02/27/13 KJ
13 01 11 00 01 RD/RA 05/30/13 KJ
13 01 11 00 01 CD RD/RA 05/31/13 KJ
13 01 11 00 01 CD RD/RA Aug. 2013 KJ
13 01 11 01 RD/RA
13 01 11 01 RD/RA PCEC letter re: CGWA 9/12/01 PCEC
13 01 11 01 RD/RA Phone Log: McCaffery-Environcon 10/03/01
13 01 11 01 RD/RA DEQ letter to BNSF re: CGWA 10/22/01 DEQ
13 01 11 01 RD/RA DNRC email to DEQ re: CGWA 01/19/02 DNRC
13 01 11 01 RD/RA DEQ letter to BNSF re: Plume Maps 01/30/02 DEQ
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 SOW Quarterly Status Report # 26 November, December 2011, January 2012
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 SOW Quarterly Status Report # 27 February, March & April 2012
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
KJ/Aldersley email to DEQ/Reynolds re: Livingston deliverables - Spring 2005 SOW Quarterly Status Report # 28 May, June, July 2012
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 SOW Quarterly Status Report # 28 May, June, July 2012
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 SOW Quarterly Status Report # 29 August, September, October 2012
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 SOW Quarterly Status Report # 30 November, December 2012, January 2013
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
KJ/Norris Cover letter to DEQ Reynolds re: Spring 2005 SOW Quarterly Status Report # 31 (Feb,Mar,Apr 2013)
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 SOW Quarterly Status Report # 31 (Feb,Mar,Apr 2013)
Site-Wide Information
(SOW) Data Summary & Confirmation Sampling Reports
Spring 2005 SOW Quarterly Status Report # 32 (May, Jun, July 2013)
Site-Wide Information
Implementation of Controlled Groundwater Area
Site-Wide Information
Implementation of Controlled Groundwater Area
Site-Wide Information
Implementation of Controlled Groundwater Area
Environcon/McCaffery
Site-Wide Information
Implementation of Controlled Groundwater Area
Site-Wide Information
Implementation of Controlled Groundwater Area
Site-Wide Information
Implementation of Controlled Groundwater Area
BN LIVINGSTON 8/26/13
Page 86 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 01 RD/RA Phone Log: Blicker/RTI 01/31/02
13 01 11 01 RD/RA Phone Log: Smith-BNSF 02/28/02
13 01 11 01 RD/RA DEQ letter to BNSF re: Dan McCaffery 3/11/02 DEQ
13 01 11 01 RD/RA DEQ internal email re: CGWA 09/19/02 DEQ
13 01 11 01 RD/RA Conference call 06/02/04
13 01 11 01 RD/RA KJ email to DEQ re: Annual Inspection 07/21/08 KJ
13 01 11 02 RD/RA
13 01 11 02 RD/RA Copy of Interim Action Field Notes 2/90-2/91
13 01 11 02 RD/RA Copy of stained gravels information
13 01 11 02 RD/RA Miscellaneous Legal Interim Action information
13 01 11 02 RD/RA Miscellaneous Interim Action Information 07/02/02
13 01 11 02 RD/RA DEQ & Envirocon emails re: Interim Actions Chronology 10/25/06
13 01 11 02 RD/RA 02/26/07 CDM
Site-Wide Information
Implementation of Controlled Groundwater Area
Site-Wide Information
Implementation of Controlled Groundwater Area
Site-Wide Information
Implementation of Controlled Groundwater Area
Site-Wide Information
Implementation of Controlled Groundwater Area
Site-Wide Information
Implementation of Controlled Groundwater Area
Site-Wide Information
Implementation of Controlled Groundwater Area
Site-Wide Information
Tasks A & H Comprehensive Interim Action Confirmation Sampling
Site-Wide Information
Tasks A & H Comprehensive Interim Action Confirmation Sampling
Site-Wide Information
Tasks A & H Comprehensive Interim Action Confirmation Sampling
Site-Wide Information
Tasks A & H Comprehensive Interim Action Confirmation Sampling
Site-Wide Information
Tasks A & H Comprehensive Interim Action Confirmation Sampling
Site-Wide Information
Tasks A & H Comprehensive Interim Action Confirmation Sampling
Site-Wide Information
Tasks A & H Comprehensive Interim Action Confirmation Sampling
CDM letter to DEQ re: Request for BN to Prepare & Submit a Summary Report describing all Interim Actions & subsequent confirmation sampling performed at BN Shop Complex
BN LIVINGSTON 8/26/13
Page 87 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 02 RD/RA 03/07/07
13 01 11 02 RD/RA DEQ internal email re: Interim Actions at BNLV 01/08/08 DEQ
13 01 11 02 RD/RA DEQ internal email re: Livingston Data Summary Report 1/10/08 DEQ
13 01 11 02 RD/RA 02/04/08 DEQ
13 01 11 02 RD/RA BN letter to DEQ re: Response to DEQ 2/4/08 letter 02/15/08 BN
13 01 11 02 RD/RA 02/13/08
13 01 11 02 RD/RA 04/17/08 KJ
13 01 11 03 RD/RA
13 01 11 03 RD/RA KJ fax to DEQ re: Sampling GW for Petroleum 2/24/05 KJ
13 01 11 03 RD/RA KJ letter to DEQ re: GW sampling for Task G 2/24/05 KJ
13 01 11 03 RD/RA DEQ letter to BN re: GW sampling 03/01/05 DEQ
Site-Wide Information
Tasks A & H Comprehensive Interim Action Confirmation Sampling
DEQ & CDM emails re: Interim Action Summary Report Request
Site-Wide Information
Tasks A & H Comprehensive Interim Action Confirmation Sampling
Site-Wide Information
Tasks A & H Comprehensive Interim Action Confirmation Sampling
Site-Wide Information
Tasks A & H Comprehensive Interim Action Confirmation Sampling
DEQ letter to D Smith/BN re: Request for Comprehensive Interim Action & Confirmation Sampling Summary Report
Site-Wide Information
Tasks A & H Comprehensive Interim Action Confirmation Sampling
Site-Wide Information
Tasks A & H Comprehensive Interim Action Confirmation Sampling
DEQ & CDM emails re: Interim Actions – Confirmation sampling report information
Site-Wide Information
Tasks A & H Comprehensive Interim Action Confirmation Sampling
Comprehensive Interim Action & Confirmation Sampling Summary Report
Site-Wide Information
Task G - "Cleanup of Dissolved- Phase Petroleum in Groundwater"
Site-Wide Information
Task G - "Cleanup of Dissolved- Phase Petroleum in Groundwater"
Site-Wide Information
Task G - "Cleanup of Dissolved- Phase Petroleum in Groundwater"
Site-Wide Information
Task G - "Cleanup of Dissolved- Phase Petroleum in Groundwater"
BN LIVINGSTON 8/26/13
Page 88 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 03 RD/RA KJ email to DEQ re: MNA sampling 03/02/05 KJ
13 01 11 03 RD/RA KJ & BN emails re: MNA sampling KJ
13 01 11 03 RD/RA 04/05/05 KJ
13 01 11 03 RD/RA K/J email to DEQ re: Lab data w/attachments 4/5/05 KJ
13 01 11 03 RD/RA Meeting Notes - A Sivers/DEQ 04/21/05 DEQ/Sivers
13 01 11 03 RD/RA CDM email to DEQ re: Task G 07/06/07 CDM
13 01 11 03 RD/RA 02/28/08 KJ
13 01 11 03 RD/RA 04/19/11 DEQ/ Reynolds
13 01 11 03 01 RD/RA Work Plan
13 01 11 03 01 RD/RA Work Plan Draft Work Plan - Task G 05/31/05 KJ
13 01 11 03 01 RD/RA Work Plan Phone Log - K/J to DEQ - J Norris & J Lee 6/21/05 KJ
13 01 11 04 RD/RA 03/05/11 KJ
13 01 11 04 RD/RA DEQ comment letter to BN re: Facility-wide HASP 04/21/05 DEQ
13 01 11 04 RD/RA K/J response to DEQ comments facility-wide HASP 6/28/05 KJ
13 01 11 04 RD/RA Health & Safety Plan insert pages for March 2005 H&SP 6/28/05
Site-Wide Information
Task G - "Cleanup of Dissolved- Phase Petroleum in Groundwater"
Site-Wide Information
Task G - "Cleanup of Dissolved- Phase Petroleum in Groundwater"
March 3-4/2005
Site-Wide Information
Task G - "Cleanup of Dissolved- Phase Petroleum in Groundwater"
K/J fax to DEQ re: Request for Contained-in-decision for purge water from March 2005
Site-Wide Information
Task G - "Cleanup of Dissolved- Phase Petroleum in Groundwater"
Site-Wide Information
Task G - "Cleanup of Dissolved- Phase Petroleum in Groundwater"
Site-Wide Information
Task G - "Cleanup of Dissolved- Phase Petroleum in Groundwater"
Site-Wide Information
Task G - "Cleanup of Dissolved- Phase Petroleum in Groundwater"
Task G – Dissolved-Phase Petroleum Hydrocarbons in Groundwater Report
Site-Wide Information
Task G - "Cleanup of Dissolved- Phase Petroleum in Groundwater"
DEQ/Reynolds letter to BN/Smith re: 2/28/08 Letter report regarding Task G Dissolved-Phase Petroleum Hydrocarbons in GW
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Facility - Wide Health & Safety Plan
Site-Wide Information
Facility - Wide Health & Safety Plan
Site-Wide Information
Facility - Wide Health & Safety Plan
Site-Wide Information
Facility - Wide Health & Safety Plan
BN LIVINGSTON 8/26/13
Page 89 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 04 RD/RA DEQ email to K/J re: ERCLs language 07/29/05 DEQ
13 01 11 04 RD/RA K/J email to DEQ re: Draft revised SAP section 8.0 08/01/05 KJ
13 01 11 04 RD/RA DEQ email to BN/K/J re: Haz Waste requirements for SAP 08/05/05 DEQ
13 01 11 04 RD/RA DEQ & K/J emails re: surveying of sample locations 08/05/05
13 01 11 04 RD/RA DEQ & K/J emails re: Domestic well sampling in SAP 8/5/05
13 01 11 04 RD/RA Health & Safety Plan insert pages for March 2005 H&SP 03/30/06
13 01 11 04 RD/RA Task Specific Health & Safety Plan 2011 02/11/11 KJ
13 01 11 04 RD/RA 03/08/12
13 01 11 04 RD/RA DEQ Health & Safety Plan for BN Livingston Shop Complex 10/16/12 DEQ/ Reynolds
13 01 11 05 CD RD/RA 03/05/11 KJ
13 01 11 05 RD/RA K/J letter to DEQ RCRA re: Facility-wide SAP 4/11/05 KJ
13 01 11 05 RD/RA DEQ RCRA letter to BNSF re: SAP 04/22/05 DEQ
13 01 11 05 RD/RA DEQ email to BN/K/J re: Copy of SAP to RTI 04/29/05 DEQ
13 01 11 05 RD/RA 05/24/05 KJ
13 01 11 05 RD/RA K/J email to DEQ re: QAPP table B4 06/22/05 KJ
13 01 11 05 RD/RA K/J email to DEQ re: VPH/EPH holding times 6/22/05 KJ
13 01 11 05 RD/RA 07/01/05 DEQ
13 01 11 05 RD/RA DEQ internal email re: SAP comments 07/18/05 DEQ
13 01 11 05 RD/RA DEQ email to BNSF re: SAP Title 07/22/05 DEQ
13 01 11 05 RD/RA DEQ email to BN re: SAP comments w/attachments 07/25/05 DEQ
13 01 11 05 RD/RA DEQ email to K/J re: Purge water treatment correspondence 8/1/05 DEQ
13 01 11 05 RD/RA Y ** DEQ internal email re: SAP - IDW soil & Water 8/10/05 DEQ
Site-Wide Information
Facility - Wide Health & Safety Plan
Site-Wide Information
Facility - Wide Health & Safety Plan
Site-Wide Information
Facility - Wide Health & Safety Plan
Site-Wide Information
Facility - Wide Health & Safety Plan
Site-Wide Information
Facility - Wide Health & Safety Plan
Site-Wide Information
Facility - Wide Health & Safety Plan
Site-Wide Information
Facility - Wide Health & Safety Plan
Site-Wide Information
Facility - Wide Health & Safety Plan
DEQ/Bucy (for Reynolds) letter to BN/Smith re: Shop Comples Task J Supplemental Investigation Report
Site-Wide Information
Facility - Wide Health & Safety Plan
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
K/J letter/fax to DEQ re: Investigation - Derived Residuals Management
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
DEQ letter/fax to BN re: DEQ comment letter-facility-wide SAP
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
BN LIVINGSTON 8/26/13
Page 90 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 05 RD/RA Y ** DEQ internal email re: SAP & RCRA issues 8/11/05 DEQ
13 01 11 05 RD/RA DEQ letter/fax to BN re: Revised section 8-0 08/12/05 DEQ
13 01 11 05 CD RD/RA Facility - Wide SAP revision 1 & 2 8/05 KJ
13 01 11 05 RD/RA Facility Wide SAP\ 08/25/05 KJ
13 01 11 05 RD/RA DEQ attorney email to BKBH re: SAP comments 08/30/05 DEQ
13 01 11 05 RD/RA 10/26/05 DEQ
13 01 11 05 RD/RA K/J email to DEQ re: SAP clarification - Air Shipping 11/1/05 KJ
13 01 11 05 RD/RA Phone Log - DEQ to K/J re: SAP clarification - Air Shipping 11/01/05 DEQ
13 01 11 05 RD/RA K/J letter to DEQ re: Revision pages to 8/05 Facility Wide SAP 12/9/05 KJ
13 01 11 05 RD/RA K/J email to DEQ re: SAP Oversight 02/15/06 KJ
13 01 11 05 RD/RA DEQ letter to BNSF re: Final SAP approval w/revisions 3/10/06 DEQ
13 01 11 05 RD/RA K/J letter to DEQ re: Final Sap revisions replacement pages 03/23/06 KJ
13 01 11 05 CD RD/RA Final Facility - Wide SAP 03/06/11 KJ
13 01 11 05 RD/RA DEQ & K/J emails re: DEQ Dec 2006 letter 1/9/07
13 01 11 05 RD/RA DEQ & K/J emails re: Sample receipts for private parties 01/29/07
13 01 11 05 CD RD/RA Facility Wide SAP Addendum No 1 1/07 KJ
13 01 11 05 RD/RA Facility Wide SAP Attachment DD
13 01 11 05 RD/RA DEQ internal emails re: VOC sampling at BNSF Facilities 2/1/07 DEQ
13 01 11 05 RD/RA Facility Wide SAP Addendum No 1 redline 6/07
13 01 11 05 CD RD/RA Facility Wide SAP Addendum No 1(Revision No 1) K/J, 6/07
13 01 11 05 RD/RA Replacement pages for Final Facility Wide SAP 6/07
13 01 11 05 RD/RA Facility Wide SAP Addendum No 2 11/27/07
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft DEQ letter to BNSF re: 2nd Draft SAP comments
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
received 2/28/07
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
BN LIVINGSTON 8/26/13
Page 91 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 05 RD/RA Y 11/29/07 DEQ internal
13 01 11 05 CD RD/RA 01/08/11
13 01 11 05 RD/RA 01/09/08 DEQ
13 01 11 05 RD/RA K/J email to DEQ re: Deliverables addendum 1 & 2 9 1/15/08 KJ
13 01 11 05 RD/RA Replacement pages for Facility Wide SAP 01/08/11
13 01 11 06 RD/RA
13 01 11 06 RD/RA K/J email to DEQ re: Sketch Map for new wells 04/27/05 KJ
13 01 11 06 RD/RA 4/27/05 KJ
13 01 11 06 RD/RA Map for Task F Scoping Meeting - Submitted to DEQ
13 01 11 06 RD/RA Meeting Notes - Denise Martin 04/28/05 DEQ / Martin
13 01 11 06 RD/RA Meeting Notes - 4/28/05 DEQ/ Amy Sivers
13 01 11 06 RD/RA Meeting Notes - Denise Martin 04/28/05 DEQ / Martin
13 01 11 06 RD/RA Draft map showing Historical MNA sampling 05/05/11
13 01 11 06 RD/RA KJ Letter to DEQ re: Groundwater monitoring event 11/05 10/28/05 KJ
13 01 11 06 RD/RA 12/09/05 CDM
13 01 11 06 RD/RA 01/24/06 KJ
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
** DEQ internal email re: DEQ legal – comments on Facility Wide SAP Addendum # 2
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Facility Wide SAP Addendum No 1 (Revision # 2) and Addendum No 2
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
DEQ letter to BNSF re: DEQ comments on Addenda No 1 & 2 of the SAP
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Facility - Wide Sampling & Analysis Plan + draft
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
K/J email to DEQ with attached discussion items for pre-WP meeting - task F
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Submitted 4/28/05
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
CDM Memorandum to DEQ re: CDM Oversight field notes from 2005 semi-annual GW monitoring
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
K/J email to DEQ re: Task F Stage 1 Part 2 postponement of submittal
BN LIVINGSTON 8/26/13
Page 92 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 RD/RA 01/31/06 DEQ
13 01 11 06 RD/RA Y ** DEQ internal email re: Task F – 1 year requirement 02/02/06 DEQ
13 01 11 06 RD/RA 3/06 KJ
13 01 11 06 RD/RA DEQ internal email re: Chemox Work Plan comments 11/08/06 DEQ
13 01 11 06 RD/RA DEQ email to CDM re: Task F schedule 03/20/07 DEQ
13 01 11 06 RD/RA DEQ & K/J emails re: Task F questions & answers DEQ
13 01 11 06 RD/RA CDM email to DEQ re: Revised PDF 04/01/07 CDM
13 01 11 06 RD/RA DEQ & K/J emails re: GW analysis methods 05/07/07
13 01 11 06 RD/RA 05/24/06 KJ
13 01 11 06 RD/RA 06/12/06
13 01 11 06 RD/RA KJ/BNSF/DEQ emails re: Groundwater sampling 06/26/06
13 01 11 06 RD/RA KJ/DEQ emails re: Groundwater sampling status 06/16/06
13 01 11 06 RD/RA 10/31/06 KJ
13 01 11 06 RD/RA 04/27/07 KJ
13 01 11 06 RD/RA 4/29-5/1/07 KJ
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
DEQ email to K/J re: Postponement - Task F stage 1 Part 2 request/approval
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Task F Stage 1 – Part 2 Pilot Test Work Plan for Volatile Organic Compound-Containing Alluvial Aquifer GW
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
KJ Letter to DEQ re: June 2006 semiannual groundwater monitoring event
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
KJ/DEQ emails re: June 2006 semiannual groundwater monitoring event
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
KJ Letter to DEQ re: November 2006 semiannual groundwater monitoring event
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
KJ email to DEQ re: Attached figure showing well layout locations
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
KJ/DEQ emails re: Applied Geochemistry – Intrinsic Biodegradation of Diesel LNAPL article
BN LIVINGSTON 8/26/13
Page 93 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 RD/RA 5/4-5/8/07
13 01 11 06 RD/RA KJ email to DEQ re: Mobile home analytical results 05/10/07 KJ
13 01 11 06 RD/RA 05/30/07
13 01 11 06 RD/RA
13 01 11 06 RD/RA KJ email to DEQ re: Electric Shop well locations 06/06/07 KJ
13 01 11 06 RD/RA 6/8-6/15/07
13 01 11 06 RD/RA KJ/DEQ emails re: Domestic water sampling program 6/15-6/20/07
13 01 11 06 RD/RA Private Well Sampling Analytical Results – June 2007 7/07
13 01 11 06 RD/RA KJ/DEQ emails re: Private well contact checklist 7/5/07
13 01 11 06 RD/RA KJ email to DEQ re: Task F items posted to website 7/17/07 KJ
13 01 11 06 RD/RA KJ email to DEQ re: Requested Task I information 7/26/07 KJ
13 01 11 06 RD/RA KJ/DEQ emails re: Task F items posted to website 07/27/07
13 01 11 06 RD/RA KJ emails to DEQ re: Task F items posted to website 7/27/07 KJ
13 01 11 06 RD/RA 8/1/07 KJ
13 01 11 06 RD/RA DEQ/KJ emails re: Krohne wells 08/03/07
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
KJ/DEQ emails re: Groundwater analyses for geochemical indicators of intrinsic biodegradation – ferrous iron
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
KJ/CDM/DEQ emails re: Task F Stage 1 Part 2 bench scale testing
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
CDM/DEQ emails re: Task F Stage 1 Part 2 bench scale testing (5/30/07-6/5/07)
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
CDM/DEQ emails re: Watson property/Confirmation of drilling activities
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
KJ email to DEQ re: Task F and Task D/E items posted to website
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
BN LIVINGSTON 8/26/13
Page 94 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 RD/RA DEQ email to KJ re: Updated figures 08/04/07 DEQ
13 01 11 06 RD/RA 08/07/07 DEQ
13 01 11 06 RD/RA 08/08/07
13 01 11 06 RD/RA Alpine Analytical - Sampling and analysis results 08/15/07 Alpine Analytical
13 01 11 06 RD/RA KJ/DEQ emails re: Task F groundwater sampling 08/23/07
13 01 11 06 RD/RA KJ email to DEQ re: Task F data posted to website 08/23/07 KJ
13 01 11 06 RD/RA 08/27/07 KJ
13 01 11 06 RD/RA 8/8-8/29/07
13 01 11 06 RD/RA KJ email to DEQ re: Task F data posted to website 8/31/07 KJ
13 01 11 06 RD/RA KJ email to DEQ re: Task F data posted to website 9/5/07 KJ
13 01 11 06 RD/RA KJ email to DEQ re: Second quarter sampling event 09/19/07 KJ
13 01 11 06 RD/RA KJ/DEQ emails re: Krohne wells 9/27-9/28/07
13 01 11 06 RD/RA DEQ/KJ emails re: MW-11 VOC data 09/28/07
13 01 11 06 RD/RA Alpine Analytical - Sampling and analysis results 10/1/07 Alpine Analytical
13 01 11 06 RD/RA KJ email to DEQ re: Task F items posted to website 10/12/07 KJ
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
DEQ letter to Krohnes re: Sampling associated with the BN Livingston Shop Complex
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater Task F Stage I Part 1 Domestic Water Sampling Program Status
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
KJ emails to DEQ re: Contact information for Grosvenor property
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
KJ/DEQ emails re: Second quarter sampling event and Boehm consent for access
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
BN LIVINGSTON 8/26/13
Page 95 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 RD/RA KJ email to DEQ re: Task F items posted to website 10/15/07 KJ
13 01 11 06 RD/RA KJ email to DEQ re: Task F items posted to website 10/17/07 KJ
13 01 11 06 RD/RA KJ email to DEQ re: Task F items posted to website 10/22/07 KJ
13 01 11 06 RD/RA 11/14/07
13 01 11 06 RD/RA KJ/DEQ emails re: Diffusion bag sampling 11/16/07
13 01 11 06 RD/RA KJ email to DEQ re: Private property sampling notifications 11/29/07 KJ
13 01 11 06 RD/RA KJ/DEQ emails re: Private property sampling notifications 11/29-12/3/07
13 01 11 06 RD/RA KJ/DEQ emails re: Third quarter sampling notification 11/9-12/3/07
13 01 11 06 RD/RA KJ/DEQ emails re: Third quarter GW sampling 11/26-12/3/07
13 01 11 06 RD/RA KJ/DEQ emails re: Third quarter sampling notification 12/3-12/5/07
13 01 11 06 RD/RA KJ/DEQ emails re: Third quarter sampling notification 11/9-12/13/07
13 01 11 06 RD/RA CDM well sampling oversight 12/19/07 CDM
13 01 11 06 RD/RA Alpine Analytical - Sampling and analysis results 12/28/07 Alpine Analytical
13 01 11 06 RD/RA Energy Labs – Diffusion bag results 01/11/08 Energy Labs
13 01 11 06 RD/RA DEQ email to KJ re: D Krohne phone call 01/16/08 DEQ
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
DEQ & K/J emails re: DEQ request for information about location of well identified as IT-1, IT-2 & IT-3
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
BN LIVINGSTON 8/26/13
Page 96 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 RD/RA KJ/DEQ emails re: Task F items posted to website 1/21-1/22/08
13 01 11 06 RD/RA DEQ/CDM emails re: Task F split samples (1/24/08-1/25/08)
13 01 11 06 RD/RA KJ/DEQ emails re: Fourth quarter sampling notification 02/22/08
13 01 11 06 RD/RA 02/22/08 KJ
13 01 11 06 RD/RA 2/22/08 KJ
13 01 11 06 RD/RA 02/22/08 KJ
13 01 11 06 RD/RA 3/17-3/18/08
13 01 11 06 RD/RA DEQ email to CDM re: Tracer test 03/31/08 DEQ
13 01 11 06 RD/RA KJ/CDM/DEQ emails re: Diffusion bag sampling 4/2-4/3/08
13 01 11 06 RD/RA KJ/DEQ emails re: Diffusion bag sampling 4/2-4/3/08
13 01 11 06 RD/RA KJ email to DEQ re: Task F items posted to website 04/22/08 KJ
13 01 11 06 RD/RA Replacement Task F items posted to website 4/25/08
13 01 11 06 RD/RA 05/08/08 KJ
13 01 11 06 RD/RA DEQ email to CDM re: March groundwater sampling letters 05/09/08 DEQ
13 01 11 06 RD/RA KJ letter to Mitchell re: Quarterly GW monitoring – June 2008 05/19/08 KJ
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
KJ Letter to Steffen re: Quarterly Groundwater Monitoring – March 2008
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
KJ Letter to Mitchell re: Quarterly Groundwater Monitoring – March 2008
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
KJ Letter to Krohne re: Quarterly Groundwater Monitoring – March 2008
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
KJ/ /BNSF/DEQ emails re: Weekly Task D/E design/construction meeting and diffusion bag sampling
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
KJ email to DEQ re: Task F Stage I Part 2 items posted to website
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
BN LIVINGSTON 8/26/13
Page 97 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 RD/RA KJ letter to Steffen re: Quarterly GW monitoring – June 2008 05/19/08 KJ
13 01 11 06 RD/RA KJ letter to Krohne re: Quarterly GW monitoring – June 2008 05/19/08 KJ
13 01 11 06 RD/RA 05/20/08
13 01 11 06 RD/RA 5/30/08 DEQ internal
13 01 11 06 RD/RA 06/13/08 DEQ
13 01 11 06 RD/RA KJ email to DEQ re: Private well sampling update 06/13/08 KJ
13 01 11 06 RD/RA KJ email to DEQ re: Private well sampling update 6/13-6/16/08 KJ
13 01 11 06 RD/RA KJ email to DEQ re: Voice mail regarding Krohne 06/18/08 KJ
13 01 11 06 RD/RA KJ/DEQ emails re: Sampling oversight 06/18/08
13 01 11 06 RD/RA 07/08/08
13 01 11 06 RD/RA 03/25/09
13 01 11 06 RD/RA 06/06/10 KJ/Norris
13 01 11 06 RD/RA Site Oversight Report 7/7/-7/16/10 CDM
13 01 11 06 RD/RA 02/01/12 KJ/Norris
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
KJ/DEQ emails re: Notification of Task F Stage I Part 1 June GW sampling event
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
DEQ internal email re: DEQ legal comments on 3/08 GW Monitoring Results & Modification Request
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
DEQ letter to BNSF re: Transmittal of 3/08 (4th Quarter) Task F Stage 1 Part 1 GW Monitoring Results and Request for Modifications to Task F Stage I Part 1 GW Monitoring Requirements
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
CDM/DEQ emails re: Planned response to comments and targeted field dates
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
K/J/ Aldersley email to DEQ/Reynolds re: Task F items posted to website KJ/Adlersley
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
K/J/Norris letter to Kent Mitchell re: Semiannual GW sampling to be conducted week of June 20th
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
KJ/Norris letter for to Kent Mitchell re: Semiannual GW monitoring at the BN Shop Comples between February 15 & 24 2012
BN LIVINGSTON 8/26/13
Page 98 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 RD/RA 11/27/13 Kennedy/Jenks
13 01 11 06 01 RD/RA
13 01 11 06 01 CD RD/RA Draft Work Plan - Task F 05/31/05 KJ
13 01 11 06 01 RD/RA RTI/PCEC comments - Task F Work Plan 08/05/05
13 01 11 06 01 RD/RA Y ** DEQ internal email re: Task F ERCLs 05/07/06 DEQ
13 01 11 06 01 RD/RA Y ** DEQ internal email re: Task F WP Section 5 SAP 05/07/06 DEQ
13 01 11 06 01 RD/RA Y ** DEQ internal email re: Task F Table 2 modifications 5/7/06 DEQ
13 01 11 06 01 RD/RA Y ** DEQ internal emails re: Task F revisions 05/08/06 DEQ
13 01 11 06 01 RD/RA Y ** DEQ internal emails re: Task F Question- COC or VOC 05/08/06 DEQ
13 01 11 06 01 RD/RA Y ** DEQ internal emails re: Task F completion date 5/8/06 DEQ
13 01 11 06 01 RD/RA 01/10/07 DEQ
13 01 11 06 01 RD/RA 02/05/07 CDM
13 01 11 06 01 RD/RA CDM email to DEQ re: Task F figures & Table 6 attachment 02/12/07 CDM
13 01 11 06 01 RD/RA CDM email to DEQ re: Revised figures attachment 2/13/07 CDM
13 01 11 06 01 RD/RA 2/13/07 CDM
13 01 11 06 01 RD/RA CDM email to DEQ re: Revised figures attachment 02/14/07 CDM
13 01 11 06 01 RD/RA 2/27/07 DEQ
13 01 11 06 01 CD RD/RA 02/07/11
13 01 11 06 01 CD RD/RA 03/07/11
13 01 11 06 01 CD RD/RA 04/07/11 DEQ
13 01 11 06 01 RD/RA 05/01/07 DEQ
Site-Wide Information
Task F - Cleanup of VOCs in Alluvial Groundwater
Groundwater Monitoring Program Directive No.1 - Proposal for modification of Groundwater Sampling Frequency and Analysis
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan DEQ email to Mark Hill/CDM re: Appendix l & capture zone 3
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
CDM Tech Memo to DEQ re: Review of Task F Stage 1 - Part1 Remedial Action Plan for VOC
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
CDM email to DEQ re: Comparison of Appendix D to Well Logs
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
DEQ letter to BNSF re: Enclosure of DEQ modified Task F Stage 1 - Part 1 Remedial Action Plan for VOC-Containing Alluvial Aquifer GW 5/05
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
CD ROM – Task F Stage 1 Part 1 Work Plan – CADD Files for Figures 21, 20A, 20B
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
CD ROM – Modified AutoCAD drawings related to Task F – VOC Plume Investigation
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Task F Stage 1- Part 1 Remedial Action Plan for VOC-Containing Alluvial Aquifer GW
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
DEQ letter/fax to BNSF re: Approval of 4.07 Final Task F Stage 1 – Part 1 Remedial Action Plan
BN LIVINGSTON 8/26/13
Page 99 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 01 RD/RA Y ** DEQ internal email re: Domestic Well Sampling Program 06/20/07 DEQ
13 01 11 06 01 RD/RA Y 02/22/08
13 01 11 06 01 RD/RA 05/23/08
13 01 11 06 01 RD/RA 06/13/08 CDM
13 01 11 06 01 RD/RA K/J email to DEQ re: Task F Part 1 sampling mod app 6/16/08 KJ
13 01 11 06 01 RD/RA CDM Task F Part 1 GW Sampling Oversight Report 06/17/08 CDM
13 01 11 06 01 RD/RA DEQ/KJ emails re: Request to sample MW-5R 12/22/08
13 01 11 06 01 RD/RA KJ/DEQ emails re: MW-5R sampling 1/9/09
13 01 11 06 01 RD/RA KJ/DEQ emails re: MW-5R sampling 01/12/09
13 01 11 06 01 RD/RA KJ email to DEQ re: Task F part 1 sampling notice 02/10/09 KJ
13 01 11 06 01 RD/RA KJ letter to Krohne re: Sampling notice 2/13/09 KJ
13 01 11 06 01 RD/RA KJ letter to Mitchell re: Sampling notice 2/13/09 KJ
13 01 11 06 01 RD/RA KJ email to DEQ re: Well MW-5R results notice 2/13/09 KJ
13 01 11 06 01 RD/RA emails re: Groundwater split samples 2/10-2/18/09
13 01 11 06 01 RD/RA K/J email to DEQ re: Task F items posted to website 03/25/09 KJ
13 01 11 06 01 RD/RA 05/27/09 KJ
13 01 11 06 01 RD/RA K/J email to DEQ re: Notification of upcoming field activities 06/10/09 KJ
13 01 11 06 01 RD/RA KJ letter to Mitchell re: Sampling notice 01/20/10 KJ
13 01 11 06 01 CD RD/RA Task F, Stage 1, Part 1 Remedial Action Report 02/04/10 KJ
13 01 11 06 01 RD/RA KJ letter to Mitchell re: Sampling notice 06/10/10 k?J
13 01 11 06 01 RD/RA 6/17/10 DEQ
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
** DEQ internal & K/J emails re: Task F – 4th Qtr GW Sampling Notification
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Task F Stage 1-Part 1 GW Monitoring Results & Request for Modification to TASK F Stage 1 – Part 1 GW Monitoring Requirements
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
CDM email to DEQ re: Mark Hill/CDM comments on Task F Stage 1-Part 1 GW Monitoring Results & Request for Modification to Task F Stage 1 – Part 1 GW Monitoring Requirements
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
K/J letter to Kent Mitchell re: Semi annual GW sampling on Mitchell property
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
DEQ letter to BNSF re: Continuation of groundwater monitoring activities
BN LIVINGSTON 8/26/13
Page 100 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 01 RD/RA 06/17/11 KJ/Aldersley
13 01 11 06 01 RD/RA 06/20/11 KJ/Aldersley
13 01 11 06 01 RD/RA 06/21/11 KJ/Aldersley
13 01 11 06 01 RD/RA 06/22/11 KJ/Aldersley
13 01 11 06 01 RD/RA 07/25/11 DEQ/Reynolds
13 01 11 06 01 RD/RA 07/26/11 J McGarry
13 01 11 06 01 RD/RA DEQ/Reynolds & K/J Aldersley emails re: Krohne wells 07/27/11
13 01 11 06 01 RD/RA 07/28/11
13 01 11 06 01 RD/RA 07/28/11
13 01 11 06 01 RD/RA 08/03/11
13 01 11 06 01 RD/RA 8/5/11 BKBH
13 01 11 06 01 RD/RA 08/09/11
13 01 11 06 01 RD/RA 8/9/11 DEQ/ Reynolds
13 01 11 06 01 RD/RA J McGarry fax to DEQ Legal re: Krohne vs BNSF 08/10/11 J McGarry
13 01 11 06 01 RD/RA 10/18/11 J McGarry
13 01 11 06 01 RD/RA 10/21/11 J McGarry
13 01 11 06 01 RD/RA 10/21/11 T Culver
13 01 11 06 01 RD/RA 11/16/11
13 01 11 06 01 RD/RA 04/06/11 KJ/Adlersley
13 01 11 06 01 RD/RA 05/08/12
13 01 11 06 01 RD/RA 05/23/12 DEQ/ Reynolds
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
K/J/Aldersley email to DEQ/Reynolds re: Preliminary private well sampling schedule
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
K/J/Aldersley email to DEQ/Reynolds re: Revised private well sampling schedule
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
K/J/Aldersley email to DEQ/Reynolds re: Private well sampling schedule
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
K/J/Aldersley email to DEQ/Reynolds re: Private well sampling schedule update
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
DEQ/Reynolds & Espresso Depot emails re: Monitoring well access
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
J McGarry email to DEQ/Haque-Hausrath-re: Krohne test well monitoring/Air mitigation
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
DEQ Legal/Haque-Hausrath emails to J McGarry, Leo Berry & Dava Kaitala
DEQ Legal/ Haque-Hausrath
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
DEQ Legal/Haque-Hausrath & J McGarry emails re: BN monitoring well on Krohnes private property
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Edwards Frickle & Culver Law firm/Culver letter to BKBH/M Etchart re: Access issues on Krohne property
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
BKBH letter to Edwards Frickle & Culver Law firm/Culver re: Krohne vs BNSF
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
DEQ Legal/Haque-Hausrath internal email re: Phone Log – Voicemail to J McGarry
DEQ Legal/ Haque-Hausrath
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
DEQ/Reynolds email to K/J re: Phone Log – Voicemail to J McGarry – Sampling on Krohnes
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
COK law/McGarry email to DEQ Haque-Hausrath re: Access to Krohne monitoring wells
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
COK law/McGarry email to DEQ Haque-Hausrath re: Access to Krohne monitoring wells
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
T Culver letter to DEQ legal/Haque-Hausrath re: Compensation to the Khrone's for access to their property
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
DEQ legal/Haque-Hausrath letter to T Culver re: Access to Mr Krohne's property
DEQ Legal/ Haque-Hausrath
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
K/J/Aldersley email to DEQ/Reynolds re: February 2011 GW sampling results posted to website
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
KJ/Aldersley & DEQ/Reynolds emails re: Natural Attentuations Parameters
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
DEQ/Reynolds email to KJ/Norris re: FW email from Resourse Tech/Johnson - Citizen concerns about well - please add wells 7M02, 7M04 & 7M05 to sampling schedule
BN LIVINGSTON 8/26/13
Page 101 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 01 RD/RA 05/29/12 KJ/Norris
13 01 11 06 01 RD/RA 06/14/12 KJ/Adlersley
13 01 11 06 01 RD/RA 06/19/12 CDMSmith/ Coan
13 01 11 06 01 RD/RA 06/20/12 KJ/Adlersley
13 01 11 06 01 RD/RA 06/21/12 KJ/Adlersley
13 01 11 06 01 RD/RA 07/03/12 KJ/Adlersley
13 01 11 06 01 RD/RA 07/09/12 KJ/Adlersley
13 01 11 06 01 RD/RA 01/15/13 KJ/Norris
13 01 11 06 01 RD/RA 01/22/13
13 01 11 06 01 RD/RA 02/06/13 KJ/Aldersley
13 01 11 06 01 RD/RA 02/08/13 KJ/Norris
13 01 11 06 01 RD/RA 02/08/13 KJ/Norris
13 01 11 06 01 RD/RA 02/14/13 KJ/Aldersley
13 01 11 06 01 RD/RA KJ/Norris & DEQ/Reynolds emails re: Field blanks samples 2/12-2/19/13
13 01 11 06 01 RD/RA 03/29/13 KJ/Aldersley
13 01 11 06 02 RD/RA
13 01 11 06 02 RD/RA Task F Stage 1 Part 2 Pilot Test Work Plan 03/01/06 KJ
13 01 11 06 02 RD/RA Y 05/10/06 DEQ
13 01 11 06 02 RD/RA 04/02/07 CDM
13 01 11 06 02 RD/RA DEQ version Task F Stage 1 – Part 2 WP Modifications 04/07/11 DEQ
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
KJ/Norris letter to Kent Mitchell re: Semi-annual GW sampling to be conducted at BN Shop Complex and access required to the former Rustad property
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
K/J/Aldersley email to DEQ/Reynolds re: Private well sampling schedule update
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
CDM Smith/Coan email to DEQ/Reynolds re: Task GW Monitoring update
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
K/J/Aldersley email to DEQ/Reynolds re: Private well sampling schedule update
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
K/J/Aldersley email to DEQ/Reynolds re: Private well sampling schedule update
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
K/J/Aldersley email to DEQ/Reynolds re: June 2012 GW sampling results posted to website
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
K/J/Aldersley email to DEQ/Reynolds re: June 2012 Private Well sampling results posted to website
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
KJ/Norris email to DEQ/Reynolds re: Attachment - DEQ GW Monitoring Directive #1
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
KJ/Norris & DEQ/Reynolds emails re: Task M RA for Abestos-containing material & Task L survey data
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
KJ/Aldersley email to DEQ/Reynolds re: Notification of GW sampling per directive #1 to commence 2/20/13
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
KJ/Norris letter to Livingston City Center/Meece re: Semi-annual GW sampling to begin 2/20/13 thru 2/28/13 at Shop Complex- need access to wells
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
KJ/Norris letter to Heart K Land & Cattle Co/Blatter re: Quarterly/semi-annual GW sampling to begin 2/20/13 thru 2/28/13 at Shop Complex- need access to wells
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
KJ/Aldersley email to DEQ/Reynolds re: Contact Chris LaRose if DEQ or CDM is going to be present during sampling
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
Site-Wide Information
Task F, Stage I, Part I Remedial Action Plan
KJ/Aldersley email to DEQ/Reynolds re: Analytical results for February 2013 sampling have been posted to the website
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
** DEQ internal email re: Task F Stage 1 Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
CDM email to DEQ re: Task F Stage 1- Part 2 WP Modifications
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
BN LIVINGSTON 8/26/13
Page 102 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 02 RD/RA 08/21/07
13 01 11 06 02 RD/RA K/J letter to DEQ re: Task F Stage 1 Part 1 Pilot Test 11/12/07 KJ
13 01 11 06 02 RD/RA 01/02/08 DEQ
13 01 11 06 02 RD/RA 01/30/08 KJ
13 01 11 06 02 RD/RA EPA letter to BNSF re: Aquifer remodification well 3/14/08 EPA
13 01 11 06 02 RD/RA Task F Stage 1 Part 2 – Planned Bromide Tracer Test 03/28/08 KJ
13 01 11 06 02 RD/RA Task F, Part 2, Bromide Tracer Oversight Report 05/05/08 CDM
13 01 11 06 02 RD/RA DEQ/BNSF Task F Stage 1 Part 2 Pilot Test 05/22/08
13 01 11 06 02 CD RD/RA 6/08 KJ
13 01 11 06 02 RD/RA Task F Part 2, Bromide Tracer Oversight Report 06/20/08 CDM
13 01 11 06 02 RD/RA Task F Stage 1 Part 2 Pilot Test WP – revision 1 6/24/08
13 01 11 06 02 RD/RA DEQ letter to BNSF re: Task F Stage 1 Part 2 08/02/08 DEQ
13 01 11 06 02 RD/RA DEQ letter to BNSF re: Revised Task F Stage 1 Part 2 WP 07/23/08 DEQ
13 01 11 06 02 CD RD/RA CD ROM transmittal: Final Task F Stage 1 Part 2 07/24/08 KJ
13 01 11 06 02 RD/RA K/J email to DEQ re: Permanganate sampling 08/14/08 KJ
13 01 11 06 02 RD/RA K/J email to DEQ re: Task F Part 2 conference call summary 08/22/08 KJ
13 01 11 06 02 RD/RA Phone Log – DEQ and K/J re: Report on pilot test 8/22/08
13 01 11 06 02 RD/RA K/J email to DEQ re: Notice of Task F posting 08/28/08 KJ
13 01 11 06 02 RD/RA CDM explanation of top down injection 08/08/11 CDM
13 01 11 06 02 RD/RA K/J email to DEQ re: Notice of items posted to web 9/15/08 KJ
13 01 11 06 02 RD/RA DEQ/KJ emails re: Task F Part 2 info posting notice 9/22/08
13 01 11 06 02 RD/RA K/J email to DEQ re: Notice of items posted to web 10/06/08 KJ
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Prima Environmental letter to K/J re: Sodium Persulfate Soil Oxidant Demand Test Results
Prima Environmental
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
DEQ letter to BNSF re: 11/12/07 letter work plan for Task F Stage 1 Part 2
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
K/J letter to DEQ re: Response to Comments Task F Stage 1 Part 2
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Final Task F Stage 1-Part 2 Pilot Test Work Plan for Volatile Organic Compound-Containing Alluvial Aquifer GW
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
BN LIVINGSTON 8/26/13
Page 103 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 02 RD/RA K/J email to DEQ re: Task F Part 2 sampling notice 12/03/08 KJ
13 01 11 06 02 RD/RA K/J email to DEQ re: Task F Part 2 sampling notice 12/10/08 KJ
13 01 11 06 02 RD/RA 01/22/09 DEQ
13 01 11 06 02 CD RD/RA 11/09/11 KJ
13 01 11 06 02 RD/RA 03/05/10 KJ/Aldersley
13 01 11 06 02 RD/RA 10/15/10 KJ Norris
13 01 11 06 02 CD RD/RA 10/15/10 KJ
13 01 11 06 02 CD RD/RA 11/11/10 KJ
13 01 11 06 02 RD/RA 11/23/10 EPA/Pratt
13 01 11 06 02 RD/RA 11/29/10 DEQ/Reynolds
13 01 11 06 02 RD/RA 02/22/11 KJ/Norris
13 01 11 06 02 RD/RA 10/17/11 KJ
13 01 11 06 02 RD/RA 10/28/11 DEQ/ Reynolds
13 01 11 06 02 RD/RA 11/04/11
13 01 11 06 02 RD/RA 11/07/11 KJ
13 01 11 06 02 RD/RA 11/16/11
13 01 11 06 02 RD/RA 11/17/11
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
DEQ letter to K/J re: Response to K/J 1/14/09 letter – request to discontinue post permanganate injection GW sampling
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Final Task F Stage 1-Part 2 Pilot Test Report for VOC-Containing Alluvial Aquifer Groundwater
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
K/J/Aldersley email to DEQ/Reynolds re: Livingston Deliverable – Task F – Part 2 Weekly Report # 4
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
K/J Norris email to DEQ/Reynolds re: Attachment – Addendum Number 2 to Final Task F Stage I Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Addendum Number 2 to Final Task F Stage I Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Revised Addendum # 2 Final Task F Stage I – Part 2 Pilot Test Work Plan for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
EPA/Pratt letter to BNSF/Smith re: Class V Underground Injection Control permit
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
DEQ/Reynolds letter to BN/Smith re: DEQ approval of Revised Addendum # 2 Final Task F Stage I – Part 2 Pilot Test Work Plan for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater – November 11, 2010
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
K/J/Norris letter to Kent Mitchell re: Request for access for sampling of GW monitoring wells
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
KJ letter report to DEQ/Reynolds re: Additional Task F Stage I-Part 2 Chemical Oxidant-Containing GW recirculation
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
DEQ/Reynolds letter to BN/Smith re: DEQ comments on KJ letter report to DEQ/Reynolds re: Additional Task F Stage I-Part 2 Chemical Oxidant-Containing GW recirculation
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
DEQ/Reynolds & Dr Eric Boyd emails re: Boyd information request
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
KJ/BNSF letter to DEQ/Reynolds re: Response to DEQ comments on Additional Task F Stage I-Part 2 Chemical Oxidant-Containing GW recirculation
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
DEQ/Olsen internal email re: Put Senator Ron Arthun on BN mailing list
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
DEQ/Reynolds email to Mr Knoebel re: DEQ response to information request
BN LIVINGSTON 8/26/13
Page 104 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 02 RD/RA 03/28/12 DEQ internal
13 01 11 06 02 RD/RA 04/03/12 DEQ/ Reynolds
13 01 11 06 02 RD/RA Jeff Moore & DEQ/Reynolds emails re: Mitigation
13 01 11 06 02 RD/RA 11/07/12
13 01 11 06 02 RD/RA 05/22/13 KJ/Norris
13 01 11 06 02 RD/RA 05/22/13 KJ/Norris
13 01 11 06 02 RD/RA KJ/Norris letter to Blake Blatter re: well sampling notice 05/22/13 KJ/Norris
13 01 11 06 02 RD/RA DEQ/Reynolds phone log - Blatter access issue 06/03/13 DEQ
13 01 11 06 02 RD/RA 06/03/13 KJ/Aldersley
13 01 11 06 02 RD/RA DEQ/Reynolds letter to BNSF/Smith re: Blatter access issue 06/04/13 DEQ/Reynolds
13 01 11 06 02 RD/RA 06/06/13 KJ/Aldersley
13 01 11 06 02 RD/RA 06/07/13 KJ/Aldersley
13 01 11 06 02 RD/RA 06/12/13 KJ/Aldersley
13 01 11 06 02 RD/RA 06/27/13 KJ/Aldersley
13 01 11 06 02 RD/RA 07/19/13 KJ/Aldersley
13 01 11 06 02 RD/RA 07/30/13 KJ/Aldersley
13 01 11 06 02 01 RD/RA Meeting Notes
13 01 11 06 02 01 RD/RA Meeting Notes Notes 7/3/07
13 01 11 06 02 01 RD/RA Meeting Notes Notes 07/06/07
13 01 11 06 02 01 RD/RA Meeting Notes Notes 10/03/07
13 01 11 06 02 01 RD/RA Meeting Notes Notes 2/5/08
13 01 11 06 02 01 RD/RA Meeting Notes Notes 05/27/08
13 01 11 06 02 01 RD/RA Meeting Notes Minutes 5/27/08
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
DEQ/Seyler internal email to Reynolds re: Phone Log - Sonoma Bank/Ed Morales - information request
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
DEQ/Reynolds email to Sonoma Bank/Morales re: Copy of EPA's new Tetrachlorethene toxicity information
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
1/20/12 & 6/14/12
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
DEQ legal/Haque-Hausrath email to [email protected] re: Information about facility
DEQ legal/ Haque-Hausrath
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
KJ/Norris letter to Chris Bendon re: private well sampling notice
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
KJ/Norris letter to Ed Meece re: well sampling notice - city of livingston
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
KJ/Aldersley & DEQ/Reynolds emails re: Email chain Blatter access issue
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
KJ/Aldersley & DEQ/Reynolds emails re: Sampling wells 92-2 and 10-8
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
KJ/Aldersleyl & DEQ/Reynolds emails re: Blatter access granted notice
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
KJ/Aldersley & DEQ/Reynolds emails re: private well (Fabian) access denied
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
KJ/Aldersley & DEQ/Reynolds emails re: MW-5RR location approval
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
KJ/Aldersley & DEQ/Reynolds emails re: private well sampling update
Site-Wide Information
Task F, Stage I, Part 2 Pilot Test Work Plan
KJ/Aldersley email to DEQ/Reynolds re: private well sampling results posted
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 105 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 02 01 RD/RA Meeting Notes Notes 06/04/08
13 01 11 06 02 01 RD/RA Meeting Notes Notes 06/05/08
13 01 11 06 02 01 RD/RA Meeting Notes CDM/DEQ notes on next steps 01/26/09
13 01 11 06 02 01 RD/RA Meeting Notes Notes 8/5/09
13 01 11 06 02 01 RD/RA Meeting Notes Notes
13 01 11 06 02 02 RD/RA Emails
13 01 11 06 02 02 RD/RA Emails KJ/DEQ emails re: Photo of NE corner of Electric Shop 5/2/07
13 01 11 06 02 02 RD/RA Emails 5/4-5/7/07
13 01 11 06 02 02 RD/RA Emails KJ/DEQ emails re: Task F Part 2 5/24/07
13 01 11 06 02 02 RD/RA Emails KJ/DEQ emails re: Task F Stage 1 Part 2 bench scale testing 5/30-6/5/07
13 01 11 06 02 02 RD/RA Emails KJ/DEQ emails re: Task F Stage 1 Part 2 bench scale testing 5/30-6/15/07
13 01 11 06 02 02 RD/RA Emails 5/30-6/18/07
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Task F bench scale test 06/27/07 KJ
13 01 11 06 02 02 RD/RA Emails DEQ/CDM emails re: Task F Part 2 10/18/07
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Task F Stage I Part 2 pilot test 11/12/07 KJ
13 01 11 06 02 02 RD/RA Emails DEQ email to KJ re: Task F Part 2 01/25/08 DEQ
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ w/Task F letter and figure attached 01/30/08 KJ
13 01 11 06 02 02 RD/RA Emails 02/14/08
13 01 11 06 02 02 RD/RA Emails 02/14/08
13 01 11 06 02 02 RD/RA Emails 2/14-2/15/08
13 01 11 06 02 02 RD/RA Emails CDM email to DEQ re: Field activity comments 2/15/08 CDM
13 01 11 06 02 02 RD/RA Emails 2/14/-2/26/08
13 01 11 06 02 02 RD/RA Emails KJ/DEQ emails re: Task F Stage 1 Part 2 3/9-3/10/08
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ/DEQ/CDM emails re: Groundwater analyses for geochemical indicators of intrinsic biodegradation – ferrous iron
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ/DEQ/CDM emails re: Task F Stage 1 Part 2 bench scale testing
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ/DEQ/CDM emails re: Notification of field activity and additional info
Site-Wide Information
KJ/DEQ emails re: Notification of field activity and additional info
Site-Wide Information
KJ/DEQ emails re: Notification of field activity and additional info
Site-Wide Information
Site-Wide Information
KJ/DEQ emails re: Notification of field activity and additional info
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 106 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 02 02 RD/RA Emails KJ/DEQ emails re: Sodium permanganate bench scale testing 3/11/-3/19/08
13 01 11 06 02 02 RD/RA Emails CDM/KJ/DEQ emails re: Field activity comments 2/15-3/31/08
13 01 11 06 02 02 RD/RA Emails CDM/KJ emails re: Bromide tracer test 2/15-4/2/08
13 01 11 06 02 02 RD/RA Emails CDM/KJ/DEQ emails re: Bromide tracer test 2/15-4/7/08
13 01 11 06 02 02 RD/RA Emails CDM email to DEQ re: Tracer test modeling 04/09/08 CDM
13 01 11 06 02 02 RD/RA Emails CDM/DEQ emails re: Tracer test 4/28/-4/29/08
13 01 11 06 02 02 RD/RA Emails KJ/CDM emails re: Bromide tracer testing 4/29-4/30/08
13 01 11 06 02 02 RD/RA Emails KJ emails to DEQ re: Items posted to website 5/2-5/5/08 KJ
13 01 11 06 02 02 RD/RA Emails KJ/DEQ emails re: Pilot test implementation 5/7-5/8/08
13 01 11 06 02 02 RD/RA Emails KJ/DEQ emails re: NaMnO4 bench scale testing results 5/21-5/22/08
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Baseline sampling notification 05/22/08 KJ
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Items posted to website 05/29/08 KJ
13 01 11 06 02 02 RD/RA Emails Figure 1 – Monitoring Well Locations 05/08/11 KJ
13 01 11 06 02 02 RD/RA Emails Figures of Bromide Tracer Test Analytical Results 05/08/11
13 01 11 06 02 02 RD/RA Emails 06/05/08 CDM
13 01 11 06 02 02 RD/RA Emails KJ/CDM emails re: Task F Part 2 06/09/08
13 01 11 06 02 02 RD/RA Emails CDM/DEQ emails re: Meeting minutes and scheduling 5/30-6/12/08
13 01 11 06 02 02 RD/RA Emails DEQ email to KJ re: Task F Part 2 6/12/08 DEQ
13 01 11 06 02 02 RD/RA Emails KJ/DEQ emails re: Task D/E EX well drilling operations 6/12-6/13/08
13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: Task F Part 2 6/12-6/13/08
13 01 11 06 02 02 RD/RA Emails 6/30/08 CDM
13 01 11 06 02 02 RD/RA Emails DEQ/CDM emails re: Task F Part 2 Work Plan comments 6/30-7/1/08
13 01 11 06 02 02 RD/RA Emails DEQ internal email re: Task F Part 2 Work Plan comments 7/1-7/2/08 DEQ
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM email to DEQ re: Reference documents and site conditions
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM email to DEQ re: Comments on Final Task F Stage I Part 2 Work Plan
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 107 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 02 02 RD/RA Emails 07/03/08 KJ
13 01 11 06 02 02 RD/RA Emails 7/17/08
13 01 11 06 02 02 RD/RA Emails CDM email to DEQ re: Work Plan revisions 07/21/08 CDM
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: GW results 7/22/08 KJ
13 01 11 06 02 02 RD/RA Emails KJ/DEQ emails re: Revised NaMnO4 calculation 07/23/08
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Livingston deliverable 07/24/08 KJ
13 01 11 06 02 02 RD/RA Emails DEQ/CDM emails re: Task F Part 2 07/30/08
13 01 11 06 02 02 RD/RA Emails DEQ/ KJ emails re: Task F pilot test schedule 07/30/08
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Task F Part 2 items posted to website 11/13/08 KJ
13 01 11 06 02 02 RD/RA Emails 01/07/09
13 01 11 06 02 02 RD/RA Emails 01/14/09 KJ
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: KJ notice of sampling 01/22/09 KJ
13 01 11 06 02 02 RD/RA Emails 2/11-2/17/09
13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: Private wells 7/28/09
13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: Task F Part 2 9/28-9/29/09
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Document deliverable 10/26/09 KJ
13 01 11 06 02 02 RD/RA Emails DEQ/KJ/CDM emails re: Document deliverables
13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: Task F Stage I Part 1 Report
13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: Task F Stage I Part 1 Report
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Document deliverables 11/09/09 KJ
13 01 11 06 02 02 RD/RA Emails KJ email to MRL re: Upcoming work at rail yard 11/11/09 KJ
13 01 11 06 02 02 RD/RA Emails KJ emails to MRL re: Upcoming work at rail yard KJ
13 01 11 06 02 02 RD/RA Emails DEQ/KJ/BNSF emails re: Conference call request
Site-Wide Information
KJ email to DEQ re: Task F Stage I Part 2 items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Task F items posted to website, Attachment - Private well summary KJ/Aldersley
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ/DEQ/CDM emails re: DEQ requests for CDM review of posted items
Site-Wide Information
KJ letter to DEQ re: Request to discontinue post-permanganate injection groundwater sampling
Site-Wide Information
Site-Wide Information KJ/DEQ emails re: Termination of post-permanganate sampling
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
10/26-10/27/09
Site-Wide Information
10/26/-10/28/09
Site-Wide Information
10/26-10/29/09
Site-Wide Information
Site-Wide Information
Site-Wide Information
11/11-11/23/09
Site-Wide Information
11/20-11/23/09
BN LIVINGSTON 8/26/13
Page 108 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 02 02 RD/RA Emails DEQ email to KJ re: Pilot Test Work Plan 11/30/09 DEQ
13 01 11 06 02 02 RD/RA Emails DEQ email to KJ re: Task F Stage I Part 1 Report 12/2/09 DEQ
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Replacement pages 12/02/09 KJ
13 01 11 06 02 02 RD/RA Emails 12/02/09 CDM/Hills
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Bedrock well construction 12/3/09 KJ
13 01 11 06 02 02 RD/RA Emails CDM email re: Location for pilot test ISCO wells 12/04/09 CDM
13 01 11 06 02 02 RD/RA Emails DEQ/Olympus/CDM/KJ emails re: Drilling schedule 12/7-12/8/09
13 01 11 06 02 02 RD/RA Emails KJ email to MRL and DEQ re: Tentative schedule 01/04/10 KJ
13 01 11 06 02 02 RD/RA Emails 1/4-1/7/10
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Candidate ISCO well locations 01/09/10 KJ
13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: PID discussion 1/10-1/11/10
13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: Candidate ISCO well locations 1/9-1/12/10
13 01 11 06 02 02 RD/RA Emails CDM email to DEQ re: Task F progress 01/12/10 CDM
13 01 11 06 02 02 RD/RA Emails DEQ/CDM emails re: Task F progress 1/12-1/13/10 DEQ
13 01 11 06 02 02 RD/RA Emails CDM email to DEQ re: Well drilling 01/13/10 CDM
13 01 11 06 02 02 RD/RA Emails CDM email to DEQ re: Task F update 1/14/10 CDM
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Items posted to website 1/14/10 KJ
13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: Transfer pit ISCO well locations 1/12-1/15/10
13 01 11 06 02 02 RD/RA Emails CDM email to DEQ re: Task F update 01/15/10 CDM
13 01 11 06 02 02 RD/RA Emails 1/16-1/19/10
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Items posted to website 1/22/10 KJ
13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: Notification of groundwater sampling event 1/27-1/29/10
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Items posted to website 2/3/10 KJ
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM/Hills email to DEQ/Reynolds re: Final Task F Stage 1-Part 2 Pilot Test Report
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ/KJ/MRL emails re: Remediation work in and around shops complex
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ/CDM/KJ emails re: Addendum #1 well location field adjustment
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 109 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Document deliverables 02/04/10 KJ
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Document deliverables 02/08/10 KJ
13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: Alluvial aquifer groundwater 2/12-2/19/10
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Items posted to website 2/24/10 KJ
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Items posted to website 03/03/10 KJ
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Items posted to website 03/05/10 KJ
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Items posted to website 03/12/10 KJ
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Items posted to website 03/23/10 KJ
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Document deliverables 3/23/10 KJ
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Items posted to website 03/24/10 KJ
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Items posted to website 3/25/10 KJ
13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: DEQ approval for sampling 3/23-4/12/10
13 01 11 06 02 02 RD/RA Emails 4/27-4/28/10
13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: Upcoming groundwater sampling 5/10-5/11/10
13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: Well at 115 N. K St. and boundary map 5/19-5/21/10
13 01 11 06 02 02 RD/RA Emails CDM email to DEQ re: SVE system 06/03/10 CDM
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Updated private well sampling program 06/03/10 KJ
13 01 11 06 02 02 RD/RA Emails DEQ/KJ/Lawellin emails re: Well testing 06/23/10
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Updated private well sampling schedule 7/9/10 KJ
13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: Updated private well sampling schedule 07/12/10
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Updated private well sampling schedule 7/13/10 KJ
13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Updated private well sampling schedule 07/14/10 KJ
13 01 11 06 02 02 RD/RA Emails 7/15-7/19/10
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ/KJ emails re: Items posted to website and termination of monitoring program
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ/KJ/Resident emails re: Private well sampling at 115 N. K St.
BN LIVINGSTON 8/26/13
Page 110 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 02 02 RD/RA Emails 08/11/10 KJ Aldersley
13 01 11 06 02 02 CD RD/RA Emails 10/14/10 KJ Aldersley
13 01 11 06 02 02 RD/RA Emails 11/11/10 KJ Aldersley
13 01 11 06 02 02 RD/RA Emails 01/05/11
13 01 11 06 02 02 RD/RA Emails 02/21/11
13 01 11 06 02 02 RD/RA Emails 3/11/11 CDM/Hills
13 01 11 06 02 02 RD/RA Emails 03/13/11 CDM/Coan
13 01 11 06 02 02 RD/RA Emails 03/14/11 CDM/Sorenson
13 01 11 06 02 02 RD/RA Emails 03/16/11 CDM/Coan
13 01 11 06 02 02 RD/RA Emails 03/17/11 CDM/Coan
13 01 11 06 02 02 RD/RA Emails 03/18/11 KJ/Norris
13 01 11 06 02 02 RD/RA Emails 03/21/11 CDM/Coan
13 01 11 06 02 02 RD/RA Emails 03/22/11 CDM/Coan
13 01 11 06 02 02 RD/RA Emails K/J, CDM, & DEQ emails re: Rush PCE results 03/24/11
13 01 11 06 02 02 RD/RA Emails 04/04/11
13 01 11 06 02 02 RD/RA Emails 04/18/11 KJ/ Norris
13 01 11 06 02 02 RD/RA Emails 05/05/11 KJ/Adlersley
13 01 11 06 02 02 RD/RA Emails CDM/Coan & K/J/Fernandes emails re: ISCO pilot test 06/13/11
13 01 11 06 02 02 RD/RA Emails CDM/Coan internal email to Hills re: Task F tentative schedule 06/16/11 CDM/Coan
13 01 11 06 02 02 RD/RA Emails 06/22/11 KJ/Aldersley
13 01 11 06 02 02 RD/RA Emails DEQ/Reynolds & CDM/Hills emails re: Task F –permanganate 06/27/11
Site-Wide Information
K/J Aldersley email to DEQ/Reynolds re: Task F items posted to website
Site-Wide Information
K/J Aldersley email to DEQ/Reynolds re: Livingston deliverables – Task F Stage I-Part 2: Soil Vapor Extraction (SVE) Report + CD sent out
Site-Wide Information
K/J Aldersley email to DEQ/Reynolds re: Livingston deliverables – Revised Addendum #2 to Final Task F Stage I-Part 2 Pilot Test Work Plan for VOC – Containing Alluvial Aquifer Groundwater sent out
Site-Wide Information
K/J/Fernandes & DEQ/Reynolds emails re: Task F – Stage I Part 2 Addendum # 2 – Well drilling activities
Site-Wide Information
K/J/Norris & CDM/Hills emails to DEQ/Reynolds re: Task F Part 2 Progress schedule
Site-Wide Information
CDM/Hills fw email to DEQ/Reynolds re: Task F ISCO pilot test update
Site-Wide Information
CDM/Coan email to DEQ/Reynolds re: Task F ISCO pilot testing tentative schedule
Site-Wide Information
CDM/Sorenson email to DEQ/Reynolds re: Task F ISCO pilot testing tentative schedule
Site-Wide Information
CDM/Coan email to DEQ/Reynolds re: Task F - PCE and NaMnO4 figures
Site-Wide Information
CDM/Coan email to DEQ/Reynolds re: Task F conference call summary
Site-Wide Information
K/J/Norris email to DEQ/Reynolds re: GW recirculation timeline
Site-Wide Information
CDM/Coan email to DEQ/Reynolds re: Task F ISCO pilot test update
Site-Wide Information
CDM/Coan email to DEQ/Reynolds re: Task F ISCO pilot test - recent PCE results
Site-Wide Information
Site-Wide Information
CDM & K/J emails cc DEQ/Reynolds re: Status of pilot test system bleed out
Site-Wide Information
K/J/Norris email to DEQ/Reynolds re: ISCO well locations & GW PCE
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: LS Preliminary GW recirculation system schedule
Site-Wide Information
Site-Wide Information
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Attachment - Task F – Part 2 Analytical data for February & May 2011
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 111 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 02 02 RD/RA Emails 06/30/11 DEQ/ Reynolds
13 01 11 06 02 02 RD/RA Emails 07/06/11 CDM/Coan
13 01 11 06 02 02 RD/RA Emails 07/20/11 KJ/Adlersley
13 01 11 06 02 02 RD/RA Emails 09/22/11 KJ/Adlersley
13 01 11 06 02 02 RD/RA Emails 10/17/11 KJ/Adlersley
13 01 11 06 02 02 RD/RA Emails 11/04/11 DEQ/ Reynolds
13 01 11 06 02 02 RD/RA Emails DEQ/Reynolds email to KJ/Fernandes re: VE well injection 11/04/11 DEQ/ Reynolds
13 01 11 06 02 02 RD/RA Emails 11/07/11 DEQ/ Reynolds
13 01 11 06 02 02 RD/RA Emails 11/10/11 KJ/ Fernandes
13 01 11 06 02 02 RD/RA Emails 11/10/11 DEQ/ Reynolds
13 01 11 06 02 02 RD/RA Emails 11/14/11 KJ/Norris
13 01 11 06 02 02 RD/RA Emails 04/19/12
13 01 11 06 02 02 RD/RA Emails 06/07/12 KJ/Aldersley
13 01 11 06 03 RD/RA
13 01 11 06 03 RD/RA 03/19/09
13 01 11 06 03 RD/RA DEQ conference call notes 03/23/09 DEQ/ Reynolds
Site-Wide Information DEQ/Reynolds email to CDM re: Task F, Stage I Part 2 Update
Site-Wide Information
CDM/Coan email to DEQ/Reynolds re: Task F, Stage I Part 2 Update
Site-Wide Information
K/J Aldersley email to DEQ/Reynolds re: GW/Private well monitoring posted to website
Site-Wide Information
K/J Aldersley email to DEQ/Reynolds re: Task F Part 2 items posted to website
Site-Wide Information
K/J Aldersley email to DEQ/Reynolds re: A description of proposed additional ISCO using GW recirculation has been sent out for 10/18/11 delivery
Site-Wide Information
DEQ/Reynolds email to CDM/Hills & K Sorenson re: Task F Part 2 update
Site-Wide Information
Site-Wide Information
DEQ/Reynolds email to CDM/Hills & K Sorenson re: Task F Part 2 update
Site-Wide Information
KJ/Fernandes email to DEQ/Reynolds re: Attachment - Lab results for Electric & Locomotive Shop NaMnO4 GW recirculation system
Site-Wide Information
DEQ/Reynolds email to CDM/Hills & K Sorenson re: Task F Part 2 update
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: FW from Fernandes - GW recirculation summary lab results
Site-Wide Information
DEQ/Reynolds & KJ/Fernandes emails re: Task F, Part 2 chemical oxidation activities
Site-Wide Information
K/J Aldersley email to DEQ/Reynolds re: Task F Stage 1 Part 2 - Comprehensive Chemical Testing Report sent out UPS
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
DEQ/K/J & CDM emails re: Agenda for conference call – Sodium Permanganate
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
BN LIVINGSTON 8/26/13
Page 112 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 03 RD/RA K/J email to DEQ re: Livingston deliverable 04/24/09 KJ
13 01 11 06 03 RD/RA 04/24/09 KJ
13 01 11 06 03 RD/RA 5/4/09
13 01 11 06 03 RD/RA CDM & DEQ emails re: Support on Task F – Kent Whiting 05/18/09
13 01 11 06 03 RD/RA DEQ & K/J emails re: GW sampling next week 06/09/09
13 01 11 06 03 RD/RA 06/10/09 CDM/Hills
13 01 11 06 03 RD/RA 09/24/09 CDM
13 01 11 06 03 CD RD/RA 10/09 KJ
13 01 11 06 03 RD/RA DEQ letter to BNSF re: 4/24/09 Pilot Test Report 10/08/09 DEQ
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Task F Stage 1 – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
DEQ & M Hills/CDM emails re: CDM question on Task F Stage 1 – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater – comments or reline strikeout?
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
CDM/Hills email to DEQ re: Revised draft comments for Task F Pilot Test Report
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
CDM Memorandum to DEQ/Reynolds re: Draft Technical Memorandum – Equilibrium Calculations and Compartment Modeling to Evaluate the Character (Phase) and Relative Mass of Tetrachloroethene in the Subsurface
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Addendum No. 1 to the Final Task F Stage 1 – Part 2 Pilot Test Work Plan for VOC-Containing Alluvial Aquifer Groundwater
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
BN LIVINGSTON 8/26/13
Page 113 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 03 RD/RA KJ letter to DEQ re: Task F Stage 1 Part 2 Pilot Test Report 11/10/09 KJ
13 01 11 06 03 RD/RA 11/20/09 DEQ
13 01 11 06 03 RD/RA 11/27/09
13 01 11 06 03 CD RD/RA 11/09/11 KJ
13 01 11 06 03 RD/RA 11/01/09 KJ
13 01 11 06 03 RD/RA KJ letter to DEQ re: Bedrock well construction 12/03/09 KJ
13 01 11 06 03 RD/RA CDM Site Oversight Report CDM
13 01 11 06 03 RD/RA EPA letter to BNSF re: Aquifer remediation well 12/23/09 EPA
13 01 11 06 03 RD/RA CDM Site Oversight Report 1/12-16/2010 CDM
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
DEQ letter to BNSF re: Comments/redline-strikeout for 10/26/09 Addendum No.1 to Pilot Test Work Plan
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Addendum to supplement Pilot Test Work Plan – Revision No. 1
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Addendum No. 1 to the Final Task F Stage 1 – Part 2 Pilot Test Work Plan for VOC-Containing Alluvial Aquifer Groundwater
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Redline/Strikeout text for Final Task F Stage I – Part 2 Pilot Test Work Plan for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater revision # 1
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
12/9/10 – 12/16/09
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
BN LIVINGSTON 8/26/13
Page 114 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 03 RD/RA CDM Site Oversight Report 1/27-28/10 CDM
13 01 11 06 03 RD/RA CDM Site Oversight Report 1/17-2/3/10 CDM
13 01 11 06 03 RD/RA KJ Weekly Letter Report on Addendum No.1 Activities 02/08/10 KJ
13 01 11 06 03 RD/RA KJ Weekly Letter Report on Addendum No.1 Activities 02/18/10 KJ
13 01 11 06 03 RD/RA KJ Weekly Letter Report on Addendum No.1 Activities 2/25/10 KJ
13 01 11 06 03 RD/RA 03/23/10 KJ
13 01 11 06 03 RD/RA KJ Weekly Letter Report on Addendum No.1 Activities 3/4/10 KJ
13 01 11 06 03 CD RD/RA 06/02/10 KJ
13 01 11 06 03 RD/RA 06/02/10
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
KJ letter to DEQ re: Continued groundwater monitoring post-permanganate injection
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Task F Stage I – Part 2 : Candidate ISCO Well Construction & Sampling Report
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Task F Stage I-Part 2: Former Electric Shop Interior Follow-Up Chemical Testing Report
BN LIVINGSTON 8/26/13
Page 115 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 03 RD/RA 06/10/11 KJ
13 01 11 06 03 RD/RA 08/25/10 DEQ LEGAL
13 01 11 06 03 RD/RA 8/25/10 KJ/Aldersley
13 01 11 06 03 CD RD/RA Task F Stage 1-Part 2: Candidate ISCO Well Sampling Report 08/25/10 KJ
13 01 11 06 03 RD/RA 9/3/10 DEQ/Reynolds
13 01 11 06 03 RD/RA 10/26/10 DEQ/Reynolds
13 01 11 06 03 CD RD/RA
13 01 11 06 03 CD RD/RA 12/6/10 KJ/Aldersley
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Electronic Copy of Task F Stage 1 – Part 2: Former Electric Shop Interior Follow-up Chemical Oxidation Testing Report
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
DEQ Legal/Haque-Hausrath internal email to Reynolds re: Phone log w/BKBH/Tietz – requested time logs
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
K/J/Aldersley email to DEQ/Reynolds re: Livingston deliverables
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
DEQ/Reynolds letter/fax to BN/Smith & to K/J Norris re: DEQ comments on 6/2/10 Task F Stage 1 – Part 2 Candidate ISCO Well Construction & Sampling Report, 6/2/10 Task F Stage 1 – Part 2: Former Electric Shop Interior Follow-up Chemical Oxidation Testing Report, & 8/25/10 Task F Stage 1-Part 2: Candidate ISCO Well Sampling Report
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
DEQ/Reynolds email to K/J/Norris, Aldersley & Fernandes re: Addendum #2 to Final Task F Stage I – Part 2 Pilot Test Work Plan for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Revised Addendum #2 Final Task F Stage I – Part 2 Pilot Test Work Plan for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
K/J/Aldersley email to DEQ/Reynolds re: CD of Revised Addendum #2 Final Task F Stage I – Part 2 Pilot Test Work Plan for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater sent UPS for delivery to DEQ on 12/7/10
BN LIVINGSTON 8/26/13
Page 116 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 03 RD/RA CDM Site Oversight Report 3/1-3/23/11 CDM
13 01 11 06 03 RD/RA 04/15/11 DEQ/ Reynolds
13 01 11 06 03 RD/RA 05/12/11
13 01 11 06 03 CD RD/RA 06/07/12 KJ
13 01 11 06 03 RD/RA DEQ/Reynolds & K/J/Norris emails re: Piping issues 06/08/11
13 01 11 06 03 RD/RA 07/19/11 KJ/Adlersley
13 01 11 06 03 RD/RA 07/27/12 CDM
13 01 11 06 03 RD/RA 06/10/13 DEQ/Reynolds
13 01 11 06 03 RD/RA 07/19/13 KJ/Adlersley
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
DEQ/Reynolds letter to BN/Smith re: DEQ approval of the 11/10/09 Final Task F Stage I - Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer GW
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Phone Log - DEQ/Reynolds & K/J Fernandes re: Permanganate testing, SVE Report comments, ect
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Task F Stage I-Part 2: Comprehensive Chemical Testing Report Vol I-III
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
K/J/Aldersley email to DEQ/Reynolds re: Task F – Part 2 data posted to website
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
CDM Smith letter to DEQ/Reynolds re: CDM comments on comprehnsive pilot testing report
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
DEQ/Reynolds letter to BN/Smith re: DEQ comments on Task F Stage I - Part 2: Comprehensive Chemical Testing Report
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater K/J/Aldersley email to DEQ/Reynolds re: Task F – Part 2 report
BN LIVINGSTON 8/26/13
Page 117 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 03 RD/RA 07/01/13 KJ
13 01 11 06 03 RD/RA 07/01/13 KJ
13 01 11 06 03 RD/RA 07/01/13 KJ
13 01 11 06 03 RD/RA 07/01/13 KJ
13 01 11 06 04 RD/RA
13 01 11 06 04 RD/RA 10/15/10 KJ
13 01 11 06 04 RD/RA 04/26/11 DEQ/ Reynolds
13 01 11 06 04 RD/RA 06/09/11 KJ
13 01 11 06 04 RD/RA 09/09/11 DEQ/ Reynolds
13 01 11 06 04 RD/RA DEQ/Reynolds & KJ/Norris emails re: DEQ SVE questions 09/22/11
13 01 11 06 04 RD/RA 12/28/11 KJ/Norris
13 01 11 06 04 RD/RA KJ/Norris email to DEQ/Reynolds re: SVE status info 05/12/13 KJ/Norris
13 01 11 06 04 RD/RA 05/18/13 KJ/Norris
13 01 11 06 04 RD/RA 07/25/13 DEQ/ Reynolds
13 01 11 06 04 RD/RA 08/09/13 KJ/Aldersley
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Revised Task F Stage I-Part 2: Comprehensive Chemical Testing Report Vol 1 of 4
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Revised Task F Stage I-Part 2: Comprehensive Chemical Testing Report Vol 2 of 4
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Revised Task F Stage I-Part 2: Comprehensive Chemical Testing Report Vol 3 of 4
Site-Wide Information
Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater
Revised Task F Stage I-Part 2: Comprehensive Chemical Testing Report Vol 4 of 4
Site-Wide Information
Task F Stage 1 – Part 2: Soil Vapor Extraction
Site-Wide Information
Task F Stage 1 – Part 2: Soil Vapor Extraction
Task F Stage 1 – Part 2: Soil Vapor Extraction (SVE) Report
Site-Wide Information
Task F Stage 1 – Part 2: Soil Vapor Extraction
DEQ/Reynolds letter to BN/Smith re: DEQ comments on Task F Stage 1 – Part 2: Soil Vapor Extraction (SVE) Report
Site-Wide Information
Task F Stage 1 – Part 2: Soil Vapor Extraction
Revised Task F Stage I-Part2: Soil Vapor Extraction (SVE) Report
Site-Wide Information
Task F Stage 1 – Part 2: Soil Vapor Extraction
DEQ/Reynolds letter to BN/Smith re: DEQ approval of Revised Task F Stage 1 – Part 2: Soil Vapor Extraction (SVE) Report
Site-Wide Information
Task F Stage 1 – Part 2: Soil Vapor Extraction
Site-Wide Information
Task F Stage 1 – Part 2: Soil Vapor Extraction
KJ/Norris email to DEQ/Reynolds re: Electric shop SVE system re: Damaged tanker car being stored in shop
Site-Wide Information
Task F Stage 1 – Part 2: Soil Vapor Extraction
Site-Wide Information
Task F Stage 1 – Part 2: Soil Vapor Extraction
KJ/Norris email to DEQ/Reynolds re: Shop Complex - Locomotive Shop and former Electric Shop SVE System shut down
Site-Wide Information
Task F Stage 1 – Part 2: Soil Vapor Extraction
DEQ/Reynolds & KJ/Fernandes emails re: SVE Rebound testing
Site-Wide Information
Task F Stage 1 – Part 2: Soil Vapor Extraction
KJ/Aldersley email to DEQ/Reynolds re: SVE System Sampling
BN LIVINGSTON 8/26/13
Page 118 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 06 04 CD RD/RA 10/10/13 BNSF/Stegman
13 01 11 06 04 RD/RA SVE rebound data 12/09/13 DEQ/ Reynolds
13 01 11 06 04 RD/RA 12/31/13 DEQ/ Reynolds
13 01 11 06 04 CD RD/RA 01/16/14 BNSF/Stegman
13 01 11 06 04 RD/RA 01/23/14 DEQ/ Reynolds
13 01 11 07 RD/RA
13 01 11 07 RD/RA DEQ internal email re: Transportation corridors 05/17/05 DEQ
13 01 11 07 RD/RA DEQ & BN meeting notes 09/01/05
13 01 11 07 RD/RA DEQ internal email re: Freezing soil samples (1) 9/6/05 DEQ
13 01 11 07 RD/RA DEQ internal email re: Freezing soil samples (2) 09/06/05 DEQ
13 01 11 07 RD/RA K/J/BNSF email to DEQ re: VPH Sampling 09/12/05
13 01 11 07 RD/RA DEQ & BN meeting notes -Task J 9/21/05
13 01 11 07 RD/RA BN letter to DEQ re: Sampling in the tracks 09/23/05 BN
13 01 11 07 RD/RA BNSF letter to DEQ re: Sampling in the Tracks 9/30/05 BN
13 01 11 07 RD/RA DEQ letter to BNSF re: Task J Supplemental Investigation WP 10/31/05 DEQ
13 01 11 07 CD RD/RA Final Task J Work Plan - 12/05 revision w/cover letter 12/15/05
Site-Wide Information
Task F Stage 1 – Part 2: Soil Vapor Extraction
Joint LRG/BNSF Sub-Slab Depressurization and Expansion of SVE Electronic Shop Work Plan
Site-Wide Information
Task F Stage 1 – Part 2: Soil Vapor Extraction
Site-Wide Information
Task F Stage 1 – Part 2: Soil Vapor Extraction
Joint Livingston Restoration Group and BNSF Railway Company Work Plan Submittals
Site-Wide Information
Task F Stage 1 – Part 2: Soil Vapor Extraction
Joint Livingston Remediation Group and BNSF Railway Company Work Plan Submittal - Revised Sub-Slab Depressurization and Expansion of Soil Vapor Extraction
Site-Wide Information
Task F Stage 1 – Part 2: Soil Vapor Extraction
Joint Livingston Restoration Group and BNSF Railway Company Work Plan Submittals
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
BN LIVINGSTON 8/26/13
Page 119 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 07 RD/RA BKBH letter to DEQ re: Sampling in the Active Track areas 12/16/05 BKBH
13 01 11 07 RD/RA DEQ internal email re: Task J start date 12/20/05 DEQ internal
13 01 11 07 RD/RA 12/20/05 KJ
13 01 11 07 RD/RA 12/27/05 KJ
13 01 11 07 RD/RA Y 01/03/06 DEQ internal
13 01 11 07 RD/RA Y ** DEQ internal email re: Task J activities/impacts on MRL 01/03/06 DEQ internal
13 01 11 07 RD/RA Y ** DEQ internal email re: Task J – conversation with S Olsen 01/05/06 DEQ internal
13 01 11 07 RD/RA 01/03/06 KJ
13 01 11 07 RD/RA 01/04/06 DEQ internal
13 01 11 07 RD/RA DEQ
13 01 11 07 RD/RA DEQ & K/J emails re: Livingston weather conditions 01/10/06
13 01 11 07 RD/RA Y 01/12/06 DEQ internal
13 01 11 07 RD/RA DEQ Legal letter/fax to BKBH re: Task J Sampling 01/13/06 DEQ Legal
13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 01/17/06
13 01 11 07 RD/RA K/J letter to Talgo re: Task J start 01/17/06 KJ
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Phone Log - K/J to DEQ re: Clarification of start date For Task J
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard K/J email to DEQ re: 2nd request to clarify start date
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
** DEQ internal email re: Internal response to Leo Barry 12/16/05 letter
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
K/J email to DEQ re: Task J start date (1/3/06)DEQ & K/J emails re: Task J Field Work
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
DEQ internal email re: Internal response to Leo Barry 12/16/05 letter
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
DEQ email to BNSF & K/J re: Task J field work record of communication (1/6/06)
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
** DEQ internal email re: Task J resolution via the director/Leo Barry letter
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
BN LIVINGSTON 8/26/13
Page 120 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 07 RD/RA 01/18/06 DEQ internal
13 01 11 07 RD/RA 01/20/06 DEQ internal
13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 1/23/06
13 01 11 07 RD/RA BKBH letter/fax to DEQ re: BNSF Task J sampling 01/23/06 BKBH
13 01 11 07 RD/RA Y ** DEQ email to K/J re: Phone call from BG-29 01/24/06 DEQ
13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 01/31/06
13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 01/31/06
13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 2/1/06
13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 02/06/06
13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update (2/13/06)
13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 02/21/06
13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 02/27/06
13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 3/13/06
13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 03/20/06
13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 03/27/06
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
DEQ internal email re: MRL contact - Electric/Locomotive Shop
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
DEQ internal email re: Phone Log – DEQ attorney & BN attorney re: Task J
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
BN LIVINGSTON 8/26/13
Page 121 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 04/03/06
13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 04/10/06
13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 04/11/06
13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 04/14/06
13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 04/17/06
13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 04/19/06
13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 4/24/06
13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 04/25/06
13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 05/01/06
13 01 11 07 RD/RA Meeting Notes – DEQ/BNSF meeting re: Task J 06/08/06
13 01 11 07 RD/RA Y ** DEQ internal email re: Legal comments to Task J 06/10/06 DEQ internal
13 01 11 07 01 RD/RA Work Plan
13 01 11 07 01 RD/RA Work Plan Draft Work Plan - Task J 05/31/05 KJ
13 01 11 07 01 RD/RA Work Plan Phone Log - Blicker/RTI to DEQ 06/21/05 RTI/Blickler
13 01 11 07 01 RD/RA Work Plan PCEC letter to DEQ re: Task J Work Plan PCEC
13 01 11 07 01 RD/RA Work Plan DEQ comment letter/fax to Task J Work Plan 8/12/05 DEQ
13 01 11 07 01 RD/RA Work Plan DEQ letter/fax to BN re: Comments to Task J 08/12/05 DEQ
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Task J - Investigation of Surface Soil in the Railyard
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 122 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 07 01 RD/RA Work Plan BNSF email to DEQ re: Sampling Plan deadline extension 09/15/05 BN
13 01 11 07 01 RD/RA Work Plan DEQ/Reynolds meeting notes on railroad activities - BN/MRL 9/19/05 DEQ/ Reynolds
13 01 11 07 01 RD/RA Work Plan 09/21/05 DEQ/ Reynolds
13 01 11 07 01 RD/RA Work Plan 10/05
13 01 11 07 01 RD/RA Work Plan 10/31/05 DEQ
13 01 11 07 01 RD/RA Work Plan K/J & DEQ emails re: Task J Work Plan extension 12/01/05
13 01 11 07 01 RD/RA Work Plan DEQ letter to BNSF re: October 2005 Tasks clarification 12/07/05 DEQ
13 01 11 07 01 RD/RA Work Plan 06/10/10 DEQ
13 01 11 07 01 RD/RA Work Plan DEQ/BNSF emails re: Proper and expeditious
13 01 11 07 01 RD/RA Work Plan 06/28/10 KJ
13 01 11 07 01 RD/RA Work Plan DEQ email to KJ re: Request for clarification 06/29/10 DEQ
13 01 11 07 01 RD/RA Work Plan DEQ/KJ emails re: Task-specific HASP 07/07/10
13 01 11 07 01 RD/RA Work Plan DEQ/KJ emails re: Notification of sampling areas 1-8 07/27/10
13 01 11 07 01 RD/RA Work Plan DEQ/KJ emails re: Items posted to website
13 01 11 07 01 RD/RA Work Plan DEQ/KJ emails re: Request for clarification 08/04/10 DEQ
13 01 11 07 01 RD/RA Work Plan DEQ, KJ, & BN meeting re: Task J Sampling - notes 09/03/10 DEQ/ Reynolds
13 01 11 07 02 RD/RA Visual Reconnaissance
13 01 11 07 02 RD/RA Visual Reconnaissance Task J Field Notes – J Keck DEQ/Keck
13 01 11 07 02 RD/RA Visual Reconnaissance
13 01 11 07 02 RD/RA Visual Reconnaissance 05/30/06 KJ
13 01 11 07 02 RD/RA Visual Reconnaissance K/J email to DEQ re: Task J Conference Call 06/07/06 KJ
13 01 11 07 02 RD/RA Visual Reconnaissance DEQ/KJ emails re: Task J 06/13/06
13 01 11 07 02 RD/RA Visual Reconnaissance DEQ/KJ email re: Task J 06/16/06
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ/Reynolds meeting notes on surface soil samples BN/BKBH, & K/J
Site-Wide Information
Final Task J (Revised) Supplemental Investigation Work Plan for Surface Soil plus electronic version
Site-Wide Information
DEQ Revised Task J Supplemental Investigation Work Plan - electronic version
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ letter to BNSF re: Request for supplemental surface soil sampling
Site-Wide Information
6/15/10-6/16/10
Site-Wide Information
KJ email to DEQ re: Request for clarification and notice of sampling activities
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
7/29/10-7/30/10
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
1/26/06-4/27/06
Site-Wide Information
DEQ/KJ emails re: Addendum No 1 to DEQ-modified Task J WP
5/11/06-5/16/06
Site-Wide Information
K/J letter to DEQ re: Task J Visual Recon – Prelim Work Draft Data Package
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 123 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 07 02 RD/RA Visual Reconnaissance DEQ/KJ emails re: SVE Systems 6/30/06-7/7/06
13 01 11 07 02 RD/RA Visual Reconnaissance Task J Visual Reconnaissance Maps 06/01/06
13 01 11 07 02 RD/RA Visual Reconnaissance Task J Visual Reconnaissance Photos 06/01/06
13 01 11 07 02 RD/RA Visual Reconnaissance Task J Visual Reconnaissance Field Forms 1 of 2 06/01/06
13 01 11 07 02 RD/RA Visual Reconnaissance Task J Visual Reconnaissance Field Forms 2 of 2 06/01/06
13 01 11 07 02 RD/RA Visual Reconnaissance 08/31/10
13 01 11 07 02 RD/RA Visual Reconnaissance CDM/Hills email to DEQ/Reynolds re: Railyard footprint 09/01/10 CDM/Hills
13 01 11 07 03 RD/RA Sampling
13 01 11 07 03 RD/RA Sampling 08/10/10 CDM/Peters
13 01 11 07 03 RD/RA Sampling 08/10/10 KJ/Aldersley
13 01 11 07 03 RD/RA Sampling 8/16/10 DEQ Legal internal
13 01 11 07 03 RD/RA Sampling 8/16/10
13 01 11 07 03 RD/RA Sampling 08/20/10
13 01 11 07 03 RD/RA Sampling DEQ/Reynolds email to K/J/Norris re: Lead analysis 8/24/10 DEQ
13 01 11 07 03 RD/RA Sampling 8/25/10 DEQ
13 01 11 07 03 RD/RA Sampling 8/26/10 KJ/Aldersley
13 01 11 07 03 RD/RA Sampling 08/26/10 DEQ
13 01 11 07 03 RD/RA Sampling DEQ/Reynolds & BN/Stegman emails re: Livingston Task J 8/26-8/27/10
13 01 11 07 03 RD/RA Sampling 08/30/10 BN/ Stegman
13 01 11 07 03 RD/RA Sampling K/J/Norris & DEQ/Reynolds re: Task J 8/30-9/2/10
13 01 11 07 03 RD/RA Sampling CDM Oversight report 8/9-8/11/10 CDM
13 01 11 07 03 RD/RA Sampling CDM Oversight report 9/13-9/16/10 CDM
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ Legal/Haque-Hausrath internal email re: Phone log with MRL Attorney/B Summerville – Task J of the ROD
DEQLegal/ Haque-Hausrath
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM/Peters email to DEQ/Reynolds re: Task J Sampling Area 7
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Task J Sampling Area 7
Site-Wide Information
DEQ Legal internal email to Reynolds re: Mtg/ MRL Attorney/ Summerville re: Surface soil sampling in Railyard
Site-Wide Information
Phone Log – Conference call: DEQ, K/J/& CDM re: Livingston Shop Complex – Tasks J & L
Site-Wide Information
K/J/Norris & DEQ/Reynolds emails re: Tasks J & L Conference call 8/16/10 summary
Site-Wide Information
Site-Wide Information
DEQ/Reynolds email to K/J/Norris & Aldersley re: Task J modifications
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Task J Conference call
Site-Wide Information
DEQ/Reynolds emails to K/J & R Keller re: Attachment – Edited version of Table 1 areas B&D
Site-Wide Information
Site-Wide Information
BN/Stegman email to DEQ/Reynolds re: Task J – new date for field mobilization
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 124 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 07 03 RD/RA Sampling 9/16/10 DEQ/ Reynolds
13 01 11 07 03 RD/RA Sampling 09/24/10
13 01 11 07 03 RD/RA Sampling 9/30/10 Energy Labs
13 01 11 07 03 RD/RA Sampling 9/30/10 Energy Labs
13 01 11 07 03 RD/RA Sampling 9/30/10 KJ/Aldersley
13 01 11 07 03 RD/RA Sampling DEQ & MRL meeting - notes 10/04/10 DEQ/ Reynolds
13 01 11 07 03 RD/RA Sampling CDM Oversight report 10/4-10/13/10 CDM
13 01 11 07 03 RD/RA Sampling 10/05/10
13 01 11 07 03 RD/RA Sampling 10/05/10
13 01 11 07 03 RD/RA Sampling 10/06/10 KJ/Aldersley
13 01 11 07 03 RD/RA Sampling 10/07/10 KJ/Aldersley
13 01 11 07 03 RD/RA Sampling KJ/Aldersley
13 01 11 07 03 RD/RA Sampling 11/08/10 KJ/Aldersley
13 01 11 07 03 RD/RA Sampling CDM Oversight Report 11/8-11/9/10 CDM
13 01 11 07 03 RD/RA Sampling 11/30/10 KJ/Aldersley
13 01 11 07 03 RD/RA Sampling 12/13/10
13 01 11 07 03 RD/RA Sampling 01/19/11 KJ/Aldersley
13 01 11 07 03 RD/RA Sampling 04/12/11 KJ/Aldersley
13 01 11 07 03 RD/RA Sampling 10/14/11 DEQ/ Reynolds
13 01 11 07 03 RD/RA Sampling 10/26/11 KJ/Norris
13 01 11 07 03 RD/RA Sampling 11/16/11 KJ/Aldersley
Site-Wide Information
DEQ/Reynolds email to BN/Smith & Stegman re: Attachment – Table 1, September Task J sampling Area E
Site-Wide Information
DEQ Legal/Haque-Hausrath & B Summerville emails re: Proposed meeting date
Site-Wide Information
Energy Labs/Johnson & DEQ/Reynolds emails re: PAH analysis
Site-Wide Information
Energy Labs/Johnson & DEQ/Reynolds emails re: PAH analysis
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Tentative Task J field schedule
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ Legal/Haque-Hausrath email to Director Opper re: MRL has granted access to BNSF for sampling
DEQ Legal/ Haque-Hausrath
Site-Wide Information
DEQ Legal/Haque-Hausrath email to B Summerville re: Sampling in railyard
DEQ Legal/ Haque-Hausrath
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Task J - Exposure Area E - Preliminary results
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Task J item posted to website – Analytical results for work plan areas 1-6 and eight
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Weekly field activities schedule (11/2/10)
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Weekly field activities schedule
Site-Wide Information
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Task J analytical results for Exposure Areas B,C,D,F, & G posted to website
Site-Wide Information
K/J/Norris & DEQ/Reynolds emails re: BN Livingston Shop Complex – Task J SI Report
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Task J items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Livingston deliverable - Task J: Surface Soil Supplemental Investigation Report sent UPS 4/12/11
Site-Wide Information
DEQ/Reynolds letter to BN/Smith re: DEQ comments to 4/12/11 Task J Supplemental Investigation Report
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: BN/KJ response to DEQ's 10/14/11 letter
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Proposed Task J sampling locations/clarifications
BN LIVINGSTON 8/26/13
Page 125 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 07 03 RD/RA Sampling 11/17/11 DEQ/ Reynolds
13 01 11 07 03 RD/RA Sampling 11/23/11 KJ/Aldersley
13 01 11 07 03 RD/RA Sampling 11/28/11
13 01 11 07 03 RD/RA Sampling 11/30/11 DEQ/ Reynolds
13 01 11 07 03 RD/RA Sampling 12/01/12 KJ/Aldersley
13 01 11 07 03 RD/RA Sampling 12/08/11
13 01 11 07 03 RD/RA Sampling 12/9-12/10/11 CDM
13 01 11 07 03 RD/RA Sampling 01/25/12 KJ/Aldersley
13 01 11 07 03 RD/RA Sampling 07/19/12 KJ/Aldersley
13 01 11 07 03 RD/RA Sampling 08/31/12 KJ/Aldersley
13 01 11 07 03 RD/RA Sampling 10/19/12 CDM Smith
13 01 11 07 03 RD/RA Sampling 10/22/12 DEQ/ Reynolds
13 01 11 07 03 RD/RA Sampling Y 01/02/13 DEQ internal
13 01 11 07 03 01 RD/RA Analytical Results
13 01 11 07 03 01 RD/RA Analytical Results DEQ split sample results 09/21/10 Energy Labs
13 01 11 07 03 01 RD/RA Analytical Results DEQ split sample results 09/29/10 Energy Labs
13 01 11 07 03 01 RD/RA Analytical Results 10/6/10 KJ/Aldersley
13 01 11 07 03 01 RD/RA Analytical Results DEQ split sample results 10/28/10 Energy Labs
13 01 11 07 03 01 RD/RA Analytical Results DEQ split sample results 10/28/10 Energy Labs
13 01 11 07 03 01 RD/RA Analytical Results DEQ split sample results 11/01/10 Energy Labs
13 01 11 07 03 01 RD/RA Analytical Results DEQ split sample results 11/29/10 Energy Labs
Site-Wide Information
DEQ/Reynolds email to KJ/Aldersley re: DEQ response to KJ 11/16/11 email
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Notification of field activities
Site-Wide Information
DEQ/Reynolds & KJ/Aldersley emails re: Attachment - Revised Sampling Approach - Iron Hiorse Trailor Park 9maps included)
Site-Wide Information
DEQ/Reynolds letter to BN/Smith re: DEQ comments to HRO#20-29, HRO#31 & 32 IDW Analytical Results & Request for Contained-out Decisions
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Notification of field activities
Site-Wide Information
DEQ/Reynolds & KJ/Aldersley emails re Notification of landspreading in C&P Packing Pit
Site-Wide Information
CDM Field oversight report - soil sampling at Ironhorse Trailer Park
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Task J Data posted to website - Analytical results from December 2011 sampling
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Notification of Task J Pre-RA Sampling
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Task J Data posted to website - Analytical results from 5 grids
Site-Wide Information
CDM Smith Memorandum to DEQ/Reynolds re: GW Monitoring Program Directive No. 1 for Tasks F & L
Site-Wide Information
DEQ/Reynolds letter to BN/Smith re: Continuation of Task F & Task L GW monitoring activities
Site-Wide Information
** DEQ legal/Haque-Haisrath & Mark Hall internal emails re: Additional F-listed waste/"no longer contained-in" determination
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Exposure Area E Surface Soil preliminary analytical results
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 126 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 07 03 01 RD/RA Analytical Results DEQ split sample results 11/29/10 Energy Labs
13 01 11 07 03 01 RD/RA Analytical Results DEQ split sample results 11/29/10 Energy Labs
13 01 11 07 03 01 RD/RA Analytical Results DEQ split sample results 11/30/10 Energy Labs
13 01 11 07 03 01 RD/RA Analytical Results DEQ split sample results 11/30/10 Energy Labs
13 01 11 07 03 01 RD/RA Analytical Results Chain of Custody 12/12/11 Energy Labs
13 01 11 07 03 01 RD/RA Analytical Results Analytical Summary Report 12/27/11 Energy Labs
13 01 11 07 03 01 RD/RA Analytical Results Analytical Summary Report 01/04/12 Energy Labs
13 01 11 07 03 01 RD/RA Analytical Results 02/22/12
13 01 11 07 03 01 RD/RA Analytical Results 04/05/12
13 01 11 07 04 CD RD/RA 04/12/11 KJ
13 01 11 07 04 RD/RA 10/14/11
13 01 11 07 04 RD/RA 02/23/12 CDM Smith
13 01 11 07 04 RD/RA 04/30/12
13 01 11 07 04 CD RD/RA 04/30/12 KJ
13 01 11 07 04 RD/RA 04/30/12 KJ/Adlersley
13 01 11 07 04 RD/RA 06/15/12 KJ/Adlersley
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ/Reynolds & KJ/Aldersley emails re: Yard location numbers for lab results
Site-Wide Information
KJ/Norris & Aldersley & DEQ/Reynolds emails re: Task J - Grid 30C
1083/ 58M101
Site-Wide Information
Task J: Surface Soil Supplemental Investigation Report Vol I-IV (Vol II-IV @ RM)
Site-Wide Information
Task J: Surface Soil Supplemental Investigation Report Vol I-IV
DEQ Memorandum to file re: Utilizing of 2009 Montana Tier 1 Risk-Based Corrective Action (RBCA) Risk-Based Screening Levels for Certain PAHs at the Facility
DEQ legal/ Haque-Hausrath
Site-Wide Information
Task J: Surface Soil Supplemental Investigation Report Vol I-IV
CDM Smith Memorandum to DEQ/Reynolds re: Task J Data Evaluation Summary
Site-Wide Information
Task J: Surface Soil Supplemental Investigation Report Vol I-IV
KJ cover letter for the Revised Task J Supplemental Investigation Report
Site-Wide Information
Task J: Surface Soil Supplemental Investigation Report Vol I-IV
Task J: Revised Surface Soil Supplemental Investigation Report Vol I & V-Addendum to Appendices D,E, & G
Site-Wide Information
Task J: Surface Soil Supplemental Investigation Report Vol I-IV
KJ/Aldersley email to DEQ/Reynolds re: Replacement pages, Spines & covers for Volumes 2,3,&4
Site-Wide Information
Task J: Surface Soil Supplemental Investigation Report Vol I-IV
KJ/Aldersley email to DEQ/Reynolds re: Attachment - Evaluation of remedial alternative tables
BN LIVINGSTON 8/26/13
Page 127 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 07 04 RD/RA 07/03/12 DEQ/ Reynolds
13 01 11 07 04 RD/RA 07/19/12 KJ
13 01 11 07 04 RD/RA 07/19/12 KJ/Adlersley
13 01 11 07 04 RD/RA 07/19/12 KJ
13 01 11 07 04 RD/RA 07/19/12
13 01 11 07 04 RD/RA 07/30/12 DEQ/ Reynolds
13 01 11 07 04 RD/RA 08/30/12 DEQ/ Reynolds
13 01 11 07 04 RD/RA 03/12/13
13 01 11 07 04 RD/RA 03/19/13
13 01 11 07 04 01 RD/RA
13 01 11 07 04 01 RD/RA 03/22/12 DEQ internal
13 01 11 07 04 01 RD/RA 03/22/12 DEQ internal
13 01 11 07 04 01 RD/RA 10/12/12
Site-Wide Information
Task J: Surface Soil Supplemental Investigation Report Vol I-IV
DEQ/Reynolds letter to BN/Smith re: April 2102 Revised Task J Surface Soil Supplemental Investigation Report
Site-Wide Information
Task J: Surface Soil Supplemental Investigation Report Vol I-IV
Task J: Revised Surface Soil Supplemental Investigation Report Vol I
Site-Wide Information
Task J: Surface Soil Supplemental Investigation Report Vol I-IV
KJ/Aldersley email to DEQ/Reynolds re: 2nd Revised Task J Surface Soil Supplemental Investigation Report sent out UPS 7/19/12
Site-Wide Information
Task J: Surface Soil Supplemental Investigation Report Vol I-IV
KJ redline strikeout of Task J 2nd Revised Surface Soil Supplemental Investigation Report
Site-Wide Information
Task J: Surface Soil Supplemental Investigation Report Vol I-IV
DEQ/Reynoldds & KJ/Aldersley emails re: Task J Report comments - hard copy
Site-Wide Information
Task J: Surface Soil Supplemental Investigation Report Vol I-IV
DEQ/Reynolds letter to BN/Smith re: July 2012 2nd Revised Task J Surface Soil Supplemental Investigation Report approved
Site-Wide Information
Task J: Surface Soil Supplemental Investigation Report Vol I-IV
DEQ/Reynolds letter to BN/Smith re: July 2012 2nd Revised Task J Surface Soil Supplemental Investigation Report comment period ended - no comments received - approved as is
Site-Wide Information
Task J: Surface Soil Supplemental Investigation Report Vol I-IV
KJ/Aldersley & DEQ/Reynolds emails re: HRO-13 Redevelopment/Sampling
Site-Wide Information
Task J: Surface Soil Supplemental Investigation Report Vol I-IV
KJ/Aldersley email to DEQ/Reynolds re: Analytical results from the 1st sampling in February 2013 posted to the website
Site-Wide Information
Analytical Results to Property Owners
Site-Wide Information
Analytical Results to Property Owners
DEQ/Martin & Reynolds internal emails re: Mobil home park sampling results
Site-Wide Information
Analytical Results to Property Owners
DEQ/Martin internal email to Reynolds re: Phone log - DEQ/Martin to Annette Steiger/mobil home park renter re: DEQ gave sample results for her lot
Site-Wide Information
Analytical Results to Property Owners
DEQ/Reynolds, MRL/Theresa Beckwith, & Iron Horse Trailor Park/Linda Budeski emails re: Contact information for Mobil Home Park residents
BN LIVINGSTON 8/26/13
Page 128 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 07 04 01 RD/RA 10/12/12 MRL/ Beckwith
13 01 11 07 04 01 RD/RA 10/12/12
13 01 11 07 04 01 RD/RA
13 01 11 07 04 01 RD/RA 10/17/12 DEQ/ Reynolds
13 01 11 07 04 01 RD/RA 10/17/12 DEQ/ Reynolds
13 01 11 07 04 01 RD/RA 10/17/12 DEQ/ Reynolds
13 01 11 07 04 01 RD/RA 10/17/12 DEQ/ Reynolds
13 01 11 07 04 01 RD/RA 10/17/12 DEQ/ Reynolds
13 01 11 07 04 01 RD/RA 10/17/12 DEQ/ Reynolds
13 01 11 07 04 01 RD/RA 10/17/12 DEQ/ Reynolds
13 01 11 07 04 01 RD/RA 10/17/12 DEQ/ Reynolds
13 01 11 07 04 01 RD/RA 10/19/12 DEQ/ Reynolds
13 01 11 07 04 01 RD/RA 10/19/12 DEQ/ Reynolds
13 01 11 07 04 01 RD/RA 10/19/12 DEQ/ Reynolds
13 01 11 07 04 01 RD/RA 10/19/12 DEQ/ Reynolds
13 01 11 07 04 01 RD/RA 10/19/12 DEQ/ Reynolds
13 01 11 07 04 01 RD/RA 10/19/12 DEQ/ Reynolds
13 01 11 07 04 01 RD/RA 10/19/12 DEQ/ Reynolds
13 01 11 07 04 01 RD/RA 10/19/12 DEQ/ Reynolds
13 01 11 07 04 01 RD/RA 10/19/12 DEQ/ Reynolds
13 01 11 07 04 01 RD/RA 10/19/12 DEQ/ Reynolds
Site-Wide Information
Analytical Results to Property Owners
MRL/Theresa Beckwith email to Iron Horse Trailor Park/Linda Budeski re: DEQ info request - Tenant list for mobil home park
Site-Wide Information
Analytical Results to Property Owners
Iron Horse Trailor Park/Linda Budeski email to DEQ/Reynolds re: Tenant list for mobil home park
Iron Horse Trailor Park/ L Budeski
Site-Wide Information
Analytical Results to Property Owners
DEQ/Reynolds, MRL/Theresa Beckwith, & KJ/Aldersley emails re: Access to Iron Horse Trailor Park
10/12-10/15/12
Site-Wide Information
Analytical Results to Property Owners
DEQ/Reynolds letter to Residents/Mr & Mrs Litner re: Analytical results for lot #13
Site-Wide Information
Analytical Results to Property Owners
DEQ/Reynolds letter to Residents/Mr & Mrs Harper re: Analytical results for lot #12
Site-Wide Information
Analytical Results to Property Owners
DEQ/Reynolds letter to Residents/Mr & Mrs Le Fannin re: Analytical results for lot #14
Site-Wide Information
Analytical Results to Property Owners
DEQ/Reynolds letter to Residents/Mr & Mrs Sherill re: Analytical results for lot #14
Site-Wide Information
Analytical Results to Property Owners
DEQ/Reynolds letter to Linda Budeski re: Analytical results for lot #15
Site-Wide Information
Analytical Results to Property Owners
DEQ/Reynolds letter to Linda Budeski re: Analytical results for lots #11, 3, 20 & area where garbage containers are located
Site-Wide Information
Analytical Results to Property Owners
DEQ/Reynolds letter to JAHD LLC re: Analytical results for lots #5, 2, 16 & 17
Site-Wide Information
Analytical Results to Property Owners
DEQ/Reynolds letter to Russ Himmelspach re: Analytical results for lots #9, 1, 21, & 24
Site-Wide Information
Analytical Results to Property Owners
DEQ/Reynolds letter to Robert Morrison re: Analytical results for lot #23
Site-Wide Information
Analytical Results to Property Owners
DEQ/Reynolds letter to Nancy Olsen re: Analytical results for lot #26
Site-Wide Information
Analytical Results to Property Owners
DEQ/Reynolds letter to Ross Little re: Analytical results for lot #19
Site-Wide Information
Analytical Results to Property Owners
DEQ/Reynolds letter to Annette Steiger re: Analytical results for lot #7
Site-Wide Information
Analytical Results to Property Owners
DEQ/Reynolds letter to Robert Morrison & Linda re: Analytical results for lot #4
Site-Wide Information
Analytical Results to Property Owners
DEQ/Reynolds letter to Mark Stoeker re: Analytical results for lot #8
Site-Wide Information
Analytical Results to Property Owners
DEQ/Reynolds letter to Wilma Beaty & Joe re: Analytical results for lot #10
Site-Wide Information
Analytical Results to Property Owners
DEQ/Reynolds letter to Joe Ott in care of Pamela Printz re: Analytical results for lot #25
Site-Wide Information
Analytical Results to Property Owners
DEQ/Reynolds letter to Liz & Claude Smith re: Analytical results for lot #18
Site-Wide Information
Analytical Results to Property Owners
DEQ/Reynolds letter to Matt Goff re: Analytical results for lot #6
BN LIVINGSTON 8/26/13
Page 129 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 07 04 01 RD/RA 10/19/12 DEQ/ Reynolds
13 01 11 07 04 01 RD/RA 10/19/12 DEQ/ Reynolds
13 01 11 07 04 01 RD/RA 10/20/12
13 01 11 07 05 RD/RA Remediation
13 01 11 07 05 RD/RA Remediation 10/10/12 KJ/Adlersley
13 01 11 07 05 RD/RA Remediation 10/23/12 KJ/Adlersley
13 01 11 07 05 RD/RA Remediation 10/26/12 KJ/Norris
13 01 11 07 05 RD/RA Remediation CDM Smith email to DEQ/Reynolds re: Task J activity 10/26/12
13 01 11 07 05 RD/RA Remediation 10/30/12 KJ
13 01 11 07 05 RD/RA Remediation 10/30/12
13 01 11 07 05 RD/RA Remediation 10/31/12
13 01 11 07 05 RD/RA Remediation 11/02/12
13 01 11 07 05 RD/RA Remediation 11/02/12 KJ/Adlersley
13 01 11 07 05 RD/RA Remediation 11/05/12
13 01 11 07 05 RD/RA Remediation 11/07/12
13 01 11 07 05 RD/RA Remediation 11/07/12
13 01 11 07 05 RD/RA Remediation DEQ/Reynolds & KJ/Aldersley emails re: Task J Grid 22J-B 11/09/12
13 01 11 07 05 RD/RA Remediation DEQ/Reynolds & KJ/Norris emails re: Residential yard cleanup 07/11/12
13 01 11 07 05 RD/RA Remediation 10/23/12 KJ/Norris
13 01 11 07 05 RD/RA Remediation
13 01 11 07 05 RD/RA Remediation 11/13/12 KJ/Adlersley
Site-Wide Information
Analytical Results to Property Owners
DEQ/Reynolds letter to Sandra Glenn re: Analytical results for lot #20
Site-Wide Information
Analytical Results to Property Owners
DEQ/Reynolds letter to Carol Callison re: Analytical results for lot #29
Site-Wide Information
Analytical Results to Property Owners
DEQ/Reynolds 10/17/12 letter to Residents/Mr & Mrs Sherill re: Analytical results for lot #14 returned to DEQ as unclaimed
Site-Wide Information
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Task J - Surface soil removal
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Task J - Backfill source materials
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: Surface soil removal from yards 4 & 5
Site-Wide Information
CDM Smith/ Simpson
Site-Wide Information
Proposed Backfill Import Source for Task J - Soil Removal/Replacement Project
Site-Wide Information
CDM Smith email to DEQ/Reynolds re: Task J activities for 10/30/12 - Attachment - Photo log
CDM Smith/ Simpson
Site-Wide Information
CDM Smith email to DEQ/Reynolds re: Task J activities for 10/31/12 - Attachment - Photo log
CDM Smith/ Simpson
Site-Wide Information
CDM Smith email to DEQ/Reynolds re: Task J activities for 11/1/12 - Attachment - Photo log
CDM Smith/ Simpson
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: KJ received information request from resident Seth Zeman
Site-Wide Information
DEQ/Reynolds & KJ/Aldersley emails re: Task J backfill revised table 1
Site-Wide Information
KJ/Aldersley & DEQ/Reynolds emails re: Task J - Extent of excavation deeper
Site-Wide Information
CDM Smith email to DEQ/Reynolds re: Task J activities for 11/6/12 - Attachment - Photo log
CDM Smith/ Simpson
Site-Wide Information
Site-Wide Information
Site-Wide Information
K/J Norris email to DEQ re: Phone call with Judge Linda Budeski - leases the Iron Horse mobil home park re: Budeski authorization for access to the mobil home park
Site-Wide Information
DEQ/Reynolds & KJ/Aldersley emails re: Preliminary surface soil analytical results and backfill for residential yards
11/10-11/13/12
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Attachment - Preliminary grid confirmation surface soil analytical results
BN LIVINGSTON 8/26/13
Page 130 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 07 05 RD/RA Remediation 11/20/12 KJ
13 01 11 07 05 RD/RA Remediation 11/27/12
13 01 11 07 05 RD/RA Remediation 12/03/12 DEQ/Seyler
13 01 11 07 05 RD/RA Remediation 12/12/12 DEQ/ Reynolds
13 01 11 07 05 RD/RA Remediation KJ/Aldersley & DEQ/Reynolds emails re: Task J - RA Report 12/13/12
13 01 11 07 05 RD/RA Remediation 07/03/13 KJ/Adlersley
13 01 11 07 05 RD/RA Remediation Task J Remedial Action Report for Surface Soil 05/06/14 KJ/Adlersley
13 01 11 08 RD/RA Well Inventory
13 01 11 08 CD RD/RA Well Inventory Draft Well Inventory 05/31/05 KJ
13 01 11 08 RD/RA Well Inventory 10/28/05 DEQ
13 01 11 08 RD/RA Well Inventory K/J letter to DEQ re: Private Well Survey 12/15/05 KJ
13 01 11 08 CD RD/RA Well Inventory 07/11/06 KJ
13 01 11 08 RD/RA Well Inventory 07/20/06 DEQ
13 01 11 08 RD/RA Well Inventory DEQ & K/J emails re: Private & Public well inventory 7/27/06
13 01 11 08 RD/RA Well Inventory 07/31/06 KJ
13 01 11 08 RD/RA Well Inventory 07/31/06 KJ
13 01 11 08 RD/RA Well Inventory DEQ internal email re: Changes left out of revised pages 8/2/06 DEQ internal
13 01 11 08 RD/RA Well Inventory 08/03/06 DEQ
13 01 11 08 RD/RA Well Inventory 01/30/07 KJ
13 01 11 08 CD RD/RA Well Inventory 01/30/07
13 01 11 08 RD/RA Well Inventory 02/06/07 DEQ
13 01 11 08 RD/RA Well Inventory 2/6/07
Site-Wide Information
Stockpiled Soil Analytical Results - Task J & Task D/E Request for Contained-Out Decision
Site-Wide Information
DEQ/Reynolds & KJ/Aldersley emails re: Analytical stockpile of jars
Site-Wide Information
DEQ/Seyler letter to BN/Smith re: DEQ does not approve BN's request for a "no longer containd-in determination for soil stockpile Sp-J-2
Site-Wide Information
DEQ/Reynolds letter to BN/Smith re: DEQ approval of BN's request for "no longer contained-in" decision
Site-Wide Information
Site-Wide Information
KJ/Aldersley & DEQ/Reynolds emails re: Task J report go-ahead
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ letter to BNSF re: Comments to draft private & public well inventory
Site-Wide Information
1166/ 38D103
Site-Wide Information
Private & Public Well Inventory Revision No. 1 - 1/06 revised w/replacement pages -
Site-Wide Information
DEQ letter to BNSF re: Private & Public Well Inventory Revision No. 1
Site-Wide Information
Site-Wide Information
K/J email to DEQ re: Replacement pages to Private & Public well inventory
Site-Wide Information
K/J letter to DEQ re: replacement pages for Private and Public Well Inventory (Revision No 1) included
Site-Wide Information
Site-Wide Information
DEQ letter to Park Co Environmental Council re: Private & Public Well Inventory
Site-Wide Information
K/J email to DEQ re: Annual update to Private & Public Well Inventory sent out in mail
1166/ 38D103
Site-Wide Information
2006 Annual Update to Private & Public Well Inventory (revision # 1)
Site-Wide Information
DEQ letter to BNSF re: 2006 Annual Update to Private & Public Well Inventory (rev # 1)
Site-Wide Information
DEQ & Bozeman City Manager emails re: HB 388 – BNSF Rail Yards
BN LIVINGSTON 8/26/13
Page 131 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 08 RD/RA Well Inventory DEQ & Bozeman City Manager emails re: Ordinance 1918 02/07/07
13 01 11 08 RD/RA Well Inventory Private & Public Well Inventory Report Revision # 2 1/08 KJ
13 01 11 08 CD RD/RA Well Inventory Private & Public Well Inventory Revision #3 01/30/09 KJ
13 01 11 08 RD/RA Well Inventory 7/13/09 DEQ
13 01 11 08 RD/RA Well Inventory KJ letter to DEQ re: 2009 Annual Update Revision No.3 07/22/09 KJ
13 01 11 08 RD/RA Well Inventory DEQ letter to BNSF re: 2009 Annual Update Revision No.3 09/08/09 DEQ
13 01 11 08 RD/RA Well Inventory DEQ/KJ emails re: Well Inventory Rev No.3
13 01 11 08 RD/RA Well Inventory KJ letter to DEQ re: 2009 Annual Update 11/18/09 KJ
13 01 11 08 RD/RA Well Inventory DEQ/Lawellin/KJ/BNSF emails re: Well survey overview
13 01 11 08 RD/RA Well Inventory KJ email to DEQ re: Document deliverables 01/28/10 KJ
13 01 11 08 CD RD/RA Well Inventory Private & Public Well Inventory (Revision #4) 1/28/10 KJ
13 01 11 08 RD/RA Well Inventory Private & Public Well Inventory – 2009 Mail Survey 01/28/10
13 01 11 08 RD/RA Well Inventory 02/25/10
13 01 11 08 RD/RA Well Inventory DEQ letter to BNSF re: 2010 Annual Update Revision No.4 04/12/10 DEQ
13 01 11 08 RD/RA Well Inventory DEQ letter to FNAF re: 2010 Annual Update Revision No.4 04/28/10 DEQ
13 01 11 08 RD/RA Well Inventory 10/13/10 KJ/Aldersley
13 01 11 08 RD/RA Well Inventory Private & Public Well Inventory (Revision #5) 01/28/11 KJ
13 01 11 08 RD/RA Well Inventory 02/10/11 KJ/Norris
13 01 11 08 RD/RA Well Inventory 02/11/11 KJ/Aldersley
13 01 11 08 RD/RA Well Inventory 04/25/11 DEQ/ Reynolds
13 01 11 08 RD/RA Well Inventory 05/24/11
Site-Wide Information
1166/ 38D103
Site-Wide Information
1166/ 38D103
Site-Wide Information
Site-Wide Information
DEQ letter to BN/Smith re: 2009 Annual Update to Private & Public Well Inventory (Revision #3) dated 1/30/09 - clarification
Site-Wide Information
Site-Wide Information
Site-Wide Information
10/29/10-10/30/10
Site-Wide Information
Site-Wide Information
12/22/09-12/29/09
Site-Wide Information
1166/ 38D103
Site-Wide Information
1166/ 38D103
Site-Wide Information
Site-Wide Information
Private & Public Well Inventory – Responses to 2009 Mail Survey CD
Site-Wide Information
Site-Wide Information
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Mr Olson – private well
Site-Wide Information
Site-Wide Information
K/J/Norris letter to DEQ/Reynolds re: Public & Private Well Inventory –Revision #5
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Replacement cover letter & tracking form for Public & Private Well Inventory –Revision #5 sent out 2/10/11
Site-Wide Information
DEQ/Reynolds email to BN/Smith re: DEQ comments on Public & Private Well Inventory –Revision #5
Site-Wide Information
K/J, CDM, & DEQ emails re: Livingston Shop Complex - Well Inventory Revision
BN LIVINGSTON 8/26/13
Page 132 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 08 RD/RA Well Inventory 05/25/11 KJ/Aldersley
13 01 11 08 RD/RA Well Inventory 06/01/11 DEQ/ Reynolds
13 01 11 08 RD/RA Well Inventory 01/30/12 KJ/Aldersley
13 01 11 08 CD RD/RA Well Inventory Private & Public Well Inventory Revision # 6 01/30/12 KJ
13 01 11 08 RD/RA Well Inventory 01/30/13 KJ/Aldersley
13 01 11 08 RD/RA Well Inventory Private & Public Well Inventory Revision #7 01/30/13 KJ
13 01 11 08 RD/RA Well Inventory 02/27/13 KJ/Aldersley
13 01 11 09 RD/RA
13 01 11 09 RD/RA Phone Log - Smith/BNSF 12/14/04 BN
13 01 11 09 RD/RA DEQ letter to BNSF re: Transmitting WET Bedrock data 12/15/04 DEQ
13 01 11 09 RD/RA 01/12/05 DEQ
13 01 11 09 RD/RA DEQ email to BNSF re: Bedrock groundwater 01/12/05 DEQ
13 01 11 09 RD/RA DEQ & K/J emails re Task F-stage 1-part 2 postponement 01/24/06
13 01 11 09 RD/RA RTI email to DEQ re: RTI comments on Task L Work Plan 01/30/06 RTI
13 01 11 09 RD/RA DEQ email to RTI re: RTI comments to Task L 01/31/06 DEQ
13 01 11 09 RD/RA 07/19/10
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Livingston Deliverable – 2011 Annual Update to Private & Public Well Inventory (Revision #5) to be delivered 5/27/11
Site-Wide Information
DEQ/Reynolds letter to BN/Smith re: DEQ approval of 2011 Annual Update to Private & Public Well Inventory (Revision #5)
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Livingston Deliverable – 2011 Annual Update to Private & Public Well Inventory (Revision #6) to be delivered 1/31/12
Site-Wide Information
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Livingston Deliverable – 2012 Annual Update to Private & Public Well Inventory (Revision #7) to be delivered 1/31/13
Site-Wide Information
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Attachment - Comprehensive well survey list
Site-Wide Information
Task L - Investigation of VOCs in the Bedrock Aquifer(s)
Site-Wide Information
Task L - Investigation of VOCs in the Bedrock Aquifer(s)
Site-Wide Information
Task L - Investigation of VOCs in the Bedrock Aquifer(s)
Site-Wide Information
Task L - Investigation of VOCs in the Bedrock Aquifer(s)
DEQ email to COK, Wheat, Brown & Mc Garry re: WET Bedrock data
Site-Wide Information
Task L - Investigation of VOCs in the Bedrock Aquifer(s)
Site-Wide Information
Task L - Investigation of VOCs in the Bedrock Aquifer(s)
Site-Wide Information
Task L - Investigation of VOCs in the Bedrock Aquifer(s)
Site-Wide Information
Task L - Investigation of VOCs in the Bedrock Aquifer(s)
Site-Wide Information
Task L - Investigation of VOCs in the Bedrock Aquifer(s)
DEQ/Reynolds letter to BN/Smith re: DEQ redline/Strikeout comments on the Draft Task L Supplemental Investigation Work Plan Aquifer GW
DEQ/ P5424Reynolds
BN LIVINGSTON 8/26/13
Page 133 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 09 RD/RA 08/01/10 DEQ
13 01 11 09 RD/RA DEQ/Reynolds & K/J/Norris emails re: Task L 9/15-9/16/10 DEQ/ Reynolds
13 01 11 09 RD/RA 09/16/10 DEQ/ Reynolds
13 01 11 09 01 RD/RA Work Plan
13 01 11 09 01 CD RD/RA Work Plan 06/01/05 KJ
13 01 11 09 01 RD/RA Work Plan 06/01/05
13 01 11 09 01 RD/RA Work Plan 08/16/10
13 01 11 09 01 CD RD/RA Work Plan 09/24/10 DEQ
13 01 11 09 01 RD/RA Work Plan 06/17/11
13 01 11 09 01 RD/RA Work Plan 06/09/11
13 01 11 09 01 RD/RA Work Plan K/J internal emails re: Task L – geophysical 07/27/11 KJ
13 01 11 09 01 RD/RA Work Plan 11/04/11 DEQ/ Reynolds
13 01 11 09 01 RD/RA Work Plan 12/13/11 KJ/Norris
13 01 11 09 01 RD/RA Work Plan 01/31/12 KJ/Aldersley
13 01 11 09 01 CD RD/RA Work Plan 01/31/12 DEQ
13 01 11 09 01 RD/RA Work Plan 03/06/12 DEQ/ Reynolds
13 01 11 09 01 RD/RA Work Plan 03/12/12 BN/Smith
13 01 11 09 01 RD/RA Work Plan CDM Smith Conference call meeting notes 03/20/12 CDM Smith
Site-Wide Information
Task L - Investigation of VOCs in the Bedrock Aquifer(s)
Task L Work Plan DEQ version –redline/strikeout with K/J redline
Site-Wide Information
Task L - Investigation of VOCs in the Bedrock Aquifer(s)
Site-Wide Information
Task L - Investigation of VOCs in the Bedrock Aquifer(s)
DEQ/Reynolds letter to BN/Smith re: DEQ comments on Task L Supplemental Investigation Work Plan for Bedrock Aquifer Groundwater – Attachment Table B to be inserted and will then be considered approved by DEQ
Site-Wide Information
Site-Wide Information
Draft Supplemental Work Plan - Task L for Bedrock Aquifers
Site-Wide Information
Draft Appendix B Environmental Requirements, Criteria, and Limitations
Site-Wide Information
K/J/Norris & DEQ/ Reynolds emails re: Task L follow-up questions
Site-Wide Information
Task L Supplemental Investigation Work Plan for Bedrock Aquifers 8/27/10 - Revised w/replacement pages
Site-Wide Information
CDM/Hills & K/J/Norris emails re: Task L well location & Operational directive 60
Site-Wide Information
DEQ/Reynolds & K/J/Norris emails re: Task L Drilling Program Path Forward
Site-Wide Information
Site-Wide Information
DEQ/Reynolds letter to BN/Smith re: DEQ request for Task L Supplemental Investigation Work Plan Addendum for Bedrock Aquifer
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: Task L Supplemental Investigation Work Plan - revised due date
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Deliverable - Addendum No 1 to Task L Supplemental Investigation Work Plan for Bedrock Aquifers - DEQ Version to be delivered 2/1/12
Site-Wide Information
Addendum No 1 to Task L Supplemental Investigation Work Plan for Bedrock Aquifers - DEQ Version
Site-Wide Information
DEQ/Reynolds letter to BN/Smith re: DEQ comments to Addendum No 1 to Task L Supplemental Investigation Work Plan for Bedrock Aquifers
Site-Wide Information
BN/Smith email to DEQ/Reynolds re: Meeting requested to discuss Task L Supplemental Investigation Work Plan Shop Complex
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 134 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 09 01 RD/RA Work Plan 04/16/12 KJ
13 01 11 09 01 RD/RA Work Plan 05/03/12 DEQ/ Reynolds
13 01 11 09 01 RD/RA Work Plan 05/04/12
13 01 11 09 01 RD/RA Work Plan 05/26/12
13 01 11 09 01 RD/RA Work Plan 6/8-6/11/12
13 01 11 09 01 RD/RA Work Plan CDM Smith Conference call meeting notes 06/22/12 CDM Smith
13 01 11 09 01 RD/RA Work Plan 07/02/12
13 01 11 09 01 RD/RA Work Plan 07/03/12
13 01 11 09 01 RD/RA Work Plan 07/09/12
13 01 11 09 01 RD/RA Work Plan 07/11/12 KJ/Adlersley
13 01 11 09 01 RD/RA Work Plan 07/18/12 KJ/Adlersley
13 01 11 09 01 RD/RA Work Plan 07/30/12 CDM Smith/ Coan
13 01 11 09 01 RD/RA Work Plan 08/13/12
13 01 11 09 01 RD/RA Work Plan 08/14/12 KJ/Adlersley
13 01 11 09 01 RD/RA Work Plan 04/02/13
13 01 11 09 01 RD/RA Work Plan 04/17/13 KJ/Norris
13 01 11 09 01 RD/RA Work Plan 04/19/13 CDM Smith
13 01 11 09 01 RD/RA Work Plan 04/23/13 DEQ/ Reynolds
13 01 11 09 01 RD/RA Work Plan 04/23/13 Geosyntec
13 01 11 09 01 RD/RA Work Plan 05/10/13 Geosyntec
Site-Wide Information
Addendum No. 1 to DEQ Version of Task L Supplemental Investigation Work Plan for Bedrock Aquifers (Revision No. 1)
Site-Wide Information
DEQ/Reynolds letter to BN/Smith re: DEQ approval of the Revised Addendum - with notes
Site-Wide Information
Conference call meeeting notes - DEQ, KJ, & CDM: Tasks L well completion
Site-Wide Information
Conference call meeeting notes - DEQ, KJ, BN, & CDM: Tasks L
Site-Wide Information
KJ/Norris & DEQ/Reynolds emails re: Task L field schedule-Activated carbon strip
Site-Wide Information
Site-Wide Information
KJ/Aldersley & DEQ/Reynolds emails re: Notification of Task F field activities
Site-Wide Information
KJ/Aldersley & DEQ/Reynolds emails re: Maps showing Revised Task L well locations
Site-Wide Information
KJ/Aldersley & DEQ/Reynolds emails re: July 2012 field activities
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Revised Task L Field schedule - Attachment -Revised Task L drilling schedule & Revised well locations
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Task L drilling schedule
Site-Wide Information
CDMSmith/Coan email to DEQ/Reynolds re: BN Livingston daily update for Saturday & Sunday, July 28-29, 2012
Site-Wide Information
CDMSmith/Coan & KJ/Schreiner emails re: Task L schedule changes
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Task L schedule update
Site-Wide Information
DEQ/Reynolds & KJ/Norris emails re: Conference call scheduling to discuss Task L
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: Conference call scheduling to discuss Task L bedrock & path forward
Site-Wide Information
CDM Smith memo to DEQ/Reynolds re: Summary of Task F/L meeting with DEQ, BN & KJ
Site-Wide Information
DEQ/Reynolds letter/fax to BN/Smith & KJ/Norris re: Additional requirements for tasks L & F supplemental investigation
Site-Wide Information
Teleconferemce meeting meetings for 4/23/13 meeting between DEQ, KJ, BN, CDM, & Geosyntec
Site-Wide Information
Teleconferemce meeting meetings for 5/10/13 meeting between DEQ, KJ, BN, CDM, & Geosyntec
BN LIVINGSTON 8/26/13
Page 135 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 09 01 CD RD/RA Work Plan 05/24/13
13 01 11 09 01 CD RD/RA Work Plan KJ/Norris & DEQ/Reynolds emails re: Info for Task L planning 04/17/13 KJ/Norris
13 01 11 09 01 CD RD/RA Work Plan 05/23/13 DEQ/Reynolds
13 01 11 09 01 CD RD/RA Work Plan 05/23/13 KJ/Aldersley
13 01 11 09 01 CD RD/RA Work Plan 05/02/13
13 01 11 09 01 CD RD/RA Work Plan 05/28/13 DEQ/Reynolds
13 01 11 09 01 CD RD/RA Work Plan 05/29/13 DEQ/Reynolds
13 01 11 09 01 CD RD/RA Work Plan 05/31/13 DEQ/ Reynolds
13 01 11 09 01 CD RD/RA Work Plan 06/21/13 DEQ/ Reynolds
13 01 11 09 01 CD RD/RA Work Plan 08/29/13
13 01 11 09 01 CD RD/RA Work Plan 10/04/13 DEQ/Reynolds
13 01 11 09 01 RD/RA Work Plan Gore Sorber - Full List of Analytes 10/09/13 DEQ/Reynolds
13 01 11 09 01 CD RD/RA Work Plan 10/10/13 BNSF/ Stegemen
13 01 11 09 01 RD/RA Work Plan 11/27/13 Kennedy/Jenks
13 01 11 09 01 RD/RA Work Plan 03/21/14 BNSF/ Stegemen
13 01 11 09 02 RD/RA Sampling
13 01 11 09 02 RD/RA Sampling 08/16/10
13 01 11 09 02 RD/RA Sampling 09/30/10 DEQ/ Reynolds
13 01 11 09 02 RD/RA Sampling 11/12/10 KJ/Adlersley
13 01 11 09 02 RD/RA Sampling CDM/Hills & DEQ/Reynolds emails re: Task L updates 11/16/10
Site-Wide Information
Addendum No. 2 to DEQ Version of Task L Supplemental Investigation Work Plan for Bedrock Aquifers
Site-Wide Information
Site-Wide Information
DEQ/Reynolds & BNSF/Stegman emails re: chain emails on Task F/LWP extension & LRG
Site-Wide Information KJ/Aldersley email to DEQ/Reynolds re: Task L WP transmittal
Site-Wide Information
GEO/McDonald & DEQ/Reynolds chain emails re: 5/17/13 meeting notes
Geosyntec/ McDonald
Site-Wide Information
DEQ/Reynolds chain email re: 5/17/13 Next steps meeting notes
Site-Wide Information
DEQ/Reynolds email to GEO/McDonald re: email on not recording meetings
Site-Wide Information
DEQ/Reynolds, BNSF/Stegman & Dave Smith emails re: chain email Task L schedule
Site-Wide Information
DEQ/Reynolds email to David Smith re: Task L WP Table B-1 comments
Site-Wide Information
Addendum No.2 to DEQ Version of Task L SI Work Plan for Bedrock Aquifer(s) (May 2013) w/ Rev. No. 1 Update (PDF)
Kennedy/Jenks Consultants
Site-Wide Information
Addendum No. 3 to DEQ Version of Task L Supplemental Investigation Work Plan for Bedrock Aquifer(s)
Site-Wide Information
Site-Wide Information
Joint Livingston Remediation Group (LRG) and BNSF Railway Company (BNSF) Work Plan Submittals
Site-Wide Information
Technical memorandum regarding Livingston Shop Complex, Task L., Qualitative Review of Passive Soil Gas Sample Results
Site-Wide Information
Joint Livingston Remediation Group (LRG) and BNSF Railway Company (BNSF) Work Plan Submittal - Former Electric Shop and Locomotive Shop Manway Remedial Design Study Work Plan
Site-Wide Information
Site-Wide Information
Phone Log - Conference call: DEQ, K/J, & CDM re: BN Livingston Shop Complex – Task J & L
Site-Wide Information
DEQ/Reynolds email to BN/Smith & MRL/Keller re: Task L well drilling access
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Task J items posted to website
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 136 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 09 02 RD/RA Sampling 11/18/10 KJ/ Norris
13 01 11 09 02 RD/RA Sampling 12/07/10
13 01 11 09 02 RD/RA Sampling 03/11/11 KJ/Norris
13 01 11 09 02 RD/RA Sampling 03/24/11 CDM/Coan
13 01 11 09 02 RD/RA Sampling CDM Oversight Report 3/22-3/29/11 CDM
13 01 11 09 02 RD/RA Sampling K/J/Norris email to DEQ/Reynolds re: Task L - Drilling 04/06/11 KJ/Norris
13 01 11 09 02 RD/RA Sampling 04/15/11
13 01 11 09 02 RD/RA Sampling 04/26/11 CDM/Coan
13 01 11 09 02 RD/RA Sampling 04/28/11 CDM/Coan
13 01 11 09 02 RD/RA Sampling 04/28/11 CDM/Coan
13 01 11 09 02 RD/RA Sampling 05/06/11 CDM/Coan
13 01 11 09 02 RD/RA Sampling 05/10/11 KJ
13 01 11 09 02 RD/RA Sampling 05/12/11
13 01 11 09 02 RD/RA Sampling KJ/Norris
13 01 11 09 02 RD/RA Sampling DEQ/Reynolds & K/J/Aldersley emails re: Task L drilling 07/12/11
13 01 11 09 02 RD/RA Sampling 07/14/11 KJ Norris
13 01 11 09 02 RD/RA Sampling 07/15/11 CDM/Coan
13 01 11 09 02 RD/RA Sampling 07/19/11 CDM/Coan
13 01 11 09 02 RD/RA Sampling 07/26/11 CDM/Coan
13 01 11 09 02 RD/RA Sampling 07/28/11 CDM/Coan
13 01 11 09 02 RD/RA Sampling 07/29/11 CDM/Coan
13 01 11 09 02 RD/RA Sampling 08/01/11 CDM/Hills
Site-Wide Information
K/J/Norris email to DEQ/Reynolds re: BN Livingston Shop Complex – Task L well construction
Site-Wide Information
K/J/Norris & DEQ/Reynolds emails re: BN Livingston Shop Complex – Suspension of Task L well construction
Site-Wide Information
K/J/Norris email to DEQ/Reynolds re: Task L - Surface casing installation
Site-Wide Information
CDM/Coan email to DEQ/Reynolds re: Task L - Surface casing installation
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ/Reynolds & K/J/Aldersley emails re: Task L drilling oversight schedule
Site-Wide Information
CDM/Coan email to DEQ/Reynolds re: Task L - Conductor casing installation update well 10-07
Site-Wide Information
CDM/Coan email to DEQ/Reynolds re: Task L - Conductor casing installation update well 10-02
Site-Wide Information
CDM/Coan email to DEQ/Reynolds re: Task L - Conductor casing installation update - well 10-03
Site-Wide Information
CDM/Coan email to DEQ/Reynolds re: Task L - Conductor casing installation update - well 10-08
Site-Wide Information
K/J/Norris & Aldersley emails to DEQ/Reynolds re:Task L conference call
Site-Wide Information
DEQ/Reynolds & CDM/Coan emails re: Task L - Conductor casing installation update - well 10-06 & other updates
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: Conference call info for Task L drilling +
Site-Wide Information
Site-Wide Information
K/J/Norris email to DEQ/Reynolds re: Livingston Task L Update
Site-Wide Information
CDM/Coan email to DEQ/Reynolds re: Task L drilling schedule update
Site-Wide Information
CDM/Coan email to DEQ/Reynolds re: Task L drilling schedule update
Site-Wide Information
CDM/Coan email to DEQ/Reynolds re: Task L bedrock coring update
Site-Wide Information
CDM/Coan email to DEQ/Reynolds re: Task L bedrock coring update
Site-Wide Information
CDM/Coan email to DEQ/Reynolds re: Task L bedrock coring update
Site-Wide Information
CDM/Hills email to DEQ/Reynolds re: Tasks L & D & E phone log
BN LIVINGSTON 8/26/13
Page 137 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 09 02 RD/RA Sampling 08/01/11 CDM/Coan
13 01 11 09 02 RD/RA Sampling 08/21/11
13 01 11 09 02 RD/RA Sampling 08/24/11
13 01 11 09 02 RD/RA Sampling DEQ/Reynolds & KJ/Aldersley emails re: Task L - Well 10-08 08/25/11
13 01 11 09 02 RD/RA Sampling 09/12/11 KJ/Adlersley
13 01 11 09 02 RD/RA Sampling 10/06/11 KJ/Adlersley
13 01 11 09 02 RD/RA Sampling 10/11/11
13 01 11 09 02 RD/RA Sampling 10/12/11 BN
13 01 11 09 02 RD/RA Sampling 11/16/11
13 01 11 09 02 RD/RA Sampling 12/09/11 KJ/Adlersley
13 01 11 09 02 RD/RA Sampling 12/15/11
13 01 11 09 02 RD/RA Sampling 01/11/12 KJ/Adlersley
13 01 11 09 02 RD/RA Sampling 03/07/12 KJ/Adlersley
13 01 11 09 02 RD/RA Sampling 04/11/12
13 01 11 09 02 RD/RA Sampling 04/18/12 DEQ/ Reynolds
13 01 11 09 02 RD/RA Sampling 07/03/12
13 01 11 09 02 RD/RA Sampling 07/19/12 KJ/Adlersley
13 01 11 09 02 RD/RA Sampling 8/22-8/28/12
13 01 11 09 02 RD/RA Sampling 09/04/12 KJ/Norris
13 01 11 09 02 RD/RA Sampling 09/04/12
13 01 11 09 02 RD/RA Sampling 09/19/12 KJ/Adlersley
Site-Wide Information
CDM/Coan email to DEQ/Reynolds re: Task L bedrock coring update
Site-Wide Information
CDM/Cohn & DEQ/Reynolds emails re: Task L - schedule update
Site-Wide Information
DEQ/Reynolds & KJ/Norris & Aldersley emails re: Task L - sampling schedule
Site-Wide Information
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Task L GW sampling notification
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Task L items posted to website - Analytical summary 1st quarter GW monitoring
Site-Wide Information
DEQ/Reynolds & KJ/Aldersley emails re: Task L - well elevations
Site-Wide Information
Agenda for Shop complex facility concepts & criteria scoping meeting 10/12/11
Site-Wide Information
KJ/Aldersley & DEQ/Reynolds emails re: 2nd quarter Task L GW sampling
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Notification of 2nd quarter GW sampling
Site-Wide Information
KJ/Norris & DEQ/Reynolds emails re: Task L rock core analysis
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: 2nd quarter GW monitoring posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: 3rd quarter GW monitoring posted to website
Site-Wide Information
Conference Call - Draft Agenda re: Tasks J & M Path forward for completion of Remedial Actions
Site-Wide Information
DEQ/Reynolds email to KJ/Norris & Aldersley re: Confirmation sampling
Site-Wide Information
DEQ/Reynolds & KJ/Aldersley emails re: Facility wide water levels
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Task L items posted to website - 4th Qtr gw monitoring results
Site-Wide Information
DEQ/Reynolds & KJ/Aldersley emails re: Task L Blank Flute installation date
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: Delay notification of Task L Blank Flute installation - equipment stalled in Denver, installation will be 9/6/12
Site-Wide Information
DEQ/Reynolds & KJ/Norris emails re: Task L Well 12-4 borehole sloughing
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Task L well development/Slug testing notification
BN LIVINGSTON 8/26/13
Page 138 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 09 02 RD/RA Sampling 09/20/12 CDM Smith
13 01 11 09 02 RD/RA Sampling 09/24/12 KJ/Norris
13 01 11 09 02 RD/RA Sampling 09/25/12 CDM Smith/ Coan
13 01 11 09 02 RD/RA Sampling KJ/Aldersley email to DEQ/Reynolds re: 12-1 Flute installation 09/26/12 KJ/Adlersley
13 01 11 09 02 RD/RA Sampling 09/27/12 CDM Smith/ Coan
13 01 11 09 02 RD/RA Sampling 09/28/12 CDM Smith/ Coan
13 01 11 09 02 RD/RA Sampling 09/28/12 KJ/Adlersley
13 01 11 09 02 RD/RA Sampling 10/25/12 CDM Smith/ Coan
13 01 11 09 02 RD/RA Sampling Well/FLUTe construction details for well 12-1 (figure)
13 01 11 09 02 RD/RA Sampling DEQ/Reynolds email to KJ/Norris re: Wells near waste piles 11/28/12 DEQ/ Reynolds
13 01 11 09 02 RD/RA Sampling 12/07/12 CDM Smith/ Coan
13 01 11 09 02 RD/RA Sampling KJ/Aldersley & DEQ/Reynolds emails re: Well 89-3 sampling 12/08/12
13 01 11 09 02 RD/RA Sampling
13 01 11 09 02 RD/RA Sampling 01/16/13 KJ/Adlersley
13 01 11 09 02 RD/RA Sampling 01/31/13
13 01 11 09 02 RD/RA Sampling 02/07/13 KJ/Adlersley
13 01 11 09 02 RD/RA Sampling 02/13/13 KJ/Adlersley
13 01 11 09 02 RD/RA Sampling 02/15/13 KJ/Norris
13 01 11 09 02 RD/RA Sampling CDM smith/Coan & KJ/Aldersley emails re: Survey data 02/20/13
13 01 11 09 02 RD/RA Sampling DEQ/Reynolds letter to BNSF/Smith re: Task L WP approval 05/30/13 DEQ/ Reynolds
13 01 11 09 02 RD/RA Sampling 07/18/13 KJ/Aldersley
Site-Wide Information
CDM Smith Memorandum to DEQ/Reynolds re: Task L - Proposed spacer intervals for FLUTe multi-channel well construction for bedrock well 12-1
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: Conference call meeting instructions
Site-Wide Information
CDM Smith/Coan email to DEQ/Reynolds re: Task L slug testing
Site-Wide Information
Site-Wide Information
CDM Smith/Coan email to DEQ/Reynolds re: Daily update for 9/26/12
Site-Wide Information
CDM Smith/Coan email to DEQ/Reynolds re: Daily update for 9/27/12
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: 12-1 Flute installation date set as 10/2312
Site-Wide Information
CDM/Coan email to DEQ/Reynolds re: Daily update for 10/23/12
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM Smith/Coan email to DEQ/Reynolds re: Attachment - Task F/L GW Monitoring Program - Directive No 1
Site-Wide Information
Site-Wide Information
DEQ/Reynolds, KJ/Aldersley & Norris emails re: Request for clarification - total iron or dissolved iron
12/10-12/11/12
Site-Wide Information
KJ/Alsersley email to DEQ/Reynolds re: Task L items posted to the website - Addendum #1 GW analytical results for 1st quarter sampling event
Site-Wide Information
DEQ/Reynolds, KJ/Aldersley & Norris emails re: DEQ information request
Site-Wide Information
KJ/Alsersley email to DEQ/Reynolds re: Updated survey information posted to the web
Site-Wide Information
KJ/Alsersley email to DEQ/Reynolds re: Task L bedrock information posted to the web
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: Attachment - Tables 1 & 2 summarize the slug test & Data analysis
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Task L Sampling notice
BN LIVINGSTON 8/26/13
Page 139 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 09 02 RD/RA Sampling 07/18/13 KJ/Aldersley
13 01 11 09 02 RD/RA Sampling 07/19/13 KJ/Fernandes
13 01 11 09 02 RD/RA Sampling 08/08/13 KJ/Aldersley
13 01 11 09 02 RD/RA Sampling Gore Sorber data 08/09/13 Kennedy/Jenks
13 01 11 10 RD/RA
13 01 11 10 RD/RA Phone Log - DEQ to G Olsen re: Task I sample results / NE-4 01/09/05 DEQ
13 01 11 10 RD/RA DEQ internal email re: ATSDR Indoor air data evaluation 06/29/05 DEQ internal
13 01 11 10 RD/RA ATSDR email to DEQ re: Indoor air data evaluation 07/10/05 ATSDR
13 01 11 10 RD/RA Y **DEQ Internal email re: Phone Log - Horiel 07/11/05 DEQ internal
13 01 11 10 RD/RA DEQ email to BN/K/J re: Mr. Horiel 07/11/05 DEQ
13 01 11 10 RD/RA 07/11/05
13 01 11 10 RD/RA DEQ email to BN re: Phone call from resident 07/27/05 DEQ
13 01 11 10 RD/RA 07/27/05 Rose Clumpers
13 01 11 10 RD/RA 08/03/05 Matt Smith
13 01 11 10 RD/RA K/J email to DEQ re: Indoor Air access info 09/16/05 KJ
13 01 11 10 RD/RA 09/28/05
13 01 11 10 RD/RA K/J email to DEQ re: Access Letters 09/30/05 KJ
13 01 11 10 RD/RA Y ** DEQ internal email re: Access 10/03/05 DEQ internal
13 01 11 10 RD/RA Y 01/13/06
13 01 11 10 RD/RA K/J email to DEQ re: Task I Status 01/17/06 KJ
13 01 11 10 RD/RA Y ** DEQ internal email re: Attorney contact – indoor air 01/18/06 DEQ internal
13 01 11 10 RD/RA Y 01/18/06 DEQ internal
Site-Wide Information
KJ/Aldersley & DEQ/Reynolds emails re: Task Z update & Gore info
Site-Wide Information
KJ/Fernanded/Aldersley & DEQ/Reynolds emails re: Task L Field work update & Gore analytes
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Task L Data Posted to Website
Site-Wide Information
Site-Wide Information
Task I - Indoor Air Investigation - 2005
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Phone Log – DEQ/Sivers & Resident/Horiel re: Resident questions about well & air sampling
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Phone Log - Livingston resident Rose Clumpers to DEQ re: Indoor air quality
Site-Wide Information
Task I - Indoor Air Investigation
Phone Log - Livingston resident Matt Smith to DEQ re: Indoor air sampling
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
K/J & BNSF letters to Livingston residents re: Access Agreements
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
** DEQ & K/J emails re: Indoor air summary table & cross referenced address list
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
** DEQ internal email re: Phone Log/MRL attorney & DEQ attorney re: indoor air issues
BN LIVINGSTON 8/26/13
Page 140 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 RD/RA Y ** DEQ internal email re: First round Talgo results 01/23/06 DEQ internal
13 01 11 10 RD/RA Talgo/Warren email to DEQ/Keck re: First round Talgo results 01/23/06 Talgo/Warren
13 01 11 10 RD/RA DEQ email to K/J re: phone log/NE-16 results 02/01/06 DEQ
13 01 11 10 RD/RA Phone Log - Conference call DEQ & Talgo re: Solvent Usage 02/15/06
13 01 11 10 RD/RA DEQ internal email re: Task I stage requirement 02/23/06 DEQ internal
13 01 11 10 RD/RA Y ** DEQ internal email re: BN script/Task I 02/24/06 DEQ internal
13 01 11 10 RD/RA Calls to Residences/Business re: Decay in Air Sampling 2/25-2/27/06
13 01 11 10 RD/RA K/J email to DEQ re: Task I contact info 02/27/06 KJ
13 01 11 10 RD/RA Y ** DEQ internal email re: Indoor air issues 02/28/06 DEQ internal
13 01 11 10 RD/RA K/J email to DEQ re: Task I Add #1 scheduling 03/01/06 KJ
13 01 11 10 RD/RA K/J email to DEQ re: SE 2 questionnaire 03/03/06 KJ
13 01 11 10 RD/RA 03/27/06 DEQ internal
13 01 11 10 RD/RA KJ/DEQ email – Indoor Air Analytical Results from 4/06 4/28-5/2/06
13 01 11 10 RD/RA 05/01/06 KJ
13 01 11 10 CD RD/RA K/J Tech Memo Task I CD 05/09/06 KJ
13 01 11 10 RD/RA DEQ internal email re: Livingston resident info request 05/15/06 DEQ internal
13 01 11 10 RD/RA 06/09/06 P Bergen
13 01 11 10 RD/RA 08/09/06 M Getz
13 01 11 10 RD/RA 8/906 J Flye
13 01 11 10 RD/RA DEQ letter to City of Livingston WWTP re: Sample results 9//06 DEQ
13 01 11 10 RD/RA DEQ letter to V Shipley re: Sample results 09/07/06 DEQ
13 01 11 10 RD/RA 09/13/06 BN/Newall
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
DEQ internal email re: Task I Addendum scheduling K/J phone log
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Quarterly Status Report No 3 Feb, March, April 2006 – Task I – Basement VOC Gas Investigation & Removal
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Phone Log – Phillip Bergen/Livingston property owner to DEQ re: Wants his indoor air sampled
Site-Wide Information
Task I - Indoor Air Investigation
Phone Log - M Getz/Livingston property owner to DEQ re: Vapor intrusion
Site-Wide Information
Task I - Indoor Air Investigation
Phone Log – J Flye/Livingston resident to DEQ re: 111 Miles lane signs in yard
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Phone Log – Pat Newall/BNSF Settlement Office to DEQ re: No offer on Bates home. Other houses demolished
BN LIVINGSTON 8/26/13
Page 141 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 RD/RA DEQ email to Sherri Peterson re: Information for J Flye 10/09/06 DEQ
13 01 11 10 CD RD/RA 10/16/06 KJ
13 01 11 10 CD RD/RA Addendum No 2 to Final Supplemental Investigation WP 01/01/07 KJ
13 01 11 10 RD/RA CDM email to DEQ re: HP Labs SOPs 01/26/07 CDM
13 01 11 10 RD/RA Y 03/01/07
13 01 11 10 RD/RA CDM email to DEQ re: Dedicated flow controllers 03/01/07 CDM
13 01 11 10 RD/RA DEQ/BNSF emails re: Institutional Controls 03/05/07
13 01 11 10 RD/RA K/J email to DEQ – SVE Applied Vacuum, Flow & ROI Data 03/07/07 KJ
13 01 11 10 RD/RA DEQ/CDM emails re: Task I – BNSF Recommendations 03/30/07
13 01 11 10 RD/RA Y 04/30/07 DEQ internal
13 01 11 10 RD/RA DEQ/KJ emails re: Contact list for Task I 04/30/07
13 01 11 10 RD/RA DEQ letter to Bill & Jennifer Jones re: Sample results 05/14/07 DEQ
13 01 11 10 RD/RA DEQ/KJ/CDM email – Analytical results 5/15-5/16/07
13 01 11 10 RD/RA DEQ/CDM/KJ emails re: Equilibrium and purge volume tests 05/18/07
13 01 11 10 RD/RA DEQ/CDM/KJ emails re: Task I Analytical Summary tables 05/21/07
13 01 11 10 RD/RA DEQ/CDM/KJ emails re: Ambient air samples 05/24/07
13 01 11 10 RD/RA DEQ email to CDM/KJ re: Ambient air samples 05/24/07 DEQ
13 01 11 10 RD/RA DEQ/CDM emails re: Draft SSD Layout Drawing 5/23-5/24/07
13 01 11 10 RD/RA 5/23-5/24/07
13 01 11 10 RD/RA KJ email to DEQ re: Task I soil gas probe locations 05/24/07 KJ
13 01 11 10 RD/RA DEQ/KJ emails re: Draft SSD Layout Drawing 05/25/07
13 01 11 10 RD/RA CDM email to DEQ re: Task I Letters 6//15/07 CDM
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Draft Addendum No 2 to Final Task I Supplemental Investigation Work Plan
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
** DEQ & K/J emails re: Access to 2 indoor air sampling locations
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
** DEQ internal emails re: Institutional Control for 405 North “L” St
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
DEQ/CDM/KJ emails re: Proposed Task I Mitigation Design Development Plan Soil Sampling Locations
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
BN LIVINGSTON 8/26/13
Page 142 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 RD/RA KJ email to DEQ re: Task I data posted to website 06/21/07 KJ
13 01 11 10 RD/RA KJ email to DEQ re: Task I data posted to website 06/29/07 KJ
13 01 11 10 RD/RA DEQ email to CDM re: Task I 07/03/07 DEQ
13 01 11 10 RD/RA DEQ/CDM/KJ emails re: Task I data posted to website 6/29-7/3/07
13 01 11 10 RD/RA DEQ/CDM emails re: June 5 air and soil gas results 07/03/07
13 01 11 10 RD/RA DEQ/CDM emails re: June 5 air and soil gas results 7/3-7/9/07
13 01 11 10 RD/RA DEQ/CDM/KJ emails re: Task I 6/29-7/20/07
13 01 11 10 RD/RA 09/14/07 DEQ Director
13 01 11 10 RD/RA Task I Mitigation Plan for 416 North K Street
13 01 11 10 RD/RA 12/01/07 KJ
13 01 11 10 RD/RA Y 01/24/08 DEQ internal
13 01 11 10 RD/RA DEQ Director’s Office correspondence re: Mark Stehly/BNSF 6/11-6/30/08 DEQ Director
13 01 11 10 CD RD/RA CD ROM – BNLV Task I - Summas.ppt
13 01 11 10 RD/RA 07/23/08 DEQ Director
13 01 11 10 RD/RA 02/19/09 KJ
13 01 11 10 RD/RA 02/19/09 KJ
13 01 11 10 RD/RA 02/19/09 KJ
13 01 11 10 RD/RA 02/19/09 KJ
13 01 11 10 RD/RA 02/19/09 KJ
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
DEQ Director’s Office correspondence re: Bill Gonder/BN contamination
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Task I Mitigation Plan for Former Talgo Paint Shop, Administration, and Warehouse Buildings
Site-Wide Information
Task I - Indoor Air Investigation
** DEQ internal email re: Documentation of phone conversation of 1/18/08, Task I letter to K/J
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
DEQ Director Opper letter to BN/M Stehly re: Response to BN letter dated 6/11/08 regarding communication with landowners
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to E Lahren re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to D Amsk re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to S Conley re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to T Core re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to B Thomas re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
BN LIVINGSTON 8/26/13
Page 143 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 RD/RA 02/19/09 KJ
13 01 11 10 RD/RA 02/19/09 KJ
13 01 11 10 RD/RA 02/19/09 KJ
13 01 11 10 RD/RA 02/19/09 KJ
13 01 11 10 RD/RA 02/19/09 KJ
13 01 11 10 RD/RA 02/19/09 KJ
13 01 11 10 RD/RA 02/19/09 KJ
13 01 11 10 RD/RA 02/19/09 KJ
13 01 11 10 RD/RA 02/19/09 KJ
13 01 11 10 RD/RA 02/19/09 KJ
13 01 11 10 RD/RA 02/19/09 KJ
13 01 11 10 RD/RA 02/19/09 KJ
13 01 11 10 RD/RA 02/19/09 KJ
13 01 11 10 RD/RA 02/23/09 KJ
13 01 11 10 RD/RA 02/23/09 KJ
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to M Siriano and S Depuy re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to E Lahren re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to M Bruha re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to S Bales re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to J Welker re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to J Mastin re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to V Blakeman re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to N Akerstrom Jr re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to C Shelley re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to D Zarnt re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to B Blankenship re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to K Pfister re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to S Chappell re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to T Moench re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to M Stein and J Ziglar re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
BN LIVINGSTON 8/26/13
Page 144 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 RD/RA 02/23/09 KJ
13 01 11 10 RD/RA 03/03/09 KJ
13 01 11 10 RD/RA 03/03/09 KJ
13 01 11 10 RD/RA 03/03/09 KJ
13 01 11 10 RD/RA 03/03/09 KJ
13 01 11 10 RD/RA 03/23/09
13 01 11 10 CD RD/RA 04/17/09 CDM
13 01 11 10 RD/RA 05/21/09
13 01 11 10 RD/RA Y 06/17/09
13 01 11 10 RD/RA 10/05/09 CDM
13 01 11 10 CD RD/RA 11/18/09 DEQ
13 01 11 10 RD/RA DEQ
13 01 11 10 RD/RA KJ
13 01 11 10 RD/RA KJ
13 01 11 10 RD/RA Y
13 01 11 10 RD/RA CDM Data Validation for 4/2010 IA sampling CDM
13 01 11 10 RD/RA CDM Data Validation for 3/2010 SG & A4 sampling 04/01/11 CDM
13 01 11 10 RD/RA 04/13/10
13 01 11 10 RD/RA CDM Data Validation for 5/2010 SG sampling CDM
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to D Miller re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to R Jenkins re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to J Jensen re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to A Mitchell re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
Site-Wide Information
Task I - Indoor Air Investigation
K/J letter to M Bednarek re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Columbia Analytical Services email to DEQ/A Reynolds re: Confirmation of Samples Receipt
Columbia Analytical
Site-Wide Information
Task I - Indoor Air Investigation
CDM letter package to DEQ/Reynolds re: Electronic and hard copies for Task I: Vapor Mitigation Investigation Maps & Figures
Site-Wide Information
Task I - Indoor Air Investigation
DEQ/Reynolds & EPA/Strausbaugh emails re: BNLV Mitigation
Site-Wide Information
Task I - Indoor Air Investigation
** DEQ Legal/Haque-Hausrath internal email re: RCRA requirements for F001 & F002
DEQ Legal/ Haque-Hausrath
Site-Wide Information
Task I - Indoor Air Investigation
CDM/Woodward Memorandum to DEQ/Reynolds re: CDM sample location map
Site-Wide Information
Task I - Indoor Air Investigation
Task I Indoor Mitigation Plan for Residential and Commercial Properties – DEQ Version
Site-Wide Information
Task I - Indoor Air Investigation
Task I Indoor Mitigation Plan for Residential and Commercial Properties – DEQ Version - redline/strikeout
Site-Wide Information
Task I - Indoor Air Investigation
Indoor Air Mitigation System Work Scope Statement and Project Manual for 1104 East Gallatin Street, Livingston
Site-Wide Information
Task I - Indoor Air Investigation
Work Scope Statement for project site at 1104 E Gallatin St - redline strikeout version
Site-Wide Information
Task I - Indoor Air Investigation
** DEQ Legal/Haque-Hausrath internal email & Allen Payne re: BN’s objections to Magistrates Findings
DEQ Legal/ Haque-Hausrath
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Data Usability Assessment for March 2010 Soil Gas & Ambient Air sampling
Site-Wide Information
Task I - Indoor Air Investigation
BN LIVINGSTON 8/26/13
Page 145 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 RD/RA Task I 2010 Soil Gas/Indoor Air Data Summary Report 06/24/10 KJ
13 01 11 10 RD/RA 07/01/10 DEQ
13 01 11 10 RD/RA 2010 Occupied Dwelling Questionnaires – attachment B
13 01 11 10 RD/RA
13 01 11 10 RD/RA 03/22/11
13 01 11 10 RD/RA 03/22/11
13 01 11 10 RD/RA Field Oversight Report 3/29-4/4/11 CDM
13 01 11 10 RD/RA 04/29/11 DEQ/ Reynolds
13 01 11 10 CD RD/RA 05/19/11 DEQ
13 01 11 10 RD/RA 05/25/11 DEQ/ Reynolds
13 01 11 10 RD/RA 08/05/11 GSI/CTEH
13 01 11 10 RD/RA 02/01/12 KJ
13 01 11 10 RD/RA 02/02/12 KJ/Adlersley
13 01 11 10 01 CD RD/RA 03/01/05 KJ
13 01 11 10 01 RD/RA K/J email to DEQ re: Indoor Air discussion topics 02/24/05 KJ
13 01 11 10 01 RD/RA DEQ internal emails re: J-E Model 02/25/05 DEQ
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
Task I Indoor Air Mitigation Plan for Residential and Commercial Properties – DEQ Version (Updated July 2010)
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
2010 Lab Analytical Reports & Chain of Custody Documentation – Attachment C
Site-Wide Information
Task I - Indoor Air Investigation
DEQ Legal/Haque-Hausrath internal memorandum re: Filing of confidential documents
DEQ Legal/ Haque-Hausrath
Site-Wide Information
Task I - Indoor Air Investigation
DEQ Legal/Haque-Hausrath internal memorandum re: Filing of confidential documents
DEQ Legal/ Haque-Hausrath
Site-Wide Information
Task I - Indoor Air Investigation
Site-Wide Information
Task I - Indoor Air Investigation
DEQ/Reynolds letter to BN/Smith re:Task I Indoor Air Mitigation Plan for Residential and Commercial Properties
Site-Wide Information
Task I - Indoor Air Investigation
Task I Indoor Air Mitigation Plan for Residential and Commercial Properties - DEQ Version N0. 2
Site-Wide Information
Task I - Indoor Air Investigation
DEQ/Reynolds letter to BN/Smith re: May 2011 Task I Indoor Air Mitigation Plan for Residential and Commercial Properties – DEQ Version #2
Site-Wide Information
Task I - Indoor Air Investigation
Identification & Removal of Indoor Sources of PCE & TCE - BN Vapor Intrusion Investigation: March-April 2011
Site-Wide Information
Task I - Indoor Air Investigation
Tech Memo - Work Scope Statement & Project Manual for 1500 East Park Street
Site-Wide Information
Task I - Indoor Air Investigation
KJ/Aldersley email to DEQ/Reynolds re: Work Scope Statement & Project Manual for 1500 East Park Street sent in mail 2/1/12
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
BN LIVINGSTON 8/26/13
Page 146 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 RD/RA Scoping Meeting minutes 02/28/05
13 01 11 10 01 RD/RA K/J email to DEQ re: J-E Model input values 04/07/05 KJ
13 01 11 10 01 RD/RA DEQ internal email re: Risk calcs in Work Plan 04/14/05 DEQ internal
13 01 11 10 01 RD/RA 04/18/05 DEQ internal
13 01 11 10 01 RD/RA DEQ letter to BN re: Comments form Indoor Air Work Plan 04/29/05 DEQ
13 01 11 10 01 RD/RA DEQ email to BN re: Indoor Air Work Plan Comments 04/29/05 DEQ
13 01 11 10 01 RD/RA Suggested Operating Procedure Sub-slab Soil Gas Monitoring 05/11/05
13 01 11 10 01 RD/RA DEQ email to BN re: Outstanding issues 05/17/05 DEQ
13 01 11 10 01 RD/RA Inside EPA article re: Indoor Air 05/17/05 EPA
13 01 11 10 01 RD/RA DEQ letter to BN re: Follow up to comments 05/19/05 DEQ
13 01 11 10 01 RD/RA DEQ internal email re: ERCLs language in work plan 5/24/05 DEQ internal
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
DEQ internal emails re: March 2005 EPA Risk Guidance - Carcinogens
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
BN LIVINGSTON 8/26/13
Page 147 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 RD/RA Revised SI Work Plan for Indoor Air w/transmittal letter 06/10/05
13 01 11 10 01 CD RD/RA SI Work Plan for Indoor Air 6/05
13 01 11 10 01 RD/RA 07/01/05 DEQ
13 01 11 10 01 RD/RA DEQ transmittal to MSU Library re: Indoor Air Work Plan 07/05/05 DEQ
13 01 11 10 01 RD/RA 7/5/05 DEQ
13 01 11 10 01 RD/RA K/J email to DEQ re: Figures in PDF 07/06/05 KJ
13 01 11 10 01 RD/RA K/J email to DEQ re: Indoor air/crawl spaces 7/8/05 KJ
13 01 11 10 01 RD/RA K/J email to DEQ re: ROD ERCL 07/21/05 KJ
13 01 11 10 01 RD/RA DEQ email to BNSF re: DEQ TEC Isopleth map 8/10/05 DEQ
13 01 11 10 01 RD/RA K/J transmittal to DEQ re: WP replacement pages 08/12/05 KJ
13 01 11 10 01 RD/RA DEQ letter/fax to BNSF re: Approval of Task I Work Plan 8/24/05 DEQ
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft DEQ letter to BN re: 2nd draft Task I Work Plan
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft DEQ transmittal to Livingston Library re: Indoor Air Work Plan
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
BN LIVINGSTON 8/26/13
Page 148 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 RD/RA KJ Letter to Evansons re: Indoor Air Sampling 09/28/05 KJ
13 01 11 10 01 RD/RA Access agreement for Livingston WWTP 10/25/05
13 01 11 10 01 RD/RA 11/14/05 KJ
13 01 11 10 01 RD/RA K/J letter to DEQ re: Request to proceed 11/15/05 KJ
13 01 11 10 01 RD/RA DEQ & K/J emails re: DEQ response to Request to proceed 11/22/05
13 01 11 10 01 RD/RA K/J email to DEQ re: Task I status - November 2005 11/28/05 KJ
13 01 11 10 01 RD/RA K/J email to DEQ re: Task I start confirmation 11/30/05 KJ
13 01 11 10 01 RD/RA DEQ/Keck Task I Field Notes DEQ/Keck
13 01 11 10 01 RD/RA Air Toxics Ltd Report 12/19/05 Air Toxics
13 01 11 10 01 RD/RA Air Toxics Ltd Report 12/19/05 Air Toxics
13 01 11 10 01 RD/RA Air Toxics Ltd Report 12/27/05 Air Toxics
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
K/J letter to DEQ re: Request for clarification of Task J Work Plan
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
12/12/05-12/16/05
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
BN LIVINGSTON 8/26/13
Page 149 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 RD/RA K/J email to DEQ re: BG 29 information 1/24/06 KJ
13 01 11 10 01 RD/RA K/J email to DEQ re: Task I Sample locations 02/03/06 KJ
13 01 11 10 01 RD/RA DEQ internal email re: K/J phone log re: Task I Scheduling 2/22/06 DEQ internal
13 01 11 10 01 RD/RA K/J email to DEQ re: 05-S-99 resident status 02/23/06 KJ
13 01 11 10 01 RD/RA DEQ internal email & BN re: Task I Addendum # 1 recap 02/24/06 DEQ internal
13 01 11 10 01 RD/RA DEQ email to K/J re: Task I Amendments outline 2/27/06 DEQ
13 01 11 10 01 RD/RA DEQ email to K/J, BN, & internal re: Task I amendment recap 02/27/06 DEQ
13 01 11 10 01 RD/RA DEQ internal email re: Task I Amendment 2/27/06 DEQ internal
13 01 11 10 01 RD/RA K/J email to DEQ re: Addendum 1 contractor 2/27/06 KJ
13 01 11 10 01 RD/RA K/J email to DEQ re: Addendum # 1 outline draft 02/27/06 KJ
13 01 11 10 01 RD/RA 2/27/06 DEQ
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
DEQ email to K/J, BN & internal re: Task I addendum 1 meeting recap
BN LIVINGSTON 8/26/13
Page 150 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 RD/RA DEQ email to BN re: Task I amendment recap 2/28/06 DEQ
13 01 11 10 01 RD/RA Y ** DEQ internal email re: Task I Sampling 2/28/06 DEQ internal
13 01 11 10 01 RD/RA DEQ email to BN re: Task I Addendum # 1 clarification 2/28/06 DEQ
13 01 11 10 01 CD RM 11 RD/RA Addendum #1 to Final Task I SI Work Plan for Indoor Air 03/17/06 KJ
13 01 11 10 01 RD/RA Addendum #1 to Final Task I SI Work Plan for Indoor Air 03/06/11 DEQ
13 01 11 10 01 RD/RA DEQ
13 01 11 10 01 RD/RA CDM Field Investigation Notes 04/05/06 CDM
13 01 11 10 01 RD/RA H&P/KJ Data Report 4/25/06
13 01 11 10 01 RD/RA 5/9/06 KJ
13 01 11 10 01 RD/RA 05/23/06 J Jones
13 01 11 10 01 RD/RA K/J email to DEQ re: Task I contacts 05/25/06 KJ
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Task I Field Notes & Activities Reports book – J Keck & A Reynolds
3/5/06 – 3/18/09
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Tech Memo – Analytical Results for Soil Gas, Flux Chamber, and Indoor Air Samples
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Phone Log – J Jones to DEQ re: Vapor sampling results & contact name
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
BN LIVINGSTON 8/26/13
Page 151 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 RD/RA 05/26/06 CDM
13 01 11 10 01 RD/RA DEQ letter to K/J re: Task I Technical discussion 6/9/06 DEQ
13 01 11 10 01 RD/RA CDM & K/J emails re: TO 15 data 06/19/06
13 01 11 10 01 RM 11 RD/RA Forward Planning for Task I: Indoor Air Investigations 06/26/06 CDM
13 01 11 10 01 RD/RA 06/27/06 KJ
13 01 11 10 01 RD/RA H&P email to K/J re: TO – 15 06/29/06 H&P
13 01 11 10 01 RD/RA 07/11/06 S Briggs
13 01 11 10 01 RD/RA 07/11/06 DEQ internal
13 01 11 10 01 RD/RA H&P, CDM & K/J emails re: Revised final TO-15 reports 07/13/06
13 01 11 10 01 RD/RA
13 01 11 10 01 RD/RA 08/06/11 H&P
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Letter Report: Field Oversight and Data Evaluation for Sub-slab Soil Gas and Indoor Air Sampling
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft K/J email to CDM re: Additional TO 15 Data for Task I – status
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Phone Log – S Briggs/Livingston WWTP to DEQ re: Inquiring about vapor intrusion results
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
DEQ internal email re: Livingston Waste Water Treatment Plant (WWTP)
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Design & Installation of a Home Radon Reduction System Handbook
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Vapor Monitoring Wells/Implants SOP (for vapor intrusion applications (revised)
BN LIVINGSTON 8/26/13
Page 152 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 RD/RA Phone Log – J Jones to DEQ re: Sampling results request 8/7/06 J Jones
13 01 11 10 01 RD/RA DEQ email to K/J re: sampling question 08/07/06 DEQ
13 01 11 10 01 RD/RA Phone Log – K/J to DEQ re: Response to sampling question 08/07/06 KJ
13 01 11 10 01 RD/RA CDM email to DEQ re: Redline version of DEQ’s 8/15/06 letter 8/15/06 CDM
13 01 11 10 01 RD/RA BNSF letter to DEQ re: Livingston Community Relations Plan 08/17/06 BN
13 01 11 10 01 RD/RA 09/14/06 DEQ
13 01 11 10 01 RD/RA K/J letter to DEQ re: Follow up to 9/21/06 meeting 09/22/06 KJ
13 01 11 10 01 RD/RA RTI & DEQ emails re: Task I Tech Memo 09/22/06
13 01 11 10 01 RD/RA CDM & DEQ emails re: Task I HAPSITE use 09/28/06
13 01 11 10 01 RD/RA 09/28/06
13 01 11 10 01 RD/RA CDM & DEQ emails re: Background sampling location 09/29/06
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
DEQ letter to BNSF re: Task I- Supplemental Indoor Air Investigations
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
DEQ & K/J emails re: Follow up to Task I discussion during 9/21/06 meeting
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
BN LIVINGSTON 8/26/13
Page 153 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 RD/RA DEQ & K/J emails re: Distribution of copies of reports 10/12/06
13 01 11 10 01 RD/RA CDM letter to DEQ - H&P Mobile Geochemistry Lab data 10/12/06 CDM
13 01 11 10 01 RD/RA K/J email to DEQ re: Task I –Addendum 2 sent for delivery 10/16/06 KJ
13 01 11 10 01 RD/RA 10/16/06 KJ
13 01 11 10 01 RD/RA 10/25/06 KJ
13 01 11 10 01 RD/RA 10/26/06
13 01 11 10 01 RD/RA 10/27/06
13 01 11 10 01 RD/RA 11/01/06 DEQ internal
13 01 11 10 01 RD/RA K/J email to DEQ re: Task I addendum no. 1 11/1/06 KJ
13 01 11 10 01 RD/RA DEQ letter to RTI re: BNSF Tech Memo April 2006 11/06/06 DEQ
13 01 11 10 01 RD/RA 11/02/06 DEQ
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Draft Addendum No 2 to Final Task I Supplemental Investigation Work Plan for Indoor Air
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
K/J email to DEQ re: Updated Draft Mitigation Design Development Plan
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
CDM & DEQ emails re: Updated Draft Mitigation Design Development Plan
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
K/J & DEQ emails re: Updated Draft Mitigation Design Development Plan
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
DEQ internal email re: Task I results letter regarding MRL’s shops
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Returned DEQ letter to Aza Ziegler re: 4/16/06 indoor air samples
BN LIVINGSTON 8/26/13
Page 154 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 RD/RA 11/14/06 DEQ
13 01 11 10 01 CD RM 11 RD/RA 11/16/06 KJ
13 01 11 10 01 RD/RA K/J fax to DEQ re: Task I Report 11/16/06 KJ
13 01 11 10 01 RD/RA DEQ email to K/J re: Task I attachments 11/17/06 DEQ
13 01 11 10 01 RD/RA 11/17/06
13 01 11 10 01 RD/RA 11/21/06
13 01 11 10 01 RD/RA DEQ & K/J emails re: SVE information 12/28/06
13 01 11 10 01 RD/RA DEQ & K/J emails re: SVE well logs 01/02/07
13 01 11 10 01 RD/RA 1/3/07 CDM
13 01 11 10 01 RD/RA 1/10/07 KJ
13 01 11 10 01 RD/RA DEQ & CDM emails re: Revised Mitigation Plan 01/15/07
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
DEQ letter to BNSF w/copy of DEQs redline/strikeout version of Addendum #2 to Final Task I Supplemental Investigation Work Plan for Indoor Air
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Task I : Draft Mitigation Design Development Plan – Shop Complex
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
DEQ & K/J emails re: Draft Mitigation Design Development Plan – e-files
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
DEQ & K/J emails re: Draft Mitigation Design Development Plan – e-files
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
CDM letter to DEQ w/Redline Revisions to Addendum No 2 to Final Task I Supplemental Investigation Work Plan for Indoor Air
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
K/J letter to DEQ re: May 26, 2006 Task I letter report by CDM
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
BN LIVINGSTON 8/26/13
Page 155 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 RD/RA 01/19/07 DEQ
13 01 11 10 01 RD/RA DEQ & CDM emails re: Sub-slab sampling 01/22/07
13 01 11 10 01 CD RM 12 RD/RA 01/29/07 DEQ
13 01 11 10 01 RD/RA CDM email to DEQ re: Revised Mitigation Plan 01/25/07 CDM
13 01 11 10 01 RD/RA CDM email to DEQ re: HP Labs SOP 01/26/07 CDM
13 01 11 10 01 RD/RA CDM letter to DEQ re: Response to KJ letter of 1/10/07 01/30/07 CDM
13 01 11 10 01 RD/RA DEQ letter to BNSF re: Approval of Addendum No 2 02/05/07 DEQ
13 01 11 10 01 RD/RA DEQ letter to KJ re: Response to KJ comments of 1/10/07 02/07/07 DEQ
13 01 11 10 01 RD/RA 02/14/07 DEQ
13 01 11 10 01 RD/RA Redline version Draft Mitigation Design Development Plan 03/01/07
13 01 11 10 01 CD RM 12 RD/RA 03/14/07 DEQ
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
DEQ letter to KJ re: Addendum No 2 to Final Task I Supplemental Investigation Work Plan for Indoor Air and 12/6/06 Summary of 11/27/06 Meeting
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Addendum No 2 to Final Task I Supplemental Investigation WP for Indoor Air, with replacement pages from 4/19/2007
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
DEQ letter to KJ re: November 2006 Task I Draft Mitigation Design Development Plan
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Task I Mitigation Design Development Plan (DEQ version, signed original w/CD), replacement pages from 4/19/2007 included
BN LIVINGSTON 8/26/13
Page 156 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 RD/RA K/J letter to DEQ re: Addendum No 2 to Final Task I 03/29/07 KJ
13 01 11 10 01 RD/RA DEQ email to K/J re: Task I Mitigation Plan e- files 04/11/07 DEQ
13 01 11 10 01 RD/RA 04/11/07 DEQ
13 01 11 10 01 RM 12 RD/RA 04/19/07 KJ
13 01 11 10 01 RD/RA 04/30/07 KJ
13 01 11 10 01 RD/RA 04/30/07 KJ
13 01 11 10 01 RD/RA CDM letter to DEQ re: Response to 3/29/07 KJ letter CDM
13 01 11 10 01 RD/RA 05/06/07 BN
13 01 11 10 01 RD/RA Air Toxics altitude correction info 05/01/07 Air Toxics
13 01 11 10 01 RD/RA H&P sampling results 06/27/07 H&P
13 01 11 10 01 RD/RA Task I LS&ES Mitigation Planning Documents 06/29/07
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
DEQ letter to KJ re: 3/16/07 Task I: Revised Mitigation Design Development Plan
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft K/J letter to DEQ re: Addendum No 2 to Final Task I
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
K/J letter to Christopher & Adrian Beyer re: Consent to sample indoor air & sub slab soil
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
K/J letter to J Long re: : Consent to sample indoor air & sub slab soil
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
BN letter to DEQ re: Task I – PRP’s Source Information from BNSF
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
BN LIVINGSTON 8/26/13
Page 157 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 RD/RA Photo of intent to demolish NE-2 (7/2007) 07/01/07
13 01 11 10 01 RD/RA CDM letter to DEQ re: Forward Planning for Task I 09/18/07 CDM
13 01 11 10 01 RM 12 RD/RA Draft Task I Design Development Report 10/01/07 KJ
13 01 11 10 01 RD/RA DEQ letter to BNSF re: Response to 3/29/07 K/J letter 10/25/07 DEQ
13 01 11 10 01 RD/RA 12/12/07 BN
13 01 11 10 01 RD/RA 01/18/08 KJ
13 01 11 10 01 RD/RA C Boehm letter to DEQ re: Indoor air testing 01/30/08 C Boehm
13 01 11 10 01 RD/RA DEQ letter to C Boehm re: Indoor air sampling 02/07/08 DEQ
13 01 11 10 01 RD/RA 02/22/08 KJ
13 01 11 10 01 RD/RA 02/22/08 KJ
13 01 11 10 01 RD/RA DEQ File Memo re: Justification for laboratory services 02/22/08 DEQ
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
BNSF letter to DEQ re: Request for additional indoor air investigations (12/12/07)
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
K/J letter to DEQ re: DEQ request for Additional Indoor Air Investigation
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
K/J letter to D Kellem re: Indoor air and soil gas sample collection and analysis
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
K/J letter to P Gunness re: Indoor air and soil gas sample collection and analysis
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
BN LIVINGSTON 8/26/13
Page 158 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 RD/RA 03/01/08
13 01 11 10 01 RD/RA S Briggs Letter to DEQ re: Water usage 03/06/08 S Briggs
13 01 11 10 01 RD/RA DEQ/CDM emails re: Invoices for BN 4/2-4/3/08
13 01 11 10 01 RD/RA Columbia Analytical Services lab report Task I 05/29/08
13 01 11 10 01 RD/RA Task I Sampling Oversight Report 05/30/08 CDM
13 01 11 10 01 RD/RA Task I source info from BNSF 05/06/08 BN
13 01 11 10 01 RD/RA BKBH letter to DEQ Legal re: BNSF Purchased Properties 06/20/08 BKBH
13 01 11 10 01 RD/RA 12/18/08 DEQ
13 01 11 10 01 RD/RA CDM letter to DEQ re: Winter 2009 Forward Planning 12/18/08 CDM
13 01 11 10 01 RD/RA BNSF letter to DEQ re: BNSF response to DEQ request 01/14/09 BN
13 01 11 10 01 RD/RA CDM email to DEQ re: Radon text 01/16/09 CDM
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Data Usability Assessment for March 2008 Soil Gas & Indoor Air Sampling Task I Addendum # 2
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Columbia Analytical
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
DEQ letter to BNSF re: Task I Request for Additional Investigation
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
BN LIVINGSTON 8/26/13
Page 159 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 RD/RA 01/21/09 DEQ
13 01 11 10 01 CD RM 12 RD/RA 02/03/09 KJ
13 01 11 10 01 RD/RA DEQ letter to BNSF re: Task I source info response 02/04/09 DEQ
13 01 11 10 01 CD RM 12 RD/RA Task I Field Activities Report 2/11-2/13/09 03/06/09 CDM
13 01 11 10 01 CD RD/RA Task I Field Activities Report 3/2-3/3/09 03/13/09 CDM
13 01 11 10 01 RD/RA 3/5-3/18/09 DEQ
13 01 11 10 01 RD/RA Task I Field Activities Report 3/19-3/20/09, 4/6/09 & 4/15/09 05/12/09 CDM
13 01 11 10 01 RM 12 RD/RA 06/12/09 KJ
13 01 11 10 01 RD/RA 06/19/09 CDM/Hills
13 01 11 10 01 RD/RA Site Oversight Report for 107 South G Street 06/24/09 CDM
13 01 11 10 01 RD/RA 06/25/09 CDM/Hills
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft DEQ letter to BNSF re: DEQ response regarding radon analysis
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Task I Indoor Air Mitigation Plan for Residential and Commercial Properties
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Task I Field Notes & Activities Reports book – J Keck & A Reynolds
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Task I Supplemental Investigation Report – BN Shop Complex
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
CDM/Hills cover letter to DEQ/Reynolds re: Draft Indoor Air, Sub-slab Soil Gas and Ambient Air Data Tables for Task I
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
CDM/Hills cover letter to DEQ/Reynolds re: Draft Non-Target Analyte Report for Task I
BN LIVINGSTON 8/26/13
Page 160 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 RD/RA 09/14/09 CDM/Hills
13 01 11 10 01 RD/RA 09/16/09 DEQ/ Reynolds
13 01 11 10 01 RD/RA 10/08/09 DEQ/ Reynolds
13 01 11 10 01 RD/RA 10/08/09 DEQ/ Reynolds
13 01 11 10 01 RD/RA BN Livingston 2005-2009 Target Analyte Report 10/20/09
13 01 11 10 01 RD/RA 12/04/09 DEQ/ Reynolds
13 01 11 10 01 RD/RA 02/02/10 K&L Gates
13 01 11 10 01 RD/RA 2005-2009 Commercial Analyte Report 02/11/10 BN
13 01 11 10 01 RD/RA 02/18/10 KJ/Norris
13 01 11 10 01 RD/RA Site Oversight Report Task I Oversight of indoor air sampling 3/8-3/31/10 CDM/ Woodward
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
CDM/Hills letter to DEQ/Reynolds re: Attachment - Example figures to Supplement Task I Property Owner Letters
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
DEQ/Reynolds letter to BN/Smith re: Calculation of Proposed Site-Specific Cleanup Levels for Indoor Air BN Shop Complex
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
DEQ/Reynolds letter to BN/Smith re: February 2009 Task I Indoor Air Mitigation Plan for Residential & Commercial Properties-BN Shop Complex, June 4, 2009 Work Scope Statement for Project Site at 1104 E Gallatin St and May 2009 Project Manual Including Specifications for Indoor Air Mitigation System at 1104 E Gallatin St (redline version)
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
DEQ/Reynolds letter to BN/Smith re: February 2009 Task I Indoor Air Mitigation Plan for Residential & Commercial Properties-BN Shop Complex, June 4, 2009 Work Scope Statement for Project Site at 1104 E Gallatin St and May 2009 Project Manual Including Specifications for Indoor Air Mitigation System at 1104 E Gallatin St
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
DEQ/Reynolds letter to BN/Smith re: BN Comments on September 2009 “Final Draft Task I RA Amendment and DEQ Quality Approved Remedy for Newly Identified Contaminants of Concern in Indoor Air”
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
K&L Gates/Lawrence letter to DEQ/Reynolds re: BN’s Proposed Indoor Air Mitigation System for 1104 E Gallatin St
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
K/J/Norris email to DEQ/Reynolds re: Working Draft BN Shop Complex Indoor Air Mitigation Guide Specifications
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
BN LIVINGSTON 8/26/13
Page 161 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 RD/RA Confirmation of sample receipt 03/10/10 CAS
13 01 11 10 01 CD RD/RA 03/10/10 KJ/Norris
13 01 11 10 01 RD/RA 03/15/10 KJ/Norris
13 01 11 10 01 RD/RA 3/18-3/24/10
13 01 11 10 01 CD RD/RA 03/26/10 CDM/Pozega
13 01 11 10 01 RD/RA Confirmation of sample receipt 03/26/10 CAS
13 01 11 10 01 RD/RA Confirmation of sample receipt 03/26/10 CAS
13 01 11 10 01 RD/RA Confirmation of sample receipt 03/26/10 CAS
13 01 11 10 01 RD/RA Confirmation of sample receipt 03/30/10 CAS
13 01 11 10 01 RD/RA Confirmation of sample receipt 03/30/10 CAS
13 01 11 10 01 CD RD/RA 04/02/10 CDM/ Pozega
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
K/J/Norris transmittal to DEQ/Reynolds re: CD containing Task I EDDs
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
K/J/Norris email to DEQ/Reynolds re: BN Shop Complex – Indoor Air Mitigation Guide Specifications- Attachments - BN Memo 030110
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
DEQ/Reynolds & K/J/Norris emails re: BN Shop Complex – Indoor Air Mitigation Guide Specifications
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
CDM/Pozega cover letter to DEQ/Reynolds re: CD with electronic files for Task I letter packages (13) on CD
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
CDM/Pozega cover letter to DEQ/Reynolds re: CD with electronic files for Task I letter packages (19) on CD
BN LIVINGSTON 8/26/13
Page 162 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 RD/RA Confirmation of sample receipt 04/02/10 CAS
13 01 11 10 01 RD/RA 04/06/10 CAS/ Aguilera
13 01 11 10 01 CD RD/RA 04/09/10 CDM/ Pozega
13 01 11 10 01 RD/RA 04/09/10 CAS/ Aguilera
13 01 11 10 01 RD/RA 04/09/10 CAS/ Aguilera
13 01 11 10 01 CD RD/RA 04/16/10 CDM/ Pozega
13 01 11 10 01 CD RD/RA 04/23/10 CDM/ Pozega
13 01 11 10 01 CD RD/RA 05/03/10 CDM/ Pozega
13 01 11 10 01 RD/RA Residential & Commercial Mitigation Plan Replacement pages 07/21/10
13 01 11 10 01 RD/RA 08/05/10 K&L Gates
13 01 11 10 01 RD/RA 03/04/11 DEQ/ Reynolds
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
CAS/Aguilera letter report to DEQ/Reynolds re: Lab results for samples submitted on 3/23/10
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
CDM/Pozega cover letter to DEQ/Reynolds re: CD with electronic files for Task I letter packages (13) on CD
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
CAS/Aguilera letter report to DEQ/Reynolds re: Lab results for samples submitted on 3/26/10
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
CAS/Aguilera letter report to DEQ/Reynolds re: Lab results for samples submitted on 3/23/10
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
CDM/Pozega cover letter to DEQ/Reynolds re: CD with electronic files for Task I vapor intrusion letter packages (21) on CD
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
CDM/Pozega cover letter to DEQ/Reynolds re: CD with electronic files for Task I vapor intrusion letter packages (20) on CD
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
CDM/Pozega cover letter to DEQ/Reynolds re: CD with electronic files for Task I vapor intrusion letter packages (16) on CD
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
K&L Gates letter to DEQ/Reynolds re: BN’s Supplemental Indoor Sampling for Purpose of Litigation
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
DEQ/Reynolds letter/fax to BNSF/Smith re: Interim Task I Risk Assessment Amendment NO. 2 and Request for Additional Indoor Air & Soil Gas Sampling
BN LIVINGSTON 8/26/13
Page 163 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 RD/RA 03/11/11 DEQ/ Reynolds
13 01 11 10 01 RD/RA 03/14/11 KJ/Norris
13 01 11 10 01 RD/RA 03/17/11 DEQ/ Reynolds
13 01 11 10 01 RD/RA 3/21-3/22/11
13 01 11 10 01 RD/RA 2011 VI sampling schedule 03/22/11
13 01 11 10 01 RD/RA 04/11/11 CAS/ Aguilera
13 01 11 10 01 RD/RA 10/06/11 KJ/ Peterson
13 01 11 10 01 RD/RA 02/01/12 KJ/Norris
13 01 11 10 01 RM 10 RD/RA 02/01/12 KJ/Dunning
13 01 11 10 01 01 RD/RA
13 01 11 10 01 01 RM 10 RD/RA 05/17/06 Miki Renick
13 01 11 10 01 01 RM 10 RD/RA 05/24/06 Dave Amsk
13 01 11 10 01 01 RM 10 RD/RA 6/12/06 Carter Boehm
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
DEQ/Reynolds letter to BN/Smith re: DEQ Decision Making Process and Task I Requirements
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
K/J/Norris email to DEQ/Reynolds re: Additional indoor air & soil gas sampling
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
DEQ/Reynold email to K/J/Norris re: Additional indoor air and soil gas sampling
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
DEQ/Reynolds & K/J/Norris emails re: Clarification for HAPSITE sampling
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
CAS/Aguilera email to DEQ/Reynolds re: Sample confirmation from Columbia Analytical
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
KJ/Peterson letter to MRL R Gustin re: Indoor air/subslab soil gas sampling at Livingston shop buildings
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
KJ/Norris cover letter for Work Scope Statement & Project Manal for Project Site - 1500 East Park Street
Site-Wide Information
Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft
KJ/Tech Memo to Olympus re: Work Scope Statement & Project Manal for Project Site - 1500 East Park Street
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Miki Renick to DEQ re: MS Renick would like to be kept informed regarding the vapor sampling conducted on her property
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Dave Amsk to DEQ re: Info request about any investigation in the area near the radio station out by the river
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Carter Boehm to DEQ re: Info request about indoor air quality sampling at Talgo property
BN LIVINGSTON 8/26/13
Page 164 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 01 RM 10 RD/RA DEQ/KJ/MRL re: H&P Data 09/06/06
13 01 11 10 01 01 RM 10 RD/RA 9/18/06 Evan Russell
13 01 11 10 01 01 RM 10 RD/RA DEQ, CDM, & K/J re: Task I Mitigation Plan conference call 2/28/07
13 01 11 10 01 01 RM 10 RD/RA DEQ & C Boehm re: Task I sampling access 03/12/07
13 01 11 10 01 01 RM 10 RD/RA DEQ & K/J re: Task I Miscellaneous 05/10/07
13 01 11 10 01 01 RM 10 RD/RA DEQ/Sally Dahl re: Sampling 12/03/07
13 01 11 10 01 01 RM 10 RD/RA DEQ & H Schuver/EPA re: Attenuation Factor 01/24/08
13 01 11 10 01 01 RM 10 RD/RA DEQ & Helen Dawson/EPA re: Attenuation Factor 01/24/08
13 01 11 10 01 01 RM 10 RD/RA DEQ & H Schuver re: VI in Livingston 04/18/08
13 01 11 10 01 01 RM 10 RD/RA DEQ & H Dawson re: Billings PCE 04/25/08
13 01 11 10 01 01 RM 10 RD/RA DEQ/Reynolds conference call re: ATDSR call notes 4/30/08 DEQ/ Reynolds
13 01 11 10 01 01 RM 10 RD/RA 05/15/08
13 01 11 10 01 01 RM 10 RD/RA DEQ & K/J re: Task F Part 2 Work Plan 05/20/08
13 01 11 10 01 01 RM 10 RD/RA 05/28/08
13 01 11 10 01 01 RM 10 RD/RA DEQ/KJ re: Task I 07/02/08
13 01 11 10 01 01 RM 10 RD/RA Phone Log DEQ & J Mack re: Vapor sampling 7/24/08
13 01 11 10 01 01 RM 10 RD/RA Phone Log R Klumpers & DEQ re: Vapor sampling 8/26/08
13 01 11 10 01 01 RM 10 RD/RA 12/16/08
13 01 11 10 01 01 RM 10 RD/RA Phone Log – DEQ & C Rody re: Info request 1/21/09
13 01 11 10 01 01 RM 10 RD/RA Phone Log – DEQ & J Revoir re: Task I sampling 01/27/09
13 01 11 10 01 01 RM 10 RD/RA 3/3/09
13 01 11 10 01 01 RM 10 RD/RA DEQ/Seyler notes on 107 S. G Street vapor complaint 04/03/09 DEQ/Seyler
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Evan Russell to DEQ re: C Boehm’s nephew – info about indoor air vapor sampling
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Phone Log – DEQ/Reynolds & ATSDR/D Strausbaugh re: Request for petition ATSDR involvement
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
DEQ & Julie McGarry re: Request for air sampling results for Hendricksons/Rainbow Motel
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Phone Log DEQ/H Harper and B Ebinger re: Vapor intrusion issues
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Phone Log – DEQ/Reynolds and Mrs. Zallinger/resident re: Interested in having her home sampled
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
BN LIVINGSTON 8/26/13
Page 165 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 01 RM 10 RD/RA Phone Log - DEQ/Fry notes re: Mrs. Kautzman 04/10/09 DEQ/Fry
13 01 11 10 01 01 RM 10 RD/RA 4/28/09 DEQ/Reynolds
13 01 11 10 01 01 RM 10 RD/RA DEQ/Reynolds email to BN/Terry re: BNSF Contact 05/29/09 DEQ/Reynolds
13 01 11 10 01 01 RM 10 RD/RA 6/26/09 DEQ/Reynolds
13 01 11 10 01 01 RM 10 RD/RA 07/24/09 DEQ/Reynolds
13 01 11 10 01 01 RM 10 RD/RA 8/12-8/14/09
13 01 11 10 01 01 RM 10 RD/RA 08/13/09
13 01 11 10 01 01 RM 10 RD/RA 8/3/11
13 01 11 10 01 02 RD/RA
13 01 11 10 01 02 RM 10 RD/RA 4/3/06
13 01 11 10 01 02 RM 10 RD/RA 5/9/06 KJ
13 01 11 10 01 02 RM 10 RD/RA 5/9/06-5/10/06
13 01 11 10 01 02 RM 10 RD/RA DEQ internal emails re: Contamination DEQ internal
13 01 11 10 01 02 RM 10 RD/RA BNSF email to DEQ re: 6/16 conference call 6/15/06 BN
13 01 11 10 01 02 RM 10 RD/RA DEQ email to CDM re: Screen Process Response 6/16/06 DEQ
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Livingston screening levels 6/23/06
13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Task I forward planning letter 6/27/06 CDM
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Task I forward planning letter 6/27/06
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Task I 7/6/06
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: TO-15 data
13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Task I comments 8/24/06 CDM
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
DEQ/Reynolds fax to Ernie Meador re: Indoor, subslab & outdoor sample results for the Pinar/Kusberin (sp?) property
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
DEQ/Reynolds note re: Discussed Air Toxics LTD Data results with Frank O’Connor
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
DEQ/Reynolds email to Riley Fox re: Results of air samples collected at property
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
DEQ/Reynolds & Austin O’Dea/Fisheries Biologist emails re: Concern about toxins in new home
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
DEQ/Reynolds internal email re: BN petition for ATDSR review of indoor air data
DEQ/Reynolds internal
Site-Wide Information
Task I – Phone Logs (5/06 to Present)
Phone Log – N Chowen & M Scott to DEQ re: Concerns about home at 226 South M Street
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Park Co Environmental Council/RTI emails re: Friday 4/7/06 meeting
Site-Wide Information
Task I – Emails (4/06 to Present)
KJ transmittal notice: Technical Memo including preliminary analytical results for soil gas, flux chamber, and indoor air sampling conducted 4/06
Site-Wide Information
Task I – Emails (4/06 to Present)
KJ/DEQ emails re: Livingston deliverable – Task I Addendum 1
Site-Wide Information
Task I – Emails (4/06 to Present)
5/16/06-5/19/06
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
7/14/06-7/18/06
Site-Wide Information
Task I – Emails (4/06 to Present)
BN LIVINGSTON 8/26/13
Page 166 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Soil vapor sampling 8/25/06 CDM
13 01 11 10 01 02 RM 10 RD/RA EPA/DEQ emails re: Soil vapor sampling
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: H&P data and 9/12/06 meeting 9/5/06-9/6/06
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Task I table with all analytes 9/11/06
13 01 11 10 01 02 RM 10 RD/RA CDM/KJ emails re: Task I site visit 09/22/06
13 01 11 10 01 02 RM 10 RD/RA DEQ email to BNSF and CDM re: Task I action items 09/22/06 DEQ
13 01 11 10 01 02 RM 10 RD/RA B Hartman/KJ emails re: Follow-up to Task I phone discussion 9/26/06
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Follow-up to Task I discussion 09/26/06
13 01 11 10 01 02 RM 10 RD/RA DEQ email to BNSF re: Follow-up to Task I discussion 09/26/06 DEQ
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Indoor air answers 10/13/06
13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: Task I work plan 10/13/06
13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Lab data 10/13/06 CDM
13 01 11 10 01 02 RM 10 RD/RA 10/25/06 RTI
13 01 11 10 01 02 RM 10 RD/RA KJ/BNSF/DEQ emails re: DEQ letters 11/10/06
13 01 11 10 01 02 RM 10 RD/RA KJ/CDM emails re: Task I Mitigation Plan 11/22/06
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Task I discussion 11/27/06 KJ
13 01 11 10 01 02 RM 10 RD/RA CDM emails re: TO-15 list 11/27/06 CDM
13 01 11 10 01 02 RM 10 RD/RA DEQ email to KJ/BNSF re: Initial follow-up on Task I meeting 11/28/06 DEQ
13 01 11 10 01 02 RM 10 RD/RA KJ/CDM emails re: August 2006 Hapsite 11/29/06
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Use of Hapsite or mobile lab 11/4/06 KJ
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Use of Hapsite or mobile lab
13 01 11 10 01 02 RM 10 RD/RA KJ/CDM emails re: Use of Hapsite or mobile lab
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
8/28/06-8/30/06
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
RTI email to DEQ re: Addendum 2 to Final Task I Supplemental Work Plan
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
12/4/06-12/5/06
Site-Wide Information
Task I – Emails (4/06 to Present)
12/4/06-12/5/06
BN LIVINGSTON 8/26/13
Page 167 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: Use of Hapsite or mobile lab
13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Draft soil gas/air sampling locations 12/7/06 CDM
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Conference call 12/07/06 KJ
13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Locomotive shop sampling locations 12/8/06 CDM
13 01 11 10 01 02 RM 10 RD/RA CDM emails re: Sampling locations for shop complex 12/8/06 CDM
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Addendum 2 modifications 12/18/06 KJ
13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: TO-15 sampling 12/11/06 CDM
13 01 11 10 01 02 RM 10 RD/RA DEQ email to CDM re: TO-15 sampling 12/11/06 DEQ
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Addendum 2 modifications 12/18/06
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Addendum 2 modifications
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: SVE information 12/19/06
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Addendum 2 modifications
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Addendum 2 modifications layout
13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: Addendum 2 modifications
13 01 11 10 01 02 RM 10 RD/RA DEQ email to CDM re: Sampling and Analysis Plan 1/10/07 DEQ
13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: KJ Task I letter 01/17/07 CDM
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Task I Addendum
13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Mitigation plan 01/18/07 CDM
13 01 11 10 01 02 RM 10 RD/RA DEQ email to KJ re: Resident with concerns 01/19/07 DEQ
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Addendum 2 01/19/07 KJ
13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: SSD reference document 01/22/07 CDM
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Canister cleaning (1/25/07) 01/25/07
Site-Wide Information
Task I – Emails (4/06 to Present)
12/4/06-12/6/06
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
12/18/06-12/19/06
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
12/18/06-12/27/06
Site-Wide Information
Task I – Emails (4/06 to Present)
12/18/06-12/27/06
Site-Wide Information
Task I – Emails (4/06 to Present)
12/18/06-1/2/07
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
1/17/07-1/18/07
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
BN LIVINGSTON 8/26/13
Page 168 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Task I mobile home location
13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: HP Labs SOPs 01/26/07 CDM
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Canister cleaning for Task I 01/26/07
13 01 11 10 01 02 RM 10 RD/RA DEQ email to KJ re: Task I issues 01/29/07 DEQ
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Addendum 2 deliverable 01/29/07 KJ
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Response to 1/10/07 KJ letter 01/31/07
13 01 11 10 01 02 RM 10 RD/RA CDM/BNSF/DEQ emails re: Dedicated flow controllers
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Addendum 2 pre-field activity 2/16/07 KJ
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Addendum 2 posted to website 02/21/07 KJ
13 01 11 10 01 02 RM 10 RD/RA DEQ email to CDM re: Mitigation plan 02/28/07 DEQ
13 01 11 10 01 02 RM 10 RD/RA CDM/KJ emails re: Task I phone call 03/01/07
13 01 11 10 01 02 RM 10 RD/RA CDM/KJ/DEQ emails re: Sampling access status 2/28/07-3/9/07
13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: Field activities schedule 3/20/07
13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: Livingston basements 3/26/07
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: BN Livingston
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Air sampling schedule 03/27/07 KJ
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Revised sampling schedule 03/29/07 KJ
13 01 11 10 01 02 RM 10 RD/RA CDM/KJ emails re: Air sampling
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Livingston basements
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: BNSF recommendations 03/29/07 KJ
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: BNSF recommendations
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: BNSF recommendations
Site-Wide Information
Task I – Emails (4/06 to Present)
1/25/07-1/26/07
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
2/14/07-2/15/07
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
3/26/07-3/27/07
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
3/28/07-3/29/07
Site-Wide Information
Task I – Emails (4/06 to Present)
3/26/07-3/29/07
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
3/29/07-3/30/07
Site-Wide Information
Task I – Emails (4/06 to Present)
3/29/07-3/30/07
BN LIVINGSTON 8/26/13
Page 169 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: BNSF recommendations
13 01 11 10 01 02 RM 10 RD/RA CDM emails re: Mitigation plan 03/30/07 CDM
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Indoor air sample costs 3/23/07-4/3/07
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Indoor air sample costs 3/23/07-4/3/07
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: SOP for soil gas sampling 4/5/07 KJ
13 01 11 10 01 02 RM 10 RD/RA KJ emails re: Addendum 2 activities update 04/09/07 KJ
13 01 11 10 01 02 RM 10 RD/RA 3/1/07-4/16/07
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Task I soil gas sampling
13 01 11 10 01 02 RM 10 RD/RA 04/26/07 KJ
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Analytical results posted to website 4/26/07 KJ
13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: EPA/OSHA indoor air issues article CDM
13 01 11 10 01 02 RM 10 RD/RA
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Task F/I well locations
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Institutional control for 405 North L St
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Analytical results posted to website 5/1/07 KJ
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Air summary table 5/8/07
13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Air summary data 05/10/07 CDM
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: More info on air summary table 05/10/07
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Mitigation plan 05/10/07
13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: Mitigation plan
13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Response to 3/29 KJ letter 05/11/07 CDM
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Relocating SGPs along Mainline
Site-Wide Information
Task I – Emails (4/06 to Present)
3/29/07-3/30/07
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
KJ/CDM/DEQ emails re: CAD file for the Task I Mitigation Plan
Site-Wide Information
Task I – Emails (4/06 to Present)
4/20/07-4/22/07
Site-Wide Information
Task I – Emails (4/06 to Present)
KJ email to DEQ re: Mitigation Design Development Plan posted to website
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
4/25/07-4/26/07
Site-Wide Information
Task I – Emails (4/06 to Present)
KJ/CDM/DEQ emails re: Analytical results posted to website and split sample results
4/26/07-4/27/07
Site-Wide Information
Task I – Emails (4/06 to Present)
4/27/07-4/30/07
Site-Wide Information
Task I – Emails (4/06 to Present)
4/26/07-5/1/07
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
5/10/07-5/11/07
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
5/11/07-5/14/07
BN LIVINGSTON 8/26/13
Page 170 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Mitigation plan
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Indoor air data
13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Indoor air sampling locations 05/14/07 CDM
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Analytical results posted to website 5/15/07 KJ
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Task I 05/18/07
13 01 11 10 01 02 RM 10 RD/RA
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Schedule for June 4-8
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Talgo shops letter 06/01/07
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Draft Talgo buildings letter 6/1/07-6/4/07
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Task I data posted to website 06/07/07 KJ
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Additional SVE testing 6/7/07 KJ
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Data for PCEC KJ
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Task I items posted to website 07/05/07 KJ
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Task I mitigation items posted to website 7/6/07 KJ
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Task I
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Task I
13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: WWTP
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Task I items posted to website 08/03/07 KJ
13 01 11 10 01 02 RM 10 RD/RA CDM emails re: Pages from analytical results tables 08/06/07 CDM
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Task I items posted to website 08/06/07 KJ
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: NE-16L duplicate 08/06/07 KJ
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Task I items posted to website 08/07/07 KJ
Site-Wide Information
Task I – Emails (4/06 to Present)
5/10/07-5/14/07
Site-Wide Information
Task I – Emails (4/06 to Present)
5/11/07-5/14/07
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
KJ/DEQ emails re: Proposed Task I Mitigation Design Development Plan soil sampling locations
5/23/07-5/24/07
Site-Wide Information
Task I – Emails (4/06 to Present)
5/29/07-5/30/07
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
6/18/07-6/20/07
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
6/29/07-7/10/07
Site-Wide Information
Task I – Emails (4/06 to Present)
6/29/07-7/10/07
Site-Wide Information
Task I – Emails (4/06 to Present)
7/26/07-7/31/07
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
BN LIVINGSTON 8/26/13
Page 171 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Data package 8/7/07-8/10/07
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Task I items posted to website 08/13/07 KJ
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Task I SGP logs posted to website 8/14/07 KJ
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Data package – altitude correction factor
13 01 11 10 01 02 RM 10 RD/RA 8/1/07-8/16/07 Iris Environmental
13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Recommended MUW wells for start-up 8/17/07 CDM
13 01 11 10 01 02 RM 10 RD/RA CDM emails re: Cinder pile inspection summary 7/2/07-8/18/07 CDM
13 01 11 10 01 02 RM 10 RD/RA KJ/CDM emails re: Indoor air sample 07-AS-ES-4 09/17/07
13 01 11 10 01 02 RM 10 RD/RA MT Rail/DEQ emails re: Wheel Shop 09/24/07
13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Profile sampling 10/09/07 CDM
13 01 11 10 01 02 RM 10 RD/RA 10/10/07 CDM
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Indoor air VOCs to remove
13 01 11 10 01 02 RM 10 RD/RA CDM emails re: Diffusion bag guidance 10/24/07 CDM
13 01 11 10 01 02 RM 10 RD/RA BNSF email to DEQ re: DEQ Task I letter of 10/25/07 11/05/07 BN
13 01 11 10 01 02 RM 10 RD/RA DEQ email to BNSF re: Task I extension 11/14/07 DEQ
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Indoor air VOCs to remove
13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: SGP data 11/27/07 CDM
13 01 11 10 01 02 RM 10 RD/RA S Dahl email to DEQ re: BN Update newsletter 11/28/07 S Dahl
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Due date for mitigation plans 11/30/07
13 01 11 10 01 02 RM 10 RD/RA 11/30/07 DEQ internal
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Task I mitigation plans 01/04/08
13 01 11 10 01 02 RM 10 RD/RA DEQ email to KJ re: #2 Rainbow Mobile Home Park 01/14/08 DEQ
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
8/0807-8/16/07
Site-Wide Information
Task I – Emails (4/06 to Present)
Iris Environmental/DEQ emails re: Altitude considerations and references
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
CDM email to DEQ re: Indoor air and soil gas probe COCs to remove
Site-Wide Information
Task I – Emails (4/06 to Present)
10/10/07-10/17/07
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
10/10/07-11/14/07
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ internal email to Director re: Vapor intrusion in Livingston
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
BN LIVINGSTON 8/26/13
Page 172 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Task I follow-up letter 1/18/08 KJ
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Task I comments
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Task I letter and other issues
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Bioventing startup modifications 1/24/08
13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: SGP-4 location
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: SGP-4 location
13 01 11 10 01 02 RM 10 RD/RA 01/29/08 DEQ
13 01 11 10 01 02 RM 10 RD/RA DEQ internal email re: Scheduling 01/29/08 DEQ internal
13 01 11 10 01 02 RM 10 RD/RA CDM/KJ/DEQ emails re: SGP-4 location w/pictures
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: SGP-4 location
13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Response to Boehm letter 02/06/08 CDM
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Sampling schedule 02/15/08 KJ
13 01 11 10 01 02 RM 10 RD/RA CDM email to Calscience re: Air sampling 02/20/08 CDM
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Price quote for Task I 2/21/08
13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Price quote from Columbia 02/22/08 CDM
13 01 11 10 01 02 RM 10 RD/RA Calscience/CDM/DEQ emails re: Air sampling
13 01 11 10 01 02 RM 10 RD/RA BKBH/KJ/DEQ emails re: Sampling 2/29/08-3/2/08
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Sampling 3/2/08 KJ
13 01 11 10 01 02 RM 10 RD/RA 03/11/08 KJ
13 01 11 10 01 02 RM 10 RD/RA Calscience/CDM emails re: Task I 03/12/08
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Items posted to website 3/17/08 KJ
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Final soil gas data 03/21/08 KJ
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
1/18/08-1/22/08
Site-Wide Information
Task I – Emails (4/06 to Present)
1/18/08-1/24/08
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
1/28/08-1/29/08
Site-Wide Information
Task I – Emails (4/06 to Present)
1/28/08-1/29/08
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ email to property owner re: Indoor air and subslab sampling
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
1/28/08-1/29/08
Site-Wide Information
Task I – Emails (4/06 to Present)
1/28/08-1/31/08
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
2/20/08-2/22/08
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
KJ email to DEQ re: Subslab soil gas results from Feb/Mar sampling
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
BN LIVINGSTON 8/26/13
Page 173 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Items posted to website 03/28/08 KJ
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Items posted to website
13 01 11 10 01 02 RM 10 RD/RA Calscience email to DEQ re: Invoices attached 4/2/08 Calscience
13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: Items posted to website
13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: Items posted to website
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Articles about TCE VI 04/09/08 KJ
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Notification of upcoming field activities 4/14/08 KJ
13 01 11 10 01 02 RM 10 RD/RA CDM emails to DEQ re: Indoor air/soil gas data CDM
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Work Order Directive 7
13 01 11 10 01 02 RM 10 RD/RA
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Task I
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Task I 4/23/08 KJ
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Summa canisters 04/23/08
13 01 11 10 01 02 RM 10 RD/RA Calscience/CDM emails re: Summa request 04/23/08
13 01 11 10 01 02 RM 10 RD/RA 04/25/08
13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Task I air and soil gas data 4/28/08 CDM
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Indoor air background concentrations 04/29/08 KJ
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Data quality assessment
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Air and soil gas data
13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: Indoor air background concentrations
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Request for Task I sample results 4/30/08 KJ
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Data quality 5/1/08-5/5/08
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
3/28/08-3/31/08
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
3/28/08-4/3/08
Site-Wide Information
Task I – Emails (4/06 to Present)
3/28/08-4/3/08
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
4/15/08-4/16/08
Site-Wide Information
Task I – Emails (4/06 to Present)
4/16/08-4/17/08
Site-Wide Information
Task I – Emails (4/06 to Present)
KJ/CDM/DEQ emails re: Notification of upcoming field activities
4/14/08-4/21/08
Site-Wide Information
Task I – Emails (4/06 to Present)
1/18/08-4/21/08
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Columbia/CDM emails re: Quote from Columbia Analytical Services for Task I
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
4/28/08-4/29/08
Site-Wide Information
Task I – Emails (4/06 to Present)
4/28/08-4/29/08
Site-Wide Information
Task I – Emails (4/06 to Present)
4/29/08-4/30/08
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
BN LIVINGSTON 8/26/13
Page 174 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Calscience data for the 2008 DEQ splits 05/08/08 KJ
13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: paper on VOCs in air KJ
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Items posted to website 05/14/08 KJ
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Items posted to website 5/22/08 KJ
13 01 11 10 01 02 RM 10 RD/RA Y ** DEQ internal email re: Request for more testing 05/27/08 DEQ internal
13 01 11 10 01 02 RM 10 RD/RA Y ** DEQ internal email re: Work plans and Henriksen results 5/27/08 DEQ internal
13 01 11 10 01 02 RM 10 RD/RA Columbia/CDM/DEQ emails re: Results of analysis
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: BTEX data
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Livingston documents
13 01 11 10 01 02 RM 10 RD/RA Property owner/DEQ emails re: Air testing results
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Items posted to website
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Items posted to website 6/2/08 KJ
13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Commercial screening levels 6/2/08-6/3/08
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: SGP data 06/12/08 KJ
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Task F Part 1 groundwater sampling update 6/12/08
13 01 11 10 01 02 RM 10 RD/RA K/J/Aldersley email to DEQ/Reynolds re: SGP data 06/13/08 KJ/Aldersley
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Indoor air sampling 6/5/08-6/13/08
13 01 11 10 01 02 RM 10 RD/RA 06/20/08 DEQ
13 01 11 10 01 02 RM 10 RD/RA CW Law/DEQ emails re: Testing results for Diana Merideth 06/30/08
13 01 11 10 01 02 RM 10 RD/RA 7/17/08 KJ
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Data posted 07/29/08 KJ
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Data posted 07/30/08 KJ
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
5/10/08-5/13/08
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
5/27/08-5/28/08
Site-Wide Information
Task I – Emails (4/06 to Present)
5/28/08-5/29/08
Site-Wide Information
Task I – Emails (4/06 to Present)
5/28/08-5/30/08
Site-Wide Information
Task I – Emails (4/06 to Present)
5/29/08-5/30/08
Site-Wide Information
Task I – Emails (4/06 to Present)
5/14/08-5/30/08
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ email to BKBH re: BNSF recently purchased properties follow-up
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
KJ email to DEQ re: Diffusion bag setting and sampling notification
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
BN LIVINGSTON 8/26/13
Page 175 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: Items posted to website
13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: Items posted to website
13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Summary table data 7/31/08 CDM
13 01 11 10 01 02 RM 10 RD/RA DEQ/Bill Johnson re: BN property rental 7/31/08-8/1/08
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Diffusion bag sampling notification 08/05/08 KJ
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Items posted 09/03/08 KJ
13 01 11 10 01 02 RM 10 RD/RA DEQ/City emails re: Shop sampling
13 01 11 10 01 02 RM 10 RD/RA 10/24/08 DEQ/ Reynolds
13 01 11 10 01 02 RM 10 RD/RA DEQ/Aspen Real Estate emails re: Vapor sampling 12/08/08
13 01 11 10 01 02 RM 10 RD/RA KPRK/DEQ emails re: Vapor sampling 12/16/08
13 01 11 10 01 02 RM 10 RD/RA DEQ/City emails re: KPRK sampling
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ email re: Kinnick sampling 12/24/08
13 01 11 10 01 02 RM 10 RD/RA DEQ email to KJ re: Task I 1/6/09 DEQ
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Sampling locations 01/09/09 KJ
13 01 11 10 01 02 RM 10 RD/RA DEQ/KJ emails re: 118 N. L St. sampling 1/21/09
13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Task I sampling locations 1/21/09
13 01 11 10 01 02 RM 10 RD/RA DEQ email to KJ re: NWE contact 01/22/09 DEQ
13 01 11 10 01 02 RM 10 RD/RA KJ email to KJ re: OSWER TCE memo 01/23/09 KJ
13 01 11 10 01 02 RM 10 RD/RA DEQ/CDM and internal emails re: Lab cost quotes 1/30/09
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Task I Mitigation Plan notice 2/2/09 KJ
13 01 11 10 01 02 RM 10 RD/RA DEQ/Columbia emails re: Split samples 02/03/09
13 01 11 10 01 02 RM 10 RD/RA DEQ/Columbia emails re: Split samples 2/3/09-2/5/09
Site-Wide Information
Task I – Emails (4/06 to Present)
7/29/08-7/30/08
Site-Wide Information
Task I – Emails (4/06 to Present)
7/29/08-7/30/08
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
9/17/08-9/18/08
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds email to M Hills, J Eisenbeis, & Jesse Woodward re: List of properties for which vapor sampling has been requested
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
12/16/08-12/22/08
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
BN LIVINGSTON 8/26/13
Page 176 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 02 RM 10 RD/RA 02/10/09 DEQ/Reynolds
13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: 2/9/09 week sampling schedule 02/05/09 KJ
13 01 11 10 01 02 RM 10 RD/RA Spreadsheet of addresses and sampling dates 2/9-2/14/09
13 01 11 10 01 02 RM 10 RD/RA DEQ email to Columbia re: Sample confirmation 2/17/09 DEQ
13 01 11 10 01 02 RM 10 RD/RA List of addresses and sampling dates 2/23-3/2/09
13 01 11 10 01 02 RM 10 RD/RA 02/24/09 CDM/Eisenbeis
13 01 11 10 01 02 RM 10 RD/RA 2/24/09
13 01 11 10 01 02 RM 10 RD/RA 2/24/09 KJ/Aldersley
13 01 11 10 01 02 RM 10 RD/RA Spreadsheet of addresses and sampling dates 2/25-3/1/09
13 01 11 10 01 02 RM 10 RD/RA DEQ/Reynolds email to M Hills re: Task I field reports needed 02/26/09 DEQ/Reynolds
13 01 11 10 01 02 RM 10 RD/RA 2/27/09 KJ/Norris
13 01 11 10 01 02 RM 10 RD/RA 3/2/09 KJ/Aldersley
13 01 11 10 01 02 RM 10 RD/RA 03/02/09 CAS/Agqilera
13 01 11 10 01 02 RM 10 RD/RA DEQ/Reynolds & K/J/Norris emails re: Task I data 03/02/09
13 01 11 10 01 02 RM 10 RD/RA 3/2/09 KJ/Aldersley
13 01 11 10 01 02 RM 10 RD/RA 03/03/09
13 01 11 10 01 02 RM 10 RD/RA 3/3/09 CDM/Hills
13 01 11 10 01 02 RM 10 RD/RA Spreadsheet of addresses and sampling dates 3/3-3/8/09
13 01 11 10 01 02 RM 10 RD/RA Chain of Custody from CAS 3/4/09
13 01 11 10 01 02 RM 10 RD/RA 03/09/09 CAS/Agqilera
13 01 11 10 01 02 RM 10 RD/RA 3/10/09
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds email to Sherri Peterson, K/J & CDM re: Plastic bags around canisters – don’t use anymore
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
CDM/Eisenbeis email to DEQ/Reynolds re: ITRC Guidance and radon
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds and CDM/Lamie emails to CDM/Eisenbeis re: Reply to Eisenbeis 2/24/09 email
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Preliminary indoor air and soil gas analytical results received to date have been posted to website
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Norris email to DEQ/Reynolds re: Comprehensive report of all Task I investigation activities conducted since January 2007
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley & DEQ/Reynolds emails re: Preliminary sampling schedule
Site-Wide Information
Task I – Emails (4/06 to Present)
K Aguilera/CAS Lab email to DEQ/Reynolds re: Sample confirmation for BN Livingston P0900737
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Additional indoor air/soil gas data has been posted to website
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds, K/J Norris and S Peterson emails re: New indoor sampling location 211 South F Street
Site-Wide Information
Task I – Emails (4/06 to Present) CDM/Hills email to CDM/Lamie re: Task I data QA/QC needed
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present) CAS/Aguilera email to DEQ/Reynolds re: Sample confirmation
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley and DEQ/Reynolds emails re: PLC data from last week has been posted to the website
BN LIVINGSTON 8/26/13
Page 177 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 02 RM 10 RD/RA KJ/Aldersley
13 01 11 10 01 02 RM 10 RD/RA 03/11/09 KJ/Aldersley
13 01 11 10 01 02 RM 10 RD/RA 03/11/09 KJ/Aldersley
13 01 11 10 01 02 RM 10 RD/RA 03/13/09 KJ/Aldersley
13 01 11 10 01 02 RM 10 RD/RA 03/22/09 KJ/Aldersley
13 01 11 10 01 02 RM 10 RD/RA 03/23/09
13 01 11 10 01 02 RM 10 RD/RA 03/24/09 CAS/Agqilera
13 01 11 10 01 02 RM 10 RD/RA 3/24/09 CAS/Agqilera
13 01 11 10 01 02 RM 10 RD/RA 03/25/09 DEQ/Reynolds
13 01 11 10 01 02 RM 10 RD/RA 03/25/09 DEQ/Reynolds
13 01 11 10 01 02 RM 10 RD/RA 03/25/09 KJ/Aldersley
13 01 11 10 01 02 RM 10 RD/RA 03/25/09 CAS/Agqilera
13 01 11 10 01 02 RM 10 RD/RA 3/26/09
13 01 11 10 01 02 RM 10 RD/RA 03/27/09
13 01 11 10 01 02 RM 10 RD/RA 03/27/09 KJ/Aldersley
13 01 11 10 01 02 RM 10 RD/RA CDM/Lamie & DEQ/Reynolds emails re: Subslab leaks 3/31/09\
13 01 11 10 01 02 RM 10 RD/RA CDM/Eisenbeis email to DEQ re: Subslab leaks 03/31/09 CDM/ Eisenbeis
13 01 11 10 01 02 RM 10 RD/RA 03/31/09 CAS/ Agqilera
13 01 11 10 01 02 RM 10 RD/RA 04/04/09 DEQ/ Reynolds
13 01 11 10 01 02 RM 10 RD/RA 04/06/09
13 01 11 10 01 02 RM 10 RD/RA 4/07/09 CDM/ Woodward
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Soil gas reports posted to the web
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: A Summary Table of the soil gas and indoor air data to date has been posted to web
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Preliminary Task I sampling schedule for next week
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Task I Items posted to the web
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Task I Items posted to the web
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & CDM/Hills emails re: SGP and groundwater sampling letters
Site-Wide Information
Task I – Emails (4/06 to Present)
K Aguilera/CAS Lab email to DEQ/Reynolds re: Lab did not receive canister ID 1SC00096 which associated with sample ID 09-SG-712-DEQ
Site-Wide Information
Task I – Emails (4/06 to Present)
K Aguilera/CAS Lab & DEQ/Reynolds emails re: Canister found – will not be analyzed
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds email to K/J/Aldersley re: Attachments – Task I data
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds email to CDM/Hills re: Attachments – Task I data
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Task I Items posted to the web
Site-Wide Information
Task I – Emails (4/06 to Present)
K Aguilera/CAS Lab & DEQ/Reynolds emails re: Lost canister arrived at lab – still do not analyze
Site-Wide Information
Task I – Emails (4/06 to Present)
CDM/Woodward, Hills & Lamie & DEQ/Reynolds emails re: Parent/duplicate sample sets
Site-Wide Information
Task I – Emails (4/06 to Present)
CDM/Hills & Lamie and DEQ emails re: Parent/duplicate sample information
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Task I Items posted to the web
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
K Aguilera/CAS Lab email to DEQ/Reynolds re: 2-4 day delay in mailing out TO-15 data reports
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds emails to CDM & K/J re: 107 South G Street – Kutzman home
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Fry and Ed Coleman emails re: 107 South G Street indoor air complaint
Site-Wide Information
Task I – Emails (4/06 to Present)
CDM/Woodward email to DEQ/Fry re: 107 South G Street field visit
BN LIVINGSTON 8/26/13
Page 178 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 02 RM 10 RD/RA 4/7/09
13 01 11 10 01 02 RM 10 RD/RA 4/8/09
13 01 11 10 01 02 RM 10 RD/RA 4/9/09
13 01 11 10 01 02 RM 10 RD/RA 04/09/09 KJ/Aldersley
13 01 11 10 01 02 RM 10 RD/RA CAS
13 01 11 10 01 02 RM 10 RD/RA 04/10/09 DEQ internal
13 01 11 10 01 02 RM 10 RD/RA 04/10/09 DEQ/Fry internal
13 01 11 10 01 02 RM 10 RD/RA 4/10/09
13 01 11 10 01 02 RM 10 RD/RA 04/13/09 DEQ/ Reynolds
13 01 11 10 01 02 RM 10 RD/RA 4/13/09
13 01 11 10 01 02 RM 10 RD/RA 4/14/09 KJ/Aldersley
13 01 11 10 01 02 RM 10 RD/RA 04/16/09 KJ/Aldersley
13 01 11 10 01 02 RM 10 RD/RA 4/16/09 KJ/Aldersley
13 01 11 10 01 02 RM 10 RD/RA 4/16/09 KJ/Aldersley
13 01 11 10 01 02 RM 10 RD/RA 04/27/09
13 01 11 10 01 02 RM 10 RD/RA 04/27/09 KJ/Aldersley
13 01 11 10 01 02 RM 10 RD/RA 4/28/09
13 01 11 10 01 02 RM 10 RD/RA 04/28/09
13 01 11 10 01 02 RM 10 RD/RA 04/28/09
13 01 11 10 01 02 RM 10 RD/RA 05/01/09 DEQ/ Reynolds
13 01 11 10 01 02 RM 10 RD/RA 05/13/09
13 01 11 10 01 02 RM 10 RD/RA 05/13/09 KJ/Aldersley
Site-Wide Information
Task I – Emails (4/06 to Present)
CDM/Woodward & DEQ/Fry emails re: Call from C Lawellin, attorney about 107 South G Street
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Fry, Dunwell & Olsen internal emails re: Media contact – Missoulian for BN Whitefish
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Fry & CDM/Norris & K/J/Aldersley emails re: 107 South G Street sampling schedule
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Task I items posted to the web
Site-Wide Information
Task I – Emails (4/06 to Present)
CAS-AIR lab email to DEQ/Reynolds re: EDD results of Analysis (SR# P0901011)
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Olsen & Fry internal emails re: 107 South G Street sampling
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Fry internal email to Reynolds re: 107 G Street – K/J sample schedule
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley and DEQ/Fry emails re: Re-sampling of 107 South G Street
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds email to CDM/Lamie & Hills re: Attachment – PDF of Final Report - samples were collected on 3/16-3/19/09
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Fry, K/J/Norris & Aldersley emails re: Soil Gas System – 1104 E Gallatin Street
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: 1104 E Gallatin Street sampling at 9:00 Wednesday 4/15/09
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Task I items posted to the web
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley & DEQ/Reynolds emails re: 1424 E Callender is location 520 written for samples
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Task I DEQ Split Samples/Deliverables
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & K/J Norris & Peterson emails re: Additional consent form
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Task I items posted to the web
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & CDM/Hills emails re: Bednarack data for location 712 on the website
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & K/J Aldersley emails re: Attachment - CDM split samples/deliverables
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & CDM/Hills emails re: Attachment - Additional 2007 split sample data
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds email to K/J/Aldersley re: DEQ can’t locate all of the radon data
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & K/J Aldersley emails re: Radon data is uploaded to website
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Task I items posted to the web – Updated summary table (5/13/09)
BN LIVINGSTON 8/26/13
Page 179 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 02 RM 10 RD/RA 5/15-5/18/09
13 01 11 10 01 02 RM 10 RD/RA 5/29-6/6/09
13 01 11 10 01 02 RM 10 RD/RA 6/4/09 KJ/Aldersley
13 01 11 10 01 02 CD RM 10 RD/RA 06/12/09 KJ/Aldersley
13 01 11 10 01 02 RM 10 RD/RA 6/17/09 KJ/Aldersley
13 01 11 10 01 02 RM 10 RD/RA 06/23/09
13 01 11 10 01 02 RM 10 RD/RA DEQ/Reynolds & CDM/Lamie emails re: “Dil factor” 6/29/09
13 01 11 10 01 02 RM 10 RD/RA 07/10/09 CDM/Hills
13 01 11 10 01 02 RM 10 RD/RA 07/13/09
13 01 11 10 01 02 RM 10 RD/RA 7/13/09 KJ/Aldersley
13 01 11 10 01 02 RM 10 RD/RA 08/18/09
13 01 11 10 01 02 RM 10 RD/RA 09/22/09 CDM/Hills
13 01 11 10 01 02 RM 10 RD/RA K/J/Norris & DEQ/Reynolds emails re: Legal Ad Public Notice 9/22/09
13 01 11 10 01 02 RM 10 RD/RA 09/30/09
13 01 11 10 01 02 RM 10 RD/RA 10/13/09
13 01 11 10 01 02 RM 10 RD/RA 10/21/09
13 01 11 10 01 02 RM 10 RD/RA BN/Stegman & DEQ/Opper emails re: Technical discussions
13 01 11 10 01 02 RM 10 RD/RA 10/23/09 KJ/Norris
13 01 11 10 01 02 RM 10 RD/RA 10/23/09
Site-Wide Information
Task I – Emails (4/06 to Present) DEQ/Reynolds & K/J/Aldersley emails re: Address clarification
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & CDM/Hills emails re: Query of CDM data base for ambient air data
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: 3 copies of the Indoor Air Mitigation System Work Scope Statement & Field Design Package for 1104 E Gallatin sent out 6/4/09 UPS
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: 4 copies of the Task I Supplemental Investigation Report sent out UPS 6/12/09
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Re sampling of indoor air at the Kautzman property set for 6/24/09 at 8:am
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & CDM/Hills emails re: Task I data – which building have full slabs and which have something else
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
CDM/Hills email to DEQ/Reynolds re: Draft comments on 1104 E Gallatin Mitigation Plan
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds and Pace Analytical/K Smit emails re: Smit needed to determine if opportunities exist for Pace to perform analytical work
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J Aldersley email to DEQ/Reynolds re: Kautzman re-sampling data posted to website
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & CDM/Woodward emails re: Data location for location 80 formerly SE -29
Site-Wide Information
Task I – Emails (4/06 to Present)
CDM/Hills email to DEQ/Reynolds re: Example drawing for location 131 – 1 layout
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & CDM/Hills emails re: DEQ requesting a map that shows all of the Task I sampling locations
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & BN/Smith emails re: Proposed date for meeting
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & Resident/ Machele Jones emails re: Sampling results for 112 N G Street
Site-Wide Information
Task I – Emails (4/06 to Present)
10/9/-10/23/09
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Norris email to DEQ/Reynolds re: Attachment - BN comments on Final Draft Task I Risk Assessment Amendment
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & BN/Smith emails re: Meeting date & location (10/23/09)
BN LIVINGSTON 8/26/13
Page 180 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 02 RM 10 RD/RA 10/26/09
13 01 11 10 01 02 RM 10 RD/RA 10/29/09
13 01 11 10 01 02 RM 10 RD/RA 10/30/09
13 01 11 10 01 02 RM 10 RD/RA DEQ/Reynolds & CDM/Woodward emails re: Location U-2 10/30/09
13 01 11 10 01 02 RM 10 RD/RA 11/2/09
13 01 11 10 01 02 RM 10 RD/RA 11/02/09
13 01 11 10 01 02 RM 10 RD/RA 11/02/09
13 01 11 10 01 02 RM 10 RD/RA 11/2/09
13 01 11 10 01 02 RM 10 RD/RA 11/02/09
13 01 11 10 01 02 RM 10 RD/RA 11/02/09
13 01 11 10 01 02 RM 10 RD/RA BN/Smith email to DEQ/Reynolds re: Meeting agenda 11/02/09 BN/Smith
13 01 11 10 01 02 RM 10 RD/RA BN/Stegman & DEQ/Reynolds emails re: Meeting agenda 11/2/09
13 01 11 10 01 02 RM 10 RD/RA 11/3/09
13 01 11 10 01 02 RM 10 RD/RA DEQ/Reynolds & CDM/Hills re: Task I notebooks 11/12/09
13 01 11 10 01 02 RM 10 RD/RA 11/18/09 KJ/Aldersley
13 01 11 10 01 02 RM 10 RD/RA 12/01/09
13 01 11 10 01 02 RM 10 RD/RA 12/2/09
13 01 11 10 01 02 RM 10 RD/RA 12/4/09
13 01 11 10 01 02 RM 10 RD/RA 12/07/09
13 01 11 10 01 02 RM 10 RD/RA DEQ/BNSF emails re: IAQ issues
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & K/J/Aldersley emails re: CD – Revised Task I Indoor Mitigation Plan for Residential & Commercial Properties – K/J can’t access
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & Courtney Lawellin emails re: Identification of samples
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & Resident/ Machele Jones emails re: Sampling results for 112 N G Street
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & K/J/Norris emails re: Task F – Stage 1 – Part 1
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & PCEC/Billau emails re: PCEC Comments on the Final Draft Risk Assessment Amendment
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & K/J/Norris emails re: BN Comments on the Final Draft Risk Assessment Amendment
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & Jeannette Blank emails re: Blank comments on the public meeting
Site-Wide Information
Task I – Emails (4/06 to Present)
Resident/N Durfey & DEQ/Reynolds emails re: Durfey comments
Site-Wide Information
Task I – Emails (4/06 to Present)
BN/Smith & DEQ/Reynolds emails re: Meeting time, date & attendees
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
CDM/Lamie & DEQ/Reynolds emails re: Attachment - Background file
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Livingston deliverables
Site-Wide Information
Task I – Emails (4/06 to Present)
Kleinfelder/Dwyer & DEQ/Reynolds emails re: Livingston mitigation triggers
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Norris email to DEQ/Reynolds re: Access permission requested for 1104 E Gallatin St.
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ Legal/Haque-Hausrath email & hard copy to Fisher court reporting re: Corrections for 11/12/09 Deposition of Aimee Reynolds
DEQ Legal/ Haque-Hausrath
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & Kleinfelder/Dwyer emails re: DEQ information to Dwyer – Attachment –Final Dispute Resolution Text, Attachment 10 Ambient Air Table & DEQ 6/8/09 letter to BN
Site-Wide Information
Task I – Emails (4/06 to Present)
12/18/09-12/21/09
BN LIVINGSTON 8/26/13
Page 181 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 02 RM 10 RD/RA 12/23/2009
13 01 11 10 01 02 RD/RA 01/07/10
13 01 11 10 01 02 RD/RA 01/12/10
13 01 11 10 01 02 RD/RA DEQ/CDM emails re: Task I decisions
13 01 11 10 01 02 RD/RA 1/29/2010
13 01 11 10 01 02 RD/RA 2/2/10
13 01 11 10 01 02 RD/RA 02/05/10 DEQ/ Reynolds
13 01 11 10 01 02 RD/RA 02/07/10 DEQ/ Reynolds
13 01 11 10 01 02 RD/RA 2/8/10 DEQ/ Reynolds
13 01 11 10 01 02 RD/RA 02/10/10 DEQ/ Reynolds
13 01 11 10 01 02 RD/RA 2/11/10
13 01 11 10 01 02 RD/RA 02/15/10
13 01 11 10 01 02 RD/RA 02/17/10
13 01 11 10 01 02 RD/RA 02/18/10 BN/ Stegman
13 01 11 10 01 02 RD/RA 02/18/10 BN/Smith
13 01 11 10 01 02 RD/RA DEQ/Reynolds email to DNREC/Galloway re: Tubing 02/18/10 DEQ/ Reynolds
13 01 11 10 01 02 RD/RA 02/19/10 PECE/Billau
13 01 11 10 01 02 RD/RA 02/19/10
13 01 11 10 01 02 RD/RA 02/19/10 GSI/Lee
13 01 11 10 01 02 RD/RA 02/19/10
Site-Wide Information
Task I – Emails (4/06 to Present)
Resident/A Tewell & DEQ/Reynolds emails re: Tewell requesting results for air quality test
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & K/J/Aldersley emails re: Locations SE-20 and 520
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Norris & DEQ/Reynolds emails re: Additional Indoor Air/Soil Gas Sampling
Site-Wide Information
Task I – Emails (4/06 to Present)
1/14/10-1/15/10
Site-Wide Information
Task I – Emails (4/06 to Present)
PCEC/Billau & DEQ/Reynolds emails re: Final Task I RA and MDEQ Approved Remedy for Newly Identified Contaminants of Concern in Indoor Air
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Norris & DEQ/Reynolds emails re: Final Task I RA and MDEQ Approved Remedy for Newly Identified Contaminants of Concern in Indoor Air
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds email to K/J/Norris & BN/Smith re: Attachment - February 2010 Task I requirements
Site-Wide Information
Task I – Emails (4/06 to Present)
Resident/Horvath & DEQ/Reynolds emails re: Horvath inquiring about contamination in home he just bought
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds email to K/J/Norris & Aldersley re: Horvath property
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds email to K/J/Norris & BN/Smith re: Task I location map and sampling protocol
Site-Wide Information
Task I – Emails (4/06 to Present)
BN/Smith & DEQ/Reynolds emails re: February 2010 Task I requirements
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Opper & BN/Stegman emails re: Indoor Air Mitigation Pilot Project & Judge Strong’s Findings
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & BN/Smith re: February 2010 Task I requirements meeting agenda
Site-Wide Information
Task I – Emails (4/06 to Present)
BN/Stegman email to DEQ/Reynolds re: BN agrees to undertake the sampling requested by DEQ in it’s 2/5/10 letter
Site-Wide Information
Task I – Emails (4/06 to Present)
BN/Smith email to DEQ/Reynolds, K/J/Norris BN/Stegman & John Conner re: Conference call update for 2/19/10
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
PECE/Billau email to Sarah Orms’ re: Air sampling for Livingston
Site-Wide Information
Task I – Emails (4/06 to Present)
H&P/Hartman & Reed & DEQ/Reynolds emails re: VI Investigation in Livingston (tubing)
Site-Wide Information
Task I – Emails (4/06 to Present)
GSI/Lee email to BN/Stegman re: VI /Mitigation spreadsheet adequately clarifies the basis for re-sampling at all locations
Site-Wide Information
Task I – Emails (4/06 to Present)
BN/Norris email to DEQ/Reynolds re: 111 Miles Ave lease has been terminated by BN & BN intends to demolish the structure
BN LIVINGSTON 8/26/13
Page 182 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 02 RD/RA Y ** BN/Stegman email to DEQ/Opper re: Pilot Project 02/21/10 BN/ Stegman
13 01 11 10 01 02 RD/RA 02/22/10
13 01 11 10 01 02 RD/RA
13 01 11 10 01 02 RD/RA 02/23/10
13 01 11 10 01 02 RD/RA 02/24/10
13 01 11 10 01 02 RD/RA 02/26/10
13 01 11 10 01 02 RD/RA DEQ/BNSF/KJ emails re: February 2010 requirements 2/5-2/26/10
13 01 11 10 01 02 RD/RA DEQ/BNSF emails re: Meeting and P&E letter 2/19-2/26/10
13 01 11 10 01 02 RD/RA 2/25-3/1/10 DEQ internal
13 01 11 10 01 02 RD/RA 03/01/10
13 01 11 10 01 02 RD/RA 03/02/10
13 01 11 10 01 02 RD/RA 03/02/10
13 01 11 10 01 02 RD/RA DEQ/Reynolds & K/J/Peterson emails re: Canister size 03/03/10
13 01 11 10 01 02 RD/RA 03/04/10
13 01 11 10 01 02 RD/RA 03/10/10 KJ/Aldersley
13 01 11 10 01 02 RD/RA 03/12/10
13 01 11 10 01 02 RD/RA 03/12/10 CDM/Hills
13 01 11 10 01 02 RD/RA 03/15/10 CDM/ Woodward
13 01 11 10 01 02 RD/RA 03/15/10 CDM/Pozega
13 01 11 10 01 02 RD/RA 03/15/10 CDM/Pozega
13 01 11 10 01 02 RD/RA 03/17/10
13 01 11 10 01 02 RD/RA DEQ/Reynolds & K/J/Norris emails re: Task I sampling 03/22/10
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & K/J/Norris emails re: SVE wells & system N6002
Site-Wide Information
Task I – Emails (4/06 to Present)
Resident/F Horiel & DEQ/Reynolds emails re: Testing & GW analytical results
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Peterson & DEQ/Reynolds emails re: Fixed gas sampling (2/23/10)
Site-Wide Information
Task I – Emails (4/06 to Present)
Property Owner/T Skurski & DEQ/Reynolds emails re: Resampling of property
Site-Wide Information
Task I – Emails (4/06 to Present)
Resident/F Horiel & DEQ/Reynolds emails re: Testing & GW analytical results
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Schiff, Reynolds & Martin internal emails re: Laboratories for VI Analysis
Site-Wide Information
Task I – Emails (4/06 to Present)
CDM/Hills & Calscience/Nowak emails re: Price quote for Vapor analysis
Site-Wide Information
Task I – Emails (4/06 to Present)
Columbia Analytical/Aguilera & CDM/Hills emails re: Price quote for Vapor analysis
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & C Lawellin emails re: Resample testing – C Goode home not available
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
CDM/Pozega & DEQ/Reynolds emails re: Task I Summary of Analytical Results Table
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Task I EDDs CD sent UPS for delivery tomorrow
Site-Wide Information
Task I – Emails (4/06 to Present)
Edwards Law Firm/Hinman & Edwards & DEQ Legal/Brooks emails re: Krohne property
Site-Wide Information
Task I – Emails (4/06 to Present)
CDM/Hills email to DEQ/Reynolds re: VI data for location 114 & 115
Site-Wide Information
Task I – Emails (4/06 to Present)
CDM/Woodward email to DEQ/Reynolds re: Krohne property (3/15/10)
Site-Wide Information
Task I – Emails (4/06 to Present)
CDM/Pozega email to DEQ/Reynolds re: Attachment – Task I letters (3/15/10)
Site-Wide Information
Task I – Emails (4/06 to Present)
CDM/Pozega email to DEQ/Reynolds re: Attachment – Task I letter – locations 317A & 317B
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & CAS lab/Aguilera emails re: Sample confirmation from Columbia Analytical
Site-Wide Information
Task I – Emails (4/06 to Present)
BN LIVINGSTON 8/26/13
Page 183 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 02 RD/RA 03/23/10
13 01 11 10 01 02 RD/RA 03/24/10
13 01 11 10 01 02 RD/RA 04/12/10 KJ/Aldersley
13 01 11 10 01 02 RD/RA 04/16/10 KJ/Aldersley
13 01 11 10 01 02 RD/RA 04/23/10
13 01 11 10 01 02 RD/RA 04/23/10 KJ/Aldersley
13 01 11 10 01 02 RD/RA 04/29/10 KJ/Aldersley
13 01 11 10 01 02 RD/RA Resident/Horvath & DEQ Reynolds re: 515 north N air quality 05/06/10
13 01 11 10 01 02 RD/RA DEQ/Reynolds & K/J/Aldersley emails re: Task I data 06/04/10
13 01 11 10 01 02 RD/RA 6/8-6/11/10
13 01 11 10 01 02 RD/RA 06/17/10
13 01 11 10 01 02 RD/RA 06/24/10
13 01 11 10 01 02 RD/RA 06/28/10
13 01 11 10 01 02 RD/RA PCEC/Billau & DEQ/Reynolds emails re: VOC sampling 06/29/10
13 01 11 10 01 02 RD/RA DEQ/Reynolds & K/J/Norris emails re: Task I data 7/15-7/20/10
13 01 11 10 01 02 RD/RA 07/20/10 KJ/Aldersley
13 01 11 10 01 02 RD/RA CDM/Lamie & Hills emails to DEQ/Reynolds re: Task I data 07/23/10
13 01 11 10 01 02 RD/RA 08/02/10
13 01 11 10 01 02 RD/RA 08/03/10 CDM/ Martich
13 01 11 10 01 02 RD/RA 08/04/10
13 01 11 10 01 02 RD/RA 08/05/10
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Norris & DEQ/Reynolds emails re: BN Shop Complex, & Talgo Building Resampling under Task I
Site-Wide Information
Task I – Emails (4/06 to Present)
C Lawellin, Brooke Kuhl, CDM/Woodward & DEQ/Reynolds emails re: BNSF Request for entry
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Lab analytical & EDDs posted to website
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Summary table posted to website
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & K/J/Peterson emails re: Address for NEW letters
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Additional Lab analytical & EDDs posted to website
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Additional Lab analytical & EDDs posted to website
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present) DEQ/Reynolds & K/J/Norris emails re: BN Shop Complex data
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & K/J/Aldersley emails re: Task I – DEQ split samples
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & K/J/Aldersley emails re: Task I -2010 Soil Gas/Indoor Air Data Summary Report sent UPS 6/24/10
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & K/J/Norris emails re: GSI “hot grab” explanation
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Task I Indoor Air Mitigation Plan for Residential and Commercial Properties- DEQ Version, updated July 2010 sent UPS
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Resident/Horvath & DEQ/Reynolds emails re: 515N N st Air Quality
Site-Wide Information
Task I – Emails (4/06 to Present)
CDM/Martich email to DEQ/Reynolds re: Livingston positive issue
Site-Wide Information
Task I – Emails (4/06 to Present)
Resident/Horvath & DEQ/Reynolds emails re: 515N N st Air Quality
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & K/.J/Aldersley emails re: Questions about Mergen property
BN LIVINGSTON 8/26/13
Page 184 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 02 RD/RA 8/4-8/11/10
13 01 11 10 01 02 RD/RA 02/15/11
13 01 11 10 01 02 RD/RA 03/05/11 KJ/ Peterson
13 01 11 10 01 02 RD/RA 03/08/11 DEQ/ Reynolds
13 01 11 10 01 02 RD/RA 03/09/11 KJ/Norris
13 01 11 10 01 02 RD/RA DEQ/Reynolds & BN/Smith emails re: DEQ 3/4/11 letter to BN 03/11/11
13 01 11 10 01 02 RD/RA DEQ/Reynolds email to BN/Smith re: Task I decision making 03/11/11 DEQ/Reynolds
13 01 11 10 01 02 RD/RA 03/18/11 BN/Smith
13 01 11 10 01 02 RD/RA Conference call schedule 03/24/11
13 01 11 10 01 02 RD/RA 03/25/11 DEQ/ Reynolds
13 01 11 10 01 02 RD/RA 04/01/11 KJ/Norris
13 01 11 10 01 02 RD/RA K/J/Norris & DEQ/Reynolds emails re: Location 23B 04/25/11
13 01 11 10 01 02 RD/RA 04/29/11 KJ/Adlersley
13 01 11 10 01 02 RD/RA K/J/Aldersley email to DEQ/Reynolds re: Task I data 05/17/11 KJ/Adlersley
13 01 11 10 01 02 RD/RA 05/31/11 KJ/Aldersley
13 01 11 10 01 02 RD/RA 06/01/11
13 01 11 10 01 02 RD/RA DEQ/Reynolds & Courtney emails re: Stephens 2011 data letter 6/1/11
13 01 11 10 01 02 RD/RA 06/07/11 KJ/Aldersley
13 01 11 10 01 02 RD/RA 06/08/11 KJ/Aldersley
13 01 11 10 01 02 RD/RA 06/14/11 KJ/Aldersley
13 01 11 10 01 02 RD/RA 06/15/11 CDM/ Martich
13 01 11 10 01 02 RD/RA K/J/Norris & DEQ/Reynolds emails re: Task I mitigation 6/21/11
Site-Wide Information
Task I – Emails (4/06 to Present)
Resident/Horvath & DEQ/Reynolds emails re: 515 N N st Air Quality
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & K/J/Peterson emails re: Unofficial heads up – Resampling
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/ Peterson email to DEQ/Reynolds re: Revised sampling schedule
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds email to BN/Smith re: Additional sampling locations
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Norris email to DEQ/Reynolds re: Indoor Air Mitigation Guide Specifications
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
BN/Smith email to DEQ/Reynolds re: DEQ 3/11/11 letter - BN requesting conference call
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds email to K/J/Norris & BN/Stegman re: Task I conference call followup
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Norris email to DEQ/Reynolds re: Task I sampling schedule update
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Task I data posted to website
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Task I data posted to website
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ Legal/Haque-Hausrath & Courtney emails re: Pinar property
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Task I indoor air data posted to website
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Revised Task I indoor air data posted to website
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: 2011 indoor air & soil gas analytical summary tables posted to website
Site-Wide Information
Task I – Emails (4/06 to Present)
CDM/Martich email to K/J/Aldersley re: Attachment – Columbia analytical reposts for split samples
Site-Wide Information
Task I – Emails (4/06 to Present)
BN LIVINGSTON 8/26/13
Page 185 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 02 RD/RA K/J/Aldersley email to DEQ/Reynolds re: Helium samples 07/25/11 KJ/Aldersley
13 01 11 10 01 02 RD/RA DEQ/Reynolds & K/J/Norris emails re: Hapsite findings 08/04/11
13 01 11 10 01 02 RD/RA KJ/Norris email to DEQ/Reynolds re: Task I Mitigation Status 08/14/11 KJ/Norris
13 01 11 10 01 02 RD/RA DEQ/Reynolds & KJ/Norris emails re: Heat in MRL buildings 01/19/12
13 01 11 10 01 02 RD/RA 01/24/12 DEQ/ Reynolds
13 01 11 10 01 02 RD/RA 01/27/12 DEQ/ Reynolds
13 01 11 10 01 02 RD/RA DEQ/Reynolds email to KJ re: Heat in Talgo buildings 01/27/12 DEQ/ Reynolds
13 01 11 10 01 02 RD/RA 02/02/12
13 01 11 10 01 02 RD/RA 02/13/12
13 01 11 10 01 02 RD/RA 03/14/12 KJ/Adlersley
13 01 11 10 01 02 RD/RA 03/23/12 KJ/Adlersley
13 01 11 10 01 02 RD/RA 05/23/12 KJ/Adlersley
13 01 11 10 01 02 RD/RA 05/25/12
13 01 11 10 01 03 RD/RA Task I - Meeting Notes
13 01 11 10 01 03 RM 10 RD/RA Notes 06/15/06
13 01 11 10 01 03 RM 10 RD/RA Notes 06/16/06
13 01 11 10 01 03 RM 10 RD/RA Notes 06/27/06
13 01 11 10 01 03 RM 10 RD/RA Notes 6/30/06
13 01 11 10 01 03 RM 10 RD/RA Notes 07/18/06
13 01 11 10 01 03 RM 10 RD/RA Notes 9/21/06
13 01 11 10 01 03 RM 10 RD/RA Map of Planned Sampling Locations 09/06/11
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds email to KJ/Norris re: Followup on the extended duration sampling
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds email to BN/Stegman, CDM, & KJ re: DEQ response regarding Extended Duration Samples
Site-Wide Information
Task I – Emails (4/06 to Present)
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & KJ/Norris emails re: Task I sampling deadline
Site-Wide Information
Task I – Emails (4/06 to Present)
GSI/McHugh & DEQ/Reynolds emails re: New PCE Toxicity factors
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Task I items posted to website - Analytical lab reports for February 2012 Task I indoor air/soil gas sampling
Site-Wide Information
Task I – Emails (4/06 to Present)
K/J/Aldersley email to DEQ/Reynolds re: Task I items posted to website - Analytical lab reports for February 2012 Task I indoor air/soil gas sampling
Site-Wide Information
Task I – Emails (4/06 to Present)
KJ/Aldersley email to DEQ/Reynolds re: Task I items posted to web - validated analytical data tables for 2012 Task I indoor air/ soil gas sampling
Site-Wide Information
Task I – Emails (4/06 to Present)
DEQ/Reynolds & KJ/Norris emails re: 4/19/12 Status of Task I items letter
Site-Wide Information
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
BN LIVINGSTON 8/26/13
Page 186 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 03 RM 10 RD/RA Notes 9/26/06
13 01 11 10 01 03 RM 10 RD/RA Notes – CDM Meeting 11/27/06
13 01 11 10 01 03 RM 10 RD/RA Notes – Task I 11/27/06
13 01 11 10 01 03 RM 10 RD/RA Notes 11/28/06
13 01 11 10 01 03 RM 10 RD/RA Notes 12/04/06
13 01 11 10 01 03 RM 10 RD/RA Notes 12/08/06
13 01 11 10 01 03 RM 10 RD/RA Notes 1/24/07
13 01 11 10 01 03 RM 10 RD/RA Maps of previous sampling locations and analytical results 01/07/11
13 01 11 10 01 03 RM 10 RD/RA Notes 03/30/07
13 01 11 10 01 03 RM 10 RD/RA Notes 4/23/07
13 01 11 10 01 03 RM 10 RD/RA Notes 05/16/07
13 01 11 10 01 03 RM 10 RD/RA Notes 05/17/07
13 01 11 10 01 03 RM 10 RD/RA Notes 7/6/07
13 01 11 10 01 03 RM 10 RD/RA Notes 08/22/07
13 01 11 10 01 03 RM 10 RD/RA Notes 08/27/07
13 01 11 10 01 03 RM 10 RD/RA Notes 10/26/07
13 01 11 10 01 03 RM 10 RD/RA Conference call info and notes 12/18/07
13 01 11 10 01 03 RM 10 RD/RA Notes 1/29/08
13 01 11 10 01 03 RM 10 RD/RA Notes 4/4/08
13 01 11 10 01 03 RM 10 RD/RA Notes 04/22/08
13 01 11 10 01 03 RM 10 RD/RA Minutes 4/22/08
13 01 11 10 01 03 RM 10 RD/RA DEQ/KJ emails re: Indoor air sampling 6/5/08-7/7/08
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
BN LIVINGSTON 8/26/13
Page 187 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 03 RM 10 RD/RA Notes 11/4/09
13 01 11 10 01 03 RM 10 RD/RA Conference call – Task I sampling & scheduling 02/18/10
13 01 11 10 01 03 RM 10 RD/RA Conference call – Task I sampling & scheduling 2/19/10
13 01 11 10 01 03 RM 10 RD/RA 08/15/12
13 01 11 10 01 03 RM 10 RD/RA 08/15/12
13 01 11 10 01 04 RD/RA
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to C. Gonder re: Task I contact SE-2 12/8/05 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Current tenant re: Task I contact NE-5 12/8/05 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to A Ziegler re: Task I contact NE-2 12/8/05 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ email to K/J re: Task I analytical reports 1/6/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ email to K/J re: Final Task I analytical reports 1/11/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to G Smith re: BG-11 results 1/12/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to W Jones re: SE-5 results 01/12/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to A Lahren re: AS -142 results 1/12/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to D. Merideth re: NE -3 results 1/12/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to M Marsh/D Shwartskopf re: AS-167 results 1/12/06 DEQ
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Vapor Intrusion Technical Exchange - DEQ & BN Proposed Agenda & meeting notes
Site-Wide Information
Task I - Meeting Notes (5/06 to Present)
Vapor Intrusion Technical Exchange - DEQ & BN draft meeting notes
Site-Wide Information
Task I - Analytical Results to Property Owners (fall 2006 to Present)
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
BN LIVINGSTON 8/26/13
Page 188 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to S Leens re: AS-157 results 1/12/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to S Bates re: NE-5 results 01/12/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to G Olsen re: NE-4 results 01/12/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to G O'Connor re: BG-29 results DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to J Bauer re: AS-23 results 01/12/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to R Taylor re: AS-43 results 1/12/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to S Briggs re: AS-78 results 01/12/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to R Klumpers re: AS-80 results 01/12/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to V Shipley re: AS-99 results 01/12/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to H Davis re: AS-132 results 01/12/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to J Evanson re: AS-108 results 1/12/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to L Winstel re: NE-1 results 1/12/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Talgo-LRC re: AS LS results 1/12/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ Letter to L Winstel re: 12R03 results 1/20/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to T Elich re: Access request 1/20/06 DEQ
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
BN LIVINGSTON 8/26/13
Page 189 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to R Keller re: Locomotive Shop sample results 11/1/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Aza Ziegler re: Analytical results 11/2/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Jim Evanson re: Analytical results 11/2/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Alvin Lahren re: Analytical results 11/02/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to M Renick & S Bates re: Sample results 11/02/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA 11/02/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to B Gonder re: Sampling results 11/02/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to D Amsk re: BNSF Tech Memo per request 11/03/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to C Boehm & G Olsen re: Sample results 11/03/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to M Marsh & D Schwartzkopf re: Sample results 11/03/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ Letter to Christine & Gary Smith re: Sample results 11/03/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to G O’Conner re: Sample results 11/03/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Kathy & Tom Elich re: Sample results 11/03/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to L Winstel re: Sample results 11/03/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Winstel returned 11/09/06 DEQ
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to C Boehm & E Russell re: BNSF Tech Memo per request
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
BN LIVINGSTON 8/26/13
Page 190 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Bates returned 11/09/06 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ fax to Carter Boehm re: Consent for Access form 05/29/07 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Richard Keller re: Analytical results 06/05/07 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Tim & Denise Massey re: Analytical results 06/05/07 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to David Burley re: Analytical results 07/27/07 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Kris Hamilton re: Analytical results 07/31/07 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Wayne Townsend re: Analytical results 07/31/07 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Carter Boehm re: Analytical results 08/07/07 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Steve Briggs re: Analytical results 08/14/07 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Ricky Edminston re: Analytical results 08/14/07 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to John Long & Jody Albrecht re: Analytical results 08/15/07 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to John Long & Sally Dahl re: Analytical results 08/15/07 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Deborah Lewis re: Analytical results 08/22/07 DEQ
13 01 11 10 01 04 RM 10 RD/RA 08/22/07 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to David & Jeannie Burley re: Analytical results 09/28/07 DEQ
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to Carter Boehm & Jonathan & Gail Eisele re: Analytical results
Site-Wide Information
Task I - Analytical Results to Property Owners
BN LIVINGSTON 8/26/13
Page 191 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to David & Jeannie Burley re: Analytical results 05/12/08 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Dwight & Kitty Krohne re: Analytical results 05/15/08 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Daniel & Tara Eddy re: Analytical results 05/16/08 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Johnny Lee & Jackie Fox re: Analytical results 06/06/08 DEQ
13 01 11 10 01 04 RM 10 RD/RA 06/10/08 DEQ
13 01 11 10 01 04 RM 10 RD/RA 06/10/08 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Jeffrey Dickerson re: Analytical results 06/12/08 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Debra Hendricksen re: Analytical results 06/13/08 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Amanda Davis re: Analytical results 06/17/08 DEQ
13 01 11 10 01 04 RM 10 RD/RA 06/20/08 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Jeffrey Dickerson re: Analytical results 06/27/08 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Steve Briggs re: Analytical results 06/27/08 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Erlynn & Esta Harris re: Analytical results 06/27/08 DEQ
13 01 11 10 01 04 RM 10 RD/RA 06/27/08 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ Fax to E Russell re: Task I data on location 68 07/23/08 DEQ
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to Devarold & Dyvonne Selkirk re: Analytical results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to Rich Keller/MRL & Guy Worthington/Guy’s Glass re: Analytical results
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to Jeffrey Dickerson re: Analytical results – another buildings results were attached to his
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to Jeffrey Richard & Sharon Tonnesen re: Analytical results
Site-Wide Information
Task I - Analytical Results to Property Owners
BN LIVINGSTON 8/26/13
Page 192 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to P Bedbury re: Analytical results 09/11/08 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to V Anderson re: Analytical results 09/15/08 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to City re: Analytical results 09/17/08 DEQ
13 01 11 10 01 04 RM 10 RD/RA D Fredericks fax to DEQ w/WET analytical results 10/21/08 D Fredericks
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Fredericks re: Analytical results 10/30/08 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to J Litchfield re: Analytical results 12/05/08 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Gapwest Broadcasting re: Analytical results 12/18/08 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Bauers re: Analytical results 12/18/08 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to R & S Brewer re: Analytical results 01/07/09 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Rev Durgan re: Analytical results 01/07/09 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to K & Z Shelley re: Analytical results 01/08/09 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to J Huttinger re: Analytical results 01/09/09 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to T Toscano re: Analytical results 01/09/09 DEQ
13 01 11 10 01 04 RM 10 RD/RA 02/19/09 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 03/25/09 DEQ/ Reynolds
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to D Krohne re: Results of analyses of split sampling
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to D Amsk re: Results of analyses of split sampling
BN LIVINGSTON 8/26/13
Page 193 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 04 RM 10 RD/RA 03/30/09 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 03/30/09 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 03/30/09 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 04/17/09 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 04/17/09 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 05/22/09 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 03/19/09 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 04/08/10 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 04/09/10 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 04/09/10 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 04/13/10 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 04/13/10 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 04/13/10 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 04/14/10 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 04/14/10 DEQ/ Reynolds
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to T Elich re: Analytical results of air samples
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Per Gunness re: Analytical results of air samples
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to M Roberts re: Analytical results of air samples
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to G Stevens re: Analytical results of air samples
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to A Long re: Analytical results of air samples
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Mr & Mrs. Jones & J Whiteside re: Analytical results for indoor and soil vapor samples
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Residents re: Indoor air or soil gas sampling results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Resident/Boehm re: Indoor air & soil vapor sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Resident/Boehm & G Olsen re: Indoor air & soil vapor sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Resident/Dore re: Indoor air & soil vapor sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Resident/Fabian re: Indoor air & soil vapor sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Resident/Harris re: Indoor air & soil vapor sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Resident/Eddy re: Indoor air & soil vapor sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Resident/Amsk re: Indoor air & indoor air split sample & soil vapor sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Resident/Erickson re: Indoor air, outdoor air & soil vapor sample results
BN LIVINGSTON 8/26/13
Page 194 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 04 RM 10 RD/RA 04/22/10 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 04/22/10 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 04/26/10 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 04/26/10 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 04/26/10 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 04/28/10 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 05/11/10 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 05/11/10 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 05/12/10 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 05/12/10 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 05/12/10 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 05/12/10 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 05/12/10 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 05/12/10 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA DEQ/Reynolds fax to Resident/Krohne re: Sampling results 06/01/10 DEQ/ Reynolds
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Resident/Earl re: Unvalidated laboratory data as requested
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Resident/Krohne re: Unvalidated laboratory data as requested
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Resident/Durgan re: Indoor air & soil vapor sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Resident/L Guggia re: Indoor air & soil vapor sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Resident/M Guggia re: Indoor air & soil vapor sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds email to Resident/Drimall re: Location 601 E Gallatin preliminary lab analytical results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Resident/Gunness & Crystal re: Indoor air & soil vapor sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Resident/Scholls re: Indoor air & soil vapor sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Resident/Elich re: Indoor air & soil vapor sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Resident/Hamilton re: Indoor air & soil vapor sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Resident/Homans re: Indoor air & soil vapor sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Resident/Eschenko re: Indoor air & soil vapor sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Resident/Fry re: Indoor air & soil vapor sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Resident/Elliot re: Indoor air & soil vapor sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
BN LIVINGSTON 8/26/13
Page 195 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 04 RM 10 RD/RA 06/02/10 Krohne
13 01 11 10 01 04 RM 10 RD/RA DEQ/Reynolds fax to Resident/Krohne re: Sampling results 06/03/10 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA Resident/Cook & DEQ/Reynolds emails re: 511 E Gallatin 06/04/10
13 01 11 10 01 04 RM 10 RD/RA 6/9-6/10/10
13 01 11 10 01 04 RM 10 RD/RA 06/25/10
13 01 11 10 01 04 RM 10 RD/RA 7/22-7/27/10
13 01 11 10 01 04 RM 10 RD/RA 11/03/10 Coleman
13 01 11 10 01 04 RM 10 RD/RA 11/03/10 J Mastin
13 01 11 10 01 04 RM 10 RD/RA 01/12/11 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 03/24/11 DEQ/ Reynolds
13 01 11 10 01 04 RM 10 RD/RA 03/25/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 04/04/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 04/12/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/06/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/06/11 DEQ
Site-Wide Information
Task I - Analytical Results to Property Owners
Resident/Krohne email to DEQ/Reynolds re: Sample results needed in easy to read format
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Resident/Horiel & DEQ/Reynolds emails re: Preliminary, unvalidated lab results
Site-Wide Information
Task I - Analytical Results to Property Owners
Resident/Drimal & DEQ/Reynolds re: 601 E Gallatin st preliminary unvalidated lab results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds & C Lawellin emails re: Mitigation on property on North I St
Site-Wide Information
Task I - Analytical Results to Property Owners
Coleman/Resident & DEQ/Reynolds emails re: Air quality results for 128 South F Street
Site-Wide Information
Task I - Analytical Results to Property Owners
J Mastin/Resident & DEQ/Reynolds emails re: Air quality results for 110 South H Street
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds email to Mr O’Day re: Attachment – 2009-2010 results for vapor intrusion sampling at residence
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letters to Residents re: HAPSITE letters for 2011 sampling
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to D Babcox re: No sampling required at 304 East Park St
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to M Roberts re: Enclosed 2008 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ email to Primo & Martich re: Address changes for database
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to J Bauerre re: Enclosed 2008 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to D Betcher re: Enclosed 2009 & 2010 air sampling data
BN LIVINGSTON 8/26/13
Page 196 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 04 RM 10 RD/RA DEQ letter toN Betley re: Enclosed 2009 air sampling data 05/06/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/06/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to D Black re: Enclosed 2009 air sampling data 05/06/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/06/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/06/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to P Brandon re: Enclosed 2009 air sampling data 05/06/09 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/09/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to M Bednarek re: Enclosed 2009 air sampling data 05/09/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to N Adkins re: Enclosed 2009 air sampling data 05/09/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/09/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to D Amsk re: Enclosed 2010 air sampling data 05/13/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to V Blakeman re: Enclosed 2009 air sampling data 05/13/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to C Boehm re: Enclosed 2010 air sampling data 05/13/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/13/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to A Conley re: Enclosed 2009 air sampling data 05/13/11 DEQ
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to S Bondurantre re : Enclosed 2009 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to Bresnan Communications re: Enclosed 2008 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to S Brewer re: Enclosed 2008 & 2009 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to N Akerstrom re: Enclosed 2009 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to K Bergsing re: Enclosed 2009 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to City of Livingston re: Enclosed 2008, 2009 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
BN LIVINGSTON 8/26/13
Page 197 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 04 RM 10 RD/RA 05/13/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to M Drimall re: Enclosed 2010 air sampling data 05/13/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to K Erickson re: Enclosed 2010 air sampling data 05/13/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to G Fabian re: Enclosed 2010 air sampling data 05/13/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to C Fenton re: Enclosed 2010 air sampling data 05/13/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to P Gunness re: Enclosed 2010 air sampling data 05/13/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to F Horiel re: Enclosed 2010 air sampling data 05/13/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to B Perriman re: Enclosed 2010 air sampling data 05/13/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/16/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to B Bullock re: Enclosed 2009 air sampling data 05/16/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to J Burgan re: Enclosed 2009 air sampling data 05/16/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to T Coleman re: Enclosed 2010 air sampling data 05/16/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to O Coon re: Enclosed 2009 air sampling data 05/16/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to K Crossman re: Enclosed 2010 air sampling data 05/16/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/16/11 DEQ
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to Country Motor Inn re: Enclosed 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to M Bruha re: Enclosed 2009 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to R Decker re: Enclosed 2009 & 2010 air sampling data
BN LIVINGSTON 8/26/13
Page 198 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to K Crossman re: Enclosed 2008 air sampling data 05/16/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to D Eddy re: Enclosed 2010 air sampling data 05/16/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to D Eggar re: Enclosed 2009 air sampling data 05/16/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to G Fawcett re: Enclosed 2009 air sampling data 05/16/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/16/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to D Frederick re: Enclosed 2009 air sampling data 05/16/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to M Giuliano re: Enclosed 2010 air sampling data 05/16/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to D Kellem re: Enclosed 2010 air sampling data 05/16/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to R Frederick re: Enclosed 2009 air sampling data 05/17/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to C Lawellin re: Letters sent to your clients in 2011 05/18/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/19/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/19/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/19/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/19/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/19/11 DEQ
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to D Ferris re: Enclosed 2009 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to 1511 East Lewis St re: Copy of letter sent to landlord regarding sampling at your home 542A
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to 1511 East Lewis St re: Copy of letter sent to landlord regarding sampling at your home 514
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to 326 North L St re: Copy of letter sent to landlord regarding sampling at your home 23B
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to 102 1/2 South G St re: Copy of letter sent to landlord regarding sampling at your home 317B
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to 111 South L St re: Copy of letter sent to landlord regarding sampling at your home 556
BN LIVINGSTON 8/26/13
Page 199 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 04 RM 10 RD/RA 05/19/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/19/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/19/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/19/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/19/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ 5/19/11 letter to 1511 East Lewis returned 05/19/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ 5/19/11 letter to 416 North K St returned 05/19/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ 5/19/11 letter to 924 East Park St returned 05/19/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to S Dore re: Enclosed 2010 air sampling data 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to J Fox re: Enclosed 2010 air sampling data 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to C Goode re: Enclosed 2009 air sampling data 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to S Gregorich re: Enclosed 2009 air sampling data 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/20/11 DEQ
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to 105 South P St re: Copy of letter sent to landlord regarding sampling at your home 510
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to 103 South N St re: Copy of letter sent to landlord regarding sampling at your home 531
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to 102 North H St re: Copy of letter sent to landlord regarding sampling at your home 166
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to 924 East Park St re: Copy of letter sent to landlord regarding sampling at your home 143
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to 416 North K St re: Copy of letter sent to landlord regarding sampling at your home NE-4
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to GapWest Broadcasting re: Enclosed 2008 & 2009 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to Hamilton Holdings re: Enclosed 2009 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners DEQ letter to H Lee Harris re: Enclosed 2009 air sampling data
BN LIVINGSTON 8/26/13
Page 200 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to J Haskins re: Enclosed 2009 air sampling data 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to G Holiway re: Enclosed 2009 air sampling data 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to A Hueitt re: Enclosed 2009 air sampling data 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to J Hueitt re: Enclosed 2009 air sampling data 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to E Kinnick re: Enclosed 2009 air sampling data 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to S Lage re: Enclosed 2009 air sampling data 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to D Lewis re: Enclosed 2010 air sampling data 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to T Lewis re: Enclosed 2009 air sampling data 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to J Litchfield re: Enclosed 2010 air sampling data 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to L Mahr re: Enclosed 2009 air sampling data 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to M Marsh re: Enclosed 2009 air sampling data 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to T Massey re: Enclosed 2010 air sampling data 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to J Mastin re: Enclosed 2010 air sampling data 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to L Mathias re: Enclosed 2009 air sampling data 05/20/11 DEQ
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to Knife River - Livingston Ready Mix re: Enclosed 2009 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
BN LIVINGSTON 8/26/13
Page 201 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to J Nelson re: Enclosed 2009 air sampling data 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Tirerama re: Enclosed 2008 air sampling data 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to F Greear re: Enclosed 2009 air sampling data 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ letter to G Frye re: Enclosed 2009 air sampling data 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ 5/20/11 letter to Lee Harris returned 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ 5/20/11 letter to Sharon Gregorich returned 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ 5/20/11 letter to Sharon Gregorich returned 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ 5/20/11 letter to Sharon Gregorich returned 05/20/11 DEQ
13 01 11 10 01 04 RM 10 RD/RA DEQ 5/20/11 letter to Graham & Caitlin Fry returned 05/20/11 DEQ
13 01 11 10 01 04 RD/RA DEQ letter to S Graham re: Enclosed 2009 air sampling data 05/25/11 DEQ
13 01 11 10 01 04 RD/RA 05/26/11 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA DEQ 5/26/11 letter to 1205 S Grand Ave returned 05/26/11 DEQ
13 01 11 10 01 04 RD/RA 05/26/11 DEQ
13 01 11 10 01 04 RD/RA 05/26/11 DEQ
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to G Worthington re: Enclosed 2008 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds & C Lawellin emails re: DEQ still sending out pre-2011 air data letters - Stephens property - location 127
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to R Smith re: Enclosed 2008 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to J Huttinger re: Enclosed 2009 & 2010 air sampling data
BN LIVINGSTON 8/26/13
Page 202 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 04 RD/RA 05/26/11 DEQ
13 01 11 10 01 04 RD/RA DEQ letter to L Lahren re: Enclosed 2008 air sampling data 05/26/11 DEQ
13 01 11 10 01 04 RD/RA 05/26/11 DEQ
13 01 11 10 01 04 RD/RA DEQ letter to A Mitchell re: Enclosed 2009 air sampling data 05/26/11 DEQ
13 01 11 10 01 04 RD/RA 05/26/11 DEQ
13 01 11 10 01 04 RD/RA DEQ letter to D Nelson re: Enclosed 2009 air sampling data 05/26/11 DEQ
13 01 11 10 01 04 RD/RA 05/26/11 DEQ
13 01 11 10 01 04 RD/RA 05/26/11 DEQ
13 01 11 10 01 04 RD/RA 05/26/11 DEQ
13 01 11 10 01 04 RD/RA DEQ letter to A Pinar re: Enclosed 2009 air sampling data 05/26/11 DEQ
13 01 11 10 01 04 RD/RA 05/26/11 DEQ
13 01 11 10 01 04 RD/RA DEQ letter to T Roth re: Enclosed 2010 air sampling data 05/26/11 DEQ
13 01 11 10 01 04 RD/RA DEQ letter to D Selkirk re: Enclosed 2010 air sampling data 05/26/11 DEQ
13 01 11 10 01 04 RD/RA DEQ letter to K Shelley re: Enclosed 2009 air sampling data 05/26/11 DEQ
13 01 11 10 01 04 RD/RA 05/26/11 DEQ
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to M Jones re: Enclosed 2009 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to C McAdam re: Enclosed 2009 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to J Nardella re: Enclosed 2009 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to Northwestern Energy re: Enclosed 2009 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to A O’Dea re: Enclosed 2009 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to Todd Parker re: Enclosed 2009 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to M Ross re: Enclosed 2008 & 2009 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to T Skurski re: Enclosed 2009 & 2010 air sampling data
BN LIVINGSTON 8/26/13
Page 203 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 04 RD/RA 05/27/11 DEQ
13 01 11 10 01 04 RD/RA DEQ letter to L Nelson re: Enclosed 2009 air sampling data 05/27/11 DEQ
13 01 11 10 01 04 RD/RA DEQ letter to G Smith re: Enclosed 2008 air sampling data 05/27/11 DEQ
13 01 11 10 01 04 RD/RA DEQ letter to K Downey re: Enclosed 2009 air sampling data 05/31/11 DEQ
13 01 11 10 01 04 RD/RA 05/31/11 DEQ
13 01 11 10 01 04 RD/RA 05/31/11 DEQ
13 01 11 10 01 04 RD/RA 05/31/11 DEQ
13 01 11 10 01 04 RD/RA DEQ letter to M Zimmer re: Enclosed 2009 air sampling data 06/01/11 DEQ
13 01 11 10 01 04 RD/RA DEQ letter to R Ziebarth re: Enclosed 2009 air sampling data 06/01/11 DEQ
13 01 11 10 01 04 RD/RA 06/01/11 DEQ
13 01 11 10 01 04 RD/RA 06/01/11 DEQ
13 01 11 10 01 04 RD/RA DEQ letter to J Whiteside re: Enclosed 2010 air sampling data 06/01/11 DEQ
13 01 11 10 01 04 RD/RA DEQ letter to J Wendland re: Enclosed 2009 air sampling data 06/01/11 DEQ
13 01 11 10 01 04 RD/RA 06/01/11 DEQ
13 01 11 10 01 04 RD/RA 06/01/11 DEQ
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to L Munro re: Enclosed 2009 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to M Roberts re: Enclosed 2008 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to H Sims re: Enclosed 2009 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to 103 South M St re: Letter sent to landlord regarding sampling done before 2011
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to D Zarnt re: Enclosed 2009 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ 6/1/11 letter to R Ziebarth returned re: Enclosed 2009 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to E Vanderwende re: Enclosed 2009 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to Turek & Pitman re: Enclosed 2009 air sampling data
BN LIVINGSTON 8/26/13
Page 204 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 04 RD/RA DEQ letter to T Toscano re: Enclosed 2009 air sampling data 06/01/11 DEQ
13 01 11 10 01 04 RD/RA 06/01/11 DEQ
13 01 11 10 01 04 RD/RA DEQ letter to A Tewell re: Enclosed 2009 air sampling data 06/01/11 DEQ
13 01 11 10 01 04 RD/RA 06/01/11 DEQ
13 01 11 10 01 04 RD/RA 06/01/11 DEQ
13 01 11 10 01 04 RD/RA DEQ letter to G Stewart re: Enclosed 2009 air sampling data 06/01/11 DEQ
13 01 11 10 01 04 RD/RA DEQ letter to G Stephens re: Enclosed 2010 air sampling data 06/01/11 DEQ
13 01 11 10 01 04 RD/RA DEQ letter to J Revoir re: Enclosed 2009 air sampling data 06/01/11 DEQ
13 01 11 10 01 04 RD/RA DEQ letter to D Merideth re: Enclosed 2008 air sampling data 06/01/11 DEQ
13 01 11 10 01 04 RD/RA 06/01/11 DEQ
13 01 11 10 01 04 RD/RA DEQ letter to D Lichty re: Enclosed 2008 air sampling data 06/01/11 DEQ
13 01 11 10 01 04 RD/RA 06/01/11 DEQ
13 01 11 10 01 04 RD/RA 06/01/11 DEQ
13 01 11 10 01 04 RD/RA DEQ letter to S Kautzman re: Enclosed 2009 air sampling data 06/01/11 DEQ
13 01 11 10 01 04 RD/RA DEQ letter to W Jones re: Enclosed 2008 air sampling data 06/01/11 DEQ
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to T Sweeney re: Enclosed 2009 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to R Tonnesen re: Enclosed 2008 & 2009 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to M Strong re: Enclosed 2008 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ 6/1/11 letter to R Tonnesen returned re: Enclosed 2008 & 2009 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to B Lahren re: Enclosed 2009 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to D Krohne re: Enclosed 2008 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
BN LIVINGSTON 8/26/13
Page 205 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 04 RD/RA 06/01/11 DEQ
13 01 11 10 01 04 RD/RA 06/01/11 DEQ
13 01 11 10 01 04 RD/RA DEQ letter to W Gonder re: Enclosed 2008 air sampling data 06/01/11 DEQ
13 01 11 10 01 04 RD/RA 06/01/11 DEQ
13 01 11 10 01 04 RD/RA 06/01/11
13 01 11 10 01 04 RD/RA 06/01/11
13 01 11 10 01 04 RD/RA DEQ 5/26/11 letter to Dana Nelson resent to Po Box 2244 06/09/11
13 01 11 10 01 04 RD/RA DEQ 5/16/11 letter to D Kellem resent to 525 US Hwy 89 N 06/09/11
13 01 11 10 01 04 RD/RA 06/09/11
13 01 11 10 01 04 RD/RA 08/17/11 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 08/18/11 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 09/12/11 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 09/12/11 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 09/12/11 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 09/12/11 DEQ/ Reynolds
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to T Jones re: Enclosed 2008 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to T Herranen re: Enclosed 2008 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ letter to Chappell & Chappell, LLC re: Enclosed 2009 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ 6/1/11 letter to T Sweeney returned re: Enclosed 2009 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ 6/1/11 letter to B Lahren returned re: Enclosed 2009 & 2010 air sampling data
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners DEQ 5/26/11 letter to Caitlin Ryan resent to 806 E Callender St
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Erlynn Harris re: Indoor air sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Brian Perriman re: Indoor air sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Jim Nardella re: Indoor air sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Nancy Adkins re: Indoor air sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Chris Jorgensen re: Indoor air sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Gerald Stephens re: Indoor air sample results
BN LIVINGSTON 8/26/13
Page 206 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 04 RD/RA 09/12/11 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 09/26/11 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 09/26/11 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 09/26/11 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 09/26/11 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 09/26/11 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 09/26/11 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 09/27/11 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 09/27/11 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 09/27/11 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 09/27/11 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 09/27/11 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 09/27/11 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 09/27/11 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA DEQ/Reynolds letter Samuel Dore re: No VI in your home 10/05/11 DEQ/ Reynolds
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Kelly Bergsing re: Indoor air sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Carter Boehm re: Indoor air sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to City of Livingston re: Indoor air sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Country Motor Inn re: Indoor air sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to George Fabian re: Indoor air sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter toCentury Warehousing Inc re: Indoor air sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Bill Gonder re: Indoor air sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Betty Lahren re: Indoor air sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Austin O'Dea re: Indoor air sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Todd Parker re: Indoor air sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Manuella Roberts re: Indoor air sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Raymond Ziebarth re: Indoor air sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Margaret Zimmer re: Indoor air sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Johnny Fox re: Indoor air sample results
Site-Wide Information
Task I - Analytical Results to Property Owners
BN LIVINGSTON 8/26/13
Page 207 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 04 RD/RA 11/30/11 T Culver
13 01 11 10 01 04 RD/RA 12/02/11
13 01 11 10 01 04 RD/RA 12/02/11
13 01 11 10 01 04 RD/RA 12/06/11
13 01 11 10 01 04 RD/RA 01/31/12 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 04/04/12 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 04/05/12 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 08/15/12 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 10/15/12 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 01/02/13 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 01/02/13 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 01/02/13 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 01/14/13 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 01/14/13 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 01/14/13 DEQ/ Reynolds
Site-Wide Information
Task I - Analytical Results to Property Owners
Edwards Fickle & Culver Law/Culver letter to DEQ legal/Haque-Hausrath re: Access to D Krohne's property
Site-Wide Information
Task I - Analytical Results to Property Owners
Cok Kinzler Law/McGarry letter to BKBH/Hoven re: Response to 11/17/11 letter
Cok Kinzler/ McGarry
Site-Wide Information
Task I - Analytical Results to Property Owners
Cok Kinzler Law/McGarry letter to BKBH/Hoven re: Response to 11/17/11 letter & T Culver 11/30/11 letter to DEQ/Haque-Hausrath
Cok Kinzler/ McGarry
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ legal/Haque-Hausrath letter to Triel Culver re: Installation of mitigationsystems and access to Krohnes properties
DEQ legal/ Haque-Hausrath
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Keren Walters re: Attachment - Sampling information that Walters requested
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Dan & Tara Eddy re: Summary information for site specific properties owned by the Eddys
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Dan & Tara Eddy re: Summary information for site specific properties owned by the Eddys
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Maggie Hayden re: Radon mitigation system
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to MRL/Walsh re: Iron Shop vapor intrusion results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Northwestern Energy/Asay re: Indoor air sample resultslocation 20
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to George Fabian re: Indoor air sample results location 39
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to George Fabian re: Indoor air sample results location 42
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Bresnan Communications/Golie re: Indoor air sample results for location 69
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to City of Livingston re: Indoor air sample results for locations 78 & 78M
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Steve Brewer re: Indoor air sample results for location 47
BN LIVINGSTON 8/26/13
Page 208 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 10 01 04 RD/RA 01/14/13 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 01/14/13 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 02/13/13 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 03/07/13 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 03/22/13 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 04/11/13 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 04/11/13 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 04/16/13
13 01 11 10 01 04 RD/RA 04/30/13
13 01 11 10 01 04 RD/RA 04/30/13 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA DEQ/Reynolds letter to D&TEddy re: Indoor air sample results 05/17/13 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 06/06/13 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 06/06/13 DEQ/ Reynolds
13 01 11 10 01 04 RD/RA 06/18/13 DEQ/ Reynolds
13 01 11 11 RD/RA
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Charles Taylor re: Indoor air sample results for location 43
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Montana Homes/Boehm re: Indoor air sample results for location 68B
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Century Warehousing/McCormick re: Indoor air sample results for location 111
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to MRL/Gustin re: Indoor air sample results for the Livingston shop Complex 704 East Gallatin
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to C Walters re: Indoor air sample results for location SE-3 119 North I Street
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to L Nelson re: Indoor air sample results for location H 513 N I Street
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Ed & Marie Kinnick re: Indoor air sample results for locations 272, 349A, 349B & 349C
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds & C Lawellin emails re: Dave Krause property up for sale…question about sampling for VI
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds & Nels Swandal emails re: Questions about106 South M Street
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to N Betley % of Nels Swandal re: Indoor air sample results for location 554 106 South M Street
Site-Wide Information
Task I - Analytical Results to Property Owners
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Century Warehousing re: Task I resent letter to Century Waresousing
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds & Commerce/Kmiller emails re: Livingston Food Pantry Task I results
Site-Wide Information
Task I - Analytical Results to Property Owners
DEQ/Reynolds letter to Jacob Burgan re: Task I letter results to Jacob Burgan
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
BN LIVINGSTON 8/26/13
Page 209 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 RD/RA Preliminary Testing September 2001-2004 2001-2004
13 01 11 11 RD/RA DEQ internal email re: 2/15/02 meeting 01/31/02 DEQ internal
13 01 11 11 RD/RA DEQ internal email re: 2/15/02 meeting 02/13/02 DEQ internal
13 01 11 11 RD/RA Meeting minutes 02/15/02
13 01 11 11 RD/RA 02/15/02
13 01 11 11 RD/RA Phone Log - McCaffery/Envirocon 02/26/02
13 01 11 11 RD/RA Phone Log - Smith/BNSF 02/28/02
13 01 11 11 RD/RA Phone Log - McCaffery/Envirocon 03/12/02
13 01 11 11 RD/RA K/J letter to DEQ re: Summary of 9/12/06 Site Walk/Meeting 09/18/06 KJ
13 01 11 11 RD/RA Y 09/18/06 DEQ internal
13 01 11 11 RD/RA 09/20/06 DEQ
13 01 11 11 RD/RA K/J email to DEQ re: Rush results for SB1 & 2 10/20/06 KJ
13 01 11 11 RD/RA 11/06/06 KJ
13 01 11 11 RD/RA K/J email to DEQ re: Task D & E lab reports on website 11/17/06 KJ
13 01 11 11 RD/RA 11/20/06 KJ
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
Draft agenda for BNSF meeting with DEQ re: LNAPL remediation
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
** DEQ Memorandum to DEQ Director Opper re: BN comments on DEQ’s Draft RAWP for Task D & Task E
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
DEQ letter to D Smith/BNSF re: Final RAWP for Task D & E Petroleum Hydrocarbon Recovery & Remediation for BN Shop Complex
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
K/J transmittal to DEQ re: Boring & well construction logs, Daily field logs, Pilot test field data forms, & IDW tracking forms
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
K/J transmittal to DEQ re: Boring & well construction logs, Drilling field notes, Field equipment calibration logs, Daily field logs, Pilot test field data forms, IDW tracking forms, & Water level & LNAPL thickness measurements
BN LIVINGSTON 8/26/13
Page 210 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 RD/RA 12/04/06 KJ
13 01 11 11 RD/RA K/J email to DEQ re: New “EX” well sampling schedule 12/22/06 KJ
13 01 11 11 RD/RA 01/27/07 KJ
13 01 11 11 RD/RA 01/03/07 KJ
13 01 11 11 RD/RA DEQ letter to Krohnes re: Sampling results 06/06/07 DEQ
13 01 11 11 RD/RA 07/25/07 KJ
13 01 11 11 RD/RA Y ** DEQ internal email re: Request for legal opinion 05/01/08 DEQ internal
13 01 11 11 RD/RA KJ letter to DEQ re: Request for Contained-in Determination 07/23/08 KJ
13 01 11 11 RD/RA KJ/DEQ emails re: Contained-in Determination 07/23/08
13 01 11 11 RD/RA KJ/DEQ emails re: Contained-in Determination letter 8/4-8/5/08
13 01 11 11 RD/RA 08/06/08 DEQ
13 01 11 11 RD/RA 06/21/11 KJ/Norris
13 01 11 11 RD/RA 06/21/11
13 01 11 11 RD/RA 01/09/12
13 01 11 11 RD/RA
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
K/J transmittal to DEQ re: Field Logs, GW well development forms & Field forms
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
K/J transmittal to DEQ re: Field equipment calibration logs, Daily field logs, Pilot test field data forms, IDW tracking forms, & Water level & LNAPL thickness measurements,
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
K/J transmittal to DEQ re: Packet of copies of documents & reports for AT&SF Railway, La Junta, CO. (In file # 1)
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
KJ transmittal of analytical results for treated water discharged to city sewer system
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
DEQ letter to BNSF re: Request for Contained-in Determination
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
K/J/Norris Technical Memorandum to DEQ re: LNAPL recoverability testing
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing DEQ/Reynolds & K/J/Norris emails re: Operational directive 60
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
DEQ/Reynolds & KJ/Norris emails re: Attachment LNAPL recovery summary table - long term & baildown testing
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing Recoverability Test Measurments - September 2010 - May 2012
BN LIVINGSTON 8/26/13
Page 211 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 RD/RA 08/30/12 KJ/Aldersley
13 01 11 11 CD RD/RA 2011 Task D/E Annual Report 12/31/12 KJ
13 01 11 11 01 RD/RA Task D & E Work Plans
13 01 11 11 01 CD RD/RA Task D & E Work Plans
13 01 11 11 01 RD/RA Task D & E Work Plans BN letter to DEQ re: Task D Work Plan 06/23/06 BN
13 01 11 11 01 RD/RA Task D & E Work Plans 08/04/06 CDM
13 01 11 11 01 RD/RA Task D & E Work Plans 08/10/06 DEQ
13 01 11 11 01 RD/RA Task D & E Work Plans 08/10/06 DEQ
13 01 11 11 01 RD/RA Task D & E Work Plans 08/10/06 DEQ
13 01 11 11 01 RD/RA Task D & E Work Plans 08/10/06 CDM
13 01 11 11 01 RD/RA Task D & E Work Plans 08/10/06 CDM
13 01 11 11 01 RD/RA Task D & E Work Plans 08/31/06 DEQ
13 01 11 11 01 RD/RA Task D & E Work Plans Task D&E Field notes 09/07/06
13 01 11 11 01 RD/RA Task D & E Work Plans RTI email to DEQ re: RTI comments on Task D&E Work Plan 09/08/06 RTI
13 01 11 11 01 RD/RA Task D & E Work Plans 09/11/06 BN
13 01 11 11 01 RD/RA Task D & E Work Plans Phone Log – R Keller to DEQ re: MRL possible expenses 09/11/06 R Keller
13 01 11 11 01 RD/RA Task D & E Work Plans 09/15/06 KJ
13 01 11 11 01 RD/RA Task D & E Work Plans 09/18/06 DEQ internal
13 01 11 11 01 RD/RA Task D & E Work Plans KJ letter to DEQ re: Summary of 9/12/06 Site Walk Meeting 09/18/06 KJ
13 01 11 11 01 RD/RA Task D & E Work Plans 09/20/06 CDM
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
KJ/Aldersley email to DEQ/Reynolds re: Attachment - Quarterly LNAPL recoverability testing data
Site-Wide Information
Tasks D & E – Free Product Recovery & Bioventing
Site-Wide Information
Site-Wide Information
Laboratory Evaluation of Diesel Fuel Behavior in the Vadose Zone of Livingston MT (M.S. Thesis – Peter J. Joy, 1990)
Site-Wide Information
Site-Wide Information CDM email to DEQ re: Task D&E Revised Work Plan Sections
Site-Wide Information
DEQ letter to RTI re: Draft Remedial Action Work Plan for Task D&E
Site-Wide Information
DEQ letter to MRL re: Draft Remedial Action Work Plan for Task D&E
Site-Wide Information
DEQ letter to BNSF re: Draft Remedial Action Work Plan for Task D&E
Site-Wide Information
CDM letter to DEQ re: Draft Remedial Action Work Plan for Task D&E
Site-Wide Information
Draft Remedial Action Work Plan for Task D&E – Petroleum Hydrocarbon Recovery & Remediation Report
Site-Wide Information
DEQ letter to BN re: DEQ response to Preparation for Draft RAWP for Task D&E Petroleum Hydrocarbon Recovery & Remediation for BN Shop Complex
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN letter to DEQ re: BN comments to Draft RAWP for Task D & E
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Task D&E RAWP Steps 1 & 2 Implementation Planning-Produced Fluids & Decon Water Treatment & Discharge
Site-Wide Information
DEQ memorandum to Director re: BNSF comments on DEQ’s Draft RAWP for Task D & E
Site-Wide Information
Site-Wide Information
Final Remedial Action Work Plan for Task D&E – Petroleum Hydrocarbon Recovery & Remediation Report
BN LIVINGSTON 8/26/13
Page 212 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 RD/RA Task D & E Work Plans 09/20/06 DEQ
13 01 11 11 01 RD/RA Task D & E Work Plans 10/04/06 BN
13 01 11 11 01 RD/RA Task D & E Work Plans 10/10/06 DEQ
13 01 11 11 01 RD/RA Task D & E Work Plans 10/10/06 DEQ
13 01 11 11 01 RD/RA Task D & E Work Plans Treated GW Discharge Log
13 01 11 11 01 RD/RA Task D & E Work Plans 10/17/06
13 01 11 11 01 RD/RA Task D & E Work Plans KJ Field Memorandum 10/17/06 KJ
13 01 11 11 01 RD/RA Task D & E Work Plans KJ Fax to DEQ re: Encroachment Permit 11/02/06 KJ
13 01 11 11 01 RD/RA Task D & E Work Plans DEQ PRS Fax to DEQ SRS re: Use of monitoring wells 11/06/06 DEQ/PRS
13 01 11 11 01 RD/RA Task D & E Work Plans Abanaki – PetroXtractor– Well Oil Skimmer pamphlet 11/20/06
13 01 11 11 01 RD/RA Task D & E Work Plans Working Draft – Location of Geologic Cross Sections 12/01/06
13 01 11 11 01 RD/RA Task D & E Work Plans 12/11/06 DEQ
13 01 11 11 01 RD/RA Task D & E Work Plans January 2007 field notes
13 01 11 11 01 RD/RA Task D & E Work Plans Draft Tasks D&E La Junta equipment specs
13 01 11 11 01 RD/RA Task D & E Work Plans Draft – Climate Data La Junta vs. Livingston
13 01 11 11 01 RD/RA Task D & E Work Plans Visually Contaminated Soil Maps & Comatograms 01/01/07
13 01 11 11 01 RD/RA Task D & E Work Plans LNAPL Thickness Information 01/01/07
13 01 11 11 01 RD/RA Task D & E Work Plans Minimum 30% Design Content Livingston Shop Complex
13 01 11 11 01 RD/RA Task D & E Work Plans 02/01/07
13 01 11 11 01 RD/RA Task D & E Work Plans 02/12/07 KJ
13 01 11 11 01 RD/RA Task D & E Work Plans 02/16/07 KJ
Site-Wide Information
DEQ letter to BN re: Final Remedial Action Work Plan for Task D&E – Petroleum Hydrocarbon Recovery & Remediation Report
Site-Wide Information
BN letter to DEQ re: Final Remedial Action Work Plan for Task D&E – Petroleum Hydrocarbon Recovery & Remediation Report
Site-Wide Information
DEQ letter to MRL re: Final RAWP for Task D&E – Petroleum Hydrocarbon Recovery & Remediation
Site-Wide Information
DEQ letter to RTI re: Final RAWP for Task D&E – Petroleum Hydrocarbon Recovery & Remediation
Site-Wide Information
10/13-11/29/06
Site-Wide Information
DEQ letter to City of Livingston WWTP re: RAWP for Task D&E – Petroleum Hydrocarbon Recovery & Remediation
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ Memorandum to John Eisenbeis re: O&M Manual for La Junta CO GW Remediation System
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Working Draft – Summary of Soil Gas Influent & Treatment System Effluent Analytical Results – Pilot Tests
Site-Wide Information
KJ Calculation Memorandum to J Norris re: Remedial Action Petroleum Hydrocarbon Recovery GAC Vessel Sizing
Site-Wide Information
KJ email to DEQ re: Livingston Deliverables Task D & E Steps 1 & 2 Report & Step 3 Work Plan
BN LIVINGSTON 8/26/13
Page 213 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 RD/RA Task D & E Work Plans 02/20/07 KJ
13 01 11 11 01 RD/RA Task D & E Work Plans 02/22/07 ZZA Inc
13 01 11 11 01 CD RD/RA Task D & E Work Plans Task D & E Steps 1 & 2 Report & Step 3 Work Plan 02/25/07 KJ
13 01 11 11 01 RD/RA Task D & E Work Plans 02/25/07 KJ
13 01 11 11 01 RD/RA Task D & E Work Plans 02/25/07 KJ
13 01 11 11 01 RD/RA Task D & E Work Plans 02/25/07 KJ
13 01 11 11 01 RD/RA Task D & E Work Plans 02/25/07 KJ
13 01 11 11 01 RD/RA Task D & E Work Plans 03/09/07
13 01 11 11 01 RD/RA Task D & E Work Plans 03/12/07 KJ
13 01 11 11 01 RD/RA Task D & E Work Plans 03/26/07 KJ
13 01 11 11 01 RD/RA Task D & E Work Plans 03/29/07 DEQ
13 01 11 11 01 RD/RA Task D & E Work Plans 04/10/07 KJ
13 01 11 11 01 RD/RA Task D & E Work Plans 04/11/07 DEQ/Bucy
13 01 11 11 01 RD/RA Task D & E Work Plans 05/07/07 PCEC
13 01 11 11 01 RD/RA Task D & E Work Plans 07/12/07 KJ
13 01 11 11 01 RD/RA Task D & E Work Plans 07/30/07 KJ
13 01 11 11 01 RD/RA Task D & E Work Plans 07/30/07 KJ
13 01 11 11 01 RD/RA Task D & E Work Plans DEQ letter to BNSF re: 7/30/07 WWTP Soil Stockpile SAP 08/06/07 DEQ
13 01 11 11 01 RD/RA Task D & E Work Plans 02/15/08 KJ
13 01 11 11 01 RD/RA Task D & E Work Plans 02/19/08 DEQ Legal
Site-Wide Information
KJ Calculation Memorandum to J Norris re: Petroleum Hydrocarbon Remedial Action Air Compressor System Sizing
Site-Wide Information
ZZA Inc letter to K/J re: Geotechnical Services for Proposed BN Water Treatment Facility
Site-Wide Information
Site-Wide Information
Appendix M for Task D & E Steps 1 & 2 Report & Step 3 Work Plan Vol I-II
Site-Wide Information
Appendix N for Task D & E Steps 1 & 2 Report & Step 3 Work Plan
Site-Wide Information
Appendix O for Task D & E Steps 1 & 2 Report & Step 3 Work Plan
Site-Wide Information
Appendix P for Task D & E Steps 1 & 2 Report & Step 3 Work Plan
Site-Wide Information
DEQ letter to BN re: Former Railyard Treatment Plan Sump Confirmation Sampling & Related Information
Site-Wide Information
KJ Internal draft Memorandum to DEQ re: Technical Information Related to the Task D&E-Phase I Remedial Action GW Treatment Equipment Pad Location
Site-Wide Information
KJ Tech Memo to J Norris re: Utilidor Upgrades Requested by DEQ
Site-Wide Information
DEQ UST Memo to DEQ SRS re: Application of UST Rules to BNLV tank systems
Site-Wide Information
KJ letter to DEQ re: Task D&E –Phase I Remedial Action 2007 – Bioventing System Off-Gas Management
Site-Wide Information
DEQ/Bucy email per Reynolds to CDM/Norris re: Attachment – CDM 4/9/07 data report work plan 30% design comments
Site-Wide Information
Park CO Environmental Council letter to DEQ re: Indoor air quality
Site-Wide Information
KJ letter report to DEQ re: K/J Response to CDM comments on Task D&E Steps 1 & 2 Report and Step 3 Work Plan and Task D&E – Phase I RA 2007 30% Design Report
Site-Wide Information
KJ letter to DEQ re: Waste Water Treatment Plant (WWTP) Soil Stockpile SAP
Site-Wide Information
KJ email to DEQ re: WWTP Soil Stockpile Sampling And Analysis Plan
Site-Wide Information
Site-Wide Information
K/J letter to CDM re: Drawing C-1 Task D&E Phase I Remedial Action 2007
Site-Wide Information
DEQ legal letter to K/J re: BN Shop Complex – Use of Documents Generated by K/J
BN LIVINGSTON 8/26/13
Page 214 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 CD RD/RA Task D & E Work Plans 02/25/08 KJ
13 01 11 11 01 RD/RA Task D & E Work Plans 03/14/08 CDM
13 01 11 11 01 RD/RA Task D & E Work Plans 03/14/08 CDM
13 01 11 11 01 RD/RA Task D & E Work Plans Addendum 1 to RAWP Task D&E 04/15/08 CDM
13 01 11 11 01 RD/RA Task D & E Work Plans DEQ letter to BN re: Addendum 1 to RAWP Task D&E 04/15/08 DEQ
13 01 11 11 01 RD/RA Task D & E Work Plans 04/25/08 BN
13 01 11 11 01 RD/RA Task D & E Work Plans DEQ email to KJ re: Biovent Well Sketch 05/08/08 DEQ
13 01 11 11 01 RD/RA Task D & E Work Plans BN Shop Complex Task D&E Phase I RA 2008 Working Draft 5/58/08 KJ
13 01 11 11 01 RD/RA Task D & E Work Plans 08/09/08 CDM
13 01 11 11 01 RD/RA Task D & E Work Plans 9/30-10/2/08 CDM
13 01 11 11 01 RD/RA Task D & E Work Plans 10/14/08 DEQ
13 01 11 11 01 RD/RA Task D & E Work Plans K/J letter to DEQ/Reynolds re: LNAPL Recoverability Testing 03/03/10 KJ
13 01 11 11 01 RD/RA Task D & E Work Plans 08/27/10 CDM/Hills
13 01 11 11 01 RD/RA Task D & E Work Plans 08/31/10 DEQ/ Reynolds
13 01 11 11 01 RD/RA Task D & E Work Plans 09/24/10 KJ/Aldersley
13 01 11 11 01 RD/RA Task D & E Work Plans 02/22/12 KJ/Aldersley
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes DEQ & CDM Meeting agenda 03/14/05
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 06/14/06
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference call w/MRL notes 06/27/06
Site-Wide Information
KJ CD containing DWF/PDF files for Livingston Project (received 2/25/08)
Site-Wide Information
CDM cover letter to DEQ re: Draft Addendum 1 to RAWP for Task D&E – Expansion of Phase I Step 3 Remediation Systems
Site-Wide Information
Draft Addendum 1 to RAWP for Task D&E – Expansion of Phase I Step 3 Remediation Systems
Site-Wide Information
Site-Wide Information
Site-Wide Information
BNSF letter to DEQ re: BN comments to Addendum # 1 to RAWP for Task D & E, Expansion of Phase1 Step 3 Remediation Systems
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM email to DEQ re: BNSF comments on RAWP Addendum 1
Site-Wide Information
CDM email to DEQ re: BNSF comments on RAWP Addendum 1 (9/30/08-10/2/08)
Site-Wide Information
DEQ letter to BNSF re: Response to BNSF’s 4/25/08 comments on RAWP Addendum
Site-Wide Information
Site-Wide Information
CDM/Hills Memorandum to DEQ/Reynolds re: Draft comments on Letter Proposal Titled “LNAPL Recoverability Testing” dated 8/3/10
Site-Wide Information
DEQ/Reynolds letter to BN/Smith re: 8/3/10 LNAPL Recoverability Testing – DEQ approves of the proposal & is providing comments
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Recoverability Testing
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Attachment - Upgraded spreadsheet of the LNAPL recoverability testing data
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 215 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Meeting w/MRL in Missoula 07/07/06
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes DEQ & CDM meeting notes 07/19/06
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes S Olsen meeting notes 08/31/06 DEQ/Olsen
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes BNSF Meeting – notes 08/31/06
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Task D&E Meeting notes 09/06/06
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Meeting Agenda notes 09/18/06
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes K/J Letter re: Summary of 9/12/06 Site Walk/Meeting 09/18/06 KJ
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Task D&E Meeting Agenda 09/20/06
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes BN Meeting – Task D&E notes
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Well Development Issue Meeting – CDM, K/J & DEQ 10/16/06
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 10/30/06
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes BN – CDM & DEQ Conference call notes 11/01/06
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes BN – CDM & DEQ Conference call notes 11/02/06
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference call notes 11/15/06
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 11/27/06
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 11/29/06
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 12/04/06
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Task D&E Pre-Design meeting notes 12/11/06
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 12/13/06
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Task D&E Design conference call notes 01/03/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 01/11/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes BNLV Design meeting notes 01/17/07
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 216 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 01/24/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Regular Design meeting 01/31/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Design Meeting notes 02/14/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 02/21/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Pre-meeting with CDM 02/28/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 03/07/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 03/14/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 03/20/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes UST Issues – meeting notes 03/21/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Task D/E Design meeting agenda & meeting notes 03/28/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Design Meeting 04/25/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Pre-meeting w/CDM 05/02/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Design Meeting 05/02/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 05/03/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Meeting with Carter Boehm, Mark Hartwig & Evan Russell 05/23/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 05/23/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Design Meeting notes 06/06/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes CDM pre-meeting 06/20/07 CDM
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 08/01/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 08/15/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 08/24/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 08/29/07
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 217 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes BNSF Remedial Action chart 09/25/07 BN
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 09/27/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 10/10/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 10/19/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 10/24/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 11/07/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 11/14/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 11/30/07
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 01/02/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 01/23/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 01/30/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 02/04/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 02/06/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 02/13/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 02/20/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 02/27/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 03/06/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Director Briefing Notes 03/06/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes 03/06/08 CDM/Hills
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 03/19/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 04/03/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 04/14/08
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
M Hills email re: Supporting info for Livingston hydrocarbon remediation
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 218 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes DEQ email re: 4/23/08 Minutes 04/25/08 DEQ
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Minutes 04/30/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Minutes 05/14/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Minutes 05/21/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 05/28/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Minutes 06/03/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Minutes 06/11/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Minutes 06/18/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes J Norris email re: 6/18/08 Meeting Notes 06/23/08 KJ/Norris
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes 07/02/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call notes 07/16/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call notes 07/17/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call notes 07/23/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call notes 07/30/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call notes 08/06/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call notes 08/13/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 09/03/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 09/10/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 09/17/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 09/24/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 10/01/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 10/08/08
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Conference call – Update on Operating Free Product Recovery & Bioventing System & discussion of 2008 construction
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 219 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 10/15/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 10/22/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 12/31/08
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 01/05/09
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 01/07/09
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 02/04/09
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 02/18/09
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 03/18/09
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 04/29/09
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 05/13/09
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 05/27/09
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 06/24/09
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes 09/23/09
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes 10/01/09
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes 10/07/09
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes 11/19/09
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes 12/17/09
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes 12/22/09
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes 01/05/10
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes – Task D&E Status meeting 06/02/10
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Conference Call Notes – Activities related to currant system operations for Task D&E Petroleum Remediation System
Site-Wide Information
Conference Call Notes – Discuss upgrade of the bioventing system and well rehabilitation
Site-Wide Information
Conference Call Notes - Conference Call Notes – Activities related to currant system operations for Task D&E Petroleum Remediation System
Site-Wide Information
Conference Call Notes – Activities related to currant system operations for Task D&E Petroleum Remediation System
Site-Wide Information
Conference Call Notes – Discuss potentially frozen LNAPL pipes and inoperative heat trace for task D/E petroleum remediation system
Site-Wide Information
Conference Call Notes – Time and cost efficiencies in Livingston related to Task D&E Remediation system O&M
Site-Wide Information
Conference Call Notes – LNAPL pipe freezing progress meeting
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 220 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes 11/19/10
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes 05/03/12
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes
13 01 11 11 01 01 RD/RA Task D & E Meeting Notes 08/02/13 DEQ/Reynolds
13 01 11 11 01 02 RD/RA Task D & E Emails
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal emails re: Request for additional Org Unit 05/10/06 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal emails re: New Org Unit Number 05/11/06 DEQ internal
13 01 11 11 01 02 RD/RA Task D & E Emails BN email to DEQ re: John-Farr Contact number 06/29/06 BN
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal emails re: Work plan and cost estimates 07/24/06 DEQ internal
13 01 11 11 01 02 RD/RA Task D & E Emails 07/27/06 DEQ internal
13 01 11 11 01 02 RD/RA Task D & E Emails 07/28/06 EPA
13 01 11 11 01 02 RD/RA Task D & E Emails 08/08/06 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Air Emissions letter 08/09/06 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails 08/11/06 DEQ ARMB
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Skimmer pump vendors 08/28/06 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails 08/28/06 KJ & DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails 08/29/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails BN email to DEQ re: RAWP Meeting – Conference number 08/30/06 BN
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to BN re: Livingston ROD interpretations 08/31/06 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails 08/31/06 KJ & DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails 08/31/06 KJ & DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails 09/06/06 KJ & DEQ
Site-Wide Information
Conference call – DEQ, BN, CDM, & K/J re: Proposed Vapor Monitoring Locations
Site-Wide Information
Conference call meeting notes - DEQ, CDM, & KJ re: Task D&E Bi-weekly meeting
Site-Wide Information
Geosyntec/Kavanaugh & DEQ/Bucy emails re: Attachment -Draft 11/7/12 meeting minutes & DEQ redlined version incorporating DEQ's edits
11/12-11/16/12
Site-Wide Information DEQ/Reynolds & KJ/Fernandes emails re: 8/2/13 meeting notes
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ internal emails re: Meeting w/Director Opper to discuss future BN costs
Site-Wide Information
EPA email to DEQ re: Class V remediation well rule authorization
Site-Wide Information
DEQ email to CDM re: Work Plan review, air permit and maps of the plume
Site-Wide Information
Site-Wide Information
DEQ ARMB email to DEQ REM re: Permit determination request & emissions calculations
Site-Wide Information
Site-Wide Information
KJ & DEQ emails re: 10-Day notification of Draft RAWP Field Activities
Site-Wide Information
KJ email to DEQ re: Preparation for Draft RAWP Field Activities
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ & DEQ emails re: Preparation for Draft RAWP Field Activities & list of pump vendors
Site-Wide Information
KJ & DEQ emails re: Preparation for Draft RAWP Field Activities & list of pump vendors
Site-Wide Information
DEQ/KJ emails re: Livingston visit – sample collection schedule
BN LIVINGSTON 8/26/13
Page 221 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/K/J emails re: Livingston visit – time & place 09/08/06 KJ & DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails 09/11/06 DEQ internal
13 01 11 11 01 02 RD/RA Task D & E Emails 09/12/06
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to CDM & DEQ re: Durham Geo Slope Indicator 9/13/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails BN email to DEQ re: BN comments to the RAWP 9/13/06 BN
13 01 11 11 01 02 RD/RA Task D & E Emails 09/13/06
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal email re: BN’s comments on Task D&E 09/15/06 DEQ internal
13 01 11 11 01 02 RD/RA Task D & E Emails 9/15/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 09/19/06
13 01 11 11 01 02 RD/RA Task D & E Emails KJ & DEQ emails re: Meetings 09/20/06
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to K/J re: Task D&E Meeting summary letter 09/22/06 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails RTI email to DEQ re: RTI comments on Task D&E RAWP 9/25/06 RTI
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Final RAWP Clarifications 09/26/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM & DEQ emails re: Final RAWP Clarifications 9/25-9/26/06
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Task D Product Skimmers 9/26/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to Ed Turner re: Final RAWP Clarifications 9/26/06 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Task D&E Meeting summary letter 9/26/06 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails 9/26/06 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Final RAWP Clarifications questions 09/27/06 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails 9/27/06 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & KJ emails re: Task D Product Skimmers 09/27/06
13 01 11 11 01 02 RD/RA Task D & E Emails 09/26/06
13 01 11 11 01 02 RD/RA Task D & E Emails 09/28/06 DEQ
Site-Wide Information
Site-Wide Information DEQ internal emails re: Task D&E Design Plan – cost recovery
Site-Wide Information
KJ/CDM emails to DEQ re: Draft RAWP, Pump test requirement
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ, CDM emails to DEQ re: Draft RAWP, Pump test requirement
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Proposed adjustment of some locations of soil borings and exploration monitoring wells to public right-of way
Site-Wide Information
DEQ & CDM emails re: Turn around time for sampling results – Alpine & Energy Labs
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ email to RTI re: Draft RAWP for Task D&E Petroleum Hydrocarbon Recovery & Remediation
Site-Wide Information
Site-Wide Information
DEQ email to K/J re: DEQ response to KJ email questions on Final RAWP
Site-Wide Information
Site-Wide Information
KJ & DEQ emails re: Drilling activity 10/3/06 & DEQ oversight of drilling activities
Site-Wide Information
DEQ email to City Manager re: Press release – Cleanup to Begin at Livingston Railyard
BN LIVINGSTON 8/26/13
Page 222 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ REM & Director emails re: Press Contact 09/28/06 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails 09/29/06 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails 10/2/06 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails 10/02/06
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal emails re: Press release 10/02/06 DEQ internal
13 01 11 11 01 02 RD/RA Task D & E Emails 10/4/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 10/09/06
13 01 11 11 01 02 RD/RA Task D & E Emails 10/09/06
13 01 11 11 01 02 RD/RA Task D & E Emails 10/09/06 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails 10/09/06
13 01 11 11 01 02 RD/RA Task D & E Emails K/J email to DEQ re: Product Skimmer Selection 10/10/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: QED’s Skimmer Recommendations 10/10/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails K/J & CDM emails re: Product Skimmer Selection 10/10/06
13 01 11 11 01 02 RD/RA Task D & E Emails CDM emails re: Proto-type testing 10/11/06 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails 10/11/06 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails K/J, CDM & DEQ emails re: QED skimmers – order them 10/13/06
13 01 11 11 01 02 RD/RA Task D & E Emails 10/16/06
13 01 11 11 01 02 RD/RA Task D & E Emails 10/17/06
13 01 11 11 01 02 RD/RA Task D & E Emails K/J & DEQ emails re: Pilot Test Issues 10/17/06
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to K/J re: Contact list for DEQ & CDM personnel 10/17/06 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails 10/17/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 10/17/06 KJ
Site-Wide Information
Site-Wide Information
CDM email to DEQ re: Oil Screen SOG & Proto-type testing SOG
Site-Wide Information
DEQ email to CDM re: Oil Screen SOG & Proto-type testing SOG
Site-Wide Information
CDM & Matt Winfield/Prosonic Corp emails re: Drill broke down – 1 drill at site
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: IDW Storage & Sampling Requirements for Final RAWP Implementation
Site-Wide Information CDM & KJ emails re: Pilot Test Observation Well Construction
Site-Wide Information CDM & KJ emails re: Pilot Test Observation Well Construction
Site-Wide Information
CDM email to DEQ re: Call w/KJ postponed until later – accident at site
Site-Wide Information
K/J & DEQ emails re: Pilot Test Multi-use Wells, Pilot Test SOG, and Pump Test
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ email to CDM re: Proto-type testing – if less than 1/8th inch of product in well the passive stage may be bypassed
Site-Wide Information
Site-Wide Information
K/J, CDM & DEQ emails re: Pilot test issues – conference call needed
Site-Wide Information
K/J, CDM & DEQ emails re: Pilot test issues- meeting summary
Site-Wide Information
Site-Wide Information
Site-Wide Information
K/J email to DEQ re: BN Livingston 1164 – results/Energy Labs
Site-Wide Information
K/J & forwarded email for Microbac Lab email to DEQ re: Results of product sampling from mid September
BN LIVINGSTON 8/26/13
Page 223 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & K/J emails re: Reporting of data in a timely manner 10/18/06
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & K/J emails re: Depot Plume Exploration Wells 10/21/06
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & KJ emails re: Weekend Status Report 10/23/06
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & KJ emails re: Weekend Status Report 10/23/06
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & KJ emails re: Pump test on PMW -1 10/24/06
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & KJ emails re: Weekend Status Report 10/24/06
13 01 11 11 01 02 RD/RA Task D & E Emails Jim Barrett & RTI emails re: Test Wells 10/24/06
13 01 11 11 01 02 RD/RA Task D & E Emails 10/24/06 Energy Labs
13 01 11 11 01 02 RD/RA Task D & E Emails CDM emails to DEQ re: Pilot Test Issues 10/25/06 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Final analytical results 11/1/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ & DEQ emails re: Issued discussed and agreed upon 11/03/06
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Final Analytical results for Air toxics 11/03/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 11/8/06
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & K/J emails re: High & low water sampling 11/8/06
13 01 11 11 01 02 RD/RA Task D & E Emails 11/08/06 KJ
13 01 11 11 01 02 CD RD/RA Task D & E Emails 11/09/06
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & KJ emails re: Pilot testing status
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & KJ emails re: Teleconference on Wed. 11/15/06 11/14/06
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & KJ emails re: Pilot testing status 11/14/06
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & KJ emails re: Topics for teleconference 11/14/06
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Analytical Reports 11/15/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 11/17/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 11/20/06 KJ
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Energy Lab email re: Results of sampling & First influent air sample from the pilot test
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ & DEQ emails re: Exploration Wells (11/5/06)K/J email to DEQ re: DGSI Skimmer report
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Final analytical reports for Air Toxics for vapor samples
Site-Wide Information
KJ email to DEQ re: 2005 Annual Monitoring & Maintenance Report on CD being sent
Site-Wide Information
11/11-11/13/06
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Trouble sending analytical reports via email
Site-Wide Information
KJ email to DEQ re: Analytical Reports posted on website/livshare on 11/20/06
BN LIVINGSTON 8/26/13
Page 224 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails 11/21/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Whitefish IRAP LNAPL Recovery update 11/22/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 11/27/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 11/30/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 12/04/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 12/5/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 12/06/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Roll Off Sampling 12/07/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 12/07/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 12/08/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 12/08/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Livingston Pre-Design meeting 12/9/06 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails 12/11/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 12/12/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ & DEQ emails re: Revised Roll-off Bin Sampling Protocol 12/13/06
13 01 11 11 01 02 RD/RA Task D & E Emails 12/14/06
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & KJ emails re: PMW-7 Pilot testing, Phase 3 12/14/06
13 01 11 11 01 02 RD/RA Task D & E Emails 12/14/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 12/19/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 12/19/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 12/21/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 12/28/06 KJ
Site-Wide Information
KJ email to DEQ re: Analytical Reports posted on website/livshare on 11/21/06
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Analytical Reports posted on website/livshare on 11/27/06
Site-Wide Information
KJ email to DEQ re: Analytical Reports posted on website/livshare on 11/30/06
Site-Wide Information
KJ email to DEQ re: Analytical Reports posted on website/livshare on 12/4/06
Site-Wide Information
DEQ email to Nic Winslow re: Pilot testing – belt skimming of wells
Site-Wide Information
KJ email to DEQ re: Analytical Reports posted on website/livshare on 12/6/06
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Analytical Reports posted on website/livshare on 12/7/06
Site-Wide Information KJ email to DEQ re: Pilot test water discharge to sanitary sewer
Site-Wide Information
KJ email to DEQ re: Analytical Reports posted on website/livshare on 12/8/06
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Analytical Reports posted on website/livshare on 12/11/06
Site-Wide Information
KJ email to DEQ re: Analytical Reports posted on website/livshare on 12/12/06
Site-Wide Information
Site-Wide Information
KJ & DEQ emails re: PMW-3 & installation of protective steel casings
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Analytical Reports posted on website/livshare on 12/14/06
Site-Wide Information
KJ email to DEQ re: Analytical Reports posted on website on 12/19/06
Site-Wide Information
KJ email to DEQ re: Working drafts of all the boring logs posted to website/livshare
Site-Wide Information
KJ email to DEQ re: Analytical Reports posted on website/livshare on 12/21/06
Site-Wide Information
KJ email to DEQ re: Analytical Reports posted on website/livshare on 12/28/06
BN LIVINGSTON 8/26/13
Page 225 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails 12/29/06 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 1/5/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 1/10/07
13 01 11 11 01 02 RD/RA Task D & E Emails 01/10/07
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Task D LNAPL measurements 01/10/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/DEQ emails re: Minimum 30% Design Content 01/15/07
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: 30 % Design Content 01/15/07
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal emails re: Effluent limits for air at BNLV 1/18/07 DEQ internal
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Effluent air emissions 1/18/07 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: DEQ ERCLs assistance 1/18/07 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: EX well sampling 01/22/07
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to MRL re: Flagger needed for 2/14-216/07 1/25/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: MRL Remediation System Coordination 01/26/07
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: MPDES permits 01/29/07
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Effluent air emissions 2/2/07
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Distribution list for Tasks D&E Report 02/07/07
13 01 11 11 01 02 RD/RA Task D & E Emails 02/07/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 02/13/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 02/14/07
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Liquid Phase GAC Isotherm Data 2/26/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 02/26/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ/CDM emails re: PVC screen & Task F Part 1 3/2/07
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Task E Air Model results 3/2/07 KJ
Site-Wide Information
KJ email to DEQ re: Analytical Reports posted on website/livshare on 12/29/06
Site-Wide Information
KJ email to DEQ re: “Working Draft” annotated outline for Tasks D&E steps 1 & 2 report & step 3 Work Plan
Site-Wide Information
DEQ/KJ emails re: Product thickness data & sampling well EX-4
Site-Wide Information DEQ/KJ emails re: Conference call & Task D&E reports update
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Task D&E Design Progress Teleconference on 2/7/07 + DEQ notes
Site-Wide Information
KJ email to DEQ re: Task D&E Design Progress Teleconference on 2/14/07 + attachment –design calcs memo for aqueous phase GAC unit sizing
Site-Wide Information
DEQ/BN emails re: Extension of due date for Task D&E fall 2006 activities
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Task D&E Treatment Pad Final Soils Report
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 226 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal emails re: Task E Air Model results 3/5/07 DEQ internal
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/CDM emails re: Task E Air Model results 3/5/07
13 01 11 11 01 02 RD/RA Task D & E Emails 03/06/07 Richard Uuglomo
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal email re: Task E Air Model results 03/06/07 DEQ internal
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Task E Air Model results 3/6/07
13 01 11 11 01 02 RD/RA Task D & E Emails 03/06/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 3/6/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 3/7/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Liquid-phase GAC Break Through Curves 3/9/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Letter about the WWTP sump 03/10/07
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to MPDES re: MPDES general permit 3/12/07 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails 3/13/07
13 01 11 11 01 02 RD/RA Task D & E Emails 03/13/07 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Treatment Pad Siting Information 3/13/07
13 01 11 11 01 02 RD/RA Task D & E Emails 3/14/08
13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Livingston Deliverables 3/16/07
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: La Junta Water Storage Tanks 3/16/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal emails re: Task E Air Model Outputs 3/19/07 DEQ internal
13 01 11 11 01 02 RD/RA Task D & E Emails 03/20/07 DEQ UST
13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: La Junta Water Storage Tanks 3/20/07
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Backwashing 03/20/07 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails 03/20/07 DEQ
Site-Wide Information
Site-Wide Information
Site-Wide Information
Richard Guglomo P.E. memorandum to KJ re: Task D&E Construction 2007
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Updated water level & apparent LNAPL thickness measurements
Site-Wide Information
KJ email to DEQ re: Request for Approval to purchase long lead items
Site-Wide Information
KJ email to DEQ re: Electrical Engineering Tech Memo & Drawings
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ/CDM emails re: Treatment Plant location & Howard Young Resume
Site-Wide Information
DEQ email to KJ re: General schedule of next phase(s) of project needed from BN
Site-Wide Information
Site-Wide Information
KJ/DEQ emails re: Task D&E – Phase 1 remedial action – Procurement
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ UST email to DEQ REM re: Livingston Shop Complex Remediation – UST Portion
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ email to K/J re: Long-lead time items to proceed with procurement
BN LIVINGSTON 8/26/13
Page 227 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails 03/21/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal email re: RCRA 3/21/07 DEQ internal
13 01 11 11 01 02 RD/RA Task D & E Emails 03/21/07 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails 3/22/07 DEQ internal
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: GAC comments 3/22/07 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: PMW wells incorporated into system 3/23/07
13 01 11 11 01 02 RD/RA Task D & E Emails CDM & DEQ emails re: New CDM team member 3/23/07
13 01 11 11 01 02 RD/RA Task D & E Emails 3/23/07
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Well locations & Soil characterization 03/26/07
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Design meeting in Helena 3/28/07 3/26/07
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to CDM re: GAC Vapor treatment costs 03/26/07 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to CDM & DEQ UST re: Utilidor modifications 03/26/07 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: SAP Addendum approval 3/26/07
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Well location & soil characterization 3/36/07
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Utilidor modifications 3/26/07
13 01 11 11 01 02 RD/RA Task D & E Emails 03/27/07
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ REM/DEQ UST emails re: Utilidor modifications 3/27/07 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails 3/27/07 DEQ UST
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Task E Air Model Outputs 03/27/07
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to CDM re: Task D&E vapor emissions 3/27/07 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/UST emails re: BNLV Memo 3/7/07 (3/29/07) 03/29/07 DEQ UST
13 01 11 11 01 02 04/04/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal email re: BNLV Groundwater 4/6/07 DEQ internal
Site-Wide Information
KJ email to DEQ re: Notice of UST Regulation conference call on 3/21/07
Site-Wide Information
Site-Wide Information
DEQ email to CDM re: Task D&E UST issues – conference call notes
Site-Wide Information
DEQ internal email re: Question on requiring a carbon discharge system
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ/DEQ emails re: GAC comments & Table 4 metals & Table 3 NA
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ/KJ emails re: Well location & soil characterization & location of disposal facility
Site-Wide Information
Site-Wide Information
UST Section email to DEQ SRS re: Meeting w/DEQ attorney to discuss utilidor & 30” pipe regulations
Site-Wide Information
Site-Wide Information
Site-Wide Information
K/J email to DEQ/CDM re: Monthly water level event – April 07
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 228 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
11 01 02 RD/RA Task D & E Emails 04/09/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email re: Off-Gas treatment 04/16/07 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails 4/16/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 4/17/07 DEQ internal
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Task D Water levels 04/19/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 4/21/07 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Biofiltration 04/23/07 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails 04/25/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to CDM re: Task D&E Emissions 5/1/07 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails 5/4/07 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails 5/4/07 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Scheduled activities 5/14/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Dumont Douglas resume 5/16/07 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Scheduled activities & updates 5/21/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Former WWTP Sump excavation 5/29/07
13 01 11 11 01 02 RD/RA Task D & E Emails 06/11/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 06/12/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 06/15/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 06/27/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Livingston deliverable 07/12/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 7/30/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 07/30/07 KJ
Site-Wide Information
KJ email to DEQ re: Updated Livingston P&IDs & Specifications
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: LNAPL sample results, including PCE analysis
Site-Wide Information
DEQ internal email re: LNAPL sample results, including PCE analysis
Site-Wide Information
Site-Wide Information
DEQ email to K/J re: Task D&E – Phase 1 Remedial Action Bioventing Off-Gas Management
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Addendums to the 30% Design Drawings & Specifications
Site-Wide Information
Site-Wide Information
CDM email to DEQ re: CDM 5/4/07 additional 30% design comments
Site-Wide Information
DEQ email to KJ re: CDM 5/4/07 additional 30% design comments
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ email to DEQ & CDM re: Geotechnical Report – Task D&E Phase 1 Remedial Action 2007 posted to website/livshare 6/11/07
Site-Wide Information
KJ email to DEQ re: Various Task D&E items posted to website/livshare 6/12/07
Site-Wide Information
KJ email to DEQ re: Updated Water Level/LNAPL thickness data – posted to website/livshare
Site-Wide Information
KJ email to DEQ re: RFI #1 addressed by Ed Turner – metal building instead of wood
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Updated construction schedule posted to the website/livshare
Site-Wide Information
KJ email to DEQ re: Updated Well Map posted to the website/livshare
BN LIVINGSTON 8/26/13
Page 229 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Livingston Private well L701 7/30/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 08/10/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 8/10/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 8/13/07
13 01 11 11 01 02 RD/RA Task D & E Emails 08/13/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 8/16/07 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails 08/17/07 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Recommended MUW Wells for start-up 08/21/07 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Start-up Data Recommendations 9/6/07 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal email re: Environmental Assessment 9/10/07 DEQ internal
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/DEQ emails re: TO 7 cost explanations 9/21/07
13 01 11 11 01 02 RD/RA Task D & E Emails 09/26/07
13 01 11 11 01 02 RD/RA Task D & E Emails 09/26/07 KJ
13 01 11 11 01 02 CD RD/RA Task D & E Emails 10/1/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Recommended Bioventing wells 10/02/07 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Recommended Bioventing wells (10/2/07) DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails 10/10/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 10/10/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 10/23/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails
13 01 11 11 01 02 RD/RA Task D & E Emails 10/24/07 KJ
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Task D MUW boring logs posted to website/livshare
Site-Wide Information
KJ email to DEQ re: WWTP soil stockpile sampling notification
Site-Wide Information
DEQ/KJ/CDM emails re: Task D&E Phase 1 Remedial Action – Working Draft O&M Manual Table of Content
Site-Wide Information
KJ email to DEQ re: Updated Water Level/LNAPL thickness data – posted to website/livshare
Site-Wide Information
CDM email to KJ re: Surface elevation survey data for the MUW wells
Site-Wide Information CDM email to DEQ re: Recommended MUW Wells for start-up
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ/DEQ emails re: Biweekly Task D/E design/construction meeting
Site-Wide Information
KJ email to DEQ re: Updated Task D&E schedule posted to website/livshare
Site-Wide Information
KJ email to DEQ re: Livingston Deliverables – Task I Draft Design Development Report
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ email/Fax to DEQ re: MUW Submersible Pump & Skimmer Installation
Site-Wide Information
KJ/CDM emails re: MUW Submersible Pump & Skimmer Installation
Site-Wide Information
KJ email to DEQ re: Task D&E Working Draft O&M Manual PDFs posted to website/livshare
Site-Wide Information
DEQ/CDM/EIC emails re: EIC’s Unique Approach to cost effective NAPL Remediation
10/23-10/14/07
Site-Wide Information
KJ email to DEQ re: Followup to 10/23/07 email – letter report for contained in decision for roll-off bin soil included in package
BN LIVINGSTON 8/26/13
Page 230 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails 10/26/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 10/31/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Task D&E Commissioning & Start-up
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: MUW coordinates 11/06/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 11/07/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Follow-up to 11/7/07 conference call 11/07/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal email re: Livingston & new RBSLs 11/9/07 DEQ internal
13 01 11 11 01 02 RD/RA Task D & E Emails 11/13/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ emails to KJ re: Excel file- datatable & wells pdf file 11/14/07 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails 11/14/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Krohne property data 11/20/07
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Posters for soil gas results 11/20/07 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails 12/16/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 12/17/07
13 01 11 11 01 02 RD/RA Task D & E Emails 12/18/07 DEQ internal
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to K/J re: O&M Plan posted to DEQ Website 12/19/07 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails 12/19/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 12/20/07 DEQ internal
13 01 11 11 01 02 RD/RA Task D & E Emails 12/20/07 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 12/24/07 KJ
Site-Wide Information
KJ email to DEQ re: Items posted to website/livshare: Task D&E MUW well development forms, updated fluid-level measurements. Task F: Water level data & GW potentiometric maps. Miscellaneous: Updated facility wide well location map
Site-Wide Information KJ email to DEQ re: Transducer Data posted to website/livshare
Site-Wide Information
DEQ/KJ emails re: Task D&E Commissioning & Start-up & Livingston Public Meeting
10/29 &11/4/07
Site-Wide Information 11/4 & 11/5/07
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Petroleum Rem System Start-up update & Copy of DEQ Params request
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ email to DEQ J/Wadhams re: Discharge of city water used for New Treatment Plant Hydraulic Testing
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Base Map CAD Drawing posted to website/livshare
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ email to DEQ J Wadhams re: Submittal of Initial Sampling Results per Petroleum Cleanup General Permit MTG790013
Site-Wide Information
KJ/DEQ emails re: DEQ Remediation System Operation Directive form
Site-Wide Information
DEQ internal email re: No legal comments on the Revised Draft O&M Plan
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: MUW Specific Capacity Tests posted to website/livshare
Site-Wide Information
DEQ internal email re: : DEQ Remediation System Operation Directive form
Site-Wide Information
KJ email to DEQ re: Startup Schedule for Task D&E – Phase 1 Rem System
Site-Wide Information
KJ email to DEQ re: Summary Table of LNAPL thickness & water level posted to the website/livshare
BN LIVINGSTON 8/26/13
Page 231 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Water & LNAPL measurements 12/31/07 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails 01/08/08 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails 01/09/08 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Network Connections for Treatment Plant 01/09/08 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails K/J email to DEQ re: Internet connection at site 01/09/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Discharge rates for startup 1/9/08 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails 01/10/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Bioventing startup modifications 01/24/08 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Casne emails re: Passwords 01/29/08
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/CDM emails re: K/J & CDM direct communications 1/30/08
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Casne emails re: Livingston electronic report file size 01/30/08
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Casne emails re: Livingston remote access 1/30/08
13 01 11 11 01 02 RD/RA Task D & E Emails 01/30/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Recovered LNAPL & Recycling 2/1/08
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Cold Weather Startup 2/4/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 02/04/08 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Copy of disk 02/05/08
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Communications need to go through DEQ 2/5/08
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Additional data – has been posted 2/5/08
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Casne emails re: Software Installation 2/7/08
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ IT Software Justification Form 02/07/08 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Casne emails re: Livingston Data Collection – IT issues 2/8/08
Site-Wide Information
Site-Wide Information
CDM email to DEQ re: Discharge rates for start up & Well Interference Model Display pdf
Site-Wide Information
DEQ Financial email to BN re: CDM Contract 4020009 & Profit Calculations
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ email to DEQ J Wadhams re: Submittal of Initial Sampling Results per Petroleum Cleanup General Permit MTG790013
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Startup Transducer Data posted to website/livshare
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM email to DEQ re: Telcon – K/J (Dick G) called to obtain clarification regarding requirements for obtaining a download of the PLC reporting file from the Livingston system
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 232 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Optimization staffing & schedule 02/08/08 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/CDM emails re: Official request for Drawing C-1 2/11/08
13 01 11 11 01 02 RD/RA Task D & E Emails 02/12/08 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails 02/12/08 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal emails re: Recycled oil questions 02/13/08 DEQ internal
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal emails re: Recovered diesel use 02/14/08 DEQ internal
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Recovered diesel use 2/14/08 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Official request for Drawing C-1 2/11/08
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & Casne emails re: Data logging 02/21/08
13 01 11 11 01 02 RD/RA Task D & E Emails 02/25/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ/Olympus emails re: Communication issues 2/28/08
13 01 11 11 01 02 RD/RA Task D & E Emails 02/28/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 02/29/08 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails 02/29/08 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Communication issues 3/2/08
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Xitech schedule 03/02/08
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Map showing additional wells 3/3/08 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails 3/6/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 03/07/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: System status notification – ruptured line 03/11/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: 3/18/08 LNAPL readings 3/17/08 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: LNAPL sample results L-87-7 03/18/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 03/19/08 CDM
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM email to DEQ re: Brief summary of the LNAPL pump optimization efforts
Site-Wide Information
CDM email to DEQ re: Summary of the NLAPL pump setting adjustments
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: PLC/SCADA data & Bioventing data posted to website
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Task D&E Phase 1 Remediation System Operations
Site-Wide Information
CDM email to DEQ re: Task D&E Phase 1 Remediation System Operations
Site-Wide Information
CDM email to DEQ re: Communication Issues – Xitech Directive form
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Fluid level measurements for 3/4-3/05/08 posted to the web
Site-Wide Information
KJ email to DEQ re: Biovent system monitoring posted to he web
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM email to DEQ re: Summary of 3/18/08 LNAPL thickness measurements
BN LIVINGSTON 8/26/13
Page 233 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Weekly Task D&E meeting rescheduled 3/28/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 03/31/08
13 01 11 11 01 02 RD/RA Task D & E Emails 03/31/08 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to CDM re: GAC fouling and Bioventing wells 3/31/08 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/CDM/KJ emails re: Bioventing testing schedule 4/2/08
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Bioventing restart 04/03/08 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Bioventing data posted to the web 04/03/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Task D&E Work Plan Addendum 04/04/08 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ SRS email to Director et al re: Product recovery 04/15/08 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to KJ re: RAWP Addendum #1 4/15/08 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ/CDM re: Proposed HDPE piping is adequate 05/01/08 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Meeting notes – respirometry testing 05/02/08
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to CDM re: Annual costs 05/09/08 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Systems Operation Directive #10 05/10/08
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/DEQ emails re: Optimization 05/10/08
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: System Operation Directive #10 5/10/08
13 01 11 11 01 02 RD/RA Task D & E Emails 05/12/08 OTS/ Chambers
13 01 11 11 01 02 RD/RA Task D & E Emails Olympus email to KJ re: Flow change in well MUW-7 05/12/08 Olympus
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Respiration testing schedule 5/12/08 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails 5/14/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 05/19/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Purge water (5/20/08) DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/DEQ emails re: LNAPL data on a CD 3/20/08
Site-Wide Information
Site-Wide Information
KJ/DEQ/CDM emails re: Bioventing system shutdown scheduled date
Site-Wide Information
DEQ email to KJ re: Take measurements before shutting down Bioventing system
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Wally Chambers/OTS email to DEQ re: New BN WWTP field tech
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Figures showing the proposed relocation of 3 bioventing wells and one EX well posted to the web
Site-Wide Information
KJ email to DEQ re: Bioventing startup test data posted to the web
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 234 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails 05/22/08 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails 5/27/08
13 01 11 11 01 02 RD/RA Task D & E Emails 5/27/08 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Air Toxics & posting to the web 05/30/08
13 01 11 11 01 02 RD/RA Task D & E Emails 06/02/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Work Order Directive #14 6/3/08
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Task D&E – Phase 1 2008 MUW Design 06/09/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 06/10/08
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/KJ/DEQ emails re: Password for online link 06/11/08
13 01 11 11 01 02 RD/RA Task D & E Emails 06/12/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/CDM emails re: Task D&E well drilling operations 06/14/08
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Construction/Operation Meeting 6/18/08 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails Olympus/KJ/DEQ emails re: Operation Directive #16 06/20/08
13 01 11 11 01 02 RD/RA Task D & E Emails Olympus/KJ emails re: Flow rate at each well 6/20/08
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: June water level data 06/20/08
13 01 11 11 01 02 RD/RA Task D & E Emails 06/23/08 KJ
13 01 11 11 01 02 CD RD/RA Task D & E Emails 6/23/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: EX well drilling location difficulties 06/25/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: EX well locations 06/26/08
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ emails to KJ re: EX well drilling 06/27/08 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: EX well drilling 06/27/08
Site-Wide Information
DEQ email to KJ re: Figures showing the proposed relocation of 3 bioventing wells and one EX well approved by DEQ
Site-Wide Information
DEQ/KJ emails re: Plant shutdown & adjustment of skimmer pumps
Site-Wide Information
CDM email to DEQ re: Plant shutdown due to power failure- skimmer pumps need to be adjusted
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Monthly water level – LNAPL updated on the web
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM/DEQ emails re: Oil-Water sensing & Eclipse 705 Guided Radar
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Discontinued use of direct push rig to construct EX well – will be using sonic rig for remaining EX wells
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Site wide Task D/E &F water levels & Task D water levels posted to the web
Site-Wide Information
KJ email to DEQ re: Livingston Deliverables – CD + Final Task F Stage 1 – Part 2 Pilot Test Work Plan for Volatile Organic Compound-Containing Alluvial Aquifer GW and Response to Comments on Task D&E – Phase 1 RA 2008 80% Design Package
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 235 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: EX-44 contamination found 7/2/08 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/DEQ emails re: System Operation Directive extension 7/2/08
13 01 11 11 01 02 RD/RA Task D & E Emails Olympus/KJ/DEQ emails re: Diagnostic testing 07/03/08
13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Field activity put on hold 7/7/08
13 01 11 11 01 02 RD/RA Task D & E Emails Olympus/KJ/CDM emails re: Oil in water stream
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Follow-up to conversation 7/10/08 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: 7/9/08 meeting minutes 7/15/08 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: GAC analytical report 7/17/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/KJ emails re: Data request 07/17/08
13 01 11 11 01 02 RD/RA Task D & E Emails KJ emails to DEQ re: Items posted to website 7/18/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email re: DEQ System Operational Directive 19 07/18/08 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/DEQ emails re: PLC data request
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: PLC data request 07/21/08 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails 07/23/08 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails 7/24/08 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails 07/28/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 7/29/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 7/30/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: TPH results 08/01/08 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails Aldersley/KJ email to DEQ re: July TPH data 8/1/08 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails Norris/KJ email to DEQ re: July TPH data 8/1/08 KJ/Norris
13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Meeting minutes and system maintenance 8/6/08-8/8/08
13 01 11 11 01 02 RD/RA Task D & E Emails 8/9/08-8/11/08
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
7/9/08-7/10/08
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
7/20/08-7/21/08
Site-Wide Information
Site-Wide Information
CDM email to DEQ re: LNAPL charts, MUW profile, and daily reports
Site-Wide Information
DEQ email to KJ/Olympus re: DEQ System Operational Directive 20
Site-Wide Information
KJ email to DEQ re: TPH test analytical results posted to website
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM/DEQ emails re: BNSF response to DEQ comments on 80% design
BN LIVINGSTON 8/26/13
Page 236 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 08/14/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 8/18/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails Olympus/CDM/DEQ emails re: Bottles of well water
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Respirometry testing notification 08/20/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ/CDM/DEQ emails re: Field oversight report 5/13 – 5/15
13 01 11 11 01 02 RD/RA Task D & E Emails 8/21/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 8/25/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 08/26/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/DEQ emails re: Start-up sections
13 01 11 11 01 02 RD/RA Task D & E Emails KJ emails re: Start-up schedule 09/04/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 9/10/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/DEQ emails re: Plume map 09/15/08
13 01 11 11 01 02 RD/RA Task D & E Emails Olympus/DEQ emails re: Progress on restart of GWTP
13 01 11 11 01 02 RD/RA Task D & E Emails Olympus/DEQ emails re: Progress on restart of GWTP
13 01 11 11 01 02 RD/RA Task D & E Emails 09/17/08 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails Olympus/DEQ emails re: Progress on restart of GWTP
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 9/18/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Olympus emails re: WTP status 09/23/08
13 01 11 11 01 02 RD/RA Task D & E Emails Olympus email to DEQ re: GWTP restart progress 9/23/08 Olympus
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Task F Part 2 groundwater sampling 09/24/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ/Olympus/CDM emails re: System Operation Directive 23 09/25/08
13 01 11 11 01 02 RD/RA Task D & E Emails Olympus email re: GWTP restart progress 9/25/08 Olympus
13 01 11 11 01 02 RD/RA Task D & E Emails Olympus email re: GWTP 09/26/08 Olympus
13 01 11 11 01 02 RD/RA Task D & E Emails Olympus email re: GWTP report 09/29/08 Olympus
Site-Wide Information
Site-Wide Information
Site-Wide Information
8/19/08-8/20/08
Site-Wide Information
Site-Wide Information
8/19/08-8/20/08
Site-Wide Information
KJ email to DEQ re: Water level and LNAPL thickness monitoring data posted to website
Site-Wide Information
Site-Wide Information
Site-Wide Information
8/27/08-8/28/08
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
9/15/08-9/16/08
Site-Wide Information
9/15/08-9/16/08
Site-Wide Information
DEQ email to KJ/Olympus re: Access to 3/5 track corridor / recovery system restart
Site-Wide Information
9/15/08-9/18/08
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 237 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Missing data 10/01/08
13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Missing data
13 01 11 11 01 02 RD/RA Task D & E Emails Olympus/DEQ emails re: Directive 23
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Notification of planned sampling activity 10/10/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 10/17/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 10/22/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/KJ/DEQ emails re: Tag IDs
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/KJ/DEQ emails re: Tag IDs
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Tag IDs 10/24/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Main line MUWs 10/24/08
13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: MUW-3 transducer data
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Tag IDs 10/31/08 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 10/31/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 10/31/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails
13 01 11 11 01 02 RD/RA Task D & E Emails KJ emails re: Weekly report KJ
13 01 11 11 01 02 RD/RA Task D & E Emails
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email re: Liquid level 11/12/08 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/DEQ emails re: Skimmer test 11/12/08
13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Tag ID request 11/13/08
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Tag IDs 11/14/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 11/14/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/KJ/DEQ emails re: Tag ID info 11/14/08
Site-Wide Information
Site-Wide Information
10/1/08-10/2/08
Site-Wide Information
10/2/08-10/3/08
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Weekly LNAPL recovery and groundwater treated
Site-Wide Information
Site-Wide Information
10/22/08-10/23/08
Site-Wide Information
10/22/08-10/23/08
Site-Wide Information
Site-Wide Information
Site-Wide Information
10/27/08-10/28/08
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Weekly LNAPL recovery and groundwater treated
Site-Wide Information
KJ/CDM/DEQ emails re: Weekly LNAPL recovery and groundwater treated
10/31/08-11/3/08
Site-Wide Information
10/31/08-11/3/08
Site-Wide Information
KJ/DEQ emails re: Weekly LNAPL recovery and groundwater treated
10/31/08-11/3/08
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Operation Directive 25 and items posted to website
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 238 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/KJ/DEQ emails re: More tag ID info 11/14/08
13 01 11 11 01 02 RD/RA Task D & E Emails KJ emails re: Xitech ballast info 11/14/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Operation Directive 26
13 01 11 11 01 02 RD/RA Task D & E Emails Olympus/CDM/DEQ emails re: Operation Directive 26 GWTP
13 01 11 11 01 02 RD/RA Task D & E Emails 11/19/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Update 11/19/08 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Olympus email re: MUW 13 11/19/08
13 01 11 11 01 02 RD/RA Task D & E Emails Olympus email re: MUW 13 pumping water 11/20/08 Olympus
13 01 11 11 01 02 RD/RA Task D & E Emails 11/21/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/DEQ emails re: Annual report requirements 11/26/08
13 01 11 11 01 02 RD/RA Task D & E Emails KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 12/05/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Conference call canceled 12/10/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 12/15/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Bioventing respirometry testing 12/15/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ emails re: Safety Directive – Beaufort Wind Scale 12/15/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM emails re: LNAPL tank summary 12/15/08 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Conference call canceled
13 01 11 11 01 02 RD/RA Task D & E Emails CDM emails to DEQ re: Summary 12/17/08 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails 12/19/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ/Olympus/DEQ emails re: Safety stop on skimmer activity
13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Skimmer pump schedule 12/23/08
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Olympus email re: Tuesday fieldwork 12/29/08
Site-Wide Information
Site-Wide Information
Site-Wide Information
11/14/08-11/17/08
Site-Wide Information
11/8/08-11/19/08
Site-Wide Information
KJ email to DEQ re: Operation Directive 25 item posted to website
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ emails to DEQ re: Operation Directive 25 items posted to website
Site-Wide Information
Site-Wide Information
KJ emails to DEQ re: Operation Directive 25 items posted to website
12/1/08-12/3/08
Site-Wide Information
KJ email to DEQ re: Operation Directive 25 items posted to website
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Operation Directive 25 items posted to website
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
12/16/08-12/17/08
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Operation Directive 25 items posted to website
Site-Wide Information
12/21/08-12/23/08
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 239 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Bioventing testing schedule
13 01 11 11 01 02 RD/RA Task D & E Emails 12/29/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Xi tech support 12/31/08 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ/CDM/DEQ emails re: Field summary 12/31/08
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Operation Directive 25 info posted 01/05/09 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email re: Skimmer meeting talking points 01/05/09 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ/CDM/Olympus re: Skimmer pump 1/6/09 DEQ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Operation Directive 25 items posted 1/8/09 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Operation Directive 25 items posted 1/12/09 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Recovery system performance 1/13/09 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 1/19/09 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ w/Main line liquid levels 01/21/09 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 01/22/09 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails CDM emails re: Production for week 1/23/09 01/23/09 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Bioventing 1/23/09
13 01 11 11 01 02 RD/RA Task D & E Emails CDM emails re: Skimmer production 1/26/09 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails 01/26/09 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Current operating condition 01/28/09 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 2/2/09 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Operation Directive 25 notice 2/9/09 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Operation Directive 25 notice 2/17/09 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 2/23/09 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 2/25/09
Site-Wide Information
12/24/08-12/29/08
Site-Wide Information
KJ email to DEQ re: Operation Directive items posted to website
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Operation Directive 25 items posted to website
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Operation Directive 25 items posted to website
Site-Wide Information
Site-Wide Information
KJ email to DEQ re: Operation Directive 25 items posted to website
Site-Wide Information
Site-Wide Information
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operative Directive #25 – Task D&E items posted to website
Site-Wide Information
DEQ/Reynolds & K/J/Norris emails re: Conference call schedule
BN LIVINGSTON 8/26/13
Page 240 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails 2/26/09
13 01 11 11 01 02 RD/RA Task D & E Emails 02/26/09 CDM/ Woodward
13 01 11 11 01 02 RD/RA Task D & E Emails 3/2/09 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Reynolds & K/J/Aldersley emails re: Lith logs for BVWs 03/06/09
13 01 11 11 01 02 RD/RA Task D & E Emails 3/909 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 3/11/09
13 01 11 11 01 02 RD/RA Task D & E Emails 3/12/09 CDM/ Stordahl
13 01 11 11 01 02 RD/RA Task D & E Emails 03/17/09
13 01 11 11 01 02 RD/RA Task D & E Emails 3/23/09 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 03/25/09 CDM/ Woodward
13 01 11 11 01 02 RD/RA Task D & E Emails 03/30/09 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails K/J/Norris & MRL/Keegan emails re: Flagger for Livingston 3/31/09\
13 01 11 11 01 02 RD/RA Task D & E Emails 03/31/09
13 01 11 11 01 02 RD/RA Task D & E Emails 03/31/09 CDM/ Woodward
13 01 11 11 01 02 RD/RA Task D & E Emails CDM, MRL, & DEQ emails re: Flagger for Livingston 3/31/09
13 01 11 11 01 02 RD/RA Task D & E Emails K/J/Norris and J Fisher emails re: Heat Trace 04/02/09
13 01 11 11 01 02 RD/RA Task D & E Emails 4/3/09 CDM/ Osterman
13 01 11 11 01 02 RD/RA Task D & E Emails 4/6/09 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 4/7/09 CDM/ Osterman
13 01 11 11 01 02 RD/RA Task D & E Emails 4/13/09 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 4/20/09 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 4/27/09 KJ/Adlersley
Site-Wide Information
DEQ/Reynolds & K/J/Norris emails re: Update – weekly directive #33 - PLC programming
Site-Wide Information
CDM/Woodward email to K/J/Norris Bioventing conference call
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
K/J/Norris & DEQ/Reynolds emails re: Moving of pump houses
Site-Wide Information
CDM/Stordahl email to DEQ/Reynolds re: LNAPL volume update
Site-Wide Information
K/J/Turner & CDM/Woodward emails re: May 2008 Biovent resp. data
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
CDM/Woodward email to DEQ/Reynolds re: Dashboard Report for 3/14/09 to 3/21/09
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
Site-Wide Information
DEQ/Reynolds & CDM/Stordahl emails re: Flagger for Livingston
Site-Wide Information
CDM/Woodward email to DEQ/Reynolds re: Flagger available on Thursday, 4/2/09
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM/Osterman email to DEQ/Reynolds re: Liquid levels in drums
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information CDM/Osterman email to Olympus/Chambers re: Drum volumes
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
BN LIVINGSTON 8/26/13
Page 241 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails 4/27/09
13 01 11 11 01 02 RD/RA Task D & E Emails 05/01/09 CDM/ Stordahl
13 01 11 11 01 02 RD/RA Task D & E Emails 5/4/09 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails K/J/Davis email to DEQ/Reynolds re: SCADA update 5/7/09 KJ/ Davis
13 01 11 11 01 02 RD/RA Task D & E Emails 5/11/09 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Reynolds & K/J/Norris emails re: Directive #36 GWTP 5/13/09
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Hill, K/J/Davis and Casne/Morehead emails re: LivShare 05/13/09
13 01 11 11 01 02 RD/RA Task D & E Emails 5/13/09 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 05/18/09 KJ/ Norris
13 01 11 11 01 02 RD/RA Task D & E Emails 5/19 /09 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 05/26/09
13 01 11 11 01 02 RD/RA Task D & E Emails 5/26/09
13 01 11 11 01 02 RD/RA Task D & E Emails 05/26/09
13 01 11 11 01 02 RD/RA Task D & E Emails 5/26/09 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 06/01/09 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 06/02/09 CDM/ Woodward
13 01 11 11 01 02 RD/RA Task D & E Emails 06/02/09 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 6/5/09 KJ/ Davis
13 01 11 11 01 02 RD/RA Task D & E Emails 06/08/09 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 6/12/09 DEQ/ Reynolds
13 01 11 11 01 02 RD/RA Task D & E Emails 06/15/09 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 06/17/09 CDM/ Hills
Site-Wide Information
K/J/Norris & DEQ/Reynolds emails re: Phase 1 remediation system operation
Site-Wide Information
CDM/Stordahl email to DEQ/Reynolds re: Attachment – DEQ System Operation Directive 36
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
Site-Wide Information
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: SCADA data has been uploaded to LivShare
Site-Wide Information
K/J/Norris email to DEQ Reynolds re: Heat tracing upgrades completed
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
CDM/Stordahl, K/J/Norris & DEQ emails re: Phase 1 remediation system interruption
Site-Wide Information
DEQ/Reynolds, J Fisher, & K/J/Norris emails: Screens on pumps
Site-Wide Information
DEQ/Reynolds & K/J/Norris emails: Screens on pumps – power outage shut off sump pump
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
CDM/Woodward email to DEQ/Reynolds re: K.J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website 5/19 /09
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
K/J/Davis email to DEQ/Reynolds re: Logging out of SCADA – forwarded to CDM
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
DEQ/Reynolds email to K/J/Norris & Aldersley re: Attachment – Respiration Testing Map
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
CDM/Hills email to DEQ re: Attachment – DEQ System Operation Directive 39 work Order
BN LIVINGSTON 8/26/13
Page 242 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails 6/22/09 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 06/23/09
13 01 11 11 01 02 RD/RA Task D & E Emails 06/24/09 CDM/ Hills
13 01 11 11 01 02 RD/RA Task D & E Emails 06/24/09 CDM/ Hills
13 01 11 11 01 02 RD/RA Task D & E Emails 6/25/09 CDM/ Woodward
13 01 11 11 01 02 RD/RA Task D & E Emails BN/Smith email to DEQ/Reynolds re: Shut down PMW-3 06/25/09 BN/ Smith
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Reynolds email to BN/Smith re” Shut down PMW-3 6/29/09 DEQ/ Reynolds
13 01 11 11 01 02 RD/RA Task D & E Emails 6/29/09 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 6/30/09
13 01 11 11 01 02 RD/RA Task D & E Emails 7/1/09 CDM/ Hills
13 01 11 11 01 02 RD/RA Task D & E Emails 07/02/09 CDM/ Woodward
13 01 11 11 01 02 RD/RA Task D & E Emails 07/06/09 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 07/06/09
13 01 11 11 01 02 RD/RA Task D & E Emails 7/8/09 CDM/ Woodward
13 01 11 11 01 02 RD/RA Task D & E Emails K/J/Davis email to DEQ/Reynolds re: Knock-out tanks 07/10/09 KJ/ Davis
13 01 11 11 01 02 RD/RA Task D & E Emails 7/10/09 CDM/ Hills
13 01 11 11 01 02 RD/RA Task D & E Emails 7/13/09 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Osterman email to DEQ/Reynolds re: Tank volumes 7/13/09 CDM/ Osterman
13 01 11 11 01 02 RD/RA Task D & E Emails 7/15/09 CDM/ Osterman
13 01 11 11 01 02 RD/RA Task D & E Emails 7/17/09
13 01 11 11 01 02 RD/RA Task D & E Emails 7/20/09 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 7/20/09 KJ/Adlersley
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
K/J/Davis, CDM/Hills & DEQ/Reynolds emails re: Respirometry Testing & Heat Trace Inspection
Site-Wide Information
CDM/Hills email to DEQ/Reynolds re: Weekly Dashboard report
Site-Wide Information
CDM/Hills email to DEQ/Reynolds re: Shut down PMW-3 & Work order directive
Site-Wide Information
CDM/Woodward email to CDM, K/J & DEQ re: Attachments – Pictures from 3/5 track carboy samples
Site-Wide Information
Site-Wide Information
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
DEQ/Reynolds & K/J/Norris emails re: Shut Down PMW-3 – DEQ disagrees with K/J factual clarification for the Administrative Record
Site-Wide Information
CDM/Hills email to DEQ/Reynolds re: FW email from CDM/Osterman – June 2009 Respiration Testing field conditions
Site-Wide Information
CDM/Woodward email to DEQ/Reynolds re: Task D&E Dashboard report
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
DEQ/Reynolds & K/J/Norris emails re: Shut down PMW-3 – Petroleum recovery system
Site-Wide Information
CDM/Woodward email to DEQ/Reynolds re: Attachment - Digital Dashboard report
Site-Wide Information
Site-Wide Information
CDM/Hills email to DEQ/Reynolds re: Comments on Task D/E Annual Report
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
Site-Wide Information
CDM/Osterman email to DEQ/Reynolds re: Attachment – Dashboard report
Site-Wide Information
CDM/Hills, DEQ/Reynolds & K/J/Davis emails re: Locked out of SCADA
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website (7/20/09)
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website (7/27/09)
BN LIVINGSTON 8/26/13
Page 243 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails 7/31/09 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 08/03/09 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails Y 08/05/09
13 01 11 11 01 02 RD/RA Task D & E Emails Y 08/06/09
13 01 11 11 01 02 RD/RA Task D & E Emails 8/10/09 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 08/13/09 DEQ/ Reynolds
13 01 11 11 01 02 RD/RA Task D & E Emails 08/23/10 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 8/31/09 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 09/02/09 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 09/03/09 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 09/03/09
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Conference call access codes 9/3/09-9/8/09
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 09/08/09 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 9/10/09 DEQ/ Reynolds
13 01 11 11 01 02 RD/RA Task D & E Emails 9/11/09
13 01 11 11 01 02 RD/RA Task D & E Emails 9/11/09 DEQ/ Reynolds
13 01 11 11 01 02 RD/RA Task D & E Emails 09/14/09 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails K/J/Norris email to DEQ/Reynolds re: LNAPL Tank draining 09/16/09 KJ/Norris
13 01 11 11 01 02 RD/RA Task D & E Emails 9/20/09 KJ/Norris
13 01 11 11 01 02 RD/RA Task D & E Emails 09/21/09 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 9/28/09 KJ/Aldersley
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website (7/31/09)
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website (8/3/09)
Site-Wide Information
** DEQ Legal/Haque-Hausrath internal email re: Response to BN 7/23/09 letter
DEQ legal/ Haque-Hausrath
Site-Wide Information
** DEQ Legal/Haque-Hausrath internal email re: Response to BN 7/23/09 letter
DEQ legal/ Haque-Hausrath
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
DEQ/Reynolds email to BN/Smith, K/J/Norris & Aldersley re: Task D&E proposal
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
K.J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website (8/31/09)
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Task D&E quarterly respirometry testing
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website (9/3/09)
Site-Wide Information
DEQ/Reynolds & K.J/Aldersley emails re: SCADA RSView Max License
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ/Reynolds letter to K/J/Norris re: July 24, 2009 BN Response to DEQ letter dated 6/19/09 regarding Bioventing Emissions Management – Task D&E Phase I RA
Site-Wide Information
CDM/Woodward & DEQ/Reynolds emails re: LNAPL recycling
Site-Wide Information
DEQ/Reynolds email to K/J/Norris & Aldersley re: LNAPL recycling
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website (9/14/09)
Site-Wide Information
Site-Wide Information
K/J/Norris email to DEQ/Reynolds re: BN Shop Complex – Task D&E – Phase I Remediation System Well Maintenance
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
BN LIVINGSTON 8/26/13
Page 244 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Reynolds & K/J/Aldersley emails re: Well redevelopment 9/29/09
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Smith & DEQ/Reynolds emails re: Well development 9/29/09
13 01 11 11 01 02 RD/RA Task D & E Emails 9/29/09
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Reynolds email to K/J/Norris MUW TV 09/30/09 DEQ/ Reynolds
13 01 11 11 01 02 RD/RA Task D & E Emails 10/01/09 DEQ/ Reynolds
13 01 11 11 01 02 RD/RA Task D & E Emails 10/05/09 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 10/6/09 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 10/7/09 KJ/Norris
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Osterman email to K/J re: Can’t get in to SCADA 19/8/09 CDM/Osterman
13 01 11 11 01 02 RD/RA Task D & E Emails 10/12/09 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 10/14/09 CDM/Osterman
13 01 11 11 01 02 RD/RA Task D & E Emails 10/19/09 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 10/20/09 CDM/Hills
13 01 11 11 01 02 RD/RA Task D & E Emails 10/26/09 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 11/02/09
13 01 11 11 01 02 RD/RA Task D & E Emails 11/2/09 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 11/02/09 CDM/ Osterman
13 01 11 11 01 02 RD/RA Task D & E Emails 11/06/09 CDM/ Stordahl
13 01 11 11 01 02 RD/RA Task D & E Emails 11/9/09 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 11/11/09 CDM/ Osterman
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Osterman & DEQ/Reynolds emails re: Liquid levels 11/12/09 CDM/ Osterman
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Osterman 7 Wally Chambers emails re: Liquid levels 11/13/09 CDM/ Osterman
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM/Woodward & Hills & DEQ/Reynolds emails re: MUW TV
Site-Wide Information
Site-Wide Information
DEQ/Reynolds email to CDM/Woodward, Lamie & Hills re: Ambient Air Quality Memo
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
K/J/Norris email to DEQ/Reynolds re: Discontinuation of BN Shop Complex bi-weekly Task D&E operations meeting
Site-Wide Information
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
CDM/Osterman & DEQ/Reynolds emails re: Liquid levels & photos
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
CDM/Hills email to DEQ/Reynolds re: Status of the well rehabilitation & Remediation System Operations
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
DEQ Legal/Haque-Hausrath internal email re: Bioventing Extraction/Injection Design Study Work Plan
DEQ legal/ Haque-Hausrath
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
CDM/Osterman email to DEQ/Reynolds re: Skimmer production & update
Site-Wide Information
CDM/Stordahl & DEQ/Reynolds re: Bioventing conference call meeting minutes
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
CDM/Osterman email to DEQ/Reynolds re: Weekly Dashboard report
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 245 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails 11/16/09 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Reynolds & K/J/Norris emails re: Task D&E Meeting 11/19/09
13 01 11 11 01 02 RD/RA Task D & E Emails 11/20/09
13 01 11 11 01 02 RD/RA Task D & E Emails 11/23/09 KJ/Aldersley
13 01 11 11 01 02 CD RD/RA Task D & E Emails 11/25/09 DEQ/ Reynolds
13 01 11 11 01 02 RD/RA Task D & E Emails 11/25/09 CDM/ Woodward
13 01 11 11 01 02 RD/RA Task D & E Emails 11/30/09 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 12/03/09 DEQ/ Reynolds
13 01 11 11 01 02 RD/RA Task D & E Emails 12/3/09 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Reynolds & K/J/Norris emails re: Liquid levels schedule 12/07/09
13 01 11 11 01 02 RD/RA Task D & E Emails 12/8/09 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 12/8-12/9/09
13 01 11 11 01 02 RD/RA Task D & E Emails 12/11/09
13 01 11 11 01 02 RD/RA Task D & E Emails 12/14/09 KJ/Davis
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Reynolds & K/J/Norris emails re: Frozen LNAPL piping 12/15/09
13 01 11 11 01 02 RD/RA Task D & E Emails 12/21/09 KJ/Davis
13 01 11 11 01 02 RD/RA Task D & E Emails 12/21/09 KJ/Norris
13 01 11 11 01 02 RD/RA Task D & E Emails 12/23/09 CDM/ Stordahl
13 01 11 11 01 02 RD/RA Task D & E Emails 12/23/09
13 01 11 11 01 02 RD/RA Task D & E Emails 12/28/09 KJ/Davis
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
Site-Wide Information
OTS/ Chambers & CDM/Osterman emails re: 11-17-09 liquid levels
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
DEQ/Reynolds email to K/J/Norris & Aldersley re: Attachment – Recovery Tank Measurement Recommendations & Well Checklist
Site-Wide Information
CDM/Woodward email to DEQ/Reynolds re: Task D&E call – GW pump
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
DEQ/Reynolds email to K/J/Davis re: Attachment – Recovery Tank Volume calculator
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
CDM/Osterman, Casne Engineering/Morehead, & K/J/Fisher emails fw to DEQ/Reynolds re: SCADA problems
Site-Wide Information
CDM/Osterman & OTS/Chambers emails cc DEQ/Reynolds re: 12-10-09 liquid levels
Site-Wide Information
K/J/Davis email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
Site-Wide Information
K/J/Davis email to DEQ/Reynolds re: Weekly Tables posted to website
Site-Wide Information
K/J/Norris email to DEQ/Reynolds re: BN Shop Complex – Task D&E – Phase I Remedial Action System O&M repair – water leak
Site-Wide Information
CDM/Stordahl email to DEQ/Reynolds fw to K/J & BN/Smith re: Livingston field operations
Site-Wide Information
DEQ/Martin internal email to Reynolds re: Free product recovery system
DEQ/Martin internal
Site-Wide Information
K/J/Davis email to DEQ/Reynolds re: Weekly Tables posted to website
BN LIVINGSTON 8/26/13
Page 246 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Reynolds letter to BN/Smith re: LNAPL frozen piping 12/31/09 DEQ/Reynolds
13 01 11 11 01 02 RD/RA Task D & E Emails 1/4/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 01/05/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 1/5/10 KJ/Norris
13 01 11 11 01 02 RD/RA Task D & E Emails 01/08/10 DEQ/ Reynolds
13 01 11 11 01 02 RD/RA Task D & E Emails 01/11/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 1/13/10 CDM/ Woodward
13 01 11 11 01 02 RD/RA Task D & E Emails 1/18/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 01/18/10 KJ/Norris
13 01 11 11 01 02 RD/RA Task D & E Emails 01/20/10 DEQ/Reynolds
13 01 11 11 01 02 RD/RA Task D & E Emails 01/21/10 KJ/Norris
13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 01/25/10 KJ
13 01 11 11 01 02 RD/RA Task D & E Emails K/J/Norris email to DEQ/Reynolds re: SCADA update 01/26/10 KJ/Norris
13 01 11 11 01 02 RD/RA Task D & E Emails 01/27/10 KJ/Norris
13 01 11 11 01 02 RD/RA Task D & E Emails 2/1/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 2/2/10 KJ/Norris
13 01 11 11 01 02 RD/RA Task D & E Emails 02/05/10
13 01 11 11 01 02 RD/RA Task D & E Emails 02/05/10
13 01 11 11 01 02 RD/RA Task D & E Emails 02/08/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 2/16/10 CDM/ Stordahl
Site-Wide Information
K/J/Norris & Davis, DEQ/Reynolds & CDM/Hills emails re: BN Shop Complex – Task D&E – Phase I Remedial Action System O&M
12/28-12/29/09
Site-Wide Information
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Norris email to DEQ/Reynolds re: BN Shop Complex – Task D&E – Phase I Remedial Action System O&M course of action as discussed during conference call
Site-Wide Information
DEQ/Reynolds email to K/J/Norris re: Response to K/J/Norris 1/5/10 email on course of action
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
CDM/Woodward email cc to DEQ/Reynolds re: Heaters in the utilidor
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Norris email to DEQ/Reynolds re: Operation Direction #45 - Livingston SCADA unavailable this week
Site-Wide Information
DEQ/Reynolds email to K/J/Norris re: BN Shop Complex – Task D&E Bioventing Design Study
Site-Wide Information
K/J/Norris email to DEQ/Reynolds re: Completed freeze protection
Site-Wide Information
Site-Wide Information
Site-Wide Information
K/J/Norris email to DEQ/Reynolds re: Attachment - BN Shop Complex – Task D&E – Phase I Remedial Action System O&M Manual Addendum # 1
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Norris email to DEQ/Reynolds re: BN Shop Complex – Mid-February Onsite meeting
Site-Wide Information
DEQ/Reynolds & K/J/Norris emails re: BN Shop Complex – Mid-February Onsite meeting
Site-Wide Information
DEQ/Reynolds & K/J/Norris emails re: Existing VMP Locations
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
CDM/Stordahl email to DEQ/Reynolds re: Routine Maintenance Advisories
BN LIVINGSTON 8/26/13
Page 247 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails 2/16/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 2/22/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 3/1/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 03/04/10 CDM/ Osterman
13 01 11 11 01 02 RD/RA Task D & E Emails 03/08/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 03/09/10
13 01 11 11 01 02 RD/RA Task D & E Emails 3/15/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 03/22/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 03/23/10
13 01 11 11 01 02 RD/RA Task D & E Emails 3/29/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 4/5/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 4/9/10 CDM/Osterman
13 01 11 11 01 02 RD/RA Task D & E Emails 04/09/10
13 01 11 11 01 02 RD/RA Task D & E Emails 04/12/10 CDM/Osterman
13 01 11 11 01 02 RD/RA Task D & E Emails 04/12/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 04/14/10
13 01 11 11 01 02 RD/RA Task D & E Emails 04/19/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 04/26/10 CDM/Osterman
13 01 11 11 01 02 RD/RA Task D & E Emails 4/28/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 4/30/10 OTS/Chambers
13 01 11 11 01 02 RD/RA Task D & E Emails Y 05/03/10
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
CDM/Osterman email to DEQ/Reynolds fw to K/J/Norris re: Problems with the SCADA at CDM
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
OTI/Chambers & CDM Woodward emails re: LNAPL on 3/9/10
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
CDM/Hills, DEQ/Reynolds, & K/J/Norris emails re: Design Study Testing of Retrofitted Bioventing System
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
CDM/Osterman email to DEQ/Reynolds fw to OTS/Chambers re: Check valves in MUW-24 & MUW-16
Site-Wide Information DEQ/Reynolds & K/J/Norris emails re: Operation Directive #48
Site-Wide Information
CDM/Osterman & OTS/Chambers email fw to DEQ Reynolds re: Check valve report
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website (4/12/10)
Site-Wide Information DEQ/Reynolds & K/J/Aldersley emails re: Respirometry testing
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
CDM/Osterman email to DEQ/Reynolds fw to K/J Aldersley re: Well information - BVW survey
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
OTS/Chambers email to VDM/Osterman fw to DEQ/Reynolds re: PMW 5, MUW 6, & PMW 2 check valve report for 4/29/10)
Site-Wide Information
** DEQ Legal/Haque-Hausrath internal email to Reynolds re: Task D&E, requirements for Phase II
DEQ leagl/ Haque-Hausrath
BN LIVINGSTON 8/26/13
Page 248 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails 05/03/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 5/11/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 5/17/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 05/24/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 05/26/10 OTS/Osterman
13 01 11 11 01 02 RD/RA Task D & E Emails 06/03/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 06/07/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 6/8/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails K/J/Aldersley email to DEQ/Reynolds re: Respirometry testing 06/10/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 6/9-6/11/10
13 01 11 11 01 02 RD/RA Task D & E Emails 06/11/10
13 01 11 11 01 02 RD/RA Task D & E Emails 6/15/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 6/18/10 CDM/Hills
13 01 11 11 01 02 RD/RA Task D & E Emails 6/23/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 6/30/10
13 01 11 11 01 02 RD/RA Task D & E Emails 7/1/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails OTS/Chambers email to DEQ/Reynolds re: Tank measurements 7/1/10 OTS/ Chambers
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Task F and D/E sampling 7/6/10-7/9/10
13 01 11 11 01 02 RD/RA Task D & E Emails 7/8/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 7/12/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 7/12-7/13/10
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
OTS/Osterman to CDM/Hills fw to DEQ/Reynolds re: Weekly Dashboard Report
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Livingston Deliverables & notification of field activities – Bioventing Extraction/Injection Design Study Completion & Radius of Influence (ROI) Analysis Report sent UPS
Site-Wide Information
Site-Wide Information
DEQ/Reynolds & K/J/Norris emails re: Bioventing Design Study Testing Report
Site-Wide Information
K/J/Aldersley & CDM/Hills emails re: Bioventing Design Study Testing Report – Attachment - revised map of proposed wells for respiration testing
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
CDM/Hills email to DEQ/Reynolds re: : Bioventing Design Study Testing Completion & ROI Analysis
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
OTS/Chambers & CDM/Hills emails re: Operational Directive #51
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
Site-Wide Information
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
CDM/Stordahl & Hills emails to DEQ/Reynolds re: Task D&E annual report – CDM comments
BN LIVINGSTON 8/26/13
Page 249 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails KJ emails to DEQ re: Items posted to website KJ
13 01 11 11 01 02 RD/RA Task D & E Emails 07/14/10 Energy Labs
13 01 11 11 01 02 RD/RA Task D & E Emails K/J Aldersley & DEQ/Reynolds emails re: LNAPL sampling 07/15/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 7/15-7/19/10
13 01 11 11 01 02 RD/RA Task D & E Emails 7/19/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 07/26/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 07/26/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 7/27/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 07/28/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 8/2/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 08/04/10
13 01 11 11 01 02 RD/RA Task D & E Emails 8/6-8/810
13 01 11 11 01 02 RD/RA Task D & E Emails 08/09/10 CDM/ Choquette
13 01 11 11 01 02 RD/RA Task D & E Emails 8/10/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 8/18/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 8/25/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 9/1/10
13 01 11 11 01 02 RD/RA Task D & E Emails 09/01/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 09/03/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 09/05/10 KJ/Norris
Site-Wide Information
7/12/10-7/13/10
Site-Wide Information
Energy Labs/Pippin email to K/J/Aldersley fw to DEQ/Reynolds re: Analysis of VOCs in product
Site-Wide Information
Site-Wide Information
DEQ/Reynolds & K/J/Norris emails re: Weekly field activities staffing schedule
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Notification of recovered LNAPL – pickup
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Notification of Task D&E field activities
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Notification of Task D&E field activities
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
CDM/Choquette & Hills emails to DEQ/Reynolds re: Extraction/Injection testing
Site-Wide Information
K/J/Fernandes & DEQ/Reynolds emails re: Task D&E treatment system power interruption
Site-Wide Information
CDM/Choquette email to K/J/Norris et al re: Operational Directive 52
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website – Follow-up
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website – Follow-up
Site-Wide Information
CDM/Hills & DEQ/Reynolds emails re: Effluent pump check valves
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website – Follow-up
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website – Follow-up – LNAPL sampling results
Site-Wide Information
K/J/Norris email to DEQ/Reynolds re: Tasks J & L conference call on 8/16/10
BN LIVINGSTON 8/26/13
Page 250 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails 09/07/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 9/9/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 9/14/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 9/20/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 9/28/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 9/30/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 09/30/10
13 01 11 11 01 02 RD/RA Task D & E Emails 10/04/10 CDM/ Osterman
13 01 11 11 01 02 RD/RA Task D & E Emails 10/5/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails CDM liquid levels 10/05/10 CDM
13 01 11 11 01 02 RD/RA Task D & E Emails 10/12/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 10/18/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 10/22/10
13 01 11 11 01 02 RD/RA Task D & E Emails 10/26/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Hills & Norris emails re: Pre-filter by-pass 10/26/10
13 01 11 11 01 02 RD/RA Task D & E Emails 10/26/10
13 01 11 11 01 02 RD/RA Task D & E Emails 10/29/10 BN/Smith
13 01 11 11 01 02 RD/RA Task D & E Emails 11/1/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 11/4/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 11/09/10 KJ/Aldersley
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Attachment – Revised Bioventing Extraction/Injection System – Interim Operation & Monitoring Plan
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website – Follow-up
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website – Follow-up
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website – Follow-up
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information K/J/Aldersley email to DEQ/Reynolds re: Recoverability testing
Site-Wide Information
DEQ/Reynolds & K/J/Aldersley emails re: Weekly field activities staffing schedule
Site-Wide Information
CDM/Osterman email to Scott Morehead re: SCADA login problems
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information BN/Smith & DEQ/Reynolds emails re: Task D/E 10/20/10 letter
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
Site-Wide Information
DEQ/Reynolds & K/J/Norris emails re: Pre-filter by-pass testing mode procedure
Site-Wide Information
BN/Smith email to DEQ/Reynolds re: BN response to DEQ 10/20/10 letter - Pre-filter by-pass
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Livingston Deliverables Bioventing Extraction/Injection Design Study Comprehensive Report sent out
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
BN LIVINGSTON 8/26/13
Page 251 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails 11/10/10 CDM/Osterman
13 01 11 11 01 02 RD/RA Task D & E Emails 11/15/10
13 01 11 11 01 02 RD/RA Task D & E Emails 11/1710 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 11/18/10
13 01 11 11 01 02 RD/RA Task D & E Emails 11/22/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 11/24/10 KJ/Norris
13 01 11 11 01 02 RD/RA Task D & E Emails 11/24/10 KJ/Norris
13 01 11 11 01 02 RD/RA Task D & E Emails 11/24/10 CDM/Stordahl
13 01 11 11 01 02 RD/RA Task D & E Emails 11/29/10 KJ/Norris
13 01 11 11 01 02 RD/RA Task D & E Emails 11/30/10
13 01 11 11 01 02 RD/RA Task D & E Emails 12/1/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 12/7/10
13 01 11 11 01 02 RD/RA Task D & E Emails 12/9/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 12/09/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 12/10/10 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 01/11/11 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 01/19/11 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 1/24/11 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 01/28/11 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 2/2/11 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 2/7/11 KJ/Aldersley
Site-Wide Information
CDM/Osterman email to DEQ/Reynolds re: 11/9/10 liquid levels
Site-Wide Information
DEQ Legal/Haque-Hausrath email to C Lawellin re: Bail down procedures
DEQ legal/ Haque-Hausrath
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
DEQ/Reynolds & K/J/Norris emails re: Task D/E report revision deadline extension
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Norris email to DEQ/Reynolds re: Summary of Task F Stage I – Part 2 Additional ISCO testing
Site-Wide Information
K/J/Norris email to DEQ/Reynolds re: Recovered LNAPL header blockage
Site-Wide Information
CDM/Stordahl email to DEQ/Reynolds re: LNAPL line freezing
Site-Wide Information
K/J/Norris email to DEQ/Reynolds re: Recovered LNAPL header blockage cleared
Site-Wide Information
CDM/Hills & K/J/Norris emails re: Recovered LNAPL header blockage – checking of heat trace schedule
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Norris & DEQ/Reynolds emails re: Recovered LNAPL header blockage – backup heat trace to be left on
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Livingston Deliverable – Revised 2009 Task D&E Annual Report revision # 1 to be delivered 12/13/10
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Livingston Deliverable –CD of Revised 2009 Task D&E Annual Report revision # 1 to be delivered 12/13/10
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Livingston deliverables – Private & Public Well Inventory revision #5 to be delivered 1/31/11
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
BN LIVINGSTON 8/26/13
Page 252 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails 2/17/11 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 2/24/11 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 3/1/11 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 03/09/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 03/15/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 03/25/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 03/31/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 04/06/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 04/15/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 04/20/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 04/27/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 05/02/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 05/11/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 05/17/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 05/24/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 05/31/11 KJ/Norris
13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Choquette email to Casne/Morehead re: SCADA System 6/1/11 CDM/ Choquette
13 01 11 11 01 02 RD/RA Task D & E Emails 06/01/11 KJ/Norris
13 01 11 11 01 02 RD/RA Task D & E Emails 06/01/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 06/07/11 KJ/Norris
13 01 11 11 01 02 RD/RA Task D & E Emails 06/08/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 6/15/11 KJ/Adlersley
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Norris email to DEQ/Reynolds re: Task D/E Phase 1 Rem. System – operations notification
Site-Wide Information
Site-Wide Information
K/J/Norris email to DEQ re: Task D/E Phase 1 Rem. System – operations notification
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Norris email to DEQ re: Task D/E Phase 1 Rem. System –RS server down
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
BN LIVINGSTON 8/26/13
Page 253 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails 06/17/11 KJ/Norris
13 01 11 11 01 02 RD/RA Task D & E Emails K/J/Norris email to DEQ re: SCADA remote access restored 06/22/11 KJ/Norris
13 01 11 11 01 02 RD/RA Task D & E Emails 06/22/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 06/23/11 DEQ/Reynolds
13 01 11 11 01 02 RD/RA Task D & E Emails 06/16/11
13 01 11 11 01 02 RD/RA Task D & E Emails 6/29/11 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 07/05/11 CDM/ Choquette
13 01 11 11 01 02 RD/RA Task D & E Emails 7/5/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 7/14/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 7/21/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 07/25/11
13 01 11 11 01 02 RD/RA Task D & E Emails 07/25/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 7/27/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 8/1/11 CDM/Hills
13 01 11 11 01 02 RD/RA Task D & E Emails 08/04/11
13 01 11 11 01 02 RD/RA Task D & E Emails 08/04/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 08/11/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 08/18/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 08/24/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 08/25/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 09/01/11 KJ/Adlersley
Site-Wide Information
K/J/Norris email to DEQ re: Task D/E Phase 1 Rem. System –RS server down
Site-Wide Information
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
DEQ/Reynolds email to CDM & K/J re: Taking water level measurements on Tuesdays
Site-Wide Information
K/J/Norris & CDM/Hills emails re: All data – LNAPL physical Chemical testing results
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
CDM/Choquette email to DEQ/Reynolds re: No flagger for 7/5/11 – not going to Livingston
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Norris & CDM/Hills emails re: Task D/E Operation Directive #61 – request for clarification
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
CDM/Hills email to DEQ/Reynolds re: Phone Log - Tasks L/D/E
Site-Wide Information
BN/Kaitala & DEQ Legal emails re: BN request for extension on DEQ 707 info request
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website - core lab data
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
BN LIVINGSTON 8/26/13
Page 254 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails 09/07/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 09/07/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 09/13/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 09/21/11 DEQ/ Reynolds
13 01 11 11 01 02 RD/RA Task D & E Emails 09/23/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 09/29/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 10/07/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 10/07/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 10/12/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 10/14/11
13 01 11 11 01 02 RD/RA Task D & E Emails 10/17/11 BN/ Stegman
13 01 11 11 01 02 RD/RA Task D & E Emails 10/19/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 10/21/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 10/27/11
13 01 11 11 01 02 RD/RA Task D & E Emails 10/28/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 11/04/11
13 01 11 11 01 02 RD/RA Task D & E Emails 11/10/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 11/18/11
13 01 11 11 01 02 RD/RA Task D & E Emails 11/18/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 12/06/11 KJ/Adlersley
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website - Updated summary table of LNAPL sampling
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
DEQ/Reynolds emails to CDM, MRL, KJ et al re: Flagger for 3/5 track portion monitoring
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Groundwater recovery system down & then back up & running
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website - weekly/quarterly info
Site-Wide Information
DEQ/Reynolds & KJ/Aldersley emails re: Monthly liquid GAC data posting location
Site-Wide Information
BN/Stegman email to DEQ/Reynolds re: Stegman thoughts from meeting with BN, CDM & DEQ
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Notification of Livingston heat trace testing schedule
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
DEQ/Reynolds, KJ/Norris & BN/Stegman emails re: Task D/E communications
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website - weekly/monthly
Site-Wide Information
DEQ/Reynolds/ KJ/Aldersley & CDM/Dudley emails re: Operation Directive #25 – Task D&E items posted to website on Livshare & LivData
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
DEQ/Reynolds & KJ/Aldersley emails re: DEQ needs chromatagram data
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
BN LIVINGSTON 8/26/13
Page 255 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails 01/09/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 01/14/12
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Reynolds email to KJ re: SCADA data 01/19/12 DEQ/ Reynolds
13 01 11 11 01 02 RD/RA Task D & E Emails 01/20/12 KJ/Norris
13 01 11 11 01 02 RD/RA Task D & E Emails 01/20/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 01/20/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 01/23/12
13 01 11 11 01 02 RD/RA Task D & E Emails 01/31/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 02/10/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 2/16/122 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 02/16/12
13 01 11 11 01 02 RD/RA Task D & E Emails 02/24/11 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 03/06/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 03/09/12 KJ/Norris
13 01 11 11 01 02 RD/RA Task D & E Emails 03/21/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 04/06/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 04/09/12 DEQ/ Reynolds
13 01 11 11 01 02 RD/RA Task D & E Emails 04/20/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 04/27/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 05/08/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 05/15/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 05/21/12 KJ/Adlersley
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
DEQ/Reynolds & KJ/Norris emails re: Task D&E changes - moving pumps
Site-Wide Information
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: Email forwarded from Jarod Fisher - chronology of difficulty experienced with mainline recovered product piping this week
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: November 2011 Respirometry testing posted to website
Site-Wide Information
Aaron Knoebel & DEQ/Reynolds emails re: Knoebel information request about property at 119 N L St
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
DEQ/Reynolds & KJ/Peterson emails re: BN Pilot test & sampling requirements
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: FW: email from KJ/Fisher re: Groundwater pump replacements
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
DEQ/Reynolds email to KJ/Norris & Aldersley re: Quarterly LNAPL thickness monitoring
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
BN LIVINGSTON 8/26/13
Page 256 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails 05/30/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 06/07/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 06/14/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 06/22/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 07/09/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 07/13/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 07/25/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 08/02/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 08/15/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 08/29/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 09/18/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 10/02/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 10/10/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 10/19/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 11/02/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 11/12/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails
13 01 11 11 01 02 RD/RA Task D & E Emails 12/04/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 12/14/12 KJ/Adlersley
13 01 11 11 01 02 RD/RA Task D & E Emails 12/17/12
13 01 11 11 01 02 RD/RA Task D & E Emails 12/31/12 KJ/Fernandes
13 01 11 11 01 02 RD/RA Task D & E Emails 01/17/13 KJ/Aldersley
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
KJ/Aldersley & DEQ/Reynolds emails re: Operation Directive #64
11/21-11/25/12
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
KJ/Fisher & DEQ/Reynolds emails re: Task D/E Phase II Wheel Shop biovent system mode
Site-Wide Information
KJ/Fernandes email to DEQ/Reynolds re: 2011 Task D/E Annual Report posted to the web
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
BN LIVINGSTON 8/26/13
Page 257 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails 01/28/13 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 02/05/13 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 02/19/13 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 03/01/13 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 03/15/13 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 03/20/13
13 01 11 11 01 02 RD/RA Task D & E Emails 03/20/13 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 03/29/13 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 04/11/13 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 04/19/13 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 04/26/13 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 05/10/13 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 05/24/13 KJ/Fernandes
13 01 11 11 01 02 RD/RA Task D & E Emails 05/29/13 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 05/31/13 KJ/Fernandes
13 01 11 11 01 02 RD/RA Task D & E Emails 06/14/13 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails K/J/Aldersley & DEQ/Reynolds emails re: Task D&E update 06/21/13 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 06/25/13 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 07/03/13 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 07/25/13 KJ/Fernandes
13 01 11 11 01 02 RD/RA Task D & E Emails 07/26/13 KJ/Aldersley
13 01 11 11 01 02 RD/RA Task D & E Emails 08/02/13 KJ/Aldersley
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
KJ/Aldersley & Vesley emails re: Livingston respirometry testing
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website
Site-Wide Information
K/J/Fernandes email to DEQ/Reynolds re: Operation Directive #65 update
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 update
Site-Wide Information
K/J/Fernandes email to DEQ/Reynolds re: Operation Directive 65 update
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 Posting
Site-Wide Information
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive 25 posting
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive 25 posting
Site-Wide Information
K/J/Fernandes & DEQ/Reynolds emails re: System shut down & resume
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive 25 posting
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 Task D/E Items posted to website
BN LIVINGSTON 8/26/13
Page 258 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Reynolds & KJ/Fernandes email re: Task D/E Work 08/09/13 DEQ/Reynolds
13 01 11 11 01 02 RD/RA Task D & E Emails 08/09/13 KJ/Aldersley
13 01 11 11 01 03 RD/RA Task D & E Phone Logs
13 01 11 11 01 03 RD/RA Task D & E Phone Logs 07/17/06 DEQ SRS
13 01 11 11 01 03 RD/RA Task D & E Phone Logs DEQ SRS to DEQ UST re: Double walled pipe 7/19/06 DEQ SRS
13 01 11 11 01 03 RD/RA Task D & E Phone Logs 09/19/06 DEQ
13 01 11 11 01 03 RD/RA Task D & E Phone Logs KJ to DEQ re: City of Livingston wants a press release 9/26/06 KJ
13 01 11 11 01 03 RD/RA Task D & E Phone Logs 9/26/06 DEQ
13 01 11 11 01 03 RD/RA Task D & E Phone Logs KJ/Olympus/DEQ emails re: Operational Directive 26
13 01 11 11 01 03 RD/RA Task D & E Phone Logs DEQ/KJ re: Treatment System location 03/12/07
13 01 11 11 01 03 RD/RA Task D & E Phone Logs DEQ/BN re: Restrictive covenant & Building location 03/12/07
13 01 11 11 01 03 RD/RA Task D & E Phone Logs 7/2/08
13 01 11 11 01 03 RD/RA Task D & E Phone Logs DEQ/KJ re: Shut down D&E 09/04/08
13 01 11 11 01 03 RD/RA Task D & E Phone Logs D&E Summary Report for 1/21/08 through 1/6/09 1/21/08
13 01 11 11 01 03 RD/RA Task D & E Phone Logs 11/18/10
13 01 11 11 01 03 RD/RA Task D & E Phone Logs Operation Directive #25 - Task D/E Items Posted to Website 08/16/13 DEQ/Reynolds
13 01 11 11 01 03 RD/RA Task D & E Phone Logs Operation Directive #25 - Task D/E Items Posted to Website 09/27/13 DEQ/Reynolds
13 01 11 11 01 03 RD/RA Task D & E Phone Logs Operation Directive #25 - Task D/E Items Posted to Website 08/30/13 DEQ/Reynolds
13 01 11 11 01 04 RD/RA Task D & E References
13 01 11 11 01 04 RD/RA Task D & E References Bioventing Principles & Practices Manual 09/01/95 EPA
13 01 11 11 01 04 RD/RA Task D & E References 06/20/05
13 01 11 11 01 04 RD/RA Task D & E References Vapor Phase Isotherm Design Parameters
Site-Wide Information
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Operation Directive #25 - Task D/E Items Posted to Website
Site-Wide Information
Site-Wide Information
DEQ SRS to Tom Reid/DEQ Water Quality Discharge Permit Bureau Chief re: Storm drain permit requirements
Site-Wide Information
Site-Wide Information
DEQ to Mark Hall re: What limits to use to determine whether the product removed is a hazardous waste
Site-Wide Information
Site-Wide Information
DEQ to Sandy Wulf/City Project Coordinator re: DEQ working on press release & wants to be sure all information needed is included
Site-Wide Information
11/14-11/17/08
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ/DEQ re: Oil in GAC units & BN has sent packet to ATSDR requesting they evaluate the vapor data – wants ATSDR to state there is no immediate health threat from vapor intrusion
Site-Wide Information
Site-Wide Information
Site-Wide Information
Phone Log – DEQ/Reynolds & K/J/Norris re: Tasks D/E & L discussion
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Intrinsic biodegradation of diesel fuel in an interval of separate phase hydrocarbons
Elsevier Science Ltd
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 259 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 04 RD/RA Task D & E References 05/01/04 Parsons
13 01 11 11 01 04 RD/RA Task D & E References Introduction to Containment Buildings Training Module 09/01/05 EPA
13 01 11 11 01 04 RD/RA Task D & E References 01/01/06 Oregon DEQ
13 01 11 11 01 04 RD/RA Task D & E References Bio Lynceus, LLC letter to DEQ re: Possible use of Products 05/02/06
13 01 11 11 01 04 RD/RA Task D & E References LPH Recovery Potential Test Report 07/10/07 EIC
13 01 11 11 01 05 RD/RA
13 01 11 11 01 05 RD/RA Screen 3 Model results –bioventing emissions 02/01/07
13 01 11 11 01 05 RD/RA 04/10/07 KJ/Norris
13 01 11 11 01 05 RD/RA 9/8/08 KJ/Norris
13 01 11 11 01 05 RD/RA 11/24/08 DEQ/ Reynolds
13 01 11 11 01 05 RD/RA 12/01/08 CDM
13 01 11 11 01 05 RD/RA 06/19/09 DEQ/ Reynolds
13 01 11 11 01 05 RD/RA 07/24/09 KJ/Norris
13 01 11 11 01 05 RD/RA 9/8/09 CDM
13 01 11 11 01 05 RD/RA 10/28/09 KJ
13 01 11 11 01 05 RD/RA 11/05/09 CDM
13 01 11 11 01 05 RD/RA 11/06/09 DEQ/ Reynolds
13 01 11 11 01 05 RD/RA 11/30/09 DEQ
13 01 11 11 01 05 RD/RA 11/30/09
Site-Wide Information
Final Procedures for Conducting Bioventing Pilot Tests and Long-Term Monitoring of Bioventing Systems
Site-Wide Information
Site-Wide Information
Guidance for Managing Hazardous Substance Air Discharges from Remedial Systems
Site-Wide Information
Site-Wide Information
Site-Wide Information
Task D&E Bioventing Emissions Management
Site-Wide Information
Task D&E Bioventing Emissions Management
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J/Norris letter to DEQ/Reynolds re: Task D&E – Phase I Remedial Action 2007 – Bioventing System Off-Gas Management
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J/Norris letter to DEQ/Reynolds re: Task D&E – Phase I Remedial Action – Summary of Bioventing Off-Gas monitoring data
Site-Wide Information
Task D&E Bioventing Emissions Management
DEQ/Reynolds email to CDM/G Siple re: K/J’s SCREEN Modeling for BN
Site-Wide Information
Task D&E Bioventing Emissions Management
CDM internal emails fw to DEQ/Reynolds re: Land use in Livingston
Site-Wide Information
Task D&E Bioventing Emissions Management
DEQ/Reynolds letter to K/J/Norris re: Task D&E – Phase I Remedial Action – Bioventing Emissions Management
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J/Norris letter to DEQ/Reynolds re: K/J response to DEQ 6/19/09 letter - : Task D&E – Phase I Remedial Action – Bioventing Emissions Management
Site-Wide Information
Task D&E Bioventing Emissions Management
CDM Draft Tech Memo to DEQ/Reynolds re: Assessment of Air Injection/Extraction Bioventing System for Task D&E Remediation System – BN Shop Complex
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J Letter report to DEQ/Reynolds re: Bioventing Extraction/Injection Design Study Work Plan
Site-Wide Information
Task D&E Bioventing Emissions Management
CDM Memorandum to DEQ/Reynolds re: CDM comments on the Bioventing Extraction/Injection Design Study Work Plan
Site-Wide Information
Task D&E Bioventing Emissions Management
DEQ/Reynolds letter to BN/Smith re: DEQ comments on the Bioventing Extraction/Injection Design Study Work Plan
Site-Wide Information
Task D&E Bioventing Emissions Management
DEQ comments on the Bioventing Extraction/Injection Design Study Work Plan
Site-Wide Information
Task D&E Bioventing Emissions Management
Revised Bioventing Extraction/Injection Design Study Work Plan
BN LIVINGSTON 8/26/13
Page 260 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 05 RD/RA 12/16/09 CDM
13 01 11 11 01 05 RD/RA 12/22/09 DEQ/ Reynolds
13 01 11 11 01 05 RD/RA 02/10/11 KJ/ Guglomo
13 01 11 11 01 05 CD RD/RA 6/8/10 KJ
13 01 11 11 01 05 RD/RA 06/25/10 CDM
13 01 11 11 01 05 RD/RA 07/20/10 DEQ/ Reynolds
13 01 11 11 01 05 RD/RA 07/27/10 KJ/Adlersley
13 01 11 11 01 05 RD/RA CDM Oversight Report 8/9-8/20/10 CDM
13 01 11 11 01 05 RD/RA 09/02/10 KJ
13 01 11 11 01 05 RD/RA 09/03/10 CDM/ Hills
13 01 11 11 01 05 RD/RA 09/07/10 KJ
13 01 11 11 01 05 RD/RA 9/16-9/17/10
13 01 11 11 01 05 RD/RA 09/17/10
13 01 11 11 01 05 RD/RA 9/23/10 KJ/Adlersley
13 01 11 11 01 05 RD/RA 09/24/10 KJ/Adlersley
13 01 11 11 01 05 RD/RA 09/28/10 KJ/Adlersley
13 01 11 11 01 05 RD/RA 10/7/10 KJ/Adlersley
Site-Wide Information
Task D&E Bioventing Emissions Management
CDM Memorandum to DEQ/Reynolds re: CDM comments on the Revised Bioventing Extraction/Injection Design Study Work Plan
Site-Wide Information
Task D&E Bioventing Emissions Management
DEQ/Reynolds letter to BN/Smith re: DEQ comments on the Revised Bioventing Extraction/Injection Design Study Work Plan
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J/Guglomo letter to DEQ Reynolds re: Response to DEQ letter dated 12/22/09 (1/18/10)Bioventing/Injection Piping Heat Trace Schematic
Site-Wide Information
Task D&E Bioventing Emissions Management
Bioventing Extraction/Injection Design Study Completion & Radius of Influence (ROI) Analysis Report
Site-Wide Information
Task D&E Bioventing Emissions Management
CDM Memorandum to DEQ/Reynolds re: CDM Draft comments on the Bioventing Extraction/Injection Design Study Completion & Radius of Influence (ROI) Analysis Report
Site-Wide Information
Task D&E Bioventing Emissions Management
DEQ/Reynolds letter to BN/Smith re: DEQ comments & clarifications on the Bioventing Extraction/Injection Design Study Completion & Radius of Influence (ROI) Analysis Report
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J/Aldersley email to DEQ/Reynolds re: Notification of Task D&E field activities
Site-Wide Information
Task D&E Bioventing Emissions Management
Site-Wide Information
Task D&E Bioventing Emissions Management
Bioventing Extraction/Injection System Interim Operation & Monitoring Plan
Site-Wide Information
Task D&E Bioventing Emissions Management
CDM/Hills email FW to K/J/Norris & BN/Smith re: DEQ comments on the Bioventing Extraction/Injection System Interim Operation & Monitoring Plan (Interim Monitoring Plan)
Site-Wide Information
Task D&E Bioventing Emissions Management
Revised Bioventing Extraction/Injection System Interim Operation & Monitoring Plan
Site-Wide Information
Task D&E Bioventing Emissions Management
Olytech/Chambers, K/J/Aldersley & DEQ Reynolds emails re: Biovent readings for GWTP & BNSF Yard monitoring 9/14/& 9/15/10
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J/Aldersley & DEQ/Reynolds emails re: Biovent Extraction/Injection Interim Measurements
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J/Aldersley email to DEQ/Reynolds re: Attachment – REV – Biovent Interim Monitoring Tables
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J/Aldersley email to DEQ/Reynolds re: Recoverability Testing
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J/Aldersley email to DEQ/Reynolds re: Attachment – REV-Biovent Interim Monitoring Table 1
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J/Aldersley email to DEQ/Reynolds re: Attachment – REV-Biovent Interim Monitoring Table 1
BN LIVINGSTON 8/26/13
Page 261 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 05 RD/RA 10/14/10 KJ/Adlersley
13 01 11 11 01 05 RD/RA 10/27/10 KJ/Adlersley
13 01 11 11 01 05 RD/RA 10/29/10 KJ/Adlersley
13 01 11 11 01 05 CD RD/RA 11/03/10 KJ
13 01 11 11 01 05 RD/RA 11/5/10 KJ/Adlersley
13 01 11 11 01 05 RD/RA 11/05/10 KJ/Norris
13 01 11 11 01 05 RD/RA 11/5/10 KJ
13 01 11 11 01 05 RD/RA 11/11/10 KJ/Adlersley
13 01 11 11 01 05 RD/RA 11/22/10 DEQ/ Reynolds
13 01 11 11 01 05 RD/RA 11/22/10 DEQ/ Reynolds
13 01 11 11 01 05 RD/RA 12/01/10
13 01 11 11 01 05 RD/RA 12/10/10 KJ/Adlersley
13 01 11 11 01 05 RD/RA K/J/Norris email to DEQ/Reynolds re: Bioventing status 12/19/10 KJ/Norris
13 01 11 11 01 05 RD/RA 12/2410 KJ/Norris
13 01 11 11 01 05 RD/RA CDM Oversight Report CDM
13 01 11 11 01 05 RD/RA 1/6/11 KJ/Norris
13 01 11 11 01 05 RD/RA 1/8/11 KJ/Norris
13 01 11 11 01 05 RD/RA 1/14/11 KJ/Adlersley
13 01 11 11 01 05 RD/RA 1/14/11 DEQ/ Reynolds
13 01 11 11 01 05 CD RD/RA 1/31/11 KJ
13 01 11 11 01 05 CD RD/RA 01/31/11 KJ
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J/Aldersley email to DEQ/Reynolds re: Attachment – REV-Biovent measurements
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J/Aldersley email to DEQ/Reynolds re: Attachment – REV-Biovent Interim Monitoring Table 1
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J/Aldersley email to DEQ/Reynolds re: Attachment – REV-Biovent Interim Monitoring Table 1
Site-Wide Information
Task D&E Bioventing Emissions Management
Bioventing Extraction/Injection Design Study Comprehensive Report
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J/Aldersley email to DEQ/Reynolds re: Attachment – REV-Biovent Interim Monitoring Table 1
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J/Norris letter to DEQ/Reynolds re: Proposed Vapor Monitoring Point (VMP) Locations to Supplement Existing Biovent Monitoring Well Network
Site-Wide Information
Task D&E Bioventing Emissions Management
Proposed Vapor Monitoring Point (VMP) Locations to Supplement Existing Biovent Monitoring Well Network Report (K/J,
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J/Aldersley email to DEQ/Reynolds re: Attachment – REV-Biovent Interim Monitoring Table 1
Site-Wide Information
Task D&E Bioventing Emissions Management
DEQ/Reynolds email to K/J/Norris re: Attachment – Recommended new Vapor monitoring point locations
Site-Wide Information
Task D&E Bioventing Emissions Management
DEQ/Reynolds email to K/J/Norris & Aldersley re: Respirometry Testing Recommended for Well Network
Site-Wide Information
Task D&E Bioventing Emissions Management
W Chambers, J Fisher, J Norris & Reynolds emails re: Biovent system monitoring
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J/Aldersley email to DEQ/Reynolds re: Attachment – Biovent Interim Monitoring Tables 1
Site-Wide Information
Task D&E Bioventing Emissions Management
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J/Norris email to DEQ/Reynolds re: Attachment – Biovent Interim Monitoring Tables 1
Site-Wide Information
Task D&E Bioventing Emissions Management
12/13-12/17/10
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J/Norris email to DEQ/Reynolds re: Attachment – REV-Biovent Interim Monitoring Tables
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J/Norris email to DEQ/Reynolds re: Attachment – REV-Biovent Interim Monitoring Tables
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J/Aldersley email to DEQ/Reynolds re: Attachment – REV-Biovent Interim Monitoring Tables
Site-Wide Information
Task D&E Bioventing Emissions Management
DEQ/Reynolds letter to BN/Smith re: November 3/2010 Bioventing Extraction/Injection Design Study Comprehensive Report, Task D/E Remedial Action
Site-Wide Information
Task D&E Bioventing Emissions Management
Bioventing Extraction/Injection System Monitoring Plan/Long Term
Site-Wide Information
Task D&E Bioventing Emissions Management
Revised Bioventing Extraction/Injection Design Study Comprehensive Report, Task D/E Remedial Action
BN LIVINGSTON 8/26/13
Page 262 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 05 RD/RA 1/31/11
13 01 11 11 01 05 RD/RA 03/28/11 KJ/Adlersley
13 01 11 11 01 05 RD/RA 04/01/11 KJ/Adlersley
13 01 11 11 01 05 RD/RA 04/06/11 KJ/Adlersley
13 01 11 11 01 05 RD/RA CDM Oversite Report CDM
13 01 11 11 01 05 RD/RA 05/11/11 KJ/Adlersley
13 01 11 11 01 05 RD/RA 07/12/11 DEQ/ Reynolds
13 01 11 11 01 05 RD/RA 07/22/11 CDM
13 01 11 11 01 05 RD/RA 07/28/11 KJ
13 01 11 11 01 05 RD/RA 07/28/11 KJ
13 01 11 11 01 05 RD/RA 07/28/11 KJ
13 01 11 11 01 05 RD/RA 07/28/11 KJ
13 01 11 11 01 05 RD/RA 08/16/11 CDM/Hills
13 01 11 11 01 05 RD/RA 08/17/11 DEQ/ Reynolds
13 01 11 11 01 05 RD/RA 08/24/11 CDM/Cohn
13 01 11 11 01 05 RD/RA 09/09/11 DEQ/ Reynolds
13 01 11 11 01 05 RD/RA 02/24/12 CDM Smith
Site-Wide Information
Task D&E Bioventing Emissions Management
DEQ/Reynolds & K/J/Norris emails re: Revised Bioventing Extraction/Injection Design Study Comprehensive Report can be viewed on liveshare
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J Aldersley email to DEQ/Reynolds re: Notification of Task D/E Bi-annual Biovent Monitoring
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J Aldersley email to DEQ/Reynolds re: Task D/E biovent monitoring cancelled for next week and moved to April 11
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J Aldersley email to DEQ/Reynolds re: Notification of field activities
Site-Wide Information
Task D&E Bioventing Emissions Management
4/11-4/17/2011
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J Aldersley email to DEQ/Reynolds re: Task D/E items posted to web - April 2011 semiannual respirometry testing data
Site-Wide Information
Task D&E Bioventing Emissions Management
DEQ/Reynolds letter to BNSF/Smith re: DEQ comments to Revised Bioventing Extraction/Injection Design Study Comprehensive Report, Task D/E Remedial Action and Bioventing Extraction/Injection System Monitoring Plan/Long Term
Site-Wide Information
Task D&E Bioventing Emissions Management
CDM Memorandum to DEQ/Reynolds re: Bioventing totals for Task D/E Remediation System
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J redline strike-out cover letter to DEQ/Reynolds re: Revised Bioventing Extraction/Injection System Monitoring Plan (Long –Term Monitoring Plan)
Site-Wide Information
Task D&E Bioventing Emissions Management
K/J cover letter to DEQ/Reynolds re: Revised Bioventing Extraction/Injection System Monitoring Plan (Long –Term Monitoring Plan)
Site-Wide Information
Task D&E Bioventing Emissions Management
Revised Bioventing Extraction/Injection System Monitoring Plan (Long –Term Monitoring Plan)
Site-Wide Information
Task D&E Bioventing Emissions Management
2nd Revised Bioventing Extraction/Injection Design Study Comprehensive Report
Site-Wide Information
Task D&E Bioventing Emissions Management
CDM/Hills email to DEQ/Reynolds re: Recommended wells for respirometry testing
Site-Wide Information
Task D&E Bioventing Emissions Management
DEQ/Reynolds email to KJ re: Attachment - Figure showing the wells to be used for August 2011 respirometry testing
Site-Wide Information
Task D&E Bioventing Emissions Management
CDM/Cohn email to DEQ/Reynolds re: Respirometry testing update
Site-Wide Information
Task D&E Bioventing Emissions Management
DEQ/Reynolds letter to BN/Smith re: DEQ approval of the Revised Bioventing Extraction/Injection System Monitoring Plan (Long –Term Monitoring Plan) & the 2nd Revised Bioventing Extraction/Injection Design Study Comprehensive Report
Site-Wide Information
Task D&E Bioventing Emissions Management
CDM Smith letter to DEQ/Reynolds re: Recommended wells for respirometry testing
BN LIVINGSTON 8/26/13
Page 263 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 01 05 RD/RA 06/14/12 CDM Smith
13 01 11 11 01 05 RD/RA 06/22/12 KJ/Adlersley
13 01 11 11 01 05 RD/RA 03/07/13 KJ/Norris
13 01 11 11 01 05 RD/RA 03/15/13 CDM Smith
13 01 11 11 01 05 RD/RA 03/22/13
13 01 11 11 01 05 RD/RA 04/16/13
13 01 11 11 01 05 RD/RA 06/11/13 CDM Smith
13 01 11 11 01 05 RD/RA 06/17/13 DEQ/ Reynolds
13 01 11 11 01 05 RD/RA 07/09/13 KJ/Fernandes
13 01 11 11 02 RD/RA Task D & E Design/Build
13 01 11 11 02 RD/RA Task D & E Design/Build 2/26/07 KJ
13 01 11 11 02 RD/RA Task D & E Design/Build Task D/E – Phase 1 Remedial Action 2007 30% Design Report 03/07/11 KJ
13 01 11 11 02 RD/RA Task D & E Design/Build 4/07 KJ
13 01 11 11 02 RD/RA Task D & E Design/Build 7/3/07 KJ
13 01 11 11 02 RD/RA Task D & E Design/Build BN
13 01 11 11 02 RD/RA Task D & E Design/Build K/J to DEQ: Subchapter 9 Notification 10/01/07 KJ
13 01 11 11 02 RD/RA Task D & E Design/Build 2008 Construction Schedule 05/08/08
13 01 11 11 02 RD/RA Task D & E Design/Build Tasks D & E Phase I - RA 2008 80% Design Report 05/08/08 KJ
13 01 11 11 02 RD/RA Task D & E Design/Build 05/08/08 KJ
13 01 11 11 02 RD/RA Task D & E Design/Build 05/08/08 KJ
13 01 11 11 02 RD/RA Task D & E Design/Build 06/08/08 KJ
Site-Wide Information
Task D&E Bioventing Emissions Management
CDM Smith letter to DEQ/Reynolds re: Recommended wells for respirometry testing
Site-Wide Information
Task D&E Bioventing Emissions Management
KJ/Alersley email to DEQ/Reynolds re: Respiromety testing schedule
Site-Wide Information
Task D&E Bioventing Emissions Management
KJ/Norris letter to DEQ/Reynolds re: Task D/E - Phase II Bioventing Respirometry Testing FrequencyBNLV Shop Complex Facility 1396021*16
Site-Wide Information
Task D&E Bioventing Emissions Management
CDM Smith memo to DEQ/Reynolds re: CDM comments on Task D/E - Phase II Bioventing Respirometry testing freqency
Site-Wide Information
Task D&E Bioventing Emissions Management
DEQ/Reynolds & KJ/Aldersley emails re: Proposed monitoring points for March 2013 respirometry testing
Site-Wide Information
Task D&E Bioventing Emissions Management
DEQ/Reynolds & KJ/Aldersley emails re: March 2013 respirometry testing data posted to the website & semi-annual testing
Site-Wide Information
Task D&E Bioventing Emissions Management
CDM memo to DEQ/Reynolds re: Draft calculation of Biodegradation via Bioventing for the Task D/E Remediation System
Site-Wide Information
Task D&E Bioventing Emissions Management
DEQ/Reynolds letter to BNSF/Smith re: 3/7/13 Task D/E Phase II Bioventing Respirometry Testing Frequency
Site-Wide Information
Task D&E Bioventing Emissions Management
KJ/Fernandes & DEQ/Reynolds emails re: Bioventing pressure data
Site-Wide Information
Site-Wide Information
Railyard Wastewater Treatment Plan Sump Confirmation Sampling & Related Information
Site-Wide Information
Site-Wide Information
Task D&E Phase I RA 07 30% Design Report Construction Issue
Site-Wide Information
K/J letter to DEQ re: Request for DEQ UST Regulations Variance for LNAPL Piping within 30 inch pipe
Site-Wide Information
BN Livingston 2007 Construction Oversight Daily Oversight Reports & Photo Logs
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Tasks D & E Phase I - RA 2008 80% Design Package Bid Walk Issue
Site-Wide Information
BN Task D & E – Phase I RA 2008 80 % Shop Complex As Built Drawings
Site-Wide Information
BN Task D & E – Phase I RA 2008 Shop Complex As Built Drawings Bid Issue
BN LIVINGSTON 8/26/13
Page 264 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 02 RD/RA Task D & E Design/Build Well placement photos 06/08/08
13 01 11 11 02 RD/RA Task D & E Design/Build CDM Oversight Summary 6/4-6/12/08 CDM
13 01 11 11 02 RD/RA Task D & E Design/Build 06/13/08 CDM
13 01 11 11 02 RD/RA Task D & E Design/Build 6/16/08 DEQ
13 01 11 11 02 RD/RA Task D & E Design/Build K/J Response to DEQ Comments on Task D/E 6/23/08 KJ
13 01 11 11 02 RD/RA Task D & E Design/Build Tasks D & E Phase I - RA 2008 Bid Issue 06/08/11 KJ
13 01 11 11 02 RD/RA Task D & E Design/Build Tasks D & E Phase I - RA 2008 Bid Issue 7/10/08 KJ
13 01 11 11 02 RD/RA Task D & E Design/Build CDM D&E Oversight Summary 6/4/-6/12/08 7/17/08 CDM
13 01 11 11 02 RD/RA Task D & E Design/Build Bid Package 8/08 KJ
13 01 11 11 02 RD/RA Task D & E Design/Build Task D&E – Phase I Remedial Action 2008 BN Shop Complex 5/18/09
13 01 11 11 02 RD/RA Task D & E Design/Build 5/27/09 KJ/Norris
13 01 11 11 02 RD/RA Task D & E Design/Build Schedule 9/08/09
13 01 11 11 02 RD/RA Task D & E Design/Build 9/3-9/8/2009
13 01 11 11 02 RD/RA Task D & E Design/Build 09/08/09 KJ/Adlersley
13 01 11 11 02 RD/RA Task D & E Design/Build 01/25/10 KJ/Adlersley
13 01 11 11 02 RD/RA Task D & E Design/Build
13 01 11 11 02 RD/RA Task D & E Design/Build 07/13/10 KJ/Adlersley
13 01 11 11 03 RD/RA Task D & E Operations
13 01 11 11 03 RD/RA Task D & E Operations 08/14/07 KJ
13 01 11 11 03 RD/RA Task D & E Operations undated
13 01 11 11 03 RD/RA Task D & E Operations D Phase I RA 2007 AS Built Drawings – Construction Issue 10/2007 KJ
13 01 11 11 03 RD/RA Task D & E Operations DEQ/KJ emails re: Recommended MUW Wells for start-up 8/22/07
13 01 11 11 03 RD/RA Task D & E Operations Operations and Maintenance Manual 10/22/07 KJ
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM Memo to DEQ re: CDM comments on 2008 80% Design Report
Site-Wide Information
DEQ letter to D Smith/BN re: DEQ comments on Tasks D & E Phase I - RA 2008 80% Design Package
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
K/J/Norris Transmittal to DEQ/Reynolds re: Record Drawings for Phase 1 Expansion
Site-Wide Information
Site-Wide Information
DEQ/Reynolds & K/J/Aldersley emails re: Conference call access codes
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Task D/E items posted to website
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Task D/E items posted to website
Site-Wide Information DEQ/Reynolds & K/J Norris emails re: Task F & D?E sampling
7/6-7/9/10 7/9/10
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: Task D/E items posted to website
Site-Wide Information
Site-Wide Information
K/J email to DEQ re: Phase I RA – Working Draft Startup Plan Table of Contents
Site-Wide Information LNAPL Recovery/Bioventing System Startup – Data Collection
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 265 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 03 RD/RA Task D & E Operations Revised Draft O&M Manual 11/30/07
13 01 11 11 03 CD RD/RA Task D & E Operations Initial O&M Plan (Initial Version) 12/19/07 CDM
13 01 11 11 03 RD/RA Task D & E Operations 1/4/08 DEQ
13 01 11 11 03 RD/RA Task D & E Operations 1/4/08 DEQ
13 01 11 11 03 RD/RA Task D & E Operations 1/23/08 KJ
13 01 11 11 03 RD/RA Task D & E Operations 01/25/08 DEQ legal
13 01 11 11 03 RD/RA Task D & E Operations 01/31/08 CDM
13 01 11 11 03 RD/RA Task D & E Operations 2/08-3/08
13 01 11 11 03 RD/RA Task D & E Operations Respiration Testing Oversight Report 05/01/08 CDM
13 01 11 11 03 RD/RA Task D & E Operations DEQ email to K/J & CDM re: 6/08 Respiration testing data 5/21/08 DEQ
13 01 11 11 03 RD/RA Task D & E Operations Task D/E Operations Flow Chart
13 01 11 11 03 RD/RA Task D & E Operations Task D/E Project Manual 8/2008 KJ
13 01 11 11 03 RD/RA Task D & E Operations Task D/E Phase I Remedial Action 08/01/08 KJ
13 01 11 11 03 RD/RA Task D & E Operations K/J letter to DEQ re: Task D/E Bioventing emissions 9/8/08 KJ
13 01 11 11 03 RD/RA Task D & E Operations CDM memo to DEQ re: Bench scale skimmer test procedures 11/06/08 CDM
13 01 11 11 03 RD/RA Task D & E Operations CDM email to DEQ re: Bench scale skimmer test results 11/12/08 CDM
13 01 11 11 03 RD/RA Task D & E Operations Revision 1 O&M Plan – Draft 11/21/08 CDM
13 01 11 11 03 RD/RA Task D & E Operations Revision 1 O&M Plan – Final 11/26/08 CDM
13 01 11 11 03 RD/RA Task D & E Operations DEQ transmittal letters re: CDM O&M Plan Revision 1 12/02/08 DEQ
13 01 11 11 03 RD/RA Task D & E Operations 12/5/08
13 01 11 11 03 RD/RA Task D & E Operations 12/01/08 KJ
13 01 11 11 03 RD/RA Task D & E Operations CDM memo to DEQ re: Skimmer pumps 12/19/08 CDM
13 01 11 11 03 RD/RA Task D & E Operations CDM email to DEQ re: Skimmer pumps 12/19/08 CDM
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ letter to RTI re: Initial O&M Plan for Task D&E – Petroleum Hydrocarbon Recovery & Remediation
Site-Wide Information
DEQ letter to K/J re: Initial O&M Plan & GW split sample results
Site-Wide Information
K/J Tech Memo to DEQ re: Startup of Task D&E Remediation System
Site-Wide Information
DEQ Legal Memo to K/J re: Startup of Task D&E Remediation System
Site-Wide Information
CDM Tech Memo to DEQ re: Continued Startup of Task D&E Remediation System
Site-Wide Information
BN Shop Complex GW & LNAPL Recovery; LNAPL Pump start & stop history
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Phase 1 Remediation System O&M Maintenance Manual Revision 1 – Redline Strikeout
Site-Wide Information
Phase I Remediation System O&M Maintenance Manual – Revision 1
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 266 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 03 RD/RA Task D & E Operations KJ email re: KJ response to skimmer pump memo 12/22/08 KJ
13 01 11 11 03 RD/RA Task D & E Operations CDM email to DEQ re: Skimmer pump testing memo 01/23/09 CDM
13 01 11 11 03 RD/RA Task D & E Operations System Summary Report 1/20/09-2/7/09 CDM
13 01 11 11 03 RD/RA Task D & E Operations System Summary Report CDM
13 01 11 11 03 CD RD/RA Task D & E Operations 2008 Task D & E Annual Report 5/09 KJ
13 01 11 11 03 RD/RA Task D & E Operations Utilidor sump photos 06/18/09
13 01 11 11 03 RD/RA Task D & E Operations CDM Site Oversight Report CDM
13 01 11 11 03 CD RD/RA Task D & E Operations 2009 Task D & E Annual Report 06/10/11 KJ
13 01 11 11 03 RD/RA Task D & E Operations CDM Site Oversight Report 6/15-6/17/10 CDM
13 01 11 11 03 RD/RA Task D & E Operations 07/12/10 CDM
13 01 11 11 03 RD/RA Task D & E Operations 09/10/10 DEQ/ Reynolds
13 01 11 11 03 RD/RA Task D & E Operations 10/13/10 CDM/ Osterman
13 01 11 11 03 RD/RA Task D & E Operations 10/13/10 CDM/ Osterman
13 01 11 11 03 RD/RA Task D & E Operations 10/20/10 DEQ/ Reynolds
13 01 11 11 03 RD/RA Task D & E Operations 10/25/10 KJ/Norris
13 01 11 11 03 RD/RA Task D & E Operations 11/05/10 DEQ/ Reynolds
13 01 11 11 03 RD/RA Task D & E Operations 11/05/10 KJ/Norris
13 01 11 11 03 RD/RA Task D & E Operations 11/10/10 DEQ/ Reynolds
13 01 11 11 03 CD RD/RA Task D & E Operations 12/9/10 KJ
13 01 11 11 03 RD/RA Task D & E Operations Redline pages for Revised 2009 Task D/E Annual Report 12/10/10 KJ
13 01 11 11 03 RD/RA Task D & E Operations 12/24/10 KJ
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
1/20/09-2/14/09
Site-Wide Information
Site-Wide Information
Site-Wide Information
12/15-12/19/09
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM/Memorandum to DEQ/Reynolds re: CDM Draft comments on the 2009 Task D/E Annual Report
Site-Wide Information
DEQ/Reynolds letter to BN/Smith re: Draft comments on the 2009 Task D/E Annual Report
Site-Wide Information
CDM/Osterman email to DEQ/Reynolds re: 10/12/10 liquid levels
Site-Wide Information
CDM/Osterman memorandum to DEQ/Reynolds re: Fluctuation of recovery well pumping levels with increasing water treatment plant pre-filter pressure
Site-Wide Information
DEQ/Reynolds letter to BN/Smith re: Fluctuation of recovery well pumping levels with increasing water treatment plant pre-filter pressure
Site-Wide Information
K/J/Norris letter to DEQ/Reynolds re: K/J response to DEQ comments to 2009 Task D/E Annual Report – K/J has questions
Site-Wide Information
DEQ/Reynolds email to K/J/Norris re: Task D?E Annual Report deadline
Site-Wide Information
K/J/Norris email to DEQ/Reynolds re: Attachment – Pre-filter by pass sampling log
Site-Wide Information
DEQ/Reynolds letter to BN/Smith re: DEQ response to BN - 2009 Task D&E Annual Report – Requests for Information/Clarification
Site-Wide Information
Revised 2009 Task D&E Annual Report Revision No. 1 Volumes I-II
Site-Wide Information
Site-Wide Information
Revised 2009 Task D&E Annual Report Revision No. 1 Volumes I-II
BN LIVINGSTON 8/26/13
Page 267 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 03 RD/RA Task D & E Operations 04/11/11 CDM
13 01 11 11 03 CD RD/RA Task D & E Operations 2010 Task D&E Annual Report 08/30/11 KJ
13 01 11 11 03 RD/RA Task D & E Operations 03/21/12
13 01 11 11 03 RD/RA Task D & E Operations KJ/Aldersley emails to DEQ/Reynolds re: Water level data 07/13/12 KJ/Adlersley
13 01 11 11 03 RD/RA Task D & E Operations 08/02/12
13 01 11 11 03 RD/RA Task D & E Operations 01/07/13
13 01 11 11 03 RD/RA Task D & E Operations 02/20/13 CDM
13 01 11 11 03 RD/RA Task D & E Operations 07/15/13 DEQ/ Reynolds
13 01 11 11 03 RD/RA Task D & E Operations Livingston Well Rehabilitation Data Olympus WO# A1642 02/04/14 Olympus/ Stine
13 01 11 11 03 CD RD/RA Task D & E Operations 2012/2013 Combined Task D/E Annual Report 06/24/14 KJ/Fernandes
13 01 11 11 03 01 RD/RA Operational Directives
13 01 11 11 03 01 RD/RA Operational Directives Directive 1 02/27/08
13 01 11 11 03 01 RD/RA Operational Directives Directive 2 03/04/08
13 01 11 11 03 01 RD/RA Operational Directives Directive 4 3/18/08
13 01 11 11 03 01 RD/RA Operational Directives Email re: Directive 3 attached 03/24/08
13 01 11 11 03 01 RD/RA Operational Directives Directive 5 03/26/08
13 01 11 11 03 01 RD/RA Operational Directives Directive 6 04/01/08
13 01 11 11 03 01 RD/RA Operational Directives Directive 7 04/15/08
13 01 11 11 03 01 RD/RA Operational Directives Directive 8 04/22/08
13 01 11 11 03 01 RD/RA Operational Directives Directive 9 4/29/08
13 01 11 11 03 01 RD/RA Operational Directives Directive 10 5/13/08
Site-Wide Information
CDM letter to DEQ/Reynolds re: Draft comments on the Revised 2009 Task D/E Annual report (Revision no. 1) Dated December 2010
Site-Wide Information
Site-Wide Information
DEQ/Reynolds email to KJ, BN & Stegman re: Attachment - DEQ's draft criteria for determining when to rest/cease recovery in Task D&E wells
Site-Wide Information
Site-Wide Information
DEQ/Reynolds & KJ/Fernandes emails re: Task D&E Annual Report - Conference call agenda
Site-Wide Information
KJ/Norris & DEQ/Reynolds emails re: Bioventing operations - Potential soil gas displacement concern
Site-Wide Information
CDM memo to DEQ/Reynolds re: Draft comments on the 2011 Task D/E Annual Report
Site-Wide Information
DEQ/Reynolds letter to BNSF/Smith re: Revision No. 1 of 2009, 2010 and 2011 Task D/E Annual Reports dated December 2010, August 2011, and December 2012 (Reports)
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 268 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 03 01 RD/RA Operational Directives Directive 11 5/22/08
13 01 11 11 03 01 RD/RA Operational Directives Directive 12 05/23/08
13 01 11 11 03 01 RD/RA Operational Directives Directive 14 06/02/08
13 01 11 11 03 01 RD/RA Operational Directives Directive 15 06/06/08
13 01 11 11 03 01 RD/RA Operational Directives Directive 16 6/19/08
13 01 11 11 03 01 RD/RA Operational Directives System Operations Update 06/20/08
13 01 11 11 03 01 RD/RA Operational Directives LNAPL Data 6/23/08 CDM
13 01 11 11 03 01 RD/RA Operational Directives D&E LNAPL Data 07/02/08
13 01 11 11 03 01 RD/RA Operational Directives Daily Report 7/8-7/9/08 CDM
13 01 11 11 03 01 RD/RA Operational Directives Directive 17 07/08/08
13 01 11 11 03 01 RD/RA Operational Directives Directive 18 7/10/08
13 01 11 11 03 01 RD/RA Operational Directives CDM email to KJ re: Explaining Directive 18 07/10/08 CDM
13 01 11 11 03 01 RD/RA Operational Directives LNAPL Recovery Data 7/13/08 CDM
13 01 11 11 03 01 RD/RA Operational Directives LNAPL Recovery Data 7/22/08 CDM
13 01 11 11 03 01 RD/RA Operational Directives LNAPL Data 07/26/08 CDM
13 01 11 11 03 01 RD/RA Operational Directives Soil & Gas Data 07/01/08 KJ
13 01 11 11 03 01 RD/RA Operational Directives Directive 19 07/25/08
13 01 11 11 03 01 RD/RA Operational Directives Directive 20 07/25/08
13 01 11 11 03 01 RD/RA Operational Directives Historic Yellowstone Water Levels 07/29/08
13 01 11 11 03 01 RD/RA Operational Directives DEQ email to KJ re: Directive 21 08/01/08 DEQ
13 01 11 11 03 01 RD/RA Operational Directives MUW Profile 08/05/08
13 01 11 11 03 01 RD/RA Operational Directives LNAPL Data for Meeting 8/7/08
13 01 11 11 03 01 RD/RA Operational Directives K/J email to DEQ re: Directive No 23 09/30/08 KJ
13 01 11 11 03 01 RD/RA Operational Directives K/J letter to DEQ re: Directive No 23 9/30/08 KJ
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 269 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 03 01 RD/RA Operational Directives CDM email to DEQ re: K/J Directive No 23 10/03/08 CDM
13 01 11 11 03 01 RD/RA Operational Directives DEQ letter to K/J re: Response to Directive No 23 request 10/10/08 DEQ
13 01 11 11 03 01 RD/RA Operational Directives Directive 24 10/15/08
13 01 11 11 03 01 RD/RA Operational Directives Directive 24 – conformed 10/23/08
13 01 11 11 03 01 RD/RA Operational Directives CDM email to DEQ re: Directive 24 exception 10/28/08 CDM
13 01 11 11 03 01 RD/RA Operational Directives DEQ letter to K/J re: DEQ response to Directive 24 exception 10/30/08 DEQ
13 01 11 11 03 01 RD/RA Operational Directives Directive 26 11/11/08
13 01 11 11 03 01 RD/RA Operational Directives Directive 27 12/3/08
13 01 11 11 03 01 RD/RA Operational Directives Directive 28 12/30/08
13 01 11 11 03 01 RD/RA Operational Directives Directive 30 1/24/09
13 01 11 11 03 01 RD/RA Operational Directives Directive 31 2/2/09
13 01 11 11 03 01 RD/RA Operational Directives Directive 32 2/10/09
13 01 11 11 03 01 RD/RA Operational Directives Directive 33 2/19/09
13 01 11 11 03 01 RD/RA Operational Directives Directive 34 03/10/09
13 01 11 11 03 01 RD/RA Operational Directives Directive 35 03/24/09
13 01 11 11 03 01 RD/RA Operational Directives Directive 36 5/5/09
13 01 11 11 03 01 RD/RA Operational Directives Directive 37 5/19/09
13 01 11 11 03 01 RD/RA Operational Directives Directive 38 6/9/09
13 01 11 11 03 01 RD/RA Operational Directives Directive 39 6/24/09
13 01 11 11 03 01 RD/RA Operational Directives Directive 40 6/30/09
13 01 11 11 03 01 RD/RA Operational Directives Directive 41 7/24/09
13 01 11 11 03 01 RD/RA Operational Directives Directive 42 8/19/09
13 01 11 11 03 01 RD/RA Operational Directives Directive 43 11/19/09
13 01 11 11 03 01 RD/RA Operational Directives Directive 45 1/26/10
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 270 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 03 01 RD/RA Operational Directives Directive 46 2/8/10
13 01 11 11 03 01 RD/RA Operational Directives Directive 47 3/17/10
13 01 11 11 03 01 RD/RA Operational Directives Directive 48 03/25/10
13 01 11 11 03 01 RD/RA Operational Directives Directive 48 03/30/10
13 01 11 11 03 01 RD/RA Operational Directives Directive 49 04/27/10
13 01 11 11 03 01 RD/RA Operational Directives Directive 50 06/10/10
13 01 11 11 03 01 RD/RA Operational Directives Directive 52 8/23/10
13 01 11 11 03 01 RD/RA Operational Directives Directive 53 9/27/10
13 01 11 11 03 01 RD/RA Operational Directives Directive 54 9/27/10
13 01 11 11 03 01 RD/RA Operational Directives Directive 55 01/28/11
13 01 11 11 03 01 RD/RA Operational Directives Directive 57 1/28/11
13 01 11 11 03 01 RD/RA Operational Directives 1/28-2/1/11
13 01 11 11 03 01 RD/RA Operational Directives Directive 58 04/04/11
13 01 11 11 03 01 RD/RA Operational Directives Directive 59 04/20/11
13 01 11 11 03 01 RD/RA Operational Directives Directive 60 06/08/11
13 01 11 11 03 01 RD/RA Operational Directives Directive 62 10/18/11
13 01 11 11 03 01 RD/RA Operational Directives Directive 63 03/05/12
13 01 11 11 03 01 RD/RA Operational Directives 05/22/12 KJ/Norris
13 01 11 11 03 01 RD/RA Operational Directives 03/11/13
13 01 11 11 03 01 RD/RA Operational Directives Directive 65 05/13/13
13 01 11 11 03 02 RD/RA MPDES Permit
13 01 11 11 03 02 RD/RA MPDES Permit 10/08/07 KJ
13 01 11 11 03 02 RD/RA MPDES Permit DEQ Letter to BNSF re: Modification of Authorization Letter 12/13/07 DEQ
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ/Reynolds & K/J/Norris emails re: Work Order Directive #57
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: Operation Directive #63 implementation schedule
Site-Wide Information
DEQ/Reynolds & KJ/Norris emails re: Operational Directive 65 - moving LNAPL recovery componets to new zones
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ Letter to B Lovelace re: Request for Amendment of Petroleum Cleanup General Permit
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 271 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 03 02 RD/RA MPDES Permit
13 01 11 11 03 02 RD/RA MPDES Permit 2/27/08 J May
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – January 2008 02/27/08
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – February 2008 03/24/08
13 01 11 11 03 02 RD/RA MPDES Permit 4/4/08 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – March 2008 4/25/08 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – April 2008 05/22/08 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – May 2008 6/17/08 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – July 2008 8/27/08 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – August 2008 09/17/08 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – November 2008 12/24/08 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – January 2009 02/23/09 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – February 2009 3/25/09 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – March 2009 04/21/09 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – April 2009 04/26/09 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – May 2009 06/15/09 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – June 2009 7/15/09 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – January 2009 2/23/09 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – July 2009 8/18/09 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – August 2009 9/22/09 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – September 2009 10/22/09 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – October 2009 11/20/09 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – November 2009 12/21/09 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – December 2009 01/22/10 KJ
Site-Wide Information
Emails re: Submittal of Initial Sampling Results per Petroleum Cleanup General Permit MTG790013
Site-Wide Information
J May Letter to BNSF re: Certification of Discharge Monitoring Results for Petroleum Cleanup General Permit
Site-Wide Information
Site-Wide Information
Site-Wide Information
BNSF Letter to J May re: Certification of Discharge Monitoring Reports for Petroleum Cleanup General Permit
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 272 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – January 2010 02/23/10 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report –February 2010 03/23/10 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – March 2010 04/23/10 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – May 2010 06/11/10 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – June 2010 07/22/10 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – July 2010 08/25/10 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – August 2010 09/23/10 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – September 2010 10/22/10 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – October 2010 11/22/10 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – November 2010 12/17/10 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – December 2010 01/25/11 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – January 2011 01/23/11 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – February 2011 03/25/11 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – March 2011 04/22/11 KJ
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – April 2011 05/23/11 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – May 2011 06/23/11 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – June 2011 07/25/11 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – August 2011 09/16/11 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – September 2011 10/26/11 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – October 2011 11/18/11 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – November 2011 12/21/11 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – December 2011 01/23/12 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – January 2012 02/23/12 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – February 2012 03/21/12 BN
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 273 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – March 2012 04/25/12 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – April 2012 05/21/12 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – May 2012 06/26/12 BN
13 01 11 11 03 02 RD/RA MPDES Permit 07/18/12 BN/Smith
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – June 2012 07/26/12 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – July 2012 08/24/12 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – August 2012 09/26/12 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – September 2012 10/24/12 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – October 2012 11/19/12 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – November 2012 12/24/12 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – December 2012 01/24/13 BN
13 01 11 11 03 02 RD/RA MPDES Permit 02/06/13 DEQ/Skubinna
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – January 2013 02/21/13 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – February 2013 03/25/13 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – March 2013 04/22/13 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – May 2013 06/21/13 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – June 2013 07/25/13 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report - July 2013 08/27/13 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report - August 2013 09/24/13 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report - September 2013 10/18/13 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report - October 2013 11/21/13 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report - November 2013 12/17/13 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report - December 2013 01/23/14 BN
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN/Smith letter to DEQ WPB/Tucker re: BNSF change of address
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ Permitting & Compliance/Skubinna letter to BN/Smith re: Confirmation letter for Petroleum Cleanup General Permit
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 274 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report - January 2014 02/21/14 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report - February 2014 03/21/14 BN
13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report - March 2014 04/21/14 BN
13 01 11 11 03 03 RD/RA CDM Reporting
13 01 11 11 03 03 RD/RA CDM Reporting Technical Memo – Bioventing Assessment 09/15/08
13 01 11 11 03 03 RD/RA CDM Reporting Technical Memo – LNAPL Recovery System 09/17/08
13 01 11 11 03 03 RD/RA CDM Reporting LNAPL Report 9/30/08
13 01 11 11 03 03 RD/RA CDM Reporting CDM email to DEQ re: Field update report 10/29/08 CDM
13 01 11 11 03 03 RD/RA CDM Reporting CDM email re: LNAPL volumes report 11/04/08 CDM
13 01 11 11 03 03 RD/RA CDM Reporting CDM email re: MUW profile report 11/5/08 CDM
13 01 11 11 03 03 RD/RA CDM Reporting System Summary Report 11/23/08
13 01 11 11 03 03 RD/RA CDM Reporting System Summary Report 11/30/08
13 01 11 11 03 03 RD/RA CDM Reporting System Summary Report 12/7/08
13 01 11 11 03 03 RD/RA CDM Reporting System Summary Report CDM
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 01/11/09
13 01 11 11 03 03 RD/RA CDM Reporting Photo showing GAC vessel implosion 01/15/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 01/17/09
13 01 11 11 03 03 RD/RA CDM Reporting 01/20/09 CDM
13 01 11 11 03 03 RD/RA CDM Reporting Discharge Monitoring Report (KJ, 01/23/09 KJ
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 01/24/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 01/31/09
13 01 11 11 03 03 RD/RA CDM Reporting System Summary Report 1/20/08-2/7/09 CDM
13 01 11 11 03 03 RD/RA CDM Reporting System Summary Report CDM
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 03/07/09
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
1/21/08 – 1/6/09
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM/Stordahl Tech Memo to DEQ/Reynolds re: Final BN LNAPL Skimmer Pump Testing
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
1/20/08-2/14/09
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 275 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 03/14/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 03/21/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 03/28/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 04/04/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 04/11/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 4/18/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 04/25/09
13 01 11 11 03 03 RD/RA CDM Reporting 05/01/09 CDM
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 5/2/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 5/9/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 05/15/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 05/22/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 05/29/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 06/05/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 6/12/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 06/19/09
13 01 11 11 03 03 RD/RA CDM Reporting 6/22-6/24/09 CDM
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 6/26/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 07/03/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 07/10/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 07/17/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 07/24/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 07/31/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 08/07/09
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM/Stordahl Tech Memo to DEQ/Reynolds re: LNAPL Pipe Freezing in Main Line Recovery System
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM/Osterman Site Oversight Report – Oversight of Task D&E In-Situ Respiration Testing
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 276 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 8/14/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 08/21/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 08/28/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 09/04/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 09/11/09
13 01 11 11 03 03 RD/RA CDM Reporting CDM Site Oversight Report – In-Situ respiration testing 9/14-9/16/09 CDM
13 01 11 11 03 03 RD/RA CDM Reporting 9/23/09 CDM
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 09/23/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 09/25/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 10/02/09
13 01 11 11 03 03 RD/RA CDM Reporting CDM Site Oversight Report – Well redevelopment 10/6/09 CDM
13 01 11 11 03 03 RD/RA CDM Reporting 10/13/09 CDM
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 10/30/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 11/6/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 11/13/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 11/20/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 11/27/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 12/04/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 12/11/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 12/18/09
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 12/25/09
13 01 11 11 03 03 RD/RA CDM Reporting 12/28/09 KJ
13 01 11 11 03 03 RD/RA CDM Reporting Heat trace amperage test 12/29/09
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM Site Oversight Report – Removal of oil from 1,000 gallon recovery tank
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM Technical Memorandum to DEQ re: Total liquid SCADA volume adjustment
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
K/J Technical memorandum re: Heat Tracing and freeze protection issues
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 277 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 03 03 RD/RA CDM Reporting 12/31/09 CDM
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 01/01/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 01/08/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 01/22/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/29/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 02/05/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 02/12/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 2/19/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Report for Vapor Wells 02/26/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 03/12/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 03/19/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 3/26/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 04/02/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 04/09/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 04/16/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 04/30/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 05/07/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 5/14/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 05/21/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 05/28/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 06/04/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Report for Vapor Wells 06/18/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2- 6/25/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2 - 7/2/10
Site-Wide Information
CDM technical memorandum re: December 2009 NLAPL pipe freezing event
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 278 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2 -7/9/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2- 7/16/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2- 7/23/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2- 7/30/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2-8/6/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2/-8/20/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2-8/27/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2- 9/3/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2- 9/10/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2-9/17/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2-9/24/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2-10/1/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2-10/8/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2-10/15/10
13 01 11 11 03 03 RD/RA CDM Reporting Final Third Quarter Task D/E Operations Summary 10/21/10 CDM
13 01 11 11 03 03 RD/RA CDM Reporting Draft Fourth Quarter Task D/E Operations Summary 10/21/10 CDM
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/- 10/22/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2-11/5/10
13 01 11 11 03 03 RD/RA CDM Reporting Task D&E Remediation System Summary Report 11/12/10
13 01 11 11 03 03 RD/RA CDM Reporting Task D&E Remediation System Summary Report 11/19/10
13 01 11 11 03 03 RD/RA CDM Reporting Task D&E Remediation System Summary Report 11/2610
13 01 11 11 03 03 RD/RA CDM Reporting Task D&E Remediation System Summary Report 12/10/10
13 01 11 11 03 03 RD/RA CDM Reporting Task D&E Remediation System Summary Report 12/17/10
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/1-1/711
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 279 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/1-1/14/11
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/1-1/21/11
13 01 11 11 03 03 RD/RA CDM Reporting Draft First Quarter 2010 Task D/E Operations Summary 12/23/10
13 01 11 11 03 03 RD/RA CDM Reporting Draft Second Quarter 2010 Task D/E Operations Summary 12/23/10
13 01 11 11 03 03 RD/RA CDM Reporting 01/24/11
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/1-1/28/11
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/1- 2/4/11
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/1- 2/11/11
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/1- 2/25/11
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/1-2/25/11
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 03/04/11
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 03/11/11
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 03/18/11
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 03/25/11
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 04/01/11
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 04/08/11
13 01 11 11 03 03 RD/RA CDM Reporting 04/14/11 DEQ/ Reynolds
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 04/15/11
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 04/22/11
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 04/29/11
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 05/06/11
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 05/13/11
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 05/27/11
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
K/J/Norris email to DEQ/Reynolds re: Attachment – LNAPL Recovery Summary tables – short & long term
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ/Reynolds email to CDM/Stordahl & Hills re: DEQ approval of 3rd & 4th qtr Task D/E Operations Summary & 1st & 2nd qtr 2010 Task D/E Operations Summary Reports
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 280 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 06/10/11
13 01 11 11 03 03 RD/RA CDM Reporting 06/15/11 CDM
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 06/17/11
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 06/24/11
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 07/08/11
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 07/22/11
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 08/20/11
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 09/03/11
13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 09/17/11
13 01 11 11 03 03 RD/RA CDM Reporting 3rd Quarter 2010 Task D/E Operations Summary Report 09/30/11 CDM
13 01 11 11 03 03 RD/RA CDM Reporting 4th Quarter 2010 Task D/E Operations Summary Report 09/30/11 CDM
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 1/1-1/14/12
13 01 11 11 03 03 RD/RA CDM Reporting 01/10/12 CDM/Dudley
13 01 11 11 03 03 RD/RA CDM Reporting Draft 2nd Quarter 2011 Task D/E Operations Summary Report 01/27/12 CDM Smith
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 1/15-1/28/12
13 01 11 11 03 03 RD/RA CDM Reporting Final 1st Quarter 2011 Task D/E Operations Summary Report 01/20/12 CDM Smith
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 1/29-2/11/12 CDM Smith
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 2/28-3/10/12 CDM Smith
13 01 11 11 03 03 RD/RA CDM Reporting Oversight Report 3/7-3/9/12 CDM Smith
Site-Wide Information
Site-Wide Information
CDM/Choquette email to DEQ/Reynolds re: Attachment - Dashboard Report
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
10/16-10/29/11
Site-Wide Information
10/30-11/19/11
Site-Wide Information
11/20-12/10/11
Site-Wide Information
12/11-12/31/11
Site-Wide Information
Site-Wide Information
CDM/Dudley email to DEQ/Reynolds re: Attachments: Dashboard reports
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 281 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 3/11-3/24/12 CDM Smith
13 01 11 11 03 03 RD/RA CDM Reporting 04/06/12
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 3/25-4/7/12 CDM Smith
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 4/8-4/21/12 CDM Smith
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 4/22-5/5/12 CDM Smith
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 5/6-5/19/12 CDM Smith
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report CDM Smith
13 01 11 11 03 03 RD/RA CDM Reporting 04/17/12 CDM Smith
13 01 11 11 03 03 RD/RA CDM Reporting 04/17/12 CDM Smith
13 01 11 11 03 03 RD/RA CDM Reporting 04/17/12 CDM Smith
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 5/20-6/2/12 BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 6/3-6/16/12 BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 6/17-6/30/12 BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 7/1-7/14/12 BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 7/15-7/28/12 BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 7/31-8/31/12 BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 9/2-9/15/12 BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 9/16-9/29/12 BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 9/30-10/7/12 BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 11/25-12/8/12 BN
Site-Wide Information
Site-Wide Information
CDM Smith/Simpson Memorandum to DEQ/Reynolds re: Removal of recovery equipment from the 3/5 track & continued LNAPL monitoring for 3/5 track recovery wells
CDM Smith/ Simpson
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM Smith/Hills cover letter to DEQ/Reynolds re: Draft 3rd & 4th Quarter 2011 Task D&E Operations Summary
Site-Wide Information Draft 3rd Quarter 2011 Task D&E Operations Summary Report
Site-Wide Information Draft 4th Quarter 2011 Task D&E Operations Summary Report
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
10/14/-10/27/12
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 282 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 12/9-12/22/12 BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 1/1-1/5/13 BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 1/6-1/19/13 BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 1/20-2/2/13 BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 2/3-2/16/13 BN
13 01 11 11 03 03 RD/RA CDM Reporting 02/15/13 CDM Smith/ Hills
13 01 11 11 03 03 RD/RA CDM Reporting 02/15/13 CDM Smith
13 01 11 11 03 03 RD/RA CDM Reporting 03/07/13
13 01 11 11 03 03 RD/RA CDM Reporting CDM Smith
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 2/17-3/2/13 BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 3/3/-3/16/13 BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 3/17-3/30/13 BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 3/31-4/13/13 BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 4/14-4/27/13 BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 4/28-5/11/13 BN
13 01 11 11 03 03 RD/RA CDM Reporting Draft Third Qtr 2012 Task D/E Operations Summary 05/17/13 CDM Smith
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 5/12-5/25/13 BN
13 01 11 11 03 03 RD/RA CDM Reporting Draft Fourth Qtr 2012 Task D/E Operations Summary 06/06/13 CDM Smith
13 01 11 11 03 03 RD/RA CDM Reporting Draft First Qtr 2013 Task D/E Operations Summary 07/31/13 CDM Smith
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period 5/26 -6/8/2013
Site-Wide Information
Site-Wide Information
12/23-12/29/12
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM Smiht/Hills cover letter to DEQ/Reynolds re: Draft 2nd Quarter 2012 Task D/E Operations Summary Report
Site-Wide Information
Draft 2nd Quarter 2012 Task D/E Operations Summary Report
Site-Wide Information
CDM Smiht/Simpson cover letter to DEQ/Reynolds re: Final 2nd Quarter 2012 Task D/E Operations Summary Report
CDM Smith/ Simpson
Site-Wide Information
Final 2nd Quarter 2012 Task D/E Operations Summary Report
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 283 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period 8/4 -8/17/2013 BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period 1/1 - 1/4/2014 BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period 1/5 -1/18/2014 BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Reprot for the reporting period BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Reprot for the reporting period BN
13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Reprot for the reporting period BN
Site-Wide Information
6/23 - 7/6/2013
Site-Wide Information
7/7 - 7/20/2013
Site-Wide Information
7/21 - 8/3/2013
Site-Wide Information
Site-Wide Information
8/18 - 8/31/2013
Site-Wide Information
9/1 - 9/14/2013
Site-Wide Information
9/15 - 9/28/2013
Site-Wide Information
9/29 - 10/12/2013
Site-Wide Information
10/13 - 10/26/2013
Site-Wide Information
10/27 - 11/9/2013
Site-Wide Information
11/10 - 11/23/2013
Site-Wide Information
11/24 - 12/7/2013
Site-Wide Information
12/8 -12/21/2013
Site-Wide Information
12/22 - 12/28/2013
Site-Wide Information
Site-Wide Information
Site-Wide Information 1/19 -2/1/2014
Site-Wide Information
2/2 - 2/15/2014
Site-Wide Information
2/16 - 3/1/2014
Site-Wide Information
3/2 - 3/15/2014
Site-Wide Information
9/28/2014 - 10/11/2014
BN LIVINGSTON 8/26/13
Page 284 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 04 RD/RA Task D & E Phase II
13 01 11 11 04 01 RD/RA Evaluation & Planning
13 01 11 11 04 01 RD/RA Evaluation & Planning 01/04/11
13 01 11 11 04 01 RD/RA Evaluation & Planning 07/14/11 DEQ Legal
13 01 11 11 04 01 RD/RA Evaluation & Planning 08/15/11 DEQ internal
13 01 11 11 04 01 RD/RA Evaluation & Planning 08/25/11 KJ/Norris
13 01 11 11 04 01 RD/RA Evaluation & Planning 11/18/11 KJ/Norris
13 01 11 11 04 01 RD/RA Evaluation & Planning 12/08/11
13 01 11 11 04 01 RD/RA Evaluation & Planning 12/12/11
13 01 11 11 04 01 RD/RA Evaluation & Planning 12/14/11 DEQ/ Reynolds
13 01 11 11 04 01 RD/RA Evaluation & Planning 12/15/11
13 01 11 11 04 01 RD/RA Evaluation & Planning 12/21/11 KJ/Norris
13 01 11 11 04 01 RD/RA Evaluation & Planning 01/04/12
13 01 11 11 04 01 RD/RA Evaluation & Planning 01/05/12 CDM/ Smith
13 01 11 11 04 01 RD/RA Evaluation & Planning 01/06/12 DEQ/ Reynolds
13 01 11 11 04 01 RD/RA Evaluation & Planning 01/17/12
13 01 11 11 04 01 RD/RA Evaluation & Planning 01/19/12
13 01 11 11 04 01 RD/RA Evaluation & Planning 01/24/12
13 01 11 11 04 01 RD/RA Evaluation & Planning 02/02/12 KJ/Norris
13 01 11 11 04 01 RD/RA Evaluation & Planning 02/08/12 KJ/Norris
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ & BN conference call draft agenda re: Phase II Conceptual Design & Implementation
Site-Wide Information
DEQ Legal/Haque-Hausrath email to BN/Kaitala & BKBH/Berry re: Attachment – Information request
Site-Wide Information
DEQ legal/Haque-Hausrath & Reynolds emails re: DEQ info request August 4th deadline extended until 8/26/11
Site-Wide Information
KJ/Norris email to DEQ legal/Haque-Hausrath re: Attachment - Task D&E cost spreadsheets
Site-Wide Information
KJ/Norris email to DEQReynolds re: Attachment - Bioventing assesses
Site-Wide Information
DEQ/Reynolds, KJ, & CDM emails re: Conference call scheduling
Site-Wide Information
Draft Agenda for 12/12/11 conference call - Draft conceptual plan
Site-Wide Information
DEQ/Reynolds email to BN/Stegman re: Bioventing vs. Free Product recovery
Site-Wide Information
DEQ/Reynolds & BN/Stegman emails re: Bioventing vs. Free Product recovery
Site-Wide Information
KJ/Norris letter to DEQ/Reynolds re: Task D/E- Phase II Conceptual Design & Implementation considerations
Site-Wide Information
Phase II Conceptual Design & Implementation Conference call meeting minutes
Site-Wide Information
Final Draft Phase II Remedial Action Work Plan - Petroleum Hydrocarbon Recovery & Remediation
Site-Wide Information
DEQ/Reynolds email to BN & KJ re: Attachments - in 3 different emails of the Final Draft Phase II Remedial Action Work Plan
Site-Wide Information
KJ/Fernandes, DEQ/Reynolds & CDM/Stordahl emails re: KJ CAD figure request
Site-Wide Information
CDMsmith/Stordahl email to KJ/Norris re: Attachment - Average LNAPL spreadsheet
CDMsmith/ Stordahl
Site-Wide Information
CDMsmith/Stordahl email to DEQ/Reynolds re: Attachment Appendix G
CDMsmith/ Stordahl
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: Due date for written comments on Final Draft Phase II Remedial Action Work Plan
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: Attachment - KJ written comments on Final Draft Phase II Remedial Action Work Plan
BN LIVINGSTON 8/26/13
Page 285 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 04 01 RD/RA Evaluation & Planning 02/08/12 KJ/Norris
13 01 11 11 04 01 RD/RA Evaluation & Planning 02/24/12 DEQ/ Reynolds
13 01 11 11 04 01 RM 13 RD/RA Evaluation & Planning 02/24/12 CDM Smith
13 01 11 11 04 01 RD/RA Evaluation & Planning 03/05/12 BN/Smith
13 01 11 11 04 01 RD/RA Evaluation & Planning 03/13/12 KJ/Fisher
13 01 11 11 04 02 RD/RA Phase II Design/Build
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 03/20/12
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 03/21/12 KJ
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 03/22/12
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build Site Oversight Report 3/27-5/10/12 CDM Smith
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 03/29/12 KJ
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 03/29/12 KJ/Norris
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 03/29/12 KJ/Norris
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/03/12
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/03/12
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/04/12 CDM/Peters
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/04/12 CDM/Stordahl
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/05/12 CDM/Peters
Site-Wide Information
KJ/Norris letter to DEQ/Reynolds re: KJ written comments on Final Draft Phase II Remedial Action Work Plan
Site-Wide Information
DEQ/Reynolds email to BN/Smith re: Attachment - Final RAWP & DEQ's response to BN's comments
Site-Wide Information
Final Phase II Remedial Action Work Plan for Task D&E - Petroleum Hydrocarbon Recovery & Remediation
Site-Wide Information
BN/Smith email to DEQ/Reynolds re: BN agrees to perform necessary work as described in the RAWP
Site-Wide Information
KJ/Fisher email to DEQ/Reynolds et al re: Wants to schedule a meeting between KJ & City to discuss permitting requirements
Site-Wide Information
Site-Wide Information
KJ/Fernandes & DEQ/Reynolds emails re: Livingston drilling activities
Site-Wide Information
Task D/E Phase II Remedial Action Preliminary Design Report
Site-Wide Information
CDM Smith/Stordahl email to KJ/Norris & DEQ/Reynolds re: Attachment - CDM preliminary comments on Phase II Design Report
CDM Smith/ Stordahl
Site-Wide Information
Site-Wide Information
KJ/Fisher & Fernandes emails re: Attachment - Meeting agenda for 3/30/12 meeting.- permitting & design review
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: Attachment - KJ's letter pertaining to CDM's comments on the Phase II Remedial Action Preliminary Design Report 3/23/12 conference call
Site-Wide Information
KJ/Norris letter to DEQ/Reynolds re: CDM Smith Comments on Task D/E Phase II Remedial Action Preliminary Design Report
Site-Wide Information
KJ/Fernandes & DEQ/Reynolds emails re: Recovery operation protocol
Site-Wide Information
CDM Smith/Stordahl memorandum to DEQ/Reynolds re: Conference call meeting summary
CDM Smith/ Stordahl
Site-Wide Information
CDM Smith/Peters email to DEQ/Reynolds re: Livingston daily update for Wednesday 4/4/12
Site-Wide Information
CDM Smith/Stordahl memorandum to DEQ/Reynolds re: March 30, 2012 meeting summary - Phase II Preliminary Engineering Design Review for Task D/E Remediation System
Site-Wide Information
CDM Smith/Peters email to DEQ/Reynolds re: Livingston daily update for Wednesday 4/5/12
BN LIVINGSTON 8/26/13
Page 286 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/06/12 KJ/ Fernandes
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/06/12
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/11/12
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/13/12
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/16/12 KJ/Norris
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/17/12
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/17/12 KJ/Norris
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/18/12 KJ/ Fernandes
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build Conference call meeting notes re: Task D/E Bi-weekly meeting 04/17/12
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/18/12 CDM Smith/ Peters
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build KJ/Fernandes email to DEQ/Reynolds re: Task D&E schedule 04/19/12 KJ/ Fernandes
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/19/12 CDM Smith/ Peters
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/25/12 CDM Smith/Coan
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/25/12 CDM Smith/Coan
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/26/12 CDM Smith/Coan
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/27/12 KJ/Fernandes
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/27/12 CDM Smith/ Hills
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/27/12 CDM Smith/ Coan
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/29/12 CDM Smith/ Peters
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 05/08/12 KJ
13 01 11 11 04 02 RD/RA Phase II Design/Build 05/09/12 KJ
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 05/10/12 Joe Faubion
Site-Wide Information
KJ/Fernandes email to DEQ/Reynolds re: Update on completed/scheduled activities
Site-Wide Information
CDM Smith/Peters emal to DEQ/Reynolds re: Modifications/Proposed modifications to well locations CDM Smith/ Peters
Site-Wide Information
CDM Smith/Peters email to DEQ/Reynolds re: Daily update for 4/11/12 CDM Smith/ Peters
Site-Wide Information
CDM Smith/Peters email to DEQ/Reynolds re: Daily update for 4/12/12 CDM Smith/ Peters
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: Task D/E Phase II Remediation bi-wekly meeting
Site-Wide Information
CDM Smith/Peters email to DEQ/Reynolds re: Multi-use wells observation summary - east end of plume CDM Smith/ Peters
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: Task D/E Phase II Remediation bi-wekly meeting
Site-Wide Information
KJ/Fernandes email to DEQ/Reynolds re: EX-50 Depth to water - 23.81, depth to product - 23.71
Site-Wide Information
Site-Wide Information
CDM Smith/Peters email to DEQ/Reynolds re: Daily update for 4/18/12
Site-Wide Information
Site-Wide Information
CDM Smith/Peters email to DEQ/Reynolds re: Daily update for 4/19/12
Site-Wide Information
CDM Smith/Peters email to DEQ/Reynolds re: Daily update for 4/24/12
Site-Wide Information
CDM Smith/Coan email to DEQ/Reynolds re: Daily update for 4/25/12
Site-Wide Information
CDM Smith/Coan email to DEQ/Reynolds re: Daily update for 4/26/12
Site-Wide Information
KJ/Fernandes & DEQ/Reynolds emails re: Livingston Task D&E
Site-Wide Information
CDM Smith/Hills email to DEQ/Reynolds re: Conference call schedule
Site-Wide Information
CDM Smith/Coan email to DEQ/Reynolds re: Daily update for 4/27/12
Site-Wide Information
CDM Smith/Peters email to DEQ/Reynolds re: Daily update for Saturday & Sunday 4/28-4/29/12
Site-Wide Information
KJ Technical Memorandum to DEQ/Reynolds re: Task D&E - Phase II MUV Summary (South of East Park Street)
Site-Wide Information
Project Manual for Task D/E - Phase II Remedial Action 2012
Site-Wide Information
Joe Faubion email to DEQ/Reynolds re: Livingston Phase II drilling update
BN LIVINGSTON 8/26/13
Page 287 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 05/11/12 KJ/Fernandes
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 05/16/12 KJ
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 05/17/12 CDM Smith
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 05/18/12 DEQ/ Reynolds
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 05/21/12 CDM Smith
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 05/23/12 DEQ/ Reynolds
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 05/11/12 KJ
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 05/30/12 KJ/Adlersley
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 06/01/12
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 06/21/12 KJ
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 06/27/12 KJ/Fernandes
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 07/03/12 KJ/Fernandes
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build DEQ/Reynolds & KJ/Fernandes emails re: Soil samples 07/03/12
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 07/03/12
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 07/09/12 KJ/Fernandes
13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 07/06/12 KJ
13 01 11 11 04 02 RD/RA Phase II Design/Build Construction Issue section 02302 Earthwork 07/13/12 KJ
13 01 11 11 04 02 RD/RA Phase II Design/Build 07/13/12
13 01 11 11 04 02 RD/RA Phase II Design/Build 07/19/12
Site-Wide Information
KJ/Fernandes & DEQ/Reynolds emails re: Livingston Task D&E Phase II - 90% Design submittal
Site-Wide Information
KJ letter to DEQ/Reynolds re: KJ response to DEQ comments on the Task D/E Phase II Remedial Action Preliminary Design Report
Site-Wide Information
CDM Smith Memorandum to DEQ/Reynolds re: CDM Smith draft comments on the 5/8/12 tech memo Task/D/E -Phase II: MUW Summary (South of East Park Street)
Site-Wide Information
DEQ/Reynolds letter to BN/Smith re: KJ Tech Memo dated 5/8/12
Site-Wide Information
CDM Smith Memorandum to DEQ/Reynolds re: CDM Smith comments on the Task D/E Phase II Remedial Action 2012, 90% Design submittal
Site-Wide Information
DEQ/Reynolds letter to BN/Smith re: DEQ comments on the Project Manual
Site-Wide Information
Task D/E Phase II Remedial Action 2012 Drawings April-May 2012
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Task D/E items posted to web - Soil & GW analytical results from recent well construction activities
Site-Wide Information
DEQ/Reynolds & KJ/Fernandes emails re: Task F, Part 2 & D/E status
Site-Wide Information
KJ/letter to DEQ/Reynolds re: KJ responses to DEQ's review of Task D&E 90% Design Submittal - Phase II RA 2012
Site-Wide Information
KJ/Fernandes email to DEQ/Reynolds re: Task D/E Phase II Remedial Action project manual/drawings
Site-Wide Information
KJ/Fernandes email to DEQ/Reynolds re: Task D/E Phase II Remedial Action - 100% Design submittal posted to KJ ftp site
Site-Wide Information
Site-Wide Information
KJ/Fernandes & DEQ/Reynolds re: Task D/E Phase II Remedial Action - 100% Design - number of copies needed
Site-Wide Information
KJ/Fernandes email to DEQ/Reynolds re: Task D/E Phase II Remedial Action - 100% Design submittal posted to KJ ftp site - incorrect website - Access at LivShare site
Site-Wide Information
Construction Issue Documents - Project Manual for Task D&E Phase II Remedial Action 2012 & Construction Plans
Site-Wide Information
Site-Wide Information
CDMSmith/Stordahl & KJ/Fernandes emails re: Construction Issue Project Manual/drawings - electronic version
Site-Wide Information
KJ/Norris & DEQ/Reynolds emails re: Pre-Construction meeting
BN LIVINGSTON 8/26/13
Page 288 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 04 02 RD/RA Phase II Design/Build 07/19/12 DEQ/ Reynolds
13 01 11 11 04 02 RD/RA Phase II Design/Build 07/20/12
13 01 11 11 04 02 RD/RA Phase II Design/Build 07/25/12 KJ/Fisher
13 01 11 11 04 02 RD/RA Phase II Design/Build 07/31/12
13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 08/02/12
13 01 11 11 04 02 RD/RA Phase II Design/Build 08/03/12 KJ
13 01 11 11 04 02 RD/RA Phase II Design/Build 08/08/12
13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 08/08/12
13 01 11 11 04 02 RD/RA Phase II Design/Build Bedding sand backfill analytical results 08/08/12 Test America
13 01 11 11 04 02 RD/RA Phase II Design/Build Phase II Construction Oversight Daily Logs 8/9/12 - CDM Smith
13 01 11 11 04 02 RD/RA Phase II Design/Build 08/22/12 CDM Smith/ Miller
13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 08/23/12
13 01 11 11 04 02 RD/RA Phase II Design/Build 08/23/12
13 01 11 11 04 02 RD/RA Phase II Design/Build 08/23/12 KJ
13 01 11 11 04 02 RD/RA Phase II Design/Build 08/29/12 CDM Smith/ Miller
13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 08/30/12
13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 09/06/12
13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 09/13/12
13 01 11 11 04 02 RD/RA Phase II Design/Build 09/19/12
13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 09/20/12
13 01 11 11 04 02 RD/RA Phase II Design/Build 09/27/12 KJ/Adlersley
Site-Wide Information
DEQ/Reynolds letter to BN/Smith re: DEQ approval of the July 2012 Project Manual for Task D&E Phase II RA with clarifications
Site-Wide Information
DEQ/Reynolds & KJ/Norris emails re: Pre-Construction meeting details
Site-Wide Information
KJ/Fisher email to DEQ/Reynolds re: Pre-Construction meeting agenda
Site-Wide Information
KJ/Fisher & DEQ/Reynolds emails re: Construction progress meetings - conference call date & time
Site-Wide Information
Site-Wide Information
KJ letter to DRQ/Reynolds re: KJ response to DEQ comments on review of contractor of proposed backfill import source
Site-Wide Information
DEQ/Reynolds & KJ/Fisher emails re: Backfill analytical results
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
CDM Smith/Miller email to DEQ/Reynolds re: Attachment - Daily log sheets for 8/15-8/21/12
Site-Wide Information
Site-Wide Information
DEQ/Reynolds & KJ/Aldersley emails re: Backfill analytical results
Site-Wide Information
KJ letter to Kinley Construction/Crisafulli re: Change Order No. 2
Site-Wide Information
CDM Smith email to DEQ/Reynolds re: Change Order # 3 Spec Section 02302 -Attachment - Plactic Pipe Installation Handbook
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ/Reynolds & KJ/Aldersley emails re: Task D&E Soil analytical results
Site-Wide Information
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Attachment - Task D&E backfill analytical results
BN LIVINGSTON 8/26/13
Page 289 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 09/27/12
13 01 11 11 04 02 RD/RA Phase II Design/Build 10/09/12 KJ/Adlersley
13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 10/11/12
13 01 11 11 04 02 RD/RA Phase II Design/Build 10/17/12 KJ/Norris
13 01 11 11 04 02 RD/RA Phase II Design/Build 10/27/12 KJ/Adlersley
13 01 11 11 04 02 RD/RA Phase II Design/Build 10/27/12 KJ/Adlersley
13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 11/01/12
13 01 11 11 04 02 RD/RA Phase II Design/Build 11/01/12 KJ/Norris
13 01 11 11 04 02 RD/RA Phase II Design/Build 11/07/12 KJ/Norris
13 01 11 11 04 02 RD/RA Phase II Design/Build 11/08/12 KJ/Fisher
13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 11/08/12
13 01 11 11 04 02 RD/RA Phase II Design/Build 11/13/12 KJ/Norris
13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 11/15/12
13 01 11 11 04 02 RD/RA Phase II Design/Build 11/26/12 KJ
13 01 11 11 04 02 RD/RA Phase II Design/Build 11/26/12 KJ
13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 11/28/12
13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 12/06/12
13 01 11 11 04 02 RD/RA Phase II Design/Build 12/14/12 KJ/Norris
13 01 11 11 04 02 RD/RA Phase II Design/Build 01/03/12
13 01 11 11 04 02 RD/RA Phase II Design/Build LNAPL skimming test measurements 01/03/13
Site-Wide Information
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Attachment - Task D&E backfill analytical results
Site-Wide Information
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: Notice of Task D/E GWTP & Remediation system power failure
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Attachment - Task D&E soil analytical results - 2nd 5-point composite sample from excess soil from trenching
Site-Wide Information
KJ/Aldersley email to DEQ/Reynolds re: Attachment - Task D&E soil analytical results - 3rd & 4th 5-point composite sample from excess soil from trenching
Site-Wide Information
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: Notification of temporary shutdown of task D/E remediation system
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: FW email fron KJ/Fernandes re: Progress Report on the AMS at MUW-41
Site-Wide Information
KJ/Fisher email to DEQ/Reynolds re: Notification of temporary shutdown of task D/E remediation system
Site-Wide Information
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: Attachment - Task D/E Adaptive Management Strategy Initial Implementation Description & Update 11/12/12
Site-Wide Information
Site-Wide Information
Analytical Results for Excess Spoils - Task D/E Phase II Remedial Action
Site-Wide Information
Analytical Results for Backfill Source Material - Task D/E Phase II Remedial Action
Site-Wide Information
Site-Wide Information
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: Attachment - Excell spreadsheet summarizing the subject LNAPL skimmer operation information
Site-Wide Information
KJ/Norris, CDM/Stordahl & DEQ/Reynolds emails re: Attachment - Skimmer operation summary
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 290 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 11 04 02 RD/RA Phase II Design/Build 01/17/13
13 01 11 11 04 02 RD/RA Phase II Design/Build 03/08/13 KJ/Norris
13 01 11 11 04 02 RD/RA Phase II Design/Build 04/19/13 KJ/Norris
13 01 11 11 04 02 RD/RA Phase II Design/Build 04/23/13 KJ/Norris
13 01 11 12 RD/RA
13 01 11 12 RD/RA 11/10/10 KJ Aldersley
13 01 11 12 RD/RA 11/18/10 KJ
13 01 11 12 01 RD/RA
13 01 11 12 01 RD/RA 09/23/10 DEQ/ Reynolds
13 01 11 12 01 RD/RA 11/10/10 KJ/Adlersley
13 01 11 12 01 RD/RA 11/18/10 KJ/Adlersley
13 01 11 12 01 RD/RA 08/15/11 DEQ/ Reynolds
13 01 11 12 01 RD/RA 09/02/11 KJ/Norris
13 01 11 12 01 RD/RA 09/02/11 KJ
13 01 11 12 01 RD/RA 09/02/11 KJ/Adlersley
Site-Wide Information
KJ/Norris & DEQ/Reynolds emails re: In-well LNAPL/water separator system
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: Attachment - Excell spreadsheet summarizing the subject LNAPL skimmer operation information
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: Task D/E Adaptive Management Strategy Initiative - MUW-41
Site-Wide Information
KJ/Norris email to DEQ/Reynolds re: Task D/E Adaptive Management - Type II recovery approach - MPE on MUW-41
Site-Wide Information
Task M – Newly Identified Sources, Areas, Media, & COCs
Site-Wide Information
Task M – Newly Identified Sources, Areas, Media, & COCs
K/J/Aldersley email to DEQ/Reynolds re: Attachment Maps showing potential asbestos-containing debris locations
Site-Wide Information
Task M – Newly Identified Sources, Areas, Media, & COCs
Task M: Visual Reconnaissance/Debris Sampling Report & Proposed Remedial Action Work Plan
Site-Wide Information
Asbestos Outside the Cinder Pile
Site-Wide Information
Asbestos Outside the Cinder Pile
DEQ/Reynolds letter to BN/Smith re: Request for Supplemental Surface Soil Sampling
Site-Wide Information
Asbestos Outside the Cinder Pile
K/J/Aldersley email to DEQ/Reynolds re: Attachment - Maps showing potential asbestos-containing debris locations
Site-Wide Information
Asbestos Outside the Cinder Pile
K/J/Aldersley email to DEQ/Reynolds re: Livingston Deliverable – Task M – Visual Reconnaissance/Debris Sampling Report & Proposed Remedial Action Work Plan + CD to be delivered 11/19/10
Site-Wide Information
Asbestos Outside the Cinder Pile
DEQ/Reynolds letter to BN/Smith re: DEQ comments on Task M – Visual Reconnaissance/Debris Sampling Report & Proposed Remedial Action Work Plan
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ letter to DEQ/Reynolds re: Table showing KJ revisions to incorporate DEQ comments on Task M – Visual Reconnaissance/Debris Sampling Report & Proposed Remedial Action Work Plan
Site-Wide Information
Asbestos Outside the Cinder Pile
Redline/strike-out version of Revised Task M – Visual Reconnaissance/Debris Sampling Report & Proposed Remedial Action Work Plan
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Aldersley email to DEQ/Reynolds re: Livingston deliverables sent UPS 9/2/11- Revised Task M – Visual Reconnaissance/Debris Sampling Report & Proposed Remedial Action Work Plan
BN LIVINGSTON 8/26/13
Page 291 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 12 01 CD RD/RA 09/02/11 KJ
13 01 11 12 01 RD/RA 09/12/11 KJ/Norris
13 01 11 12 01 RD/RA 09/13/11 KJ/Adlersley
13 01 11 12 01 CD RD/RA 09/12/11 KJ
13 01 11 12 01 RD/RA 09/15/11 DEQ/ Reynolds
13 01 11 12 01 RD/RA 10/03/11
13 01 11 12 01 RD/RA 10/21/11
13 01 11 12 01 RD/RA 11/04/11 DEQ/ Reynolds
13 01 11 12 01 RD/RA 11/28/11
13 01 11 12 01 CD RD/RA 01/02/12 KJ
13 01 11 12 01 RD/RA 03/06/12 DEQ/ Reynolds
13 01 11 12 01 RD/RA 03/09/12 KJ/Norris
13 01 11 12 01 RD/RA KJ/Aldersley & DEQ/Reynolds emails re: Task M 03/15/12
13 01 11 12 01 RD/RA 03/16/12 KJ/Aldersley
13 01 11 12 01 RD/RA 03/16/12 KJ
13 01 11 12 01 RD/RA 03/21/12 DEQ/ Reynolds
13 01 11 12 01 CD RD/RA 04/02/12 KJ
13 01 11 12 01 RD/RA 04/02/12 KJ
Site-Wide Information
Asbestos Outside the Cinder Pile
Revised Task M – Visual Reconnaissance/Debris Sampling Report & Proposed Remedial Action Work Plan
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Norris cover letter to DEQ/Reynolds re: 2nd Revised Task M – Visual Reconnaissance/Debris Sampling Report & Proposed Remedial Action Work Plan
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Aldersley email to DEQ/Reynolds re: Livingston deliverables sent UPS 9/13/11- 2nd Revised Task M – Visual Reconnaissance/Debris Sampling Report & Proposed Remedial Action Work Plan
Site-Wide Information
Asbestos Outside the Cinder Pile
2nd Revised Task M – Visual Reconnaissance/Debris Sampling Report & Proposed Remedial Action Work Plan
Site-Wide Information
Asbestos Outside the Cinder Pile
DEQ/Reynolds letter to BN/Smith re: DEQ approval of 2nd Revised Task M – Visual Reconnaissance/Debris Sampling Report & Proposed Remedial Action Work Plan
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Aldersley & DEQ/Reynolds emails re: Task M schedule - asbestos visual reconnaissance
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Aldersley & DEQ/Reynolds emails re: Task M - ACM investigation
Site-Wide Information
Asbestos Outside the Cinder Pile
DEQ/Reynolds letter to BN/Smith re: Request for cleanup of Asbestos-Containing Material
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Norris & DEQ/Reynolds emails re: Asbestos Remedial Action Plan due date extended
Site-Wide Information
Asbestos Outside the Cinder Pile
Task M Remedial Action Plan for Asbestos-Containing Materials
Site-Wide Information
Asbestos Outside the Cinder Pile
DEQ/Reynolds letter to BN/Smith re: DEQ comments on Task M Remedial Action Plan for Asbestos-Containing Materials
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Norris email to DEQ/Reynolds re: FW KJ/Aldersley email re: Task M comments questions
Site-Wide Information
Asbestos Outside the Cinder Pile
Site-Wide Information
Asbestos Outside the Cinder Pile
Livingston Deliverable : Task M Remedial Action Plan for Asbestos-Containing Materials (revision #1) sent out 3/16/12
Site-Wide Information
Asbestos Outside the Cinder Pile
Task M Remedial Action Plan for Asbestos-Containing Materials (Revision # 1)
Site-Wide Information
Asbestos Outside the Cinder Pile
DEQ/Reynolds letter to BN/Smith re: DEQ comments on Task M Remedial Action Plan for Asbestos-Containing Materials (Revision # 1)
Site-Wide Information
Asbestos Outside the Cinder Pile
Task M Remedial Action Plan for Asbestos-Containing Materials (Revision # 2)
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Norris cover letter for Task M Remedial Action Plan for Asbestos-Containing Materials (Revision # 2)
BN LIVINGSTON 8/26/13
Page 292 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 12 01 RD/RA 04/11/12
13 01 11 12 01 RD/RA 04/11/12 DEQ/ Reynolds
13 01 11 12 01 RD/RA 05/01/12
13 01 11 12 01 RD/RA 05/03/12 KJ/Norris
13 01 11 12 01 RD/RA BN/Smith email to DEQ/Reynolds re: Task M debris piles 06/21/12 BN/Smith
13 01 11 12 01 RD/RA 06/30/12
13 01 11 12 01 RD/RA 07/02/12 DEQ/ Reynolds
13 01 11 12 01 RD/RA 07/12/12
13 01 11 12 01 RD/RA 07/19/12 KJ/Norris
13 01 11 12 01 RD/RA 08/29/12 RTI/Johnson
13 01 11 12 01 RD/RA 08/30/12 DEQ/ Reynolds
13 01 11 12 01 RD/RA 08/30/12 DEQ/ Reynolds
13 01 11 12 01 RD/RA 09/12/12 KJ/Aldersley
13 01 11 12 01 CD RD/RA 09/12/12 KJ/Aldersley
13 01 11 12 01 RD/RA 09/14/12 DEQ/ Reynolds
13 01 11 12 01 RD/RA 09/26/12 KJ/Adlersley
Site-Wide Information
Asbestos Outside the Cinder Pile
Draft Agenda for conference call meeting re: Tasks J & M Status & Path forward for Completion of Remedial Activities
Site-Wide Information
Asbestos Outside the Cinder Pile
DEQ/Reynolds letter to BN/Smith re: DEQ approval of Task M Remedial Action Plan for Asbestos-Containing Materials (Revision # 2)
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Aldersley & Nic Winslow emails re: Asbestos warning signs are posted
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Norris email to DEQ/Reynolds re: Attachment - Photos of ACM Asbestos warning signs
Site-Wide Information
Asbestos Outside the Cinder Pile
Site-Wide Information
Asbestos Outside the Cinder Pile
DEQ/Reynolds & KJ/Norris emails re: Tasks J&M pre-sampling
Site-Wide Information
Asbestos Outside the Cinder Pile
DEQ/Reynolds email to KJ/Norris re: Attachments- Task M table
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Aldersley & DEQ/Reynolds emails re: Evaluation of Remedial Alternatives table
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Norris transmittal to DEQ/Reynolds re: Tracking Form, Replacement Table Of Contents & Table 2 to the Task M Remedial Action Plan for Asbestos Containing Materials - revision 2
Site-Wide Information
Asbestos Outside the Cinder Pile
RTI/Johnson email to DEQ/Reynolds re: Attachment -RTI comments on the Task M Remedial Action Plan for Asbestos Containing Materials (Rev. 2)
Site-Wide Information
Asbestos Outside the Cinder Pile
DEQ/Reynolds letter to BN/Smith re: Public comments on the Task M Remedial Action Plan for Asbestos Containing Materials that require modifications
Site-Wide Information
Asbestos Outside the Cinder Pile
DEQ/Reynolds letter to RTI/Johnson re: Enclosure - DEQ Responsiveness Summary addressing RTI comments
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Aldersley email to DEQ/Reynolds re: Livingston Deliverables
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ transmittal to DEQ/Reynolds re: Tracking Form, Replacement Table Of Contents & Section 3 to the Task M Remedial Action Plan for Asbestos Containing Materials - revision 2 (dated 4/12) + CD's of Revisions 2, 3 & 4
Site-Wide Information
Asbestos Outside the Cinder Pile
DEQ/Reynolds letter to BN/Smith re: DEQ approval with modifications of the Task M Remedial Action Plan for Asbestos Containing Materials - revision 2 with July 2012 Table 2 & September 2012 replacement pages
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Aldersley email to DEQ/Reynolds re: Updated PDF of Task M Remedial Action Plan for Asbestos-Containing Materials sent out 9/26/12 by UPS
BN LIVINGSTON 8/26/13
Page 293 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 12 01 CD RD/RA 09/26/12 KJ
13 01 11 12 01 CD RD/RA 10/23/12 KJ/Norris
13 01 11 12 01 RD/RA 11/05/12
13 01 11 12 01 RD/RA 11/05/12
13 01 11 12 01 RD/RA 11/05/12
13 01 11 12 01 RD/RA 11/14/12
13 01 11 12 01 RD/RA 11/14/12
13 01 11 12 01 RD/RA 11/15/12 MRL
13 01 11 12 01 RD/RA 11/19/12
13 01 11 12 01 RD/RA
13 01 11 12 01 RD/RA 11/30/12 KJ/Aldersley
13 01 11 12 01 RD/RA 12/03/12
13 01 11 12 01 RD/RA 11/30-12/3/12
13 01 11 12 01 RD/RA 12/06/12 DEQ/Reynolds
13 01 11 12 01 RD/RA 12/5-12/6-12
13 01 11 12 01 RD/RA 12/06/12
13 01 11 12 01 RD/RA 12/07/12 KJ
13 01 11 12 01 RD/RA 12/13/12 DEQ/Reynolds
13 01 11 12 01 RD/RA 01/01/13 KJ/Norris
13 01 11 12 01 RD/RA 01/03/12 DEQ/Reynolds
13 01 11 12 01 RD/RA 1/17/2013 KJ/Norris
13 01 11 12 01 RD/RA 01/22/13 DEQ/Reynolds
Site-Wide Information
Asbestos Outside the Cinder Pile
Task M Remedial Action Plan for Asbestos Containing Materials (Revision #2) with DEQ edit (CD only)
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Norris email to DEQ legal/Haque-Hausrath re: Oral authorization from Judge Budeski for BN & its contractors to perform remedial action work in yards 4 & 5
Site-Wide Information
Asbestos Outside the Cinder Pile
MRL: Debris Pile Site Removal Data Valadation Analysis Report for samples collected 10/30/12
Environmental Solutions
Site-Wide Information
Asbestos Outside the Cinder Pile
MRL: Debris Pile Site Removal Asbestos Sample Results for samples collected 10/30/12
Environmental Solutions
Site-Wide Information
Asbestos Outside the Cinder Pile
MRL: Debris Pile Site Removal PAH, EPH, VOC-Test Pit Sample Results for samples collected 10/30/12
Environmental Solutions
Site-Wide Information
Asbestos Outside the Cinder Pile
MRL: Debris Pile Site Removal Data Valadation Analysis Report for samples collected 11/7/12
Environmental Solutions
Site-Wide Information
Asbestos Outside the Cinder Pile
MRL: Debris Pile Site Removal PAH, EPH, VOC-Test Pit Sample Results for samples collected 11/7/12
Environmental Solutions
Site-Wide Information
Asbestos Outside the Cinder Pile
Environmental Solutions/Rogers email fwd to DEQ/Reynolds re: Data waiting on the TCLP for metals
Site-Wide Information
Asbestos Outside the Cinder Pile
DEQ/Reynolds & BN/Smith emails re: Task M Asbestos cleanup
Site-Wide Information
Asbestos Outside the Cinder Pile
DEQ/Reynolds & MRL/Shelly emails re: Some debris samples fail the land disposal restrictions
11/16-11/20/12
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Aldersley email to DEQ/Reynolds re: Task M - Update: Attachment - photos of asbestos removal areas
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Norris & DEQ/Reynolds emails re: Debris piles & adjacent"potential ACM removal area"
Site-Wide Information
Asbestos Outside the Cinder Pile
DEQ/Reynolds & KJ/Aldersley emails re: KJ Attachment - Task M -ACM screening photos & results
Site-Wide Information
Asbestos Outside the Cinder Pile
DEQ/Reynolds email to MRL/Shelly re: Cleanup & permit for debris piles removal
Site-Wide Information
Asbestos Outside the Cinder Pile
ACP/Morse, DEQ/Reynolds, & KJ/Norris emails re: Asbestos permit
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Aldersley & Montana Asbestos Control/Morse emails re: Permit application - Schroeder
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Lee & Norris emails re: MRL end of year track protection limitations - no flagger
Site-Wide Information
Asbestos Outside the Cinder Pile
DEQ/Reynolds letter to MRL/Shelly re: MRL-Soil & debris pile site removal
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Norris email to DEQ/Reynolds re: KJ unable to complete Task M - asbestos removal in 2012
Site-Wide Information
Asbestos Outside the Cinder Pile
DEQ/Reynolds letter to BN/Smith re: Task M Remedial Action for Asbestos Containing Materials
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Norris letter/email to DEQ/Reynolds re: Task M RA for Asbestos-containing material update
Site-Wide Information
Asbestos Outside the Cinder Pile
DEQ/Reynolds email to KJ/Norris re: Response to KJ 1/17/13 letter
BN LIVINGSTON 8/26/13
Page 294 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 12 01 RD/RA 01/23/13
13 01 11 12 01 RD/RA MRL/Shelly & DEQ/Reynolds emails re: Debris piles 02/01/13
13 01 11 12 01 RD/RA 02/27/13 DEQ/Reynolds
13 01 11 12 01 RD/RA 03/07/13
13 01 11 12 01 RD/RA 03/20/13 KJ/Aldersley
13 01 11 12 01 RD/RA 03/27/13 KJ/Aldersley
13 01 11 12 01 RD/RA 04/03/13 KJ/Norris
13 01 11 12 01 RD/RA 04/23/13 KJ/Aldersley
13 01 11 12 01 RD/RA 05/10/13 KJ/Aldersley
13 01 11 12 01 RD/RA 05/22/13 DEQ/Reynolds
13 01 11 12 01 RD/RA KJ/Aldersley email to DEQ/Reynolds re: Task M Backfill 06/11/13 KJ/Aldersley
13 01 11 12 01 RD/RA KJ/Aldersley email to DEQ/Reynolds re: Task M route change 06/18/13 KJ/Aldersley
13 01 11 12 01 RD/RA 06/18/13 DEQ/ Jsanderson
13 01 11 12 01 RD/RA 06/18/13 KJ/Aldersley
13 01 11 12 01 RD/RA KJ/Aldersley & DEQ/Reynolds emails re: Debris pile photos 06/21/13 KJ/Aldersley
13 01 11 12 01 RD/RA Livingston Enterprise - Task M Display Ad - Route change 06/21/13
13 01 11 12 01 RD/RA Bozeman Chronicle - Task M Display Ad - Route change 06/23/13 Bozeman Chronicle
13 01 11 12 01 RD/RA 06/24/13 KJ/Aldersley
13 01 11 12 01 RD/RA 06/27/13 KJ/Aldersley
13 01 11 12 01 RD/RA 07/08/13 KJ/Aldersley
13 01 11 12 01 RD/RA 07/23/13
13 01 11 12 01 RD/RA 07/25/13 KJ/Fernandes
Site-Wide Information
Asbestos Outside the Cinder Pile
DEQ/Reynolds & Allied Waste/Seeberger emails re: Livingston BN soils not from a CERCLA site
Site-Wide Information
Asbestos Outside the Cinder Pile
Site-Wide Information
Asbestos Outside the Cinder Pile
DEQ/Reynolds email to MRL/Shelly re: Task M debris piles removal
Site-Wide Information
Asbestos Outside the Cinder Pile
Asbestos Abatement Final Documentation for MRL Debris Pile
Environmental Contractors
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Aldersley email to DEQ/Reynolds re: Task M - Weekly evaluation of field conditions
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Aldersley email to DEQ/Reynolds re: Task M - Weekly evaluation of field conditions
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Norris email to DEQ/Reynolds re: Task M - Notification of field activities
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Aldersley email to DEQ/Reynolds re: Task M - revised schedule for start date
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Aldersley email to DEQ/Reynolds re: Task M activities will commence on 6/24/13
Site-Wide Information
Asbestos Outside the Cinder Pile
DEQ/Reynolds letter to MRL/Shelley re: Asbestos Abatement Final Documentation for MRL Debris Pile
Site-Wide Information
Asbestos Outside the Cinder Pile
Site-Wide Information
Asbestos Outside the Cinder Pile
Site-Wide Information
Asbestos Outside the Cinder Pile
DEQ/Sanderson email to Daily Chronicle & DEQ/Reynolds re: Task M Disply ad - route change
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Aldersley email to DEQ/Reynolds & Mark Hills re: Task M PPE requirements
Site-Wide Information
Asbestos Outside the Cinder Pile
Site-Wide Information
Asbestos Outside the Cinder Pile
Livingston Enterprise
Site-Wide Information
Asbestos Outside the Cinder Pile
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Aldersley email to DEQ/Reynolds re: Debris pile proposed confirmation sampling location
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Aldersley & DEQ/Reynolds emails re: Revised debris pile conf sampling locations
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Aldersley email to DEQ/Reynolds re: Task M Summary of field decisions
Site-Wide Information
Asbestos Outside the Cinder Pile
OLY/Larango & DEQ/Reynolds emails re: MRL Debris pile confirmation sampling proposal
OlympusTech/ LaRango
Site-Wide Information
Asbestos Outside the Cinder Pile
KJ/Fernandes, BNSF/Smith & DEQ/Reynolds emails re: email on MRL debris pile conf sampling
BN LIVINGSTON 8/26/13
Page 295 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 11 12 01 RD/RA 05/06/14 KJ/Fernandes
13 01 12
13 01 13 Cost Recovery
13 01 13 01 Cost Recovery Correspondence
13 01 13 01 Cost Recovery Correspondence DEQ internal email re: EQPF loans outstanding 03/08/99 DEQ internal
13 01 13 01 Cost Recovery Correspondence DEQ Letter to BNSF re: Cost recovery 09/28/04 DEQ
13 01 13 01 Cost Recovery Correspondence DEQ internal email re: Outstanding past costs 01/28/05 DEQ internal
13 01 13 01 Cost Recovery Correspondence DEQ internal email re: Cost recovery 08/11/06 DEQ internal
13 01 13 01 Cost Recovery Correspondence 11/01/11 DEQ/Martin
13 01 13 02 Cost Recovery Miscellaneous
13 01 13 02 Cost Recovery Miscellaneous Y ** DEQ internal memo re: Washington Group 07/24/01 DEQ internal
13 01 14
13 01 14 01 Plans
13 01 14 01 Plans 03/01/89
13 01 14 01 Plans 3/90 DHES
13 01 14 01 Plans DRAFT Envirocon Community Relations Program (Envirocon 04/01/90 Envirocon
13 01 14 01 Plans 6/91 DHES
13 01 14 01 Plans Public meeting notice 11/03/10
13 01 14 02 Document Distribution
13 01 14 02 Document Distribution MDHES letter to interested persons re: Draft Consent Decree 07/05/90 MDHES
13 01 14 02 Document Distribution Livingston Repository Inventory 07/01/91
13 01 14 02 Document Distribution DHES internal letter re: Mailing lists 2/24/95 DHES
Site-Wide Information
Asbestos Outside the Cinder Pile
Task M Remedial Action Report for Asbestos-Containing Materials
Site-Wide Information
O&M (for future use)
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ/Martin email to BN/Smith re: Clarification of BN's invoice question
Site-Wide Information
Site-Wide Information
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Draft Community Concerns Reports and Proposed Community Relations Plan for the Burlington Northern/Livingston Site (DHES/Solid & Haz Waste Bureau
DHES/Solid & Hazardous Waste Bureau
Site-Wide Information
Community Relations
DRAFT Burlington Northern/Livingston Environmental Cleanup Site Community Involvement Plan
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Community Involvement Plan Burlington Northern/Livingston Environmental Cleanup Site
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
BN LIVINGSTON 8/26/13
Page 296 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 14 02 Document Distribution DHES letter to EPA re: NPL determinations 08/24/95 DHES
13 01 14 02 Document Distribution Livingston Library Inventory Index 7/04
13 01 14 02 Document Distribution DEQ transmittal to MSU Bozeman re: Draft CD & SOWs 9/8/04 DEQ
13 01 14 02 Document Distribution 9/8/04 DEQ
13 01 14 02 Document Distribution DEQ transmittal to PCEC re: Draft CD & SOW 09/08/04 DEQ
13 01 14 02 Document Distribution DEQ transmittal to RTI re: Draft CD & SOW 09/08/04 DEQ
13 01 14 02 Document Distribution 9/8/04 DEQ
13 01 14 02 Document Distribution DEQ transmittal to Livingston Library re: Draft CD & SOWs 09/08/04 DEQ
13 01 14 02 Document Distribution Fischer email to DEQ re: Mailing list 09/27/04 Fischer
13 01 14 02 Document Distribution DEQ letter to MSU Library re: Spring 2005 SOW 7/1/05 DEQ
13 01 14 02 Document Distribution DEQ letter to Livingston Library re: Spring 2005 SOW 07/01/05 DEQ
13 01 14 02 Document Distribution DEQ letter to Livingston Library re: Repository Documents 2/14/06 DEQ
13 01 14 03
13 01 14 03 Press Releases DEQ press release re: Cinder Pile Capping 02/17/05 DEQ
13 01 14 03 Press Releases 09/21/09 DEQ
13 01 14 03 Press Releases 9/22/09 DEQ
13 01 14 03 Press Releases 09/24/09
13 01 14 03 Press Releases Livingston Enterprise Affidavit of Publication and tear sheet 09/24/09
13 01 14 03 Press Releases DEQ press release re: Public meeting scheduled 10/22/09 10/07/09 DEQ
13 01 14 03 Press Releases DEQ press release email to Livingston Enterprise 10/9/09 DEQ
13 01 14 03 Press Releases 10/25/10 DEQ/ Peterson
13 01 14 03 Press Releases 07/24/12 DEQ/ Peterson
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
DEQ transmittal to Livingston Commissioners re: Draft CD & SOW
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
DEQ transmittal to Park CO. Commissioners re: Draft CD & SOWs
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Press Releases (Documents dated before 2/17/05 are not itemized)
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
DEQ email to Livingston Enterprise re: Request for public notice legal ad
Site-Wide Information
Community Relations
DEQ email to Bozeman Chronicle re: Request for public notice legal ad
Site-Wide Information
Community Relations
Bozeman Daily Chronicle Affidavit of Publication and tear sheet
Bozeman Daily Chronicle
Site-Wide Information
Community Relations
Livingston Enterprize
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
DEQ/Peterson email re: For immediate release – DEQ accepting public comments on railyard cleanup
Site-Wide Information
Community Relations
DEQ/Peterson email re: For immediate release – DEQ public meeting planned on railyard cleanup
BN LIVINGSTON 8/26/13
Page 297 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 14 03 Press Releases Livingston Enterprise Affidavit of Publication and tear sheet 07/27/12
13 01 14 03 Press Releases 07/27/12
13 01 14 04
13 01 14 04 Wall Street Journal article re: Rise in lawsuits against railroads 02/03/99 Wall Street Journal
13 01 14 04 05/15/01 Bozeman Chronical
13 01 14 04 05/15/01 Bozeman Chronical
13 01 14 04 Bozeman Chronicle Article re: Delays in ROD 05/16/01 Bozeman Chronical
13 01 14 04 Emailed press clipping re: Slow Progress 05/17/01
13 01 14 04 Bozeman Chronicle Article re: Progress with TOD 06/18/01 Bozeman Chronical
13 01 14 04 Montana Standard Article 7/15/01 Montana Standard
13 01 14 04 Bozeman Chronicle Article re: ROD issuance 09/20/01 Bozeman Chronical
13 01 14 04 Livingston Enterprise Article re: ROD 09/25/01
13 01 14 04 MSNBC Web Article re: New LRC President 11/14/01 MSMBC
13 01 14 04 Livingston Enterprise Article re: ROD 11/15/01
13 01 14 04 01/31/02 Bozeman Chronical
13 01 14 04 Bozeman Chronicle Article re: Depot 05/28/02 Bozeman Chronical
13 01 14 04 07/30/02
13 01 14 04 Livingston Enterprise article 09/10/04
13 01 14 04 Livingston Enterprise article re: Public meeting 09/27/04
13 01 14 04 Livingston Enterprise article re: Public meeting 10/01/04
13 01 14 04 State of the Arts article re: Depot Renovation 11/04/11 State of the Arts
Site-Wide Information
Community Relations
Livingston Enterprize
Site-Wide Information
Community Relations
Bozeman Daily Chronicle Affidavit of Publication and tear sheet
Bozeman Daily Chronicle
Site-Wide Information
Community Relations
Press Clippings (newspaper articles) (Articles dated before 2/3/99 are not itemized)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Bozeman Chronicle Article re: Railroad workers health issues, contamination
Site-Wide Information
Community Relations
Press Clippings (newspaper articles) Bozeman Chronicle Article re: Private litigation by rail workers
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Bozeman Chronicle Article re: Development on Yellowstone Floodplain
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise article re: Business sues BN over rail yard cleanup
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
BN LIVINGSTON 8/26/13
Page 298 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 14 04 Livingston Enterprise article re: Public meeting on 2/23/05 02/16/05
13 01 14 04 02/17/05
13 01 14 04 Billings Gazette article re: Cinder Pile Capping 02/18/05 Billings Gazette
13 01 14 04 Livingston Enterprise article re: Cinder Pile Capping 02/18/05
13 01 14 04 2/20/05 Bozeman Chronical
13 01 14 04 Livingston Enterprise article re: Cinder Pile Capping 2/26/05
13 01 14 04 Livingston Enterprise article re: Public meeting on 2/23/05 2/22/05
13 01 14 04 Bozeman Chronicle Article re: Cinder Pile 02/23/05 Bozeman Chronical
13 01 14 04 Livingston Enterprise Article re: Cinder Pile Capping begins 3/11/05
13 01 14 04 Livingston Enterprise article re: Cinder Pile Capping 03/14/05
13 01 14 04 Spokesman Review articles re: BN sites, including Livingston 04/24/05 Spokesman Review
13 01 14 04 Spokesman Review articles re: BN sites, including Livingston 4/25/05 Spokesman Review
13 01 14 04 Spokesman Review articles re: BNSF 5/15/05 Spokesman Review
13 01 14 04 7/8/05
13 01 14 04 7/8/05 Bozeman Chronical
13 01 14 04 07/10/05 Bozeman Chronical
13 01 14 04 07/11/05
13 01 14 04 Associated Press article re: Spring 2005 SOW public comment 7/11/05 Associated Press
13 01 14 04 Associated Press article re: Indoor Air, Spring 2005 SOW 07/15/05 Associated Press
13 01 14 04 Livingston Enterprise article re: Indoor Air, Spring 2005 SOW 7/15/05
13 01 14 04 07/15/05 Havre Daily News
13 01 14 04 Livingston Enterprise Display AD re: Public comment 07/28/05
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise article re: Cinder pile capping to begin in March
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Bozeman Chronicle Article re: Public Meeting notice for 2/23/05
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise Legal AD re: Public comment on Spring 2005 SOW
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Bozeman Chronicle Legal AD re: Public comment on Spring 2005 SOW
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Bozeman Chronicle Display AD re: Public meeting & public comment on Spring 2005 SOW
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise Display AD re: Public meeting & public comment on Spring 2005 SOW
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Havre Daily News article re: Contamination from BNSF seepage feared in Livingston
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise
BN LIVINGSTON 8/26/13
Page 299 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 14 04 12/3/05 Bozeman Chronical
13 01 14 04 Missoulian article re: BN buyout 12/4/05 Missioulian
13 01 14 04 Envirocon email to DEQ re: BN buyout Associated Press 12/5/05 Envirocon
13 01 14 04 DEQ internal email re: BN buyout MSNBC 12/05/05 DEW internal
13 01 14 04 DEQ internal email re: BN buyout - Bozeman Chronical article 12/12/05 DEW internal
13 01 14 04 DEQ internal email re: BN buyout - Livingston Enterprise 12/12/05 DEW internal
13 01 14 04 12/08/05
13 01 14 04 01/27/06 Billings Gazette
13 01 14 04 2/17/06
13 01 14 04 Livingston Enterprise article re: Soil Plume to be Tested 2/27/06
13 01 14 04 03/17/06 Billings Gazette
13 01 14 04 DEQ internal email re: Press contact/Livingston Enterprise 3/17/06 DEQ internal
13 01 14 04 DEQ internal email re A.P. article 3/17/06 DEQ internal
13 01 14 04 03/17/06
13 01 14 04 3/21/06 Billings Gazette
13 01 14 04 DEQ internal email re: Queen City News article 03/22/06 DEQ internal
13 01 14 04 Missoula Independent article re: Railroaded 03/23/06
13 01 14 04 Livingston Enterprise article re: Soil gas testing under way 4/6/06
13 01 14 04 Enterprise News Digest article re: Soil gas testing under way 4/7/06 Enterprise Daily
13 01 14 04 Livingston Weekly 4/13/06 Livingston Weekly
13 01 14 04 04/10/06
13 01 14 04 4/13/06
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Bozeman Chronicle article re: BNSF planning to buy part of Livingston
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise article re: Residents face decision – Railroad buying rights to purchase homes in polluted area
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Billings Gazette article re: BNSF blames state for cleanup delays
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise article re: Higher levels of pollutants found in homes
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Billings Gazette article re: State to fix Livingston site, then bill BNSF
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise article re: Schweitzer: State will do cleanup of Livingston contaminates
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Billings Gazette article re: BNSF disputes governor’s criticism of cleanup
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Missoula Independent
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Enterprise News Digest article re: BNSF moves ahead with buying homes on north side
Enterprise News Digest
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Helena Independent Record article re: Montanans deserve the facts concerning BNSF’s environmental actions
Helena Independent Record
BN LIVINGSTON 8/26/13
Page 300 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 14 04 4/27/06 Billings Gazette
13 01 14 04 Missoula Independent article re: Schweitzer steps up to BNSF 04/27/06
13 01 14 04 Great Fall Tribune article re: State, BNSF clash over cleanup 05/07/06 Great Falls Tribune
13 01 14 04 05/08/06 Great Falls Tribune
13 01 14 04 05/15/06 Miles City Star
13 01 14 04 07/10/06
13 01 14 04 07/18/06 Great Falls Tribune
13 01 14 04 07/28/06
13 01 14 04 8/1/06 Missoulian
13 01 14 04 08/12/06 DEQ internal
13 01 14 04 8/17/06
13 01 14 04 08/22/06 DEQ internal
13 01 14 04 9/25/06
13 01 14 04 10/5/06
13 01 14 04 10/6/06 DEQ internal
13 01 14 04 10/6/06
13 01 14 04 DEQ internal email re: Press contact 10/23/06 DEQ internal
13 01 14 04 DEQ internal email re: Press contact 10/27/06 DEQ internal
13 01 14 04 11/02/06 Montana Pioneer
13 01 14 04 11/06 Montana Pioneer
13 01 14 04 12/12/06
13 01 14 04 Spokesman Review article re: A Cautionary Tale Spokesman Review
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Billings Gazette article re: Schweitzer: BNSF rail cleanup excuses duplications
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Missoula Independent
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Great Falls Tribune article re: Ex-workers blame rail yard in deaths
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Miles City Star article re: New Superfund Project Officer named
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Enterprise News Digest article re: MRL agrees to buy Talgo-LRC
Enterprise News Digest
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Great Falls Tribune article re” DEQ: Major issues still need attention at Livingston rail yard
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise article re: Railyard diesel work starts next week
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Missoulian article re: Railroad to lower certain shipping rates for wheat
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
DEQ internal email re: Opper’s first cut on article about new approach to cleanup
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
The Bismarck Tribune article re: Mandan presents cleanup update
The Bismark Tribune
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
DEQ internal email re: Other DEQ employee comments to Opper’s article
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Enterprise News Digest article re: Rail yard diesel cleanup work starts soon
Enterprise News Digest
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Chronicle article re: Cleanup begins at BNSF diesel spill site
Livingston Chronical
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
DEQ internal email re: : Cleanup begins at BNSF diesel spill site
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Helena Independent Record article re: Cleanup of Livingston diesel under way
Helena Independent Record
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Montana Pioneer email to DEQ re: Rail Yard cleanup back on track – Governor plays hardball with BNSF
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
The Montana Pioneer article re: Rail Yard cleanup back on track – Governor plays hardball with BNSF
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise article re: Solvent plume found to be larger than earlier estimates
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
BN LIVINGSTON 8/26/13
Page 301 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 14 04 1/9/07 Billings Gazette
13 01 14 04 1/30/07
13 01 14 04 2/2/07 Daily Interlake
13 01 14 04 DEQ internal emails re: Livingston press release 04/11/07 DEQ internal
13 01 14 04 4/13/07
13 01 14 04 Livingston Enterprise article re: Rail yard cleanup begins 04/16/07
13 01 14 04 K/J email to DEQ re: Article about Carter Boehm 4/18/07 KJ
13 01 14 04 04/27/07
13 01 14 04 5/10/07
13 01 14 04 08/13/07 Miles City Star
13 01 14 04 08/13/07
13 01 14 04 08/13/07 Missioulian
13 01 14 04 08/14/07 Billings Gazette
13 01 14 04 Great Falls Tribune article re: BNSF starts Livingston cleanup 8/17/07 Great Falls Tribune
13 01 14 04 09/18/07
13 01 14 04 09/30/07
13 01 14 04 10/1/07 Billings Gazette
13 01 14 04 Belgrade News article re: City, residents sue BNSF 10/2/07 Belgrade News
13 01 14 04 Livingston Enterprise article re: BNSF levels more homes 10/2/07
13 01 14 04 CD DVD of report on Governor’s site visit 10/16/07
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Billings Gazette article re: Railway considers coal to liquids idea
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Helena article re: BNSF to spend $54.4 million in improvements across Montana
Helena Independent Record
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Daily Interlake article re: House measure would fund Evergreen cleanup
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Helena article – More progress being made in Livingston Rail yard cleanup
Helena Independent Record
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Enterprise News Digest article re: MRL land lease costs escalate for business owners on Park Street
Enterprise News Digest
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Helena Independent Record article re: Cut cable knocks out Verizon wireless service
Helena Independent Record
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Miles City Star article re: Livingston Railyard gets deep clean from BNSF
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Helena Independent Record article re: BNSF cleaning up rail yard
Helena Independent Record
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Missoulian article re: Livingston rail yard gets deep clean from BNSF
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Billings Gazette article re: Action on Livingston rail yard pollution
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise article re: City votes to join lawsuit against BNSF
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Helena Independent Record article re: Livingston, residents sue BNSF over rail yard pollution
Helena Independent Record
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Billings Gazette article re: Livingston sues over rail yard cleanup
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
BN LIVINGSTON 8/26/13
Page 302 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 14 04 Livingston Enterprise article re: Schweitzer tours cleanup site 10/16/07
13 01 14 04 10/16/07 Bozeman Chronical
13 01 14 04 10/17/07 Bozeman Chronical
13 01 14 04 10/18/07 DEQ internal
13 01 14 04 Flathead Beacon Article on Liability 7/25/08 Flathead Beacon
13 01 14 04 AP Article on Liability 7/25/08 Associated Press
13 01 14 04 DEQ internal email re: Liability article 7/25/08 DEQ internal
13 01 14 04 Missoulian Article on Liability 07/30/08 Missoulian
13 01 14 04 K/J transmittal – October 2008 Activities 09/29/08 KJ
13 01 14 04 10/10/08 KJ
13 01 14 04 DEQ email to K/J re: Task status 10/23/08 DEQ
13 01 14 04 10/23/08 DEQ
13 01 14 04 DEQ internal email re: Enterprise article on Task D&E 2008 11/10/08 DEQ internal
13 01 14 04 DEQ internal email re: Press contact for Livingston Enterprise 12/04/08 DEQ internal
13 01 14 04 06/26/09
13 01 14 04 DEQ internal emails re: Article about dispute resolution 6/29/09 DEQ internal
13 01 14 04 06/29/09
13 01 14 04 07/08/09 DEQ legal
13 01 14 04 7/9/09 DEQ legal
13 01 14 04 7/13/09
13 01 14 04 8/13/09
13 01 14 04 10/8/09 Billings Gazette
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Bozeman Chronical article re: Governor impressed with work on BN’s Livingston pollution site
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Bozeman Chronicle article re: Schweitzer impressed with Livingston railyard cleanup
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
DEQ internal email re: Governor tours Livingston yard’s groundwater treatment plant
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
K/J letter to DEQ re: Technical WP for LNAPL Sampling & Analysis
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
DEQ email to K/J re: Response to Tech WP for LNAPL sampling & analysis
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise article re: City upset with BNSF rail cleanup
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise article re: City Upset with BNSF rail cleanup
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
DEQ legal email to Matt Dettori/Enterprise re: DEQ Director Opper’s decision on dispute resolution
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
DEQ legal internal email re: Dispute resolution – follow –up press contact
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise article re: State nixes BNSF appeal on air quality
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise article re: BNSF files petition in federal court
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Billings Gazette: Hearing set to review railyard cleanup in Livingston
BN LIVINGSTON 8/26/13
Page 303 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 14 04 10/08/09 Missoulian
13 01 14 04 10/23/09
13 01 14 04 11/3/09 Associated Press
13 01 14 04 11/09/09
13 01 14 04 11/17/09
13 01 14 04 11/24/09
13 01 14 04 Associated Press: Woman sues BNSF over cancer 5/14/10 Associated Press
13 01 14 04 08/03/10 Missoulian
13 01 14 04 11/05/10 Billings Gazette
13 01 14 04 11/05/10 Associated Press
13 01 14 04 11/05/10 Associated Press
13 01 14 04 11/5/10
13 01 14 04 11/12/10 Spokesman Review
13 01 14 04 02/10/12 Bozeman Chronical
13 01 14 04 03/05/12
13 01 14 04 03/28/12
13 01 14 04 04/04/12
13 01 14 04 Livingston Enterprise article: Court rules against BNSF 04/04/12
13 01 14 04 04/06/12
13 01 14 04 04/27/12
13 01 14 04 04/29/12 USA Today
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Missoulian: Burlington Northern removes 17,400 gallons of petroleum from Livingston railyard
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise article re: DEQ updates BNSF rail yard cleanup efforts
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Associated Press: Buffett’s Berkshire buying Burlington Northern RR
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise: Cleanup, lawsuit unaffected by BNSF sale
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise: Barrett steps down as head of Park County Environmental Council
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise article re: BNSF survey set to account for wells
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Missoulian: Retired Burlington Northern engineer gets $3.7M for lung disease caused by diesel fumes
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Billings Gazette: 9th Circuit declines to interfere in BNSF lawsuit
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Associated Press: 9th Circuit declines to interfere in BNSF lawsuit
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Associated Press latimes.com: Federal appeals court won’t intervene in Montana residents environmental suit against BNSF
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise: DEQ: Health risk from solvents re-evaluated
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
The Spokesman Review: Vestal: BNSF derails its “good neighbor” policy
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Bozeman Daily Chronicle article : Landmark Montana Supreme Court ruling states polluters can be held accountable decades later
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise article: Mediation fails between BNSF & Livingston
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise article: BNSF ask for delay in pollution trial
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Current article: Questions & Answers with Park Co Environmental Council Director Kerry Fee
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise article: DEQ report indicates less diesel fuel beneath Livingston than earlier estimated
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise article: BNSF plume trial starts on Monday
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
USA Today article: BNSF Railway company plume trial to begin
BN LIVINGSTON 8/26/13
Page 304 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 14 04 04/30/12
13 01 14 04 05/01/12
13 01 14 04 Livingston Enterprise article: Livingston cleanup complicated 05/02/12
13 01 14 04 Independent Press article: BNSF plume trial to begin 05/03/12 Independent Press
13 01 14 04 05/04/12
13 01 14 04 05/08/12
13 01 14 04 05/08/12 Associated Press
13 01 14 04 Livingston Enterprise article: City accepts BNSF deal 05/09/12
13 01 14 04 08/09/12
13 01 14 04 Livingston Enterprise article: DEQ hears indoor air comments 08/13/12
13 01 14 04 01/09/13 red.Orbit.com
13 01 14 05
13 01 14 05 Technical Assistance Grants Spring 2007 PCEC
13 01 14 05 Technical Assistance Grants PCEC Newsletter - Summer 2011 PCEC
13 01 14 06
13 01 14 06 DHES fact sheet - CD, site info 3/90 DHES
13 01 14 06 4/90 DHES
13 01 14 06 DHES fact sheet 05/01/90 DHES
13 01 14 06 DHES fact sheet - Consent Decree, Free Product recovery 07/01/90 DHES
13 01 14 06 DHES fact sheet - Diesel Pump test 10/90 DHES
13 01 14 06 DHES fact sheet - Pancreatic cancer study 11/01/90 DHES
13 01 14 06 DHES fact sheet - Risk Assessment, Basement gas 12/01/90 DHES
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise article: BNSF Railway Company plume trial to begin
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise article: Lawyers spar over BNSF plume size
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise article: Hydrologist touts rail yard cleanup plans
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise article: BNSF, Livingston residents, city reach deal
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Associated Press article: BNSF offers $36M settlement in Livingston lawsuit
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise article: Meeting to Discuss easing rail yard cleanup standards
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
Livingston Enterprise
Site-Wide Information
Community Relations
Press Clippings (newspaper articles)
redOrbit.com article: "May be Decades Before Contaminated GW Sites are Cleaned Up"
Site-Wide Information
Community Relations
Technical Assistance Grants
Site-Wide Information
Community Relations
PCEC Newsletter article – PCEC Awarded Second Technical Assistance Grant from USEPA -
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
DHES fact sheet - Yellowstone River, Community involvement plan, LIFE
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
BN LIVINGSTON 8/26/13
Page 305 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 14 06 DHES fact sheet - Free Product recovery, various 2/91 DHES
13 01 14 06 DHES fact sheet - Well survey 5/91 DHES
13 01 14 06 DHES fact sheet - Choosing a Remedy 06/01/91 DHES
13 01 14 06 DHES fact sheet - Health Assessment 10/01/91 DHES
13 01 14 06 DHES fact sheet - Draft RI report 11/91 DHES
13 01 14 06 DHES fact sheet - Basement Gas 5/92 DHES
13 01 14 06 DHES fact sheet - Various activities 7/92 DHES
13 01 14 06 DHES fact sheet - Draft RI/Mission Wye 08/01/92 DHES
13 01 14 06 DHES fact sheet - RI/FS Activities 10/01/92 DHES
13 01 14 06 DHES fact sheet - RI/FS Activities 12/01/92 DHES
13 01 14 06 DHES fact sheet - Risk Assessment & Draft RI report 04/01/93 DHES
13 01 14 06 ATSDR Update Fact Sheet 2/00 ATSDR
13 01 14 06 DEQ Progress Report re: Letter to Golnar, City Manager 05/19/04 DEQ
13 01 14 06 9/21/04 DEQ
13 01 14 06 DEQ email to BN re: Draft site update sheet 02/07/05 DEQ
13 01 14 06 DEQ fact sheet - Cinder Pile Capping 2/11/05 DEQ
13 01 14 06 DEQ fax to RTI re: Fact sheet 2/14/05 DEQ
13 01 14 06 DEQ email to BN/K/J re: Draft update sheet 06/29/05 DEQ
13 01 14 06 DEQ Site Update Sheet 07/05/11 DEQ
13 01 14 06 DEQ Fact Sheet 2/06 DEQ
13 01 14 06 DEQ Fact Sheet 11/07/11 DEQ
13 01 14 06 DEQ Site Update 10/09 DEQ
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
DEQ letter to Livingston Library re: Public meeting & Fact sheets
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
BN LIVINGSTON 8/26/13
Page 306 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 14 06 DEQ Site Update 10/10/11 DEQ
13 01 14 06 DEQ Site Update 07/01/12 DEQ
13 01 14 07 General Correspondence
13 01 14 07 General Correspondence Y ** Iron Horse Trailer Park residents 06/29/01
13 01 14 07 General Correspondence Email to DEQ re: New well on commercial lot 08/02/04
13 01 14 07 General Correspondence DEQ email to Livingston Library re: Repository 10/28/04 DEQ
13 01 14 07 General Correspondence Livingston Library email to DEQ re: Repository 10/29/04 Livingston Library
13 01 14 07 General Correspondence Phone Log - L Winstel to DEQ re: Indoor air sampling/well 10/14/05 L Winstel
13 01 14 07 General Correspondence DEQ internal email re: BNSF buyout confirmation 12/5/05 DEQ internal
13 01 14 07 General Correspondence 02/10/06 DEQ
13 01 14 07 General Correspondence DEQ internal email re: Private well sampling request 05/02/06 DEQ internal
13 01 14 07 General Correspondence DEQ internal emails re: Private well sampling request 5/2/06-5/5/06 DEQ internal
13 01 14 07 General Correspondence K/J email to DEQ re: Domestic water sampling 05/05/06 KJ
13 01 14 07 General Correspondence DEQ & K/J emails re: Domestic water sampling results 06/22/06
13 01 14 07 General Correspondence K/J letter to DEQ re: Domestic well sampling results 06/22/06 KJ
13 01 14 07 General Correspondence DEQ letter to Terry Tillet re: Sampling results for private well 07/13/06 DEQ
13 01 14 07 General Correspondence 7/14/06 DEQ
13 01 14 07 General Correspondence 10/10/06 DEQ
13 01 14 07 General Correspondence 10/10/06 DEQ
13 01 14 07 General Correspondence K/J emails re: Townsend property 12/28/06 KJ
13 01 14 07 General Correspondence 01/12/07 DEQ
13 01 14 07 General Correspondence 01/12/07 DEQ
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Fact Sheets (Progress Reports)
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
DEQ email to K/J, BNSF, & internal re: Phone Log – G Green re: Indoor air monitoring
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
DEQ letter to Todd & Kristen Wester re: Sampling results for private well
Site-Wide Information
Community Relations
DEQ letter to Ted & Georgann Watson re: Sampling results for gw monitoring well 94-2
Site-Wide Information
Community Relations
DEQ letter to Mark Grosvenor re: Sampling results for gw monitoring well 94-1
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
DEQ letter to Ted & Georgann Watson re: Sampling results for gw monitoring well 94-2
Site-Wide Information
Community Relations
DEQ letter to Mark Grosvenor re: Sampling results for gw monitoring well 94-1
BN LIVINGSTON 8/26/13
Page 307 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 14 07 General Correspondence 03/19/07 DEQ
13 01 14 07 General Correspondence 05/22/07 CDM
13 01 14 07 General Correspondence KJ/DEQ emails re: Owner contact info 05/25/07
13 01 14 07 General Correspondence DEQ letter to E Skillman re: Sampling results 06/05/07 DEQ
13 01 14 07 General Correspondence KJ email to DEQ/CDM re: Watson property 06/08/07 KJ
13 01 14 07 General Correspondence KJ/DEQ emails re: Domestic water sampling schedule 6/26-6/27/07
13 01 14 07 General Correspondence CDM/DEQ emails re: Krohne well logs 07/03/07
13 01 14 07 General Correspondence KJ email to DEQ re: Historical VOC data for Well 94-2 7/20/07 KJ
13 01 14 07 General Correspondence DEQ letter to Watsons re: Sampling results 07/24/07 DEQ
13 01 14 07 General Correspondence VOC Analytical results for Wells 94-2 and 07-6 07/01/07
13 01 14 07 General Correspondence KJ email to DEQ re: Private well 12Q02 update 08/14/07 KJ
13 01 14 07 General Correspondence DEQ letter to Jones re: Sampling results 08/28/07 DEQ
13 01 14 07 General Correspondence DEQ letter to D Henriksen re: Sampling results 08/28/07 DEQ
13 01 14 07 General Correspondence DEQ letter to K Mitchell re: Sampling results 08/30/07 DEQ
13 01 14 07 General Correspondence DEQ letter to E Harris re: Sampling results 08/30/07 DEQ
13 01 14 07 General Correspondence DEQ letter to Tonnesens re: Sampling results 08/30/07 DEQ
13 01 14 07 General Correspondence DEQ letter to J Gardner re: Sampling results 08/31/07 DEQ
13 01 14 07 General Correspondence DEQ letter to C Boehm re: Sampling results 10/01/07 DEQ
13 01 14 07 General Correspondence Olympus letter to BNSF re: Disposition of waste materials 10/30/07 Olympus
13 01 14 07 General Correspondence Olympus letter to BNSF re: Well abandonment activities 10/30/07 Olympus
13 01 14 07 General Correspondence KJ/DEQ emails re: Drinking water well sample 12/4-12/12/07
13 01 14 07 General Correspondence DEQ letter to Mr & Mrs Krohne re: Sampling results 2/19/09 DEQ
Site-Wide Information
Community Relations
DEQ fax to Ted Watson re: 1/12/07 letter with 11/06 sampling results
Site-Wide Information
Community Relations
CDM email to DEQ re: Draft letters for 609 Gallatin and 318 Castle
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
BN LIVINGSTON 8/26/13
Page 308 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 14 07 General Correspondence DEQ letter to C Boehm re: Sampling results 07/15/09 DEQ
13 01 14 07 General Correspondence DEQ letter to Mr & Mrs Van Gytenbeek re: Sampling results 7/27/09 DEQ
13 01 14 07 General Correspondence DEQ letter to C Boehm re: Sampling results 07/27/09 DEQ
13 01 14 07 General Correspondence DEQ letter to Mr & Mrs Krohne re: Sampling Results 7/27/09 DEQ
13 01 14 07 General Correspondence M Giuliano request for info re: 111 South K St 8/25-8/26/09 M Giuliano
13 01 14 07 General Correspondence 9/29-9/30/09 A Stern
13 01 14 07 General Correspondence B Morris request for plume map/info on 131 South P St 10/5/09 B Morris
13 01 14 07 General Correspondence D Johnson letter to DEQ re: Info on 314 South H St 10/12/09 D Johnson
13 01 14 07 General Correspondence 10/13/09 DEQ
13 01 14 07 General Correspondence DEQ/Becker family emails re: Science fair project
13 01 14 07 General Correspondence N Davis request to video tape public meeting 10/21/09 N Davis
13 01 14 07 General Correspondence DEQ/CDM/Katelyn emails re: Science fair project
13 01 14 07 General Correspondence K Ziebarth request for info on contamination at 210 South E St 10/23-11/2/09 K Ziebarth
13 01 14 07 General Correspondence DEQ phone log: D Kubly concerns about City water quality 11/2/09 DEQ
13 01 14 07 General Correspondence 11/09/09 DEQ
13 01 14 07 General Correspondence R Morris request to be added to mailing list 11/12/09 R Morris
13 01 14 07 General Correspondence T Coleman
13 01 14 07 General Correspondence C Crayton request for info on 106 North G St C Crayton
13 01 14 07 General Correspondence H Blesius request for info on air quality 12/3-12/8/09 H Blesius
13 01 14 07 General Correspondence 2/17-2/18/10 S Dorrance
13 01 14 07 General Correspondence DEQ letter Francis Horiel re: Sampling Results 02/23/10 DEQ
13 01 14 07 General Correspondence DEQ letter Francis Horiel re: Sampling Results 02/25/10 DEQ
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
A Stern request for info re: Possible community garden at North M Street Park
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
DEQ phone log: L Hagen questions regarding a property transaction
Site-Wide Information
Community Relations
10/9/09-10/18/09
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
10/18-10/21/09
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations DEQ letter to Richard & Sharon Tonnesen re: Sampling Results
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
T Coleman request for info on sample locations near 128 South F St
10/27-11/15/09
Site-Wide Information
Community Relations
11/21-11/23/09
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Phone log: S Dorrance request for info on radio station with in plume area
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
BN LIVINGSTON 8/26/13
Page 309 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 14 07 General Correspondence DEQ letter David & Jeannie Burley re: Sampling Results 2/26/10 DEQ
13 01 14 07 General Correspondence DEQ letter Erlynn Harris re: Sampling Results 02/26/10 DEQ
13 01 14 07 General Correspondence DEQ letter Bill & Jennifer Jones re: Sampling Results 2/26/10 DEQ
13 01 14 07 General Correspondence DEQ letter to C Boehm re: Sampling results 02/26/10 DEQ
13 01 14 07 General Correspondence DEQ letter to Shari & Gary Norton re: Sampling results 2/26/10 DEQ
13 01 14 07 General Correspondence 02/26/10 DEQ
13 01 14 07 General Correspondence DEQ letter to Steve Briggs re: Sampling results 03/01/10 DEQ
13 01 14 07 General Correspondence DEQ letter to K Mitchell re: Sampling results 03/02/10 DEQ
13 01 14 07 General Correspondence DEQ letter to Ted & Georgann Watson re: Sampling results 3/2/10 DEQ
13 01 14 07 General Correspondence DEQ letter to Shari & Gary Norton re: Sampling results 03/08/10 DEQ
13 01 14 07 General Correspondence C Rodi request for info on 127 South P St 06/04/10 C Rodi
13 01 14 07 General Correspondence G Ward request for plume maps 06/21/10 G Ward
13 01 14 07 General Correspondence 7/15-10/6/10
13 01 14 07 General Correspondence 10/18/10
13 01 14 07 General Correspondence 04/21/11
13 01 14 07 General Correspondence
13 01 14 07 General Correspondence 08/11/11 DEQ/ Reynolds
13 01 14 07 General Correspondence 08/15/11 DEQ/ Reynolds
13 01 14 07 General Correspondence 08/15/11 DEQ/ Reynolds
13 01 14 07 General Correspondence 08/15/11 DEQ/ Reynolds
13 01 14 07 General Correspondence 08/15/11 DEQ/ Reynolds
13 01 14 07 General Correspondence 08/15/11 DEQ/ Reynolds
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
DEQ letter to D Johnson re: Request for info about groundwater contamination around 314 South H St
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
K/J/Aldersley, DEQ/Reynolds & K Michels emails re: Private well sampling – 115North K Street
Site-Wide Information
Community Relations
DEQ/Reynolds & S Caldwell emails re: Last power point presentation
Site-Wide Information
Community Relations
DEQ/Reynolds & KJ/Aldersley emails re: Private well owners & location
Site-Wide Information
Community Relations
K/J/Aldersley, DEQ/Reynolds & Property Owner/K Michels re: Private well sampling 115 North K Street & sampling results
7/15/10 – 2/4/11
Site-Wide Information
Community Relations
DEQ/Reynolds letter to D & K Krohne re: Sampling results from June 2009 & June 2010
Site-Wide Information
Community Relations
DEQ/Reynolds letter to Kent Mitchell re: Groundwater analytical results
Site-Wide Information
Community Relations
DEQ/Reynolds letter to Kenneth Handl re: Groundwater analytical results
Site-Wide Information
Community Relations
DEQ/Reynolds letter to George Fabian re: Groundwater analytical results
Site-Wide Information
Community Relations
DEQ/Reynolds letter to Tim Daily re: Groundwater analytical results
Site-Wide Information
Community Relations
DEQ/Reynolds letter to Steve Briggs re: Groundwater analytical results
BN LIVINGSTON 8/26/13
Page 310 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 14 07 General Correspondence 08/15/11 DEQ/ Reynolds
13 01 14 07 General Correspondence 08/16/11 DEQ/ Reynolds
13 01 14 07 General Correspondence 08/16/11 DEQ/ Reynolds
13 01 14 07 General Correspondence 08/16/11 DEQ/ Reynolds
13 01 14 07 General Correspondence 08/16/11 DEQ/ Reynolds
13 01 14 07 General Correspondence 08/16/11 DEQ/ Reynolds
13 01 14 07 General Correspondence 09/05/12
13 01 14 07 General Correspondence 10/01/12
13 01 14 07 General Correspondence 10/01/12 DEQ/ Reynolds
13 01 14 07 General Correspondence 10/01/12 DEQ/ Reynolds
13 01 14 07 General Correspondence 10/02/12 DEQ/ Reynolds
13 01 14 07 General Correspondence 10/03/12 DEQ/ Reynolds
13 01 14 07 General Correspondence 10/03/12 DEQ/ Reynolds
13 01 14 07 General Correspondence 10/03/12 DEQ/ Reynolds
13 01 14 07 General Correspondence 10/03/12 DEQ/ Reynolds
13 01 14 07 General Correspondence 10/03/12 DEQ/ Reynolds
13 01 14 07 General Correspondence 10/03/12 DEQ/ Reynolds
13 01 14 07 General Correspondence 10/03/12 DEQ/ Reynolds
13 01 14 07 General Correspondence 11/05/12 DEQ/ Reynolds
13 01 14 07 General Correspondence 11/05/12 DEQ/ Reynolds
13 01 14 07 General Correspondence 03/05/13 KJ/Aldersley
Site-Wide Information
Community Relations
DEQ/Reynolds letter to David Burley re: Groundwater analytical results
Site-Wide Information
Community Relations
DEQ/Reynolds letter to Kirk Michels re: Groundwater analytical results
Site-Wide Information
Community Relations
DEQ/Reynolds letter to William Jones re: Groundwater analytical results
Site-Wide Information
Community Relations
DEQ/Reynolds letter to Frank Horiel re: Groundwater analytical results
Site-Wide Information
Community Relations
DEQ/Reynolds letter to Erlynn Harris re: Groundwater analytical results
Site-Wide Information
Community Relations
DEQ/Reynolds letter to Richard Tonnesen re: Groundwater analytical results
Site-Wide Information
Community Relations
DEQ/Reynolds & KJ/Aldersley emails re: Contact list for private wells
Site-Wide Information
Community Relations
DEQ/Reynolds & KJ/Aldersley emails re: 2011 sampling - well 8C01
Site-Wide Information
Community Relations
DEQ/Reynolds letter to Steve Briggs re: Groundwater analytical results - well 7L01
Site-Wide Information
Community Relations
DEQ/Reynolds letter to David Burley re: Groundwater analytical results - well 12R02
Site-Wide Information
Community Relations
DEQ/Reynolds letter to Erlynn Harris re: Groundwater analytical results - well 7Q01
Site-Wide Information
Community Relations
DEQ/Reynolds letter to William Jones re: Groundwater analytical results - well 18D04
Site-Wide Information
Community Relations
DEQ/Reynolds letter to Dwight Krohne re: Groundwater analytical results - wells MW-10 & EX-28
Site-Wide Information
Community Relations
DEQ/Reynolds letter to Richard Tonnesen re: Groundwater analytical results - well 7P17
Site-Wide Information
Community Relations
DEQ/Reynolds letter to Tim Dailey re: Groundwater analytical results - well 18C03
Site-Wide Information
Community Relations
DEQ/Reynolds letter to Kenneth Handl re: Groundwater analytical results - well 18D11
Site-Wide Information
Community Relations
DEQ/Reynolds letter to George Fabian re: Groundwater analytical results - well 12R06
Site-Wide Information
Community Relations
DEQ/Reynolds letter to Kirk Michels re: Groundwater analytical results - well 18D06
Site-Wide Information
Community Relations
DEQ/Reynolds letter to City Manager/Meece re: Sampling results for property formerly owned by Ted & Georgann Watson
Site-Wide Information
Community Relations
DEQ/Reynolds letter to Kent Mitchell re: Groundwater analytical results
Site-Wide Information
Community Relations
KJ/Aldersley email to DEQ/Reynolds re: Change of property ownership - Krohne property is now Bender property
BN LIVINGSTON 8/26/13
Page 311 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 14 08 Photographs
13 01 14 08 Photographs Slides
13 01 14 08 Photographs Photos – Site Inspection w/John Wadhams and John Mills 07/09/97 Envirocon
13 01 14 08 CD Photographs CD ROM - Task C - 11/16/05; Task F -6/13/06; Task I 9/7/06 CDM
13 01 14 08 CD Photographs CD ROM – Livingston Railyard Fall 2006
13 01 14 08 CD Photographs CD ROM – April 2008 MUW Wells – Jack-n-bore
13 01 14 09 Slides
13 01 14 10
13 01 14 10 Public Meetings Public Meeting Agenda 09/22/98
13 01 14 10 Public Meetings Meetings Minutes 11/14/01
13 01 14 10 Public Meetings Livingston Enterprise display ad re: Public Meeting 9/24/04
13 01 14 10 Public Meetings Bozeman Chronical display ad re: Public Meeting 09/26/04
13 01 14 10 CD Public Meetings Public Meeting - Power Point Presentation 09/30/04
13 01 14 10 Public Meetings Public Meeting handouts 09/30/04
13 01 14 10 CD Public Meetings Public meeting presentation - Cinder Pile Capping 02/23/05
13 01 14 10 Public Meetings DEQ email to BN re: Public meeting 6/29/05 DEQ
13 01 14 10 Public Meetings DEQ & K/J emails re: Update Sheet 06/30/05
13 01 14 10 Public Meetings DEQ email to BN re: 7/13/05 Public meeting 07/01/05 DEQ
13 01 14 10 Public Meetings Public Meeting handout 07/13/05
13 01 14 10 CD Public Meetings Public Meeting CD 07/13/05
13 01 14 10 Public Meetings Meeting overheads – New Project Manager “Aimee Reynolds” 11/28/07
13 01 14 10 Public Meetings 11/28/07 Livingston Library
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Public Meetings (Documents dated before 9/22/98 are not itemized)
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Livingston-Park County Public Library email to DEQ re: Meeting Room Policy
BN LIVINGSTON 8/26/13
Page 312 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 14 10 Public Meetings Add name to mailing list sheet 11/28/07
13 01 14 10 Public Meetings 4/30/08
13 01 14 10 CD Public Meetings 5/7/08 DEQ
13 01 14 10 Public Meetings Meeting overheads – notes 10/22/09
13 01 14 10 Public Meetings Add name to mailing list sheet 10/22/09
13 01 14 10 CD Public Meetings 5/17/10
13 01 14 10 Public Meetings 10/25/10 DEQ/ Reynolds
13 01 14 10 Public Meetings 10/25/10 DEQ/ Reynolds
13 01 14 10 Public Meetings DEQ
13 01 14 10 CD Public Meetings DEQ Public Meeting Presentation & Handouts – CD DEQ
13 01 14 10 Public Meetings DEQ Public Meeting agenda and Power Point presentation 11/3/10 DEQ
13 01 14 10 Public Meetings Public meeting sign in sheet 11/03/10 DEQ
13 01 14 10 Public Meetings 05/18/12
13 01 14 10 CD Public Meetings DEQ/Reynolds class presentation overheads 05/24/12
13 01 14 10 CD Public Meetings BN Shop Complex sign in sheet 08/09/12
13 01 14 10 CD Public Meetings BN Shop Complex meeting overheads 08/09/12
13 01 14 10 CD Public Meetings
13 01 14 10 Public Meetings Public meeting sign-in sheet - BNLV - Restoration Committee 08/13/12
13 01 14 10 Public Meetings Park High Presentation 05/20/14
13 01 14 11 Public Hearings 8/88-9/90
13 01 14 11 Public Hearings 08/23/89
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
DEQ & Natalie Davis/Park County High School emails re: Class presentation
Site-Wide Information
Community Relations
Park County High School Chemistry Class Presentation CD ROM
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Park County High School Chemistry Class Presentation CD ROM
Site-Wide Information
Community Relations
DEQ/Reynolds email to P Payovich re: Attachment – Legal ad for 11/3/10 public meeting
Site-Wide Information
Community Relations
DEQ/Reynolds email to P Payovich re: Copy of Press Release – DEQ accepting public comments on Railyard cleanup
Site-Wide Information
Community Relations
DEQ Post card – error in October Update for public meeting date
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
DEQ/Reynolds & Park High/N Davis emails re: Scheduling Park High Chemistry class presentation
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
8/9/12 Public meeting slides & posters & 8/13/12 Restoration Committee Presentation
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
1166/ 38D103
Site-Wide Information
Community Relations
1166/ 38D103
Site-Wide Information
Community Relations
Reporter's Transcript of Proceedings RE: Partial Consent Decree and Interim Remedial Work Plan, Livingston District Courtroom
BN LIVINGSTON 8/26/13
Page 313 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 14 11 Public Hearings Hearing Record Appendices I & II 8/23/89
13 01 14 12
13 01 14 12 DEQ internal email re: Press contact - ROD 05/15/01 DEQ internal
13 01 14 12 DEQ internal email re: Press contact - ROD 05/15/01 DEQ internal
13 01 14 12 DEQ internal email re: Press contact - C&P Packing Property 6/4/2001 DEQ internal
13 01 14 12 DEQ internal email re: Press contact - ROD 09/19/01 DEQ internal
13 01 14 12 DEQ internal email re: Press contact - ROD 09/20/01 DEQ internal
13 01 14 12 DEQ internal email re: Press contact - ROD 09/20/01 DEQ internal
13 01 14 12 DEQ internal email re: Press contact - Progress 04/22/02 DEQ internal
13 01 14 12 DEQ internal email re: Press contact - Cinder Pile 04/11/03 DEQ internal
13 01 14 12 DEQ internal email re: Press contact - Cinder Pile 06/04/03 DEQ internal
13 01 14 12 Email to DEQ from Livingston Enterprise 09/08/04
13 01 14 12 9/9/04 DEQ internal
13 01 14 12 9/10/04 DEQ internal
13 01 14 12 DEQ internal email re: Press contact-perchlorate at Livingston 9/10/04 DEQ internal
13 01 14 12 2/4/05 DEQ internal
13 01 14 12 DEQ fax to Paula Clauson re: Fact sheet 2/14/05 DEQ internal
13 01 14 12 Phone Log - Livingston Enterprise re: Cinder Pile 02/17/05
13 01 14 12 Phone Log - Northern News Network re: Cinder Pile 2/18/05
13 01 14 12 DEQ email to Spokane Review 4/11/05 DEQ
13 01 14 12 DEQ internal email re: Info request 05/03/05 DEQ internal
13 01 14 12 Phone Log - Osterkamp, CBS News 5/11/05
1166/ 38D103
Site-Wide Information
Community Relations
Site-Wide Information
Community Relations
Press/Media Contacts (Documents dated before 5/15/01 are not itemized)
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Livingston Enterprise
Site-Wide Information
Community Relations Press/Media Contacts
DEQ internal email re: Phone Log - Paula Clawson/Livingston Enterprise
Site-Wide Information
Community Relations Press/Media Contacts
DEQ internal email re: Phone Log - Paula Clawson/Livingston Enterprise
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
DEQ internal email re: Press contact -Livingston Enterprise re: Cinder Pile
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
BN LIVINGSTON 8/26/13
Page 314 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 14 12 KXLY TV Interview notes 5/11/05
13 01 14 12 DEQ email to CBS News re: ROD 05/12/05 DEQ
13 01 14 12 DEQ email to CBS News re: CECRA Priorities List 05/16/05 DEQ
13 01 14 12 DEQ email to CBS News re: CECRA Priorities List 05/17/05 DEQ
13 01 14 12 DEQ internal email re: Press contact/AP 06/14/05 DEQ internal
13 01 14 12 DEQ internal email re: Press contact/IR 6/1505 DEQ internal
13 01 14 12 DEQ email to Livingston Enterprise re: Update Sheet 07/18/05 DEQ
13 01 14 12 DEQ internal email re: Bozeman Chronical contact 11/30/05 DEQ internal
13 01 14 12 DEQ internal email re: Livingston Enterprise contact 12/8/05 DEQ internal
13 01 14 12 01/26/06 DEQ internal
13 01 14 12 1/30/06 DEQ internal
13 01 14 12 DEQ internal email re: Press contact 02/16/06 DEQ internal
13 01 14 12 DEQ internal email re: Press Contact 2/17/06 DEQ internal
13 01 14 12 DEQ internal email re: BN Livingston press contact 2/22/06 DEQ internal
13 01 14 12 Internal email re: BN Livingston press contact 03/01/06 DEQ internal
13 01 14 12 Phone Log –Bozeman Chronical 3/2/06
13 01 14 12 Livingston Weekly contact 3/9/06 Livingston Weekly
13 01 14 12 3/14/06 Livingston Weekly
13 01 14 12 DEQ internal email re: Livingston Weekly interview: 3/27/06 DEQ internal
13 01 14 12 DEQ internal email re: Livingston Weekly press contact 03/27/06 DEQ internal
13 01 14 12 3/28/06 DEQ
13 01 14 12 03/28/06 DEQ internal
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
DEQ internal email re: Livingston Enterprise - Letter from DEQ Director to BNSF
Site-Wide Information
Community Relations Press/Media Contacts
DEQ internal email re: Long News Service - Livingston Activities/status
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
D Nolt/Livingston Weekly email to DEQ re: Livingston Weekly BNSF site inquiry
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
DEQ email to D Nolt/Livingston Weekly re: Additional info sent
Site-Wide Information
Community Relations Press/Media Contacts
DEQ internal email re: Press contact – Engineering News Review
BN LIVINGSTON 8/26/13
Page 315 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 14 12 4/3/06
13 01 14 12 DEQ internal email re: Great Falls Tribune press contact 04/12/06 DEQ internal
13 01 14 12 DEQ internal email re: Great Falls Tribune request 05/05/06 DEQ internal
13 01 14 12 5/12/06 DEQ internal
13 01 14 12 DEQ internal email re: Q-2 News press contact 11/09/07 DEQ internal
13 01 14 12 12/6/07 DEQ internal
13 01 14 12 06/25/08 DEQ internal
13 01 14 12 Billings Gazette article re: BN second quarter profit rises 7/23/09 Billings Gazette
13 01 14 12 8/12/09 DEQ internal
13 01 14 12 DEQ internal email re: Press contact w/Livingston Enterprise 11/06/09 DEQ internal
13 01 14 12 DEQ internal email re: Press contact w/Livingston Enterprise 12/1/09 DEQ internal
13 01 14 12 DEQ internal email re: Press contact w/Livingston Enterprise 2/10/10 DEQ internal
13 01 14 12 10/29/10 DEQ internal
13 01 14 12 11/4/10 DEQ internal
13 01 14 12 11/5/10 DEQ/ Reynolds
13 01 14 12 04/04/12 DEQ internal
13 01 14 12 04/05/12 DEQ internal
13 01 14 12 04/18/12
13 01 14 12 04/20/12
13 01 14 12 04/20/12
13 01 14 12 04/23/12
Site-Wide Information
Community Relations Press/Media Contacts
T Armistead/Engineering News Review email to DEQ re: Info request
Engineering News Review
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
DEQ internal email re: Bill Kidd/Long News in Austin, Texas press contact
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
DEQ internal email re: Jay Coehn of KTVO/Billings re: Cleaning up Montana
Site-Wide Information
Community Relations Press/Media Contacts
DEQ internal email re: Sue Gallagher/Associated Press re: Update on Livingston since Governor stepped in 2006
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
DEQ/Reynolds & DEQ Legal/Haque-Hausrath internal emails re: Press contact with Matt Detori/Livingston Enterprise
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
Site-Wide Information
Community Relations Press/Media Contacts
DEQ/Reynolds internal emails re: Press contact – new Livingston Enterprise reporter – Wes Venteicher
Site-Wide Information
Community Relations Press/Media Contacts
DEQ/Reynolds internal emails re: Press contact – new Livingston Enterprise reporter – Wes Venteicher at 11/3/10 public meeting
Site-Wide Information
Community Relations Press/Media Contacts
DEQ/Reynolds email to Wes Venteicher re: Attachment - PCE plume
Site-Wide Information
Community Relations Press/Media Contacts
DEQ/Reynolds internal email re: Phone call with Wes Venteicher re: New wells being drilled
Site-Wide Information
Community Relations Press/Media Contacts
DEQ/Dunwell internal email to Reynolds re: Contact with Livingston Current publisher
Site-Wide Information
Community Relations Press/Media Contacts
DEQ/Reynolds & Wes Venteicher re: Press Contact information request
Site-Wide Information
Community Relations Press/Media Contacts
Livingston Current/Neill email to DEQ/Reynolds re: Contaminant information
Livingston Current/ Neill
Site-Wide Information
Community Relations Press/Media Contacts
DEQ/Reynolds & Livingston Current/Neill emails re: Question & Answer public forum
Site-Wide Information
Community Relations Press/Media Contacts
Livingstone Currant/Neill email to DEQ/Reynolds re: Q&A for Livingston Site
Livingston Current/ Neill
BN LIVINGSTON 8/26/13
Page 316 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 14 12 05/03/12 DEQ/ Reynolds
13 01 14 12 04/10/13 DEQ internal
13 01 14 12 04/10/13
13 01 15
13 01 16 Accounting
13 01 16 01 Accounting Budgets 11/89-8/96
13 01 16 02 Accounting Quarterly Reports 7/94-6/95
13 01 16 03 Accounting Monthly Reports 7/89-6/97
13 01 16 04 Accounting 6/94-6/97
13 01 16 05 Accounting 6/91-6/00
13 01 16 06 Accounting 6/89-9/02
13 01 16 06 Accounting 6/16/00 HSI Geotrans
13 01 16 06 Accounting DEQ internal email re: Funding 09/19/01 DEQ internal
13 01 16 06 Accounting DEQ internal emails re: Penalty payment, EQPF 02/20/02 DEQ internal
13 01 16 06 Accounting DEQ internal email re: Contractor 3/13/02 DEQ internal
13 01 16 06 Accounting TEEMI Status Summary 9/27/02
13 01 16 07 Accounting 1/91-6/93
13 01 16 07 Accounting John
13 01 16 07 Accounting Joe
13 01 16 07 Accounting Leased Car
13 01 16 08 Accounting Response Costs 8/89-2/96
Site-Wide Information
Community Relations Press/Media Contacts
DEQ/Reynolds email to Livingston Currant/Neill re: Reynolds responses to Q&A
Site-Wide Information
Community Relations Press/Media Contacts
DEQ/Chambers & Tom Livers emails re: Media contact - info request
Site-Wide Information
Community Relations Press/Media Contacts
Media contact/Webb & DEQ/Reynolds emails re: BN contract with Envirocon
Site-Wide Information
SCAP (This file is not used)
Site-Wide Information
1008/ 45A604
Site-Wide Information
1008/ 45A604
Site-Wide Information
1008/ 45A604
Site-Wide Information
1008/ 45A604
Site-Wide Information
Vouchers, Invoices, and Supporting Information
1008/ 45A604
Site-Wide Information
Vouchers, Invoices, and Supporting Information MBMG
1008/ 45A604
Site-Wide Information
Correspondence (6/89-9/02) (Documents dated before 6/16/00 are not itemized)
1008/ 45A604
Site-Wide Information Correspondence (6/89-9/02)
Phone Log - HSI Geotrans to DEQ re: New consultant to BN site
1008/ 45A604
Site-Wide Information Correspondence (6/89-9/02)
1008/ 45A604
Site-Wide Information Correspondence (6/89-9/02)
1008/ 45A604
Site-Wide Information Correspondence (6/89-9/02)
1008/ 45A604
Site-Wide Information Correspondence (6/89-9/02)
1008/ 45A604
Site-Wide Information
Employee Training, Travel, Leased Car
1008/ 45A604
Site-Wide Information
Employee Training, Travel, Leased Car
1008/ 45A604
Site-Wide Information
Employee Training, Travel, Leased Car
1008/ 45A604
Site-Wide Information
Employee Training, Travel, Leased Car
1008/ 45A604
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 317 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 16 08 Accounting Response Costs Desk Calendars 1992-1999
13 01 17 1/94-12/00
13 01 18 (file empty)
13 01 18 Park County # 220038
13 01 18 USEPA # 800286
13 01 19 References
13 01 19 01 References
13 01 19 02 References
13 01 19 03 References
13 01 19 04 References
13 01 19 04 References 9/92 ATSDR
13 01 19 04 References 09/01/93
13 01 19 04 References 01/03/97 ATSDR
13 01 19 04 References ATSDR Public Info Sheet 2/2000 ATSDR
13 01 19 04 References 1997 Petitioned Public Health Assessment 07/01/08 KJ
13 01 19 04 References KJ Letter to ATSDR re: Request Receipt 08/04/08 KJ
1008/ 45A604
Site-Wide Information
1167/ 38D106
Site-Wide Information
Contracts (See Contracts/ Agreements Master File)
Site-Wide Information
Cooperative Agreements (See Cooperative Agreements Master File)
Site-Wide Information
Cooperative Agreements
Site-Wide Information
Cooperative Agreements
Site-Wide Information
Site-Wide Information
General Correspondence (file empty)
Site-Wide Information
Waste Treatment (file empty)
Site-Wide Information SITE Program (file empty)
Site-Wide Information
ATSDR Health Assessment/Pancreatic Cancer Study
1167/ 38D106
Site-Wide Information
ATSDR Health Assessment/Pancreatic Cancer Study
Final Report Investigation of a Cluster of Pancreatic Cancer Deaths in Livingston and Park County, Montana
1167/ 38D106
Site-Wide Information
ATSDR Health Assessment/Pancreatic Cancer Study
Pancreatic Cancer Mortality in Montana a Records Based Case-Control Study (ATSDR/MDHES)
1167/ 38D106
Site-Wide Information
ATSDR Health Assessment/Pancreatic Cancer Study
ATSDR Petitioned Public Health Assessment for public comment
1167/ 38D106
Site-Wide Information
ATSDR Health Assessment/Pancreatic Cancer Study
1167/ 38D106
Site-Wide Information
ATSDR Health Assessment/Pancreatic Cancer Study
1167/ 38D106
Site-Wide Information
ATSDR Health Assessment/Pancreatic Cancer Study
BN LIVINGSTON 8/26/13
Page 318 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 19 04 References DEQ email to ATSDR re: Vapor intrusion split & GW data 08/29/08 DEQ
13 01 19 04 References ATSDR email to DEQ re: K/J letter status 08/29/08 ATSDR
13 01 19 04 References DEQ internal email re: ATSDR contact 12/11/08 DEQ internal
13 01 19 04 References Phone Log – DEQ & Dan Strausbaugh re: BNSF petition 3/10/09
13 01 19 04 References KJ
13 01 19 04 References 9/3/09 EPA/ Strausbaugh
13 01 19 04 References 12/21/10 KJ/ Norris
13 01 19 04 References
13 01 19 04 References Y 10/11/12
13 01 19 04 References Y ** DEQ comments on Draft ATDSR 10/29/12
13 01 19 05 References 4/91-5-91
13 01 19 05 References Correspondence 5/90-9/91
13 01 19 05 01 References RASC Calendar 06/13/05
13 01 19 05 02 References Minutes to RASC Meetings 02/20/91
13 01 19 05 03 References 05/01/91
13 01 19 05 04 References 2/91-3/91
13 01 19 05 05 References Risk Assessment Proposals 4/91
13 01 19 06 06 References Baseline Risk Assessment 2/91 CDM
1167/ 38D106
Site-Wide Information
ATSDR Health Assessment/Pancreatic Cancer Study
1167/ 38D106
Site-Wide Information
ATSDR Health Assessment/Pancreatic Cancer Study
1167/ 38D106
Site-Wide Information
ATSDR Health Assessment/Pancreatic Cancer Study
1167/ 38D106
Site-Wide Information
ATSDR Health Assessment/Pancreatic Cancer Study
1167/ 38D106
Site-Wide Information
ATSDR Health Assessment/Pancreatic Cancer Study
Data package submitted to ATDSR for review was generated by BNSF contractor – K/J independent of DEQ instruction
received 5/20/09
1167/ 38D106
Site-Wide Information
ATSDR Health Assessment/Pancreatic Cancer Study
EPA/Strausbaugh email to DEQ/Reynolds re: ATSDR decision letter
1167/ 38D106
Site-Wide Information
ATSDR Health Assessment/Pancreatic Cancer Study
K/J/Norris letter to Dr. Michelle Watters re: 1997 Petitioned Public Health Assessment
1167/ 38D106
Site-Wide Information
ATSDR Health Assessment/Pancreatic Cancer Study
EPA, K/J, & Dr Watters emails Forward to DEQ re: ATDSR review of indoor air quality data related to the BN Shop Complex
10/24/09 - 1/3/10
Site-Wide Information
ATSDR Health Assessment/Pancreatic Cancer Study ** EPA/Strausbaugh & DEQ/Reynolds emails re: Draft ATSDR
Site-Wide Information
ATSDR Health Assessment/Pancreatic Cancer Study
1007 / 45A601
Site-Wide Information
Risk Assessment Steering Committee
1007 / 45A601
Site-Wide Information
1007 / 45A601
Site-Wide Information
1007 / 45A601
Site-Wide Information
1007 / 45A601
Site-Wide Information
Request for Qualifications & Contractor Selection
1007 / 45A601
Site-Wide Information
Qualification Statements from Contractors
1007 / 45A601
Site-Wide Information
1007 / 45A601
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 319 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 19 06 References
13 01 19 06 01 References 1/92-9/92
13 01 19 06 01 References 2/14/92 CDM
13 01 19 06 02 References PRGs and COCs 3/92-8/92
13 01 19 06 02 References Preliminary Exposure Pathways Analysis and Assumptions 05/29/92 CDM
13 01 19 06 03 References 6/91-6/94
13 01 19 06 03 References 9/14/92 CDM
13 01 19 06 04 References Contract Negotiations 1988-1991
13 01 19 06 06 References Risk Assessments
13 01 19 06 References Risk Assessments 10/12/92 CDM
13 01 19 06 06 References Risk Assessments 12/14/92 CDM
13 01 19 06 06 References Risk Assessments 08/24/94 CDM
13 01 19 06 06 References Risk Assessments 05/01/93 CDM
13 01 19 06 06 References Risk Assessments DEQ letter to BNSF re: GW Modeling for soil cleanup levels 09/07/93 DEQ
13 01 19 06 06 References Risk Assessments 3/22/94 DEQ
13 01 19 06 06 References Risk Assessments 5/16/94 CDM
13 01 19 06 06 References Risk Assessments 08/01/94 DEQ
13 01 19 06 06 01 References
13 01 19 06 06 01 References 05/06/08 KJ
13 01 19 06 06 01 References 2/6/09 DEQ
13 01 19 06 06 01 References 03/10/09 DEQ/ Reynolds
13 01 19 06 06 01 References 09/16/09 DEQ
Site-Wide Information
EPA Technical Review (no file)
1007/ 45A601
Site-Wide Information
Site Overview Data Evaluation
1007/ 45A601
Site-Wide Information
Overview of Remedial Investigations and Field Activities at Burlington Northern Livingston Rail Yard
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
Preliminary Draft, Comments
1007/ 45A601
Site-Wide Information
Burlington Northern Livingston Rail Yard Preliminary Draft Risk Assessment Chapter 1.0 through 5.0
1007/ 45A601
Site-Wide Information
Site-Wide Information
1167/ 38D106
Site-Wide Information
Draft Report Risk Assessment Livingston Rail Yard Volume I Text, Volume II Appendices
1167/ 38D106
Site-Wide Information
Draft Report Risk Assessment Livingston Rail Yard Volume I Text, Volume II Appendices
1167/ 38D106
Site-Wide Information CDM letter to DEQ re: Risk analysis for TPH in subsurface soil
1167/ 38D106
Site-Wide Information
Final Report Baseline Risk Assessment Livingston Rail yard Volume I Text, Volume II Appendices
1167/ 38D106
Site-Wide Information
1167/ 38D106
Site-Wide Information DEQ letter to CDM re: Model parameters for soil cleanup levels
1167/ 38D106
Site-Wide Information
CDM letter to DEQ re: Comments on subsurface soil cleanup levels
1167/ 38D106
Site-Wide Information
DEQ letter to Envirocon re: Cleanup levels for chlorinated solvents in soil & groundwater
Site-Wide Information
Risk Assessment Addendums
Site-Wide Information
Risk Assessment Addendums
KJ letter to DEQ re: BNSF proposed commercial/industrial indoor air screening levels
Site-Wide Information
Risk Assessment Addendums
DEQ letter to KJ re: DEQ response to proposed commercial/ industrial screening levels
Site-Wide Information
Risk Assessment Addendums
DEQ/Reynolds letter to BN/Smith re: Site-Specific cleanup levels for indoor air
Site-Wide Information
Risk Assessment Addendums
Final Draft Task I Risk Assessment Amendment & MDEQ Approved Remedy for Newly Identified Contaminants of Concern in Indoor Air
BN LIVINGSTON 8/26/13
Page 320 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 19 06 06 01 References 10/23/09 PCEC/ Billau
13 01 19 06 06 01 References 10/23/09 J Black
13 01 19 06 06 01 References 10/23/09 N Durfey
13 01 19 06 06 01 References 10/23/09 Bill Moser
13 01 19 06 06 01 References 10/23/09 KJ
13 01 19 06 06 01 References Resident/Bob Farrell to DEQ/Reynolds re: Concerned citizen 10/25/09 Bob Farrell
13 01 19 06 06 01 References 2/1/10 DEQ legal internal
13 01 19 06 06 01 References 2/4/10
13 01 19 06 06 01 References 2/10/10 Bozeman Chronical
13 01 19 06 06 01 References Draft Final Task I Risk Assessment Amendment #2 10/20/10
13 01 19 06 06 01 References 10/25/10 Bozeman Chronical
13 01 19 06 06 01 References 10/25/10
13 01 19 06 06 01 References 10/25/10 DEQ/ Reynolds
13 01 19 06 06 01 References 10/25/10 DEQ/ Reynolds
13 01 19 06 06 01 References 11/05/10 D & K Krohne
13 01 19 06 06 01 References 11/22/10 RTI/ Johnson
13 01 19 06 06 01 References 11/23/10 KJ/Norris
Site-Wide Information
Risk Assessment Addendums
PCEC/Billau email to DEQ/Reynolds re: PCEC comments on Final Draft Task I Risk Assessment Amendment
Site-Wide Information
Risk Assessment Addendums
Resident/J Blank email to DEQ/Reynolds re: Resident comments on Public Meeting
Site-Wide Information
Risk Assessment Addendums
Resident/N Durfey email to DEQ/Reynolds re: Resident comments
Site-Wide Information
Risk Assessment Addendums
Bill Moser email to DEQ/Reynolds re: Comments on public meeting
Site-Wide Information
Risk Assessment Addendums
BN comments on the Final Draft Task I Risk Assessment Amendment
Site-Wide Information
Risk Assessment Addendums
Site-Wide Information
Risk Assessment Addendums
DEQ Legal/Haque-Hausrath internal email re: DEQ has finalized its Draft Task I Risk Assessment Amendment & MDEQ Approved Remedy for Newly Identified Contaminants of Concern in Indoor Air
Site-Wide Information
Risk Assessment Addendums
Livingston Enterprise Affidavit of Publication re: Final Task I Risk Assessment Amendment & MDEQ Approved Remedy for Newly Identified Contaminants of Concern in Indoor Air
Livingston Enterprise
Site-Wide Information
Risk Assessment Addendums
Bozeman Chronicle Affidavit of Publication re: Final Task I Risk Assessment Amendment & MDEQ Approved Remedy for Newly Identified Contaminants of Concern in Indoor Air
Site-Wide Information
Risk Assessment Addendums
Site-Wide Information
Risk Assessment Addendums
Bozeman Chronicle Affidavit of Publication re: Public Notice - Final Task I Risk Assessment Amendment # 2 out for public comment
Site-Wide Information
Risk Assessment Addendums
Livingston Enterprise Affidavit of Publication re: Public Notice - Final Task I Risk Assessment Amendment # 2 out for public comment
Livingston Enterprise
Site-Wide Information
Risk Assessment Addendums
DEQ/Reynolds email to BN/Smith & K/J/Norris & Aldersley re: Attachment – Proposed revised indoor air cleanup levels
Site-Wide Information
Risk Assessment Addendums
DEQ/Reynolds letter to BN/Smith re: BNSF Request to Recalculate Proposed Site-Specific Cleanup Levels for Indoor Air Included in the June 24, 2010 Task I – 2010 Soil Gas/Indoor Air Data Summary Report
Site-Wide Information
Risk Assessment Addendums
Residents Dwight & Kitty Krohne “comments” on Draft Final Task I Risk Assessment Addendum # 2
Site-Wide Information
Risk Assessment Addendums
RTI/Johnson email to DEQ/Reynolds re: Attachment – RTI Task I Risk Assessment Amendment 2 comments
Site-Wide Information
Risk Assessment Addendums
K/J/Norris email to DEQ/Reynolds re: Faxed K/J comments to Task I Risk Assessment Amendment # 2
BN LIVINGSTON 8/26/13
Page 321 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 19 06 06 01 References 11/23/10 KJ/Norris
13 01 19 06 06 01 References 11/23/10 DEQ/ Reynolds
13 01 19 06 06 01 References 11/23/10 KJ/Norris
13 01 19 06 06 01 References Interim Final Task I Risk Assessment Amendment No. 2 03/11/11 DEQ
13 01 19 06 06 01 References 08/29/12 KJ/Norris
13 01 19 06 06 01 References 08/29/12 KJ/Norris
13 01 19 06 06 01 References 08/31/12 DEQ/ Reynolds
13 01 19 07 References Hazardous Waste
13 01 19 08 References 3/1987
13 01 19 09 References 8/87-10/99
13 01 19 09 References Utah DOH
13 01 19 10 References TPH Cleanup Levels
13 01 19 10 References TPH Cleanup Levels Winter 1989 GW monitoring article 06/20/05
13 01 19 10 References TPH Cleanup Levels Draft - ReTec Model for Cleanup Levels
13 01 19 10 References TPH Cleanup Levels Article on State Cleanup Levels 12/01/91
13 01 19 10 References TPH Cleanup Levels Lust Program Guidelines May, 1992
13 01 19 10 References TPH Cleanup Levels Remediation Article- Cleanup Standards
13 01 19 10 References TPH Cleanup Levels Washington Dept of Ecology memo re: Soils Matrix 10/30/92
13 01 19 10 References TPH Cleanup Levels NGWA Meeting Proceedings
13 01 19 10 References TPH Cleanup Levels Washington State Dept of Ecology memo re: Soil Standards 4/23/93
13 01 19 10 References TPH Cleanup Levels DHES letter to BN re: TPH & Free Product recovery 8/27/93 DHES
13 01 19 10 References TPH Cleanup Levels CDM letter to DEQ re: TPH paper 1/31/94 CDM
Site-Wide Information
Risk Assessment Addendums
K/J/Norris email to DEQ/Reynolds re: K/J comments to Task I Risk Assessment Amendment # 2
Site-Wide Information
Risk Assessment Addendums
DEQ/Reynolds fax to K/J/Norris re: Task I Risk Assessment Amendment # 2 comments
Site-Wide Information
Risk Assessment Addendums
K/J/Norris letter to DEQ/Reynolds re: K/J response to DEQ comments on Task I – 2010 Soil Gas/Indoor Air Data Summary Report & Draft Final Task I Risk Assessment Amendment # 2
Site-Wide Information
Risk Assessment Addendums
Site-Wide Information
Risk Assessment Addendums
KJ/Norris email to DEQ/Reynolds re: Attachment - BN/KJ comments on the Final Draft Task I Risk Assessment Amendment No. 2
Site-Wide Information
Risk Assessment Addendums
KJ/Norris letter to DEQ/Reynolds re: KJ comments on the Final Draft Task I Risk Assessment Amendment No. 2
Site-Wide Information
Risk Assessment Addendums
DEQ/Reynolds letter to BN/Smith re: Attachment - Final Task I Risk Assessment Amendment No. 2
Site-Wide Information
1007/ 45A601
Site-Wide Information
Contaminant Health Advisory Sheets
1007/ 45A601
Site-Wide Information
Community Health Concerns
1007/ 45A601
Site-Wide Information
Community Health Concerns (8/87-10/99)
Utah DOH letter to resident re: Health effects of various contaminants during pregnancy
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
Summer 1992
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
11/ 4 - 11/6/92
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 322 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 19 10 References TPH Cleanup Levels CDM letter to DEQ re: TPH paper 02/01/94 CDM
13 01 19 10 References TPH Cleanup Levels Y ** DEQ internal memo re: TPH 3/16/98 DEQ internal
13 01 19 10 References TPH Cleanup Levels Phone Log - Brown/Energy Labs 2/8/94
13 01 19 10 References TPH Cleanup Levels 2/10/94
13 01 19 10 References TPH Cleanup Levels Phone Log - CDM 2/14/94
13 01 19 10 References TPH Cleanup Levels DEQ memo re: TPH 2/16/94 DEQ
13 01 19 10 References TPH Cleanup Levels DHES letter to BN re: Use of ReTec Model at Livingston 02/23/94 DHES
13 01 19 10 References TPH Cleanup Levels DEQ fax to Nolan re: Treatability tests 02/28/94 DEQ
13 01 19 10 References TPH Cleanup Levels CDM letter to DEQ re: Work Plan 04/15/94 CDM
13 01 19 10 References TPH Cleanup Levels Envirocon letter to DEQ re: 4/4/94 conference call 04/27/94 Envirocon
13 01 19 10 References TPH Cleanup Levels MycoTech fax to DEQ re: SOP for measuring bacteria in soil 4/28/94 MycoTech
13 01 19 10 References TPH Cleanup Levels DHES letter to Envirocon re: TPH articles 05/03/94 DHES
13 01 19 10 References TPH Cleanup Levels Washington State Dept of Ecology Site Register 05/24/94
13 01 19 10 References TPH Cleanup Levels CDM fax to DEQ re: Final RI Data - Risk Assessment 6/23/94 CDM
13 01 19 10 References TPH Cleanup Levels Description of Beaverell Series Soils
13 01 19 10 References TPH Cleanup Levels Phone Log - CDM 08/16/94
13 01 19 10 References TPH Cleanup Levels Phone Log - Oregon DEQ 8/26/94
13 01 19 10 References TPH Cleanup Levels 10/28/94 DEQ internal
13 01 19 10 References TPH Cleanup Levels GeoTrans TPH Cleanup Levels Report, Mission Wye 11/28/94 GeoTrans
13 01 19 10 References TPH Cleanup Levels Oregon DEQ fax re: Cleanup Levels 3/31/95 Oregon DEQ
13 01 19 10 References TPH Cleanup Levels State Summary GW TPH Cleanup Levels 11/01/95
13 01 19 10 References TPH Cleanup Levels Energy Labs memo to DEQ re: DRO Analysis 12/16/97 Energy Labs
13 01 19 10 References TPH Cleanup Levels Envirocon letter to DEQ re: TPH data, TPH V. EPH Analysis 8/28/01 Envirocon
1007/ 45A601
Site-Wide Information
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
Washington State Dept of Ecology fax to DEQ re: UST regulations
Washington State Dept of Ecology
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
Washington State Dept of Ecology
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
DEQ internal memo re: TPH Cleanup Level for Mission Wye facility
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 323 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 19 11 References Bio-remediation References 11/94-1/95
13 01 19 11 References Bio-remediation References ES&T letter to DEQ re: Biotrans Model 11/02/94 ES&T
13 01 19 11 References Bio-remediation References Bioremediation in the Field Search System Report 1/25/95
13 01 19 12 References 10/04-11/04
13 01 19 12 References Print out from Cadastral Database - Rail Yard 10/27/04
13 01 19 12 References 11/18/04
13 01 19 12 References LRY Deeds
13 01 19 13 References 4/93-9/05
13 01 19 13 References Soil Vapor Extraction Information 4/93
13 01 19 13 References 9/19/05
13 01 20
13 01 20 01
13 01 21 SEAs – slides 12/01/97
13 01 22
13 01 22 01 5/90-4/01
13 01 22 01 Y ** DEQ & R Collins emails re: NRD Assessment 12/04/07
13 01 22 01 Y ** DEQ internal email re: Court Order Injunction 04/30/08
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
1007/ 45A601
Site-Wide Information
References - Property Ownership
1007/ 45A601
Site-Wide Information
References - Property Ownership
1007/ 45A601
Site-Wide Information
References - Property Ownership
Property Ownership research for rail yard - includes map & various deeds
1007/ 45A601
Site-Wide Information
References - Property Ownership
1007/ 45A601
Site-Wide Information
References - Railyard Operations & Track Safety
1007/ 45A601
Site-Wide Information
References - Railyard Operations & Track Safety
1007/ 45A601
Site-Wide Information
References - Railyard Operations & Track Safety
BN/MRL meeting re: Track safety - attendance list, meeting notes & handouts
1007/ 45A601
Site-Wide Information
Interagency Coordination (empty)
1007/ 45A601
Site-Wide Information
Interagency Coordination
Geographic Information System (GIS) (empty)
1009/ 45A602
Site-Wide Information
Site-Wide Information
Natural Resource Damage Claims
1009/ 45A602
Site-Wide Information
Natural Resource Damage Claims
Correspondence – non confidential
1009/ 45A602
Site-Wide Information
Natural Resource Damage Claims
1009/ 45A602
Site-Wide Information
Natural Resource Damage Claims
BN LIVINGSTON 8/26/13
Page 324 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 23
13 01 24
13 01 25 UST
13 01 25 01 UST Other BN Tank Sites 12/90-9/94
13 01 25 02 UST Y 1/87-7/95
13 01 25 02 UST Draft Generic Tank Removal Work Plan
13 01 25 02 UST DHES letter to City of Livingston Fire Chief re: Tanks 1/23/87 DHES
13 01 25 02 UST Olympus letter to DHES re: Tank Removal Work Plan 7/26/87 Olympus
13 01 25 02 UST 8/1/88 DHES
13 01 25 02 UST Olympus letter to DHES re: Work Proposal - UST removal 8/2/88 Olympus
13 01 25 02 UST Work Plan - UST Removal 09/01/88
13 01 25 02 UST 10/27/88
13 01 25 02 UST 11/9/88
13 01 25 02 UST Tank removal meeting minutes 1/12/89
13 01 25 02 UST 04/13/89 Chen-Northern
13 01 25 02 UST 04/28/89 ReTec
13 01 25 02 UST 9/89
13 01 25 02 UST Phone Log - Mills/Envirocon 06/05/95 Envirocon/ Mills
13 01 25 02 UST Phone Log - Dupont 07/14/95
Site-Wide Information
Local Governments (empty)
Site-Wide Information
(intentionally left blank)
Site-Wide Information
1009/ 45A602
Site-Wide Information
1009/ 45A602
Site-Wide Information
** BN Livingston Correspondence (Some documents are not itemized)
1009/ 45A602
Site-Wide Information
BN Livingston Correspondence
1009/ 45A602
Site-Wide Information
BN Livingston Correspondence
1009/ 45A602
Site-Wide Information
BN Livingston Correspondence
1009/ 45A602
Site-Wide Information
BN Livingston Correspondence
DHES office memo re: BN Livingston tank removal walk through
1009/ 45A602
Site-Wide Information
BN Livingston Correspondence
1009/ 45A602
Site-Wide Information
BN Livingston Correspondence
1009/ 45A602
Site-Wide Information
BN Livingston Correspondence
Work Plan for the Removal of Storage Tanks, Piping and Contaminated Soils (Remediation Technologies/Olympus Environmental
1009/ 45A602
Site-Wide Information
BN Livingston Correspondence
Amendment to the QA/QC Plan as Part of the Work Plan for the Removal of Storage Tanks Piping and Contaminated Soils (Remediation Technologies, Olympus Environmental
1009/ 45A602
Site-Wide Information
BN Livingston Correspondence
1009/ 45A602
Site-Wide Information
BN Livingston Correspondence
Interim Report Storage Tank, Piping, and Contaminated Soil Removal
1009/ 45A602
Site-Wide Information
BN Livingston Correspondence
Summary Report for the Removal of Storage Tanks, Piping and Contaminated Soils/Gravels Text and 4 Appendices (ReTec
1009/ 45A602
Site-Wide Information
BN Livingston Correspondence
Summary Report Management of Containerized Materials Tank Removal Program (Remediation Technologies, Olympus Environmental
1009/ 45A602
Site-Wide Information
BN Livingston Correspondence
1009/ 45A602
Site-Wide Information
BN Livingston Correspondence
BN LIVINGSTON 8/26/13
Page 325 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 26
13 01 26 01 Drinking Water
13 01 26 01 01 Sampling Results
13 01 26 01 01 1988 Water System and Well Analysis for Livingston, MT 11/01/88 Morrison Maierle
13 01 26 01 01 10/16/89 Envirocon
13 01 26 01 01 3/26/90 Morrison Maierle
13 01 26 02
13 01 26 02 January, 1988 Onsite and Offsite Groundwater Investigations 03/01/88 ReTec
13 01 26 02 05/01/88 ReTec
13 01 26 02 10/01/88 ReTec
13 01 26 02 3/89 ReTec
13 01 26 02 Standard Operating Procedures for Ground Water Sampling 08/01/90 Envirocon
13 01 26 02 9/90 GW Monitoring Report 01/01/91
13 01 26 02 10/90 GW Monitoring Report 1/91
13 01 26 02 11/90 GW Monitoring Report 02/01/91
Site-Wide Information
Sampling/ Contaminant Sources
1168/ 39F806
Site-Wide Information
Sampling/ Contaminant Sources
1168/ 38F806
Site-Wide Information
Sampling/ Contaminant Sources
1168/ 39F807
Site-Wide Information
Sampling/ Contaminant Sources
1168/ 38F807
Site-Wide Information
Sampling/ Contaminant Sources
Livingston Municipal Drinking Water Sampling Results September 1989
1168/ 39F808
Site-Wide Information
Sampling/ Contaminant Sources
Clinic Well & Billman Creek Well Design Report (Morrison-Maierle
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1011/ 45A603
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1011/ 45A603
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
Addendum to January, 1988 Onsite and Offsite Groundwater Investigations
1011/ 45A603
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
Summary of Groundwater Investigations and Conceptual Design of Fuel Recovery System Volume I Text Volume II Appendices
1011/ 45A603
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
Report of Groundwater Investigations Livingston, Montana Fueling Facility June 1988-January 1989
1011/ 45A603
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1011/ 45A603
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1011/ 45A603
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1011/ 45A603
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
BN LIVINGSTON 8/26/13
Page 326 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 26 02 2/91GW Monitoring Report 7/91
13 01 26 02 8/91 GW Sampling Results 10/01/91
13 01 26 02 Oct, Nov, & Dec 1991 GW Sampling Results 02/01/92
13 01 26 02 8/97
13 01 26 02 1998 Annual GW Sampling Report 9/98
13 01 26 02 DEQ letter to Rustad re: Sampling Results 12/01/98 DEQ
13 01 26 02 DEQ email to Erickson re: 2000 GW Report 01/19/01 DEQ
13 01 26 02 Y ** DEQ Internal Email re: Report Circulation 05/01/01 DEQ internal
13 01 26 02 Envirocon fax to DEQ re: 2001 PCE results 06/25/01 Envirocon
13 01 26 02 Site visit report re: 11/29/01 site visit 01/09/02
13 01 26 02 Envirocon letter to DEQ re: Product thickness data 2/5/02 Envirocon
13 01 26 02 2001 Annual GW Sampling Report 03/04/02 Envirocon
13 01 26 02 Envirocon letter to DEQ re: 2001 Annual GW Sampling report 3/4/02 Envirocon
13 01 26 02 DEQ internal email re: Opportunistic GW sampling 06/10/03 DEQ internal
13 01 26 02 BN letter to DEQ re: GW sampling 06/20/03 BN
1011/ 45A603
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1011/ 45A603
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1011/ 45A603
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1011/ 45A603
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence 1997 Annual GW Sampling Report
1011/ 45A603
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1011/ 45A603
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
BN LIVINGSTON 8/26/13
Page 327 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 26 02 DEQ letter to Petit re: GW data 8/12/03 DEQ
13 01 26 02 DEQ fax to Petit re: 2003 GW results 8/13/03 DEQ
13 01 26 02 10/31/03 KJ
13 01 26 02 03/10/04 Envirocon
13 01 26 02 DEQ Letter to BNSF re: Groundwater Sampling 04/15/04 DEQ
13 01 26 02 DEQ Letter to K/J re: Groundwater Sampling DEQ
13 01 26 02 DEQ Letter to Livingston City re: Depot Center 05/03/04 DEQ
13 01 26 02 Phone Log: Kraja, K/J 5/3/04
13 01 26 02 Emails - K/J & DEQ re: Groundwater Sampling 05/03/04
13 01 26 02 DEQ Letter to BNSF re: Depot Center 05/04/04 DEQ
13 01 26 02 Email - Kennedy/Jenks to DEQ re: Groundwater Sampling 5/4/04 KJ
13 01 26 02 Phone Log: Smith/BNSF 5/5/04
13 01 26 02 Kennedy/Jenks FAX to DEQ re: May Schedule 05/05/04 KJ
13 01 26 02 Schedule for June 2004 Fieldwork 5/17/04
13 01 26 02 DEQ Transmittal to MSU re: 2003 Annual GW Report 05/19/04 DEQ
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
K/J letter/fax to DEQ re: Changes in Analytical Laboratories & Methods
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
Envirocon report to DEQ re: Former East End Conoco, contains VPH data for L-87-7
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
BN LIVINGSTON 8/26/13
Page 328 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 26 02 DEQ Transmittal to State Library re: 2003 Annual GW Report 5/19/04 DEQ
13 01 26 02 DEQ Transmittal to PECE re: 2003 Annual GW Report 5/19/04 DEQ
13 01 26 02 DEQ Transmittal to RTI re: 2003 Annual GW Report 5/19/04 DEQ
13 01 26 02 DEQ Transmittal to U of M re: 2003 Annual GW Report 05/19/04 DEQ
13 01 26 02 5/19/04 DEQ
13 01 26 02 DEQ Transmittal to L-P Library re: 2003 Annual GW Report 5/19/04 DEQ
13 01 26 02 DEQ Letter to BN re: Private Wells 05/21/04 DEQ
13 01 26 02 GW split-sample VOC Lab report 6/04
13 01 26 02 DEQ comment letter to BNSF re: 2003 GW Report 06/11/04 DEQ
13 01 26 02 Phone Log: Davies & Kraja, K/J 06/15/04
13 01 26 02 Phone Log: Kraja, K/J 06/17/04
13 01 26 02 June 2004 GW Sampling Field Notes 05/30/04
13 01 26 02 June 2004 DEQ Split GW Samples COC. 05/31/04
13 01 26 02 une 2004 Split sample results - EPH Fractions 06/01/04
13 01 26 02 DEQ Internal Email re: Purge Water (1) 06/30/04 DEQ internal
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
DEQ Transmittal to City of Livingston re: 2003 Annual GW Report
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
BN LIVINGSTON 8/26/13
Page 329 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 26 02 DEQ Internal Email re: Purge Water (2) 6/30/04 DEQ internal
13 01 26 02 DEQ Internal Email re: Purge Water (3) 06/30/04 DEQ internal
13 01 26 02 Phone Log: Mrs. Rustad 6/30/04
13 01 26 02 Kennedy/Jenks Field Schedule 07/04/11 KJ
13 01 26 02 Phone Log: Kraja, K/J 7/1/04
13 01 26 02 Phone Log: Smith/BNSF 7/12/04
13 01 26 02 K/J email attachment - Preliminary Lab Data, Part 1 7/16/04 KJ
13 01 26 02 K/J email attachment - Preliminary Lab Data, Part 2 7/16/04 KJ
13 01 26 02 Phone Log: Kraja, K/J 7/19/04
13 01 26 02 Email - K/J to DEQ re: Preliminary Analytical Data 7/19/04 KJ
13 01 26 02 7/23/04 DEQ
13 01 26 02 DEQ email to K/J re: Data 7/29/04 DEQ
13 01 26 02 K/J email to DEQ attachment - Preliminary lab data 07/30/04 KJ
13 01 26 02 K/J email to DEQ re: Lab data 07/30/04 KJ
13 01 26 02 K/J email to DEQ re: Chromatograms 07/30/04 KJ
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
DEQ transmittal to BNSF, RTI, K/Js re: Split sample VOC Lab report
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
BN LIVINGSTON 8/26/13
Page 330 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 26 02 K/J email to DEQ re: Well 89-8 07/30/04 KJ
13 01 26 02 DEQ letter to BNSF re: Access to private property 8/4/04 DEQ
13 01 26 02 Phone Log: Kraja, K/J 8/9/04
13 01 26 02 Phone Log: Blicker/RTI 8/10/04
13 01 26 02 08/11/04 DEQ
13 01 26 02 Phone Log: J Norris/KJ 8/26/04
13 01 26 02 08/27/04 KJ
13 01 26 02 Phone Log: J Norris/K/J 8/30/04
13 01 26 02 DEQ email to K/J re: Due date for 2003 GW report 08/30/04 DEQ
13 01 26 02 Y ** DEQ internal email re: Purge water treatment 09/20/04 DEQ internal
13 01 26 02 Revised Annual GW Sampling Report 2003 10/01/04 KJ
13 01 26 02 DEQ letter to BN re: IDW Disposal 10/1/04 DEQ
13 01 26 02 K/J email to DEQ re: Revised 2003 Report 10/21/04 KJ
13 01 26 02 10/22/04 KJ
13 01 26 02 10/28/04 DEQ
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
DEQ transmittal to BNSF, K/J, RTI re: Split sample petroleum data
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
K/J email to DEQ re: Landowner info for monitoring wells (w/attachments)
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1011/ 45A603
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
K/J transmittal to DEQ re: Extra copies of revised 2003 GW report
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
DEQ transmittal to Livingston Library re: Revised 2003 GW report
BN LIVINGSTON 8/26/13
Page 331 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 26 02 DEQ transmittal to RTI re: Revised 2003 GW report 10/28/04 DEQ
13 01 26 02 10/28/04 DEQ
13 01 26 02 DEQ transmittal to PCEC re: Revised 2003 GW report 10/28/04 DEQ
13 01 26 02 10/28/04 DEQ
13 01 26 02 DEQ transmittal to MSU re: Revised 2003 GW report 10/28/04 DEQ
13 01 26 02 K/J letter to DEQ re: Changes to Labs & methods 10/31/04 KJ
13 01 26 02 DEQ split samples groundwater- COC 11/04 DEQ
13 01 26 02 KJ email to DEQ re: 94-2 well 11/09/04 KJ
13 01 26 02 GW Sampling Logs for DEQ Split Samples 11/04/11
13 01 26 02 DEQ sample receipt 94-2 11/17/04 DEQ
13 01 26 02 KJ letter to DEQ re: Low flow sampling plan 02/01/05 KJ
13 01 26 02 DEQ letter to Randy Taylor re: Nov 04 GW data 02/04/05 DEQ
13 01 26 02 DEQ letter to BN /KJ re: 11/04 GW split samples 02/04/05 DEQ
13 01 26 02 DEQ transmittal to Watsons re: 94-2 Nov 04 GW data 02/14/05 DEQ
13 01 26 02 DEQ transmittal to Rustad re: 94-1 Nov 04 GW data 2/14/05 DEQ
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
DEQ transmittal to Park Co. Sanitarian re: Revised 2003 GW report
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
DEQ transmittal to City of Livingston re: Revised 2003 GW report
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
BN LIVINGSTON 8/26/13
Page 332 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 26 02 DEQ transmittal to RTI re: Nov 04 GW data 02/14/05 DEQ
13 01 26 02 DEQ transmittal to Talgo - LRC re: Nov 04 GW data 2/14/05 DEQ
13 01 26 02 DEQ transmittal to MRL re: Nov 04 GW data 02/14/05 DEQ
13 01 26 02 DEQ letter to BN re: Approval of IDR Water Treatment Plan 2/14/05 DEQ
13 01 26 02 2/14/05 DEQ
13 01 26 02 DEQ fax to BN/KJ re: WP approval & contained in decision 2/14/05 DEQ
13 01 26 02 DEQ email to BN/K/J re: Natural Attenuation Sampling 3/3/05 DEQ
13 01 26 02 03/25/05 DEQ internal
13 01 26 02 3/29/05 KJ
13 01 26 02 K/J email to DEQ re: Well Map & Index 04/26/05 KJ
13 01 26 02 DEQ letter to BNSF re: Low flow sampling 05/20/05 DEQ
13 01 26 02 K/J letter/fax to DEQ re: June 2005 Sampling event 06/01/05 KJ
13 01 26 02 K/J letter/fax to DEQ re: June 2005 Sampling event 6/8/05 KJ
13 01 26 02 DEQ email to K/J re: June 2005 Sampling Event 06/10/05 DEQ
13 01 26 02 K/J transmittal letter to DEQ re: Access letters to landowners 6/13/05 KJ
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
DEQ letter to BN re: Contained in decision, Nov 2004 purgewater
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence DEQ internal email re: Chromium waste from Hach colorimeter
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
K/J letter to DEQ re: Well ID, replacement pages for 2003 annual report
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
BN LIVINGSTON 8/26/13
Page 333 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 26 02 DEQ fax to K/J re: Jones Oil MWS, lab data 06/15/05 DEQ
13 01 26 02 K/J email to DEQ re: Annual report 06/29/05 KJ
13 01 26 02 DEQ transmittal to BN re: June 2005 split sample data 7/3/05 DEQ
13 01 26 02 DEQ transmittal to Livingston Library 7/5/05 DEQ
13 01 26 02 DEQ transmittal to MSU Library 07/05/05 DEQ
13 01 26 02 DEQ internal email re: Modeling pumping well capture zone 7/6/05 DEQ internal
13 01 26 02 DEQ & K/J emails re: June 2005 duplicate samples 08/03/05
13 01 26 02 10/28/05 KJ
13 01 26 02 DEQ email to K/J re: Permission to sample MW - 89-B 10/31/05 DEQ
13 01 26 02 DEQ internal email re: Change of ownership - well 94-1 12/16/05 DEQ internal
13 01 26 02 DEQ letter to D&K Krohne re: 9/21/07 sampling results 12/18/07 DEQ
13 01 26 02 DEQ letter to C Boehm re: 9/21/07 sampling results 12/31/07 DEQ
13 01 26 02 DEQ letter to T&G Watson re: 9/20/07 sampling results 01/03/08 DEQ
13 01 26 02 DEQ letter to K Mitchell re: 9/17/07-9/18/07 sampling results 01/03/08 DEQ
13 01 26 02 DEQ letter to D&K Krohne re: 9/19/07 sampling results 01/25/08 DEQ
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
K/J letter to DEQ re: GW monitoring 11/05 sampling notification
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
BN LIVINGSTON 8/26/13
Page 334 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 26 02 DEQ letter to T&G Watson re: 12/14/07 sampling results 01/25/08 DEQ
13 01 26 02 DEQ letter to C Boehm re: 12/19/07 sampling results 01/25/08 DEQ
13 01 26 02 1/30/08 DEQ
13 01 26 02 DEQ letter to E & RP Gytenbeek re: 12/19/07 sampling results 01/30/08 DEQ
13 01 26 02 D Lovell email to DEQ re: Van Gytenbeek well analysis 03/24/08 D Lovell
13 01 26 02 01
13 01 26 02 01 Groundwater Sampling Results July 1987 09/01/87 ReTec
13 01 26 02 01 Ground Water Sampling Results May 1989 7/20/89 Envirocon
13 01 26 02 01 Ground Water Sampling Results June 1989 08/07/89 Envirocon
13 01 26 02 01 Ground Water Sampling Results July 1989 9/15/89 Envirocon
13 01 26 02 01 Ground Water Sampling Results August 1989 10/23/89 Envirocon
13 01 26 02 01 Ground Water Sampling Results September 1989 11/15/89 Envirocon
13 01 26 02 01 October 1989 Monthly Ground Water Sampling Results 12/29/89 Envirocon
13 01 26 02 01 November 1989 Monthly Ground Water Sampling Results 2/13/90 Envirocon
13 01 26 02 01 December 1989 Monthly Ground Water Sampling Results 03/15/90 Envirocon
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
DEQ letter to K Mitchell re: 12/18/07 & 12/20/07 sampling results
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1010/ 45A605
Site-Wide Information
Sampling/ Contaminant Sources
Groundwater correspondence
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources
GW Sampling Results (contains 1 floppy disk)
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
BN LIVINGSTON 8/26/13
Page 335 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 26 02 01 January 1990 Monthly Ground Water Sampling Results 03/20/90 Envirocon
13 01 26 02 01 February 1990 Monthly Ground Water Sampling Results 6/28/90 Envirocon
13 01 26 02 01 March 1990 Monthly Ground Water Sampling Results 8/3/90 Envirocon
13 01 26 02 01 April 1990 Monthly Ground Water Sampling Results 09/18/90 Envirocon
13 01 26 02 01 May 1990 Monthly Ground Water Sampling Results 8/21/90 Envirocon
13 01 26 02 01 June 1990 Monthly Ground Water Sampling Results 10/02/90 Envirocon
13 01 26 02 01 July 1990 Monthly Ground Water Sampling Results 10/02/90 Envirocon
13 01 26 02 01 12/27/90 Envirocon
13 01 26 02 01 1/7/91 Envirocon
13 01 26 02 01 1/14/91 Envirocon
13 01 26 02 01 02/11/91 Envirocon
13 01 26 02 01 December 1990 Ground Water Sampling Results 02/13/91 Envirocon
13 01 26 02 01 02/26/91 Envirocon
13 01 26 02 01 07/10/91 Envirocon
13 01 26 02 01 April 1991 Ground Water Sampling Results 07/19/91 Envirocon
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
August 1990 Monthly Ground Water Sampling Results (no report)
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
September 1990 Quarterly Ground Water Sampling Results (no report)
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
October 1990 Quarterly Ground Water Sampling Results (no report)
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
November 1990 Quarterly Ground Water Sampling Results (no report)
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results January 1991 Ground Water Sampling Results
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
February 1991 Semiannual Ground Water Sampling Results (no report)
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
BN LIVINGSTON 8/26/13
Page 336 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 26 02 01 10/91 Envirocon
13 01 26 02 01 10/25/91 Envirocon
13 01 26 02 01 September 1991 Ground Water Sampling Results 11/20/91 Envirocon
13 01 26 02 01 02/20/92 Envirocon
13 01 26 02 01 05/20/92 Envirocon
13 01 26 02 01 Second Quarter 1992 Ground Water Sampling Results 8/7/92 Envirocon
13 01 26 02 01 Third Quarter 1992 Ground Water Sampling Results 11/11/92 Envirocon
13 01 26 02 01 Fourth Quarter 1992 Ground Water Sampling Results 2/18/93 Envirocon
13 01 26 02 01 First Quarter 1993 Ground Water Sampling Results 04/18/93 Envirocon
13 01 26 02 01 May 1993 Annual Ground Water Sampling Results 10/20/93 Envirocon
13 01 26 02 01 2/14/94 Envirocon
13 01 26 02 01 1994 Annual Ground Water Sampling Report 11/03/94 Envirocon
13 01 26 02 01 First Quarter 1994 Ground Water Sample Results 04/11/94 Envirocon
13 01 26 02 01 1995 Annual GW Sampling Report 01/01/96 Envirocon
13 01 26 02 01 Geotrans regression curves analysis for VOCs in GW 5/6/96 Geotrans
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results June 1991 Ground Water Sampling Results
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
August 1991 Annual Ground Water Sampling Results (no report)
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
October, November, and December 1991 Ground Water Sampling Results (no report)
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results First Quarter 1992 Ground Water Sampling Results
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1012/ 45A701
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
August and November 1993 Quarterly Ground Water Sampling Results
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
BN LIVINGSTON 8/26/13
Page 337 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 26 02 01 1996 Annual GW Sampling Report 09/01/96 Envirocon
13 01 26 02 01 1999 Annual GW Sampling Report 12/99 Envirocon
13 01 26 02 01 2000 Annual Groundwater Sampling Report 4/01 Envirocon
13 01 26 02 01 2001 Annual Groundwater Sampling Report 03/04/02 Envirocon
13 01 26 02 01 2002 Annual Groundwater Sampling Report 03/19/02 Envirocon
13 01 26 02 01 KJ letter to DEQ re: Tabulated June 2003 monitoring results 08/08/03 KJ
13 01 26 02 01 05/04/11 KJ
13 01 26 02 01 DEQ's GW data validation 6/04 DEQ
13 01 26 02 01 DEQ split sample lab data validation 11/01/04 DEQ
13 01 26 02 01 DEQ GW split sample lab data 11/01/04 DEQ
13 01 26 02 01 Nov 2004 GW sampling data
13 01 26 02 01 12/10/04 DEQ
13 01 26 02 01 DEQ email to BN re: Work Plan 01/12/05 DEQ
13 01 26 02 01 Phone Log - BN/Smith to DEQ 1/12/05 BN
13 01 26 02 01 GW sampling results - lab data for 11/04 1/12/05
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results 2003 Annual Groundwater Sampling Report
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1/28/05 received
2/2/05
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
DEQ letter to RTI re: Split sample VOC data; water treatment correspondence
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
BN LIVINGSTON 8/26/13
Page 338 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 26 02 01 KJ email to DEQ re: Lab data 01/17/05 KJ
13 01 26 02 01 KJ email to DEQ re: 11/040 Blind duplicate samples 01/19/05 KJ
13 01 26 02 01 DEQ data validation for K/J 11/04 GW data 1/23/05 DEQ
13 01 26 02 01 Phone Log - BN/Smith to DEQ 1/31/05 BN
13 01 26 02 01 K/J & DEQ emails re: 2004 Annual GW Report 04/18/05
13 01 26 02 01 Annual GW Sampling Report 2004 6/05 KJ
13 01 26 02 01 DEQ Split sample results 89-4 & 89-8 07/07/05 DEQ
13 01 26 02 01 DEQ COC for split GW samples 07/07/05 DEQ
13 01 26 02 01 GW Sample results 07/21/05
13 01 26 02 01 DEQ split sample data for June 2005 GW sampling 7/27/05 DEQ
13 01 26 02 01 K/J email to DEQ re: Water elevations 07/28/05 KJ
13 01 26 02 01 K/J email to DEQ re: June 2005 GW data 7/28/05 KJ
13 01 26 02 01 K/J email to DEQ re: Duplicates 8/3/05 KJ
13 01 26 02 01 K/J email to DEQ re: Duplicate GW samples, June 2005 08/04/05 KJ
13 01 26 02 01 DEQ Data validation - June 2005 GW data part 1 08/05/05 DEQ
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
BN LIVINGSTON 8/26/13
Page 339 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 26 02 01 DEQ Data validation - June 2005 GW data part 2 8/5/05 DEQ
13 01 26 02 01 10/29/05 DEQ
13 01 26 02 01 12/09/05 DEQ
13 01 26 02 01 01/05/06 KJ
13 01 26 02 01 2005 Annual Monitoring & Maintenance Plan 3/06 KJ
13 01 26 02 01 2006 Annual Monitoring & Maintenance Report 3/07 KJ
13 01 26 02 01 2007 Annual Monitoring & Maintenance Report 3/08 KJ
13 01 26 02 01 CD 2008 Annual Monitoring & Maintenance Report 03/09/09 KJ
13 01 26 02 01 2009 Annual Monitoring & Maintenance Report 03/10/10 KJ
13 01 26 02 01 CD 2010 Annual Monitoring & Maintenance Report Vol I-II 3/11 KJ
13 01 26 02 01 08/25/11 DEQ/ Rrynolds
13 01 26 02 01 03/30/12 KJ
13 01 26 02 01 CD 03/30/12 KJ
13 01 26 02 01 CD RM 11 2012 Annual Monitoring & Maintenance Report Vol I-II 03/30/13 KJ
13 01 26 02 01 CD Mar. 2014 KJ
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
DEQ letter to T Rustad re: Letter returned & new owner information
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results DEQ letter to T Rustad re: 2nd contact attempt
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
K/J letter to DEQ re: Domestic well sampling results, 408 N K Street
1172/ 60E705
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1172/ 60E705
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1172/ 60E705
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1172/ 60E705
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1172/ 60E705
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
1171/ 60E704
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
DEQ/Reynolds letter to BN/Smith re: DEQ comments/clarifications on the 2010 Annual Monitoring & Maintenance Report
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
KJ cover letter for Draft 2011 Annual Moniroting & Maintenance Report
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
Draft 2011 Annual Moniroting & Maintenance Report Vol I-II
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
Site-Wide Information
Sampling/ Contaminant Sources GW Sampling Results
2013 Annual Monitoring and Maintenance Report Volumes 1, 2, and 3
BN LIVINGSTON 8/26/13
Page 340 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 26 02 02 MDHES Sampling Results 5/88-5/01
13 01 26 02 03 Well Logs 1986-1987
13 01 26 02 03 Well Logs Well completion logs
13 01 26 02 03 Well Logs
13 01 26 02 04 10/04-11/05
13 01 26 02 04 DEQ letter to BN re: IDW sampling treatment & disposal 10/08/04 DEQ
13 01 26 02 04 Phone Log: Norris/K/J 10/15/04
13 01 26 02 04 K/J fax to DEQ re: IDW Treatment Work Plan 10/15/04 KJ
13 01 26 02 04 K/J letter to DEQ re: Purge water treatment 10/15/04 KJ
13 01 26 02 04 K/J fax to DEQ re: Purge water treatment 10/15/04 KJ
13 01 26 02 04 K/J email to DEQ re: Water Treatment Work Plan 10/22/04 KJ
13 01 26 02 04 DEQ letter to BN re: Purge Water Treatment Work Plan 10//28/04 DEQ
13 01 26 02 04 DEQ fax to BN re: Purge Water Treatment Work Plan 10//28/04 DEQ
13 01 26 02 04 K/J Revised Purge Water Treatment Work Plan 11/15/04 KJ
13 01 26 02 04 K/J response to comments- Purge Water Treatment Work Plan 11/15/04 KJ
1008/ 45A604
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Logs for HRR, RW, LPZ Senes & MW-1-10 & private wells
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
BN LIVINGSTON 8/26/13
Page 341 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 26 02 04 K/J fax to DEQ re: Purge Water Treatment Work Plan 11/15/04 KJ
13 01 26 02 04 DEQ email to K/J re: Revised Treatment Work Plan 11/16/04 DEQ
13 01 26 02 04 11/23/04 Park Co. Sanitarian
13 01 26 02 04 12/10/04 DEQ
13 01 26 02 04 02/01/05 KJ
13 01 26 02 04 KJ letter to DEQ re: Revised IDR Water Treatment Work Plan 02/01/05 KJ
13 01 26 02 04 KJ letter to DEQ re: Treated purge water from November 2004 02/01/05 KJ
13 01 26 02 04 Phone Log - Norris/KJ 2/11/05
13 01 26 02 04 K/J letter to DEQ re: March 2005 Purge Water 4/5/05 KJ
13 01 26 02 04 DEQ letter/fax to BN re: March 2005 Purge Water 05/19/05 DEQ
13 01 26 02 04 K/J letter to DEQ re: March 2005 Purge water disposal 07/05/05 KJ
13 01 26 02 04 DEQ email to K/J & BN re: Treated Purge water sampling 07/07/05 DEQ
13 01 26 02 04 DEQ email to BN re: March 2005 Purge water table 1 7/25/05 DEQ
13 01 26 02 04 07/26/05 KJ
13 01 26 02 04 K/J letter to DEQ re: June 2005 purge water 08/05/05 KJ
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
Phone Log - R Taylor, Park Co. Sanitarian to DEQ & return call re: Treated purge water - potential discharge to sanitary sewer
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
DEQ letter to RTI re: Split sample VOC data; water treatment correspondence
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
KJ letter to DEQ re: Response to comments, IDR Water Treatment Work Plan
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
K/J transmittal to DEQ re: Revised table 1, March 2005 Purge water
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
BN LIVINGSTON 8/26/13
Page 342 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 26 02 04 DEQ letter to BNSF re: March 2005 Purge water 08/23/05 DEQ
13 01 26 02 04 DEQ letter to BN re: June 2005 purge water 10/28/05 DEQ
13 01 26 02 04 11/22/05 KJ
13 01 26 02 05 Photographs/Slides 4/00-11/01
13 01 26 03 Soils
13 01 26 04 UST
13 01 26 05 Sludge
13 01 26 05 Waste Characterization Sampling Plan 07/01/87
13 01 26 05 Waste Characterization Results 11/01/87
13 01 26 06
13 01 26 06 10/18/07 KJ
13 01 26 07 Y
13 01 26 07 ** Private Wells Envirocon Private Well Work Plan 7/7/1989 Envirocon
13 01 26 07 ** Private Wells Sample results - Ruggles well 09/26/00
13 01 26 07 ** Private Wells City of Livingston fax to DEQ re: Gregory well request 01/10/01 City of Livingston
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Purge Water Treatment Work Plan
K/J letter to DEQ re: Disposal of IDR water from March/June GW monitoring event
Site-Wide Information
Sampling/ Contaminant Sources
Site-Wide Information
Sampling/ Contaminant Sources
1169/ 41J603
Site-Wide Information
Sampling/ Contaminant Sources
1169/ 41J603
Site-Wide Information
Sampling/ Contaminant Sources
1169/ 41J603
Site-Wide Information
Sampling/ Contaminant Sources
Remediation Technologies
1169/ 41J603
Site-Wide Information
Sampling/ Contaminant Sources
Remediation Technologies
1170/ 44F603
Site-Wide Information
Sampling/ Contaminant Sources
WWTP Wastes/LRC Sludge (Documents dated before 10/18/07 are not itemized)
1170/ 44F603
Site-Wide Information
Sampling/ Contaminant Sources WWTP Wastes/LRC Sludge
Former WWTP Sump Excavation – Soil Sampling Analytical Results & Request for Contained-in Decision
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
** Private Wells (non-confidential 2/88-10/05)
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
BN LIVINGSTON 8/26/13
Page 343 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 26 07 ** Private Wells 1/26/01 Envirocon
13 01 26 07 ** Private Wells Y ** Phone Log - Lee, re: Health 06/29/01
13 01 26 07 ** Private Wells Phone Log: McCaffery 7/10/01
13 01 26 07 ** Private Wells DEQ Field notes - Iron Horse Trailer Park 7/1/01 DEQ
13 01 26 07 ** Private Wells DEQ letter to Haverson re: Iron Horse Trailer Park 7/25/01 DEQ
13 01 26 07 ** Private Wells October 2001 Envirocon Well Inventory Map Envirocon
13 01 26 07 ** Private Wells June 2002 Envirocon Well Inventory Map Envirocon
13 01 26 07 ** Private Wells BN letter to Heniksen re: Well sampling results 08/22/03 BN
13 01 26 07 ** Private Wells DEQ letter to BN re: Private Wells 5/21/04 DEQ
13 01 26 07 ** Private Wells Phone Log: Smith/BNSF 5/24/04
13 01 26 07 ** Private Wells Kennedy Jenks email + attachment to DEQ 06/04/04 KJ
13 01 26 07 ** Private Wells Phone Log: John Norris/Kennedy Jenks
13 01 26 07 ** Private Wells 06/07/04 DEQ
13 01 26 07 ** Private Wells Kennedy/Jenks attachment to email re: Private wells 06/10/04 KJ
13 01 26 07 ** Private Wells Kennedy Jenks email to DEQ re: Private wells 06/10/04 KJ
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
Envirocon submittal to DEQ re: Private wells near C&P Packing
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
DEQ transmittal to RTI re: Private well information from Kennedy/Jenks
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
BN LIVINGSTON 8/26/13
Page 344 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 26 07 ** Private Wells DEQ email to Kennedy/Jenks re: Private wells 06/10/04 DEQ
13 01 26 07 ** Private Wells Phone Log: Norris-Kennedy/Jenks 06/10/04
13 01 26 07 ** Private Wells Kennedy/Jenks fax to DEQ re: Ruggles possible domestic well 06/10/04 KJ
13 01 26 07 ** Private Wells Phone Log: Ruggles 06/14/04
13 01 26 07 ** Private Wells Phone Log: Ruggles 06/15/04
13 01 26 07 ** Private Wells June 2004 GW Sampling Field Notes 06/01/04
13 01 26 07 ** Private Wells Phone Log: Norris/K/J 09/21/04
13 01 26 07 ** Private Wells DEQ letter to Rustad re: 2004 data 94-1 09/22/04 DEQ
13 01 26 07 ** Private Wells DEQ letter to Hendrikesen/Rainbow re: 2004 data, supply well 09/22/04 DEQ
13 01 26 07 ** Private Wells DEQ letter to Steffen re: 2004 data 92-2 09/22/04 DEQ
13 01 26 07 ** Private Wells K/J email attachment re: LNAPL data, June 2004 09/23/04 KJ
13 01 26 07 ** Private Wells Phone Log: Smith/BN 10/01/04
13 01 26 07 ** Private Wells Phone Log: John Norris/Kennedy Jenks 06/04/04
13 01 26 07 ** Private Wells DEQ letter to Jockers re: MW-19 sampling results 10/28/05 DEQ
13 01 26 07 ** Private Wells DEQ letter to T Watson re: Sampling results for well 94-2 10/28/05 DEQ
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
BN LIVINGSTON 8/26/13
Page 345 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 26 07 ** Private Wells DEQ letter to T Elich re: Indoor air sampling 10/28/05 DEQ
13 01 26 07 ** Private Wells 10/28/05 DEQ
13 01 26 07 ** Private Wells DEQ letter to B Rustad re: Sampling results for well 94-1 10/29/05 DEQ
13 01 26 07 ** Private Wells DEQ letter to B Rustad re: Rustad contact 12/08/05 DEQ
13 01 26 07 ** Private Wells DEQ internal emails re: Phone log - Watson 01/20/06 DEQ internal
13 01 26 07 01 Krohne Well
13 01 26 07 01 Krohne Well Phone Log: Krohne 6/11-6/18/04
13 01 26 07 02
13 01 26 07 02 Private Wells Survey Ground Water Sampling Results From Private Water Wells 08/01/89 Envirocon
13 01 26 07 02 Private Wells Survey DEQ letter to Residents re: Well Sampling/Post card 02/12/91 DEQ
13 01 26 07 02 Private Wells Survey DEQ/ Cunningham
13 01 26 07 02 Private Wells Survey DEQ letter to Haverson re: Iron Horse Trailer Park 07/25/01 DEQ
13 01 26 07 02 Private Wells Survey Phone Log: Carter re: Iron Horse Trailer Park 07/31/01
13 01 26 08 Sampling Log Books
13 01 26 08 Sampling Log Books Y ** Site Work Activity Field Book – John Wadhams 12/89-11/95 J Wadhams
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
DEQ letter to BNSF re: Purge water from June 2005 GW sampling
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1170/ 44F603
Site-Wide Information
Sampling/ Contaminant Sources
1170/ 44F603
Site-Wide Information
Sampling/ Contaminant Sources
1170/ 44F603
Site-Wide Information
Sampling/ Contaminant Sources
Private Wells Survey (Documents dated before 8/89 are not itemized)
1170/ 44F603
Site-Wide Information
Sampling/ Contaminant Sources
1170/ 44F603
Site-Wide Information
Sampling/ Contaminant Sources
1170/ 44F603
Site-Wide Information
Sampling/ Contaminant Sources
Phone Log - M Cunningham to Mary Quisenberry re: Wells in Iron Horse Trailer Park
1170/ 44F603
Site-Wide Information
Sampling/ Contaminant Sources
1170/ 44F603
Site-Wide Information
Sampling/ Contaminant Sources
1170/ 44F603
Site-Wide Information
Sampling/ Contaminant Sources
Site-Wide Information
Sampling/ Contaminant Sources
BN LIVINGSTON 8/26/13
Page 346 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 26 08 Sampling Log Books Y ** Site Work Activity Field Book – John Wadhams 1/96-4/00 J Wadhams
13 01 26 08 Sampling Log Books Sampling Log Record – John Wadhams 12/89-6/91 J Wadhams
13 01 26 08 Sampling Log Books 4/91-4/93 J Michaletz
13 01 26 08 Sampling Log Books DEQ Field Book – Mandy Cunningham 5/01-4/03 DEQ/ Cunningham
13 01 26 08 Sampling Log Books Y ** DEQ Field Book – Amy Sivers 4/04-3/05 DEQ/ Sivers
13 01 26 08 01 Site Visit Reports
13 01 26 08 01 Site Visit Reports Site Visit 04/23/04
13 01 26 08 01 Site Visit Reports Site Visit Photographs (disk) 04/23/04
13 01 26 08 02 HSPs
13 01 26 08 02 HSPs HSP Site Visit 04/23/04
13 01 26 08 02 HSPs GW sampling event DEQ HASP 11/01/04 DEQ
13 01 26 09 Oils 8/90-7/91
13 01 26 10
13 01 26 11 Park County Landfill 11/78-6/85
13 01 26 12 Asbestos 1/90-6/07
Site-Wide Information
Sampling/ Contaminant Sources
1170/ 44F603
Site-Wide Information
Sampling/ Contaminant Sources
1170/ 44F603
Site-Wide Information
Sampling/ Contaminant Sources
Sampling Log Record - Joe Michaletz: Mission Y BN-Livingston
1170/ 44F603
Site-Wide Information
Sampling/ Contaminant Sources
Site-Wide Information
Sampling/ Contaminant Sources
1170/ 44F603
Site-Wide Information
Sampling/ Contaminant Sources
1170/ 44F603
Site-Wide Information
Sampling/ Contaminant Sources
1170/ 44F603
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1013/ 45A704
Site-Wide Information
Sampling/ Contaminant Sources
1014/ 45A702
Site-Wide Information
Sampling/ Contaminant Sources
Site-Wide Information
Sampling/ Contaminant Sources Shop Wastes (file empty)
1014/ 45A702
Site-Wide Information
Sampling/ Contaminant Sources
1014/ 45A702
Site-Wide Information
Sampling/ Contaminant Sources
BN LIVINGSTON 8/26/13
Page 347 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 26 12 Asbestos Asbestos Complaint 06/20/07
13 01 26 13 Other/Unknown Results 8/85-2/92
13 01 26 14 Work Zone Air Monitoring
13 01 26 14 Work Zone Air Monitoring Air Monitoring Program Report 02/23/90 Envirocon
13 01 26 14 Work Zone Air Monitoring Air Monitoring Program Report Envirocon
13 01 26 15 Basement Gas 9/89-8/01
13 01 26 16 Yellowstone River 8/89-11/04
13 01 26 16 Yellowstone River Phone Log: Wadhams, DEQ 11/03/04
13 01 26 17 MDHES Lab Charges 4/91-11/97 MDHES
13 01 26 18 Soil Vapor Extraction 7/91-3/95
13 01 26 19 4/91-1/93
13 01 26 20 2/95-2/96
13 01 26 20 Confirmation Soil Sampling 02/01/95 Envirocon
13 01 27 Related Sites
13 01 27 01 Related Sites Park County Landfill 11/78-8/99
13 01 27 02 Related Sites Other Refueling Sites 9/86-7/00
1014/ 45A702
Site-Wide Information
Sampling/ Contaminant Sources
1014/ 45A702
Site-Wide Information
Sampling/ Contaminant Sources
1014/ 45A702
Site-Wide Information
Sampling/ Contaminant Sources
1014/ 45A702
Site-Wide Information
Sampling/ Contaminant Sources
1014/ 45A702
Site-Wide Information
Sampling/ Contaminant Sources
1014/ 45A702
Site-Wide Information
Sampling/ Contaminant Sources
1014/ 45A702
Site-Wide Information
Sampling/ Contaminant Sources
1014/ 45A702
Site-Wide Information
Sampling/ Contaminant Sources
1014/ 45A702
Site-Wide Information
Sampling/ Contaminant Sources
1014/ 45A702
Site-Wide Information
Sampling/ Contaminant Sources
1014/ 45A702
Site-Wide Information
Sampling/ Contaminant Sources
Split Soil Sample Results from Joe Michaletz Office
1014/ 45A702
Site-Wide Information
Sampling/ Contaminant Sources Confirmation Soil Sampling
1014/ 45A702
Site-Wide Information
Sampling/ Contaminant Sources Confirmation Soil Sampling
Site-Wide Information
1014/ 45A702
Site-Wide Information
1015/ 45B403
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 348 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 27 03 Related Sites Other-Terry’s Chevron 11/87-5/98
13 01 27 03 Related Sites Other-Terry’s Chevron Waste Characterization Results 11/01/87 ReTec
13 01 27 03 Related Sites Other-Terry’s Chevron 01/01/88 Hydrometrics
13 01 27 03 Related Sites Other-Terry’s Chevron 06/01/89 Hydrometrics
13 01 27 04 Related Sites MRL
13 01 27 04 Related Sites MRL DEQ Letter to K/J re: MRL 01/30/07 DEQ
13 01 27 04 Related Sites MRL Occupational Hygiene Survey MRL Report 12/08/06 KJ
13 01 27 05 Related Sites LRC
13 01 27 05 Related Sites LRC 01/23/89 LRC
13 01 27 05 Related Sites LRC DEQ internal email re: Oil spill at LRC 05/22/02 DEQ internal
13 01 27 06 Related Sites Former East End Conoco
13 01 27 06 Related Sites Former East End Conoco DEQ internal Email re: PRS 02/28/02 DEQ internal
13 01 27 06 Related Sites Former East End Conoco Envirocon
13 01 27 06 Related Sites Former East End Conoco 09/18/06 DEQ
13 01 27 06 Related Sites Former East End Conoco 03/02/07 DEQ
13 01 27 06 Related Sites Former East End Conoco 11/26/07 DEQ
13 01 27 06 Related Sites Former East End Conoco East End Conoco Reports 1995-2007
13 01 27 06 Related Sites Former East End Conoco Emails re: Followup analysis 02/21/08
13 01 27 06 Related Sites Former East End Conoco Lab results Livingston M2@JonesOil & L-87-7 04/25/08
13 01 27 06 Related Sites Former East End Conoco 03/28/11 DEQ/Cala
13 01 27 07 Related Sites
1015/ 45B403
Site-Wide Information
1015/ 45B403
Site-Wide Information
1015/ 45B403
Site-Wide Information
Final Investigation and Remediation of a Fuel Release From Tracy's Chevron Service Station Livingston, MT Summary Report
1015/ 45B403
Site-Wide Information
Investigation and Remediation of a Fuel Release From Tracy's Chevron Service Station Livingston, MT Executive Summary Report
Site-Wide Information
Site-Wide Information
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
Livingston Rebuild Center, Incorporated Industrial Waste Management
1173/ 61P606
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Envirocon letter to DEQ PRS re: Groundwater Sampling Report – 6th Annual Event
Site-Wide Information
DEQ Letter to R Shelley re: Request for Work Plan for Pilot Test of Fabric Belt Free-Phase Product Recovery System
Site-Wide Information
DEQ Letter to R Shelley re: Approval of Work Plan Updated 2/2/07 for Pilot Test of Fabric Belt Free-Phase Product Recovery System
Site-Wide Information
DEQ Letter to J Flipowicz re: 2/26/07 Lube Oil Spill at the Mt Rail Link Rail Yard
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ/Cala letter to MRL/Shelley re: No Further Corrective Action Required for petroleum release at the Former East End Conoco, 813 East Park
1173/ 61P606
Site-Wide Information
Livingston City Shop Complex
BN LIVINGSTON 8/26/13
Page 349 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 27 07 Related Sites DEQ internal emails re: City Shop Complex 02/01/02 DEQ internal
13 01 27 07 Related Sites 05/01/03
13 01 27 08 Related Sites 111 Miles Lane South
13 01 27 08 Related Sites 111 Miles Lane South Public Health Statement-TPH
13 01 27 08 Related Sites 111Miles Lane South ATSDR Tox FAQs for PCE ATSDR
13 01 27 08 Related Sites 111Miles Lane South DEQ Health & Safety Plan for Site Inspection DEQ
13 01 27 08 Related Sites 111Miles Lane South Y ** Phone Log - Kim Smith to DEQ 08/12/02
13 01 27 08 Related Sites 111Miles Lane South DEQ Site inspection report 08/19/02 DEQ
13 01 27 08 Related Sites 111Miles Lane South Site Inspection photographs 08/19/02
13 01 27 08 Related Sites 111Miles Lane South DEQ fax to BNSF re: Site inspection report 08/29/02 DEQ
13 01 27 08 Related Sites 111Miles Lane South DEQ fax to Park County Sanitarian re: Site inspection report 08/29/02 DEQ
13 01 27 09 Related Sites 101 South I Street
13 01 28
13 01 28 Status Reports February 1990 - December 1990 Monthly Status Reports 3/7/90-1/4/91 Envirocon
13 01 28 Status Reports January 1991 – December 1991 Monthly Status Reports 2/12/91-1/1/92 Envirocon
13 01 28 Status Reports 1/1/92-4/14/92 Envirocon
13 01 28 Status Reports 4/1/93-1/13/94 Envirocon
13 01 28 Status Reports 1994 Annual Status Report 04/01/94 Envirocon
13 01 28 Status Reports 1995 Annual Status Report 05/01/96 Envirocon
13 01 28 Status Reports 1996 Annual Status Report 04/01/97 Envirocon
13 01 28 Status Reports 1997 Annual Status Report 04/01/98 Envirocon
13 01 29
13 01 29 01 Technical Meetings 1/92-9/05
1173/ 61P606
Site-Wide Information
Livingston City Shop Complex
1173/ 61P606
Site-Wide Information
Livingston City Shop Complex
HAZMAT Report for Yellowstone Bridge Replacement Vol. I-II
Hyalite Environmental
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
Site-Wide Information
1015/ 45B403
Site-Wide Information
Status Reports (1/88-5/98)
1015/ 45B403
Site-Wide Information
1015/ 45B403
Site-Wide Information
1015/ 45B403
Site-Wide Information
First thru Fourth Quarter 1992 Status Report (January - December)
1015/ 45B403
Site-Wide Information
First thru Fourth Quarter 1993 Status Report (January - December)
1015/ 45B403
Site-Wide Information
1015/ 45B403
Site-Wide Information
1015/ 45B403
Site-Wide Information
1015/ 45B403
Site-Wide Information
Site-Wide Information
Meetings/ Technical
1015/ 45B403
Site-Wide Information
Meetings/ Technical
BN LIVINGSTON 8/26/13
Page 350 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 29 01 Technical Meetings BNSF, DEQ, MRL meeting handouts 09/02/05
13 01 29 02 3/89-2/92
13 01 29 03 LIFE Meetings 10/01/90
13 01 30
13 01 30 01 Documents 7/89-3/03
13 01 31
13 01 31 05/09/89 Envirocon
13 01 31 01
13 01 32
13 01 32 01 05/01/04
13 01 32 01 Judson Park Irrigation Well Letter to Livingston City re: Depot Center 05/03/04
13 01 32 01 Judson Park Irrigation Well DEQ letter to BNSF re: Depot Center 05/04/04 DEQ
13 01 32 02 Proposed Heat Exchange 4/04-6/05
13 01 32 02 Proposed Heat Exchange Phone Log: Blicker/RTI 04/16/04
13 01 32 02 Proposed Heat Exchange City info re: Depot well request 04/16/04
13 01 32 02 Proposed Heat Exchange Phone Log: Golnar-City of Livingston 04/19/04
13 01 32 02 Proposed Heat Exchange Golnar email re: Meeting 04/20/04
13 01 32 02 Proposed Heat Exchange Emails re: System Design (2) 04/21/04
13 01 32 02 Proposed Heat Exchange Emails re: System Design 04/21/04
13 01 32 02 Proposed Heat Exchange Phone Log: Brian Blicker/RTI 04/21/04
13 01 32 02 Proposed Heat Exchange Phone Log: Tim Coleman-ACE re: Well system design 04/22/04
13 01 32 02 Proposed Heat Exchange Site Visit Report 04/23/04
1015/ 45B403
Site-Wide Information
Meetings/ Technical
1015/ 45B403
Site-Wide Information
Meetings/ Technical Legal Meeting
1015/ 45B403
Site-Wide Information
Meetings/ Technical
Site-Wide Information
Information Repositories
1016/ 45B406
Site-Wide Information
Information Repositories
1173/ 61P606
Site-Wide Information
Guidance Documents
1173/ 61P606
Site-Wide Information
Guidance Documents
CERCLA/NCP Guidance Evaluation Livingston Rail Yard Remediation
1173/ 61P606
Site-Wide Information
Guidance Documents
Hazardous Waste Policy & Interpretations
Site-Wide Information
Livingston Depot Center
1016/ 45B406
Site-Wide Information
Livingston Depot Center
Judson Park Irrigation Well
1016/ 45B406
Site-Wide Information
Livingston Depot Center
1016/ 45B406
Site-Wide Information
Livingston Depot Center
1016/ 45B406
Site-Wide Information
Livingston Depot Center
1016/ 45B406
Site-Wide Information
Livingston Depot Center
1016/ 45B406
Site-Wide Information
Livingston Depot Center
1016/ 45B406
Site-Wide Information
Livingston Depot Center
1016/ 45B406
Site-Wide Information
Livingston Depot Center
1016/ 45B406
Site-Wide Information
Livingston Depot Center
1016/ 45B406
Site-Wide Information
Livingston Depot Center
1016/ 45B406
Site-Wide Information
Livingston Depot Center
1016/ 45B406
Site-Wide Information
Livingston Depot Center
1016/ 45B406
Site-Wide Information
Livingston Depot Center
BN LIVINGSTON 8/26/13
Page 351 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 32 02 Proposed Heat Exchange Email, Blicker/RTI to City & DEQ re: Permit requirements 04/26/04 RTI/Blicker
13 01 32 02 Proposed Heat Exchange DEQ letter to Livingston City re: Depot Center 05/03/04 DEQ
13 01 32 02 Proposed Heat Exchange DEQ letter to BNSF re: Depot Center 05/04/04 DEQ
13 01 32 02 Proposed Heat Exchange Phone Log: Don Olsen/O2 Architects 05/24/04
13 01 32 02 Proposed Heat Exchange O2 Architechs email to DEQ re: Trench Excavation depot 06/22/05 O2 Architechs
13 01 32 03 1/05-8/05
13 01 32 03 Phone Log - Olsen/O2 Architects 01/19/05
13 01 32 03 Phone Log - Golnar/City Manager 01/19/05
13 01 32 03 Phone Log - Ingram Clevenger 01/19/05
13 01 32 03 01/19/05 O2 Architechs
13 01 32 03 Phone Log - Smith/BN 01/20/05
13 01 32 03 O2 email to City re: Depot 01/20/05 O2 Architechs
13 01 32 03 DEQ email to Ingram Clevenger re: Depot 01/20/05 DEQ
13 01 32 03 O2 email to DEQ re: Bid specs 01/20/05 O2 Architechs
13 01 32 03 Phone Log - Blicker/RTI 01/21/05
13 01 32 03 DEQ letter to City re: Depot 01/28/05 DEQ
13 01 32 03 Phone Log - Gentri/MRL 01/31/05
13 01 32 03 Phone Log - Shelbey/MRL 01/31/05
13 01 32 03 O2 Architects email to DEQ re: Depot 02/01/05 O2 Architechs
13 01 32 03 O2 Architects email to DEQ re: Construction 06/22/05 O2 Architechs
13 01 32 03 Phone Log - DEQ to BN re: Livingston Depot Excavation 06/23/05 DEQ
13 01 32 03 DEQ email to O2A, City, Depot re: Soil sampling 07/08/05 DEQ
1016/ 45B406
Site-Wide Information
Livingston Depot Center
1016/ 45B406
Site-Wide Information
Livingston Depot Center
1016/ 45B406
Site-Wide Information
Livingston Depot Center
1016/ 45B406
Site-Wide Information
Livingston Depot Center
1016/ 45B406
Site-Wide Information
Livingston Depot Center
Site-Wide Information
Livingston Depot Center
Depot Center - 2005 Renovation Work
1016/ 45B406
Site-Wide Information
Livingston Depot Center
Depot Center - 2005 Renovation Work
1016/ 45B406
Site-Wide Information
Livingston Depot Center
Depot Center - 2005 Renovation Work
1016/ 45B406
Site-Wide Information
Livingston Depot Center
Depot Center - 2005 Renovation Work
1016/ 45B406
Site-Wide Information
Livingston Depot Center
Depot Center - 2005 Renovation Work O2 Architects email to DEQ re: Bid Specs w/bid specs attached
1016/ 45B406
Site-Wide Information
Livingston Depot Center
Depot Center - 2005 Renovation Work
1016/ 45B406
Site-Wide Information
Livingston Depot Center
Depot Center - 2005 Renovation Work
1016/ 45B406
Site-Wide Information
Livingston Depot Center
Depot Center - 2005 Renovation Work
1016/ 45B406
Site-Wide Information
Livingston Depot Center
Depot Center - 2005 Renovation Work
1016/ 45B406
Site-Wide Information
Livingston Depot Center
Depot Center - 2005 Renovation Work
1016/ 45B406
Site-Wide Information
Livingston Depot Center
Depot Center - 2005 Renovation Work
1016/ 45B406
Site-Wide Information
Livingston Depot Center
Depot Center - 2005 Renovation Work
1016/ 45B406
Site-Wide Information
Livingston Depot Center
Depot Center - 2005 Renovation Work
1016/ 45B406
Site-Wide Information
Livingston Depot Center
Depot Center - 2005 Renovation Work
1016/ 45B406
Site-Wide Information
Livingston Depot Center
Depot Center - 2005 Renovation Work
1016/ 45B406
Site-Wide Information
Livingston Depot Center
Depot Center - 2005 Renovation Work
1016/ 45B406
Site-Wide Information
Livingston Depot Center
Depot Center - 2005 Renovation Work
BN LIVINGSTON 8/26/13
Page 352 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 32 03 O2A email to DEQ re: Excavation 07/09/05 O2 Architechs
13 01 32 03 K/J transmittal to DEQ re: Depot soil data 08/04/05 KJ
13 01 32 03 DEQ email to O2A re: Depot excavation 08/04/05 DEQ
13 01 32 03 DEQ letter to City of Livingston re: Soil data 09/08/05 DEQ
13 01 32 03 O2A email to DEQ re: Soil data 08/10/05 O2 Architechs
13 01 32 03 O2A email to DEQ re: Trench 08/25/05 O2 Architechs
13 01 33 Private Litigation
13 01 33 01 Private Litigatio C&P Packing 2/00-8/09
13 01 33 01 Private Litigatio C&P Packing Scheduling Minute Entry Order 02/15/00
13 01 33 01 Private Litigatio C&P Packing CWB&M fax to DEQ re: Amended Complaint (8/2/00) 08/02/00 CWB&M
13 01 33 01 Private Litigatio C&P Packing CWB&M letter to Clerk of Court re: Wadhams deposition 08/11/00 CWB&M
13 01 33 01 Private Litigatio C&P Packing BN answer to complaint 08/15/00 BN
13 01 33 01 Private Litigatio C&P Packing 09/21/00 DEQ
13 01 33 01 Private Litigatio C&P Packing 09/28/00
13 01 33 01 Private Litigatio C&P Packing Attachment to Deposition of John Wadhams 10/02/00
13 01 33 01 Private Litigatio C&P Packing DEQ faxes to Attorney's re: Depositions 10/10/00 DEQ
13 01 33 01 Private Litigatio C&P Packing 10/12/00 DEQ
13 01 33 01 Private Litigatio C&P Packing 10/12/00
13 01 33 01 Private Litigatio C&P Packing Notice of Withdrawal of Motion 10/18/00
13 01 33 01 Private Litigatio C&P Packing Deposition of Bruce Sheppard 11/01/00 Bruce Shepard
13 01 33 01 Private Litigatio C&P Packing Deposition of Joe Michaletz 11/06/00 Joe Michaletz
13 01 33 01 Private Litigatio C&P Packing DEQ email to K/J re: Purge water storage at C&P Packing 11/10/00 DEQ
1016/ 45B406
Site-Wide Information
Livingston Depot Center
Depot Center - 2005 Renovation Work
1016/ 45B406
Site-Wide Information
Livingston Depot Center
Depot Center - 2005 Renovation Work
1016/ 45B406
Site-Wide Information
Livingston Depot Center
Depot Center - 2005 Renovation Work
1016/ 45B406
Site-Wide Information
Livingston Depot Center
Depot Center - 2005 Renovation Work
1016/ 45B406
Site-Wide Information
Livingston Depot Center
Depot Center - 2005 Renovation Work
1016/ 45B406
Site-Wide Information
Livingston Depot Center
Depot Center - 2005 Renovation Work
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
DEQ letter to Edwards, Tolstedt & Fickle re: Wadhams deposition
1016/ 45B406
Site-Wide Information
Edwards, Tolstedt & Fickle letter to Clerk of District Court re: Plaintiff's motion
Edwards, Tolstedt & Fickle
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
DEQ letter to Edwards, Tolstedt & Fickle re: Wadhams deposition
1016/ 45B406
Site-Wide Information
Edwards, Tolstedt & Fickle letter to DEQ re: Wadhams deposition
Edwards, Tolstedt & Fickle
1016/ 45B406
Site-Wide Information
Site-Wide Information
Site-Wide Information
1016/ 45B406
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 353 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 33 01 Private Litigatio C&P Packing 11/15/00
13 01 33 01 Private Litigatio C&P Packing 11/16/00
13 01 33 01 Private Litigatio C&P Packing DEQ internal email re: Discharge permits 12/11/00 DEQ internal
13 01 33 01 Private Litigatio C&P Packing DEQ internal email re: Well Ordinance 12/12/00 DEQ internal
13 01 33 01 Private Litigatio C&P Packing Y 01/24/01 DEQ internal
13 01 33 01 Private Litigatio C&P Packing Sump Sampling Report & Closure Plan 02/25/09 KJ
13 01 33 01 Private Litigatio C&P Packing 07/13/09 DEQ
13 01 33 01 Private Litigatio C&P Packing 07/22/09 KJ/Norris
13 01 33 01 Private Litigatio C&P Packing 07/29/09 DEQ/ Reynolds
13 01 33 01 Private Litigatio C&P Packing 08/18/09 KJ/Aldersley
13 01 33 02 Private Litigatio 6/00/2/05
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - McGarry 06/23/00
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ letter to Petit re: Plume Map 05/22/01 DEQ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - McGarry 06/04/01
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ internal email re: Attorney contact 06/05/01 DEQ internal
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - McGarry 06/24/01
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner McGarry letter to DEQ re: Caspner 08/30/00 McGarry
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ letter to McGarry re: Caspner 09/20/01 DEQ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ fax to Rite re: Cleanup Levels 12/14/01 DEQ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ internal email re: Well Logs for Paul Petit 08/08/03 DEQ internal
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ email to WET re: Well Installations 04/30/04 DEQ
1016/ 45B406
Site-Wide Information
Edwards, Tolstedt & Fickle letter to DEQ re: Wadhams deposition
Edwards, Tolstedt & Fickle
1016/ 45B406
Site-Wide Information
Edwards, Tolstedt & Fickle letter to DEQ re: Wadhams deposition
Edwards, Tolstedt & Fickle
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
Site-Wide Information
** DEQ internal memo re: C&P Settlement & Lagoon waste concerns
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
DEQ letter to BN/Smith re: DEQ comments on Sump Sampling Report & Closure Plan
1016/ 45B406
Site-Wide Information
K/J/Norris letter to DEQ/Reynolds re: Enclosure - Revised Table 1 to the Former C&P Packing Pit – Sump Sampling Report & Closure Plan dated 2/25/09
1016/ 45B406
Site-Wide Information
DEQ/Reynolds letter to BN/Smith re: DEQ approval of Closure Plan
1016/ 45B406
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds re: C&P Packing Sump Closure – Notification of field activities
1016/ 45B406
Site-Wide Information
Ruggles, Hallett & Caspner
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 354 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET email to DEQ re: Multi level monitoring systems 04/30/04 WET
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET letter to DEQ re: Proposed Work Plan 04/30/04 WET
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - D Erickson/WET 04/30/04
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Attorney letter to DEQ re: Work Plan 04/30/04
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Dave Erickson/WET 05/04/04
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Vincent/WET 05/04/04
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ permission letter to WET 05/06/04 DEQ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner CWB&M letter & fax to DEQ re: Field work schedule 05/07/04 CWB&M
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - WET 05/07/04
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET transmittal to DEQ re: May 26 2004 work plans 05/26/04 WET
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - RTI 06/07/04
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ transmittal to RTI re: WET work plans 06/07/04 DEQ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Vincent/WET 06/07/04
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Norris/KJ 06/10/04
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner KJ letter to DEQ re: MW construction, GW sampling 06/10/04 KJ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ transmittal to RTI re: BNSF Work Plan 06/15/04 DEQ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner 06/23/04 DEQ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ letter to WET re: Work Plan (Hallet Minerals vs. BNSF) 06/23/04 DEQ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ memo to file re: LNAPL sampling at 90-1C 06/30/04 DEQ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ letter to BN re: Work Plan (Ruggles & Hallet) 06/30/04 DEQ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ internal email re: Purge water (3) 06/30/04 DEQ internal
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ internal email re: Purge water (3) 06/30/04 DEQ internal
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
DEQ letter to WET re: Work Plan (Ruggles Excavation vs. BNSF)
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 355 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Smith/BN 07/19/04
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Erickson/WET 07/19/04
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Kraja/KJ 07/19/04
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner 07/21/04 WET
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET fax to DEQ re: Data 07/22/04 WET
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Smith/BN 07/22/04
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Erickson/WET 07/22/04
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET email to DEQ re: Plume animation 07/23/04 WET
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ transmittal to RTI re: WET expert report 07/27/04 DEQ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET email to DEQ re: Drilling 08/24/04 WET
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET map showing WET well locations 08/26/04 WET
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ email to WET re: Scheduled well installation 08/27/04 DEQ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ email to WET re: Well Info 08/30/04 DEQ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Norris/KJ 09/01/04
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Erickson/WET 09/02/04
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET email to DEQ re: Wells (1) 09/03/04 WET
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET email to DEQ re: Wells (2) 09/03/04 WET
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET email to DEQ re: Wells (3) 09/03/04 WET
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET email to DEQ re: Well completion on Talgo 09/03/04 WET
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Erickson/WET 09/03/04
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET fax to DEQ re: Well logs 09/03/04 WET
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET GW data laboratory reports received by mail 09/07/04 WET
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
WET Expert Report - Hallett Minerals v. BN & Ruggles Excavation v. BN
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 356 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET email to DEQ re: Investigation data 09/08/04 WET
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner K/J Letter to DEQ re: Disposal of Well Installation wastes 09/08/04 KJ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner CWB&M transmittal letter to DEQ re: WET expert Report 09/08/04 CWB&M
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ email to Erickson/WET re: Draft Modified CD & SOWs 09/09/04 DEQ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ email to WET re: Data 09/09/04 DEQ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ data validation 9/10/04 for BN installed well RUG -1 DEQ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Smith/BN re: IDW disposal 09/20/04
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ letter to BN re: IDW Disposal 10/01/04 DEQ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Erickson/WET 10/05/04
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Logs - Norris/K/J (10/5 - 10/8/04) 10/5-10/8/04
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Analytical data for well on Talgo from WET LLC 10/12/04 WET
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner 10/13/04 KJ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ email to WET re: Analytical data received 10/14/04 DEQ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ letter to BN re: Permission to relocate drummed water 10/20/04 DEQ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Erickson/WET
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ letter to BN re: Ruggles water contained-in decision 10/27/04 DEQ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ internal email re: WET data - well near Electric Shop 11/01/04 DEQ internal
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ email to WET re: Information needed 11/23/04 DEQ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET email to DEQ re: Talgo well 11/23/04 WET
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ email to BN re: Well data 12/14/04 DEQ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ email to BN re: More well data 12/14/04 DEQ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Lab data for WET-1 well 02/08/05 WET
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
K/J letter & fax to DEQ re: Requesting contained-in decision for purge water from Ruggles
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
10/21-10/27/04
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 357 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Erickson/WET 02/09/05
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET transmittal to DEQ re: Bedrock well info & lab data 02/11/05 WET
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ email to WET re: Sampling data 02/14/05 DEQ
13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner 02/16/05 WET
13 01 33 03 Private Litigatio City of Livingston, et al
13 01 33 03 Private Litigatio City of Livingston, et al Y 06/08/07 DEQ internal
13 01 33 03 Private Litigatio City of Livingston, et al Y ** DEQ internal emails re: Phone call w/City Attorney 07/18/07 DEQ internal
13 01 33 03 Private Litigatio City of Livingston, et al 08/29/07
13 01 33 03 Private Litigatio City of Livingston, et al BNSF letter to City Commission re: Lawsuit 09/13/07 BN
13 01 33 03 Private Litigatio City of Livingston, et al Phone Log – DEQ/C Boehm 09/23/07
13 01 33 03 Private Litigatio City of Livingston, et al City of Livingston et al. Complaint 09/27/07
13 01 33 03 Private Litigatio City of Livingston, et al Third Party Complaint for Declaratory Judgment 12/01/07
13 01 33 03 Private Litigatio City of Livingston, et al Summons 12/01/07
13 01 33 03 Private Litigatio City of Livingston, et al 12/18/07 WET
13 01 33 03 Private Litigatio City of Livingston, et al BNSF’s Motion to Join DEQ as Necessary Party 12/19/07 BN
13 01 33 03 Private Litigatio City of Livingston, et al BNSF Memo in Support of Joinder Motion 12/19/07 BN
13 01 33 03 Private Litigatio City of Livingston, et al Defendants’ Memo Supporting Motion for Injunction 12/20/07
13 01 33 03 Private Litigatio City of Livingston, et al Y 12/28/07 DEQ internal
13 01 33 03 Private Litigatio City of Livingston, et al Notice of Activity 01/03/08
13 01 33 03 Private Litigatio City of Livingston, et al Plaintiff’s Memo on Motion for Injunction 01/03/08
13 01 33 03 Private Litigatio City of Livingston, et al Y 01/08/08 DEQ internal
13 01 33 03 Private Litigatio City of Livingston, et al Y 01/10/08 DEQ internal
13 01 33 03 Private Litigatio City of Livingston, et al Y ** DEQ internal email re: Litigation meeting 01/14/08 DEQ internal
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
WET lab data for MW in railyard & electric shop (received -2/16/05)
Site-Wide Information
Site-Wide Information
** DEQ internal email re: Phone Log- DEQ & Mark Hartwig re: Class Action Lawsuit
Site-Wide Information
Site-Wide Information
Associated Attorneys letter to Property Owners re: Meeting on 9/5/07
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site Investigation Procedures (WET, 8/2000) (Received 12/18/07)
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
** DEQ internal email re: Draft Response to BN’s Motion for Injunction
Site-Wide Information
Site-Wide Information
Site-Wide Information
** DEQ internal email re: Draft Response to BN’s Motion for Joinder
Site-Wide Information
** DEQ internal email re: Draft Response to BN’s Motion for Joinder
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 358 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 33 03 Private Litigatio City of Livingston, et al Notice of Activity 01/17/08
13 01 33 03 Private Litigatio City of Livingston, et al Y 01/18/08 DEQ internal
13 01 33 03 Private Litigatio City of Livingston, et al Plaintiffs’ Brief Opposing DEQ Joinder 01/22/08
13 01 33 03 Private Litigatio City of Livingston, et al Notice of Electronic Filing 01/25/08
13 01 33 03 Private Litigatio City of Livingston, et al DEQ Brief Opposing Motion to Join 01/31/08 DEQ
13 01 33 03 Private Litigatio City of Livingston, et al Order Denying BNSF Joinder 02/13/08
13 01 33 03 Private Litigatio City of Livingston, et al Y 02/22/08 DEQ internal
13 01 33 03 Private Litigatio City of Livingston, et al Intervener’s Brief Opposing Motion for Injunction 02/22/08
13 01 33 03 Private Litigatio City of Livingston, et al DEQ Reply in Support of Motion to Dismiss BNSF Claim 02/29/08 DEQ
13 01 33 03 Private Litigatio City of Livingston, et al City v BNSF – Pleadings File #1
13 01 33 03 Private Litigatio City of Livingston, et al Y 04/15/08 DEQ internal
13 01 33 03 Private Litigatio City of Livingston, et al Y 04/15/08 DEQ internal
13 01 33 03 Private Litigatio City of Livingston, et al Findings and Recommendations of Magistrate Judge 04/30/08
13 01 33 03 Private Litigatio City of Livingston, et al DEQ Letter to M Kovacich re: Litigation 05/15/08 DEQ
13 01 33 03 Private Litigatio City of Livingston, et al 07/01/08 WET
13 01 33 03 Private Litigatio City of Livingston, et al CDM Comments on WET private litigation work plans 07/08/08 CDM
13 01 33 03 Private Litigatio City of Livingston, et al DEQ/B Summerville emails re: Schedule 7/31-8/4/08 DEQ
13 01 33 03 Private Litigatio City of Livingston, et al Y ** DEQ internal emails re: Water Rights 08/12/08 DEQ internal
13 01 33 03 Private Litigatio City of Livingston, et al DEQ Letter to WET re: DEQ Comments on 7/1/08 Work Plan 08/12/08 DEQ
13 01 33 03 Private Litigatio City of Livingston, et al Time Schedule Order 08/12/08
13 01 33 03 Private Litigatio City of Livingston, et al Y ** DEQ internal email re: Litigation Documents 08/13/08 DEQ internal
13 01 33 03 Private Litigatio City of Livingston, et al Mediation Order 08/22/08
13 01 33 03 Private Litigatio City of Livingston, et al Certificate of Conformance related to Injunction 09/02/08
Site-Wide Information
Site-Wide Information
** DEQ internal email re: Activity in Case 6:88-cv-00141-DWM-RKS State of Montana vs BN
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
** DEQ internal email re: Livingston Plaintiffs’ Brief Opposing Motion for Injunction
Site-Wide Information
Site-Wide Information
Site-Wide Information
9/27/07-4/14/08
Site-Wide Information
** DEQ email internal & to John North re: BN Federal Injunction Hearing
Site-Wide Information
** DEQ internal email re: BN Voluntarily dismissed third party complaint
Site-Wide Information
Site-Wide Information
Site-Wide Information
WET Letter to DEQ re: Work Plan for Soil, Groundwater & Sub-Slab Vapor Investigation
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 359 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 33 03 Private Litigatio City of Livingston, et al WET Request to DEQ for Modified Work Plan 09/03/08 WET
13 01 33 03 Private Litigatio City of Livingston, et al DEQ Memo re: Mitigation 09/05/08 DEQ
13 01 33 03 Private Litigatio City of Livingston, et al DEQ email re: WET WP review 09/12/08 DEQ
13 01 33 03 Private Litigatio City of Livingston, et al DEQ fax to WET re: Screening levels 10/23/08 DEQ
13 01 33 03 Private Litigatio City of Livingston, et al Y **DEQ internal email re: Envirocon complaint 12/11/08 DEQ internal
13 01 33 03 Private Litigatio City of Livingston, et al DEQ/BKBH emails re: File Review 12/12/08
13 01 33 03 Private Litigatio City of Livingston, et al Envirocon Request to Amend Complaint Against DEQ 12/12/08 Envirocon
13 01 33 03 Private Litigatio City of Livingston, et al Response Brief of Intervenors Appellees 12/22/08
13 01 33 03 Private Litigatio City of Livingston, et al Intervenors’ Supplemental Excerpts of Record 12/23/08
13 01 33 03 Private Litigatio City of Livingston, et al Mayor’s Office/DEQ emails re: BNSF extension request 12/29/08
13 01 33 03 Private Litigatio City of Livingston, et al 01/05/09
13 01 33 03 Private Litigatio City of Livingston, et al Mayor’s Office email to DEQ re: Brief filing 01/06/09 Mayor's Office
13 01 33 03 Private Litigatio City of Livingston, et al BNSF’s Answer to Plaintiffs’ Second Amended Complaint 01/07/09 BN
13 01 33 03 Private Litigatio City of Livingston, et al 01/07/09 BN
13 01 33 03 Private Litigatio City of Livingston, et al BNSF Reply Brief 01/20/09 BN
13 01 33 03 Private Litigatio City of Livingston, et al DEQ email to BKBH re: File review 01/29/09 DEQ
13 01 33 03 Private Litigatio City of Livingston, et al Phone log – DEQ/Llewellyn 02/06/09
13 01 33 03 Private Litigatio City of Livingston, et al WET email to DEQ re: BN data 2/11-2/12/09 WET
13 01 33 03 Private Litigatio City of Livingston, et al Third Party Lawsuit 02/11/09
13 01 33 03 Private Litigatio City of Livingston, et al WET Data 02/11/09 WET
13 01 33 03 Private Litigatio City of Livingston, et al K/J email to DEQ re: WET data – copies wanted 02/23/09 KJ
13 01 33 03 Private Litigatio City of Livingston, et al 02/24/09 DEQ internal
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Plaintiffs’ brief opposing Envirocon 3rd Party Complaint against DEQ
Site-Wide Information
Site-Wide Information
Site-Wide Information
David Smith’s Answer to Plaintiffs’ Second Amended Complaint
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ internal email, & to CDM re: 18 ambient air samples WET collected in the fall of 2008
BN LIVINGSTON 8/26/13
Page 360 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 33 03 Private Litigatio City of Livingston, et al 03/09/09 LS&K
13 01 33 03 Private Litigatio City of Livingston, et al 03/18/09 District Court
13 01 33 03 Private Litigatio City of Livingston, et al 03/18/09
13 01 33 03 Private Litigatio City of Livingston, et al Y 03/20/09 DEQ legal internal
13 01 33 03 Private Litigatio City of Livingston, et al K/J & DEQ emails re: Info request about WET 03/29/09
13 01 33 03 Private Litigatio City of Livingston, et al 04/01/09 DEQ/ Reynolds
13 01 33 03 Private Litigatio City of Livingston, et al Meeting notes – Location 134, Richardson property 04/01/09 DEQ/ Reynolds
13 01 33 03 Private Litigatio City of Livingston, et al 04/09/09
13 01 33 03 Private Litigatio City of Livingston, et al 04/28/09
13 01 33 03 Private Litigatio City of Livingston, et al 04/30/09
13 01 33 03 Private Litigatio City of Livingston, et al 05/14/09
13 01 33 03 Private Litigatio City of Livingston, et al 05/21/09
13 01 33 03 Private Litigatio City of Livingston, et al 05/21/09
13 01 33 03 Private Litigatio City of Livingston, et al 06/09/09
13 01 33 03 Private Litigatio City of Livingston, et al 06/23/09
13 01 33 03 Private Litigatio City of Livingston, et al 06/29/09
13 01 33 03 Private Litigatio City of Livingston, et al 07/01/09
13 01 33 03 Private Litigatio City of Livingston, et al 07/09/09
13 01 33 03 Private Litigatio City of Livingston, et al 07/16/09
13 01 33 03 Private Litigatio City of Livingston, et al 07/21/09
13 01 33 03 Private Litigatio City of Livingston, et al 07/22/09
Site-Wide Information
Lewis, Slovak & Kovacich letter to June Little/Clerk of District Court, Livingston re: For filing – Plaintiff’s Correction to Brief in Opposition to Envirocon, Inc’s Motion for Case Management Order
Site-Wide Information
MT 6th Judicial District Court, Park Co. re: Order granting Defendant David Smith’s Motion for Summary Judgment
Site-Wide Information
MT 6th Judicial District Court, Park Co. re: Order Granting Change of Venue
Site-Wide Information
** N4640DEQ legal internal email re: Livingston 3rd Party Lawsuit
Site-Wide Information
Site-Wide Information
DEQ/Reynolds & C Lawellin emails re: Livingston testing – Richardson/Tate property
Site-Wide Information
Site-Wide Information
DEQ Legal/Haque-Hausrath & C Lawellin emails re: Contact with DEQ employees and contractors
Site-Wide Information
C Lawellin & DEQ/Reynolds emails re: Attachment – February/March testing results
Site-Wide Information
DEQ Legal/Haque-Hausrath letter pack to C Lawellin re: Your Client’s February & March 2009 Sampling Results
DEQ Legal/ Haque-Hausrath
Site-Wide Information
DEQ Legal/Haque-Hausrath letter to C Lawellin re: February & March 2009 radon data
DEQ Legal/ Haque-Hausrath
Site-Wide Information
DEQ Legal/Haque-Hausrath and C Lawellin emails re: C Lawellin did not receive Feb/March 2009 sampling package
Site-Wide Information
DEQ Legal/Haque-Hausrath letter pack to C Lawellin re: DEQ resending February & March 2009 sampling Results
DEQ Legal/ Haque-Hausrath
Site-Wide Information
WET & DEQ emails re: Additional sampling at Kautzman residence
Site-Wide Information
DEQ legal & Courtney Lawellin emails re: Coping of dispute resolution documents
Site-Wide Information
DEQ legal letter to Courtney Lawellin re: Response to info request
Site-Wide Information
DEQ Legal/Haque-Hausrath email to DEQ/Reynolds re: Attachment – Filled out 9th Circuit hearing notice
DEQ Legal/ Haque-Hausrath
Site-Wide Information
WET & DEQ emails re: Residential air regional Screening Levels
Site-Wide Information DEQ & Courtney Lawellin emails re: Results from 114 North K
Site-Wide Information
US Court of Appeals 9th Circuit Document re: Intervenors-Appellees Motion for Additional Argument Time
Site-Wide Information
US Court of Appeals 9th Circuit Document re: Appellant BNSF’s Response to Intervenors’ Motion for Additional Argument Time
BN LIVINGSTON 8/26/13
Page 361 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 33 03 Private Litigatio City of Livingston, et al 07/27/09
13 01 33 03 Private Litigatio City of Livingston, et al 08/19/09
13 01 33 03 Private Litigatio City of Livingston, et al
13 01 33 03 Private Litigatio City of Livingston, et al C Lawellin & DEQ/Reynolds emails re: Well surveys 12/21/09
13 01 33 03 Private Litigatio City of Livingston, et al C Lawellin & DEQ/Reynolds emails re: Well surveys 12/22/09
13 01 33 03 Private Litigatio City of Livingston, et al 01/04/10 GSI
13 01 33 03 Private Litigatio City of Livingston, et al C Lawellin email to DEQ re: Well survey follow up 01/05/10 C Lawellin
13 01 33 03 Private Litigatio City of Livingston, et al 01/06/10 DEQ/ Reynolds
13 01 33 03 Private Litigatio City of Livingston, et al 01/29/10 K&L Gates
13 01 33 03 Private Litigatio City of Livingston, et al Legal Ad to be published in the Bozeman Daily Chronicle 02/02/10
13 01 33 03 Private Litigatio City of Livingston, et al 02/09/10
13 01 33 03 Private Litigatio City of Livingston, et al 02/25/10
13 01 33 03 Private Litigatio City of Livingston, et al 03/02/10 C Lawellin
13 01 33 03 Private Litigatio City of Livingston, et al 03/16/10
13 01 33 03 Private Litigatio City of Livingston, et al 03/15/10
13 01 33 03 Private Litigatio City of Livingston, et al 03/19/10 DEQ/ Reynolds
13 01 33 03 Private Litigatio City of Livingston, et al 03/19/10
13 01 33 03 Private Litigatio City of Livingston, et al 03/23/10
13 01 33 03 Private Litigatio City of Livingston, et al 03/23/10
13 01 33 03 Private Litigatio City of Livingston, et al 03/23/10 M Hartwig
13 01 33 03 Private Litigatio City of Livingston, et al M Hartwig letter to K&L Gates/Kuhl re: Request for Entry 03/23/10 M Hartwig
Site-Wide Information
US Court of Appeals 9th Circuit Document re: Appellant BNSF is allotted an additional 10 minutes of argument time for a total of 20 minutes granted by the court
Site-Wide Information
C Lawellin and DEQ/Reynolds emails re: DEQ attachment – TT-McAdam 1103 Gallatin results
Site-Wide Information
C Lawellin & DEQ Legal/Haque-Hausrath emails re: Well surveys
12/14-12/17/09
Site-Wide Information
Site-Wide Information
Site-Wide Information
Table 1A State plaintiff sites proposed for supplemental indoor air quality sampling
Site-Wide Information
Site-Wide Information
DEQ/Reynolds email to BN/Smith & K/J/Norris fw to C Lawellin re: Well surveys
Site-Wide Information
K&L Gates letter to DEQ re: BN’s Proposed Supplemental Indoor Sampling for Purposes of Litigation
Site-Wide Information
Site-Wide Information
DEQ Legal/Haque-Hausrath email to K&L Gates/Lawrence re: BN’s Proposed Supplemental Indoor Sampling
DEQ Legal/ Haque-Hausrath
Site-Wide Information
C Lawellin & DEQ/Reynolds emails re: March indoor air sampling
Site-Wide Information
C Lawellin email to DEQ re: Schedule for testing at plaintiff properties
Site-Wide Information
DEQ Legal/Haque-Hausrath & M Hartwig emails re: DEQ-required indoor air Resampling 7 sampling pursuant to rule 34
Site-Wide Information
K&L gates/Kuhl & C Lawellin emails re: BN proposed inspection/sampling schedule
Site-Wide Information
DEQ/Reynolds Draft email to BN/Smith & K/J/Norris & Aldersley to DEQ Legal fw re: Draft for review – DEQ-required indoor air sampling
Site-Wide Information
M Hartwig, C Lawellin, & K&L Gates/Kuhl letter/emails re: BN proposed inspection/sampling schedule
Site-Wide Information
C Lawellin & K&L Gates/Kuhl emails re: Revised sampling schedule & request for entry
Site-Wide Information
DEQ Legal/Haque-Hausrath letter/email to C Trueblood re: DEQ response to Trueblood 3/19/10 letter
DEQ legal/ Haque-Hausrath
Site-Wide Information M Hartwig letter to K&L Gates/Lawrence re: Request for Entry
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 362 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 33 03 Private Litigatio City of Livingston, et al 05/26/10
13 01 33 03 Private Litigatio City of Livingston, et al 05/27/10 DEQ legal internal
13 01 33 03 Private Litigatio City of Livingston, et al 05/27/10
13 01 33 03 Private Litigatio City of Livingston, et al 06/02/10
13 01 33 03 Private Litigatio City of Livingston, et al 06/16/10 KJ/Adlersley
13 01 33 03 Private Litigatio City of Livingston, et al 06/21/10 C Lawellin
13 01 33 03 Private Litigatio City of Livingston, et al 06/22/10 DEQ Legal internal
13 01 33 03 Private Litigatio City of Livingston, et al 6/23-6/24/10
13 01 33 03 Private Litigatio City of Livingston, et al 06/24/10 C Lawellin
13 01 33 03 Private Litigatio City of Livingston, et al 06/24/10
13 01 33 03 Private Litigatio City of Livingston, et al 06/28/10 KJ/Adlersley
13 01 33 03 Private Litigatio City of Livingston, et al DEQ/Reynolds & C Lawellin emails re: Personnel question 07/06/10
13 01 33 03 Private Litigatio City of Livingston, et al 07/19/10
13 01 33 03 Private Litigatio City of Livingston, et al 7/22-7/27/10
13 01 33 03 Private Litigatio City of Livingston, et al 07/28/10
13 01 33 03 Private Litigatio City of Livingston, et al 09/17/10
13 01 33 03 Private Litigatio City of Livingston, et al 10/28/10 C Lawellin
13 01 33 03 Private Litigatio City of Livingston, et al 11/01/10
13 01 33 03 Private Litigatio City of Livingston, et al 11/01/10 DEQ legal internal
13 01 33 03 Private Litigatio City of Livingston, et al 11/02/10
13 01 33 03 Private Litigatio City of Livingston, et al 12/01/10
13 01 33 03 Private Litigatio City of Livingston, et al C Lawellin & DEQ/Reynolds emails re: CDM Oversight 11/03/10
Site-Wide Information
DEQ Legal/Haque-Hausrath & C Lawellin emails re: Well Surveys
Site-Wide Information
DEQ Legal/Haque-Hausrath internal email re: Phone log w/C Lawellin
Site-Wide Information
DEQ Legal/Haque-Hausrath email to C Lawellin re: Copy of 5/21/10 letter from K/J to DEQ/Reynolds
DEQ legal/ Haque-Hausrath
Site-Wide Information
DEQ Legal/Haque-Hausrath & C Lawellin emails re: Well drilling
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds fw to C Lawellin re: Private well summary – 2010 sampling event
Site-Wide Information
C Lawellin email to DEQ re: Well testing – would like conference call before testing starts
Site-Wide Information
DEQ Legal/Haque-Hausrath internal email re: Phone log w/C Lawellin & M Hartwig
Site-Wide Information
DEQ/Reynolds & C Lawellin emails re: Gerry & Darlene Stephens
Site-Wide Information
C Lawellin email to DEQ fw to K/J/Norris re: Additional wells - Well testing
Site-Wide Information
DEQ Legal/Haque-Hausrath email to C Lawellin re: DEQ/Reynolds email to K/J/Norris fw to C Lawellin
DEQ legal/ Haque-Hausrath
Site-Wide Information
K/J/Aldersley email to DEQ/Reynolds fw to C Lawellin re: Well testing
Site-Wide Information
Site-Wide Information
C Lawellin & B Summerville emails fw to DEQ/Reynolds re: Access for entry
Site-Wide Information
DEQ/Reynolds & C Lawellin emails re: Mitigation on the D Richardson property
Site-Wide Information
DEQ Legal/Haque-Hausrath internal email re: Phone log w/C Lawellin
DEQ legal/ Haque-Hausrath
Site-Wide Information
DEQ/Reynolds & C Lawellin emails re: DEQ Attachment – LNAPL testing – BN Proposal & DEQ comments
Site-Wide Information
C Lawellin email to DEQ/Reynolds, Haque-Hausrath re: LNAPL & other stuff
Site-Wide Information
For Publication – US Court of Appeals for the Ninth Circuit re: Opinion by Judge Pregerson
Site-Wide Information
DEQ Legal/Haque-Hausrath internal email to Reynolds re: Phone log for conference call with C Lawellin
Site-Wide Information
C Lawellin & DEQ/Reynolds emails re: Final Task I – 1993 CDM Final Baseline Risk Assessment referenced
Site-Wide Information
DEQ Legal/Haque-Hausrath email to C Lawellin re: Final Task I – 1993 CDM Final Baseline Risk Assessment
DEQ Legal/ Haque-Hausrath
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 363 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 33 03 Private Litigatio City of Livingston, et al 11/08/10
13 01 33 03 Private Litigatio City of Livingston, et al 11/09/10 DEQ legal internal
13 01 33 03 Private Litigatio City of Livingston, et al 11/10/10
13 01 33 03 Private Litigatio City of Livingston, et al 11/11/10 J McGarry
13 01 33 03 Private Litigatio City of Livingston, et al 01/04/11 John A Conner
13 01 33 03 Private Litigatio City of Livingston, et al Expert Report of Jay Vandeven 01/05/11 Jay Vandeven
13 01 33 03 Private Litigatio City of Livingston, et al 01/05/11
13 01 33 03 Private Litigatio City of Livingston, et al 03/28/11 DEQ legal internal
13 01 33 03 Private Litigatio City of Livingston, et al 04/05/11 DEQ legal internal
13 01 33 03 Private Litigatio City of Livingston, et al 04/06/11 J McGarry
13 01 33 03 Private Litigatio City of Livingston, et al 04/19/11
13 01 33 03 Private Litigatio City of Livingston, et al 5/13-5/16/11
13 01 33 03 Private Litigatio City of Livingston, et al 05/17/11
13 01 33 03 Private Litigatio City of Livingston, et al 05/26/11 Billings Gazette
13 01 33 03 Private Litigatio City of Livingston, et al 09/09/11
13 01 33 03 Private Litigatio City of Livingston, et al 03/27/12
13 01 33 03 Private Litigatio City of Livingston, et al 03/27/12 DEQ internal
13 01 33 03 Private Litigatio City of Livingston, et al 04/19/12
13 01 33 03 Private Litigatio City of Livingston, et al 05/09/12
13 01 33 03 Private Litigatio City of Livingston, et al Livingston City Commission Addendum 6/512
Site-Wide Information
Phone Log – DEQ/Reynolds & WET/Erickson re: Bedrock well drilling
Site-Wide Information
Phone Log – DEQ Legal/Haque-Hausrath internal email to Reynolds re: Conference call notes from call with C Lawellin
Site-Wide Information
DEQ Legal/Haque-Hausrath letter to O’Keefe Drilling Company re: Information request for well logs drilled by O’Keefe from 1/1/08 to present and who the clients were in 4 sections in Livingston
DEQ Legal/ Haque-Hausrath
Site-Wide Information
Julie McGarry email to DEQ Legal/Haque-Hausrath re: Response to DEq phone call – WET activities
Site-Wide Information
Expert Opinion of John A. Conner - Regarding Indoor Air Vapor Intrusion Concerns at Specific Properties in Livingston - Appendix D
Site-Wide Information
Site-Wide Information
Clayton & Company/David Clayton letter to K&L Gates/Kuhl re: Export Report & Consulting Assignment
Clayton & Company
Site-Wide Information
DEQ Legal/ Haque-Hausrath internal email to Reynolds re: Phone log from Julie McGarry
Site-Wide Information
DEQ Legal/ Haque-Hausrath internal email to Reynolds re: Phone log from Julie McGarry
Site-Wide Information
J McGarry email to DEQ Legal/Haque-Hausrath re: Access denied for testing by Krohnes
Site-Wide Information
DEQ Legal/ Haque-Hausrath email to J McGarry re: Krohne testing
DEQ legal/ Haque-Hausrath
Site-Wide Information
DEQ Legal/ Haque-Hausrath & C Lawellin emails re: Task I contact list
DEQ Legal/ Haque-Hausrath
Site-Wide Information
DEQ Legal/ Haque-Hausrath internal email to Reynolds re: Phone log with C Lawellin
DEQ Legal/ Haque-Hausrath
Site-Wide Information
Billings Gazette article re:"Livingston's pollution suit against rail company heads to court"
Site-Wide Information
Court document re: BNSF'S Opposition to Plantiffs' Motion in Limine regarding DEQ Evidence (recieved)
Site-Wide Information
LSKLaw/Komac & DEQ/Haque-Hausrath & Wallis emails re: Information request for archived electronic files
Site-Wide Information
DEQ/Seyler & DEQ IT emails re: Request for search for archived files
Site-Wide Information
DEQ legal/Haque-Hausrath internal email to Reynolds re: Phone log - Courtney Llawellyn & Rich Waddell - Trial witnesses
DEQ Legal/ Haque-Hausrath
Site-Wide Information
DEQ legal/Haque-Hausrath internal emails re: Settlement of third-party litigation
DEQ Legal/ Haque-Hausrath
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 364 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 33 03 Private Litigatio City of Livingston, et al Y 06/06/12
13 01 33 03 Private Litigatio City of Livingston, et al 07/18/12
13 01 33 03 Private Litigatio City of Livingston, et al 08/08/12
13 01 33 03 Private Litigatio City of Livingston, et al DEQ Submittal of WET Litigation Data 03/27/13 WET
13 01 33 03 01 Private Litigatio Restoration Committee
13 01 33 03 01 Private Litigatio Restoration Committee 07/16/12
13 01 33 03 01 Private Litigatio Restoration Committee 07/19/12
13 01 33 03 01 Private Litigatio Restoration Committee Y 08/08/12
13 01 33 03 01 Private Litigatio Restoration Committee ROD Task list for Restoration Committee 08/13/12
13 01 33 03 01 Private Litigatio Restoration Committee DEQ handouts for the Restoration Committee Meeting 08/13/12 DEQ
13 01 33 03 01 Private Litigatio Restoration Committee 11/9/2012 WET/Green
13 01 33 03 01 Private Litigatio Restoration Committee 11/13/2012
13 01 33 03 01 Private Litigatio Restoration Committee 11/13/12
13 01 33 03 01 Private Litigatio Restoration Committee 11/13/2012
13 01 33 03 01 Private Litigatio Restoration Committee Y 11/13/12 DEQ/Cote
13 01 33 03 01 Private Litigatio Restoration Committee 03/07/13 DEQ/Reynolds
13 01 33 03 01 Private Litigatio Restoration Committee 05/29/13 BNSF/Stegman
13 01 33 03 01 Private Litigatio Restoration Committee 06/13/13 DEQ/Reynolds
13 01 33 03 01 Private Litigatio Restoration Committee 06/13/13 DEQ/Reynolds
13 01 33 03 01 Private Litigatio Restoration Committee DEQ/Reynolds letter to BNSF & LRG re: communications 06/13/13 DEQ/Reynolds
13 01 33 03 01 Private Litigatio Restoration Committee 6/19/13 BNSF/LRG/DEQ meeting notes 06/19/13
Site-Wide Information
** DEQ legal/Haque-Hausrath memorandum to Director Opper re: Summary of Third Party Settlement
DEQ Legal/ Haque-Hausrath
Site-Wide Information
DEQ legal/Haque-Hausrath email to LSK Law/Kovacich re: DEQ request for copy of the trust agreement & settlement
DEQ Legal/ Haque-Hausrath
Site-Wide Information
LSKLaw/Kovacich email to DEQ/Haque-Hausrath re: Attachment - Livingston settlement agreement
LSK Law/ Kovacich
Site-Wide Information
Site-Wide Information
Site-Wide Information
Livingston Enterprise article re: Committee that will manage BNSF settlement cleanup fund to meet
Livingston Enterprise
Site-Wide Information
Restoration Group/Nelson & DEQ/Reynolds emails re: Group requesting a meeting with DEQ/Reynolds
Site-Wide Information
** DEQ Memorandum re: Shop Complex, Summary of 3rd Party Settlement, DEQ's Authority to Requie=re Permission for 3rd Party Work
DEQ legal/ Haque-Hausrath
Site-Wide Information
Site-Wide Information
Site-Wide Information
Phone log - WET/Green to DEQ/Reynolds re: WET signed contract with LRG & still no meeting with BN
Site-Wide Information
Phone log - Summary: DEQ/Reynolds & legal/Morgan to Lawellen Law/Lawellen re: Discussion about LRG, BN & WET
Site-Wide Information
Phone Log - DEQ/Reynolds & WET/Green re: Discussion on getting data from WET & meeting with BN
Site-Wide Information
DEQ/Reynolds email to Lawellen Law/Lawellen re: Attachment - Task L GW Analytical Results, 1st thru 4th quarter
Site-Wide Information
** DEQ/Cote internal email to Reynolds/& legal re: Phone log with WET - Discussion of figures from WET's Multi-Phase Quarterly Monitoring Report/February/April 2012
Site-Wide Information
DEQ/Reynolds internal email to Haque-Hausrath re: Phone log with WET - work plans
Site-Wide Information
BNSF/Stegman email to DEQ/Reynolds re: BNSF notice regarding LRG WPs
Site-Wide Information
DEQ/Reynolds & BNSF/Stegman emails re: BNSF agenda for 6/19/13 BNSF/LRG/DEQ meeting
Site-Wide Information
DEQ/Reynolds, BNSF/Stegman & WET-lic/Erickson emails re: Email chain 6/19/13 meeting
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 365 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 33 03 01 Private Litigatio Restoration Committee 06/28/13 DEQ/Reynolds
13 01 33 03 01 Private Litigatio Restoration Committee 07/02/13 DEQ/Reynolds
13 01 33 03 01 Private Litigatio Restoration Committee 07/03/13 DEQ/Reynolds
13 01 33 03 01 Private Litigatio Restoration Committee 07/08/13 LAW/Lawellin
13 01 33 03 01 Private Litigatio Restoration Committee 08/01/13 DEQ/Reynolds
13 01 33 03 01 Private Litigatio Restoration Committee 08/07/13 LRG/Nelson
13 01 33 03 01 Private Litigatio Restoration Committee LRG/Nelson & DEQ/Reynolds re: LRG email chain 08/06/13 LRG/Nelson
13 01 33 03 01 Private Litigatio Restoration Committee LRG Work Plans 10/11/13 DEQ/Reynolds
13 01 33 03 01 Private Litigatio Restoration Committee 10/10/13 DEQ/Reynolds
13 01 33 04 Private Litigatio
13 01 33 04 Private Litigatio Henriksen Complaint 10/10/07 Henreksen
13 01 33 04 Private Litigatio DEQ Letter to CWK re: Remedial Action by Third Parties 05/15/08 DEQ
13 01 33 04 Private Litigatio CWK Letter to DEQ re: Property owners represented 06/12/08 CWK
13 01 33 04 Private Litigatio WET Letter to DEQ re: WET Work Plan 06/30/08 WET
13 01 33 04 Private Litigatio 07/24/08
13 01 33 04 Private Litigatio DEQ Letter to WET re: Comments on WET WP 07/25/08 DEQ
13 01 33 04 Private Litigatio BNSF Memo on Joinder Motion – Merideth 08/04/08 BN
Site-Wide Information
DEQ/Reynolds letter to LRG/Nelson re: letter to LRG conveying Task list info.
Site-Wide Information
DEQ/Reynolds email to DEQ/Hague-Hausrath re: DEQ documentation of 7/2/13 Charley Green Call
Site-Wide Information
DEQ/Reynolds letter to LRG/Nelson re: conveying Task list info
Site-Wide Information
LAW/Lawellin & DEQ/Smith emails re: LRG attending field work
Site-Wide Information
DEQ/Reynolds, BNSF/Stegman & WET-lic/Erickson emails re: Email chain BNSF/LRG/DEQ meeting & activities
Site-Wide Information
LRG/Nelson, DEQ/Reynolds & Allen Stegman emails re; Stegman respond to LRG email chain
Site-Wide Information
Site-Wide Information
Site-Wide Information
Joint Livingston remediation Group and BNSF Railway Company Work Plan Submittals
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne (represented by Cok, Wheat & Kinzler)
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
DEQ & CWK emails re: Seeking approval of Proposed Work Plans
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
BN LIVINGSTON 8/26/13
Page 366 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 33 04 Private Litigatio BNSF Joinder Motion – Merideth 08/04/08 BN
13 01 33 04 Private Litigatio BNSF Memo on Joinder Motion – Burley 08/04/08 BN
13 01 33 04 Private Litigatio BNSF Motion for Joinder – Burley 08/04/08 BN
13 01 33 04 Private Litigatio BNSF Memo on Joinder Motion – Nelson 08/04/08 BN
13 01 33 04 Private Litigatio BNSF Motion for Joinder – Nelson 08/04/08 BN
13 01 33 04 Private Litigatio DEQ Motion for Intervention – Burley DEQ
13 01 33 04 Private Litigatio DEQ Motion for Intervention – Burley, Merideth, Nelson 08/18/08 DEQ
13 01 33 04 Private Litigatio Order Granting DEQ Intervention – Burley, Merideth, Nelson 08/20/08
13 01 33 04 Private Litigatio WET Work Plan for Ambient Air Monitoring 08/20/08 WET
13 01 33 04 Private Litigatio Modified WET Work Plan 08/20/08 WET
13 01 33 04 Private Litigatio 08/21/08
13 01 33 04 Private Litigatio Certificate of Service of DEQ Opposition to Joinder 08/21/08
13 01 33 04 Private Litigatio DEQ Opposition to Joinder – Burley, Merideth, Nelson 08/21/08 DEQ
13 01 33 04 Private Litigatio Opposition to Joinder – Burley, Merideth, Nelson 08/22/08
13 01 33 04 Private Litigatio BNSF Joinder Reply – Burley, Merideth, Nelson 09/04/08 BN
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Notice of Filing of DEQ Response to Motion – Burley, Merideth, Nelson
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
BN LIVINGSTON 8/26/13
Page 367 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 33 04 Private Litigatio DEQ internal email re: Henriksen lawsuit 09/09/08 DEQ internal
13 01 33 04 Private Litigatio DEQ Letter to WET re: Comments on WET WP 09/15/08 DEQ
13 01 33 04 Private Litigatio DEQ Letter to WET re: Permission for WET WP 09/15/08 DEQ
13 01 33 04 Private Litigatio Y **DEQ internal email re: Henriksen lawsuit 09/24/08 DEQ internal
13 01 33 04 Private Litigatio Motion for Hearing – Burley, Merideth, Nelson 09/30/08
13 01 33 04 Private Litigatio – Burley, Merideth, Nelson 09/30/08
13 01 33 04 Private Litigatio Order Granting Stipulation – Burley, Merideth, Nelson 09/30/08
13 01 33 04 Private Litigatio CWK letter to DEQ re: Krohne property 10/06/08 CWK
13 01 33 04 Private Litigatio Order Denying BNSF Joinder – Burley, Merideth, Nelson 10/10/08
13 01 33 04 Private Litigatio DEQ Letter to CWK re: Krohne samples 10/16/08 DEQ
13 01 33 04 Private Litigatio CWK Letter to DEQ requesting Horiel Results 11/26/08 CWK
13 01 33 04 Private Litigatio KJ/DEQ emails re: Horiel sampling 12/01/08
13 01 33 04 Private Litigatio KJ/DEQ emails re: Nelson results 12/01/08
13 01 33 04 Private Litigatio DEQ Letter to WET re: Modified 9/3/08 WET WP Permission 12/02/08 DEQ
13 01 33 04 Private Litigatio DEQ internal email re: Horiel testing 12/04/08 DEQ internal
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
BN LIVINGSTON 8/26/13
Page 368 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 33 04 Private Litigatio DEQ/KJ emails re: Rainbow Motel ownership 12/4-12/5/08
13 01 33 04 Private Litigatio DEQ internal email re: Horiel results 12/05/08 DEQ internal
13 01 33 04 Private Litigatio DEQ letter to F Horiel re: Horiel results 12/05/08 DEQ
13 01 33 04 Private Litigatio DEQ/CWK emails re: Horiel well usage 12/08/08
13 01 33 04 Private Litigatio CWK email to DEQ confirming Rainbow Motel ownership 12/08/08 CWK
13 01 33 04 Private Litigatio DEQ/CWK email re: Horiel testing 12/08/08
13 01 33 04 Private Litigatio DEQ/BKBH emails re: Rainbow Motel tenants 12/10/08
13 01 33 04 Private Litigatio 12/10/08 CWK
13 01 33 04 Private Litigatio DEQ email to BKBH re: Rainbow Motel licensing 12/18/08 DEQ
13 01 33 04 Private Litigatio DEQ Letter to WET re: WET info request 12/23/08 DEQ
13 01 33 04 Private Litigatio CWK/DEQ emails re: File review 12/29/08
13 01 33 04 Private Litigatio CWK/DEQ emails re: Testing data 12/29/08
13 01 33 04 Private Litigatio CWK email to DEQ re: Document request 01/13/09 CWK
13 01 33 04 Private Litigatio CWK email to DEQ re: Document request 01/14/09 CWK
13 01 33 04 Private Litigatio WET/DEQ emails re: WET draft requesting 707 extension 01/21/09
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
CWK letter to DEQ re: Document request – Burley, Nelson, Merideth
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
BN LIVINGSTON 8/26/13
Page 369 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 33 04 Private Litigatio WET letter to DEQ re: Requesting 707 extension 01/22/09 WET
13 01 33 04 Private Litigatio Phone Log – DEQ/McGarry re: 707 request 01/22/09
13 01 33 04 Private Litigatio 02/02/09 CWK
13 01 33 04 Private Litigatio Phone Log – DEQ/McGarry re: Document request 02/02/09
13 01 33 04 Private Litigatio Phone Log – DEQ/McGarry re: Info request 02/03/09
13 01 33 04 Private Litigatio DEQ email to WET re: 707 deadline extension 02/04/09 DEQ
13 01 33 04 Private Litigatio Phone Log – DEQ & McGarry re: Vapor intrusion question 02/06/09
13 01 33 04 Private Litigatio Phone log – DEQ & CWK re: 707 request 02/10/09
13 01 33 04 Private Litigatio CWK letter to DEQ re: 707 letter 02/11/09 CWK
13 01 33 04 Private Litigatio Data Submittal for Investigation 02/11/09 WET
13 01 33 04 Private Litigatio WET
13 01 33 04 Private Litigatio 03/27/09 DEQ
13 01 33 04 Private Litigatio 4/5-4/14/09
13 01 33 04 Private Litigatio J McGarry email to DEQ re: Testing results info wanted 04/22/09 J McGarry
13 01 33 04 Private Litigatio DEQ & J McGarry emails re: Testing results 04/27/09
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
CWK letter to DEQ re: Requesting dispute resolution exhibits (2/2/09)
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
SUB-Slab and indoor air monitoring – Lab detections of COC’s spreadsheet
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
DEQ email to J McGarry/Cok law re: Recent testing results for Nelson & Horiel
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
DEQ/Reynolds & K/J/Aldersley/Norris emails re: Soil Gas System – 1104 E Gallatin
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
BN LIVINGSTON 8/26/13
Page 370 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 33 04 Private Litigatio 05/01/08 KJ
13 01 33 04 Private Litigatio 06/04/09 KJ/Norris
13 01 33 04 Private Litigatio 06/04/09 KJ
13 01 33 04 Private Litigatio 06/09/09
13 01 33 04 Private Litigatio 06/10/09
13 01 33 04 Private Litigatio DEQ & C Lawellin emails re: Water testing 06/15/09
13 01 33 04 Private Litigatio 7/8/-7/9/09
13 01 33 04 Private Litigatio 07/13/09
13 01 33 04 Private Litigatio 07/20/09 DEQ legal internal
13 01 33 04 Private Litigatio 07/21/09 DEQ legal internal
13 01 33 04 Private Litigatio 07/21/09
13 01 33 04 Private Litigatio 07/22/09
13 01 33 04 Private Litigatio 07/23/09
13 01 33 04 Private Litigatio 07/27/09 DEQ legal internal
13 01 33 04 Private Litigatio 07/28/09 K&L Gates
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Project Manual Including Specifications for Indoor Air Mitigation System at 1104 E. Gallatin Street
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
K/J/Norris cover letter to DEQ/Reynolds re: Indoor Air Mitigation System Work Scope Statement and Field Design Package 1104 E. Gallatin Street
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
K/J Memorandum to Olympus re: Work Scope Statement for Project site at 1104 E Gallatin Street
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
DEQ legal and J McGarry emails re: Test results for clients follow-up
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
DEQ legal and J McGarry emails re: Krohne GW results sheets 2009
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
CWL/McGarry/Figgins & DEQ Legal/Haque-Hausrath emails re: Test results for clients
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
DEQ legal & Cok, Wheat & Kinzler emails re: Test results for clients
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
DEQ Legal/Haque-Hausrath internal email to Reynolds & Martin re: Phone log from Dan Hoven – FYI
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
DEQ Legal/Haque-Hausrath internal email to Reynolds & Martin re: Phone log with Attorney from K&L Gates
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
US District Court Billings Montana District Subpoena In A Civil Case
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
K&L Gates/Kuhl & DEQ Legal/Haque-Hausrath emails re: Burley et al. v. BNSF
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
DEQ Legal/Haque-Hausrath letter to K & L Gates/Kuhl re: Subpoena fees for BN deposition of A Reynolds (7/23/09)
DEQ Legal/ Haque-Hausrath
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
DEQ Legal/Haque-Hausrath internal email to Reynolds re: Phone log with Julie McGarry
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
K&L Gates letter to DEQ Legal/Haque-Hausrath re: Subpoena fees for BN Deposition of A Reynolds
BN LIVINGSTON 8/26/13
Page 371 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 33 04 Private Litigatio 07/28/09
13 01 33 04 Private Litigatio 07/30/09
13 01 33 04 Private Litigatio 07/30/09 K&L Gates
13 01 33 04 Private Litigatio 07/31/09
13 01 33 04 Private Litigatio 08/20/09 DEQ legal internal
13 01 33 04 Private Litigatio 08/24/09 DEQ legal internal
13 01 33 04 Private Litigatio 08/26/09 DEQ legal internal
13 01 33 04 Private Litigatio 08/26/09 K&L Gates
13 01 33 04 Private Litigatio 08/26/09 DEQ legal/ Mackie
13 01 33 04 Private Litigatio 08/26/09
13 01 33 04 Private Litigatio 08/26/09
13 01 33 04 Private Litigatio 08/26/09
13 01 33 04 Private Litigatio 08/27/09
13 01 33 04 Private Litigatio 09/14/09
13 01 33 04 Private Litigatio 09/15/09 K&L Gates
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
K&L Gates/Kuhl & DEQ Legal/Haque-Hausrath emails re: BNSF Livingston federal cases, deposition date for DEQ employees
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
DEQ Legal/Haque-Hausrath, CWL/McGarry & K&L Gates/Kuhl emails re: BN federal cases, deposition date for DEQ employees
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
K&L Gates letter to DEQ/Reynolds re: BN’s Amended Notice of Deposition of A Reynolds & MDEQ’s Designee
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
US District Court Amended Notice of Deposition Upon Oral Examination of MDEQ
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
DEQ Legal email to Becky Summerville re: BN Livingston Deposition of A Reynolds
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
DEQ Legal/Haque-Hausrath internal email re: Phone log call from Dan Hoven re: Petition briefing schedule
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
DEQ Legal/Haque-Hausrath internal email re: Phone log call with B Kuhl re: 30(b) (6)
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
B Kuhl letter to DEQ re: Amended Notice of Deposition of A Reynolds
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
DEQ Legal/Mackie letter to K&L Gates/Kuhl re: Acceptance of Service relative to A Reynolds deposition
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
US District Court Second Amended Notice of Deposition Upon Oral Examination of MDEQ
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
US District Court Second Amended Notice of Deposition Upon Oral Examination of A Reynolds
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
US District Court Acceptance of Service: Subpoena and Second Amended Notices of Depositions of MDEQ & A Reynolds
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Amended Notice of Deposition Upon Oral Examination of A Reynolds
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
DEQ Legal/Haque-Hausrath email to Edwards Law/Culver & Chris re: DEQ attorney Brooks attending depositions in place of Haque-Hausrath
DEQ Legal/ Haque-Hausrath
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
K&L Gates/Kuhl letter to DEQ Legal/Haque-Hausrath re: Documents to be reviewed before the depositions of MDEQ & A Reynolds
BN LIVINGSTON 8/26/13
Page 372 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 33 04 Private Litigatio Y 09/22/09 DEQ legal/Brooks
13 01 33 04 Private Litigatio 09/23/09
13 01 33 04 Private Litigatio 09/23/09
09/25/09
13 01 33 04 Private Litigatio 10/06/09
13 01 33 04 Private Litigatio
13 01 33 04 Private Litigatio 11/03/09
13 01 33 04 Private Litigatio 11/06/09
13 01 33 04 Private Litigatio 11/11/09
13 01 33 04 Private Litigatio 11/12/09
13 01 33 04 Private Litigatio 11/14/09
13 01 33 04 Private Litigatio 12/08/09 KJ/Norris
13 01 33 04 Private Litigatio 01/07/10 DEQ legal internal
13 01 33 04 Private Litigatio 03/28/11
13 01 33 04 Private Litigatio 04/05/11
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
** DEQ Legal/Brooks email to John Wadhams re: BN Depositions
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
US District Court Third Amended Notice of Deposition Upon Oral Examination of MDEQ
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
US District Court Third Amended Notice of Deposition Upon Oral Examination of A Reynolds
US District Court Deposition Upon Oral Examination of A Reynolds
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Master Index of Dave and Jeannie Burley, et al, Diana & Kenneth Merideth et al, & Dana Nelson et al vs BNSF (Updated 10/6/09)
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
DEQ Legal/Haque-Hausrath, Edwards Law/Culver & K&L Gates/Lawrence emails re: Continuation of A Reynolds Deposition
10/15-10/30/09
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
DEQ Legal/Haque-Hausrath email to Fisher Court Reporting re: Notarized copy of the correction pages for the deposition of A Reynolds
DEQ Legal/ Haque-Hausrath
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
DEQ Legal/Haque-Hausrath email to K&L Gates, Edwards Law, & CWL re: Spelling of Aimee Reynolds name
DEQ Legal/ Haque-Hausrath
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
K&L Gates & DEQ Legal emails re: Continuation of Deposition of A Reynolds
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
US District Court Notice of Continuation of Deposition Upon Oral Examination of A Reynolds & MDEQ
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Deposition Upon Oral Examination of Aimee Reynolds , Vol II Dave Burley vs BNSF
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
K/J/Norris email to DEQ/Reynolds re: 1104 E Gallatin St Residential Indoor Mitigation System & letter from CWL to BKBH/Hoven
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
DEQ Legal/Haque-Hausrath internal email re: Phone log call with J McGarry re: Vapor intrusion & proposed cleanup levels for indoor air
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
DEQ Legal/ Haque-Hausrath internal email to Reynolds re: Phone log from Julie McGarry
DEQ Legal/ Haque-Hausrath
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
DEQ Legal/ Haque-Hausrath internal email to Reynolds re: Phone log from Julie McGarry
DEQ Legal/ Haque-Hausrath
BN LIVINGSTON 8/26/13
Page 373 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 33 04 Private Litigatio 04/06/11 J McGarry
13 01 33 04 Private Litigatio 04/19/11
13 01 33 04 Private Litigatio 09/05/12
13 01 33 04 Private Litigatio 09/26/12 Pacifica Law Group
13 01 33 04 Private Litigatio 08/28/12
13 01 33 04 Private Litigatio 08/28/12
13 01 33 04 Private Litigatio 10/03/12
13 01 33 04 Private Litigatio 10/04/12
13 01 33 04 Private Litigatio 11/28/12
13 01 33 04 Private Litigatio 11/28/12
13 01 33 04 Private Litigatio 11/28/12
13 01 33 04 Private Litigatio 10/26/12 BN/Kuhl
13 01 33 04 Private Litigatio 11/09/12 Pacifica Law Group
13 01 34 Interim Actions
13 01 34 01 Interim Actions
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
J McGarry email to DEQ Legal/Haque-Hausrath re: Access denied for testing by Krohnes
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
DEQ Legal/ Haque-Hausrath email to J McGarry re: Krohne testing
DEQ Legal/ Haque-Hausrath
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Cok Kinzler Law/McGarry & DEQ legal/Haque-Hausrath emails re: McGarry request for testing data - DEQ response
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Pacific Law Group/Lawrence letter to DEQ/Reynolds & Haque-Hausrath re: BNSF's Request for Entry to inspect and sample for purposes of litigation pending in the US District Court
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Disctrict Court Papers for Dave Burley re: BNSF's request for entry
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Disctrict Court Papers for Diana & Kenneth Merideth re: BNSF's request for entry
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Cok Kinzler Law/McGarry & DEQ legal/Haque-Hausrath emails re: McGarry request for cost estimates for air mitigation system for Burley/Khrone - DEQ response
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Cok Kinzler Law/McGarry & DEQ legal/Haque-Hausrath emails re: McGarry request for information on air mitigation system for Burley/Khrone - DEQ response
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Disctrict Court Papers for Francis Horiel re: BNSF's request for entry
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Disctrict Court Papers for Dwight & Kitty Khrone re: BNSF's request for entry
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Disctrict Court Papers for Dana Nelson re: BNSF's request for entry
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
BN/Kuhl letter to DEQ legal/Haque-Hausrath re:BN's potential conveyance of Livingston real property to institutional controls
Site-Wide Information
Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne
Pacific Law Group/Lawrence letter to DEQ/Reynolds & Haque-Hausrath re: Results from BNSF's sampling pursuant to its Request for Entry
Site-Wide Information
Site-Wide Information
Electric Shop Excavation (heading)
BN LIVINGSTON 8/26/13
Page 374 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 34 01 01 Interim Actions Work Plans 1/99-8/07
13 01 34 01 01 Interim Actions Work Plans HSI Geotrans fax to DEQ re: Comments to Work Plan 01/13/99 Geotrans
13 01 34 01 01 Interim Actions Work Plans DEQ letter to BNSF re: Work Plan 02/23/99 DEQ
13 01 34 01 01 Interim Actions Work Plans Electric Shop Soil Excavation Final Work Plan 06/28/99
13 01 34 01 01 Interim Actions Work Plans Final revision of Electric Shop Work Plan 06/28/99
13 01 34 01 01 Interim Actions Work Plans 07/01/99 DEQ
13 01 34 01 01 Interim Actions Work Plans Activity report 02/25/00
13 01 34 01 01 Interim Actions Work Plans Envirocon transmittal - Electric Shop Work Plan 09/05/01 Envirocon
13 01 34 01 01 Interim Actions Work Plans Envirocon Transmittal-Addendum 03/15/02 Envirocon
13 01 34 01 01 Interim Actions Work Plans 03/15/02
13 01 34 01 01 Interim Actions Work Plans 07/03/02 TetraTech
13 01 34 01 01 Interim Actions Work Plans Tetra Tech Letter to DEQ re: Addendum 07/03/02 TetraTech
13 01 34 01 01 Interim Actions Work Plans DEQ letter to BNSF re: Comments to Addendum 02/12/03 DEQ
13 01 34 01 01 Interim Actions Work Plans DEQ & K/J emails re: Revised Task I Work Plan 06/10/05
13 01 34 01 01 Interim Actions Work Plans 10/24/05 KJ
13 01 34 01 01 Interim Actions Work Plans 08/20/07 KJ
13 01 34 01 02 Interim Actions 6/00-8/06
13 01 34 01 02 Interim Actions Phone Log: Smith-BNSF 02/28/00
13 01 34 01 02 Interim Actions May 2000 Slide Photos - Electric Shop Excavation
13 01 34 01 02 Interim Actions Phone Log: Wieringa-Envirocon 06/07/00
13 01 34 01 02 Interim Actions Phone Log: Wieringa-Envirocon 06/15/00
13 01 34 01 02 Interim Actions Envirocon letter re: Excavation 06/26/00 Envirocon
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
DEQ letter to Envirocon re: Final revision of Electric Shop Work Plan
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
Electric Shop Soil Excavation Final Work Plan Addendum 1-Draft
1016/ 45B406
Site-Wide Information
Tetra Tech letter to DEQ re: Recommended comments to Electric Shop Work Plan Addendum No I
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
K/J letter to DEQ re: Electric Shop soil disposal request & work plan
1016/ 45B406
Site-Wide Information
Electric Shop Excavation Soil Sampling Analytical Results and Request for Contained-in Decision
Site-Wide Information
Implementation & Remedial Action
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
BN LIVINGSTON 8/26/13
Page 375 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 34 01 02 Interim Actions Phone Log: Blicker 07/21/00
13 01 34 01 02 Interim Actions Envircon fax re: Soil Sampling e 09/06/00 Envirocon
13 01 34 01 02 Interim Actions Phone Log - McCaffery/Envirocon - Electric Shop 05/11/01
13 01 34 01 02 Interim Actions Phone Log: Barrett PCEC 07/10/01
13 01 34 01 02 Interim Actions DEQ Transmittal-Soils Report to PCEC (2002) DEQ
13 01 34 01 02 Interim Actions DEQ Transmittal to RTI - Soils Report (2002) DEQ
13 01 34 01 02 Interim Actions Site Visit report re: 11/29/01 site visit 01/09/02
13 01 34 01 02 Interim Actions Envirocon letter re: Soil Sampling (2) 01/15/02 Envirocon
13 01 34 01 02 Interim Actions DEQ letter to BNSF re: Soil Treatment 04/08/03 DEQ
13 01 34 01 02 Interim Actions Envirocon letter to DEQ re: Soils Treatment 04/08/03 Envirocon
13 01 34 01 02 Interim Actions Envirocon fax to DEQ re: Soils Treatment 04/08/03 Envirocon
13 01 34 01 02 Interim Actions Phone Log - DEQ to McCaffery/Envirocon 03/15/05 DEQ
13 01 34 01 02 Interim Actions DEQ fax to Envirocon re: Format for Contained-in request 03/15/05 DEQ
13 01 34 01 02 Interim Actions Envirocon letter to DEQ re: Soil disposal, & subsequent faxes 03/21/05 Envirocon
13 01 34 01 02 Interim Actions DEQ internal email re: Soils contained- in request 03/28/05 DEQ internal
13 01 34 01 02 Interim Actions DEQ letter to Envirocon re: Contained-in decision for soils 03/29/05 DEQ
13 01 34 01 02 Interim Actions Envirocon letter to DEQ re: SVE soil sampling 04/18/05 Envirocon
13 01 34 01 02 Interim Actions DEQ letter to BN re: Operational SVE pile sampling 04/22/05 DEQ
13 01 34 01 02 Interim Actions 10/24/05 KJ
13 01 34 01 02 Interim Actions Electric Shop Excavation Soil Sampling & Analysis Plan 08/17/05 KJ
13 01 34 01 02 Interim Actions 12/11/06 DEQ
13 01 34 01 03 Interim Actions Debris Treatment 4/03-10/07
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
K/J letter to DEQ re: Electric Shop soil disposal request & work plan
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
1016/ 45B406
Site-Wide Information
Implementation & Remedial Action
DEQ letter to BNSF re: DEQ approval of the Electric Shop Soil Sampling & Analysis Plan
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 376 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 34 01 03 Interim Actions Debris Treatment 04/25/03 DEQ
13 01 34 01 03 Interim Actions Debris Treatment Internal DEQ meeting notes re: Hazardous Waste 10/21/03 DEQ internal
13 01 34 01 03 Interim Actions Debris Treatment DEQ internal email re: Hazardous waste 10/24/03 DEQ internal
13 01 34 01 03 Interim Actions Debris Treatment DEQ email to BNSF re: Debris treatment standards 03/30/04 DEQ
13 01 34 01 03 Interim Actions Debris Treatment Phone Log: Smith-BNSF 04/01/04
13 01 34 01 03 Interim Actions Debris Treatment Phone Log: Smith 04/05/04
13 01 34 01 03 Interim Actions Debris Treatment DEQ internal email re: Debris Rule 268-45 04/07/04 DEQ internal
13 01 34 01 03 Interim Actions Debris Treatment DEQ internal email re: Debris treatment 04/08/04 DEQ internal
13 01 34 01 03 Interim Actions Debris Treatment Site visit report 04/23/04
13 01 34 01 03 Interim Actions Debris Treatment Conference call 06/02/04
13 01 34 01 03 Interim Actions Debris Treatment Johnson Site visit report 06/03/04 Johnson
13 01 34 01 03 Interim Actions Debris Treatment Meeting notes - A Sivers & I Johnson 06/09/04
13 01 34 01 03 Interim Actions Debris Treatment Phone Log: McCaffrey/Envirocon 06/10/04
13 01 34 01 03 Interim Actions Debris Treatment RCRA email to Envirocon re: Photographs 06/10/04
13 01 34 01 03 Interim Actions Debris Treatment Phone Log: Smith/BNSF 06/16/04
13 01 34 01 03 Interim Actions Debris Treatment Envirocon letter to DEQ re: Concrete debris treatment 06/18/04 Envirocon
13 01 34 01 03 Interim Actions Debris Treatment 06/18/04 Envirocon
13 01 34 01 03 Interim Actions Debris Treatment DEQ transmittal to RTI re: Debris treatment report 06/22/04 DEQ
13 01 34 01 03 Interim Actions Debris Treatment RTI email to DEQ re: Electric Shop Debris 07/09/04 RTI
13 01 34 01 03 Interim Actions Debris Treatment Phone Log: Smith/BNSF 07/12/04
13 01 34 01 03 Interim Actions Debris Treatment Envirocon letter to DEQ re: Truckbed residue sampling 04/18/05 Envirocon
13 01 34 01 03 Interim Actions Debris Treatment 04/18/05 DEQ
1016/ 45B406
Site-Wide Information
DEQ Email to Envirocon re: Placement of Electric Shop material on cinder pile
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
Envirocon transmittal to DEQ re; Shop debris treatment letter report
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
DEQ letter to BN re: Treatment of materials from Electric Shop excavation
BN LIVINGSTON 8/26/13
Page 377 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 34 01 03 Interim Actions Debris Treatment Phone Log - Dan McCaffery to DEQ 04/26/05 D McCaffery
13 01 34 01 03 Interim Actions Debris Treatment DEQ letter to BN re: Truckbed residue sampling 05/23/05 DEQ
13 01 34 01 03 Interim Actions Debris Treatment DEQ email to Envirocon re: Truckbed residue data 08/08/05 DEQ
13 01 34 01 03 Interim Actions Debris Treatment Envirocon fax to DEQ re: Truckbed residue analytical data 08/08/05 Envirocon
13 01 34 01 03 Interim Actions Debris Treatment DEQ email to BNSF & Envirocon re: Sampling photos 10/03/05 DEQ
13 01 34 01 03 Interim Actions Debris Treatment 10/12/05
13 01 34 01 03 Interim Actions Debris Treatment Truck Bed Silty Residue Sampling Results Report 11/11/05
13 01 34 01 03 Interim Actions Debris Treatment 12/15/06 DEQ
13 01 34 01 03 Interim Actions Debris Treatment 12/15/06 DEQ
13 01 34 01 03 Interim Actions Debris Treatment Truck BED Silty Residue Sampling Results revisions 02/01/07 DEQ/ Reynolds
13 01 34 01 03 Interim Actions Debris Treatment 02/26/07
13 01 34 01 03 Interim Actions Debris Treatment SAP for Treated Concrete & Rock Debris revisions 02/26/07 DEQ/ Reynolds
13 01 34 01 03 Interim Actions Debris Treatment 02/27/07 KJ
13 01 34 01 03 Interim Actions Debris Treatment 02/27/07
13 01 34 01 03 Interim Actions Debris Treatment 04/24/07 DEQ
13 01 34 01 03 Interim Actions Debris Treatment 04/24/07 DEQ
13 01 34 01 03 Interim Actions Debris Treatment K/J email to DEQ re: Livingston Deliverables 07/03/07 KJ
13 01 34 01 03 Interim Actions Debris Treatment DEQ/KJ emails re: Resample Soil Pile #28 7/23-7/24/07
13 01 34 01 03 Interim Actions Debris Treatment K/J email to DEQ re: Livingston Deliverable 08/20/07 KJ
13 01 34 01 03 Interim Actions Debris Treatment DEQ letter to BNSF re: Electric Shop 08/20/07 DEQ
13 01 34 01 03 Interim Actions Debris Treatment DEQ/KJ emails re: Truck Bed 10/3-10/4/07
13 01 34 01 03 Interim Actions Debris Treatment DEQ letter to BNSF re: Truck bed sampling results 10/04/07 DEQ
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
Phone Log - K/J & DEQ re: Handling & disposal of Electric Shop soils & Debris
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
DEQ letter to BNSF re: October 28, 2005 Draft SAP for Treated Rock & Concrete Debris – Shop Complex
1016/ 45B406
Site-Wide Information
DEQ letter to BNSF re: November 11, 2005 Truck Bed Residue Sampling Result & request for Contained-in decision
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
DEQ & K/J emails re: Revised SAP for Treated Concrete & Rock Debris
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
K/J letter report to DEQ re: Revised SAP for Treated Concrete & Rock Debris
1016/ 45B406
Site-Wide Information
Truck Bed Silty Residue Sampling Results & Request for Contained-in Decision
1016/ 45B406
Site-Wide Information
DEQ letter to BNSF re: SAP for Treated Concrete & Rock Debris
1016/ 45B406
Site-Wide Information
DEQ letter to BNSF re: 2/27/07 Truck Bed Silty Residue Sampling Results & Request for Contained-in Decision
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 378 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 34 01 04 Interim Actions Work Plans Violation 12/01-11/05
13 01 34 01 04 Interim Actions Work Plans Violation DEQ internal email re: Soils 12/20/01 DEQ internal
13 01 34 01 04 Interim Actions Work Plans Violation Phone Log: Smith-BNSF 12/21/01
13 01 34 01 04 Interim Actions Work Plans Violation DEQ internal memo re: Work Plan Violation 12/21/01 DEQ internal
13 01 34 01 04 Interim Actions Work Plans Violation Phone Log: McCaffery/Envircon 12/31/01
13 01 34 01 04 Interim Actions Work Plans Violation Y ** DEQ internal email re: Penalties 01/04/02 DEQ internal
13 01 34 01 04 Interim Actions Work Plans Violation Envirocon letter re: Soil Sampling 01/15/02 Envirocon
13 01 34 01 04 Interim Actions Work Plans Violation Y ** DEQ internal memo re: Violation 01/18/02 DEQ internal
13 01 34 01 04 Interim Actions Work Plans Violation Phone Log: PCEC 01/30/02
13 01 34 01 04 Interim Actions Work Plans Violation Electric Shop WP Violation Settlement Agreement 01/31/02
13 01 34 01 04 Interim Actions Work Plans Violation DEQ Transmittal to Steven Wade re: Settlement agreement 02/12/02 DEQ
13 01 34 01 04 Interim Actions Work Plans Violation Phone Log: McCaffery-Envirocon 12/24/02
13 01 34 01 04 Interim Actions Work Plans Violation DEQ letter to BN re: Uncovered soil pile 10/28/05 DEQ
13 01 34 01 04 Interim Actions Work Plans Violation 11/22/05 KJ
13 01 34 02 Interim Actions
13 01 34 02 Interim Actions DEQ internal email re: MRL vault cinders 03/15/04 DEQ internal
13 01 34 02 Interim Actions DEQ internal email re: MRL vault cinders 03/18/04 DEQ internal
13 01 34 02 Interim Actions DEQ email to BN re: MRL vault cinders 03/18/04 DEQ
13 01 34 02 Interim Actions DEQ internal email re: MRL vault cinders 03/18/04 DEQ internal
13 01 34 02 Interim Actions Phone Log: McCaffrey/Envirocon 06/10/04
13 01 34 02 Interim Actions Phone Log: McCaffrey/Envirocon 06/10/04
13 01 34 02 Interim Actions Phone Log: Smith/BNSF 07/27/04
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
Site-Wide Information
1016/ 45B406
Site-Wide Information
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
1016/ 45B406
Site-Wide Information
K/J letter to DEQ re: Electric Shop stockpile response to DEQ 10/28/05 letter
Site-Wide Information
Task C - Cinder Pile Capping
Site-Wide Information
Task C - Cinder Pile Capping
Site-Wide Information
Task C - Cinder Pile Capping
Site-Wide Information
Task C - Cinder Pile Capping
Site-Wide Information
Task C - Cinder Pile Capping
Site-Wide Information
Task C - Cinder Pile Capping
Site-Wide Information
Task C - Cinder Pile Capping
Site-Wide Information
Task C - Cinder Pile Capping
BN LIVINGSTON 8/26/13
Page 379 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 34 02 Interim Actions Phone Log: Smith/BNSF 08/10/04
13 01 34 02 Interim Actions Phone Log: Smith/BNSF 08/12/04
13 01 34 02 Interim Actions Y ** DEQ internal email re: ERCLs 11/04/04 DEQ internal
13 01 34 02 Interim Actions DEQ internal email re: Shrubs in Cinder pile 11/05/04 DEQ internal
13 01 34 02 Interim Actions Phone Log - Blicker/RTI 02/04/05
13 01 34 02 Interim Actions Phone Log - Golnar/City of Livingston 02/04/05
13 01 34 02 Interim Actions Phone Log- Smith/BN 02/04/05
13 01 34 02 Interim Actions Envirocon email to DEQ re: Traffic figure for public meeting 02/08/05 Envirocon
13 01 34 02 Interim Actions 02/18/05 BN
13 01 34 02 Interim Actions DEQ email to RTI re: Cinder Pile public meeting 02/24/05 DEQ
13 01 34 02 Interim Actions DEQ email to BN re: Stormwater permit 02/25/05 DEQ
13 01 34 02 Interim Actions Y ** DEQ & RTI emails re: Cinder Pile Cap 05/10/06
13 01 34 02 01 Interim Actions Cinder Pile Work Plans
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ letter to Envirocon re: Cinder Pile 07/21/93 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ letter to Envirocon re: Cinder Pile 07/28/97 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ letter to BNSF re: Cinder Pile fencing 10/03/98 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ letter to BNSF re: Cinder Pile fencing 10/05/98 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Revised 2000 Vegetation Guidelines (Revised)
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: John Wadhams (6/2000) 06/01/00
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Denise Martin 06/05/00
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Wieringa/Envirocon 06/15/00
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Wieringa/Envirocon 06/22/00
Site-Wide Information
Task C - Cinder Pile Capping
Site-Wide Information
Task C - Cinder Pile Capping
Site-Wide Information
Task C - Cinder Pile Capping
Site-Wide Information
Task C - Cinder Pile Capping
Site-Wide Information
Task C - Cinder Pile Capping
Site-Wide Information
Task C - Cinder Pile Capping
Site-Wide Information
Task C - Cinder Pile Capping
Site-Wide Information
Task C - Cinder Pile Capping
Site-Wide Information
Task C - Cinder Pile Capping
BN transmittal to DEQ re: Copy of Stormwater permit for Cinder Pile
Site-Wide Information
Task C - Cinder Pile Capping
Site-Wide Information
Task C - Cinder Pile Capping
Site-Wide Information
Task C - Cinder Pile Capping
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 380 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Wieringa/Envirocon 06/21/00
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Wadhams 06/19/00
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Envirocon email to DEQ re: Cinder pile electric lines & photos Envirocon
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Wieninga/Envirocon 06/27/00
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: KOK/Envirocon 06/28/00
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Envirocon 06/29/00
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Wadhams 06/26/00
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Envirocon (1) 06/30/00
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Envirocon (2) 06/30/00
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Envirocon letter to DEQ re: Cinder pile utility work 06/30/00 Envirocon
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Envirocon email to DEQ re: Cinder pile utility work 07/03/00 Envirocon
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Joy/Envirocon 07/05/00
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Wieninga/Envirocon 07/05/00
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Wieninga/Envirocon 07/05/00
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: MT Power Co. 07/05/00
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: MT Power Co. 07/06/00
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: McDonough 07/06/00
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Sullivan-MPC Bozeman 07/12/00
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: KOK/Envirocon 09/12/00
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Envirocon letter to DEQ re: Request for interim action 09/20/00
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Rocky Mountain Engineers 09/25/00
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Wieninga/Envirocon 09/25/00
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 381 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: John Wadhams/DEQ 10/03/00
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ internal email re: Cinder pile 10/03/00 DEQ internal
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ memo to the file 10/04/00 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Wieninga/Envirocon 10/05/00
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Wieninga/Envirocon 10/18/00
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 10/19/00 DEQ internal
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ internal memo: Cinder pile capping costs 12/04/00 DEQ internal
13 01 34 02 01 Interim Actions Cinder Pile Work Plans RTI letter to Envirocon re: Cinder pile capping 04/16/01 RTI
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log - McCaffery/Envirocon - Cinder Pile Capping 05/11/01
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Meeting minutes 06/07/01 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Envirocon fax re: Various issues 06/20/01 Envirocon
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Envirocon fax re: Cinder pile 06/20/01 Envirocon
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: McCaffrey/Envirocon 06/20/01
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: McCaffrey/Envirocon 06/27/01
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Envirocon fax re: Cinder pile cap thickness 10/13/01 Envirocon
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ internal email: ACM 11/05/01 DEQ internal
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: David Smith/BNSF 11/28/01
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ internal email re: Cinder pile 12/03/01 DEQ internal
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 12/19/01
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 12/19/01 Envirocon
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 12/20/01 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: McCaffrey/Envirocon 12/20/01
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
DEQ internal email re: Free product testing, cinder pile sampling
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information 1st Draft Cinder Pile Work Plan
1173/ 61P606
Site-Wide Information Envirocon transmittal re: 1st Draft Cinder Pile Work Plan
1173/ 61P606
Site-Wide Information DEQ transmittal to RTI re: 1st Draft Cinder Pile Work Plan
1173/ 61P606
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 382 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 01/22/02 PECE
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Blicker/RTI 01/31/02
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: David Smith/BNSF 02/28/02
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Y ** DEQ internal email re: Cinder Pile ACM 03/06/02
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: McCaffrey/Envirocon 03/06/02
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: David Smith/BNSF 03/11/02
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 05/23/02 TetraTech
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Y ** DEQ internal email re: Asbestos ERCLS 01/13/03 DEQ internal
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Y ** DEQ internal email re: Cinder pile plan, Electric shop soils 01/13/03 DEQ internal
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Y ** DEQ internal email re: Fenton's Reagent 01/13/03 DEQ internal
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 02/06/03 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 03/18/03 Envirocon
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 03/20/03 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Email from Envirocon to DEQ re: Dust control 03/24/03 Envirocon
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 03/27/03 PECE
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 03/28/03 DEQ internal
13 01 34 02 01 Interim Actions Cinder Pile Work Plans City of Livingston letter to DEQ re: Truck haul plans 03/31/03 City of Livingston
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 04/03/03 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ & Envirocon emails re: Seed mix 04/22/03
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ email to Envirocon re: Seed mix 04/23/03 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 03/18/03
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 04/25/03 DEQ
1173/ 61P606
Site-Wide Information PECE letter re: Comments to 1st Draft Cinder Pile Work Plan
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
Tetra Tech letter to DEQ re: Comments to the 1st Draft Cinder Pile Work Plan
Site-Wide Information
Site-Wide Information
Site-Wide Information
1173/ 61P606
Site-Wide Information
DEQ letter to BNSF re: Comments to the 1st Draft Cinder Pile Work Plan
1173/ 61P606
Site-Wide Information Envirocon cover letter to 2nd Draft Cinder Pile Work Plan
1173/ 61P606
Site-Wide Information DEQ cover letter to RTI for 2nd Draft Cinder Pile Work Plan
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information PCEC Comments to 2nd Draft Cinder Pile Work Plan
1173/ 61P606
Site-Wide Information DEQ internal email re: 2nd Draft Cinder Pile Work Plan
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
DEQ letter to BNSF re: Comments to 2nd Draft Cinder Pile Work Plan
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information 2nd Draft Cinder Pile Work Plan
1173/ 61P606
Site-Wide Information
DEQ email to Envirocon re: Placement of electric shop material on cinder pile
BN LIVINGSTON 8/26/13
Page 383 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 08/06/03
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 08/06/03 Envirocon
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 08/14/03 Deq
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Internal DEQ meeting notes re: Hazardous Waste 10/21/03 DEQ internal
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ internal email re: Hazardous Waste 10/24/03 DEQ internal
13 01 34 02 01 Interim Actions Cinder Pile Work Plans BN email to DEQ re: Work Plan & schedule 03/09/04 BN
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 03/15/04 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 03/29/04
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 03/29/04 Envirocon
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Smith/BNSF 03/30/04
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ letter to BNSF re: Vault Cinders 03/30/04 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ letter to RTI/PCEC re: Cinder Pile Work Plan 04/02/04 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 04/07/04 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Blicker/RTI 04/07/04
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Smith/BNSF 04/08/04
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Envirocon fax re: Cinders 04/12/04
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 04/12/04
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ letter to RTI re: Cinder Pile Work Plan 04/16/04 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 04/16/04 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Y ** DEQ internal emails re: Cinder Pile Work Plan & SOW 11/23/04 DEQ internal
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ email to BNSF re: Work Plan 01/12/05 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log – BN to DEQ re: Cinder Pile Work Plan 01/12/05 BN
1173/ 61P606
Site-Wide Information 3rd Draft Cinder Pile Work Plan
1173/ 61P606
Site-Wide Information Envirocon cover letter to 3rd Draft Cinder Pile Work Plan
1173/ 61P606
Site-Wide Information DEQ transmittal to RTI re: Cinder Pile Work Plan 3rd Draft
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
DEQ letter to BNSF re: Comments to 3rd Draft Cinder Pile Work Plan
1173/ 61P606
Site-Wide Information 4th Draft Cinder Pile Work Plan
1173/ 61P606
Site-Wide Information
Envirocon letter to DEQ re: 4th Draft Cinder Pile Work Plan replacement inserts & DEQ Comments response
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information DEQ letter to BNSF re: 4th Draft Cinder Pile Work Plan
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information 3rd Draft cinder pile work plan appendix G page 3
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
DEQ letter to BNSF re: Comments to 4th draft Cinder Pile Work Plan
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 384 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 01/21/05 Envirocon
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log – BN to DEQ re: Cinder Pile Work Plan 01/31/05 BN
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 01/31/05 Envirocon
13 01 34 02 01 CD Interim Actions Cinder Pile Work Plans Cinder Pile Work Plan electronic files on CD 02/01/05
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ letter to BN re: Approval of Cinder Pile Work Plan 02/04/05 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ email to BN re: Materials for Public Meeting 02/08/05 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ/BN emails re: Work Plan copies for repositories 02/09/05
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Envirocon revised schedule for Cinder Pile capping 02/10/05 Envirocon
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 02/10/05 Envirocon
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 02/11/05 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 02/11/05 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ transmittal to MSU Library re: Cinder Pile Work Plan 02/11/05 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ transmittal to RTI re: Cinder Pile Work Plan 02/11/05 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 02/11/05 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ transmittal to MRL re: Cinder Pile Work Plan 02/11/05 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ transmittal to Talgo-LRC re: Cinder Pile Work Plan 02/11/05 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans 02/15/05 Envirocon
13 01 34 02 01 Interim Actions Cinder Pile Work Plans Envirocon revised figure 3-1 02/15/05 Envirocon
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ email to Envirocon re: Revised schedule 02/15/05 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ email to Talgo-LRC re: Work Plan & schedule 02/28/05 DEQ
13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ email to Envirocon re: Extra Work Plan to Talgo-LRC 03/01/05 DEQ
13 01 34 02 02 Interim Actions
1173/ 61P606
Site-Wide Information
Envirocon transmittal letter to DEQ re: 5th draft Cinder Pile Work Plan
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information 5th draft Cinder Pile Work Plan
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
Envirocon transmittal to DEQ re: Extra copies of Cinder Pile Work Plan
1173/ 61P606
Site-Wide Information
DEQ transmittal to Park Co. Commissioners re: Cinder Pile Work Plan
1173/ 61P606
Site-Wide Information
DEQ transmittal to City Commissioners re: Cinder Pile Work Plan
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
DEQ transmittal to Livingston Library re: Cinder Pile Work Plan
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
Envirocon transmittal to DEQ re: Additional copies of Work Plan; revised figure 3-1
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
BN LIVINGSTON 8/26/13
Page 385 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 34 02 02 Interim Actions DEQ email to BN re: Storm water permitting 02/03/05 DEQ
13 01 34 02 02 Interim Actions Phone Log - Kurt Wieringa/Envirocon to DEQ 03/15/05 Envirocon
13 01 34 02 02 Interim Actions Phone Log - D Tisdell/Envirocon to DEQ 03/15/05 Envirocon
13 01 34 02 02 Interim Actions Phone Log - DEQ to D McCaffery/Envirocon 03/15/05 DEQ
13 01 34 02 02 Interim Actions DEQ email to BN re: Sub-grade approval 03/17/05 DEQ
13 01 34 02 02 Interim Actions Phone Logs - Wieringa/Envirocon 3/22-3/29/05 Envirocon
13 01 34 02 02 Interim Actions Phone Log - Wieringa/Envirocon to DEQ 03/30/05 Envirocon
13 01 34 02 02 Interim Actions DEQ internal emails re: Seed mix 04/14/05 DEQ internal
13 01 34 02 02 Interim Actions Phone Log - Joe Russell Trucking/Seeding 04/14/05
13 01 34 02 02 Interim Actions DEQ & K Wieringa emails re: Weather/work 04/18/05
13 01 34 02 02 Interim Actions NESH Ad requirements for signature - discussed 5/3/05 05/03/05
13 01 34 02 02 Interim Actions DEQ internal email re: Cinder Pile signage 05/03/05 DEQ internal
13 01 34 02 02 Interim Actions DEQ & Envirocon emails re: Fencing 05/19/05
13 01 34 02 02 Interim Actions Envirocon email to DEQ re: Cinder Pile fence 06/08/05 Envirocon
13 01 34 02 02 Interim Actions Envirocon email to DEQ re: Cinder Pile fence 06/09/05 Envirocon
13 01 34 02 02 Interim Actions Envirocon email to DEQ re: Cinder Pile fence 06/10/05 Envirocon
13 01 34 02 02 Interim Actions DEQ internal email re: Cinder Pile fencing 06/29/05 DEQ internal
13 01 34 02 02 Interim Actions DEQ & Envirocon emails re: Cinder pile inspection form 08/23/05
13 01 34 02 02 Interim Actions DEQ email to BNSF re: Inspections 09/02/05 DEQ
13 01 34 02 02 Interim Actions Envirocon fax to DEQ re: Weed Control Plan 09/16/05 Envirocon
13 01 34 02 02 Interim Actions 10/12/05 Envirocon
13 01 34 02 02 Interim Actions Draft Cinder Pile Cap Remedial Action Report 10/13/05 Envirocon
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
Envirocon letter to DEQ re: Potential ACM contained within Livingston Rail Yard Cinder Pile
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
BN LIVINGSTON 8/26/13
Page 386 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 34 02 02 Interim Actions Draft Cinder Pile Cap Remedial Action Transmittal 10/13/05 Envirocon
13 01 34 02 02 Interim Actions Field Book - 3/9/05 - 10/26/05 3/9-10/26/05 DEQ
13 01 34 02 02 Interim Actions 06/06/11 KJ Aldersley
13 01 34 02 02 Interim Actions 11/14/11 DEQ/ Reynolds
13 01 34 02 02 Interim Actions 11/16/11
13 01 34 02 02 Interim Actions 12/28/11 Evirocon
13 01 34 02 02 CD Interim Actions 2nd Draft Cinder Pile Cap Remedial Action Report 12/29/11 Evirocon
13 01 34 02 02 Interim Actions 01/03/12 Evirocon
13 01 34 02 02 Interim Actions 02/08/12
13 01 34 02 02 Interim Actions 03/01/12 DEQ/ Reynolds
13 01 34 02 03 Interim Actions
13 01 34 02 03 Interim Actions DEQ & Envirocon emails re: Cinder Pile Inspection 08/16/05
13 01 34 02 03 Interim Actions Envirocon Cinder Pile inspection report for July 2005 09/12/05 Envirocon
13 01 34 02 03 Interim Actions 09/16/05 DEQ
13 01 34 02 03 Interim Actions DEQ & Envirocon emails re: Cinder Pile plant photos 10/28/05
13 01 34 02 03 Interim Actions 10/28/05 DEQ
13 01 34 02 03 Interim Actions DEQ/Envirocon emails re: Cinder pile inspection 05/11/06
13 01 34 02 03 Interim Actions Phone Log – DEQ/D Caffery re: Cinder pile inspection 05/11/06
13 01 34 02 03 Interim Actions DEQ/KJ emails re: Cinder pile inspection 05/22/06
13 01 34 02 03 Interim Actions DEQ/KJ emails re: Cinder pile inspection 05/25/06
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
1173/ 61P606
Site-Wide Information
Task C - Cinder Pile Capping
K/J/Aldersley email to EQ/Reynolds re: Notification of Annual Cinder Pile Inspection
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
DEQ/Reynolds letter to BN/Smith re: DEQ comments on the Draft Cinder Pile Cap Remedial Action Report (10/13/05)
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
DEQ legal/Haque-Hausrath & BKBH/ J Luther emails re: Institutional controls - Cinder Pile
1173/ 61P606
Site-Wide Information
Task C - Cinder Pile Capping
Envirocon/McCaffery cover letter to DEQ/Reynolds re: Attached - Electronic copies of 2nd Draft Cinder Pile Cap Remedial Action Report
1173/ 61P606
Site-Wide Information
Task C - Cinder Pile Capping
1173/ 61P606
Site-Wide Information
Task C - Cinder Pile Capping
Envirocon/McCaffery cover letter to DEQ/Reynolds re: 2nd Draft Cinder Pile Cap Remedial Action Report
1173/ 61P606
Site-Wide Information
Cinder Pile Capping -Implementation
BKBH/Luther & DEQ legal/Haque-Hausrath emails re: Cinder pile institutional controls - Attachment - Recorded IC's pdf
1173/ 61P606
Site-Wide Information
Task C - Cinder Pile Capping
DEQ/Reynolds letter to BN/Smith re: DEQ approves the 2nd Draft Cinder Pile Cap Remedial Action Report with the inclusion of the final filed Ics.
Site-Wide Information
Cinder Pile Inspection Reports
Site-Wide Information
Cinder Pile Inspection Reports
Site-Wide Information
Cinder Pile Inspection Reports
Site-Wide Information
Cinder Pile Inspection Reports DEQ email to BN & Envirocon re: July 2005 Inspection Report
Site-Wide Information
Cinder Pile Inspection Reports
Site-Wide Information
Cinder Pile Inspection Reports
DEQ letter to BN re: Listed waste soil piles at BN Shop Complex
Site-Wide Information
Cinder Pile Inspection Reports
Site-Wide Information
Cinder Pile Inspection Reports
Site-Wide Information
Cinder Pile Inspection Reports
Site-Wide Information
Cinder Pile Inspection Reports
BN LIVINGSTON 8/26/13
Page 387 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 34 02 03 Interim Actions DEQ/CDM emails re: Cinder pile 6/3-6/20/07
13 01 34 02 03 Interim Actions KJ email to DEQ re: Cinder pile inspection 06/20/07 KJ
13 01 34 02 03 Interim Actions DEQ/KJ emails re: Cinder pile 06/03/08
13 01 34 02 03 Interim Actions DEQ/CDM emails re: Cinder pile 6/11-6/12/08
13 01 34 02 03 Interim Actions Site Oversight Report 06/09/09 CDM
13 01 34 02 03 Interim Actions CDM email to DEQ re: Task C – Cinder Pile billing time 06/10/09 CDM
13 01 34 02 03 Interim Actions KJ email to DEQ re: Annual inspection scheduled 05/26/10 KJ
13 01 34 02 03 Interim Actions Annual Cinder Pile Cap Inspection Report 06/10/10 CDM
13 01 34 02 03 Interim Actions CDM Oversight Report 06/09/11 CDM
13 01 34 02 03 Interim Actions 05/25/12
13 01 34 02 03 Interim Actions CDM Smith Oversight Report 05/31/12 CDM Smith
13 01 34 02 03 Interim Actions 06/03/13 KJ/Aldersley
13 01 34 02 03 Interim Actions 07/08/13 KJ/Aldersley
13 01 34 03 Interim Actions C&P Packing
13 01 34 03 Interim Actions C&P Packing C&P Packing Investigation Report 11/10/00 WET
13 01 34 03 Interim Actions C&P Packing WET transmittal to DEQ re: C&P Packing report 11/13/00 WET
13 01 34 03 Interim Actions C&P Packing Replacement page for C&P Packing report 11/15/00 WET
13 01 34 03 Interim Actions C&P Packing 11/17/00
13 01 34 03 Interim Actions C&P Packing C&P Packing legal description
13 01 34 03 Interim Actions C&P Packing DEQ letter to BN re: C&P Packing Work Plan 11/21/00 DEQ
13 01 34 03 Interim Actions C&P Packing BN letter DEQ re: Investigation at C&P 11/29/00 BN
13 01 34 03 Interim Actions C&P Packing Envirocon fax to DEQ re: Work Plan approvals 12/01/00 Envirocon
Site-Wide Information
Cinder Pile Inspection Reports
Site-Wide Information
Cinder Pile Inspection Reports
Site-Wide Information
Cinder Pile Inspection Reports
Site-Wide Information
Cinder Pile Inspection Reports
Site-Wide Information
Cinder Pile Inspection Reports
Site-Wide Information
Cinder Pile Inspection Reports
Site-Wide Information
Cinder Pile Inspection Reports
Site-Wide Information
Cinder Pile Inspection Reports
Site-Wide Information
Cinder Pile Inspection Reports
Site-Wide Information
Cinder Pile Inspection Reports
KJ/Aldersley & DEQ/Reynolds emails re: Notification of Cinder Pile inspection
Site-Wide Information
Cinder Pile Inspection Reports
Site-Wide Information
Cinder Pile Inspection Reports
KJ/Aldersley & DEQ/Reynolds emails re: Cinder Pile inspection email
Site-Wide Information
Cinder Pile Inspection Reports
KJ/Aldersley email to DEQ/Reynolds re: Cinder Pile vegetation email
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
CWB & McGarry letter to DEQ re: Proposed Plan - C&P Packing
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 388 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 34 03 Interim Actions C&P Packing CWB&M fax/& letter to DEQ re: Objection to Proposed Plan 12/01/00 CWB&M
13 01 34 03 Interim Actions C&P Packing 12/04/00 Envirocon
13 01 34 03 Interim Actions C&P Packing DEQ internal email re: Permit requirements 12/12/00 DEQ internal
13 01 34 03 Interim Actions C&P Packing Phone Log - Erickson/WET 12/12/00
13 01 34 03 Interim Actions C&P Packing Phone Log - McCaffrey/Envirocon 12/13/00
13 01 34 03 Interim Actions C&P Packing Phone Log - KOK/Envirocon 12/14/00
13 01 34 03 Interim Actions C&P Packing Lab data sheets for C&P Packing report (received 12/14/00) 12/14/00 WET
13 01 34 03 Interim Actions C&P Packing WET fax to DEQ re: Test pit logs 12/14/00 WET
13 01 34 03 Interim Actions C&P Packing 12/14/00 Envirocon
13 01 34 03 Interim Actions C&P Packing 12/15/00 DEQ
13 01 34 03 Interim Actions C&P Packing DEQ fax to Envirocon re: Objection top Proposed Plan 12/15/00 DEQ
13 01 34 03 Interim Actions C&P Packing WET C&P Packing test pit logs (received 12/18/00) 12/18/00 WET
13 01 34 03 Interim Actions C&P Packing CWB&M letter to DEQ re: Objections to Proposed Plan 12/28/00 CWB&M
13 01 34 03 Interim Actions C&P Packing CWB&M letter to DEQ re: Objections to Proposed Plan 12/29/00 CWB&M
13 01 34 03 Interim Actions C&P Packing DEQ fax to RTI re: WET C&P Packing Report 01/19/01 DEQ
13 01 34 03 Interim Actions C&P Packing DEQ fax to Sheperd re: C&P Packing 02/22/01 DEQ
13 01 34 03 Interim Actions C&P Packing DEQ fax to Thurber re: Test pit maps 02/27/01 DEQ
13 01 34 03 Interim Actions C&P Packing DEQ comment letter to BN re: Draft C&P Packing Work Plan 02/28/01 DEQ
13 01 34 03 Interim Actions C&P Packing Phone Log - Smith/BN 05/01/01
13 01 34 03 Interim Actions C&P Packing DEQ email to BN re: Deadline for C&P Work Plan 05/02/01 DEQ
13 01 34 03 Interim Actions C&P Packing 05/16/01 Mosser
13 01 34 03 Interim Actions C&P Packing Meeting minutes 06/07/01 DEQ
Site-Wide Information
Site-Wide Information
Envirocon letter to DEQ re: Data missing from WET C&P report
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Envirocon transmittal to DEQ re: Draft C&P Packing Work Plan
Site-Wide Information
DEQ fax to Envirocon re: Test pit logs, chain of custody & replacement page - C&P Packing report
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Mosser letter to Library Board of Trustees re: CMC East Main Depot site, Dioxins
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 389 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 34 03 Interim Actions C&P Packing 06/14/01 Envirocon
13 01 34 03 Interim Actions C&P Packing Envirocon letter to DEQ re: DEQ comments to draft work plan 06/14/01 Envirocon
13 01 34 03 Interim Actions C&P Packing 06/15/01 Envirocon
13 01 34 03 Interim Actions C&P Packing DEQ fax to Livingston Enterprise 06/20/01 DEQ
13 01 34 03 Interim Actions C&P Packing Y ** DEQ internal email re: Dioxins 06/25/01 DEQ internal
13 01 34 03 Interim Actions C&P Packing 07/10/01 DEQ
13 01 34 03 Interim Actions C&P Packing 07/10/01 DEQ
13 01 34 03 Interim Actions C&P Packing State Library search - Pacific Hide & Fur 07/12/01
13 01 34 03 Interim Actions C&P Packing DEQ internal email re: Pacific Hide & Fur 07/16/01 DEQ internal
13 01 34 03 Interim Actions C&P Packing 09/12/01
13 01 34 03 Interim Actions C&P Packing RTI letter to DEQ re: Pacific Hide & Fur transformers 11/09/01 RTI
13 01 34 03 Interim Actions C&P Packing Phone Log - Smith/BN 02/28/02
13 01 34 03 Interim Actions C&P Packing Phone Log - Golnar/City of Livingston 03/06/02
13 01 34 03 Interim Actions C&P Packing DEQ letter to Martin re: Detention Facility @ C&P Packing 04/11/02 DEQ
13 01 34 03 Interim Actions C&P Packing Phone Log - Smith/BN 02/24/05
13 01 34 03 Interim Actions C&P Packing DEQ letter to BN re: Use of C&P Packing property 03/02/05 DEQ
13 01 34 03 Interim Actions C&P Packing Phone Log - D Smith/BN 03/04/05
13 01 34 03 Interim Actions C&P Packing BN Letter to DEQ re: Trespasser 03/17/05 BN
13 01 34 03 Interim Actions C&P Packing BN Letter to DEQ re: Demolition of structure 03/17/05 BN
13 01 34 03 01 Interim Actions Work Plans
13 01 34 03 01 Interim Actions Work Plans DEQ comment letter to BN re: Draft C&P Packing Work Plan 02/28/01 DEQ
13 01 34 03 01 Interim Actions Work Plans Phone Log: Carter 07/31/01
Site-Wide Information 2nd Draft C&P Packing Work Plan
Site-Wide Information
Site-Wide Information Envirocon email to DEQ re: 2nd Draft C&P Packing Work Plan
Site-Wide Information
Site-Wide Information
Site-Wide Information DEQ transmittal to RTI re: 2nd Draft C&P Packing Work Plan
Site-Wide Information DEQ transmittal to PCEC re: 2nd Draft C&P Packing Work Plan
Site-Wide Information
Site-Wide Information
Site-Wide Information RTI/PCEC comments to DEQ re: 2nd draft C&P Work Plan
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 390 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 34 03 01 Interim Actions Work Plans Phone Log: Blicker-RTI 01/31/02
13 01 34 03 01 Interim Actions Work Plans Tetra Tech email to DEQ re: C&P Packing Work Plan 05/30/02 TetraTech
13 01 34 03 01 Interim Actions Work Plans Y 05/30/02 DEQ internal
13 01 34 03 01 Interim Actions Work Plans Y ** DEQ internal email re: C&P Packing Work Plan 06/21/02 DEQ internal
13 01 34 03 01 Interim Actions Work Plans KJ Letter to DEQ re: C&P Packing – Pit SAP 10/29/07 KJ
13 01 34 03 01 Interim Actions Work Plans KJ/DEQ/BNSF email re: C&P Packing – sampling 11/28/07
13 01 34 03 01 Interim Actions Work Plans 11/30/07 CDM
13 01 34 03 01 Interim Actions Work Plans DEQ Letter to BNSF re: C&P Packing SAP 01/24/08 DEQ
13 01 34 03 01 Interim Actions Work Plans KJ email to DEQ re: C&P Packing – sampling notification 01/09/08 KJ
13 01 34 03 01 Interim Actions Work Plans KJ/DEQ emails re: C&P Packing – sampling question 01/10/08
13 01 34 03 01 Interim Actions Work Plans KJ/DEQ emails re: C&P Packing – pit sampling notification 01/09/08
13 01 34 03 01 Interim Actions Work Plans KJ email to DEQ re: C&P Packing – pit sampling notification 04/23/08 KJ
13 01 34 03 01 Interim Actions Work Plans KJ email to DEQ re: C&P Packing Deliverables 07/02/08 KJ
13 01 34 03 01 Interim Actions Work Plans 07/24/08 DEQ
13 01 34 03 02 Interim Actions Reports
13 01 34 03 02 Interim Actions Reports Site Oversight Report 05/08/08 CDM
13 01 34 03 02 Interim Actions Reports 07/02/08 KJ
13 01 34 03 02 Interim Actions Reports K/J email to DEQ: June 2008 Well 89-6 Data 07/10/08 KJ
13 01 34 03 02 Interim Actions Reports Notice of Landspreading 08/01/08
13 01 34 03 02 Interim Actions Reports K/J email to DEQ re: C&P sump sampling notification 10/08/08 KJ
13 01 34 03 02 Interim Actions Reports Former C&P Packing Pit Sumps – Closure Report 10/06/09 KJ
Site-Wide Information
Site-Wide Information
Site-Wide Information
** DEQ internal email re: Tetra Tech comments to Draft C&P Packing Work Plan
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information CDM Letter to DEQ re: C&P Packing Draft Comments on SAP
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
DEQ Letter to BNSF re: C&P Packing – Soil sampling results and request to landspread treated electric shop soil and WWTP sump soil
Site-Wide Information
Site-Wide Information
Site-Wide Information
Former C&P Packing Pit – Soil Sampling Analytical Results & Request to Landspread Treated Electric Shop Soil & WWTP Sump Soil
Site-Wide Information
Site-Wide Information
Site-Wide Information
Site-Wide Information
BN LIVINGSTON 8/26/13
Page 391 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 34 03 02 Interim Actions Reports
13 01 34 03 02 Interim Actions Reports
13 01 35 Reports
13 01 35 Reports 07/20/09 DEQ internal
13 01 35 Reports 07/20/09 DEQ internal
13 01 35 01
13 01 35 01 DEQ & L Pfister emails re: Flood Plain map correspondence 06/24/05
13 01 35 01 07/11/05
13 01 35 01 Hyalite letter to DEQ re: Proposed sewer upgrades 07/18/05 Hyalite
13 01 35 01 DEQ letter to Hyalite re: Sewer upgrade work 07/27/05 DEQ
13 01 35 02
13 01 35 02 02/10/05 DEQ
13 01 35 02 DEQ letter to MRL re: Ongoing maintenance operations 04/28/05 DEQ
13 01 35 02 05/05/05 MRL
Site-Wide Information
Site-Wide Information
Site-Wide Information
3rd Party Work Permitted at the Facility (See also 13-01-32)
1172/ 60E705
Site-Wide Information
3rd Party Work Permitted at the Facility (See also 13-01-32)
DEQ internal emails re: Finding of No Significant Impact and Environmental Assessment for City of Livingston Waste Water Treatment Project
1172/ 60E705
Site-Wide Information
3rd Party Work Permitted at the Facility
DEQ internal emails re: Finding of No Significant Impact and Environmental Assessment for City of Livingston Waste Water Treatment Project
1172/ 60E705
Site-Wide Information
3rd Party Work Permitted at the Facility
Hyalite Proposed Sewer Upgrades
1172/ 60E705
Site-Wide Information
3rd Party Work Permitted at the Facility
Hyalite Proposed Sewer Upgrades
1172/ 60E705
Site-Wide Information
3rd Party Work Permitted at the Facility
Hyalite Proposed Sewer Upgrades
Phone Log - DEQ & C Roark re: City/ACOE sewer replacement & Upgrades
1172/ 60E705
Site-Wide Information
3rd Party Work Permitted at the Facility
Hyalite Proposed Sewer Upgrades
1172/ 60E705
Site-Wide Information
3rd Party Work Permitted at the Facility
Hyalite Proposed Sewer Upgrades
Site-Wide Information
3rd Party Work Permitted at the Facility
MRL Maintenance/Track Work
Site-Wide Information
3rd Party Work Permitted at the Facility
MRL Maintenance/Track Work
Phone Log – DEQ to S Stafford/Talgo re: Worker exposure scenario
Site-Wide Information
3rd Party Work Permitted at the Facility
MRL Maintenance/Track Work
Site-Wide Information
3rd Party Work Permitted at the Facility
MRL Maintenance/Track Work
MT Rail Link/R Shelly email to DEQ/Sivers re: Sampling of area where food pellets were spilled
BN LIVINGSTON 8/26/13
Page 392 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 35 02 MRL letter to DEQ re: Track work 07/20/05 MRL
13 01 35 02 DEQ internal email re: Railroad tie disposal 07/27/05 DEQ internal
13 01 35 02 DEQ letter to MRL re: Track work 08/17/05 DEQ
13 01 35 02 DEQ letter to BNSF re: MRL track work 08/17/05 DEQ
13 01 35 02 DEQ email to BN re: Soil sampling during track maintenance 09/29/05 DEQ
13 01 35 02 DEQ letter to MRL re: Tie replacement 10/07/05 DEQ
13 01 35 02 DEQ letter/fax to BNSF re: Tie replacement 10/07/05 DEQ
13 01 35 02 07/05/06 MRL
13 01 35 02 07/30/06 DEQ
13 01 35 02 08/08/06 MRL
13 01 35 02 08/22/06 MRL
13 01 35 02 03/05/07 MRL
13 01 35 02 04/05/07 MRL
13 01 35 02 04/24/07 DEQ
13 01 35 02 MRL Letter to DEQ re: Reinstall Track 07/26/07 MRL
Site-Wide Information
3rd Party Work Permitted at the Facility
MRL Maintenance/Track Work
Site-Wide Information
3rd Party Work Permitted at the Facility
MRL Maintenance/Track Work
Site-Wide Information
3rd Party Work Permitted at the Facility
MRL Maintenance/Track Work
Site-Wide Information
3rd Party Work Permitted at the Facility
MRL Maintenance/Track Work
Site-Wide Information
3rd Party Work Permitted at the Facility
MRL Maintenance/Track Work
Site-Wide Information
3rd Party Work Permitted at the Facility
MRL Maintenance/Track Work
Site-Wide Information
3rd Party Work Permitted at the Facility
MRL Maintenance/Track Work
Site-Wide Information
3rd Party Work Permitted at the Facility
MRL Maintenance/Track Work
MRL letter to DEQ re: Manhole installation at Livingston Railyard
Site-Wide Information
3rd Party Work Permitted at the Facility
MRL Maintenance/Track Work
DEQ letter/fax to MRL re: Manhole installation at Livingston Railyard
Site-Wide Information
3rd Party Work Permitted at the Facility
MRL Maintenance/Track Work
Phone Log – R Shelley/MRL to DEQ re: Approval of manhole installation & Sale of Talgo-LRC property to MRL closed on 8/4/06
Site-Wide Information
3rd Party Work Permitted at the Facility
MRL Maintenance/Track Work
Phone Log – R Keller/MRL to DEQ re: Cleanup of debris on Talgo property
Site-Wide Information
3rd Party Work Permitted at the Facility
MRL Maintenance/Track Work
MRL letter report to DEQ re: Records showing procedures & tests done during the cleanup of the former Talgo facility
Site-Wide Information
3rd Party Work Permitted at the Facility
MRL Maintenance/Track Work MRL letter to DEQ re: Manhole removal at Livingston Railyard
Site-Wide Information
3rd Party Work Permitted at the Facility
MRL Maintenance/Track Work
DEQ letter/fax to MRL re: Manhole removal at Livingston Railyard sampling required
Site-Wide Information
3rd Party Work Permitted at the Facility
MRL Maintenance/Track Work
BN LIVINGSTON 8/26/13
Page 393 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 35 02 DEQ Letter to MRL re: Reinstall of Track 08/23/08 DEQ
13 01 35 03
13 01 35 03 DEQ/Sivers & MDT/C Helm emails re: Yellowstone Bridge
13 01 35 03 MDT Soil Boring Map & Lab Data 12/14/04 MDT
13 01 35 03 DEQ & MDT emails re: Yellowstone R. Bridge 05/10/05
13 01 35 03 Cora Helm email to DEQ re: Permission to begin work 12/22/06 C Helm
13 01 35 03 DEQ & MDT emails re: Bridge replacement 01/22/07
13 01 35 03 DEQ & MDT emails re: Bridge replacement 01/22/07
13 01 35 03 03/20/07 MDT
13 01 35 03 DEQ & K/J emails re: Livingston Bridge replacement 04/23/07
13 01 35 03 CDM email to DEQ re: MDT Geotechnical Drilling Work Plan 05/02/07 CDM
13 01 35 03 05/07/07 DEQ
13 01 35 03 DEQ & MDT emails re: Livingston Bridge Geo Tech Drilling 05/07/07
13 01 35 03 05/29/07
13 01 35 03 09/20/07 MDT/ Goodman
Site-Wide Information
3rd Party Work Permitted at the Facility
MRL Maintenance/Track Work
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
10/20/04-5/9/05
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
MDT letter to DEQ re: Proposed Geotechnical Drilling Activities within State Superfund Boundaries
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
DEQ letter to MDT re: Proposed Geotechnical Drilling Activities within State Superfund Boundaries
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
DEQ & Brian Goodman emails re: Yellowstone Bridge replacement
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
B Goodman email to DEQ re: Proposed Geotechnical Drilling Activities, MDT Bridge Replacement Project
BN LIVINGSTON 8/26/13
Page 394 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 35 03 02/06/07 MDT/ Goodman
13 01 35 03 02/14/08 DEQ
13 01 35 03 MDT Bridge analytical results 07/03/08 MDT
13 01 35 03 MDT email to DEQ re: MDT bridge drilling notice 12/02/08 MDT
13 01 35 03 08/27/08
13 01 35 03 06/30/09
13 01 35 03 8/12-9/8/09
13 01 35 03 DEQ email to MDT re: Soil excavation 10/01/09 DEQ
13 01 35 03 10/06/10 MDT/ Goodman
13 01 35 03 11/23/10 DEQ/ Reynolds
13 01 35 03 4/25-5/27/11 MDT/ Goodman
13 01 35 03 01/12/12
13 01 35 03 01/13/12
13 01 35 03 01/18/12
13 01 35 03 DEQ/Reynolds email to MDT/Goodman re: Piling removal 01/23/12 DEQ/ Reynolds
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
B Goodman letter to DEQ re: Proposed Geotechnical Drilling Activities Work Plan within State Superfund Boundaries
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
DEQ letter to B Goodman re: Proposed Geotechnical Drilling Activities within State Superfund Boundaries
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Phone log: DEQ Rem/DEQ PCD re: MDT’s proposal to dewater
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
DEQ & Brian Goodman emails re: Yellowstone River Bridge – Livingston
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
DEQ/MDT emails re: Groundwater generation per drilled shaft installation
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
MDT/Goodman letter to BN/Smith re: Proposed GW treatment from construction of new bridge across Yellowstone River
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
DEQ/Reynolds letter to MDT/Goodman re: DEQ response to MDT 10/6/10 letter approving BNSF wastewater plant to receive water generated from building the new bridge
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
MDT Environmental/Goodman, BN/Smith & DEQ/Reynolds emails re: Wastewater from drilled shafts
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
KJ/Norris, MDT/Goodman & BN/Smith emails re: MDT Yellowstone Bridge replacement - Prospective bidders
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
MDT/Goodman & BN/Smith emails re: MDT needs access agreement - BN provides link to apply for access
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
MDT/Goodman email to BN/Smith & KJ/Norris re: MDT has decided to pull the Yellowstone Bridge replacement project from the currant bid letting
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
BN LIVINGSTON 8/26/13
Page 395 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 35 03 Bridge Design Plans
13 01 35 03 02/27/12 DEQ/ Reynolds
13 01 35 03 03/21/12
13 01 35 03 06/18/12
13 01 35 03 10/30/12
13 01 35 03 10/30/12
13 01 35 03 12/04/12 DEQ/Reynolds
13 01 35 03 Data validation Checklist & analytical results 12/04/12 Anatek Labs
13 01 35 03
13 01 35 03 12/14/12 DEQ/Reynolds
13 01 35 03 Data validation Checklist & analytical results 12/14/12 Anatek Labs
13 01 35 03 12/21/12 DEQ/Reynolds
13 01 35 03 Data validation Checklist & analytical results 12/19/12 Anatek Labs
13 01 35 03 12/27/12 DEQ/Reynolds
13 01 35 03 Data validation Checklist & analytical results 01/23/13 Anatek Labs
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
DEQ/Reynolds email to MDT/Goodman re: Bridge replacement- groundwater hazardous waste
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Meeting date & Agenda re: CN 4790 Yellowstone River - NE Livingston -Pier removal & contaminated aquifer issues
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
DEQ/Haque-Hausrath internal email to Reynolds re: Phone log - MDT legal/Eggart - CECRA liability if they do bridge replacement in facility boundaries
DEQ legal/ Haque-Hausrath
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
MDT/Goodman & DEQ/Reynolds emails re: Attachment 4790 bridge plans & sample results from first shaft drilled
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Sletten Construction/Mares & MDT/Goodman emails re: Disposal of contaminated soils
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
DEQ/Bucy letter via email to Sletten Construction/Mares re: Stockpiled soil from MDT Highway 89 bridge replacement
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
MDT/Goodman & DEQ/Reynolds emails re: Attachment - MDT contained in decision
10/29/-12/11/12
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
DEQ/Reynolds letter via email to Sletten Construction & MSE/Ward re: Stockpiled soil from MDT Highway 89 bridge replacement represented by sample # 1212013-006A
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
DEQ/Reynolds letter via email to Sletten Construction & MSE/Ward re: Stockpiled soil from MDT Highway 89 bridge replacement represented by sample # 1212068-006A
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
DEQ/Reynolds letter via email to Sletten Construction & MSE/Ward re: Stockpiled soil from MDT Highway 89 bridge replacement represented by sample # 1212081-006A & 1212081-012A
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
BN LIVINGSTON 8/26/13
Page 396 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 35 03 01/25/13 DEQ/Reynolds
13 01 35 03 Data validation Checklist & analytical results 02/13/13 Anatek Labs
13 01 35 03 Data validation Checklist & analytical results 02/14/13 Anatek Labs
13 01 35 03 02/22/13 DEQ/Reynolds
13 01 35 03 03/08/13 DEQ internal
13 01 35 03 03/29/13 DEQ/Reynolds
13 01 35 03 Data validation Checklist & analytical results 04/01/13 Anatek Labs
13 01 35 03 04/16/13
13 01 35 03 04/22/13 DEQ/Reynolds
13 01 35 03 04/30/13
13 01 35 03 05/01/13 Hydrometrics
13 01 35 03 05/06/13
13 01 35 03 05/08/13
13 01 35 03 05/14/13
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
DEQ/Reynolds letter via email to Sletten Construction & MSE/Ward re: Stockpiled soil from MDT Highway 89 bridge replacement represented by sample # 1301074-006A
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Site-Wide Information
3rd Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
DEQ/Reynolds letter via email to Sletten Construction & MSE/Ward re: Stockpiled soil from MDT Highway 89 bridge replacement represented by sample # 1302049-006A & 1302061-006A
Site-Wide Information
4th Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
DEQ/Reynolds & Mark Hall internal emails re: Results for B13030176
Site-Wide Information
5th Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
DEQ/Reynolds letter/email to MDT/Goodman re: Proper disposal of GW recovered from Livingston bridge replacement
Site-Wide Information
6th Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Site-Wide Information
7th Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
DEQ/Reynolds & MDT/Anderson emails re: SAP submission deadline & site visit on 4/19/13
Site-Wide Information
8th Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
DEQ/Reynolds letter via email to Slettin Construction & Sara Ward re: Recovered GW/surface water from MDT Highway 89 bridge replacement represented by sample # 1303145-001A & 1303145-002A
Site-Wide Information
9th Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
MDT/Goodman & DEQ/Reynolds emails re: Monitoring wells near bridge
Site-Wide Information
10th Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
MDT Yellowstone River Bridge Project BR 11-1(44)56 UPN 4790 Wastewater Discharge to Fisher Sand and Gravel
Site-Wide Information
10th Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
DEQ/Reynolds, MDT/Goodman, & KJ/Aldersley emails re: Monitoring well near bridge - ownership of property
Site-Wide Information
11th Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
MDT/Goodman, KJ/Norris & KJ/Aldersley emails re: Abandonment of monitoring well MW-5R
Site-Wide Information
12th Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
MDT/Anderson & DEQ/Reynolds emails re: Hydrometrics proposal for GW Investigation in response to wastewater discharge in the Fisher Sand & Gravel
BN LIVINGSTON 8/26/13
Page 397 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 35 03 05/15/13
13 01 35 03 05/30/13 DEQ/Reynolds
13 01 35 03 05/16/13
13 01 35 03 04/30/13 Aaron Anderson
13 01 35 03 06/25/13 Hydrometrics
13 01 35 03 GW Investigation Report Fischer Sand and Gravel 08/21/13 MDT/Anderson
13 01 35 03 Fischer Sand and Gravel completion letter 10/02/13 DEQ/Reynolds
13 01 35 04 1172/ Rib & Chop Shop
13 01 35 04 Rib & Chop Shop DEQ/A Alan phone log re: evidence of contamination 04/14/08
13 01 35 04 Rib & Chop Shop DEQ Letter to A Allen re: Chop Shop parking lot paving 04/25/08 DEQ
13 01 35 05 Yellowstone Preserve
13 01 35 05 Yellowstone Preserve 11/27/07 Resource Tech
13 01 35 05 Yellowstone Preserve B Blicker letter to DEQ re: Water and sewer line installation 12/13/07 B Blickler
13 01 35 05 Yellowstone Preserve Yellowstone Preserve Map 04/01/07 KJ
13 01 35 05 Yellowstone Preserve RTI Letter to DEQ re: Water and sewer line installation 08/10/07 RTI
Site-Wide Information
13th Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
MDT/Cogley, KJ/Aldersley & DEQ/Reynolds emails re: Abandonment of MW-5R
Site-Wide Information
14th Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
DEQ/Reynolds email/letter to MDT/Anderson re: MDT bridge, MW WP approval
Site-Wide Information
15th Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
MSE/Ward & DEQ/Reynolds emails re: MDT water disposal info
MSE TA Laboratory/ Ward
Site-Wide Information
16th Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Aaron Anderson & DEQ/Reynolds emails re: MDT Bridge concrete info
Site-Wide Information
17th Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Hydo/Boettcher email to FISHER/Jesson, Aaron Anderson & DEQ/Reynolds re: MDT Bridge MW Sampling notice
Site-Wide Information
18th Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Site-Wide Information
18th Party Work Permitted at the Facility
MDT Hwy 89 Bridge Replacement
Site-Wide Information
3rd Party Work Permitted at the Facility
1172/ 60E705
Site-Wide Information
3rd Party Work Permitted at the Facility
1172/ 60E705
Site-Wide Information
3rd Party Work Permitted at the Facility
1172/ 60E705
Site-Wide Information
3rd Party Work Permitted at the Facility
1172/ 60E705
Site-Wide Information
3rd Party Work Permitted at the Facility
Revised Water and Sewer Line Installation Soil and GW Mgmt Plan
1172/ 60E705
Site-Wide Information
3rd Party Work Permitted at the Facility
1172/ 60E705
Site-Wide Information
3rd Party Work Permitted at the Facility
1172/ 60E705
Site-Wide Information
3rd Party Work Permitted at the Facility
BN LIVINGSTON 8/26/13
Page 398 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 35 05 Yellowstone Preserve DEQ Letter to RTI re: Water and sewer line installation 10/25/07 DEQ
13 01 35 05 Yellowstone Preserve DEQ/D Baldwin emails re: BN Livingston Complex Question 04/29/08
13 01 35 06 Montague Place
13 01 35 06 Montague Place DEQ/S Pitman emails re: Montague Place Addition 9/14-9/24/07
13 01 35 06 Montague Place B Blicker letter to DEQ re: Water and sewer line installation 12/28/07 B Blickler
13 01 35 06 Montague Place DEQ letter to B Blicker re: Water and sewer line installation 01/08/08 DEQ
13 01 35 06 Montague Place Y ** DEQ internal email re: Montague letter 01/08/08 DEQ internal
13 01 35 07
13 01 35 07 06/27/07 Hyalite Env
13 01 35 07 DEQ/Hyalite Env email to DEQ re: Project manager 06/28/07
13 01 35 08
13 01 35 08 04/17/13
13 01 35 08 10/03/13 DEQ/Reynolds
13 01 35 08 10/24/13 PE/ Desper
13 01 35 08 Livingston Healthcare offsite utilities 10/25/13 PE/ Desper
1172/ 60E705
Site-Wide Information
3rd Party Work Permitted at the Facility
1172/ 60E705
Site-Wide Information
3rd Party Work Permitted at the Facility
1172/ 60E705
Site-Wide Information
3rd Party Work Permitted at the Facility
1172/ 60E705
Site-Wide Information
3rd Party Work Permitted at the Facility
1172/ 60E705
Site-Wide Information
3rd Party Work Permitted at the Facility
1172/ 60E705
Site-Wide Information
3rd Party Work Permitted at the Facility
Site-Wide Information
3rd Party Work Permitted at the Facility
1172/ 60E705
Site-Wide Information
3rd Party Work Permitted at the Facility
City of Livingston Waste Transfer Facility
1172/ 60E705
Site-Wide Information
3rd Party Work Permitted at the Facility
City of Livingston Waste Transfer Facility
Hyalite Env Letter to DEQ re: Request for Input City Waste Transfer
1172/ 60E705
Site-Wide Information
3rd Party Work Permitted at the Facility
City of Livingston Waste Transfer Facility
Site-Wide Information
3rd Party Work Permitted at the Facility
City Water/Sewer to new Hospital
Site-Wide Information
3rd Party Work Permitted at the Facility
City Water/Sewer to new Hospital
DEQ/Reynolds & CDM Smith/Stordahl emails re: Drinking water lines for a public water supply
Site-Wide Information
4th Party Work Permitted at the Facility
City Water/Sewer to new Hospital
Third-Party Remedial Actions within the Burlington Northern Livingston Shop Complex State Superfund Facility Boundaries
Site-Wide Information
5th Party Work Permitted at the Facility
City Water/Sewer to new Hospital
Livingston Healthcare Offsite Utility Extension Project Work Plan
Site-Wide Information
6th Party Work Permitted at the Facility
City Water/Sewer to new Hospital
BN LIVINGSTON 8/26/13
Page 399 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
13 01 35 08 Livingston HealthCare Off-Site Utility Extension Project 11/07/13 DEQ/Reynolds
13 01 35 08 11/07/13 DEQ/Reynolds
13 01 35 08 11/18/13 CTA/Mulholland
13 01 35 08 Livingston HealthCare Utilities Expansion 11/182013 CTA/Mulholland
13 01 35 08 BNSF groundwater 11/26/13 DEQ/Reynolds
13 01 35 08 BNSF groundwater 12/04/13 DEQ/Reyneolds
13 01 35 08 12/20/13 CTA/Mulholland
13 01 35 08 12/30/13 DEQ/Reynolds
13 01 35 08 01/22/14 CTA/Mulholland
13 01 35 08 01/28/14 DEQ/Reynolds
The following documents and files contain information related to the BN Livingston Complex and are incorporated into the Administrative Record:
1 BN files at the Underground Storage Tank, Metcalf building and Leaking Underground Storage Tank program located at the Last Chance Building.
2 BN Livingston Complex hazardous waste files in the Air and Waste Management Bureau located at the Metcalf Building.
3 Livingston Rebuild Center MPDES and Envirocon MPDES files for the on-site wastewater treatment plant Located at the Water Protection Bureau.
4 Seven boxes of documents from Cogswell and Wherle stored at the Records Management Bureau, 1320 Bozeman St., Helena, MT.
Site-Wide Information
7th Party Work Permitted at the Facility
City Water/Sewer to new Hospital
Site-Wide Information
8th Party Work Permitted at the Facility
City Water/Sewer to new Hospital
Livingston Healthcare Offsite Utility Extension Project Work Plan, October 24, 2013
Site-Wide Information
9th Party Work Permitted at the Facility
City Water/Sewer to new Hospital
Livingston HealthCare Offsite Utility Extension Project Work Plan Third Party Remedial Actions within the Burlington Northern Livingston Shop Complex
Site-Wide Information
10th Party Work Permitted at the Facility
City Water/Sewer to new Hospital
Site-Wide Information
11th Party Work Permitted at the Facility
City Water/Sewer to new Hospital
Site-Wide Information
12th Party Work Permitted at the Facility
City Water/Sewer to new Hospital
Site-Wide Information
12th Party Work Permitted at the Facility
City Water/Sewer to new Hospital
Livingston HealthCare Offsite Utility Extension Project Work Plan - Dewatering Addendum Third Party Remedial Actions within the Burlington Northern Livingston Shop Complex
Site-Wide Information
13th Party Work Permitted at the Facility
City Water/Sewer to new Hospital
Livingston HealthCare Offsite Utility Extension Project Work Plan - Dewatering Addendum - Third Party Remedial Actions within the Burlington Northern Livingston Shop Complex
Site-Wide Information
14th Party Work Permitted at the Facility
City Water/Sewer to new Hospital
Livingston HealthCare Offsite Utility Extension Project Work Plan - Pre-Construction Dewatering Test Results
Site-Wide Information
15th Party Work Permitted at the Facility
City Water/Sewer to new Hospital
Livingston HealthCare Offsite Utility Extension Project Work Plan - Pre-Construction Dewatering Test Results
BN LIVINGSTON 8/26/13
Page 400 of 403
Tertiary Heading Site Name & Title or Subject Date AuthorSite ID
Media
Remote Storage
Primary Heading
Secondary Heading
Confidential
G:\REM\GUIDES\BN Livingston.doc
Bioventing Principles & Practices Manual, Intrinsic biodegradation of diesel fuel in an interval of separate phase hydrocarbons,Vapor Phase Isotherm Design ParametersFinal Procedures for Conducting Bioventing Pilot Tests and Long-Term Monitoring of Bioventing SyIntroduction to Containment Buildings Training Module Introduction to Tanks Training Module EPA, 9/05Guidance for Managing Hazardous Substance Air Discharges from Remedial Systems Bio Lynceus, LLC letter to DEQ re: Possible use of Products
EPA, 9/1/1995 Elsevier Science Ltd, 1998
Parsons, 5/4/2011EPA, 9/5/2011
Oregon DEQ, 1/6/20115/2/2006
BN Livingston Guide Index
BN Livingston Guide Index
1. ** indicate some or all information is in the confidential files
13 01 01 Site Overview13 01 02 PRP Information13 01 03 Pre-Remedial Activities13 01 04 Correspondence13 01 05 Administrative Orders/Consent Decrees13 01 06 Information Requests13 01 07 RI/FS13 01 08 ARARs13 01 09 RI/FS Reports13 01 10 ROD13 01 11 RD/RA13 01 12 O&M13 01 13 Cost Recovery13 01 14 Community Relations13 01 15 SCAP13 01 16 Accounting13 01 17 Contracts (See Contracts/Agreements Master file)13 01 18 Cooperative Agreements (See Cooperative Agreements master file)13 01 19 References13 01 20 Interagency Cooridination13 01 21 SEAS13 01 22 Natural Resource Damage Claims13 01 23 Local Governments13 01 24 (Intentially left blank)13 01 25 UST13 01 26 Sampling/Contaminant Sources13 01 27 Related Sites13 01 28 Status Reports13 01 29 Meetings/Technical13 01 30 Information Repositories13 01 31 Guidance Documents13 01 32 Livingston Depot Center13 01 33 Private Litigation13 01 34 Interim Actions13 01 35 3rd Party Work Permitted at the Facility
Notes:
2. The numbers following the document name are the box/locator number for Records Management