[xls]deq.mt.govdeq.mt.gov/portals/112/land/statesuperfund/... · web view13. 13 1. 13 1 1. 13 1 1...

334
BN LIVINGSTON 8/26/13 Page 1 of 334 Tertiary Heading Site Name & Title or Subject Date Author 13 BN/LIVINGSTON 8/26/13 13 01 13 01 01 Site Overview 13 01 01 01 Site Overview RCRA Permits 13 01 01 02 Site Overview Legal Issues 13 01 01 02 Site Overview Legal Issues Y ** Larson fax to DEQ re: Haz Waste 07/16/90 Larson 13 01 01 02 Site Overview Legal Issues Larson proposed format for Administrative Record 08/15/90 Larson 13 01 01 02 Site Overview Legal Issues Larson memo to MDHES re: Administrative record 08/15/90 Larson 13 01 01 02 Site Overview Legal Issues MDHES letter to Larson re: Administrative Record 09/18/90 DHES 13 01 01 02 Site Overview Legal Issues Y ** Larson fax to DEQ re: Draft letter to MRL/LRC 02/22/91 Larson 13 01 01 02 Site Overview Legal Issues Y ** DEQ memo re: Legal requirements 04/02/91 DEQ 13 01 01 02 Site Overview Legal Issues Y ** Response Action memo 01/02/92 13 01 01 02 Site Overview Legal Issues Y ** DHES memo re: Hazardous Waste 01/13/92 DHES 13 01 01 02 Site Overview Legal Issues 04/02/92 13 01 01 02 Site Overview Legal Issues Y ** Memo re: Attorney fees 02/15/93 13 01 01 02 Site Overview Legal Issues Y ** DEQ memo re: Attorney fees 02/22/93 DEQ 13 01 01 02 Site Overview Legal Issues Y ** DEQ internal memo re: Legal issues 08/10/94 DEQ 13 01 01 02 Site Overview Legal Issues Y ** DEQ email re: Hazardous Waste 06/17/98 DEQ 13 01 01 02 Site Overview Legal Issues Park County court papers 06/10/99 Park County 13 01 01 02 Site Overview Legal Issues DEQ Letter to BKBH re: Property Information 08/24/05 DEQ 13 01 01 02 Site Overview Legal Issues Y ** DEQ internal email re: DEQ Director meeting notes 03/09/06 DEQ 13 01 01 02 Site Overview Legal Issues Y ** DEQ internal email re: WQB-7 vs. DEQ -7 criteria 05/08/06 DEQ 13 01 01 02 Site Overview Legal Issues Y ** DEQ internal email re: MRL Access Agreements 06/23/06 DEQ 13 01 01 02 Site Overview Legal Issues Y 09/01/06 DEQ 13 01 01 02 Site Overview Legal Issues Y ** DEQ & BN emails re: Institutional Controls 03/05/07 DEQ 13 01 01 02 Site Overview Legal Issues Y ** DEQ internal emails re: BNLV Groundwater 04/06/07 DEQ 13 01 01 02 Site Overview Legal Issues Y 12/03/07 DEQ e ID Med ia Remote Storage Primary Heading Secondary Heading Confide ntial Site-Wide Information Site-Wide Information Site-Wide Information Site-Wide Information Site-Wide Information Site-Wide Information Site-Wide Information Site-Wide Information Site-Wide Information Site-Wide Information Site-Wide Information Site-Wide Information Site-Wide Information Preliminary Identification & Description of Applicable Legal Requirements Site-Wide Information Site-Wide Information Site-Wide Information Site-Wide Information Site-Wide Information Site-Wide Information Site-Wide Information Site-Wide Information Site-Wide Information Site-Wide Information Version of CECRA Applicable to Livingston & Mission Wye Site-Wide Information Site-Wide Information Site-Wide Information ** DEQ internal email re: BN Tasks requiring legal review

Upload: phungkhanh

Post on 02-Apr-2018

253 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 1 of 403

Tertiary Heading Site Name & Title or Subject Date Author

13 BN/LIVINGSTON 8/26/13

13 01

13 01 01 Site Overview

13 01 01 01 Site Overview RCRA Permits

13 01 01 02 Site Overview Legal Issues

13 01 01 02 Site Overview Legal Issues Y ** Larson fax to DEQ re: Haz Waste 07/16/90 Larson

13 01 01 02 Site Overview Legal Issues Larson proposed format for Administrative Record 08/15/90 Larson

13 01 01 02 Site Overview Legal Issues Larson memo to MDHES re: Administrative record 08/15/90 Larson

13 01 01 02 Site Overview Legal Issues MDHES letter to Larson re: Administrative Record 09/18/90 DHES

13 01 01 02 Site Overview Legal Issues Y ** Larson fax to DEQ re: Draft letter to MRL/LRC 02/22/91 Larson

13 01 01 02 Site Overview Legal Issues Y ** DEQ memo re: Legal requirements 04/02/91 DEQ

13 01 01 02 Site Overview Legal Issues Y ** Response Action memo 01/02/92

13 01 01 02 Site Overview Legal Issues Y ** DHES memo re: Hazardous Waste 01/13/92 DHES

13 01 01 02 Site Overview Legal Issues 04/02/92

13 01 01 02 Site Overview Legal Issues Y ** Memo re: Attorney fees 02/15/93

13 01 01 02 Site Overview Legal Issues Y ** DEQ memo re: Attorney fees 02/22/93 DEQ

13 01 01 02 Site Overview Legal Issues Y ** DEQ internal memo re: Legal issues 08/10/94 DEQ

13 01 01 02 Site Overview Legal Issues Y ** DEQ email re: Hazardous Waste 06/17/98 DEQ

13 01 01 02 Site Overview Legal Issues Park County court papers 06/10/99 Park County

13 01 01 02 Site Overview Legal Issues DEQ Letter to BKBH re: Property Information 08/24/05 DEQ

13 01 01 02 Site Overview Legal Issues Y ** DEQ internal email re: DEQ Director meeting notes 03/09/06 DEQ

13 01 01 02 Site Overview Legal Issues Y ** DEQ internal email re: WQB-7 vs. DEQ -7 criteria 05/08/06 DEQ

Site ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Preliminary Identification & Description of Applicable Legal Requirements

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 2: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 2 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 01 02 Site Overview Legal Issues Y ** DEQ internal email re: MRL Access Agreements 06/23/06 DEQ

13 01 01 02 Site Overview Legal Issues Y 09/01/06 DEQ

13 01 01 02 Site Overview Legal Issues Y ** DEQ & BN emails re: Institutional Controls 03/05/07 DEQ

13 01 01 02 Site Overview Legal Issues Y ** DEQ internal emails re: BNLV Groundwater 04/06/07 DEQ

13 01 01 02 Site Overview Legal Issues Y ** DEQ internal email re: BN Tasks requiring legal review 12/03/07 DEQ

13 01 01 02 Site Overview Legal Issues Y 02/10/08 DEQ

13 01 01 02 Site Overview Legal Issues Y 02/12/08 DEQ

13 01 01 02 Site Overview Legal Issues Y ** DEQ & CDM emails re: Two Options for AutoCad 02/15/08 DEQ

13 01 01 02 Site Overview Legal Issues Y ** DEQ internal emails re: Consent Decree protocol 06/24/08 DEQ

13 01 01 02 Site Overview Legal Issues Y ** DEQ Memorandum 09/28/10 DEQ

13 01 01 02 Site Overview Legal Issues Y ** DEQ Memorandum 09/28/10 DEQ

13 01 01 02 Site Overview Legal Issues 10/01/10 DEQ

13 01 01 02 01 Site Overview

13 01 01 02 01 Site Overview PPA Maps

13 01 01 02 01 Site Overview DEQ/B Gregg emails re: Livingston Shops 09/08/06

13 01 01 02 01 Site Overview DEQ/B Gregg emails re: Livingston Shops 09/11/06

13 01 01 02 01 Site Overview 09/11/06

13 01 01 02 01 Site Overview DEQ/M Kaster email re: Legal contacts 09/26/06

13 01 01 02 01 Site Overview DEQ/M Kaster emails re: Livingston 9/26-9/27/06

13 01 01 02 01 Site Overview DEQ/M Kaster emails re: Livingston Map 9/26-9/28/06

13 01 01 02 01 Site Overview DEQ/B Gregg emails re: BNLSC Annual Monitoring Report 10/04/06

13 01 01 02 01 Site Overview Y ** DEQ internal email re: Potential Purchaser 10/17/06 DEQ internal

13 01 01 02 01 Site Overview DEQ/M Kaster email re: BN Livingston 10/17/06

Site-Wide Information

Site-Wide Information

** DEQ internal memo re: Draft Legal Analysis of Version of CECRA Applicable to Livingston & Mission Wye

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

** DEQ internal email re: Consent to use computer generated Information

Site-Wide Information

** DEQ internal & K/J emails re: Conference call – K/J’s claim of copyright

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ Legal/Haque-Hausrath email to B Summerville re: Jurisdiction

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

Communication Summary – DEQ/B Gregg & Judy Jackson re: ENSR and Empire Building Materials

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

Page 3: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 3 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 01 02 01 Site Overview E Meece letter to DEQ Director re: Empire’s request 10/18/06 E Meece

13 01 01 02 01 Site Overview Y 10/26/06 DEQ internal

13 01 01 02 01 Site Overview Y ** DEQ internal email re: Prospective Purchaser Agreement 10/26/06 DEQ internal

13 01 01 02 01 Site Overview DEQ internal email re: PPA at BNLV 10/26/06 DEQ internal

13 01 01 02 01 Site Overview Y ** DEQ internal email re: BN Livingston PPA with Empire 10/30/06 DEQ internal

13 01 01 02 01 Site Overview Y 10/31/06 DEQ Legal

13 01 01 02 01 Site Overview DEQ internal email with Director’s Office letter to E Meece 10/31/06 DEQ internal

13 01 01 02 01 Site Overview Y ** DEQ internal email re: PPA 11/0/06 DEQ internal

13 01 01 02 01 Site Overview DEQ/B Gregg emails re: BN LSC wells 11/01/06

13 01 01 02 01 Site Overview DEQ Letter to E Meece re: Prospective Purchaser 11/02/06 DEQ

13 01 01 02 01 Site Overview DEQ internal email re: CDM PPA activities 11/03/06 DEQ internal

13 01 01 02 01 Site Overview DEQ fax to M Kaster – Prospective Purchaser Agreement 11/06/06 DEQ

13 01 01 02 01 Site Overview DEQ email to M Kaster re: Prospective Purchaser Agreement 11/08/06 DEQ

13 01 01 02 01 Site Overview DEQ and P Cote emails re: BN Brownfield 11/7-11/24/06

13 01 01 02 01 Site Overview DEQ & M Kaster emails re: Prospective Purchaser Agreement 11/8-12/15/06

13 01 01 02 01 Site Overview DEQ internal email re: PPA Update 10/24/07 DEQ internal

13 01 01 02 01 Site Overview DEQ & Empire emails re: Meeting 1/3-1/4/08

13 01 01 02 01 Site Overview Y ** DEQ internal meeting re: BNLV PPA meeting/notes 01/09/08 DEQ internal

13 01 01 02 01 Site Overview DEQ/MBL/Empire Meeting Notes 01/15/08

13 01 01 02 01 Site Overview 11/09/10

13 01 01 02 01 Site Overview 11/09/10 DEQ Legal/ Kirley

13 01 01 02 01 Site Overview 07/10/13 DEQ/Reynolds

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

** DEQ internal email re: Prospective Purchaser Agreement (PPA)

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

** DEQ Legal to DEQ Director Opper re: Prospective Purchaser Agreement

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

Site-Wide Information

Prospective Purchase Agreements

DEQ Legal/Haque-Hausrath internal email to Reynolds re: Phone log with B Summerville

DEQ Legal/ Haque-Hausrath

Site-Wide Information

Prospective Purchase Agreements

DEQ Legal/Kirley email to B Summerville re: Attachment – EPA Model PPA & copy of DEQ agreement with KRY

Site-Wide Information

Prospective Purchase Agreements

DEQ/Reynolds email to DEQ/Haque-Hausrath re: DEQ documentation of Karl Swanson call

Page 4: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 4 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 01 03 Site Overview UIC Permits

13 01 01 04 Site Overview

13 01 01 05 Site Overview Air Quality Regulations

13 01 01 05 Site Overview Air Quality Regulations MDHES internal memo re: Air quality regulations 03/26/91 MDHES

13 01 01 05 Site Overview Air Quality Regulations Envirocon letter to MDHES re: Allowable air emissions 05/16/91 Envirocon

13 01 01 05 Site Overview Air Quality Regulations MDHES letter to Envirocon re: Allowable air emissions 05/28/91 MDHES

13 01 01 06 Site Overview

13 01 02

13 01 02 01 PRP Information PRP Search Reports

13 01 02 01 PRP Information PRP Search Reports 10/15/92

13 01 03

13 01 03 01 Site Investigation

13 01 03 01 Site Investigation Site History Report Livingston Montana Fueling Facility 06/01/87 ReTec

13 01 03 01 Site Investigation Monthly Progress Reports 06/09/05

13 01 03 01 Site Investigation Environmental Site Audit Report 01/01/89 Envirocom

13 01 03 01 Site Investigation Analytical Results Report BN-Livingston Shop Complex 11/10/89

13 01 03 01 Site Investigation 05/11/90

13 01 03 02

13 01 03 02 Analytical Results Report 11/01/89

13 01 03 02 10/01/91

13 01 03 02 Draft Analytical Results Report 03/18/92 URS

13 01 03 02 Draft Analytical Results Report Appendix C-Data Packages 03/18/92 URS

Site-Wide Information

Site-Wide Information

Water Use Permits/Landfarm & MPDES Permits

1158/ 07J602

Site-Wide Information

1158/ 07J602

Site-Wide Information

1158/ 07J602

Site-Wide Information

1158/ 07J602

Site-Wide Information

Site-Wide Information

Ranking sheets & Data base forms

Site-Wide Information

PRP Information

1158/ 07J602

Site-Wide Information

Site-Wide Information

Potentially Responsible Parties: Adjacent to the Livingston Rail Yard, Livingston, MT

Historical Research Associates

Site-Wide Information

Pre-Remedial Activities

999/ 45A403

Site-Wide Information

Pre-Remedial Activities

999/ 45A404

Site-Wide Information

Pre-Remedial Activities

999/ 45A405

Site-Wide Information

Pre-Remedial Activities

999/ 45A406

Site-Wide Information

Pre-Remedial Activities

999/ 45A407

Site-Wide Information

Pre-Remedial Activities

Ecology and Environment

999/ 45A408

Site-Wide Information

Pre-Remedial Activities

Final Work Plan for Burlington Northern Livingston Shop Complex

Ecology and Environment

999/ 45A409

Site-Wide Information

Pre-Remedial Activities

Sampling and Analytical Data

999/ 45A410

Site-Wide Information

Pre-Remedial Activities

Sampling and Analytical Data

Ecology and Environment

999/ 45A411

Site-Wide Information

Pre-Remedial Activities

Sampling and Analytical Data

Field Activities Report Burlington Northern-Livingston Shop Complex

Ecology and Environment

999/ 45A412

Site-Wide Information

Pre-Remedial Activities

Sampling and Analytical Data

999/ 45A413

Site-Wide Information

Pre-Remedial Activities

Sampling and Analytical Data

Page 5: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 5 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 03 02 Analytical Results Report 04/30/92 URS

13 01 03 02 07/28/06

13 01 03 02 01/05/07

13 01 03 03 PA/SI

13 01 03 03 PA/SI CD/Order 10/11/07

13 01 03 04 Hazard Ranking System

13 01 03 05

13 01 03 05 Y ** DEQ memo re: Interview w/Alfred Jacobsen 06/17/88

13 01 04 Correspondence

13 01 04 Correspondence 5/31-6/1/2006

13 01 04 Correspondence DEQ/Talgo emails re: Manway(s) 06/06/06

13 01 04 Correspondence 06/07/06 KJ

13 01 04 Correspondence 06/07/06 KJ

13 01 04 Correspondence DEQ/MRL emails re: Meeting on 7/5/06 6/29-7/5/06

13 01 04 Correspondence Iowa DNR email to DEQ re: BNSF railroad site in Iowa 07/13/06 Iowa DNR

13 01 04 01 Correspondence

13 01 04 01 Correspondence State DEQ Director letter to BNSF 12/06/05 DEQ Director

13 01 04 01 Correspondence State DEQ Director letter to Governor 03/15/06 DEQ Director

13 01 04 01 Correspondence State DEQ internal email re: Draft Implementation letter 03/21/06 DEQ internal

13 01 04 01 Correspondence State DEQ internal email re: Draft Implementation letter 04/03/06 DEQ internal

13 01 04 01 Correspondence State 04/06/06 MT Legislature

13 01 04 01 Correspondence State DEQ Director letter to M Stehly re: DEQ approach 04/17/06 DEQ Director

999/ 45A414

Site-Wide Information

Pre-Remedial Activities

Sampling and Analytical Data

999/ 45A415

Site-Wide Information

Pre-Remedial Activities

Sampling and Analytical Data

Preliminary Analytical results – 6/06 Semiannual GW Monitoring Event

999/ 45A416

Site-Wide Information

Pre-Remedial Activities

Sampling and Analytical Data

Preliminary Analytical results – 11/06 Semiannual GW Monitoring Event

999/ 45A417

Site-Wide Information

Pre-Remedial Activities

999/ 45A418

Site-Wide Information

Pre-Remedial Activities

999/ 45A419

Site-Wide Information

Pre-Remedial Activities

1000/ 45A406

Site-Wide Information

Pre-Remedial Activities

History (4 folders, 10/86-10/91)

Site-Wide Information

Pre-Remedial Activities

Site-Wide Information

Site-Wide Information

DEQ/MRL/Talgo/CDM emails re: Meeting to discuss free product recovery and bioventing plans (

Site-Wide Information

Site-Wide Information

K/J Letter to MRL re: Notice of environmental investigation activity

Site-Wide Information

K/J Letter to Talgo re: Notice of environmental investigation activity

Site-Wide Information

Site-Wide Information

Site-Wide Information

State (Documents dated before 12/6/05 are not itemized)

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Montana Legislature Fiscal letter to Representative Sinrud re: Status Implementation Funding - Livingston

Site-Wide Information

Page 6: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 6 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 04 01 Correspondence State Y ** DEQ internal email re: Project Officer 04/24/06 DEQ internal

13 01 04 01 Correspondence State BN90 floppy disk

13 01 04 01 Correspondence State DEQ internal email re: RTI change of address 05/05/06 DEQ internal

13 01 04 01 Correspondence State DEQ internal email re: BN Livingston 06/15/06 DEQ internal

13 01 04 01 Correspondence State Site Summary Report 06/21/06 DEQ

13 01 04 01 Correspondence State DEQ internal email re: Governor visit 06/21/06 DEQ internal

13 01 04 01 Correspondence State Err:509 06/22/06 DEQ internal

13 01 04 01 Correspondence State 06/23/06

13 01 04 01 Correspondence State DEQ internal email re: Summary sheet 07/11/06 DEQ internal

13 01 04 01 Correspondence State 07/21/06 DEQ internal

13 01 04 01 Correspondence State DEQ Director/Project Officer emails re: Costs and schedules 7/21-7/26/06 DEQ internal

13 01 04 01 Correspondence State DEQ internal email re: Staging BN work 8/3-8/4/06 DEQ internal

13 01 04 01 Correspondence State DEQ internal email re: Staging BN work 8/3-8/12/06 DEQ internal

13 01 04 01 Correspondence State DEQ Director/BNSF emails re: BN Livingston 9/13-9/15/06

13 01 04 01 Correspondence State 09/24/06 DEQ internal

13 01 04 01 Correspondence State DEQ internal emails re: Field work and cell phone 09/25/06 DEQ internal

13 01 04 01 Correspondence State DEQ internal email re: Three issues 04/04/07 DEQ internal

13 01 04 01 Correspondence State DEQ internal email re: BNLV information 04/09/07 DEQ internal

13 01 04 01 Correspondence State DEQ internal emails re: Meeting with the Governor’s Office 04/17/07 DEQ internal

13 01 04 01 Correspondence State DEQ internal emails re: BNSF comments 06/06/07 DEQ internal

13 01 04 01 Correspondence State DEQ internal emails re: BN Livingston Public Meeting 07/31/07 DEQ internal

13 01 04 01 Correspondence State DEQ internal emails re: FYI on soil gas results and progress 8/24-8/27/07 DEQ internal

13 01 04 01 Correspondence State DEQ internal

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ Legal/ Vachowski internal email to Reynolds re: MRL Access Agreements

DEQ Legal/ Vachowski

Site-Wide Information

Site-Wide Information

DEQ internal memo: A Reynolds to Director Opper re: Costs & schedules for BN Livingston

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information DEQ Director/Project Officer emails re: Cover letter for RAWP

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ internal emails re: Governor’s visit and accomplishments list

10/15-10/16/07

Page 7: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 7 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 04 01 Correspondence State DEQ Director/Project Officer emails re: Vapor intrusion 11/30-12/3/07 DEQ internal

13 01 04 01 Correspondence State DEQ internal emails re: BN Helena 10/17-12/4/07 DEQ internal

13 01 04 01 Correspondence State DEQ internal emails re: Vapor intrusion DEQ internal

13 01 04 01 Correspondence State DEQ internal emails re: MRL/BNSF Access Agreement 02/14/08 DEQ internal

13 01 04 01 Correspondence State 07/23/08 DEQ Director

13 01 04 01 Correspondence State DEQ internal emails re: Summary for Director Opper 01/16/09 DEQ internal

13 01 04 01 Correspondence State 06/15/09 DEQ Reinke

13 01 04 01 Correspondence State DEQ/Martin internal email re: BNSF sampling ay railyards 07/22/09 DEQ Martin

13 01 04 01 Correspondence State DEQ internal email re: Technical meetings 10/06/09 DEQ internal

13 01 04 01 Correspondence State DEQ internal email re: Public meeting feedback 10/23/09 DEQ internal

13 01 04 01 Correspondence State Y 11/09/09 DEQ/Legal internal

13 01 04 01 Correspondence State Y 11/10/09 DEQ/Legal internal

13 01 04 01 Correspondence State Y 06/17/10 DEQ/Legal internal

13 01 04 01 Correspondence State DEQ internal email re: Recent invoices and payments 6/3-6/7/10 DEQ internal

13 01 04 01 Correspondence State DEQ internal email re: Meeting schedules 08/03/10 DEQ internal

13 01 04 01 Correspondence State 09/29/10 Bob Ebinger

13 01 04 01 Correspondence State 02/29/12 DEQ/ Skibicki

13 01 04 02 Correspondence

13 01 04 02 Correspondence EPA DHES letter to EPA on proposed listing 10/19/94 MDHES

13 01 04 02 Correspondence EPA 08/24/95 MDHES

13 01 04 02 Correspondence EPA DEQ internal email re: EPA info request 11/28/01 DEQ internal

13 01 04 02 Correspondence EPA DEQ fax to Chiotti re: info request 12/18/01 DEQ

13 01 04 02 Correspondence EPA DEQ email to EPA re: Update 06/04/02 DEQ

Site-Wide Information

Site-Wide Information

Site-Wide Information

11/30-12/11/07

Site-Wide Information

Site-Wide Information

DEQ Director Letter to M Stehly/BNSF re: Response to letter of 6/11/08 w/Memo of 7/22/07 attached

Site-Wide Information

Site-Wide Information

DEQ/Reinke letter to DEQ/Reynolds re: Trichloroethylene question answers

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

** DEQ Legal/Haque-Hausrath internal email re: Railroad badge

Site-Wide Information

** DEQ Legal/Haque-Hausrath and Reynolds emails re: Railroad badge

Site-Wide Information

** DEQ Legal/Haque-Hausrath and Reynolds emails re: P&E language & Consent Order

Site-Wide Information

Site-Wide Information

Site-Wide Information

Phone Log – Representative for Livingston/Bob Ebinger to DEQ/Reynolds re: Unhappy constituents

Site-Wide Information

DEQ/Skibicki & BN/Smith emails re: BN not interested in Tracy's Chevron monitoring wells

Site-Wide Information

EPA (Documents dated before 11/28/2001 are not itemized)

Site-Wide Information

Site-Wide Information

DHES/Marsh letter to EPA/Wardell re: State input on National Priorities List Determinations

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 8: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 8 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 04 02 Correspondence EPA DEQ email to EPA re: Draft modified CD & SOWs 09/09/04 DEQ

13 01 04 02 Correspondence EPA EPA email to DEQ re: Draft modified CD & SOWs 09/09/04 EPA

13 01 04 02 Correspondence EPA EPA email to DEQ re: Draft modified CD & SOWs 09/13/04 EPA

13 01 04 02 Correspondence EPA DEQ letter to BKBH re: Property Information 08/24/05 EPA

13 01 04 02 Correspondence EPA DEQ/EPA emails re: Estimated NPL deletion dates 4/18-5/24/06

13 01 04 02 Correspondence EPA DEQ/EPA emails re: Estimated dates 4/18-5/25/06

13 01 04 02 Correspondence EPA 09/19/08 DEQ

13 01 04 02 Correspondence EPA 03/25/09

13 01 04 02 Correspondence EPA 03/25/09 DEQ internal

13 01 04 02 Correspondence EPA DEQ/Reynolds email to EPA/Hoogerheide re: BNLV status 12/07/09 DEQ/ Reynolds

13 01 04 02 Correspondence EPA 10/22/12

13 01 04 02 Correspondence EPA 10/23/12 EPA/ Hammer

13 01 04 02 Correspondence EPA 10/26/12 DEQ/ Reynolds

13 01 04 02 Correspondence EPA 03/05/13

13 01 04 02 Correspondence EPA CETCO/Jung & EPA/Hammer emails re: Info from EPA 06/21/13 CETCO/Jung

13 01 04 02 Correspondence EPA EPA/Hammer & DEQ/Reynolds emails re: Info to EPA 06/24/13 EPA/ Hammer

13 01 04 03 Correspondence

13 01 04 03 Correspondence PRPs Washington Corp letter to BN re: Liability 07/12/88 Washington Corp

13 01 04 03 Correspondence PRPs DEQ letter to Orze re: Facility Ownership 05/03/99 DEQ

13 01 04 03 Correspondence PRPs Phone Log - DEQ & McDonough/BN 06/19/00

13 01 04 03 Correspondence PRPs Phone Log - DEQ & Wadhams 06/19/00

13 01 04 03 Correspondence PRPs DEQ internal email re: BNSF address change 07/06/00 DEQ internal

13 01 04 03 Correspondence PRPs Phone Log - DEQ & BN/McDonough 07/06/00

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ email to EPA re: Superfund Long-Term Human Health Protection Worksheet

Site-Wide Information

DEQ & EPA emails re: BN Shop complex schedule for complete cleanup

Site-Wide Information

DEQ internal email re: BN Shop complex schedule for complete cleanup

Site-Wide Information

Site-Wide Information

EPA/Hammer & DEQ/Reynolds emails re: EPA needs site update

Site-Wide Information

EPA/Hammer email to DEQ/Reynolds re: BN Livingston Shop Complex history

Site-Wide Information

DEQ/Reynolds email to EPA/Hammer re: BN Livingston Shop Complex history

Site-Wide Information

DEQ/Reynolds & EPA/Hammer emails re: Follow-up on resident inquiry

Site-Wide Information

Site-Wide Information

Site-Wide Information

PRPs (Documents dated before 5/03/99 are not itemized)

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 9: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 9 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 04 03 Correspondence PRPs BN email to DEQ re: Address 11/21/00 BN

13 01 04 03 Correspondence PRPs DEQ internal email re: PAH Risk Assessment 07/13/01 DEQ internal

13 01 04 03 Correspondence PRPs DEQ internal email re: File Guide 07/13/01 DEQ internal

13 01 04 03 Correspondence PRPs DEQ internal email re: BN contacting John Wadhams 09/19/01 DEQ internal

13 01 04 03 Correspondence PRPs DEQ internal email re: Project contacts 09/19/01 DEQ internal

13 01 04 03 Correspondence PRPs DEQ letter to BN re: Project contact 09/20/01 DEQ

13 01 04 03 Correspondence PRPs BN Letter to DEQ re: BNSF Personnel 09/24/01 BN

13 01 04 03 Correspondence PRPs Emails re: Meeting agenda 02/13/02

13 01 04 03 Correspondence PRPs BN change of address 08/20/02 BN

13 01 04 03 Correspondence PRPs DEQ letter to BN re: Access to private property 08/04/04 DEQ

13 01 04 03 Correspondence PRPs Phone Log - Smith/BN 09/01/04

13 01 04 03 Correspondence PRPs Phone Log - Smith/BN 09/02/04

13 01 04 03 Correspondence PRPs 09/15/04 DEQ

13 01 04 03 Correspondence PRPs DEQ letter to Talgo re: Public Meeting 09/21/04 DEQ

13 01 04 03 Correspondence PRPs DEQ letter to BNSF re: Public Meeting 09/21/04 DEQ

13 01 04 03 Correspondence PRPs DEQ letter to MRL re: Reports 10/28/04 DEQ

13 01 04 03 Correspondence PRPs Phone Log - DEQ/Talgo LRC 10/19-11/1/04

13 01 04 03 Correspondence PRPs Phone Log - DEQ/Talgo LRC 02/10/05

13 01 04 03 Correspondence PRPs Y 12/01/05 DEQ

13 01 04 03 Correspondence PRPs DEQ email to Talco re: DEQ response to Talco Questions 03/02/06 DEQ

13 01 04 03 Correspondence PRPs BNSF letter to Director re: BN response to Governor 03/17/06 BN

13 01 04 03 Correspondence PRPs DEQ internal email re: Phone Log – BN/DEQ 03/23/06 DEQ internal

13 01 04 03 Correspondence PRPs BKBH email to DEQ re: Site Attorney 04/05/06 BKBH

13 01 04 03 Correspondence PRPs BKBH letter to DEQ re: Livingston Railyard 04/14/06 BKBH

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Phone Log - DEQ to BN re: Info needed for BN/Livingston/Mission Wye public meeting

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

** DEQ internal email re: Attorney correspondence – Livingston & Mission Wye

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 10: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 10 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 04 03 Correspondence PRPs BNSF Letter to DEQ Director 04/18/06 BN

13 01 04 03 Correspondence PRPs Great Falls Tribune article 04/28/06 GT Falls Tribune

13 01 04 03 Correspondence PRPs DEQ email to BN re: Project Officer change 04/21/06 DEQ

13 01 04 03 Correspondence PRPs DEQ/KJ/BNSF emails re: Meeting on 6/14 6/9-6/12/06

13 01 04 03 Correspondence PRPs DEQ letter to BKBH re: Contact with DEQ’s consultants 08/28/09 DEQ

13 01 04 03 Correspondence PRPs DEQ/BKBH emails re: Livingston file copies 09/04/09

13 01 04 03 Correspondence PRPs DEQ/BKBH emails re: Certified documents 9/8-9/9/09

13 01 04 03 Correspondence PRPs DEQ/BNSF emails re: Response to proposal 10/9-10/22/09

13 01 04 03 Correspondence PRPs DEQ meeting notes re: Planning meeting for 2010 12/22/09 DEQ

13 01 04 03 Correspondence PRPs DEQ/BNSF emails re: Definition of Sites in Montana 2/8-3/3/10

13 01 04 03 Correspondence PRPs DEQ/BNSF emails re: Agency oversight budget 3/5-3/17/10

13 01 04 03 Correspondence PRPs 06/10/10

13 01 04 03 Correspondence PRPs 06/30/10 BKBH

13 01 04 03 Correspondence PRPs 07/15/10 BKBH

13 01 04 03 Correspondence PRPs 10/05/10 BKBH

13 01 04 03 Correspondence PRPs 11/10/10

13 01 04 03 Correspondence PRPs 03/22/11 Geosyntec

13 01 04 03 Correspondence PRPs 03/25/11 BN/ Stegman

13 01 04 03 Correspondence PRPs 03/27/11 BN/ Stegman

13 01 04 03 Correspondence PRPs DEQ/Martin internal email re: Mike Kavanaugh Telephone log 04/25/11 DEQ internal

13 01 04 03 Correspondence PRPs 07/22/11 DEQ internal

13 01 04 03 Correspondence PRPs 05/30/12 BN/Smith

13 01 04 03 Correspondence PRPs 09/24/12 BN/Engdahl

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ Legal/Haque-Hausrath email to BKBH/Etchart re: 75-10-707 Request

DEQ Legal/ Haque-Hausrath

Site-Wide Information

BKBH letter to DEQ Legal/Haque-Hausrath re: BKBH response to DEQ 6/10/10 email – Recent BN purchased properties

Site-Wide Information

BKBH/Etchart letter to DEQ Legal/Haque-Hausrath re: Property acquisition in Livingston

Site-Wide Information

BKBH/Berry letter to DEQ Legal/Travis re: BKBH response to DEQ 9/3/10 letter

Site-Wide Information

DEQ Legal/Haque-Hausrath & BKBH/Cole emails re: Document request

DEQ Legal/ Haque-Hausrath

Site-Wide Information

Geosyntec/Kavanaugh email to DEQ/Martin re: Meeting followup

Site-Wide Information

BN/Stegman email to DEQ/Martin & Olsen re: Transparency issue

Site-Wide Information

BN/Stegman email to DEQ/Martin & Olsen re: Transparency issue

Site-Wide Information

Site-Wide Information

DEQ/Martin internal email re: BNSF (7/20/11) meeting followup

Site-Wide Information

BN letter to DEQ BN project managers re: Change of address for BN project manager/Smith

Site-Wide Information

BN/Engdahl to DEQ BN Project officers re: BN remediation manager contact change

Page 11: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 11 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 04 03 Correspondence PRPs 01/24/13

13 01 04 03 Correspondence PRPs Y **Phone Log - DEQ/ Brooks/ Kuhl Re: Mtg Summary 06/06/13 DEQ/ Brooks

13 01 04 03 Correspondence PRPs Y **Phone Log - DEQ/ Brooks/ Kuhl 06/27/13 DEQ/ Brooks

13 01 04 03 Correspondence PRPs DEQ/Internal emails re: Kavanaugh meeting 07/22/13 DEQ/Martin

13 01 04 03 Correspondence PRPs DEQ/Rowsey

13 01 04 04 Correspondence

13 01 04 04 Correspondence Envirocon Phone Log - DEQ & Envirocon re: Info request 12/01/00

13 01 04 04 Correspondence Envirocon Envirocon fax to DEQ re: Phase II RI Work Plan 12/01/00 Envirocon

13 01 04 04 Correspondence Envirocon Envirocon transmittal to DEQ re: CAD files 07/12/01 Envirocon

13 01 04 04 Correspondence Envirocon Phone Log - DEQ/Envirocon 07/31/01

13 01 04 04 Correspondence Envirocon Phone Log - Envirocon to DEQ 08/13/01 Envirocon

13 01 04 04 Correspondence Envirocon Phone Log: Dan McCaffery to DEQ 10/22/01 Dan McCaffery

13 01 04 04 Correspondence Envirocon DEQ internal email re: Verbal communications 02/05/03 DEQ internal

13 01 04 05 Correspondence

13 01 04 05 Correspondence Governor letters to Tillet 04/27/00 Governor

13 01 04 05 Correspondence DEQ & PCEC meeting notes 06/07/01

13 01 04 05 Correspondence DEQ email to Billau 07/11/01 DEQ

13 01 04 05 Correspondence PCEC email to DEQ re: Site visit, office 07/31/01 PCEC

13 01 04 05 Correspondence PCEC email to DEQ re: ROD 'Ad" for media 11/09/01 PCEC

13 01 04 05 Correspondence PCEC letter to DEQ re: Progress 03/19/02 PCEC

13 01 04 05 Correspondence DEQ letter to PCEC re: Progress 06/02/02 DEQ

Site-Wide Information

BN/Smith & DEQ/Reynolds emails re: DEQ attachment - Progress reports for invoicec 4A1300108 & 4A1300110

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ/Rowsey, Shana DeBoer, Richard Coffy, DEQ/Blair & Martin, BNSF/Smith emails re: Invoice clarification

999/ 45A403

Site-Wide Information

Envirocon (Documents dated before 12/1/00 are not itemized)

999/ 45A403

Site-Wide Information

999/ 45A403

Site-Wide Information

999/ 45A403

Site-Wide Information

999/ 45A403

Site-Wide Information

999/ 45A403

Site-Wide Information

999/ 45A403

Site-Wide Information

999/ 45A403

Site-Wide Information

Site-Wide Information

Other/Public/ATSDR, etc/PCEC (Documents dated before 4/27/00 are not itemized)

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Page 12: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 12 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 04 05 Correspondence DEQ transmittal to RTI - various 06/13/02 DEQ

13 01 04 05 Correspondence PCEC letter to DEQ re: Progress 06/20/02 PCEC

13 01 04 05 Correspondence DEQ letter to PCEC re: Progress 08/12/02 DEQ

13 01 04 05 Correspondence Phone Log - Blicker/RTI 01/02/03

13 01 04 05 Correspondence Phone Log - Blicker/RTI 01/28/03

13 01 04 05 Correspondence DEQ email to RTI re: DEQ personnel changes 06/11/03 DEQ

13 01 04 05 Correspondence MDOT letter to DEQ re: Sampling for bridge replacement 07/11/03 MDOT

13 01 04 05 Correspondence DEQ letter to MDOT re: Sampling for bridge replacement 07/14/03 DEQ

13 01 04 05 Correspondence DEQ letter to RTI re: Public Meeting 09/21/04 DEQ

13 01 04 05 Correspondence DEQ letter to MRL re: Public Meeting 09/21/04 DEQ

13 01 04 05 Correspondence DEQ letter to PCEC re: Public Meeting 09/21/04 DEQ

13 01 04 05 Correspondence Phone Log - DEQ to Shelly/MRL 10/19/04 DEQ

13 01 04 05 Correspondence DEQ email to A Perez/Director of Talco 03/02/06 DEQ

13 01 04 05 Correspondence 03/20/06 RTI

13 01 04 05 Correspondence Y ** DEQ internal email re: Phone Log – DEQ/MRL Attorneys 03/20/06 DEQ

13 01 04 05 Correspondence RTI email to DEQ re: Questions about Task F 03/29/06 RTI

13 01 04 05 Correspondence DEQ internal email re: Attorney email 05/01/06 DEQ

13 01 04 05 Correspondence DEQ internal email re: Private well sampling request 05/02/06 DEQ

13 01 04 05 Correspondence DEQ email to Robin Saha re: EQC questions 05/04/06 DEQ

13 01 04 05 Correspondence 07/23/09 EPA

13 01 04 05 Correspondence DEQ email forward to PCEC: Decision letter PDF attachments 09/08/09 DEQ

13 01 04 05 Correspondence DEQ/PCEC/BNSF emails re: Community meeting October 22 10/3-10/11/09

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

RTI email to DEQ re: RTI questions about State Implementation

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

EPA/Quick email to DEQ re: TAG Grant Progress reports and Task I Livingston Railyard

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Page 13: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 13 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 04 05 Correspondence DEQ/PCEC emails re: Community meeting 10/23/09

13 01 04 05 Correspondence PCEC/Fee, R Billau & DEQ/Reynolds emails re: TAG grant 10/06/10 PCEC

13 01 04 05 Correspondence Thank you note from the Governor 02/05/11

13 01 04 05 Correspondence 04/18/12

13 01 04 05 Correspondence PCEC Newsletter Summer 2013 PCEC Newsletter

13 01 04 05 Correspondence 07/01/13

13 01 04 05 Correspondence 07/09/13

13 01 04 06 Correspondence ReTec Correspondence 3/87-9/88

13 01 04 07 Correspondence 5/89-5/98

13 01 04 07 Correspondence DHES letter to LIFE re: Health concerns 02/19/92

13 01 04 07 Correspondence Y ** DHES letter to LIFE re: Health concerns 02/19/92

13 01 04 08 Correspondence 5/89-4/90

13 01 04 09 Correspondence Olympus

13 01 04 10 Correspondence

13 01 04 10 Correspondence City of Livingston DEQ meeting with City & Depot Representatives 04/23/04 DEQ

13 01 04 10 Correspondence City of Livingston Meeting notes - Golnar, city manager 07/20/04

13 01 04 10 Correspondence City of Livingston DEQ internal email re: Brownfields money for Livingston 07/22/04 DEQ internal

13 01 04 10 Correspondence City of Livingston 09/21/04 DEQ

13 01 04 10 Correspondence City of Livingston DEQ letter to Golnar re: ATSDR Fact Sheets 10/08/04 DEQ

13 01 04 10 Correspondence City of Livingston Phone Log - Golnar 10/13/04

13 01 04 10 Correspondence City of Livingston 10/21/04 City of Livingston

13 01 04 10 Correspondence City of Livingston Phone Log - Golnar 11/01/04

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

DEQ/Reynolds & Livingston Current/Neill emails re: Public forum

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

PMRE/White & DEQ/Reynolds emails re: 103 E Chinook info request

Prudential MT Real Estate

Site-Wide Information

Other/Public/ATSDR, etc/PCEC

DEQ/Haque-Hausrath email to Julie McGarry re: Plume map info request

DEQ/Haque-Hausrath

999/ 45A403

Site-Wide Information

999/ 45A403

Site-Wide Information LIFE Correspondence

999/ 45A403

Site-Wide Information LIFE Correspondence

Site-Wide Information LIFE Correspondence

999/ 45A403

Site-Wide Information

GeoTrans, Inc Correspondence

Site-Wide Information

Site-Wide Information

City of Livingston (Documents dated before 4/23/04 are not itemized)

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ letter to Livingston City Commissioners re: Public Meeting

Site-Wide Information

Site-Wide Information

Site-Wide Information

City of Livingston letter to DEQ re: Well ordinance (w/copy of ordinance attached)

Site-Wide Information

Page 14: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 14 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 04 10 Correspondence City of Livingston Y 10/21/04 DEQ internal

13 01 04 10 City of Livingston BNLV Meeting notes 03/10/09 DEQ/ Reynolds

13 01 04 10 Correspondence City of Livingston DEQ/City Manager emails re: Public meeting 09/17/09

13 01 04 10 Correspondence City of Livingston DEQ internal emails re: Caller referral 12/01/09 DEQ internal

13 01 04 10 Correspondence City of Livingston DEQ & City Manager emails re: OSHA letter 11/20-12/2/09

13 01 04 10 Correspondence City of Livingston Ed Meece & DEQ/Reynolds emails re: MRL air quality testing 01/23/12

13 01 04 10 Correspondence City of Livingston 04/19/12

13 01 04 10 Correspondence City of Livingston City Manager/Meece conference call meeting notes 04/26/12

13 01 04 10 Correspondence City of Livingston 07/06/12

13 01 04 10 Correspondence City of Livingston 09/27/12 DEQ/ Reynolds

13 01 04 10 Correspondence City of Livingston 09/27/12

13 01 04 11 Correspondence

13 01 04 11 Correspondence Park County 09/15/04 DEQ

13 01 04 11 Correspondence Park County DEQ letter to Park Co. Commissioners re: Public Meeting 09/21/04 DEQ

13 01 04 11 Correspondence Park County Phone Log - DEQ to Taylor 11/01/04 DEQ

13 01 04 11 Correspondence Park County PCEC Newsletter 01/01/12 PCEC

13 01 04 11 Correspondence Park County PCEC Newsletter Summer 2012 PCEC

13 01 04 12 Correspondence Telephone Logs

13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/G Davis re: Ozone on hydrogen peroxide 02/22/06

13 01 04 12 Correspondence Telephone Logs 6/5-6/6/06

13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/KJ re: Status of projects 06/06/06

13 01 04 12 Correspondence Telephone Logs Memo to File TO 37 re: Former Envirocon employee 06/07/06

13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/D McCaffery re: Sampling on the SVE soils 06/12/06

Site-Wide Information

** DEQ internal email re: Proposed development on Talgo property

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

City Manager/Meece & MRL/Walsh emails re: Conference call scheduling

Site-Wide Information

City Manager/ Meece

Site-Wide Information

City Manager/Meece & DEQ/Reynolds emails re: Schedule on track

Site-Wide Information

DEQ/Reynolds email to City Manager/Meece re: Answeres to Meece's 9/26/12 questions

Site-Wide Information

City Manager/Meece email to DEQ/Reynolds re: Reply to DEQ/Reynolds 9/26/12 email

City Manager/ Meece

Site-Wide Information

Park County (Documents dated before 9/15/04 are not itemized)

Site-Wide Information

DEQ letter to Randy Taylor, Sanitarian re: Groundwater Reports

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information Phone Log DEQ/D Stordahl (CDM) re: Task Order 37 activities

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 15: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 15 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/T Tillet re: GW analysis on property 07/13/06

13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/J Norris re: Home at 111 Miles Lane 08/09/06

13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/J Norris re: BNLV 04/11/07

13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/D Smith re: BNLV 05/10/07

13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/J Norris re: Several issues 07/19/07

13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/D Krohne 08/29/07

13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/E Gytenbeek re: DW wells sampled 12/04/07

13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/E Jackson re: Property question 12/05/07

13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/S Briggs re: City water 12/05/07

13 01 04 12 Correspondence Telephone Logs Phone Log DEQ/D Smith re: Future tasks 12/07/07

13 01 04 12 Correspondence Telephone Logs Y ** Phone Log Anonymous to DEQ re: Oozing tar pits on road 02/18/09

13 01 04 12 Correspondence Telephone Logs Voice mail log – J Norris/KJ 10/28/09

13 01 04 12 Correspondence Telephone Logs Phone log – L Novak/KJ 11/20/09

13 01 04 12 Correspondence Telephone Logs Phone log – L Novich/KJ 02/23/09

13 01 04 12 Correspondence Telephone Logs Phone log – J Norris/KJ 05/28/10

13 01 04 12 Correspondence Telephone Logs Phone log – DEQ/Reynolds internal email – legislator call 09/22/10 DEQ internal

13 01 04 12 Correspondence Telephone Logs 09/22/10

13 01 04 13 Correspondence 3/88-12/96

13 01 04 14 Correspondence Kennedy/Jenks

13 01 04 14 Correspondence Kennedy/Jenks K/J fax to DEQ re: June Activity Schedule 05/17/04 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J letter to DEQ re: Property Owners 08/27/04 KJ

13 01 04 14 Correspondence Kennedy/Jenks Phone Log - J Norris/K/J 09/01/04 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J email to DEQ re: Property boundaries 09/01/04 KJ

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Phone log – DEQ Legal/Haque-Hausrath internal email re: call with BN/Summerville requesting a meeting w/MRL re: Jurisdictional issues

DEQ legal/ Haque-Hausrath

999/ 45A403

Site-Wide Information

Ralph Hanks Correspondence

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 16: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 16 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 04 14 Correspondence Kennedy/Jenks K/J letter to DEQ re: Field Activities scheduled for Sept 2004 09/03/04 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J email to DEQ re: Well survey data 09/23/04 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J fax to DEQ re: October Activities 10/06/04 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J letter to DEQ re: October Activities 10/06/04 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J fax to DEQ re: November Activities 10/29/04 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J memo to DEQ re: November field schedule 10/29/04 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J fax to DEQ re: December Activities 11/29/04 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J letter to DEQ re: December Activities 11/29/04 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J fax to DEQ re: January Activities 01/03/05 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J fax/transmittal to DEQ re: February Activities 02/02/05 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J letter to DEQ re: March Activities 02/28/05 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J fax/transmittal to DEQ re: March Activities 03/01/05 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J Fax/transmittal re: April Activities 04/08/05 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal re: May activities 05/03/05 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal re: July activities 07/07/05 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal re: August Activities 08/05/04 KJ

13 01 04 14 Correspondence Kennedy/Jenks 3/2-3/4/05

13 01 04 14 Correspondence Kennedy/Jenks 04/26/05 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J fax to DEQ re: May Activities 05/03/05 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J letter/fax to DEQ re: June Activities 05/25/05 KJ

13 01 04 14 Correspondence Kennedy/Jenks DEQ email to K/J re: Document distribution 06/01/05 DEQ

13 01 04 14 Correspondence Kennedy/Jenks K/J letter/fax to DEQ re: September Activities 08/29/05 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J letter to DEQ re: January 2006 Activities 12/29/05 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J letter to DEQ re: February 2006 Activities 02/02/06 KJ

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ/Sivers &K/J/Norris emails re: Natural attenuation Sampling

Site-Wide Information

K/J/Norris email to DEQ/Sivers re: BN Livingston Shop Complex Well Map

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 17: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 17 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 04 14 Correspondence Kennedy/Jenks K/J fax to DEQ re: March 2006 Activities 02/03/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J Field Activities schedule March 2006 03/01/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J fax to DEQ re: April 2006 Activities 03/31/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal – April 2006 Field Activities 03/30/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J email re: Livingston weather conditions 05/01/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal – May 2006 Activities 05/04/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks 05/09/06 DEQ

13 01 04 14 Correspondence Kennedy/Jenks 05/09/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks 05/22/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks 05/23/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks DEQ email to KJ re: Task I Contacts 05/25/06 DEQ

13 01 04 14 Correspondence Kennedy/Jenks K/J email to DEQ re: Livingston Deliverables 05/30/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks 05/30/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal – June 2006 Activities 06/01/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks B Moore email to DEQ re: pedestrian underpass 06/05/06 B Moore

13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal – July 2006 Activities 06/06/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: BNLV Groundwater elevations 06/06/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks DEQ/KJ/BNSF emails re: Meeting on June 14 06/09/06

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Logs for HRO-20 through HRO-24 06/16/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ/Bartlett & West emails re: BNSF right-of-way map 6/21-6/23/06

13 01 04 14 Correspondence Kennedy/Jenks KJ/B&W emails re: Further information: BNSF r/w map 6/21-6/27/06

13 01 04 14 Correspondence Kennedy/Jenks KJ email to CDM re: Soil data attached 06/27/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ email to CDM re: Soil additional files 06/27/06 KJ

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ email to K/J re: Livingston Deliverable – Task I Addendum No.1

Site-Wide Information

KJ email to DEQ re: Revised ERCLs Appendices for Tasks F and G RAPs and Task L SIWP

Site-Wide Information

K/J transmittal cover re: updated ERCL tables for Task F, G, and L

Site-Wide Information

KJ fax to DEQ re: Livingston Deliverable and Contained-in Decision

Site-Wide Information

Site-Wide Information

Site-Wide Information

K/J transmittal – Semiannual Monitoring letters to request access – Henikensen, Watson, Steffen, and Grosvenor

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 18: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 18 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 04 14 Correspondence Kennedy/Jenks 6/21-6/28/06

13 01 04 14 Correspondence Kennedy/Jenks DEQ/KJ emails re: Rotasonic boring logs 06/29/06

13 01 04 14 Correspondence Kennedy/Jenks DEQ/KJ emails re: SVE systems 06/30/06

13 01 04 14 Correspondence Kennedy/Jenks K/J email to DEQ re: Annual Facility Inspection 07/10/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Livingston Deliverables 07/28/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J email to DEQ re: Request for a Contained-in Decision 08/11/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J email to DEQ re: Livingston Deliverable 08/17/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: KJ interim point of contact 09/21/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks 10/09/06 DEQ

13 01 04 14 Correspondence Kennedy/Jenks N Winslow email re: NW Energy schedule issues 10/27/06 N Winslow

13 01 04 14 Correspondence Kennedy/Jenks 11/01/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks 11/01/06

13 01 04 14 Correspondence Kennedy/Jenks 11/01/06

13 01 04 14 Correspondence Kennedy/Jenks DEQ/K/J emails re: Semiannual GW Monitoring – Notification 11/02/06

13 01 04 14 CD Correspondence Kennedy/Jenks 11/09/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J email to DEQ re: Quarterly Status Report – No.5 11/21/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal – December 2006 Activities 12/04/06 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal – January 2007 Activities 01/03/07 KJ

13 01 04 14 Correspondence Kennedy/Jenks 01/08/07 KJ

13 01 04 14 Correspondence Kennedy/Jenks 01/09/07 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal – February 2007 Activities 02/01/07 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal – March 2007 Activities 02/20/07 KJ

Site-Wide Information

DEQ/CDM/B&W emails re: further information: BNSF r/w map

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ email to K/J re: Groundwater sampling results for June 2006

Site-Wide Information

Site-Wide Information

K/J transmittal – Semiannual Monitoring letters to request access – Watson, Steffen, and Grosvenor – Letter of Notification of Field Activities to MRL

Site-Wide Information

DEQ/K/J emails re: Semiannual Groundwater Monitoring – Notification

Site-Wide Information

DEQ/K/J email re: Semiannual Groundwater Monitoring – Notification

Site-Wide Information

Site-Wide Information

K/J transmittal cover – CD ROM containing pdf files of the 2005 Annual Monitoring and Maintenance Report

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

K/J transmittal cover – CD of Task F Stage 1 – Part 1 Remedial Action Plan for VOC-Containing Alluvial Aquifer GW

Site-Wide Information

K/J email to DEQ re: Facility-Wide Sampling and Analysis Plan – Addendum No.1

Site-Wide Information

Site-Wide Information

Page 19: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 19 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 04 14 Correspondence Kennedy/Jenks 02/26/07 KJ

13 01 04 14 Correspondence Kennedy/Jenks 02/27/07 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J email to DEQ re: January 2007 GW Analytical Results 03/09/07 KJ

13 01 04 14 Correspondence Kennedy/Jenks 03/15/07 KJ

13 01 04 14 Correspondence Kennedy/Jenks DEQ/K/J email re: Hydrographs 03/19/07

13 01 04 14 Correspondence Kennedy/Jenks 03/20/07 DEQ/ Meierhenry

13 01 04 14 Correspondence Kennedy/Jenks K/J email to DEQ re: DEQ Split Samples 03/20/07 KJ

13 01 04 14 Correspondence Kennedy/Jenks 03/29/07 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J email to DEQ re: Purge Water Landspread 04/02/07 KJ

13 01 04 14 Correspondence Kennedy/Jenks 04/09/07 KJ

13 01 04 14 Correspondence Kennedy/Jenks 04/19/07 KJ

13 01 04 14 Correspondence Kennedy/Jenks DEQ email to KJ re: Email communication with KJ 05/10/07 DEQ

13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal – June 2007 Activities 05/15/07 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal – June 2008 Activities 05/27/07 KJ

13 01 04 14 Correspondence Kennedy/Jenks 05/29/07

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Livingston Deliverables 05/30/07 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Drilling schedule 05/31/07 KJ

13 01 04 14 Correspondence Kennedy/Jenks 06/05/07 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Livingston Deliverable 06/05/07 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ/DEQ/CDM emails re: Schedule of upcoming activities 06/15/07

Site-Wide Information

K/J email to DEQ re: Livingston Deliverables – Spring 2005 SOW – Quarterly Status Report No.6

Site-Wide Information

K/J email to DEQ re: Livingston Deliverables – Truck Bed Silty Residue Sampling Results & Request for Contained-in Decision; Sampling and Analysis Plan for Treated Concrete and Rock Debris

Site-Wide Information

Site-Wide Information

K/J email to DEQ re: Livingston Deliverables – Task I: Mitigation Design Development Plan; Task D/E – Phase I Remedial Action 2007 – 30% Design Report

Site-Wide Information

Site-Wide Information

DEQ/Meierhenry email to DEQ re: Livingston Shop Complex Remediation Project – UST Portion

Site-Wide Information

Site-Wide Information

K/J email to DEQ re: Livingston Deliverables – 2006 Annual Monitoring and Maintenance Report

Site-Wide Information

Site-Wide Information

K/J email to DEQ re: Livingston Deliverable – Task F Stage I – Part 1 Remedial Action Plan for VOC-Containing Alluvial Aquifer GW

Site-Wide Information

K/J email to DEQ re: Livingston Deliverable – Replacement pages/inserts for: Task I: Mitigation Design Dev Plan; Task I Addendum No.2: Task D/E Phase 1; Updated Table 3

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ/KJ/CDM emails re: Planned activities and email attachments

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ transmittal – Facility-Wide SAP Addendum No 1, Revision No 1

Site-Wide Information

Site-Wide Information

Page 20: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 20 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Task I and Task F items posted to website 07/16/07 KJ

13 01 04 14 Correspondence Kennedy/Jenks 07/26/07

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Updated laboratory analytical reports 08/30/07 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ transmittal – September Activities 09/04/07 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ/DEQ emails re: Livingston public meeting 10/29/07 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Livingston Deliverables 11/28/07 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Livingston Deliverables 01/30/08 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J email to DEQ re: Communications 02/13/08 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ fax transmittal – March Activities 02/20/08 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Livingston Deliverables 02/28/08 KJ

13 01 04 14 Correspondence Kennedy/Jenks 02/29/08

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Livingston Deliverable 03/27/08 KJ

13 01 04 14 Correspondence Kennedy/Jenks DEQ/KJ emails re: Purge water 03/20/08

13 01 04 14 Correspondence Kennedy/Jenks KJ fax transmittal – June field schedule 05/27/08 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Livingston documents transmittal 05/28/08 KJ

13 01 04 14 Correspondence Kennedy/Jenks 07/11/08 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal – September 2008 Activities 08/25/08 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J emails re: Livingston Deliverable 08/27/08 KJ

13 01 04 14 Correspondence Kennedy/Jenks DEQ email to CDM re: Items to remove from Livshare 09/15/08 DEQ

13 01 04 14 Correspondence Kennedy/Jenks Phone Log – DEQ/KJ re: K/J update 11/05/08

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: KJ SOW Quarterly Report 13 notice 11/21/08 KJ

13 01 04 14 Correspondence Kennedy/Jenks DEQ/KJ emails re: ARC GIS Map 11/26/08

13 01 04 14 Correspondence Kennedy/Jenks KJ December Activity Notice 12/01/08 KJ

Site-Wide Information

Site-Wide Information

KJ/CDM emails re: Task I and Task F items posted to website 7/16/07-7/26/07

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ/KJ emails re: Schedule of activities requiring access to MRL property

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

K/J email re: Livingston Deliverable Task F, 2 WP and D/E Bid Documents

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 21: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 21 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 04 14 Correspondence Kennedy/Jenks K/J fax/transmittal to DEQ re: March 2009 field activities 02/23/09 KJ

13 01 04 14 Correspondence Kennedy/Jenks 02/27/09 KJ

13 01 04 14 Correspondence Kennedy/Jenks 03/10/09 KJ

13 01 04 14 Correspondence Kennedy/Jenks 03/27/09 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J fax/transmittal to DEQ re: June 2009 field activities 05/18/09 KJ

13 01 04 14 Correspondence Kennedy/Jenks 05/28/09 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J emails to DEQ re: Upcoming field activities schedule 06/03/09 KJ

13 01 04 14 Correspondence Kennedy/Jenks DEQ email to K/J re: Domestic well sampling at 308 Garnier 06/04/09 DEQ

13 01 04 14 Correspondence Kennedy/Jenks DEQ email to KJ re: Document review 06/19/09 DEQ

13 01 04 14 Correspondence Kennedy/Jenks K/J email to DEQ re: Annual facility inspection notification 07/06/09 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Document deliverables 08/27/09 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ fax to DEQ – BNSF September 2009 Activities 09/02/09 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Document deliverables 11/25/09 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ fax to DEQ – BNSF December 2009 Activities 12/03/09 KJ

13 01 04 14 Correspondence Kennedy/Jenks DEQ letter to KJ re: DEQ modification of KJ documents 02/11/10 DEQ

13 01 04 14 Correspondence Kennedy/Jenks DEQ email to KJ re: DEQ modification of KJ documents 02/16/10 DEQ

13 01 04 14 Correspondence Kennedy/Jenks DEQ letter to KJ re: DEQ modification of KJ documents 02/25/10 DEQ

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Document deliverables 02/25/10 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ fax to DEQ re: BNSF March Activities 03/02/10 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: 2010 HASP 03/08/10 KJ

13 01 04 14 Correspondence Kennedy/Jenks DEQ/KJ emails re: KPRK drinking water 03/09/10

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Document deliverables 03/30/10 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Items posted to website 04/23/10 KJ

Site-Wide Information

Site-Wide Information

K/J email to DEQ re: Documents sent by UPS for delivery tomorrow

Site-Wide Information

K/J Transmittal to DEQ re: CD’s containing BNLV air & soil gas data

Site-Wide Information

K/J email to DEQ re: Documents sent by UPS for delivery tomorrow

Site-Wide Information

Site-Wide Information

K/J email to DEQ re: Documents sent by UPS for delivery tomorrow

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 22: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 22 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Document deliverables 05/28/10 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Document deliverables 06/02/10 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Points discussed to follow up on 06/07/10 KJ

13 01 04 14 Correspondence Kennedy/Jenks 06/08/10 DEQ

13 01 04 14 Correspondence Kennedy/Jenks DEQ email to KJ re: Points discussed to follow up one 06/08/10 DEQ

13 01 04 14 Correspondence Kennedy/Jenks KJ fax to DEQ – BNSF July 2010 Activities 06/30/10 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ email to DEQ re: Weekly field activities staffing schedule 07/15/10 KJ

13 01 04 14 Correspondence Kennedy/Jenks DEQ/KJ emails re: Weekly field activities staffing schedule 07/27/10

13 01 04 14 Correspondence Kennedy/Jenks DEQ/KJ emails re: Analytical data 07/29/10

13 01 04 14 Correspondence Kennedy/Jenks weekly field activities staffing schedule 08/01/10 KJ

13 01 04 14 Correspondence Kennedy/Jenks KJ fax to DEQ – BNSF August 2010 field activities schedule 08/03/10 KJ

13 01 04 14 Correspondence Kennedy/Jenks K/J transmittal to DEQ re: August 2010 Activities 08/03/10 KJ

13 01 04 14 Correspondence Kennedy/Jenks 08/04/10 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 08/12/10 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks weekly field activities staffing schedule 08/21/10 KJ

13 01 04 14 Correspondence Kennedy/Jenks 08/23/10 DEQ

13 01 04 14 Correspondence Kennedy/Jenks 08/27/10 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 08/31/10 KJ/Lee

13 01 04 14 Correspondence Kennedy/Jenks 09/15/10 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 09/15/10 KJ/ Norris

13 01 04 14 Correspondence Kennedy/Jenks 09/29/10 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 10/05/10 KJ

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ email to BNSF/KJ re: Notification of field activities and progress reporting

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

K/J/Aldersley & DEQ/Reynolds emails re: Annual facility insurance notice

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Weekly field activities staffing schedule

Site-Wide Information

Site-Wide Information

DEQ/Reynolds email to K/J re: Attachment - New DEQ data validation guidelines

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Livingston deliverables – Quarterly status report #20 & Task L Supplemental WP for Bedrock Aquifers

Site-Wide Information

K/J/Lee fax to DEQ/Reynolds re: September 2010 field activities

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Weekly field activities staffing schedule as of 9/15/10

Site-Wide Information

K/J/Norris email to DEQ/Reynolds re: Proposed conference call – Task D/E & F

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Weekly field activities staffing schedule as of 9/29/10

Site-Wide Information

K/J/Lee letter/fax to DEQ/Reynolds re: October 2010 field schedule

Page 23: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 23 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 04 14 Correspondence Kennedy/Jenks 10/07/10 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 10/14/10 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 10/22/10 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 10/29/10 KJ

13 01 04 14 Correspondence Kennedy/Jenks 10/29/10 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 11/08/10 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 11/11/10 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 11/29/10 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 12/01/10 KJ/Lee

13 01 04 14 Correspondence Kennedy/Jenks 12/02/10 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 12/08/10 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 12/10/10 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 01/07/11 KJ/Lee

13 01 04 14 Correspondence Kennedy/Jenks 01/12/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 01/21/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 01/26/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 01/13/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 02/03/11 KJ

13 01 04 14 Correspondence Kennedy/Jenks 02/11/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 02/17/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 02/24/11 KJ/Adlersley

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Weekly field activities staffing schedule as of 10/7/10

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Weekly field activities staffing schedule as of 10/14/10

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Weekly field activities staffing schedule as of 10/22/10

Site-Wide Information

K/J/Lee letter/fax to DEQ/Reynolds re: November 2010 field schedule

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Weekly field activities staffing schedule as of 10/29/10

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Weekly field activities staffing schedule as of 11/5/10

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Respiromentry testing &Weekly field activities staffing schedule as of 11/11/10

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Livingston Deliverables – Quarterly Status Report No 21to be delivered 11/30/10 to DEQ

Site-Wide Information

K/J/Lee Letter of Transmittal & Fax to DEQ/Reynolds re: December 2010 Activities

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Weekly field activities staffing schedule as of 12/1/10

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Follow - up to weekly field activities schedule as of 12/1/10

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: No change to 12/1/10 field activities schedule

Site-Wide Information

K/J/Lee email to DEQ/Reynolds re: January 2011 Field Activities

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 1-13-11

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: No change to 1/13/11 field activities schedule

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 1/26/11

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 2/2/11

Site-Wide Information

K/J/Lee Letter/fax to DEQ/Reynolds re: February 2011 Field Activities

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 2/10/11

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Task F – Part (addendum # 2) and Task D/E posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 2/24/11

Page 24: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 24 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 04 14 Correspondence Kennedy/Jenks 02/28/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 02/28/11 KJ/Lee

13 01 04 14 Correspondence Kennedy/Jenks 03/04/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 03/04/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 03/09/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks K/J/Norris email to DEQ re: Contacting John Norris 03/17/11 KJ Norris

13 01 04 14 Correspondence Kennedy/Jenks 04/01/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 04/04/11 KJ/ Norris

13 01 04 14 Correspondence Kennedy/Jenks 04/06/11 KJ Aldersley

13 01 04 14 Correspondence Kennedy/Jenks 04/07/11 KJ/ Norris

13 01 04 14 Correspondence Kennedy/Jenks 04/14/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks K/J/Norris email to DEQ re: Contacting John Norris 04/15/11 KJ/ Norris

13 01 04 14 Correspondence Kennedy/Jenks 04/20/11 BN/ Stegman

13 01 04 14 Correspondence Kennedy/Jenks 04/29/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks K/J/Lee transmittal to BN/Smith re: May 2011 Field schedule 05/04/11 KJ/ Lee

13 01 04 14 Correspondence Kennedy/Jenks 05/05/11 KJ/ Lee

13 01 04 14 Correspondence Kennedy/Jenks 05/11/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 05/19/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 05/20/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 05/20/11 KJ/ Lee

13 01 04 14 Correspondence Kennedy/Jenks 05/27/11 KJ/Adlersley

Site-Wide Information

K/J Aldersley email to DEQ/Reynolds re: Livingston deliverable – Quarterly Report #22 went out UPS on 2/28/11

Site-Wide Information

K/J/Lee letter/fax to DEQ/Reynolds re: March 2011 field schedule

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 3/3/11

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Attachment – Part 2 of REV – Biovent Interim Monitoring Tables

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 3/9/11

Site-Wide Information

Site-Wide Information

K/J Aldersley email to DEQ/Reynolds re: Livingston deliverable - 2010Annual Monitoring & Maintenance Report went out UPS 3/31/11

Site-Wide Information

K/J Norris email to DEQ re: Updated Indoor Air sampling schedule

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 4/6/11

Site-Wide Information K/J Norris email/fax to BN/Smith re: April 2011 Field Schedule

Site-Wide Information

K/J Aldersley email to DEQ/Reynolds re: March 2011 GW sampling results posted to DEQ website

Site-Wide Information

Site-Wide Information

DEQ/Martin internal email re: fw - email from BN/Stegman - Transparency issues

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 4/27/11

Site-Wide Information

Site-Wide Information

K/J/Lee transmittal to DEQ/Reynolds re: May 2011 Field schedule

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 5/11/11

Site-Wide Information

K/J Aldersley email to DEQ/Reynolds re: Livingston deliverable - Task I Indoor Air Mitigation Plan for Residential & Commercial Properties sent UPS 5/20/11

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Updated well map posted to website

Site-Wide Information

K/J/Lee transmittal to DEQ/Reynolds re: June 2011 Field schedule

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 5/27/11

Page 25: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 25 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 04 14 Correspondence Kennedy/Jenks 06/09/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 06/10/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 06/16/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 06/22/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks DEQ/Reynolds & K/J Aldersley emails re: Well coordinates 06/29/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 07/01/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 07/05/11

13 01 04 14 Correspondence Kennedy/Jenks 07/06/11 KJ/Lee

13 01 04 14 Correspondence Kennedy/Jenks K/J/Lee fax to DEQ/Reynolds re: July 2011 Field activities 07/07/11 KJ/Lee

13 01 04 14 Correspondence Kennedy/Jenks 07/21/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 07/28/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 08/04/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 08/05/11 KJ/Lee

13 01 04 14 Correspondence Kennedy/Jenks 08/18/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 08/25/11

13 01 04 14 Correspondence Kennedy/Jenks 08/30/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 09/01/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 09/08/11 KJ/Lee

13 01 04 14 Correspondence Kennedy/Jenks 09/29/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 10/07/11 KJ/Lee

13 01 04 14 Correspondence Kennedy/Jenks 10/12/11 KJ/Adlersley

Site-Wide Information

K/J Aldersley email to DEQ/Reynolds re: Livingston deliverables - Revised Task F Stage I-Part 2: Soil Vapor Extraction Report

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 6/8/11

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 6/15/12

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 6/22/11

Site-Wide Information

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Notification for Task L & Task D&E Activities

Site-Wide Information

DEQ/Reynolds, K/J/Aldersley & CDM/Cohn emails re: Well coordinates

Site-Wide Information

K/J/Lee transmittal to DEQ/Reynolds re: July 2011 Field activities

Site-Wide Information

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 7/21/11

Site-Wide Information

K/J Aldersley email to DEQ/Reynolds re: Livingston deliverables -2nd Revised Bioventing Extraction/Injection Design Study & Revised Bioventing Extraction/Injection System Monitoring Plan

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Field schedule as of 8/4/11

Site-Wide Information

K/J/Lee transmittal to DEQ/Reynolds re: August 2011 Field activities

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 8/18/11

Site-Wide Information

KJ/Aldersley & CDM/Hills emails to DEQ/Reynolds re: Field schedule as of 8/25/11

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Quarterly Status report #24 sent UPS

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 9/1/11

Site-Wide Information

K/J/Lee letter/fax to DEQ/Reynolds re: September 2011 Field activities

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 9/29/11

Site-Wide Information

K/J/Lee transmittal to DEQ/Reynolds re: October 2011 Field activities

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 10/12/11

Page 26: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 26 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 04 14 Correspondence Kennedy/Jenks 10/21/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 10/28/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 11/02/11 KJ/Norton

13 01 04 14 Correspondence Kennedy/Jenks 11/02/11

13 01 04 14 Correspondence Kennedy/Jenks 11/18/11

13 01 04 14 Correspondence Kennedy/Jenks 11/213/11 KJ/Lee

13 01 04 14 Correspondence Kennedy/Jenks 11/29/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 12/08/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 01/06/12 KJ/Lee

13 01 04 14 Correspondence Kennedy/Jenks 01/31/12 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 01/31/12 KJ/Lee

13 01 04 14 Correspondence Kennedy/Jenks 02/10/12 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 02/16/12 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 02/28/12 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks Field activities scheduled for March 2012 03/01/12

13 01 04 14 Correspondence Kennedy/Jenks 03/30/12 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 03/30/11 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 04/06/12 KJ/Lee

13 01 04 14 Correspondence Kennedy/Jenks 04/16/12 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 04/17/12 KJ/Adlersley

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 10/21/11

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 10/28/11

Site-Wide Information

KJ/Norton email to DEQ/Reynolds re: November 2011 Field activities

Site-Wide Information

KJ/Aldersley & DEQ/Reynolds emails re: Electronic copies of SOW quarterly reports

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 11/18/11

Site-Wide Information

KJ/Lee email to DEQ/Reynolds re: December 2011 Field activities

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Quarterly Status Report # 25 sent out in mail

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 12/8/11

Site-Wide Information

KJ/Lee email to DEQ/Reynolds re: January 2012 Field Schedule

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 1/31/12

Site-Wide Information

KJ/Lee email to DEQ/Reynolds re: February 2012 Field Schedule

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Weekly Field Activities

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Weekly Field Activities as of 2/12/12

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Quarterly Status Report # 26 sent out in mail

Site-Wide Information

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: 2011 Annual Monitoring & Maintenance Report sent out for delivery

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Task M Remedial Action Plan for Asbestos-Containing Materials revision 2 sent out for delivery

Site-Wide Information

KJ/Lee Transmittal to DEQ/Reynolds re: April 2012 Field Activities

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Addendum #1 to DEQ Version of Task L Supplemental Investigation Work Plan for Bedrock Aquifers revision #1 sent out for delivery

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Replacement pages for entire Section 3 of the Addendum #1 to DEQ Version of Task L Supplemental Investigation Work Plan for Bedrock Aquifers revision #1 sent out for delivery

Page 27: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 27 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 04 14 Correspondence Kennedy/Jenks 05/08/12 KJ/Lee

13 01 04 14 Correspondence Kennedy/Jenks 05/23/12 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 05/24/12 KJ/Lee

13 01 04 14 Correspondence Kennedy/Jenks 06/07/12 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 06/14/12 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 07/06/12 KJ/Lee

13 01 04 14 Correspondence Kennedy/Jenks 07/12/12 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 07/25/12 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 02/27/13 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 03/12/13

13 01 04 14 Correspondence Kennedy/Jenks 03/28/13 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks KJ/Aldersley email to DEQ/Reynolds re: KJ document notice 05/30/13 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks KJ/Aldersley & DEQ/Reynolds emails re: Field work notice 06/05/13 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks KJ/Aldersley email to DEQ/Reynolds re: Field schedule 06/12/13 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks 06/18/13 KJ/Fernandes

13 01 04 14 Correspondence Kennedy/Jenks KJ/Aldersley email to DEQ/Reynolds re: Field Schedule 06/18/13 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks KJ/Aldersley email to DEQ/Reynolds re: KJ Field Schedule 06/28/13 KJ/Adlersley

13 01 04 14 Correspondence Kennedy/Jenks KJ/Fernandes & DEQ/Reynolds emails re: KJ status report 07/12/13 KJ/Fernandes

13 01 04 14 Correspondence Kennedy/Jenks KJ/Fernandes email to DEQ/Reynolds re: KJ Status call 07/23/13 KJ/Fernandes

13 01 04 14 Correspondence Kennedy/Jenks KJ/Aldersley & DEQ/Reynolds emails re: KJ status report 07/25/13 KJ/Adlersley

13 01 04 15 Correspondence CDM Conflict of Interest

13 01 04 15 Correspondence CDM Conflict of Interest Meeting notes 05/15/06

13 01 04 15 Correspondence CDM Conflict of Interest DEQ internal emails re: CDM potential conflict of interest 10/17/06 DEQ internal

Site-Wide Information

KJ/Lee Transmittal to DEQ/Reynolds re: May 2012 Field Activities

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 5/23/12

Site-Wide Information

KJ/Lee Transmittal to DEQ/Reynolds re: June 2012 Field Activities

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 6/7/12

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 6/14/12

Site-Wide Information

KJ/Lee Transmittal to DEQ/Reynolds re: July 2012 Field Activities

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 7/12/12

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Field schedule as of 7/25/12

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Quarterly status report # 30 sent out for delivery

Site-Wide Information

DEQ/Reynolds & KJ/Aldersley emails re: Water level survey data December 2012

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: 2012 Annual Monitoring & Maintenance Report sent out 3/28/13

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ/Fernandes letter to DEQ/Reynolds re: Project Contact/Manager

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 28: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 28 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 04 15 Correspondence CDM Conflict of Interest 10/17/06 CDM internal

13 01 04 15 Correspondence CDM Conflict of Interest 10/23/06 DEQ internal

13 01 04 15 Correspondence CDM Conflict of Interest DEQ internal emails re: CDM Conflict of Interest Waiver 10/30/06 DEQ internal

13 01 04 15 Correspondence CDM Conflict of Interest DEQ & CDM emails re: Conflict of Interest proposed meeting 12/20/06

13 01 04 15 Correspondence CDM Conflict of Interest 11/06/06 DEQ

13 01 04 15 Correspondence CDM Conflict of Interest CDM/DEQ Conflicts of Interest Meeting Agenda 01/05/07

13 01 04 15 Correspondence CDM Conflict of Interest DEQ Conflicts of Interest meeting notes 01/05/07 DEQ

13 01 04 15 Correspondence CDM Conflict of Interest 01/19/07 CDM

13 01 04 15 Correspondence CDM Conflict of Interest Follow-up meeting to communications training notes 05/15/07

13 01 04 15 Correspondence CDM Conflict of Interest Meeting notes 09/20/07

13 01 04 15 Correspondence CDM Conflict of Interest Meeting notes 11/05/07

13 01 04 15 Correspondence CDM Conflict of Interest Meeting notes 12/12/07

13 01 04 16 Correspondence CDM General

13 01 04 16 Correspondence CDM General DEQ email to CDM re: BNLV Work Plans 06/06/06 DEQ

13 01 04 16 Correspondence CDM General DEQ/CDM emails re: Request to add employees to invoices

13 01 04 16 Correspondence CDM General CDM email to DEQ re: Conference call 06/27/06 CDM

13 01 04 16 Correspondence CDM General

13 01 04 16 Correspondence CDM General CDM email to DEQ re: Tracking Sheet 06/18/06 CDM

13 01 04 16 Correspondence CDM General CDM/DEQ emails re: Update 08/13/07

13 01 04 16 Correspondence CDM General CDM/DEQ emails re: Task Order modifications

13 01 04 16 Correspondence CDM General CDM/DEQ emails re: Livingston Deliverables 04/24/08

13 01 04 16 Correspondence CDM General DEQ/CDM emails re: Task Status 10/02/08

Site-Wide Information

CDM internal Memo re: Followup to clarify & confirm the steps CDM will take to minimize the potential conflict of interest

Site-Wide Information

DEQ internal emails re: Waiver of conflicts (use of CDM employees for DEQ experts)

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ letter to D Stordahl/CDM re: Contract #402009 Conflict of Interest - - Identified conflicts

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM letter to DEQ Division Administrator/S Olsen re: CDM will not enter into a Master Service Agreement w/BNSF in other states

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

6/22-6/26/2006

Site-Wide Information

Site-Wide Information

Cascade Drilling/CDM/DEQ emails re: Sonic drilling techniques

6/22-6/29/2006

Site-Wide Information

Site-Wide Information

Site-Wide Information

2/14-2/15/2008

Site-Wide Information

Site-Wide Information

Page 29: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 29 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 04 16 Correspondence CDM General CDM email to DEQ re: Quarterly reports 09/24/09 CDM

13 01 04 16 Correspondence CDM General DEQ email to CDM re: Railsafe program badges 11/16/09 DEQ

13 01 04 16 Correspondence CDM General 09/28/12

13 01 05

13 01 05 01 Enforcement History

13 01 05 01 Enforcement History 06/05/89 Envirocon

13 01 05 01 Enforcement History Y ** DEQ internal email re: Letter to BNSF 09/10/04 DEQ internal

13 01 05 01 Enforcement History 3/12-3/14/13

13 01 05 01 Enforcement History 04/03/12

13 01 05 02

13 01 05 02 Modified Partial Consent Decree and Partial Consent Decree

13 01 05 02 DEQ Memo re: Filing of confidential memo 03/03/09 DEQ

13 01 05 03

13 01 05 03 CD Financial – Annual Report Forms 10-K 1985-1987 08/16/88

13 01 05 03 MDHES letter to Leo Berry re: CD renegotiations 1017/89 MDHES

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM Smith/Sorenson email to DEQ/Reynolds re: LNAPL Meeting with BN

CDM Smith/ Sorenson

Site-Wide Information

Administrative Orders/Consent Decrees

Site-Wide Information

Administrative Orders/Consent Decrees

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Regulatory Framework Evaluation Livingston Rail Yard Remediation

Site-Wide Information

Administrative Orders/Consent Decrees

Site-Wide Information

Administrative Orders/Consent Decrees

CDM Smith/Hills email to DEQ/Reynolds - FW email from CDM/Whiting re: Complaint from Ryan Franks; DEQ/Reynolds email to Enforcement/C Anderson re: Attachment - Complaint Report

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ Enforcement/Steinweden email to DEQ/Reynolds re: Livingston complaint - Ryan Frank

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Documents (Documents dated before 1/1/02 are not itemized)

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Documents

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Documents

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

Page 30: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 30 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 05 03 US District Court – Consent Decree Amendment 05/03/90 US District Court

13 01 05 03 BKBH letter to DHES re: Obligations to the Consent Decree 05/21/90 BKBH

13 01 05 03 DEQ meeting agenda 08/16/01 DEQ

13 01 05 03 DEQ & Tetratech emails re: SOW tasks 07/02/02

13 01 05 03 DEQ draft modified consent decree 09/07/04 DEQ

13 01 05 03 Phone Log - DEQ to BN/Smith 09/07/04 DEQ

13 01 05 03 Meeting minutes - DEQ & BNSF 09/08/04 DEQ

13 01 05 03 DEQ email to McGarry re: Draft modified CD & SOWs 09/09/04 DEQ

13 01 05 03 Certified mail return receipt - BNSF notice letter 09/09/04

13 01 05 03 DEQ letter to MRL re: Draft modified CD & SOWs 09/10/04 DEQ

13 01 05 03 DEQ letter to Talgo/LRC re: Draft CD & SOWs 09/10/04 DEQ

13 01 05 03 DEQ & RTI emails re: Public Meeting 09/14/04

13 01 05 03 09/30/04 City of Livingston

13 01 05 03 BKBH letter to DEQ's attorney re: Entering negotiations 10/04/04 BKBH

13 01 05 03 Phone Log - Erickson/WET re: Draft SOW 10/05/04 WET

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

Draft City of Livingston comments to modified consent decree & SOWs

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

Page 31: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 31 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 05 03 DEQ letter to BKBH/Leo Berry re: Negotiations 10/06/04 DEQ

13 01 05 03 10/07/04 DEQ internal

13 01 05 03 Phone Log – DEQ to Smith/BNSF 10/07/04 DEQ

13 01 05 03 DEQ Conference call notes 10/11/04 DEQ

13 01 05 03 RTI email to DEQ re Comments to Draft CD & SOWs 10/13/04 RTI

13 01 05 03 PCEC comments to Draft CD & SOWs 10/13/04 PCEC

13 01 05 03 PCEC comments to Draft modified CD & SOWs 10/13/04 PCEC

13 01 05 03 DEQ email to RTI re: comments to Draft SOW & CD 10/14/04 DEQ

13 01 05 03 DEQ email to BNSF/K/J re: SOW in Word format 10/14/04 DEQ

13 01 05 03 DEQ internal email re: Schedule for meetings 10/14/04 DEQ internal

13 01 05 03 Y ** DEQ internal email re: Review time 10/25/04 DEQ internal

13 01 05 03 DEQ internal email re: BN Draft redline CD & SOW 11/23/04 DEQ internal

13 01 05 03 12/13/04 DEQ

13 01 05 03 12/22/04

13 01 05 03 BN Draft CD (Redline of DEQ CD 9/04) 12/22/04 BN

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

DEQ internal email to Capediville re: Meeting request response

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

Meeting notes/A Sivers re; BNSF Livingston/Mission Wye negotiations

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

BN Draft Livingston SOW (Redline version of DEQ's 9/04 SOW)

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

Page 32: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 32 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 05 03 BKBH letter to DEQ re: Draft CD & SOW 12/22/04 BKBH

13 01 05 03 BN/Smith letter to DEQ/Olsen re: Schedule 12/30/04 BN

13 01 05 03 Y DEQ internal

13 01 05 03 RTI email to DEQ re: Progress on CD/SOW negotiations 01/13/05 RTI

13 01 05 03 DEQ email to RTI re: Progress on CD/SOW negotiations 01/13/05 DEQ

13 01 05 03 Y ** DEQ Draft Spring SOW 01/21/05 DEQ

13 01 05 03 01/24/05 DEQ

13 01 05 03 DEQ Meeting Notes 01/26/05 DEQ

13 01 05 03 DEQ Meeting Notes 02/02/05 DEQ

13 01 05 03 02/22/05 DEQ

13 01 05 03 DEQ Meeting Notes 02/28/05

13 01 05 03 DEQ Meeting Notes 03/11/05

13 01 05 03 DEQ Meeting Notes (May-June?, 2005)

13 01 05 03 BNSF/BKBH transmittal to DEQ re: Property Map 08/05/05

13 01 05 03 Y ** DEQ email to BN re: Property Info 08/08/05

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

** Draft SOW internal emails, revisions, responses & notes (12/04-1/05)

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

DEQ email to BN re: Proposed Spring SOW subtasks language

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

DEQ email to Norris, Smith, BKBH & DEQ re: Revised draft SOW w/attachments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

Page 33: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 33 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 05 03 Y ** DEQ letter ** Meeting Minutes 09/01/05

13 01 05 03 DEQ & K/J emails re: Spring 2005 SOW effective date 09/20/05

13 01 05 03 Y ** Meeting Notes 09/21/05

13 01 05 03 Y ** DEQ internal emails re: SOW negotiations - Task J 09/23/05

13 01 05 03 DEQ & K/J emails re: Master schedule for Spring 2005 SOW 10/05/05

13 01 05 03 Y 10/09/07 DEQ internal

13 01 05 03 Y 10/10/07 DEQ internal

13 01 05 03 BNSF Letter to EPA re: Financial Test for Liability Coverage 03/24/08 BN

13 01 05 03 Y ** DEQ internal email re: Financial Assurance Documents 04/23/08 DEQ internal

13 01 05 03 BNSF Letter to EPA re: Financial Test for Liability Coverage 03/24/09 BN

13 01 05 03 BNSF Letter to DEQ re: Financial Test for Liability Coverage 02/11/10 BN

13 01 05 03 02/11/10

13 01 05 03 Financial Annual Report Forms 10-K 02/11/10

13 01 05 03 03/29/11 BN/Brown

13 01 05 03 03/23/12 BN/Brown

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

** DEQ internal email re: Stipulation and modification to Consent Decree

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

** DEQ internal email re: Copy of Order for Court to sign - draft & redline

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

Price Waterhouse Coopers letter to Board of Directors of BNSF re: Report of Independent Accountants

Price Waterhouse Coopers

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

BN/D Brown letter to DEQ/Reynolds re: Financial Test for Liability Coverage

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

BN/Brown letter to DEQ/Reynolds re: Attachments re: Financial Test for Liability Coverage

Page 34: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 34 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 05 03 04/03/12

13 01 05 03 Financial test for liability coverage Form 10-K ending 12/31/12 03/28/13 BN

13 01 05 03 Financial Test for liability coverage MTT 310-010087 03/31/14 BN/Brown

13 01 05 04

13 01 05 05 Notice letters

13 01 05 05 Notice letters DEQ notice letter to BNSF 09/07/04 DEQ

13 01 05 06

13 01 05 07 Unilateral Judicial Action

13 01 05 08

13 01 05 08 Deposition of Donald E. Shipman 10/20/88

13 01 05 08 Deposition of Ann Muccigrosso Colpitts 11/02/88

13 01 05 08 Changes in Ann Colpitts deposition 12/19/88

13 01 05 08 11/01/00

13 01 05 09 ** Depositions Y (Non-confidential documents sent to Records Management)

13 01 05 10 Y (Non-confidential documents sent to Records Management)

1158/ 07J602

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

DEQ legal/Haque-Hausrath email to Dava Kaitala re: Financial test for liability coverage - non confidential

DEQ leagl/ Haque-Hausrath

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

Site-Wide Information

Administrative Orders/Consent Decrees

Order/Consent Decree Amendments

Site-Wide Information

Administrative Orders/Consent Decrees

104(e) Requests/Responses (empty)

1160/ 27A605

Site-Wide Information

Administrative Orders/Consent Decrees

1160/ 27A605

Site-Wide Information

Administrative Orders/Consent Decrees

Site-Wide Information

Administrative Orders/Consent Decrees Judicial Referrals (empty)

1160/ 27A605

Site-Wide Information

Administrative Orders/Consent Decrees

1160/ 27A605

Site-Wide Information

Administrative Orders/Consent Decrees

Affidavits/Depositions & Referenced Exhibits

1160/ 27A605

Site-Wide Information

Administrative Orders/Consent Decrees

Affidavits/Depositions & Referenced Exhibits

1160/ 27A605

Site-Wide Information

Administrative Orders/Consent Decrees

Affidavits/Depositions & Referenced Exhibits

1160/ 27A605

Site-Wide Information

Administrative Orders/Consent Decrees

Affidavits/Depositions & Referenced Exhibits

1160/ 27A605

Site-Wide Information

Administrative Orders/Consent Decrees

Affidavits/Depositions & Referenced Exhibits Notice of intent to continue deposition of John Wadhams, DEQ

1159/ 08D505 1160/ 27A605

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

** Cogswell & Wehrle Legal Memo's

Page 35: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 35 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 05 11 Joint Status Reports

13 01 05 11 Joint Status Reports March 1-May 31, 2000 status report 3/1-5/30/00

13 01 05 11 Joint Status Reports June 1-August 31, 2000 status report 6/1/-8/31/00

13 01 05 11 Joint Status Reports BKBH

13 01 05 11 Joint Status Reports September 1, 2000 - March 31,2001 status report 9/1/00-3/31/01

13 01 05 11 Joint Status Reports BKBH

13 01 05 11 Joint Status Reports April 1-June 30, 2001 status report 4/1-6/30/01

13 01 05 11 Joint Status Reports DEQ internal email re: Joint Status Report 10/10/07 DEQ

13 01 05 11 Joint Status Reports Joint Status Report 10/10/07

13 01 05 12 Spring 2005 SOW

13 01 05 12 Spring 2005 SOW 10/11/04 DEQ/Martin

13 01 05 12 Spring 2005 SOW DEQ/Martin meeting notes re: Meeting with BN 10/26/04 DEQ/Martin

13 01 05 12 Spring 2005 SOW DEQ/Sivers meeting notes re: Meeting with BN 10/26/04 DEQ Sivers

13 01 05 12 Spring 2005 SOW DEQ/Sivers meeting notes 01/01/05 DEQ Sivers

13 01 05 12 Spring 2005 SOW 01/21/05 DEQ Sivers

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees BKB&H fax to DEQ re: Draft 32nd joint status report

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees BKB&H fax to DEQ re: Draft 33rd joint status report

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ/Martin meeting minutes – conference call w/BN Attorneys & Consultants

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ/Sivers email to BN/Smith & K/J/Norris re: High priority tasks

Page 36: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 36 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 05 12 Spring 2005 SOW DEQ/Sivers meeting notes 01/26/05 DEQ Sivers

13 01 05 12 Spring 2005 SOW 01/28/05 DEQ Sivers

13 01 05 12 Spring 2005 SOW K/J email to DEQ re: Deviations language 02/01/05 KJ

13 01 05 12 Spring 2005 SOW 02/02/05 DEQ Sivers

13 01 05 12 Spring 2005 SOW 02/04/05

13 01 05 12 Spring 2005 SOW DEQ/Sivers conference call notes 02/08/05 DEQ Sivers

13 01 05 12 Spring 2005 SOW Phone Log – DEQ/Sivers & K/J Norris re: SOW/Attachment 2 02/11/05

13 01 05 12 Spring 2005 SOW K/J/Norris email to DEQ/Sivers re: Plume map language 02/14/05 KJ/ Norris

13 01 05 12 Spring 2005 SOW 02/25/05 RETEC/ Colpitts

13 01 05 12 Spring 2005 SOW 04/11/05 DEQ Sivers

13 01 05 12 Spring 2005 SOW 04/12/05 DEQ

13 01 05 12 Spring 2005 SOW 04/29/05 DEQ Sivers

13 01 05 12 Spring 2005 SOW DEQ email to BN & K/J re: Attachment – Draft Spring SOW 05/05/05 DEQ

13 01 05 12 Spring 2005 SOW DEQ/Sivers meeting notes (SOW meeting 05/05/05 DEQ Sivers

13 01 05 12 Spring 2005 SOW 05/06/05 DEQ internal

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ/Sivers email to BN/Smith & K/J/Norris re: SOW attachments

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ/Sivers email to BN/Smith & K/J/Norris re: Plume map language

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Phone Log – DEQ/Sivers & Henderson re: Fate & Transport modeling

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

RETEC/Colpitts email to DEQ/Sivers re: Action item from last week’s meeting

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ/Sivers email to BN/Smith & K/J/Norris re: SOW attachments

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ email to BN & K/J re: Attachment - DEQ Draft Spring SOW

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ/Sivers Email to BN/Smith, K/J/Norris & BKBH/Steve W re: Draft Spring SOW

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ/Capdeville & Sivers emails re: Phone Log DEQ/Sivers & BN/Smith (5/6/05)

Page 37: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 37 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 05 12 Spring 2005 SOW BNSF proposed language for SOW 05/10/05 BNSF

13 01 05 12 Spring 2005 SOW 06/09/05 DEQ

13 01 05 12 Spring 2005 SOW 06/27/05

13 01 05 12 Spring 2005 SOW DEQ/Sivers email to K/J/Norris re: Final Spring SOW 06/30/05 DEQ Sivers

13 01 05 13 Dispute Resolution

13 01 05 13 Dispute Resolution 01/21/09 BNSF

13 01 05 13 Dispute Resolution Y ** DEQ internal email re: Dispute resolution process 01/22/09 DEQ internal

13 01 05 13 Dispute Resolution DEQ letter to Dwight Krohne re: Dispute resolution 01/26/09 DEQ

13 01 05 13 Dispute Resolution DEQ letter to Rick Keller re: Dispute resolution 01/26/09 DEQ

13 01 05 13 Dispute Resolution DEQ letter to Erlynn Harris re: Dispute resolution 01/26/09 DEQ

13 01 05 13 Dispute Resolution DEQ letter to Johnny Lee & Jackie Fox re: Dispute resolution 01/26/09 DEQ

13 01 05 13 Dispute Resolution DEQ letter to Joanna Lithfield re: Dispute resolution 01/26/09 DEQ

13 01 05 13 Dispute Resolution DEQ letter to David Burley re: Dispute resolution 01/26/09 DEQ

13 01 05 13 Dispute Resolution Y ** DEQ internal email re: Dispute resolution process 01/26/09 DEQ

13 01 05 13 Dispute Resolution Y ** DEQ internal email re: Dispute resolution process 01/26/09 DEQ internal

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ email to BN/Smith re: Attachment – DEQ Redline Final Draft Spring SOW

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ Legal/Capdeville email to BN re: Attachment - Spring SOW

DEQ legal/ Capedeville

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

BNSF letter to DEQ Director Opper re: BN request for dispute resolution

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Site-Wide Information

Administrative Orders/Consent Decrees

Site-Wide Information

Administrative Orders/Consent Decrees

Page 38: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 38 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 05 13 Dispute Resolution 01/27/09 DEQ internal

13 01 05 13 Dispute Resolution 01/28/09 DEQ internal

13 01 05 13 Dispute Resolution 01/28/09 DEQ internal

13 01 05 13 Dispute Resolution Y ** DEQ internal email re: Mediators 01/28/09 DEQ internal

13 01 05 13 Dispute Resolution Y ** DEQ internal email re: Dispute resolution process 01/28/09 DEQ internal

13 01 05 13 Dispute Resolution Y ** DEQ internal email re: Dispute resolution process 01/28/09 DEQ internal

13 01 05 13 Dispute Resolution Y ** DEQ internal email re: Dispute resolution schedule 01/29/09 DEQ internal

13 01 05 13 Dispute Resolution 01/28/09 DEQ internal

13 01 05 13 Dispute Resolution 01/29/09 DEQ internal

13 01 05 13 Dispute Resolution 01/30/09 DEQ internal

13 01 05 13 Dispute Resolution DEQ email to Director Opper re: Dispute resolution 02/03/09 DEQ

13 01 05 13 Dispute Resolution DEQ internal email re: BNSF’s three proposed mediators 02/26/09 DEQ internal

13 01 05 13 Dispute Resolution 03/18/09 BKBH

13 01 05 13 Dispute Resolution 03/19/09 EPA

13 01 05 13 Dispute Resolution 03/30/09 DEQ internal

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ internal email re: Phone log – DEQ & Dan Hoven/BN Attorney re: Dispute resolution

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ internal email re: Phone log – DEQ voice mail to Dan Hoven/BN Attorney re: Dispute resolution

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ internal email re: Phone log – Dan Hoven/BN Attorney voice mail to DEQ re: Dispute resolution

Site-Wide Information

Administrative Orders/Consent Decrees

Site-Wide Information

Administrative Orders/Consent Decrees

Site-Wide Information

Administrative Orders/Consent Decrees

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ internal email re: Phone log – Dan Hoven/BN Attorney voice mail to DEQ re: Dispute resolution

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ internal email re: Phone log – DEQ & Dan Hoven/BN Attorney re: Mediators/30 days

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ internal email re: Phone Log - DEQ & Dan Hoven/BN Attorney re: DEQ refuses to shorten time to select mediators

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

BKBH letter to DEQ legal re: State of MT v. BN, Rejection of DEQ’s Proposed Mediator’s

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

D Strausbaugh/EPA & Sue Neurath emails re: Draft starter memo for data

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ internal email – phone log : Haque-Hausrath/DEQ legal & D Hoven/BN legal re: Mediation scheduling

Page 39: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 39 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 05 13 Dispute Resolution DEQ meeting notes (call) 04/01/09 DEQ/Reynolds

13 01 05 13 Dispute Resolution 04/01/09 DEQ legal

13 01 05 13 Dispute Resolution 04/02/09 Taleff Law

13 01 05 13 Dispute Resolution 04/02/09 DEQ legal

13 01 05 13 Dispute Resolution 04/06/09 DEQ internal

13 01 05 13 Dispute Resolution 04/13/09 DEQ legal

13 01 05 13 Dispute Resolution DEQ legal internal email re: Phone log with Dan Hoven 04/13/09 DEQ internal

13 01 05 13 Dispute Resolution 04/13/09 DEQ Legal

13 01 05 13 Dispute Resolution 04/13/09 DEQ Legal

13 01 05 13 Dispute Resolution 04/16/09 DEQ Legal

13 01 05 13 Dispute Resolution 04/22/09 DEQ Legal

13 01 05 13 Dispute Resolution 04/23/09 DEQ Legal

13 01 05 13 Dispute Resolution 04/23/09 DEQ

13 01 05 13 Dispute Resolution 04/24/09 DEQ

13 01 05 13 Dispute Resolution DEQ legal internal email re: Phone call with Oliver Goe 04/24/09 DEQ legal

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ legal letter/fax to Mick Taleff re: Contact people for DEQ and draft of agreed-to agenda and procedures for the dispute resolution

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Taleff Law Office letter to DEQ & BKBH re: Confirmation of agreement to act as mediator

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ legal letter/fax to D Hoven/BKBH re: Agreed-to Mediation Agenda & Procedures

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ legal internal email re: Dispute Resolution, length of submittal

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ legal email to M Taleff re: DEQ concerns about state public record requirements & other potential issues

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ legal email to Dan Hoven re: Agreed-to Mediation Agenda & Procedures: Length of Submittal and Attendance

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ legal email to m Taleff re: Proposed revised mediation agreement

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ legal email to Dan Hoven re: Agreed-to Mediation Agenda & Procedures: Length of Submittal and Attendance

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ legal letter to M Taleff re: Signed Revised Mediation Agreement

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ legal letter to M Taleff re: DEQ’s Mediation Position Statement

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ’s Position Statement for BN Shop Complex Dispute Resolution

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ email to M Taleff re: DEQ has been inadvertently sending letters to M Taleff at an incorrect address

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Page 40: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 40 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 05 13 Dispute Resolution 04/24/09 DEQ legal

13 01 05 13 Dispute Resolution 04/24/09 BKBH

13 01 05 13 Dispute Resolution 04/24/09 BKBH

13 01 05 13 Dispute Resolution 05/11/09 DEQ

13 01 05 13 Dispute Resolution 05/11/09 DEQ legal

13 01 05 13 Dispute Resolution BN’s response to DEQ’s Proposal 05/26/09 BNSF

13 01 05 13 Dispute Resolution 06/04/09 DEQ legal

13 01 05 13 Dispute Resolution 06/08/09 DEQ

13 01 05 13 Dispute Resolution 06/08/09 DEQ

13 01 05 13 Dispute Resolution 06/08/09 DEQ legal

13 01 05 13 Dispute Resolution 06/09/09 DEQ

13 01 05 13 Dispute Resolution 06/10/09 PCEC

13 01 05 13 Dispute Resolution 06/10/09 K&L Gates

13 01 05 13 Dispute Resolution 06/12/09 DEQ legal

13 01 05 13 Dispute Resolution 06/12/09 DEQ legal

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ legal email to D Hoven re: DEQ Confirmation of people attending the mediation

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Oliver Goe/BKBH email to DEQ re: BN attendees are in letter being sent to DEQ

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

BKBH letter/CD to DEQ re: Dispute resolution of DEQ process and standards for mitigation of indoor air – BNSF’s mediation statement

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ email to M Taleff, D Hoven & C Trueblood re: DEQ’s proposal for resolving BN 1/21/09 dispute resolution request

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ legal email to C Trueblood re: DEQ’s proposal for resolving BN 1/21/09 dispute resolution request – BN counter proposal

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ legal email to C Trueblood re: DEQ’s proposal for resolving BN 1/21/09 dispute resolution request – BN counter proposal

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ email to C Trueblood, D Hoven, & P Nehring re: DEQ’s response to BN’s 5/26/09 letter to DEQ

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ letter to C Trueblood, D Hoven, & P Nehring re: DEQ’s response to BN’s rejection of DEQ’s 5/11/09 proposed resolution

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ legal letter to Director R Opper re: Request for Decision on BN’s 1/21/09 dispute resolution

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ email to Director Opper & Tom Livers re: Electronic copy of BN dispute resolution

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

PCEC’s letter to DEQ/Opper re: BN’s latest contention in avoidance of work

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

C Trueblood/K&L Gates letter to DEQ re: BN request for dispute resolution of DEQ process and standards for testing and mitigation of indoor air

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ legal & C Trueblood emails re: DEQ response to BN’s 5/25/09 letter

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ legal email to Director Opper re: Attachment - letter responding to BN’s 6/12/09 letter

Page 41: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 41 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 05 13 Dispute Resolution 06/12/09 DEQ legal

13 01 05 13 Dispute Resolution 06/12/09 BKBH

13 01 05 13 Dispute Resolution 06/12/09 DEQ legal

13 01 05 13 Dispute Resolution 06/12/09 DEQ legal

13 01 05 13 Dispute Resolution 06/18/09 DEQ legal

13 01 05 13 Dispute Resolution 06/24/09 BKBH

13 01 05 13 Dispute Resolution 07/06/09 DEQ Director

13 01 05 13 Dispute Resolution 07/07/09 DEQ internal

13 01 05 13 Dispute Resolution 04/08/09 BNSF

13 01 05 13 Dispute Resolution 07/13/09 DEQ Director

13 01 05 13 Dispute Resolution 07/14/09

13 01 05 13 Dispute Resolution Y 07/27/09 DEQ internal

13 01 05 13 Dispute Resolution Dispute Resolution Administrative Record Files 1-5 (7/09)

13 01 05 13 Dispute Resolution 08/05/09

13 01 05 13 Dispute Resolution 08/05/09 DEQ internal

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ legal email to D Hoven, C Trueblood & P Nehring re: Attachment - letter responding to BN’s 6/12/09 letter

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

BKBH letter to DEQ Director Opper re: Request for decision on BN’s 1/21/09 dispute resolution

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ legal letter to Director Opper re: DEQ ‘s response to BN letter to Director dated 6/12/09 request to submit additional materials

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ legal letter to C Trueblood re: DEQ response to Trublood’s 6/10/09 letter & CD of first 12 reference items listed in DEQ’s 6/8/09 letter

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ legal internal email re: Director Opper email to D Hoven re: Opper ‘s response to D Hoven’s 6/12/09 letter

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

BKBH letter to DEQ Director Opper re: Response to DEQ legal 6/8/09 letter to Opper & C Trueblood

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ Director Opper’s Decision on BN’s 1/21/09 Dispute Resolution

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ/Wittenberg to DEQ re: Attachment – Director Opper’s decision on BN 1/21/09 Dispute Resolution

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

A Stegman/BN letter/email to DEQ Director Opper re: Confidentiality provisions of the mediation agreement

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ Director Opper letter to A Stegman/BN re: Dispute resolution mediation agreement

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ/Opper & A Stegman/BN emails re: BN - Whitefish newspaper article coming out

Site-Wide Information

Administrative Orders/Consent Decrees

** DEQ Legal/Haque-Hausrath internal email re: BNLV Dispute Resolution – Time for Appeal

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Court Document 147 – BN’s Petition for Review of DEQ’s Final Agency Action

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ Legal/Brooks internal email re: Notice of Electronic Court Filing of Document 147

Page 42: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 42 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 05 13 Dispute Resolution Y 08/06/09 DEQ internal

13 01 05 13 Dispute Resolution Y 08/06/09 DEQ internal

13 01 05 13 Dispute Resolution Y 08/06/09 DEQ internal

13 01 05 13 Dispute Resolution Y 08/12/09 DEQ internal

13 01 05 13 CD Dispute Resolution 08/20/09

13 01 05 13 Dispute Resolution Y 08/24/09 DEQ internal

13 01 05 13 Dispute Resolution Court Document 152 – Court Order 08/24/09

13 01 05 13 Dispute Resolution 09/25/09

13 01 05 13 Dispute Resolution 09/25/09

13 01 05 13 Dispute Resolution Y 09/29/09 DEQ internal

13 01 05 13 Dispute Resolution Y ** Historic GW data 09/29/09

13 01 05 13 Dispute Resolution 10/09/09

13 01 05 13 Dispute Resolution Court Document 157 – Notice of Appearance 10/09/09

13 01 05 13 Dispute Resolution 10/09/09

13 01 05 13 Dispute Resolution 10/09/09

Site-Wide Information

Administrative Orders/Consent Decrees

** DEQ Legal/Haque-Hausrath and Director Opper emails re: Summary of BN’s Appeal of the Directors Written Decision in Dispute Resolution

Site-Wide Information

Administrative Orders/Consent Decrees

** DEQ Legal/Haque-Hausrath and Director Opper emails re: Summary of BN’s Appeal of the Directors Written Decision in Dispute Resolution

Site-Wide Information

Administrative Orders/Consent Decrees

** DEQ Legal/Haque-Hausrath email to Director Opper re: Options for Response to BNSF’s Petition to Federal Court

Site-Wide Information

Administrative Orders/Consent Decrees

** DEQ Legal/Haque-Hausrath email to Director Opper re: Proposal for Response to BN’s Petition to Federal Court

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Court Document 148 – Plaintiff’s Motion to Dismiss Defendants Petition Pursuant to Rule and Brief in Support of It’s Motion to Dismiss

Site-Wide Information

Administrative Orders/Consent Decrees

** DEQ Legal/Haque-Hausrath internal email re: Livingston petition, briefing schedule

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Court Document – Defendant BNSF’s Procedural Suggestions for Resolving BNSF’s Petition for review of DEQ’s Final Agency Action on Indoor Air Quality

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Court Document 153 – Defendant BNSF’s Brief on Court’s Jurisdiction to Hear BNSF’s Petition for Review of DEQ’s Final Agency Action on Indoor Air Quality

Site-Wide Information

Administrative Orders/Consent Decrees

** DEQ/Reynolds internal email re: Comments on BNSF’s Briefs

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Court Document – Plaintiff’s Reply Brief on Proposed Procedural Method for Resolving the Dispute Raised by Defendants Petition

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Court Document 160 – Plaintiff’s Reply Regarding Court’s Jurisdiction to Review the Dispute Raised by the Defendant’s Petition

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Court Document – Plaintiff’s Reply Brief on Proposed Procedural Method for Resolving the Dispute Raised by Defendant’s Petition

Page 43: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 43 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 05 13 Dispute Resolution 10/09/09

13 01 05 13 Dispute Resolution 11/02/09

13 01 05 13 Dispute Resolution Y 11/03/09 DEQ internal

13 01 05 13 Dispute Resolution 11/13/09

13 01 05 13 Dispute Resolution 11/13/09

13 01 05 13 Dispute Resolution 11/13/09

13 01 05 13 Dispute Resolution 11/17/09

13 01 05 13 Dispute Resolution Y 12/16/09 DEQ internal

13 01 05 13 Dispute Resolution Y ** CDM memorandum to DEQ 12/22/09 CDM

13 01 05 13 Dispute Resolution 12/23/09

13 01 05 13 Dispute Resolution Y 01/11/10

13 01 05 13 Dispute Resolution 01/11/10

13 01 05 13 Dispute Resolution 01/12/10

13 01 05 13 Dispute Resolution 01/11/10

13 01 05 13 Dispute Resolution Y 01/14/10 DEQ internal

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Court Document – BNSF’s Brief in Support of it’s Petition for Review of DEQ’s Final Agency Action

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Court Document 162 – Order – Telephonic Status Conference date

Site-Wide Information

Administrative Orders/Consent Decrees

** DEQ Legal/Haque-Hausrath internal email re: Notes from Court Status Conference

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Court Document – BNSF’s Supplemental Designation of Administrative Record Materials

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Mayer-Brown/Berghoff fax/email to DEQ Legal re: Indoor Air Quality Administrative Record

Mayer-Brown/ Berghoff

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ Legal/Haque-Hausrath letter to Mayer-Brown/Berghoff re: DEQ response to Berghoff 11/13/09 fax/email

DEQ legal/ Haque-Hausrath

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Court Document 165 – Notice of Conventional Filing of Document

Site-Wide Information

Administrative Orders/Consent Decrees

** DEQ Legal/Haque-Hausrath to DEQ Director Opper re: BNSF Brief excerpts

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Court Document 167 – Plaintiff’s Response to BNSF’s Cross Motion for Summary Judgment and Reply Brief in Support of it’s Motion for Summary Judgment

Site-Wide Information

Administrative Orders/Consent Decrees

** DEQ Legal/Haque-Hausrath internal email & Allan Payne re: Motion for leave to File

DEQ legal/ Haque-Hausrath

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Court Document 168 – BNSF’s Motion for Leave to File Instanter its Reply to Brief in Support of it’s Petition for Review

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Mayer-Brown/Sostrin & DEQ Legal/Haque-Hausrath emails re: Response to request regarding motion

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Court Document 171 – Supplement to BNSF’s Motion for Leave to File Instanter it’s Reply to Brief in Support of it’s Petition for Review

Site-Wide Information

Administrative Orders/Consent Decrees

** DEQ Legal/Haque-Hausrath & Brooks emails re: BNSF bringing blown up exhibits to hearing

Page 44: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 44 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 05 13 Dispute Resolution 01/21/10

13 01 05 13 Dispute Resolution 01/25/10

13 01 05 13 Dispute Resolution 01/27/10

13 01 05 13 Dispute Resolution Court Document 178 – Findings 7 Recommendations 02/08/10

13 01 05 13 Dispute Resolution Y 02/19/10 DEQ internal

13 01 05 13 Dispute Resolution 02/22/10

13 01 05 13 Dispute Resolution Y 02/27/10 DEQ internal

13 01 05 13 Dispute Resolution 03/04/10

13 01 05 13 Dispute Resolution Court Document 180 – Court Order – Case is Closed 03/26/10

13 01 05 13 Administrative Record 2 boxes @RM

13 01 06

13 01 06 01 FOIAs

13 01 06 01 FOIAs 07/25/91 DHES/ Andersen

13 01 06 01 FOIAs 08/01/91 DHES/ Andersen

13 01 06 01 FOIAs 11/14/08

13 01 06 01 FOIAs M Nicklin & DEQ/Reynolds emails re: ARGIS map request 11/26/08

13 01 06 01 FOIAs 04/03/09

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Court Document 175 – Plaintiff’s Supplemental Citation to the Administrative Record

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

DEQ Legal/Haque-Hausrath & Mayer-Brown/Berghoff emails re: Filing deadlines (1/14 – 1/25/10)

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Notice of Electronic Filing Court Document 176 – Transcript of Motion Hearing Proceedings

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Site-Wide Information

Administrative Orders/Consent Decrees

** DEQ Legal/Haque-Hausrath internal Memorandum re: Lessons learned from Dispute Resolution with BNSF

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Court Document 179 – BNSF’s Objections & Clarifications to the Magistrate’s Findings & Recommendations

Site-Wide Information

Administrative Orders/Consent Decrees

** DEQ Legal internal emails re: Draft response to BN Objections to Judge Strong Findings

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

Document 180 – Plaintiff’s Response to BNSF’s Objections to the Magistrate’s Findings 7 Recommendations

1161/ 33A103

Site-Wide Information

Administrative Orders/Consent Decrees

1161/ 33A103 -1162/ 34A503

Site-Wide Information

Administrative Orders/Consent Decrees

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

DHES/Andersen memo to Ray Hoffman re: BN Livingston overhead rate

Site-Wide Information

Information Requests

DHES/Andersen memo to Ray Hoffman re: BN Livingston overhead rate

Site-Wide Information

Information Requests

M Giuliano & DEQ/Reynolds emails re: 111 S K ST info request

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

DEQ PWS/Kandelin email to DEQ/Reynolds re: Livingston Shop Complex GW Model

DEQ PWS/ Kandelin

Page 45: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 45 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 06 01 FOIAs 04/03/09 DEQ

13 01 06 01 FOIAs 05/14/09

13 01 06 01 FOIAs 5/12-5/18/09

13 01 06 01 FOIAs 06/15/09 CDM

13 01 06 01 FOIAs 06/16/09 DEQ

13 01 06 01 FOIAs 07/22/09

13 01 06 01 FOIAs 08/13/09

13 01 06 01 FOIAs 08/13/09 DEQ

13 01 06 01 FOIAs 04/27/11

13 01 06 02 Public Requests

13 01 06 02 Public Requests DHES letter to Clare Lemke re: Draft Master Plan Schedule 05/22/91 DHES/

13 01 06 02 Public Requests Small, Hatch, Doubek & Pyfer letter to DHES re: Info request 05/13/92 SHD&P

13 01 06 02 Public Requests DEQ letter to TRC re: Proposed Plan 02/20/01 DEQ

13 01 06 02 Public Requests DEQ internal email re: Rep. Lee info request 06/29/01 DEQ internal

13 01 06 02 Public Requests DEQ email to Lee re: Iron Horse Trailer Park 07/16/01 DEQ

13 01 06 02 Public Requests DEQ internal email re: IT Corporation info request 10/18/01 DEQ internal

13 01 06 02 Public Requests Phone Log: IT Corporation 10/23/01

13 01 06 02 Public Requests 12/05/01 Gregory

13 01 06 02 Public Requests DEQ letter to Gregory re: Irrigation 12/17/01 DEQ

13 01 06 02 Public Requests DEQ email to Sue Martin re: Info request 03/21/02 DEQ

13 01 06 02 Public Requests 03/25/02 S Martin

Site-Wide Information

Information Requests

DEQ/Fry & Reynolds emails to Kandelin re: GW model info request

Site-Wide Information

Information Requests

Phone Log – DEQ & David Clayton/Appraiser working for BN re: BN Shop Complex - property evaluation

Site-Wide Information

Information Requests

DEQ & Natalie Davis/Livingston teacher emails re: Info request for updated cleanup status

Site-Wide Information

Information Requests

CDM email to DEQ re: Voice message forwarded from CDM to DEQ re: Adria Pope called to ask about results of sampling at 1601 Lewis Street

Site-Wide Information

Information Requests

Phone Log – DEQ to Adria Pope re: Status of contamination at 1601 Lewis St

Site-Wide Information

Information Requests

DEQ Legal/Haque-Hausrath to Cok Wheat & Kinzler/McGarry re: Response to 1/21/09 information request

DEQ legal/ Haque-Hausrath

Site-Wide Information

Information Requests

Phone Log – DEQ & Gary Gullickson/Mystery Ranch – Back Pack Company re: MRL wants to purchase gym facility and maybe land (

Site-Wide Information

Information Requests

DEQ/Reynolds email to Gary Gullickson re: Data for the recreation center

Site-Wide Information

Information Requests

Espresso Depot/D Krohne & DEQ/Reynolds emails re: Immediate Freedom of Information Act

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Gregory email to DEQ re: Report on contaminated water use for irrigation

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Sue Martin letter to DEQ re: Former C & P Packing info request

Page 46: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 46 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 06 02 Public Requests DEQ email to Shane Deranleau re: Info request 11/14/02 DEQ

13 01 06 02 Public Requests Phone Log - Lunden/Environmental Strategies 07/09/03

13 01 06 02 Public Requests DEQ email to Knuteson re: Cancer report 07/14/03 DEQ

13 01 06 02 Public Requests DEQ letter to Moran re: Property at 305 E. Park St 11/07/03 DEQ

13 01 06 02 Public Requests Phone Log - North Dakota Dept of Health 02/03/04

13 01 06 02 Public Requests DEQ email to Contractor re: Depot info request 01/20/05 DEQ

13 01 06 02 Public Requests DEQ & Strata Environmental emails re: Due Diligence 05/05/05

13 01 06 02 Public Requests Phone Log - Strata Environmental to DEQ re: Info request 05/05/05

13 01 06 02 Public Requests DEQ & Bauer emails re: Basement Gas 09/16/05

13 01 06 02 Public Requests Livingston email to DEQ re: Indoor Air & mailing list 09/19/05 City of Livingston

13 01 06 02 Public Requests DEQ & Livingston resident emails re: Indoor air 09/19/05

13 01 06 02 Public Requests DEQ email to Cotter re: File Guide 09/20/05 DEQ

13 01 06 02 Public Requests DEQ internal email re: C&W request for info 03/22/06 DEQ internal

13 01 06 02 Public Requests Y ** M Ross email to DEQ re: Request for air sampling 04/07/06 M Ross

13 01 06 02 Public Requests 05/01/06 DEQ internal

13 01 06 02 Public Requests DEQ internal email re: EQC 05/08/06 DEQ internal

13 01 06 02 Public Requests 05/23/06 Horizon Realty

13 01 06 02 Public Requests DEQ & Nancy MacCracken emails re: Railyard Contamination 05/24/06

13 01 06 02 Public Requests 05/24/06 Bob Moore

13 01 06 02 Public Requests 06/29/06 Don Lent

13 01 06 02 Public Requests 07/17/06 Dave Amsk

13 01 06 02 Public Requests 08/07/06 Manny Getz

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Strata Environmental

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

DEQ internal email re: Contact with attorney in Virginia re: Livingston CD

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Phone Log – Scott Pitman/Horizon Realty to DEQ re: Block 3 of the Montag Addition

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Phone Log – Bob Moore/Livingston property owner to DEQ re: Entranko Study prepared in 2002

Site-Wide Information

Information Requests

Phone Log – Don Lent/Realtor in Bozeman to DEQ re: Talgo property

Site-Wide Information

Information Requests

Phone Log – Dave Amsk/Livingston property owner to DEQ re: Vapor intrusion data

Site-Wide Information

Information Requests

Phone Log – Manny Getz/Livingston property owner to DEQ re: Opening day care

Page 47: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 47 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 06 02 Public Requests 08/09/06 Governor's Office

13 01 06 02 Public Requests 08/09/06

13 01 06 02 Public Requests DEQ & PRIMUS emails re: Water quality in Livingston 08/10/06

13 01 06 02 Public Requests DEQ internal emails re: Water quality in Livingston 08/10/06 DEQ internal

13 01 06 02 Public Requests DEQ email to PRIMUS re: Water quality in Livingston 08/10/06 DEQ

13 01 06 02 Public Requests DEQ email to PRIMUS re: Answers to Superfund questions 08/11/06 DEQ

13 01 06 02 Public Requests DEQ internal email re: Water quality in Livingston 08/11/06 DEQ internal

13 01 06 02 Public Requests DEQ email to PRIMUS re: Water quality in Livingston 08/14/06 DEQ

13 01 06 02 Public Requests DEQ internal emails re: Water quality in Livingston 08/14/06 DEQ internal

13 01 06 02 Public Requests DEQ/Envirocouncil emails re: Isoconcentration maps 08/30/06

13 01 06 02 Public Requests 09/11/06 Saprina Bates

13 01 06 02 Public Requests 09/11/06 DEQ internal

13 01 06 02 Public Requests Phone Log – DEQ to Saprina Bates re: Relocation of residence 09/13/06 DEQ

13 01 06 02 Public Requests 10/02/06 DEQ

13 01 06 02 Public Requests 10/23/06 DEQ

13 01 06 02 Public Requests 10/23/06 DEQi

13 01 06 02 Public Requests DEQ & EPA emails re: Livingston info request – Dr Schulein 10/24/06

13 01 06 02 Public Requests DEQ & K Parkes emails re: Cost of cleanup comparisons 10/24/06

13 01 06 02 Public Requests DEQ/RTI emails re: Test wells 10/24/06

13 01 06 02 Public Requests 12/01/06

13 01 06 02 Public Requests 12/07/06

13 01 06 02 Public Requests DEQ email to M Ross re: Response to Information request 12/28/06 DEQ

Site-Wide Information

Information Requests

Phone Log – Bob/Governor Sweitzer’s office to DEQ re: Call from Jane Flye re: contamination signs in yard

Site-Wide Information

Information Requests

Phone Log – Michael Wainwright to DEQ re: Drinking water supply

Michael Wainwright

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Phone Log – Saprina Bates/Livingston resident to DEQ re: Relocation of residence

Site-Wide Information

Information Requests

DEQ internal email re: Saprina Bates/Livingston resident to DEQ re: Relocation of residence

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

DEQ email to Scott M @ Daily Chronical re: indoor Air Investigation

Site-Wide Information

Information Requests

DEQ email to C Poulet/EPA re: Dr Mark Schulein – testing for exposure to chlorinated solvents

Site-Wide Information

Information Requests

DEQ internal email re: Info request for comparison of costs of cleanup

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests DEQ & N MacCracken emails re: Attorney contact information

Site-Wide Information

Information Requests

DEQ & M Ross/Livingston resident emails re: Monitoring questions

Site-Wide Information

Information Requests

Page 48: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 48 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 06 02 Public Requests 01/04/07 Northwest Energy

13 01 06 02 Public Requests Email re: Receipt for email sent to M Ross 02/06/07

13 01 06 02 Public Requests DEQ & Brian Goodman emails re: Work Plan 02/07/07

13 01 06 02 Public Requests 03/16/07 Dave Viers

13 01 06 02 Public Requests 03/19/07

13 01 06 02 Public Requests 03/22/07

13 01 06 02 Public Requests DEQ & James Wainwright emails re: Envirocon 04/30/07

13 01 06 02 Public Requests DEQ & N MacCracken emails re: Contamination 5/16-5/21/07

13 01 06 02 Public Requests DEQ & N MacCracken emails re: Contact information 05/24/07

13 01 06 02 Public Requests DEQ internal email re: Info request (6/5/07-6/7/07) 06/07/07 DEQ internal

13 01 06 02 Public Requests DEQ internal email re: Dewatering in Livingston 06/11/07 DEQ internal

13 01 06 02 Public Requests DEQ internal email re: RTI follow-up 06/12/07 DEQ internal

13 01 06 02 Public Requests DEQ internal email re: BN Livingston contact 06/19/07 DEQ internal

13 01 06 02 Public Requests DEQ & L Frederick Communication Log re: Well sampling 06/20/07

13 01 06 02 Public Requests 07/31/07

13 01 06 02 Public Requests DEQ & ERA Landmark emails re: DEQ website link 8/15-8/21/07

13 01 06 02 Public Requests 08/29/07 DEQ

13 01 06 02 Public Requests DEQ email to Moore re: Livingston maps 08/30/07 DEQ

13 01 06 02 Public Requests DEQ internal email re: Phone message 08/31/07 DEQ internal

13 01 06 02 Public Requests 09/04/07 BNSF

13 01 06 02 Public Requests DEQ & B Gonder emails re: Property owner questions 09/13/07

13 01 06 02 Public Requests DEQ letter to J Burgess re: Site information 10/01/07 DEQ

Site-Wide Information

Information Requests

Phone Log – Pat Asay/Northwest Energy to DEQ re: Expansion of Northwest Energy facility

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Phone Log – Dave Viers/Livingston resident to DEQ re: EX -10 well results

Site-Wide Information

Information Requests

Phone Log – Dick Murphy/Park Co Commissioner to DEQ re: Contamination in East Livingston north of railroad tracks

Park Co. Commissioner

Site-Wide Information

Information Requests

DEQ & Ed Meece/Livingston City Manager re: Livingston RR Yards

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

DEQ & ERA Landmark emails re: Livingston Plume/Realtors Meeting

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests DEQ email to Scott @yourhomeinmontana re: Livingston maps

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

BNSF letter to Bruce Lay/Coldwell Banker re: Buy-sell agreement

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Page 49: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 49 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 06 02 Public Requests DEQ & ERA Landmark emails re: Livingston property 10/18/07

13 01 06 02 Public Requests DEQ email to DEA Inc re: Plume map 12/05/07 DEQ

13 01 06 02 Public Requests DEQ & Gaia Tech emails re: Groundwater plume 12/06/07

13 01 06 02 Public Requests DEQ fax to BKBH re: Mailing list 12/14/07 DEQ

13 01 06 02 Public Requests DEQ & BKBH emails re: Document research 01/24/08

13 01 06 02 Public Requests 02/20/08

13 01 06 02 Public Requests KJ & DEQ emails re: BN Livingston files 02/28/08

13 01 06 02 Public Requests 3/13-3/17/08

13 01 06 02 Public Requests DEQ email to KL Gates re: Contact with DEQ staff 03/18/08 DEQ

13 01 06 02 Public Requests DEQ & Amsk email re: PVC question 03/18/08

13 01 06 02 Public Requests 4/17-4/24/08

13 01 06 02 Public Requests 4/17-4/24/08

13 01 06 02 Public Requests 02/02/09

13 01 06 02 Public Requests BKBK letter to DEQ re: Records request 07/09/10 BKBH

13 01 06 02 Public Requests 07/21/10 DEQ Legal

13 01 06 02 Public Requests 08/04/10 DEQ Legal

13 01 06 02 Public Requests 09/23/10

13 01 06 02 Public Requests DEQ/Reynolds & Valulytics/Rodi emails re: 513 North Street 10/27/10

13 01 06 02 Public Requests DEQ/Reynolds & Valulytics/Rodi emails re: 106 South I Street 11/09/10

13 01 06 02 Public Requests 12/08/10 DEQ

13 01 06 02 Public Requests 12/10/10 DEQ/ Reynolds

13 01 06 02 Public Requests 12/22/10

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

City Manager/Rep. Ebinger & DEQ emails re: Test well at Mayor’s Landing

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

KL Gates & DEQ internal emails re: Public records request (3/13/08-3/17/08)

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Water Right Solutions/DEQ/CDM emails re: BN Livingston Complex question

Site-Wide Information

Information Requests

Water Right Solutions & DEQ emails re: BN Livingston Complex

Site-Wide Information

Information Requests

DEQ & Hebbard Blesius/ERA Landmark re: Blesius request for plume information

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

DEQ Legal/Haque-Hausrath email to BKBH/John re: Records request

Site-Wide Information

Information Requests

DEQ Legal/ Haque-Hausrath Letter/email to BKBH/Dan re: DEQ response to BKBH Records request

Site-Wide Information

Information Requests DEQ/Reynolds & Valuytics/Rodi emails re: 111 North H Street

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests

DEQ/Wallis email to WET/Thomson re: Site file guide to be reviewed

Site-Wide Information

Information Requests

DEQ/Reynolds email to Earth & Water/Nicklin re: Attachment – Livingston _GW_VOC

Site-Wide Information

Information Requests

C Lawellin, DEQ/Reynolds, K/J/Norris & MT Rail/Keegan emails re: BN site remediation – signal dept cleaning up Matl. Area

Page 50: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 50 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 06 02 Public Requests 12/22/10 DEQ/ Reynolds

13 01 06 02 Public Requests DEQ internal emails re: BKBH request for records 01/25/11 DEQ internal

13 01 06 02 Public Requests 02/11/11 DEQ/ Whittenberg

13 01 06 02 Public Requests 03/07/11

13 01 06 02 Public Requests 03/12/12 DEQ/ Reynolds

13 01 06 02 Public Requests 03/12/12 DEQ/ Reynolds

13 01 06 02 Public Requests 04/16/12

13 01 06 02 Public Requests 05/14/12

13 01 06 02 Public Requests 05/18/12 DEQ/ Reynolds

13 01 06 02 Public Requests 04/09/13 DEQ/ Reynolds

13 01 06 02 Public Requests 04/10/13

13 01 06 03

13 01 06 03 Miscellaneous EPA email to DEQ re: Info request 09/21/00 EPA

13 01 06 03 Miscellaneous Phone Log: Western States Bio Solve 10/22/01

13 01 06 03 Miscellaneous DEQ email to Ray Miline re: HiPOx treatment of groundwater 01/11/02 DEQ

13 01 06 03 Miscellaneous DEQ letter to Lee-Roark re: MDT Phase I 05/05/03 DEQ

13 01 06 03 Miscellaneous 08/14/03 DEQ

13 01 06 03 Miscellaneous DEQ email to Tetra Tech re: Retec Fate & Transport Model 12/31/03 DEQ

13 01 06 03 Miscellaneous 04/07/06 M Ross

13 01 06 03 Miscellaneous 05/22/06 DEQ

13 01 06 03 Miscellaneous 05/24/06 Rob Lober

Site-Wide Information

Information Requests

DEQ/Reynolds email to C Lawellin re: BN site remediation – signal dept cleaning up Matl. Area

Site-Wide Information

Information Requests

Site-Wide Information

Information Requests DEQ/Whittenberg letter to BKBH/Tietz re: Request for Records

Site-Wide Information

Information Requests

DEQ/Reynolds & Kurt Holm emails re: Appraisal of 615 E Gallatin

Site-Wide Information

Information Requests

DEQ/Reynolds email to Bob Farrell re: Resident concerned about vapor intrusion

Site-Wide Information

Information Requests

DEQ/Reynolds & Bob Farrell emails re: Resident concerned about vapor intrusion

Site-Wide Information

Information Requests

DEQ/Martin internal email to Reynolds re: Phone Log - Concerned citizen

DEQ/Martin internal

Site-Wide Information

Information Requests

CDM Smith/Larson email to DEQ/Reynolds re: FYI - Sent PCE & LNAPL files to Erica Hoffman at Park County

CDM Smith/ Larson

Site-Wide Information

Information Requests

DEQ/Reynolds letter to Debby Bickford re: Response to inquiry re- Conditions at BN Shop Complex

Site-Wide Information

Information Requests

DEQ/Reynolds email to Lynette Zwereman re: Response to information request

Site-Wide Information

Information Requests

Environmental Council/Kerry Fee email to DEQ/Reynolds re: Response to DEQ email about Lynette Zwerneman info request

Environmental Council/Fee

Site-Wide Information

Information Requests

Miscellaneous (Documents dated before 9/21/00 are not itemized)

1162/ 34A503

Site-Wide Information

Information Requests

1162/ 34A503

Site-Wide Information

Information Requests

1162/ 34A503

Site-Wide Information

Information Requests

1162/ 34A503

Site-Wide Information

Information Requests

1162/ 34A503

Site-Wide Information

Information Requests

DEQ email to Scott re: Superfund Redevelopment initiative info request

1162/ 34A503

Site-Wide Information

Information Requests

1162/ 34A503

Site-Wide Information

Information Requests

Resident/M Ross email to DEQ/Keck re: Request for air sampling

1162/ 34A503

Site-Wide Information

Information Requests

Phone Log – DEQ to Kennedy Jenks re: Contact directly with CDM not appropriate

1162/ 34A503

Site-Wide Information

Information Requests

Phone Log – Rob Lober voice mail to DEQ re: Acquisition of the LRC property

Page 51: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 51 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 06 03 Miscellaneous 05/25/06 Talgo/Perez

13 01 06 03 Miscellaneous 05/30/06 Cascade Drilling

13 01 06 03 Miscellaneous DEQ & MRL emails re: Subsurface structures 06/06/06

13 01 06 03 Miscellaneous Phone Log - Brian Blicker/PCEC to DEQ re: Update 08/07/06 PCEC/Blicker

13 01 06 03 Miscellaneous 08/08/06 D Erickson

13 01 06 03 Miscellaneous CDM email to DEQ re: Isoconcentration Maps 08/09/06 CDM

13 01 06 03 Miscellaneous 09/26/06

13 01 06 03 Miscellaneous 09/28/06

13 01 06 03 Miscellaneous 10/05/06 DEQ internal

13 01 06 03 Miscellaneous DEQ email to Todd Everts re: Work Plan for Task D& E 10/06/06 DEQ

13 01 06 03 Miscellaneous CDM info request for Contract: 402009 TO 37 Status Reports 11/27/06 CDM

13 01 06 03 Miscellaneous DEQ letter to D Smith re: Monthly Progress Reports 12/05/06 DEQ

13 01 06 03 Miscellaneous 03/14/07 DEQ internal

13 01 06 03 Miscellaneous DEQ & RTI emails re: Maps of LRY plume 03/23/07

13 01 06 03 Miscellaneous 09/01/10 DEQ legal

13 01 06 03 Miscellaneous 09/03/10 DEQ legal

13 01 06 03 Miscellaneous 09/08/10 BKBH/Berry

13 01 06 03 Miscellaneous 09/08/10 BKBH/Berry

13 01 06 03 Miscellaneous DEQ/Reynolds & Signe Lahren emails re: Livingston Plume 09/16/10

13 01 07 RI/FS

13 01 07 01 RI/FS Schedules 6/90-3/93

13 01 07 02 RI/FS

1162/ 34A503

Site-Wide Information

Information Requests

Phone Log – Antonio Perez/Talgo to DEQ re: National Railway interested in purchasing some or all of Talgo property

1162/ 34A503

Site-Wide Information

Information Requests

Phone Log – Jim Pender/Cascade Drilling to DEQ re: Interested in helping with drilling

1162/ 34A503

Site-Wide Information

Information Requests

1162/ 34A503

Site-Wide Information

Information Requests

1162/ 34A503

Site-Wide Information

Information Requests

Phone Log – Dave Erickson to DEQ re: Status of tasks at facility

1162/ 34A503

Site-Wide Information

Information Requests

1162/ 34A503

Site-Wide Information

Information Requests

Phone Log – Ed Meece/City Manager, Livingston to DEQ re: Press release

City Manager/ Meece

1162/ 34A503

Site-Wide Information

Information Requests

DEQ & Ed Meece/City Manager, Livingston emails re: Press release

1162/ 34A503

Site-Wide Information

Information Requests

DEQ internal email re: EQC request –Work Plan for Task E & F

1162/ 34A503

Site-Wide Information

Information Requests

1162/ 34A503

Site-Wide Information

Information Requests

1162/ 34A503

Site-Wide Information

Information Requests

1162/ 34A503

Site-Wide Information

Information Requests

DEQ internal emails re: D Smith/BNSF requested copies of current CDM & Tetra Tech contracts

1162/ 34A503

Site-Wide Information

Information Requests

1162/ 34A503

Site-Wide Information

Information Requests

DEQ Legal/Haque-Hausrath email to BKBH/John re: Copies of time logs available

1162/ 34A503

Site-Wide Information

Information Requests

DEQ Legal/Travis letter to BKBH/Laughner re: Contaminated soils transported in uncovered rail cars

1162/ 34A503

Site-Wide Information

Information Requests

BKBH/Berry letter to DEQ Legal/S Travis re: Response to DEQ 9/3/10 letter

1162/ 34A503

Site-Wide Information

Information Requests

BKBH/Berry letter to DEQ Legal/S Travis re: Change of BKBH contact person

1162/ 34A503

Site-Wide Information

Information Requests

Site-Wide Information

1000/ 45A406

Site-Wide Information

Site-Wide Information

Contractor Selection (no file)

Page 52: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 52 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 07 03 RI/FS 6/88-4/90

13 01 07 04 RI/FS 04/01/89

13 01 07 04 RI/FS MDHES Work Plan Comments (6/88-4/89)

13 01 07 04 RI/FS Final Interim Source Control Work Plan Sludge Isolation 11/29/89 Envirocon

13 01 07 04 RI/FS Amendments to the Interim Remedial Measures Work Plan 121/89 Envirocon

13 01 07 04 RI/FS Envirocon Fax to MPHES re: Sludge Characterization 11/01/91 Envirocon

13 01 07 04 RI/FS Phase II Remedial Investigation Work Plans 02/06/92 Envirocon

13 01 07 04 01 RI/FS 9/87-10/92

13 01 07 04 01 RI/FS February 1988 Trip Report well installation & sampling 05/01/88 ReTec

13 01 07 04 01 RI/FS April 1988 Trip Report well installation & sampling 05/01/88 ReTec

13 01 07 04 02 RI/FS

13 01 07 04 02 RI/FS Ambient Air Monitoring Report Livingston Railyard 02/28/91 Envirocon/ Bison

13 01 07 04 02 RI/FS Second Quarterly Ambient Air Monitoring Report 06/07/91 Envirocon/ Bison

1000/ 45A406

Site-Wide Information

RI/FS Scoping and Public Hearing Comments on IRMWP (MDHES response)

1001/ 45A501

Site-Wide Information

Workplan - Remedial Measures WP w/Amendments & Addendums

1001/ 45A501

Site-Wide Information

Workplan - Remedial Measures WP w/Amendments & Addendums

1001/ 45A501

Site-Wide Information

Workplan - Remedial Measures WP w/Amendments & Addendums

1001/ 45A501

Site-Wide Information

Workplan - Remedial Measures WP w/Amendments & Addendums

1001/ 45A501

Site-Wide Information

Workplan - Remedial Measures WP w/Amendments & Addendums

1001/ 45A501

Site-Wide Information

Workplan - Remedial Measures WP w/Amendments & Addendums

1001/ 45A501

Site-Wide Information

Additional Monitoring Wells/Other Drilling Activities

1001/ 45A501

Site-Wide Information

Additional Monitoring Wells/Other Drilling Activities

1001/ 45A501

Site-Wide Information

Additional Monitoring Wells/Other Drilling Activities

1163/ 34A505

Site-Wide Information

Ambient Air Monitoring Plan/14-4/includes sample data

1163/ 34A505

Site-Wide Information

Ambient Air Monitoring Plan/14-4/includes sample data

1163/ 34A505

Site-Wide Information

Ambient Air Monitoring Plan/14-4/includes sample data

Page 53: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 53 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 07 04 02 RI/FS Third Quarterly Ambient Air Monitoring Report (Envirocon 10/11/91 Envirocon

13 01 07 04 02 RI/FS Fourth Quarterly Report Ambient Air Monitoring Report 11/21/91 Envirocon

13 01 07 04 02 RI/FS 1991 Annual Air Quality Data Summary 04/02/92 Bison

13 01 07 04 02 RI/FS Second Quarter 1992 Ambient Air Monitoring Report 08/28/92 Envirocon

13 01 07 04 02 RI/FS 01/12/93 Envirocon

13 01 07 04 RI/FS Basement Gas

13 01 07 04 03 01 RI/FS

13 01 07 04 03 02 RI/FS Phase I - Investigation

13 01 07 04 03 02 RI/FS Phase I - Investigation Envirocon letter to DEQ re: Basement Gas data 01/11/91 Envirocon

13 01 07 04 03 03 RI/FS Phase II Investigation

13 01 07 04 03 03 RI/FS Phase II Investigation 04/10/91 DHES

13 01 07 04 03 03 RI/FS Phase II Investigation Envirocon

13 01 07 04 03 03 RI/FS Phase II Investigation Revised Draft Indoor Air Quality Investigation Work Plan 01/07/92 Envirocon

13 01 07 04 03 03 RI/FS Phase II Investigation Revised Draft Indoor Air Quality Investigation Work Plan 01/27/92 Envirocon

13 01 07 04 03 03 RI/FS Phase II Investigation Livingston Rail Yard Indoor Air Quality Investigation Report 03/27/92 Envirocon

13 01 07 04 03 03 RI/FS Phase II Investigation 03/27/92 Envirocon

13 01 07 04 03 04 RI/FS

13 01 07 04 03 04 RI/FS 05/14/92 CDM

13 01 07 04 03 04 RI/FS 06/04/92 DEQ

13 01 07 04 03 04 RI/FS 69/92 CDM

1163/ 34A505

Site-Wide Information

Ambient Air Monitoring Plan/14-4/includes sample data

1163/ 34A505

Site-Wide Information

Ambient Air Monitoring Plan/14-4/includes sample data

1163/ 34A505

Site-Wide Information

Ambient Air Monitoring Plan/14-4/includes sample data

1163/ 34A505

Site-Wide Information

Ambient Air Monitoring Plan/14-4/includes sample data

1163/ 34A505

Site-Wide Information

Ambient Air Monitoring Plan/14-4/includes sample data

Livingston Rail Yard Ambient Air Monitoring Report Third Quarter 1992 and October 1991 Through September 1992 One-Year Summary

Site-Wide Information

1163/ 34A505

Site-Wide Information

Early MDHES Basement Gas Samples

1163/ 34A505

Site-Wide Information

1163/ 34A505

Site-Wide Information

1163/ 34A505

Site-Wide Information

1163/ 34A505

Site-Wide Information

DHES letter to Envirocon re: Confirmation soil gas screening - Consent Decree violation

1163/ 34A505

Site-Wide Information

Envirocon letter to DEQ re: Response to DEQ April 24, 1991 letter

1163/ 34A505

Site-Wide Information

1163/ 34A505

Site-Wide Information

1163/ 34A505

Site-Wide Information

1163/ 34A505

Site-Wide Information

Livingston Rail Yard Indoor Air Quality Investigation Report Appendices

1163/ 34A505

Site-Wide Information

Phase II Investigation Risk Assessment

1163/ 34A505

Site-Wide Information

Phase II Investigation Risk Assessment

Preliminary Assessment of the Livingston Rail yard Indoor Air Quality Investigation Report

1163/ 34A505

Site-Wide Information

Phase II Investigation Risk Assessment DEQ letter to BNSF/BKBH re: Proposed SOW - Basement Gas

1163/ 34A505

Site-Wide Information

Phase II Investigation Risk Assessment

Preliminary Assessment of the Livingston Rail yard Indoor Air Quality Investigation Report

Page 54: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 54 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 07 04 03 05 RI/FS Phase III Investigation

13 01 07 04 03 05 RI/FS Phase III Investigation Livingston Rail Yard Indoor Air Quality Investigation Report 03/27/92 Envirocon

13 01 07 04 03 05 RI/FS Phase III Investigation DEQ Memo re: Need for additional basement gas sampling 07/21/92 DEQ

13 01 07 04 03 05 RI/FS Phase III Investigation Phase III Indoor Air Quality Investigation Report 12/07/92 Envirocon

13 01 07 04 03 05 RI/FS Phase III Investigation 04/05/93 CDM

13 01 07 04 03 05 01 RI/FS Phase IV Investigation Soil-Venting Treatability-Test Work Plan 04/02/93 Envirocon

13 01 07 04 03 06 RI/FS Test System Installation

13 01 07 04 03 RI/FS 8/89-8/92

13 01 07 04 04 RI/FS 12/89-4/90

13 01 07 04 05 RI/FS 7/88-12/90

13 01 07 04 06 RI/FS 6/87-6/95

13 01 07 04 07 01 RI/FS 3/90-6/90

13 01 07 04 07 01 RI/FS 06/12/90 MDHES

13 01 07 04 07 02 RI/FS 3/90-9/91

13 01 07 04 07 02 RI/FS Ambient Air Quality Impact Assessment Pilot Air Stripper 11/13/90 Bison/ Envirocon

13 01 07 04 07 03 RI/FS 4/91-3/92

13 01 07 04 07 03 RI/FS 14.9 Pilot-Scale Hydrocarbon Recovery System 04/15/91

13 01 07 04 07 03 RI/FS DRAFT 14.9 Pilot-Scale Hydrocarbon Recovery System 06/13/91

13 01 07 04 07 03 RI/FS DHES internal email re: Nondegradation 03/17/92 DHES

13 01 07 04 07 04 RI/FS 5/91-3/92

1163/ 34A505

Site-Wide Information

1163/ 34A505

Site-Wide Information

1163/ 34A505

Site-Wide Information

1163/ 34A505

Site-Wide Information

1163/ 34A505

Site-Wide Information

Final Assessment of the Livingston Rail Yard Indoor Air Quality Investigation Report

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1001/ 45A501

Site-Wide Information

Ground Water Monitoring Plan/5-2

1001/ 45A501

Site-Wide Information

Diesel Fuel Sheen Monitoring Plan/5-1

1001/ 45A501

Site-Wide Information

Grit Chamber Work Plan/7-1

1002/ 45A504

Site-Wide Information

Hydrocarbon Recovery (3 folders)

1002/ 45A504

Site-Wide Information

Phase I - Hydrocarbon Recovery Evaluation Test Cell 1 & 2/6-1 (Documents dated before 6/12/1990 are not itemized)

1002/ 45A504

Site-Wide Information

Phase I - Hydrocarbon Recovery Evaluation Test Cell 1 & 2/6-1

MDHES letter to KOK/Envirocon re: Comments to test cell #2 Hydrocarbon recovery WP

1002/ 45A504

Site-Wide Information

Hydrocarbon Recovery Test Cell 3/14-7

1002/ 45A504

Site-Wide Information

Hydrocarbon Recovery Test Cell 3/14-8

1002/ 45A504

Site-Wide Information

Hydrocarbon Recovery Test Cell 4/14-9

1002/ 45A504

Site-Wide Information

Hydrocarbon Recovery Test Cell 4/14-9

1002/ 45A504

Site-Wide Information

Hydrocarbon Recovery Test Cell 4/14-9

1002/ 45A504

Site-Wide Information

Hydrocarbon Recovery Test Cell 4/14-9

1002/ 45A504

Site-Wide Information

Hydrocarbon Recovery Test Cell 5

Page 55: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 55 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 07 04 08 RI/FS

13 01 07 04 09 RI/FS 1/90-7/94

13 01 07 04 09 RI/FS BN Livingston Field Note December 1990

13 01 07 04 09 RI/FS BN Livingston Record Mission Wye 1/2/91-4/16/93

13 01 07 04 10 RI/FS Sludge Management 11/89-10/91

13 01 07 04 10 RI/FS Sludge Management Interim Source Control Work Plan Sludge Isolation 11/01/89 Envirocon

13 01 07 04 10 RI/FS Sludge Management Final Interim Source Control Work Plan Sludge Isolation 11/29/89 Envirocon

13 01 07 04 10 RI/FS Sludge Management 11/08/90 Envirocon

13 01 07 04 10 RI/FS Sludge Management DEQ Memo re: Haz Waste Regulations 07/15/91 DEQ

13 01 07 04 10 RI/FS Sludge Management Envirocon letter to DHES re: Sludge Characterization 10/14/91 Envirocon

13 01 07 04 11 RI/FS Soils Investigation/4-1 4/91-11/92

13 01 07 04 12 RI/FS 6/90-3/95

13 01 07 04 12 RI/FS DHES letter to Envirocon re: Vapor Extraction Test extension 08/05/91 DHES

13 01 07 04 12 RI/FS 11/15/91 Envirocon

13 01 07 04 12 RI/FS 02/13/92 Envirocon

13 01 07 04 12 RI/FS Monthly Soil Vapor Extraction Report 04/01/92 Envirocon

13 01 07 04 12 RI/FS March 1992 Monthly Soil Vapor Extraction Report 05/18/92 Envirocon

13 01 07 04 12 RI/FS April 1992 Soil Vapor Extraction Report 06/09/92 Envirocon

13 01 07 04 12 RI/FS May and June 1992 Soil Vapor Extraction Report 08/03/92 Envirocon

Site-Wide Information

Private Wells Survey (In File #13-01-26-07-02)

1001/ 45A501

Site-Wide Information

Miscellaneous Field Activities

1001/ 45A501

Site-Wide Information

Miscellaneous Field Activities

1001/ 45A501

Site-Wide Information

Miscellaneous Field Activities

1001/ 45A501

Site-Wide Information

1001/ 45A501

Site-Wide Information

1001/ 45A501

Site-Wide Information

1001/ 45A501

Site-Wide Information

Envirocon letter to DHES re: Comment response, Sludge Dessication Work Plan

1001/ 45A501

Site-Wide Information

1001/ 45A501

Site-Wide Information

1001/ 45A501

Site-Wide Information

1003/ 45A502

Site-Wide Information

Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)

1003/ 45A502

Site-Wide Information

Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)

1003/ 45A502

Site-Wide Information

Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)

DRAFT Removal-Action Work Plan for Soils Containing Chlorinated Volatile Organic Compounds

1003/ 45A502

Site-Wide Information

Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)

Removal-Action Work Plan for Soils Containing Chlorinated Volatile Organic Compounds

1003/ 45A502

Site-Wide Information

Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)

1003/ 45A502

Site-Wide Information

Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)

1003/ 45A502

Site-Wide Information

Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)

1003/ 45A502

Site-Wide Information

Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)

Page 56: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 56 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 07 04 12 RI/FS Third Quarter 1992 Soil Vapor Extraction Report 11/03/92 Envirocon

13 01 07 04 12 RI/FS Fourth Quarter 1992 Soil Vapor Extraction Report 01/15/93 Envirocon

13 01 07 04 12 RI/FS 04/02/93 Envirocon

13 01 07 04 12 RI/FS 05/21/93 Envirocon

13 01 07 04 12 RI/FS First Quarter 1993 Soil Vapor Extraction Report 05/27/93 Envirocon

13 01 07 04 12 RI/FS Second Quarter 1993 Soil Vapor Extraction Report 09/07/93 Envirocon

13 01 07 04 12 RI/FS Third and Fourth Quarter 1993 Soil Vapor Extraction Report 01/24/94 Envirocon

13 01 07 04 12 RI/FS First Quarter 1994 Soil Vapor Extraction Results 04/18/94 Envirocon

13 01 07 04 12 RI/FS 1994 Annual Soil Vapor Extraction Report 09/08/94 Envirocon

13 01 07 04 13 RI/FS SPCC Plan 5/90-10/90

13 01 07 04 14 RI/FS 1/90-2/90

13 01 07 04 15 RI/FS Surficial Soils 1/87-7/92

13 01 07 04 15 RI/FS Surficial Soils Surficial-Soil Investigation Report 07/20/92 Envirocon

13 01 07 04 15 RI/FS Surficial Soils Surficial-Soil Investigation Report Appendix B 07/29/92 Envirocon

13 01 07 04 16 RI/FS Asbestos 2/91-8/08

13 01 07 04 16 RI/FS C Anderson email to C Boehm re: Asbestos complaint 08/30/07 C Anderson

13 01 07 04 16 RI/FS DEQ internal email re: Asbestos remediation in Livingston 08/22/08 DEQ internal

13 01 07 04 17 RI/FS Track Pan Installation 8/90-6/93

1003/ 45A502

Site-Wide Information

Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)

1003/ 45A502

Site-Wide Information

Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)

1003/ 45A502

Site-Wide Information

Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)

Soil-Venting Treatability-Test Work Plan for the Livingston Rail Yard

1003/ 45A502

Site-Wide Information

Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)

Soil-Venting/Air-Sparging Treatability-Test Work Plan for the Livingston Rail Yard

1003/ 45A502

Site-Wide Information

Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)

1003/ 45A502

Site-Wide Information

Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)

1003/ 45A502

Site-Wide Information

Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)

1003/ 45A502

Site-Wide Information

Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)

1003/ 45A502

Site-Wide Information

Soil Vapor Extraction Plan 14-5 (includes sample data 14-5)

1003/ 45A502

Site-Wide Information

1003/ 45A502

Site-Wide Information

Stained Gravels Removal Plan

1003/ 45A502

Site-Wide Information

1003/ 45A502

Site-Wide Information

1003/ 45A502

Site-Wide Information

1003/ 45A502

Site-Wide Information

Site-Wide Information

Site-Wide Information

1003/ 45A502

Site-Wide Information

Page 57: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 57 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 07 04 17 RI/FS Track Pan Installation Soil Removal 12/14/90 Envirocon

13 01 07 04 18 RI/FS

13 01 07 04 18 01 RI/FS

13 01 07 04 18 01 RI/FS 06/12/90 MDHES

13 01 07 04 18 01 RI/FS Envirocon fax to MDHES re: Submittal of Addendum 14-6 08/31/90 Envirocon

13 01 07 04 18 02 RI/FS 5/90-9/91

13 01 07 04 19 RI/FS 5/87-1/89

13 01 07 04 19 RI/FS Soil Gas Investigation Livingston Montana Fueling Facility 01/01/89

13 01 07 04 20 RI/FS Sludge Removal 2/91-6/93

13 01 07 04 20 RI/FS Sludge Removal DHES letter to Envirocon re: Sludge Removal Plan 06/24/91 DHES

13 01 07 04 20 RI/FS Sludge Removal Y ** Transmittal to DHES from J Larson re: TCRA 03/16/92 J Larson

13 01 07 04 20 RI/FS Sludge Removal Y ** J Larson memo to DHES re: TCRA 03/24/92 J Larson

13 01 07 04 20 RI/FS Sludge Removal Sludge Removal-Action Work Plan 05/29/92 Envirocon

13 01 07 04 21 RI/FS

13 01 07 04 21 01 RI/FS

13 01 07 04 21 02 RI/FS Overhead Transparencies

13 01 07 04 21 03 RI/FS

13 01 07 04 21 04 RI/FS

13 01 07 04 21 05 RI/FS 1993-1995 Slides

13 01 07 04 21 06 RI/FS 1992 Slides

13 01 07 04 21 07 RI/FS 1991 Photos & Slides

1003/ 45A502

Site-Wide Information

Site-Wide Information

Wastewater Treatment Plan

1003/ 45A502

Site-Wide Information

Wastewater Treatment Plan/14-6 (Documents dated before 6/12/90 are not itemized)

1003/ 45A502

Site-Wide Information

Wastewater Treatment Plan/14-6

MDHES letter to KOK/Envirocon re: Sludge management Plan, WWTP

1003/ 45A502

Site-Wide Information

Wastewater Treatment Plan/14-6

1003/ 45A502

Site-Wide Information

Wastewater Treatment Plan/14-2

1003/ 45A502

Site-Wide Information

Early ReTec/BN Livingston Workplans

Site-Wide Information

Early ReTec/BN Livingston Workplans

Remediation Technologies

1004/ 45A505

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

1004/ 45A505

Site-Wide Information

Site-Wide Information

Presentations/Slides/ Photos

1004/ 45A505

Site-Wide Information Presentations (3/94-2/98)

1004/ 45A505

Site-Wide Information

Site-Wide Information

Joe's Slides 12/90 - 5/93 (in file 13-01-07-04-21-08)(not on shelf)

Site-Wide Information

RI & Removal & Remedial Action Slides 7/93 - 9/93 (file empty)

1004/ 45A505

Site-Wide Information

1004/ 45A505

Site-Wide Information

1004/ 45A505

Site-Wide Information

Page 58: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 58 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 07 04 21 08 RI/FS

13 01 07 04 21 09 RI/FS 1990 Slides

13 01 07 04 21 10 RI/FS 1988-89 Slides

13 01 07 04 21 11 RI/FS Slides UST 1988-89

13 01 07 04 22 RI/FS

13 01 07 04 22 01 RI/FS 4/92-6/92

13 01 07 04 22 02 RI/FS DNAPL Investigation/5.1 4/92-8/92

13 01 07 04 22 03 RI/FS 4/92-7/92

13 01 07 04 23 RI/FS Soil Gas Sampling/9-1

13 01 07 04 23 RI/FS Soil Gas Sampling/9-2 7/88-1/92 ReTec

13 01 07 04 24 RI/FS 5/90-9/91

13 01 07 04 25 RI/FS Phase II RI-Soil/3.2 5/92-6/92

13 01 07 04 26 RI/FS 10/07/94 Envirocon

13 01 07 04 26 RI/FS Confirmation Soil Sampling Work Plan 12/05/95 Envirocon

13 01 07 04 27 RI/FS

13 01 07 04 28 RI/FS Miscellaneous Maps

13 01 07 04 28 RI/FS Miscellaneous Maps Miscellaneous Maps

13 01 07 04 28 RI/FS Miscellaneous Maps Comprehensive Well Map 07/01/07 KJ

13 01 07 05 RI/FS 3/91-5/92

13 01 07 05 RI/FS 05/18/92 Envirocon

13 01 07 06 RI/FS QAPP 2/87-3/91 Envirocon

1004/ 45A505

Site-Wide Information

1990 Photos/Joe's Slides 12/90 - 5/93

1004/ 45A505

Site-Wide Information

1004/ 45A505

Site-Wide Information

1004/ 45A505

Site-Wide Information

Site-Wide Information

Miscellaneous Work Plans (not on shelf)

1004/ 45A505

Site-Wide Information

Chlorinated Hydrocarbon Column Study/4.1

1004/ 45A505

Site-Wide Information

1004/ 45A505

Site-Wide Information

Yellowstone River Underflow Investigations/5.2

1004/ 45A505

Site-Wide Information

1004/ 45A505

Site-Wide Information

Work Plan to Perform a Soil Gas Investigation Livingston MT Fueling Facility

1004/ 45A505

Site-Wide Information

Analytical Characterization Amendment/4.2

1004/ 45A505

Site-Wide Information

1005/ 45A503

Site-Wide Information

Confirmation Soil Sampling Work Plan

1005/ 45A503

Site-Wide Information

Confirmation Soil Sampling Work Plan

1005/ 45A503

Site-Wide Information

Electric Shop Work Plan June 18, 1999 (3/95-4/00)

1005/ 45A503

Site-Wide Information

1005/ 45A503

Site-Wide Information

1005/ 45A503

Site-Wide Information

1005/ 45A503

Site-Wide Information

Data Management Work Plan 9-2, 10-2

1005/ 45A503

Site-Wide Information

Data Management Work Plan 9-2, 10-3

Environmental Information Management Software Reporting Program User's Guide

1005/ 45A503

Site-Wide Information

Page 59: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 59 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 07 06 RI/FS QAPP 03/22/91 Envirocon

13 01 07 07 RI/FS 1989-1991

13 01 07 08 RI/FS

13 01 07 09 RI/FS

13 01 07 09 RI/FS Health & Safety Plan Site Specific H&S Plan – Railyard 01/01/98

13 01 07 09 RI/FS Health & Safety Plan DEQ Health & Safety Plan for well sampling 05/22/01 DEQ

13 01 07 10 RI/FS Review Comments 3/89-11/89

13 01 07 11 RI/FS Response to Comments 4/89-11/89

13 01 07 12 RI/FS

13 01 07 13 RI/FS

13 01 07 13 RI/FS MDHES letter to KOK/Envirocon re: Sludge Pit waste 06/12/90 MDHES

13 01 07 13 RI/FS 10/28/92 MDHES

13 01 07 13 RI/FS 11/17/92 MDHES

13 01 07 13 RI/FS 03/01/93 Envirocon

13 01 07 13 RI/FS 04/16/93 Envirocon

13 01 07 13 RI/FS Safety -Kleen manifest-400 gallons diesel fuel 08/18/93 Safety Kleen

13 01 07 13 RI/FS 09/03/93 BKBH

1005/ 45A503

Site-Wide Information

May 1989 Through May 1990 Yearly Quality Assurance/Quality Control Report

1005/ 45A503

Site-Wide Information

MDHES Sample QA/QC Information

Site-Wide Information

Site Management Plan (file empty)

1005/ 45A503

Site-Wide Information

Health & Safety Plan (Documents dated before 5/22/01 are not itemized)

1005/ 45A503

Site-Wide Information

1005/ 45A503

Site-Wide Information

1005/ 45A503

Site-Wide Information

1005/ 45A503

Site-Wide Information

Site-Wide Information Sampling Plans (file empty)

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

MDHES letter to Mills & KOK/Envirocon re: Recycling waste oil & recovered diesel fuel

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

MDHES letter to KOK/Envirocon re: Recycling of recovered free product/fuel

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Envirocon letter to MDHES re: Disposal of fuels & contaminated soils & debris

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Envirocon letter to MDHES re: Disposal of hazardous diesel fuel

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

BKBH letter to Assistant Attorney General re: Recycling of recovered fuel

Page 60: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 60 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 07 13 RI/FS 03/30/06 KJ

13 01 07 13 RI/FS DEQ Notification No 1 – Offsite Waste Disposal 07/12/06 KJ

13 01 07 13 RI/FS 07/28/06 KJ

13 01 07 13 RI/FS 08/11/06 KJ

13 01 07 13 RI/FS 12/14/06 DEQ

13 01 07 13 RI/FS 12/15/06 DEQ

13 01 07 13 RI/FS 12/15/06 KJ

13 01 07 13 RI/FS DEQ Notification No 2 – Offsite Waste Disposal 01/25/07 KJ

13 01 07 13 RI/FS DEQ Notification No 3 – Offsite Waste Disposal 02/06/07 KJ

13 01 07 13 RI/FS DEQ Notification No 4 – Offsite Waste Disposal 05/24/07 KJ

13 01 07 13 RI/FS DEQ Notification No 5 – Offsite Waste Disposal 06/14/07 KJ

13 01 07 13 RI/FS DEQ Notification No 6 – Offsite Waste Disposal 06/25/07 KJ

13 01 07 13 RI/FS K/J email to DEQ re: Disposal Notification No 6 06/26/07 KJ

13 01 07 13 RI/FS DEQ Notification No 7 – Offsite Waste Disposal 09/05/07 KJ

13 01 07 13 RI/FS DEQ Notification No 8 – Offsite Waste Disposal 09/05/07 KJ

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Request for Contained-In Determination Investigation-Derived Residual Water – November 2005

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Request for Contained-In Determination Investigation-Derived Residual Water – June 2006

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Request for Contained-In Determination Investigation-Derived Residual Soil

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

DEQ letter to D Smith/BNSF re: Purgewater from 11/05 GW sampling event

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

DEQ letter to D Smith/BNSF re: Purgewater from 6/06 GW sampling event

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

DEQ letter to D Smith/BNSF re: Request for Contained-In Determination Investigation-Derived Residual Soil

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Page 61: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 61 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 07 13 RI/FS DEQ Notification No 9 – Offsite Waste Disposal 10/05/07 KJ

13 01 07 13 RI/FS K/J email to DEQ re: Disposal Notification No 9 10/08/07 KJ

13 01 07 13 RI/FS 10/18/07 KJ

13 01 07 13 RI/FS Request for Contained-in Decision – Soil 10/23/07 KJ

13 01 07 13 RI/FS 11/13/07 DEQ

13 01 07 13 RI/FS 11/13/07 DEQ

13 01 07 13 RI/FS 11/14/07 KJ

13 01 07 13 RI/FS DEQ email to K/J re: Storing used GAC 11/14/07 DEQ

13 01 07 13 RI/FS K/J email to DEQ re: Used GAC handling procedures 11/14/07 KJ

13 01 07 13 RI/FS DEQ/KJ emails re: Various Topics 11/15/07

13 01 07 13 RI/FS DEQ Notification No 10 – Offsite Waste Disposal 11/19/07 KJ

13 01 07 13 RI/FS K/J email to DEQ re: Offsite Disposal Notification No 10 11/19/07 KJ

13 01 07 13 RI/FS DEQ/KJ emails re: Soil Contained-in HRO #4 11/20/07

13 01 07 13 RI/FS DEQ letter to D Smith/BNSF re: GAC handling procedures 01/03/08 DEQ

13 01 07 13 RI/FS DEQ/KJ email re: Offsite Disposal Summary 01/09/08

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Former Wastewater Treatment Plant Sump Excavation – Soil Sampling Analytical Results and Request for Contained-in Decision

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

DEQ letter to D Smith/BNSF re: Former WWTP Sump Excavation – Soil SAR and Request for Contained-in Decision

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

DEQ letter to D Smith/BNSF re: BN Livingston Shop Complex Facility – Request for Contained-in Determination for Investigation-Derived Soil

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

K/J letter to DEQ re: Used Granular Activated Carbon Handling Procedures

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Page 62: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 62 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 07 13 RI/FS DEQ Notification No 11 – Offsite Waste Disposal 05/08/08 KJ

13 01 07 13 RI/FS DEQ Notification No 12 – Offsite Waste Disposal 05/15/08 KJ

13 01 07 13 RI/FS 05/30/08 DEQ internal

13 01 07 13 RI/FS DEQ/A Adersley emails re: Livingston Documents 05/30/08

13 01 07 13 RI/FS 06/13/08 KJ

13 01 07 13 RI/FS 06/24/08 DEQ

13 01 07 13 RI/FS DEQ Notification No 13 – Offsite Waste Disposal 07/25/08 KJ

13 01 07 13 RI/FS DEQ Notification No 14 – Offsite Waste Disposal 08/21/08 KJ

13 01 07 13 RI/FS DEQ Notification No 15 – Offsite Waste Disposal 08/27/08 KJ

13 01 07 13 RI/FS Request for Contained-in Decision – Soil 08/27/08 KJ

13 01 07 13 RI/FS DEQ Letter to D Smith re: Notification No 14 08/28/08 DEQ

13 01 07 13 RI/FS DEQ Notification No 16 – Offsite Waste Disposal 08/28/08 KJ

13 01 07 13 RI/FS DEQ Notification No 17 – Offsite Waste Disposal 09/04/08 KJ

13 01 07 13 RI/FS 09/15/08 DEQ

13 01 07 13 RI/FS K/J email to DEQ re: Landspread notice HRO#9 10/03/08 KJ

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

DEQ internal email re: Comment on 5/15/08 Offsite Waste Disposal

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Request for Contained-in Determination – Used Granular Activated Carbon

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

DEQ Letter to D Smith re: Request for Contained-In Determination – Used Granular Activated Carbon

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

DEQ letter to BNSF re: Request for Contained in Decision – Soil (HRO#9)

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Page 63: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 63 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 07 13 RI/FS 12/04/08 KJ

13 01 07 13 RI/FS 01/19/09 KJ/Adlersley

13 01 07 13 RI/FS DEQ Notification No 18 – Offsite Waste Disposal 01/21/09 KJ

13 01 07 13 RI/FS DEQ Notification No 19 – Offsite Waste Disposal 05/19/09 KJ

13 01 07 13 RI/FS 07/13/09 DEQ

13 01 07 13 RI/FS DEQ Notification No 20 – Offsite Waste Disposal 07/15/09 KJ

13 01 07 13 RI/FS 09/02/09 KJ

13 01 07 13 RI/FS Request for Contained-in Decision – Soil 03/30/10 KJ

13 01 07 13 RI/FS 04/13/10 KJ

13 01 07 13 RI/FS 05/11/10 DEQ

13 01 07 13 RI/FS KJ email to DEQ re: Request for clarification 05/19/10 KJ

13 01 07 13 RI/FS 05/21/10 KJ

13 01 07 13 RI/FS KJ email to DEQ re: Landspreading and offsite disposal 05/26/10 KJ

13 01 07 13 RI/FS HRO#17 through HRO#19 Analytical Results 06/30/10 KJ

13 01 07 13 RI/FS 07/23/10 KJ

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Request for Contained-in Decision – Task F Stage I Part 2 Soil (Drum #48)

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

K/J/Aldersley email to DEQ/Reynolds re: Drum #48 landspread notice

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

DEQ letter to D Smith re: DEQ Notification No 19 – Offsite Waste Disposal

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

KJ letter to DEQ re: Notification No 21 – Offsite Waste Disposal

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

KJ letter to DEQ re: Notification No 22 – Offsite Waste Disposal

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet DEQ letter to BNSF re: Request for contained-in decision – soil

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

KJ letter to DEQ re: Notification No 23 – Offsite Waste Disposal

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

KJ letter to DEQ re: HRO#17 through HRO#19 request for contained-out determination

Page 64: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 64 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 07 13 RI/FS DEQ/KJ emails re: Request for contained-out determination

13 01 07 13 RI/FS DEQ/KJ emails re: Request for contained-out determination

13 01 07 13 RI/FS 07/27/10 DEQ/ Reynolds

13 01 07 13 RI/FS 07/29/10 KJ

13 01 07 13 RI/FS Request for Contained-in Decision - SVE System Condensate 05/19/11 KJ

13 01 07 13 RI/FS 05/24/11 DEQ/ Reynolds

13 01 07 13 RI/FS 08/24/11 KJ

13 01 07 13 RI/FS 09/29/11 KJ/Alderley

13 01 07 13 RI/FS 09/29/11 KJ/Norris

13 01 07 13 RI/FS 10/04/11 DEQ/ Reynolds

13 01 07 13 RI/FS 10/18/11

13 01 07 13 RI/FS 11/23/11 KJ

13 01 07 13 RI/FS 11/30/11 DEQ/ Reynolds

13 01 07 13 RI/FS 12/08/11

13 01 07 13 RI/FS 08/24/12 KJ

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

7/23-7/26/2010

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

7/23-7/27/2010

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

DEQ/Reynolds letter to BN/Smith re: HRO#17 through HRO#19 Request for Contained-out Determination – BN Shop Complex

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

KJ letter to DEQ re: Notification No 24 – Offsite Waste Disposal

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

DEQ/Reynolds letter to BN/Smith re: Request for Contained-in Decision - SVE System Condensate

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

KJ letter to DEQ re: Notification No 25 – Offsite Waste Disposal

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

KJ/Aldersley email to DEQ/Reynolds re: Letter response to DEQ's comments on IDW quantities sent UPS 9/29/11

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

KJ letter to DEQ/Reynolds re: Response to DEQ comments on Investigation-Derived Waste (IDW) Quantities

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

DEQ/Reynolds letter to BN/Smith re: DEQ response to KJ response to DEQ comments on IDW Quantities

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

DEQ/Reynolds & KJ/Alderslet emails re: Task L & waste characterization

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

HRO#20-HRO#29, HRO #31 & 32 - IDW Characterization Analytical Results & Request for contained-in decision

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

DEQ/Reynolds letter to BN/Smith re: DEQ comments to HRO#20-29, HRO#31 & 32 IDW Analytical Results & Request for Contained-out Decisions

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

DEQ/Reynolds & KJ/Aldersley emails re: Notification of landspreading in C&P Packing Pit

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

HRO#33-HRO#39 - IDW Characterization Analytical Results & Request for contained-in decision

Page 65: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 65 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 07 13 RI/FS 08/30/12 DEQ/ Reynolds

13 01 07 13 RI/FS 09/05/12 KJ/Adlersley

13 01 07 13 RI/FS 09/25/12 DEQ/ Reynolds

13 01 07 13 RI/FS 09/25/12 M Hendrickson

13 01 07 13 RI/FS 09/25/12 KJ/Norris

13 01 07 13 RI/FS 09/26/12

13 01 07 13 RI/FS 10/8-10/9/12

13 01 07 13 RI/FS 10/09/12 KJ/Adlersley

13 01 07 13 RI/FS 11/21/12 KJ/Norris

13 01 07 13 RI/FS

13 01 07 13 RI/FS 12/14/12 KJ/Norris

13 01 07 13 RI/FS 12/14/12 KJ

13 01 07 13 RI/FS 12/14/12 KJ

13 01 07 13 RI/FS 01/02/13 DEQ/Reynolds

13 01 07 13 RI/FS 01/02/13 DEQ/Reynolds

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

DEQ/Reynolds letter to BN/Smith re: DEQ comments to HRO#33-HRO#39 IDW Analytical Results & Request for Contained-out Decisions

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

KJ/Aldersley email to DEQ/Reynolds re: Notice of landspreading

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

DEQ/Reynolds email to Ricknold Thompson re: BN roll off bin disposal

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

DEQ/WUTMB/Hendrickson email to DEQ/Reynolds & R Thompson re: BN roll off bin disposal

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

KJ/Norris email to Republic Services/Ideson re: Attachment - Liquid-Phase GAC Profile smaples

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Ricknold Thompson email to DEQ/Reynolds re: Attachment - Photos of cleanup of dumped GAC roll off bin; & FW email from Gallatin Solid Waste Management District/Martin Bey Richnold Thompson

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

KJ/Aldersley & DEQ/Reynolds emails re: Task D&E Spent Carbon

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

KJ/Aldersley email to DEQ/Reynolds re: EPH Screen will be added to the list of required analyses

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

KJ letter to DEQ re: Notification No 27 – Offsite Waste Disposal

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

DEQ/Reynolds & KJ/Aldersley emails re: Office Waste Disposal Notification No 26

11/21/-11/30/12

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

KJ letter to DEQ re: Notification No 26 – Offsite Waste Disposal

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Request for Contained-Out Decision - Soil & Weir Tank Sediment Residuals

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Request for Contained-Out Decision - Used GAC/Soil/Debris Mix

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

DEQ/Reynolds letter to BN/Smith re: DEQ approval to BN's request for a "no longer contained in" determination for GAC/Soil Debris Mix

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

DEQ/Reynolds letter to BN/Smith re: DEQ approval to BN's request for a "Contained Out" Decision for Soil & Weir Tank Sediment Residuals in roll-off bins

Page 66: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 66 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 07 13 RI/FS 01/25/13 KJ/Alderley

13 01 07 13 RI/FS 02/15/13 KJ/Norris

13 01 07 13 RI/FS 05/29/13 KJ/Norris

13 01 07 13 RI/FS 7/2013 IDW Tracking Sheet 07/01/13

13 01 07 13 RI/FS 07/25/13 KJ/Fernandes

13 01 07 13 RI/FS 08/01/13 DEQ/Reynolds

13 01 07 13 RI/FS 09/04/13 KJ/Fernandes

13 01 07 13 RI/FS 11/20/14 BNSF/Aldersley

13 01 08 ARARs

13 01 08 01 ARARs Correspondence 6/89-12/92

13 01 08 02 ARAR Determinations 4/92-12/92

13 01 09 RI/FS Reports

13 01 09 01 RI/FS Reports

13 01 09 02 RI/FS Reports

13 01 09 03 RI/FS Reports

13 01 09 04 RI/FS Reports

13 01 09 04 RI/FS Reports Environmental Site Audit Report (1/89) Envirocon

13 01 09 04 RI/FS Reports 1998 Annual GW Sampling Report (9/98)

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

KJ/Aldersley email to DEQ/Reynolds re: Notification of landspreading in C&P Packing pit

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

KJ/letter to DEQ/Reynolds re: Notification No 28 – Offsite Waste Disposal

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

KJ/Norris letter to DEQ/Reynolds re: offsite waste disposal notification no. 29

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

KJ/Fernandes letter to DEQ/Reynolds re: ACM/Soil contained in request

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

DEQ/Reynolds letter DEQ/Smith re: Request for No Longer Contained-In Decision - Asbestos - Containing Material (ACM)/Soil in SC-RO1 and SC-RO2 related to Task M, Shop Complex Facility

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

KJ/Fernandes letter to DEQ/Reynolds re: DEQ Notification No. 30 - Offsite Waste Disposal

Site-Wide Information

Disposal of Investigation-Derived Wastes – Tracking Sheet

HRO#50 Characterization Analytical Results and Request for a No-longer Contained-in Decision

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

Site-Wide Information

Cultural Resources Report (file empty)

Site-Wide Information

Endangered Species Report (file empty)

Site-Wide Information

Floodplain and Wetlands Assessment Report (file empty)

1006/ 45A506

Site-Wide Information

Sampling and Analysis Data

1006/ 45A506

Site-Wide Information Sampling and Analysis Data

1006/ 45A506

Site-Wide Information Sampling and Analysis Data

Page 67: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 67 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 09 05 RI/FS Reports Draft RI Report 01/08/00

13 01 09 05 RI/FS Reports Draft RI Report 09/01/91 Envirocon

13 01 09 05 RI/FS Reports Draft RI Report Responses to Draft Remedial Investigation Report Comments 04/14/92 Envirocon

13 01 09 05 RI/FS Reports Draft RI Report 11/10/92 Envirocon

13 01 09 06 RI/FS Reports

13 01 09 07 RI/FS Reports 5/91-5/92

13 01 09 07 RI/FS Reports Preliminary Screening of Alternatives 12/26/91 Envirocon

13 01 09 08 RI/FS Reports

13 01 09 09 RI/FS Reports

13 01 09 10 RI/FS Reports Institutional Controls

13 01 09 10 RI/FS Reports Institutional Controls 06/05/10

13 01 09 10 RI/FS Reports Institutional Controls 07/30/10 DEQ/ Reynolds

13 01 09 10 RI/FS Reports Institutional Controls 08/30/10 BKBH/Wade

13 01 09 10 RI/FS Reports Institutional Controls 09/29/10 BN/Smith

13 01 09 10 RI/FS Reports Institutional Controls 11/19/10

13 01 09 10 RI/FS Reports Institutional Controls 12/03/10 BKBH

13 01 09 10 RI/FS Reports Institutional Controls 12/08/10 DEQ legal/ Kirley

13 01 09 10 RI/FS Reports Institutional Controls 03/18/11

13 01 09 10 RI/FS Reports Institutional Controls 04/25/11

1006/ 45A506

Site-Wide Information

1006/ 45A506

Site-Wide Information

Livingston Rail Yard Draft Remedial Investigation Report Volume I, Volumes II-V Appendices

1006/ 45A506

Site-Wide Information

1006/ 45A506

Site-Wide Information Draft Final Livingston Rail Yard Remedial Investigation Report

Site-Wide Information

Technologies Screening Document (file empty)

1007/ 45A601

Site-Wide Information

Alternatives Screening Document

1007/ 45A601

Site-Wide Information

Alternatives Screening Document

Site-Wide Information

Treatability Work Plan (file empty)

Site-Wide Information

Treatability Report (file empty)

Site-Wide Information

Site-Wide Information

DEQ legal/Haque-Hausrath letter to BKBH/Hoven & Berry re: Disposition of Purchased properties

DEQ legal/ Haque-Hausrath

Site-Wide Information

DEQ/Reynolds letter to BN/Smith re: BN Livingston Shop Complex Facility, Section 711 Proper & Expeditious Letter requiring Institutional Controls on Cinder Pile & Certain of BNSF’s currently owned properties

Site-Wide Information

BKBH letter to DEQ/Reynolds re: Response to DEQ 7/30/10 letter - Section 711 Proper & Expeditious Letter requiring Institutional Controls on Cinder Pile & Certain of BNSF’s currently owned properties

Site-Wide Information

BN/Smith letter to DEQ/Reynolds re: BN response to DEQ 7/30/10 letter - typo found in BKBH 8/30/10 letter, corrected in this letter

Site-Wide Information

DEQ legal/Haque-Hausrath letter to BN/BKBH/Wade re: DEQ comments on BN's 9/29/10 & 8/30/10 letters

DEQ legal/ Haque-Hausrath

Site-Wide Information

BKBH/Berry letter to DEQ Legal/Haque-Hausrath re: Schedule a meeting to discuss Institutional Controls/cinder pile

Site-Wide Information

DEQ Legal/Kirley internal email re: Institutional controls for cinder pile & other properties

Site-Wide Information

BN/Smith & DEQ Legal/Haque-Hausrath emails re: Livingston IC's DEQ March 11 letter

Site-Wide Information

BN/Smith & DEQ Legal/Haque-Hausrath emails re: Livingston IC's DEQ March 11 letter

Page 68: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 68 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 09 10 RI/FS Reports Institutional Controls 05/16/11

13 01 09 10 RI/FS Reports Institutional Controls 06/21/11

13 01 09 10 RI/FS Reports Institutional Controls 07/14/11

13 01 09 10 RI/FS Reports Institutional Controls 07/20/11 BN/ Kaitala

13 01 09 10 RI/FS Reports Institutional Controls 07/26/11

13 01 09 10 RI/FS Reports Institutional Controls DEQ meeting notes - BN, BKBH, & DEQ IC's meeting 06/21/11 DEQ/ Reynolds

13 01 09 10 RI/FS Reports Institutional Controls 76/30-7/1/11

13 01 09 10 RI/FS Reports Institutional Controls 07/14/11

13 01 09 10 RI/FS Reports Institutional Controls 08/15/11

13 01 09 10 RI/FS Reports Institutional Controls 08/24/11

13 01 09 10 RI/FS Reports Institutional Controls 08/25/11

13 01 09 10 RI/FS Reports Institutional Controls 08/25/11

13 01 09 10 RI/FS Reports Institutional Controls 08/26/11

13 01 09 10 RI/FS Reports Institutional Controls 08/26/11 BKBH/ Luther

13 01 09 10 RI/FS Reports Institutional Controls 08/29/11 BKBH/ Berry

13 01 09 10 RI/FS Reports Institutional Controls 09/01/11

13 01 09 10 RI/FS Reports Institutional Controls 09/15/11 BKBH/ Luther

13 01 09 10 RI/FS Reports Institutional Controls 09/21/11 BKBH/ Luther

13 01 09 10 RI/FS Reports Institutional Controls 09/30/11

Site-Wide Information

DEQ/Reynolds & Haque-Hausrath & BN/Smith emails re: Livingston IC's DEQ March 11 letter

Site-Wide Information

DEQ Legal Haque-Hausrath email to Dava Kaitala re: Follow-up to 6/21/11 IC's meeting

DEQ legal/ Haque-Hausrath

Site-Wide Information

DEQ Legal Haque-Hausrath email to BKBH/Berry re: DEQ approval of ICs in Document 704552

DEQ legal/ Haque-Hausrath

Site-Wide Information

BNSF/Kaitala email to DEQ legal/Haque-Hausrath re: Update – Cinder Pile & Livingston info request

Site-Wide Information

DEQ Legal Haque-Hausrath email to Dava Kaitala re: Update – Cinder Pile & Livingston info request

DEQ legal/ Haque-Hausrath

Site-Wide Information

Site-Wide Information

DEQ legal/Haque-Hausrath & BN legal/Kaitala emails re: Livingston IC's

Site-Wide Information

DEQ legal/Haque-Hausrath email letter to BKBH/Berry & BN/Kaitala re: Costs of conducting Phase I of the Task D/E Bioventing

DEQ legal/ Haque-Hausrath

Site-Wide Information

DEQ legal/Haque-Hausrath email letter to BKBH/Berry & BN/Kaitala re: Follow-up on DEQ required IC's

DEQ legal/ Haque-Hausrath

Site-Wide Information

DEQ legal/Haque-Hausrath internal email to Reynolds re: Phone log w/BN/Kaitala re: Status of IC's

DEQ legal/ Haque-Hausrath

Site-Wide Information

DEQ legal/Haque-Hausrath email to BKBH/Berry & BN/Kaitala re: Missed deadline for IC's

DEQ legal/ Haque-Hausrath

Site-Wide Information

DEQ legal/Haque-Hausrath email to DEQ Director/Opper re: BN' s Missed deadline for IC's

DEQ legal/ Haque-Hausrath

Site-Wide Information

DEQ legal/Haque-Hausrath, BN/Kaitala & BKBH/Berry emails Cinder pile boundary & IC's

DEQ legal/ Haque-Hausrath

Site-Wide Information

BKBH/Luther email to DEQ legal/Haque-Hausrath re: Attachment - Declaration of Institutional Controls on Real Property

Site-Wide Information

BKBH/Berry email to DEQ legal re: Boundary of cinder pile & IC's

Site-Wide Information

DEQ legal/Haque-Hausrath email letter to BKBH/Berry & BN/Kaitala re: Attachment - DEQ approved IC's for the cinder pile BNSF ownership & final DEQ deadline

DEQ legal/ Haque-Hausrath

Site-Wide Information

BKBH/Luther email to DEQ legal/Haque-Hausrath re: Attachment - Recorded Declaration of Institutional Controls on Real Property

Site-Wide Information

BKBH/Luther email to DEQ legal/Haque-Hausrath re: Attachment - Recorded Declaration of Institutional Controls on cinder pile

Site-Wide Information

DEQ legal/Haque-Hausrath email letter to BKBH/Berry & BN/Kaitala re: Attachment - DEQ approval of filed IC's on residences, Conditional approval of filed IC's on cinder pile & timeline for DEQ review of Cinder Pile RA Report

DEQ legal/ Haque-Hausrath

Page 69: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 69 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 09 11 RI/FS Reports Final Draft RI/FS Report

13 01 09 11 RI/FS Reports Final Draft RI/FS Report Draft Primary-Hydrocarbon Feasibility Study Report 03/22/93 Envirocon

13 01 09 11 RI/FS Reports Final Draft RI/FS Report Final Draft Primary-Hydrocarbon Feasibility Study Report 05/08/96 Envirocon

13 01 09 11 RI/FS Reports Final Draft RI/FS Report Final Draft FS Report 09/13/96 Envirocon

13 01 09 12 RI/FS Reports

13 01 09 12 RI/FS Reports Proposed Plan MDHES transmittal - Proposed Plan 09/10/98 DEQ

13 01 09 12 01 CD RI/FS Reports 4/96-3/98

13 01 09 12 01 RI/FS Reports Free Product 04/01/96 HSI Geotrans

13 01 09 12 01 RI/FS Reports Free Product 02/11/97 HSI Geotrans

13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans memo to DEQ re: Soil Hydrocarbons 05/14/97 HSI Geotrans

13 01 09 12 01 RI/FS Reports Free Product 05/27/97 HSI Geotrans

13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans fax re: Biodegradation rates 06/25/97 HSI Geotrans

13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans memo to DEQ re: Free product removal 07/28/97 HSI Geotrans

13 01 09 12 01 RI/FS Reports Free Product John Mills letter to Utah WRL re: Hydrocarbon Plume 08/03/97 John Mills

13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans memo to DEQ re: Soil & GW alternatives 08/27/97 HSI Geotrans

13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans fax re: Cost of alternatives - present worth 09/02/97 HSI Geotrans

13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans fax to DEQ re: Free product guidance 09/22/97 HSI Geotrans

13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans memo to DEQ re: Costs for alternatives 09/24/97 HSI Geotrans

13 01 09 12 01 RI/FS Reports Free Product 09/24/97 HSI Geotrans

13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans Maps in AutoCad CD 9/15-10/14/97 HSI Geotrans

13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans fax to DEQ re: Horizontal Wells 11/04/97 HSI Geotrans

13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans memo to DEQ re: Biodegradiation rates 01/28/98 HSI Geotrans

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

Proposed Plan (9/1998) (AR) (Documents dated before 9/10/1998 are not itemized)

1164/ 34A506

Site-Wide Information

1007/ 45A601

Site-Wide Information

Free Product (CD + 31/2 floppies)

1007/ 45A601

Site-Wide Information

Evaluation of Hydrocarbon Contamination at the Livingston Railyard Final version Vol 1

1007/ 45A601

Site-Wide Information

HSI Geotrans letter to DEQ re: Preferred alternatives section (w/attached figures & digital files –word perfect)

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

HSI Geotrans memo to DEQ re: Cost estimate for preferred alternative

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

HSI Geotrans memo to DEQ re: Cost estimates for alternatives (faxed)

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

Page 70: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 70 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans memo to DEQ re: Soil standards for TPH 01/28/98 HSI Geotrans

13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans memo to DEQ re: Possible cleanup standards 02/19/98 HSI Geotrans

13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans memo to DEQ re: TPH leaching potential 02/19/98 HSI Geotrans

13 01 09 12 01 RI/FS Reports Free Product HSI Geotrans memo to DEQ re: Hydrocarbon remedy 03/12/98 HSI Geotrans

13 01 09 12 01 RI/FS Reports Free Product 03/16/98 HSI Geotrans

13 01 09 13 RI/FS Reports Responsiveness Summary 06/08/99

13 01 09 14 RI/FS Reports

13 01 09 14 RI/FS Reports 03/01/94 Envirocon

13 01 09 14 RI/FS Reports Livingston Rail Yard Feasibility Study Report 08/01/94 Envirocon

13 01 09 14 RI/FS Reports DEQ letter to Envirocon re: Meeting & FS Info 07/28/97 DEQ

13 01 09 14 RI/FS Reports K/Jetter to BNSF re: Free product recovery at sites in Montana 07/28/97 KJ

13 01 09 14 RI/FS Reports John Mills letter to Utah Water Research Laboratory 08/03/97 John Mills

13 01 09 14 RI/FS Reports BNSF letter to DEQ re: Free Product 08/20/97 BN

13 01 09 14 RI/FS Reports 12/18/97 DEQ

13 01 09 15 RI/FS Reports Review Comments 3/89-4/95

13 01 09 16 RI/FS Reports Response to Comments 3/89-7/89

13 01 10 ROD

13 01 10 ROD 10/06/98 J Wadhams

13 01 10 ROD Public Hearing Transcript 10/22/98

13 01 10 ROD 01/13/99 DEQ

13 01 10 ROD HSI Geotrans memo to DEQ re: Schedule 02/01/99 GeoTrans

13 01 10 ROD HSI Geotrans memo to DEQ re: Schedule 02/01/99 GeoTrans

13 01 10 ROD DEQ memo re: HSI GeoTrans re: Map 02/25/99 DEQ

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

HSI Geotrans memo to DEQ re: Hydrocarbon portion of preferred remedy

1007/ 45A601

Site-Wide Information

Site-Wide Information Final RI/FS Report

1165/ 34A601

Site-Wide Information Final RI/FS Report

Livingston Rail Yard Final Remedial Investigation Report Volume I Text, Volumes II-VII Appendices

1165/ 34A601

Site-Wide Information Final RI/FS Report

1165/ 34A601

Site-Wide Information Final RI/FS Report

1165/ 34A601

Site-Wide Information Final RI/FS Report

1165/ 34A601

Site-Wide Information Final RI/FS Report

1165/ 34A601

Site-Wide Information Final RI/FS Report

1165/ 34A601

Site-Wide Information Final RI/FS Report

DEQ letter to BNSF re: August 20th 1997 letter - Free product removal

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

Site-Wide Information

1164/ 34A506

Site-Wide Information

John Wadhams email to Mary Capdeville re: BN Livingston ERCLs

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

DEQ letter to Judy McDonough/BNSF re: Draft schedule of activities for BN Livingston Complex

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

Page 71: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 71 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 10 ROD 03/01/99 GeoTrans

13 01 10 ROD DEQ internal email re: ROD Review 04/09/99 DEQ

13 01 10 ROD HSI Geotrans memo to DEQ re: Section 10 of ROD 04/20/99 GeoTrans

13 01 10 ROD 04/20/99 GeoTrans

13 01 10 ROD DEQ memo re: Review 06/16/99 DEQ

13 01 10 ROD DEQ letter to MRL re: Safety 07/12/99 DEQ

13 01 10 ROD Attorney letter to DEQ re: MRL Safety 07/19/99

13 01 10 ROD DEQ letter to MRL re: Safety 10/04/99 DEQ

13 01 10 ROD PCEC letter to DEQ re: ROD 11/19/99 PCEC

13 01 10 ROD DEQ letter to PCEC re: ROD 01/07/00 DEQ

13 01 10 ROD PCEC email to DEQ re: ROD 04/12/00 PCEC

13 01 10 ROD DEQ email to PCEC re: ROD 04/19/00 DEQ

13 01 10 ROD DEQ email to Raney re: NRD 05/20/00 DEQ

13 01 10 ROD Phone Log: Wieringa/Envirocon 06/14/00

13 01 10 ROD Phone Log: Wieringa/Envirocon 06/15/00

13 01 10 ROD Phone Log: RTI 06/28/00

13 01 10 ROD Phone Log: DEQ to RTI 07/06/00 DEQ

13 01 10 ROD City of Livingston fax to DEQ re: Meeting agenda 09/08/00 City of Livingston

13 01 10 ROD DEQ memo re: Cost Estimate 12/12/00 DEQ

13 01 10 ROD PCEC letter to DEQ 05/04/01 PCEC

13 01 10 ROD DEQ Briefing paper re: ROD 05/10/01 DEQ

13 01 10 ROD DEQ internal meeting minutes 05/10/01 DEQ internal

13 01 10 ROD DEQ internal email re: Meeting 05/18/01 DEQ internal

13 01 10 ROD Meeting minutes 06/07/01

1164/ 34A506

Site-Wide Information

HSI GeoTrans response to comments, Responsiveness Summary-Additional Comments

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information HSI Geotrans 2nd Draft Section X of ROD

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

Page 72: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 72 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 10 ROD Meeting Presentation

13 01 10 ROD Meeting minutes 07/07/01

13 01 10 ROD DEQ email to BN re: Indoor Air 07/13/01 DEQ

13 01 10 ROD Phone Log: DEQ to R Billau 07/26/01 DEQ

13 01 10 ROD DEQ internal email re: Meeting 08/01/01 DEQ internal

13 01 10 ROD DEQ internal email re: Meeting 08/02/01 DEQ internal

13 01 10 ROD Phone Log: DEQ to McCaffery/Envirocon 08/08/01 DEQ

13 01 10 ROD Envirocon fax to DEQ re: Confirmation sampling 08/13/01 Envirocon

13 01 10 ROD Meeting attendance 08/16/01

13 01 10 ROD DEQ-BNSF meeting agenda 08/16/01

13 01 10 ROD Meeting Minutes 08/16/01

13 01 10 ROD Phone Log: Golnar (2001)

13 01 10 ROD Envirocon email to DEQ re: meeting minutes 08/21/01 Envirocon

13 01 10 ROD PC Planning email to DEQ re: Zoning Maps 08/29/01 PC Planning

13 01 10 ROD Phone Log: Caldwell 09/04/01

13 01 10 CD ROD HSI Geotrans CD: Figures for ROD 09/01/01 GeoTrans

13 01 10 ROD ROD report 09/01/01

13 01 10 ROD DEQ letter to BKBH re: ROD 09/11/01 DEQ

13 01 10 ROD DEQ transmittal to BN re: ROD 09/11/01 DEQ

13 01 10 ROD DEQ transmittal to Livingston Library re: ROD 09/12/01 DEQ

13 01 10 ROD DEQ transmittal to MSU re: ROD 09/12/01 DEQ

13 01 10 ROD DEQ transmittal to UM re: ROD 09/13/01 DEQ

13 01 10 ROD Phone Log: McCaffery/Envirocon 09/13/01

13 01 10 ROD Phone Log: Golnar re: ROD 09/19/01

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

Page 73: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 73 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 10 ROD DEQ email to Petit re: ROD 09/25/01 DEQ

13 01 10 ROD DEQ email to Talgo re: ROD on line 09/20/01 DEQ

13 01 10 ROD Phone Log: Talgo LRC 09/21/01

13 01 10 ROD DEQ internal letter re: ROD 09/24/01 DEQ internal

13 01 10 ROD Phone Log - Golnar 10/30/01

13 01 10 ROD RTI fax to DEQ re: meeting 11/13/01 RTI

13 01 10 ROD Meeting sign in sheet 11/14/01

13 01 10 ROD Public meeting minutes 11/14/01

13 01 10 ROD DEQ email to PCEC re: Meeting 11/15/01 DEQ

13 01 10 ROD DEQ internal email re: Meeting 11/15/01 DEQ internal

13 01 10 ROD DEQ transmittal to RTI re: ROD 11/24/01 DEQ

13 01 10 ROD DEQ transmittal to Billau re: ROD 11/30/01 DEQ

13 01 10 ROD Phone Log - Blicker/RTI 01/31/02

13 01 10 ROD 06/25/07 EPA

13 01 10 ROD PCEC Newsletter – Fall 2007 11/20/07 PCEC

13 01 10 01 ROD

13 01 10 01 ROD Public Hearing Transcript 10/22/98

13 01 10 01 ROD DEQ email 05/25/99 DEQ

13 01 10 01 ROD Phone Log: Internal 09/01/99 DEQ internal

13 01 10 01 ROD Attorney letter to Steve Golnar re: Well Moratorium 09/17/99 DEQ legal

13 01 10 01 ROD City Memo re: Well head protection 10/14/99 City of Livingston

13 01 10 01 ROD DEQ letter to BNSF re: Free Product recovery, CGWA 10/21/99 DEQ

13 01 10 01 ROD Park CO. letter to DEQ requesting CGWA 12/28/99 Park Co.

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

D Hammer/EPA email to envirocouncil@imt FW re: TAG Award

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

Page 74: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 74 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 10 01 ROD DEQ internal email re: CGWA 03/20/00 DEQ internal

13 01 10 01 ROD DEQ fax to Envirocon re: Plume Boundaries 04/24/00 DEQ

13 01 10 01 ROD DEQ internal email re: CGWA Application forms 08/17/00 DEQ internal

13 01 10 01 ROD City of Livingston fax to DEQ re: Meeting Agenda 09/08/00 City of Livingston

13 01 10 01 ROD Phone Log: Golnar 09/08/00

13 01 10 01 ROD DEQ internal email re: CGWA 09/12/00 DEQ internal

13 01 10 01 ROD PCEC letter to City re: CGWA 09/15/00 PCEC

13 01 10 01 ROD Phone Log: Land & Water 12/11/00

13 01 10 01 ROD Joe Meek email to DEQ re: Well Ordinance 01/25/01 Joe Meek

13 01 10 01 ROD DEQ email to Russell Levens 02/01/01 DEQ

13 01 10 01 ROD PCEC letter to DEQ re: CGWA 04/14/01 PCEC

13 01 10 01 ROD PCEC letter to DEQ 05/04/01 PCEC

13 01 10 01 ROD DEQ Briefing paper re: ROD 05/10/01 DEQ

13 01 10 01 ROD DEQ internal meeting minutes 05/10/01 DEQ internal

13 01 10 01 ROD DEQ internal email re: Meeting 05/18/01 DEQ internal

13 01 10 01 ROD Meeting minutes 06/07/01

13 01 10 01 ROD PCEC letter to DEQ re: 2000 Groundwater report 06/22/01 PCEC

13 01 10 01 ROD Meeting Presentation

13 01 10 01 ROD Phone Log: Bill Harris (2001)

13 01 10 01 ROD Meeting minutes 07/07/01

13 01 10 01 ROD DEQ internal email re: Additional hire 07/13/01 DEQ internal

13 01 10 01 ROD DEQ internal email re: Meeting 08/02/01 DEQ internal

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

Page 75: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 75 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 10 01 ROD Meeting Attendance 08/16/01

13 01 10 01 ROD Envirocon email to DEQ re: Meeting minutes 08/21/01 Envirocon

13 01 10 01 ROD Record of Decision 09/01/01

13 01 10 01 ROD DEQ letter to BNSF re: MW Network 10/22/01 DEQ

13 01 10 01 ROD Phone Log: Golnar 10/30/01

13 01 10 01 ROD RTI fax to DEQ re: Meeting 11/13/01 RTI

13 01 10 01 ROD Meeting sign in sheet 11/14/01

13 01 10 01 ROD Public meeting minutes 11/14/01

13 01 10 01 ROD Phone Log: Miller (2002)

13 01 10 01 ROD Phone Log: Blicker/RTI 01/31/02

13 01 10 01 CD ROD DEQ letter to BNSF re: Task I Addendum # 1 03/13/06 DEQ

13 01 10 01 ROD DEQ letter to BNSF re Task I Addendum # 1 03/16/06 DEQ

13 01 10 02 ROD Free Product

13 01 10 02 ROD Free Product DEQ internal fax re: Free product recovery EPA ruling 10/09/92 DEQ internal

13 01 10 02 ROD Free Product DEQ internal email re: Phone call, McDonough 9/1097 DEQ internal

13 01 10 02 ROD Free Product Y ** DEQ internal email re: Call from Envirocon's counsel 07/17/05 DEQ internal

13 01 10 02 ROD Free Product Cole letter to DEQ re: Proposed Plan (Retyped) 10/05/98 Cole

13 01 10 02 ROD Free Product DEQ internal email re: Free Product Status Report 10/18/98 DEQ internal

13 01 10 02 ROD Free Product McGee letter to DEQ re: Proposed Plan (Retyped) 10/19/98 McGee

13 01 10 02 ROD Free Product Geotech fax to DEQ re: Passive skimmers 10/29/98 Geoteck

13 01 10 02 ROD Free Product MRL letter to DEQ re: Comments on Proposed Plan 11/05/98 MRL

13 01 10 02 ROD Free Product PCEC letter to DEQ re: Proposed Plan 11/19/98 PCEC

13 01 10 02 ROD Free Product 11/22/98 City of Livingston

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

Controlled Groundwater Area

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

City of Livingston letter to DEQ re: Comments on Proposed Plan, w/attachments (11/22/98)

Page 76: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 76 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 10 02 ROD Free Product BKBH letter to DEQ re: BNSF comments to Proposed Plan 11/23/98 BKBH

13 01 10 02 ROD Free Product 11/24/98 DEQ

13 01 10 02 ROD Free Product HSI Geotrans memo to DEQ re: Hydrocarbon Remedy 02/12/99 Geotrans

13 01 10 02 ROD Free Product Envirocon letter to DEQ re: Pump tests 09/03/99 Envirocon

13 01 10 02 ROD Free Product Phone Log - Wieringa/Envirocon 09/07/99 Envirocon

13 01 10 02 ROD Free Product Envirocon fax to DEQ re: Well product data (page 2 only) 09/07/99 Envirocon

13 01 10 02 ROD Free Product Envirocon letter to DEQ re: Pump evaluation 09/09/99 Envirocon

13 01 10 02 ROD Free Product Envirocon fax to DEQ re: Product levels graph 09/10/99 Envirocon

13 01 10 02 ROD Free Product Envirocon fax to DEQ re: Product levels graph 09/16/99 Envirocon

13 01 10 02 ROD Free Product Internal DEQ email re: Free product removal survey results 09/21/99 DEQ internal

13 01 10 02 ROD Free Product DEQ letter to BNSF re: Diesel fuel recovery 10/21/99 DEQ

13 01 10 02 ROD Free Product Envirocon letter to DEQ re: Pump evaluation 10/27/99 Envirocon

13 01 10 02 ROD Free Product DEQ fax to Envirocon re: Hydrocarbon Pumps 11/08/99 DEQ

13 01 10 02 ROD Free Product HSI Geotrans memo to DEQ re: Hydrocarbon recovery rates 12/29/99 Geotrans

13 01 10 02 ROD Free Product 01/03/00 Envirocon

13 01 10 02 ROD Free Product DEQ internal memo re: Free product recovery 01/04/00 DEQ internal

13 01 10 02 ROD Free Product HSI Geotrans memo to DEQ re: Text for ROD 01/27/00 Geotrans

13 01 10 02 ROD Free Product Park St. well data received from Wieringa/Envirocon 02/14/00 Envirocon

13 01 10 02 ROD Free Product Phone Log - Wieringa/Envirocon 10/18/00 Envirocon

13 01 10 02 ROD Free Product DEQ internal email re: Vacuum-enhanced recovery 10/18/00 DEQ internal

13 01 10 02 01 ROD

13 01 10 02 01 ROD Land & Water letter to DEQ re: Statement of qualifications 10/15/98 Land & Water

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information DEQ Memo re: BNSF & Envirocon comments to Proposed Plan

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

Envirocon letter to DEQ re: Free product recovery equipment evaluation

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

Statement of Qualifications (Free Product Recovery)

1164/ 34A506

Site-Wide Information

Statement of Qualifications (Free Product Recovery)

Page 77: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 77 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 10 02 01 ROD HSI Geotrans letter to DEQ re: Statement of qualifications 10/16/98 Geotrans

13 01 10 02 01 ROD 10/21/98 MSE-HKM

13 01 10 03 ROD ROD References

13 01 10 03 ROD ROD References Journal article - Bioremediation (Winter 1989)

13 01 10 03 ROD ROD References US EPA memo re: Superfund Decision Documents 02/18/92 EPA

13 01 10 03 ROD ROD References US EPA memo re: Technical Impractability 10/04/93 EPA

13 01 10 03 ROD ROD References ROD Abstract 09/28/94

13 01 10 03 ROD ROD References 09/01/96 EPA

13 01 10 03 ROD ROD References Park County Zoning Plan 01/01/97

13 01 10 03 ROD ROD References Example of ROD language re: Asbestos 06/25/97

13 01 10 03 ROD ROD References 11/23/98

13 01 10 03 ROD ROD References

13 01 10 03 ROD ROD References EPA Superfund Record of Decision: Interim Actions 09/01/99 EPA

13 01 10 03 ROD ROD References

13 01 10 03 ROD ROD References

13 01 10 03 ROD ROD References 08/01/01 DEQ

13 01 11 RD/RA

13 01 11 RD/RA General Field Notes – books 5/9-11/17/06

13 01 11 RD/RA General Field Notes – books

13 01 11 00 RD/RA Statement of Work

13 01 11 00 RD/RA Statement of Work DEQ internal email re: SOW 09/12/01 DEQ internal

13 01 11 00 RD/RA Statement of Work Phone Log - BN to DEQ 02/28/02 BN

1164/ 34A506

Site-Wide Information

Statement of Qualifications (Free Product Recovery)

1164/ 34A506

Site-Wide Information

Statement of Qualifications (Free Product Recovery)

MSE-HKM letter to DEQ re: Statement of qualifications, passive diesel fuel recovery

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

EPA Report - How to Effectively Recover Free Product at LUST Sites

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

Mass Loss from LNAPL Pools Under Fluctuating Water Table Conditions

1164/ 34A506

Site-Wide Information

Draft - Presumptive Response Strategy & Ex-Situ Treatment Technologies for Contaminated GW at CERCLA sites

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

Soil, Bedrock & GW Sampling Using Rotasonic Drilling Techniques

1164/ 34A506

Site-Wide Information

A Guide to Developing & Documenting Cost Estimates During the Feasibility Study

1164/ 34A506

Site-Wide Information

DEQ memo re: LNAPL Recovery (1/4/00) Livingston Planning/Zoning Map

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

1164/ 34A506

Site-Wide Information

11/17/06-6/19/09

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 78: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 78 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 00 RD/RA Statement of Work Tetra Tech letter to DEQ re: SOW review 04/26/02 TetraTech

13 01 11 00 RD/RA Statement of Work Tetra Tech Transmittal to DEQ re: Draft SOW 05/09/02 TetraTech

13 01 11 00 RD/RA Statement of Work Draft Statement of Work for RD/RA 05/01/02 TetraTech

13 01 11 00 RD/RA Statement of Work DEQ transmittal to BNSF re: Draft SOW 05/30/02 DEQ

13 01 11 00 RD/RA Statement of Work Draft Statement of Work for RD/RA red line version 06/01/02 TetraTech

13 01 11 00 RD/RA Statement of Work Tetra Tech Transmittal to DEQ Red Line Draft SOW 06/24/02 TetraTech

13 01 11 00 RD/RA Statement of Work BKBH letter to DEQ re: Comments to ROD 07/01/02 BKBH

13 01 11 00 RD/RA Statement of Work DEQ memo to files re: BNSF proposed changes to SOW 07/01/02 DEQ

13 01 11 00 RD/RA Statement of Work DEQ internal email re: BKBH letter of 7/1/02 07/03/02 DEQ internal

13 01 11 00 RD/RA Statement of Work Phone Log: Blicker/RTI 06/07/04

13 01 11 00 RD/RA Statement of Work Phone Log: Smith/BNSF 07/12/04

13 01 11 00 RD/RA Statement of Work Draft Statement of Work for RD/RA 09/01/04

13 01 11 00 RD/RA Statement of Work Phone Log - Smith/BN re: Livingston & Mission Wye SOWs 09/02/04

13 01 11 00 RD/RA Statement of Work DEQ email to BN re: Bedrock Aquifier data 09/08/04 DEQ

13 01 11 00 RD/RA Statement of Work Y 10/11/04 DEQ

13 01 11 00 RD/RA Statement of Work PCEC comments to Draft modified CD & SOWs 10/13/04 PCEC

13 01 11 00 RD/RA Statement of Work Y ** DEQ/BN Meeting notes - Martin 10/26/04

13 01 11 00 RD/RA Statement of Work Y ** DEQ/BN Meeting notes - Sivers 10/26/04

13 01 11 00 RD/RA Statement of Work Y ** DEQ meeting notes 01/01/05 DEQ

13 01 11 00 RD/RA Statement of Work DEQ fax to K/J re: Purge Water Policy (1/12/05) 01/12/05 DEQ

13 01 11 00 RD/RA Statement of Work K/J fax to DEQ re: Purge Water Policy 01/12/05 KJ

13 01 11 00 RD/RA Statement of Work Y ** DEQ email to BN re: High Priority Tasks M 01/21/05 DEQ

13 01 11 00 RD/RA Statement of Work DEQ internal email re: Survey Benchmarks 01/21/05 DEQ internal

13 01 11 00 RD/RA Statement of Work DEQ internal email re: Lead modeling fate & transport 01/26/05 DEQ internal

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

** DEQ meeting minutes - conference call w/BN, Attorneys & consultants

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 79: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 79 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 00 RD/RA Statement of Work Y ** Meeting notes - Sivers 01/26/05 DEQ

13 01 11 00 RD/RA Statement of Work Y ** DEQ internal email re: Defining facility boundary (1/26/05) 01/26/05 DEQ internal

13 01 11 00 RD/RA Statement of Work Y ** DEQ email to BN re: SOW Attachment 2 01/28/05 DEQ

13 01 11 00 RD/RA Statement of Work Y ** DEQ internal emails re: SOW issues 01/28/05 DEQ internal

13 01 11 00 RD/RA Statement of Work Y ** DEQ internal emails re: VPH 01/28/05 DEQ internal

13 01 11 00 RD/RA Statement of Work Y ** DEQ internal emails re: EPC calculation 01/31/05 DEQ internal

13 01 11 00 RD/RA Statement of Work Y ** K/J emailed deviations language to DEQ 02/01/05 KJ

13 01 11 00 RD/RA Statement of Work Y ** DEQ email to BN re: Plume Map language 02/02/05 DEQ

13 01 11 00 RD/RA Statement of Work Y ** Meeting notes - Sivers 02/02/05 DEQ

13 01 11 00 RD/RA Statement of Work Y 02/04/05 Henderson

13 01 11 00 RD/RA Statement of Work Conference call notes - Sivers 02/08/05 DEQ/Sivers

13 01 11 00 RD/RA Statement of Work Y ** Phone Log - Norris/K/J re: SOW Attachments 02/11/05 KJ/Norris

13 01 11 00 RD/RA Statement of Work Y ** DEQ internal email re: Risk Assessment 02/11/05 DEQ

13 01 11 00 RD/RA Statement of Work DEQ internal email re: Fate & Transport modeling 2/11/05 DEQ

13 01 11 00 RD/RA Statement of Work Y ** K/J email to DEQ re: Plume Map language 02/14/05 KJ

13 01 11 00 RD/RA Statement of Work DEQ internal emails re: VPH vs. GRO data 2/17/05 DEQ

13 01 11 00 RD/RA Statement of Work DEQ internal emails re: Protection of Groundwater 02/17/05 DEQ

13 01 11 00 RD/RA Statement of Work Phone Log - K/J to DEQ re: Spring 2005 SOW 02/23/05 DEQ

13 01 11 00 RD/RA Statement of Work Y ** DEQ internal email re: TI waivers 03/02/05 DEQ

13 01 11 00 RD/RA Statement of Work Y ** DEQ email to BN re: SOW Attachments 4/11/05 DEQ

13 01 11 00 RD/RA Statement of Work Y ** DEQ Draft Spring SOW 04/05/11 DEQ

13 01 11 00 RD/RA Statement of Work Y ** DEQ internal emails re: Screening Levels 4/11-4/18/05 DEQ

13 01 11 00 RD/RA Statement of Work Y ** DEQ email to BN re: Draft Spring SOW 04/29/05 DEQ

13 01 11 00 RD/RA Statement of Work Y ** BNSF proposed language for SOW 05/05/11 DEQ

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

** Phone Log - Henderson to DEQ re Fate & Transport Modeling

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 80: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 80 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 00 RD/RA Statement of Work Y ** DEQ email to BN re: Draft Spring SOW 5/5/05 DEQ

13 01 11 00 RD/RA Statement of Work Y ** DEQ Draft Spring SOW 05/05/05 DEQ

13 01 11 00 RD/RA Statement of Work Y ** BN Livingston SOW meeting notes 05/05/05

13 01 11 00 RD/RA Statement of Work Y ** DEQ internal email re: PAHs in Surface Soil Task 5/6/05 DEQ

13 01 11 00 RD/RA Statement of Work Y ** Phone Log - Smith/BN to DEQ 05/06/05 BN/Smith

13 01 11 00 RD/RA Statement of Work K/J email to DEQ re: Dual purpose bioventing wells 5/7/05 KJ

13 01 11 00 RD/RA Statement of Work Y ** DEQ internal email re: Vinyl Chloride GW Cleanup Level 5/9/05 DEQ

13 01 11 00 RD/RA Statement of Work Y ** BN Livingston Surface soil requirements meeting notes 5/9/05

13 01 11 00 RD/RA Statement of Work Y 06/09/05 DEQ

13 01 11 00 RD/RA Statement of Work DEQ email to J/K re: SOW attachment # 2 06/22/05 DEQ

13 01 11 00 RD/RA Statement of Work Y ** DEQ email to BN re: Spring SOW 06/27/05 DEQ

13 01 11 00 RD/RA Statement of Work Y ** DEQ email to BN/K/J re: Final Spring SOW 06/30/05 DEQ

13 01 11 00 RD/RA Statement of Work

13 01 11 00 RD/RA Statement of Work DEQ letter to Talgo-LRC re: Spring 2005 SOW 07/01/05 DEQ

13 01 11 00 RD/RA Statement of Work DEQ letter to MRL re: Spring 2005 SOW 07/01/05 DEQ

13 01 11 00 RD/RA Statement of Work DEQ letter to Park Co Sanitarian re: Spring 2005 SOW 07/01/05 DEQ

13 01 11 00 RD/RA Statement of Work 07/01/05 DEQ

13 01 11 00 RD/RA Statement of Work 07/01/05 DEQ

13 01 11 00 RD/RA Statement of Work DEQ letter to PECE re: Spring 2005 SOW 7/1/05 DEQ

13 01 11 00 RD/RA Statement of Work DEQ letter to RTI re: Spring 2005 SOW 7/1/05 DEQ

13 01 11 00 RD/RA Statement of Work DEQ/BN/KJ emails re: ERCL Tables DEQ

13 01 11 00 RD/RA Statement of Work Final Statement of Work for Spring 2005 Activities 08/09/05

13 01 11 00 RD/RA Statement of Work 08/22/05 BN

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

** DEQ email to BN - Final draft Spring SOW w/SOW attached

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Draft Spring 2005 SOW (June 2005) Out for Public Comment July 6-August 5, 2005

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ letter to Park County Commissioners re: Spring 2005 SOW

Site-Wide Information

DEQ letter to Livingston City Commissioners re: Spring 2005 SOW

Site-Wide Information

Site-Wide Information

Site-Wide Information

7/21/05-7/29/05

Site-Wide Information

Site-Wide Information

BNSF/M Stehly letter to DEQ Division Administrator/Olsen re: BN Agreement to conduct Spring SOW

Page 81: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 81 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 00 RD/RA Statement of Work Y 08/22/05 BN/M Stehly

13 01 11 00 RD/RA Statement of Work SOW Meeting Agenda 09/01/05

13 01 11 00 RD/RA Statement of Work DEQ email to BNSF re: Effective dates of Spring SOW 09/20/05 DEQ

13 01 11 00 RD/RA Statement of Work K/J letter to DEQ re: Master Schedule for Spring SOW 10/13/05 KJ

13 01 11 00 RD/RA Statement of Work Master Schedule for Spring SOW 10/13/05

13 01 11 00 RD/RA Statement of Work DEQ letter/fax to BNSF re: Draft Master Schedule comments 10/29/05 DEQ

13 01 11 00 RD/RA Statement of Work 11/16/05 KJ

13 01 11 00 RD/RA Statement of Work DEQ letter to BNSF re: BN Contact 04/28/06 DEQ

13 01 11 00 CD RD/RA Statement of Work Task F, Task G, Task L (Rev 1) – ERCLs and Figure 05/01/06 KJ

13 01 11 00 RD/RA Statement of Work DEQ/KJ emails re: Fate and Transport 02/28/07

13 01 11 00 RD/RA Statement of Work DEQ/KJ emails re: Fate and Transport 02/28/07

13 01 11 00 RD/RA Statement of Work KJ email to DEQ re: Livingston Deliverable 8/30/07 KJ

13 01 11 00 RD/RA Statement of Work 8/30/10

13 01 11 00 01 RD/RA

13 01 11 00 01 RD/RA Envirocon Confirmation Soil Sampling Report 12/05/95 Envirocon

13 01 11 00 01 RD/RA Envirocon Data Summaries 07/01/02 Envirocon

13 01 11 00 01 RD/RA DEQ letter to RTI re: Data Summaries 07/03/02 DEQ

13 01 11 00 01 RD/RA Tetra Tech email to DEQ re: Data Summary Report 07/22/02 TetraTech

13 01 11 00 01 RD/RA Tetra Tech Comments to DEQ re: Data Summary Report 08/01/02 TetraTech

Site-Wide Information

** BNSF/M Stehly letter to DEQ Division Administrator/Olsen re: BN Agreement to conduct Spring SOW

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

K/J letter to DEQ re: Updated Master Schedule for Spring SOW plus electronic version

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Memorandum re: Determination that Statement of Work for Spring 2005 Activities Negotiations should be filed in public files

DEQ Legal/ Haque-Hausrath

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Page 82: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 82 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 00 01 RD/RA 11/22/05 KJ

13 01 11 00 01 RD/RA 02/01/06 KJ

13 01 11 00 01 RD/RA 03/02/06 DEQ internal

13 01 11 00 01 RD/RA 03/07/06 CDM

13 01 11 00 01 RD/RA 03/08/06 DEQ

13 01 11 00 01 RD/RA 03/08/06 B Hartman

13 01 11 00 01 RD/RA K/J email to DEQ re: Task I Addendum # 1 reference 03/09/06 KJ

13 01 11 00 01 RD/RA B Hartman email to DEQ re: Task I Addendum # 1 03/09/06 B Hartman

13 01 11 00 01 RD/RA CDM email to DEQ re: Task I Addendum #1 reference 03/10/06 CDM

13 01 11 00 01 RD/RA K/J email to DEQ re: Task I Addendum # 1 03/10/06 KJ

13 01 11 00 01 RD/RA B Hartman email to DEQ re: Task I Addendum # 1 reference 03/14/06 B Hartman

13 01 11 00 01 RD/RA Phone Log – K/J & DEQ re: Task I Addendum 03/16/06

13 01 11 00 01 RD/RA 03/16/06 DEQ

13 01 11 00 01 RD/RA K/J email to DEQ re: Task I Addendum # 1 start date 03/17/06 KJ

13 01 11 00 01 RD/RA 03/22/06 KJ

1084/ 58M102

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 SOW Quarterly status report # 1 - August thru October 2005

1084/ 58M102

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 SOW Quarterly status report # 2 - November, December 2005, January 2006

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

DEQ internal email - Phone Log – DEQ & BNSF re: Task I Addendum # 1

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

CDM letter to DEQ re: CDM comments to Task I Addendum # 1 Draft

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

DEQ email to B Hartman & K/J re: Task I Addendum # 1 reference

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

B Hartman email to DEQ & K/J re: Task I Addendum # 1 reference

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

DEQ email to BNSF, K/J, RTI, A Aldersley & L Vachowski re: Task I Addendum correction

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

K/J email to DEQ re: Implementation of Amendment #1 to Task I SI Work Plan

Page 83: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 83 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 00 01 RD/RA DEQ internal email re: Task I Addendum # 1 start 03/27/06 DEQ internal

13 01 11 00 01 RD/RA DEQ email to K/J re: Task I start confirmation/4-5-06 03/29/06 DEQ

13 01 11 00 01 RD/RA K/J email to DEQ re: Task I schedule for 4/06 03/29/06 KJ

13 01 11 00 01 RD/RA DEQ internal email re: Task I preliminary results 05/02/06 DEQ internal

13 01 11 00 01 RD/RA 05/01/06 KJ

13 01 11 00 01 RD/RA Y ** DEQ internal email re: Status of different Task Orders 05/11/06 DEQ internal

13 01 11 00 01 RD/RA 08/01/06 KJ

13 01 11 00 01 RD/RA 11/01/06 KJ

13 01 11 00 01 RD/RA 02/01/07 KJ

13 01 11 00 01 RD/RA 05/01/07 KJ

13 01 11 00 01 RD/RA 08/01/07 KJ

13 01 11 00 01 RD/RA 11/01/07 KJ

13 01 11 00 01 RD/RA 02/01/08 KJ

13 01 11 00 01 RD/RA 05/01/08 KJ

13 01 11 00 01 RD/RA 08/01/08 KJ

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

1084/ 58M102

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 Statement of Work Quarterly Status Report # 3 (Feb, March, April 2006)

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

1084/ 58M102

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 Statement of Work Quarterly Status Report No 4 (May, June, July 2006)

1084/ 58M102

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 Statement of Work Quarterly Status Report No 5 (August, Sept, Oct 2006)

1084/ 58M102

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 Statement of Work Quarterly Status Report No 6 (Nov, Dec 2006, Jan 2007)

1084/ 58M102

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 Statement of Work Quarterly Status Report No 7 - Feb, March April 2007

1084/ 58M102

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 Statement of Work Quarterly Status Report No 8 – May, June, & July 2007

1084/ 58M102

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 Statement of Work Quarterly Status Report No 9 –August, Sept, & October 2007

1084/ 58M102

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 Statement of Work Quarterly Status Report No 10 –November, December 2007, January 2008

1085/ 48F602

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 Statement of Work Quarterly Status Report No 11 –February, March, April 2008

1085/ 48F602

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 Statement of Work – Quarterly Status Report No. 12

Page 84: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 84 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 00 01 RD/RA 11/01/08 KJ

13 01 11 00 01 RD/RA 02/01/09 KJ

13 01 11 00 01 RD/RA 05/01/09 KJ

13 01 11 00 01 RD/RA 08/01/09 KJ

13 01 11 00 01 RD/RA 11/01/09 KJ

13 01 11 00 01 RD/RA 02/01/10 KJ

13 01 11 00 01 RD/RA 05/01/10 KJ

13 01 11 00 01 RD/RA 08/01/10 KJ

13 01 11 00 01 RD/RA 11/01/10 KJ

13 01 11 00 01 RD/RA 02/25/11 KJ

13 01 11 00 01 RD/RA 05/04/11 DEQ/ Reynolds

13 01 11 00 01 05/27/11 KJ/Adlersley

13 01 11 00 01 RD/RA 05/27/11 KJ

13 01 11 00 01 CD RD/RA 08/30/11 KJ

13 01 11 00 01 CD RD/RA 11/29/11 KJ

1085/ 48F602

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 Statement of Work Quarterly Status Report No 13 – August, September, October 2008

1085/ 48F602

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 SOW Quarterly Status Report # 14 Feb – February 2009

1085/ 48F602

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 SOW Quarterly Status Report # 15 Feb – April 2009

1085/ 48F602

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 SOW Quarterly Status Report # 16 May, June, & July 2009

1086/ 48F603

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 SOW Quarterly Status Report # 17 August, September & October 2009

1086/ 48F603

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 SOW Quarterly Status Report # 18 November, December 2009, January 2010

1086/ 48F603

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 SOW Quarterly Status Report # 19, February, March April 2010

1086/ 48F603

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 SOW Quarterly Status Report # 20, May, June, & July 2010

1086/ 48F603

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 SOW Quarterly Status Report # 21 Vol I-III, August, September & October 2010 (Vol II-III @RM)

1087/ 48F604

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 SOW Quarterly Status Report # 22 Vol I-II, November, December 2010, & January 2011 (Vol II @ RM)

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

DEQ/Reynolds letter to BN/Smith re: 2/25/11 Spring 2005 SOW Quarterly Status Report # 22

(SOW) Data Summary & Confirmation Sampling Reports

K/J/Aldersley email to DEQ/Reynolds re: Livingston Deliverables Spring 2005 SOW Quarterly Status Report # 23 Vol I-II, February, March, & April 2011 to be sent UPS

1087/ 48F604

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 SOW Quarterly Status Report # 23 Vol I-II, February, March, & April 2011 (Vol II @RM)

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 SOW Quarterly Status Report # 24 May, June, July 2011 (CD of Reports 22, 23 & 24)

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 SOW Quarterly Status Report # 25 August, September & October 2011

Page 85: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 85 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 00 01 CD RD/RA 02/28/12 KJ

13 01 11 00 01 CD RD/RA 05/31/12 KJ

13 01 11 00 01 CD RD/RA 08/30/12 KJ

13 01 11 00 01 RD/RA 08/30/12 KJ+P2

13 01 11 00 01 CD RD/RA 11/29/12 KJ

13 01 11 00 01 CD RD/RA 02/27/13 KJ

13 01 11 00 01 RD/RA 05/30/13 KJ

13 01 11 00 01 CD RD/RA 05/31/13 KJ

13 01 11 00 01 CD RD/RA Aug. 2013 KJ

13 01 11 01 RD/RA

13 01 11 01 RD/RA PCEC letter re: CGWA 9/12/01 PCEC

13 01 11 01 RD/RA Phone Log: McCaffery-Environcon 10/03/01

13 01 11 01 RD/RA DEQ letter to BNSF re: CGWA 10/22/01 DEQ

13 01 11 01 RD/RA DNRC email to DEQ re: CGWA 01/19/02 DNRC

13 01 11 01 RD/RA DEQ letter to BNSF re: Plume Maps 01/30/02 DEQ

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 SOW Quarterly Status Report # 26 November, December 2011, January 2012

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 SOW Quarterly Status Report # 27 February, March & April 2012

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

KJ/Aldersley email to DEQ/Reynolds re: Livingston deliverables - Spring 2005 SOW Quarterly Status Report # 28 May, June, July 2012

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 SOW Quarterly Status Report # 28 May, June, July 2012

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 SOW Quarterly Status Report # 29 August, September, October 2012

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 SOW Quarterly Status Report # 30 November, December 2012, January 2013

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

KJ/Norris Cover letter to DEQ Reynolds re: Spring 2005 SOW Quarterly Status Report # 31 (Feb,Mar,Apr 2013)

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 SOW Quarterly Status Report # 31 (Feb,Mar,Apr 2013)

Site-Wide Information

(SOW) Data Summary & Confirmation Sampling Reports

Spring 2005 SOW Quarterly Status Report # 32 (May, Jun, July 2013)

Site-Wide Information

Implementation of Controlled Groundwater Area

Site-Wide Information

Implementation of Controlled Groundwater Area

Site-Wide Information

Implementation of Controlled Groundwater Area

Environcon/McCaffery

Site-Wide Information

Implementation of Controlled Groundwater Area

Site-Wide Information

Implementation of Controlled Groundwater Area

Site-Wide Information

Implementation of Controlled Groundwater Area

Page 86: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 86 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 01 RD/RA Phone Log: Blicker/RTI 01/31/02

13 01 11 01 RD/RA Phone Log: Smith-BNSF 02/28/02

13 01 11 01 RD/RA DEQ letter to BNSF re: Dan McCaffery 3/11/02 DEQ

13 01 11 01 RD/RA DEQ internal email re: CGWA 09/19/02 DEQ

13 01 11 01 RD/RA Conference call 06/02/04

13 01 11 01 RD/RA KJ email to DEQ re: Annual Inspection 07/21/08 KJ

13 01 11 02 RD/RA

13 01 11 02 RD/RA Copy of Interim Action Field Notes 2/90-2/91

13 01 11 02 RD/RA Copy of stained gravels information

13 01 11 02 RD/RA Miscellaneous Legal Interim Action information

13 01 11 02 RD/RA Miscellaneous Interim Action Information 07/02/02

13 01 11 02 RD/RA DEQ & Envirocon emails re: Interim Actions Chronology 10/25/06

13 01 11 02 RD/RA 02/26/07 CDM

Site-Wide Information

Implementation of Controlled Groundwater Area

Site-Wide Information

Implementation of Controlled Groundwater Area

Site-Wide Information

Implementation of Controlled Groundwater Area

Site-Wide Information

Implementation of Controlled Groundwater Area

Site-Wide Information

Implementation of Controlled Groundwater Area

Site-Wide Information

Implementation of Controlled Groundwater Area

Site-Wide Information

Tasks A & H Comprehensive Interim Action Confirmation Sampling

Site-Wide Information

Tasks A & H Comprehensive Interim Action Confirmation Sampling

Site-Wide Information

Tasks A & H Comprehensive Interim Action Confirmation Sampling

Site-Wide Information

Tasks A & H Comprehensive Interim Action Confirmation Sampling

Site-Wide Information

Tasks A & H Comprehensive Interim Action Confirmation Sampling

Site-Wide Information

Tasks A & H Comprehensive Interim Action Confirmation Sampling

Site-Wide Information

Tasks A & H Comprehensive Interim Action Confirmation Sampling

CDM letter to DEQ re: Request for BN to Prepare & Submit a Summary Report describing all Interim Actions & subsequent confirmation sampling performed at BN Shop Complex

Page 87: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 87 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 02 RD/RA 03/07/07

13 01 11 02 RD/RA DEQ internal email re: Interim Actions at BNLV 01/08/08 DEQ

13 01 11 02 RD/RA DEQ internal email re: Livingston Data Summary Report 1/10/08 DEQ

13 01 11 02 RD/RA 02/04/08 DEQ

13 01 11 02 RD/RA BN letter to DEQ re: Response to DEQ 2/4/08 letter 02/15/08 BN

13 01 11 02 RD/RA 02/13/08

13 01 11 02 RD/RA 04/17/08 KJ

13 01 11 03 RD/RA

13 01 11 03 RD/RA KJ fax to DEQ re: Sampling GW for Petroleum 2/24/05 KJ

13 01 11 03 RD/RA KJ letter to DEQ re: GW sampling for Task G 2/24/05 KJ

13 01 11 03 RD/RA DEQ letter to BN re: GW sampling 03/01/05 DEQ

Site-Wide Information

Tasks A & H Comprehensive Interim Action Confirmation Sampling

DEQ & CDM emails re: Interim Action Summary Report Request

Site-Wide Information

Tasks A & H Comprehensive Interim Action Confirmation Sampling

Site-Wide Information

Tasks A & H Comprehensive Interim Action Confirmation Sampling

Site-Wide Information

Tasks A & H Comprehensive Interim Action Confirmation Sampling

DEQ letter to D Smith/BN re: Request for Comprehensive Interim Action & Confirmation Sampling Summary Report

Site-Wide Information

Tasks A & H Comprehensive Interim Action Confirmation Sampling

Site-Wide Information

Tasks A & H Comprehensive Interim Action Confirmation Sampling

DEQ & CDM emails re: Interim Actions – Confirmation sampling report information

Site-Wide Information

Tasks A & H Comprehensive Interim Action Confirmation Sampling

Comprehensive Interim Action & Confirmation Sampling Summary Report

Site-Wide Information

Task G - "Cleanup of Dissolved- Phase Petroleum in Groundwater"

Site-Wide Information

Task G - "Cleanup of Dissolved- Phase Petroleum in Groundwater"

Site-Wide Information

Task G - "Cleanup of Dissolved- Phase Petroleum in Groundwater"

Site-Wide Information

Task G - "Cleanup of Dissolved- Phase Petroleum in Groundwater"

Page 88: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 88 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 03 RD/RA KJ email to DEQ re: MNA sampling 03/02/05 KJ

13 01 11 03 RD/RA KJ & BN emails re: MNA sampling KJ

13 01 11 03 RD/RA 04/05/05 KJ

13 01 11 03 RD/RA K/J email to DEQ re: Lab data w/attachments 4/5/05 KJ

13 01 11 03 RD/RA Meeting Notes - A Sivers/DEQ 04/21/05 DEQ/Sivers

13 01 11 03 RD/RA CDM email to DEQ re: Task G 07/06/07 CDM

13 01 11 03 RD/RA 02/28/08 KJ

13 01 11 03 RD/RA 04/19/11 DEQ/ Reynolds

13 01 11 03 01 RD/RA Work Plan

13 01 11 03 01 RD/RA Work Plan Draft Work Plan - Task G 05/31/05 KJ

13 01 11 03 01 RD/RA Work Plan Phone Log - K/J to DEQ - J Norris & J Lee 6/21/05 KJ

13 01 11 04 RD/RA 03/05/11 KJ

13 01 11 04 RD/RA DEQ comment letter to BN re: Facility-wide HASP 04/21/05 DEQ

13 01 11 04 RD/RA K/J response to DEQ comments facility-wide HASP 6/28/05 KJ

13 01 11 04 RD/RA Health & Safety Plan insert pages for March 2005 H&SP 6/28/05

Site-Wide Information

Task G - "Cleanup of Dissolved- Phase Petroleum in Groundwater"

Site-Wide Information

Task G - "Cleanup of Dissolved- Phase Petroleum in Groundwater"

March 3-4/2005

Site-Wide Information

Task G - "Cleanup of Dissolved- Phase Petroleum in Groundwater"

K/J fax to DEQ re: Request for Contained-in-decision for purge water from March 2005

Site-Wide Information

Task G - "Cleanup of Dissolved- Phase Petroleum in Groundwater"

Site-Wide Information

Task G - "Cleanup of Dissolved- Phase Petroleum in Groundwater"

Site-Wide Information

Task G - "Cleanup of Dissolved- Phase Petroleum in Groundwater"

Site-Wide Information

Task G - "Cleanup of Dissolved- Phase Petroleum in Groundwater"

Task G – Dissolved-Phase Petroleum Hydrocarbons in Groundwater Report

Site-Wide Information

Task G - "Cleanup of Dissolved- Phase Petroleum in Groundwater"

DEQ/Reynolds letter to BN/Smith re: 2/28/08 Letter report regarding Task G Dissolved-Phase Petroleum Hydrocarbons in GW

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Facility - Wide Health & Safety Plan

Site-Wide Information

Facility - Wide Health & Safety Plan

Site-Wide Information

Facility - Wide Health & Safety Plan

Site-Wide Information

Facility - Wide Health & Safety Plan

Page 89: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 89 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 04 RD/RA DEQ email to K/J re: ERCLs language 07/29/05 DEQ

13 01 11 04 RD/RA K/J email to DEQ re: Draft revised SAP section 8.0 08/01/05 KJ

13 01 11 04 RD/RA DEQ email to BN/K/J re: Haz Waste requirements for SAP 08/05/05 DEQ

13 01 11 04 RD/RA DEQ & K/J emails re: surveying of sample locations 08/05/05

13 01 11 04 RD/RA DEQ & K/J emails re: Domestic well sampling in SAP 8/5/05

13 01 11 04 RD/RA Health & Safety Plan insert pages for March 2005 H&SP 03/30/06

13 01 11 04 RD/RA Task Specific Health & Safety Plan 2011 02/11/11 KJ

13 01 11 04 RD/RA 03/08/12

13 01 11 04 RD/RA DEQ Health & Safety Plan for BN Livingston Shop Complex 10/16/12 DEQ/ Reynolds

13 01 11 05 CD RD/RA 03/05/11 KJ

13 01 11 05 RD/RA K/J letter to DEQ RCRA re: Facility-wide SAP 4/11/05 KJ

13 01 11 05 RD/RA DEQ RCRA letter to BNSF re: SAP 04/22/05 DEQ

13 01 11 05 RD/RA DEQ email to BN/K/J re: Copy of SAP to RTI 04/29/05 DEQ

13 01 11 05 RD/RA 05/24/05 KJ

13 01 11 05 RD/RA K/J email to DEQ re: QAPP table B4 06/22/05 KJ

13 01 11 05 RD/RA K/J email to DEQ re: VPH/EPH holding times 6/22/05 KJ

13 01 11 05 RD/RA 07/01/05 DEQ

13 01 11 05 RD/RA DEQ internal email re: SAP comments 07/18/05 DEQ

13 01 11 05 RD/RA DEQ email to BNSF re: SAP Title 07/22/05 DEQ

13 01 11 05 RD/RA DEQ email to BN re: SAP comments w/attachments 07/25/05 DEQ

13 01 11 05 RD/RA DEQ email to K/J re: Purge water treatment correspondence 8/1/05 DEQ

13 01 11 05 RD/RA Y ** DEQ internal email re: SAP - IDW soil & Water 8/10/05 DEQ

Site-Wide Information

Facility - Wide Health & Safety Plan

Site-Wide Information

Facility - Wide Health & Safety Plan

Site-Wide Information

Facility - Wide Health & Safety Plan

Site-Wide Information

Facility - Wide Health & Safety Plan

Site-Wide Information

Facility - Wide Health & Safety Plan

Site-Wide Information

Facility - Wide Health & Safety Plan

Site-Wide Information

Facility - Wide Health & Safety Plan

Site-Wide Information

Facility - Wide Health & Safety Plan

DEQ/Bucy (for Reynolds) letter to BN/Smith re: Shop Comples Task J Supplemental Investigation Report

Site-Wide Information

Facility - Wide Health & Safety Plan

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

K/J letter/fax to DEQ re: Investigation - Derived Residuals Management

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

DEQ letter/fax to BN re: DEQ comment letter-facility-wide SAP

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Page 90: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 90 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 05 RD/RA Y ** DEQ internal email re: SAP & RCRA issues 8/11/05 DEQ

13 01 11 05 RD/RA DEQ letter/fax to BN re: Revised section 8-0 08/12/05 DEQ

13 01 11 05 CD RD/RA Facility - Wide SAP revision 1 & 2 8/05 KJ

13 01 11 05 RD/RA Facility Wide SAP\ 08/25/05 KJ

13 01 11 05 RD/RA DEQ attorney email to BKBH re: SAP comments 08/30/05 DEQ

13 01 11 05 RD/RA 10/26/05 DEQ

13 01 11 05 RD/RA K/J email to DEQ re: SAP clarification - Air Shipping 11/1/05 KJ

13 01 11 05 RD/RA Phone Log - DEQ to K/J re: SAP clarification - Air Shipping 11/01/05 DEQ

13 01 11 05 RD/RA K/J letter to DEQ re: Revision pages to 8/05 Facility Wide SAP 12/9/05 KJ

13 01 11 05 RD/RA K/J email to DEQ re: SAP Oversight 02/15/06 KJ

13 01 11 05 RD/RA DEQ letter to BNSF re: Final SAP approval w/revisions 3/10/06 DEQ

13 01 11 05 RD/RA K/J letter to DEQ re: Final Sap revisions replacement pages 03/23/06 KJ

13 01 11 05 CD RD/RA Final Facility - Wide SAP 03/06/11 KJ

13 01 11 05 RD/RA DEQ & K/J emails re: DEQ Dec 2006 letter 1/9/07

13 01 11 05 RD/RA DEQ & K/J emails re: Sample receipts for private parties 01/29/07

13 01 11 05 CD RD/RA Facility Wide SAP Addendum No 1 1/07 KJ

13 01 11 05 RD/RA Facility Wide SAP Attachment DD

13 01 11 05 RD/RA DEQ internal emails re: VOC sampling at BNSF Facilities 2/1/07 DEQ

13 01 11 05 RD/RA Facility Wide SAP Addendum No 1 redline 6/07

13 01 11 05 CD RD/RA Facility Wide SAP Addendum No 1(Revision No 1) K/J, 6/07

13 01 11 05 RD/RA Replacement pages for Final Facility Wide SAP 6/07

13 01 11 05 RD/RA Facility Wide SAP Addendum No 2 11/27/07

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft DEQ letter to BNSF re: 2nd Draft SAP comments

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

received 2/28/07

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Page 91: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 91 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 05 RD/RA Y 11/29/07 DEQ internal

13 01 11 05 CD RD/RA 01/08/11

13 01 11 05 RD/RA 01/09/08 DEQ

13 01 11 05 RD/RA K/J email to DEQ re: Deliverables addendum 1 & 2 9 1/15/08 KJ

13 01 11 05 RD/RA Replacement pages for Facility Wide SAP 01/08/11

13 01 11 06 RD/RA

13 01 11 06 RD/RA K/J email to DEQ re: Sketch Map for new wells 04/27/05 KJ

13 01 11 06 RD/RA 4/27/05 KJ

13 01 11 06 RD/RA Map for Task F Scoping Meeting - Submitted to DEQ

13 01 11 06 RD/RA Meeting Notes - Denise Martin 04/28/05 DEQ / Martin

13 01 11 06 RD/RA Meeting Notes - 4/28/05 DEQ/ Amy Sivers

13 01 11 06 RD/RA Meeting Notes - Denise Martin 04/28/05 DEQ / Martin

13 01 11 06 RD/RA Draft map showing Historical MNA sampling 05/05/11

13 01 11 06 RD/RA KJ Letter to DEQ re: Groundwater monitoring event 11/05 10/28/05 KJ

13 01 11 06 RD/RA 12/09/05 CDM

13 01 11 06 RD/RA 01/24/06 KJ

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

** DEQ internal email re: DEQ legal – comments on Facility Wide SAP Addendum # 2

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Facility Wide SAP Addendum No 1 (Revision # 2) and Addendum No 2

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

DEQ letter to BNSF re: DEQ comments on Addenda No 1 & 2 of the SAP

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Facility - Wide Sampling & Analysis Plan + draft

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

K/J email to DEQ with attached discussion items for pre-WP meeting - task F

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Submitted 4/28/05

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

CDM Memorandum to DEQ re: CDM Oversight field notes from 2005 semi-annual GW monitoring

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

K/J email to DEQ re: Task F Stage 1 Part 2 postponement of submittal

Page 92: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 92 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 RD/RA 01/31/06 DEQ

13 01 11 06 RD/RA Y ** DEQ internal email re: Task F – 1 year requirement 02/02/06 DEQ

13 01 11 06 RD/RA 3/06 KJ

13 01 11 06 RD/RA DEQ internal email re: Chemox Work Plan comments 11/08/06 DEQ

13 01 11 06 RD/RA DEQ email to CDM re: Task F schedule 03/20/07 DEQ

13 01 11 06 RD/RA DEQ & K/J emails re: Task F questions & answers DEQ

13 01 11 06 RD/RA CDM email to DEQ re: Revised PDF 04/01/07 CDM

13 01 11 06 RD/RA DEQ & K/J emails re: GW analysis methods 05/07/07

13 01 11 06 RD/RA 05/24/06 KJ

13 01 11 06 RD/RA 06/12/06

13 01 11 06 RD/RA KJ/BNSF/DEQ emails re: Groundwater sampling 06/26/06

13 01 11 06 RD/RA KJ/DEQ emails re: Groundwater sampling status 06/16/06

13 01 11 06 RD/RA 10/31/06 KJ

13 01 11 06 RD/RA 04/27/07 KJ

13 01 11 06 RD/RA 4/29-5/1/07 KJ

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

DEQ email to K/J re: Postponement - Task F stage 1 Part 2 request/approval

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Task F Stage 1 – Part 2 Pilot Test Work Plan for Volatile Organic Compound-Containing Alluvial Aquifer GW

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

KJ Letter to DEQ re: June 2006 semiannual groundwater monitoring event

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

KJ/DEQ emails re: June 2006 semiannual groundwater monitoring event

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

KJ Letter to DEQ re: November 2006 semiannual groundwater monitoring event

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

KJ email to DEQ re: Attached figure showing well layout locations

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

KJ/DEQ emails re: Applied Geochemistry – Intrinsic Biodegradation of Diesel LNAPL article

Page 93: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 93 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 RD/RA 5/4-5/8/07

13 01 11 06 RD/RA KJ email to DEQ re: Mobile home analytical results 05/10/07 KJ

13 01 11 06 RD/RA 05/30/07

13 01 11 06 RD/RA

13 01 11 06 RD/RA KJ email to DEQ re: Electric Shop well locations 06/06/07 KJ

13 01 11 06 RD/RA 6/8-6/15/07

13 01 11 06 RD/RA KJ/DEQ emails re: Domestic water sampling program 6/15-6/20/07

13 01 11 06 RD/RA Private Well Sampling Analytical Results – June 2007 7/07

13 01 11 06 RD/RA KJ/DEQ emails re: Private well contact checklist 7/5/07

13 01 11 06 RD/RA KJ email to DEQ re: Task F items posted to website 7/17/07 KJ

13 01 11 06 RD/RA KJ email to DEQ re: Requested Task I information 7/26/07 KJ

13 01 11 06 RD/RA KJ/DEQ emails re: Task F items posted to website 07/27/07

13 01 11 06 RD/RA KJ emails to DEQ re: Task F items posted to website 7/27/07 KJ

13 01 11 06 RD/RA 8/1/07 KJ

13 01 11 06 RD/RA DEQ/KJ emails re: Krohne wells 08/03/07

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

KJ/DEQ emails re: Groundwater analyses for geochemical indicators of intrinsic biodegradation – ferrous iron

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

KJ/CDM/DEQ emails re: Task F Stage 1 Part 2 bench scale testing

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

CDM/DEQ emails re: Task F Stage 1 Part 2 bench scale testing (5/30/07-6/5/07)

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

CDM/DEQ emails re: Watson property/Confirmation of drilling activities

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

KJ email to DEQ re: Task F and Task D/E items posted to website

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Page 94: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 94 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 RD/RA DEQ email to KJ re: Updated figures 08/04/07 DEQ

13 01 11 06 RD/RA 08/07/07 DEQ

13 01 11 06 RD/RA 08/08/07

13 01 11 06 RD/RA Alpine Analytical - Sampling and analysis results 08/15/07 Alpine Analytical

13 01 11 06 RD/RA KJ/DEQ emails re: Task F groundwater sampling 08/23/07

13 01 11 06 RD/RA KJ email to DEQ re: Task F data posted to website 08/23/07 KJ

13 01 11 06 RD/RA 08/27/07 KJ

13 01 11 06 RD/RA 8/8-8/29/07

13 01 11 06 RD/RA KJ email to DEQ re: Task F data posted to website 8/31/07 KJ

13 01 11 06 RD/RA KJ email to DEQ re: Task F data posted to website 9/5/07 KJ

13 01 11 06 RD/RA KJ email to DEQ re: Second quarter sampling event 09/19/07 KJ

13 01 11 06 RD/RA KJ/DEQ emails re: Krohne wells 9/27-9/28/07

13 01 11 06 RD/RA DEQ/KJ emails re: MW-11 VOC data 09/28/07

13 01 11 06 RD/RA Alpine Analytical - Sampling and analysis results 10/1/07 Alpine Analytical

13 01 11 06 RD/RA KJ email to DEQ re: Task F items posted to website 10/12/07 KJ

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

DEQ letter to Krohnes re: Sampling associated with the BN Livingston Shop Complex

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater Task F Stage I Part 1 Domestic Water Sampling Program Status

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

KJ emails to DEQ re: Contact information for Grosvenor property

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

KJ/DEQ emails re: Second quarter sampling event and Boehm consent for access

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Page 95: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 95 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 RD/RA KJ email to DEQ re: Task F items posted to website 10/15/07 KJ

13 01 11 06 RD/RA KJ email to DEQ re: Task F items posted to website 10/17/07 KJ

13 01 11 06 RD/RA KJ email to DEQ re: Task F items posted to website 10/22/07 KJ

13 01 11 06 RD/RA 11/14/07

13 01 11 06 RD/RA KJ/DEQ emails re: Diffusion bag sampling 11/16/07

13 01 11 06 RD/RA KJ email to DEQ re: Private property sampling notifications 11/29/07 KJ

13 01 11 06 RD/RA KJ/DEQ emails re: Private property sampling notifications 11/29-12/3/07

13 01 11 06 RD/RA KJ/DEQ emails re: Third quarter sampling notification 11/9-12/3/07

13 01 11 06 RD/RA KJ/DEQ emails re: Third quarter GW sampling 11/26-12/3/07

13 01 11 06 RD/RA KJ/DEQ emails re: Third quarter sampling notification 12/3-12/5/07

13 01 11 06 RD/RA KJ/DEQ emails re: Third quarter sampling notification 11/9-12/13/07

13 01 11 06 RD/RA CDM well sampling oversight 12/19/07 CDM

13 01 11 06 RD/RA Alpine Analytical - Sampling and analysis results 12/28/07 Alpine Analytical

13 01 11 06 RD/RA Energy Labs – Diffusion bag results 01/11/08 Energy Labs

13 01 11 06 RD/RA DEQ email to KJ re: D Krohne phone call 01/16/08 DEQ

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

DEQ & K/J emails re: DEQ request for information about location of well identified as IT-1, IT-2 & IT-3

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Page 96: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 96 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 RD/RA KJ/DEQ emails re: Task F items posted to website 1/21-1/22/08

13 01 11 06 RD/RA DEQ/CDM emails re: Task F split samples (1/24/08-1/25/08)

13 01 11 06 RD/RA KJ/DEQ emails re: Fourth quarter sampling notification 02/22/08

13 01 11 06 RD/RA 02/22/08 KJ

13 01 11 06 RD/RA 2/22/08 KJ

13 01 11 06 RD/RA 02/22/08 KJ

13 01 11 06 RD/RA 3/17-3/18/08

13 01 11 06 RD/RA DEQ email to CDM re: Tracer test 03/31/08 DEQ

13 01 11 06 RD/RA KJ/CDM/DEQ emails re: Diffusion bag sampling 4/2-4/3/08

13 01 11 06 RD/RA KJ/DEQ emails re: Diffusion bag sampling 4/2-4/3/08

13 01 11 06 RD/RA KJ email to DEQ re: Task F items posted to website 04/22/08 KJ

13 01 11 06 RD/RA Replacement Task F items posted to website 4/25/08

13 01 11 06 RD/RA 05/08/08 KJ

13 01 11 06 RD/RA DEQ email to CDM re: March groundwater sampling letters 05/09/08 DEQ

13 01 11 06 RD/RA KJ letter to Mitchell re: Quarterly GW monitoring – June 2008 05/19/08 KJ

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

KJ Letter to Steffen re: Quarterly Groundwater Monitoring – March 2008

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

KJ Letter to Mitchell re: Quarterly Groundwater Monitoring – March 2008

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

KJ Letter to Krohne re: Quarterly Groundwater Monitoring – March 2008

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

KJ/ /BNSF/DEQ emails re: Weekly Task D/E design/construction meeting and diffusion bag sampling

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

KJ email to DEQ re: Task F Stage I Part 2 items posted to website

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Page 97: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 97 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 RD/RA KJ letter to Steffen re: Quarterly GW monitoring – June 2008 05/19/08 KJ

13 01 11 06 RD/RA KJ letter to Krohne re: Quarterly GW monitoring – June 2008 05/19/08 KJ

13 01 11 06 RD/RA 05/20/08

13 01 11 06 RD/RA 5/30/08 DEQ internal

13 01 11 06 RD/RA 06/13/08 DEQ

13 01 11 06 RD/RA KJ email to DEQ re: Private well sampling update 06/13/08 KJ

13 01 11 06 RD/RA KJ email to DEQ re: Private well sampling update 6/13-6/16/08 KJ

13 01 11 06 RD/RA KJ email to DEQ re: Voice mail regarding Krohne 06/18/08 KJ

13 01 11 06 RD/RA KJ/DEQ emails re: Sampling oversight 06/18/08

13 01 11 06 RD/RA 07/08/08

13 01 11 06 RD/RA 03/25/09

13 01 11 06 RD/RA 06/06/10 KJ/Norris

13 01 11 06 RD/RA Site Oversight Report 7/7/-7/16/10 CDM

13 01 11 06 RD/RA 02/01/12 KJ/Norris

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

KJ/DEQ emails re: Notification of Task F Stage I Part 1 June GW sampling event

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

DEQ internal email re: DEQ legal comments on 3/08 GW Monitoring Results & Modification Request

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

DEQ letter to BNSF re: Transmittal of 3/08 (4th Quarter) Task F Stage 1 Part 1 GW Monitoring Results and Request for Modifications to Task F Stage I Part 1 GW Monitoring Requirements

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

CDM/DEQ emails re: Planned response to comments and targeted field dates

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

K/J/ Aldersley email to DEQ/Reynolds re: Task F items posted to website   KJ/Adlersley

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

K/J/Norris letter to Kent Mitchell re: Semiannual GW sampling to be conducted week of June 20th

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

KJ/Norris letter for to Kent Mitchell re: Semiannual GW monitoring at the BN Shop Comples between February 15 & 24 2012

Page 98: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 98 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 RD/RA 11/27/13 Kennedy/Jenks

13 01 11 06 01 RD/RA

13 01 11 06 01 CD RD/RA Draft Work Plan - Task F 05/31/05 KJ

13 01 11 06 01 RD/RA RTI/PCEC comments - Task F Work Plan 08/05/05

13 01 11 06 01 RD/RA Y ** DEQ internal email re: Task F ERCLs 05/07/06 DEQ

13 01 11 06 01 RD/RA Y ** DEQ internal email re: Task F WP Section 5 SAP 05/07/06 DEQ

13 01 11 06 01 RD/RA Y ** DEQ internal email re: Task F Table 2 modifications 5/7/06 DEQ

13 01 11 06 01 RD/RA Y ** DEQ internal emails re: Task F revisions 05/08/06 DEQ

13 01 11 06 01 RD/RA Y ** DEQ internal emails re: Task F Question- COC or VOC 05/08/06 DEQ

13 01 11 06 01 RD/RA Y ** DEQ internal emails re: Task F completion date 5/8/06 DEQ

13 01 11 06 01 RD/RA 01/10/07 DEQ

13 01 11 06 01 RD/RA 02/05/07 CDM

13 01 11 06 01 RD/RA CDM email to DEQ re: Task F figures & Table 6 attachment 02/12/07 CDM

13 01 11 06 01 RD/RA CDM email to DEQ re: Revised figures attachment 2/13/07 CDM

13 01 11 06 01 RD/RA 2/13/07 CDM

13 01 11 06 01 RD/RA CDM email to DEQ re: Revised figures attachment 02/14/07 CDM

13 01 11 06 01 RD/RA 2/27/07 DEQ

13 01 11 06 01 CD RD/RA 02/07/11

13 01 11 06 01 CD RD/RA 03/07/11

13 01 11 06 01 CD RD/RA 04/07/11 DEQ

13 01 11 06 01 RD/RA 05/01/07 DEQ

Site-Wide Information

Task F - Cleanup of VOCs in Alluvial Groundwater

Groundwater Monitoring Program Directive No.1 - Proposal for modification of Groundwater Sampling Frequency and Analysis

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan DEQ email to Mark Hill/CDM re: Appendix l & capture zone 3

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

CDM Tech Memo to DEQ re: Review of Task F Stage 1 - Part1 Remedial Action Plan for VOC

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

CDM email to DEQ re: Comparison of Appendix D to Well Logs

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

DEQ letter to BNSF re: Enclosure of DEQ modified Task F Stage 1 - Part 1 Remedial Action Plan for VOC-Containing Alluvial Aquifer GW 5/05

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

CD ROM – Task F Stage 1 Part 1 Work Plan – CADD Files for Figures 21, 20A, 20B

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

CD ROM – Modified AutoCAD drawings related to Task F – VOC Plume Investigation

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Task F Stage 1- Part 1 Remedial Action Plan for VOC-Containing Alluvial Aquifer GW

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

DEQ letter/fax to BNSF re: Approval of 4.07 Final Task F Stage 1 – Part 1 Remedial Action Plan

Page 99: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 99 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 01 RD/RA Y ** DEQ internal email re: Domestic Well Sampling Program 06/20/07 DEQ

13 01 11 06 01 RD/RA Y 02/22/08

13 01 11 06 01 RD/RA 05/23/08

13 01 11 06 01 RD/RA 06/13/08 CDM

13 01 11 06 01 RD/RA K/J email to DEQ re: Task F Part 1 sampling mod app 6/16/08 KJ

13 01 11 06 01 RD/RA CDM Task F Part 1 GW Sampling Oversight Report 06/17/08 CDM

13 01 11 06 01 RD/RA DEQ/KJ emails re: Request to sample MW-5R 12/22/08

13 01 11 06 01 RD/RA KJ/DEQ emails re: MW-5R sampling 1/9/09

13 01 11 06 01 RD/RA KJ/DEQ emails re: MW-5R sampling 01/12/09

13 01 11 06 01 RD/RA KJ email to DEQ re: Task F part 1 sampling notice 02/10/09 KJ

13 01 11 06 01 RD/RA KJ letter to Krohne re: Sampling notice 2/13/09 KJ

13 01 11 06 01 RD/RA KJ letter to Mitchell re: Sampling notice 2/13/09 KJ

13 01 11 06 01 RD/RA KJ email to DEQ re: Well MW-5R results notice 2/13/09 KJ

13 01 11 06 01 RD/RA emails re: Groundwater split samples 2/10-2/18/09

13 01 11 06 01 RD/RA K/J email to DEQ re: Task F items posted to website 03/25/09 KJ

13 01 11 06 01 RD/RA 05/27/09 KJ

13 01 11 06 01 RD/RA K/J email to DEQ re: Notification of upcoming field activities 06/10/09 KJ

13 01 11 06 01 RD/RA KJ letter to Mitchell re: Sampling notice 01/20/10 KJ

13 01 11 06 01 CD RD/RA Task F, Stage 1, Part 1 Remedial Action Report 02/04/10 KJ

13 01 11 06 01 RD/RA KJ letter to Mitchell re: Sampling notice 06/10/10 k?J

13 01 11 06 01 RD/RA 6/17/10 DEQ

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

** DEQ internal & K/J emails re: Task F – 4th Qtr GW Sampling Notification

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Task F Stage 1-Part 1 GW Monitoring Results & Request for Modification to TASK F Stage 1 – Part 1 GW Monitoring Requirements

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

CDM email to DEQ re: Mark Hill/CDM comments on Task F Stage 1-Part 1 GW Monitoring Results & Request for Modification to Task F Stage 1 – Part 1 GW Monitoring Requirements

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

K/J letter to Kent Mitchell re: Semi annual GW sampling on Mitchell property

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

DEQ letter to BNSF re: Continuation of groundwater monitoring activities

Page 100: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 100 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 01 RD/RA 06/17/11 KJ/Aldersley

13 01 11 06 01 RD/RA 06/20/11 KJ/Aldersley

13 01 11 06 01 RD/RA 06/21/11 KJ/Aldersley

13 01 11 06 01 RD/RA 06/22/11 KJ/Aldersley

13 01 11 06 01 RD/RA 07/25/11 DEQ/Reynolds

13 01 11 06 01 RD/RA 07/26/11 J McGarry

13 01 11 06 01 RD/RA DEQ/Reynolds & K/J Aldersley emails re: Krohne wells 07/27/11

13 01 11 06 01 RD/RA 07/28/11

13 01 11 06 01 RD/RA 07/28/11

13 01 11 06 01 RD/RA 08/03/11

13 01 11 06 01 RD/RA 8/5/11 BKBH

13 01 11 06 01 RD/RA 08/09/11

13 01 11 06 01 RD/RA 8/9/11 DEQ/ Reynolds

13 01 11 06 01 RD/RA J McGarry fax to DEQ Legal re: Krohne vs BNSF 08/10/11 J McGarry

13 01 11 06 01 RD/RA 10/18/11 J McGarry

13 01 11 06 01 RD/RA 10/21/11 J McGarry

13 01 11 06 01 RD/RA 10/21/11 T Culver

13 01 11 06 01 RD/RA 11/16/11

13 01 11 06 01 RD/RA 04/06/11 KJ/Adlersley

13 01 11 06 01 RD/RA 05/08/12

13 01 11 06 01 RD/RA 05/23/12 DEQ/ Reynolds

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

K/J/Aldersley email to DEQ/Reynolds re: Preliminary private well sampling schedule

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

K/J/Aldersley email to DEQ/Reynolds re: Revised private well sampling schedule

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

K/J/Aldersley email to DEQ/Reynolds re: Private well sampling schedule

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

K/J/Aldersley email to DEQ/Reynolds re: Private well sampling schedule update

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

DEQ/Reynolds & Espresso Depot emails re: Monitoring well access

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

J McGarry email to DEQ/Haque-Hausrath-re: Krohne test well monitoring/Air mitigation

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

DEQ Legal/Haque-Hausrath emails to J McGarry, Leo Berry & Dava Kaitala

DEQ Legal/ Haque-Hausrath

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

DEQ Legal/Haque-Hausrath & J McGarry emails re: BN monitoring well on Krohnes private property

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Edwards Frickle & Culver Law firm/Culver letter to BKBH/M Etchart re: Access issues on Krohne property

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

BKBH letter to Edwards Frickle & Culver Law firm/Culver re: Krohne vs BNSF

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

DEQ Legal/Haque-Hausrath internal email re: Phone Log – Voicemail to J McGarry

DEQ Legal/ Haque-Hausrath

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

DEQ/Reynolds email to K/J re: Phone Log – Voicemail to J McGarry – Sampling on Krohnes

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

COK law/McGarry email to DEQ Haque-Hausrath re: Access to Krohne monitoring wells

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

COK law/McGarry email to DEQ Haque-Hausrath re: Access to Krohne monitoring wells

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

T Culver letter to DEQ legal/Haque-Hausrath re: Compensation to the Khrone's for access to their property

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

DEQ legal/Haque-Hausrath letter to T Culver re: Access to Mr Krohne's property

DEQ Legal/ Haque-Hausrath

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

K/J/Aldersley email to DEQ/Reynolds re: February 2011 GW sampling results posted to website

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

KJ/Aldersley & DEQ/Reynolds emails re: Natural Attentuations Parameters

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

DEQ/Reynolds email to KJ/Norris re: FW email from Resourse Tech/Johnson - Citizen concerns about well - please add wells 7M02, 7M04 & 7M05 to sampling schedule

Page 101: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 101 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 01 RD/RA 05/29/12 KJ/Norris

13 01 11 06 01 RD/RA 06/14/12 KJ/Adlersley

13 01 11 06 01 RD/RA 06/19/12 CDMSmith/ Coan

13 01 11 06 01 RD/RA 06/20/12 KJ/Adlersley

13 01 11 06 01 RD/RA 06/21/12 KJ/Adlersley

13 01 11 06 01 RD/RA 07/03/12 KJ/Adlersley

13 01 11 06 01 RD/RA 07/09/12 KJ/Adlersley

13 01 11 06 01 RD/RA 01/15/13 KJ/Norris

13 01 11 06 01 RD/RA 01/22/13

13 01 11 06 01 RD/RA 02/06/13 KJ/Aldersley

13 01 11 06 01 RD/RA 02/08/13 KJ/Norris

13 01 11 06 01 RD/RA 02/08/13 KJ/Norris

13 01 11 06 01 RD/RA 02/14/13 KJ/Aldersley

13 01 11 06 01 RD/RA KJ/Norris & DEQ/Reynolds emails re: Field blanks samples 2/12-2/19/13

13 01 11 06 01 RD/RA 03/29/13 KJ/Aldersley

13 01 11 06 02 RD/RA

13 01 11 06 02 RD/RA Task F Stage 1 Part 2 Pilot Test Work Plan 03/01/06 KJ

13 01 11 06 02 RD/RA Y 05/10/06 DEQ

13 01 11 06 02 RD/RA 04/02/07 CDM

13 01 11 06 02 RD/RA DEQ version Task F Stage 1 – Part 2 WP Modifications 04/07/11 DEQ

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

KJ/Norris letter to Kent Mitchell re: Semi-annual GW sampling to be conducted at BN Shop Complex and access required to the former Rustad property

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

K/J/Aldersley email to DEQ/Reynolds re: Private well sampling schedule update

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

CDM Smith/Coan email to DEQ/Reynolds re: Task GW Monitoring update

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

K/J/Aldersley email to DEQ/Reynolds re: Private well sampling schedule update

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

K/J/Aldersley email to DEQ/Reynolds re: Private well sampling schedule update

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

K/J/Aldersley email to DEQ/Reynolds re: June 2012 GW sampling results posted to website

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

K/J/Aldersley email to DEQ/Reynolds re: June 2012 Private Well sampling results posted to website

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

KJ/Norris email to DEQ/Reynolds re: Attachment - DEQ GW Monitoring Directive #1

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

KJ/Norris & DEQ/Reynolds emails re: Task M RA for Abestos-containing material & Task L survey data

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

KJ/Aldersley email to DEQ/Reynolds re: Notification of GW sampling per directive #1 to commence 2/20/13

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

KJ/Norris letter to Livingston City Center/Meece re: Semi-annual GW sampling to begin 2/20/13 thru 2/28/13 at Shop Complex- need access to wells

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

KJ/Norris letter to Heart K Land & Cattle Co/Blatter re: Quarterly/semi-annual GW sampling to begin 2/20/13 thru 2/28/13 at Shop Complex- need access to wells

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

KJ/Aldersley email to DEQ/Reynolds re: Contact Chris LaRose if DEQ or CDM is going to be present during sampling

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

Site-Wide Information

Task F, Stage I, Part I Remedial Action Plan

KJ/Aldersley email to DEQ/Reynolds re: Analytical results for February 2013 sampling have been posted to the website

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

** DEQ internal email re: Task F Stage 1 Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

CDM email to DEQ re: Task F Stage 1- Part 2 WP Modifications

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Page 102: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 102 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 02 RD/RA 08/21/07

13 01 11 06 02 RD/RA K/J letter to DEQ re: Task F Stage 1 Part 1 Pilot Test 11/12/07 KJ

13 01 11 06 02 RD/RA 01/02/08 DEQ

13 01 11 06 02 RD/RA 01/30/08 KJ

13 01 11 06 02 RD/RA EPA letter to BNSF re: Aquifer remodification well 3/14/08 EPA

13 01 11 06 02 RD/RA Task F Stage 1 Part 2 – Planned Bromide Tracer Test 03/28/08 KJ

13 01 11 06 02 RD/RA Task F, Part 2, Bromide Tracer Oversight Report 05/05/08 CDM

13 01 11 06 02 RD/RA DEQ/BNSF Task F Stage 1 Part 2 Pilot Test 05/22/08

13 01 11 06 02 CD RD/RA 6/08 KJ

13 01 11 06 02 RD/RA Task F Part 2, Bromide Tracer Oversight Report 06/20/08 CDM

13 01 11 06 02 RD/RA Task F Stage 1 Part 2 Pilot Test WP – revision 1 6/24/08

13 01 11 06 02 RD/RA DEQ letter to BNSF re: Task F Stage 1 Part 2 08/02/08 DEQ

13 01 11 06 02 RD/RA DEQ letter to BNSF re: Revised Task F Stage 1 Part 2 WP 07/23/08 DEQ

13 01 11 06 02 CD RD/RA CD ROM transmittal: Final Task F Stage 1 Part 2 07/24/08 KJ

13 01 11 06 02 RD/RA K/J email to DEQ re: Permanganate sampling 08/14/08 KJ

13 01 11 06 02 RD/RA K/J email to DEQ re: Task F Part 2 conference call summary 08/22/08 KJ

13 01 11 06 02 RD/RA Phone Log – DEQ and K/J re: Report on pilot test 8/22/08

13 01 11 06 02 RD/RA K/J email to DEQ re: Notice of Task F posting 08/28/08 KJ

13 01 11 06 02 RD/RA CDM explanation of top down injection 08/08/11 CDM

13 01 11 06 02 RD/RA K/J email to DEQ re: Notice of items posted to web 9/15/08 KJ

13 01 11 06 02 RD/RA DEQ/KJ emails re: Task F Part 2 info posting notice 9/22/08

13 01 11 06 02 RD/RA K/J email to DEQ re: Notice of items posted to web 10/06/08 KJ

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Prima Environmental letter to K/J re: Sodium Persulfate Soil Oxidant Demand Test Results

Prima Environmental

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

DEQ letter to BNSF re: 11/12/07 letter work plan for Task F Stage 1 Part 2

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

K/J letter to DEQ re: Response to Comments Task F Stage 1 Part 2

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Final Task F Stage 1-Part 2 Pilot Test Work Plan for Volatile Organic Compound-Containing Alluvial Aquifer GW

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Page 103: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 103 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 02 RD/RA K/J email to DEQ re: Task F Part 2 sampling notice 12/03/08 KJ

13 01 11 06 02 RD/RA K/J email to DEQ re: Task F Part 2 sampling notice 12/10/08 KJ

13 01 11 06 02 RD/RA 01/22/09 DEQ

13 01 11 06 02 CD RD/RA 11/09/11 KJ

13 01 11 06 02 RD/RA 03/05/10 KJ/Aldersley

13 01 11 06 02 RD/RA 10/15/10 KJ Norris

13 01 11 06 02 CD RD/RA 10/15/10 KJ

13 01 11 06 02 CD RD/RA 11/11/10 KJ

13 01 11 06 02 RD/RA 11/23/10 EPA/Pratt

13 01 11 06 02 RD/RA 11/29/10 DEQ/Reynolds

13 01 11 06 02 RD/RA 02/22/11 KJ/Norris

13 01 11 06 02 RD/RA 10/17/11 KJ

13 01 11 06 02 RD/RA 10/28/11 DEQ/ Reynolds

13 01 11 06 02 RD/RA 11/04/11

13 01 11 06 02 RD/RA 11/07/11 KJ

13 01 11 06 02 RD/RA 11/16/11

13 01 11 06 02 RD/RA 11/17/11

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

DEQ letter to K/J re: Response to K/J 1/14/09 letter – request to discontinue post permanganate injection GW sampling

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Final Task F Stage 1-Part 2 Pilot Test Report for VOC-Containing Alluvial Aquifer Groundwater

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

K/J/Aldersley email to DEQ/Reynolds re: Livingston Deliverable – Task F – Part 2 Weekly Report # 4

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

K/J Norris email to DEQ/Reynolds re: Attachment – Addendum Number 2 to Final Task F Stage I Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Addendum Number 2 to Final Task F Stage I Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Revised Addendum # 2 Final Task F Stage I – Part 2 Pilot Test Work Plan for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

EPA/Pratt letter to BNSF/Smith re: Class V Underground Injection Control permit

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

DEQ/Reynolds letter to BN/Smith re: DEQ approval of Revised Addendum # 2 Final Task F Stage I – Part 2 Pilot Test Work Plan for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater – November 11, 2010

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

K/J/Norris letter to Kent Mitchell re: Request for access for sampling of GW monitoring wells

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

KJ letter report to DEQ/Reynolds re: Additional Task F Stage I-Part 2 Chemical Oxidant-Containing GW recirculation

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

DEQ/Reynolds letter to BN/Smith re: DEQ comments on KJ letter report to DEQ/Reynolds re: Additional Task F Stage I-Part 2 Chemical Oxidant-Containing GW recirculation

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

DEQ/Reynolds & Dr Eric Boyd emails re: Boyd information request

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

KJ/BNSF letter to DEQ/Reynolds re: Response to DEQ comments on Additional Task F Stage I-Part 2 Chemical Oxidant-Containing GW recirculation

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

DEQ/Olsen internal email re: Put Senator Ron Arthun on BN mailing list

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

DEQ/Reynolds email to Mr Knoebel re: DEQ response to information request

Page 104: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 104 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 02 RD/RA 03/28/12 DEQ internal

13 01 11 06 02 RD/RA 04/03/12 DEQ/ Reynolds

13 01 11 06 02 RD/RA Jeff Moore & DEQ/Reynolds emails re: Mitigation

13 01 11 06 02 RD/RA 11/07/12

13 01 11 06 02 RD/RA 05/22/13 KJ/Norris

13 01 11 06 02 RD/RA 05/22/13 KJ/Norris

13 01 11 06 02 RD/RA KJ/Norris letter to Blake Blatter re: well sampling notice 05/22/13 KJ/Norris

13 01 11 06 02 RD/RA DEQ/Reynolds phone log - Blatter access issue 06/03/13 DEQ

13 01 11 06 02 RD/RA 06/03/13 KJ/Aldersley

13 01 11 06 02 RD/RA DEQ/Reynolds letter to BNSF/Smith re: Blatter access issue 06/04/13 DEQ/Reynolds

13 01 11 06 02 RD/RA 06/06/13 KJ/Aldersley

13 01 11 06 02 RD/RA 06/07/13 KJ/Aldersley

13 01 11 06 02 RD/RA 06/12/13 KJ/Aldersley

13 01 11 06 02 RD/RA 06/27/13 KJ/Aldersley

13 01 11 06 02 RD/RA 07/19/13 KJ/Aldersley

13 01 11 06 02 RD/RA 07/30/13 KJ/Aldersley

13 01 11 06 02 01 RD/RA Meeting Notes

13 01 11 06 02 01 RD/RA Meeting Notes Notes 7/3/07

13 01 11 06 02 01 RD/RA Meeting Notes Notes 07/06/07

13 01 11 06 02 01 RD/RA Meeting Notes Notes 10/03/07

13 01 11 06 02 01 RD/RA Meeting Notes Notes 2/5/08

13 01 11 06 02 01 RD/RA Meeting Notes Notes 05/27/08

13 01 11 06 02 01 RD/RA Meeting Notes Minutes 5/27/08

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

DEQ/Seyler internal email to Reynolds re: Phone Log - Sonoma Bank/Ed Morales - information request

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

DEQ/Reynolds email to Sonoma Bank/Morales re: Copy of EPA's new Tetrachlorethene toxicity information

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

1/20/12 & 6/14/12

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

DEQ legal/Haque-Hausrath email to [email protected] re: Information about facility

DEQ legal/ Haque-Hausrath

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

KJ/Norris letter to Chris Bendon re: private well sampling notice

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

KJ/Norris letter to Ed Meece re: well sampling notice - city of livingston

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

KJ/Aldersley & DEQ/Reynolds emails re: Email chain Blatter access issue

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

KJ/Aldersley & DEQ/Reynolds emails re: Sampling wells 92-2 and 10-8

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

KJ/Aldersleyl & DEQ/Reynolds emails re: Blatter access granted notice

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

KJ/Aldersley & DEQ/Reynolds emails re: private well (Fabian) access denied

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

KJ/Aldersley & DEQ/Reynolds emails re: MW-5RR location approval

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

KJ/Aldersley & DEQ/Reynolds emails re: private well sampling update

Site-Wide Information

Task F, Stage I, Part 2 Pilot Test Work Plan

KJ/Aldersley email to DEQ/Reynolds re: private well sampling results posted

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 105: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 105 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 02 01 RD/RA Meeting Notes Notes 06/04/08

13 01 11 06 02 01 RD/RA Meeting Notes Notes 06/05/08

13 01 11 06 02 01 RD/RA Meeting Notes CDM/DEQ notes on next steps 01/26/09

13 01 11 06 02 01 RD/RA Meeting Notes Notes 8/5/09

13 01 11 06 02 01 RD/RA Meeting Notes Notes

13 01 11 06 02 02 RD/RA Emails

13 01 11 06 02 02 RD/RA Emails KJ/DEQ emails re: Photo of NE corner of Electric Shop 5/2/07

13 01 11 06 02 02 RD/RA Emails 5/4-5/7/07

13 01 11 06 02 02 RD/RA Emails KJ/DEQ emails re: Task F Part 2 5/24/07

13 01 11 06 02 02 RD/RA Emails KJ/DEQ emails re: Task F Stage 1 Part 2 bench scale testing 5/30-6/5/07

13 01 11 06 02 02 RD/RA Emails KJ/DEQ emails re: Task F Stage 1 Part 2 bench scale testing 5/30-6/15/07

13 01 11 06 02 02 RD/RA Emails 5/30-6/18/07

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Task F bench scale test 06/27/07 KJ

13 01 11 06 02 02 RD/RA Emails DEQ/CDM emails re: Task F Part 2 10/18/07

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Task F Stage I Part 2 pilot test 11/12/07 KJ

13 01 11 06 02 02 RD/RA Emails DEQ email to KJ re: Task F Part 2 01/25/08 DEQ

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ w/Task F letter and figure attached 01/30/08 KJ

13 01 11 06 02 02 RD/RA Emails 02/14/08

13 01 11 06 02 02 RD/RA Emails 02/14/08

13 01 11 06 02 02 RD/RA Emails 2/14-2/15/08

13 01 11 06 02 02 RD/RA Emails CDM email to DEQ re: Field activity comments 2/15/08 CDM

13 01 11 06 02 02 RD/RA Emails 2/14/-2/26/08

13 01 11 06 02 02 RD/RA Emails KJ/DEQ emails re: Task F Stage 1 Part 2 3/9-3/10/08

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ/DEQ/CDM emails re: Groundwater analyses for geochemical indicators of intrinsic biodegradation – ferrous iron

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ/DEQ/CDM emails re: Task F Stage 1 Part 2 bench scale testing

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ/DEQ/CDM emails re: Notification of field activity and additional info

Site-Wide Information

KJ/DEQ emails re: Notification of field activity and additional info

Site-Wide Information

KJ/DEQ emails re: Notification of field activity and additional info

Site-Wide Information

Site-Wide Information

KJ/DEQ emails re: Notification of field activity and additional info

Site-Wide Information

Page 106: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 106 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 02 02 RD/RA Emails KJ/DEQ emails re: Sodium permanganate bench scale testing 3/11/-3/19/08

13 01 11 06 02 02 RD/RA Emails CDM/KJ/DEQ emails re: Field activity comments 2/15-3/31/08

13 01 11 06 02 02 RD/RA Emails CDM/KJ emails re: Bromide tracer test 2/15-4/2/08

13 01 11 06 02 02 RD/RA Emails CDM/KJ/DEQ emails re: Bromide tracer test 2/15-4/7/08

13 01 11 06 02 02 RD/RA Emails CDM email to DEQ re: Tracer test modeling 04/09/08 CDM

13 01 11 06 02 02 RD/RA Emails CDM/DEQ emails re: Tracer test 4/28/-4/29/08

13 01 11 06 02 02 RD/RA Emails KJ/CDM emails re: Bromide tracer testing 4/29-4/30/08

13 01 11 06 02 02 RD/RA Emails KJ emails to DEQ re: Items posted to website 5/2-5/5/08 KJ

13 01 11 06 02 02 RD/RA Emails KJ/DEQ emails re: Pilot test implementation 5/7-5/8/08

13 01 11 06 02 02 RD/RA Emails KJ/DEQ emails re: NaMnO4 bench scale testing results 5/21-5/22/08

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Baseline sampling notification 05/22/08 KJ

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Items posted to website 05/29/08 KJ

13 01 11 06 02 02 RD/RA Emails Figure 1 – Monitoring Well Locations 05/08/11 KJ

13 01 11 06 02 02 RD/RA Emails Figures of Bromide Tracer Test Analytical Results 05/08/11

13 01 11 06 02 02 RD/RA Emails 06/05/08 CDM

13 01 11 06 02 02 RD/RA Emails KJ/CDM emails re: Task F Part 2 06/09/08

13 01 11 06 02 02 RD/RA Emails CDM/DEQ emails re: Meeting minutes and scheduling 5/30-6/12/08

13 01 11 06 02 02 RD/RA Emails DEQ email to KJ re: Task F Part 2 6/12/08 DEQ

13 01 11 06 02 02 RD/RA Emails KJ/DEQ emails re: Task D/E EX well drilling operations 6/12-6/13/08

13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: Task F Part 2 6/12-6/13/08

13 01 11 06 02 02 RD/RA Emails 6/30/08 CDM

13 01 11 06 02 02 RD/RA Emails DEQ/CDM emails re: Task F Part 2 Work Plan comments 6/30-7/1/08

13 01 11 06 02 02 RD/RA Emails DEQ internal email re: Task F Part 2 Work Plan comments 7/1-7/2/08 DEQ

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM email to DEQ re: Reference documents and site conditions

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM email to DEQ re: Comments on Final Task F Stage I Part 2 Work Plan

Site-Wide Information

Site-Wide Information

Page 107: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 107 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 02 02 RD/RA Emails 07/03/08 KJ

13 01 11 06 02 02 RD/RA Emails 7/17/08

13 01 11 06 02 02 RD/RA Emails CDM email to DEQ re: Work Plan revisions 07/21/08 CDM

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: GW results 7/22/08 KJ

13 01 11 06 02 02 RD/RA Emails KJ/DEQ emails re: Revised NaMnO4 calculation 07/23/08

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Livingston deliverable 07/24/08 KJ

13 01 11 06 02 02 RD/RA Emails DEQ/CDM emails re: Task F Part 2 07/30/08

13 01 11 06 02 02 RD/RA Emails DEQ/ KJ emails re: Task F pilot test schedule 07/30/08

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Task F Part 2 items posted to website 11/13/08 KJ

13 01 11 06 02 02 RD/RA Emails 01/07/09

13 01 11 06 02 02 RD/RA Emails 01/14/09 KJ

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: KJ notice of sampling 01/22/09 KJ

13 01 11 06 02 02 RD/RA Emails 2/11-2/17/09

13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: Private wells 7/28/09

13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: Task F Part 2 9/28-9/29/09

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Document deliverable 10/26/09 KJ

13 01 11 06 02 02 RD/RA Emails DEQ/KJ/CDM emails re: Document deliverables

13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: Task F Stage I Part 1 Report

13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: Task F Stage I Part 1 Report

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Document deliverables 11/09/09 KJ

13 01 11 06 02 02 RD/RA Emails KJ email to MRL re: Upcoming work at rail yard 11/11/09 KJ

13 01 11 06 02 02 RD/RA Emails KJ emails to MRL re: Upcoming work at rail yard KJ

13 01 11 06 02 02 RD/RA Emails DEQ/KJ/BNSF emails re: Conference call request

Site-Wide Information

KJ email to DEQ re: Task F Stage I Part 2 items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Task F items posted to website, Attachment - Private well summary   KJ/Aldersley

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ/DEQ/CDM emails re: DEQ requests for CDM review of posted items

Site-Wide Information

KJ letter to DEQ re: Request to discontinue post-permanganate injection groundwater sampling

Site-Wide Information

Site-Wide Information KJ/DEQ emails re: Termination of post-permanganate sampling

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

10/26-10/27/09

Site-Wide Information

10/26/-10/28/09

Site-Wide Information

10/26-10/29/09

Site-Wide Information

Site-Wide Information

Site-Wide Information

11/11-11/23/09

Site-Wide Information

11/20-11/23/09

Page 108: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 108 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 02 02 RD/RA Emails DEQ email to KJ re: Pilot Test Work Plan 11/30/09 DEQ

13 01 11 06 02 02 RD/RA Emails DEQ email to KJ re: Task F Stage I Part 1 Report 12/2/09 DEQ

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Replacement pages 12/02/09 KJ

13 01 11 06 02 02 RD/RA Emails 12/02/09 CDM/Hills

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Bedrock well construction 12/3/09 KJ

13 01 11 06 02 02 RD/RA Emails CDM email re: Location for pilot test ISCO wells 12/04/09 CDM

13 01 11 06 02 02 RD/RA Emails DEQ/Olympus/CDM/KJ emails re: Drilling schedule 12/7-12/8/09

13 01 11 06 02 02 RD/RA Emails KJ email to MRL and DEQ re: Tentative schedule 01/04/10 KJ

13 01 11 06 02 02 RD/RA Emails 1/4-1/7/10

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Candidate ISCO well locations 01/09/10 KJ

13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: PID discussion 1/10-1/11/10

13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: Candidate ISCO well locations 1/9-1/12/10

13 01 11 06 02 02 RD/RA Emails CDM email to DEQ re: Task F progress 01/12/10 CDM

13 01 11 06 02 02 RD/RA Emails DEQ/CDM emails re: Task F progress 1/12-1/13/10 DEQ

13 01 11 06 02 02 RD/RA Emails CDM email to DEQ re: Well drilling 01/13/10 CDM

13 01 11 06 02 02 RD/RA Emails CDM email to DEQ re: Task F update 1/14/10 CDM

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Items posted to website 1/14/10 KJ

13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: Transfer pit ISCO well locations 1/12-1/15/10

13 01 11 06 02 02 RD/RA Emails CDM email to DEQ re: Task F update 01/15/10 CDM

13 01 11 06 02 02 RD/RA Emails 1/16-1/19/10

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Items posted to website 1/22/10 KJ

13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: Notification of groundwater sampling event 1/27-1/29/10

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Items posted to website 2/3/10 KJ

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM/Hills email to DEQ/Reynolds re: Final Task F Stage 1-Part 2 Pilot Test Report

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ/KJ/MRL emails re: Remediation work in and around shops complex

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ/CDM/KJ emails re: Addendum #1 well location field adjustment

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 109: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 109 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Document deliverables 02/04/10 KJ

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Document deliverables 02/08/10 KJ

13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: Alluvial aquifer groundwater 2/12-2/19/10

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Items posted to website 2/24/10 KJ

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Items posted to website 03/03/10 KJ

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Items posted to website 03/05/10 KJ

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Items posted to website 03/12/10 KJ

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Items posted to website 03/23/10 KJ

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Document deliverables 3/23/10 KJ

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Items posted to website 03/24/10 KJ

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Items posted to website 3/25/10 KJ

13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: DEQ approval for sampling 3/23-4/12/10

13 01 11 06 02 02 RD/RA Emails 4/27-4/28/10

13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: Upcoming groundwater sampling 5/10-5/11/10

13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: Well at 115 N. K St. and boundary map 5/19-5/21/10

13 01 11 06 02 02 RD/RA Emails CDM email to DEQ re: SVE system 06/03/10 CDM

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Updated private well sampling program 06/03/10 KJ

13 01 11 06 02 02 RD/RA Emails DEQ/KJ/Lawellin emails re: Well testing 06/23/10

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Updated private well sampling schedule 7/9/10 KJ

13 01 11 06 02 02 RD/RA Emails DEQ/KJ emails re: Updated private well sampling schedule 07/12/10

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Updated private well sampling schedule 7/13/10 KJ

13 01 11 06 02 02 RD/RA Emails KJ email to DEQ re: Updated private well sampling schedule 07/14/10 KJ

13 01 11 06 02 02 RD/RA Emails 7/15-7/19/10

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ/KJ emails re: Items posted to website and termination of monitoring program

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ/KJ/Resident emails re: Private well sampling at 115 N. K St.

Page 110: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 110 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 02 02 RD/RA Emails 08/11/10 KJ Aldersley

13 01 11 06 02 02 CD RD/RA Emails 10/14/10 KJ Aldersley

13 01 11 06 02 02 RD/RA Emails 11/11/10 KJ Aldersley

13 01 11 06 02 02 RD/RA Emails 01/05/11

13 01 11 06 02 02 RD/RA Emails 02/21/11

13 01 11 06 02 02 RD/RA Emails 3/11/11 CDM/Hills

13 01 11 06 02 02 RD/RA Emails 03/13/11 CDM/Coan

13 01 11 06 02 02 RD/RA Emails 03/14/11 CDM/Sorenson

13 01 11 06 02 02 RD/RA Emails 03/16/11 CDM/Coan

13 01 11 06 02 02 RD/RA Emails 03/17/11 CDM/Coan

13 01 11 06 02 02 RD/RA Emails 03/18/11 KJ/Norris

13 01 11 06 02 02 RD/RA Emails 03/21/11 CDM/Coan

13 01 11 06 02 02 RD/RA Emails 03/22/11 CDM/Coan

13 01 11 06 02 02 RD/RA Emails K/J, CDM, & DEQ emails re: Rush PCE results 03/24/11

13 01 11 06 02 02 RD/RA Emails 04/04/11

13 01 11 06 02 02 RD/RA Emails 04/18/11 KJ/ Norris

13 01 11 06 02 02 RD/RA Emails 05/05/11 KJ/Adlersley

13 01 11 06 02 02 RD/RA Emails CDM/Coan & K/J/Fernandes emails re: ISCO pilot test 06/13/11

13 01 11 06 02 02 RD/RA Emails CDM/Coan internal email to Hills re: Task F tentative schedule 06/16/11 CDM/Coan

13 01 11 06 02 02 RD/RA Emails 06/22/11 KJ/Aldersley

13 01 11 06 02 02 RD/RA Emails DEQ/Reynolds & CDM/Hills emails re: Task F –permanganate 06/27/11

Site-Wide Information

K/J Aldersley email to DEQ/Reynolds re: Task F items posted to website

Site-Wide Information

K/J Aldersley email to DEQ/Reynolds re: Livingston deliverables – Task F Stage I-Part 2: Soil Vapor Extraction (SVE) Report + CD sent out

Site-Wide Information

K/J Aldersley email to DEQ/Reynolds re: Livingston deliverables – Revised Addendum #2 to Final Task F Stage I-Part 2 Pilot Test Work Plan for VOC – Containing Alluvial Aquifer Groundwater sent out

Site-Wide Information

K/J/Fernandes & DEQ/Reynolds emails re: Task F – Stage I Part 2 Addendum # 2 – Well drilling activities

Site-Wide Information

K/J/Norris & CDM/Hills emails to DEQ/Reynolds re: Task F Part 2 Progress schedule

Site-Wide Information

CDM/Hills fw email to DEQ/Reynolds re: Task F ISCO pilot test update

Site-Wide Information

CDM/Coan email to DEQ/Reynolds re: Task F ISCO pilot testing tentative schedule

Site-Wide Information

CDM/Sorenson email to DEQ/Reynolds re: Task F ISCO pilot testing tentative schedule

Site-Wide Information

CDM/Coan email to DEQ/Reynolds re: Task F - PCE and NaMnO4 figures

Site-Wide Information

CDM/Coan email to DEQ/Reynolds re: Task F conference call summary

Site-Wide Information

K/J/Norris email to DEQ/Reynolds re: GW recirculation timeline

Site-Wide Information

CDM/Coan email to DEQ/Reynolds re: Task F ISCO pilot test update

Site-Wide Information

CDM/Coan email to DEQ/Reynolds re: Task F ISCO pilot test - recent PCE results

Site-Wide Information

Site-Wide Information

CDM & K/J emails cc DEQ/Reynolds re: Status of pilot test system bleed out

Site-Wide Information

K/J/Norris email to DEQ/Reynolds re: ISCO well locations & GW PCE

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: LS Preliminary GW recirculation system schedule

Site-Wide Information

Site-Wide Information

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Attachment - Task F – Part 2 Analytical data for February & May 2011

Site-Wide Information

Page 111: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 111 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 02 02 RD/RA Emails 06/30/11 DEQ/ Reynolds

13 01 11 06 02 02 RD/RA Emails 07/06/11 CDM/Coan

13 01 11 06 02 02 RD/RA Emails 07/20/11 KJ/Adlersley

13 01 11 06 02 02 RD/RA Emails 09/22/11 KJ/Adlersley

13 01 11 06 02 02 RD/RA Emails 10/17/11 KJ/Adlersley

13 01 11 06 02 02 RD/RA Emails 11/04/11 DEQ/ Reynolds

13 01 11 06 02 02 RD/RA Emails DEQ/Reynolds email to KJ/Fernandes re: VE well injection 11/04/11 DEQ/ Reynolds

13 01 11 06 02 02 RD/RA Emails 11/07/11 DEQ/ Reynolds

13 01 11 06 02 02 RD/RA Emails 11/10/11 KJ/ Fernandes

13 01 11 06 02 02 RD/RA Emails 11/10/11 DEQ/ Reynolds

13 01 11 06 02 02 RD/RA Emails 11/14/11 KJ/Norris

13 01 11 06 02 02 RD/RA Emails 04/19/12

13 01 11 06 02 02 RD/RA Emails 06/07/12 KJ/Aldersley

13 01 11 06 03 RD/RA

13 01 11 06 03 RD/RA 03/19/09

13 01 11 06 03 RD/RA DEQ conference call notes 03/23/09 DEQ/ Reynolds

Site-Wide Information DEQ/Reynolds email to CDM re: Task F, Stage I Part 2 Update

Site-Wide Information

CDM/Coan email to DEQ/Reynolds re: Task F, Stage I Part 2 Update

Site-Wide Information

K/J Aldersley email to DEQ/Reynolds re: GW/Private well monitoring posted to website

Site-Wide Information

K/J Aldersley email to DEQ/Reynolds re: Task F Part 2 items posted to website

Site-Wide Information

K/J Aldersley email to DEQ/Reynolds re: A description of proposed additional ISCO using GW recirculation has been sent out for 10/18/11 delivery

Site-Wide Information

DEQ/Reynolds email to CDM/Hills & K Sorenson re: Task F Part 2 update

Site-Wide Information

Site-Wide Information

DEQ/Reynolds email to CDM/Hills & K Sorenson re: Task F Part 2 update

Site-Wide Information

KJ/Fernandes email to DEQ/Reynolds re: Attachment - Lab results for Electric & Locomotive Shop NaMnO4 GW recirculation system

Site-Wide Information

DEQ/Reynolds email to CDM/Hills & K Sorenson re: Task F Part 2 update

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: FW from Fernandes - GW recirculation summary lab results

Site-Wide Information

DEQ/Reynolds & KJ/Fernandes emails re: Task F, Part 2 chemical oxidation activities

Site-Wide Information

K/J Aldersley email to DEQ/Reynolds re: Task F Stage 1 Part 2 - Comprehensive Chemical Testing Report sent out UPS

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

DEQ/K/J & CDM emails re: Agenda for conference call – Sodium Permanganate

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Page 112: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 112 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 03 RD/RA K/J email to DEQ re: Livingston deliverable 04/24/09 KJ

13 01 11 06 03 RD/RA 04/24/09 KJ

13 01 11 06 03 RD/RA 5/4/09

13 01 11 06 03 RD/RA CDM & DEQ emails re: Support on Task F – Kent Whiting 05/18/09

13 01 11 06 03 RD/RA DEQ & K/J emails re: GW sampling next week 06/09/09

13 01 11 06 03 RD/RA 06/10/09 CDM/Hills

13 01 11 06 03 RD/RA 09/24/09 CDM

13 01 11 06 03 CD RD/RA 10/09 KJ

13 01 11 06 03 RD/RA DEQ letter to BNSF re: 4/24/09 Pilot Test Report 10/08/09 DEQ

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Task F Stage 1 – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

DEQ & M Hills/CDM emails re: CDM question on Task F Stage 1 – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater – comments or reline strikeout?

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

CDM/Hills email to DEQ re: Revised draft comments for Task F Pilot Test Report

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

CDM Memorandum to DEQ/Reynolds re: Draft Technical Memorandum – Equilibrium Calculations and Compartment Modeling to Evaluate the Character (Phase) and Relative Mass of Tetrachloroethene in the Subsurface

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Addendum No. 1 to the Final Task F Stage 1 – Part 2 Pilot Test Work Plan for VOC-Containing Alluvial Aquifer Groundwater

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Page 113: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 113 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 03 RD/RA KJ letter to DEQ re: Task F Stage 1 Part 2 Pilot Test Report 11/10/09 KJ

13 01 11 06 03 RD/RA 11/20/09 DEQ

13 01 11 06 03 RD/RA 11/27/09

13 01 11 06 03 CD RD/RA 11/09/11 KJ

13 01 11 06 03 RD/RA 11/01/09 KJ

13 01 11 06 03 RD/RA KJ letter to DEQ re: Bedrock well construction 12/03/09 KJ

13 01 11 06 03 RD/RA CDM Site Oversight Report CDM

13 01 11 06 03 RD/RA EPA letter to BNSF re: Aquifer remediation well 12/23/09 EPA

13 01 11 06 03 RD/RA CDM Site Oversight Report 1/12-16/2010 CDM

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

DEQ letter to BNSF re: Comments/redline-strikeout for 10/26/09 Addendum No.1 to Pilot Test Work Plan

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Addendum to supplement Pilot Test Work Plan – Revision No. 1

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Addendum No. 1 to the Final Task F Stage 1 – Part 2 Pilot Test Work Plan for VOC-Containing Alluvial Aquifer Groundwater

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Redline/Strikeout text for Final Task F Stage I – Part 2 Pilot Test Work Plan for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater revision # 1

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

12/9/10 – 12/16/09

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Page 114: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 114 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 03 RD/RA CDM Site Oversight Report 1/27-28/10 CDM

13 01 11 06 03 RD/RA CDM Site Oversight Report 1/17-2/3/10 CDM

13 01 11 06 03 RD/RA KJ Weekly Letter Report on Addendum No.1 Activities 02/08/10 KJ

13 01 11 06 03 RD/RA KJ Weekly Letter Report on Addendum No.1 Activities 02/18/10 KJ

13 01 11 06 03 RD/RA KJ Weekly Letter Report on Addendum No.1 Activities 2/25/10 KJ

13 01 11 06 03 RD/RA 03/23/10 KJ

13 01 11 06 03 RD/RA KJ Weekly Letter Report on Addendum No.1 Activities 3/4/10 KJ

13 01 11 06 03 CD RD/RA 06/02/10 KJ

13 01 11 06 03 RD/RA 06/02/10

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

KJ letter to DEQ re: Continued groundwater monitoring post-permanganate injection

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Task F Stage I – Part 2 : Candidate ISCO Well Construction & Sampling Report

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Task F Stage I-Part 2: Former Electric Shop Interior Follow-Up Chemical Testing Report

Page 115: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 115 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 03 RD/RA 06/10/11 KJ

13 01 11 06 03 RD/RA 08/25/10 DEQ LEGAL

13 01 11 06 03 RD/RA 8/25/10 KJ/Aldersley

13 01 11 06 03 CD RD/RA Task F Stage 1-Part 2: Candidate ISCO Well Sampling Report 08/25/10 KJ

13 01 11 06 03 RD/RA 9/3/10 DEQ/Reynolds

13 01 11 06 03 RD/RA 10/26/10 DEQ/Reynolds

13 01 11 06 03 CD RD/RA

13 01 11 06 03 CD RD/RA 12/6/10 KJ/Aldersley

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Electronic Copy of Task F Stage 1 – Part 2: Former Electric Shop Interior Follow-up Chemical Oxidation Testing Report

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

DEQ Legal/Haque-Hausrath internal email to Reynolds re: Phone log w/BKBH/Tietz – requested time logs

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

K/J/Aldersley email to DEQ/Reynolds re: Livingston deliverables

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

DEQ/Reynolds letter/fax to BN/Smith & to K/J Norris re: DEQ comments on 6/2/10 Task F Stage 1 – Part 2 Candidate ISCO Well Construction & Sampling Report, 6/2/10 Task F Stage 1 – Part 2: Former Electric Shop Interior Follow-up Chemical Oxidation Testing Report, & 8/25/10 Task F Stage 1-Part 2: Candidate ISCO Well Sampling Report

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

DEQ/Reynolds email to K/J/Norris, Aldersley & Fernandes re: Addendum #2 to Final Task F Stage I – Part 2 Pilot Test Work Plan for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Revised Addendum #2 Final Task F Stage I – Part 2 Pilot Test Work Plan for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

K/J/Aldersley email to DEQ/Reynolds re: CD of Revised Addendum #2 Final Task F Stage I – Part 2 Pilot Test Work Plan for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater sent UPS for delivery to DEQ on 12/7/10

Page 116: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 116 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 03 RD/RA CDM Site Oversight Report 3/1-3/23/11 CDM

13 01 11 06 03 RD/RA 04/15/11 DEQ/ Reynolds

13 01 11 06 03 RD/RA 05/12/11

13 01 11 06 03 CD RD/RA 06/07/12 KJ

13 01 11 06 03 RD/RA DEQ/Reynolds & K/J/Norris emails re: Piping issues 06/08/11

13 01 11 06 03 RD/RA 07/19/11 KJ/Adlersley

13 01 11 06 03 RD/RA 07/27/12 CDM

13 01 11 06 03 RD/RA 06/10/13 DEQ/Reynolds

13 01 11 06 03 RD/RA 07/19/13 KJ/Adlersley

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

DEQ/Reynolds letter to BN/Smith re: DEQ approval of the 11/10/09 Final Task F Stage I - Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer GW

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Phone Log - DEQ/Reynolds & K/J Fernandes re: Permanganate testing, SVE Report comments, ect

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Task F Stage I-Part 2: Comprehensive Chemical Testing Report Vol I-III

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

K/J/Aldersley email to DEQ/Reynolds re: Task F – Part 2 data posted to website

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

CDM Smith letter to DEQ/Reynolds re: CDM comments on comprehnsive pilot testing report

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

DEQ/Reynolds letter to BN/Smith re: DEQ comments on Task F Stage I - Part 2: Comprehensive Chemical Testing Report

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater K/J/Aldersley email to DEQ/Reynolds re: Task F – Part 2 report

Page 117: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 117 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 03 RD/RA 07/01/13 KJ

13 01 11 06 03 RD/RA 07/01/13 KJ

13 01 11 06 03 RD/RA 07/01/13 KJ

13 01 11 06 03 RD/RA 07/01/13 KJ

13 01 11 06 04 RD/RA

13 01 11 06 04 RD/RA 10/15/10 KJ

13 01 11 06 04 RD/RA 04/26/11 DEQ/ Reynolds

13 01 11 06 04 RD/RA 06/09/11 KJ

13 01 11 06 04 RD/RA 09/09/11 DEQ/ Reynolds

13 01 11 06 04 RD/RA DEQ/Reynolds & KJ/Norris emails re: DEQ SVE questions 09/22/11

13 01 11 06 04 RD/RA 12/28/11 KJ/Norris

13 01 11 06 04 RD/RA KJ/Norris email to DEQ/Reynolds re: SVE status info 05/12/13 KJ/Norris

13 01 11 06 04 RD/RA 05/18/13 KJ/Norris

13 01 11 06 04 RD/RA 07/25/13 DEQ/ Reynolds

13 01 11 06 04 RD/RA 08/09/13 KJ/Aldersley

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Revised Task F Stage I-Part 2: Comprehensive Chemical Testing Report Vol 1 of 4

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Revised Task F Stage I-Part 2: Comprehensive Chemical Testing Report Vol 2 of 4

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Revised Task F Stage I-Part 2: Comprehensive Chemical Testing Report Vol 3 of 4

Site-Wide Information

Task F – Part 2 Pilot Test Report for Volatile Organic Compound-Containing Alluvial Aquifer Groundwater

Revised Task F Stage I-Part 2: Comprehensive Chemical Testing Report Vol 4 of 4

Site-Wide Information

Task F Stage 1 – Part 2: Soil Vapor Extraction

Site-Wide Information

Task F Stage 1 – Part 2: Soil Vapor Extraction

Task F Stage 1 – Part 2: Soil Vapor Extraction (SVE) Report

Site-Wide Information

Task F Stage 1 – Part 2: Soil Vapor Extraction

DEQ/Reynolds letter to BN/Smith re: DEQ comments on Task F Stage 1 – Part 2: Soil Vapor Extraction (SVE) Report

Site-Wide Information

Task F Stage 1 – Part 2: Soil Vapor Extraction

Revised Task F Stage I-Part2: Soil Vapor Extraction (SVE) Report

Site-Wide Information

Task F Stage 1 – Part 2: Soil Vapor Extraction

DEQ/Reynolds letter to BN/Smith re: DEQ approval of Revised Task F Stage 1 – Part 2: Soil Vapor Extraction (SVE) Report

Site-Wide Information

Task F Stage 1 – Part 2: Soil Vapor Extraction

Site-Wide Information

Task F Stage 1 – Part 2: Soil Vapor Extraction

KJ/Norris email to DEQ/Reynolds re: Electric shop SVE system re: Damaged tanker car being stored in shop

Site-Wide Information

Task F Stage 1 – Part 2: Soil Vapor Extraction

Site-Wide Information

Task F Stage 1 – Part 2: Soil Vapor Extraction

KJ/Norris email to DEQ/Reynolds re: Shop Complex - Locomotive Shop and former Electric Shop SVE System shut down

Site-Wide Information

Task F Stage 1 – Part 2: Soil Vapor Extraction

DEQ/Reynolds & KJ/Fernandes emails re: SVE Rebound testing

Site-Wide Information

Task F Stage 1 – Part 2: Soil Vapor Extraction

KJ/Aldersley email to DEQ/Reynolds re: SVE System Sampling

Page 118: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 118 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 06 04 CD RD/RA 10/10/13 BNSF/Stegman

13 01 11 06 04 RD/RA SVE rebound data 12/09/13 DEQ/ Reynolds

13 01 11 06 04 RD/RA 12/31/13 DEQ/ Reynolds

13 01 11 06 04 CD RD/RA 01/16/14 BNSF/Stegman

13 01 11 06 04 RD/RA 01/23/14 DEQ/ Reynolds

13 01 11 07 RD/RA

13 01 11 07 RD/RA DEQ internal email re: Transportation corridors 05/17/05 DEQ

13 01 11 07 RD/RA DEQ & BN meeting notes 09/01/05

13 01 11 07 RD/RA DEQ internal email re: Freezing soil samples (1) 9/6/05 DEQ

13 01 11 07 RD/RA DEQ internal email re: Freezing soil samples (2) 09/06/05 DEQ

13 01 11 07 RD/RA K/J/BNSF email to DEQ re: VPH Sampling 09/12/05

13 01 11 07 RD/RA DEQ & BN meeting notes -Task J 9/21/05

13 01 11 07 RD/RA BN letter to DEQ re: Sampling in the tracks 09/23/05 BN

13 01 11 07 RD/RA BNSF letter to DEQ re: Sampling in the Tracks 9/30/05 BN

13 01 11 07 RD/RA DEQ letter to BNSF re: Task J Supplemental Investigation WP 10/31/05 DEQ

13 01 11 07 CD RD/RA Final Task J Work Plan - 12/05 revision w/cover letter 12/15/05

Site-Wide Information

Task F Stage 1 – Part 2: Soil Vapor Extraction

Joint LRG/BNSF Sub-Slab Depressurization and Expansion of SVE Electronic Shop Work Plan

Site-Wide Information

Task F Stage 1 – Part 2: Soil Vapor Extraction

Site-Wide Information

Task F Stage 1 – Part 2: Soil Vapor Extraction

Joint Livingston Restoration Group and BNSF Railway Company Work Plan Submittals

Site-Wide Information

Task F Stage 1 – Part 2: Soil Vapor Extraction

Joint Livingston Remediation Group and BNSF Railway Company Work Plan Submittal - Revised Sub-Slab Depressurization and Expansion of Soil Vapor Extraction

Site-Wide Information

Task F Stage 1 – Part 2: Soil Vapor Extraction

Joint Livingston Restoration Group and BNSF Railway Company Work Plan Submittals

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Page 119: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 119 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 07 RD/RA BKBH letter to DEQ re: Sampling in the Active Track areas 12/16/05 BKBH

13 01 11 07 RD/RA DEQ internal email re: Task J start date 12/20/05 DEQ internal

13 01 11 07 RD/RA 12/20/05 KJ

13 01 11 07 RD/RA 12/27/05 KJ

13 01 11 07 RD/RA Y 01/03/06 DEQ internal

13 01 11 07 RD/RA Y ** DEQ internal email re: Task J activities/impacts on MRL 01/03/06 DEQ internal

13 01 11 07 RD/RA Y ** DEQ internal email re: Task J – conversation with S Olsen 01/05/06 DEQ internal

13 01 11 07 RD/RA 01/03/06 KJ

13 01 11 07 RD/RA 01/04/06 DEQ internal

13 01 11 07 RD/RA DEQ

13 01 11 07 RD/RA DEQ & K/J emails re: Livingston weather conditions 01/10/06

13 01 11 07 RD/RA Y 01/12/06 DEQ internal

13 01 11 07 RD/RA DEQ Legal letter/fax to BKBH re: Task J Sampling 01/13/06 DEQ Legal

13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 01/17/06

13 01 11 07 RD/RA K/J letter to Talgo re: Task J start 01/17/06 KJ

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Phone Log - K/J to DEQ re: Clarification of start date For Task J

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard K/J email to DEQ re: 2nd request to clarify start date

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

** DEQ internal email re: Internal response to Leo Barry 12/16/05 letter

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

K/J email to DEQ re: Task J start date (1/3/06)DEQ & K/J emails re: Task J Field Work

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

DEQ internal email re: Internal response to Leo Barry 12/16/05 letter

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

DEQ email to BNSF & K/J re: Task J field work record of communication (1/6/06)

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

** DEQ internal email re: Task J resolution via the director/Leo Barry letter

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Page 120: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 120 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 07 RD/RA 01/18/06 DEQ internal

13 01 11 07 RD/RA 01/20/06 DEQ internal

13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 1/23/06

13 01 11 07 RD/RA BKBH letter/fax to DEQ re: BNSF Task J sampling 01/23/06 BKBH

13 01 11 07 RD/RA Y ** DEQ email to K/J re: Phone call from BG-29 01/24/06 DEQ

13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 01/31/06

13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 01/31/06

13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 2/1/06

13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 02/06/06

13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update (2/13/06)

13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 02/21/06

13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 02/27/06

13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 3/13/06

13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 03/20/06

13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 03/27/06

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

DEQ internal email re: MRL contact - Electric/Locomotive Shop

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

DEQ internal email re: Phone Log – DEQ attorney & BN attorney re: Task J

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Page 121: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 121 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 04/03/06

13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 04/10/06

13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 04/11/06

13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 04/14/06

13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 04/17/06

13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 04/19/06

13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 4/24/06

13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 04/25/06

13 01 11 07 RD/RA DEQ & K/J emails re: Task J weather update 05/01/06

13 01 11 07 RD/RA Meeting Notes – DEQ/BNSF meeting re: Task J 06/08/06

13 01 11 07 RD/RA Y ** DEQ internal email re: Legal comments to Task J 06/10/06 DEQ internal

13 01 11 07 01 RD/RA Work Plan

13 01 11 07 01 RD/RA Work Plan Draft Work Plan - Task J 05/31/05 KJ

13 01 11 07 01 RD/RA Work Plan Phone Log - Blicker/RTI to DEQ 06/21/05 RTI/Blickler

13 01 11 07 01 RD/RA Work Plan PCEC letter to DEQ re: Task J Work Plan PCEC

13 01 11 07 01 RD/RA Work Plan DEQ comment letter/fax to Task J Work Plan 8/12/05 DEQ

13 01 11 07 01 RD/RA Work Plan DEQ letter/fax to BN re: Comments to Task J 08/12/05 DEQ

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Task J - Investigation of Surface Soil in the Railyard

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 122: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 122 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 07 01 RD/RA Work Plan BNSF email to DEQ re: Sampling Plan deadline extension 09/15/05 BN

13 01 11 07 01 RD/RA Work Plan DEQ/Reynolds meeting notes on railroad activities - BN/MRL 9/19/05 DEQ/ Reynolds

13 01 11 07 01 RD/RA Work Plan 09/21/05 DEQ/ Reynolds

13 01 11 07 01 RD/RA Work Plan 10/05

13 01 11 07 01 RD/RA Work Plan 10/31/05 DEQ

13 01 11 07 01 RD/RA Work Plan K/J & DEQ emails re: Task J Work Plan extension 12/01/05

13 01 11 07 01 RD/RA Work Plan DEQ letter to BNSF re: October 2005 Tasks clarification 12/07/05 DEQ

13 01 11 07 01 RD/RA Work Plan 06/10/10 DEQ

13 01 11 07 01 RD/RA Work Plan DEQ/BNSF emails re: Proper and expeditious

13 01 11 07 01 RD/RA Work Plan 06/28/10 KJ

13 01 11 07 01 RD/RA Work Plan DEQ email to KJ re: Request for clarification 06/29/10 DEQ

13 01 11 07 01 RD/RA Work Plan DEQ/KJ emails re: Task-specific HASP 07/07/10

13 01 11 07 01 RD/RA Work Plan DEQ/KJ emails re: Notification of sampling areas 1-8 07/27/10

13 01 11 07 01 RD/RA Work Plan DEQ/KJ emails re: Items posted to website

13 01 11 07 01 RD/RA Work Plan DEQ/KJ emails re: Request for clarification 08/04/10 DEQ

13 01 11 07 01 RD/RA Work Plan DEQ, KJ, & BN meeting re: Task J Sampling - notes 09/03/10 DEQ/ Reynolds

13 01 11 07 02 RD/RA Visual Reconnaissance

13 01 11 07 02 RD/RA Visual Reconnaissance Task J Field Notes – J Keck DEQ/Keck

13 01 11 07 02 RD/RA Visual Reconnaissance

13 01 11 07 02 RD/RA Visual Reconnaissance 05/30/06 KJ

13 01 11 07 02 RD/RA Visual Reconnaissance K/J email to DEQ re: Task J Conference Call 06/07/06 KJ

13 01 11 07 02 RD/RA Visual Reconnaissance DEQ/KJ emails re: Task J 06/13/06

13 01 11 07 02 RD/RA Visual Reconnaissance DEQ/KJ email re: Task J 06/16/06

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ/Reynolds meeting notes on surface soil samples BN/BKBH, & K/J

Site-Wide Information

Final Task J (Revised) Supplemental Investigation Work Plan for Surface Soil plus electronic version

Site-Wide Information

DEQ Revised Task J Supplemental Investigation Work Plan - electronic version

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ letter to BNSF re: Request for supplemental surface soil sampling

Site-Wide Information

6/15/10-6/16/10

Site-Wide Information

KJ email to DEQ re: Request for clarification and notice of sampling activities

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

7/29/10-7/30/10

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

1/26/06-4/27/06

Site-Wide Information

DEQ/KJ emails re: Addendum No 1 to DEQ-modified Task J WP

5/11/06-5/16/06

Site-Wide Information

K/J letter to DEQ re: Task J Visual Recon – Prelim Work Draft Data Package

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 123: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 123 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 07 02 RD/RA Visual Reconnaissance DEQ/KJ emails re: SVE Systems 6/30/06-7/7/06

13 01 11 07 02 RD/RA Visual Reconnaissance Task J Visual Reconnaissance Maps 06/01/06

13 01 11 07 02 RD/RA Visual Reconnaissance Task J Visual Reconnaissance Photos 06/01/06

13 01 11 07 02 RD/RA Visual Reconnaissance Task J Visual Reconnaissance Field Forms 1 of 2 06/01/06

13 01 11 07 02 RD/RA Visual Reconnaissance Task J Visual Reconnaissance Field Forms 2 of 2 06/01/06

13 01 11 07 02 RD/RA Visual Reconnaissance 08/31/10

13 01 11 07 02 RD/RA Visual Reconnaissance CDM/Hills email to DEQ/Reynolds re: Railyard footprint 09/01/10 CDM/Hills

13 01 11 07 03 RD/RA Sampling

13 01 11 07 03 RD/RA Sampling 08/10/10 CDM/Peters

13 01 11 07 03 RD/RA Sampling 08/10/10 KJ/Aldersley

13 01 11 07 03 RD/RA Sampling 8/16/10 DEQ Legal internal

13 01 11 07 03 RD/RA Sampling 8/16/10

13 01 11 07 03 RD/RA Sampling 08/20/10

13 01 11 07 03 RD/RA Sampling DEQ/Reynolds email to K/J/Norris re: Lead analysis 8/24/10 DEQ

13 01 11 07 03 RD/RA Sampling 8/25/10 DEQ

13 01 11 07 03 RD/RA Sampling 8/26/10 KJ/Aldersley

13 01 11 07 03 RD/RA Sampling 08/26/10 DEQ

13 01 11 07 03 RD/RA Sampling DEQ/Reynolds & BN/Stegman emails re: Livingston Task J 8/26-8/27/10

13 01 11 07 03 RD/RA Sampling 08/30/10 BN/ Stegman

13 01 11 07 03 RD/RA Sampling K/J/Norris & DEQ/Reynolds re: Task J 8/30-9/2/10

13 01 11 07 03 RD/RA Sampling CDM Oversight report 8/9-8/11/10 CDM

13 01 11 07 03 RD/RA Sampling CDM Oversight report 9/13-9/16/10 CDM

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ Legal/Haque-Hausrath internal email re: Phone log with MRL Attorney/B Summerville – Task J of the ROD

DEQLegal/ Haque-Hausrath

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM/Peters email to DEQ/Reynolds re: Task J Sampling Area 7

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Task J Sampling Area 7

Site-Wide Information

DEQ Legal internal email to Reynolds re: Mtg/ MRL Attorney/ Summerville re: Surface soil sampling in Railyard

Site-Wide Information

Phone Log – Conference call: DEQ, K/J/& CDM re: Livingston Shop Complex – Tasks J & L

Site-Wide Information

K/J/Norris & DEQ/Reynolds emails re: Tasks J & L Conference call 8/16/10 summary

Site-Wide Information

Site-Wide Information

DEQ/Reynolds email to K/J/Norris & Aldersley re: Task J modifications

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Task J Conference call

Site-Wide Information

DEQ/Reynolds emails to K/J & R Keller re: Attachment – Edited version of Table 1 areas B&D

Site-Wide Information

Site-Wide Information

BN/Stegman email to DEQ/Reynolds re: Task J – new date for field mobilization

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 124: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 124 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 07 03 RD/RA Sampling 9/16/10 DEQ/ Reynolds

13 01 11 07 03 RD/RA Sampling 09/24/10

13 01 11 07 03 RD/RA Sampling 9/30/10 Energy Labs

13 01 11 07 03 RD/RA Sampling 9/30/10 Energy Labs

13 01 11 07 03 RD/RA Sampling 9/30/10 KJ/Aldersley

13 01 11 07 03 RD/RA Sampling DEQ & MRL meeting - notes 10/04/10 DEQ/ Reynolds

13 01 11 07 03 RD/RA Sampling CDM Oversight report 10/4-10/13/10 CDM

13 01 11 07 03 RD/RA Sampling 10/05/10

13 01 11 07 03 RD/RA Sampling 10/05/10

13 01 11 07 03 RD/RA Sampling 10/06/10 KJ/Aldersley

13 01 11 07 03 RD/RA Sampling 10/07/10 KJ/Aldersley

13 01 11 07 03 RD/RA Sampling KJ/Aldersley

13 01 11 07 03 RD/RA Sampling 11/08/10 KJ/Aldersley

13 01 11 07 03 RD/RA Sampling CDM Oversight Report 11/8-11/9/10 CDM

13 01 11 07 03 RD/RA Sampling 11/30/10 KJ/Aldersley

13 01 11 07 03 RD/RA Sampling 12/13/10

13 01 11 07 03 RD/RA Sampling 01/19/11 KJ/Aldersley

13 01 11 07 03 RD/RA Sampling 04/12/11 KJ/Aldersley

13 01 11 07 03 RD/RA Sampling 10/14/11 DEQ/ Reynolds

13 01 11 07 03 RD/RA Sampling 10/26/11 KJ/Norris

13 01 11 07 03 RD/RA Sampling 11/16/11 KJ/Aldersley

Site-Wide Information

DEQ/Reynolds email to BN/Smith & Stegman re: Attachment – Table 1, September Task J sampling Area E

Site-Wide Information

DEQ Legal/Haque-Hausrath & B Summerville emails re: Proposed meeting date

Site-Wide Information

Energy Labs/Johnson & DEQ/Reynolds emails re: PAH analysis

Site-Wide Information

Energy Labs/Johnson & DEQ/Reynolds emails re: PAH analysis

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Tentative Task J field schedule

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ Legal/Haque-Hausrath email to Director Opper re: MRL has granted access to BNSF for sampling

DEQ Legal/ Haque-Hausrath

Site-Wide Information

DEQ Legal/Haque-Hausrath email to B Summerville re: Sampling in railyard

DEQ Legal/ Haque-Hausrath

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Task J - Exposure Area E - Preliminary results

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Task J item posted to website – Analytical results for work plan areas 1-6 and eight

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Weekly field activities schedule (11/2/10)

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Weekly field activities schedule

Site-Wide Information

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Task J analytical results for Exposure Areas B,C,D,F, & G posted to website

Site-Wide Information

K/J/Norris & DEQ/Reynolds emails re: BN Livingston Shop Complex – Task J SI Report

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Task J items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Livingston deliverable - Task J: Surface Soil Supplemental Investigation Report sent UPS 4/12/11

Site-Wide Information

DEQ/Reynolds letter to BN/Smith re: DEQ comments to 4/12/11 Task J Supplemental Investigation Report

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: BN/KJ response to DEQ's 10/14/11 letter

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Proposed Task J sampling locations/clarifications

Page 125: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 125 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 07 03 RD/RA Sampling 11/17/11 DEQ/ Reynolds

13 01 11 07 03 RD/RA Sampling 11/23/11 KJ/Aldersley

13 01 11 07 03 RD/RA Sampling 11/28/11

13 01 11 07 03 RD/RA Sampling 11/30/11 DEQ/ Reynolds

13 01 11 07 03 RD/RA Sampling 12/01/12 KJ/Aldersley

13 01 11 07 03 RD/RA Sampling 12/08/11

13 01 11 07 03 RD/RA Sampling 12/9-12/10/11 CDM

13 01 11 07 03 RD/RA Sampling 01/25/12 KJ/Aldersley

13 01 11 07 03 RD/RA Sampling 07/19/12 KJ/Aldersley

13 01 11 07 03 RD/RA Sampling 08/31/12 KJ/Aldersley

13 01 11 07 03 RD/RA Sampling 10/19/12 CDM Smith

13 01 11 07 03 RD/RA Sampling 10/22/12 DEQ/ Reynolds

13 01 11 07 03 RD/RA Sampling Y 01/02/13 DEQ internal

13 01 11 07 03 01 RD/RA Analytical Results

13 01 11 07 03 01 RD/RA Analytical Results DEQ split sample results 09/21/10 Energy Labs

13 01 11 07 03 01 RD/RA Analytical Results DEQ split sample results 09/29/10 Energy Labs

13 01 11 07 03 01 RD/RA Analytical Results 10/6/10 KJ/Aldersley

13 01 11 07 03 01 RD/RA Analytical Results DEQ split sample results 10/28/10 Energy Labs

13 01 11 07 03 01 RD/RA Analytical Results DEQ split sample results 10/28/10 Energy Labs

13 01 11 07 03 01 RD/RA Analytical Results DEQ split sample results 11/01/10 Energy Labs

13 01 11 07 03 01 RD/RA Analytical Results DEQ split sample results 11/29/10 Energy Labs

Site-Wide Information

DEQ/Reynolds email to KJ/Aldersley re: DEQ response to KJ 11/16/11 email

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Notification of field activities

Site-Wide Information

DEQ/Reynolds & KJ/Aldersley emails re: Attachment - Revised Sampling Approach - Iron Hiorse Trailor Park 9maps included)

Site-Wide Information

DEQ/Reynolds letter to BN/Smith re: DEQ comments to HRO#20-29, HRO#31 & 32 IDW Analytical Results & Request for Contained-out Decisions

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Notification of field activities

Site-Wide Information

DEQ/Reynolds & KJ/Aldersley emails re Notification of landspreading in C&P Packing Pit

Site-Wide Information

CDM Field oversight report - soil sampling at Ironhorse Trailer Park

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Task J Data posted to website - Analytical results from December 2011 sampling

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Notification of Task J Pre-RA Sampling

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Task J Data posted to website - Analytical results from 5 grids

Site-Wide Information

CDM Smith Memorandum to DEQ/Reynolds re: GW Monitoring Program Directive No. 1 for Tasks F & L

Site-Wide Information

DEQ/Reynolds letter to BN/Smith re: Continuation of Task F & Task L GW monitoring activities

Site-Wide Information

** DEQ legal/Haque-Haisrath & Mark Hall internal emails re: Additional F-listed waste/"no longer contained-in" determination

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Exposure Area E Surface Soil preliminary analytical results

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 126: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 126 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 07 03 01 RD/RA Analytical Results DEQ split sample results 11/29/10 Energy Labs

13 01 11 07 03 01 RD/RA Analytical Results DEQ split sample results 11/29/10 Energy Labs

13 01 11 07 03 01 RD/RA Analytical Results DEQ split sample results 11/30/10 Energy Labs

13 01 11 07 03 01 RD/RA Analytical Results DEQ split sample results 11/30/10 Energy Labs

13 01 11 07 03 01 RD/RA Analytical Results Chain of Custody 12/12/11 Energy Labs

13 01 11 07 03 01 RD/RA Analytical Results Analytical Summary Report 12/27/11 Energy Labs

13 01 11 07 03 01 RD/RA Analytical Results Analytical Summary Report 01/04/12 Energy Labs

13 01 11 07 03 01 RD/RA Analytical Results 02/22/12

13 01 11 07 03 01 RD/RA Analytical Results 04/05/12

13 01 11 07 04 CD RD/RA 04/12/11 KJ

13 01 11 07 04 RD/RA 10/14/11

13 01 11 07 04 RD/RA 02/23/12 CDM Smith

13 01 11 07 04 RD/RA 04/30/12

13 01 11 07 04 CD RD/RA 04/30/12 KJ

13 01 11 07 04 RD/RA 04/30/12 KJ/Adlersley

13 01 11 07 04 RD/RA 06/15/12 KJ/Adlersley

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ/Reynolds & KJ/Aldersley emails re: Yard location numbers for lab results

Site-Wide Information

KJ/Norris & Aldersley & DEQ/Reynolds emails re: Task J - Grid 30C

1083/ 58M101

Site-Wide Information

Task J: Surface Soil Supplemental Investigation Report Vol I-IV (Vol II-IV @ RM)

Site-Wide Information

Task J: Surface Soil Supplemental Investigation Report Vol I-IV

DEQ Memorandum to file re: Utilizing of 2009 Montana Tier 1 Risk-Based Corrective Action (RBCA) Risk-Based Screening Levels for Certain PAHs at the Facility

DEQ legal/ Haque-Hausrath

Site-Wide Information

Task J: Surface Soil Supplemental Investigation Report Vol I-IV

CDM Smith Memorandum to DEQ/Reynolds re: Task J Data Evaluation Summary

Site-Wide Information

Task J: Surface Soil Supplemental Investigation Report Vol I-IV

KJ cover letter for the Revised Task J Supplemental Investigation Report

Site-Wide Information

Task J: Surface Soil Supplemental Investigation Report Vol I-IV

Task J: Revised Surface Soil Supplemental Investigation Report Vol I & V-Addendum to Appendices D,E, & G

Site-Wide Information

Task J: Surface Soil Supplemental Investigation Report Vol I-IV

KJ/Aldersley email to DEQ/Reynolds re: Replacement pages, Spines & covers for Volumes 2,3,&4

Site-Wide Information

Task J: Surface Soil Supplemental Investigation Report Vol I-IV

KJ/Aldersley email to DEQ/Reynolds re: Attachment - Evaluation of remedial alternative tables

Page 127: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 127 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 07 04 RD/RA 07/03/12 DEQ/ Reynolds

13 01 11 07 04 RD/RA 07/19/12 KJ

13 01 11 07 04 RD/RA 07/19/12 KJ/Adlersley

13 01 11 07 04 RD/RA 07/19/12 KJ

13 01 11 07 04 RD/RA 07/19/12

13 01 11 07 04 RD/RA 07/30/12 DEQ/ Reynolds

13 01 11 07 04 RD/RA 08/30/12 DEQ/ Reynolds

13 01 11 07 04 RD/RA 03/12/13

13 01 11 07 04 RD/RA 03/19/13

13 01 11 07 04 01 RD/RA

13 01 11 07 04 01 RD/RA 03/22/12 DEQ internal

13 01 11 07 04 01 RD/RA 03/22/12 DEQ internal

13 01 11 07 04 01 RD/RA 10/12/12

Site-Wide Information

Task J: Surface Soil Supplemental Investigation Report Vol I-IV

DEQ/Reynolds letter to BN/Smith re: April 2102 Revised Task J Surface Soil Supplemental Investigation Report

Site-Wide Information

Task J: Surface Soil Supplemental Investigation Report Vol I-IV

Task J: Revised Surface Soil Supplemental Investigation Report Vol I

Site-Wide Information

Task J: Surface Soil Supplemental Investigation Report Vol I-IV

KJ/Aldersley email to DEQ/Reynolds re: 2nd Revised Task J Surface Soil Supplemental Investigation Report sent out UPS 7/19/12

Site-Wide Information

Task J: Surface Soil Supplemental Investigation Report Vol I-IV

KJ redline strikeout of Task J 2nd Revised Surface Soil Supplemental Investigation Report

Site-Wide Information

Task J: Surface Soil Supplemental Investigation Report Vol I-IV

DEQ/Reynoldds & KJ/Aldersley emails re: Task J Report comments - hard copy

Site-Wide Information

Task J: Surface Soil Supplemental Investigation Report Vol I-IV

DEQ/Reynolds letter to BN/Smith re: July 2012 2nd Revised Task J Surface Soil Supplemental Investigation Report approved

Site-Wide Information

Task J: Surface Soil Supplemental Investigation Report Vol I-IV

DEQ/Reynolds letter to BN/Smith re: July 2012 2nd Revised Task J Surface Soil Supplemental Investigation Report comment period ended - no comments received - approved as is

Site-Wide Information

Task J: Surface Soil Supplemental Investigation Report Vol I-IV

KJ/Aldersley & DEQ/Reynolds emails re: HRO-13 Redevelopment/Sampling

Site-Wide Information

Task J: Surface Soil Supplemental Investigation Report Vol I-IV

KJ/Aldersley email to DEQ/Reynolds re: Analytical results from the 1st sampling in February 2013 posted to the website

Site-Wide Information

Analytical Results to Property Owners

Site-Wide Information

Analytical Results to Property Owners

DEQ/Martin & Reynolds internal emails re: Mobil home park sampling results

Site-Wide Information

Analytical Results to Property Owners

DEQ/Martin internal email to Reynolds re: Phone log - DEQ/Martin to Annette Steiger/mobil home park renter re: DEQ gave sample results for her lot

Site-Wide Information

Analytical Results to Property Owners

DEQ/Reynolds, MRL/Theresa Beckwith, & Iron Horse Trailor Park/Linda Budeski emails re: Contact information for Mobil Home Park residents

Page 128: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 128 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 07 04 01 RD/RA 10/12/12 MRL/ Beckwith

13 01 11 07 04 01 RD/RA 10/12/12

13 01 11 07 04 01 RD/RA

13 01 11 07 04 01 RD/RA 10/17/12 DEQ/ Reynolds

13 01 11 07 04 01 RD/RA 10/17/12 DEQ/ Reynolds

13 01 11 07 04 01 RD/RA 10/17/12 DEQ/ Reynolds

13 01 11 07 04 01 RD/RA 10/17/12 DEQ/ Reynolds

13 01 11 07 04 01 RD/RA 10/17/12 DEQ/ Reynolds

13 01 11 07 04 01 RD/RA 10/17/12 DEQ/ Reynolds

13 01 11 07 04 01 RD/RA 10/17/12 DEQ/ Reynolds

13 01 11 07 04 01 RD/RA 10/17/12 DEQ/ Reynolds

13 01 11 07 04 01 RD/RA 10/19/12 DEQ/ Reynolds

13 01 11 07 04 01 RD/RA 10/19/12 DEQ/ Reynolds

13 01 11 07 04 01 RD/RA 10/19/12 DEQ/ Reynolds

13 01 11 07 04 01 RD/RA 10/19/12 DEQ/ Reynolds

13 01 11 07 04 01 RD/RA 10/19/12 DEQ/ Reynolds

13 01 11 07 04 01 RD/RA 10/19/12 DEQ/ Reynolds

13 01 11 07 04 01 RD/RA 10/19/12 DEQ/ Reynolds

13 01 11 07 04 01 RD/RA 10/19/12 DEQ/ Reynolds

13 01 11 07 04 01 RD/RA 10/19/12 DEQ/ Reynolds

13 01 11 07 04 01 RD/RA 10/19/12 DEQ/ Reynolds

Site-Wide Information

Analytical Results to Property Owners

MRL/Theresa Beckwith email to Iron Horse Trailor Park/Linda Budeski re: DEQ info request - Tenant list for mobil home park

Site-Wide Information

Analytical Results to Property Owners

Iron Horse Trailor Park/Linda Budeski email to DEQ/Reynolds re: Tenant list for mobil home park

Iron Horse Trailor Park/ L Budeski

Site-Wide Information

Analytical Results to Property Owners

DEQ/Reynolds, MRL/Theresa Beckwith, & KJ/Aldersley emails re: Access to Iron Horse Trailor Park

10/12-10/15/12

Site-Wide Information

Analytical Results to Property Owners

DEQ/Reynolds letter to Residents/Mr & Mrs Litner re: Analytical results for lot #13

Site-Wide Information

Analytical Results to Property Owners

DEQ/Reynolds letter to Residents/Mr & Mrs Harper re: Analytical results for lot #12

Site-Wide Information

Analytical Results to Property Owners

DEQ/Reynolds letter to Residents/Mr & Mrs Le Fannin re: Analytical results for lot #14

Site-Wide Information

Analytical Results to Property Owners

DEQ/Reynolds letter to Residents/Mr & Mrs Sherill re: Analytical results for lot #14

Site-Wide Information

Analytical Results to Property Owners

DEQ/Reynolds letter to Linda Budeski re: Analytical results for lot #15

Site-Wide Information

Analytical Results to Property Owners

DEQ/Reynolds letter to Linda Budeski re: Analytical results for lots #11, 3, 20 & area where garbage containers are located

Site-Wide Information

Analytical Results to Property Owners

DEQ/Reynolds letter to JAHD LLC re: Analytical results for lots #5, 2, 16 & 17

Site-Wide Information

Analytical Results to Property Owners

DEQ/Reynolds letter to Russ Himmelspach re: Analytical results for lots #9, 1, 21, & 24

Site-Wide Information

Analytical Results to Property Owners

DEQ/Reynolds letter to Robert Morrison re: Analytical results for lot #23

Site-Wide Information

Analytical Results to Property Owners

DEQ/Reynolds letter to Nancy Olsen re: Analytical results for lot #26

Site-Wide Information

Analytical Results to Property Owners

DEQ/Reynolds letter to Ross Little re: Analytical results for lot #19

Site-Wide Information

Analytical Results to Property Owners

DEQ/Reynolds letter to Annette Steiger re: Analytical results for lot #7

Site-Wide Information

Analytical Results to Property Owners

DEQ/Reynolds letter to Robert Morrison & Linda re: Analytical results for lot #4

Site-Wide Information

Analytical Results to Property Owners

DEQ/Reynolds letter to Mark Stoeker re: Analytical results for lot #8

Site-Wide Information

Analytical Results to Property Owners

DEQ/Reynolds letter to Wilma Beaty & Joe re: Analytical results for lot #10

Site-Wide Information

Analytical Results to Property Owners

DEQ/Reynolds letter to Joe Ott in care of Pamela Printz re: Analytical results for lot #25

Site-Wide Information

Analytical Results to Property Owners

DEQ/Reynolds letter to Liz & Claude Smith re: Analytical results for lot #18

Site-Wide Information

Analytical Results to Property Owners

DEQ/Reynolds letter to Matt Goff re: Analytical results for lot #6

Page 129: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 129 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 07 04 01 RD/RA 10/19/12 DEQ/ Reynolds

13 01 11 07 04 01 RD/RA 10/19/12 DEQ/ Reynolds

13 01 11 07 04 01 RD/RA 10/20/12

13 01 11 07 05 RD/RA Remediation

13 01 11 07 05 RD/RA Remediation 10/10/12 KJ/Adlersley

13 01 11 07 05 RD/RA Remediation 10/23/12 KJ/Adlersley

13 01 11 07 05 RD/RA Remediation 10/26/12 KJ/Norris

13 01 11 07 05 RD/RA Remediation CDM Smith email to DEQ/Reynolds re: Task J activity 10/26/12

13 01 11 07 05 RD/RA Remediation 10/30/12 KJ

13 01 11 07 05 RD/RA Remediation 10/30/12

13 01 11 07 05 RD/RA Remediation 10/31/12

13 01 11 07 05 RD/RA Remediation 11/02/12

13 01 11 07 05 RD/RA Remediation 11/02/12 KJ/Adlersley

13 01 11 07 05 RD/RA Remediation 11/05/12

13 01 11 07 05 RD/RA Remediation 11/07/12

13 01 11 07 05 RD/RA Remediation 11/07/12

13 01 11 07 05 RD/RA Remediation DEQ/Reynolds & KJ/Aldersley emails re: Task J Grid 22J-B 11/09/12

13 01 11 07 05 RD/RA Remediation DEQ/Reynolds & KJ/Norris emails re: Residential yard cleanup 07/11/12

13 01 11 07 05 RD/RA Remediation 10/23/12 KJ/Norris

13 01 11 07 05 RD/RA Remediation

13 01 11 07 05 RD/RA Remediation 11/13/12 KJ/Adlersley

Site-Wide Information

Analytical Results to Property Owners

DEQ/Reynolds letter to Sandra Glenn re: Analytical results for lot #20

Site-Wide Information

Analytical Results to Property Owners

DEQ/Reynolds letter to Carol Callison re: Analytical results for lot #29

Site-Wide Information

Analytical Results to Property Owners

DEQ/Reynolds 10/17/12 letter to Residents/Mr & Mrs Sherill re: Analytical results for lot #14 returned to DEQ as unclaimed

Site-Wide Information

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Task J - Surface soil removal

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Task J - Backfill source materials

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: Surface soil removal from yards 4 & 5

Site-Wide Information

CDM Smith/ Simpson

Site-Wide Information

Proposed Backfill Import Source for Task J - Soil Removal/Replacement Project

Site-Wide Information

CDM Smith email to DEQ/Reynolds re: Task J activities for 10/30/12 - Attachment - Photo log

CDM Smith/ Simpson

Site-Wide Information

CDM Smith email to DEQ/Reynolds re: Task J activities for 10/31/12 - Attachment - Photo log

CDM Smith/ Simpson

Site-Wide Information

CDM Smith email to DEQ/Reynolds re: Task J activities for 11/1/12 - Attachment - Photo log

CDM Smith/ Simpson

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: KJ received information request from resident Seth Zeman

Site-Wide Information

DEQ/Reynolds & KJ/Aldersley emails re: Task J backfill revised table 1

Site-Wide Information

KJ/Aldersley & DEQ/Reynolds emails re: Task J - Extent of excavation deeper

Site-Wide Information

CDM Smith email to DEQ/Reynolds re: Task J activities for 11/6/12 - Attachment - Photo log

CDM Smith/ Simpson

Site-Wide Information

Site-Wide Information

Site-Wide Information

K/J Norris email to DEQ re: Phone call with Judge Linda Budeski - leases the Iron Horse mobil home park re: Budeski authorization for access to the mobil home park

Site-Wide Information

DEQ/Reynolds & KJ/Aldersley emails re: Preliminary surface soil analytical results and backfill for residential yards

11/10-11/13/12

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Attachment - Preliminary grid confirmation surface soil analytical results

Page 130: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 130 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 07 05 RD/RA Remediation 11/20/12 KJ

13 01 11 07 05 RD/RA Remediation 11/27/12

13 01 11 07 05 RD/RA Remediation 12/03/12 DEQ/Seyler

13 01 11 07 05 RD/RA Remediation 12/12/12 DEQ/ Reynolds

13 01 11 07 05 RD/RA Remediation KJ/Aldersley & DEQ/Reynolds emails re: Task J - RA Report 12/13/12

13 01 11 07 05 RD/RA Remediation 07/03/13 KJ/Adlersley

13 01 11 07 05 RD/RA Remediation Task J Remedial Action Report for Surface Soil 05/06/14 KJ/Adlersley

13 01 11 08 RD/RA Well Inventory

13 01 11 08 CD RD/RA Well Inventory Draft Well Inventory 05/31/05 KJ

13 01 11 08 RD/RA Well Inventory 10/28/05 DEQ

13 01 11 08 RD/RA Well Inventory K/J letter to DEQ re: Private Well Survey 12/15/05 KJ

13 01 11 08 CD RD/RA Well Inventory 07/11/06 KJ

13 01 11 08 RD/RA Well Inventory 07/20/06 DEQ

13 01 11 08 RD/RA Well Inventory DEQ & K/J emails re: Private & Public well inventory 7/27/06

13 01 11 08 RD/RA Well Inventory 07/31/06 KJ

13 01 11 08 RD/RA Well Inventory 07/31/06 KJ

13 01 11 08 RD/RA Well Inventory DEQ internal email re: Changes left out of revised pages 8/2/06 DEQ internal

13 01 11 08 RD/RA Well Inventory 08/03/06 DEQ

13 01 11 08 RD/RA Well Inventory 01/30/07 KJ

13 01 11 08 CD RD/RA Well Inventory 01/30/07

13 01 11 08 RD/RA Well Inventory 02/06/07 DEQ

13 01 11 08 RD/RA Well Inventory 2/6/07

Site-Wide Information

Stockpiled Soil Analytical Results - Task J & Task D/E Request for Contained-Out Decision

Site-Wide Information

DEQ/Reynolds & KJ/Aldersley emails re: Analytical stockpile of jars

Site-Wide Information

DEQ/Seyler letter to BN/Smith re: DEQ does not approve BN's request for a "no longer containd-in determination for soil stockpile Sp-J-2

Site-Wide Information

DEQ/Reynolds letter to BN/Smith re: DEQ approval of BN's request for "no longer contained-in" decision

Site-Wide Information

Site-Wide Information

KJ/Aldersley & DEQ/Reynolds emails re: Task J report go-ahead

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ letter to BNSF re: Comments to draft private & public well inventory

Site-Wide Information

1166/ 38D103

Site-Wide Information

Private & Public Well Inventory Revision No. 1 - 1/06 revised w/replacement pages -

Site-Wide Information

DEQ letter to BNSF re: Private & Public Well Inventory Revision No. 1

Site-Wide Information

Site-Wide Information

K/J email to DEQ re: Replacement pages to Private & Public well inventory

Site-Wide Information

K/J letter to DEQ re: replacement pages for Private and Public Well Inventory (Revision No 1) included

Site-Wide Information

Site-Wide Information

DEQ letter to Park Co Environmental Council re: Private & Public Well Inventory

Site-Wide Information

K/J email to DEQ re: Annual update to Private & Public Well Inventory sent out in mail

1166/ 38D103

Site-Wide Information

2006 Annual Update to Private & Public Well Inventory (revision # 1)

Site-Wide Information

DEQ letter to BNSF re: 2006 Annual Update to Private & Public Well Inventory (rev # 1)

Site-Wide Information

DEQ & Bozeman City Manager emails re: HB 388 – BNSF Rail Yards

Page 131: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 131 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 08 RD/RA Well Inventory DEQ & Bozeman City Manager emails re: Ordinance 1918 02/07/07

13 01 11 08 RD/RA Well Inventory Private & Public Well Inventory Report Revision # 2 1/08 KJ

13 01 11 08 CD RD/RA Well Inventory Private & Public Well Inventory Revision #3 01/30/09 KJ

13 01 11 08 RD/RA Well Inventory 7/13/09 DEQ

13 01 11 08 RD/RA Well Inventory KJ letter to DEQ re: 2009 Annual Update Revision No.3 07/22/09 KJ

13 01 11 08 RD/RA Well Inventory DEQ letter to BNSF re: 2009 Annual Update Revision No.3 09/08/09 DEQ

13 01 11 08 RD/RA Well Inventory DEQ/KJ emails re: Well Inventory Rev No.3

13 01 11 08 RD/RA Well Inventory KJ letter to DEQ re: 2009 Annual Update 11/18/09 KJ

13 01 11 08 RD/RA Well Inventory DEQ/Lawellin/KJ/BNSF emails re: Well survey overview

13 01 11 08 RD/RA Well Inventory KJ email to DEQ re: Document deliverables 01/28/10 KJ

13 01 11 08 CD RD/RA Well Inventory Private & Public Well Inventory (Revision #4) 1/28/10 KJ

13 01 11 08 RD/RA Well Inventory Private & Public Well Inventory – 2009 Mail Survey 01/28/10

13 01 11 08 RD/RA Well Inventory 02/25/10

13 01 11 08 RD/RA Well Inventory DEQ letter to BNSF re: 2010 Annual Update Revision No.4 04/12/10 DEQ

13 01 11 08 RD/RA Well Inventory DEQ letter to FNAF re: 2010 Annual Update Revision No.4 04/28/10 DEQ

13 01 11 08 RD/RA Well Inventory 10/13/10 KJ/Aldersley

13 01 11 08 RD/RA Well Inventory Private & Public Well Inventory (Revision #5) 01/28/11 KJ

13 01 11 08 RD/RA Well Inventory 02/10/11 KJ/Norris

13 01 11 08 RD/RA Well Inventory 02/11/11 KJ/Aldersley

13 01 11 08 RD/RA Well Inventory 04/25/11 DEQ/ Reynolds

13 01 11 08 RD/RA Well Inventory 05/24/11

Site-Wide Information

1166/ 38D103

Site-Wide Information

1166/ 38D103

Site-Wide Information

Site-Wide Information

DEQ letter to BN/Smith re: 2009 Annual Update to Private & Public Well Inventory (Revision #3) dated 1/30/09 - clarification

Site-Wide Information

Site-Wide Information

Site-Wide Information

10/29/10-10/30/10

Site-Wide Information

Site-Wide Information

12/22/09-12/29/09

Site-Wide Information

1166/ 38D103

Site-Wide Information

1166/ 38D103

Site-Wide Information

Site-Wide Information

Private & Public Well Inventory – Responses to 2009 Mail Survey CD

Site-Wide Information

Site-Wide Information

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Mr Olson – private well

Site-Wide Information

Site-Wide Information

K/J/Norris letter to DEQ/Reynolds re: Public & Private Well Inventory –Revision #5

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Replacement cover letter & tracking form for Public & Private Well Inventory –Revision #5 sent out 2/10/11

Site-Wide Information

DEQ/Reynolds email to BN/Smith re: DEQ comments on Public & Private Well Inventory –Revision #5

Site-Wide Information

K/J, CDM, & DEQ emails re: Livingston Shop Complex - Well Inventory Revision

Page 132: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 132 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 08 RD/RA Well Inventory 05/25/11 KJ/Aldersley

13 01 11 08 RD/RA Well Inventory 06/01/11 DEQ/ Reynolds

13 01 11 08 RD/RA Well Inventory 01/30/12 KJ/Aldersley

13 01 11 08 CD RD/RA Well Inventory Private & Public Well Inventory Revision # 6 01/30/12 KJ

13 01 11 08 RD/RA Well Inventory 01/30/13 KJ/Aldersley

13 01 11 08 RD/RA Well Inventory Private & Public Well Inventory Revision #7 01/30/13 KJ

13 01 11 08 RD/RA Well Inventory 02/27/13 KJ/Aldersley

13 01 11 09 RD/RA

13 01 11 09 RD/RA Phone Log - Smith/BNSF 12/14/04 BN

13 01 11 09 RD/RA DEQ letter to BNSF re: Transmitting WET Bedrock data 12/15/04 DEQ

13 01 11 09 RD/RA 01/12/05 DEQ

13 01 11 09 RD/RA DEQ email to BNSF re: Bedrock groundwater 01/12/05 DEQ

13 01 11 09 RD/RA DEQ & K/J emails re Task F-stage 1-part 2 postponement 01/24/06

13 01 11 09 RD/RA RTI email to DEQ re: RTI comments on Task L Work Plan 01/30/06 RTI

13 01 11 09 RD/RA DEQ email to RTI re: RTI comments to Task L 01/31/06 DEQ

13 01 11 09 RD/RA 07/19/10

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Livingston Deliverable – 2011 Annual Update to Private & Public Well Inventory (Revision #5) to be delivered 5/27/11

Site-Wide Information

DEQ/Reynolds letter to BN/Smith re: DEQ approval of 2011 Annual Update to Private & Public Well Inventory (Revision #5)

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Livingston Deliverable – 2011 Annual Update to Private & Public Well Inventory (Revision #6) to be delivered 1/31/12

Site-Wide Information

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Livingston Deliverable – 2012 Annual Update to Private & Public Well Inventory (Revision #7) to be delivered 1/31/13

Site-Wide Information

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Attachment - Comprehensive well survey list

Site-Wide Information

Task L - Investigation of VOCs in the Bedrock Aquifer(s)

Site-Wide Information

Task L - Investigation of VOCs in the Bedrock Aquifer(s)

Site-Wide Information

Task L - Investigation of VOCs in the Bedrock Aquifer(s)

Site-Wide Information

Task L - Investigation of VOCs in the Bedrock Aquifer(s)

DEQ email to COK, Wheat, Brown & Mc Garry re: WET Bedrock data

Site-Wide Information

Task L - Investigation of VOCs in the Bedrock Aquifer(s)

Site-Wide Information

Task L - Investigation of VOCs in the Bedrock Aquifer(s)

Site-Wide Information

Task L - Investigation of VOCs in the Bedrock Aquifer(s)

Site-Wide Information

Task L - Investigation of VOCs in the Bedrock Aquifer(s)

Site-Wide Information

Task L - Investigation of VOCs in the Bedrock Aquifer(s)

DEQ/Reynolds letter to BN/Smith re: DEQ redline/Strikeout comments on the Draft Task L Supplemental Investigation Work Plan Aquifer GW

DEQ/ P5424Reynolds

Page 133: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 133 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 09 RD/RA 08/01/10 DEQ

13 01 11 09 RD/RA DEQ/Reynolds & K/J/Norris emails re: Task L 9/15-9/16/10 DEQ/ Reynolds

13 01 11 09 RD/RA 09/16/10 DEQ/ Reynolds

13 01 11 09 01 RD/RA Work Plan

13 01 11 09 01 CD RD/RA Work Plan 06/01/05 KJ

13 01 11 09 01 RD/RA Work Plan 06/01/05

13 01 11 09 01 RD/RA Work Plan 08/16/10

13 01 11 09 01 CD RD/RA Work Plan 09/24/10 DEQ

13 01 11 09 01 RD/RA Work Plan 06/17/11

13 01 11 09 01 RD/RA Work Plan 06/09/11

13 01 11 09 01 RD/RA Work Plan K/J internal emails re: Task L – geophysical 07/27/11 KJ

13 01 11 09 01 RD/RA Work Plan 11/04/11 DEQ/ Reynolds

13 01 11 09 01 RD/RA Work Plan 12/13/11 KJ/Norris

13 01 11 09 01 RD/RA Work Plan 01/31/12 KJ/Aldersley

13 01 11 09 01 CD RD/RA Work Plan 01/31/12 DEQ

13 01 11 09 01 RD/RA Work Plan 03/06/12 DEQ/ Reynolds

13 01 11 09 01 RD/RA Work Plan 03/12/12 BN/Smith

13 01 11 09 01 RD/RA Work Plan CDM Smith Conference call meeting notes 03/20/12 CDM Smith

Site-Wide Information

Task L - Investigation of VOCs in the Bedrock Aquifer(s)

Task L Work Plan DEQ version –redline/strikeout with K/J redline

Site-Wide Information

Task L - Investigation of VOCs in the Bedrock Aquifer(s)

Site-Wide Information

Task L - Investigation of VOCs in the Bedrock Aquifer(s)

DEQ/Reynolds letter to BN/Smith re: DEQ comments on Task L Supplemental Investigation Work Plan for Bedrock Aquifer Groundwater – Attachment Table B to be inserted and will then be considered approved by DEQ

Site-Wide Information

Site-Wide Information

Draft Supplemental Work Plan - Task L for Bedrock Aquifers

Site-Wide Information

Draft Appendix B Environmental Requirements, Criteria, and Limitations

Site-Wide Information

K/J/Norris & DEQ/ Reynolds emails re: Task L follow-up questions

Site-Wide Information

Task L Supplemental Investigation Work Plan for Bedrock Aquifers 8/27/10 - Revised w/replacement pages

Site-Wide Information

CDM/Hills & K/J/Norris emails re: Task L well location & Operational directive 60

Site-Wide Information

DEQ/Reynolds & K/J/Norris emails re: Task L Drilling Program Path Forward

Site-Wide Information

Site-Wide Information

DEQ/Reynolds letter to BN/Smith re: DEQ request for Task L Supplemental Investigation Work Plan Addendum for Bedrock Aquifer

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: Task L Supplemental Investigation Work Plan - revised due date

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Deliverable - Addendum No 1 to Task L Supplemental Investigation Work Plan for Bedrock Aquifers - DEQ Version to be delivered 2/1/12

Site-Wide Information

Addendum No 1 to Task L Supplemental Investigation Work Plan for Bedrock Aquifers - DEQ Version

Site-Wide Information

DEQ/Reynolds letter to BN/Smith re: DEQ comments to Addendum No 1 to Task L Supplemental Investigation Work Plan for Bedrock Aquifers

Site-Wide Information

BN/Smith email to DEQ/Reynolds re: Meeting requested to discuss Task L Supplemental Investigation Work Plan Shop Complex

Site-Wide Information

Page 134: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 134 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 09 01 RD/RA Work Plan 04/16/12 KJ

13 01 11 09 01 RD/RA Work Plan 05/03/12 DEQ/ Reynolds

13 01 11 09 01 RD/RA Work Plan 05/04/12

13 01 11 09 01 RD/RA Work Plan 05/26/12

13 01 11 09 01 RD/RA Work Plan 6/8-6/11/12

13 01 11 09 01 RD/RA Work Plan CDM Smith Conference call meeting notes 06/22/12 CDM Smith

13 01 11 09 01 RD/RA Work Plan 07/02/12

13 01 11 09 01 RD/RA Work Plan 07/03/12

13 01 11 09 01 RD/RA Work Plan 07/09/12

13 01 11 09 01 RD/RA Work Plan 07/11/12 KJ/Adlersley

13 01 11 09 01 RD/RA Work Plan 07/18/12 KJ/Adlersley

13 01 11 09 01 RD/RA Work Plan 07/30/12 CDM Smith/ Coan

13 01 11 09 01 RD/RA Work Plan 08/13/12

13 01 11 09 01 RD/RA Work Plan 08/14/12 KJ/Adlersley

13 01 11 09 01 RD/RA Work Plan 04/02/13

13 01 11 09 01 RD/RA Work Plan 04/17/13 KJ/Norris

13 01 11 09 01 RD/RA Work Plan 04/19/13 CDM Smith

13 01 11 09 01 RD/RA Work Plan 04/23/13 DEQ/ Reynolds

13 01 11 09 01 RD/RA Work Plan 04/23/13 Geosyntec

13 01 11 09 01 RD/RA Work Plan 05/10/13 Geosyntec

Site-Wide Information

Addendum No. 1 to DEQ Version of Task L Supplemental Investigation Work Plan for Bedrock Aquifers (Revision No. 1)

Site-Wide Information

DEQ/Reynolds letter to BN/Smith re: DEQ approval of the Revised Addendum - with notes

Site-Wide Information

Conference call meeeting notes - DEQ, KJ, & CDM: Tasks L well completion

Site-Wide Information

Conference call meeeting notes - DEQ, KJ, BN, & CDM: Tasks L

Site-Wide Information

KJ/Norris & DEQ/Reynolds emails re: Task L field schedule-Activated carbon strip

Site-Wide Information

Site-Wide Information

KJ/Aldersley & DEQ/Reynolds emails re: Notification of Task F field activities

Site-Wide Information

KJ/Aldersley & DEQ/Reynolds emails re: Maps showing Revised Task L well locations

Site-Wide Information

KJ/Aldersley & DEQ/Reynolds emails re: July 2012 field activities

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Revised Task L Field schedule - Attachment -Revised Task L drilling schedule & Revised well locations

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Task L drilling schedule

Site-Wide Information

CDMSmith/Coan email to DEQ/Reynolds re: BN Livingston daily update for Saturday & Sunday, July 28-29, 2012

Site-Wide Information

CDMSmith/Coan & KJ/Schreiner emails re: Task L schedule changes

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Task L schedule update

Site-Wide Information

DEQ/Reynolds & KJ/Norris emails re: Conference call scheduling to discuss Task L

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: Conference call scheduling to discuss Task L bedrock & path forward

Site-Wide Information

CDM Smith memo to DEQ/Reynolds re: Summary of Task F/L meeting with DEQ, BN & KJ

Site-Wide Information

DEQ/Reynolds letter/fax to BN/Smith & KJ/Norris re: Additional requirements for tasks L & F supplemental investigation

Site-Wide Information

Teleconferemce meeting meetings for 4/23/13 meeting between DEQ, KJ, BN, CDM, & Geosyntec

Site-Wide Information

Teleconferemce meeting meetings for 5/10/13 meeting between DEQ, KJ, BN, CDM, & Geosyntec

Page 135: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 135 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 09 01 CD RD/RA Work Plan 05/24/13

13 01 11 09 01 CD RD/RA Work Plan KJ/Norris & DEQ/Reynolds emails re: Info for Task L planning 04/17/13 KJ/Norris

13 01 11 09 01 CD RD/RA Work Plan 05/23/13 DEQ/Reynolds

13 01 11 09 01 CD RD/RA Work Plan 05/23/13 KJ/Aldersley

13 01 11 09 01 CD RD/RA Work Plan 05/02/13

13 01 11 09 01 CD RD/RA Work Plan 05/28/13 DEQ/Reynolds

13 01 11 09 01 CD RD/RA Work Plan 05/29/13 DEQ/Reynolds

13 01 11 09 01 CD RD/RA Work Plan 05/31/13 DEQ/ Reynolds

13 01 11 09 01 CD RD/RA Work Plan 06/21/13 DEQ/ Reynolds

13 01 11 09 01 CD RD/RA Work Plan 08/29/13

13 01 11 09 01 CD RD/RA Work Plan 10/04/13 DEQ/Reynolds

13 01 11 09 01 RD/RA Work Plan Gore Sorber - Full List of Analytes 10/09/13 DEQ/Reynolds

13 01 11 09 01 CD RD/RA Work Plan 10/10/13 BNSF/ Stegemen

13 01 11 09 01 RD/RA Work Plan 11/27/13 Kennedy/Jenks

13 01 11 09 01 RD/RA Work Plan 03/21/14 BNSF/ Stegemen

13 01 11 09 02 RD/RA Sampling

13 01 11 09 02 RD/RA Sampling 08/16/10

13 01 11 09 02 RD/RA Sampling 09/30/10 DEQ/ Reynolds

13 01 11 09 02 RD/RA Sampling 11/12/10 KJ/Adlersley

13 01 11 09 02 RD/RA Sampling CDM/Hills & DEQ/Reynolds emails re: Task L updates 11/16/10

Site-Wide Information

Addendum No. 2 to DEQ Version of Task L Supplemental Investigation Work Plan for Bedrock Aquifers

Site-Wide Information

Site-Wide Information

DEQ/Reynolds & BNSF/Stegman emails re: chain emails on Task F/LWP extension & LRG

Site-Wide Information KJ/Aldersley email to DEQ/Reynolds re: Task L WP transmittal

Site-Wide Information

GEO/McDonald & DEQ/Reynolds chain emails re: 5/17/13 meeting notes

Geosyntec/ McDonald

Site-Wide Information

DEQ/Reynolds chain email re: 5/17/13 Next steps meeting notes

Site-Wide Information

DEQ/Reynolds email to GEO/McDonald re: email on not recording meetings

Site-Wide Information

DEQ/Reynolds, BNSF/Stegman & Dave Smith emails re: chain email Task L schedule

Site-Wide Information

DEQ/Reynolds email to David Smith re: Task L WP Table B-1 comments

Site-Wide Information

Addendum No.2 to DEQ Version of Task L SI Work Plan for Bedrock Aquifer(s) (May 2013) w/ Rev. No. 1 Update (PDF)

Kennedy/Jenks Consultants

Site-Wide Information

Addendum No. 3 to DEQ Version of Task L Supplemental Investigation Work Plan for Bedrock Aquifer(s)

Site-Wide Information

Site-Wide Information

Joint Livingston Remediation Group (LRG) and BNSF Railway Company (BNSF) Work Plan Submittals

Site-Wide Information

Technical memorandum regarding Livingston Shop Complex, Task L., Qualitative Review of Passive Soil Gas Sample Results

Site-Wide Information

Joint Livingston Remediation Group (LRG) and BNSF Railway Company (BNSF) Work Plan Submittal - Former Electric Shop and Locomotive Shop Manway Remedial Design Study Work Plan

Site-Wide Information

Site-Wide Information

Phone Log - Conference call: DEQ, K/J, & CDM re: BN Livingston Shop Complex – Task J & L

Site-Wide Information

DEQ/Reynolds email to BN/Smith & MRL/Keller re: Task L well drilling access

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Task J items posted to website

Site-Wide Information

Page 136: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 136 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 09 02 RD/RA Sampling 11/18/10 KJ/ Norris

13 01 11 09 02 RD/RA Sampling 12/07/10

13 01 11 09 02 RD/RA Sampling 03/11/11 KJ/Norris

13 01 11 09 02 RD/RA Sampling 03/24/11 CDM/Coan

13 01 11 09 02 RD/RA Sampling CDM Oversight Report 3/22-3/29/11 CDM

13 01 11 09 02 RD/RA Sampling K/J/Norris email to DEQ/Reynolds re: Task L - Drilling 04/06/11 KJ/Norris

13 01 11 09 02 RD/RA Sampling 04/15/11

13 01 11 09 02 RD/RA Sampling 04/26/11 CDM/Coan

13 01 11 09 02 RD/RA Sampling 04/28/11 CDM/Coan

13 01 11 09 02 RD/RA Sampling 04/28/11 CDM/Coan

13 01 11 09 02 RD/RA Sampling 05/06/11 CDM/Coan

13 01 11 09 02 RD/RA Sampling 05/10/11 KJ

13 01 11 09 02 RD/RA Sampling 05/12/11

13 01 11 09 02 RD/RA Sampling KJ/Norris

13 01 11 09 02 RD/RA Sampling DEQ/Reynolds & K/J/Aldersley emails re: Task L drilling 07/12/11

13 01 11 09 02 RD/RA Sampling 07/14/11 KJ Norris

13 01 11 09 02 RD/RA Sampling 07/15/11 CDM/Coan

13 01 11 09 02 RD/RA Sampling 07/19/11 CDM/Coan

13 01 11 09 02 RD/RA Sampling 07/26/11 CDM/Coan

13 01 11 09 02 RD/RA Sampling 07/28/11 CDM/Coan

13 01 11 09 02 RD/RA Sampling 07/29/11 CDM/Coan

13 01 11 09 02 RD/RA Sampling 08/01/11 CDM/Hills

Site-Wide Information

K/J/Norris email to DEQ/Reynolds re: BN Livingston Shop Complex – Task L well construction

Site-Wide Information

K/J/Norris & DEQ/Reynolds emails re: BN Livingston Shop Complex – Suspension of Task L well construction

Site-Wide Information

K/J/Norris email to DEQ/Reynolds re: Task L - Surface casing installation

Site-Wide Information

CDM/Coan email to DEQ/Reynolds re: Task L - Surface casing installation

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ/Reynolds & K/J/Aldersley emails re: Task L drilling oversight schedule

Site-Wide Information

CDM/Coan email to DEQ/Reynolds re: Task L - Conductor casing installation update well 10-07

Site-Wide Information

CDM/Coan email to DEQ/Reynolds re: Task L - Conductor casing installation update well 10-02

Site-Wide Information

CDM/Coan email to DEQ/Reynolds re: Task L - Conductor casing installation update - well 10-03

Site-Wide Information

CDM/Coan email to DEQ/Reynolds re: Task L - Conductor casing installation update - well 10-08

Site-Wide Information

K/J/Norris & Aldersley emails to DEQ/Reynolds re:Task L conference call

Site-Wide Information

DEQ/Reynolds & CDM/Coan emails re: Task L - Conductor casing installation update - well 10-06 & other updates

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: Conference call info for Task L drilling +

Site-Wide Information

Site-Wide Information

K/J/Norris email to DEQ/Reynolds re: Livingston Task L Update

Site-Wide Information

CDM/Coan email to DEQ/Reynolds re: Task L drilling schedule update

Site-Wide Information

CDM/Coan email to DEQ/Reynolds re: Task L drilling schedule update

Site-Wide Information

CDM/Coan email to DEQ/Reynolds re: Task L bedrock coring update

Site-Wide Information

CDM/Coan email to DEQ/Reynolds re: Task L bedrock coring update

Site-Wide Information

CDM/Coan email to DEQ/Reynolds re: Task L bedrock coring update

Site-Wide Information

CDM/Hills email to DEQ/Reynolds re: Tasks L & D & E phone log

Page 137: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 137 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 09 02 RD/RA Sampling 08/01/11 CDM/Coan

13 01 11 09 02 RD/RA Sampling 08/21/11

13 01 11 09 02 RD/RA Sampling 08/24/11

13 01 11 09 02 RD/RA Sampling DEQ/Reynolds & KJ/Aldersley emails re: Task L - Well 10-08 08/25/11

13 01 11 09 02 RD/RA Sampling 09/12/11 KJ/Adlersley

13 01 11 09 02 RD/RA Sampling 10/06/11 KJ/Adlersley

13 01 11 09 02 RD/RA Sampling 10/11/11

13 01 11 09 02 RD/RA Sampling 10/12/11 BN

13 01 11 09 02 RD/RA Sampling 11/16/11

13 01 11 09 02 RD/RA Sampling 12/09/11 KJ/Adlersley

13 01 11 09 02 RD/RA Sampling 12/15/11

13 01 11 09 02 RD/RA Sampling 01/11/12 KJ/Adlersley

13 01 11 09 02 RD/RA Sampling 03/07/12 KJ/Adlersley

13 01 11 09 02 RD/RA Sampling 04/11/12

13 01 11 09 02 RD/RA Sampling 04/18/12 DEQ/ Reynolds

13 01 11 09 02 RD/RA Sampling 07/03/12

13 01 11 09 02 RD/RA Sampling 07/19/12 KJ/Adlersley

13 01 11 09 02 RD/RA Sampling 8/22-8/28/12

13 01 11 09 02 RD/RA Sampling 09/04/12 KJ/Norris

13 01 11 09 02 RD/RA Sampling 09/04/12

13 01 11 09 02 RD/RA Sampling 09/19/12 KJ/Adlersley

Site-Wide Information

CDM/Coan email to DEQ/Reynolds re: Task L bedrock coring update

Site-Wide Information

CDM/Cohn & DEQ/Reynolds emails re: Task L - schedule update

Site-Wide Information

DEQ/Reynolds & KJ/Norris & Aldersley emails re: Task L - sampling schedule

Site-Wide Information

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Task L GW sampling notification

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Task L items posted to website - Analytical summary 1st quarter GW monitoring

Site-Wide Information

DEQ/Reynolds & KJ/Aldersley emails re: Task L - well elevations

Site-Wide Information

Agenda for Shop complex facility concepts & criteria scoping meeting 10/12/11

Site-Wide Information

KJ/Aldersley & DEQ/Reynolds emails re: 2nd quarter Task L GW sampling

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Notification of 2nd quarter GW sampling

Site-Wide Information

KJ/Norris & DEQ/Reynolds emails re: Task L rock core analysis

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: 2nd quarter GW monitoring posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: 3rd quarter GW monitoring posted to website

Site-Wide Information

Conference Call - Draft Agenda re: Tasks J & M Path forward for completion of Remedial Actions

Site-Wide Information

DEQ/Reynolds email to KJ/Norris & Aldersley re: Confirmation sampling

Site-Wide Information

DEQ/Reynolds & KJ/Aldersley emails re: Facility wide water levels

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Task L items posted to website - 4th Qtr gw monitoring results

Site-Wide Information

DEQ/Reynolds & KJ/Aldersley emails re: Task L Blank Flute installation date

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: Delay notification of Task L Blank Flute installation - equipment stalled in Denver, installation will be 9/6/12

Site-Wide Information

DEQ/Reynolds & KJ/Norris emails re: Task L Well 12-4 borehole sloughing

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Task L well development/Slug testing notification

Page 138: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 138 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 09 02 RD/RA Sampling 09/20/12 CDM Smith

13 01 11 09 02 RD/RA Sampling 09/24/12 KJ/Norris

13 01 11 09 02 RD/RA Sampling 09/25/12 CDM Smith/ Coan

13 01 11 09 02 RD/RA Sampling KJ/Aldersley email to DEQ/Reynolds re: 12-1 Flute installation 09/26/12 KJ/Adlersley

13 01 11 09 02 RD/RA Sampling 09/27/12 CDM Smith/ Coan

13 01 11 09 02 RD/RA Sampling 09/28/12 CDM Smith/ Coan

13 01 11 09 02 RD/RA Sampling 09/28/12 KJ/Adlersley

13 01 11 09 02 RD/RA Sampling 10/25/12 CDM Smith/ Coan

13 01 11 09 02 RD/RA Sampling Well/FLUTe construction details for well 12-1 (figure)

13 01 11 09 02 RD/RA Sampling DEQ/Reynolds email to KJ/Norris re: Wells near waste piles 11/28/12 DEQ/ Reynolds

13 01 11 09 02 RD/RA Sampling 12/07/12 CDM Smith/ Coan

13 01 11 09 02 RD/RA Sampling KJ/Aldersley & DEQ/Reynolds emails re: Well 89-3 sampling 12/08/12

13 01 11 09 02 RD/RA Sampling

13 01 11 09 02 RD/RA Sampling 01/16/13 KJ/Adlersley

13 01 11 09 02 RD/RA Sampling 01/31/13

13 01 11 09 02 RD/RA Sampling 02/07/13 KJ/Adlersley

13 01 11 09 02 RD/RA Sampling 02/13/13 KJ/Adlersley

13 01 11 09 02 RD/RA Sampling 02/15/13 KJ/Norris

13 01 11 09 02 RD/RA Sampling CDM smith/Coan & KJ/Aldersley emails re: Survey data 02/20/13

13 01 11 09 02 RD/RA Sampling DEQ/Reynolds letter to BNSF/Smith re: Task L WP approval 05/30/13 DEQ/ Reynolds

13 01 11 09 02 RD/RA Sampling 07/18/13 KJ/Aldersley

Site-Wide Information

CDM Smith Memorandum to DEQ/Reynolds re: Task L - Proposed spacer intervals for FLUTe multi-channel well construction for bedrock well 12-1

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: Conference call meeting instructions

Site-Wide Information

CDM Smith/Coan email to DEQ/Reynolds re: Task L slug testing

Site-Wide Information

Site-Wide Information

CDM Smith/Coan email to DEQ/Reynolds re: Daily update for 9/26/12

Site-Wide Information

CDM Smith/Coan email to DEQ/Reynolds re: Daily update for 9/27/12

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: 12-1 Flute installation date set as 10/2312

Site-Wide Information

CDM/Coan email to DEQ/Reynolds re: Daily update for 10/23/12

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM Smith/Coan email to DEQ/Reynolds re: Attachment - Task F/L GW Monitoring Program - Directive No 1

Site-Wide Information

Site-Wide Information

DEQ/Reynolds, KJ/Aldersley & Norris emails re: Request for clarification - total iron or dissolved iron

12/10-12/11/12

Site-Wide Information

KJ/Alsersley email to DEQ/Reynolds re: Task L items posted to the website - Addendum #1 GW analytical results for 1st quarter sampling event

Site-Wide Information

DEQ/Reynolds, KJ/Aldersley & Norris emails re: DEQ information request

Site-Wide Information

KJ/Alsersley email to DEQ/Reynolds re: Updated survey information posted to the web

Site-Wide Information

KJ/Alsersley email to DEQ/Reynolds re: Task L bedrock information posted to the web

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: Attachment - Tables 1 & 2 summarize the slug test & Data analysis

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Task L Sampling notice

Page 139: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 139 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 09 02 RD/RA Sampling 07/18/13 KJ/Aldersley

13 01 11 09 02 RD/RA Sampling 07/19/13 KJ/Fernandes

13 01 11 09 02 RD/RA Sampling 08/08/13 KJ/Aldersley

13 01 11 09 02 RD/RA Sampling Gore Sorber data 08/09/13 Kennedy/Jenks

13 01 11 10 RD/RA

13 01 11 10 RD/RA Phone Log - DEQ to G Olsen re: Task I sample results / NE-4 01/09/05 DEQ

13 01 11 10 RD/RA DEQ internal email re: ATSDR Indoor air data evaluation 06/29/05 DEQ internal

13 01 11 10 RD/RA ATSDR email to DEQ re: Indoor air data evaluation 07/10/05 ATSDR

13 01 11 10 RD/RA Y **DEQ Internal email re: Phone Log - Horiel 07/11/05 DEQ internal

13 01 11 10 RD/RA DEQ email to BN/K/J re: Mr. Horiel 07/11/05 DEQ

13 01 11 10 RD/RA 07/11/05

13 01 11 10 RD/RA DEQ email to BN re: Phone call from resident 07/27/05 DEQ

13 01 11 10 RD/RA 07/27/05 Rose Clumpers

13 01 11 10 RD/RA 08/03/05 Matt Smith

13 01 11 10 RD/RA K/J email to DEQ re: Indoor Air access info 09/16/05 KJ

13 01 11 10 RD/RA 09/28/05

13 01 11 10 RD/RA K/J email to DEQ re: Access Letters 09/30/05 KJ

13 01 11 10 RD/RA Y ** DEQ internal email re: Access 10/03/05 DEQ internal

13 01 11 10 RD/RA Y 01/13/06

13 01 11 10 RD/RA K/J email to DEQ re: Task I Status 01/17/06 KJ

13 01 11 10 RD/RA Y ** DEQ internal email re: Attorney contact – indoor air 01/18/06 DEQ internal

13 01 11 10 RD/RA Y 01/18/06 DEQ internal

Site-Wide Information

KJ/Aldersley & DEQ/Reynolds emails re: Task Z update & Gore info

Site-Wide Information

KJ/Fernanded/Aldersley & DEQ/Reynolds emails re: Task L Field work update & Gore analytes

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Task L Data Posted to Website

Site-Wide Information

Site-Wide Information

Task I - Indoor Air Investigation - 2005

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Phone Log – DEQ/Sivers & Resident/Horiel re: Resident questions about well & air sampling

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Phone Log - Livingston resident Rose Clumpers to DEQ re: Indoor air quality

Site-Wide Information

Task I - Indoor Air Investigation

Phone Log - Livingston resident Matt Smith to DEQ re: Indoor air sampling

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

K/J & BNSF letters to Livingston residents re: Access Agreements

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

** DEQ & K/J emails re: Indoor air summary table & cross referenced address list

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

** DEQ internal email re: Phone Log/MRL attorney & DEQ attorney re: indoor air issues

Page 140: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 140 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 RD/RA Y ** DEQ internal email re: First round Talgo results 01/23/06 DEQ internal

13 01 11 10 RD/RA Talgo/Warren email to DEQ/Keck re: First round Talgo results 01/23/06 Talgo/Warren

13 01 11 10 RD/RA DEQ email to K/J re: phone log/NE-16 results 02/01/06 DEQ

13 01 11 10 RD/RA Phone Log - Conference call DEQ & Talgo re: Solvent Usage 02/15/06

13 01 11 10 RD/RA DEQ internal email re: Task I stage requirement 02/23/06 DEQ internal

13 01 11 10 RD/RA Y ** DEQ internal email re: BN script/Task I 02/24/06 DEQ internal

13 01 11 10 RD/RA Calls to Residences/Business re: Decay in Air Sampling 2/25-2/27/06

13 01 11 10 RD/RA K/J email to DEQ re: Task I contact info 02/27/06 KJ

13 01 11 10 RD/RA Y ** DEQ internal email re: Indoor air issues 02/28/06 DEQ internal

13 01 11 10 RD/RA K/J email to DEQ re: Task I Add #1 scheduling 03/01/06 KJ

13 01 11 10 RD/RA K/J email to DEQ re: SE 2 questionnaire 03/03/06 KJ

13 01 11 10 RD/RA 03/27/06 DEQ internal

13 01 11 10 RD/RA KJ/DEQ email – Indoor Air Analytical Results from 4/06 4/28-5/2/06

13 01 11 10 RD/RA 05/01/06 KJ

13 01 11 10 CD RD/RA K/J Tech Memo Task I CD 05/09/06 KJ

13 01 11 10 RD/RA DEQ internal email re: Livingston resident info request 05/15/06 DEQ internal

13 01 11 10 RD/RA 06/09/06 P Bergen

13 01 11 10 RD/RA 08/09/06 M Getz

13 01 11 10 RD/RA 8/906 J Flye

13 01 11 10 RD/RA DEQ letter to City of Livingston WWTP re: Sample results 9//06 DEQ

13 01 11 10 RD/RA DEQ letter to V Shipley re: Sample results 09/07/06 DEQ

13 01 11 10 RD/RA 09/13/06 BN/Newall

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

DEQ internal email re: Task I Addendum scheduling K/J phone log

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Quarterly Status Report No 3 Feb, March, April 2006 – Task I – Basement VOC Gas Investigation & Removal

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Phone Log – Phillip Bergen/Livingston property owner to DEQ re: Wants his indoor air sampled

Site-Wide Information

Task I - Indoor Air Investigation

Phone Log - M Getz/Livingston property owner to DEQ re: Vapor intrusion

Site-Wide Information

Task I - Indoor Air Investigation

Phone Log – J Flye/Livingston resident to DEQ re: 111 Miles lane signs in yard

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Phone Log – Pat Newall/BNSF Settlement Office to DEQ re: No offer on Bates home. Other houses demolished

Page 141: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 141 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 RD/RA DEQ email to Sherri Peterson re: Information for J Flye 10/09/06 DEQ

13 01 11 10 CD RD/RA 10/16/06 KJ

13 01 11 10 CD RD/RA Addendum No 2 to Final Supplemental Investigation WP 01/01/07 KJ

13 01 11 10 RD/RA CDM email to DEQ re: HP Labs SOPs 01/26/07 CDM

13 01 11 10 RD/RA Y 03/01/07

13 01 11 10 RD/RA CDM email to DEQ re: Dedicated flow controllers 03/01/07 CDM

13 01 11 10 RD/RA DEQ/BNSF emails re: Institutional Controls 03/05/07

13 01 11 10 RD/RA K/J email to DEQ – SVE Applied Vacuum, Flow & ROI Data 03/07/07 KJ

13 01 11 10 RD/RA DEQ/CDM emails re: Task I – BNSF Recommendations 03/30/07

13 01 11 10 RD/RA Y 04/30/07 DEQ internal

13 01 11 10 RD/RA DEQ/KJ emails re: Contact list for Task I 04/30/07

13 01 11 10 RD/RA DEQ letter to Bill & Jennifer Jones re: Sample results 05/14/07 DEQ

13 01 11 10 RD/RA DEQ/KJ/CDM email – Analytical results 5/15-5/16/07

13 01 11 10 RD/RA DEQ/CDM/KJ emails re: Equilibrium and purge volume tests 05/18/07

13 01 11 10 RD/RA DEQ/CDM/KJ emails re: Task I Analytical Summary tables 05/21/07

13 01 11 10 RD/RA DEQ/CDM/KJ emails re: Ambient air samples 05/24/07

13 01 11 10 RD/RA DEQ email to CDM/KJ re: Ambient air samples 05/24/07 DEQ

13 01 11 10 RD/RA DEQ/CDM emails re: Draft SSD Layout Drawing 5/23-5/24/07

13 01 11 10 RD/RA 5/23-5/24/07

13 01 11 10 RD/RA KJ email to DEQ re: Task I soil gas probe locations 05/24/07 KJ

13 01 11 10 RD/RA DEQ/KJ emails re: Draft SSD Layout Drawing 05/25/07

13 01 11 10 RD/RA CDM email to DEQ re: Task I Letters 6//15/07 CDM

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Draft Addendum No 2 to Final Task I Supplemental Investigation Work Plan

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

** DEQ & K/J emails re: Access to 2 indoor air sampling locations

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

** DEQ internal emails re: Institutional Control for 405 North “L” St

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

DEQ/CDM/KJ emails re: Proposed Task I Mitigation Design Development Plan Soil Sampling Locations

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Page 142: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 142 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 RD/RA KJ email to DEQ re: Task I data posted to website 06/21/07 KJ

13 01 11 10 RD/RA KJ email to DEQ re: Task I data posted to website 06/29/07 KJ

13 01 11 10 RD/RA DEQ email to CDM re: Task I 07/03/07 DEQ

13 01 11 10 RD/RA DEQ/CDM/KJ emails re: Task I data posted to website 6/29-7/3/07

13 01 11 10 RD/RA DEQ/CDM emails re: June 5 air and soil gas results 07/03/07

13 01 11 10 RD/RA DEQ/CDM emails re: June 5 air and soil gas results 7/3-7/9/07

13 01 11 10 RD/RA DEQ/CDM/KJ emails re: Task I 6/29-7/20/07

13 01 11 10 RD/RA 09/14/07 DEQ Director

13 01 11 10 RD/RA Task I Mitigation Plan for 416 North K Street

13 01 11 10 RD/RA 12/01/07 KJ

13 01 11 10 RD/RA Y 01/24/08 DEQ internal

13 01 11 10 RD/RA DEQ Director’s Office correspondence re: Mark Stehly/BNSF 6/11-6/30/08 DEQ Director

13 01 11 10 CD RD/RA CD ROM – BNLV Task I - Summas.ppt

13 01 11 10 RD/RA 07/23/08 DEQ Director

13 01 11 10 RD/RA 02/19/09 KJ

13 01 11 10 RD/RA 02/19/09 KJ

13 01 11 10 RD/RA 02/19/09 KJ

13 01 11 10 RD/RA 02/19/09 KJ

13 01 11 10 RD/RA 02/19/09 KJ

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

DEQ Director’s Office correspondence re: Bill Gonder/BN contamination

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Task I Mitigation Plan for Former Talgo Paint Shop, Administration, and Warehouse Buildings

Site-Wide Information

Task I - Indoor Air Investigation

** DEQ internal email re: Documentation of phone conversation of 1/18/08, Task I letter to K/J

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

DEQ Director Opper letter to BN/M Stehly re: Response to BN letter dated 6/11/08 regarding communication with landowners

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to E Lahren re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to D Amsk re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to S Conley re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to T Core re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to B Thomas re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Page 143: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 143 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 RD/RA 02/19/09 KJ

13 01 11 10 RD/RA 02/19/09 KJ

13 01 11 10 RD/RA 02/19/09 KJ

13 01 11 10 RD/RA 02/19/09 KJ

13 01 11 10 RD/RA 02/19/09 KJ

13 01 11 10 RD/RA 02/19/09 KJ

13 01 11 10 RD/RA 02/19/09 KJ

13 01 11 10 RD/RA 02/19/09 KJ

13 01 11 10 RD/RA 02/19/09 KJ

13 01 11 10 RD/RA 02/19/09 KJ

13 01 11 10 RD/RA 02/19/09 KJ

13 01 11 10 RD/RA 02/19/09 KJ

13 01 11 10 RD/RA 02/19/09 KJ

13 01 11 10 RD/RA 02/23/09 KJ

13 01 11 10 RD/RA 02/23/09 KJ

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to M Siriano and S Depuy re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to E Lahren re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to M Bruha re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to S Bales re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to J Welker re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to J Mastin re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to V Blakeman re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to N Akerstrom Jr re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to C Shelley re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to D Zarnt re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to B Blankenship re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to K Pfister re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to S Chappell re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to T Moench re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to M Stein and J Ziglar re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Page 144: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 144 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 RD/RA 02/23/09 KJ

13 01 11 10 RD/RA 03/03/09 KJ

13 01 11 10 RD/RA 03/03/09 KJ

13 01 11 10 RD/RA 03/03/09 KJ

13 01 11 10 RD/RA 03/03/09 KJ

13 01 11 10 RD/RA 03/23/09

13 01 11 10 CD RD/RA 04/17/09 CDM

13 01 11 10 RD/RA 05/21/09

13 01 11 10 RD/RA Y 06/17/09

13 01 11 10 RD/RA 10/05/09 CDM

13 01 11 10 CD RD/RA 11/18/09 DEQ

13 01 11 10 RD/RA DEQ

13 01 11 10 RD/RA KJ

13 01 11 10 RD/RA KJ

13 01 11 10 RD/RA Y

13 01 11 10 RD/RA CDM Data Validation for 4/2010 IA sampling CDM

13 01 11 10 RD/RA CDM Data Validation for 3/2010 SG & A4 sampling 04/01/11 CDM

13 01 11 10 RD/RA 04/13/10

13 01 11 10 RD/RA CDM Data Validation for 5/2010 SG sampling CDM

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to D Miller re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to R Jenkins re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to J Jensen re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to A Mitchell re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Site-Wide Information

Task I - Indoor Air Investigation

K/J letter to M Bednarek re: Access request for Indoor Air and Soil Gas Sample Collection and Analysis Related to Supplemental Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Columbia Analytical Services email to DEQ/A Reynolds re: Confirmation of Samples Receipt

Columbia Analytical

Site-Wide Information

Task I - Indoor Air Investigation

CDM letter package to DEQ/Reynolds re: Electronic and hard copies for Task I: Vapor Mitigation Investigation Maps & Figures

Site-Wide Information

Task I - Indoor Air Investigation

DEQ/Reynolds & EPA/Strausbaugh emails re: BNLV Mitigation

Site-Wide Information

Task I - Indoor Air Investigation

** DEQ Legal/Haque-Hausrath internal email re: RCRA requirements for F001 & F002

DEQ Legal/ Haque-Hausrath

Site-Wide Information

Task I - Indoor Air Investigation

CDM/Woodward Memorandum to DEQ/Reynolds re: CDM sample location map

Site-Wide Information

Task I - Indoor Air Investigation

Task I Indoor Mitigation Plan for Residential and Commercial Properties – DEQ Version

Site-Wide Information

Task I - Indoor Air Investigation

Task I Indoor Mitigation Plan for Residential and Commercial Properties – DEQ Version - redline/strikeout

Site-Wide Information

Task I - Indoor Air Investigation

Indoor Air Mitigation System Work Scope Statement and Project Manual for 1104 East Gallatin Street, Livingston

Site-Wide Information

Task I - Indoor Air Investigation

Work Scope Statement for project site at 1104 E Gallatin St - redline strikeout version

Site-Wide Information

Task I - Indoor Air Investigation

** DEQ Legal/Haque-Hausrath internal email & Allen Payne re: BN’s objections to Magistrates Findings

DEQ Legal/ Haque-Hausrath

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Data Usability Assessment for March 2010 Soil Gas & Ambient Air sampling

Site-Wide Information

Task I - Indoor Air Investigation

Page 145: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 145 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 RD/RA Task I 2010 Soil Gas/Indoor Air Data Summary Report 06/24/10 KJ

13 01 11 10 RD/RA 07/01/10 DEQ

13 01 11 10 RD/RA 2010 Occupied Dwelling Questionnaires – attachment B

13 01 11 10 RD/RA

13 01 11 10 RD/RA 03/22/11

13 01 11 10 RD/RA 03/22/11

13 01 11 10 RD/RA Field Oversight Report 3/29-4/4/11 CDM

13 01 11 10 RD/RA 04/29/11 DEQ/ Reynolds

13 01 11 10 CD RD/RA 05/19/11 DEQ

13 01 11 10 RD/RA 05/25/11 DEQ/ Reynolds

13 01 11 10 RD/RA 08/05/11 GSI/CTEH

13 01 11 10 RD/RA 02/01/12 KJ

13 01 11 10 RD/RA 02/02/12 KJ/Adlersley

13 01 11 10 01 CD RD/RA 03/01/05 KJ

13 01 11 10 01 RD/RA K/J email to DEQ re: Indoor Air discussion topics 02/24/05 KJ

13 01 11 10 01 RD/RA DEQ internal emails re: J-E Model 02/25/05 DEQ

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

Task I Indoor Air Mitigation Plan for Residential and Commercial Properties – DEQ Version (Updated July 2010)

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

2010 Lab Analytical Reports & Chain of Custody Documentation – Attachment C

Site-Wide Information

Task I - Indoor Air Investigation

DEQ Legal/Haque-Hausrath internal memorandum re: Filing of confidential documents

DEQ Legal/ Haque-Hausrath

Site-Wide Information

Task I - Indoor Air Investigation

DEQ Legal/Haque-Hausrath internal memorandum re: Filing of confidential documents

DEQ Legal/ Haque-Hausrath

Site-Wide Information

Task I - Indoor Air Investigation

Site-Wide Information

Task I - Indoor Air Investigation

DEQ/Reynolds letter to BN/Smith re:Task I Indoor Air Mitigation Plan for Residential and Commercial Properties

Site-Wide Information

Task I - Indoor Air Investigation

Task I Indoor Air Mitigation Plan for Residential and Commercial Properties - DEQ Version N0. 2

Site-Wide Information

Task I - Indoor Air Investigation

DEQ/Reynolds letter to BN/Smith re: May 2011 Task I Indoor Air Mitigation Plan for Residential and Commercial Properties – DEQ Version #2

Site-Wide Information

Task I - Indoor Air Investigation

Identification & Removal of Indoor Sources of PCE & TCE - BN Vapor Intrusion Investigation: March-April 2011

Site-Wide Information

Task I - Indoor Air Investigation

Tech Memo - Work Scope Statement & Project Manual for 1500 East Park Street

Site-Wide Information

Task I - Indoor Air Investigation

KJ/Aldersley email to DEQ/Reynolds re: Work Scope Statement & Project Manual for 1500 East Park Street sent in mail 2/1/12

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Page 146: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 146 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 RD/RA Scoping Meeting minutes 02/28/05

13 01 11 10 01 RD/RA K/J email to DEQ re: J-E Model input values 04/07/05 KJ

13 01 11 10 01 RD/RA DEQ internal email re: Risk calcs in Work Plan 04/14/05 DEQ internal

13 01 11 10 01 RD/RA 04/18/05 DEQ internal

13 01 11 10 01 RD/RA DEQ letter to BN re: Comments form Indoor Air Work Plan 04/29/05 DEQ

13 01 11 10 01 RD/RA DEQ email to BN re: Indoor Air Work Plan Comments 04/29/05 DEQ

13 01 11 10 01 RD/RA Suggested Operating Procedure Sub-slab Soil Gas Monitoring 05/11/05

13 01 11 10 01 RD/RA DEQ email to BN re: Outstanding issues 05/17/05 DEQ

13 01 11 10 01 RD/RA Inside EPA article re: Indoor Air 05/17/05 EPA

13 01 11 10 01 RD/RA DEQ letter to BN re: Follow up to comments 05/19/05 DEQ

13 01 11 10 01 RD/RA DEQ internal email re: ERCLs language in work plan 5/24/05 DEQ internal

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

DEQ internal emails re: March 2005 EPA Risk Guidance - Carcinogens

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Page 147: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 147 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 RD/RA Revised SI Work Plan for Indoor Air w/transmittal letter 06/10/05

13 01 11 10 01 CD RD/RA SI Work Plan for Indoor Air 6/05

13 01 11 10 01 RD/RA 07/01/05 DEQ

13 01 11 10 01 RD/RA DEQ transmittal to MSU Library re: Indoor Air Work Plan 07/05/05 DEQ

13 01 11 10 01 RD/RA 7/5/05 DEQ

13 01 11 10 01 RD/RA K/J email to DEQ re: Figures in PDF 07/06/05 KJ

13 01 11 10 01 RD/RA K/J email to DEQ re: Indoor air/crawl spaces 7/8/05 KJ

13 01 11 10 01 RD/RA K/J email to DEQ re: ROD ERCL 07/21/05 KJ

13 01 11 10 01 RD/RA DEQ email to BNSF re: DEQ TEC Isopleth map 8/10/05 DEQ

13 01 11 10 01 RD/RA K/J transmittal to DEQ re: WP replacement pages 08/12/05 KJ

13 01 11 10 01 RD/RA DEQ letter/fax to BNSF re: Approval of Task I Work Plan 8/24/05 DEQ

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft DEQ letter to BN re: 2nd draft Task I Work Plan

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft DEQ transmittal to Livingston Library re: Indoor Air Work Plan

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Page 148: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 148 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 RD/RA KJ Letter to Evansons re: Indoor Air Sampling 09/28/05 KJ

13 01 11 10 01 RD/RA Access agreement for Livingston WWTP 10/25/05

13 01 11 10 01 RD/RA 11/14/05 KJ

13 01 11 10 01 RD/RA K/J letter to DEQ re: Request to proceed 11/15/05 KJ

13 01 11 10 01 RD/RA DEQ & K/J emails re: DEQ response to Request to proceed 11/22/05

13 01 11 10 01 RD/RA K/J email to DEQ re: Task I status - November 2005 11/28/05 KJ

13 01 11 10 01 RD/RA K/J email to DEQ re: Task I start confirmation 11/30/05 KJ

13 01 11 10 01 RD/RA DEQ/Keck Task I Field Notes DEQ/Keck

13 01 11 10 01 RD/RA Air Toxics Ltd Report 12/19/05 Air Toxics

13 01 11 10 01 RD/RA Air Toxics Ltd Report 12/19/05 Air Toxics

13 01 11 10 01 RD/RA Air Toxics Ltd Report 12/27/05 Air Toxics

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

K/J letter to DEQ re: Request for clarification of Task J Work Plan

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

12/12/05-12/16/05

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Page 149: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 149 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 RD/RA K/J email to DEQ re: BG 29 information 1/24/06 KJ

13 01 11 10 01 RD/RA K/J email to DEQ re: Task I Sample locations 02/03/06 KJ

13 01 11 10 01 RD/RA DEQ internal email re: K/J phone log re: Task I Scheduling 2/22/06 DEQ internal

13 01 11 10 01 RD/RA K/J email to DEQ re: 05-S-99 resident status 02/23/06 KJ

13 01 11 10 01 RD/RA DEQ internal email & BN re: Task I Addendum # 1 recap 02/24/06 DEQ internal

13 01 11 10 01 RD/RA DEQ email to K/J re: Task I Amendments outline 2/27/06 DEQ

13 01 11 10 01 RD/RA DEQ email to K/J, BN, & internal re: Task I amendment recap 02/27/06 DEQ

13 01 11 10 01 RD/RA DEQ internal email re: Task I Amendment 2/27/06 DEQ internal

13 01 11 10 01 RD/RA K/J email to DEQ re: Addendum 1 contractor 2/27/06 KJ

13 01 11 10 01 RD/RA K/J email to DEQ re: Addendum # 1 outline draft 02/27/06 KJ

13 01 11 10 01 RD/RA 2/27/06 DEQ

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

DEQ email to K/J, BN & internal re: Task I addendum 1 meeting recap

Page 150: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 150 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 RD/RA DEQ email to BN re: Task I amendment recap 2/28/06 DEQ

13 01 11 10 01 RD/RA Y ** DEQ internal email re: Task I Sampling 2/28/06 DEQ internal

13 01 11 10 01 RD/RA DEQ email to BN re: Task I Addendum # 1 clarification 2/28/06 DEQ

13 01 11 10 01 CD RM 11 RD/RA Addendum #1 to Final Task I SI Work Plan for Indoor Air 03/17/06 KJ

13 01 11 10 01 RD/RA Addendum #1 to Final Task I SI Work Plan for Indoor Air 03/06/11 DEQ

13 01 11 10 01 RD/RA DEQ

13 01 11 10 01 RD/RA CDM Field Investigation Notes 04/05/06 CDM

13 01 11 10 01 RD/RA H&P/KJ Data Report 4/25/06

13 01 11 10 01 RD/RA 5/9/06 KJ

13 01 11 10 01 RD/RA 05/23/06 J Jones

13 01 11 10 01 RD/RA K/J email to DEQ re: Task I contacts 05/25/06 KJ

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Task I Field Notes & Activities Reports book – J Keck & A Reynolds

3/5/06 – 3/18/09

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Tech Memo – Analytical Results for Soil Gas, Flux Chamber, and Indoor Air Samples

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Phone Log – J Jones to DEQ re: Vapor sampling results & contact name

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Page 151: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 151 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 RD/RA 05/26/06 CDM

13 01 11 10 01 RD/RA DEQ letter to K/J re: Task I Technical discussion 6/9/06 DEQ

13 01 11 10 01 RD/RA CDM & K/J emails re: TO 15 data 06/19/06

13 01 11 10 01 RM 11 RD/RA Forward Planning for Task I: Indoor Air Investigations 06/26/06 CDM

13 01 11 10 01 RD/RA 06/27/06 KJ

13 01 11 10 01 RD/RA H&P email to K/J re: TO – 15 06/29/06 H&P

13 01 11 10 01 RD/RA 07/11/06 S Briggs

13 01 11 10 01 RD/RA 07/11/06 DEQ internal

13 01 11 10 01 RD/RA H&P, CDM & K/J emails re: Revised final TO-15 reports 07/13/06

13 01 11 10 01 RD/RA

13 01 11 10 01 RD/RA 08/06/11 H&P

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Letter Report: Field Oversight and Data Evaluation for Sub-slab Soil Gas and Indoor Air Sampling

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft K/J email to CDM re: Additional TO 15 Data for Task I – status

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Phone Log – S Briggs/Livingston WWTP to DEQ re: Inquiring about vapor intrusion results

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

DEQ internal email re: Livingston Waste Water Treatment Plant (WWTP)

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Design & Installation of a Home Radon Reduction System Handbook

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Vapor Monitoring Wells/Implants SOP (for vapor intrusion applications (revised)

Page 152: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 152 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 RD/RA Phone Log – J Jones to DEQ re: Sampling results request 8/7/06 J Jones

13 01 11 10 01 RD/RA DEQ email to K/J re: sampling question 08/07/06 DEQ

13 01 11 10 01 RD/RA Phone Log – K/J to DEQ re: Response to sampling question 08/07/06 KJ

13 01 11 10 01 RD/RA CDM email to DEQ re: Redline version of DEQ’s 8/15/06 letter 8/15/06 CDM

13 01 11 10 01 RD/RA BNSF letter to DEQ re: Livingston Community Relations Plan 08/17/06 BN

13 01 11 10 01 RD/RA 09/14/06 DEQ

13 01 11 10 01 RD/RA K/J letter to DEQ re: Follow up to 9/21/06 meeting 09/22/06 KJ

13 01 11 10 01 RD/RA RTI & DEQ emails re: Task I Tech Memo 09/22/06

13 01 11 10 01 RD/RA CDM & DEQ emails re: Task I HAPSITE use 09/28/06

13 01 11 10 01 RD/RA 09/28/06

13 01 11 10 01 RD/RA CDM & DEQ emails re: Background sampling location 09/29/06

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

DEQ letter to BNSF re: Task I- Supplemental Indoor Air Investigations

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

DEQ & K/J emails re: Follow up to Task I discussion during 9/21/06 meeting

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Page 153: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 153 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 RD/RA DEQ & K/J emails re: Distribution of copies of reports 10/12/06

13 01 11 10 01 RD/RA CDM letter to DEQ - H&P Mobile Geochemistry Lab data 10/12/06 CDM

13 01 11 10 01 RD/RA K/J email to DEQ re: Task I –Addendum 2 sent for delivery 10/16/06 KJ

13 01 11 10 01 RD/RA 10/16/06 KJ

13 01 11 10 01 RD/RA 10/25/06 KJ

13 01 11 10 01 RD/RA 10/26/06

13 01 11 10 01 RD/RA 10/27/06

13 01 11 10 01 RD/RA 11/01/06 DEQ internal

13 01 11 10 01 RD/RA K/J email to DEQ re: Task I addendum no. 1 11/1/06 KJ

13 01 11 10 01 RD/RA DEQ letter to RTI re: BNSF Tech Memo April 2006 11/06/06 DEQ

13 01 11 10 01 RD/RA 11/02/06 DEQ

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Draft Addendum No 2 to Final Task I Supplemental Investigation Work Plan for Indoor Air

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

K/J email to DEQ re: Updated Draft Mitigation Design Development Plan

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

CDM & DEQ emails re: Updated Draft Mitigation Design Development Plan

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

K/J & DEQ emails re: Updated Draft Mitigation Design Development Plan

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

DEQ internal email re: Task I results letter regarding MRL’s shops

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Returned DEQ letter to Aza Ziegler re: 4/16/06 indoor air samples

Page 154: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 154 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 RD/RA 11/14/06 DEQ

13 01 11 10 01 CD RM 11 RD/RA 11/16/06 KJ

13 01 11 10 01 RD/RA K/J fax to DEQ re: Task I Report 11/16/06 KJ

13 01 11 10 01 RD/RA DEQ email to K/J re: Task I attachments 11/17/06 DEQ

13 01 11 10 01 RD/RA 11/17/06

13 01 11 10 01 RD/RA 11/21/06

13 01 11 10 01 RD/RA DEQ & K/J emails re: SVE information 12/28/06

13 01 11 10 01 RD/RA DEQ & K/J emails re: SVE well logs 01/02/07

13 01 11 10 01 RD/RA 1/3/07 CDM

13 01 11 10 01 RD/RA 1/10/07 KJ

13 01 11 10 01 RD/RA DEQ & CDM emails re: Revised Mitigation Plan 01/15/07

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

DEQ letter to BNSF w/copy of DEQs redline/strikeout version of Addendum #2 to Final Task I Supplemental Investigation Work Plan for Indoor Air

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Task I : Draft Mitigation Design Development Plan – Shop Complex

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

DEQ & K/J emails re: Draft Mitigation Design Development Plan – e-files

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

DEQ & K/J emails re: Draft Mitigation Design Development Plan – e-files

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

CDM letter to DEQ w/Redline Revisions to Addendum No 2 to Final Task I Supplemental Investigation Work Plan for Indoor Air

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

K/J letter to DEQ re: May 26, 2006 Task I letter report by CDM

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Page 155: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 155 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 RD/RA 01/19/07 DEQ

13 01 11 10 01 RD/RA DEQ & CDM emails re: Sub-slab sampling 01/22/07

13 01 11 10 01 CD RM 12 RD/RA 01/29/07 DEQ

13 01 11 10 01 RD/RA CDM email to DEQ re: Revised Mitigation Plan 01/25/07 CDM

13 01 11 10 01 RD/RA CDM email to DEQ re: HP Labs SOP 01/26/07 CDM

13 01 11 10 01 RD/RA CDM letter to DEQ re: Response to KJ letter of 1/10/07 01/30/07 CDM

13 01 11 10 01 RD/RA DEQ letter to BNSF re: Approval of Addendum No 2 02/05/07 DEQ

13 01 11 10 01 RD/RA DEQ letter to KJ re: Response to KJ comments of 1/10/07 02/07/07 DEQ

13 01 11 10 01 RD/RA 02/14/07 DEQ

13 01 11 10 01 RD/RA Redline version Draft Mitigation Design Development Plan 03/01/07

13 01 11 10 01 CD RM 12 RD/RA 03/14/07 DEQ

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

DEQ letter to KJ re: Addendum No 2 to Final Task I Supplemental Investigation Work Plan for Indoor Air and 12/6/06 Summary of 11/27/06 Meeting

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Addendum No 2 to Final Task I Supplemental Investigation WP for Indoor Air, with replacement pages from 4/19/2007

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

DEQ letter to KJ re: November 2006 Task I Draft Mitigation Design Development Plan

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Task I Mitigation Design Development Plan (DEQ version, signed original w/CD), replacement pages from 4/19/2007 included

Page 156: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 156 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 RD/RA K/J letter to DEQ re: Addendum No 2 to Final Task I 03/29/07 KJ

13 01 11 10 01 RD/RA DEQ email to K/J re: Task I Mitigation Plan e- files 04/11/07 DEQ

13 01 11 10 01 RD/RA 04/11/07 DEQ

13 01 11 10 01 RM 12 RD/RA 04/19/07 KJ

13 01 11 10 01 RD/RA 04/30/07 KJ

13 01 11 10 01 RD/RA 04/30/07 KJ

13 01 11 10 01 RD/RA CDM letter to DEQ re: Response to 3/29/07 KJ letter CDM

13 01 11 10 01 RD/RA 05/06/07 BN

13 01 11 10 01 RD/RA Air Toxics altitude correction info 05/01/07 Air Toxics

13 01 11 10 01 RD/RA H&P sampling results 06/27/07 H&P

13 01 11 10 01 RD/RA Task I LS&ES Mitigation Planning Documents 06/29/07

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

DEQ letter to KJ re: 3/16/07 Task I: Revised Mitigation Design Development Plan

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft K/J letter to DEQ re: Addendum No 2 to Final Task I

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

K/J letter to Christopher & Adrian Beyer re: Consent to sample indoor air & sub slab soil

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

K/J letter to J Long re: : Consent to sample indoor air & sub slab soil

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

BN letter to DEQ re: Task I – PRP’s Source Information from BNSF

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Page 157: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 157 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 RD/RA Photo of intent to demolish NE-2 (7/2007) 07/01/07

13 01 11 10 01 RD/RA CDM letter to DEQ re: Forward Planning for Task I 09/18/07 CDM

13 01 11 10 01 RM 12 RD/RA Draft Task I Design Development Report 10/01/07 KJ

13 01 11 10 01 RD/RA DEQ letter to BNSF re: Response to 3/29/07 K/J letter 10/25/07 DEQ

13 01 11 10 01 RD/RA 12/12/07 BN

13 01 11 10 01 RD/RA 01/18/08 KJ

13 01 11 10 01 RD/RA C Boehm letter to DEQ re: Indoor air testing 01/30/08 C Boehm

13 01 11 10 01 RD/RA DEQ letter to C Boehm re: Indoor air sampling 02/07/08 DEQ

13 01 11 10 01 RD/RA 02/22/08 KJ

13 01 11 10 01 RD/RA 02/22/08 KJ

13 01 11 10 01 RD/RA DEQ File Memo re: Justification for laboratory services 02/22/08 DEQ

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

BNSF letter to DEQ re: Request for additional indoor air investigations (12/12/07)

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

K/J letter to DEQ re: DEQ request for Additional Indoor Air Investigation

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

K/J letter to D Kellem re: Indoor air and soil gas sample collection and analysis

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

K/J letter to P Gunness re: Indoor air and soil gas sample collection and analysis

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Page 158: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 158 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 RD/RA 03/01/08

13 01 11 10 01 RD/RA S Briggs Letter to DEQ re: Water usage 03/06/08 S Briggs

13 01 11 10 01 RD/RA DEQ/CDM emails re: Invoices for BN 4/2-4/3/08

13 01 11 10 01 RD/RA Columbia Analytical Services lab report Task I 05/29/08

13 01 11 10 01 RD/RA Task I Sampling Oversight Report 05/30/08 CDM

13 01 11 10 01 RD/RA Task I source info from BNSF 05/06/08 BN

13 01 11 10 01 RD/RA BKBH letter to DEQ Legal re: BNSF Purchased Properties 06/20/08 BKBH

13 01 11 10 01 RD/RA 12/18/08 DEQ

13 01 11 10 01 RD/RA CDM letter to DEQ re: Winter 2009 Forward Planning 12/18/08 CDM

13 01 11 10 01 RD/RA BNSF letter to DEQ re: BNSF response to DEQ request 01/14/09 BN

13 01 11 10 01 RD/RA CDM email to DEQ re: Radon text 01/16/09 CDM

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Data Usability Assessment for March 2008 Soil Gas & Indoor Air Sampling Task I Addendum # 2

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Columbia Analytical

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

DEQ letter to BNSF re: Task I Request for Additional Investigation

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Page 159: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 159 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 RD/RA 01/21/09 DEQ

13 01 11 10 01 CD RM 12 RD/RA 02/03/09 KJ

13 01 11 10 01 RD/RA DEQ letter to BNSF re: Task I source info response 02/04/09 DEQ

13 01 11 10 01 CD RM 12 RD/RA Task I Field Activities Report 2/11-2/13/09 03/06/09 CDM

13 01 11 10 01 CD RD/RA Task I Field Activities Report 3/2-3/3/09 03/13/09 CDM

13 01 11 10 01 RD/RA 3/5-3/18/09 DEQ

13 01 11 10 01 RD/RA Task I Field Activities Report 3/19-3/20/09, 4/6/09 & 4/15/09 05/12/09 CDM

13 01 11 10 01 RM 12 RD/RA 06/12/09 KJ

13 01 11 10 01 RD/RA 06/19/09 CDM/Hills

13 01 11 10 01 RD/RA Site Oversight Report for 107 South G Street 06/24/09 CDM

13 01 11 10 01 RD/RA 06/25/09 CDM/Hills

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft DEQ letter to BNSF re: DEQ response regarding radon analysis

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Task I Indoor Air Mitigation Plan for Residential and Commercial Properties

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Task I Field Notes & Activities Reports book – J Keck & A Reynolds

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Task I Supplemental Investigation Report – BN Shop Complex

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

CDM/Hills cover letter to DEQ/Reynolds re: Draft Indoor Air, Sub-slab Soil Gas and Ambient Air Data Tables for Task I

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

CDM/Hills cover letter to DEQ/Reynolds re: Draft Non-Target Analyte Report for Task I

Page 160: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 160 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 RD/RA 09/14/09 CDM/Hills

13 01 11 10 01 RD/RA 09/16/09 DEQ/ Reynolds

13 01 11 10 01 RD/RA 10/08/09 DEQ/ Reynolds

13 01 11 10 01 RD/RA 10/08/09 DEQ/ Reynolds

13 01 11 10 01 RD/RA BN Livingston 2005-2009 Target Analyte Report 10/20/09

13 01 11 10 01 RD/RA 12/04/09 DEQ/ Reynolds

13 01 11 10 01 RD/RA 02/02/10 K&L Gates

13 01 11 10 01 RD/RA 2005-2009 Commercial Analyte Report 02/11/10 BN

13 01 11 10 01 RD/RA 02/18/10 KJ/Norris

13 01 11 10 01 RD/RA Site Oversight Report Task I Oversight of indoor air sampling 3/8-3/31/10 CDM/ Woodward

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

CDM/Hills letter to DEQ/Reynolds re: Attachment - Example figures to Supplement Task I Property Owner Letters

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

DEQ/Reynolds letter to BN/Smith re: Calculation of Proposed Site-Specific Cleanup Levels for Indoor Air BN Shop Complex

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

DEQ/Reynolds letter to BN/Smith re: February 2009 Task I Indoor Air Mitigation Plan for Residential & Commercial Properties-BN Shop Complex, June 4, 2009 Work Scope Statement for Project Site at 1104 E Gallatin St and May 2009 Project Manual Including Specifications for Indoor Air Mitigation System at 1104 E Gallatin St (redline version)

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

DEQ/Reynolds letter to BN/Smith re: February 2009 Task I Indoor Air Mitigation Plan for Residential & Commercial Properties-BN Shop Complex, June 4, 2009 Work Scope Statement for Project Site at 1104 E Gallatin St and May 2009 Project Manual Including Specifications for Indoor Air Mitigation System at 1104 E Gallatin St

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

DEQ/Reynolds letter to BN/Smith re: BN Comments on September 2009 “Final Draft Task I RA Amendment and DEQ Quality Approved Remedy for Newly Identified Contaminants of Concern in Indoor Air”

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

K&L Gates/Lawrence letter to DEQ/Reynolds re: BN’s Proposed Indoor Air Mitigation System for 1104 E Gallatin St

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

K/J/Norris email to DEQ/Reynolds re: Working Draft BN Shop Complex Indoor Air Mitigation Guide Specifications

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Page 161: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 161 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 RD/RA Confirmation of sample receipt 03/10/10 CAS

13 01 11 10 01 CD RD/RA 03/10/10 KJ/Norris

13 01 11 10 01 RD/RA 03/15/10 KJ/Norris

13 01 11 10 01 RD/RA 3/18-3/24/10

13 01 11 10 01 CD RD/RA 03/26/10 CDM/Pozega

13 01 11 10 01 RD/RA Confirmation of sample receipt 03/26/10 CAS

13 01 11 10 01 RD/RA Confirmation of sample receipt 03/26/10 CAS

13 01 11 10 01 RD/RA Confirmation of sample receipt 03/26/10 CAS

13 01 11 10 01 RD/RA Confirmation of sample receipt 03/30/10 CAS

13 01 11 10 01 RD/RA Confirmation of sample receipt 03/30/10 CAS

13 01 11 10 01 CD RD/RA 04/02/10 CDM/ Pozega

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

K/J/Norris transmittal to DEQ/Reynolds re: CD containing Task I EDDs

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

K/J/Norris email to DEQ/Reynolds re: BN Shop Complex – Indoor Air Mitigation Guide Specifications- Attachments - BN Memo 030110

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

DEQ/Reynolds & K/J/Norris emails re: BN Shop Complex – Indoor Air Mitigation Guide Specifications

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

CDM/Pozega cover letter to DEQ/Reynolds re: CD with electronic files for Task I letter packages (13) on CD

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

CDM/Pozega cover letter to DEQ/Reynolds re: CD with electronic files for Task I letter packages (19) on CD

Page 162: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 162 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 RD/RA Confirmation of sample receipt 04/02/10 CAS

13 01 11 10 01 RD/RA 04/06/10 CAS/ Aguilera

13 01 11 10 01 CD RD/RA 04/09/10 CDM/ Pozega

13 01 11 10 01 RD/RA 04/09/10 CAS/ Aguilera

13 01 11 10 01 RD/RA 04/09/10 CAS/ Aguilera

13 01 11 10 01 CD RD/RA 04/16/10 CDM/ Pozega

13 01 11 10 01 CD RD/RA 04/23/10 CDM/ Pozega

13 01 11 10 01 CD RD/RA 05/03/10 CDM/ Pozega

13 01 11 10 01 RD/RA Residential & Commercial Mitigation Plan Replacement pages 07/21/10

13 01 11 10 01 RD/RA 08/05/10 K&L Gates

13 01 11 10 01 RD/RA 03/04/11 DEQ/ Reynolds

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

CAS/Aguilera letter report to DEQ/Reynolds re: Lab results for samples submitted on 3/23/10

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

CDM/Pozega cover letter to DEQ/Reynolds re: CD with electronic files for Task I letter packages (13) on CD

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

CAS/Aguilera letter report to DEQ/Reynolds re: Lab results for samples submitted on 3/26/10

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

CAS/Aguilera letter report to DEQ/Reynolds re: Lab results for samples submitted on 3/23/10

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

CDM/Pozega cover letter to DEQ/Reynolds re: CD with electronic files for Task I vapor intrusion letter packages (21) on CD

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

CDM/Pozega cover letter to DEQ/Reynolds re: CD with electronic files for Task I vapor intrusion letter packages (20) on CD

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

CDM/Pozega cover letter to DEQ/Reynolds re: CD with electronic files for Task I vapor intrusion letter packages (16) on CD

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

K&L Gates letter to DEQ/Reynolds re: BN’s Supplemental Indoor Sampling for Purpose of Litigation

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

DEQ/Reynolds letter/fax to BNSF/Smith re: Interim Task I Risk Assessment Amendment NO. 2 and Request for Additional Indoor Air & Soil Gas Sampling

Page 163: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 163 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 RD/RA 03/11/11 DEQ/ Reynolds

13 01 11 10 01 RD/RA 03/14/11 KJ/Norris

13 01 11 10 01 RD/RA 03/17/11 DEQ/ Reynolds

13 01 11 10 01 RD/RA 3/21-3/22/11

13 01 11 10 01 RD/RA 2011 VI sampling schedule 03/22/11

13 01 11 10 01 RD/RA 04/11/11 CAS/ Aguilera

13 01 11 10 01 RD/RA 10/06/11 KJ/ Peterson

13 01 11 10 01 RD/RA 02/01/12 KJ/Norris

13 01 11 10 01 RM 10 RD/RA 02/01/12 KJ/Dunning

13 01 11 10 01 01 RD/RA

13 01 11 10 01 01 RM 10 RD/RA 05/17/06 Miki Renick

13 01 11 10 01 01 RM 10 RD/RA 05/24/06 Dave Amsk

13 01 11 10 01 01 RM 10 RD/RA 6/12/06 Carter Boehm

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

DEQ/Reynolds letter to BN/Smith re: DEQ Decision Making Process and Task I Requirements

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

K/J/Norris email to DEQ/Reynolds re: Additional indoor air & soil gas sampling

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

DEQ/Reynold email to K/J/Norris re: Additional indoor air and soil gas sampling

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

DEQ/Reynolds & K/J/Norris emails re: Clarification for HAPSITE sampling

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

CAS/Aguilera email to DEQ/Reynolds re: Sample confirmation from Columbia Analytical

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

KJ/Peterson letter to MRL R Gustin re: Indoor air/subslab soil gas sampling at Livingston shop buildings

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

KJ/Norris cover letter for Work Scope Statement & Project Manal for Project Site - 1500 East Park Street

Site-Wide Information

Draft Task I - Supplemental Investigation Work Plan for Indoor Air plus draft

KJ/Tech Memo to Olympus re: Work Scope Statement & Project Manal for Project Site - 1500 East Park Street

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Miki Renick to DEQ re: MS Renick would like to be kept informed regarding the vapor sampling conducted on her property

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Dave Amsk to DEQ re: Info request about any investigation in the area near the radio station out by the river

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Carter Boehm to DEQ re: Info request about indoor air quality sampling at Talgo property

Page 164: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 164 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 01 RM 10 RD/RA DEQ/KJ/MRL re: H&P Data 09/06/06

13 01 11 10 01 01 RM 10 RD/RA 9/18/06 Evan Russell

13 01 11 10 01 01 RM 10 RD/RA DEQ, CDM, & K/J re: Task I Mitigation Plan conference call 2/28/07

13 01 11 10 01 01 RM 10 RD/RA DEQ & C Boehm re: Task I sampling access 03/12/07

13 01 11 10 01 01 RM 10 RD/RA DEQ & K/J re: Task I Miscellaneous 05/10/07

13 01 11 10 01 01 RM 10 RD/RA DEQ/Sally Dahl re: Sampling 12/03/07

13 01 11 10 01 01 RM 10 RD/RA DEQ & H Schuver/EPA re: Attenuation Factor 01/24/08

13 01 11 10 01 01 RM 10 RD/RA DEQ & Helen Dawson/EPA re: Attenuation Factor 01/24/08

13 01 11 10 01 01 RM 10 RD/RA DEQ & H Schuver re: VI in Livingston 04/18/08

13 01 11 10 01 01 RM 10 RD/RA DEQ & H Dawson re: Billings PCE 04/25/08

13 01 11 10 01 01 RM 10 RD/RA DEQ/Reynolds conference call re: ATDSR call notes 4/30/08 DEQ/ Reynolds

13 01 11 10 01 01 RM 10 RD/RA 05/15/08

13 01 11 10 01 01 RM 10 RD/RA DEQ & K/J re: Task F Part 2 Work Plan 05/20/08

13 01 11 10 01 01 RM 10 RD/RA 05/28/08

13 01 11 10 01 01 RM 10 RD/RA DEQ/KJ re: Task I 07/02/08

13 01 11 10 01 01 RM 10 RD/RA Phone Log DEQ & J Mack re: Vapor sampling 7/24/08

13 01 11 10 01 01 RM 10 RD/RA Phone Log R Klumpers & DEQ re: Vapor sampling 8/26/08

13 01 11 10 01 01 RM 10 RD/RA 12/16/08

13 01 11 10 01 01 RM 10 RD/RA Phone Log – DEQ & C Rody re: Info request 1/21/09

13 01 11 10 01 01 RM 10 RD/RA Phone Log – DEQ & J Revoir re: Task I sampling 01/27/09

13 01 11 10 01 01 RM 10 RD/RA 3/3/09

13 01 11 10 01 01 RM 10 RD/RA DEQ/Seyler notes on 107 S. G Street vapor complaint 04/03/09 DEQ/Seyler

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Evan Russell to DEQ re: C Boehm’s nephew – info about indoor air vapor sampling

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Phone Log – DEQ/Reynolds & ATSDR/D Strausbaugh re: Request for petition ATSDR involvement

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

DEQ & Julie McGarry re: Request for air sampling results for Hendricksons/Rainbow Motel

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Phone Log DEQ/H Harper and B Ebinger re: Vapor intrusion issues

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Phone Log – DEQ/Reynolds and Mrs. Zallinger/resident re: Interested in having her home sampled

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Page 165: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 165 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 01 RM 10 RD/RA Phone Log - DEQ/Fry notes re: Mrs. Kautzman 04/10/09 DEQ/Fry

13 01 11 10 01 01 RM 10 RD/RA 4/28/09 DEQ/Reynolds

13 01 11 10 01 01 RM 10 RD/RA DEQ/Reynolds email to BN/Terry re: BNSF Contact 05/29/09 DEQ/Reynolds

13 01 11 10 01 01 RM 10 RD/RA 6/26/09 DEQ/Reynolds

13 01 11 10 01 01 RM 10 RD/RA 07/24/09 DEQ/Reynolds

13 01 11 10 01 01 RM 10 RD/RA 8/12-8/14/09

13 01 11 10 01 01 RM 10 RD/RA 08/13/09

13 01 11 10 01 01 RM 10 RD/RA 8/3/11

13 01 11 10 01 02 RD/RA

13 01 11 10 01 02 RM 10 RD/RA 4/3/06

13 01 11 10 01 02 RM 10 RD/RA 5/9/06 KJ

13 01 11 10 01 02 RM 10 RD/RA 5/9/06-5/10/06

13 01 11 10 01 02 RM 10 RD/RA DEQ internal emails re: Contamination DEQ internal

13 01 11 10 01 02 RM 10 RD/RA BNSF email to DEQ re: 6/16 conference call 6/15/06 BN

13 01 11 10 01 02 RM 10 RD/RA DEQ email to CDM re: Screen Process Response 6/16/06 DEQ

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Livingston screening levels 6/23/06

13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Task I forward planning letter 6/27/06 CDM

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Task I forward planning letter 6/27/06

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Task I 7/6/06

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: TO-15 data

13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Task I comments 8/24/06 CDM

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

DEQ/Reynolds fax to Ernie Meador re: Indoor, subslab & outdoor sample results for the Pinar/Kusberin (sp?) property

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

DEQ/Reynolds note re: Discussed Air Toxics LTD Data results with Frank O’Connor

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

DEQ/Reynolds email to Riley Fox re: Results of air samples collected at property

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

DEQ/Reynolds & Austin O’Dea/Fisheries Biologist emails re: Concern about toxins in new home

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

DEQ/Reynolds internal email re: BN petition for ATDSR review of indoor air data

DEQ/Reynolds internal

Site-Wide Information

Task I – Phone Logs (5/06 to Present)

Phone Log – N Chowen & M Scott to DEQ re: Concerns about home at 226 South M Street

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Park Co Environmental Council/RTI emails re: Friday 4/7/06 meeting

Site-Wide Information

Task I – Emails (4/06 to Present)

KJ transmittal notice: Technical Memo including preliminary analytical results for soil gas, flux chamber, and indoor air sampling conducted 4/06

Site-Wide Information

Task I – Emails (4/06 to Present)

KJ/DEQ emails re: Livingston deliverable – Task I Addendum 1

Site-Wide Information

Task I – Emails (4/06 to Present)

5/16/06-5/19/06

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

7/14/06-7/18/06

Site-Wide Information

Task I – Emails (4/06 to Present)

Page 166: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 166 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Soil vapor sampling 8/25/06 CDM

13 01 11 10 01 02 RM 10 RD/RA EPA/DEQ emails re: Soil vapor sampling

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: H&P data and 9/12/06 meeting 9/5/06-9/6/06

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Task I table with all analytes 9/11/06

13 01 11 10 01 02 RM 10 RD/RA CDM/KJ emails re: Task I site visit 09/22/06

13 01 11 10 01 02 RM 10 RD/RA DEQ email to BNSF and CDM re: Task I action items 09/22/06 DEQ

13 01 11 10 01 02 RM 10 RD/RA B Hartman/KJ emails re: Follow-up to Task I phone discussion 9/26/06

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Follow-up to Task I discussion 09/26/06

13 01 11 10 01 02 RM 10 RD/RA DEQ email to BNSF re: Follow-up to Task I discussion 09/26/06 DEQ

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Indoor air answers 10/13/06

13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: Task I work plan 10/13/06

13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Lab data 10/13/06 CDM

13 01 11 10 01 02 RM 10 RD/RA 10/25/06 RTI

13 01 11 10 01 02 RM 10 RD/RA KJ/BNSF/DEQ emails re: DEQ letters 11/10/06

13 01 11 10 01 02 RM 10 RD/RA KJ/CDM emails re: Task I Mitigation Plan 11/22/06

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Task I discussion 11/27/06 KJ

13 01 11 10 01 02 RM 10 RD/RA CDM emails re: TO-15 list 11/27/06 CDM

13 01 11 10 01 02 RM 10 RD/RA DEQ email to KJ/BNSF re: Initial follow-up on Task I meeting 11/28/06 DEQ

13 01 11 10 01 02 RM 10 RD/RA KJ/CDM emails re: August 2006 Hapsite 11/29/06

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Use of Hapsite or mobile lab 11/4/06 KJ

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Use of Hapsite or mobile lab

13 01 11 10 01 02 RM 10 RD/RA KJ/CDM emails re: Use of Hapsite or mobile lab

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

8/28/06-8/30/06

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

RTI email to DEQ re: Addendum 2 to Final Task I Supplemental Work Plan

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

12/4/06-12/5/06

Site-Wide Information

Task I – Emails (4/06 to Present)

12/4/06-12/5/06

Page 167: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 167 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: Use of Hapsite or mobile lab

13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Draft soil gas/air sampling locations 12/7/06 CDM

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Conference call 12/07/06 KJ

13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Locomotive shop sampling locations 12/8/06 CDM

13 01 11 10 01 02 RM 10 RD/RA CDM emails re: Sampling locations for shop complex 12/8/06 CDM

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Addendum 2 modifications 12/18/06 KJ

13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: TO-15 sampling 12/11/06 CDM

13 01 11 10 01 02 RM 10 RD/RA DEQ email to CDM re: TO-15 sampling 12/11/06 DEQ

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Addendum 2 modifications 12/18/06

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Addendum 2 modifications

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: SVE information 12/19/06

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Addendum 2 modifications

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Addendum 2 modifications layout

13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: Addendum 2 modifications

13 01 11 10 01 02 RM 10 RD/RA DEQ email to CDM re: Sampling and Analysis Plan 1/10/07 DEQ

13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: KJ Task I letter 01/17/07 CDM

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Task I Addendum

13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Mitigation plan 01/18/07 CDM

13 01 11 10 01 02 RM 10 RD/RA DEQ email to KJ re: Resident with concerns 01/19/07 DEQ

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Addendum 2 01/19/07 KJ

13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: SSD reference document 01/22/07 CDM

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Canister cleaning (1/25/07) 01/25/07

Site-Wide Information

Task I – Emails (4/06 to Present)

12/4/06-12/6/06

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

12/18/06-12/19/06

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

12/18/06-12/27/06

Site-Wide Information

Task I – Emails (4/06 to Present)

12/18/06-12/27/06

Site-Wide Information

Task I – Emails (4/06 to Present)

12/18/06-1/2/07

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

1/17/07-1/18/07

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Page 168: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 168 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Task I mobile home location

13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: HP Labs SOPs 01/26/07 CDM

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Canister cleaning for Task I 01/26/07

13 01 11 10 01 02 RM 10 RD/RA DEQ email to KJ re: Task I issues 01/29/07 DEQ

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Addendum 2 deliverable 01/29/07 KJ

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Response to 1/10/07 KJ letter 01/31/07

13 01 11 10 01 02 RM 10 RD/RA CDM/BNSF/DEQ emails re: Dedicated flow controllers

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Addendum 2 pre-field activity 2/16/07 KJ

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Addendum 2 posted to website 02/21/07 KJ

13 01 11 10 01 02 RM 10 RD/RA DEQ email to CDM re: Mitigation plan 02/28/07 DEQ

13 01 11 10 01 02 RM 10 RD/RA CDM/KJ emails re: Task I phone call 03/01/07

13 01 11 10 01 02 RM 10 RD/RA CDM/KJ/DEQ emails re: Sampling access status 2/28/07-3/9/07

13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: Field activities schedule 3/20/07

13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: Livingston basements 3/26/07

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: BN Livingston

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Air sampling schedule 03/27/07 KJ

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Revised sampling schedule 03/29/07 KJ

13 01 11 10 01 02 RM 10 RD/RA CDM/KJ emails re: Air sampling

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Livingston basements

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: BNSF recommendations 03/29/07 KJ

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: BNSF recommendations

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: BNSF recommendations

Site-Wide Information

Task I – Emails (4/06 to Present)

1/25/07-1/26/07

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

2/14/07-2/15/07

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

3/26/07-3/27/07

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

3/28/07-3/29/07

Site-Wide Information

Task I – Emails (4/06 to Present)

3/26/07-3/29/07

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

3/29/07-3/30/07

Site-Wide Information

Task I – Emails (4/06 to Present)

3/29/07-3/30/07

Page 169: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 169 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: BNSF recommendations

13 01 11 10 01 02 RM 10 RD/RA CDM emails re: Mitigation plan 03/30/07 CDM

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Indoor air sample costs 3/23/07-4/3/07

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Indoor air sample costs 3/23/07-4/3/07

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: SOP for soil gas sampling 4/5/07 KJ

13 01 11 10 01 02 RM 10 RD/RA KJ emails re: Addendum 2 activities update 04/09/07 KJ

13 01 11 10 01 02 RM 10 RD/RA 3/1/07-4/16/07

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Task I soil gas sampling

13 01 11 10 01 02 RM 10 RD/RA 04/26/07 KJ

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Analytical results posted to website 4/26/07 KJ

13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: EPA/OSHA indoor air issues article CDM

13 01 11 10 01 02 RM 10 RD/RA

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Task F/I well locations

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Institutional control for 405 North L St

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Analytical results posted to website 5/1/07 KJ

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Air summary table 5/8/07

13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Air summary data 05/10/07 CDM

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: More info on air summary table 05/10/07

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Mitigation plan 05/10/07

13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: Mitigation plan

13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Response to 3/29 KJ letter 05/11/07 CDM

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Relocating SGPs along Mainline

Site-Wide Information

Task I – Emails (4/06 to Present)

3/29/07-3/30/07

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

KJ/CDM/DEQ emails re: CAD file for the Task I Mitigation Plan

Site-Wide Information

Task I – Emails (4/06 to Present)

4/20/07-4/22/07

Site-Wide Information

Task I – Emails (4/06 to Present)

KJ email to DEQ re: Mitigation Design Development Plan posted to website

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

4/25/07-4/26/07

Site-Wide Information

Task I – Emails (4/06 to Present)

KJ/CDM/DEQ emails re: Analytical results posted to website and split sample results

4/26/07-4/27/07

Site-Wide Information

Task I – Emails (4/06 to Present)

4/27/07-4/30/07

Site-Wide Information

Task I – Emails (4/06 to Present)

4/26/07-5/1/07

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

5/10/07-5/11/07

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

5/11/07-5/14/07

Page 170: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 170 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Mitigation plan

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Indoor air data

13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Indoor air sampling locations 05/14/07 CDM

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Analytical results posted to website 5/15/07 KJ

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Task I 05/18/07

13 01 11 10 01 02 RM 10 RD/RA

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Schedule for June 4-8

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Talgo shops letter 06/01/07

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Draft Talgo buildings letter 6/1/07-6/4/07

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Task I data posted to website 06/07/07 KJ

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Additional SVE testing 6/7/07 KJ

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Data for PCEC KJ

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Task I items posted to website 07/05/07 KJ

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Task I mitigation items posted to website 7/6/07 KJ

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Task I

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Task I

13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: WWTP

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Task I items posted to website 08/03/07 KJ

13 01 11 10 01 02 RM 10 RD/RA CDM emails re: Pages from analytical results tables 08/06/07 CDM

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Task I items posted to website 08/06/07 KJ

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: NE-16L duplicate 08/06/07 KJ

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Task I items posted to website 08/07/07 KJ

Site-Wide Information

Task I – Emails (4/06 to Present)

5/10/07-5/14/07

Site-Wide Information

Task I – Emails (4/06 to Present)

5/11/07-5/14/07

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

KJ/DEQ emails re: Proposed Task I Mitigation Design Development Plan soil sampling locations

5/23/07-5/24/07

Site-Wide Information

Task I – Emails (4/06 to Present)

5/29/07-5/30/07

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

6/18/07-6/20/07

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

6/29/07-7/10/07

Site-Wide Information

Task I – Emails (4/06 to Present)

6/29/07-7/10/07

Site-Wide Information

Task I – Emails (4/06 to Present)

7/26/07-7/31/07

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Page 171: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 171 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Data package 8/7/07-8/10/07

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Task I items posted to website 08/13/07 KJ

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Task I SGP logs posted to website 8/14/07 KJ

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Data package – altitude correction factor

13 01 11 10 01 02 RM 10 RD/RA 8/1/07-8/16/07 Iris Environmental

13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Recommended MUW wells for start-up 8/17/07 CDM

13 01 11 10 01 02 RM 10 RD/RA CDM emails re: Cinder pile inspection summary 7/2/07-8/18/07 CDM

13 01 11 10 01 02 RM 10 RD/RA KJ/CDM emails re: Indoor air sample 07-AS-ES-4 09/17/07

13 01 11 10 01 02 RM 10 RD/RA MT Rail/DEQ emails re: Wheel Shop 09/24/07

13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Profile sampling 10/09/07 CDM

13 01 11 10 01 02 RM 10 RD/RA 10/10/07 CDM

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Indoor air VOCs to remove

13 01 11 10 01 02 RM 10 RD/RA CDM emails re: Diffusion bag guidance 10/24/07 CDM

13 01 11 10 01 02 RM 10 RD/RA BNSF email to DEQ re: DEQ Task I letter of 10/25/07 11/05/07 BN

13 01 11 10 01 02 RM 10 RD/RA DEQ email to BNSF re: Task I extension 11/14/07 DEQ

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Indoor air VOCs to remove

13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: SGP data 11/27/07 CDM

13 01 11 10 01 02 RM 10 RD/RA S Dahl email to DEQ re: BN Update newsletter 11/28/07 S Dahl

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Due date for mitigation plans 11/30/07

13 01 11 10 01 02 RM 10 RD/RA 11/30/07 DEQ internal

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Task I mitigation plans 01/04/08

13 01 11 10 01 02 RM 10 RD/RA DEQ email to KJ re: #2 Rainbow Mobile Home Park 01/14/08 DEQ

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

8/0807-8/16/07

Site-Wide Information

Task I – Emails (4/06 to Present)

Iris Environmental/DEQ emails re: Altitude considerations and references

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

CDM email to DEQ re: Indoor air and soil gas probe COCs to remove

Site-Wide Information

Task I – Emails (4/06 to Present)

10/10/07-10/17/07

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

10/10/07-11/14/07

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ internal email to Director re: Vapor intrusion in Livingston

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Page 172: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 172 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Task I follow-up letter 1/18/08 KJ

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Task I comments

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Task I letter and other issues

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Bioventing startup modifications 1/24/08

13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: SGP-4 location

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: SGP-4 location

13 01 11 10 01 02 RM 10 RD/RA 01/29/08 DEQ

13 01 11 10 01 02 RM 10 RD/RA DEQ internal email re: Scheduling 01/29/08 DEQ internal

13 01 11 10 01 02 RM 10 RD/RA CDM/KJ/DEQ emails re: SGP-4 location w/pictures

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: SGP-4 location

13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Response to Boehm letter 02/06/08 CDM

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Sampling schedule 02/15/08 KJ

13 01 11 10 01 02 RM 10 RD/RA CDM email to Calscience re: Air sampling 02/20/08 CDM

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Price quote for Task I 2/21/08

13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Price quote from Columbia 02/22/08 CDM

13 01 11 10 01 02 RM 10 RD/RA Calscience/CDM/DEQ emails re: Air sampling

13 01 11 10 01 02 RM 10 RD/RA BKBH/KJ/DEQ emails re: Sampling 2/29/08-3/2/08

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Sampling 3/2/08 KJ

13 01 11 10 01 02 RM 10 RD/RA 03/11/08 KJ

13 01 11 10 01 02 RM 10 RD/RA Calscience/CDM emails re: Task I 03/12/08

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Items posted to website 3/17/08 KJ

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Final soil gas data 03/21/08 KJ

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

1/18/08-1/22/08

Site-Wide Information

Task I – Emails (4/06 to Present)

1/18/08-1/24/08

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

1/28/08-1/29/08

Site-Wide Information

Task I – Emails (4/06 to Present)

1/28/08-1/29/08

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ email to property owner re: Indoor air and subslab sampling

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

1/28/08-1/29/08

Site-Wide Information

Task I – Emails (4/06 to Present)

1/28/08-1/31/08

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

2/20/08-2/22/08

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

KJ email to DEQ re: Subslab soil gas results from Feb/Mar sampling

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Page 173: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 173 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Items posted to website 03/28/08 KJ

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Items posted to website

13 01 11 10 01 02 RM 10 RD/RA Calscience email to DEQ re: Invoices attached 4/2/08 Calscience

13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: Items posted to website

13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: Items posted to website

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Articles about TCE VI 04/09/08 KJ

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Notification of upcoming field activities 4/14/08 KJ

13 01 11 10 01 02 RM 10 RD/RA CDM emails to DEQ re: Indoor air/soil gas data CDM

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Work Order Directive 7

13 01 11 10 01 02 RM 10 RD/RA

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Task I

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Task I 4/23/08 KJ

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Summa canisters 04/23/08

13 01 11 10 01 02 RM 10 RD/RA Calscience/CDM emails re: Summa request 04/23/08

13 01 11 10 01 02 RM 10 RD/RA 04/25/08

13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Task I air and soil gas data 4/28/08 CDM

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Indoor air background concentrations 04/29/08 KJ

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Data quality assessment

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Air and soil gas data

13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: Indoor air background concentrations

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Request for Task I sample results 4/30/08 KJ

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Data quality 5/1/08-5/5/08

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

3/28/08-3/31/08

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

3/28/08-4/3/08

Site-Wide Information

Task I – Emails (4/06 to Present)

3/28/08-4/3/08

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

4/15/08-4/16/08

Site-Wide Information

Task I – Emails (4/06 to Present)

4/16/08-4/17/08

Site-Wide Information

Task I – Emails (4/06 to Present)

KJ/CDM/DEQ emails re: Notification of upcoming field activities

4/14/08-4/21/08

Site-Wide Information

Task I – Emails (4/06 to Present)

1/18/08-4/21/08

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Columbia/CDM emails re: Quote from Columbia Analytical Services for Task I

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

4/28/08-4/29/08

Site-Wide Information

Task I – Emails (4/06 to Present)

4/28/08-4/29/08

Site-Wide Information

Task I – Emails (4/06 to Present)

4/29/08-4/30/08

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Page 174: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 174 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Calscience data for the 2008 DEQ splits 05/08/08 KJ

13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: paper on VOCs in air KJ

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Items posted to website 05/14/08 KJ

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Items posted to website 5/22/08 KJ

13 01 11 10 01 02 RM 10 RD/RA Y ** DEQ internal email re: Request for more testing 05/27/08 DEQ internal

13 01 11 10 01 02 RM 10 RD/RA Y ** DEQ internal email re: Work plans and Henriksen results 5/27/08 DEQ internal

13 01 11 10 01 02 RM 10 RD/RA Columbia/CDM/DEQ emails re: Results of analysis

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: BTEX data

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Livingston documents

13 01 11 10 01 02 RM 10 RD/RA Property owner/DEQ emails re: Air testing results

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Items posted to website

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Items posted to website 6/2/08 KJ

13 01 11 10 01 02 RM 10 RD/RA CDM/DEQ emails re: Commercial screening levels 6/2/08-6/3/08

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: SGP data 06/12/08 KJ

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Task F Part 1 groundwater sampling update 6/12/08

13 01 11 10 01 02 RM 10 RD/RA K/J/Aldersley email to DEQ/Reynolds re: SGP data 06/13/08 KJ/Aldersley

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Indoor air sampling 6/5/08-6/13/08

13 01 11 10 01 02 RM 10 RD/RA 06/20/08 DEQ

13 01 11 10 01 02 RM 10 RD/RA CW Law/DEQ emails re: Testing results for Diana Merideth 06/30/08

13 01 11 10 01 02 RM 10 RD/RA 7/17/08 KJ

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Data posted 07/29/08 KJ

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Data posted 07/30/08 KJ

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

5/10/08-5/13/08

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

5/27/08-5/28/08

Site-Wide Information

Task I – Emails (4/06 to Present)

5/28/08-5/29/08

Site-Wide Information

Task I – Emails (4/06 to Present)

5/28/08-5/30/08

Site-Wide Information

Task I – Emails (4/06 to Present)

5/29/08-5/30/08

Site-Wide Information

Task I – Emails (4/06 to Present)

5/14/08-5/30/08

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ email to BKBH re: BNSF recently purchased properties follow-up

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

KJ email to DEQ re: Diffusion bag setting and sampling notification

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Page 175: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 175 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: Items posted to website

13 01 11 10 01 02 RM 10 RD/RA KJ/CDM/DEQ emails re: Items posted to website

13 01 11 10 01 02 RM 10 RD/RA CDM email to DEQ re: Summary table data 7/31/08 CDM

13 01 11 10 01 02 RM 10 RD/RA DEQ/Bill Johnson re: BN property rental 7/31/08-8/1/08

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Diffusion bag sampling notification 08/05/08 KJ

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Items posted 09/03/08 KJ

13 01 11 10 01 02 RM 10 RD/RA DEQ/City emails re: Shop sampling

13 01 11 10 01 02 RM 10 RD/RA 10/24/08 DEQ/ Reynolds

13 01 11 10 01 02 RM 10 RD/RA DEQ/Aspen Real Estate emails re: Vapor sampling 12/08/08

13 01 11 10 01 02 RM 10 RD/RA KPRK/DEQ emails re: Vapor sampling 12/16/08

13 01 11 10 01 02 RM 10 RD/RA DEQ/City emails re: KPRK sampling

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ email re: Kinnick sampling 12/24/08

13 01 11 10 01 02 RM 10 RD/RA DEQ email to KJ re: Task I 1/6/09 DEQ

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Sampling locations 01/09/09 KJ

13 01 11 10 01 02 RM 10 RD/RA DEQ/KJ emails re: 118 N. L St. sampling 1/21/09

13 01 11 10 01 02 RM 10 RD/RA KJ/DEQ emails re: Task I sampling locations 1/21/09

13 01 11 10 01 02 RM 10 RD/RA DEQ email to KJ re: NWE contact 01/22/09 DEQ

13 01 11 10 01 02 RM 10 RD/RA KJ email to KJ re: OSWER TCE memo 01/23/09 KJ

13 01 11 10 01 02 RM 10 RD/RA DEQ/CDM and internal emails re: Lab cost quotes 1/30/09

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: Task I Mitigation Plan notice 2/2/09 KJ

13 01 11 10 01 02 RM 10 RD/RA DEQ/Columbia emails re: Split samples 02/03/09

13 01 11 10 01 02 RM 10 RD/RA DEQ/Columbia emails re: Split samples 2/3/09-2/5/09

Site-Wide Information

Task I – Emails (4/06 to Present)

7/29/08-7/30/08

Site-Wide Information

Task I – Emails (4/06 to Present)

7/29/08-7/30/08

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

9/17/08-9/18/08

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds email to M Hills, J Eisenbeis, & Jesse Woodward re: List of properties for which vapor sampling has been requested

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

12/16/08-12/22/08

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Page 176: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 176 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 02 RM 10 RD/RA 02/10/09 DEQ/Reynolds

13 01 11 10 01 02 RM 10 RD/RA KJ email to DEQ re: 2/9/09 week sampling schedule 02/05/09 KJ

13 01 11 10 01 02 RM 10 RD/RA Spreadsheet of addresses and sampling dates 2/9-2/14/09

13 01 11 10 01 02 RM 10 RD/RA DEQ email to Columbia re: Sample confirmation 2/17/09 DEQ

13 01 11 10 01 02 RM 10 RD/RA List of addresses and sampling dates 2/23-3/2/09

13 01 11 10 01 02 RM 10 RD/RA 02/24/09 CDM/Eisenbeis

13 01 11 10 01 02 RM 10 RD/RA 2/24/09

13 01 11 10 01 02 RM 10 RD/RA 2/24/09 KJ/Aldersley

13 01 11 10 01 02 RM 10 RD/RA Spreadsheet of addresses and sampling dates 2/25-3/1/09

13 01 11 10 01 02 RM 10 RD/RA DEQ/Reynolds email to M Hills re: Task I field reports needed 02/26/09 DEQ/Reynolds

13 01 11 10 01 02 RM 10 RD/RA 2/27/09 KJ/Norris

13 01 11 10 01 02 RM 10 RD/RA 3/2/09 KJ/Aldersley

13 01 11 10 01 02 RM 10 RD/RA 03/02/09 CAS/Agqilera

13 01 11 10 01 02 RM 10 RD/RA DEQ/Reynolds & K/J/Norris emails re: Task I data 03/02/09

13 01 11 10 01 02 RM 10 RD/RA 3/2/09 KJ/Aldersley

13 01 11 10 01 02 RM 10 RD/RA 03/03/09

13 01 11 10 01 02 RM 10 RD/RA 3/3/09 CDM/Hills

13 01 11 10 01 02 RM 10 RD/RA Spreadsheet of addresses and sampling dates 3/3-3/8/09

13 01 11 10 01 02 RM 10 RD/RA Chain of Custody from CAS 3/4/09

13 01 11 10 01 02 RM 10 RD/RA 03/09/09 CAS/Agqilera

13 01 11 10 01 02 RM 10 RD/RA 3/10/09

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds email to Sherri Peterson, K/J & CDM re: Plastic bags around canisters – don’t use anymore

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

CDM/Eisenbeis email to DEQ/Reynolds re: ITRC Guidance and radon

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds and CDM/Lamie emails to CDM/Eisenbeis re: Reply to Eisenbeis 2/24/09 email

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Preliminary indoor air and soil gas analytical results received to date have been posted to website

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Norris email to DEQ/Reynolds re: Comprehensive report of all Task I investigation activities conducted since January 2007

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley & DEQ/Reynolds emails re: Preliminary sampling schedule

Site-Wide Information

Task I – Emails (4/06 to Present)

K Aguilera/CAS Lab email to DEQ/Reynolds re: Sample confirmation for BN Livingston P0900737

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Additional indoor air/soil gas data has been posted to website

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds, K/J Norris and S Peterson emails re: New indoor sampling location 211 South F Street

Site-Wide Information

Task I – Emails (4/06 to Present) CDM/Hills email to CDM/Lamie re: Task I data QA/QC needed

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present) CAS/Aguilera email to DEQ/Reynolds re: Sample confirmation

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley and DEQ/Reynolds emails re: PLC data from last week has been posted to the website

Page 177: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 177 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 02 RM 10 RD/RA KJ/Aldersley

13 01 11 10 01 02 RM 10 RD/RA 03/11/09 KJ/Aldersley

13 01 11 10 01 02 RM 10 RD/RA 03/11/09 KJ/Aldersley

13 01 11 10 01 02 RM 10 RD/RA 03/13/09 KJ/Aldersley

13 01 11 10 01 02 RM 10 RD/RA 03/22/09 KJ/Aldersley

13 01 11 10 01 02 RM 10 RD/RA 03/23/09

13 01 11 10 01 02 RM 10 RD/RA 03/24/09 CAS/Agqilera

13 01 11 10 01 02 RM 10 RD/RA 3/24/09 CAS/Agqilera

13 01 11 10 01 02 RM 10 RD/RA 03/25/09 DEQ/Reynolds

13 01 11 10 01 02 RM 10 RD/RA 03/25/09 DEQ/Reynolds

13 01 11 10 01 02 RM 10 RD/RA 03/25/09 KJ/Aldersley

13 01 11 10 01 02 RM 10 RD/RA 03/25/09 CAS/Agqilera

13 01 11 10 01 02 RM 10 RD/RA 3/26/09

13 01 11 10 01 02 RM 10 RD/RA 03/27/09

13 01 11 10 01 02 RM 10 RD/RA 03/27/09 KJ/Aldersley

13 01 11 10 01 02 RM 10 RD/RA CDM/Lamie & DEQ/Reynolds emails re: Subslab leaks 3/31/09\

13 01 11 10 01 02 RM 10 RD/RA CDM/Eisenbeis email to DEQ re: Subslab leaks 03/31/09 CDM/ Eisenbeis

13 01 11 10 01 02 RM 10 RD/RA 03/31/09 CAS/ Agqilera

13 01 11 10 01 02 RM 10 RD/RA 04/04/09 DEQ/ Reynolds

13 01 11 10 01 02 RM 10 RD/RA 04/06/09

13 01 11 10 01 02 RM 10 RD/RA 4/07/09 CDM/ Woodward

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Soil gas reports posted to the web

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: A Summary Table of the soil gas and indoor air data to date has been posted to web

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Preliminary Task I sampling schedule for next week

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Task I Items posted to the web

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Task I Items posted to the web

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & CDM/Hills emails re: SGP and groundwater sampling letters

Site-Wide Information

Task I – Emails (4/06 to Present)

K Aguilera/CAS Lab email to DEQ/Reynolds re: Lab did not receive canister ID 1SC00096 which associated with sample ID 09-SG-712-DEQ

Site-Wide Information

Task I – Emails (4/06 to Present)

K Aguilera/CAS Lab & DEQ/Reynolds emails re: Canister found – will not be analyzed

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds email to K/J/Aldersley re: Attachments – Task I data

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds email to CDM/Hills re: Attachments – Task I data

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Task I Items posted to the web

Site-Wide Information

Task I – Emails (4/06 to Present)

K Aguilera/CAS Lab & DEQ/Reynolds emails re: Lost canister arrived at lab – still do not analyze

Site-Wide Information

Task I – Emails (4/06 to Present)

CDM/Woodward, Hills & Lamie & DEQ/Reynolds emails re: Parent/duplicate sample sets

Site-Wide Information

Task I – Emails (4/06 to Present)

CDM/Hills & Lamie and DEQ emails re: Parent/duplicate sample information

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Task I Items posted to the web

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

K Aguilera/CAS Lab email to DEQ/Reynolds re: 2-4 day delay in mailing out TO-15 data reports

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds emails to CDM & K/J re: 107 South G Street – Kutzman home

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Fry and Ed Coleman emails re: 107 South G Street indoor air complaint

Site-Wide Information

Task I – Emails (4/06 to Present)

CDM/Woodward email to DEQ/Fry re: 107 South G Street field visit

Page 178: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 178 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 02 RM 10 RD/RA 4/7/09

13 01 11 10 01 02 RM 10 RD/RA 4/8/09

13 01 11 10 01 02 RM 10 RD/RA 4/9/09

13 01 11 10 01 02 RM 10 RD/RA 04/09/09 KJ/Aldersley

13 01 11 10 01 02 RM 10 RD/RA CAS

13 01 11 10 01 02 RM 10 RD/RA 04/10/09 DEQ internal

13 01 11 10 01 02 RM 10 RD/RA 04/10/09 DEQ/Fry internal

13 01 11 10 01 02 RM 10 RD/RA 4/10/09

13 01 11 10 01 02 RM 10 RD/RA 04/13/09 DEQ/ Reynolds

13 01 11 10 01 02 RM 10 RD/RA 4/13/09

13 01 11 10 01 02 RM 10 RD/RA 4/14/09 KJ/Aldersley

13 01 11 10 01 02 RM 10 RD/RA 04/16/09 KJ/Aldersley

13 01 11 10 01 02 RM 10 RD/RA 4/16/09 KJ/Aldersley

13 01 11 10 01 02 RM 10 RD/RA 4/16/09 KJ/Aldersley

13 01 11 10 01 02 RM 10 RD/RA 04/27/09

13 01 11 10 01 02 RM 10 RD/RA 04/27/09 KJ/Aldersley

13 01 11 10 01 02 RM 10 RD/RA 4/28/09

13 01 11 10 01 02 RM 10 RD/RA 04/28/09

13 01 11 10 01 02 RM 10 RD/RA 04/28/09

13 01 11 10 01 02 RM 10 RD/RA 05/01/09 DEQ/ Reynolds

13 01 11 10 01 02 RM 10 RD/RA 05/13/09

13 01 11 10 01 02 RM 10 RD/RA 05/13/09 KJ/Aldersley

Site-Wide Information

Task I – Emails (4/06 to Present)

CDM/Woodward & DEQ/Fry emails re: Call from C Lawellin, attorney about 107 South G Street

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Fry, Dunwell & Olsen internal emails re: Media contact – Missoulian for BN Whitefish

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Fry & CDM/Norris & K/J/Aldersley emails re: 107 South G Street sampling schedule

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Task I items posted to the web

Site-Wide Information

Task I – Emails (4/06 to Present)

CAS-AIR lab email to DEQ/Reynolds re: EDD results of Analysis (SR# P0901011)

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Olsen & Fry internal emails re: 107 South G Street sampling

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Fry internal email to Reynolds re: 107 G Street – K/J sample schedule

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley and DEQ/Fry emails re: Re-sampling of 107 South G Street

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds email to CDM/Lamie & Hills re: Attachment – PDF of Final Report - samples were collected on 3/16-3/19/09

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Fry, K/J/Norris & Aldersley emails re: Soil Gas System – 1104 E Gallatin Street

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: 1104 E Gallatin Street sampling at 9:00 Wednesday 4/15/09

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Task I items posted to the web

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley & DEQ/Reynolds emails re: 1424 E Callender is location 520 written for samples

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Task I DEQ Split Samples/Deliverables

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & K/J Norris & Peterson emails re: Additional consent form

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Task I items posted to the web

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & CDM/Hills emails re: Bednarack data for location 712 on the website

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & K/J Aldersley emails re: Attachment - CDM split samples/deliverables

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & CDM/Hills emails re: Attachment - Additional 2007 split sample data

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds email to K/J/Aldersley re: DEQ can’t locate all of the radon data

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & K/J Aldersley emails re: Radon data is uploaded to website

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Task I items posted to the web – Updated summary table (5/13/09)

Page 179: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 179 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 02 RM 10 RD/RA 5/15-5/18/09

13 01 11 10 01 02 RM 10 RD/RA 5/29-6/6/09

13 01 11 10 01 02 RM 10 RD/RA 6/4/09 KJ/Aldersley

13 01 11 10 01 02 CD RM 10 RD/RA 06/12/09 KJ/Aldersley

13 01 11 10 01 02 RM 10 RD/RA 6/17/09 KJ/Aldersley

13 01 11 10 01 02 RM 10 RD/RA 06/23/09

13 01 11 10 01 02 RM 10 RD/RA DEQ/Reynolds & CDM/Lamie emails re: “Dil factor” 6/29/09

13 01 11 10 01 02 RM 10 RD/RA 07/10/09 CDM/Hills

13 01 11 10 01 02 RM 10 RD/RA 07/13/09

13 01 11 10 01 02 RM 10 RD/RA 7/13/09 KJ/Aldersley

13 01 11 10 01 02 RM 10 RD/RA 08/18/09

13 01 11 10 01 02 RM 10 RD/RA 09/22/09 CDM/Hills

13 01 11 10 01 02 RM 10 RD/RA K/J/Norris & DEQ/Reynolds emails re: Legal Ad Public Notice 9/22/09

13 01 11 10 01 02 RM 10 RD/RA 09/30/09

13 01 11 10 01 02 RM 10 RD/RA 10/13/09

13 01 11 10 01 02 RM 10 RD/RA 10/21/09

13 01 11 10 01 02 RM 10 RD/RA BN/Stegman & DEQ/Opper emails re: Technical discussions

13 01 11 10 01 02 RM 10 RD/RA 10/23/09 KJ/Norris

13 01 11 10 01 02 RM 10 RD/RA 10/23/09

Site-Wide Information

Task I – Emails (4/06 to Present) DEQ/Reynolds & K/J/Aldersley emails re: Address clarification

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & CDM/Hills emails re: Query of CDM data base for ambient air data

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: 3 copies of the Indoor Air Mitigation System Work Scope Statement & Field Design Package for 1104 E Gallatin sent out 6/4/09 UPS

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: 4 copies of the Task I Supplemental Investigation Report sent out UPS 6/12/09

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Re sampling of indoor air at the Kautzman property set for 6/24/09 at 8:am

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & CDM/Hills emails re: Task I data – which building have full slabs and which have something else

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

CDM/Hills email to DEQ/Reynolds re: Draft comments on 1104 E Gallatin Mitigation Plan

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds and Pace Analytical/K Smit emails re: Smit needed to determine if opportunities exist for Pace to perform analytical work

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J Aldersley email to DEQ/Reynolds re: Kautzman re-sampling data posted to website

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & CDM/Woodward emails re: Data location for location 80 formerly SE -29

Site-Wide Information

Task I – Emails (4/06 to Present)

CDM/Hills email to DEQ/Reynolds re: Example drawing for location 131 – 1 layout

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & CDM/Hills emails re: DEQ requesting a map that shows all of the Task I sampling locations

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & BN/Smith emails re: Proposed date for meeting

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & Resident/ Machele Jones emails re: Sampling results for 112 N G Street

Site-Wide Information

Task I – Emails (4/06 to Present)

10/9/-10/23/09

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Norris email to DEQ/Reynolds re: Attachment - BN comments on Final Draft Task I Risk Assessment Amendment

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & BN/Smith emails re: Meeting date & location (10/23/09)

Page 180: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 180 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 02 RM 10 RD/RA 10/26/09

13 01 11 10 01 02 RM 10 RD/RA 10/29/09

13 01 11 10 01 02 RM 10 RD/RA 10/30/09

13 01 11 10 01 02 RM 10 RD/RA DEQ/Reynolds & CDM/Woodward emails re: Location U-2 10/30/09

13 01 11 10 01 02 RM 10 RD/RA 11/2/09

13 01 11 10 01 02 RM 10 RD/RA 11/02/09

13 01 11 10 01 02 RM 10 RD/RA 11/02/09

13 01 11 10 01 02 RM 10 RD/RA 11/2/09

13 01 11 10 01 02 RM 10 RD/RA 11/02/09

13 01 11 10 01 02 RM 10 RD/RA 11/02/09

13 01 11 10 01 02 RM 10 RD/RA BN/Smith email to DEQ/Reynolds re: Meeting agenda 11/02/09 BN/Smith

13 01 11 10 01 02 RM 10 RD/RA BN/Stegman & DEQ/Reynolds emails re: Meeting agenda 11/2/09

13 01 11 10 01 02 RM 10 RD/RA 11/3/09

13 01 11 10 01 02 RM 10 RD/RA DEQ/Reynolds & CDM/Hills re: Task I notebooks 11/12/09

13 01 11 10 01 02 RM 10 RD/RA 11/18/09 KJ/Aldersley

13 01 11 10 01 02 RM 10 RD/RA 12/01/09

13 01 11 10 01 02 RM 10 RD/RA 12/2/09

13 01 11 10 01 02 RM 10 RD/RA 12/4/09

13 01 11 10 01 02 RM 10 RD/RA 12/07/09

13 01 11 10 01 02 RM 10 RD/RA DEQ/BNSF emails re: IAQ issues

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & K/J/Aldersley emails re: CD – Revised Task I Indoor Mitigation Plan for Residential & Commercial Properties – K/J can’t access

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & Courtney Lawellin emails re: Identification of samples

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & Resident/ Machele Jones emails re: Sampling results for 112 N G Street

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & K/J/Norris emails re: Task F – Stage 1 – Part 1

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & PCEC/Billau emails re: PCEC Comments on the Final Draft Risk Assessment Amendment

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & K/J/Norris emails re: BN Comments on the Final Draft Risk Assessment Amendment

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & Jeannette Blank emails re: Blank comments on the public meeting

Site-Wide Information

Task I – Emails (4/06 to Present)

Resident/N Durfey & DEQ/Reynolds emails re: Durfey comments

Site-Wide Information

Task I – Emails (4/06 to Present)

BN/Smith & DEQ/Reynolds emails re: Meeting time, date & attendees

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

CDM/Lamie & DEQ/Reynolds emails re: Attachment - Background file

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Livingston deliverables

Site-Wide Information

Task I – Emails (4/06 to Present)

Kleinfelder/Dwyer & DEQ/Reynolds emails re: Livingston mitigation triggers

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Norris email to DEQ/Reynolds re: Access permission requested for 1104 E Gallatin St.

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ Legal/Haque-Hausrath email & hard copy to Fisher court reporting re: Corrections for 11/12/09 Deposition of Aimee Reynolds

DEQ Legal/ Haque-Hausrath

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & Kleinfelder/Dwyer emails re: DEQ information to Dwyer – Attachment –Final Dispute Resolution Text, Attachment 10 Ambient Air Table & DEQ 6/8/09 letter to BN

Site-Wide Information

Task I – Emails (4/06 to Present)

12/18/09-12/21/09

Page 181: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 181 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 02 RM 10 RD/RA 12/23/2009

13 01 11 10 01 02 RD/RA 01/07/10

13 01 11 10 01 02 RD/RA 01/12/10

13 01 11 10 01 02 RD/RA DEQ/CDM emails re: Task I decisions

13 01 11 10 01 02 RD/RA 1/29/2010

13 01 11 10 01 02 RD/RA 2/2/10

13 01 11 10 01 02 RD/RA 02/05/10 DEQ/ Reynolds

13 01 11 10 01 02 RD/RA 02/07/10 DEQ/ Reynolds

13 01 11 10 01 02 RD/RA 2/8/10 DEQ/ Reynolds

13 01 11 10 01 02 RD/RA 02/10/10 DEQ/ Reynolds

13 01 11 10 01 02 RD/RA 2/11/10

13 01 11 10 01 02 RD/RA 02/15/10

13 01 11 10 01 02 RD/RA 02/17/10

13 01 11 10 01 02 RD/RA 02/18/10 BN/ Stegman

13 01 11 10 01 02 RD/RA 02/18/10 BN/Smith

13 01 11 10 01 02 RD/RA DEQ/Reynolds email to DNREC/Galloway re: Tubing 02/18/10 DEQ/ Reynolds

13 01 11 10 01 02 RD/RA 02/19/10 PECE/Billau

13 01 11 10 01 02 RD/RA 02/19/10

13 01 11 10 01 02 RD/RA 02/19/10 GSI/Lee

13 01 11 10 01 02 RD/RA 02/19/10

Site-Wide Information

Task I – Emails (4/06 to Present)

Resident/A Tewell & DEQ/Reynolds emails re: Tewell requesting results for air quality test

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & K/J/Aldersley emails re: Locations SE-20 and 520

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Norris & DEQ/Reynolds emails re: Additional Indoor Air/Soil Gas Sampling

Site-Wide Information

Task I – Emails (4/06 to Present)

1/14/10-1/15/10

Site-Wide Information

Task I – Emails (4/06 to Present)

PCEC/Billau & DEQ/Reynolds emails re: Final Task I RA and MDEQ Approved Remedy for Newly Identified Contaminants of Concern in Indoor Air

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Norris & DEQ/Reynolds emails re: Final Task I RA and MDEQ Approved Remedy for Newly Identified Contaminants of Concern in Indoor Air

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds email to K/J/Norris & BN/Smith re: Attachment - February 2010 Task I requirements

Site-Wide Information

Task I – Emails (4/06 to Present)

Resident/Horvath & DEQ/Reynolds emails re: Horvath inquiring about contamination in home he just bought

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds email to K/J/Norris & Aldersley re: Horvath property

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds email to K/J/Norris & BN/Smith re: Task I location map and sampling protocol

Site-Wide Information

Task I – Emails (4/06 to Present)

BN/Smith & DEQ/Reynolds emails re: February 2010 Task I requirements

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Opper & BN/Stegman emails re: Indoor Air Mitigation Pilot Project & Judge Strong’s Findings

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & BN/Smith re: February 2010 Task I requirements meeting agenda

Site-Wide Information

Task I – Emails (4/06 to Present)

BN/Stegman email to DEQ/Reynolds re: BN agrees to undertake the sampling requested by DEQ in it’s 2/5/10 letter

Site-Wide Information

Task I – Emails (4/06 to Present)

BN/Smith email to DEQ/Reynolds, K/J/Norris BN/Stegman & John Conner re: Conference call update for 2/19/10

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

PECE/Billau email to Sarah Orms’ re: Air sampling for Livingston

Site-Wide Information

Task I – Emails (4/06 to Present)

H&P/Hartman & Reed & DEQ/Reynolds emails re: VI Investigation in Livingston (tubing)

Site-Wide Information

Task I – Emails (4/06 to Present)

GSI/Lee email to BN/Stegman re: VI /Mitigation spreadsheet adequately clarifies the basis for re-sampling at all locations

Site-Wide Information

Task I – Emails (4/06 to Present)

BN/Norris email to DEQ/Reynolds re: 111 Miles Ave lease has been terminated by BN & BN intends to demolish the structure

Page 182: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 182 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 02 RD/RA Y ** BN/Stegman email to DEQ/Opper re: Pilot Project 02/21/10 BN/ Stegman

13 01 11 10 01 02 RD/RA 02/22/10

13 01 11 10 01 02 RD/RA

13 01 11 10 01 02 RD/RA 02/23/10

13 01 11 10 01 02 RD/RA 02/24/10

13 01 11 10 01 02 RD/RA 02/26/10

13 01 11 10 01 02 RD/RA DEQ/BNSF/KJ emails re: February 2010 requirements 2/5-2/26/10

13 01 11 10 01 02 RD/RA DEQ/BNSF emails re: Meeting and P&E letter 2/19-2/26/10

13 01 11 10 01 02 RD/RA 2/25-3/1/10 DEQ internal

13 01 11 10 01 02 RD/RA 03/01/10

13 01 11 10 01 02 RD/RA 03/02/10

13 01 11 10 01 02 RD/RA 03/02/10

13 01 11 10 01 02 RD/RA DEQ/Reynolds & K/J/Peterson emails re: Canister size 03/03/10

13 01 11 10 01 02 RD/RA 03/04/10

13 01 11 10 01 02 RD/RA 03/10/10 KJ/Aldersley

13 01 11 10 01 02 RD/RA 03/12/10

13 01 11 10 01 02 RD/RA 03/12/10 CDM/Hills

13 01 11 10 01 02 RD/RA 03/15/10 CDM/ Woodward

13 01 11 10 01 02 RD/RA 03/15/10 CDM/Pozega

13 01 11 10 01 02 RD/RA 03/15/10 CDM/Pozega

13 01 11 10 01 02 RD/RA 03/17/10

13 01 11 10 01 02 RD/RA DEQ/Reynolds & K/J/Norris emails re: Task I sampling 03/22/10

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & K/J/Norris emails re: SVE wells & system N6002

Site-Wide Information

Task I – Emails (4/06 to Present)

Resident/F Horiel & DEQ/Reynolds emails re: Testing & GW analytical results

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Peterson & DEQ/Reynolds emails re: Fixed gas sampling (2/23/10)

Site-Wide Information

Task I – Emails (4/06 to Present)

Property Owner/T Skurski & DEQ/Reynolds emails re: Resampling of property

Site-Wide Information

Task I – Emails (4/06 to Present)

Resident/F Horiel & DEQ/Reynolds emails re: Testing & GW analytical results

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Schiff, Reynolds & Martin internal emails re: Laboratories for VI Analysis

Site-Wide Information

Task I – Emails (4/06 to Present)

CDM/Hills & Calscience/Nowak emails re: Price quote for Vapor analysis

Site-Wide Information

Task I – Emails (4/06 to Present)

Columbia Analytical/Aguilera & CDM/Hills emails re: Price quote for Vapor analysis

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & C Lawellin emails re: Resample testing – C Goode home not available

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

CDM/Pozega & DEQ/Reynolds emails re: Task I Summary of Analytical Results Table

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Task I EDDs CD sent UPS for delivery tomorrow

Site-Wide Information

Task I – Emails (4/06 to Present)

Edwards Law Firm/Hinman & Edwards & DEQ Legal/Brooks emails re: Krohne property

Site-Wide Information

Task I – Emails (4/06 to Present)

CDM/Hills email to DEQ/Reynolds re: VI data for location 114 & 115

Site-Wide Information

Task I – Emails (4/06 to Present)

CDM/Woodward email to DEQ/Reynolds re: Krohne property (3/15/10)

Site-Wide Information

Task I – Emails (4/06 to Present)

CDM/Pozega email to DEQ/Reynolds re: Attachment – Task I letters (3/15/10)

Site-Wide Information

Task I – Emails (4/06 to Present)

CDM/Pozega email to DEQ/Reynolds re: Attachment – Task I letter – locations 317A & 317B

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & CAS lab/Aguilera emails re: Sample confirmation from Columbia Analytical

Site-Wide Information

Task I – Emails (4/06 to Present)

Page 183: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 183 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 02 RD/RA 03/23/10

13 01 11 10 01 02 RD/RA 03/24/10

13 01 11 10 01 02 RD/RA 04/12/10 KJ/Aldersley

13 01 11 10 01 02 RD/RA 04/16/10 KJ/Aldersley

13 01 11 10 01 02 RD/RA 04/23/10

13 01 11 10 01 02 RD/RA 04/23/10 KJ/Aldersley

13 01 11 10 01 02 RD/RA 04/29/10 KJ/Aldersley

13 01 11 10 01 02 RD/RA Resident/Horvath & DEQ Reynolds re: 515 north N air quality 05/06/10

13 01 11 10 01 02 RD/RA DEQ/Reynolds & K/J/Aldersley emails re: Task I data 06/04/10

13 01 11 10 01 02 RD/RA 6/8-6/11/10

13 01 11 10 01 02 RD/RA 06/17/10

13 01 11 10 01 02 RD/RA 06/24/10

13 01 11 10 01 02 RD/RA 06/28/10

13 01 11 10 01 02 RD/RA PCEC/Billau & DEQ/Reynolds emails re: VOC sampling 06/29/10

13 01 11 10 01 02 RD/RA DEQ/Reynolds & K/J/Norris emails re: Task I data 7/15-7/20/10

13 01 11 10 01 02 RD/RA 07/20/10 KJ/Aldersley

13 01 11 10 01 02 RD/RA CDM/Lamie & Hills emails to DEQ/Reynolds re: Task I data 07/23/10

13 01 11 10 01 02 RD/RA 08/02/10

13 01 11 10 01 02 RD/RA 08/03/10 CDM/ Martich

13 01 11 10 01 02 RD/RA 08/04/10

13 01 11 10 01 02 RD/RA 08/05/10

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Norris & DEQ/Reynolds emails re: BN Shop Complex, & Talgo Building Resampling under Task I

Site-Wide Information

Task I – Emails (4/06 to Present)

C Lawellin, Brooke Kuhl, CDM/Woodward & DEQ/Reynolds emails re: BNSF Request for entry

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Lab analytical & EDDs posted to website

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Summary table posted to website

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & K/J/Peterson emails re: Address for NEW letters

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Additional Lab analytical & EDDs posted to website

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Additional Lab analytical & EDDs posted to website

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present) DEQ/Reynolds & K/J/Norris emails re: BN Shop Complex data

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & K/J/Aldersley emails re: Task I – DEQ split samples

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & K/J/Aldersley emails re: Task I -2010 Soil Gas/Indoor Air Data Summary Report sent UPS 6/24/10

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & K/J/Norris emails re: GSI “hot grab” explanation

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Task I Indoor Air Mitigation Plan for Residential and Commercial Properties- DEQ Version, updated July 2010 sent UPS

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Resident/Horvath & DEQ/Reynolds emails re: 515N N st Air Quality

Site-Wide Information

Task I – Emails (4/06 to Present)

CDM/Martich email to DEQ/Reynolds re: Livingston positive issue

Site-Wide Information

Task I – Emails (4/06 to Present)

Resident/Horvath & DEQ/Reynolds emails re: 515N N st Air Quality

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & K/.J/Aldersley emails re: Questions about Mergen property

Page 184: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 184 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 02 RD/RA 8/4-8/11/10

13 01 11 10 01 02 RD/RA 02/15/11

13 01 11 10 01 02 RD/RA 03/05/11 KJ/ Peterson

13 01 11 10 01 02 RD/RA 03/08/11 DEQ/ Reynolds

13 01 11 10 01 02 RD/RA 03/09/11 KJ/Norris

13 01 11 10 01 02 RD/RA DEQ/Reynolds & BN/Smith emails re: DEQ 3/4/11 letter to BN 03/11/11

13 01 11 10 01 02 RD/RA DEQ/Reynolds email to BN/Smith re: Task I decision making 03/11/11 DEQ/Reynolds

13 01 11 10 01 02 RD/RA 03/18/11 BN/Smith

13 01 11 10 01 02 RD/RA Conference call schedule 03/24/11

13 01 11 10 01 02 RD/RA 03/25/11 DEQ/ Reynolds

13 01 11 10 01 02 RD/RA 04/01/11 KJ/Norris

13 01 11 10 01 02 RD/RA K/J/Norris & DEQ/Reynolds emails re: Location 23B 04/25/11

13 01 11 10 01 02 RD/RA 04/29/11 KJ/Adlersley

13 01 11 10 01 02 RD/RA K/J/Aldersley email to DEQ/Reynolds re: Task I data 05/17/11 KJ/Adlersley

13 01 11 10 01 02 RD/RA 05/31/11 KJ/Aldersley

13 01 11 10 01 02 RD/RA 06/01/11

13 01 11 10 01 02 RD/RA DEQ/Reynolds & Courtney emails re: Stephens 2011 data letter 6/1/11

13 01 11 10 01 02 RD/RA 06/07/11 KJ/Aldersley

13 01 11 10 01 02 RD/RA 06/08/11 KJ/Aldersley

13 01 11 10 01 02 RD/RA 06/14/11 KJ/Aldersley

13 01 11 10 01 02 RD/RA 06/15/11 CDM/ Martich

13 01 11 10 01 02 RD/RA K/J/Norris & DEQ/Reynolds emails re: Task I mitigation 6/21/11

Site-Wide Information

Task I – Emails (4/06 to Present)

Resident/Horvath & DEQ/Reynolds emails re: 515 N N st Air Quality

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & K/J/Peterson emails re: Unofficial heads up – Resampling

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/ Peterson email to DEQ/Reynolds re: Revised sampling schedule

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds email to BN/Smith re: Additional sampling locations

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Norris email to DEQ/Reynolds re: Indoor Air Mitigation Guide Specifications

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

BN/Smith email to DEQ/Reynolds re: DEQ 3/11/11 letter - BN requesting conference call

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds email to K/J/Norris & BN/Stegman re: Task I conference call followup

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Norris email to DEQ/Reynolds re: Task I sampling schedule update

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Task I data posted to website

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Task I data posted to website

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ Legal/Haque-Hausrath & Courtney emails re: Pinar property

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Task I indoor air data posted to website

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Revised Task I indoor air data posted to website

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: 2011 indoor air & soil gas analytical summary tables posted to website

Site-Wide Information

Task I – Emails (4/06 to Present)

CDM/Martich email to K/J/Aldersley re: Attachment – Columbia analytical reposts for split samples

Site-Wide Information

Task I – Emails (4/06 to Present)

Page 185: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 185 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 02 RD/RA K/J/Aldersley email to DEQ/Reynolds re: Helium samples 07/25/11 KJ/Aldersley

13 01 11 10 01 02 RD/RA DEQ/Reynolds & K/J/Norris emails re: Hapsite findings 08/04/11

13 01 11 10 01 02 RD/RA KJ/Norris email to DEQ/Reynolds re: Task I Mitigation Status 08/14/11 KJ/Norris

13 01 11 10 01 02 RD/RA DEQ/Reynolds & KJ/Norris emails re: Heat in MRL buildings 01/19/12

13 01 11 10 01 02 RD/RA 01/24/12 DEQ/ Reynolds

13 01 11 10 01 02 RD/RA 01/27/12 DEQ/ Reynolds

13 01 11 10 01 02 RD/RA DEQ/Reynolds email to KJ re: Heat in Talgo buildings 01/27/12 DEQ/ Reynolds

13 01 11 10 01 02 RD/RA 02/02/12

13 01 11 10 01 02 RD/RA 02/13/12

13 01 11 10 01 02 RD/RA 03/14/12 KJ/Adlersley

13 01 11 10 01 02 RD/RA 03/23/12 KJ/Adlersley

13 01 11 10 01 02 RD/RA 05/23/12 KJ/Adlersley

13 01 11 10 01 02 RD/RA 05/25/12

13 01 11 10 01 03 RD/RA Task I - Meeting Notes

13 01 11 10 01 03 RM 10 RD/RA Notes 06/15/06

13 01 11 10 01 03 RM 10 RD/RA Notes 06/16/06

13 01 11 10 01 03 RM 10 RD/RA Notes 06/27/06

13 01 11 10 01 03 RM 10 RD/RA Notes 6/30/06

13 01 11 10 01 03 RM 10 RD/RA Notes 07/18/06

13 01 11 10 01 03 RM 10 RD/RA Notes 9/21/06

13 01 11 10 01 03 RM 10 RD/RA Map of Planned Sampling Locations 09/06/11

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds email to KJ/Norris re: Followup on the extended duration sampling

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds email to BN/Stegman, CDM, & KJ re: DEQ response regarding Extended Duration Samples

Site-Wide Information

Task I – Emails (4/06 to Present)

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & KJ/Norris emails re: Task I sampling deadline

Site-Wide Information

Task I – Emails (4/06 to Present)

GSI/McHugh & DEQ/Reynolds emails re: New PCE Toxicity factors

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Task I items posted to website - Analytical lab reports for February 2012 Task I indoor air/soil gas sampling

Site-Wide Information

Task I – Emails (4/06 to Present)

K/J/Aldersley email to DEQ/Reynolds re: Task I items posted to website - Analytical lab reports for February 2012 Task I indoor air/soil gas sampling

Site-Wide Information

Task I – Emails (4/06 to Present)

KJ/Aldersley email to DEQ/Reynolds re: Task I items posted to web - validated analytical data tables for 2012 Task I indoor air/ soil gas sampling

Site-Wide Information

Task I – Emails (4/06 to Present)

DEQ/Reynolds & KJ/Norris emails re: 4/19/12 Status of Task I items letter

Site-Wide Information

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Page 186: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 186 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 03 RM 10 RD/RA Notes 9/26/06

13 01 11 10 01 03 RM 10 RD/RA Notes – CDM Meeting 11/27/06

13 01 11 10 01 03 RM 10 RD/RA Notes – Task I 11/27/06

13 01 11 10 01 03 RM 10 RD/RA Notes 11/28/06

13 01 11 10 01 03 RM 10 RD/RA Notes 12/04/06

13 01 11 10 01 03 RM 10 RD/RA Notes 12/08/06

13 01 11 10 01 03 RM 10 RD/RA Notes 1/24/07

13 01 11 10 01 03 RM 10 RD/RA Maps of previous sampling locations and analytical results 01/07/11

13 01 11 10 01 03 RM 10 RD/RA Notes 03/30/07

13 01 11 10 01 03 RM 10 RD/RA Notes 4/23/07

13 01 11 10 01 03 RM 10 RD/RA Notes 05/16/07

13 01 11 10 01 03 RM 10 RD/RA Notes 05/17/07

13 01 11 10 01 03 RM 10 RD/RA Notes 7/6/07

13 01 11 10 01 03 RM 10 RD/RA Notes 08/22/07

13 01 11 10 01 03 RM 10 RD/RA Notes 08/27/07

13 01 11 10 01 03 RM 10 RD/RA Notes 10/26/07

13 01 11 10 01 03 RM 10 RD/RA Conference call info and notes 12/18/07

13 01 11 10 01 03 RM 10 RD/RA Notes 1/29/08

13 01 11 10 01 03 RM 10 RD/RA Notes 4/4/08

13 01 11 10 01 03 RM 10 RD/RA Notes 04/22/08

13 01 11 10 01 03 RM 10 RD/RA Minutes 4/22/08

13 01 11 10 01 03 RM 10 RD/RA DEQ/KJ emails re: Indoor air sampling 6/5/08-7/7/08

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Page 187: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 187 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 03 RM 10 RD/RA Notes 11/4/09

13 01 11 10 01 03 RM 10 RD/RA Conference call – Task I sampling & scheduling 02/18/10

13 01 11 10 01 03 RM 10 RD/RA Conference call – Task I sampling & scheduling 2/19/10

13 01 11 10 01 03 RM 10 RD/RA 08/15/12

13 01 11 10 01 03 RM 10 RD/RA 08/15/12

13 01 11 10 01 04 RD/RA

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to C. Gonder re: Task I contact SE-2 12/8/05 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Current tenant re: Task I contact NE-5 12/8/05 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to A Ziegler re: Task I contact NE-2 12/8/05 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ email to K/J re: Task I analytical reports 1/6/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ email to K/J re: Final Task I analytical reports 1/11/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to G Smith re: BG-11 results 1/12/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to W Jones re: SE-5 results 01/12/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to A Lahren re: AS -142 results 1/12/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to D. Merideth re: NE -3 results 1/12/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to M Marsh/D Shwartskopf re: AS-167 results 1/12/06 DEQ

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Vapor Intrusion Technical Exchange - DEQ & BN Proposed Agenda & meeting notes

Site-Wide Information

Task I - Meeting Notes (5/06 to Present)

Vapor Intrusion Technical Exchange - DEQ & BN draft meeting notes

Site-Wide Information

Task I - Analytical Results to Property Owners (fall 2006 to Present)

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Page 188: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 188 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to S Leens re: AS-157 results 1/12/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to S Bates re: NE-5 results 01/12/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to G Olsen re: NE-4 results 01/12/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to G O'Connor re: BG-29 results DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to J Bauer re: AS-23 results 01/12/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to R Taylor re: AS-43 results 1/12/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to S Briggs re: AS-78 results 01/12/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to R Klumpers re: AS-80 results 01/12/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to V Shipley re: AS-99 results 01/12/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to H Davis re: AS-132 results 01/12/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to J Evanson re: AS-108 results 1/12/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to L Winstel re: NE-1 results 1/12/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Talgo-LRC re: AS LS results 1/12/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ Letter to L Winstel re: 12R03 results 1/20/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to T Elich re: Access request 1/20/06 DEQ

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Page 189: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 189 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to R Keller re: Locomotive Shop sample results 11/1/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Aza Ziegler re: Analytical results 11/2/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Jim Evanson re: Analytical results 11/2/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Alvin Lahren re: Analytical results 11/02/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to M Renick & S Bates re: Sample results 11/02/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA 11/02/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to B Gonder re: Sampling results 11/02/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to D Amsk re: BNSF Tech Memo per request 11/03/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to C Boehm & G Olsen re: Sample results 11/03/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to M Marsh & D Schwartzkopf re: Sample results 11/03/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ Letter to Christine & Gary Smith re: Sample results 11/03/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to G O’Conner re: Sample results 11/03/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Kathy & Tom Elich re: Sample results 11/03/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to L Winstel re: Sample results 11/03/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Winstel returned 11/09/06 DEQ

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to C Boehm & E Russell re: BNSF Tech Memo per request

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Page 190: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 190 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Bates returned 11/09/06 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ fax to Carter Boehm re: Consent for Access form 05/29/07 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Richard Keller re: Analytical results 06/05/07 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Tim & Denise Massey re: Analytical results 06/05/07 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to David Burley re: Analytical results 07/27/07 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Kris Hamilton re: Analytical results 07/31/07 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Wayne Townsend re: Analytical results 07/31/07 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Carter Boehm re: Analytical results 08/07/07 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Steve Briggs re: Analytical results 08/14/07 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Ricky Edminston re: Analytical results 08/14/07 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to John Long & Jody Albrecht re: Analytical results 08/15/07 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to John Long & Sally Dahl re: Analytical results 08/15/07 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Deborah Lewis re: Analytical results 08/22/07 DEQ

13 01 11 10 01 04 RM 10 RD/RA 08/22/07 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to David & Jeannie Burley re: Analytical results 09/28/07 DEQ

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to Carter Boehm & Jonathan & Gail Eisele re: Analytical results

Site-Wide Information

Task I - Analytical Results to Property Owners

Page 191: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 191 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to David & Jeannie Burley re: Analytical results 05/12/08 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Dwight & Kitty Krohne re: Analytical results 05/15/08 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Daniel & Tara Eddy re: Analytical results 05/16/08 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Johnny Lee & Jackie Fox re: Analytical results 06/06/08 DEQ

13 01 11 10 01 04 RM 10 RD/RA 06/10/08 DEQ

13 01 11 10 01 04 RM 10 RD/RA 06/10/08 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Jeffrey Dickerson re: Analytical results 06/12/08 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Debra Hendricksen re: Analytical results 06/13/08 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Amanda Davis re: Analytical results 06/17/08 DEQ

13 01 11 10 01 04 RM 10 RD/RA 06/20/08 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Jeffrey Dickerson re: Analytical results 06/27/08 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Steve Briggs re: Analytical results 06/27/08 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Erlynn & Esta Harris re: Analytical results 06/27/08 DEQ

13 01 11 10 01 04 RM 10 RD/RA 06/27/08 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ Fax to E Russell re: Task I data on location 68 07/23/08 DEQ

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to Devarold & Dyvonne Selkirk re: Analytical results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to Rich Keller/MRL & Guy Worthington/Guy’s Glass re: Analytical results

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to Jeffrey Dickerson re: Analytical results – another buildings results were attached to his

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to Jeffrey Richard & Sharon Tonnesen re: Analytical results

Site-Wide Information

Task I - Analytical Results to Property Owners

Page 192: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 192 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to P Bedbury re: Analytical results 09/11/08 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to V Anderson re: Analytical results 09/15/08 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to City re: Analytical results 09/17/08 DEQ

13 01 11 10 01 04 RM 10 RD/RA D Fredericks fax to DEQ w/WET analytical results 10/21/08 D Fredericks

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Fredericks re: Analytical results 10/30/08 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to J Litchfield re: Analytical results 12/05/08 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Gapwest Broadcasting re: Analytical results 12/18/08 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Bauers re: Analytical results 12/18/08 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to R & S Brewer re: Analytical results 01/07/09 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Rev Durgan re: Analytical results 01/07/09 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to K & Z Shelley re: Analytical results 01/08/09 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to J Huttinger re: Analytical results 01/09/09 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to T Toscano re: Analytical results 01/09/09 DEQ

13 01 11 10 01 04 RM 10 RD/RA 02/19/09 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 03/25/09 DEQ/ Reynolds

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to D Krohne re: Results of analyses of split sampling

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to D Amsk re: Results of analyses of split sampling

Page 193: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 193 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 04 RM 10 RD/RA 03/30/09 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 03/30/09 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 03/30/09 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 04/17/09 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 04/17/09 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 05/22/09 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 03/19/09 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 04/08/10 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 04/09/10 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 04/09/10 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 04/13/10 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 04/13/10 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 04/13/10 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 04/14/10 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 04/14/10 DEQ/ Reynolds

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to T Elich re: Analytical results of air samples

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Per Gunness re: Analytical results of air samples

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to M Roberts re: Analytical results of air samples

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to G Stevens re: Analytical results of air samples

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to A Long re: Analytical results of air samples

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Mr & Mrs. Jones & J Whiteside re: Analytical results for indoor and soil vapor samples

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Residents re: Indoor air or soil gas sampling results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Resident/Boehm re: Indoor air & soil vapor sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Resident/Boehm & G Olsen re: Indoor air & soil vapor sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Resident/Dore re: Indoor air & soil vapor sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Resident/Fabian re: Indoor air & soil vapor sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Resident/Harris re: Indoor air & soil vapor sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Resident/Eddy re: Indoor air & soil vapor sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Resident/Amsk re: Indoor air & indoor air split sample & soil vapor sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Resident/Erickson re: Indoor air, outdoor air & soil vapor sample results

Page 194: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 194 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 04 RM 10 RD/RA 04/22/10 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 04/22/10 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 04/26/10 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 04/26/10 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 04/26/10 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 04/28/10 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 05/11/10 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 05/11/10 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 05/12/10 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 05/12/10 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 05/12/10 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 05/12/10 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 05/12/10 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 05/12/10 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA DEQ/Reynolds fax to Resident/Krohne re: Sampling results 06/01/10 DEQ/ Reynolds

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Resident/Earl re: Unvalidated laboratory data as requested

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Resident/Krohne re: Unvalidated laboratory data as requested

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Resident/Durgan re: Indoor air & soil vapor sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Resident/L Guggia re: Indoor air & soil vapor sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Resident/M Guggia re: Indoor air & soil vapor sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds email to Resident/Drimall re: Location 601 E Gallatin preliminary lab analytical results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Resident/Gunness & Crystal re: Indoor air & soil vapor sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Resident/Scholls re: Indoor air & soil vapor sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Resident/Elich re: Indoor air & soil vapor sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Resident/Hamilton re: Indoor air & soil vapor sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Resident/Homans re: Indoor air & soil vapor sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Resident/Eschenko re: Indoor air & soil vapor sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Resident/Fry re: Indoor air & soil vapor sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Resident/Elliot re: Indoor air & soil vapor sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

Page 195: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 195 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 04 RM 10 RD/RA 06/02/10 Krohne

13 01 11 10 01 04 RM 10 RD/RA DEQ/Reynolds fax to Resident/Krohne re: Sampling results 06/03/10 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA Resident/Cook & DEQ/Reynolds emails re: 511 E Gallatin 06/04/10

13 01 11 10 01 04 RM 10 RD/RA 6/9-6/10/10

13 01 11 10 01 04 RM 10 RD/RA 06/25/10

13 01 11 10 01 04 RM 10 RD/RA 7/22-7/27/10

13 01 11 10 01 04 RM 10 RD/RA 11/03/10 Coleman

13 01 11 10 01 04 RM 10 RD/RA 11/03/10 J Mastin

13 01 11 10 01 04 RM 10 RD/RA 01/12/11 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 03/24/11 DEQ/ Reynolds

13 01 11 10 01 04 RM 10 RD/RA 03/25/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 04/04/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 04/12/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/06/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/06/11 DEQ

Site-Wide Information

Task I - Analytical Results to Property Owners

Resident/Krohne email to DEQ/Reynolds re: Sample results needed in easy to read format

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Resident/Horiel & DEQ/Reynolds emails re: Preliminary, unvalidated lab results

Site-Wide Information

Task I - Analytical Results to Property Owners

Resident/Drimal & DEQ/Reynolds re: 601 E Gallatin st preliminary unvalidated lab results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds & C Lawellin emails re: Mitigation on property on North I St

Site-Wide Information

Task I - Analytical Results to Property Owners

Coleman/Resident & DEQ/Reynolds emails re: Air quality results for 128 South F Street

Site-Wide Information

Task I - Analytical Results to Property Owners

J Mastin/Resident & DEQ/Reynolds emails re: Air quality results for 110 South H Street

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds email to Mr O’Day re: Attachment – 2009-2010 results for vapor intrusion sampling at residence

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letters to Residents re: HAPSITE letters for 2011 sampling

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to D Babcox re: No sampling required at 304 East Park St

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to M Roberts re: Enclosed 2008 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ email to Primo & Martich re: Address changes for database

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to J Bauerre re: Enclosed 2008 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to D Betcher re: Enclosed 2009 & 2010 air sampling data

Page 196: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 196 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 04 RM 10 RD/RA DEQ letter toN Betley re: Enclosed 2009 air sampling data 05/06/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/06/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to D Black re: Enclosed 2009 air sampling data 05/06/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/06/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/06/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to P Brandon re: Enclosed 2009 air sampling data 05/06/09 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/09/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to M Bednarek re: Enclosed 2009 air sampling data 05/09/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to N Adkins re: Enclosed 2009 air sampling data 05/09/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/09/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to D Amsk re: Enclosed 2010 air sampling data 05/13/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to V Blakeman re: Enclosed 2009 air sampling data 05/13/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to C Boehm re: Enclosed 2010 air sampling data 05/13/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/13/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to A Conley re: Enclosed 2009 air sampling data 05/13/11 DEQ

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to S Bondurantre re : Enclosed 2009 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to Bresnan Communications re: Enclosed 2008 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to S Brewer re: Enclosed 2008 & 2009 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to N Akerstrom re: Enclosed 2009 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to K Bergsing re: Enclosed 2009 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to City of Livingston re: Enclosed 2008, 2009 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

Page 197: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 197 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 04 RM 10 RD/RA 05/13/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to M Drimall re: Enclosed 2010 air sampling data 05/13/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to K Erickson re: Enclosed 2010 air sampling data 05/13/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to G Fabian re: Enclosed 2010 air sampling data 05/13/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to C Fenton re: Enclosed 2010 air sampling data 05/13/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to P Gunness re: Enclosed 2010 air sampling data 05/13/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to F Horiel re: Enclosed 2010 air sampling data 05/13/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to B Perriman re: Enclosed 2010 air sampling data 05/13/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/16/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to B Bullock re: Enclosed 2009 air sampling data 05/16/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to J Burgan re: Enclosed 2009 air sampling data 05/16/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to T Coleman re: Enclosed 2010 air sampling data 05/16/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to O Coon re: Enclosed 2009 air sampling data 05/16/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to K Crossman re: Enclosed 2010 air sampling data 05/16/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/16/11 DEQ

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to Country Motor Inn re: Enclosed 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to M Bruha re: Enclosed 2009 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to R Decker re: Enclosed 2009 & 2010 air sampling data

Page 198: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 198 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to K Crossman re: Enclosed 2008 air sampling data 05/16/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to D Eddy re: Enclosed 2010 air sampling data 05/16/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to D Eggar re: Enclosed 2009 air sampling data 05/16/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to G Fawcett re: Enclosed 2009 air sampling data 05/16/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/16/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to D Frederick re: Enclosed 2009 air sampling data 05/16/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to M Giuliano re: Enclosed 2010 air sampling data 05/16/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to D Kellem re: Enclosed 2010 air sampling data 05/16/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to R Frederick re: Enclosed 2009 air sampling data 05/17/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to C Lawellin re: Letters sent to your clients in 2011 05/18/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/19/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/19/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/19/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/19/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/19/11 DEQ

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to D Ferris re: Enclosed 2009 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to 1511 East Lewis St re: Copy of letter sent to landlord regarding sampling at your home 542A

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to 1511 East Lewis St re: Copy of letter sent to landlord regarding sampling at your home 514

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to 326 North L St re: Copy of letter sent to landlord regarding sampling at your home 23B

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to 102 1/2 South G St re: Copy of letter sent to landlord regarding sampling at your home 317B

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to 111 South L St re: Copy of letter sent to landlord regarding sampling at your home 556

Page 199: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 199 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 04 RM 10 RD/RA 05/19/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/19/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/19/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/19/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/19/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ 5/19/11 letter to 1511 East Lewis returned 05/19/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ 5/19/11 letter to 416 North K St returned 05/19/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ 5/19/11 letter to 924 East Park St returned 05/19/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to S Dore re: Enclosed 2010 air sampling data 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to J Fox re: Enclosed 2010 air sampling data 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to C Goode re: Enclosed 2009 air sampling data 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to S Gregorich re: Enclosed 2009 air sampling data 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/20/11 DEQ

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to 105 South P St re: Copy of letter sent to landlord regarding sampling at your home 510

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to 103 South N St re: Copy of letter sent to landlord regarding sampling at your home 531

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to 102 North H St re: Copy of letter sent to landlord regarding sampling at your home 166

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to 924 East Park St re: Copy of letter sent to landlord regarding sampling at your home 143

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to 416 North K St re: Copy of letter sent to landlord regarding sampling at your home NE-4

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to GapWest Broadcasting re: Enclosed 2008 & 2009 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to Hamilton Holdings re: Enclosed 2009 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners DEQ letter to H Lee Harris re: Enclosed 2009 air sampling data

Page 200: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 200 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to J Haskins re: Enclosed 2009 air sampling data 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to G Holiway re: Enclosed 2009 air sampling data 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to A Hueitt re: Enclosed 2009 air sampling data 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to J Hueitt re: Enclosed 2009 air sampling data 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to E Kinnick re: Enclosed 2009 air sampling data 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to S Lage re: Enclosed 2009 air sampling data 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to D Lewis re: Enclosed 2010 air sampling data 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to T Lewis re: Enclosed 2009 air sampling data 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to J Litchfield re: Enclosed 2010 air sampling data 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to L Mahr re: Enclosed 2009 air sampling data 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to M Marsh re: Enclosed 2009 air sampling data 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to T Massey re: Enclosed 2010 air sampling data 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to J Mastin re: Enclosed 2010 air sampling data 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to L Mathias re: Enclosed 2009 air sampling data 05/20/11 DEQ

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to Knife River - Livingston Ready Mix re: Enclosed 2009 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Page 201: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 201 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to J Nelson re: Enclosed 2009 air sampling data 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to Tirerama re: Enclosed 2008 air sampling data 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to F Greear re: Enclosed 2009 air sampling data 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ letter to G Frye re: Enclosed 2009 air sampling data 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ 5/20/11 letter to Lee Harris returned 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ 5/20/11 letter to Sharon Gregorich returned 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ 5/20/11 letter to Sharon Gregorich returned 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ 5/20/11 letter to Sharon Gregorich returned 05/20/11 DEQ

13 01 11 10 01 04 RM 10 RD/RA DEQ 5/20/11 letter to Graham & Caitlin Fry returned 05/20/11 DEQ

13 01 11 10 01 04 RD/RA DEQ letter to S Graham re: Enclosed 2009 air sampling data 05/25/11 DEQ

13 01 11 10 01 04 RD/RA 05/26/11 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA DEQ 5/26/11 letter to 1205 S Grand Ave returned 05/26/11 DEQ

13 01 11 10 01 04 RD/RA 05/26/11 DEQ

13 01 11 10 01 04 RD/RA 05/26/11 DEQ

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to G Worthington re: Enclosed 2008 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds & C Lawellin emails re: DEQ still sending out pre-2011 air data letters - Stephens property - location 127

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to R Smith re: Enclosed 2008 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to J Huttinger re: Enclosed 2009 & 2010 air sampling data

Page 202: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 202 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 04 RD/RA 05/26/11 DEQ

13 01 11 10 01 04 RD/RA DEQ letter to L Lahren re: Enclosed 2008 air sampling data 05/26/11 DEQ

13 01 11 10 01 04 RD/RA 05/26/11 DEQ

13 01 11 10 01 04 RD/RA DEQ letter to A Mitchell re: Enclosed 2009 air sampling data 05/26/11 DEQ

13 01 11 10 01 04 RD/RA 05/26/11 DEQ

13 01 11 10 01 04 RD/RA DEQ letter to D Nelson re: Enclosed 2009 air sampling data 05/26/11 DEQ

13 01 11 10 01 04 RD/RA 05/26/11 DEQ

13 01 11 10 01 04 RD/RA 05/26/11 DEQ

13 01 11 10 01 04 RD/RA 05/26/11 DEQ

13 01 11 10 01 04 RD/RA DEQ letter to A Pinar re: Enclosed 2009 air sampling data 05/26/11 DEQ

13 01 11 10 01 04 RD/RA 05/26/11 DEQ

13 01 11 10 01 04 RD/RA DEQ letter to T Roth re: Enclosed 2010 air sampling data 05/26/11 DEQ

13 01 11 10 01 04 RD/RA DEQ letter to D Selkirk re: Enclosed 2010 air sampling data 05/26/11 DEQ

13 01 11 10 01 04 RD/RA DEQ letter to K Shelley re: Enclosed 2009 air sampling data 05/26/11 DEQ

13 01 11 10 01 04 RD/RA 05/26/11 DEQ

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to M Jones re: Enclosed 2009 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to C McAdam re: Enclosed 2009 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to J Nardella re: Enclosed 2009 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to Northwestern Energy re: Enclosed 2009 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to A O’Dea re: Enclosed 2009 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to Todd Parker re: Enclosed 2009 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to M Ross re: Enclosed 2008 & 2009 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to T Skurski re: Enclosed 2009 & 2010 air sampling data

Page 203: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 203 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 04 RD/RA 05/27/11 DEQ

13 01 11 10 01 04 RD/RA DEQ letter to L Nelson re: Enclosed 2009 air sampling data 05/27/11 DEQ

13 01 11 10 01 04 RD/RA DEQ letter to G Smith re: Enclosed 2008 air sampling data 05/27/11 DEQ

13 01 11 10 01 04 RD/RA DEQ letter to K Downey re: Enclosed 2009 air sampling data 05/31/11 DEQ

13 01 11 10 01 04 RD/RA 05/31/11 DEQ

13 01 11 10 01 04 RD/RA 05/31/11 DEQ

13 01 11 10 01 04 RD/RA 05/31/11 DEQ

13 01 11 10 01 04 RD/RA DEQ letter to M Zimmer re: Enclosed 2009 air sampling data 06/01/11 DEQ

13 01 11 10 01 04 RD/RA DEQ letter to R Ziebarth re: Enclosed 2009 air sampling data 06/01/11 DEQ

13 01 11 10 01 04 RD/RA 06/01/11 DEQ

13 01 11 10 01 04 RD/RA 06/01/11 DEQ

13 01 11 10 01 04 RD/RA DEQ letter to J Whiteside re: Enclosed 2010 air sampling data 06/01/11 DEQ

13 01 11 10 01 04 RD/RA DEQ letter to J Wendland re: Enclosed 2009 air sampling data 06/01/11 DEQ

13 01 11 10 01 04 RD/RA 06/01/11 DEQ

13 01 11 10 01 04 RD/RA 06/01/11 DEQ

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to L Munro re: Enclosed 2009 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to M Roberts re: Enclosed 2008 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to H Sims re: Enclosed 2009 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to 103 South M St re: Letter sent to landlord regarding sampling done before 2011

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to D Zarnt re: Enclosed 2009 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ 6/1/11 letter to R Ziebarth returned re: Enclosed 2009 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to E Vanderwende re: Enclosed 2009 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to Turek & Pitman re: Enclosed 2009 air sampling data

Page 204: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 204 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 04 RD/RA DEQ letter to T Toscano re: Enclosed 2009 air sampling data 06/01/11 DEQ

13 01 11 10 01 04 RD/RA 06/01/11 DEQ

13 01 11 10 01 04 RD/RA DEQ letter to A Tewell re: Enclosed 2009 air sampling data 06/01/11 DEQ

13 01 11 10 01 04 RD/RA 06/01/11 DEQ

13 01 11 10 01 04 RD/RA 06/01/11 DEQ

13 01 11 10 01 04 RD/RA DEQ letter to G Stewart re: Enclosed 2009 air sampling data 06/01/11 DEQ

13 01 11 10 01 04 RD/RA DEQ letter to G Stephens re: Enclosed 2010 air sampling data 06/01/11 DEQ

13 01 11 10 01 04 RD/RA DEQ letter to J Revoir re: Enclosed 2009 air sampling data 06/01/11 DEQ

13 01 11 10 01 04 RD/RA DEQ letter to D Merideth re: Enclosed 2008 air sampling data 06/01/11 DEQ

13 01 11 10 01 04 RD/RA 06/01/11 DEQ

13 01 11 10 01 04 RD/RA DEQ letter to D Lichty re: Enclosed 2008 air sampling data 06/01/11 DEQ

13 01 11 10 01 04 RD/RA 06/01/11 DEQ

13 01 11 10 01 04 RD/RA 06/01/11 DEQ

13 01 11 10 01 04 RD/RA DEQ letter to S Kautzman re: Enclosed 2009 air sampling data 06/01/11 DEQ

13 01 11 10 01 04 RD/RA DEQ letter to W Jones re: Enclosed 2008 air sampling data 06/01/11 DEQ

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to T Sweeney re: Enclosed 2009 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to R Tonnesen re: Enclosed 2008 & 2009 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to M Strong re: Enclosed 2008 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ 6/1/11 letter to R Tonnesen returned re: Enclosed 2008 & 2009 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to B Lahren re: Enclosed 2009 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to D Krohne re: Enclosed 2008 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Page 205: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 205 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 04 RD/RA 06/01/11 DEQ

13 01 11 10 01 04 RD/RA 06/01/11 DEQ

13 01 11 10 01 04 RD/RA DEQ letter to W Gonder re: Enclosed 2008 air sampling data 06/01/11 DEQ

13 01 11 10 01 04 RD/RA 06/01/11 DEQ

13 01 11 10 01 04 RD/RA 06/01/11

13 01 11 10 01 04 RD/RA 06/01/11

13 01 11 10 01 04 RD/RA DEQ 5/26/11 letter to Dana Nelson resent to Po Box 2244 06/09/11

13 01 11 10 01 04 RD/RA DEQ 5/16/11 letter to D Kellem resent to 525 US Hwy 89 N 06/09/11

13 01 11 10 01 04 RD/RA 06/09/11

13 01 11 10 01 04 RD/RA 08/17/11 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 08/18/11 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 09/12/11 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 09/12/11 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 09/12/11 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 09/12/11 DEQ/ Reynolds

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to T Jones re: Enclosed 2008 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to T Herranen re: Enclosed 2008 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ letter to Chappell & Chappell, LLC re: Enclosed 2009 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ 6/1/11 letter to T Sweeney returned re: Enclosed 2009 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ 6/1/11 letter to B Lahren returned re: Enclosed 2009 & 2010 air sampling data

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners DEQ 5/26/11 letter to Caitlin Ryan resent to 806 E Callender St

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Erlynn Harris re: Indoor air sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Brian Perriman re: Indoor air sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Jim Nardella re: Indoor air sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Nancy Adkins re: Indoor air sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Chris Jorgensen re: Indoor air sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Gerald Stephens re: Indoor air sample results

Page 206: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 206 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 04 RD/RA 09/12/11 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 09/26/11 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 09/26/11 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 09/26/11 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 09/26/11 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 09/26/11 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 09/26/11 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 09/27/11 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 09/27/11 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 09/27/11 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 09/27/11 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 09/27/11 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 09/27/11 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 09/27/11 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA DEQ/Reynolds letter Samuel Dore re: No VI in your home 10/05/11 DEQ/ Reynolds

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Kelly Bergsing re: Indoor air sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Carter Boehm re: Indoor air sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to City of Livingston re: Indoor air sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Country Motor Inn re: Indoor air sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to George Fabian re: Indoor air sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter toCentury Warehousing Inc re: Indoor air sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Bill Gonder re: Indoor air sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Betty Lahren re: Indoor air sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Austin O'Dea re: Indoor air sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Todd Parker re: Indoor air sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Manuella Roberts re: Indoor air sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Raymond Ziebarth re: Indoor air sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Margaret Zimmer re: Indoor air sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Johnny Fox re: Indoor air sample results

Site-Wide Information

Task I - Analytical Results to Property Owners

Page 207: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 207 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 04 RD/RA 11/30/11 T Culver

13 01 11 10 01 04 RD/RA 12/02/11

13 01 11 10 01 04 RD/RA 12/02/11

13 01 11 10 01 04 RD/RA 12/06/11

13 01 11 10 01 04 RD/RA 01/31/12 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 04/04/12 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 04/05/12 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 08/15/12 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 10/15/12 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 01/02/13 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 01/02/13 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 01/02/13 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 01/14/13 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 01/14/13 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 01/14/13 DEQ/ Reynolds

Site-Wide Information

Task I - Analytical Results to Property Owners

Edwards Fickle & Culver Law/Culver letter to DEQ legal/Haque-Hausrath re: Access to D Krohne's property

Site-Wide Information

Task I - Analytical Results to Property Owners

Cok Kinzler Law/McGarry letter to BKBH/Hoven re: Response to 11/17/11 letter

Cok Kinzler/ McGarry

Site-Wide Information

Task I - Analytical Results to Property Owners

Cok Kinzler Law/McGarry letter to BKBH/Hoven re: Response to 11/17/11 letter & T Culver 11/30/11 letter to DEQ/Haque-Hausrath

Cok Kinzler/ McGarry

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ legal/Haque-Hausrath letter to Triel Culver re: Installation of mitigationsystems and access to Krohnes properties

DEQ legal/ Haque-Hausrath

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Keren Walters re: Attachment - Sampling information that Walters requested

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Dan & Tara Eddy re: Summary information for site specific properties owned by the Eddys

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Dan & Tara Eddy re: Summary information for site specific properties owned by the Eddys

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Maggie Hayden re: Radon mitigation system

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to MRL/Walsh re: Iron Shop vapor intrusion results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Northwestern Energy/Asay re: Indoor air sample resultslocation 20

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to George Fabian re: Indoor air sample results location 39

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to George Fabian re: Indoor air sample results location 42

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Bresnan Communications/Golie re: Indoor air sample results for location 69

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to City of Livingston re: Indoor air sample results for locations 78 & 78M

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Steve Brewer re: Indoor air sample results for location 47

Page 208: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 208 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 10 01 04 RD/RA 01/14/13 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 01/14/13 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 02/13/13 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 03/07/13 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 03/22/13 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 04/11/13 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 04/11/13 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 04/16/13

13 01 11 10 01 04 RD/RA 04/30/13

13 01 11 10 01 04 RD/RA 04/30/13 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA DEQ/Reynolds letter to D&TEddy re: Indoor air sample results 05/17/13 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 06/06/13 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 06/06/13 DEQ/ Reynolds

13 01 11 10 01 04 RD/RA 06/18/13 DEQ/ Reynolds

13 01 11 11 RD/RA

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Charles Taylor re: Indoor air sample results for location 43

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Montana Homes/Boehm re: Indoor air sample results for location 68B

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Century Warehousing/McCormick re: Indoor air sample results for location 111

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to MRL/Gustin re: Indoor air sample results for the Livingston shop Complex 704 East Gallatin

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to C Walters re: Indoor air sample results for location SE-3 119 North I Street

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to L Nelson re: Indoor air sample results for location H 513 N I Street

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Ed & Marie Kinnick re: Indoor air sample results for locations 272, 349A, 349B & 349C

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds & C Lawellin emails re: Dave Krause property up for sale…question about sampling for VI

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds & Nels Swandal emails re: Questions about106 South M Street

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to N Betley % of Nels Swandal re: Indoor air sample results for location 554 106 South M Street

Site-Wide Information

Task I - Analytical Results to Property Owners

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Century Warehousing re: Task I resent letter to Century Waresousing

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds & Commerce/Kmiller emails re: Livingston Food Pantry Task I results

Site-Wide Information

Task I - Analytical Results to Property Owners

DEQ/Reynolds letter to Jacob Burgan re: Task I letter results to Jacob Burgan

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

Page 209: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 209 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 RD/RA Preliminary Testing September 2001-2004 2001-2004

13 01 11 11 RD/RA DEQ internal email re: 2/15/02 meeting 01/31/02 DEQ internal

13 01 11 11 RD/RA DEQ internal email re: 2/15/02 meeting 02/13/02 DEQ internal

13 01 11 11 RD/RA Meeting minutes 02/15/02

13 01 11 11 RD/RA 02/15/02

13 01 11 11 RD/RA Phone Log - McCaffery/Envirocon 02/26/02

13 01 11 11 RD/RA Phone Log - Smith/BNSF 02/28/02

13 01 11 11 RD/RA Phone Log - McCaffery/Envirocon 03/12/02

13 01 11 11 RD/RA K/J letter to DEQ re: Summary of 9/12/06 Site Walk/Meeting 09/18/06 KJ

13 01 11 11 RD/RA Y 09/18/06 DEQ internal

13 01 11 11 RD/RA 09/20/06 DEQ

13 01 11 11 RD/RA K/J email to DEQ re: Rush results for SB1 & 2 10/20/06 KJ

13 01 11 11 RD/RA 11/06/06 KJ

13 01 11 11 RD/RA K/J email to DEQ re: Task D & E lab reports on website 11/17/06 KJ

13 01 11 11 RD/RA 11/20/06 KJ

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

Draft agenda for BNSF meeting with DEQ re: LNAPL remediation

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

** DEQ Memorandum to DEQ Director Opper re: BN comments on DEQ’s Draft RAWP for Task D & Task E

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

DEQ letter to D Smith/BNSF re: Final RAWP for Task D & E Petroleum Hydrocarbon Recovery & Remediation for BN Shop Complex

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

K/J transmittal to DEQ re: Boring & well construction logs, Daily field logs, Pilot test field data forms, & IDW tracking forms

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

K/J transmittal to DEQ re: Boring & well construction logs, Drilling field notes, Field equipment calibration logs, Daily field logs, Pilot test field data forms, IDW tracking forms, & Water level & LNAPL thickness measurements

Page 210: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 210 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 RD/RA 12/04/06 KJ

13 01 11 11 RD/RA K/J email to DEQ re: New “EX” well sampling schedule 12/22/06 KJ

13 01 11 11 RD/RA 01/27/07 KJ

13 01 11 11 RD/RA 01/03/07 KJ

13 01 11 11 RD/RA DEQ letter to Krohnes re: Sampling results 06/06/07 DEQ

13 01 11 11 RD/RA 07/25/07 KJ

13 01 11 11 RD/RA Y ** DEQ internal email re: Request for legal opinion 05/01/08 DEQ internal

13 01 11 11 RD/RA KJ letter to DEQ re: Request for Contained-in Determination 07/23/08 KJ

13 01 11 11 RD/RA KJ/DEQ emails re: Contained-in Determination 07/23/08

13 01 11 11 RD/RA KJ/DEQ emails re: Contained-in Determination letter 8/4-8/5/08

13 01 11 11 RD/RA 08/06/08 DEQ

13 01 11 11 RD/RA 06/21/11 KJ/Norris

13 01 11 11 RD/RA 06/21/11

13 01 11 11 RD/RA 01/09/12

13 01 11 11 RD/RA

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

K/J transmittal to DEQ re: Field Logs, GW well development forms & Field forms

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

K/J transmittal to DEQ re: Field equipment calibration logs, Daily field logs, Pilot test field data forms, IDW tracking forms, & Water level & LNAPL thickness measurements,

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

K/J transmittal to DEQ re: Packet of copies of documents & reports for AT&SF Railway, La Junta, CO. (In file # 1)

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

KJ transmittal of analytical results for treated water discharged to city sewer system

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

DEQ letter to BNSF re: Request for Contained-in Determination

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

K/J/Norris Technical Memorandum to DEQ re: LNAPL recoverability testing

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing DEQ/Reynolds & K/J/Norris emails re: Operational directive 60

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

DEQ/Reynolds & KJ/Norris emails re: Attachment LNAPL recovery summary table - long term & baildown testing

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing Recoverability Test Measurments - September 2010 - May 2012

Page 211: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 211 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 RD/RA 08/30/12 KJ/Aldersley

13 01 11 11 CD RD/RA 2011 Task D/E Annual Report 12/31/12 KJ

13 01 11 11 01 RD/RA Task D & E Work Plans

13 01 11 11 01 CD RD/RA Task D & E Work Plans

13 01 11 11 01 RD/RA Task D & E Work Plans BN letter to DEQ re: Task D Work Plan 06/23/06 BN

13 01 11 11 01 RD/RA Task D & E Work Plans 08/04/06 CDM

13 01 11 11 01 RD/RA Task D & E Work Plans 08/10/06 DEQ

13 01 11 11 01 RD/RA Task D & E Work Plans 08/10/06 DEQ

13 01 11 11 01 RD/RA Task D & E Work Plans 08/10/06 DEQ

13 01 11 11 01 RD/RA Task D & E Work Plans 08/10/06 CDM

13 01 11 11 01 RD/RA Task D & E Work Plans 08/10/06 CDM

13 01 11 11 01 RD/RA Task D & E Work Plans 08/31/06 DEQ

13 01 11 11 01 RD/RA Task D & E Work Plans Task D&E Field notes 09/07/06

13 01 11 11 01 RD/RA Task D & E Work Plans RTI email to DEQ re: RTI comments on Task D&E Work Plan 09/08/06 RTI

13 01 11 11 01 RD/RA Task D & E Work Plans 09/11/06 BN

13 01 11 11 01 RD/RA Task D & E Work Plans Phone Log – R Keller to DEQ re: MRL possible expenses 09/11/06 R Keller

13 01 11 11 01 RD/RA Task D & E Work Plans 09/15/06 KJ

13 01 11 11 01 RD/RA Task D & E Work Plans 09/18/06 DEQ internal

13 01 11 11 01 RD/RA Task D & E Work Plans KJ letter to DEQ re: Summary of 9/12/06 Site Walk Meeting 09/18/06 KJ

13 01 11 11 01 RD/RA Task D & E Work Plans 09/20/06 CDM

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

KJ/Aldersley email to DEQ/Reynolds re: Attachment - Quarterly LNAPL recoverability testing data

Site-Wide Information

Tasks D & E – Free Product Recovery & Bioventing

Site-Wide Information

Site-Wide Information

Laboratory Evaluation of Diesel Fuel Behavior in the Vadose Zone of Livingston MT (M.S. Thesis – Peter J. Joy, 1990)

Site-Wide Information

Site-Wide Information CDM email to DEQ re: Task D&E Revised Work Plan Sections

Site-Wide Information

DEQ letter to RTI re: Draft Remedial Action Work Plan for Task D&E

Site-Wide Information

DEQ letter to MRL re: Draft Remedial Action Work Plan for Task D&E

Site-Wide Information

DEQ letter to BNSF re: Draft Remedial Action Work Plan for Task D&E

Site-Wide Information

CDM letter to DEQ re: Draft Remedial Action Work Plan for Task D&E

Site-Wide Information

Draft Remedial Action Work Plan for Task D&E – Petroleum Hydrocarbon Recovery & Remediation Report

Site-Wide Information

DEQ letter to BN re: DEQ response to Preparation for Draft RAWP for Task D&E Petroleum Hydrocarbon Recovery & Remediation for BN Shop Complex

Site-Wide Information

Site-Wide Information

Site-Wide Information

BN letter to DEQ re: BN comments to Draft RAWP for Task D & E

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Task D&E RAWP Steps 1 & 2 Implementation Planning-Produced Fluids & Decon Water Treatment & Discharge

Site-Wide Information

DEQ memorandum to Director re: BNSF comments on DEQ’s Draft RAWP for Task D & E

Site-Wide Information

Site-Wide Information

Final Remedial Action Work Plan for Task D&E – Petroleum Hydrocarbon Recovery & Remediation Report

Page 212: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 212 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 RD/RA Task D & E Work Plans 09/20/06 DEQ

13 01 11 11 01 RD/RA Task D & E Work Plans 10/04/06 BN

13 01 11 11 01 RD/RA Task D & E Work Plans 10/10/06 DEQ

13 01 11 11 01 RD/RA Task D & E Work Plans 10/10/06 DEQ

13 01 11 11 01 RD/RA Task D & E Work Plans Treated GW Discharge Log

13 01 11 11 01 RD/RA Task D & E Work Plans 10/17/06

13 01 11 11 01 RD/RA Task D & E Work Plans KJ Field Memorandum 10/17/06 KJ

13 01 11 11 01 RD/RA Task D & E Work Plans KJ Fax to DEQ re: Encroachment Permit 11/02/06 KJ

13 01 11 11 01 RD/RA Task D & E Work Plans DEQ PRS Fax to DEQ SRS re: Use of monitoring wells 11/06/06 DEQ/PRS

13 01 11 11 01 RD/RA Task D & E Work Plans Abanaki – PetroXtractor– Well Oil Skimmer pamphlet 11/20/06

13 01 11 11 01 RD/RA Task D & E Work Plans Working Draft – Location of Geologic Cross Sections 12/01/06

13 01 11 11 01 RD/RA Task D & E Work Plans 12/11/06 DEQ

13 01 11 11 01 RD/RA Task D & E Work Plans January 2007 field notes

13 01 11 11 01 RD/RA Task D & E Work Plans Draft Tasks D&E La Junta equipment specs

13 01 11 11 01 RD/RA Task D & E Work Plans Draft – Climate Data La Junta vs. Livingston

13 01 11 11 01 RD/RA Task D & E Work Plans Visually Contaminated Soil Maps & Comatograms 01/01/07

13 01 11 11 01 RD/RA Task D & E Work Plans LNAPL Thickness Information 01/01/07

13 01 11 11 01 RD/RA Task D & E Work Plans Minimum 30% Design Content Livingston Shop Complex

13 01 11 11 01 RD/RA Task D & E Work Plans 02/01/07

13 01 11 11 01 RD/RA Task D & E Work Plans 02/12/07 KJ

13 01 11 11 01 RD/RA Task D & E Work Plans 02/16/07 KJ

Site-Wide Information

DEQ letter to BN re: Final Remedial Action Work Plan for Task D&E – Petroleum Hydrocarbon Recovery & Remediation Report

Site-Wide Information

BN letter to DEQ re: Final Remedial Action Work Plan for Task D&E – Petroleum Hydrocarbon Recovery & Remediation Report

Site-Wide Information

DEQ letter to MRL re: Final RAWP for Task D&E – Petroleum Hydrocarbon Recovery & Remediation

Site-Wide Information

DEQ letter to RTI re: Final RAWP for Task D&E – Petroleum Hydrocarbon Recovery & Remediation

Site-Wide Information

10/13-11/29/06

Site-Wide Information

DEQ letter to City of Livingston WWTP re: RAWP for Task D&E – Petroleum Hydrocarbon Recovery & Remediation

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ Memorandum to John Eisenbeis re: O&M Manual for La Junta CO GW Remediation System

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Working Draft – Summary of Soil Gas Influent & Treatment System Effluent Analytical Results – Pilot Tests

Site-Wide Information

KJ Calculation Memorandum to J Norris re: Remedial Action Petroleum Hydrocarbon Recovery GAC Vessel Sizing

Site-Wide Information

KJ email to DEQ re: Livingston Deliverables Task D & E Steps 1 & 2 Report & Step 3 Work Plan

Page 213: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 213 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 RD/RA Task D & E Work Plans 02/20/07 KJ

13 01 11 11 01 RD/RA Task D & E Work Plans 02/22/07 ZZA Inc

13 01 11 11 01 CD RD/RA Task D & E Work Plans Task D & E Steps 1 & 2 Report & Step 3 Work Plan 02/25/07 KJ

13 01 11 11 01 RD/RA Task D & E Work Plans 02/25/07 KJ

13 01 11 11 01 RD/RA Task D & E Work Plans 02/25/07 KJ

13 01 11 11 01 RD/RA Task D & E Work Plans 02/25/07 KJ

13 01 11 11 01 RD/RA Task D & E Work Plans 02/25/07 KJ

13 01 11 11 01 RD/RA Task D & E Work Plans 03/09/07

13 01 11 11 01 RD/RA Task D & E Work Plans 03/12/07 KJ

13 01 11 11 01 RD/RA Task D & E Work Plans 03/26/07 KJ

13 01 11 11 01 RD/RA Task D & E Work Plans 03/29/07 DEQ

13 01 11 11 01 RD/RA Task D & E Work Plans 04/10/07 KJ

13 01 11 11 01 RD/RA Task D & E Work Plans 04/11/07 DEQ/Bucy

13 01 11 11 01 RD/RA Task D & E Work Plans 05/07/07 PCEC

13 01 11 11 01 RD/RA Task D & E Work Plans 07/12/07 KJ

13 01 11 11 01 RD/RA Task D & E Work Plans 07/30/07 KJ

13 01 11 11 01 RD/RA Task D & E Work Plans 07/30/07 KJ

13 01 11 11 01 RD/RA Task D & E Work Plans DEQ letter to BNSF re: 7/30/07 WWTP Soil Stockpile SAP 08/06/07 DEQ

13 01 11 11 01 RD/RA Task D & E Work Plans 02/15/08 KJ

13 01 11 11 01 RD/RA Task D & E Work Plans 02/19/08 DEQ Legal

Site-Wide Information

KJ Calculation Memorandum to J Norris re: Petroleum Hydrocarbon Remedial Action Air Compressor System Sizing

Site-Wide Information

ZZA Inc letter to K/J re: Geotechnical Services for Proposed BN Water Treatment Facility

Site-Wide Information

Site-Wide Information

Appendix M for Task D & E Steps 1 & 2 Report & Step 3 Work Plan Vol I-II

Site-Wide Information

Appendix N for Task D & E Steps 1 & 2 Report & Step 3 Work Plan

Site-Wide Information

Appendix O for Task D & E Steps 1 & 2 Report & Step 3 Work Plan

Site-Wide Information

Appendix P for Task D & E Steps 1 & 2 Report & Step 3 Work Plan

Site-Wide Information

DEQ letter to BN re: Former Railyard Treatment Plan Sump Confirmation Sampling & Related Information

Site-Wide Information

KJ Internal draft Memorandum to DEQ re: Technical Information Related to the Task D&E-Phase I Remedial Action GW Treatment Equipment Pad Location

Site-Wide Information

KJ Tech Memo to J Norris re: Utilidor Upgrades Requested by DEQ

Site-Wide Information

DEQ UST Memo to DEQ SRS re: Application of UST Rules to BNLV tank systems

Site-Wide Information

KJ letter to DEQ re: Task D&E –Phase I Remedial Action 2007 – Bioventing System Off-Gas Management

Site-Wide Information

DEQ/Bucy email per Reynolds to CDM/Norris re: Attachment – CDM 4/9/07 data report work plan 30% design comments

Site-Wide Information

Park CO Environmental Council letter to DEQ re: Indoor air quality

Site-Wide Information

KJ letter report to DEQ re: K/J Response to CDM comments on Task D&E Steps 1 & 2 Report and Step 3 Work Plan and Task D&E – Phase I RA 2007 30% Design Report

Site-Wide Information

KJ letter to DEQ re: Waste Water Treatment Plant (WWTP) Soil Stockpile SAP

Site-Wide Information

KJ email to DEQ re: WWTP Soil Stockpile Sampling And Analysis Plan

Site-Wide Information

Site-Wide Information

K/J letter to CDM re: Drawing C-1 Task D&E Phase I Remedial Action 2007

Site-Wide Information

DEQ legal letter to K/J re: BN Shop Complex – Use of Documents Generated by K/J

Page 214: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 214 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 CD RD/RA Task D & E Work Plans 02/25/08 KJ

13 01 11 11 01 RD/RA Task D & E Work Plans 03/14/08 CDM

13 01 11 11 01 RD/RA Task D & E Work Plans 03/14/08 CDM

13 01 11 11 01 RD/RA Task D & E Work Plans Addendum 1 to RAWP Task D&E 04/15/08 CDM

13 01 11 11 01 RD/RA Task D & E Work Plans DEQ letter to BN re: Addendum 1 to RAWP Task D&E 04/15/08 DEQ

13 01 11 11 01 RD/RA Task D & E Work Plans 04/25/08 BN

13 01 11 11 01 RD/RA Task D & E Work Plans DEQ email to KJ re: Biovent Well Sketch 05/08/08 DEQ

13 01 11 11 01 RD/RA Task D & E Work Plans BN Shop Complex Task D&E Phase I RA 2008 Working Draft 5/58/08 KJ

13 01 11 11 01 RD/RA Task D & E Work Plans 08/09/08 CDM

13 01 11 11 01 RD/RA Task D & E Work Plans 9/30-10/2/08 CDM

13 01 11 11 01 RD/RA Task D & E Work Plans 10/14/08 DEQ

13 01 11 11 01 RD/RA Task D & E Work Plans K/J letter to DEQ/Reynolds re: LNAPL Recoverability Testing 03/03/10 KJ

13 01 11 11 01 RD/RA Task D & E Work Plans 08/27/10 CDM/Hills

13 01 11 11 01 RD/RA Task D & E Work Plans 08/31/10 DEQ/ Reynolds

13 01 11 11 01 RD/RA Task D & E Work Plans 09/24/10 KJ/Aldersley

13 01 11 11 01 RD/RA Task D & E Work Plans 02/22/12 KJ/Aldersley

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes DEQ & CDM Meeting agenda 03/14/05

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 06/14/06

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference call w/MRL notes 06/27/06

Site-Wide Information

KJ CD containing DWF/PDF files for Livingston Project (received 2/25/08)

Site-Wide Information

CDM cover letter to DEQ re: Draft Addendum 1 to RAWP for Task D&E – Expansion of Phase I Step 3 Remediation Systems

Site-Wide Information

Draft Addendum 1 to RAWP for Task D&E – Expansion of Phase I Step 3 Remediation Systems

Site-Wide Information

Site-Wide Information

Site-Wide Information

BNSF letter to DEQ re: BN comments to Addendum # 1 to RAWP for Task D & E, Expansion of Phase1 Step 3 Remediation Systems

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM email to DEQ re: BNSF comments on RAWP Addendum 1

Site-Wide Information

CDM email to DEQ re: BNSF comments on RAWP Addendum 1 (9/30/08-10/2/08)

Site-Wide Information

DEQ letter to BNSF re: Response to BNSF’s 4/25/08 comments on RAWP Addendum

Site-Wide Information

Site-Wide Information

CDM/Hills Memorandum to DEQ/Reynolds re: Draft comments on Letter Proposal Titled “LNAPL Recoverability Testing” dated 8/3/10

Site-Wide Information

DEQ/Reynolds letter to BN/Smith re: 8/3/10 LNAPL Recoverability Testing – DEQ approves of the proposal & is providing comments

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Recoverability Testing

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Attachment - Upgraded spreadsheet of the LNAPL recoverability testing data

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 215: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 215 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Meeting w/MRL in Missoula 07/07/06

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes DEQ & CDM meeting notes 07/19/06

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes S Olsen meeting notes 08/31/06 DEQ/Olsen

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes BNSF Meeting – notes 08/31/06

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Task D&E Meeting notes 09/06/06

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Meeting Agenda notes 09/18/06

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes K/J Letter re: Summary of 9/12/06 Site Walk/Meeting 09/18/06 KJ

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Task D&E Meeting Agenda 09/20/06

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes BN Meeting – Task D&E notes

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Well Development Issue Meeting – CDM, K/J & DEQ 10/16/06

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 10/30/06

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes BN – CDM & DEQ Conference call notes 11/01/06

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes BN – CDM & DEQ Conference call notes 11/02/06

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference call notes 11/15/06

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 11/27/06

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 11/29/06

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 12/04/06

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Task D&E Pre-Design meeting notes 12/11/06

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 12/13/06

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Task D&E Design conference call notes 01/03/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 01/11/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes BNLV Design meeting notes 01/17/07

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 216: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 216 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 01/24/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Regular Design meeting 01/31/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Design Meeting notes 02/14/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 02/21/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Pre-meeting with CDM 02/28/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 03/07/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 03/14/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 03/20/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes UST Issues – meeting notes 03/21/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Task D/E Design meeting agenda & meeting notes 03/28/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Design Meeting 04/25/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Pre-meeting w/CDM 05/02/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Design Meeting 05/02/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 05/03/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Meeting with Carter Boehm, Mark Hartwig & Evan Russell 05/23/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 05/23/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Design Meeting notes 06/06/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes CDM pre-meeting 06/20/07 CDM

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 08/01/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 08/15/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 08/24/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 08/29/07

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 217: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 217 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes BNSF Remedial Action chart 09/25/07 BN

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 09/27/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 10/10/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 10/19/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 10/24/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 11/07/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 11/14/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 11/30/07

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 01/02/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 01/23/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 01/30/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 02/04/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 02/06/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 02/13/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 02/20/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 02/27/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 03/06/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Director Briefing Notes 03/06/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes 03/06/08 CDM/Hills

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 03/19/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 04/03/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 04/14/08

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

M Hills email re: Supporting info for Livingston hydrocarbon remediation

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 218: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 218 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes DEQ email re: 4/23/08 Minutes 04/25/08 DEQ

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Minutes 04/30/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Minutes 05/14/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Minutes 05/21/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Notes 05/28/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Minutes 06/03/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Minutes 06/11/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Minutes 06/18/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes J Norris email re: 6/18/08 Meeting Notes 06/23/08 KJ/Norris

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes 07/02/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call notes 07/16/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call notes 07/17/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call notes 07/23/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call notes 07/30/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call notes 08/06/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call notes 08/13/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 09/03/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 09/10/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 09/17/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 09/24/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 10/01/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 10/08/08

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Conference call – Update on Operating Free Product Recovery & Bioventing System & discussion of 2008 construction

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 219: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 219 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 10/15/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 10/22/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 12/31/08

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 01/05/09

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 01/07/09

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 02/04/09

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 02/18/09

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 03/18/09

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 04/29/09

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 05/13/09

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 05/27/09

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes 06/24/09

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes 09/23/09

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes 10/01/09

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes 10/07/09

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes 11/19/09

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes 12/17/09

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes 12/22/09

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes 01/05/10

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes Conference Call Notes – Task D&E Status meeting 06/02/10

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Conference Call Notes – Activities related to currant system operations for Task D&E Petroleum Remediation System

Site-Wide Information

Conference Call Notes – Discuss upgrade of the bioventing system and well rehabilitation

Site-Wide Information

Conference Call Notes - Conference Call Notes – Activities related to currant system operations for Task D&E Petroleum Remediation System

Site-Wide Information

Conference Call Notes – Activities related to currant system operations for Task D&E Petroleum Remediation System

Site-Wide Information

Conference Call Notes – Discuss potentially frozen LNAPL pipes and inoperative heat trace for task D/E petroleum remediation system

Site-Wide Information

Conference Call Notes – Time and cost efficiencies in Livingston related to Task D&E Remediation system O&M

Site-Wide Information

Conference Call Notes – LNAPL pipe freezing progress meeting

Site-Wide Information

Page 220: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 220 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes 11/19/10

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes 05/03/12

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes

13 01 11 11 01 01 RD/RA Task D & E Meeting Notes 08/02/13 DEQ/Reynolds

13 01 11 11 01 02 RD/RA Task D & E Emails

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal emails re: Request for additional Org Unit 05/10/06 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal emails re: New Org Unit Number 05/11/06 DEQ internal

13 01 11 11 01 02 RD/RA Task D & E Emails BN email to DEQ re: John-Farr Contact number 06/29/06 BN

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal emails re: Work plan and cost estimates 07/24/06 DEQ internal

13 01 11 11 01 02 RD/RA Task D & E Emails 07/27/06 DEQ internal

13 01 11 11 01 02 RD/RA Task D & E Emails 07/28/06 EPA

13 01 11 11 01 02 RD/RA Task D & E Emails 08/08/06 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Air Emissions letter 08/09/06 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails 08/11/06 DEQ ARMB

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Skimmer pump vendors 08/28/06 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails 08/28/06 KJ & DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails 08/29/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails BN email to DEQ re: RAWP Meeting – Conference number 08/30/06 BN

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to BN re: Livingston ROD interpretations 08/31/06 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails 08/31/06 KJ & DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails 08/31/06 KJ & DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails 09/06/06 KJ & DEQ

Site-Wide Information

Conference call – DEQ, BN, CDM, & K/J re: Proposed Vapor Monitoring Locations

Site-Wide Information

Conference call meeting notes - DEQ, CDM, & KJ re: Task D&E Bi-weekly meeting

Site-Wide Information

Geosyntec/Kavanaugh & DEQ/Bucy emails re: Attachment -Draft 11/7/12 meeting minutes & DEQ redlined version incorporating DEQ's edits

11/12-11/16/12

Site-Wide Information DEQ/Reynolds & KJ/Fernandes emails re: 8/2/13 meeting notes

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ internal emails re: Meeting w/Director Opper to discuss future BN costs

Site-Wide Information

EPA email to DEQ re: Class V remediation well rule authorization

Site-Wide Information

DEQ email to CDM re: Work Plan review, air permit and maps of the plume

Site-Wide Information

Site-Wide Information

DEQ ARMB email to DEQ REM re: Permit determination request & emissions calculations

Site-Wide Information

Site-Wide Information

KJ & DEQ emails re: 10-Day notification of Draft RAWP Field Activities

Site-Wide Information

KJ email to DEQ re: Preparation for Draft RAWP Field Activities

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ & DEQ emails re: Preparation for Draft RAWP Field Activities & list of pump vendors

Site-Wide Information

KJ & DEQ emails re: Preparation for Draft RAWP Field Activities & list of pump vendors

Site-Wide Information

DEQ/KJ emails re: Livingston visit – sample collection schedule

Page 221: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 221 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/K/J emails re: Livingston visit – time & place 09/08/06 KJ & DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails 09/11/06 DEQ internal

13 01 11 11 01 02 RD/RA Task D & E Emails 09/12/06

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to CDM & DEQ re: Durham Geo Slope Indicator 9/13/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails BN email to DEQ re: BN comments to the RAWP 9/13/06 BN

13 01 11 11 01 02 RD/RA Task D & E Emails 09/13/06

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal email re: BN’s comments on Task D&E 09/15/06 DEQ internal

13 01 11 11 01 02 RD/RA Task D & E Emails 9/15/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 09/19/06

13 01 11 11 01 02 RD/RA Task D & E Emails KJ & DEQ emails re: Meetings 09/20/06

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to K/J re: Task D&E Meeting summary letter 09/22/06 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails RTI email to DEQ re: RTI comments on Task D&E RAWP 9/25/06 RTI

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Final RAWP Clarifications 09/26/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM & DEQ emails re: Final RAWP Clarifications 9/25-9/26/06

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Task D Product Skimmers 9/26/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to Ed Turner re: Final RAWP Clarifications 9/26/06 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Task D&E Meeting summary letter 9/26/06 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails 9/26/06 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Final RAWP Clarifications questions 09/27/06 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails 9/27/06 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & KJ emails re: Task D Product Skimmers 09/27/06

13 01 11 11 01 02 RD/RA Task D & E Emails 09/26/06

13 01 11 11 01 02 RD/RA Task D & E Emails 09/28/06 DEQ

Site-Wide Information

Site-Wide Information DEQ internal emails re: Task D&E Design Plan – cost recovery

Site-Wide Information

KJ/CDM emails to DEQ re: Draft RAWP, Pump test requirement

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ, CDM emails to DEQ re: Draft RAWP, Pump test requirement

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Proposed adjustment of some locations of soil borings and exploration monitoring wells to public right-of way

Site-Wide Information

DEQ & CDM emails re: Turn around time for sampling results – Alpine & Energy Labs

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ email to RTI re: Draft RAWP for Task D&E Petroleum Hydrocarbon Recovery & Remediation

Site-Wide Information

Site-Wide Information

DEQ email to K/J re: DEQ response to KJ email questions on Final RAWP

Site-Wide Information

Site-Wide Information

KJ & DEQ emails re: Drilling activity 10/3/06 & DEQ oversight of drilling activities

Site-Wide Information

DEQ email to City Manager re: Press release – Cleanup to Begin at Livingston Railyard

Page 222: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 222 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ REM & Director emails re: Press Contact 09/28/06 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails 09/29/06 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails 10/2/06 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails 10/02/06

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal emails re: Press release 10/02/06 DEQ internal

13 01 11 11 01 02 RD/RA Task D & E Emails 10/4/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 10/09/06

13 01 11 11 01 02 RD/RA Task D & E Emails 10/09/06

13 01 11 11 01 02 RD/RA Task D & E Emails 10/09/06 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails 10/09/06

13 01 11 11 01 02 RD/RA Task D & E Emails K/J email to DEQ re: Product Skimmer Selection 10/10/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: QED’s Skimmer Recommendations 10/10/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails K/J & CDM emails re: Product Skimmer Selection 10/10/06

13 01 11 11 01 02 RD/RA Task D & E Emails CDM emails re: Proto-type testing 10/11/06 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails 10/11/06 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails K/J, CDM & DEQ emails re: QED skimmers – order them 10/13/06

13 01 11 11 01 02 RD/RA Task D & E Emails 10/16/06

13 01 11 11 01 02 RD/RA Task D & E Emails 10/17/06

13 01 11 11 01 02 RD/RA Task D & E Emails K/J & DEQ emails re: Pilot Test Issues 10/17/06

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to K/J re: Contact list for DEQ & CDM personnel 10/17/06 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails 10/17/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 10/17/06 KJ

Site-Wide Information

Site-Wide Information

CDM email to DEQ re: Oil Screen SOG & Proto-type testing SOG

Site-Wide Information

DEQ email to CDM re: Oil Screen SOG & Proto-type testing SOG

Site-Wide Information

CDM & Matt Winfield/Prosonic Corp emails re: Drill broke down – 1 drill at site

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: IDW Storage & Sampling Requirements for Final RAWP Implementation

Site-Wide Information CDM & KJ emails re: Pilot Test Observation Well Construction

Site-Wide Information CDM & KJ emails re: Pilot Test Observation Well Construction

Site-Wide Information

CDM email to DEQ re: Call w/KJ postponed until later – accident at site

Site-Wide Information

K/J & DEQ emails re: Pilot Test Multi-use Wells, Pilot Test SOG, and Pump Test

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ email to CDM re: Proto-type testing – if less than 1/8th inch of product in well the passive stage may be bypassed

Site-Wide Information

Site-Wide Information

K/J, CDM & DEQ emails re: Pilot test issues – conference call needed

Site-Wide Information

K/J, CDM & DEQ emails re: Pilot test issues- meeting summary

Site-Wide Information

Site-Wide Information

Site-Wide Information

K/J email to DEQ re: BN Livingston 1164 – results/Energy Labs

Site-Wide Information

K/J & forwarded email for Microbac Lab email to DEQ re: Results of product sampling from mid September

Page 223: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 223 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & K/J emails re: Reporting of data in a timely manner 10/18/06

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & K/J emails re: Depot Plume Exploration Wells 10/21/06

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & KJ emails re: Weekend Status Report 10/23/06

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & KJ emails re: Weekend Status Report 10/23/06

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & KJ emails re: Pump test on PMW -1 10/24/06

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & KJ emails re: Weekend Status Report 10/24/06

13 01 11 11 01 02 RD/RA Task D & E Emails Jim Barrett & RTI emails re: Test Wells 10/24/06

13 01 11 11 01 02 RD/RA Task D & E Emails 10/24/06 Energy Labs

13 01 11 11 01 02 RD/RA Task D & E Emails CDM emails to DEQ re: Pilot Test Issues 10/25/06 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Final analytical results 11/1/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ & DEQ emails re: Issued discussed and agreed upon 11/03/06

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Final Analytical results for Air toxics 11/03/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 11/8/06

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & K/J emails re: High & low water sampling 11/8/06

13 01 11 11 01 02 RD/RA Task D & E Emails 11/08/06 KJ

13 01 11 11 01 02 CD RD/RA Task D & E Emails 11/09/06

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & KJ emails re: Pilot testing status

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & KJ emails re: Teleconference on Wed. 11/15/06 11/14/06

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & KJ emails re: Pilot testing status 11/14/06

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & KJ emails re: Topics for teleconference 11/14/06

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Analytical Reports 11/15/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 11/17/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 11/20/06 KJ

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Energy Lab email re: Results of sampling & First influent air sample from the pilot test

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ & DEQ emails re: Exploration Wells (11/5/06)K/J email to DEQ re: DGSI Skimmer report

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Final analytical reports for Air Toxics for vapor samples

Site-Wide Information

KJ email to DEQ re: 2005 Annual Monitoring & Maintenance Report on CD being sent

Site-Wide Information

11/11-11/13/06

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Trouble sending analytical reports via email

Site-Wide Information

KJ email to DEQ re: Analytical Reports posted on website/livshare on 11/20/06

Page 224: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 224 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails 11/21/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Whitefish IRAP LNAPL Recovery update 11/22/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 11/27/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 11/30/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 12/04/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 12/5/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 12/06/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Roll Off Sampling 12/07/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 12/07/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 12/08/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 12/08/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Livingston Pre-Design meeting 12/9/06 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails 12/11/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 12/12/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ & DEQ emails re: Revised Roll-off Bin Sampling Protocol 12/13/06

13 01 11 11 01 02 RD/RA Task D & E Emails 12/14/06

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & KJ emails re: PMW-7 Pilot testing, Phase 3 12/14/06

13 01 11 11 01 02 RD/RA Task D & E Emails 12/14/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 12/19/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 12/19/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 12/21/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 12/28/06 KJ

Site-Wide Information

KJ email to DEQ re: Analytical Reports posted on website/livshare on 11/21/06

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Analytical Reports posted on website/livshare on 11/27/06

Site-Wide Information

KJ email to DEQ re: Analytical Reports posted on website/livshare on 11/30/06

Site-Wide Information

KJ email to DEQ re: Analytical Reports posted on website/livshare on 12/4/06

Site-Wide Information

DEQ email to Nic Winslow re: Pilot testing – belt skimming of wells

Site-Wide Information

KJ email to DEQ re: Analytical Reports posted on website/livshare on 12/6/06

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Analytical Reports posted on website/livshare on 12/7/06

Site-Wide Information KJ email to DEQ re: Pilot test water discharge to sanitary sewer

Site-Wide Information

KJ email to DEQ re: Analytical Reports posted on website/livshare on 12/8/06

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Analytical Reports posted on website/livshare on 12/11/06

Site-Wide Information

KJ email to DEQ re: Analytical Reports posted on website/livshare on 12/12/06

Site-Wide Information

Site-Wide Information

KJ & DEQ emails re: PMW-3 & installation of protective steel casings

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Analytical Reports posted on website/livshare on 12/14/06

Site-Wide Information

KJ email to DEQ re: Analytical Reports posted on website on 12/19/06

Site-Wide Information

KJ email to DEQ re: Working drafts of all the boring logs posted to website/livshare

Site-Wide Information

KJ email to DEQ re: Analytical Reports posted on website/livshare on 12/21/06

Site-Wide Information

KJ email to DEQ re: Analytical Reports posted on website/livshare on 12/28/06

Page 225: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 225 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails 12/29/06 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 1/5/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 1/10/07

13 01 11 11 01 02 RD/RA Task D & E Emails 01/10/07

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Task D LNAPL measurements 01/10/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/DEQ emails re: Minimum 30% Design Content 01/15/07

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: 30 % Design Content 01/15/07

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal emails re: Effluent limits for air at BNLV 1/18/07 DEQ internal

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Effluent air emissions 1/18/07 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: DEQ ERCLs assistance 1/18/07 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: EX well sampling 01/22/07

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to MRL re: Flagger needed for 2/14-216/07 1/25/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: MRL Remediation System Coordination 01/26/07

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: MPDES permits 01/29/07

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Effluent air emissions 2/2/07

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Distribution list for Tasks D&E Report 02/07/07

13 01 11 11 01 02 RD/RA Task D & E Emails 02/07/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 02/13/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 02/14/07

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Liquid Phase GAC Isotherm Data 2/26/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 02/26/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ/CDM emails re: PVC screen & Task F Part 1 3/2/07

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Task E Air Model results 3/2/07 KJ

Site-Wide Information

KJ email to DEQ re: Analytical Reports posted on website/livshare on 12/29/06

Site-Wide Information

KJ email to DEQ re: “Working Draft” annotated outline for Tasks D&E steps 1 & 2 report & step 3 Work Plan

Site-Wide Information

DEQ/KJ emails re: Product thickness data & sampling well EX-4

Site-Wide Information DEQ/KJ emails re: Conference call & Task D&E reports update

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Task D&E Design Progress Teleconference on 2/7/07 + DEQ notes

Site-Wide Information

KJ email to DEQ re: Task D&E Design Progress Teleconference on 2/14/07 + attachment –design calcs memo for aqueous phase GAC unit sizing

Site-Wide Information

DEQ/BN emails re: Extension of due date for Task D&E fall 2006 activities

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Task D&E Treatment Pad Final Soils Report

Site-Wide Information

Site-Wide Information

Page 226: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 226 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal emails re: Task E Air Model results 3/5/07 DEQ internal

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/CDM emails re: Task E Air Model results 3/5/07

13 01 11 11 01 02 RD/RA Task D & E Emails 03/06/07 Richard Uuglomo

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal email re: Task E Air Model results 03/06/07 DEQ internal

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Task E Air Model results 3/6/07

13 01 11 11 01 02 RD/RA Task D & E Emails 03/06/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 3/6/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 3/7/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Liquid-phase GAC Break Through Curves 3/9/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Letter about the WWTP sump 03/10/07

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to MPDES re: MPDES general permit 3/12/07 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails 3/13/07

13 01 11 11 01 02 RD/RA Task D & E Emails 03/13/07 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Treatment Pad Siting Information 3/13/07

13 01 11 11 01 02 RD/RA Task D & E Emails 3/14/08

13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Livingston Deliverables 3/16/07

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: La Junta Water Storage Tanks 3/16/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal emails re: Task E Air Model Outputs 3/19/07 DEQ internal

13 01 11 11 01 02 RD/RA Task D & E Emails 03/20/07 DEQ UST

13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: La Junta Water Storage Tanks 3/20/07

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Backwashing 03/20/07 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails 03/20/07 DEQ

Site-Wide Information

Site-Wide Information

Site-Wide Information

Richard Guglomo P.E. memorandum to KJ re: Task D&E Construction 2007

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Updated water level & apparent LNAPL thickness measurements

Site-Wide Information

KJ email to DEQ re: Request for Approval to purchase long lead items

Site-Wide Information

KJ email to DEQ re: Electrical Engineering Tech Memo & Drawings

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ/CDM emails re: Treatment Plant location & Howard Young Resume

Site-Wide Information

DEQ email to KJ re: General schedule of next phase(s) of project needed from BN

Site-Wide Information

Site-Wide Information

KJ/DEQ emails re: Task D&E – Phase 1 remedial action – Procurement

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ UST email to DEQ REM re: Livingston Shop Complex Remediation – UST Portion

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ email to K/J re: Long-lead time items to proceed with procurement

Page 227: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 227 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails 03/21/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal email re: RCRA 3/21/07 DEQ internal

13 01 11 11 01 02 RD/RA Task D & E Emails 03/21/07 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails 3/22/07 DEQ internal

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: GAC comments 3/22/07 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: PMW wells incorporated into system 3/23/07

13 01 11 11 01 02 RD/RA Task D & E Emails CDM & DEQ emails re: New CDM team member 3/23/07

13 01 11 11 01 02 RD/RA Task D & E Emails 3/23/07

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Well locations & Soil characterization 03/26/07

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Design meeting in Helena 3/28/07 3/26/07

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to CDM re: GAC Vapor treatment costs 03/26/07 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to CDM & DEQ UST re: Utilidor modifications 03/26/07 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: SAP Addendum approval 3/26/07

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Well location & soil characterization 3/36/07

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Utilidor modifications 3/26/07

13 01 11 11 01 02 RD/RA Task D & E Emails 03/27/07

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ REM/DEQ UST emails re: Utilidor modifications 3/27/07 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails 3/27/07 DEQ UST

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Task E Air Model Outputs 03/27/07

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to CDM re: Task D&E vapor emissions 3/27/07 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/UST emails re: BNLV Memo 3/7/07 (3/29/07) 03/29/07 DEQ UST

13 01 11 11 01 02 04/04/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal email re: BNLV Groundwater 4/6/07 DEQ internal

Site-Wide Information

KJ email to DEQ re: Notice of UST Regulation conference call on 3/21/07

Site-Wide Information

Site-Wide Information

DEQ email to CDM re: Task D&E UST issues – conference call notes

Site-Wide Information

DEQ internal email re: Question on requiring a carbon discharge system

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ/DEQ emails re: GAC comments & Table 4 metals & Table 3 NA

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ/KJ emails re: Well location & soil characterization & location of disposal facility

Site-Wide Information

Site-Wide Information

UST Section email to DEQ SRS re: Meeting w/DEQ attorney to discuss utilidor & 30” pipe regulations

Site-Wide Information

Site-Wide Information

Site-Wide Information

K/J email to DEQ/CDM re: Monthly water level event – April 07

Site-Wide Information

Page 228: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 228 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

11 01 02 RD/RA Task D & E Emails 04/09/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email re: Off-Gas treatment 04/16/07 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails 4/16/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 4/17/07 DEQ internal

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Task D Water levels 04/19/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 4/21/07 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Biofiltration 04/23/07 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails 04/25/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to CDM re: Task D&E Emissions 5/1/07 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails 5/4/07 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails 5/4/07 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Scheduled activities 5/14/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Dumont Douglas resume 5/16/07 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Scheduled activities & updates 5/21/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Former WWTP Sump excavation 5/29/07

13 01 11 11 01 02 RD/RA Task D & E Emails 06/11/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 06/12/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 06/15/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 06/27/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Livingston deliverable 07/12/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 7/30/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 07/30/07 KJ

Site-Wide Information

KJ email to DEQ re: Updated Livingston P&IDs & Specifications

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: LNAPL sample results, including PCE analysis

Site-Wide Information

DEQ internal email re: LNAPL sample results, including PCE analysis

Site-Wide Information

Site-Wide Information

DEQ email to K/J re: Task D&E – Phase 1 Remedial Action Bioventing Off-Gas Management

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Addendums to the 30% Design Drawings & Specifications

Site-Wide Information

Site-Wide Information

CDM email to DEQ re: CDM 5/4/07 additional 30% design comments

Site-Wide Information

DEQ email to KJ re: CDM 5/4/07 additional 30% design comments

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ email to DEQ & CDM re: Geotechnical Report – Task D&E Phase 1 Remedial Action 2007 posted to website/livshare 6/11/07

Site-Wide Information

KJ email to DEQ re: Various Task D&E items posted to website/livshare 6/12/07

Site-Wide Information

KJ email to DEQ re: Updated Water Level/LNAPL thickness data – posted to website/livshare

Site-Wide Information

KJ email to DEQ re: RFI #1 addressed by Ed Turner – metal building instead of wood

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Updated construction schedule posted to the website/livshare

Site-Wide Information

KJ email to DEQ re: Updated Well Map posted to the website/livshare

Page 229: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 229 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Livingston Private well L701 7/30/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 08/10/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 8/10/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 8/13/07

13 01 11 11 01 02 RD/RA Task D & E Emails 08/13/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 8/16/07 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails 08/17/07 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Recommended MUW Wells for start-up 08/21/07 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Start-up Data Recommendations 9/6/07 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal email re: Environmental Assessment 9/10/07 DEQ internal

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/DEQ emails re: TO 7 cost explanations 9/21/07

13 01 11 11 01 02 RD/RA Task D & E Emails 09/26/07

13 01 11 11 01 02 RD/RA Task D & E Emails 09/26/07 KJ

13 01 11 11 01 02 CD RD/RA Task D & E Emails 10/1/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Recommended Bioventing wells 10/02/07 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Recommended Bioventing wells (10/2/07) DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails 10/10/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 10/10/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 10/23/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails

13 01 11 11 01 02 RD/RA Task D & E Emails 10/24/07 KJ

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Task D MUW boring logs posted to website/livshare

Site-Wide Information

KJ email to DEQ re: WWTP soil stockpile sampling notification

Site-Wide Information

DEQ/KJ/CDM emails re: Task D&E Phase 1 Remedial Action – Working Draft O&M Manual Table of Content

Site-Wide Information

KJ email to DEQ re: Updated Water Level/LNAPL thickness data – posted to website/livshare

Site-Wide Information

CDM email to KJ re: Surface elevation survey data for the MUW wells

Site-Wide Information CDM email to DEQ re: Recommended MUW Wells for start-up

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ/DEQ emails re: Biweekly Task D/E design/construction meeting

Site-Wide Information

KJ email to DEQ re: Updated Task D&E schedule posted to website/livshare

Site-Wide Information

KJ email to DEQ re: Livingston Deliverables – Task I Draft Design Development Report

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ email/Fax to DEQ re: MUW Submersible Pump & Skimmer Installation

Site-Wide Information

KJ/CDM emails re: MUW Submersible Pump & Skimmer Installation

Site-Wide Information

KJ email to DEQ re: Task D&E Working Draft O&M Manual PDFs posted to website/livshare

Site-Wide Information

DEQ/CDM/EIC emails re: EIC’s Unique Approach to cost effective NAPL Remediation

10/23-10/14/07

Site-Wide Information

KJ email to DEQ re: Followup to 10/23/07 email – letter report for contained in decision for roll-off bin soil included in package

Page 230: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 230 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails 10/26/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 10/31/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Task D&E Commissioning & Start-up

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: MUW coordinates 11/06/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 11/07/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Follow-up to 11/7/07 conference call 11/07/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal email re: Livingston & new RBSLs 11/9/07 DEQ internal

13 01 11 11 01 02 RD/RA Task D & E Emails 11/13/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ emails to KJ re: Excel file- datatable & wells pdf file 11/14/07 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails 11/14/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Krohne property data 11/20/07

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Posters for soil gas results 11/20/07 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails 12/16/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 12/17/07

13 01 11 11 01 02 RD/RA Task D & E Emails 12/18/07 DEQ internal

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to K/J re: O&M Plan posted to DEQ Website 12/19/07 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails 12/19/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 12/20/07 DEQ internal

13 01 11 11 01 02 RD/RA Task D & E Emails 12/20/07 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 12/24/07 KJ

Site-Wide Information

KJ email to DEQ re: Items posted to website/livshare: Task D&E MUW well development forms, updated fluid-level measurements. Task F: Water level data & GW potentiometric maps. Miscellaneous: Updated facility wide well location map

Site-Wide Information KJ email to DEQ re: Transducer Data posted to website/livshare

Site-Wide Information

DEQ/KJ emails re: Task D&E Commissioning & Start-up & Livingston Public Meeting

10/29 &11/4/07

Site-Wide Information 11/4 & 11/5/07

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Petroleum Rem System Start-up update & Copy of DEQ Params request

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ email to DEQ J/Wadhams re: Discharge of city water used for New Treatment Plant Hydraulic Testing

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Base Map CAD Drawing posted to website/livshare

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ email to DEQ J Wadhams re: Submittal of Initial Sampling Results per Petroleum Cleanup General Permit MTG790013

Site-Wide Information

KJ/DEQ emails re: DEQ Remediation System Operation Directive form

Site-Wide Information

DEQ internal email re: No legal comments on the Revised Draft O&M Plan

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: MUW Specific Capacity Tests posted to website/livshare

Site-Wide Information

DEQ internal email re: : DEQ Remediation System Operation Directive form

Site-Wide Information

KJ email to DEQ re: Startup Schedule for Task D&E – Phase 1 Rem System

Site-Wide Information

KJ email to DEQ re: Summary Table of LNAPL thickness & water level posted to the website/livshare

Page 231: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 231 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Water & LNAPL measurements 12/31/07 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails 01/08/08 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails 01/09/08 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Network Connections for Treatment Plant 01/09/08 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails K/J email to DEQ re: Internet connection at site 01/09/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Discharge rates for startup 1/9/08 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails 01/10/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Bioventing startup modifications 01/24/08 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Casne emails re: Passwords 01/29/08

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/CDM emails re: K/J & CDM direct communications 1/30/08

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Casne emails re: Livingston electronic report file size 01/30/08

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Casne emails re: Livingston remote access 1/30/08

13 01 11 11 01 02 RD/RA Task D & E Emails 01/30/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Recovered LNAPL & Recycling 2/1/08

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Cold Weather Startup 2/4/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 02/04/08 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Copy of disk 02/05/08

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Communications need to go through DEQ 2/5/08

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Additional data – has been posted 2/5/08

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Casne emails re: Software Installation 2/7/08

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ IT Software Justification Form 02/07/08 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Casne emails re: Livingston Data Collection – IT issues 2/8/08

Site-Wide Information

Site-Wide Information

CDM email to DEQ re: Discharge rates for start up & Well Interference Model Display pdf

Site-Wide Information

DEQ Financial email to BN re: CDM Contract 4020009 & Profit Calculations

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ email to DEQ J Wadhams re: Submittal of Initial Sampling Results per Petroleum Cleanup General Permit MTG790013

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Startup Transducer Data posted to website/livshare

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM email to DEQ re: Telcon – K/J (Dick G) called to obtain clarification regarding requirements for obtaining a download of the PLC reporting file from the Livingston system

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 232: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 232 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Optimization staffing & schedule 02/08/08 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/CDM emails re: Official request for Drawing C-1 2/11/08

13 01 11 11 01 02 RD/RA Task D & E Emails 02/12/08 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails 02/12/08 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal emails re: Recycled oil questions 02/13/08 DEQ internal

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ internal emails re: Recovered diesel use 02/14/08 DEQ internal

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Recovered diesel use 2/14/08 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Official request for Drawing C-1 2/11/08

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ & Casne emails re: Data logging 02/21/08

13 01 11 11 01 02 RD/RA Task D & E Emails 02/25/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ/Olympus emails re: Communication issues 2/28/08

13 01 11 11 01 02 RD/RA Task D & E Emails 02/28/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 02/29/08 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails 02/29/08 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Communication issues 3/2/08

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Xitech schedule 03/02/08

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Map showing additional wells 3/3/08 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails 3/6/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 03/07/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: System status notification – ruptured line 03/11/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: 3/18/08 LNAPL readings 3/17/08 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: LNAPL sample results L-87-7 03/18/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 03/19/08 CDM

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM email to DEQ re: Brief summary of the LNAPL pump optimization efforts

Site-Wide Information

CDM email to DEQ re: Summary of the NLAPL pump setting adjustments

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: PLC/SCADA data & Bioventing data posted to website

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Task D&E Phase 1 Remediation System Operations

Site-Wide Information

CDM email to DEQ re: Task D&E Phase 1 Remediation System Operations

Site-Wide Information

CDM email to DEQ re: Communication Issues – Xitech Directive form

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Fluid level measurements for 3/4-3/05/08 posted to the web

Site-Wide Information

KJ email to DEQ re: Biovent system monitoring posted to he web

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM email to DEQ re: Summary of 3/18/08 LNAPL thickness measurements

Page 233: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 233 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Weekly Task D&E meeting rescheduled 3/28/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 03/31/08

13 01 11 11 01 02 RD/RA Task D & E Emails 03/31/08 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to CDM re: GAC fouling and Bioventing wells 3/31/08 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/CDM/KJ emails re: Bioventing testing schedule 4/2/08

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Bioventing restart 04/03/08 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Bioventing data posted to the web 04/03/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Task D&E Work Plan Addendum 04/04/08 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ SRS email to Director et al re: Product recovery 04/15/08 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to KJ re: RAWP Addendum #1 4/15/08 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ/CDM re: Proposed HDPE piping is adequate 05/01/08 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Meeting notes – respirometry testing 05/02/08

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to CDM re: Annual costs 05/09/08 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Systems Operation Directive #10 05/10/08

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/DEQ emails re: Optimization 05/10/08

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: System Operation Directive #10 5/10/08

13 01 11 11 01 02 RD/RA Task D & E Emails 05/12/08 OTS/ Chambers

13 01 11 11 01 02 RD/RA Task D & E Emails Olympus email to KJ re: Flow change in well MUW-7 05/12/08 Olympus

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Respiration testing schedule 5/12/08 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails 5/14/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 05/19/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Purge water (5/20/08) DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/DEQ emails re: LNAPL data on a CD 3/20/08

Site-Wide Information

Site-Wide Information

KJ/DEQ/CDM emails re: Bioventing system shutdown scheduled date

Site-Wide Information

DEQ email to KJ re: Take measurements before shutting down Bioventing system

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Wally Chambers/OTS email to DEQ re: New BN WWTP field tech

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Figures showing the proposed relocation of 3 bioventing wells and one EX well posted to the web

Site-Wide Information

KJ email to DEQ re: Bioventing startup test data posted to the web

Site-Wide Information

Site-Wide Information

Page 234: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 234 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails 05/22/08 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails 5/27/08

13 01 11 11 01 02 RD/RA Task D & E Emails 5/27/08 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Air Toxics & posting to the web 05/30/08

13 01 11 11 01 02 RD/RA Task D & E Emails 06/02/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Work Order Directive #14 6/3/08

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Task D&E – Phase 1 2008 MUW Design 06/09/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 06/10/08

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/KJ/DEQ emails re: Password for online link 06/11/08

13 01 11 11 01 02 RD/RA Task D & E Emails 06/12/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/CDM emails re: Task D&E well drilling operations 06/14/08

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Construction/Operation Meeting 6/18/08 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails Olympus/KJ/DEQ emails re: Operation Directive #16 06/20/08

13 01 11 11 01 02 RD/RA Task D & E Emails Olympus/KJ emails re: Flow rate at each well 6/20/08

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: June water level data 06/20/08

13 01 11 11 01 02 RD/RA Task D & E Emails 06/23/08 KJ

13 01 11 11 01 02 CD RD/RA Task D & E Emails 6/23/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: EX well drilling location difficulties 06/25/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: EX well locations 06/26/08

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ emails to KJ re: EX well drilling 06/27/08 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: EX well drilling 06/27/08

Site-Wide Information

DEQ email to KJ re: Figures showing the proposed relocation of 3 bioventing wells and one EX well approved by DEQ

Site-Wide Information

DEQ/KJ emails re: Plant shutdown & adjustment of skimmer pumps

Site-Wide Information

CDM email to DEQ re: Plant shutdown due to power failure- skimmer pumps need to be adjusted

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Monthly water level – LNAPL updated on the web

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM/DEQ emails re: Oil-Water sensing & Eclipse 705 Guided Radar

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Discontinued use of direct push rig to construct EX well – will be using sonic rig for remaining EX wells

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Site wide Task D/E &F water levels & Task D water levels posted to the web

Site-Wide Information

KJ email to DEQ re: Livingston Deliverables – CD + Final Task F Stage 1 – Part 2 Pilot Test Work Plan for Volatile Organic Compound-Containing Alluvial Aquifer GW and Response to Comments on Task D&E – Phase 1 RA 2008 80% Design Package

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 235: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 235 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: EX-44 contamination found 7/2/08 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/DEQ emails re: System Operation Directive extension 7/2/08

13 01 11 11 01 02 RD/RA Task D & E Emails Olympus/KJ/DEQ emails re: Diagnostic testing 07/03/08

13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Field activity put on hold 7/7/08

13 01 11 11 01 02 RD/RA Task D & E Emails Olympus/KJ/CDM emails re: Oil in water stream

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Follow-up to conversation 7/10/08 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: 7/9/08 meeting minutes 7/15/08 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: GAC analytical report 7/17/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/KJ emails re: Data request 07/17/08

13 01 11 11 01 02 RD/RA Task D & E Emails KJ emails to DEQ re: Items posted to website 7/18/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email re: DEQ System Operational Directive 19 07/18/08 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/DEQ emails re: PLC data request

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: PLC data request 07/21/08 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails 07/23/08 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails 7/24/08 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails 07/28/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 7/29/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 7/30/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: TPH results 08/01/08 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails Aldersley/KJ email to DEQ re: July TPH data 8/1/08 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails Norris/KJ email to DEQ re: July TPH data 8/1/08 KJ/Norris

13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Meeting minutes and system maintenance 8/6/08-8/8/08

13 01 11 11 01 02 RD/RA Task D & E Emails 8/9/08-8/11/08

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

7/9/08-7/10/08

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

7/20/08-7/21/08

Site-Wide Information

Site-Wide Information

CDM email to DEQ re: LNAPL charts, MUW profile, and daily reports

Site-Wide Information

DEQ email to KJ/Olympus re: DEQ System Operational Directive 20

Site-Wide Information

KJ email to DEQ re: TPH test analytical results posted to website

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM/DEQ emails re: BNSF response to DEQ comments on 80% design

Page 236: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 236 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 08/14/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 8/18/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails Olympus/CDM/DEQ emails re: Bottles of well water

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Respirometry testing notification 08/20/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ/CDM/DEQ emails re: Field oversight report 5/13 – 5/15

13 01 11 11 01 02 RD/RA Task D & E Emails 8/21/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 8/25/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 08/26/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/DEQ emails re: Start-up sections

13 01 11 11 01 02 RD/RA Task D & E Emails KJ emails re: Start-up schedule 09/04/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 9/10/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/DEQ emails re: Plume map 09/15/08

13 01 11 11 01 02 RD/RA Task D & E Emails Olympus/DEQ emails re: Progress on restart of GWTP

13 01 11 11 01 02 RD/RA Task D & E Emails Olympus/DEQ emails re: Progress on restart of GWTP

13 01 11 11 01 02 RD/RA Task D & E Emails 09/17/08 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails Olympus/DEQ emails re: Progress on restart of GWTP

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 9/18/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Olympus emails re: WTP status 09/23/08

13 01 11 11 01 02 RD/RA Task D & E Emails Olympus email to DEQ re: GWTP restart progress 9/23/08 Olympus

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Task F Part 2 groundwater sampling 09/24/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ/Olympus/CDM emails re: System Operation Directive 23 09/25/08

13 01 11 11 01 02 RD/RA Task D & E Emails Olympus email re: GWTP restart progress 9/25/08 Olympus

13 01 11 11 01 02 RD/RA Task D & E Emails Olympus email re: GWTP 09/26/08 Olympus

13 01 11 11 01 02 RD/RA Task D & E Emails Olympus email re: GWTP report 09/29/08 Olympus

Site-Wide Information

Site-Wide Information

Site-Wide Information

8/19/08-8/20/08

Site-Wide Information

Site-Wide Information

8/19/08-8/20/08

Site-Wide Information

KJ email to DEQ re: Water level and LNAPL thickness monitoring data posted to website

Site-Wide Information

Site-Wide Information

Site-Wide Information

8/27/08-8/28/08

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

9/15/08-9/16/08

Site-Wide Information

9/15/08-9/16/08

Site-Wide Information

DEQ email to KJ/Olympus re: Access to 3/5 track corridor / recovery system restart

Site-Wide Information

9/15/08-9/18/08

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 237: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 237 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Missing data 10/01/08

13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Missing data

13 01 11 11 01 02 RD/RA Task D & E Emails Olympus/DEQ emails re: Directive 23

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Notification of planned sampling activity 10/10/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 10/17/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 10/22/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/KJ/DEQ emails re: Tag IDs

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/KJ/DEQ emails re: Tag IDs

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Tag IDs 10/24/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Main line MUWs 10/24/08

13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: MUW-3 transducer data

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ re: Tag IDs 10/31/08 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 10/31/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 10/31/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails

13 01 11 11 01 02 RD/RA Task D & E Emails KJ emails re: Weekly report KJ

13 01 11 11 01 02 RD/RA Task D & E Emails

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email re: Liquid level 11/12/08 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/DEQ emails re: Skimmer test 11/12/08

13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Tag ID request 11/13/08

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Tag IDs 11/14/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 11/14/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/KJ/DEQ emails re: Tag ID info 11/14/08

Site-Wide Information

Site-Wide Information

10/1/08-10/2/08

Site-Wide Information

10/2/08-10/3/08

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Weekly LNAPL recovery and groundwater treated

Site-Wide Information

Site-Wide Information

10/22/08-10/23/08

Site-Wide Information

10/22/08-10/23/08

Site-Wide Information

Site-Wide Information

Site-Wide Information

10/27/08-10/28/08

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Weekly LNAPL recovery and groundwater treated

Site-Wide Information

KJ/CDM/DEQ emails re: Weekly LNAPL recovery and groundwater treated

10/31/08-11/3/08

Site-Wide Information

10/31/08-11/3/08

Site-Wide Information

KJ/DEQ emails re: Weekly LNAPL recovery and groundwater treated

10/31/08-11/3/08

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Operation Directive 25 and items posted to website

Site-Wide Information

Page 238: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 238 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/KJ/DEQ emails re: More tag ID info 11/14/08

13 01 11 11 01 02 RD/RA Task D & E Emails KJ emails re: Xitech ballast info 11/14/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Operation Directive 26

13 01 11 11 01 02 RD/RA Task D & E Emails Olympus/CDM/DEQ emails re: Operation Directive 26 GWTP

13 01 11 11 01 02 RD/RA Task D & E Emails 11/19/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ re: Update 11/19/08 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Olympus email re: MUW 13 11/19/08

13 01 11 11 01 02 RD/RA Task D & E Emails Olympus email re: MUW 13 pumping water 11/20/08 Olympus

13 01 11 11 01 02 RD/RA Task D & E Emails 11/21/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/DEQ emails re: Annual report requirements 11/26/08

13 01 11 11 01 02 RD/RA Task D & E Emails KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 12/05/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Conference call canceled 12/10/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 12/15/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Bioventing respirometry testing 12/15/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ emails re: Safety Directive – Beaufort Wind Scale 12/15/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM emails re: LNAPL tank summary 12/15/08 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Conference call canceled

13 01 11 11 01 02 RD/RA Task D & E Emails CDM emails to DEQ re: Summary 12/17/08 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails 12/19/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ/Olympus/DEQ emails re: Safety stop on skimmer activity

13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Skimmer pump schedule 12/23/08

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Olympus email re: Tuesday fieldwork 12/29/08

Site-Wide Information

Site-Wide Information

Site-Wide Information

11/14/08-11/17/08

Site-Wide Information

11/8/08-11/19/08

Site-Wide Information

KJ email to DEQ re: Operation Directive 25 item posted to website

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ emails to DEQ re: Operation Directive 25 items posted to website

Site-Wide Information

Site-Wide Information

KJ emails to DEQ re: Operation Directive 25 items posted to website

12/1/08-12/3/08

Site-Wide Information

KJ email to DEQ re: Operation Directive 25 items posted to website

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Operation Directive 25 items posted to website

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

12/16/08-12/17/08

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Operation Directive 25 items posted to website

Site-Wide Information

12/21/08-12/23/08

Site-Wide Information

Site-Wide Information

Page 239: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 239 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails KJ/DEQ emails re: Bioventing testing schedule

13 01 11 11 01 02 RD/RA Task D & E Emails 12/29/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Xi tech support 12/31/08 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ/CDM/DEQ emails re: Field summary 12/31/08

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Operation Directive 25 info posted 01/05/09 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email re: Skimmer meeting talking points 01/05/09 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ email to KJ/CDM/Olympus re: Skimmer pump 1/6/09 DEQ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Operation Directive 25 items posted 1/8/09 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Operation Directive 25 items posted 1/12/09 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Recovery system performance 1/13/09 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 1/19/09 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM email to DEQ w/Main line liquid levels 01/21/09 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 01/22/09 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails CDM emails re: Production for week 1/23/09 01/23/09 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Bioventing 1/23/09

13 01 11 11 01 02 RD/RA Task D & E Emails CDM emails re: Skimmer production 1/26/09 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails 01/26/09 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Current operating condition 01/28/09 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 2/2/09 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Operation Directive 25 notice 2/9/09 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Operation Directive 25 notice 2/17/09 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 2/23/09 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 2/25/09

Site-Wide Information

12/24/08-12/29/08

Site-Wide Information

KJ email to DEQ re: Operation Directive items posted to website

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Operation Directive 25 items posted to website

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Operation Directive 25 items posted to website

Site-Wide Information

Site-Wide Information

KJ email to DEQ re: Operation Directive 25 items posted to website

Site-Wide Information

Site-Wide Information

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operative Directive #25 – Task D&E items posted to website

Site-Wide Information

DEQ/Reynolds & K/J/Norris emails re: Conference call schedule

Page 240: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 240 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails 2/26/09

13 01 11 11 01 02 RD/RA Task D & E Emails 02/26/09 CDM/ Woodward

13 01 11 11 01 02 RD/RA Task D & E Emails 3/2/09 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Reynolds & K/J/Aldersley emails re: Lith logs for BVWs 03/06/09

13 01 11 11 01 02 RD/RA Task D & E Emails 3/909 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 3/11/09

13 01 11 11 01 02 RD/RA Task D & E Emails 3/12/09 CDM/ Stordahl

13 01 11 11 01 02 RD/RA Task D & E Emails 03/17/09

13 01 11 11 01 02 RD/RA Task D & E Emails 3/23/09 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 03/25/09 CDM/ Woodward

13 01 11 11 01 02 RD/RA Task D & E Emails 03/30/09 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails K/J/Norris & MRL/Keegan emails re: Flagger for Livingston 3/31/09\

13 01 11 11 01 02 RD/RA Task D & E Emails 03/31/09

13 01 11 11 01 02 RD/RA Task D & E Emails 03/31/09 CDM/ Woodward

13 01 11 11 01 02 RD/RA Task D & E Emails CDM, MRL, & DEQ emails re: Flagger for Livingston 3/31/09

13 01 11 11 01 02 RD/RA Task D & E Emails K/J/Norris and J Fisher emails re: Heat Trace 04/02/09

13 01 11 11 01 02 RD/RA Task D & E Emails 4/3/09 CDM/ Osterman

13 01 11 11 01 02 RD/RA Task D & E Emails 4/6/09 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 4/7/09 CDM/ Osterman

13 01 11 11 01 02 RD/RA Task D & E Emails 4/13/09 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 4/20/09 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 4/27/09 KJ/Adlersley

Site-Wide Information

DEQ/Reynolds & K/J/Norris emails re: Update – weekly directive #33 - PLC programming

Site-Wide Information

CDM/Woodward email to K/J/Norris Bioventing conference call

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

K/J/Norris & DEQ/Reynolds emails re: Moving of pump houses

Site-Wide Information

CDM/Stordahl email to DEQ/Reynolds re: LNAPL volume update

Site-Wide Information

K/J/Turner & CDM/Woodward emails re: May 2008 Biovent resp. data

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

CDM/Woodward email to DEQ/Reynolds re: Dashboard Report for 3/14/09 to 3/21/09

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

Site-Wide Information

DEQ/Reynolds & CDM/Stordahl emails re: Flagger for Livingston

Site-Wide Information

CDM/Woodward email to DEQ/Reynolds re: Flagger available on Thursday, 4/2/09

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM/Osterman email to DEQ/Reynolds re: Liquid levels in drums

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information CDM/Osterman email to Olympus/Chambers re: Drum volumes

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Page 241: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 241 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails 4/27/09

13 01 11 11 01 02 RD/RA Task D & E Emails 05/01/09 CDM/ Stordahl

13 01 11 11 01 02 RD/RA Task D & E Emails 5/4/09 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails K/J/Davis email to DEQ/Reynolds re: SCADA update 5/7/09 KJ/ Davis

13 01 11 11 01 02 RD/RA Task D & E Emails 5/11/09 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Reynolds & K/J/Norris emails re: Directive #36 GWTP 5/13/09

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Hill, K/J/Davis and Casne/Morehead emails re: LivShare 05/13/09

13 01 11 11 01 02 RD/RA Task D & E Emails 5/13/09 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 05/18/09 KJ/ Norris

13 01 11 11 01 02 RD/RA Task D & E Emails 5/19 /09 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 05/26/09

13 01 11 11 01 02 RD/RA Task D & E Emails 5/26/09

13 01 11 11 01 02 RD/RA Task D & E Emails 05/26/09

13 01 11 11 01 02 RD/RA Task D & E Emails 5/26/09 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 06/01/09 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 06/02/09 CDM/ Woodward

13 01 11 11 01 02 RD/RA Task D & E Emails 06/02/09 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 6/5/09 KJ/ Davis

13 01 11 11 01 02 RD/RA Task D & E Emails 06/08/09 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 6/12/09 DEQ/ Reynolds

13 01 11 11 01 02 RD/RA Task D & E Emails 06/15/09 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 06/17/09 CDM/ Hills

Site-Wide Information

K/J/Norris & DEQ/Reynolds emails re: Phase 1 remediation system operation

Site-Wide Information

CDM/Stordahl email to DEQ/Reynolds re: Attachment – DEQ System Operation Directive 36

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

Site-Wide Information

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: SCADA data has been uploaded to LivShare

Site-Wide Information

K/J/Norris email to DEQ Reynolds re: Heat tracing upgrades completed

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

CDM/Stordahl, K/J/Norris & DEQ emails re: Phase 1 remediation system interruption

Site-Wide Information

DEQ/Reynolds, J Fisher, & K/J/Norris emails: Screens on pumps

Site-Wide Information

DEQ/Reynolds & K/J/Norris emails: Screens on pumps – power outage shut off sump pump

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

CDM/Woodward email to DEQ/Reynolds re: K.J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website 5/19 /09

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

K/J/Davis email to DEQ/Reynolds re: Logging out of SCADA – forwarded to CDM

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

DEQ/Reynolds email to K/J/Norris & Aldersley re: Attachment – Respiration Testing Map

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

CDM/Hills email to DEQ re: Attachment – DEQ System Operation Directive 39 work Order

Page 242: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 242 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails 6/22/09 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 06/23/09

13 01 11 11 01 02 RD/RA Task D & E Emails 06/24/09 CDM/ Hills

13 01 11 11 01 02 RD/RA Task D & E Emails 06/24/09 CDM/ Hills

13 01 11 11 01 02 RD/RA Task D & E Emails 6/25/09 CDM/ Woodward

13 01 11 11 01 02 RD/RA Task D & E Emails BN/Smith email to DEQ/Reynolds re: Shut down PMW-3 06/25/09 BN/ Smith

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Reynolds email to BN/Smith re” Shut down PMW-3 6/29/09 DEQ/ Reynolds

13 01 11 11 01 02 RD/RA Task D & E Emails 6/29/09 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 6/30/09

13 01 11 11 01 02 RD/RA Task D & E Emails 7/1/09 CDM/ Hills

13 01 11 11 01 02 RD/RA Task D & E Emails 07/02/09 CDM/ Woodward

13 01 11 11 01 02 RD/RA Task D & E Emails 07/06/09 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 07/06/09

13 01 11 11 01 02 RD/RA Task D & E Emails 7/8/09 CDM/ Woodward

13 01 11 11 01 02 RD/RA Task D & E Emails K/J/Davis email to DEQ/Reynolds re: Knock-out tanks 07/10/09 KJ/ Davis

13 01 11 11 01 02 RD/RA Task D & E Emails 7/10/09 CDM/ Hills

13 01 11 11 01 02 RD/RA Task D & E Emails 7/13/09 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Osterman email to DEQ/Reynolds re: Tank volumes 7/13/09 CDM/ Osterman

13 01 11 11 01 02 RD/RA Task D & E Emails 7/15/09 CDM/ Osterman

13 01 11 11 01 02 RD/RA Task D & E Emails 7/17/09

13 01 11 11 01 02 RD/RA Task D & E Emails 7/20/09 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 7/20/09 KJ/Adlersley

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

K/J/Davis, CDM/Hills & DEQ/Reynolds emails re: Respirometry Testing & Heat Trace Inspection

Site-Wide Information

CDM/Hills email to DEQ/Reynolds re: Weekly Dashboard report

Site-Wide Information

CDM/Hills email to DEQ/Reynolds re: Shut down PMW-3 & Work order directive

Site-Wide Information

CDM/Woodward email to CDM, K/J & DEQ re: Attachments – Pictures from 3/5 track carboy samples

Site-Wide Information

Site-Wide Information

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

DEQ/Reynolds & K/J/Norris emails re: Shut Down PMW-3 – DEQ disagrees with K/J factual clarification for the Administrative Record

Site-Wide Information

CDM/Hills email to DEQ/Reynolds re: FW email from CDM/Osterman – June 2009 Respiration Testing field conditions

Site-Wide Information

CDM/Woodward email to DEQ/Reynolds re: Task D&E Dashboard report

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

DEQ/Reynolds & K/J/Norris emails re: Shut down PMW-3 – Petroleum recovery system

Site-Wide Information

CDM/Woodward email to DEQ/Reynolds re: Attachment - Digital Dashboard report

Site-Wide Information

Site-Wide Information

CDM/Hills email to DEQ/Reynolds re: Comments on Task D/E Annual Report

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

Site-Wide Information

CDM/Osterman email to DEQ/Reynolds re: Attachment – Dashboard report

Site-Wide Information

CDM/Hills, DEQ/Reynolds & K/J/Davis emails re: Locked out of SCADA

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website (7/20/09)

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website (7/27/09)

Page 243: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 243 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails 7/31/09 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 08/03/09 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails Y 08/05/09

13 01 11 11 01 02 RD/RA Task D & E Emails Y 08/06/09

13 01 11 11 01 02 RD/RA Task D & E Emails 8/10/09 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 08/13/09 DEQ/ Reynolds

13 01 11 11 01 02 RD/RA Task D & E Emails 08/23/10 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 8/31/09 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 09/02/09 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 09/03/09 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 09/03/09

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Conference call access codes 9/3/09-9/8/09

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 09/08/09 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 9/10/09 DEQ/ Reynolds

13 01 11 11 01 02 RD/RA Task D & E Emails 9/11/09

13 01 11 11 01 02 RD/RA Task D & E Emails 9/11/09 DEQ/ Reynolds

13 01 11 11 01 02 RD/RA Task D & E Emails 09/14/09 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails K/J/Norris email to DEQ/Reynolds re: LNAPL Tank draining 09/16/09 KJ/Norris

13 01 11 11 01 02 RD/RA Task D & E Emails 9/20/09 KJ/Norris

13 01 11 11 01 02 RD/RA Task D & E Emails 09/21/09 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 9/28/09 KJ/Aldersley

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website (7/31/09)

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website (8/3/09)

Site-Wide Information

** DEQ Legal/Haque-Hausrath internal email re: Response to BN 7/23/09 letter

DEQ legal/ Haque-Hausrath

Site-Wide Information

** DEQ Legal/Haque-Hausrath internal email re: Response to BN 7/23/09 letter

DEQ legal/ Haque-Hausrath

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

DEQ/Reynolds email to BN/Smith, K/J/Norris & Aldersley re: Task D&E proposal

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

K.J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website (8/31/09)

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Task D&E quarterly respirometry testing

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website (9/3/09)

Site-Wide Information

DEQ/Reynolds & K.J/Aldersley emails re: SCADA RSView Max License

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ/Reynolds letter to K/J/Norris re: July 24, 2009 BN Response to DEQ letter dated 6/19/09 regarding Bioventing Emissions Management – Task D&E Phase I RA

Site-Wide Information

CDM/Woodward & DEQ/Reynolds emails re: LNAPL recycling

Site-Wide Information

DEQ/Reynolds email to K/J/Norris & Aldersley re: LNAPL recycling

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website (9/14/09)

Site-Wide Information

Site-Wide Information

K/J/Norris email to DEQ/Reynolds re: BN Shop Complex – Task D&E – Phase I Remediation System Well Maintenance

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Page 244: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 244 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Reynolds & K/J/Aldersley emails re: Well redevelopment 9/29/09

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Smith & DEQ/Reynolds emails re: Well development 9/29/09

13 01 11 11 01 02 RD/RA Task D & E Emails 9/29/09

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Reynolds email to K/J/Norris MUW TV 09/30/09 DEQ/ Reynolds

13 01 11 11 01 02 RD/RA Task D & E Emails 10/01/09 DEQ/ Reynolds

13 01 11 11 01 02 RD/RA Task D & E Emails 10/05/09 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 10/6/09 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 10/7/09 KJ/Norris

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Osterman email to K/J re: Can’t get in to SCADA 19/8/09 CDM/Osterman

13 01 11 11 01 02 RD/RA Task D & E Emails 10/12/09 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 10/14/09 CDM/Osterman

13 01 11 11 01 02 RD/RA Task D & E Emails 10/19/09 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 10/20/09 CDM/Hills

13 01 11 11 01 02 RD/RA Task D & E Emails 10/26/09 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 11/02/09

13 01 11 11 01 02 RD/RA Task D & E Emails 11/2/09 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 11/02/09 CDM/ Osterman

13 01 11 11 01 02 RD/RA Task D & E Emails 11/06/09 CDM/ Stordahl

13 01 11 11 01 02 RD/RA Task D & E Emails 11/9/09 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 11/11/09 CDM/ Osterman

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Osterman & DEQ/Reynolds emails re: Liquid levels 11/12/09 CDM/ Osterman

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Osterman 7 Wally Chambers emails re: Liquid levels 11/13/09 CDM/ Osterman

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM/Woodward & Hills & DEQ/Reynolds emails re: MUW TV

Site-Wide Information

Site-Wide Information

DEQ/Reynolds email to CDM/Woodward, Lamie & Hills re: Ambient Air Quality Memo

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

K/J/Norris email to DEQ/Reynolds re: Discontinuation of BN Shop Complex bi-weekly Task D&E operations meeting

Site-Wide Information

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

CDM/Osterman & DEQ/Reynolds emails re: Liquid levels & photos

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

CDM/Hills email to DEQ/Reynolds re: Status of the well rehabilitation & Remediation System Operations

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

DEQ Legal/Haque-Hausrath internal email re: Bioventing Extraction/Injection Design Study Work Plan

DEQ legal/ Haque-Hausrath

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

CDM/Osterman email to DEQ/Reynolds re: Skimmer production & update

Site-Wide Information

CDM/Stordahl & DEQ/Reynolds re: Bioventing conference call meeting minutes

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

CDM/Osterman email to DEQ/Reynolds re: Weekly Dashboard report

Site-Wide Information

Site-Wide Information

Page 245: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 245 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails 11/16/09 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Reynolds & K/J/Norris emails re: Task D&E Meeting 11/19/09

13 01 11 11 01 02 RD/RA Task D & E Emails 11/20/09

13 01 11 11 01 02 RD/RA Task D & E Emails 11/23/09 KJ/Aldersley

13 01 11 11 01 02 CD RD/RA Task D & E Emails 11/25/09 DEQ/ Reynolds

13 01 11 11 01 02 RD/RA Task D & E Emails 11/25/09 CDM/ Woodward

13 01 11 11 01 02 RD/RA Task D & E Emails 11/30/09 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 12/03/09 DEQ/ Reynolds

13 01 11 11 01 02 RD/RA Task D & E Emails 12/3/09 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Reynolds & K/J/Norris emails re: Liquid levels schedule 12/07/09

13 01 11 11 01 02 RD/RA Task D & E Emails 12/8/09 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 12/8-12/9/09

13 01 11 11 01 02 RD/RA Task D & E Emails 12/11/09

13 01 11 11 01 02 RD/RA Task D & E Emails 12/14/09 KJ/Davis

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Reynolds & K/J/Norris emails re: Frozen LNAPL piping 12/15/09

13 01 11 11 01 02 RD/RA Task D & E Emails 12/21/09 KJ/Davis

13 01 11 11 01 02 RD/RA Task D & E Emails 12/21/09 KJ/Norris

13 01 11 11 01 02 RD/RA Task D & E Emails 12/23/09 CDM/ Stordahl

13 01 11 11 01 02 RD/RA Task D & E Emails 12/23/09

13 01 11 11 01 02 RD/RA Task D & E Emails 12/28/09 KJ/Davis

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

Site-Wide Information

OTS/ Chambers & CDM/Osterman emails re: 11-17-09 liquid levels

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

DEQ/Reynolds email to K/J/Norris & Aldersley re: Attachment – Recovery Tank Measurement Recommendations & Well Checklist

Site-Wide Information

CDM/Woodward email to DEQ/Reynolds re: Task D&E call – GW pump

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

DEQ/Reynolds email to K/J/Davis re: Attachment – Recovery Tank Volume calculator

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

CDM/Osterman, Casne Engineering/Morehead, & K/J/Fisher emails fw to DEQ/Reynolds re: SCADA problems

Site-Wide Information

CDM/Osterman & OTS/Chambers emails cc DEQ/Reynolds re: 12-10-09 liquid levels

Site-Wide Information

K/J/Davis email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

Site-Wide Information

K/J/Davis email to DEQ/Reynolds re: Weekly Tables posted to website

Site-Wide Information

K/J/Norris email to DEQ/Reynolds re: BN Shop Complex – Task D&E – Phase I Remedial Action System O&M repair – water leak

Site-Wide Information

CDM/Stordahl email to DEQ/Reynolds fw to K/J & BN/Smith re: Livingston field operations

Site-Wide Information

DEQ/Martin internal email to Reynolds re: Free product recovery system

DEQ/Martin internal

Site-Wide Information

K/J/Davis email to DEQ/Reynolds re: Weekly Tables posted to website

Page 246: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 246 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Reynolds letter to BN/Smith re: LNAPL frozen piping 12/31/09 DEQ/Reynolds

13 01 11 11 01 02 RD/RA Task D & E Emails 1/4/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 01/05/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 1/5/10 KJ/Norris

13 01 11 11 01 02 RD/RA Task D & E Emails 01/08/10 DEQ/ Reynolds

13 01 11 11 01 02 RD/RA Task D & E Emails 01/11/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 1/13/10 CDM/ Woodward

13 01 11 11 01 02 RD/RA Task D & E Emails 1/18/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 01/18/10 KJ/Norris

13 01 11 11 01 02 RD/RA Task D & E Emails 01/20/10 DEQ/Reynolds

13 01 11 11 01 02 RD/RA Task D & E Emails 01/21/10 KJ/Norris

13 01 11 11 01 02 RD/RA Task D & E Emails KJ email to DEQ re: Items posted to website 01/25/10 KJ

13 01 11 11 01 02 RD/RA Task D & E Emails K/J/Norris email to DEQ/Reynolds re: SCADA update 01/26/10 KJ/Norris

13 01 11 11 01 02 RD/RA Task D & E Emails 01/27/10 KJ/Norris

13 01 11 11 01 02 RD/RA Task D & E Emails 2/1/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 2/2/10 KJ/Norris

13 01 11 11 01 02 RD/RA Task D & E Emails 02/05/10

13 01 11 11 01 02 RD/RA Task D & E Emails 02/05/10

13 01 11 11 01 02 RD/RA Task D & E Emails 02/08/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 2/16/10 CDM/ Stordahl

Site-Wide Information

K/J/Norris & Davis, DEQ/Reynolds & CDM/Hills emails re: BN Shop Complex – Task D&E – Phase I Remedial Action System O&M

12/28-12/29/09

Site-Wide Information

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Norris email to DEQ/Reynolds re: BN Shop Complex – Task D&E – Phase I Remedial Action System O&M course of action as discussed during conference call

Site-Wide Information

DEQ/Reynolds email to K/J/Norris re: Response to K/J/Norris 1/5/10 email on course of action

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

CDM/Woodward email cc to DEQ/Reynolds re: Heaters in the utilidor

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Norris email to DEQ/Reynolds re: Operation Direction #45 - Livingston SCADA unavailable this week

Site-Wide Information

DEQ/Reynolds email to K/J/Norris re: BN Shop Complex – Task D&E Bioventing Design Study

Site-Wide Information

K/J/Norris email to DEQ/Reynolds re: Completed freeze protection

Site-Wide Information

Site-Wide Information

Site-Wide Information

K/J/Norris email to DEQ/Reynolds re: Attachment - BN Shop Complex – Task D&E – Phase I Remedial Action System O&M Manual Addendum # 1

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Norris email to DEQ/Reynolds re: BN Shop Complex – Mid-February Onsite meeting

Site-Wide Information

DEQ/Reynolds & K/J/Norris emails re: BN Shop Complex – Mid-February Onsite meeting

Site-Wide Information

DEQ/Reynolds & K/J/Norris emails re: Existing VMP Locations

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

CDM/Stordahl email to DEQ/Reynolds re: Routine Maintenance Advisories

Page 247: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 247 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails 2/16/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 2/22/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 3/1/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 03/04/10 CDM/ Osterman

13 01 11 11 01 02 RD/RA Task D & E Emails 03/08/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 03/09/10

13 01 11 11 01 02 RD/RA Task D & E Emails 3/15/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 03/22/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 03/23/10

13 01 11 11 01 02 RD/RA Task D & E Emails 3/29/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 4/5/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 4/9/10 CDM/Osterman

13 01 11 11 01 02 RD/RA Task D & E Emails 04/09/10

13 01 11 11 01 02 RD/RA Task D & E Emails 04/12/10 CDM/Osterman

13 01 11 11 01 02 RD/RA Task D & E Emails 04/12/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 04/14/10

13 01 11 11 01 02 RD/RA Task D & E Emails 04/19/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 04/26/10 CDM/Osterman

13 01 11 11 01 02 RD/RA Task D & E Emails 4/28/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 4/30/10 OTS/Chambers

13 01 11 11 01 02 RD/RA Task D & E Emails Y 05/03/10

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

CDM/Osterman email to DEQ/Reynolds fw to K/J/Norris re: Problems with the SCADA at CDM

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

OTI/Chambers & CDM Woodward emails re: LNAPL on 3/9/10

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

CDM/Hills, DEQ/Reynolds, & K/J/Norris emails re: Design Study Testing of Retrofitted Bioventing System

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

CDM/Osterman email to DEQ/Reynolds fw to OTS/Chambers re: Check valves in MUW-24 & MUW-16

Site-Wide Information DEQ/Reynolds & K/J/Norris emails re: Operation Directive #48

Site-Wide Information

CDM/Osterman & OTS/Chambers email fw to DEQ Reynolds re: Check valve report

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website (4/12/10)

Site-Wide Information DEQ/Reynolds & K/J/Aldersley emails re: Respirometry testing

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

CDM/Osterman email to DEQ/Reynolds fw to K/J Aldersley re: Well information - BVW survey

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

OTS/Chambers email to VDM/Osterman fw to DEQ/Reynolds re: PMW 5, MUW 6, & PMW 2 check valve report for 4/29/10)

Site-Wide Information

** DEQ Legal/Haque-Hausrath internal email to Reynolds re: Task D&E, requirements for Phase II

DEQ leagl/ Haque-Hausrath

Page 248: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 248 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails 05/03/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 5/11/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 5/17/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 05/24/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 05/26/10 OTS/Osterman

13 01 11 11 01 02 RD/RA Task D & E Emails 06/03/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 06/07/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 6/8/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails K/J/Aldersley email to DEQ/Reynolds re: Respirometry testing 06/10/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 6/9-6/11/10

13 01 11 11 01 02 RD/RA Task D & E Emails 06/11/10

13 01 11 11 01 02 RD/RA Task D & E Emails 6/15/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 6/18/10 CDM/Hills

13 01 11 11 01 02 RD/RA Task D & E Emails 6/23/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 6/30/10

13 01 11 11 01 02 RD/RA Task D & E Emails 7/1/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails OTS/Chambers email to DEQ/Reynolds re: Tank measurements 7/1/10 OTS/ Chambers

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/KJ emails re: Task F and D/E sampling 7/6/10-7/9/10

13 01 11 11 01 02 RD/RA Task D & E Emails 7/8/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 7/12/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 7/12-7/13/10

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

OTS/Osterman to CDM/Hills fw to DEQ/Reynolds re: Weekly Dashboard Report

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Livingston Deliverables & notification of field activities – Bioventing Extraction/Injection Design Study Completion & Radius of Influence (ROI) Analysis Report sent UPS

Site-Wide Information

Site-Wide Information

DEQ/Reynolds & K/J/Norris emails re: Bioventing Design Study Testing Report

Site-Wide Information

K/J/Aldersley & CDM/Hills emails re: Bioventing Design Study Testing Report – Attachment - revised map of proposed wells for respiration testing

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

CDM/Hills email to DEQ/Reynolds re: : Bioventing Design Study Testing Completion & ROI Analysis

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

OTS/Chambers & CDM/Hills emails re: Operational Directive #51

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

Site-Wide Information

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

CDM/Stordahl & Hills emails to DEQ/Reynolds re: Task D&E annual report – CDM comments

Page 249: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 249 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails KJ emails to DEQ re: Items posted to website KJ

13 01 11 11 01 02 RD/RA Task D & E Emails 07/14/10 Energy Labs

13 01 11 11 01 02 RD/RA Task D & E Emails K/J Aldersley & DEQ/Reynolds emails re: LNAPL sampling 07/15/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 7/15-7/19/10

13 01 11 11 01 02 RD/RA Task D & E Emails 7/19/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 07/26/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 07/26/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 7/27/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 07/28/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 8/2/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 08/04/10

13 01 11 11 01 02 RD/RA Task D & E Emails 8/6-8/810

13 01 11 11 01 02 RD/RA Task D & E Emails 08/09/10 CDM/ Choquette

13 01 11 11 01 02 RD/RA Task D & E Emails 8/10/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 8/18/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 8/25/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 9/1/10

13 01 11 11 01 02 RD/RA Task D & E Emails 09/01/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 09/03/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 09/05/10 KJ/Norris

Site-Wide Information

7/12/10-7/13/10

Site-Wide Information

Energy Labs/Pippin email to K/J/Aldersley fw to DEQ/Reynolds re: Analysis of VOCs in product

Site-Wide Information

Site-Wide Information

DEQ/Reynolds & K/J/Norris emails re: Weekly field activities staffing schedule

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Notification of recovered LNAPL – pickup

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Notification of Task D&E field activities

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Notification of Task D&E field activities

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

CDM/Choquette & Hills emails to DEQ/Reynolds re: Extraction/Injection testing

Site-Wide Information

K/J/Fernandes & DEQ/Reynolds emails re: Task D&E treatment system power interruption

Site-Wide Information

CDM/Choquette email to K/J/Norris et al re: Operational Directive 52

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website – Follow-up

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website – Follow-up

Site-Wide Information

CDM/Hills & DEQ/Reynolds emails re: Effluent pump check valves

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website – Follow-up

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website – Follow-up – LNAPL sampling results

Site-Wide Information

K/J/Norris email to DEQ/Reynolds re: Tasks J & L conference call on 8/16/10

Page 250: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 250 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails 09/07/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 9/9/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 9/14/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 9/20/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 9/28/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 9/30/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 09/30/10

13 01 11 11 01 02 RD/RA Task D & E Emails 10/04/10 CDM/ Osterman

13 01 11 11 01 02 RD/RA Task D & E Emails 10/5/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails CDM liquid levels 10/05/10 CDM

13 01 11 11 01 02 RD/RA Task D & E Emails 10/12/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 10/18/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 10/22/10

13 01 11 11 01 02 RD/RA Task D & E Emails 10/26/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Hills & Norris emails re: Pre-filter by-pass 10/26/10

13 01 11 11 01 02 RD/RA Task D & E Emails 10/26/10

13 01 11 11 01 02 RD/RA Task D & E Emails 10/29/10 BN/Smith

13 01 11 11 01 02 RD/RA Task D & E Emails 11/1/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 11/4/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 11/09/10 KJ/Aldersley

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Attachment – Revised Bioventing Extraction/Injection System – Interim Operation & Monitoring Plan

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website – Follow-up

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website – Follow-up

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website – Follow-up

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information K/J/Aldersley email to DEQ/Reynolds re: Recoverability testing

Site-Wide Information

DEQ/Reynolds & K/J/Aldersley emails re: Weekly field activities staffing schedule

Site-Wide Information

CDM/Osterman email to Scott Morehead re: SCADA login problems

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information BN/Smith & DEQ/Reynolds emails re: Task D/E 10/20/10 letter

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

Site-Wide Information

DEQ/Reynolds & K/J/Norris emails re: Pre-filter by-pass testing mode procedure

Site-Wide Information

BN/Smith email to DEQ/Reynolds re: BN response to DEQ 10/20/10 letter - Pre-filter by-pass

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Livingston Deliverables Bioventing Extraction/Injection Design Study Comprehensive Report sent out

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Page 251: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 251 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails 11/10/10 CDM/Osterman

13 01 11 11 01 02 RD/RA Task D & E Emails 11/15/10

13 01 11 11 01 02 RD/RA Task D & E Emails 11/1710 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 11/18/10

13 01 11 11 01 02 RD/RA Task D & E Emails 11/22/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 11/24/10 KJ/Norris

13 01 11 11 01 02 RD/RA Task D & E Emails 11/24/10 KJ/Norris

13 01 11 11 01 02 RD/RA Task D & E Emails 11/24/10 CDM/Stordahl

13 01 11 11 01 02 RD/RA Task D & E Emails 11/29/10 KJ/Norris

13 01 11 11 01 02 RD/RA Task D & E Emails 11/30/10

13 01 11 11 01 02 RD/RA Task D & E Emails 12/1/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 12/7/10

13 01 11 11 01 02 RD/RA Task D & E Emails 12/9/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 12/09/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 12/10/10 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 01/11/11 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 01/19/11 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 1/24/11 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 01/28/11 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 2/2/11 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 2/7/11 KJ/Aldersley

Site-Wide Information

CDM/Osterman email to DEQ/Reynolds re: 11/9/10 liquid levels

Site-Wide Information

DEQ Legal/Haque-Hausrath email to C Lawellin re: Bail down procedures

DEQ legal/ Haque-Hausrath

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

DEQ/Reynolds & K/J/Norris emails re: Task D/E report revision deadline extension

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Norris email to DEQ/Reynolds re: Summary of Task F Stage I – Part 2 Additional ISCO testing

Site-Wide Information

K/J/Norris email to DEQ/Reynolds re: Recovered LNAPL header blockage

Site-Wide Information

CDM/Stordahl email to DEQ/Reynolds re: LNAPL line freezing

Site-Wide Information

K/J/Norris email to DEQ/Reynolds re: Recovered LNAPL header blockage cleared

Site-Wide Information

CDM/Hills & K/J/Norris emails re: Recovered LNAPL header blockage – checking of heat trace schedule

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Norris & DEQ/Reynolds emails re: Recovered LNAPL header blockage – backup heat trace to be left on

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Livingston Deliverable – Revised 2009 Task D&E Annual Report revision # 1 to be delivered 12/13/10

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Livingston Deliverable –CD of Revised 2009 Task D&E Annual Report revision # 1 to be delivered 12/13/10

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Livingston deliverables – Private & Public Well Inventory revision #5 to be delivered 1/31/11

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Page 252: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 252 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails 2/17/11 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 2/24/11 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 3/1/11 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 03/09/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 03/15/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 03/25/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 03/31/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 04/06/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 04/15/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 04/20/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 04/27/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 05/02/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 05/11/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 05/17/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 05/24/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 05/31/11 KJ/Norris

13 01 11 11 01 02 RD/RA Task D & E Emails CDM/Choquette email to Casne/Morehead re: SCADA System 6/1/11 CDM/ Choquette

13 01 11 11 01 02 RD/RA Task D & E Emails 06/01/11 KJ/Norris

13 01 11 11 01 02 RD/RA Task D & E Emails 06/01/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 06/07/11 KJ/Norris

13 01 11 11 01 02 RD/RA Task D & E Emails 06/08/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 6/15/11 KJ/Adlersley

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Norris email to DEQ/Reynolds re: Task D/E Phase 1 Rem. System – operations notification

Site-Wide Information

Site-Wide Information

K/J/Norris email to DEQ re: Task D/E Phase 1 Rem. System – operations notification

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Norris email to DEQ re: Task D/E Phase 1 Rem. System –RS server down

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Page 253: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 253 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails 06/17/11 KJ/Norris

13 01 11 11 01 02 RD/RA Task D & E Emails K/J/Norris email to DEQ re: SCADA remote access restored 06/22/11 KJ/Norris

13 01 11 11 01 02 RD/RA Task D & E Emails 06/22/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 06/23/11 DEQ/Reynolds

13 01 11 11 01 02 RD/RA Task D & E Emails 06/16/11

13 01 11 11 01 02 RD/RA Task D & E Emails 6/29/11 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 07/05/11 CDM/ Choquette

13 01 11 11 01 02 RD/RA Task D & E Emails 7/5/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 7/14/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 7/21/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 07/25/11

13 01 11 11 01 02 RD/RA Task D & E Emails 07/25/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 7/27/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 8/1/11 CDM/Hills

13 01 11 11 01 02 RD/RA Task D & E Emails 08/04/11

13 01 11 11 01 02 RD/RA Task D & E Emails 08/04/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 08/11/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 08/18/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 08/24/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 08/25/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 09/01/11 KJ/Adlersley

Site-Wide Information

K/J/Norris email to DEQ re: Task D/E Phase 1 Rem. System –RS server down

Site-Wide Information

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

DEQ/Reynolds email to CDM & K/J re: Taking water level measurements on Tuesdays

Site-Wide Information

K/J/Norris & CDM/Hills emails re: All data – LNAPL physical Chemical testing results

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

CDM/Choquette email to DEQ/Reynolds re: No flagger for 7/5/11 – not going to Livingston

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Norris & CDM/Hills emails re: Task D/E Operation Directive #61 – request for clarification

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

CDM/Hills email to DEQ/Reynolds re: Phone Log - Tasks L/D/E

Site-Wide Information

BN/Kaitala & DEQ Legal emails re: BN request for extension on DEQ 707 info request

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website - core lab data

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Page 254: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 254 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails 09/07/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 09/07/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 09/13/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 09/21/11 DEQ/ Reynolds

13 01 11 11 01 02 RD/RA Task D & E Emails 09/23/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 09/29/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 10/07/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 10/07/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 10/12/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 10/14/11

13 01 11 11 01 02 RD/RA Task D & E Emails 10/17/11 BN/ Stegman

13 01 11 11 01 02 RD/RA Task D & E Emails 10/19/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 10/21/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 10/27/11

13 01 11 11 01 02 RD/RA Task D & E Emails 10/28/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 11/04/11

13 01 11 11 01 02 RD/RA Task D & E Emails 11/10/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 11/18/11

13 01 11 11 01 02 RD/RA Task D & E Emails 11/18/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 12/06/11 KJ/Adlersley

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website - Updated summary table of LNAPL sampling

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

DEQ/Reynolds emails to CDM, MRL, KJ et al re: Flagger for 3/5 track portion monitoring

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Groundwater recovery system down & then back up & running

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website - weekly/quarterly info

Site-Wide Information

DEQ/Reynolds & KJ/Aldersley emails re: Monthly liquid GAC data posting location

Site-Wide Information

BN/Stegman email to DEQ/Reynolds re: Stegman thoughts from meeting with BN, CDM & DEQ

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Notification of Livingston heat trace testing schedule

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

DEQ/Reynolds, KJ/Norris & BN/Stegman emails re: Task D/E communications

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website - weekly/monthly

Site-Wide Information

DEQ/Reynolds/ KJ/Aldersley & CDM/Dudley emails re: Operation Directive #25 – Task D&E items posted to website on Livshare & LivData

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

DEQ/Reynolds & KJ/Aldersley emails re: DEQ needs chromatagram data

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Page 255: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 255 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails 01/09/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 01/14/12

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Reynolds email to KJ re: SCADA data 01/19/12 DEQ/ Reynolds

13 01 11 11 01 02 RD/RA Task D & E Emails 01/20/12 KJ/Norris

13 01 11 11 01 02 RD/RA Task D & E Emails 01/20/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 01/20/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 01/23/12

13 01 11 11 01 02 RD/RA Task D & E Emails 01/31/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 02/10/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 2/16/122 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 02/16/12

13 01 11 11 01 02 RD/RA Task D & E Emails 02/24/11 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 03/06/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 03/09/12 KJ/Norris

13 01 11 11 01 02 RD/RA Task D & E Emails 03/21/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 04/06/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 04/09/12 DEQ/ Reynolds

13 01 11 11 01 02 RD/RA Task D & E Emails 04/20/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 04/27/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 05/08/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 05/15/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 05/21/12 KJ/Adlersley

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

DEQ/Reynolds & KJ/Norris emails re: Task D&E changes - moving pumps

Site-Wide Information

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: Email forwarded from Jarod Fisher - chronology of difficulty experienced with mainline recovered product piping this week

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: November 2011 Respirometry testing posted to website

Site-Wide Information

Aaron Knoebel & DEQ/Reynolds emails re: Knoebel information request about property at 119 N L St

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

DEQ/Reynolds & KJ/Peterson emails re: BN Pilot test & sampling requirements

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: FW: email from KJ/Fisher re: Groundwater pump replacements

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

DEQ/Reynolds email to KJ/Norris & Aldersley re: Quarterly LNAPL thickness monitoring

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Page 256: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 256 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails 05/30/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 06/07/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 06/14/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 06/22/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 07/09/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 07/13/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 07/25/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 08/02/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 08/15/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 08/29/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 09/18/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 10/02/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 10/10/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 10/19/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 11/02/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 11/12/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails

13 01 11 11 01 02 RD/RA Task D & E Emails 12/04/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 12/14/12 KJ/Adlersley

13 01 11 11 01 02 RD/RA Task D & E Emails 12/17/12

13 01 11 11 01 02 RD/RA Task D & E Emails 12/31/12 KJ/Fernandes

13 01 11 11 01 02 RD/RA Task D & E Emails 01/17/13 KJ/Aldersley

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

KJ/Aldersley & DEQ/Reynolds emails re: Operation Directive #64

11/21-11/25/12

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

KJ/Fisher & DEQ/Reynolds emails re: Task D/E Phase II Wheel Shop biovent system mode

Site-Wide Information

KJ/Fernandes email to DEQ/Reynolds re: 2011 Task D/E Annual Report posted to the web

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Page 257: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 257 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails 01/28/13 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 02/05/13 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 02/19/13 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 03/01/13 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 03/15/13 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 03/20/13

13 01 11 11 01 02 RD/RA Task D & E Emails 03/20/13 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 03/29/13 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 04/11/13 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 04/19/13 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 04/26/13 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 05/10/13 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 05/24/13 KJ/Fernandes

13 01 11 11 01 02 RD/RA Task D & E Emails 05/29/13 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 05/31/13 KJ/Fernandes

13 01 11 11 01 02 RD/RA Task D & E Emails 06/14/13 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails K/J/Aldersley & DEQ/Reynolds emails re: Task D&E update 06/21/13 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 06/25/13 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 07/03/13 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 07/25/13 KJ/Fernandes

13 01 11 11 01 02 RD/RA Task D & E Emails 07/26/13 KJ/Aldersley

13 01 11 11 01 02 RD/RA Task D & E Emails 08/02/13 KJ/Aldersley

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

KJ/Aldersley & Vesley emails re: Livingston respirometry testing

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 – Task D&E items posted to website

Site-Wide Information

K/J/Fernandes email to DEQ/Reynolds re: Operation Directive #65 update

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 update

Site-Wide Information

K/J/Fernandes email to DEQ/Reynolds re: Operation Directive 65 update

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 Posting

Site-Wide Information

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive 25 posting

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive 25 posting

Site-Wide Information

K/J/Fernandes & DEQ/Reynolds emails re: System shut down & resume

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive 25 posting

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Operation Directive #25 Task D/E Items posted to website

Page 258: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 258 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 02 RD/RA Task D & E Emails DEQ/Reynolds & KJ/Fernandes email re: Task D/E Work 08/09/13 DEQ/Reynolds

13 01 11 11 01 02 RD/RA Task D & E Emails 08/09/13 KJ/Aldersley

13 01 11 11 01 03 RD/RA Task D & E Phone Logs

13 01 11 11 01 03 RD/RA Task D & E Phone Logs 07/17/06 DEQ SRS

13 01 11 11 01 03 RD/RA Task D & E Phone Logs DEQ SRS to DEQ UST re: Double walled pipe 7/19/06 DEQ SRS

13 01 11 11 01 03 RD/RA Task D & E Phone Logs 09/19/06 DEQ

13 01 11 11 01 03 RD/RA Task D & E Phone Logs KJ to DEQ re: City of Livingston wants a press release 9/26/06 KJ

13 01 11 11 01 03 RD/RA Task D & E Phone Logs 9/26/06 DEQ

13 01 11 11 01 03 RD/RA Task D & E Phone Logs KJ/Olympus/DEQ emails re: Operational Directive 26

13 01 11 11 01 03 RD/RA Task D & E Phone Logs DEQ/KJ re: Treatment System location 03/12/07

13 01 11 11 01 03 RD/RA Task D & E Phone Logs DEQ/BN re: Restrictive covenant & Building location 03/12/07

13 01 11 11 01 03 RD/RA Task D & E Phone Logs 7/2/08

13 01 11 11 01 03 RD/RA Task D & E Phone Logs DEQ/KJ re: Shut down D&E 09/04/08

13 01 11 11 01 03 RD/RA Task D & E Phone Logs D&E Summary Report for 1/21/08 through 1/6/09 1/21/08

13 01 11 11 01 03 RD/RA Task D & E Phone Logs 11/18/10

13 01 11 11 01 03 RD/RA Task D & E Phone Logs Operation Directive #25 - Task D/E Items Posted to Website 08/16/13 DEQ/Reynolds

13 01 11 11 01 03 RD/RA Task D & E Phone Logs Operation Directive #25 - Task D/E Items Posted to Website 09/27/13 DEQ/Reynolds

13 01 11 11 01 03 RD/RA Task D & E Phone Logs Operation Directive #25 - Task D/E Items Posted to Website 08/30/13 DEQ/Reynolds

13 01 11 11 01 04 RD/RA Task D & E References

13 01 11 11 01 04 RD/RA Task D & E References Bioventing Principles & Practices Manual 09/01/95 EPA

13 01 11 11 01 04 RD/RA Task D & E References 06/20/05

13 01 11 11 01 04 RD/RA Task D & E References Vapor Phase Isotherm Design Parameters

Site-Wide Information

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Operation Directive #25 - Task D/E Items Posted to Website

Site-Wide Information

Site-Wide Information

DEQ SRS to Tom Reid/DEQ Water Quality Discharge Permit Bureau Chief re: Storm drain permit requirements

Site-Wide Information

Site-Wide Information

DEQ to Mark Hall re: What limits to use to determine whether the product removed is a hazardous waste

Site-Wide Information

Site-Wide Information

DEQ to Sandy Wulf/City Project Coordinator re: DEQ working on press release & wants to be sure all information needed is included

Site-Wide Information

11/14-11/17/08

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ/DEQ re: Oil in GAC units & BN has sent packet to ATSDR requesting they evaluate the vapor data – wants ATSDR to state there is no immediate health threat from vapor intrusion

Site-Wide Information

Site-Wide Information

Site-Wide Information

Phone Log – DEQ/Reynolds & K/J/Norris re: Tasks D/E & L discussion

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Intrinsic biodegradation of diesel fuel in an interval of separate phase hydrocarbons

Elsevier Science Ltd

Site-Wide Information

Page 259: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 259 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 04 RD/RA Task D & E References 05/01/04 Parsons

13 01 11 11 01 04 RD/RA Task D & E References Introduction to Containment Buildings Training Module 09/01/05 EPA

13 01 11 11 01 04 RD/RA Task D & E References 01/01/06 Oregon DEQ

13 01 11 11 01 04 RD/RA Task D & E References Bio Lynceus, LLC letter to DEQ re: Possible use of Products 05/02/06

13 01 11 11 01 04 RD/RA Task D & E References LPH Recovery Potential Test Report 07/10/07 EIC

13 01 11 11 01 05 RD/RA

13 01 11 11 01 05 RD/RA Screen 3 Model results –bioventing emissions 02/01/07

13 01 11 11 01 05 RD/RA 04/10/07 KJ/Norris

13 01 11 11 01 05 RD/RA 9/8/08 KJ/Norris

13 01 11 11 01 05 RD/RA 11/24/08 DEQ/ Reynolds

13 01 11 11 01 05 RD/RA 12/01/08 CDM

13 01 11 11 01 05 RD/RA 06/19/09 DEQ/ Reynolds

13 01 11 11 01 05 RD/RA 07/24/09 KJ/Norris

13 01 11 11 01 05 RD/RA 9/8/09 CDM

13 01 11 11 01 05 RD/RA 10/28/09 KJ

13 01 11 11 01 05 RD/RA 11/05/09 CDM

13 01 11 11 01 05 RD/RA 11/06/09 DEQ/ Reynolds

13 01 11 11 01 05 RD/RA 11/30/09 DEQ

13 01 11 11 01 05 RD/RA 11/30/09

Site-Wide Information

Final Procedures for Conducting Bioventing Pilot Tests and Long-Term Monitoring of Bioventing Systems

Site-Wide Information

Site-Wide Information

Guidance for Managing Hazardous Substance Air Discharges from Remedial Systems

Site-Wide Information

Site-Wide Information

Site-Wide Information

Task D&E Bioventing Emissions Management

Site-Wide Information

Task D&E Bioventing Emissions Management

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J/Norris letter to DEQ/Reynolds re: Task D&E – Phase I Remedial Action 2007 – Bioventing System Off-Gas Management

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J/Norris letter to DEQ/Reynolds re: Task D&E – Phase I Remedial Action – Summary of Bioventing Off-Gas monitoring data

Site-Wide Information

Task D&E Bioventing Emissions Management

DEQ/Reynolds email to CDM/G Siple re: K/J’s SCREEN Modeling for BN

Site-Wide Information

Task D&E Bioventing Emissions Management

CDM internal emails fw to DEQ/Reynolds re: Land use in Livingston

Site-Wide Information

Task D&E Bioventing Emissions Management

DEQ/Reynolds letter to K/J/Norris re: Task D&E – Phase I Remedial Action – Bioventing Emissions Management

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J/Norris letter to DEQ/Reynolds re: K/J response to DEQ 6/19/09 letter - : Task D&E – Phase I Remedial Action – Bioventing Emissions Management

Site-Wide Information

Task D&E Bioventing Emissions Management

CDM Draft Tech Memo to DEQ/Reynolds re: Assessment of Air Injection/Extraction Bioventing System for Task D&E Remediation System – BN Shop Complex

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J Letter report to DEQ/Reynolds re: Bioventing Extraction/Injection Design Study Work Plan

Site-Wide Information

Task D&E Bioventing Emissions Management

CDM Memorandum to DEQ/Reynolds re: CDM comments on the Bioventing Extraction/Injection Design Study Work Plan

Site-Wide Information

Task D&E Bioventing Emissions Management

DEQ/Reynolds letter to BN/Smith re: DEQ comments on the Bioventing Extraction/Injection Design Study Work Plan

Site-Wide Information

Task D&E Bioventing Emissions Management

DEQ comments on the Bioventing Extraction/Injection Design Study Work Plan

Site-Wide Information

Task D&E Bioventing Emissions Management

Revised Bioventing Extraction/Injection Design Study Work Plan

Page 260: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 260 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 05 RD/RA 12/16/09 CDM

13 01 11 11 01 05 RD/RA 12/22/09 DEQ/ Reynolds

13 01 11 11 01 05 RD/RA 02/10/11 KJ/ Guglomo

13 01 11 11 01 05 CD RD/RA 6/8/10 KJ

13 01 11 11 01 05 RD/RA 06/25/10 CDM

13 01 11 11 01 05 RD/RA 07/20/10 DEQ/ Reynolds

13 01 11 11 01 05 RD/RA 07/27/10 KJ/Adlersley

13 01 11 11 01 05 RD/RA CDM Oversight Report 8/9-8/20/10 CDM

13 01 11 11 01 05 RD/RA 09/02/10 KJ

13 01 11 11 01 05 RD/RA 09/03/10 CDM/ Hills

13 01 11 11 01 05 RD/RA 09/07/10 KJ

13 01 11 11 01 05 RD/RA 9/16-9/17/10

13 01 11 11 01 05 RD/RA 09/17/10

13 01 11 11 01 05 RD/RA 9/23/10 KJ/Adlersley

13 01 11 11 01 05 RD/RA 09/24/10 KJ/Adlersley

13 01 11 11 01 05 RD/RA 09/28/10 KJ/Adlersley

13 01 11 11 01 05 RD/RA 10/7/10 KJ/Adlersley

Site-Wide Information

Task D&E Bioventing Emissions Management

CDM Memorandum to DEQ/Reynolds re: CDM comments on the Revised Bioventing Extraction/Injection Design Study Work Plan

Site-Wide Information

Task D&E Bioventing Emissions Management

DEQ/Reynolds letter to BN/Smith re: DEQ comments on the Revised Bioventing Extraction/Injection Design Study Work Plan

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J/Guglomo letter to DEQ Reynolds re: Response to DEQ letter dated 12/22/09 (1/18/10)Bioventing/Injection Piping Heat Trace Schematic

Site-Wide Information

Task D&E Bioventing Emissions Management

Bioventing Extraction/Injection Design Study Completion & Radius of Influence (ROI) Analysis Report

Site-Wide Information

Task D&E Bioventing Emissions Management

CDM Memorandum to DEQ/Reynolds re: CDM Draft comments on the Bioventing Extraction/Injection Design Study Completion & Radius of Influence (ROI) Analysis Report

Site-Wide Information

Task D&E Bioventing Emissions Management

DEQ/Reynolds letter to BN/Smith re: DEQ comments & clarifications on the Bioventing Extraction/Injection Design Study Completion & Radius of Influence (ROI) Analysis Report

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J/Aldersley email to DEQ/Reynolds re: Notification of Task D&E field activities

Site-Wide Information

Task D&E Bioventing Emissions Management

Site-Wide Information

Task D&E Bioventing Emissions Management

Bioventing Extraction/Injection System Interim Operation & Monitoring Plan

Site-Wide Information

Task D&E Bioventing Emissions Management

CDM/Hills email FW to K/J/Norris & BN/Smith re: DEQ comments on the Bioventing Extraction/Injection System Interim Operation & Monitoring Plan (Interim Monitoring Plan)

Site-Wide Information

Task D&E Bioventing Emissions Management

Revised Bioventing Extraction/Injection System Interim Operation & Monitoring Plan

Site-Wide Information

Task D&E Bioventing Emissions Management

Olytech/Chambers, K/J/Aldersley & DEQ Reynolds emails re: Biovent readings for GWTP & BNSF Yard monitoring 9/14/& 9/15/10

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J/Aldersley & DEQ/Reynolds emails re: Biovent Extraction/Injection Interim Measurements

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J/Aldersley email to DEQ/Reynolds re: Attachment – REV – Biovent Interim Monitoring Tables

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J/Aldersley email to DEQ/Reynolds re: Recoverability Testing

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J/Aldersley email to DEQ/Reynolds re: Attachment – REV-Biovent Interim Monitoring Table 1

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J/Aldersley email to DEQ/Reynolds re: Attachment – REV-Biovent Interim Monitoring Table 1

Page 261: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 261 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 05 RD/RA 10/14/10 KJ/Adlersley

13 01 11 11 01 05 RD/RA 10/27/10 KJ/Adlersley

13 01 11 11 01 05 RD/RA 10/29/10 KJ/Adlersley

13 01 11 11 01 05 CD RD/RA 11/03/10 KJ

13 01 11 11 01 05 RD/RA 11/5/10 KJ/Adlersley

13 01 11 11 01 05 RD/RA 11/05/10 KJ/Norris

13 01 11 11 01 05 RD/RA 11/5/10 KJ

13 01 11 11 01 05 RD/RA 11/11/10 KJ/Adlersley

13 01 11 11 01 05 RD/RA 11/22/10 DEQ/ Reynolds

13 01 11 11 01 05 RD/RA 11/22/10 DEQ/ Reynolds

13 01 11 11 01 05 RD/RA 12/01/10

13 01 11 11 01 05 RD/RA 12/10/10 KJ/Adlersley

13 01 11 11 01 05 RD/RA K/J/Norris email to DEQ/Reynolds re: Bioventing status 12/19/10 KJ/Norris

13 01 11 11 01 05 RD/RA 12/2410 KJ/Norris

13 01 11 11 01 05 RD/RA CDM Oversight Report CDM

13 01 11 11 01 05 RD/RA 1/6/11 KJ/Norris

13 01 11 11 01 05 RD/RA 1/8/11 KJ/Norris

13 01 11 11 01 05 RD/RA 1/14/11 KJ/Adlersley

13 01 11 11 01 05 RD/RA 1/14/11 DEQ/ Reynolds

13 01 11 11 01 05 CD RD/RA 1/31/11 KJ

13 01 11 11 01 05 CD RD/RA 01/31/11 KJ

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J/Aldersley email to DEQ/Reynolds re: Attachment – REV-Biovent measurements

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J/Aldersley email to DEQ/Reynolds re: Attachment – REV-Biovent Interim Monitoring Table 1

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J/Aldersley email to DEQ/Reynolds re: Attachment – REV-Biovent Interim Monitoring Table 1

Site-Wide Information

Task D&E Bioventing Emissions Management

Bioventing Extraction/Injection Design Study Comprehensive Report

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J/Aldersley email to DEQ/Reynolds re: Attachment – REV-Biovent Interim Monitoring Table 1

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J/Norris letter to DEQ/Reynolds re: Proposed Vapor Monitoring Point (VMP) Locations to Supplement Existing Biovent Monitoring Well Network

Site-Wide Information

Task D&E Bioventing Emissions Management

Proposed Vapor Monitoring Point (VMP) Locations to Supplement Existing Biovent Monitoring Well Network Report (K/J,

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J/Aldersley email to DEQ/Reynolds re: Attachment – REV-Biovent Interim Monitoring Table 1

Site-Wide Information

Task D&E Bioventing Emissions Management

DEQ/Reynolds email to K/J/Norris re: Attachment – Recommended new Vapor monitoring point locations

Site-Wide Information

Task D&E Bioventing Emissions Management

DEQ/Reynolds email to K/J/Norris & Aldersley re: Respirometry Testing Recommended for Well Network

Site-Wide Information

Task D&E Bioventing Emissions Management

W Chambers, J Fisher, J Norris & Reynolds emails re: Biovent system monitoring

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J/Aldersley email to DEQ/Reynolds re: Attachment – Biovent Interim Monitoring Tables 1

Site-Wide Information

Task D&E Bioventing Emissions Management

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J/Norris email to DEQ/Reynolds re: Attachment – Biovent Interim Monitoring Tables 1

Site-Wide Information

Task D&E Bioventing Emissions Management

12/13-12/17/10

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J/Norris email to DEQ/Reynolds re: Attachment – REV-Biovent Interim Monitoring Tables

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J/Norris email to DEQ/Reynolds re: Attachment – REV-Biovent Interim Monitoring Tables

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J/Aldersley email to DEQ/Reynolds re: Attachment – REV-Biovent Interim Monitoring Tables

Site-Wide Information

Task D&E Bioventing Emissions Management

DEQ/Reynolds letter to BN/Smith re: November 3/2010 Bioventing Extraction/Injection Design Study Comprehensive Report, Task D/E Remedial Action

Site-Wide Information

Task D&E Bioventing Emissions Management

Bioventing Extraction/Injection System Monitoring Plan/Long Term

Site-Wide Information

Task D&E Bioventing Emissions Management

Revised Bioventing Extraction/Injection Design Study Comprehensive Report, Task D/E Remedial Action

Page 262: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 262 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 05 RD/RA 1/31/11

13 01 11 11 01 05 RD/RA 03/28/11 KJ/Adlersley

13 01 11 11 01 05 RD/RA 04/01/11 KJ/Adlersley

13 01 11 11 01 05 RD/RA 04/06/11 KJ/Adlersley

13 01 11 11 01 05 RD/RA CDM Oversite Report CDM

13 01 11 11 01 05 RD/RA 05/11/11 KJ/Adlersley

13 01 11 11 01 05 RD/RA 07/12/11 DEQ/ Reynolds

13 01 11 11 01 05 RD/RA 07/22/11 CDM

13 01 11 11 01 05 RD/RA 07/28/11 KJ

13 01 11 11 01 05 RD/RA 07/28/11 KJ

13 01 11 11 01 05 RD/RA 07/28/11 KJ

13 01 11 11 01 05 RD/RA 07/28/11 KJ

13 01 11 11 01 05 RD/RA 08/16/11 CDM/Hills

13 01 11 11 01 05 RD/RA 08/17/11 DEQ/ Reynolds

13 01 11 11 01 05 RD/RA 08/24/11 CDM/Cohn

13 01 11 11 01 05 RD/RA 09/09/11 DEQ/ Reynolds

13 01 11 11 01 05 RD/RA 02/24/12 CDM Smith

Site-Wide Information

Task D&E Bioventing Emissions Management

DEQ/Reynolds & K/J/Norris emails re: Revised Bioventing Extraction/Injection Design Study Comprehensive Report can be viewed on liveshare

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J Aldersley email to DEQ/Reynolds re: Notification of Task D/E Bi-annual Biovent Monitoring

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J Aldersley email to DEQ/Reynolds re: Task D/E biovent monitoring cancelled for next week and moved to April 11

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J Aldersley email to DEQ/Reynolds re: Notification of field activities

Site-Wide Information

Task D&E Bioventing Emissions Management

4/11-4/17/2011

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J Aldersley email to DEQ/Reynolds re: Task D/E items posted to web - April 2011 semiannual respirometry testing data

Site-Wide Information

Task D&E Bioventing Emissions Management

DEQ/Reynolds letter to BNSF/Smith re: DEQ comments to Revised Bioventing Extraction/Injection Design Study Comprehensive Report, Task D/E Remedial Action and Bioventing Extraction/Injection System Monitoring Plan/Long Term

Site-Wide Information

Task D&E Bioventing Emissions Management

CDM Memorandum to DEQ/Reynolds re: Bioventing totals for Task D/E Remediation System

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J redline strike-out cover letter to DEQ/Reynolds re: Revised Bioventing Extraction/Injection System Monitoring Plan (Long –Term Monitoring Plan)

Site-Wide Information

Task D&E Bioventing Emissions Management

K/J cover letter to DEQ/Reynolds re: Revised Bioventing Extraction/Injection System Monitoring Plan (Long –Term Monitoring Plan)

Site-Wide Information

Task D&E Bioventing Emissions Management

Revised Bioventing Extraction/Injection System Monitoring Plan (Long –Term Monitoring Plan)

Site-Wide Information

Task D&E Bioventing Emissions Management

2nd Revised Bioventing Extraction/Injection Design Study Comprehensive Report

Site-Wide Information

Task D&E Bioventing Emissions Management

CDM/Hills email to DEQ/Reynolds re: Recommended wells for respirometry testing

Site-Wide Information

Task D&E Bioventing Emissions Management

DEQ/Reynolds email to KJ re: Attachment - Figure showing the wells to be used for August 2011 respirometry testing

Site-Wide Information

Task D&E Bioventing Emissions Management

CDM/Cohn email to DEQ/Reynolds re: Respirometry testing update

Site-Wide Information

Task D&E Bioventing Emissions Management

DEQ/Reynolds letter to BN/Smith re: DEQ approval of the Revised Bioventing Extraction/Injection System Monitoring Plan (Long –Term Monitoring Plan) & the 2nd Revised Bioventing Extraction/Injection Design Study Comprehensive Report

Site-Wide Information

Task D&E Bioventing Emissions Management

CDM Smith letter to DEQ/Reynolds re: Recommended wells for respirometry testing

Page 263: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 263 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 01 05 RD/RA 06/14/12 CDM Smith

13 01 11 11 01 05 RD/RA 06/22/12 KJ/Adlersley

13 01 11 11 01 05 RD/RA 03/07/13 KJ/Norris

13 01 11 11 01 05 RD/RA 03/15/13 CDM Smith

13 01 11 11 01 05 RD/RA 03/22/13

13 01 11 11 01 05 RD/RA 04/16/13

13 01 11 11 01 05 RD/RA 06/11/13 CDM Smith

13 01 11 11 01 05 RD/RA 06/17/13 DEQ/ Reynolds

13 01 11 11 01 05 RD/RA 07/09/13 KJ/Fernandes

13 01 11 11 02 RD/RA Task D & E Design/Build

13 01 11 11 02 RD/RA Task D & E Design/Build 2/26/07 KJ

13 01 11 11 02 RD/RA Task D & E Design/Build Task D/E – Phase 1 Remedial Action 2007 30% Design Report 03/07/11 KJ

13 01 11 11 02 RD/RA Task D & E Design/Build 4/07 KJ

13 01 11 11 02 RD/RA Task D & E Design/Build 7/3/07 KJ

13 01 11 11 02 RD/RA Task D & E Design/Build BN

13 01 11 11 02 RD/RA Task D & E Design/Build K/J to DEQ: Subchapter 9 Notification 10/01/07 KJ

13 01 11 11 02 RD/RA Task D & E Design/Build 2008 Construction Schedule 05/08/08

13 01 11 11 02 RD/RA Task D & E Design/Build Tasks D & E Phase I - RA 2008 80% Design Report 05/08/08 KJ

13 01 11 11 02 RD/RA Task D & E Design/Build 05/08/08 KJ

13 01 11 11 02 RD/RA Task D & E Design/Build 05/08/08 KJ

13 01 11 11 02 RD/RA Task D & E Design/Build 06/08/08 KJ

Site-Wide Information

Task D&E Bioventing Emissions Management

CDM Smith letter to DEQ/Reynolds re: Recommended wells for respirometry testing

Site-Wide Information

Task D&E Bioventing Emissions Management

KJ/Alersley email to DEQ/Reynolds re: Respiromety testing schedule

Site-Wide Information

Task D&E Bioventing Emissions Management

KJ/Norris letter to DEQ/Reynolds re: Task D/E - Phase II Bioventing Respirometry Testing FrequencyBNLV Shop Complex Facility 1396021*16

Site-Wide Information

Task D&E Bioventing Emissions Management

CDM Smith memo to DEQ/Reynolds re: CDM comments on Task D/E - Phase II Bioventing Respirometry testing freqency

Site-Wide Information

Task D&E Bioventing Emissions Management

DEQ/Reynolds & KJ/Aldersley emails re: Proposed monitoring points for March 2013 respirometry testing

Site-Wide Information

Task D&E Bioventing Emissions Management

DEQ/Reynolds & KJ/Aldersley emails re: March 2013 respirometry testing data posted to the website & semi-annual testing

Site-Wide Information

Task D&E Bioventing Emissions Management

CDM memo to DEQ/Reynolds re: Draft calculation of Biodegradation via Bioventing for the Task D/E Remediation System

Site-Wide Information

Task D&E Bioventing Emissions Management

DEQ/Reynolds letter to BNSF/Smith re: 3/7/13 Task D/E Phase II Bioventing Respirometry Testing Frequency

Site-Wide Information

Task D&E Bioventing Emissions Management

KJ/Fernandes & DEQ/Reynolds emails re: Bioventing pressure data

Site-Wide Information

Site-Wide Information

Railyard Wastewater Treatment Plan Sump Confirmation Sampling & Related Information

Site-Wide Information

Site-Wide Information

Task D&E Phase I RA 07 30% Design Report Construction Issue

Site-Wide Information

K/J letter to DEQ re: Request for DEQ UST Regulations Variance for LNAPL Piping within 30 inch pipe

Site-Wide Information

BN Livingston 2007 Construction Oversight Daily Oversight Reports & Photo Logs

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Tasks D & E Phase I - RA 2008 80% Design Package Bid Walk Issue

Site-Wide Information

BN Task D & E – Phase I RA 2008 80 % Shop Complex As Built Drawings

Site-Wide Information

BN Task D & E – Phase I RA 2008 Shop Complex As Built Drawings Bid Issue

Page 264: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 264 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 02 RD/RA Task D & E Design/Build Well placement photos 06/08/08

13 01 11 11 02 RD/RA Task D & E Design/Build CDM Oversight Summary 6/4-6/12/08 CDM

13 01 11 11 02 RD/RA Task D & E Design/Build 06/13/08 CDM

13 01 11 11 02 RD/RA Task D & E Design/Build 6/16/08 DEQ

13 01 11 11 02 RD/RA Task D & E Design/Build K/J Response to DEQ Comments on Task D/E 6/23/08 KJ

13 01 11 11 02 RD/RA Task D & E Design/Build Tasks D & E Phase I - RA 2008 Bid Issue 06/08/11 KJ

13 01 11 11 02 RD/RA Task D & E Design/Build Tasks D & E Phase I - RA 2008 Bid Issue 7/10/08 KJ

13 01 11 11 02 RD/RA Task D & E Design/Build CDM D&E Oversight Summary 6/4/-6/12/08 7/17/08 CDM

13 01 11 11 02 RD/RA Task D & E Design/Build Bid Package 8/08 KJ

13 01 11 11 02 RD/RA Task D & E Design/Build Task D&E – Phase I Remedial Action 2008 BN Shop Complex 5/18/09

13 01 11 11 02 RD/RA Task D & E Design/Build 5/27/09 KJ/Norris

13 01 11 11 02 RD/RA Task D & E Design/Build Schedule 9/08/09

13 01 11 11 02 RD/RA Task D & E Design/Build 9/3-9/8/2009

13 01 11 11 02 RD/RA Task D & E Design/Build 09/08/09 KJ/Adlersley

13 01 11 11 02 RD/RA Task D & E Design/Build 01/25/10 KJ/Adlersley

13 01 11 11 02 RD/RA Task D & E Design/Build

13 01 11 11 02 RD/RA Task D & E Design/Build 07/13/10 KJ/Adlersley

13 01 11 11 03 RD/RA Task D & E Operations

13 01 11 11 03 RD/RA Task D & E Operations 08/14/07 KJ

13 01 11 11 03 RD/RA Task D & E Operations undated

13 01 11 11 03 RD/RA Task D & E Operations D Phase I RA 2007 AS Built Drawings – Construction Issue 10/2007 KJ

13 01 11 11 03 RD/RA Task D & E Operations DEQ/KJ emails re: Recommended MUW Wells for start-up 8/22/07

13 01 11 11 03 RD/RA Task D & E Operations Operations and Maintenance Manual 10/22/07 KJ

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM Memo to DEQ re: CDM comments on 2008 80% Design Report

Site-Wide Information

DEQ letter to D Smith/BN re: DEQ comments on Tasks D & E Phase I - RA 2008 80% Design Package

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

K/J/Norris Transmittal to DEQ/Reynolds re: Record Drawings for Phase 1 Expansion

Site-Wide Information

Site-Wide Information

DEQ/Reynolds & K/J/Aldersley emails re: Conference call access codes

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Task D/E items posted to website

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Task D/E items posted to website

Site-Wide Information DEQ/Reynolds & K/J Norris emails re: Task F & D?E sampling

7/6-7/9/10 7/9/10

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: Task D/E items posted to website

Site-Wide Information

Site-Wide Information

K/J email to DEQ re: Phase I RA – Working Draft Startup Plan Table of Contents

Site-Wide Information LNAPL Recovery/Bioventing System Startup – Data Collection

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 265: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 265 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 03 RD/RA Task D & E Operations Revised Draft O&M Manual 11/30/07

13 01 11 11 03 CD RD/RA Task D & E Operations Initial O&M Plan (Initial Version) 12/19/07 CDM

13 01 11 11 03 RD/RA Task D & E Operations 1/4/08 DEQ

13 01 11 11 03 RD/RA Task D & E Operations 1/4/08 DEQ

13 01 11 11 03 RD/RA Task D & E Operations 1/23/08 KJ

13 01 11 11 03 RD/RA Task D & E Operations 01/25/08 DEQ legal

13 01 11 11 03 RD/RA Task D & E Operations 01/31/08 CDM

13 01 11 11 03 RD/RA Task D & E Operations 2/08-3/08

13 01 11 11 03 RD/RA Task D & E Operations Respiration Testing Oversight Report 05/01/08 CDM

13 01 11 11 03 RD/RA Task D & E Operations DEQ email to K/J & CDM re: 6/08 Respiration testing data 5/21/08 DEQ

13 01 11 11 03 RD/RA Task D & E Operations Task D/E Operations Flow Chart

13 01 11 11 03 RD/RA Task D & E Operations Task D/E Project Manual 8/2008 KJ

13 01 11 11 03 RD/RA Task D & E Operations Task D/E Phase I Remedial Action 08/01/08 KJ

13 01 11 11 03 RD/RA Task D & E Operations K/J letter to DEQ re: Task D/E Bioventing emissions 9/8/08 KJ

13 01 11 11 03 RD/RA Task D & E Operations CDM memo to DEQ re: Bench scale skimmer test procedures 11/06/08 CDM

13 01 11 11 03 RD/RA Task D & E Operations CDM email to DEQ re: Bench scale skimmer test results 11/12/08 CDM

13 01 11 11 03 RD/RA Task D & E Operations Revision 1 O&M Plan – Draft 11/21/08 CDM

13 01 11 11 03 RD/RA Task D & E Operations Revision 1 O&M Plan – Final 11/26/08 CDM

13 01 11 11 03 RD/RA Task D & E Operations DEQ transmittal letters re: CDM O&M Plan Revision 1 12/02/08 DEQ

13 01 11 11 03 RD/RA Task D & E Operations 12/5/08

13 01 11 11 03 RD/RA Task D & E Operations 12/01/08 KJ

13 01 11 11 03 RD/RA Task D & E Operations CDM memo to DEQ re: Skimmer pumps 12/19/08 CDM

13 01 11 11 03 RD/RA Task D & E Operations CDM email to DEQ re: Skimmer pumps 12/19/08 CDM

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ letter to RTI re: Initial O&M Plan for Task D&E – Petroleum Hydrocarbon Recovery & Remediation

Site-Wide Information

DEQ letter to K/J re: Initial O&M Plan & GW split sample results

Site-Wide Information

K/J Tech Memo to DEQ re: Startup of Task D&E Remediation System

Site-Wide Information

DEQ Legal Memo to K/J re: Startup of Task D&E Remediation System

Site-Wide Information

CDM Tech Memo to DEQ re: Continued Startup of Task D&E Remediation System

Site-Wide Information

BN Shop Complex GW & LNAPL Recovery; LNAPL Pump start & stop history

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Phase 1 Remediation System O&M Maintenance Manual Revision 1 – Redline Strikeout

Site-Wide Information

Phase I Remediation System O&M Maintenance Manual – Revision 1

Site-Wide Information

Site-Wide Information

Page 266: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 266 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 03 RD/RA Task D & E Operations KJ email re: KJ response to skimmer pump memo 12/22/08 KJ

13 01 11 11 03 RD/RA Task D & E Operations CDM email to DEQ re: Skimmer pump testing memo 01/23/09 CDM

13 01 11 11 03 RD/RA Task D & E Operations System Summary Report 1/20/09-2/7/09 CDM

13 01 11 11 03 RD/RA Task D & E Operations System Summary Report CDM

13 01 11 11 03 CD RD/RA Task D & E Operations 2008 Task D & E Annual Report 5/09 KJ

13 01 11 11 03 RD/RA Task D & E Operations Utilidor sump photos 06/18/09

13 01 11 11 03 RD/RA Task D & E Operations CDM Site Oversight Report CDM

13 01 11 11 03 CD RD/RA Task D & E Operations 2009 Task D & E Annual Report 06/10/11 KJ

13 01 11 11 03 RD/RA Task D & E Operations CDM Site Oversight Report 6/15-6/17/10 CDM

13 01 11 11 03 RD/RA Task D & E Operations 07/12/10 CDM

13 01 11 11 03 RD/RA Task D & E Operations 09/10/10 DEQ/ Reynolds

13 01 11 11 03 RD/RA Task D & E Operations 10/13/10 CDM/ Osterman

13 01 11 11 03 RD/RA Task D & E Operations 10/13/10 CDM/ Osterman

13 01 11 11 03 RD/RA Task D & E Operations 10/20/10 DEQ/ Reynolds

13 01 11 11 03 RD/RA Task D & E Operations 10/25/10 KJ/Norris

13 01 11 11 03 RD/RA Task D & E Operations 11/05/10 DEQ/ Reynolds

13 01 11 11 03 RD/RA Task D & E Operations 11/05/10 KJ/Norris

13 01 11 11 03 RD/RA Task D & E Operations 11/10/10 DEQ/ Reynolds

13 01 11 11 03 CD RD/RA Task D & E Operations 12/9/10 KJ

13 01 11 11 03 RD/RA Task D & E Operations Redline pages for Revised 2009 Task D/E Annual Report 12/10/10 KJ

13 01 11 11 03 RD/RA Task D & E Operations 12/24/10 KJ

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

1/20/09-2/14/09

Site-Wide Information

Site-Wide Information

Site-Wide Information

12/15-12/19/09

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM/Memorandum to DEQ/Reynolds re: CDM Draft comments on the 2009 Task D/E Annual Report

Site-Wide Information

DEQ/Reynolds letter to BN/Smith re: Draft comments on the 2009 Task D/E Annual Report

Site-Wide Information

CDM/Osterman email to DEQ/Reynolds re: 10/12/10 liquid levels

Site-Wide Information

CDM/Osterman memorandum to DEQ/Reynolds re: Fluctuation of recovery well pumping levels with increasing water treatment plant pre-filter pressure

Site-Wide Information

DEQ/Reynolds letter to BN/Smith re: Fluctuation of recovery well pumping levels with increasing water treatment plant pre-filter pressure

Site-Wide Information

K/J/Norris letter to DEQ/Reynolds re: K/J response to DEQ comments to 2009 Task D/E Annual Report – K/J has questions

Site-Wide Information

DEQ/Reynolds email to K/J/Norris re: Task D?E Annual Report deadline

Site-Wide Information

K/J/Norris email to DEQ/Reynolds re: Attachment – Pre-filter by pass sampling log

Site-Wide Information

DEQ/Reynolds letter to BN/Smith re: DEQ response to BN - 2009 Task D&E Annual Report – Requests for Information/Clarification

Site-Wide Information

Revised 2009 Task D&E Annual Report Revision No. 1 Volumes I-II

Site-Wide Information

Site-Wide Information

Revised 2009 Task D&E Annual Report Revision No. 1 Volumes I-II

Page 267: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 267 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 03 RD/RA Task D & E Operations 04/11/11 CDM

13 01 11 11 03 CD RD/RA Task D & E Operations 2010 Task D&E Annual Report 08/30/11 KJ

13 01 11 11 03 RD/RA Task D & E Operations 03/21/12

13 01 11 11 03 RD/RA Task D & E Operations KJ/Aldersley emails to DEQ/Reynolds re: Water level data 07/13/12 KJ/Adlersley

13 01 11 11 03 RD/RA Task D & E Operations 08/02/12

13 01 11 11 03 RD/RA Task D & E Operations 01/07/13

13 01 11 11 03 RD/RA Task D & E Operations 02/20/13 CDM

13 01 11 11 03 RD/RA Task D & E Operations 07/15/13 DEQ/ Reynolds

13 01 11 11 03 RD/RA Task D & E Operations Livingston Well Rehabilitation Data Olympus WO# A1642 02/04/14 Olympus/ Stine

13 01 11 11 03 CD RD/RA Task D & E Operations 2012/2013 Combined Task D/E Annual Report 06/24/14 KJ/Fernandes

13 01 11 11 03 01 RD/RA Operational Directives

13 01 11 11 03 01 RD/RA Operational Directives Directive 1 02/27/08

13 01 11 11 03 01 RD/RA Operational Directives Directive 2 03/04/08

13 01 11 11 03 01 RD/RA Operational Directives Directive 4 3/18/08

13 01 11 11 03 01 RD/RA Operational Directives Email re: Directive 3 attached 03/24/08

13 01 11 11 03 01 RD/RA Operational Directives Directive 5 03/26/08

13 01 11 11 03 01 RD/RA Operational Directives Directive 6 04/01/08

13 01 11 11 03 01 RD/RA Operational Directives Directive 7 04/15/08

13 01 11 11 03 01 RD/RA Operational Directives Directive 8 04/22/08

13 01 11 11 03 01 RD/RA Operational Directives Directive 9 4/29/08

13 01 11 11 03 01 RD/RA Operational Directives Directive 10 5/13/08

Site-Wide Information

CDM letter to DEQ/Reynolds re: Draft comments on the Revised 2009 Task D/E Annual report (Revision no. 1) Dated December 2010

Site-Wide Information

Site-Wide Information

DEQ/Reynolds email to KJ, BN & Stegman re: Attachment - DEQ's draft criteria for determining when to rest/cease recovery in Task D&E wells

Site-Wide Information

Site-Wide Information

DEQ/Reynolds & KJ/Fernandes emails re: Task D&E Annual Report - Conference call agenda

Site-Wide Information

KJ/Norris & DEQ/Reynolds emails re: Bioventing operations - Potential soil gas displacement concern

Site-Wide Information

CDM memo to DEQ/Reynolds re: Draft comments on the 2011 Task D/E Annual Report

Site-Wide Information

DEQ/Reynolds letter to BNSF/Smith re: Revision No. 1 of 2009, 2010 and 2011 Task D/E Annual Reports dated December 2010, August 2011, and December 2012 (Reports)

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 268: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 268 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 03 01 RD/RA Operational Directives Directive 11 5/22/08

13 01 11 11 03 01 RD/RA Operational Directives Directive 12 05/23/08

13 01 11 11 03 01 RD/RA Operational Directives Directive 14 06/02/08

13 01 11 11 03 01 RD/RA Operational Directives Directive 15 06/06/08

13 01 11 11 03 01 RD/RA Operational Directives Directive 16 6/19/08

13 01 11 11 03 01 RD/RA Operational Directives System Operations Update 06/20/08

13 01 11 11 03 01 RD/RA Operational Directives LNAPL Data 6/23/08 CDM

13 01 11 11 03 01 RD/RA Operational Directives D&E LNAPL Data 07/02/08

13 01 11 11 03 01 RD/RA Operational Directives Daily Report 7/8-7/9/08 CDM

13 01 11 11 03 01 RD/RA Operational Directives Directive 17 07/08/08

13 01 11 11 03 01 RD/RA Operational Directives Directive 18 7/10/08

13 01 11 11 03 01 RD/RA Operational Directives CDM email to KJ re: Explaining Directive 18 07/10/08 CDM

13 01 11 11 03 01 RD/RA Operational Directives LNAPL Recovery Data 7/13/08 CDM

13 01 11 11 03 01 RD/RA Operational Directives LNAPL Recovery Data 7/22/08 CDM

13 01 11 11 03 01 RD/RA Operational Directives LNAPL Data 07/26/08 CDM

13 01 11 11 03 01 RD/RA Operational Directives Soil & Gas Data 07/01/08 KJ

13 01 11 11 03 01 RD/RA Operational Directives Directive 19 07/25/08

13 01 11 11 03 01 RD/RA Operational Directives Directive 20 07/25/08

13 01 11 11 03 01 RD/RA Operational Directives Historic Yellowstone Water Levels 07/29/08

13 01 11 11 03 01 RD/RA Operational Directives DEQ email to KJ re: Directive 21 08/01/08 DEQ

13 01 11 11 03 01 RD/RA Operational Directives MUW Profile 08/05/08

13 01 11 11 03 01 RD/RA Operational Directives LNAPL Data for Meeting 8/7/08

13 01 11 11 03 01 RD/RA Operational Directives K/J email to DEQ re: Directive No 23 09/30/08 KJ

13 01 11 11 03 01 RD/RA Operational Directives K/J letter to DEQ re: Directive No 23 9/30/08 KJ

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 269: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 269 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 03 01 RD/RA Operational Directives CDM email to DEQ re: K/J Directive No 23 10/03/08 CDM

13 01 11 11 03 01 RD/RA Operational Directives DEQ letter to K/J re: Response to Directive No 23 request 10/10/08 DEQ

13 01 11 11 03 01 RD/RA Operational Directives Directive 24 10/15/08

13 01 11 11 03 01 RD/RA Operational Directives Directive 24 – conformed 10/23/08

13 01 11 11 03 01 RD/RA Operational Directives CDM email to DEQ re: Directive 24 exception 10/28/08 CDM

13 01 11 11 03 01 RD/RA Operational Directives DEQ letter to K/J re: DEQ response to Directive 24 exception 10/30/08 DEQ

13 01 11 11 03 01 RD/RA Operational Directives Directive 26 11/11/08

13 01 11 11 03 01 RD/RA Operational Directives Directive 27 12/3/08

13 01 11 11 03 01 RD/RA Operational Directives Directive 28 12/30/08

13 01 11 11 03 01 RD/RA Operational Directives Directive 30 1/24/09

13 01 11 11 03 01 RD/RA Operational Directives Directive 31 2/2/09

13 01 11 11 03 01 RD/RA Operational Directives Directive 32 2/10/09

13 01 11 11 03 01 RD/RA Operational Directives Directive 33 2/19/09

13 01 11 11 03 01 RD/RA Operational Directives Directive 34 03/10/09

13 01 11 11 03 01 RD/RA Operational Directives Directive 35 03/24/09

13 01 11 11 03 01 RD/RA Operational Directives Directive 36 5/5/09

13 01 11 11 03 01 RD/RA Operational Directives Directive 37 5/19/09

13 01 11 11 03 01 RD/RA Operational Directives Directive 38 6/9/09

13 01 11 11 03 01 RD/RA Operational Directives Directive 39 6/24/09

13 01 11 11 03 01 RD/RA Operational Directives Directive 40 6/30/09

13 01 11 11 03 01 RD/RA Operational Directives Directive 41 7/24/09

13 01 11 11 03 01 RD/RA Operational Directives Directive 42 8/19/09

13 01 11 11 03 01 RD/RA Operational Directives Directive 43 11/19/09

13 01 11 11 03 01 RD/RA Operational Directives Directive 45 1/26/10

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 270: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 270 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 03 01 RD/RA Operational Directives Directive 46 2/8/10

13 01 11 11 03 01 RD/RA Operational Directives Directive 47 3/17/10

13 01 11 11 03 01 RD/RA Operational Directives Directive 48 03/25/10

13 01 11 11 03 01 RD/RA Operational Directives Directive 48 03/30/10

13 01 11 11 03 01 RD/RA Operational Directives Directive 49 04/27/10

13 01 11 11 03 01 RD/RA Operational Directives Directive 50 06/10/10

13 01 11 11 03 01 RD/RA Operational Directives Directive 52 8/23/10

13 01 11 11 03 01 RD/RA Operational Directives Directive 53 9/27/10

13 01 11 11 03 01 RD/RA Operational Directives Directive 54 9/27/10

13 01 11 11 03 01 RD/RA Operational Directives Directive 55 01/28/11

13 01 11 11 03 01 RD/RA Operational Directives Directive 57 1/28/11

13 01 11 11 03 01 RD/RA Operational Directives 1/28-2/1/11

13 01 11 11 03 01 RD/RA Operational Directives Directive 58 04/04/11

13 01 11 11 03 01 RD/RA Operational Directives Directive 59 04/20/11

13 01 11 11 03 01 RD/RA Operational Directives Directive 60 06/08/11

13 01 11 11 03 01 RD/RA Operational Directives Directive 62 10/18/11

13 01 11 11 03 01 RD/RA Operational Directives Directive 63 03/05/12

13 01 11 11 03 01 RD/RA Operational Directives 05/22/12 KJ/Norris

13 01 11 11 03 01 RD/RA Operational Directives 03/11/13

13 01 11 11 03 01 RD/RA Operational Directives Directive 65 05/13/13

13 01 11 11 03 02 RD/RA MPDES Permit

13 01 11 11 03 02 RD/RA MPDES Permit 10/08/07 KJ

13 01 11 11 03 02 RD/RA MPDES Permit DEQ Letter to BNSF re: Modification of Authorization Letter 12/13/07 DEQ

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ/Reynolds & K/J/Norris emails re: Work Order Directive #57

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: Operation Directive #63 implementation schedule

Site-Wide Information

DEQ/Reynolds & KJ/Norris emails re: Operational Directive 65 - moving LNAPL recovery componets to new zones

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ Letter to B Lovelace re: Request for Amendment of Petroleum Cleanup General Permit

Site-Wide Information

Page 271: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 271 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 03 02 RD/RA MPDES Permit

13 01 11 11 03 02 RD/RA MPDES Permit 2/27/08 J May

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – January 2008 02/27/08

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – February 2008 03/24/08

13 01 11 11 03 02 RD/RA MPDES Permit 4/4/08 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – March 2008 4/25/08 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – April 2008 05/22/08 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – May 2008 6/17/08 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – July 2008 8/27/08 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – August 2008 09/17/08 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – November 2008 12/24/08 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – January 2009 02/23/09 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – February 2009 3/25/09 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – March 2009 04/21/09 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – April 2009 04/26/09 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – May 2009 06/15/09 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – June 2009 7/15/09 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – January 2009 2/23/09 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – July 2009 8/18/09 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – August 2009 9/22/09 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – September 2009 10/22/09 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – October 2009 11/20/09 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – November 2009 12/21/09 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – December 2009 01/22/10 KJ

Site-Wide Information

Emails re: Submittal of Initial Sampling Results per Petroleum Cleanup General Permit MTG790013

Site-Wide Information

J May Letter to BNSF re: Certification of Discharge Monitoring Results for Petroleum Cleanup General Permit

Site-Wide Information

Site-Wide Information

Site-Wide Information

BNSF Letter to J May re: Certification of Discharge Monitoring Reports for Petroleum Cleanup General Permit

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 272: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 272 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – January 2010 02/23/10 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report –February 2010 03/23/10 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – March 2010 04/23/10 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – May 2010 06/11/10 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – June 2010 07/22/10 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – July 2010 08/25/10 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – August 2010 09/23/10 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – September 2010 10/22/10 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – October 2010 11/22/10 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – November 2010 12/17/10 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – December 2010 01/25/11 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – January 2011 01/23/11 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – February 2011 03/25/11 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – March 2011 04/22/11 KJ

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – April 2011 05/23/11 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – May 2011 06/23/11 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – June 2011 07/25/11 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – August 2011 09/16/11 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – September 2011 10/26/11 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – October 2011 11/18/11 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – November 2011 12/21/11 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – December 2011 01/23/12 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – January 2012 02/23/12 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – February 2012 03/21/12 BN

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 273: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 273 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – March 2012 04/25/12 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – April 2012 05/21/12 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – May 2012 06/26/12 BN

13 01 11 11 03 02 RD/RA MPDES Permit 07/18/12 BN/Smith

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – June 2012 07/26/12 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – July 2012 08/24/12 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – August 2012 09/26/12 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – September 2012 10/24/12 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – October 2012 11/19/12 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – November 2012 12/24/12 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – December 2012 01/24/13 BN

13 01 11 11 03 02 RD/RA MPDES Permit 02/06/13 DEQ/Skubinna

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – January 2013 02/21/13 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – February 2013 03/25/13 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – March 2013 04/22/13 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – May 2013 06/21/13 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report – June 2013 07/25/13 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report - July 2013 08/27/13 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report - August 2013 09/24/13 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report - September 2013 10/18/13 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report - October 2013 11/21/13 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report - November 2013 12/17/13 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report - December 2013 01/23/14 BN

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

BN/Smith letter to DEQ WPB/Tucker re: BNSF change of address

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ Permitting & Compliance/Skubinna letter to BN/Smith re: Confirmation letter for Petroleum Cleanup General Permit

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 274: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 274 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report - January 2014 02/21/14 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report - February 2014 03/21/14 BN

13 01 11 11 03 02 RD/RA MPDES Permit Discharge Monitoring Report - March 2014 04/21/14 BN

13 01 11 11 03 03 RD/RA CDM Reporting

13 01 11 11 03 03 RD/RA CDM Reporting Technical Memo – Bioventing Assessment 09/15/08

13 01 11 11 03 03 RD/RA CDM Reporting Technical Memo – LNAPL Recovery System 09/17/08

13 01 11 11 03 03 RD/RA CDM Reporting LNAPL Report 9/30/08

13 01 11 11 03 03 RD/RA CDM Reporting CDM email to DEQ re: Field update report 10/29/08 CDM

13 01 11 11 03 03 RD/RA CDM Reporting CDM email re: LNAPL volumes report 11/04/08 CDM

13 01 11 11 03 03 RD/RA CDM Reporting CDM email re: MUW profile report 11/5/08 CDM

13 01 11 11 03 03 RD/RA CDM Reporting System Summary Report 11/23/08

13 01 11 11 03 03 RD/RA CDM Reporting System Summary Report 11/30/08

13 01 11 11 03 03 RD/RA CDM Reporting System Summary Report 12/7/08

13 01 11 11 03 03 RD/RA CDM Reporting System Summary Report CDM

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 01/11/09

13 01 11 11 03 03 RD/RA CDM Reporting Photo showing GAC vessel implosion 01/15/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 01/17/09

13 01 11 11 03 03 RD/RA CDM Reporting 01/20/09 CDM

13 01 11 11 03 03 RD/RA CDM Reporting Discharge Monitoring Report (KJ, 01/23/09 KJ

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 01/24/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 01/31/09

13 01 11 11 03 03 RD/RA CDM Reporting System Summary Report 1/20/08-2/7/09 CDM

13 01 11 11 03 03 RD/RA CDM Reporting System Summary Report CDM

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 03/07/09

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

1/21/08 – 1/6/09

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM/Stordahl Tech Memo to DEQ/Reynolds re: Final BN LNAPL Skimmer Pump Testing

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

1/20/08-2/14/09

Site-Wide Information

Page 275: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 275 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 03/14/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 03/21/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 03/28/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 04/04/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 04/11/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 4/18/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 04/25/09

13 01 11 11 03 03 RD/RA CDM Reporting 05/01/09 CDM

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 5/2/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 5/9/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 05/15/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 05/22/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 05/29/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 06/05/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 6/12/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 06/19/09

13 01 11 11 03 03 RD/RA CDM Reporting 6/22-6/24/09 CDM

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 6/26/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 07/03/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 07/10/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 07/17/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 07/24/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 07/31/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 08/07/09

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM/Stordahl Tech Memo to DEQ/Reynolds re: LNAPL Pipe Freezing in Main Line Recovery System

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM/Osterman Site Oversight Report – Oversight of Task D&E In-Situ Respiration Testing

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 276: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 276 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 8/14/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 08/21/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 08/28/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 09/04/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 09/11/09

13 01 11 11 03 03 RD/RA CDM Reporting CDM Site Oversight Report – In-Situ respiration testing 9/14-9/16/09 CDM

13 01 11 11 03 03 RD/RA CDM Reporting 9/23/09 CDM

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 09/23/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 09/25/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 10/02/09

13 01 11 11 03 03 RD/RA CDM Reporting CDM Site Oversight Report – Well redevelopment 10/6/09 CDM

13 01 11 11 03 03 RD/RA CDM Reporting 10/13/09 CDM

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 10/30/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 11/6/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 11/13/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 11/20/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 11/27/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 12/04/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 12/11/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 12/18/09

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 12/25/09

13 01 11 11 03 03 RD/RA CDM Reporting 12/28/09 KJ

13 01 11 11 03 03 RD/RA CDM Reporting Heat trace amperage test 12/29/09

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM Site Oversight Report – Removal of oil from 1,000 gallon recovery tank

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM Technical Memorandum to DEQ re: Total liquid SCADA volume adjustment

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

K/J Technical memorandum re: Heat Tracing and freeze protection issues

Site-Wide Information

Page 277: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 277 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 03 03 RD/RA CDM Reporting 12/31/09 CDM

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 01/01/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 01/08/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 01/22/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/29/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 02/05/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 02/12/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 2/19/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Report for Vapor Wells 02/26/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 03/12/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 03/19/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 3/26/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 04/02/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 04/09/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 04/16/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 04/30/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 05/07/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 5/14/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 05/21/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 05/28/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 06/04/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Report for Vapor Wells 06/18/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2- 6/25/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2 - 7/2/10

Site-Wide Information

CDM technical memorandum re: December 2009 NLAPL pipe freezing event

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 278: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 278 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2 -7/9/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2- 7/16/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2- 7/23/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2- 7/30/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2-8/6/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2/-8/20/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2-8/27/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2- 9/3/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2- 9/10/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2-9/17/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2-9/24/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2-10/1/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2-10/8/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2-10/15/10

13 01 11 11 03 03 RD/RA CDM Reporting Final Third Quarter Task D/E Operations Summary 10/21/10 CDM

13 01 11 11 03 03 RD/RA CDM Reporting Draft Fourth Quarter Task D/E Operations Summary 10/21/10 CDM

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/- 10/22/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/2-11/5/10

13 01 11 11 03 03 RD/RA CDM Reporting Task D&E Remediation System Summary Report 11/12/10

13 01 11 11 03 03 RD/RA CDM Reporting Task D&E Remediation System Summary Report 11/19/10

13 01 11 11 03 03 RD/RA CDM Reporting Task D&E Remediation System Summary Report 11/2610

13 01 11 11 03 03 RD/RA CDM Reporting Task D&E Remediation System Summary Report 12/10/10

13 01 11 11 03 03 RD/RA CDM Reporting Task D&E Remediation System Summary Report 12/17/10

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/1-1/711

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 279: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 279 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/1-1/14/11

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/1-1/21/11

13 01 11 11 03 03 RD/RA CDM Reporting Draft First Quarter 2010 Task D/E Operations Summary 12/23/10

13 01 11 11 03 03 RD/RA CDM Reporting Draft Second Quarter 2010 Task D/E Operations Summary 12/23/10

13 01 11 11 03 03 RD/RA CDM Reporting 01/24/11

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/1-1/28/11

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/1- 2/4/11

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/1- 2/11/11

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/1- 2/25/11

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 1/1-2/25/11

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 03/04/11

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 03/11/11

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 03/18/11

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 03/25/11

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 04/01/11

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 04/08/11

13 01 11 11 03 03 RD/RA CDM Reporting 04/14/11 DEQ/ Reynolds

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 04/15/11

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 04/22/11

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 04/29/11

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 05/06/11

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 05/13/11

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 05/27/11

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

K/J/Norris email to DEQ/Reynolds re: Attachment – LNAPL Recovery Summary tables – short & long term

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ/Reynolds email to CDM/Stordahl & Hills re: DEQ approval of 3rd & 4th qtr Task D/E Operations Summary & 1st & 2nd qtr 2010 Task D/E Operations Summary Reports

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 280: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 280 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 06/10/11

13 01 11 11 03 03 RD/RA CDM Reporting 06/15/11 CDM

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 06/17/11

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 06/24/11

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 07/08/11

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 07/22/11

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 08/20/11

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 09/03/11

13 01 11 11 03 03 RD/RA CDM Reporting Remediation System Summary Report 09/17/11

13 01 11 11 03 03 RD/RA CDM Reporting 3rd Quarter 2010 Task D/E Operations Summary Report 09/30/11 CDM

13 01 11 11 03 03 RD/RA CDM Reporting 4th Quarter 2010 Task D/E Operations Summary Report 09/30/11 CDM

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 1/1-1/14/12

13 01 11 11 03 03 RD/RA CDM Reporting 01/10/12 CDM/Dudley

13 01 11 11 03 03 RD/RA CDM Reporting Draft 2nd Quarter 2011 Task D/E Operations Summary Report 01/27/12 CDM Smith

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 1/15-1/28/12

13 01 11 11 03 03 RD/RA CDM Reporting Final 1st Quarter 2011 Task D/E Operations Summary Report 01/20/12 CDM Smith

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 1/29-2/11/12 CDM Smith

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 2/28-3/10/12 CDM Smith

13 01 11 11 03 03 RD/RA CDM Reporting Oversight Report 3/7-3/9/12 CDM Smith

Site-Wide Information

Site-Wide Information

CDM/Choquette email to DEQ/Reynolds re: Attachment - Dashboard Report

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

10/16-10/29/11

Site-Wide Information

10/30-11/19/11

Site-Wide Information

11/20-12/10/11

Site-Wide Information

12/11-12/31/11

Site-Wide Information

Site-Wide Information

CDM/Dudley email to DEQ/Reynolds re: Attachments: Dashboard reports

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 281: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 281 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 3/11-3/24/12 CDM Smith

13 01 11 11 03 03 RD/RA CDM Reporting 04/06/12

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 3/25-4/7/12 CDM Smith

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 4/8-4/21/12 CDM Smith

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 4/22-5/5/12 CDM Smith

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 5/6-5/19/12 CDM Smith

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report CDM Smith

13 01 11 11 03 03 RD/RA CDM Reporting 04/17/12 CDM Smith

13 01 11 11 03 03 RD/RA CDM Reporting 04/17/12 CDM Smith

13 01 11 11 03 03 RD/RA CDM Reporting 04/17/12 CDM Smith

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 5/20-6/2/12 BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 6/3-6/16/12 BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 6/17-6/30/12 BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 7/1-7/14/12 BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 7/15-7/28/12 BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 7/31-8/31/12 BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 9/2-9/15/12 BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 9/16-9/29/12 BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 9/30-10/7/12 BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 11/25-12/8/12 BN

Site-Wide Information

Site-Wide Information

CDM Smith/Simpson Memorandum to DEQ/Reynolds re: Removal of recovery equipment from the 3/5 track & continued LNAPL monitoring for 3/5 track recovery wells

CDM Smith/ Simpson

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM Smith/Hills cover letter to DEQ/Reynolds re: Draft 3rd & 4th Quarter 2011 Task D&E Operations Summary

Site-Wide Information Draft 3rd Quarter 2011 Task D&E Operations Summary Report

Site-Wide Information Draft 4th Quarter 2011 Task D&E Operations Summary Report

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

10/14/-10/27/12

Site-Wide Information

Page 282: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 282 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 12/9-12/22/12 BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 1/1-1/5/13 BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 1/6-1/19/13 BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 1/20-2/2/13 BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 2/3-2/16/13 BN

13 01 11 11 03 03 RD/RA CDM Reporting 02/15/13 CDM Smith/ Hills

13 01 11 11 03 03 RD/RA CDM Reporting 02/15/13 CDM Smith

13 01 11 11 03 03 RD/RA CDM Reporting 03/07/13

13 01 11 11 03 03 RD/RA CDM Reporting CDM Smith

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 2/17-3/2/13 BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 3/3/-3/16/13 BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 3/17-3/30/13 BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 3/31-4/13/13 BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 4/14-4/27/13 BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 4/28-5/11/13 BN

13 01 11 11 03 03 RD/RA CDM Reporting Draft Third Qtr 2012 Task D/E Operations Summary 05/17/13 CDM Smith

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard report 5/12-5/25/13 BN

13 01 11 11 03 03 RD/RA CDM Reporting Draft Fourth Qtr 2012 Task D/E Operations Summary 06/06/13 CDM Smith

13 01 11 11 03 03 RD/RA CDM Reporting Draft First Qtr 2013 Task D/E Operations Summary 07/31/13 CDM Smith

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period 5/26 -6/8/2013

Site-Wide Information

Site-Wide Information

12/23-12/29/12

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM Smiht/Hills cover letter to DEQ/Reynolds re: Draft 2nd Quarter 2012 Task D/E Operations Summary Report

Site-Wide Information

Draft 2nd Quarter 2012 Task D/E Operations Summary Report

Site-Wide Information

CDM Smiht/Simpson cover letter to DEQ/Reynolds re: Final 2nd Quarter 2012 Task D/E Operations Summary Report

CDM Smith/ Simpson

Site-Wide Information

Final 2nd Quarter 2012 Task D/E Operations Summary Report

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 283: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 283 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period 8/4 -8/17/2013 BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period 1/1 - 1/4/2014 BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period 1/5 -1/18/2014 BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Report for the reporting period BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Reprot for the reporting period BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Reprot for the reporting period BN

13 01 11 11 03 03 RD/RA CDM Reporting Dashboard Reprot for the reporting period BN

Site-Wide Information

6/23 - 7/6/2013

Site-Wide Information

7/7 - 7/20/2013

Site-Wide Information

7/21 - 8/3/2013

Site-Wide Information

Site-Wide Information

8/18 - 8/31/2013

Site-Wide Information

9/1 - 9/14/2013

Site-Wide Information

9/15 - 9/28/2013

Site-Wide Information

9/29 - 10/12/2013

Site-Wide Information

10/13 - 10/26/2013

Site-Wide Information

10/27 - 11/9/2013

Site-Wide Information

11/10 - 11/23/2013

Site-Wide Information

11/24 - 12/7/2013

Site-Wide Information

12/8 -12/21/2013

Site-Wide Information

12/22 - 12/28/2013

Site-Wide Information

Site-Wide Information

Site-Wide Information 1/19 -2/1/2014

Site-Wide Information

2/2 - 2/15/2014

Site-Wide Information

2/16 - 3/1/2014

Site-Wide Information

3/2 - 3/15/2014

Site-Wide Information

9/28/2014 - 10/11/2014

Page 284: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 284 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 04 RD/RA Task D & E Phase II

13 01 11 11 04 01 RD/RA Evaluation & Planning

13 01 11 11 04 01 RD/RA Evaluation & Planning 01/04/11

13 01 11 11 04 01 RD/RA Evaluation & Planning 07/14/11 DEQ Legal

13 01 11 11 04 01 RD/RA Evaluation & Planning 08/15/11 DEQ internal

13 01 11 11 04 01 RD/RA Evaluation & Planning 08/25/11 KJ/Norris

13 01 11 11 04 01 RD/RA Evaluation & Planning 11/18/11 KJ/Norris

13 01 11 11 04 01 RD/RA Evaluation & Planning 12/08/11

13 01 11 11 04 01 RD/RA Evaluation & Planning 12/12/11

13 01 11 11 04 01 RD/RA Evaluation & Planning 12/14/11 DEQ/ Reynolds

13 01 11 11 04 01 RD/RA Evaluation & Planning 12/15/11

13 01 11 11 04 01 RD/RA Evaluation & Planning 12/21/11 KJ/Norris

13 01 11 11 04 01 RD/RA Evaluation & Planning 01/04/12

13 01 11 11 04 01 RD/RA Evaluation & Planning 01/05/12 CDM/ Smith

13 01 11 11 04 01 RD/RA Evaluation & Planning 01/06/12 DEQ/ Reynolds

13 01 11 11 04 01 RD/RA Evaluation & Planning 01/17/12

13 01 11 11 04 01 RD/RA Evaluation & Planning 01/19/12

13 01 11 11 04 01 RD/RA Evaluation & Planning 01/24/12

13 01 11 11 04 01 RD/RA Evaluation & Planning 02/02/12 KJ/Norris

13 01 11 11 04 01 RD/RA Evaluation & Planning 02/08/12 KJ/Norris

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ & BN conference call draft agenda re: Phase II Conceptual Design & Implementation

Site-Wide Information

DEQ Legal/Haque-Hausrath email to BN/Kaitala & BKBH/Berry re: Attachment – Information request

Site-Wide Information

DEQ legal/Haque-Hausrath & Reynolds emails re: DEQ info request August 4th deadline extended until 8/26/11

Site-Wide Information

KJ/Norris email to DEQ legal/Haque-Hausrath re: Attachment - Task D&E cost spreadsheets

Site-Wide Information

KJ/Norris email to DEQReynolds re: Attachment - Bioventing assesses

Site-Wide Information

DEQ/Reynolds, KJ, & CDM emails re: Conference call scheduling

Site-Wide Information

Draft Agenda for 12/12/11 conference call - Draft conceptual plan

Site-Wide Information

DEQ/Reynolds email to BN/Stegman re: Bioventing vs. Free Product recovery

Site-Wide Information

DEQ/Reynolds & BN/Stegman emails re: Bioventing vs. Free Product recovery

Site-Wide Information

KJ/Norris letter to DEQ/Reynolds re: Task D/E- Phase II Conceptual Design & Implementation considerations

Site-Wide Information

Phase II Conceptual Design & Implementation Conference call meeting minutes

Site-Wide Information

Final Draft Phase II Remedial Action Work Plan - Petroleum Hydrocarbon Recovery & Remediation

Site-Wide Information

DEQ/Reynolds email to BN & KJ re: Attachments - in 3 different emails of the Final Draft Phase II Remedial Action Work Plan

Site-Wide Information

KJ/Fernandes, DEQ/Reynolds & CDM/Stordahl emails re: KJ CAD figure request

Site-Wide Information

CDMsmith/Stordahl email to KJ/Norris re: Attachment - Average LNAPL spreadsheet

CDMsmith/ Stordahl

Site-Wide Information

CDMsmith/Stordahl email to DEQ/Reynolds re: Attachment Appendix G

CDMsmith/ Stordahl

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: Due date for written comments on Final Draft Phase II Remedial Action Work Plan

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: Attachment - KJ written comments on Final Draft Phase II Remedial Action Work Plan

Page 285: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 285 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 04 01 RD/RA Evaluation & Planning 02/08/12 KJ/Norris

13 01 11 11 04 01 RD/RA Evaluation & Planning 02/24/12 DEQ/ Reynolds

13 01 11 11 04 01 RM 13 RD/RA Evaluation & Planning 02/24/12 CDM Smith

13 01 11 11 04 01 RD/RA Evaluation & Planning 03/05/12 BN/Smith

13 01 11 11 04 01 RD/RA Evaluation & Planning 03/13/12 KJ/Fisher

13 01 11 11 04 02 RD/RA Phase II Design/Build

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 03/20/12

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 03/21/12 KJ

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 03/22/12

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build Site Oversight Report 3/27-5/10/12 CDM Smith

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 03/29/12 KJ

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 03/29/12 KJ/Norris

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 03/29/12 KJ/Norris

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/03/12

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/03/12

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/04/12 CDM/Peters

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/04/12 CDM/Stordahl

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/05/12 CDM/Peters

Site-Wide Information

KJ/Norris letter to DEQ/Reynolds re: KJ written comments on Final Draft Phase II Remedial Action Work Plan

Site-Wide Information

DEQ/Reynolds email to BN/Smith re: Attachment - Final RAWP & DEQ's response to BN's comments

Site-Wide Information

Final Phase II Remedial Action Work Plan for Task D&E - Petroleum Hydrocarbon Recovery & Remediation

Site-Wide Information

BN/Smith email to DEQ/Reynolds re: BN agrees to perform necessary work as described in the RAWP

Site-Wide Information

KJ/Fisher email to DEQ/Reynolds et al re: Wants to schedule a meeting between KJ & City to discuss permitting requirements

Site-Wide Information

Site-Wide Information

KJ/Fernandes & DEQ/Reynolds emails re: Livingston drilling activities

Site-Wide Information

Task D/E Phase II Remedial Action Preliminary Design Report

Site-Wide Information

CDM Smith/Stordahl email to KJ/Norris & DEQ/Reynolds re: Attachment - CDM preliminary comments on Phase II Design Report

CDM Smith/ Stordahl

Site-Wide Information

Site-Wide Information

KJ/Fisher & Fernandes emails re: Attachment - Meeting agenda for 3/30/12 meeting.- permitting & design review

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: Attachment - KJ's letter pertaining to CDM's comments on the Phase II Remedial Action Preliminary Design Report 3/23/12 conference call

Site-Wide Information

KJ/Norris letter to DEQ/Reynolds re: CDM Smith Comments on Task D/E Phase II Remedial Action Preliminary Design Report

Site-Wide Information

KJ/Fernandes & DEQ/Reynolds emails re: Recovery operation protocol

Site-Wide Information

CDM Smith/Stordahl memorandum to DEQ/Reynolds re: Conference call meeting summary

CDM Smith/ Stordahl

Site-Wide Information

CDM Smith/Peters email to DEQ/Reynolds re: Livingston daily update for Wednesday 4/4/12

Site-Wide Information

CDM Smith/Stordahl memorandum to DEQ/Reynolds re: March 30, 2012 meeting summary - Phase II Preliminary Engineering Design Review for Task D/E Remediation System

Site-Wide Information

CDM Smith/Peters email to DEQ/Reynolds re: Livingston daily update for Wednesday 4/5/12

Page 286: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 286 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/06/12 KJ/ Fernandes

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/06/12

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/11/12

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/13/12

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/16/12 KJ/Norris

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/17/12

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/17/12 KJ/Norris

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/18/12 KJ/ Fernandes

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build Conference call meeting notes re: Task D/E Bi-weekly meeting 04/17/12

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/18/12 CDM Smith/ Peters

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build KJ/Fernandes email to DEQ/Reynolds re: Task D&E schedule 04/19/12 KJ/ Fernandes

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/19/12 CDM Smith/ Peters

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/25/12 CDM Smith/Coan

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/25/12 CDM Smith/Coan

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/26/12 CDM Smith/Coan

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/27/12 KJ/Fernandes

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/27/12 CDM Smith/ Hills

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/27/12 CDM Smith/ Coan

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 04/29/12 CDM Smith/ Peters

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 05/08/12 KJ

13 01 11 11 04 02 RD/RA Phase II Design/Build 05/09/12 KJ

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 05/10/12 Joe Faubion

Site-Wide Information

KJ/Fernandes email to DEQ/Reynolds re: Update on completed/scheduled activities

Site-Wide Information

CDM Smith/Peters emal to DEQ/Reynolds re: Modifications/Proposed modifications to well locations CDM Smith/ Peters

Site-Wide Information

CDM Smith/Peters email to DEQ/Reynolds re: Daily update for 4/11/12 CDM Smith/ Peters

Site-Wide Information

CDM Smith/Peters email to DEQ/Reynolds re: Daily update for 4/12/12 CDM Smith/ Peters

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: Task D/E Phase II Remediation bi-wekly meeting

Site-Wide Information

CDM Smith/Peters email to DEQ/Reynolds re: Multi-use wells observation summary - east end of plume CDM Smith/ Peters

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: Task D/E Phase II Remediation bi-wekly meeting

Site-Wide Information

KJ/Fernandes email to DEQ/Reynolds re: EX-50 Depth to water - 23.81, depth to product - 23.71

Site-Wide Information

Site-Wide Information

CDM Smith/Peters email to DEQ/Reynolds re: Daily update for 4/18/12

Site-Wide Information

Site-Wide Information

CDM Smith/Peters email to DEQ/Reynolds re: Daily update for 4/19/12

Site-Wide Information

CDM Smith/Peters email to DEQ/Reynolds re: Daily update for 4/24/12

Site-Wide Information

CDM Smith/Coan email to DEQ/Reynolds re: Daily update for 4/25/12

Site-Wide Information

CDM Smith/Coan email to DEQ/Reynolds re: Daily update for 4/26/12

Site-Wide Information

KJ/Fernandes & DEQ/Reynolds emails re: Livingston Task D&E

Site-Wide Information

CDM Smith/Hills email to DEQ/Reynolds re: Conference call schedule

Site-Wide Information

CDM Smith/Coan email to DEQ/Reynolds re: Daily update for 4/27/12

Site-Wide Information

CDM Smith/Peters email to DEQ/Reynolds re: Daily update for Saturday & Sunday 4/28-4/29/12

Site-Wide Information

KJ Technical Memorandum to DEQ/Reynolds re: Task D&E - Phase II MUV Summary (South of East Park Street)

Site-Wide Information

Project Manual for Task D/E - Phase II Remedial Action 2012

Site-Wide Information

Joe Faubion email to DEQ/Reynolds re: Livingston Phase II drilling update

Page 287: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 287 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 05/11/12 KJ/Fernandes

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 05/16/12 KJ

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 05/17/12 CDM Smith

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 05/18/12 DEQ/ Reynolds

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 05/21/12 CDM Smith

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 05/23/12 DEQ/ Reynolds

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 05/11/12 KJ

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 05/30/12 KJ/Adlersley

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 06/01/12

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 06/21/12 KJ

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 06/27/12 KJ/Fernandes

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 07/03/12 KJ/Fernandes

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build DEQ/Reynolds & KJ/Fernandes emails re: Soil samples 07/03/12

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 07/03/12

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 07/09/12 KJ/Fernandes

13 01 11 11 04 02 RM 13 RD/RA Phase II Design/Build 07/06/12 KJ

13 01 11 11 04 02 RD/RA Phase II Design/Build Construction Issue section 02302 Earthwork 07/13/12 KJ

13 01 11 11 04 02 RD/RA Phase II Design/Build 07/13/12

13 01 11 11 04 02 RD/RA Phase II Design/Build 07/19/12

Site-Wide Information

KJ/Fernandes & DEQ/Reynolds emails re: Livingston Task D&E Phase II - 90% Design submittal

Site-Wide Information

KJ letter to DEQ/Reynolds re: KJ response to DEQ comments on the Task D/E Phase II Remedial Action Preliminary Design Report

Site-Wide Information

CDM Smith Memorandum to DEQ/Reynolds re: CDM Smith draft comments on the 5/8/12 tech memo Task/D/E -Phase II: MUW Summary (South of East Park Street)

Site-Wide Information

DEQ/Reynolds letter to BN/Smith re: KJ Tech Memo dated 5/8/12

Site-Wide Information

CDM Smith Memorandum to DEQ/Reynolds re: CDM Smith comments on the Task D/E Phase II Remedial Action 2012, 90% Design submittal

Site-Wide Information

DEQ/Reynolds letter to BN/Smith re: DEQ comments on the Project Manual

Site-Wide Information

Task D/E Phase II Remedial Action 2012 Drawings April-May 2012

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Task D/E items posted to web - Soil & GW analytical results from recent well construction activities

Site-Wide Information

DEQ/Reynolds & KJ/Fernandes emails re: Task F, Part 2 & D/E status

Site-Wide Information

KJ/letter to DEQ/Reynolds re: KJ responses to DEQ's review of Task D&E 90% Design Submittal - Phase II RA 2012

Site-Wide Information

KJ/Fernandes email to DEQ/Reynolds re: Task D/E Phase II Remedial Action project manual/drawings

Site-Wide Information

KJ/Fernandes email to DEQ/Reynolds re: Task D/E Phase II Remedial Action - 100% Design submittal posted to KJ ftp site

Site-Wide Information

Site-Wide Information

KJ/Fernandes & DEQ/Reynolds re: Task D/E Phase II Remedial Action - 100% Design - number of copies needed

Site-Wide Information

KJ/Fernandes email to DEQ/Reynolds re: Task D/E Phase II Remedial Action - 100% Design submittal posted to KJ ftp site - incorrect website - Access at LivShare site

Site-Wide Information

Construction Issue Documents - Project Manual for Task D&E Phase II Remedial Action 2012 & Construction Plans

Site-Wide Information

Site-Wide Information

CDMSmith/Stordahl & KJ/Fernandes emails re: Construction Issue Project Manual/drawings - electronic version

Site-Wide Information

KJ/Norris & DEQ/Reynolds emails re: Pre-Construction meeting

Page 288: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 288 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 04 02 RD/RA Phase II Design/Build 07/19/12 DEQ/ Reynolds

13 01 11 11 04 02 RD/RA Phase II Design/Build 07/20/12

13 01 11 11 04 02 RD/RA Phase II Design/Build 07/25/12 KJ/Fisher

13 01 11 11 04 02 RD/RA Phase II Design/Build 07/31/12

13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 08/02/12

13 01 11 11 04 02 RD/RA Phase II Design/Build 08/03/12 KJ

13 01 11 11 04 02 RD/RA Phase II Design/Build 08/08/12

13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 08/08/12

13 01 11 11 04 02 RD/RA Phase II Design/Build Bedding sand backfill analytical results 08/08/12 Test America

13 01 11 11 04 02 RD/RA Phase II Design/Build Phase II Construction Oversight Daily Logs 8/9/12 - CDM Smith

13 01 11 11 04 02 RD/RA Phase II Design/Build 08/22/12 CDM Smith/ Miller

13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 08/23/12

13 01 11 11 04 02 RD/RA Phase II Design/Build 08/23/12

13 01 11 11 04 02 RD/RA Phase II Design/Build 08/23/12 KJ

13 01 11 11 04 02 RD/RA Phase II Design/Build 08/29/12 CDM Smith/ Miller

13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 08/30/12

13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 09/06/12

13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 09/13/12

13 01 11 11 04 02 RD/RA Phase II Design/Build 09/19/12

13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 09/20/12

13 01 11 11 04 02 RD/RA Phase II Design/Build 09/27/12 KJ/Adlersley

Site-Wide Information

DEQ/Reynolds letter to BN/Smith re: DEQ approval of the July 2012 Project Manual for Task D&E Phase II RA with clarifications

Site-Wide Information

DEQ/Reynolds & KJ/Norris emails re: Pre-Construction meeting details

Site-Wide Information

KJ/Fisher email to DEQ/Reynolds re: Pre-Construction meeting agenda

Site-Wide Information

KJ/Fisher & DEQ/Reynolds emails re: Construction progress meetings - conference call date & time

Site-Wide Information

Site-Wide Information

KJ letter to DRQ/Reynolds re: KJ response to DEQ comments on review of contractor of proposed backfill import source

Site-Wide Information

DEQ/Reynolds & KJ/Fisher emails re: Backfill analytical results

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

CDM Smith/Miller email to DEQ/Reynolds re: Attachment - Daily log sheets for 8/15-8/21/12

Site-Wide Information

Site-Wide Information

DEQ/Reynolds & KJ/Aldersley emails re: Backfill analytical results

Site-Wide Information

KJ letter to Kinley Construction/Crisafulli re: Change Order No. 2

Site-Wide Information

CDM Smith email to DEQ/Reynolds re: Change Order # 3 Spec Section 02302 -Attachment - Plactic Pipe Installation Handbook

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ/Reynolds & KJ/Aldersley emails re: Task D&E Soil analytical results

Site-Wide Information

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Attachment - Task D&E backfill analytical results

Page 289: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 289 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 09/27/12

13 01 11 11 04 02 RD/RA Phase II Design/Build 10/09/12 KJ/Adlersley

13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 10/11/12

13 01 11 11 04 02 RD/RA Phase II Design/Build 10/17/12 KJ/Norris

13 01 11 11 04 02 RD/RA Phase II Design/Build 10/27/12 KJ/Adlersley

13 01 11 11 04 02 RD/RA Phase II Design/Build 10/27/12 KJ/Adlersley

13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 11/01/12

13 01 11 11 04 02 RD/RA Phase II Design/Build 11/01/12 KJ/Norris

13 01 11 11 04 02 RD/RA Phase II Design/Build 11/07/12 KJ/Norris

13 01 11 11 04 02 RD/RA Phase II Design/Build 11/08/12 KJ/Fisher

13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 11/08/12

13 01 11 11 04 02 RD/RA Phase II Design/Build 11/13/12 KJ/Norris

13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 11/15/12

13 01 11 11 04 02 RD/RA Phase II Design/Build 11/26/12 KJ

13 01 11 11 04 02 RD/RA Phase II Design/Build 11/26/12 KJ

13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 11/28/12

13 01 11 11 04 02 RD/RA Phase II Design/Build Weekly meeting agenda 12/06/12

13 01 11 11 04 02 RD/RA Phase II Design/Build 12/14/12 KJ/Norris

13 01 11 11 04 02 RD/RA Phase II Design/Build 01/03/12

13 01 11 11 04 02 RD/RA Phase II Design/Build LNAPL skimming test measurements 01/03/13

Site-Wide Information

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Attachment - Task D&E backfill analytical results

Site-Wide Information

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: Notice of Task D/E GWTP & Remediation system power failure

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Attachment - Task D&E soil analytical results - 2nd 5-point composite sample from excess soil from trenching

Site-Wide Information

KJ/Aldersley email to DEQ/Reynolds re: Attachment - Task D&E soil analytical results - 3rd & 4th 5-point composite sample from excess soil from trenching

Site-Wide Information

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: Notification of temporary shutdown of task D/E remediation system

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: FW email fron KJ/Fernandes re: Progress Report on the AMS at MUW-41

Site-Wide Information

KJ/Fisher email to DEQ/Reynolds re: Notification of temporary shutdown of task D/E remediation system

Site-Wide Information

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: Attachment - Task D/E Adaptive Management Strategy Initial Implementation Description & Update 11/12/12

Site-Wide Information

Site-Wide Information

Analytical Results for Excess Spoils - Task D/E Phase II Remedial Action

Site-Wide Information

Analytical Results for Backfill Source Material - Task D/E Phase II Remedial Action

Site-Wide Information

Site-Wide Information

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: Attachment - Excell spreadsheet summarizing the subject LNAPL skimmer operation information

Site-Wide Information

KJ/Norris, CDM/Stordahl & DEQ/Reynolds emails re: Attachment - Skimmer operation summary

Site-Wide Information

Page 290: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 290 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 11 04 02 RD/RA Phase II Design/Build 01/17/13

13 01 11 11 04 02 RD/RA Phase II Design/Build 03/08/13 KJ/Norris

13 01 11 11 04 02 RD/RA Phase II Design/Build 04/19/13 KJ/Norris

13 01 11 11 04 02 RD/RA Phase II Design/Build 04/23/13 KJ/Norris

13 01 11 12 RD/RA

13 01 11 12 RD/RA 11/10/10 KJ Aldersley

13 01 11 12 RD/RA 11/18/10 KJ

13 01 11 12 01 RD/RA

13 01 11 12 01 RD/RA 09/23/10 DEQ/ Reynolds

13 01 11 12 01 RD/RA 11/10/10 KJ/Adlersley

13 01 11 12 01 RD/RA 11/18/10 KJ/Adlersley

13 01 11 12 01 RD/RA 08/15/11 DEQ/ Reynolds

13 01 11 12 01 RD/RA 09/02/11 KJ/Norris

13 01 11 12 01 RD/RA 09/02/11 KJ

13 01 11 12 01 RD/RA 09/02/11 KJ/Adlersley

Site-Wide Information

KJ/Norris & DEQ/Reynolds emails re: In-well LNAPL/water separator system

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: Attachment - Excell spreadsheet summarizing the subject LNAPL skimmer operation information

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: Task D/E Adaptive Management Strategy Initiative - MUW-41

Site-Wide Information

KJ/Norris email to DEQ/Reynolds re: Task D/E Adaptive Management - Type II recovery approach - MPE on MUW-41

Site-Wide Information

Task M – Newly Identified Sources, Areas, Media, & COCs

Site-Wide Information

Task M – Newly Identified Sources, Areas, Media, & COCs

K/J/Aldersley email to DEQ/Reynolds re: Attachment Maps showing potential asbestos-containing debris locations

Site-Wide Information

Task M – Newly Identified Sources, Areas, Media, & COCs

Task M: Visual Reconnaissance/Debris Sampling Report & Proposed Remedial Action Work Plan

Site-Wide Information

Asbestos Outside the Cinder Pile

Site-Wide Information

Asbestos Outside the Cinder Pile

DEQ/Reynolds letter to BN/Smith re: Request for Supplemental Surface Soil Sampling

Site-Wide Information

Asbestos Outside the Cinder Pile

K/J/Aldersley email to DEQ/Reynolds re: Attachment - Maps showing potential asbestos-containing debris locations

Site-Wide Information

Asbestos Outside the Cinder Pile

K/J/Aldersley email to DEQ/Reynolds re: Livingston Deliverable – Task M – Visual Reconnaissance/Debris Sampling Report & Proposed Remedial Action Work Plan + CD to be delivered 11/19/10

Site-Wide Information

Asbestos Outside the Cinder Pile

DEQ/Reynolds letter to BN/Smith re: DEQ comments on Task M – Visual Reconnaissance/Debris Sampling Report & Proposed Remedial Action Work Plan

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ letter to DEQ/Reynolds re: Table showing KJ revisions to incorporate DEQ comments on Task M – Visual Reconnaissance/Debris Sampling Report & Proposed Remedial Action Work Plan

Site-Wide Information

Asbestos Outside the Cinder Pile

Redline/strike-out version of Revised Task M – Visual Reconnaissance/Debris Sampling Report & Proposed Remedial Action Work Plan

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Aldersley email to DEQ/Reynolds re: Livingston deliverables sent UPS 9/2/11- Revised Task M – Visual Reconnaissance/Debris Sampling Report & Proposed Remedial Action Work Plan

Page 291: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 291 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 12 01 CD RD/RA 09/02/11 KJ

13 01 11 12 01 RD/RA 09/12/11 KJ/Norris

13 01 11 12 01 RD/RA 09/13/11 KJ/Adlersley

13 01 11 12 01 CD RD/RA 09/12/11 KJ

13 01 11 12 01 RD/RA 09/15/11 DEQ/ Reynolds

13 01 11 12 01 RD/RA 10/03/11

13 01 11 12 01 RD/RA 10/21/11

13 01 11 12 01 RD/RA 11/04/11 DEQ/ Reynolds

13 01 11 12 01 RD/RA 11/28/11

13 01 11 12 01 CD RD/RA 01/02/12 KJ

13 01 11 12 01 RD/RA 03/06/12 DEQ/ Reynolds

13 01 11 12 01 RD/RA 03/09/12 KJ/Norris

13 01 11 12 01 RD/RA KJ/Aldersley & DEQ/Reynolds emails re: Task M 03/15/12

13 01 11 12 01 RD/RA 03/16/12 KJ/Aldersley

13 01 11 12 01 RD/RA 03/16/12 KJ

13 01 11 12 01 RD/RA 03/21/12 DEQ/ Reynolds

13 01 11 12 01 CD RD/RA 04/02/12 KJ

13 01 11 12 01 RD/RA 04/02/12 KJ

Site-Wide Information

Asbestos Outside the Cinder Pile

Revised Task M – Visual Reconnaissance/Debris Sampling Report & Proposed Remedial Action Work Plan

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Norris cover letter to DEQ/Reynolds re: 2nd Revised Task M – Visual Reconnaissance/Debris Sampling Report & Proposed Remedial Action Work Plan

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Aldersley email to DEQ/Reynolds re: Livingston deliverables sent UPS 9/13/11- 2nd Revised Task M – Visual Reconnaissance/Debris Sampling Report & Proposed Remedial Action Work Plan

Site-Wide Information

Asbestos Outside the Cinder Pile

2nd Revised Task M – Visual Reconnaissance/Debris Sampling Report & Proposed Remedial Action Work Plan

Site-Wide Information

Asbestos Outside the Cinder Pile

DEQ/Reynolds letter to BN/Smith re: DEQ approval of 2nd Revised Task M – Visual Reconnaissance/Debris Sampling Report & Proposed Remedial Action Work Plan

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Aldersley & DEQ/Reynolds emails re: Task M schedule - asbestos visual reconnaissance

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Aldersley & DEQ/Reynolds emails re: Task M - ACM investigation

Site-Wide Information

Asbestos Outside the Cinder Pile

DEQ/Reynolds letter to BN/Smith re: Request for cleanup of Asbestos-Containing Material

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Norris & DEQ/Reynolds emails re: Asbestos Remedial Action Plan due date extended

Site-Wide Information

Asbestos Outside the Cinder Pile

Task M Remedial Action Plan for Asbestos-Containing Materials

Site-Wide Information

Asbestos Outside the Cinder Pile

DEQ/Reynolds letter to BN/Smith re: DEQ comments on Task M Remedial Action Plan for Asbestos-Containing Materials

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Norris email to DEQ/Reynolds re: FW KJ/Aldersley email re: Task M comments questions

Site-Wide Information

Asbestos Outside the Cinder Pile

Site-Wide Information

Asbestos Outside the Cinder Pile

Livingston Deliverable : Task M Remedial Action Plan for Asbestos-Containing Materials (revision #1) sent out 3/16/12

Site-Wide Information

Asbestos Outside the Cinder Pile

Task M Remedial Action Plan for Asbestos-Containing Materials (Revision # 1)

Site-Wide Information

Asbestos Outside the Cinder Pile

DEQ/Reynolds letter to BN/Smith re: DEQ comments on Task M Remedial Action Plan for Asbestos-Containing Materials (Revision # 1)

Site-Wide Information

Asbestos Outside the Cinder Pile

Task M Remedial Action Plan for Asbestos-Containing Materials (Revision # 2)

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Norris cover letter for Task M Remedial Action Plan for Asbestos-Containing Materials (Revision # 2)

Page 292: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 292 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 12 01 RD/RA 04/11/12

13 01 11 12 01 RD/RA 04/11/12 DEQ/ Reynolds

13 01 11 12 01 RD/RA 05/01/12

13 01 11 12 01 RD/RA 05/03/12 KJ/Norris

13 01 11 12 01 RD/RA BN/Smith email to DEQ/Reynolds re: Task M debris piles 06/21/12 BN/Smith

13 01 11 12 01 RD/RA 06/30/12

13 01 11 12 01 RD/RA 07/02/12 DEQ/ Reynolds

13 01 11 12 01 RD/RA 07/12/12

13 01 11 12 01 RD/RA 07/19/12 KJ/Norris

13 01 11 12 01 RD/RA 08/29/12 RTI/Johnson

13 01 11 12 01 RD/RA 08/30/12 DEQ/ Reynolds

13 01 11 12 01 RD/RA 08/30/12 DEQ/ Reynolds

13 01 11 12 01 RD/RA 09/12/12 KJ/Aldersley

13 01 11 12 01 CD RD/RA 09/12/12 KJ/Aldersley

13 01 11 12 01 RD/RA 09/14/12 DEQ/ Reynolds

13 01 11 12 01 RD/RA 09/26/12 KJ/Adlersley

Site-Wide Information

Asbestos Outside the Cinder Pile

Draft Agenda for conference call meeting re: Tasks J & M Status & Path forward for Completion of Remedial Activities

Site-Wide Information

Asbestos Outside the Cinder Pile

DEQ/Reynolds letter to BN/Smith re: DEQ approval of Task M Remedial Action Plan for Asbestos-Containing Materials (Revision # 2)

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Aldersley & Nic Winslow emails re: Asbestos warning signs are posted

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Norris email to DEQ/Reynolds re: Attachment - Photos of ACM Asbestos warning signs

Site-Wide Information

Asbestos Outside the Cinder Pile

Site-Wide Information

Asbestos Outside the Cinder Pile

DEQ/Reynolds & KJ/Norris emails re: Tasks J&M pre-sampling

Site-Wide Information

Asbestos Outside the Cinder Pile

DEQ/Reynolds email to KJ/Norris re: Attachments- Task M table

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Aldersley & DEQ/Reynolds emails re: Evaluation of Remedial Alternatives table

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Norris transmittal to DEQ/Reynolds re: Tracking Form, Replacement Table Of Contents & Table 2 to the Task M Remedial Action Plan for Asbestos Containing Materials - revision 2

Site-Wide Information

Asbestos Outside the Cinder Pile

RTI/Johnson email to DEQ/Reynolds re: Attachment -RTI comments on the Task M Remedial Action Plan for Asbestos Containing Materials (Rev. 2)

Site-Wide Information

Asbestos Outside the Cinder Pile

DEQ/Reynolds letter to BN/Smith re: Public comments on the Task M Remedial Action Plan for Asbestos Containing Materials that require modifications

Site-Wide Information

Asbestos Outside the Cinder Pile

DEQ/Reynolds letter to RTI/Johnson re: Enclosure - DEQ Responsiveness Summary addressing RTI comments

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Aldersley email to DEQ/Reynolds re: Livingston Deliverables

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ transmittal to DEQ/Reynolds re: Tracking Form, Replacement Table Of Contents & Section 3 to the Task M Remedial Action Plan for Asbestos Containing Materials - revision 2 (dated 4/12) + CD's of Revisions 2, 3 & 4

Site-Wide Information

Asbestos Outside the Cinder Pile

DEQ/Reynolds letter to BN/Smith re: DEQ approval with modifications of the Task M Remedial Action Plan for Asbestos Containing Materials - revision 2 with July 2012 Table 2 & September 2012 replacement pages

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Aldersley email to DEQ/Reynolds re: Updated PDF of Task M Remedial Action Plan for Asbestos-Containing Materials sent out 9/26/12 by UPS

Page 293: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 293 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 12 01 CD RD/RA 09/26/12 KJ

13 01 11 12 01 CD RD/RA 10/23/12 KJ/Norris

13 01 11 12 01 RD/RA 11/05/12

13 01 11 12 01 RD/RA 11/05/12

13 01 11 12 01 RD/RA 11/05/12

13 01 11 12 01 RD/RA 11/14/12

13 01 11 12 01 RD/RA 11/14/12

13 01 11 12 01 RD/RA 11/15/12 MRL

13 01 11 12 01 RD/RA 11/19/12

13 01 11 12 01 RD/RA

13 01 11 12 01 RD/RA 11/30/12 KJ/Aldersley

13 01 11 12 01 RD/RA 12/03/12

13 01 11 12 01 RD/RA 11/30-12/3/12

13 01 11 12 01 RD/RA 12/06/12 DEQ/Reynolds

13 01 11 12 01 RD/RA 12/5-12/6-12

13 01 11 12 01 RD/RA 12/06/12

13 01 11 12 01 RD/RA 12/07/12 KJ

13 01 11 12 01 RD/RA 12/13/12 DEQ/Reynolds

13 01 11 12 01 RD/RA 01/01/13 KJ/Norris

13 01 11 12 01 RD/RA 01/03/12 DEQ/Reynolds

13 01 11 12 01 RD/RA 1/17/2013 KJ/Norris

13 01 11 12 01 RD/RA 01/22/13 DEQ/Reynolds

Site-Wide Information

Asbestos Outside the Cinder Pile

Task M Remedial Action Plan for Asbestos Containing Materials (Revision #2) with DEQ edit (CD only)

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Norris email to DEQ legal/Haque-Hausrath re: Oral authorization from Judge Budeski for BN & its contractors to perform remedial action work in yards 4 & 5

Site-Wide Information

Asbestos Outside the Cinder Pile

MRL: Debris Pile Site Removal Data Valadation Analysis Report for samples collected 10/30/12

Environmental Solutions

Site-Wide Information

Asbestos Outside the Cinder Pile

MRL: Debris Pile Site Removal Asbestos Sample Results for samples collected 10/30/12

Environmental Solutions

Site-Wide Information

Asbestos Outside the Cinder Pile

MRL: Debris Pile Site Removal PAH, EPH, VOC-Test Pit Sample Results for samples collected 10/30/12

Environmental Solutions

Site-Wide Information

Asbestos Outside the Cinder Pile

MRL: Debris Pile Site Removal Data Valadation Analysis Report for samples collected 11/7/12

Environmental Solutions

Site-Wide Information

Asbestos Outside the Cinder Pile

MRL: Debris Pile Site Removal PAH, EPH, VOC-Test Pit Sample Results for samples collected 11/7/12

Environmental Solutions

Site-Wide Information

Asbestos Outside the Cinder Pile

Environmental Solutions/Rogers email fwd to DEQ/Reynolds re: Data waiting on the TCLP for metals

Site-Wide Information

Asbestos Outside the Cinder Pile

DEQ/Reynolds & BN/Smith emails re: Task M Asbestos cleanup

Site-Wide Information

Asbestos Outside the Cinder Pile

DEQ/Reynolds & MRL/Shelly emails re: Some debris samples fail the land disposal restrictions

11/16-11/20/12

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Aldersley email to DEQ/Reynolds re: Task M - Update: Attachment - photos of asbestos removal areas

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Norris & DEQ/Reynolds emails re: Debris piles & adjacent"potential ACM removal area"

Site-Wide Information

Asbestos Outside the Cinder Pile

DEQ/Reynolds & KJ/Aldersley emails re: KJ Attachment - Task M -ACM screening photos & results

Site-Wide Information

Asbestos Outside the Cinder Pile

DEQ/Reynolds email to MRL/Shelly re: Cleanup & permit for debris piles removal

Site-Wide Information

Asbestos Outside the Cinder Pile

ACP/Morse, DEQ/Reynolds, & KJ/Norris emails re: Asbestos permit

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Aldersley & Montana Asbestos Control/Morse emails re: Permit application - Schroeder

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Lee & Norris emails re: MRL end of year track protection limitations - no flagger

Site-Wide Information

Asbestos Outside the Cinder Pile

DEQ/Reynolds letter to MRL/Shelly re: MRL-Soil & debris pile site removal

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Norris email to DEQ/Reynolds re: KJ unable to complete Task M - asbestos removal in 2012

Site-Wide Information

Asbestos Outside the Cinder Pile

DEQ/Reynolds letter to BN/Smith re: Task M Remedial Action for Asbestos Containing Materials

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Norris letter/email to DEQ/Reynolds re: Task M RA for Asbestos-containing material update

Site-Wide Information

Asbestos Outside the Cinder Pile

DEQ/Reynolds email to KJ/Norris re: Response to KJ 1/17/13 letter

Page 294: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 294 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 12 01 RD/RA 01/23/13

13 01 11 12 01 RD/RA MRL/Shelly & DEQ/Reynolds emails re: Debris piles 02/01/13

13 01 11 12 01 RD/RA 02/27/13 DEQ/Reynolds

13 01 11 12 01 RD/RA 03/07/13

13 01 11 12 01 RD/RA 03/20/13 KJ/Aldersley

13 01 11 12 01 RD/RA 03/27/13 KJ/Aldersley

13 01 11 12 01 RD/RA 04/03/13 KJ/Norris

13 01 11 12 01 RD/RA 04/23/13 KJ/Aldersley

13 01 11 12 01 RD/RA 05/10/13 KJ/Aldersley

13 01 11 12 01 RD/RA 05/22/13 DEQ/Reynolds

13 01 11 12 01 RD/RA KJ/Aldersley email to DEQ/Reynolds re: Task M Backfill 06/11/13 KJ/Aldersley

13 01 11 12 01 RD/RA KJ/Aldersley email to DEQ/Reynolds re: Task M route change 06/18/13 KJ/Aldersley

13 01 11 12 01 RD/RA 06/18/13 DEQ/ Jsanderson

13 01 11 12 01 RD/RA 06/18/13 KJ/Aldersley

13 01 11 12 01 RD/RA KJ/Aldersley & DEQ/Reynolds emails re: Debris pile photos 06/21/13 KJ/Aldersley

13 01 11 12 01 RD/RA Livingston Enterprise - Task M Display Ad - Route change 06/21/13

13 01 11 12 01 RD/RA Bozeman Chronicle - Task M Display Ad - Route change 06/23/13 Bozeman Chronicle

13 01 11 12 01 RD/RA 06/24/13 KJ/Aldersley

13 01 11 12 01 RD/RA 06/27/13 KJ/Aldersley

13 01 11 12 01 RD/RA 07/08/13 KJ/Aldersley

13 01 11 12 01 RD/RA 07/23/13

13 01 11 12 01 RD/RA 07/25/13 KJ/Fernandes

Site-Wide Information

Asbestos Outside the Cinder Pile

DEQ/Reynolds & Allied Waste/Seeberger emails re: Livingston BN soils not from a CERCLA site

Site-Wide Information

Asbestos Outside the Cinder Pile

Site-Wide Information

Asbestos Outside the Cinder Pile

DEQ/Reynolds email to MRL/Shelly re: Task M debris piles removal

Site-Wide Information

Asbestos Outside the Cinder Pile

Asbestos Abatement Final Documentation for MRL Debris Pile

Environmental Contractors

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Aldersley email to DEQ/Reynolds re: Task M - Weekly evaluation of field conditions

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Aldersley email to DEQ/Reynolds re: Task M - Weekly evaluation of field conditions

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Norris email to DEQ/Reynolds re: Task M - Notification of field activities

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Aldersley email to DEQ/Reynolds re: Task M - revised schedule for start date

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Aldersley email to DEQ/Reynolds re: Task M activities will commence on 6/24/13

Site-Wide Information

Asbestos Outside the Cinder Pile

DEQ/Reynolds letter to MRL/Shelley re: Asbestos Abatement Final Documentation for MRL Debris Pile

Site-Wide Information

Asbestos Outside the Cinder Pile

Site-Wide Information

Asbestos Outside the Cinder Pile

Site-Wide Information

Asbestos Outside the Cinder Pile

DEQ/Sanderson email to Daily Chronicle & DEQ/Reynolds re: Task M Disply ad - route change

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Aldersley email to DEQ/Reynolds & Mark Hills re: Task M PPE requirements

Site-Wide Information

Asbestos Outside the Cinder Pile

Site-Wide Information

Asbestos Outside the Cinder Pile

Livingston Enterprise

Site-Wide Information

Asbestos Outside the Cinder Pile

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Aldersley email to DEQ/Reynolds re: Debris pile proposed confirmation sampling location

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Aldersley & DEQ/Reynolds emails re: Revised debris pile conf sampling locations

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Aldersley email to DEQ/Reynolds re: Task M Summary of field decisions

Site-Wide Information

Asbestos Outside the Cinder Pile

OLY/Larango & DEQ/Reynolds emails re: MRL Debris pile confirmation sampling proposal

OlympusTech/ LaRango

Site-Wide Information

Asbestos Outside the Cinder Pile

KJ/Fernandes, BNSF/Smith & DEQ/Reynolds emails re: email on MRL debris pile conf sampling

Page 295: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 295 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 11 12 01 RD/RA 05/06/14 KJ/Fernandes

13 01 12

13 01 13 Cost Recovery

13 01 13 01 Cost Recovery Correspondence

13 01 13 01 Cost Recovery Correspondence DEQ internal email re: EQPF loans outstanding 03/08/99 DEQ internal

13 01 13 01 Cost Recovery Correspondence DEQ Letter to BNSF re: Cost recovery 09/28/04 DEQ

13 01 13 01 Cost Recovery Correspondence DEQ internal email re: Outstanding past costs 01/28/05 DEQ internal

13 01 13 01 Cost Recovery Correspondence DEQ internal email re: Cost recovery 08/11/06 DEQ internal

13 01 13 01 Cost Recovery Correspondence 11/01/11 DEQ/Martin

13 01 13 02 Cost Recovery Miscellaneous

13 01 13 02 Cost Recovery Miscellaneous Y ** DEQ internal memo re: Washington Group 07/24/01 DEQ internal

13 01 14

13 01 14 01 Plans

13 01 14 01 Plans 03/01/89

13 01 14 01 Plans 3/90 DHES

13 01 14 01 Plans DRAFT Envirocon Community Relations Program (Envirocon 04/01/90 Envirocon

13 01 14 01 Plans 6/91 DHES

13 01 14 01 Plans Public meeting notice 11/03/10

13 01 14 02 Document Distribution

13 01 14 02 Document Distribution MDHES letter to interested persons re: Draft Consent Decree 07/05/90 MDHES

13 01 14 02 Document Distribution Livingston Repository Inventory 07/01/91

13 01 14 02 Document Distribution DHES internal letter re: Mailing lists 2/24/95 DHES

Site-Wide Information

Asbestos Outside the Cinder Pile

Task M Remedial Action Report for Asbestos-Containing Materials

Site-Wide Information

O&M (for future use)

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ/Martin email to BN/Smith re: Clarification of BN's invoice question

Site-Wide Information

Site-Wide Information

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Draft Community Concerns Reports and Proposed Community Relations Plan for the Burlington Northern/Livingston Site (DHES/Solid & Haz Waste Bureau

DHES/Solid & Hazardous Waste Bureau

Site-Wide Information

Community Relations

DRAFT Burlington Northern/Livingston Environmental Cleanup Site Community Involvement Plan

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Community Involvement Plan Burlington Northern/Livingston Environmental Cleanup Site

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Page 296: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 296 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 14 02 Document Distribution DHES letter to EPA re: NPL determinations 08/24/95 DHES

13 01 14 02 Document Distribution Livingston Library Inventory Index 7/04

13 01 14 02 Document Distribution DEQ transmittal to MSU Bozeman re: Draft CD & SOWs 9/8/04 DEQ

13 01 14 02 Document Distribution 9/8/04 DEQ

13 01 14 02 Document Distribution DEQ transmittal to PCEC re: Draft CD & SOW 09/08/04 DEQ

13 01 14 02 Document Distribution DEQ transmittal to RTI re: Draft CD & SOW 09/08/04 DEQ

13 01 14 02 Document Distribution 9/8/04 DEQ

13 01 14 02 Document Distribution DEQ transmittal to Livingston Library re: Draft CD & SOWs 09/08/04 DEQ

13 01 14 02 Document Distribution Fischer email to DEQ re: Mailing list 09/27/04 Fischer

13 01 14 02 Document Distribution DEQ letter to MSU Library re: Spring 2005 SOW 7/1/05 DEQ

13 01 14 02 Document Distribution DEQ letter to Livingston Library re: Spring 2005 SOW 07/01/05 DEQ

13 01 14 02 Document Distribution DEQ letter to Livingston Library re: Repository Documents 2/14/06 DEQ

13 01 14 03

13 01 14 03 Press Releases DEQ press release re: Cinder Pile Capping 02/17/05 DEQ

13 01 14 03 Press Releases 09/21/09 DEQ

13 01 14 03 Press Releases 9/22/09 DEQ

13 01 14 03 Press Releases 09/24/09

13 01 14 03 Press Releases Livingston Enterprise Affidavit of Publication and tear sheet 09/24/09

13 01 14 03 Press Releases DEQ press release re: Public meeting scheduled 10/22/09 10/07/09 DEQ

13 01 14 03 Press Releases DEQ press release email to Livingston Enterprise 10/9/09 DEQ

13 01 14 03 Press Releases 10/25/10 DEQ/ Peterson

13 01 14 03 Press Releases 07/24/12 DEQ/ Peterson

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

DEQ transmittal to Livingston Commissioners re: Draft CD & SOW

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

DEQ transmittal to Park CO. Commissioners re: Draft CD & SOWs

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Press Releases (Documents dated before 2/17/05 are not itemized)

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

DEQ email to Livingston Enterprise re: Request for public notice legal ad

Site-Wide Information

Community Relations

DEQ email to Bozeman Chronicle re: Request for public notice legal ad

Site-Wide Information

Community Relations

Bozeman Daily Chronicle Affidavit of Publication and tear sheet

Bozeman Daily Chronicle

Site-Wide Information

Community Relations

Livingston Enterprize

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

DEQ/Peterson email re: For immediate release – DEQ accepting public comments on railyard cleanup

Site-Wide Information

Community Relations

DEQ/Peterson email re: For immediate release – DEQ public meeting planned on railyard cleanup

Page 297: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 297 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 14 03 Press Releases Livingston Enterprise Affidavit of Publication and tear sheet 07/27/12

13 01 14 03 Press Releases 07/27/12

13 01 14 04

13 01 14 04 Wall Street Journal article re: Rise in lawsuits against railroads 02/03/99 Wall Street Journal

13 01 14 04 05/15/01 Bozeman Chronical

13 01 14 04 05/15/01 Bozeman Chronical

13 01 14 04 Bozeman Chronicle Article re: Delays in ROD 05/16/01 Bozeman Chronical

13 01 14 04 Emailed press clipping re: Slow Progress 05/17/01

13 01 14 04 Bozeman Chronicle Article re: Progress with TOD 06/18/01 Bozeman Chronical

13 01 14 04 Montana Standard Article 7/15/01 Montana Standard

13 01 14 04 Bozeman Chronicle Article re: ROD issuance 09/20/01 Bozeman Chronical

13 01 14 04 Livingston Enterprise Article re: ROD 09/25/01

13 01 14 04 MSNBC Web Article re: New LRC President 11/14/01 MSMBC

13 01 14 04 Livingston Enterprise Article re: ROD 11/15/01

13 01 14 04 01/31/02 Bozeman Chronical

13 01 14 04 Bozeman Chronicle Article re: Depot 05/28/02 Bozeman Chronical

13 01 14 04 07/30/02

13 01 14 04 Livingston Enterprise article 09/10/04

13 01 14 04 Livingston Enterprise article re: Public meeting 09/27/04

13 01 14 04 Livingston Enterprise article re: Public meeting 10/01/04

13 01 14 04 State of the Arts article re: Depot Renovation 11/04/11 State of the Arts

Site-Wide Information

Community Relations

Livingston Enterprize

Site-Wide Information

Community Relations

Bozeman Daily Chronicle Affidavit of Publication and tear sheet

Bozeman Daily Chronicle

Site-Wide Information

Community Relations

Press Clippings (newspaper articles) (Articles dated before 2/3/99 are not itemized)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Bozeman Chronicle Article re: Railroad workers health issues, contamination

Site-Wide Information

Community Relations

Press Clippings (newspaper articles) Bozeman Chronicle Article re: Private litigation by rail workers

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Bozeman Chronicle Article re: Development on Yellowstone Floodplain

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise article re: Business sues BN over rail yard cleanup

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Page 298: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 298 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 14 04 Livingston Enterprise article re: Public meeting on 2/23/05 02/16/05

13 01 14 04 02/17/05

13 01 14 04 Billings Gazette article re: Cinder Pile Capping 02/18/05 Billings Gazette

13 01 14 04 Livingston Enterprise article re: Cinder Pile Capping 02/18/05

13 01 14 04 2/20/05 Bozeman Chronical

13 01 14 04 Livingston Enterprise article re: Cinder Pile Capping 2/26/05

13 01 14 04 Livingston Enterprise article re: Public meeting on 2/23/05 2/22/05

13 01 14 04 Bozeman Chronicle Article re: Cinder Pile 02/23/05 Bozeman Chronical

13 01 14 04 Livingston Enterprise Article re: Cinder Pile Capping begins 3/11/05

13 01 14 04 Livingston Enterprise article re: Cinder Pile Capping 03/14/05

13 01 14 04 Spokesman Review articles re: BN sites, including Livingston 04/24/05 Spokesman Review

13 01 14 04 Spokesman Review articles re: BN sites, including Livingston 4/25/05 Spokesman Review

13 01 14 04 Spokesman Review articles re: BNSF 5/15/05 Spokesman Review

13 01 14 04 7/8/05

13 01 14 04 7/8/05 Bozeman Chronical

13 01 14 04 07/10/05 Bozeman Chronical

13 01 14 04 07/11/05

13 01 14 04 Associated Press article re: Spring 2005 SOW public comment 7/11/05 Associated Press

13 01 14 04 Associated Press article re: Indoor Air, Spring 2005 SOW 07/15/05 Associated Press

13 01 14 04 Livingston Enterprise article re: Indoor Air, Spring 2005 SOW 7/15/05

13 01 14 04 07/15/05 Havre Daily News

13 01 14 04 Livingston Enterprise Display AD re: Public comment 07/28/05

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise article re: Cinder pile capping to begin in March

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Bozeman Chronicle Article re: Public Meeting notice for 2/23/05

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise Legal AD re: Public comment on Spring 2005 SOW

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Bozeman Chronicle Legal AD re: Public comment on Spring 2005 SOW

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Bozeman Chronicle Display AD re: Public meeting & public comment on Spring 2005 SOW

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise Display AD re: Public meeting & public comment on Spring 2005 SOW

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Havre Daily News article re: Contamination from BNSF seepage feared in Livingston

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise

Page 299: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 299 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 14 04 12/3/05 Bozeman Chronical

13 01 14 04 Missoulian article re: BN buyout 12/4/05 Missioulian

13 01 14 04 Envirocon email to DEQ re: BN buyout Associated Press 12/5/05 Envirocon

13 01 14 04 DEQ internal email re: BN buyout MSNBC 12/05/05 DEW internal

13 01 14 04 DEQ internal email re: BN buyout - Bozeman Chronical article 12/12/05 DEW internal

13 01 14 04 DEQ internal email re: BN buyout - Livingston Enterprise 12/12/05 DEW internal

13 01 14 04 12/08/05

13 01 14 04 01/27/06 Billings Gazette

13 01 14 04 2/17/06

13 01 14 04 Livingston Enterprise article re: Soil Plume to be Tested 2/27/06

13 01 14 04 03/17/06 Billings Gazette

13 01 14 04 DEQ internal email re: Press contact/Livingston Enterprise 3/17/06 DEQ internal

13 01 14 04 DEQ internal email re A.P. article 3/17/06 DEQ internal

13 01 14 04 03/17/06

13 01 14 04 3/21/06 Billings Gazette

13 01 14 04 DEQ internal email re: Queen City News article 03/22/06 DEQ internal

13 01 14 04 Missoula Independent article re: Railroaded 03/23/06

13 01 14 04 Livingston Enterprise article re: Soil gas testing under way 4/6/06

13 01 14 04 Enterprise News Digest article re: Soil gas testing under way 4/7/06 Enterprise Daily

13 01 14 04 Livingston Weekly 4/13/06 Livingston Weekly

13 01 14 04 04/10/06

13 01 14 04 4/13/06

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Bozeman Chronicle article re: BNSF planning to buy part of Livingston

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise article re: Residents face decision – Railroad buying rights to purchase homes in polluted area

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Billings Gazette article re: BNSF blames state for cleanup delays

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise article re: Higher levels of pollutants found in homes

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Billings Gazette article re: State to fix Livingston site, then bill BNSF

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise article re: Schweitzer: State will do cleanup of Livingston contaminates

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Billings Gazette article re: BNSF disputes governor’s criticism of cleanup

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Missoula Independent

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Enterprise News Digest article re: BNSF moves ahead with buying homes on north side

Enterprise News Digest

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Helena Independent Record article re: Montanans deserve the facts concerning BNSF’s environmental actions

Helena Independent Record

Page 300: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 300 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 14 04 4/27/06 Billings Gazette

13 01 14 04 Missoula Independent article re: Schweitzer steps up to BNSF 04/27/06

13 01 14 04 Great Fall Tribune article re: State, BNSF clash over cleanup 05/07/06 Great Falls Tribune

13 01 14 04 05/08/06 Great Falls Tribune

13 01 14 04 05/15/06 Miles City Star

13 01 14 04 07/10/06

13 01 14 04 07/18/06 Great Falls Tribune

13 01 14 04 07/28/06

13 01 14 04 8/1/06 Missoulian

13 01 14 04 08/12/06 DEQ internal

13 01 14 04 8/17/06

13 01 14 04 08/22/06 DEQ internal

13 01 14 04 9/25/06

13 01 14 04 10/5/06

13 01 14 04 10/6/06 DEQ internal

13 01 14 04 10/6/06

13 01 14 04 DEQ internal email re: Press contact 10/23/06 DEQ internal

13 01 14 04 DEQ internal email re: Press contact 10/27/06 DEQ internal

13 01 14 04 11/02/06 Montana Pioneer

13 01 14 04 11/06 Montana Pioneer

13 01 14 04 12/12/06

13 01 14 04 Spokesman Review article re: A Cautionary Tale Spokesman Review

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Billings Gazette article re: Schweitzer: BNSF rail cleanup excuses duplications

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Missoula Independent

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Great Falls Tribune article re: Ex-workers blame rail yard in deaths

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Miles City Star article re: New Superfund Project Officer named

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Enterprise News Digest article re: MRL agrees to buy Talgo-LRC

Enterprise News Digest

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Great Falls Tribune article re” DEQ: Major issues still need attention at Livingston rail yard

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise article re: Railyard diesel work starts next week

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Missoulian article re: Railroad to lower certain shipping rates for wheat

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

DEQ internal email re: Opper’s first cut on article about new approach to cleanup

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

The Bismarck Tribune article re: Mandan presents cleanup update

The Bismark Tribune

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

DEQ internal email re: Other DEQ employee comments to Opper’s article

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Enterprise News Digest article re: Rail yard diesel cleanup work starts soon

Enterprise News Digest

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Chronicle article re: Cleanup begins at BNSF diesel spill site

Livingston Chronical

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

DEQ internal email re: : Cleanup begins at BNSF diesel spill site

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Helena Independent Record article re: Cleanup of Livingston diesel under way

Helena Independent Record

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Montana Pioneer email to DEQ re: Rail Yard cleanup back on track – Governor plays hardball with BNSF

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

The Montana Pioneer article re: Rail Yard cleanup back on track – Governor plays hardball with BNSF

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise article re: Solvent plume found to be larger than earlier estimates

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Page 301: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 301 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 14 04 1/9/07 Billings Gazette

13 01 14 04 1/30/07

13 01 14 04 2/2/07 Daily Interlake

13 01 14 04 DEQ internal emails re: Livingston press release 04/11/07 DEQ internal

13 01 14 04 4/13/07

13 01 14 04 Livingston Enterprise article re: Rail yard cleanup begins 04/16/07

13 01 14 04 K/J email to DEQ re: Article about Carter Boehm 4/18/07 KJ

13 01 14 04 04/27/07

13 01 14 04 5/10/07

13 01 14 04 08/13/07 Miles City Star

13 01 14 04 08/13/07

13 01 14 04 08/13/07 Missioulian

13 01 14 04 08/14/07 Billings Gazette

13 01 14 04 Great Falls Tribune article re: BNSF starts Livingston cleanup 8/17/07 Great Falls Tribune

13 01 14 04 09/18/07

13 01 14 04 09/30/07

13 01 14 04 10/1/07 Billings Gazette

13 01 14 04 Belgrade News article re: City, residents sue BNSF 10/2/07 Belgrade News

13 01 14 04 Livingston Enterprise article re: BNSF levels more homes 10/2/07

13 01 14 04 CD DVD of report on Governor’s site visit 10/16/07

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Billings Gazette article re: Railway considers coal to liquids idea

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Helena article re: BNSF to spend $54.4 million in improvements across Montana

Helena Independent Record

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Daily Interlake article re: House measure would fund Evergreen cleanup

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Helena article – More progress being made in Livingston Rail yard cleanup

Helena Independent Record

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Enterprise News Digest article re: MRL land lease costs escalate for business owners on Park Street

Enterprise News Digest

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Helena Independent Record article re: Cut cable knocks out Verizon wireless service

Helena Independent Record

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Miles City Star article re: Livingston Railyard gets deep clean from BNSF

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Helena Independent Record article re: BNSF cleaning up rail yard

Helena Independent Record

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Missoulian article re: Livingston rail yard gets deep clean from BNSF

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Billings Gazette article re: Action on Livingston rail yard pollution

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise article re: City votes to join lawsuit against BNSF

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Helena Independent Record article re: Livingston, residents sue BNSF over rail yard pollution

Helena Independent Record

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Billings Gazette article re: Livingston sues over rail yard cleanup

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Page 302: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 302 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 14 04 Livingston Enterprise article re: Schweitzer tours cleanup site 10/16/07

13 01 14 04 10/16/07 Bozeman Chronical

13 01 14 04 10/17/07 Bozeman Chronical

13 01 14 04 10/18/07 DEQ internal

13 01 14 04 Flathead Beacon Article on Liability 7/25/08 Flathead Beacon

13 01 14 04 AP Article on Liability 7/25/08 Associated Press

13 01 14 04 DEQ internal email re: Liability article 7/25/08 DEQ internal

13 01 14 04 Missoulian Article on Liability 07/30/08 Missoulian

13 01 14 04 K/J transmittal – October 2008 Activities 09/29/08 KJ

13 01 14 04 10/10/08 KJ

13 01 14 04 DEQ email to K/J re: Task status 10/23/08 DEQ

13 01 14 04 10/23/08 DEQ

13 01 14 04 DEQ internal email re: Enterprise article on Task D&E 2008 11/10/08 DEQ internal

13 01 14 04 DEQ internal email re: Press contact for Livingston Enterprise 12/04/08 DEQ internal

13 01 14 04 06/26/09

13 01 14 04 DEQ internal emails re: Article about dispute resolution 6/29/09 DEQ internal

13 01 14 04 06/29/09

13 01 14 04 07/08/09 DEQ legal

13 01 14 04 7/9/09 DEQ legal

13 01 14 04 7/13/09

13 01 14 04 8/13/09

13 01 14 04 10/8/09 Billings Gazette

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Bozeman Chronical article re: Governor impressed with work on BN’s Livingston pollution site

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Bozeman Chronicle article re: Schweitzer impressed with Livingston railyard cleanup

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

DEQ internal email re: Governor tours Livingston yard’s groundwater treatment plant

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

K/J letter to DEQ re: Technical WP for LNAPL Sampling & Analysis

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

DEQ email to K/J re: Response to Tech WP for LNAPL sampling & analysis

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise article re: City upset with BNSF rail cleanup

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise article re: City Upset with BNSF rail cleanup

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

DEQ legal email to Matt Dettori/Enterprise re: DEQ Director Opper’s decision on dispute resolution

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

DEQ legal internal email re: Dispute resolution – follow –up press contact

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise article re: State nixes BNSF appeal on air quality

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise article re: BNSF files petition in federal court

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Billings Gazette: Hearing set to review railyard cleanup in Livingston

Page 303: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 303 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 14 04 10/08/09 Missoulian

13 01 14 04 10/23/09

13 01 14 04 11/3/09 Associated Press

13 01 14 04 11/09/09

13 01 14 04 11/17/09

13 01 14 04 11/24/09

13 01 14 04 Associated Press: Woman sues BNSF over cancer 5/14/10 Associated Press

13 01 14 04 08/03/10 Missoulian

13 01 14 04 11/05/10 Billings Gazette

13 01 14 04 11/05/10 Associated Press

13 01 14 04 11/05/10 Associated Press

13 01 14 04 11/5/10

13 01 14 04 11/12/10 Spokesman Review

13 01 14 04 02/10/12 Bozeman Chronical

13 01 14 04 03/05/12

13 01 14 04 03/28/12

13 01 14 04 04/04/12

13 01 14 04 Livingston Enterprise article: Court rules against BNSF 04/04/12

13 01 14 04 04/06/12

13 01 14 04 04/27/12

13 01 14 04 04/29/12 USA Today

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Missoulian: Burlington Northern removes 17,400 gallons of petroleum from Livingston railyard

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise article re: DEQ updates BNSF rail yard cleanup efforts

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Associated Press: Buffett’s Berkshire buying Burlington Northern RR

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise: Cleanup, lawsuit unaffected by BNSF sale

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise: Barrett steps down as head of Park County Environmental Council

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise article re: BNSF survey set to account for wells

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Missoulian: Retired Burlington Northern engineer gets $3.7M for lung disease caused by diesel fumes

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Billings Gazette: 9th Circuit declines to interfere in BNSF lawsuit

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Associated Press: 9th Circuit declines to interfere in BNSF lawsuit

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Associated Press latimes.com: Federal appeals court won’t intervene in Montana residents environmental suit against BNSF

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise: DEQ: Health risk from solvents re-evaluated

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

The Spokesman Review: Vestal: BNSF derails its “good neighbor” policy

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Bozeman Daily Chronicle article : Landmark Montana Supreme Court ruling states polluters can be held accountable decades later

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise article: Mediation fails between BNSF & Livingston

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise article: BNSF ask for delay in pollution trial

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Current article: Questions & Answers with Park Co Environmental Council Director Kerry Fee

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise article: DEQ report indicates less diesel fuel beneath Livingston than earlier estimated

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise article: BNSF plume trial starts on Monday

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

USA Today article: BNSF Railway company plume trial to begin

Page 304: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 304 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 14 04 04/30/12

13 01 14 04 05/01/12

13 01 14 04 Livingston Enterprise article: Livingston cleanup complicated 05/02/12

13 01 14 04 Independent Press article: BNSF plume trial to begin 05/03/12 Independent Press

13 01 14 04 05/04/12

13 01 14 04 05/08/12

13 01 14 04 05/08/12 Associated Press

13 01 14 04 Livingston Enterprise article: City accepts BNSF deal 05/09/12

13 01 14 04 08/09/12

13 01 14 04 Livingston Enterprise article: DEQ hears indoor air comments 08/13/12

13 01 14 04 01/09/13 red.Orbit.com

13 01 14 05

13 01 14 05 Technical Assistance Grants Spring 2007 PCEC

13 01 14 05 Technical Assistance Grants PCEC Newsletter - Summer 2011 PCEC

13 01 14 06

13 01 14 06 DHES fact sheet - CD, site info 3/90 DHES

13 01 14 06 4/90 DHES

13 01 14 06 DHES fact sheet 05/01/90 DHES

13 01 14 06 DHES fact sheet - Consent Decree, Free Product recovery 07/01/90 DHES

13 01 14 06 DHES fact sheet - Diesel Pump test 10/90 DHES

13 01 14 06 DHES fact sheet - Pancreatic cancer study 11/01/90 DHES

13 01 14 06 DHES fact sheet - Risk Assessment, Basement gas 12/01/90 DHES

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise article: BNSF Railway Company plume trial to begin

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise article: Lawyers spar over BNSF plume size

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise article: Hydrologist touts rail yard cleanup plans

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise article: BNSF, Livingston residents, city reach deal

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Associated Press article: BNSF offers $36M settlement in Livingston lawsuit

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise article: Meeting to Discuss easing rail yard cleanup standards

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

Livingston Enterprise

Site-Wide Information

Community Relations

Press Clippings (newspaper articles)

redOrbit.com article: "May be Decades Before Contaminated GW Sites are Cleaned Up"

Site-Wide Information

Community Relations

Technical Assistance Grants

Site-Wide Information

Community Relations

PCEC Newsletter article – PCEC Awarded Second Technical Assistance Grant from USEPA -

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

DHES fact sheet - Yellowstone River, Community involvement plan, LIFE

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Page 305: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 305 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 14 06 DHES fact sheet - Free Product recovery, various 2/91 DHES

13 01 14 06 DHES fact sheet - Well survey 5/91 DHES

13 01 14 06 DHES fact sheet - Choosing a Remedy 06/01/91 DHES

13 01 14 06 DHES fact sheet - Health Assessment 10/01/91 DHES

13 01 14 06 DHES fact sheet - Draft RI report 11/91 DHES

13 01 14 06 DHES fact sheet - Basement Gas 5/92 DHES

13 01 14 06 DHES fact sheet - Various activities 7/92 DHES

13 01 14 06 DHES fact sheet - Draft RI/Mission Wye 08/01/92 DHES

13 01 14 06 DHES fact sheet - RI/FS Activities 10/01/92 DHES

13 01 14 06 DHES fact sheet - RI/FS Activities 12/01/92 DHES

13 01 14 06 DHES fact sheet - Risk Assessment & Draft RI report 04/01/93 DHES

13 01 14 06 ATSDR Update Fact Sheet 2/00 ATSDR

13 01 14 06 DEQ Progress Report re: Letter to Golnar, City Manager 05/19/04 DEQ

13 01 14 06 9/21/04 DEQ

13 01 14 06 DEQ email to BN re: Draft site update sheet 02/07/05 DEQ

13 01 14 06 DEQ fact sheet - Cinder Pile Capping 2/11/05 DEQ

13 01 14 06 DEQ fax to RTI re: Fact sheet 2/14/05 DEQ

13 01 14 06 DEQ email to BN/K/J re: Draft update sheet 06/29/05 DEQ

13 01 14 06 DEQ Site Update Sheet 07/05/11 DEQ

13 01 14 06 DEQ Fact Sheet 2/06 DEQ

13 01 14 06 DEQ Fact Sheet 11/07/11 DEQ

13 01 14 06 DEQ Site Update 10/09 DEQ

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

DEQ letter to Livingston Library re: Public meeting & Fact sheets

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Page 306: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 306 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 14 06 DEQ Site Update 10/10/11 DEQ

13 01 14 06 DEQ Site Update 07/01/12 DEQ

13 01 14 07 General Correspondence

13 01 14 07 General Correspondence Y ** Iron Horse Trailer Park residents 06/29/01

13 01 14 07 General Correspondence Email to DEQ re: New well on commercial lot 08/02/04

13 01 14 07 General Correspondence DEQ email to Livingston Library re: Repository 10/28/04 DEQ

13 01 14 07 General Correspondence Livingston Library email to DEQ re: Repository 10/29/04 Livingston Library

13 01 14 07 General Correspondence Phone Log - L Winstel to DEQ re: Indoor air sampling/well 10/14/05 L Winstel

13 01 14 07 General Correspondence DEQ internal email re: BNSF buyout confirmation 12/5/05 DEQ internal

13 01 14 07 General Correspondence 02/10/06 DEQ

13 01 14 07 General Correspondence DEQ internal email re: Private well sampling request 05/02/06 DEQ internal

13 01 14 07 General Correspondence DEQ internal emails re: Private well sampling request 5/2/06-5/5/06 DEQ internal

13 01 14 07 General Correspondence K/J email to DEQ re: Domestic water sampling 05/05/06 KJ

13 01 14 07 General Correspondence DEQ & K/J emails re: Domestic water sampling results 06/22/06

13 01 14 07 General Correspondence K/J letter to DEQ re: Domestic well sampling results 06/22/06 KJ

13 01 14 07 General Correspondence DEQ letter to Terry Tillet re: Sampling results for private well 07/13/06 DEQ

13 01 14 07 General Correspondence 7/14/06 DEQ

13 01 14 07 General Correspondence 10/10/06 DEQ

13 01 14 07 General Correspondence 10/10/06 DEQ

13 01 14 07 General Correspondence K/J emails re: Townsend property 12/28/06 KJ

13 01 14 07 General Correspondence 01/12/07 DEQ

13 01 14 07 General Correspondence 01/12/07 DEQ

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Fact Sheets (Progress Reports)

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

DEQ email to K/J, BNSF, & internal re: Phone Log – G Green re: Indoor air monitoring

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

DEQ letter to Todd & Kristen Wester re: Sampling results for private well

Site-Wide Information

Community Relations

DEQ letter to Ted & Georgann Watson re: Sampling results for gw monitoring well 94-2

Site-Wide Information

Community Relations

DEQ letter to Mark Grosvenor re: Sampling results for gw monitoring well 94-1

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

DEQ letter to Ted & Georgann Watson re: Sampling results for gw monitoring well 94-2

Site-Wide Information

Community Relations

DEQ letter to Mark Grosvenor re: Sampling results for gw monitoring well 94-1

Page 307: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 307 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 14 07 General Correspondence 03/19/07 DEQ

13 01 14 07 General Correspondence 05/22/07 CDM

13 01 14 07 General Correspondence KJ/DEQ emails re: Owner contact info 05/25/07

13 01 14 07 General Correspondence DEQ letter to E Skillman re: Sampling results 06/05/07 DEQ

13 01 14 07 General Correspondence KJ email to DEQ/CDM re: Watson property 06/08/07 KJ

13 01 14 07 General Correspondence KJ/DEQ emails re: Domestic water sampling schedule 6/26-6/27/07

13 01 14 07 General Correspondence CDM/DEQ emails re: Krohne well logs 07/03/07

13 01 14 07 General Correspondence KJ email to DEQ re: Historical VOC data for Well 94-2 7/20/07 KJ

13 01 14 07 General Correspondence DEQ letter to Watsons re: Sampling results 07/24/07 DEQ

13 01 14 07 General Correspondence VOC Analytical results for Wells 94-2 and 07-6 07/01/07

13 01 14 07 General Correspondence KJ email to DEQ re: Private well 12Q02 update 08/14/07 KJ

13 01 14 07 General Correspondence DEQ letter to Jones re: Sampling results 08/28/07 DEQ

13 01 14 07 General Correspondence DEQ letter to D Henriksen re: Sampling results 08/28/07 DEQ

13 01 14 07 General Correspondence DEQ letter to K Mitchell re: Sampling results 08/30/07 DEQ

13 01 14 07 General Correspondence DEQ letter to E Harris re: Sampling results 08/30/07 DEQ

13 01 14 07 General Correspondence DEQ letter to Tonnesens re: Sampling results 08/30/07 DEQ

13 01 14 07 General Correspondence DEQ letter to J Gardner re: Sampling results 08/31/07 DEQ

13 01 14 07 General Correspondence DEQ letter to C Boehm re: Sampling results 10/01/07 DEQ

13 01 14 07 General Correspondence Olympus letter to BNSF re: Disposition of waste materials 10/30/07 Olympus

13 01 14 07 General Correspondence Olympus letter to BNSF re: Well abandonment activities 10/30/07 Olympus

13 01 14 07 General Correspondence KJ/DEQ emails re: Drinking water well sample 12/4-12/12/07

13 01 14 07 General Correspondence DEQ letter to Mr & Mrs Krohne re: Sampling results 2/19/09 DEQ

Site-Wide Information

Community Relations

DEQ fax to Ted Watson re: 1/12/07 letter with 11/06 sampling results

Site-Wide Information

Community Relations

CDM email to DEQ re: Draft letters for 609 Gallatin and 318 Castle

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Page 308: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 308 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 14 07 General Correspondence DEQ letter to C Boehm re: Sampling results 07/15/09 DEQ

13 01 14 07 General Correspondence DEQ letter to Mr & Mrs Van Gytenbeek re: Sampling results 7/27/09 DEQ

13 01 14 07 General Correspondence DEQ letter to C Boehm re: Sampling results 07/27/09 DEQ

13 01 14 07 General Correspondence DEQ letter to Mr & Mrs Krohne re: Sampling Results 7/27/09 DEQ

13 01 14 07 General Correspondence M Giuliano request for info re: 111 South K St 8/25-8/26/09 M Giuliano

13 01 14 07 General Correspondence 9/29-9/30/09 A Stern

13 01 14 07 General Correspondence B Morris request for plume map/info on 131 South P St 10/5/09 B Morris

13 01 14 07 General Correspondence D Johnson letter to DEQ re: Info on 314 South H St 10/12/09 D Johnson

13 01 14 07 General Correspondence 10/13/09 DEQ

13 01 14 07 General Correspondence DEQ/Becker family emails re: Science fair project

13 01 14 07 General Correspondence N Davis request to video tape public meeting 10/21/09 N Davis

13 01 14 07 General Correspondence DEQ/CDM/Katelyn emails re: Science fair project

13 01 14 07 General Correspondence K Ziebarth request for info on contamination at 210 South E St 10/23-11/2/09 K Ziebarth

13 01 14 07 General Correspondence DEQ phone log: D Kubly concerns about City water quality 11/2/09 DEQ

13 01 14 07 General Correspondence 11/09/09 DEQ

13 01 14 07 General Correspondence R Morris request to be added to mailing list 11/12/09 R Morris

13 01 14 07 General Correspondence T Coleman

13 01 14 07 General Correspondence C Crayton request for info on 106 North G St C Crayton

13 01 14 07 General Correspondence H Blesius request for info on air quality 12/3-12/8/09 H Blesius

13 01 14 07 General Correspondence 2/17-2/18/10 S Dorrance

13 01 14 07 General Correspondence DEQ letter Francis Horiel re: Sampling Results 02/23/10 DEQ

13 01 14 07 General Correspondence DEQ letter Francis Horiel re: Sampling Results 02/25/10 DEQ

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

A Stern request for info re: Possible community garden at North M Street Park

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

DEQ phone log: L Hagen questions regarding a property transaction

Site-Wide Information

Community Relations

10/9/09-10/18/09

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

10/18-10/21/09

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations DEQ letter to Richard & Sharon Tonnesen re: Sampling Results

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

T Coleman request for info on sample locations near 128 South F St

10/27-11/15/09

Site-Wide Information

Community Relations

11/21-11/23/09

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Phone log: S Dorrance request for info on radio station with in plume area

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Page 309: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 309 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 14 07 General Correspondence DEQ letter David & Jeannie Burley re: Sampling Results 2/26/10 DEQ

13 01 14 07 General Correspondence DEQ letter Erlynn Harris re: Sampling Results 02/26/10 DEQ

13 01 14 07 General Correspondence DEQ letter Bill & Jennifer Jones re: Sampling Results 2/26/10 DEQ

13 01 14 07 General Correspondence DEQ letter to C Boehm re: Sampling results 02/26/10 DEQ

13 01 14 07 General Correspondence DEQ letter to Shari & Gary Norton re: Sampling results 2/26/10 DEQ

13 01 14 07 General Correspondence 02/26/10 DEQ

13 01 14 07 General Correspondence DEQ letter to Steve Briggs re: Sampling results 03/01/10 DEQ

13 01 14 07 General Correspondence DEQ letter to K Mitchell re: Sampling results 03/02/10 DEQ

13 01 14 07 General Correspondence DEQ letter to Ted & Georgann Watson re: Sampling results 3/2/10 DEQ

13 01 14 07 General Correspondence DEQ letter to Shari & Gary Norton re: Sampling results 03/08/10 DEQ

13 01 14 07 General Correspondence C Rodi request for info on 127 South P St 06/04/10 C Rodi

13 01 14 07 General Correspondence G Ward request for plume maps 06/21/10 G Ward

13 01 14 07 General Correspondence 7/15-10/6/10

13 01 14 07 General Correspondence 10/18/10

13 01 14 07 General Correspondence 04/21/11

13 01 14 07 General Correspondence

13 01 14 07 General Correspondence 08/11/11 DEQ/ Reynolds

13 01 14 07 General Correspondence 08/15/11 DEQ/ Reynolds

13 01 14 07 General Correspondence 08/15/11 DEQ/ Reynolds

13 01 14 07 General Correspondence 08/15/11 DEQ/ Reynolds

13 01 14 07 General Correspondence 08/15/11 DEQ/ Reynolds

13 01 14 07 General Correspondence 08/15/11 DEQ/ Reynolds

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

DEQ letter to D Johnson re: Request for info about groundwater contamination around 314 South H St

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

K/J/Aldersley, DEQ/Reynolds & K Michels emails re: Private well sampling – 115North K Street

Site-Wide Information

Community Relations

DEQ/Reynolds & S Caldwell emails re: Last power point presentation

Site-Wide Information

Community Relations

DEQ/Reynolds & KJ/Aldersley emails re: Private well owners & location

Site-Wide Information

Community Relations

K/J/Aldersley, DEQ/Reynolds & Property Owner/K Michels re: Private well sampling 115 North K Street & sampling results

7/15/10 – 2/4/11

Site-Wide Information

Community Relations

DEQ/Reynolds letter to D & K Krohne re: Sampling results from June 2009 & June 2010

Site-Wide Information

Community Relations

DEQ/Reynolds letter to Kent Mitchell re: Groundwater analytical results

Site-Wide Information

Community Relations

DEQ/Reynolds letter to Kenneth Handl re: Groundwater analytical results

Site-Wide Information

Community Relations

DEQ/Reynolds letter to George Fabian re: Groundwater analytical results

Site-Wide Information

Community Relations

DEQ/Reynolds letter to Tim Daily re: Groundwater analytical results

Site-Wide Information

Community Relations

DEQ/Reynolds letter to Steve Briggs re: Groundwater analytical results

Page 310: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 310 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 14 07 General Correspondence 08/15/11 DEQ/ Reynolds

13 01 14 07 General Correspondence 08/16/11 DEQ/ Reynolds

13 01 14 07 General Correspondence 08/16/11 DEQ/ Reynolds

13 01 14 07 General Correspondence 08/16/11 DEQ/ Reynolds

13 01 14 07 General Correspondence 08/16/11 DEQ/ Reynolds

13 01 14 07 General Correspondence 08/16/11 DEQ/ Reynolds

13 01 14 07 General Correspondence 09/05/12

13 01 14 07 General Correspondence 10/01/12

13 01 14 07 General Correspondence 10/01/12 DEQ/ Reynolds

13 01 14 07 General Correspondence 10/01/12 DEQ/ Reynolds

13 01 14 07 General Correspondence 10/02/12 DEQ/ Reynolds

13 01 14 07 General Correspondence 10/03/12 DEQ/ Reynolds

13 01 14 07 General Correspondence 10/03/12 DEQ/ Reynolds

13 01 14 07 General Correspondence 10/03/12 DEQ/ Reynolds

13 01 14 07 General Correspondence 10/03/12 DEQ/ Reynolds

13 01 14 07 General Correspondence 10/03/12 DEQ/ Reynolds

13 01 14 07 General Correspondence 10/03/12 DEQ/ Reynolds

13 01 14 07 General Correspondence 10/03/12 DEQ/ Reynolds

13 01 14 07 General Correspondence 11/05/12 DEQ/ Reynolds

13 01 14 07 General Correspondence 11/05/12 DEQ/ Reynolds

13 01 14 07 General Correspondence 03/05/13 KJ/Aldersley

Site-Wide Information

Community Relations

DEQ/Reynolds letter to David Burley re: Groundwater analytical results

Site-Wide Information

Community Relations

DEQ/Reynolds letter to Kirk Michels re: Groundwater analytical results

Site-Wide Information

Community Relations

DEQ/Reynolds letter to William Jones re: Groundwater analytical results

Site-Wide Information

Community Relations

DEQ/Reynolds letter to Frank Horiel re: Groundwater analytical results

Site-Wide Information

Community Relations

DEQ/Reynolds letter to Erlynn Harris re: Groundwater analytical results

Site-Wide Information

Community Relations

DEQ/Reynolds letter to Richard Tonnesen re: Groundwater analytical results

Site-Wide Information

Community Relations

DEQ/Reynolds & KJ/Aldersley emails re: Contact list for private wells

Site-Wide Information

Community Relations

DEQ/Reynolds & KJ/Aldersley emails re: 2011 sampling - well 8C01

Site-Wide Information

Community Relations

DEQ/Reynolds letter to Steve Briggs re: Groundwater analytical results - well 7L01

Site-Wide Information

Community Relations

DEQ/Reynolds letter to David Burley re: Groundwater analytical results - well 12R02

Site-Wide Information

Community Relations

DEQ/Reynolds letter to Erlynn Harris re: Groundwater analytical results - well 7Q01

Site-Wide Information

Community Relations

DEQ/Reynolds letter to William Jones re: Groundwater analytical results - well 18D04

Site-Wide Information

Community Relations

DEQ/Reynolds letter to Dwight Krohne re: Groundwater analytical results - wells MW-10 & EX-28

Site-Wide Information

Community Relations

DEQ/Reynolds letter to Richard Tonnesen re: Groundwater analytical results - well 7P17

Site-Wide Information

Community Relations

DEQ/Reynolds letter to Tim Dailey re: Groundwater analytical results - well 18C03

Site-Wide Information

Community Relations

DEQ/Reynolds letter to Kenneth Handl re: Groundwater analytical results - well 18D11

Site-Wide Information

Community Relations

DEQ/Reynolds letter to George Fabian re: Groundwater analytical results - well 12R06

Site-Wide Information

Community Relations

DEQ/Reynolds letter to Kirk Michels re: Groundwater analytical results - well 18D06

Site-Wide Information

Community Relations

DEQ/Reynolds letter to City Manager/Meece re: Sampling results for property formerly owned by Ted & Georgann Watson

Site-Wide Information

Community Relations

DEQ/Reynolds letter to Kent Mitchell re: Groundwater analytical results

Site-Wide Information

Community Relations

KJ/Aldersley email to DEQ/Reynolds re: Change of property ownership - Krohne property is now Bender property

Page 311: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 311 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 14 08 Photographs

13 01 14 08 Photographs Slides

13 01 14 08 Photographs Photos – Site Inspection w/John Wadhams and John Mills 07/09/97 Envirocon

13 01 14 08 CD Photographs CD ROM - Task C - 11/16/05; Task F -6/13/06; Task I 9/7/06 CDM

13 01 14 08 CD Photographs CD ROM – Livingston Railyard Fall 2006

13 01 14 08 CD Photographs CD ROM – April 2008 MUW Wells – Jack-n-bore

13 01 14 09 Slides

13 01 14 10

13 01 14 10 Public Meetings Public Meeting Agenda 09/22/98

13 01 14 10 Public Meetings Meetings Minutes 11/14/01

13 01 14 10 Public Meetings Livingston Enterprise display ad re: Public Meeting 9/24/04

13 01 14 10 Public Meetings Bozeman Chronical display ad re: Public Meeting 09/26/04

13 01 14 10 CD Public Meetings Public Meeting - Power Point Presentation 09/30/04

13 01 14 10 Public Meetings Public Meeting handouts 09/30/04

13 01 14 10 CD Public Meetings Public meeting presentation - Cinder Pile Capping 02/23/05

13 01 14 10 Public Meetings DEQ email to BN re: Public meeting 6/29/05 DEQ

13 01 14 10 Public Meetings DEQ & K/J emails re: Update Sheet 06/30/05

13 01 14 10 Public Meetings DEQ email to BN re: 7/13/05 Public meeting 07/01/05 DEQ

13 01 14 10 Public Meetings Public Meeting handout 07/13/05

13 01 14 10 CD Public Meetings Public Meeting CD 07/13/05

13 01 14 10 Public Meetings Meeting overheads – New Project Manager “Aimee Reynolds” 11/28/07

13 01 14 10 Public Meetings 11/28/07 Livingston Library

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Public Meetings (Documents dated before 9/22/98 are not itemized)

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Livingston-Park County Public Library email to DEQ re: Meeting Room Policy

Page 312: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 312 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 14 10 Public Meetings Add name to mailing list sheet 11/28/07

13 01 14 10 Public Meetings 4/30/08

13 01 14 10 CD Public Meetings 5/7/08 DEQ

13 01 14 10 Public Meetings Meeting overheads – notes 10/22/09

13 01 14 10 Public Meetings Add name to mailing list sheet 10/22/09

13 01 14 10 CD Public Meetings 5/17/10

13 01 14 10 Public Meetings 10/25/10 DEQ/ Reynolds

13 01 14 10 Public Meetings 10/25/10 DEQ/ Reynolds

13 01 14 10 Public Meetings DEQ

13 01 14 10 CD Public Meetings DEQ Public Meeting Presentation & Handouts – CD DEQ

13 01 14 10 Public Meetings DEQ Public Meeting agenda and Power Point presentation 11/3/10 DEQ

13 01 14 10 Public Meetings Public meeting sign in sheet 11/03/10 DEQ

13 01 14 10 Public Meetings 05/18/12

13 01 14 10 CD Public Meetings DEQ/Reynolds class presentation overheads 05/24/12

13 01 14 10 CD Public Meetings BN Shop Complex sign in sheet 08/09/12

13 01 14 10 CD Public Meetings BN Shop Complex meeting overheads 08/09/12

13 01 14 10 CD Public Meetings

13 01 14 10 Public Meetings Public meeting sign-in sheet - BNLV - Restoration Committee 08/13/12

13 01 14 10 Public Meetings Park High Presentation 05/20/14

13 01 14 11 Public Hearings 8/88-9/90

13 01 14 11 Public Hearings 08/23/89

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

DEQ & Natalie Davis/Park County High School emails re: Class presentation

Site-Wide Information

Community Relations

Park County High School Chemistry Class Presentation CD ROM

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Park County High School Chemistry Class Presentation CD ROM

Site-Wide Information

Community Relations

DEQ/Reynolds email to P Payovich re: Attachment – Legal ad for 11/3/10 public meeting

Site-Wide Information

Community Relations

DEQ/Reynolds email to P Payovich re: Copy of Press Release – DEQ accepting public comments on Railyard cleanup

Site-Wide Information

Community Relations

DEQ Post card – error in October Update for public meeting date

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

DEQ/Reynolds & Park High/N Davis emails re: Scheduling Park High Chemistry class presentation

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

8/9/12 Public meeting slides & posters & 8/13/12 Restoration Committee Presentation

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

1166/ 38D103

Site-Wide Information

Community Relations

1166/ 38D103

Site-Wide Information

Community Relations

Reporter's Transcript of Proceedings RE: Partial Consent Decree and Interim Remedial Work Plan, Livingston District Courtroom

Page 313: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 313 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 14 11 Public Hearings Hearing Record Appendices I & II 8/23/89

13 01 14 12

13 01 14 12 DEQ internal email re: Press contact - ROD 05/15/01 DEQ internal

13 01 14 12 DEQ internal email re: Press contact - ROD 05/15/01 DEQ internal

13 01 14 12 DEQ internal email re: Press contact - C&P Packing Property 6/4/2001 DEQ internal

13 01 14 12 DEQ internal email re: Press contact - ROD 09/19/01 DEQ internal

13 01 14 12 DEQ internal email re: Press contact - ROD 09/20/01 DEQ internal

13 01 14 12 DEQ internal email re: Press contact - ROD 09/20/01 DEQ internal

13 01 14 12 DEQ internal email re: Press contact - Progress 04/22/02 DEQ internal

13 01 14 12 DEQ internal email re: Press contact - Cinder Pile 04/11/03 DEQ internal

13 01 14 12 DEQ internal email re: Press contact - Cinder Pile 06/04/03 DEQ internal

13 01 14 12 Email to DEQ from Livingston Enterprise 09/08/04

13 01 14 12 9/9/04 DEQ internal

13 01 14 12 9/10/04 DEQ internal

13 01 14 12 DEQ internal email re: Press contact-perchlorate at Livingston 9/10/04 DEQ internal

13 01 14 12 2/4/05 DEQ internal

13 01 14 12 DEQ fax to Paula Clauson re: Fact sheet 2/14/05 DEQ internal

13 01 14 12 Phone Log - Livingston Enterprise re: Cinder Pile 02/17/05

13 01 14 12 Phone Log - Northern News Network re: Cinder Pile 2/18/05

13 01 14 12 DEQ email to Spokane Review 4/11/05 DEQ

13 01 14 12 DEQ internal email re: Info request 05/03/05 DEQ internal

13 01 14 12 Phone Log - Osterkamp, CBS News 5/11/05

1166/ 38D103

Site-Wide Information

Community Relations

Site-Wide Information

Community Relations

Press/Media Contacts (Documents dated before 5/15/01 are not itemized)

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Livingston Enterprise

Site-Wide Information

Community Relations Press/Media Contacts

DEQ internal email re: Phone Log - Paula Clawson/Livingston Enterprise

Site-Wide Information

Community Relations Press/Media Contacts

DEQ internal email re: Phone Log - Paula Clawson/Livingston Enterprise

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

DEQ internal email re: Press contact -Livingston Enterprise re: Cinder Pile

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Page 314: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 314 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 14 12 KXLY TV Interview notes 5/11/05

13 01 14 12 DEQ email to CBS News re: ROD 05/12/05 DEQ

13 01 14 12 DEQ email to CBS News re: CECRA Priorities List 05/16/05 DEQ

13 01 14 12 DEQ email to CBS News re: CECRA Priorities List 05/17/05 DEQ

13 01 14 12 DEQ internal email re: Press contact/AP 06/14/05 DEQ internal

13 01 14 12 DEQ internal email re: Press contact/IR 6/1505 DEQ internal

13 01 14 12 DEQ email to Livingston Enterprise re: Update Sheet 07/18/05 DEQ

13 01 14 12 DEQ internal email re: Bozeman Chronical contact 11/30/05 DEQ internal

13 01 14 12 DEQ internal email re: Livingston Enterprise contact 12/8/05 DEQ internal

13 01 14 12 01/26/06 DEQ internal

13 01 14 12 1/30/06 DEQ internal

13 01 14 12 DEQ internal email re: Press contact 02/16/06 DEQ internal

13 01 14 12 DEQ internal email re: Press Contact 2/17/06 DEQ internal

13 01 14 12 DEQ internal email re: BN Livingston press contact 2/22/06 DEQ internal

13 01 14 12 Internal email re: BN Livingston press contact 03/01/06 DEQ internal

13 01 14 12 Phone Log –Bozeman Chronical 3/2/06

13 01 14 12 Livingston Weekly contact 3/9/06 Livingston Weekly

13 01 14 12 3/14/06 Livingston Weekly

13 01 14 12 DEQ internal email re: Livingston Weekly interview: 3/27/06 DEQ internal

13 01 14 12 DEQ internal email re: Livingston Weekly press contact 03/27/06 DEQ internal

13 01 14 12 3/28/06 DEQ

13 01 14 12 03/28/06 DEQ internal

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

DEQ internal email re: Livingston Enterprise - Letter from DEQ Director to BNSF

Site-Wide Information

Community Relations Press/Media Contacts

DEQ internal email re: Long News Service - Livingston Activities/status

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

D Nolt/Livingston Weekly email to DEQ re: Livingston Weekly BNSF site inquiry

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

DEQ email to D Nolt/Livingston Weekly re: Additional info sent

Site-Wide Information

Community Relations Press/Media Contacts

DEQ internal email re: Press contact – Engineering News Review

Page 315: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 315 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 14 12 4/3/06

13 01 14 12 DEQ internal email re: Great Falls Tribune press contact 04/12/06 DEQ internal

13 01 14 12 DEQ internal email re: Great Falls Tribune request 05/05/06 DEQ internal

13 01 14 12 5/12/06 DEQ internal

13 01 14 12 DEQ internal email re: Q-2 News press contact 11/09/07 DEQ internal

13 01 14 12 12/6/07 DEQ internal

13 01 14 12 06/25/08 DEQ internal

13 01 14 12 Billings Gazette article re: BN second quarter profit rises 7/23/09 Billings Gazette

13 01 14 12 8/12/09 DEQ internal

13 01 14 12 DEQ internal email re: Press contact w/Livingston Enterprise 11/06/09 DEQ internal

13 01 14 12 DEQ internal email re: Press contact w/Livingston Enterprise 12/1/09 DEQ internal

13 01 14 12 DEQ internal email re: Press contact w/Livingston Enterprise 2/10/10 DEQ internal

13 01 14 12 10/29/10 DEQ internal

13 01 14 12 11/4/10 DEQ internal

13 01 14 12 11/5/10 DEQ/ Reynolds

13 01 14 12 04/04/12 DEQ internal

13 01 14 12 04/05/12 DEQ internal

13 01 14 12 04/18/12

13 01 14 12 04/20/12

13 01 14 12 04/20/12

13 01 14 12 04/23/12

Site-Wide Information

Community Relations Press/Media Contacts

T Armistead/Engineering News Review email to DEQ re: Info request

Engineering News Review

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

DEQ internal email re: Bill Kidd/Long News in Austin, Texas press contact

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

DEQ internal email re: Jay Coehn of KTVO/Billings re: Cleaning up Montana

Site-Wide Information

Community Relations Press/Media Contacts

DEQ internal email re: Sue Gallagher/Associated Press re: Update on Livingston since Governor stepped in 2006

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

DEQ/Reynolds & DEQ Legal/Haque-Hausrath internal emails re: Press contact with Matt Detori/Livingston Enterprise

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

Site-Wide Information

Community Relations Press/Media Contacts

DEQ/Reynolds internal emails re: Press contact – new Livingston Enterprise reporter – Wes Venteicher

Site-Wide Information

Community Relations Press/Media Contacts

DEQ/Reynolds internal emails re: Press contact – new Livingston Enterprise reporter – Wes Venteicher at 11/3/10 public meeting

Site-Wide Information

Community Relations Press/Media Contacts

DEQ/Reynolds email to Wes Venteicher re: Attachment - PCE plume

Site-Wide Information

Community Relations Press/Media Contacts

DEQ/Reynolds internal email re: Phone call with Wes Venteicher re: New wells being drilled

Site-Wide Information

Community Relations Press/Media Contacts

DEQ/Dunwell internal email to Reynolds re: Contact with Livingston Current publisher

Site-Wide Information

Community Relations Press/Media Contacts

DEQ/Reynolds & Wes Venteicher re: Press Contact information request

Site-Wide Information

Community Relations Press/Media Contacts

Livingston Current/Neill email to DEQ/Reynolds re: Contaminant information

Livingston Current/ Neill

Site-Wide Information

Community Relations Press/Media Contacts

DEQ/Reynolds & Livingston Current/Neill emails re: Question & Answer public forum

Site-Wide Information

Community Relations Press/Media Contacts

Livingstone Currant/Neill email to DEQ/Reynolds re: Q&A for Livingston Site

Livingston Current/ Neill

Page 316: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 316 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 14 12 05/03/12 DEQ/ Reynolds

13 01 14 12 04/10/13 DEQ internal

13 01 14 12 04/10/13

13 01 15

13 01 16 Accounting

13 01 16 01 Accounting Budgets 11/89-8/96

13 01 16 02 Accounting Quarterly Reports 7/94-6/95

13 01 16 03 Accounting Monthly Reports 7/89-6/97

13 01 16 04 Accounting 6/94-6/97

13 01 16 05 Accounting 6/91-6/00

13 01 16 06 Accounting 6/89-9/02

13 01 16 06 Accounting 6/16/00 HSI Geotrans

13 01 16 06 Accounting DEQ internal email re: Funding 09/19/01 DEQ internal

13 01 16 06 Accounting DEQ internal emails re: Penalty payment, EQPF 02/20/02 DEQ internal

13 01 16 06 Accounting DEQ internal email re: Contractor 3/13/02 DEQ internal

13 01 16 06 Accounting TEEMI Status Summary 9/27/02

13 01 16 07 Accounting 1/91-6/93

13 01 16 07 Accounting John

13 01 16 07 Accounting Joe

13 01 16 07 Accounting Leased Car

13 01 16 08 Accounting Response Costs 8/89-2/96

Site-Wide Information

Community Relations Press/Media Contacts

DEQ/Reynolds email to Livingston Currant/Neill re: Reynolds responses to Q&A

Site-Wide Information

Community Relations Press/Media Contacts

DEQ/Chambers & Tom Livers emails re: Media contact - info request

Site-Wide Information

Community Relations Press/Media Contacts

Media contact/Webb & DEQ/Reynolds emails re: BN contract with Envirocon

Site-Wide Information

SCAP (This file is not used)

Site-Wide Information

1008/ 45A604

Site-Wide Information

1008/ 45A604

Site-Wide Information

1008/ 45A604

Site-Wide Information

1008/ 45A604

Site-Wide Information

Vouchers, Invoices, and Supporting Information

1008/ 45A604

Site-Wide Information

Vouchers, Invoices, and Supporting Information MBMG

1008/ 45A604

Site-Wide Information

Correspondence (6/89-9/02) (Documents dated before 6/16/00 are not itemized)

1008/ 45A604

Site-Wide Information Correspondence (6/89-9/02)

Phone Log - HSI Geotrans to DEQ re: New consultant to BN site

1008/ 45A604

Site-Wide Information Correspondence (6/89-9/02)

1008/ 45A604

Site-Wide Information Correspondence (6/89-9/02)

1008/ 45A604

Site-Wide Information Correspondence (6/89-9/02)

1008/ 45A604

Site-Wide Information Correspondence (6/89-9/02)

1008/ 45A604

Site-Wide Information

Employee Training, Travel, Leased Car

1008/ 45A604

Site-Wide Information

Employee Training, Travel, Leased Car

1008/ 45A604

Site-Wide Information

Employee Training, Travel, Leased Car

1008/ 45A604

Site-Wide Information

Employee Training, Travel, Leased Car

1008/ 45A604

Site-Wide Information

Page 317: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 317 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 16 08 Accounting Response Costs Desk Calendars 1992-1999

13 01 17 1/94-12/00

13 01 18 (file empty)

13 01 18 Park County # 220038

13 01 18 USEPA # 800286

13 01 19 References

13 01 19 01 References

13 01 19 02 References

13 01 19 03 References

13 01 19 04 References

13 01 19 04 References 9/92 ATSDR

13 01 19 04 References 09/01/93

13 01 19 04 References 01/03/97 ATSDR

13 01 19 04 References ATSDR Public Info Sheet 2/2000 ATSDR

13 01 19 04 References 1997 Petitioned Public Health Assessment 07/01/08 KJ

13 01 19 04 References KJ Letter to ATSDR re: Request Receipt 08/04/08 KJ

1008/ 45A604

Site-Wide Information

1167/ 38D106

Site-Wide Information

Contracts (See Contracts/ Agreements Master File)

Site-Wide Information

Cooperative Agreements (See Cooperative Agreements Master File)

Site-Wide Information

Cooperative Agreements

Site-Wide Information

Cooperative Agreements

Site-Wide Information

Site-Wide Information

General Correspondence (file empty)

Site-Wide Information

Waste Treatment (file empty)

Site-Wide Information SITE Program (file empty)

Site-Wide Information

ATSDR Health Assessment/Pancreatic Cancer Study

1167/ 38D106

Site-Wide Information

ATSDR Health Assessment/Pancreatic Cancer Study

Final Report Investigation of a Cluster of Pancreatic Cancer Deaths in Livingston and Park County, Montana

1167/ 38D106

Site-Wide Information

ATSDR Health Assessment/Pancreatic Cancer Study

Pancreatic Cancer Mortality in Montana a Records Based Case-Control Study (ATSDR/MDHES)

1167/ 38D106

Site-Wide Information

ATSDR Health Assessment/Pancreatic Cancer Study

ATSDR Petitioned Public Health Assessment for public comment

1167/ 38D106

Site-Wide Information

ATSDR Health Assessment/Pancreatic Cancer Study

1167/ 38D106

Site-Wide Information

ATSDR Health Assessment/Pancreatic Cancer Study

1167/ 38D106

Site-Wide Information

ATSDR Health Assessment/Pancreatic Cancer Study

Page 318: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 318 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 19 04 References DEQ email to ATSDR re: Vapor intrusion split & GW data 08/29/08 DEQ

13 01 19 04 References ATSDR email to DEQ re: K/J letter status 08/29/08 ATSDR

13 01 19 04 References DEQ internal email re: ATSDR contact 12/11/08 DEQ internal

13 01 19 04 References Phone Log – DEQ & Dan Strausbaugh re: BNSF petition 3/10/09

13 01 19 04 References KJ

13 01 19 04 References 9/3/09 EPA/ Strausbaugh

13 01 19 04 References 12/21/10 KJ/ Norris

13 01 19 04 References

13 01 19 04 References Y 10/11/12

13 01 19 04 References Y ** DEQ comments on Draft ATDSR 10/29/12

13 01 19 05 References 4/91-5-91

13 01 19 05 References Correspondence 5/90-9/91

13 01 19 05 01 References RASC Calendar 06/13/05

13 01 19 05 02 References Minutes to RASC Meetings 02/20/91

13 01 19 05 03 References 05/01/91

13 01 19 05 04 References 2/91-3/91

13 01 19 05 05 References Risk Assessment Proposals 4/91

13 01 19 06 06 References Baseline Risk Assessment 2/91 CDM

1167/ 38D106

Site-Wide Information

ATSDR Health Assessment/Pancreatic Cancer Study

1167/ 38D106

Site-Wide Information

ATSDR Health Assessment/Pancreatic Cancer Study

1167/ 38D106

Site-Wide Information

ATSDR Health Assessment/Pancreatic Cancer Study

1167/ 38D106

Site-Wide Information

ATSDR Health Assessment/Pancreatic Cancer Study

1167/ 38D106

Site-Wide Information

ATSDR Health Assessment/Pancreatic Cancer Study

Data package submitted to ATDSR for review was generated by BNSF contractor – K/J independent of DEQ instruction

received 5/20/09

1167/ 38D106

Site-Wide Information

ATSDR Health Assessment/Pancreatic Cancer Study

EPA/Strausbaugh email to DEQ/Reynolds re: ATSDR decision letter

1167/ 38D106

Site-Wide Information

ATSDR Health Assessment/Pancreatic Cancer Study

  K/J/Norris letter to Dr. Michelle Watters re: 1997 Petitioned Public Health Assessment

1167/ 38D106

Site-Wide Information

ATSDR Health Assessment/Pancreatic Cancer Study

EPA, K/J, & Dr Watters emails Forward to DEQ re: ATDSR review of indoor air quality data related to the BN Shop Complex

10/24/09 - 1/3/10

Site-Wide Information

ATSDR Health Assessment/Pancreatic Cancer Study ** EPA/Strausbaugh & DEQ/Reynolds emails re: Draft ATSDR

Site-Wide Information

ATSDR Health Assessment/Pancreatic Cancer Study

1007 / 45A601

Site-Wide Information

Risk Assessment Steering Committee

1007 / 45A601

Site-Wide Information

1007 / 45A601

Site-Wide Information

1007 / 45A601

Site-Wide Information

1007 / 45A601

Site-Wide Information

Request for Qualifications & Contractor Selection

1007 / 45A601

Site-Wide Information

Qualification Statements from Contractors

1007 / 45A601

Site-Wide Information

1007 / 45A601

Site-Wide Information

Page 319: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 319 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 19 06 References

13 01 19 06 01 References 1/92-9/92

13 01 19 06 01 References 2/14/92 CDM

13 01 19 06 02 References PRGs and COCs 3/92-8/92

13 01 19 06 02 References Preliminary Exposure Pathways Analysis and Assumptions 05/29/92 CDM

13 01 19 06 03 References 6/91-6/94

13 01 19 06 03 References 9/14/92 CDM

13 01 19 06 04 References Contract Negotiations 1988-1991

13 01 19 06 06 References Risk Assessments

13 01 19 06 References Risk Assessments 10/12/92 CDM

13 01 19 06 06 References Risk Assessments 12/14/92 CDM

13 01 19 06 06 References Risk Assessments 08/24/94 CDM

13 01 19 06 06 References Risk Assessments 05/01/93 CDM

13 01 19 06 06 References Risk Assessments DEQ letter to BNSF re: GW Modeling for soil cleanup levels 09/07/93 DEQ

13 01 19 06 06 References Risk Assessments 3/22/94 DEQ

13 01 19 06 06 References Risk Assessments 5/16/94 CDM

13 01 19 06 06 References Risk Assessments 08/01/94 DEQ

13 01 19 06 06 01 References

13 01 19 06 06 01 References 05/06/08 KJ

13 01 19 06 06 01 References 2/6/09 DEQ

13 01 19 06 06 01 References 03/10/09 DEQ/ Reynolds

13 01 19 06 06 01 References 09/16/09 DEQ

Site-Wide Information

EPA Technical Review (no file)

1007/ 45A601

Site-Wide Information

Site Overview Data Evaluation

1007/ 45A601

Site-Wide Information

Overview of Remedial Investigations and Field Activities at Burlington Northern Livingston Rail Yard

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

Preliminary Draft, Comments

1007/ 45A601

Site-Wide Information

Burlington Northern Livingston Rail Yard Preliminary Draft Risk Assessment Chapter 1.0 through 5.0

1007/ 45A601

Site-Wide Information

Site-Wide Information

1167/ 38D106

Site-Wide Information

Draft Report Risk Assessment Livingston Rail Yard Volume I Text, Volume II Appendices

1167/ 38D106

Site-Wide Information

Draft Report Risk Assessment Livingston Rail Yard Volume I Text, Volume II Appendices

1167/ 38D106

Site-Wide Information CDM letter to DEQ re: Risk analysis for TPH in subsurface soil

1167/ 38D106

Site-Wide Information

Final Report Baseline Risk Assessment Livingston Rail yard Volume I Text, Volume II Appendices

1167/ 38D106

Site-Wide Information

1167/ 38D106

Site-Wide Information DEQ letter to CDM re: Model parameters for soil cleanup levels

1167/ 38D106

Site-Wide Information

CDM letter to DEQ re: Comments on subsurface soil cleanup levels

1167/ 38D106

Site-Wide Information

DEQ letter to Envirocon re: Cleanup levels for chlorinated solvents in soil & groundwater

Site-Wide Information

Risk Assessment Addendums

Site-Wide Information

Risk Assessment Addendums

KJ letter to DEQ re: BNSF proposed commercial/industrial indoor air screening levels

Site-Wide Information

Risk Assessment Addendums

DEQ letter to KJ re: DEQ response to proposed commercial/ industrial screening levels

Site-Wide Information

Risk Assessment Addendums

DEQ/Reynolds letter to BN/Smith re: Site-Specific cleanup levels for indoor air

Site-Wide Information

Risk Assessment Addendums

Final Draft Task I Risk Assessment Amendment & MDEQ Approved Remedy for Newly Identified Contaminants of Concern in Indoor Air

Page 320: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 320 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 19 06 06 01 References 10/23/09 PCEC/ Billau

13 01 19 06 06 01 References 10/23/09 J Black

13 01 19 06 06 01 References 10/23/09 N Durfey

13 01 19 06 06 01 References 10/23/09 Bill Moser

13 01 19 06 06 01 References 10/23/09 KJ

13 01 19 06 06 01 References Resident/Bob Farrell to DEQ/Reynolds re: Concerned citizen 10/25/09 Bob Farrell

13 01 19 06 06 01 References 2/1/10 DEQ legal internal

13 01 19 06 06 01 References 2/4/10

13 01 19 06 06 01 References 2/10/10 Bozeman Chronical

13 01 19 06 06 01 References Draft Final Task I Risk Assessment Amendment #2 10/20/10

13 01 19 06 06 01 References 10/25/10 Bozeman Chronical

13 01 19 06 06 01 References 10/25/10

13 01 19 06 06 01 References 10/25/10 DEQ/ Reynolds

13 01 19 06 06 01 References 10/25/10 DEQ/ Reynolds

13 01 19 06 06 01 References 11/05/10 D & K Krohne

13 01 19 06 06 01 References 11/22/10 RTI/ Johnson

13 01 19 06 06 01 References 11/23/10 KJ/Norris

Site-Wide Information

Risk Assessment Addendums

PCEC/Billau email to DEQ/Reynolds re: PCEC comments on Final Draft Task I Risk Assessment Amendment

Site-Wide Information

Risk Assessment Addendums

Resident/J Blank email to DEQ/Reynolds re: Resident comments on Public Meeting

Site-Wide Information

Risk Assessment Addendums

Resident/N Durfey email to DEQ/Reynolds re: Resident comments

Site-Wide Information

Risk Assessment Addendums

Bill Moser email to DEQ/Reynolds re: Comments on public meeting

Site-Wide Information

Risk Assessment Addendums

BN comments on the Final Draft Task I Risk Assessment Amendment

Site-Wide Information

Risk Assessment Addendums

Site-Wide Information

Risk Assessment Addendums

DEQ Legal/Haque-Hausrath internal email re: DEQ has finalized its Draft Task I Risk Assessment Amendment & MDEQ Approved Remedy for Newly Identified Contaminants of Concern in Indoor Air

Site-Wide Information

Risk Assessment Addendums

Livingston Enterprise Affidavit of Publication re: Final Task I Risk Assessment Amendment & MDEQ Approved Remedy for Newly Identified Contaminants of Concern in Indoor Air

Livingston Enterprise

Site-Wide Information

Risk Assessment Addendums

Bozeman Chronicle Affidavit of Publication re: Final Task I Risk Assessment Amendment & MDEQ Approved Remedy for Newly Identified Contaminants of Concern in Indoor Air

Site-Wide Information

Risk Assessment Addendums

Site-Wide Information

Risk Assessment Addendums

Bozeman Chronicle Affidavit of Publication re: Public Notice - Final Task I Risk Assessment Amendment # 2 out for public comment

Site-Wide Information

Risk Assessment Addendums

Livingston Enterprise Affidavit of Publication re: Public Notice - Final Task I Risk Assessment Amendment # 2 out for public comment

Livingston Enterprise

Site-Wide Information

Risk Assessment Addendums

DEQ/Reynolds email to BN/Smith & K/J/Norris & Aldersley re: Attachment – Proposed revised indoor air cleanup levels

Site-Wide Information

Risk Assessment Addendums

DEQ/Reynolds letter to BN/Smith re: BNSF Request to Recalculate Proposed Site-Specific Cleanup Levels for Indoor Air Included in the June 24, 2010 Task I – 2010 Soil Gas/Indoor Air Data Summary Report

Site-Wide Information

Risk Assessment Addendums

Residents Dwight & Kitty Krohne “comments” on Draft Final Task I Risk Assessment Addendum # 2

Site-Wide Information

Risk Assessment Addendums

RTI/Johnson email to DEQ/Reynolds re: Attachment – RTI Task I Risk Assessment Amendment 2 comments

Site-Wide Information

Risk Assessment Addendums

K/J/Norris email to DEQ/Reynolds re: Faxed K/J comments to Task I Risk Assessment Amendment # 2

Page 321: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 321 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 19 06 06 01 References 11/23/10 KJ/Norris

13 01 19 06 06 01 References 11/23/10 DEQ/ Reynolds

13 01 19 06 06 01 References 11/23/10 KJ/Norris

13 01 19 06 06 01 References Interim Final Task I Risk Assessment Amendment No. 2 03/11/11 DEQ

13 01 19 06 06 01 References 08/29/12 KJ/Norris

13 01 19 06 06 01 References 08/29/12 KJ/Norris

13 01 19 06 06 01 References 08/31/12 DEQ/ Reynolds

13 01 19 07 References Hazardous Waste

13 01 19 08 References 3/1987

13 01 19 09 References 8/87-10/99

13 01 19 09 References Utah DOH

13 01 19 10 References TPH Cleanup Levels

13 01 19 10 References TPH Cleanup Levels Winter 1989 GW monitoring article 06/20/05

13 01 19 10 References TPH Cleanup Levels Draft - ReTec Model for Cleanup Levels

13 01 19 10 References TPH Cleanup Levels Article on State Cleanup Levels 12/01/91

13 01 19 10 References TPH Cleanup Levels Lust Program Guidelines May, 1992

13 01 19 10 References TPH Cleanup Levels Remediation Article- Cleanup Standards

13 01 19 10 References TPH Cleanup Levels Washington Dept of Ecology memo re: Soils Matrix 10/30/92

13 01 19 10 References TPH Cleanup Levels NGWA Meeting Proceedings

13 01 19 10 References TPH Cleanup Levels Washington State Dept of Ecology memo re: Soil Standards 4/23/93

13 01 19 10 References TPH Cleanup Levels DHES letter to BN re: TPH & Free Product recovery 8/27/93 DHES

13 01 19 10 References TPH Cleanup Levels CDM letter to DEQ re: TPH paper 1/31/94 CDM

Site-Wide Information

Risk Assessment Addendums

K/J/Norris email to DEQ/Reynolds re: K/J comments to Task I Risk Assessment Amendment # 2

Site-Wide Information

Risk Assessment Addendums

DEQ/Reynolds fax to K/J/Norris re: Task I Risk Assessment Amendment # 2 comments

Site-Wide Information

Risk Assessment Addendums

K/J/Norris letter to DEQ/Reynolds re: K/J response to DEQ comments on Task I – 2010 Soil Gas/Indoor Air Data Summary Report & Draft Final Task I Risk Assessment Amendment # 2

Site-Wide Information

Risk Assessment Addendums

Site-Wide Information

Risk Assessment Addendums

KJ/Norris email to DEQ/Reynolds re: Attachment - BN/KJ comments on the Final Draft Task I Risk Assessment Amendment No. 2

Site-Wide Information

Risk Assessment Addendums

KJ/Norris letter to DEQ/Reynolds re: KJ comments on the Final Draft Task I Risk Assessment Amendment No. 2

Site-Wide Information

Risk Assessment Addendums

DEQ/Reynolds letter to BN/Smith re: Attachment - Final Task I Risk Assessment Amendment No. 2

Site-Wide Information

1007/ 45A601

Site-Wide Information

Contaminant Health Advisory Sheets

1007/ 45A601

Site-Wide Information

Community Health Concerns

1007/ 45A601

Site-Wide Information

Community Health Concerns (8/87-10/99)

Utah DOH letter to resident re: Health effects of various contaminants during pregnancy

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

  Summer 1992

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

11/ 4 - 11/6/92

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

Page 322: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 322 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 19 10 References TPH Cleanup Levels CDM letter to DEQ re: TPH paper 02/01/94 CDM

13 01 19 10 References TPH Cleanup Levels Y ** DEQ internal memo re: TPH 3/16/98 DEQ internal

13 01 19 10 References TPH Cleanup Levels Phone Log - Brown/Energy Labs 2/8/94

13 01 19 10 References TPH Cleanup Levels 2/10/94

13 01 19 10 References TPH Cleanup Levels Phone Log - CDM 2/14/94

13 01 19 10 References TPH Cleanup Levels DEQ memo re: TPH 2/16/94 DEQ

13 01 19 10 References TPH Cleanup Levels DHES letter to BN re: Use of ReTec Model at Livingston 02/23/94 DHES

13 01 19 10 References TPH Cleanup Levels DEQ fax to Nolan re: Treatability tests 02/28/94 DEQ

13 01 19 10 References TPH Cleanup Levels CDM letter to DEQ re: Work Plan 04/15/94 CDM

13 01 19 10 References TPH Cleanup Levels Envirocon letter to DEQ re: 4/4/94 conference call 04/27/94 Envirocon

13 01 19 10 References TPH Cleanup Levels MycoTech fax to DEQ re: SOP for measuring bacteria in soil 4/28/94 MycoTech

13 01 19 10 References TPH Cleanup Levels DHES letter to Envirocon re: TPH articles 05/03/94 DHES

13 01 19 10 References TPH Cleanup Levels Washington State Dept of Ecology Site Register 05/24/94

13 01 19 10 References TPH Cleanup Levels CDM fax to DEQ re: Final RI Data - Risk Assessment 6/23/94 CDM

13 01 19 10 References TPH Cleanup Levels Description of Beaverell Series Soils

13 01 19 10 References TPH Cleanup Levels Phone Log - CDM 08/16/94

13 01 19 10 References TPH Cleanup Levels Phone Log - Oregon DEQ 8/26/94

13 01 19 10 References TPH Cleanup Levels 10/28/94 DEQ internal

13 01 19 10 References TPH Cleanup Levels GeoTrans TPH Cleanup Levels Report, Mission Wye 11/28/94 GeoTrans

13 01 19 10 References TPH Cleanup Levels Oregon DEQ fax re: Cleanup Levels 3/31/95 Oregon DEQ

13 01 19 10 References TPH Cleanup Levels State Summary GW TPH Cleanup Levels 11/01/95

13 01 19 10 References TPH Cleanup Levels Energy Labs memo to DEQ re: DRO Analysis 12/16/97 Energy Labs

13 01 19 10 References TPH Cleanup Levels Envirocon letter to DEQ re: TPH data, TPH V. EPH Analysis 8/28/01 Envirocon

1007/ 45A601

Site-Wide Information

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

Washington State Dept of Ecology fax to DEQ re: UST regulations

Washington State Dept of Ecology

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

Washington State Dept of Ecology

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

DEQ internal memo re: TPH Cleanup Level for Mission Wye facility

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

Page 323: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 323 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 19 11 References Bio-remediation References 11/94-1/95

13 01 19 11 References Bio-remediation References ES&T letter to DEQ re: Biotrans Model 11/02/94 ES&T

13 01 19 11 References Bio-remediation References Bioremediation in the Field Search System Report 1/25/95

13 01 19 12 References 10/04-11/04

13 01 19 12 References Print out from Cadastral Database - Rail Yard 10/27/04

13 01 19 12 References 11/18/04

13 01 19 12 References LRY Deeds

13 01 19 13 References 4/93-9/05

13 01 19 13 References Soil Vapor Extraction Information 4/93

13 01 19 13 References 9/19/05

13 01 20

13 01 20 01

13 01 21 SEAs – slides 12/01/97

13 01 22

13 01 22 01 5/90-4/01

13 01 22 01 Y ** DEQ & R Collins emails re: NRD Assessment 12/04/07

13 01 22 01 Y ** DEQ internal email re: Court Order Injunction 04/30/08

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

1007/ 45A601

Site-Wide Information

References - Property Ownership

1007/ 45A601

Site-Wide Information

References - Property Ownership

1007/ 45A601

Site-Wide Information

References - Property Ownership

Property Ownership research for rail yard - includes map & various deeds

1007/ 45A601

Site-Wide Information

References - Property Ownership

1007/ 45A601

Site-Wide Information

References - Railyard Operations & Track Safety

1007/ 45A601

Site-Wide Information

References - Railyard Operations & Track Safety

1007/ 45A601

Site-Wide Information

References - Railyard Operations & Track Safety

BN/MRL meeting re: Track safety - attendance list, meeting notes & handouts

1007/ 45A601

Site-Wide Information

Interagency Coordination (empty)

1007/ 45A601

Site-Wide Information

Interagency Coordination

Geographic Information System (GIS) (empty)

1009/ 45A602

Site-Wide Information

Site-Wide Information

Natural Resource Damage Claims

1009/ 45A602

Site-Wide Information

Natural Resource Damage Claims

Correspondence – non confidential

1009/ 45A602

Site-Wide Information

Natural Resource Damage Claims

1009/ 45A602

Site-Wide Information

Natural Resource Damage Claims

Page 324: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 324 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 23

13 01 24

13 01 25 UST

13 01 25 01 UST Other BN Tank Sites 12/90-9/94

13 01 25 02 UST Y 1/87-7/95

13 01 25 02 UST Draft Generic Tank Removal Work Plan

13 01 25 02 UST DHES letter to City of Livingston Fire Chief re: Tanks 1/23/87 DHES

13 01 25 02 UST Olympus letter to DHES re: Tank Removal Work Plan 7/26/87 Olympus

13 01 25 02 UST 8/1/88 DHES

13 01 25 02 UST Olympus letter to DHES re: Work Proposal - UST removal 8/2/88 Olympus

13 01 25 02 UST Work Plan - UST Removal 09/01/88

13 01 25 02 UST 10/27/88

13 01 25 02 UST 11/9/88

13 01 25 02 UST Tank removal meeting minutes 1/12/89

13 01 25 02 UST 04/13/89 Chen-Northern

13 01 25 02 UST 04/28/89 ReTec

13 01 25 02 UST 9/89

13 01 25 02 UST Phone Log - Mills/Envirocon 06/05/95 Envirocon/ Mills

13 01 25 02 UST Phone Log - Dupont 07/14/95

Site-Wide Information

Local Governments (empty)

Site-Wide Information

(intentionally left blank)

Site-Wide Information

1009/ 45A602

Site-Wide Information

1009/ 45A602

Site-Wide Information

** BN Livingston Correspondence (Some documents are not itemized)

1009/ 45A602

Site-Wide Information

BN Livingston Correspondence

1009/ 45A602

Site-Wide Information

BN Livingston Correspondence

1009/ 45A602

Site-Wide Information

BN Livingston Correspondence

1009/ 45A602

Site-Wide Information

BN Livingston Correspondence

DHES office memo re: BN Livingston tank removal walk through

1009/ 45A602

Site-Wide Information

BN Livingston Correspondence

1009/ 45A602

Site-Wide Information

BN Livingston Correspondence

1009/ 45A602

Site-Wide Information

BN Livingston Correspondence

Work Plan for the Removal of Storage Tanks, Piping and Contaminated Soils (Remediation Technologies/Olympus Environmental

1009/ 45A602

Site-Wide Information

BN Livingston Correspondence

Amendment to the QA/QC Plan as Part of the Work Plan for the Removal of Storage Tanks Piping and Contaminated Soils (Remediation Technologies, Olympus Environmental

1009/ 45A602

Site-Wide Information

BN Livingston Correspondence

1009/ 45A602

Site-Wide Information

BN Livingston Correspondence

Interim Report Storage Tank, Piping, and Contaminated Soil Removal

1009/ 45A602

Site-Wide Information

BN Livingston Correspondence

Summary Report for the Removal of Storage Tanks, Piping and Contaminated Soils/Gravels Text and 4 Appendices (ReTec

1009/ 45A602

Site-Wide Information

BN Livingston Correspondence

Summary Report Management of Containerized Materials Tank Removal Program (Remediation Technologies, Olympus Environmental

1009/ 45A602

Site-Wide Information

BN Livingston Correspondence

1009/ 45A602

Site-Wide Information

BN Livingston Correspondence

Page 325: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 325 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 26

13 01 26 01 Drinking Water

13 01 26 01 01 Sampling Results

13 01 26 01 01 1988 Water System and Well Analysis for Livingston, MT 11/01/88 Morrison Maierle

13 01 26 01 01 10/16/89 Envirocon

13 01 26 01 01 3/26/90 Morrison Maierle

13 01 26 02

13 01 26 02 January, 1988 Onsite and Offsite Groundwater Investigations 03/01/88 ReTec

13 01 26 02 05/01/88 ReTec

13 01 26 02 10/01/88 ReTec

13 01 26 02 3/89 ReTec

13 01 26 02 Standard Operating Procedures for Ground Water Sampling 08/01/90 Envirocon

13 01 26 02 9/90 GW Monitoring Report 01/01/91

13 01 26 02 10/90 GW Monitoring Report 1/91

13 01 26 02 11/90 GW Monitoring Report 02/01/91

Site-Wide Information

Sampling/ Contaminant Sources

1168/ 39F806

Site-Wide Information

Sampling/ Contaminant Sources

1168/ 38F806

Site-Wide Information

Sampling/ Contaminant Sources

1168/ 39F807

Site-Wide Information

Sampling/ Contaminant Sources

1168/ 38F807

Site-Wide Information

Sampling/ Contaminant Sources

Livingston Municipal Drinking Water Sampling Results September 1989

1168/ 39F808

Site-Wide Information

Sampling/ Contaminant Sources

Clinic Well & Billman Creek Well Design Report (Morrison-Maierle

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1011/ 45A603

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1011/ 45A603

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

Addendum to January, 1988 Onsite and Offsite Groundwater Investigations

1011/ 45A603

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

Summary of Groundwater Investigations and Conceptual Design of Fuel Recovery System Volume I Text Volume II Appendices

1011/ 45A603

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

Report of Groundwater Investigations Livingston, Montana Fueling Facility June 1988-January 1989

1011/ 45A603

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1011/ 45A603

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1011/ 45A603

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1011/ 45A603

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

Page 326: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 326 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 26 02 2/91GW Monitoring Report 7/91

13 01 26 02 8/91 GW Sampling Results 10/01/91

13 01 26 02 Oct, Nov, & Dec 1991 GW Sampling Results 02/01/92

13 01 26 02 8/97

13 01 26 02 1998 Annual GW Sampling Report 9/98

13 01 26 02 DEQ letter to Rustad re: Sampling Results 12/01/98 DEQ

13 01 26 02 DEQ email to Erickson re: 2000 GW Report 01/19/01 DEQ

13 01 26 02 Y ** DEQ Internal Email re: Report Circulation 05/01/01 DEQ internal

13 01 26 02 Envirocon fax to DEQ re: 2001 PCE results 06/25/01 Envirocon

13 01 26 02 Site visit report re: 11/29/01 site visit 01/09/02

13 01 26 02 Envirocon letter to DEQ re: Product thickness data 2/5/02 Envirocon

13 01 26 02 2001 Annual GW Sampling Report 03/04/02 Envirocon

13 01 26 02 Envirocon letter to DEQ re: 2001 Annual GW Sampling report 3/4/02 Envirocon

13 01 26 02 DEQ internal email re: Opportunistic GW sampling 06/10/03 DEQ internal

13 01 26 02 BN letter to DEQ re: GW sampling 06/20/03 BN

1011/ 45A603

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1011/ 45A603

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1011/ 45A603

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1011/ 45A603

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence 1997 Annual GW Sampling Report

1011/ 45A603

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1011/ 45A603

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

Page 327: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 327 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 26 02 DEQ letter to Petit re: GW data 8/12/03 DEQ

13 01 26 02 DEQ fax to Petit re: 2003 GW results 8/13/03 DEQ

13 01 26 02 10/31/03 KJ

13 01 26 02 03/10/04 Envirocon

13 01 26 02 DEQ Letter to BNSF re: Groundwater Sampling 04/15/04 DEQ

13 01 26 02 DEQ Letter to K/J re: Groundwater Sampling DEQ

13 01 26 02 DEQ Letter to Livingston City re: Depot Center 05/03/04 DEQ

13 01 26 02 Phone Log: Kraja, K/J 5/3/04

13 01 26 02 Emails - K/J & DEQ re: Groundwater Sampling 05/03/04

13 01 26 02 DEQ Letter to BNSF re: Depot Center 05/04/04 DEQ

13 01 26 02 Email - Kennedy/Jenks to DEQ re: Groundwater Sampling 5/4/04 KJ

13 01 26 02 Phone Log: Smith/BNSF 5/5/04

13 01 26 02 Kennedy/Jenks FAX to DEQ re: May Schedule 05/05/04 KJ

13 01 26 02 Schedule for June 2004 Fieldwork 5/17/04

13 01 26 02 DEQ Transmittal to MSU re: 2003 Annual GW Report 05/19/04 DEQ

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

K/J letter/fax to DEQ re: Changes in Analytical Laboratories & Methods

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

Envirocon report to DEQ re: Former East End Conoco, contains VPH data for L-87-7

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

Page 328: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 328 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 26 02 DEQ Transmittal to State Library re: 2003 Annual GW Report 5/19/04 DEQ

13 01 26 02 DEQ Transmittal to PECE re: 2003 Annual GW Report 5/19/04 DEQ

13 01 26 02 DEQ Transmittal to RTI re: 2003 Annual GW Report 5/19/04 DEQ

13 01 26 02 DEQ Transmittal to U of M re: 2003 Annual GW Report 05/19/04 DEQ

13 01 26 02 5/19/04 DEQ

13 01 26 02 DEQ Transmittal to L-P Library re: 2003 Annual GW Report 5/19/04 DEQ

13 01 26 02 DEQ Letter to BN re: Private Wells 05/21/04 DEQ

13 01 26 02 GW split-sample VOC Lab report 6/04

13 01 26 02 DEQ comment letter to BNSF re: 2003 GW Report 06/11/04 DEQ

13 01 26 02 Phone Log: Davies & Kraja, K/J 06/15/04

13 01 26 02 Phone Log: Kraja, K/J 06/17/04

13 01 26 02 June 2004 GW Sampling Field Notes 05/30/04

13 01 26 02 June 2004 DEQ Split GW Samples COC. 05/31/04

13 01 26 02 une 2004 Split sample results - EPH Fractions 06/01/04

13 01 26 02 DEQ Internal Email re: Purge Water (1) 06/30/04 DEQ internal

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

DEQ Transmittal to City of Livingston re: 2003 Annual GW Report

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

Page 329: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 329 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 26 02 DEQ Internal Email re: Purge Water (2) 6/30/04 DEQ internal

13 01 26 02 DEQ Internal Email re: Purge Water (3) 06/30/04 DEQ internal

13 01 26 02 Phone Log: Mrs. Rustad 6/30/04

13 01 26 02 Kennedy/Jenks Field Schedule 07/04/11 KJ

13 01 26 02 Phone Log: Kraja, K/J 7/1/04

13 01 26 02 Phone Log: Smith/BNSF 7/12/04

13 01 26 02 K/J email attachment - Preliminary Lab Data, Part 1 7/16/04 KJ

13 01 26 02 K/J email attachment - Preliminary Lab Data, Part 2 7/16/04 KJ

13 01 26 02 Phone Log: Kraja, K/J 7/19/04

13 01 26 02 Email - K/J to DEQ re: Preliminary Analytical Data 7/19/04 KJ

13 01 26 02 7/23/04 DEQ

13 01 26 02 DEQ email to K/J re: Data 7/29/04 DEQ

13 01 26 02 K/J email to DEQ attachment - Preliminary lab data 07/30/04 KJ

13 01 26 02 K/J email to DEQ re: Lab data 07/30/04 KJ

13 01 26 02 K/J email to DEQ re: Chromatograms 07/30/04 KJ

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

DEQ transmittal to BNSF, RTI, K/Js re: Split sample VOC Lab report

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

Page 330: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 330 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 26 02 K/J email to DEQ re: Well 89-8 07/30/04 KJ

13 01 26 02 DEQ letter to BNSF re: Access to private property 8/4/04 DEQ

13 01 26 02 Phone Log: Kraja, K/J 8/9/04

13 01 26 02 Phone Log: Blicker/RTI 8/10/04

13 01 26 02 08/11/04 DEQ

13 01 26 02 Phone Log: J Norris/KJ 8/26/04

13 01 26 02 08/27/04 KJ

13 01 26 02 Phone Log: J Norris/K/J 8/30/04

13 01 26 02 DEQ email to K/J re: Due date for 2003 GW report 08/30/04 DEQ

13 01 26 02 Y ** DEQ internal email re: Purge water treatment 09/20/04 DEQ internal

13 01 26 02 Revised Annual GW Sampling Report 2003 10/01/04 KJ

13 01 26 02 DEQ letter to BN re: IDW Disposal 10/1/04 DEQ

13 01 26 02 K/J email to DEQ re: Revised 2003 Report 10/21/04 KJ

13 01 26 02 10/22/04 KJ

13 01 26 02 10/28/04 DEQ

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

DEQ transmittal to BNSF, K/J, RTI re: Split sample petroleum data

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

K/J email to DEQ re: Landowner info for monitoring wells (w/attachments)

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1011/ 45A603

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

K/J transmittal to DEQ re: Extra copies of revised 2003 GW report

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

DEQ transmittal to Livingston Library re: Revised 2003 GW report

Page 331: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 331 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 26 02 DEQ transmittal to RTI re: Revised 2003 GW report 10/28/04 DEQ

13 01 26 02 10/28/04 DEQ

13 01 26 02 DEQ transmittal to PCEC re: Revised 2003 GW report 10/28/04 DEQ

13 01 26 02 10/28/04 DEQ

13 01 26 02 DEQ transmittal to MSU re: Revised 2003 GW report 10/28/04 DEQ

13 01 26 02 K/J letter to DEQ re: Changes to Labs & methods 10/31/04 KJ

13 01 26 02 DEQ split samples groundwater- COC 11/04 DEQ

13 01 26 02 KJ email to DEQ re: 94-2 well 11/09/04 KJ

13 01 26 02 GW Sampling Logs for DEQ Split Samples 11/04/11

13 01 26 02 DEQ sample receipt 94-2 11/17/04 DEQ

13 01 26 02 KJ letter to DEQ re: Low flow sampling plan 02/01/05 KJ

13 01 26 02 DEQ letter to Randy Taylor re: Nov 04 GW data 02/04/05 DEQ

13 01 26 02 DEQ letter to BN /KJ re: 11/04 GW split samples 02/04/05 DEQ

13 01 26 02 DEQ transmittal to Watsons re: 94-2 Nov 04 GW data 02/14/05 DEQ

13 01 26 02 DEQ transmittal to Rustad re: 94-1 Nov 04 GW data 2/14/05 DEQ

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

DEQ transmittal to Park Co. Sanitarian re: Revised 2003 GW report

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

DEQ transmittal to City of Livingston re: Revised 2003 GW report

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

Page 332: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 332 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 26 02 DEQ transmittal to RTI re: Nov 04 GW data 02/14/05 DEQ

13 01 26 02 DEQ transmittal to Talgo - LRC re: Nov 04 GW data 2/14/05 DEQ

13 01 26 02 DEQ transmittal to MRL re: Nov 04 GW data 02/14/05 DEQ

13 01 26 02 DEQ letter to BN re: Approval of IDR Water Treatment Plan 2/14/05 DEQ

13 01 26 02 2/14/05 DEQ

13 01 26 02 DEQ fax to BN/KJ re: WP approval & contained in decision 2/14/05 DEQ

13 01 26 02 DEQ email to BN/K/J re: Natural Attenuation Sampling 3/3/05 DEQ

13 01 26 02 03/25/05 DEQ internal

13 01 26 02 3/29/05 KJ

13 01 26 02 K/J email to DEQ re: Well Map & Index 04/26/05 KJ

13 01 26 02 DEQ letter to BNSF re: Low flow sampling 05/20/05 DEQ

13 01 26 02 K/J letter/fax to DEQ re: June 2005 Sampling event 06/01/05 KJ

13 01 26 02 K/J letter/fax to DEQ re: June 2005 Sampling event 6/8/05 KJ

13 01 26 02 DEQ email to K/J re: June 2005 Sampling Event 06/10/05 DEQ

13 01 26 02 K/J transmittal letter to DEQ re: Access letters to landowners 6/13/05 KJ

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

DEQ letter to BN re: Contained in decision, Nov 2004 purgewater

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence DEQ internal email re: Chromium waste from Hach colorimeter

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

K/J letter to DEQ re: Well ID, replacement pages for 2003 annual report

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

Page 333: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 333 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 26 02 DEQ fax to K/J re: Jones Oil MWS, lab data 06/15/05 DEQ

13 01 26 02 K/J email to DEQ re: Annual report 06/29/05 KJ

13 01 26 02 DEQ transmittal to BN re: June 2005 split sample data 7/3/05 DEQ

13 01 26 02 DEQ transmittal to Livingston Library 7/5/05 DEQ

13 01 26 02 DEQ transmittal to MSU Library 07/05/05 DEQ

13 01 26 02 DEQ internal email re: Modeling pumping well capture zone 7/6/05 DEQ internal

13 01 26 02 DEQ & K/J emails re: June 2005 duplicate samples 08/03/05

13 01 26 02 10/28/05 KJ

13 01 26 02 DEQ email to K/J re: Permission to sample MW - 89-B 10/31/05 DEQ

13 01 26 02 DEQ internal email re: Change of ownership - well 94-1 12/16/05 DEQ internal

13 01 26 02 DEQ letter to D&K Krohne re: 9/21/07 sampling results 12/18/07 DEQ

13 01 26 02 DEQ letter to C Boehm re: 9/21/07 sampling results 12/31/07 DEQ

13 01 26 02 DEQ letter to T&G Watson re: 9/20/07 sampling results 01/03/08 DEQ

13 01 26 02 DEQ letter to K Mitchell re: 9/17/07-9/18/07 sampling results 01/03/08 DEQ

13 01 26 02 DEQ letter to D&K Krohne re: 9/19/07 sampling results 01/25/08 DEQ

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

K/J letter to DEQ re: GW monitoring 11/05 sampling notification

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

Page 334: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 334 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 26 02 DEQ letter to T&G Watson re: 12/14/07 sampling results 01/25/08 DEQ

13 01 26 02 DEQ letter to C Boehm re: 12/19/07 sampling results 01/25/08 DEQ

13 01 26 02 1/30/08 DEQ

13 01 26 02 DEQ letter to E & RP Gytenbeek re: 12/19/07 sampling results 01/30/08 DEQ

13 01 26 02 D Lovell email to DEQ re: Van Gytenbeek well analysis 03/24/08 D Lovell

13 01 26 02 01

13 01 26 02 01 Groundwater Sampling Results July 1987 09/01/87 ReTec

13 01 26 02 01 Ground Water Sampling Results May 1989 7/20/89 Envirocon

13 01 26 02 01 Ground Water Sampling Results June 1989 08/07/89 Envirocon

13 01 26 02 01 Ground Water Sampling Results July 1989 9/15/89 Envirocon

13 01 26 02 01 Ground Water Sampling Results August 1989 10/23/89 Envirocon

13 01 26 02 01 Ground Water Sampling Results September 1989 11/15/89 Envirocon

13 01 26 02 01 October 1989 Monthly Ground Water Sampling Results 12/29/89 Envirocon

13 01 26 02 01 November 1989 Monthly Ground Water Sampling Results 2/13/90 Envirocon

13 01 26 02 01 December 1989 Monthly Ground Water Sampling Results 03/15/90 Envirocon

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

DEQ letter to K Mitchell re: 12/18/07 & 12/20/07 sampling results

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1010/ 45A605

Site-Wide Information

Sampling/ Contaminant Sources

Groundwater correspondence

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources

GW Sampling Results (contains 1 floppy disk)

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Page 335: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 335 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 26 02 01 January 1990 Monthly Ground Water Sampling Results 03/20/90 Envirocon

13 01 26 02 01 February 1990 Monthly Ground Water Sampling Results 6/28/90 Envirocon

13 01 26 02 01 March 1990 Monthly Ground Water Sampling Results 8/3/90 Envirocon

13 01 26 02 01 April 1990 Monthly Ground Water Sampling Results 09/18/90 Envirocon

13 01 26 02 01 May 1990 Monthly Ground Water Sampling Results 8/21/90 Envirocon

13 01 26 02 01 June 1990 Monthly Ground Water Sampling Results 10/02/90 Envirocon

13 01 26 02 01 July 1990 Monthly Ground Water Sampling Results 10/02/90 Envirocon

13 01 26 02 01 12/27/90 Envirocon

13 01 26 02 01 1/7/91 Envirocon

13 01 26 02 01 1/14/91 Envirocon

13 01 26 02 01 02/11/91 Envirocon

13 01 26 02 01 December 1990 Ground Water Sampling Results 02/13/91 Envirocon

13 01 26 02 01 02/26/91 Envirocon

13 01 26 02 01 07/10/91 Envirocon

13 01 26 02 01 April 1991 Ground Water Sampling Results 07/19/91 Envirocon

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

August 1990 Monthly Ground Water Sampling Results (no report)

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

September 1990 Quarterly Ground Water Sampling Results (no report)

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

October 1990 Quarterly Ground Water Sampling Results (no report)

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

November 1990 Quarterly Ground Water Sampling Results (no report)

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results January 1991 Ground Water Sampling Results

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

February 1991 Semiannual Ground Water Sampling Results (no report)

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Page 336: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 336 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 26 02 01 10/91 Envirocon

13 01 26 02 01 10/25/91 Envirocon

13 01 26 02 01 September 1991 Ground Water Sampling Results 11/20/91 Envirocon

13 01 26 02 01 02/20/92 Envirocon

13 01 26 02 01 05/20/92 Envirocon

13 01 26 02 01 Second Quarter 1992 Ground Water Sampling Results 8/7/92 Envirocon

13 01 26 02 01 Third Quarter 1992 Ground Water Sampling Results 11/11/92 Envirocon

13 01 26 02 01 Fourth Quarter 1992 Ground Water Sampling Results 2/18/93 Envirocon

13 01 26 02 01 First Quarter 1993 Ground Water Sampling Results 04/18/93 Envirocon

13 01 26 02 01 May 1993 Annual Ground Water Sampling Results 10/20/93 Envirocon

13 01 26 02 01 2/14/94 Envirocon

13 01 26 02 01 1994 Annual Ground Water Sampling Report 11/03/94 Envirocon

13 01 26 02 01 First Quarter 1994 Ground Water Sample Results 04/11/94 Envirocon

13 01 26 02 01 1995 Annual GW Sampling Report 01/01/96 Envirocon

13 01 26 02 01 Geotrans regression curves analysis for VOCs in GW 5/6/96 Geotrans

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results June 1991 Ground Water Sampling Results

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

August 1991 Annual Ground Water Sampling Results (no report)

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

October, November, and December 1991 Ground Water Sampling Results (no report)

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results First Quarter 1992 Ground Water Sampling Results

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1012/ 45A701

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

August and November 1993 Quarterly Ground Water Sampling Results

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Page 337: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 337 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 26 02 01 1996 Annual GW Sampling Report 09/01/96 Envirocon

13 01 26 02 01 1999 Annual GW Sampling Report 12/99 Envirocon

13 01 26 02 01 2000 Annual Groundwater Sampling Report 4/01 Envirocon

13 01 26 02 01 2001 Annual Groundwater Sampling Report 03/04/02 Envirocon

13 01 26 02 01 2002 Annual Groundwater Sampling Report 03/19/02 Envirocon

13 01 26 02 01 KJ letter to DEQ re: Tabulated June 2003 monitoring results 08/08/03 KJ

13 01 26 02 01 05/04/11 KJ

13 01 26 02 01 DEQ's GW data validation 6/04 DEQ

13 01 26 02 01 DEQ split sample lab data validation 11/01/04 DEQ

13 01 26 02 01 DEQ GW split sample lab data 11/01/04 DEQ

13 01 26 02 01 Nov 2004 GW sampling data

13 01 26 02 01 12/10/04 DEQ

13 01 26 02 01 DEQ email to BN re: Work Plan 01/12/05 DEQ

13 01 26 02 01 Phone Log - BN/Smith to DEQ 1/12/05 BN

13 01 26 02 01 GW sampling results - lab data for 11/04 1/12/05

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results 2003 Annual Groundwater Sampling Report

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1/28/05 received

2/2/05

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

DEQ letter to RTI re: Split sample VOC data; water treatment correspondence

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Page 338: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 338 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 26 02 01 KJ email to DEQ re: Lab data 01/17/05 KJ

13 01 26 02 01 KJ email to DEQ re: 11/040 Blind duplicate samples 01/19/05 KJ

13 01 26 02 01 DEQ data validation for K/J 11/04 GW data 1/23/05 DEQ

13 01 26 02 01 Phone Log - BN/Smith to DEQ 1/31/05 BN

13 01 26 02 01 K/J & DEQ emails re: 2004 Annual GW Report 04/18/05

13 01 26 02 01 Annual GW Sampling Report 2004 6/05 KJ

13 01 26 02 01 DEQ Split sample results 89-4 & 89-8 07/07/05 DEQ

13 01 26 02 01 DEQ COC for split GW samples 07/07/05 DEQ

13 01 26 02 01 GW Sample results 07/21/05

13 01 26 02 01 DEQ split sample data for June 2005 GW sampling 7/27/05 DEQ

13 01 26 02 01 K/J email to DEQ re: Water elevations 07/28/05 KJ

13 01 26 02 01 K/J email to DEQ re: June 2005 GW data 7/28/05 KJ

13 01 26 02 01 K/J email to DEQ re: Duplicates 8/3/05 KJ

13 01 26 02 01 K/J email to DEQ re: Duplicate GW samples, June 2005 08/04/05 KJ

13 01 26 02 01 DEQ Data validation - June 2005 GW data part 1 08/05/05 DEQ

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Page 339: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 339 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 26 02 01 DEQ Data validation - June 2005 GW data part 2 8/5/05 DEQ

13 01 26 02 01 10/29/05 DEQ

13 01 26 02 01 12/09/05 DEQ

13 01 26 02 01 01/05/06 KJ

13 01 26 02 01 2005 Annual Monitoring & Maintenance Plan 3/06 KJ

13 01 26 02 01 2006 Annual Monitoring & Maintenance Report 3/07 KJ

13 01 26 02 01 2007 Annual Monitoring & Maintenance Report 3/08 KJ

13 01 26 02 01 CD 2008 Annual Monitoring & Maintenance Report 03/09/09 KJ

13 01 26 02 01 2009 Annual Monitoring & Maintenance Report 03/10/10 KJ

13 01 26 02 01 CD 2010 Annual Monitoring & Maintenance Report Vol I-II 3/11 KJ

13 01 26 02 01 08/25/11 DEQ/ Rrynolds

13 01 26 02 01 03/30/12 KJ

13 01 26 02 01 CD 03/30/12 KJ

13 01 26 02 01 CD RM 11 2012 Annual Monitoring & Maintenance Report Vol I-II 03/30/13 KJ

13 01 26 02 01 CD Mar. 2014 KJ

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

DEQ letter to T Rustad re: Letter returned & new owner information

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results DEQ letter to T Rustad re: 2nd contact attempt

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

K/J letter to DEQ re: Domestic well sampling results, 408 N K Street

1172/ 60E705

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1172/ 60E705

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1172/ 60E705

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1172/ 60E705

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1172/ 60E705

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

1171/ 60E704

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

DEQ/Reynolds letter to BN/Smith re: DEQ comments/clarifications on the 2010 Annual Monitoring & Maintenance Report

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

KJ cover letter for Draft 2011 Annual Moniroting & Maintenance Report

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Draft 2011 Annual Moniroting & Maintenance Report Vol I-II

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

Site-Wide Information

Sampling/ Contaminant Sources GW Sampling Results

2013 Annual Monitoring and Maintenance Report Volumes 1, 2, and 3

Page 340: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 340 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 26 02 02 MDHES Sampling Results 5/88-5/01

13 01 26 02 03 Well Logs 1986-1987

13 01 26 02 03 Well Logs Well completion logs

13 01 26 02 03 Well Logs

13 01 26 02 04 10/04-11/05

13 01 26 02 04 DEQ letter to BN re: IDW sampling treatment & disposal 10/08/04 DEQ

13 01 26 02 04 Phone Log: Norris/K/J 10/15/04

13 01 26 02 04 K/J fax to DEQ re: IDW Treatment Work Plan 10/15/04 KJ

13 01 26 02 04 K/J letter to DEQ re: Purge water treatment 10/15/04 KJ

13 01 26 02 04 K/J fax to DEQ re: Purge water treatment 10/15/04 KJ

13 01 26 02 04 K/J email to DEQ re: Water Treatment Work Plan 10/22/04 KJ

13 01 26 02 04 DEQ letter to BN re: Purge Water Treatment Work Plan 10//28/04 DEQ

13 01 26 02 04 DEQ fax to BN re: Purge Water Treatment Work Plan 10//28/04 DEQ

13 01 26 02 04 K/J Revised Purge Water Treatment Work Plan 11/15/04 KJ

13 01 26 02 04 K/J response to comments- Purge Water Treatment Work Plan 11/15/04 KJ

1008/ 45A604

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Logs for HRR, RW, LPZ Senes & MW-1-10 & private wells

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

Page 341: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 341 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 26 02 04 K/J fax to DEQ re: Purge Water Treatment Work Plan 11/15/04 KJ

13 01 26 02 04 DEQ email to K/J re: Revised Treatment Work Plan 11/16/04 DEQ

13 01 26 02 04 11/23/04 Park Co. Sanitarian

13 01 26 02 04 12/10/04 DEQ

13 01 26 02 04 02/01/05 KJ

13 01 26 02 04 KJ letter to DEQ re: Revised IDR Water Treatment Work Plan 02/01/05 KJ

13 01 26 02 04 KJ letter to DEQ re: Treated purge water from November 2004 02/01/05 KJ

13 01 26 02 04 Phone Log - Norris/KJ 2/11/05

13 01 26 02 04 K/J letter to DEQ re: March 2005 Purge Water 4/5/05 KJ

13 01 26 02 04 DEQ letter/fax to BN re: March 2005 Purge Water 05/19/05 DEQ

13 01 26 02 04 K/J letter to DEQ re: March 2005 Purge water disposal 07/05/05 KJ

13 01 26 02 04 DEQ email to K/J & BN re: Treated Purge water sampling 07/07/05 DEQ

13 01 26 02 04 DEQ email to BN re: March 2005 Purge water table 1 7/25/05 DEQ

13 01 26 02 04 07/26/05 KJ

13 01 26 02 04 K/J letter to DEQ re: June 2005 purge water 08/05/05 KJ

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

Phone Log - R Taylor, Park Co. Sanitarian to DEQ & return call re: Treated purge water - potential discharge to sanitary sewer

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

DEQ letter to RTI re: Split sample VOC data; water treatment correspondence

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

KJ letter to DEQ re: Response to comments, IDR Water Treatment Work Plan

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

K/J transmittal to DEQ re: Revised table 1, March 2005 Purge water

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

Page 342: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 342 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 26 02 04 DEQ letter to BNSF re: March 2005 Purge water 08/23/05 DEQ

13 01 26 02 04 DEQ letter to BN re: June 2005 purge water 10/28/05 DEQ

13 01 26 02 04 11/22/05 KJ

13 01 26 02 05 Photographs/Slides 4/00-11/01

13 01 26 03 Soils

13 01 26 04 UST

13 01 26 05 Sludge

13 01 26 05 Waste Characterization Sampling Plan 07/01/87

13 01 26 05 Waste Characterization Results 11/01/87

13 01 26 06

13 01 26 06 10/18/07 KJ

13 01 26 07 Y

13 01 26 07 ** Private Wells Envirocon Private Well Work Plan 7/7/1989 Envirocon

13 01 26 07 ** Private Wells Sample results - Ruggles well 09/26/00

13 01 26 07 ** Private Wells City of Livingston fax to DEQ re: Gregory well request 01/10/01 City of Livingston

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Purge Water Treatment Work Plan

K/J letter to DEQ re: Disposal of IDR water from March/June GW monitoring event

Site-Wide Information

Sampling/ Contaminant Sources

Site-Wide Information

Sampling/ Contaminant Sources

1169/ 41J603

Site-Wide Information

Sampling/ Contaminant Sources

1169/ 41J603

Site-Wide Information

Sampling/ Contaminant Sources

1169/ 41J603

Site-Wide Information

Sampling/ Contaminant Sources

Remediation Technologies

1169/ 41J603

Site-Wide Information

Sampling/ Contaminant Sources

Remediation Technologies

1170/ 44F603

Site-Wide Information

Sampling/ Contaminant Sources

WWTP Wastes/LRC Sludge (Documents dated before 10/18/07 are not itemized)

1170/ 44F603

Site-Wide Information

Sampling/ Contaminant Sources WWTP Wastes/LRC Sludge

Former WWTP Sump Excavation – Soil Sampling Analytical Results & Request for Contained-in Decision

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

** Private Wells (non-confidential 2/88-10/05)

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Page 343: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 343 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 26 07 ** Private Wells 1/26/01 Envirocon

13 01 26 07 ** Private Wells Y ** Phone Log - Lee, re: Health 06/29/01

13 01 26 07 ** Private Wells Phone Log: McCaffery 7/10/01

13 01 26 07 ** Private Wells DEQ Field notes - Iron Horse Trailer Park 7/1/01 DEQ

13 01 26 07 ** Private Wells DEQ letter to Haverson re: Iron Horse Trailer Park 7/25/01 DEQ

13 01 26 07 ** Private Wells October 2001 Envirocon Well Inventory Map Envirocon

13 01 26 07 ** Private Wells June 2002 Envirocon Well Inventory Map Envirocon

13 01 26 07 ** Private Wells BN letter to Heniksen re: Well sampling results 08/22/03 BN

13 01 26 07 ** Private Wells DEQ letter to BN re: Private Wells 5/21/04 DEQ

13 01 26 07 ** Private Wells Phone Log: Smith/BNSF 5/24/04

13 01 26 07 ** Private Wells Kennedy Jenks email + attachment to DEQ 06/04/04 KJ

13 01 26 07 ** Private Wells Phone Log: John Norris/Kennedy Jenks

13 01 26 07 ** Private Wells 06/07/04 DEQ

13 01 26 07 ** Private Wells Kennedy/Jenks attachment to email re: Private wells 06/10/04 KJ

13 01 26 07 ** Private Wells Kennedy Jenks email to DEQ re: Private wells 06/10/04 KJ

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Envirocon submittal to DEQ re: Private wells near C&P Packing

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

DEQ transmittal to RTI re: Private well information from Kennedy/Jenks

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Page 344: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 344 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 26 07 ** Private Wells DEQ email to Kennedy/Jenks re: Private wells 06/10/04 DEQ

13 01 26 07 ** Private Wells Phone Log: Norris-Kennedy/Jenks 06/10/04

13 01 26 07 ** Private Wells Kennedy/Jenks fax to DEQ re: Ruggles possible domestic well 06/10/04 KJ

13 01 26 07 ** Private Wells Phone Log: Ruggles 06/14/04

13 01 26 07 ** Private Wells Phone Log: Ruggles 06/15/04

13 01 26 07 ** Private Wells June 2004 GW Sampling Field Notes 06/01/04

13 01 26 07 ** Private Wells Phone Log: Norris/K/J 09/21/04

13 01 26 07 ** Private Wells DEQ letter to Rustad re: 2004 data 94-1 09/22/04 DEQ

13 01 26 07 ** Private Wells DEQ letter to Hendrikesen/Rainbow re: 2004 data, supply well 09/22/04 DEQ

13 01 26 07 ** Private Wells DEQ letter to Steffen re: 2004 data 92-2 09/22/04 DEQ

13 01 26 07 ** Private Wells K/J email attachment re: LNAPL data, June 2004 09/23/04 KJ

13 01 26 07 ** Private Wells Phone Log: Smith/BN 10/01/04

13 01 26 07 ** Private Wells Phone Log: John Norris/Kennedy Jenks 06/04/04

13 01 26 07 ** Private Wells DEQ letter to Jockers re: MW-19 sampling results 10/28/05 DEQ

13 01 26 07 ** Private Wells DEQ letter to T Watson re: Sampling results for well 94-2 10/28/05 DEQ

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

Page 345: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 345 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 26 07 ** Private Wells DEQ letter to T Elich re: Indoor air sampling 10/28/05 DEQ

13 01 26 07 ** Private Wells 10/28/05 DEQ

13 01 26 07 ** Private Wells DEQ letter to B Rustad re: Sampling results for well 94-1 10/29/05 DEQ

13 01 26 07 ** Private Wells DEQ letter to B Rustad re: Rustad contact 12/08/05 DEQ

13 01 26 07 ** Private Wells DEQ internal emails re: Phone log - Watson 01/20/06 DEQ internal

13 01 26 07 01 Krohne Well

13 01 26 07 01 Krohne Well Phone Log: Krohne 6/11-6/18/04

13 01 26 07 02

13 01 26 07 02 Private Wells Survey Ground Water Sampling Results From Private Water Wells 08/01/89 Envirocon

13 01 26 07 02 Private Wells Survey DEQ letter to Residents re: Well Sampling/Post card 02/12/91 DEQ

13 01 26 07 02 Private Wells Survey DEQ/ Cunningham

13 01 26 07 02 Private Wells Survey DEQ letter to Haverson re: Iron Horse Trailer Park 07/25/01 DEQ

13 01 26 07 02 Private Wells Survey Phone Log: Carter re: Iron Horse Trailer Park 07/31/01

13 01 26 08 Sampling Log Books

13 01 26 08 Sampling Log Books Y ** Site Work Activity Field Book – John Wadhams 12/89-11/95 J Wadhams

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

DEQ letter to BNSF re: Purge water from June 2005 GW sampling

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1170/ 44F603

Site-Wide Information

Sampling/ Contaminant Sources

1170/ 44F603

Site-Wide Information

Sampling/ Contaminant Sources

1170/ 44F603

Site-Wide Information

Sampling/ Contaminant Sources

Private Wells Survey (Documents dated before 8/89 are not itemized)

1170/ 44F603

Site-Wide Information

Sampling/ Contaminant Sources

1170/ 44F603

Site-Wide Information

Sampling/ Contaminant Sources

1170/ 44F603

Site-Wide Information

Sampling/ Contaminant Sources

Phone Log - M Cunningham to Mary Quisenberry re: Wells in Iron Horse Trailer Park

1170/ 44F603

Site-Wide Information

Sampling/ Contaminant Sources

1170/ 44F603

Site-Wide Information

Sampling/ Contaminant Sources

1170/ 44F603

Site-Wide Information

Sampling/ Contaminant Sources

Site-Wide Information

Sampling/ Contaminant Sources

Page 346: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 346 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 26 08 Sampling Log Books Y ** Site Work Activity Field Book – John Wadhams 1/96-4/00 J Wadhams

13 01 26 08 Sampling Log Books Sampling Log Record – John Wadhams 12/89-6/91 J Wadhams

13 01 26 08 Sampling Log Books 4/91-4/93 J Michaletz

13 01 26 08 Sampling Log Books DEQ Field Book – Mandy Cunningham 5/01-4/03 DEQ/ Cunningham

13 01 26 08 Sampling Log Books Y ** DEQ Field Book – Amy Sivers 4/04-3/05 DEQ/ Sivers

13 01 26 08 01 Site Visit Reports

13 01 26 08 01 Site Visit Reports Site Visit 04/23/04

13 01 26 08 01 Site Visit Reports Site Visit Photographs (disk) 04/23/04

13 01 26 08 02 HSPs

13 01 26 08 02 HSPs HSP Site Visit 04/23/04

13 01 26 08 02 HSPs GW sampling event DEQ HASP 11/01/04 DEQ

13 01 26 09 Oils 8/90-7/91

13 01 26 10

13 01 26 11 Park County Landfill 11/78-6/85

13 01 26 12 Asbestos 1/90-6/07

Site-Wide Information

Sampling/ Contaminant Sources

1170/ 44F603

Site-Wide Information

Sampling/ Contaminant Sources

1170/ 44F603

Site-Wide Information

Sampling/ Contaminant Sources

Sampling Log Record - Joe Michaletz: Mission Y BN-Livingston

1170/ 44F603

Site-Wide Information

Sampling/ Contaminant Sources

Site-Wide Information

Sampling/ Contaminant Sources

1170/ 44F603

Site-Wide Information

Sampling/ Contaminant Sources

1170/ 44F603

Site-Wide Information

Sampling/ Contaminant Sources

1170/ 44F603

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1013/ 45A704

Site-Wide Information

Sampling/ Contaminant Sources

1014/ 45A702

Site-Wide Information

Sampling/ Contaminant Sources

Site-Wide Information

Sampling/ Contaminant Sources Shop Wastes (file empty)

1014/ 45A702

Site-Wide Information

Sampling/ Contaminant Sources

1014/ 45A702

Site-Wide Information

Sampling/ Contaminant Sources

Page 347: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 347 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 26 12 Asbestos Asbestos Complaint 06/20/07

13 01 26 13 Other/Unknown Results 8/85-2/92

13 01 26 14 Work Zone Air Monitoring

13 01 26 14 Work Zone Air Monitoring Air Monitoring Program Report 02/23/90 Envirocon

13 01 26 14 Work Zone Air Monitoring Air Monitoring Program Report Envirocon

13 01 26 15 Basement Gas 9/89-8/01

13 01 26 16 Yellowstone River 8/89-11/04

13 01 26 16 Yellowstone River Phone Log: Wadhams, DEQ 11/03/04

13 01 26 17 MDHES Lab Charges 4/91-11/97 MDHES

13 01 26 18 Soil Vapor Extraction 7/91-3/95

13 01 26 19 4/91-1/93

13 01 26 20 2/95-2/96

13 01 26 20 Confirmation Soil Sampling 02/01/95 Envirocon

13 01 27 Related Sites

13 01 27 01 Related Sites Park County Landfill 11/78-8/99

13 01 27 02 Related Sites Other Refueling Sites 9/86-7/00

1014/ 45A702

Site-Wide Information

Sampling/ Contaminant Sources

1014/ 45A702

Site-Wide Information

Sampling/ Contaminant Sources

1014/ 45A702

Site-Wide Information

Sampling/ Contaminant Sources

1014/ 45A702

Site-Wide Information

Sampling/ Contaminant Sources

1014/ 45A702

Site-Wide Information

Sampling/ Contaminant Sources

1014/ 45A702

Site-Wide Information

Sampling/ Contaminant Sources

1014/ 45A702

Site-Wide Information

Sampling/ Contaminant Sources

1014/ 45A702

Site-Wide Information

Sampling/ Contaminant Sources

1014/ 45A702

Site-Wide Information

Sampling/ Contaminant Sources

1014/ 45A702

Site-Wide Information

Sampling/ Contaminant Sources

1014/ 45A702

Site-Wide Information

Sampling/ Contaminant Sources

Split Soil Sample Results from Joe Michaletz Office

1014/ 45A702

Site-Wide Information

Sampling/ Contaminant Sources Confirmation Soil Sampling

1014/ 45A702

Site-Wide Information

Sampling/ Contaminant Sources Confirmation Soil Sampling

Site-Wide Information

1014/ 45A702

Site-Wide Information

1015/ 45B403

Site-Wide Information

Page 348: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 348 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 27 03 Related Sites Other-Terry’s Chevron 11/87-5/98

13 01 27 03 Related Sites Other-Terry’s Chevron Waste Characterization Results 11/01/87 ReTec

13 01 27 03 Related Sites Other-Terry’s Chevron 01/01/88 Hydrometrics

13 01 27 03 Related Sites Other-Terry’s Chevron 06/01/89 Hydrometrics

13 01 27 04 Related Sites MRL

13 01 27 04 Related Sites MRL DEQ Letter to K/J re: MRL 01/30/07 DEQ

13 01 27 04 Related Sites MRL Occupational Hygiene Survey MRL Report 12/08/06 KJ

13 01 27 05 Related Sites LRC

13 01 27 05 Related Sites LRC 01/23/89 LRC

13 01 27 05 Related Sites LRC DEQ internal email re: Oil spill at LRC 05/22/02 DEQ internal

13 01 27 06 Related Sites Former East End Conoco

13 01 27 06 Related Sites Former East End Conoco DEQ internal Email re: PRS 02/28/02 DEQ internal

13 01 27 06 Related Sites Former East End Conoco Envirocon

13 01 27 06 Related Sites Former East End Conoco 09/18/06 DEQ

13 01 27 06 Related Sites Former East End Conoco 03/02/07 DEQ

13 01 27 06 Related Sites Former East End Conoco 11/26/07 DEQ

13 01 27 06 Related Sites Former East End Conoco East End Conoco Reports 1995-2007

13 01 27 06 Related Sites Former East End Conoco Emails re: Followup analysis 02/21/08

13 01 27 06 Related Sites Former East End Conoco Lab results Livingston M2@JonesOil & L-87-7 04/25/08

13 01 27 06 Related Sites Former East End Conoco 03/28/11 DEQ/Cala

13 01 27 07 Related Sites

1015/ 45B403

Site-Wide Information

1015/ 45B403

Site-Wide Information

1015/ 45B403

Site-Wide Information

Final Investigation and Remediation of a Fuel Release From Tracy's Chevron Service Station Livingston, MT Summary Report

1015/ 45B403

Site-Wide Information

Investigation and Remediation of a Fuel Release From Tracy's Chevron Service Station Livingston, MT Executive Summary Report

Site-Wide Information

Site-Wide Information

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

Livingston Rebuild Center, Incorporated Industrial Waste Management

1173/ 61P606

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Envirocon letter to DEQ PRS re: Groundwater Sampling Report – 6th Annual Event

Site-Wide Information

DEQ Letter to R Shelley re: Request for Work Plan for Pilot Test of Fabric Belt Free-Phase Product Recovery System

Site-Wide Information

DEQ Letter to R Shelley re: Approval of Work Plan Updated 2/2/07 for Pilot Test of Fabric Belt Free-Phase Product Recovery System

Site-Wide Information

DEQ Letter to J Flipowicz re: 2/26/07 Lube Oil Spill at the Mt Rail Link Rail Yard

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ/Cala letter to MRL/Shelley re: No Further Corrective Action Required for petroleum release at the Former East End Conoco, 813 East Park

1173/ 61P606

Site-Wide Information

Livingston City Shop Complex

Page 349: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 349 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 27 07 Related Sites DEQ internal emails re: City Shop Complex 02/01/02 DEQ internal

13 01 27 07 Related Sites 05/01/03

13 01 27 08 Related Sites 111 Miles Lane South

13 01 27 08 Related Sites 111 Miles Lane South Public Health Statement-TPH

13 01 27 08 Related Sites 111Miles Lane South ATSDR Tox FAQs for PCE ATSDR

13 01 27 08 Related Sites 111Miles Lane South DEQ Health & Safety Plan for Site Inspection DEQ

13 01 27 08 Related Sites 111Miles Lane South Y ** Phone Log - Kim Smith to DEQ 08/12/02

13 01 27 08 Related Sites 111Miles Lane South DEQ Site inspection report 08/19/02 DEQ

13 01 27 08 Related Sites 111Miles Lane South Site Inspection photographs 08/19/02

13 01 27 08 Related Sites 111Miles Lane South DEQ fax to BNSF re: Site inspection report 08/29/02 DEQ

13 01 27 08 Related Sites 111Miles Lane South DEQ fax to Park County Sanitarian re: Site inspection report 08/29/02 DEQ

13 01 27 09 Related Sites 101 South I Street

13 01 28

13 01 28 Status Reports February 1990 - December 1990 Monthly Status Reports 3/7/90-1/4/91 Envirocon

13 01 28 Status Reports January 1991 – December 1991 Monthly Status Reports 2/12/91-1/1/92 Envirocon

13 01 28 Status Reports 1/1/92-4/14/92 Envirocon

13 01 28 Status Reports 4/1/93-1/13/94 Envirocon

13 01 28 Status Reports 1994 Annual Status Report 04/01/94 Envirocon

13 01 28 Status Reports 1995 Annual Status Report 05/01/96 Envirocon

13 01 28 Status Reports 1996 Annual Status Report 04/01/97 Envirocon

13 01 28 Status Reports 1997 Annual Status Report 04/01/98 Envirocon

13 01 29

13 01 29 01 Technical Meetings 1/92-9/05

1173/ 61P606

Site-Wide Information

Livingston City Shop Complex

1173/ 61P606

Site-Wide Information

Livingston City Shop Complex

HAZMAT Report for Yellowstone Bridge Replacement Vol. I-II

Hyalite Environmental

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

Site-Wide Information

1015/ 45B403

Site-Wide Information

Status Reports (1/88-5/98)

1015/ 45B403

Site-Wide Information

1015/ 45B403

Site-Wide Information

1015/ 45B403

Site-Wide Information

First thru Fourth Quarter 1992 Status Report (January - December)

1015/ 45B403

Site-Wide Information

First thru Fourth Quarter 1993 Status Report (January - December)

1015/ 45B403

Site-Wide Information

1015/ 45B403

Site-Wide Information

1015/ 45B403

Site-Wide Information

1015/ 45B403

Site-Wide Information

Site-Wide Information

Meetings/ Technical

1015/ 45B403

Site-Wide Information

Meetings/ Technical

Page 350: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 350 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 29 01 Technical Meetings BNSF, DEQ, MRL meeting handouts 09/02/05

13 01 29 02 3/89-2/92

13 01 29 03 LIFE Meetings 10/01/90

13 01 30

13 01 30 01 Documents 7/89-3/03

13 01 31

13 01 31 05/09/89 Envirocon

13 01 31 01

13 01 32

13 01 32 01 05/01/04

13 01 32 01 Judson Park Irrigation Well Letter to Livingston City re: Depot Center 05/03/04

13 01 32 01 Judson Park Irrigation Well DEQ letter to BNSF re: Depot Center 05/04/04 DEQ

13 01 32 02 Proposed Heat Exchange 4/04-6/05

13 01 32 02 Proposed Heat Exchange Phone Log: Blicker/RTI 04/16/04

13 01 32 02 Proposed Heat Exchange City info re: Depot well request 04/16/04

13 01 32 02 Proposed Heat Exchange Phone Log: Golnar-City of Livingston 04/19/04

13 01 32 02 Proposed Heat Exchange Golnar email re: Meeting 04/20/04

13 01 32 02 Proposed Heat Exchange Emails re: System Design (2) 04/21/04

13 01 32 02 Proposed Heat Exchange Emails re: System Design 04/21/04

13 01 32 02 Proposed Heat Exchange Phone Log: Brian Blicker/RTI 04/21/04

13 01 32 02 Proposed Heat Exchange Phone Log: Tim Coleman-ACE re: Well system design 04/22/04

13 01 32 02 Proposed Heat Exchange Site Visit Report 04/23/04

1015/ 45B403

Site-Wide Information

Meetings/ Technical

1015/ 45B403

Site-Wide Information

Meetings/ Technical Legal Meeting

1015/ 45B403

Site-Wide Information

Meetings/ Technical

Site-Wide Information

Information Repositories

1016/ 45B406

Site-Wide Information

Information Repositories

1173/ 61P606

Site-Wide Information

Guidance Documents

1173/ 61P606

Site-Wide Information

Guidance Documents

CERCLA/NCP Guidance Evaluation Livingston Rail Yard Remediation

1173/ 61P606

Site-Wide Information

Guidance Documents

Hazardous Waste Policy & Interpretations

Site-Wide Information

Livingston Depot Center

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Judson Park Irrigation Well

1016/ 45B406

Site-Wide Information

Livingston Depot Center

1016/ 45B406

Site-Wide Information

Livingston Depot Center

1016/ 45B406

Site-Wide Information

Livingston Depot Center

1016/ 45B406

Site-Wide Information

Livingston Depot Center

1016/ 45B406

Site-Wide Information

Livingston Depot Center

1016/ 45B406

Site-Wide Information

Livingston Depot Center

1016/ 45B406

Site-Wide Information

Livingston Depot Center

1016/ 45B406

Site-Wide Information

Livingston Depot Center

1016/ 45B406

Site-Wide Information

Livingston Depot Center

1016/ 45B406

Site-Wide Information

Livingston Depot Center

1016/ 45B406

Site-Wide Information

Livingston Depot Center

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Page 351: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 351 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 32 02 Proposed Heat Exchange Email, Blicker/RTI to City & DEQ re: Permit requirements 04/26/04 RTI/Blicker

13 01 32 02 Proposed Heat Exchange DEQ letter to Livingston City re: Depot Center 05/03/04 DEQ

13 01 32 02 Proposed Heat Exchange DEQ letter to BNSF re: Depot Center 05/04/04 DEQ

13 01 32 02 Proposed Heat Exchange Phone Log: Don Olsen/O2 Architects 05/24/04

13 01 32 02 Proposed Heat Exchange O2 Architechs email to DEQ re: Trench Excavation depot 06/22/05 O2 Architechs

13 01 32 03 1/05-8/05

13 01 32 03 Phone Log - Olsen/O2 Architects 01/19/05

13 01 32 03 Phone Log - Golnar/City Manager 01/19/05

13 01 32 03 Phone Log - Ingram Clevenger 01/19/05

13 01 32 03 01/19/05 O2 Architechs

13 01 32 03 Phone Log - Smith/BN 01/20/05

13 01 32 03 O2 email to City re: Depot 01/20/05 O2 Architechs

13 01 32 03 DEQ email to Ingram Clevenger re: Depot 01/20/05 DEQ

13 01 32 03 O2 email to DEQ re: Bid specs 01/20/05 O2 Architechs

13 01 32 03 Phone Log - Blicker/RTI 01/21/05

13 01 32 03 DEQ letter to City re: Depot 01/28/05 DEQ

13 01 32 03 Phone Log - Gentri/MRL 01/31/05

13 01 32 03 Phone Log - Shelbey/MRL 01/31/05

13 01 32 03 O2 Architects email to DEQ re: Depot 02/01/05 O2 Architechs

13 01 32 03 O2 Architects email to DEQ re: Construction 06/22/05 O2 Architechs

13 01 32 03 Phone Log - DEQ to BN re: Livingston Depot Excavation 06/23/05 DEQ

13 01 32 03 DEQ email to O2A, City, Depot re: Soil sampling 07/08/05 DEQ

1016/ 45B406

Site-Wide Information

Livingston Depot Center

1016/ 45B406

Site-Wide Information

Livingston Depot Center

1016/ 45B406

Site-Wide Information

Livingston Depot Center

1016/ 45B406

Site-Wide Information

Livingston Depot Center

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Site-Wide Information

Livingston Depot Center

Depot Center - 2005 Renovation Work

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Depot Center - 2005 Renovation Work

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Depot Center - 2005 Renovation Work

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Depot Center - 2005 Renovation Work

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Depot Center - 2005 Renovation Work O2 Architects email to DEQ re: Bid Specs w/bid specs attached

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Depot Center - 2005 Renovation Work

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Depot Center - 2005 Renovation Work

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Depot Center - 2005 Renovation Work

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Depot Center - 2005 Renovation Work

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Depot Center - 2005 Renovation Work

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Depot Center - 2005 Renovation Work

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Depot Center - 2005 Renovation Work

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Depot Center - 2005 Renovation Work

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Depot Center - 2005 Renovation Work

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Depot Center - 2005 Renovation Work

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Depot Center - 2005 Renovation Work

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Depot Center - 2005 Renovation Work

Page 352: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 352 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 32 03 O2A email to DEQ re: Excavation 07/09/05 O2 Architechs

13 01 32 03 K/J transmittal to DEQ re: Depot soil data 08/04/05 KJ

13 01 32 03 DEQ email to O2A re: Depot excavation 08/04/05 DEQ

13 01 32 03 DEQ letter to City of Livingston re: Soil data 09/08/05 DEQ

13 01 32 03 O2A email to DEQ re: Soil data 08/10/05 O2 Architechs

13 01 32 03 O2A email to DEQ re: Trench 08/25/05 O2 Architechs

13 01 33 Private Litigation

13 01 33 01 Private Litigatio C&P Packing 2/00-8/09

13 01 33 01 Private Litigatio C&P Packing Scheduling Minute Entry Order 02/15/00

13 01 33 01 Private Litigatio C&P Packing CWB&M fax to DEQ re: Amended Complaint (8/2/00) 08/02/00 CWB&M

13 01 33 01 Private Litigatio C&P Packing CWB&M letter to Clerk of Court re: Wadhams deposition 08/11/00 CWB&M

13 01 33 01 Private Litigatio C&P Packing BN answer to complaint 08/15/00 BN

13 01 33 01 Private Litigatio C&P Packing 09/21/00 DEQ

13 01 33 01 Private Litigatio C&P Packing 09/28/00

13 01 33 01 Private Litigatio C&P Packing Attachment to Deposition of John Wadhams 10/02/00

13 01 33 01 Private Litigatio C&P Packing DEQ faxes to Attorney's re: Depositions 10/10/00 DEQ

13 01 33 01 Private Litigatio C&P Packing 10/12/00 DEQ

13 01 33 01 Private Litigatio C&P Packing 10/12/00

13 01 33 01 Private Litigatio C&P Packing Notice of Withdrawal of Motion 10/18/00

13 01 33 01 Private Litigatio C&P Packing Deposition of Bruce Sheppard 11/01/00 Bruce Shepard

13 01 33 01 Private Litigatio C&P Packing Deposition of Joe Michaletz 11/06/00 Joe Michaletz

13 01 33 01 Private Litigatio C&P Packing DEQ email to K/J re: Purge water storage at C&P Packing 11/10/00 DEQ

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Depot Center - 2005 Renovation Work

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Depot Center - 2005 Renovation Work

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Depot Center - 2005 Renovation Work

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Depot Center - 2005 Renovation Work

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Depot Center - 2005 Renovation Work

1016/ 45B406

Site-Wide Information

Livingston Depot Center

Depot Center - 2005 Renovation Work

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

DEQ letter to Edwards, Tolstedt & Fickle re: Wadhams deposition

1016/ 45B406

Site-Wide Information

Edwards, Tolstedt & Fickle letter to Clerk of District Court re: Plaintiff's motion

Edwards, Tolstedt & Fickle

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

DEQ letter to Edwards, Tolstedt & Fickle re: Wadhams deposition

1016/ 45B406

Site-Wide Information

Edwards, Tolstedt & Fickle letter to DEQ re: Wadhams deposition

Edwards, Tolstedt & Fickle

1016/ 45B406

Site-Wide Information

Site-Wide Information

Site-Wide Information

1016/ 45B406

Site-Wide Information

Page 353: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 353 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 33 01 Private Litigatio C&P Packing 11/15/00

13 01 33 01 Private Litigatio C&P Packing 11/16/00

13 01 33 01 Private Litigatio C&P Packing DEQ internal email re: Discharge permits 12/11/00 DEQ internal

13 01 33 01 Private Litigatio C&P Packing DEQ internal email re: Well Ordinance 12/12/00 DEQ internal

13 01 33 01 Private Litigatio C&P Packing Y 01/24/01 DEQ internal

13 01 33 01 Private Litigatio C&P Packing Sump Sampling Report & Closure Plan 02/25/09 KJ

13 01 33 01 Private Litigatio C&P Packing 07/13/09 DEQ

13 01 33 01 Private Litigatio C&P Packing 07/22/09 KJ/Norris

13 01 33 01 Private Litigatio C&P Packing 07/29/09 DEQ/ Reynolds

13 01 33 01 Private Litigatio C&P Packing 08/18/09 KJ/Aldersley

13 01 33 02 Private Litigatio 6/00/2/05

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - McGarry 06/23/00

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ letter to Petit re: Plume Map 05/22/01 DEQ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - McGarry 06/04/01

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ internal email re: Attorney contact 06/05/01 DEQ internal

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - McGarry 06/24/01

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner McGarry letter to DEQ re: Caspner 08/30/00 McGarry

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ letter to McGarry re: Caspner 09/20/01 DEQ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ fax to Rite re: Cleanup Levels 12/14/01 DEQ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ internal email re: Well Logs for Paul Petit 08/08/03 DEQ internal

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ email to WET re: Well Installations 04/30/04 DEQ

1016/ 45B406

Site-Wide Information

Edwards, Tolstedt & Fickle letter to DEQ re: Wadhams deposition

Edwards, Tolstedt & Fickle

1016/ 45B406

Site-Wide Information

Edwards, Tolstedt & Fickle letter to DEQ re: Wadhams deposition

Edwards, Tolstedt & Fickle

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

Site-Wide Information

** DEQ internal memo re: C&P Settlement & Lagoon waste concerns

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

DEQ letter to BN/Smith re: DEQ comments on Sump Sampling Report & Closure Plan

1016/ 45B406

Site-Wide Information

K/J/Norris letter to DEQ/Reynolds re: Enclosure - Revised Table 1 to the Former C&P Packing Pit – Sump Sampling Report & Closure Plan dated 2/25/09

1016/ 45B406

Site-Wide Information

DEQ/Reynolds letter to BN/Smith re: DEQ approval of Closure Plan

1016/ 45B406

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds re: C&P Packing Sump Closure – Notification of field activities

1016/ 45B406

Site-Wide Information

Ruggles, Hallett & Caspner

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

Page 354: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 354 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET email to DEQ re: Multi level monitoring systems 04/30/04 WET

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET letter to DEQ re: Proposed Work Plan 04/30/04 WET

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - D Erickson/WET 04/30/04

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Attorney letter to DEQ re: Work Plan 04/30/04

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Dave Erickson/WET 05/04/04

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Vincent/WET 05/04/04

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ permission letter to WET 05/06/04 DEQ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner CWB&M letter & fax to DEQ re: Field work schedule 05/07/04 CWB&M

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - WET 05/07/04

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET transmittal to DEQ re: May 26 2004 work plans 05/26/04 WET

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - RTI 06/07/04

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ transmittal to RTI re: WET work plans 06/07/04 DEQ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Vincent/WET 06/07/04

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Norris/KJ 06/10/04

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner KJ letter to DEQ re: MW construction, GW sampling 06/10/04 KJ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ transmittal to RTI re: BNSF Work Plan 06/15/04 DEQ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner 06/23/04 DEQ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ letter to WET re: Work Plan (Hallet Minerals vs. BNSF) 06/23/04 DEQ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ memo to file re: LNAPL sampling at 90-1C 06/30/04 DEQ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ letter to BN re: Work Plan (Ruggles & Hallet) 06/30/04 DEQ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ internal email re: Purge water (3) 06/30/04 DEQ internal

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ internal email re: Purge water (3) 06/30/04 DEQ internal

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

DEQ letter to WET re: Work Plan (Ruggles Excavation vs. BNSF)

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

Page 355: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 355 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Smith/BN 07/19/04

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Erickson/WET 07/19/04

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Kraja/KJ 07/19/04

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner 07/21/04 WET

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET fax to DEQ re: Data 07/22/04 WET

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Smith/BN 07/22/04

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Erickson/WET 07/22/04

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET email to DEQ re: Plume animation 07/23/04 WET

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ transmittal to RTI re: WET expert report 07/27/04 DEQ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET email to DEQ re: Drilling 08/24/04 WET

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET map showing WET well locations 08/26/04 WET

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ email to WET re: Scheduled well installation 08/27/04 DEQ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ email to WET re: Well Info 08/30/04 DEQ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Norris/KJ 09/01/04

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Erickson/WET 09/02/04

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET email to DEQ re: Wells (1) 09/03/04 WET

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET email to DEQ re: Wells (2) 09/03/04 WET

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET email to DEQ re: Wells (3) 09/03/04 WET

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET email to DEQ re: Well completion on Talgo 09/03/04 WET

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Erickson/WET 09/03/04

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET fax to DEQ re: Well logs 09/03/04 WET

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET GW data laboratory reports received by mail 09/07/04 WET

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

WET Expert Report - Hallett Minerals v. BN & Ruggles Excavation v. BN

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

Page 356: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 356 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET email to DEQ re: Investigation data 09/08/04 WET

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner K/J Letter to DEQ re: Disposal of Well Installation wastes 09/08/04 KJ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner CWB&M transmittal letter to DEQ re: WET expert Report 09/08/04 CWB&M

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ email to Erickson/WET re: Draft Modified CD & SOWs 09/09/04 DEQ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ email to WET re: Data 09/09/04 DEQ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ data validation 9/10/04 for BN installed well RUG -1 DEQ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Smith/BN re: IDW disposal 09/20/04

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ letter to BN re: IDW Disposal 10/01/04 DEQ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Erickson/WET 10/05/04

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Logs - Norris/K/J (10/5 - 10/8/04) 10/5-10/8/04

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Analytical data for well on Talgo from WET LLC 10/12/04 WET

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner 10/13/04 KJ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ email to WET re: Analytical data received 10/14/04 DEQ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ letter to BN re: Permission to relocate drummed water 10/20/04 DEQ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Erickson/WET

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ letter to BN re: Ruggles water contained-in decision 10/27/04 DEQ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ internal email re: WET data - well near Electric Shop 11/01/04 DEQ internal

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ email to WET re: Information needed 11/23/04 DEQ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET email to DEQ re: Talgo well 11/23/04 WET

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ email to BN re: Well data 12/14/04 DEQ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ email to BN re: More well data 12/14/04 DEQ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Lab data for WET-1 well 02/08/05 WET

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

K/J letter & fax to DEQ re: Requesting contained-in decision for purge water from Ruggles

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

10/21-10/27/04

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

Page 357: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 357 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner Phone Log - Erickson/WET 02/09/05

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner WET transmittal to DEQ re: Bedrock well info & lab data 02/11/05 WET

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner DEQ email to WET re: Sampling data 02/14/05 DEQ

13 01 33 02 Private Litigatio Ruggles, Hallett & Caspner 02/16/05 WET

13 01 33 03 Private Litigatio City of Livingston, et al

13 01 33 03 Private Litigatio City of Livingston, et al Y 06/08/07 DEQ internal

13 01 33 03 Private Litigatio City of Livingston, et al Y ** DEQ internal emails re: Phone call w/City Attorney 07/18/07 DEQ internal

13 01 33 03 Private Litigatio City of Livingston, et al 08/29/07

13 01 33 03 Private Litigatio City of Livingston, et al BNSF letter to City Commission re: Lawsuit 09/13/07 BN

13 01 33 03 Private Litigatio City of Livingston, et al Phone Log – DEQ/C Boehm 09/23/07

13 01 33 03 Private Litigatio City of Livingston, et al City of Livingston et al. Complaint 09/27/07

13 01 33 03 Private Litigatio City of Livingston, et al Third Party Complaint for Declaratory Judgment 12/01/07

13 01 33 03 Private Litigatio City of Livingston, et al Summons 12/01/07

13 01 33 03 Private Litigatio City of Livingston, et al 12/18/07 WET

13 01 33 03 Private Litigatio City of Livingston, et al BNSF’s Motion to Join DEQ as Necessary Party 12/19/07 BN

13 01 33 03 Private Litigatio City of Livingston, et al BNSF Memo in Support of Joinder Motion 12/19/07 BN

13 01 33 03 Private Litigatio City of Livingston, et al Defendants’ Memo Supporting Motion for Injunction 12/20/07

13 01 33 03 Private Litigatio City of Livingston, et al Y 12/28/07 DEQ internal

13 01 33 03 Private Litigatio City of Livingston, et al Notice of Activity 01/03/08

13 01 33 03 Private Litigatio City of Livingston, et al Plaintiff’s Memo on Motion for Injunction 01/03/08

13 01 33 03 Private Litigatio City of Livingston, et al Y 01/08/08 DEQ internal

13 01 33 03 Private Litigatio City of Livingston, et al Y 01/10/08 DEQ internal

13 01 33 03 Private Litigatio City of Livingston, et al Y ** DEQ internal email re: Litigation meeting 01/14/08 DEQ internal

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

WET lab data for MW in railyard & electric shop (received -2/16/05)

Site-Wide Information

Site-Wide Information

** DEQ internal email re: Phone Log- DEQ & Mark Hartwig re: Class Action Lawsuit

Site-Wide Information

Site-Wide Information

Associated Attorneys letter to Property Owners re: Meeting on 9/5/07

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site Investigation Procedures (WET, 8/2000) (Received 12/18/07)

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

** DEQ internal email re: Draft Response to BN’s Motion for Injunction

Site-Wide Information

Site-Wide Information

Site-Wide Information

** DEQ internal email re: Draft Response to BN’s Motion for Joinder

Site-Wide Information

** DEQ internal email re: Draft Response to BN’s Motion for Joinder

Site-Wide Information

Page 358: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 358 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 33 03 Private Litigatio City of Livingston, et al Notice of Activity 01/17/08

13 01 33 03 Private Litigatio City of Livingston, et al Y 01/18/08 DEQ internal

13 01 33 03 Private Litigatio City of Livingston, et al Plaintiffs’ Brief Opposing DEQ Joinder 01/22/08

13 01 33 03 Private Litigatio City of Livingston, et al Notice of Electronic Filing 01/25/08

13 01 33 03 Private Litigatio City of Livingston, et al DEQ Brief Opposing Motion to Join 01/31/08 DEQ

13 01 33 03 Private Litigatio City of Livingston, et al Order Denying BNSF Joinder 02/13/08

13 01 33 03 Private Litigatio City of Livingston, et al Y 02/22/08 DEQ internal

13 01 33 03 Private Litigatio City of Livingston, et al Intervener’s Brief Opposing Motion for Injunction 02/22/08

13 01 33 03 Private Litigatio City of Livingston, et al DEQ Reply in Support of Motion to Dismiss BNSF Claim 02/29/08 DEQ

13 01 33 03 Private Litigatio City of Livingston, et al City v BNSF – Pleadings File #1

13 01 33 03 Private Litigatio City of Livingston, et al Y 04/15/08 DEQ internal

13 01 33 03 Private Litigatio City of Livingston, et al Y 04/15/08 DEQ internal

13 01 33 03 Private Litigatio City of Livingston, et al Findings and Recommendations of Magistrate Judge 04/30/08

13 01 33 03 Private Litigatio City of Livingston, et al DEQ Letter to M Kovacich re: Litigation 05/15/08 DEQ

13 01 33 03 Private Litigatio City of Livingston, et al 07/01/08 WET

13 01 33 03 Private Litigatio City of Livingston, et al CDM Comments on WET private litigation work plans 07/08/08 CDM

13 01 33 03 Private Litigatio City of Livingston, et al DEQ/B Summerville emails re: Schedule 7/31-8/4/08 DEQ

13 01 33 03 Private Litigatio City of Livingston, et al Y ** DEQ internal emails re: Water Rights 08/12/08 DEQ internal

13 01 33 03 Private Litigatio City of Livingston, et al DEQ Letter to WET re: DEQ Comments on 7/1/08 Work Plan 08/12/08 DEQ

13 01 33 03 Private Litigatio City of Livingston, et al Time Schedule Order 08/12/08

13 01 33 03 Private Litigatio City of Livingston, et al Y ** DEQ internal email re: Litigation Documents 08/13/08 DEQ internal

13 01 33 03 Private Litigatio City of Livingston, et al Mediation Order 08/22/08

13 01 33 03 Private Litigatio City of Livingston, et al Certificate of Conformance related to Injunction 09/02/08

Site-Wide Information

Site-Wide Information

** DEQ internal email re: Activity in Case 6:88-cv-00141-DWM-RKS State of Montana vs BN

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

** DEQ internal email re: Livingston Plaintiffs’ Brief Opposing Motion for Injunction

Site-Wide Information

Site-Wide Information

Site-Wide Information

9/27/07-4/14/08

Site-Wide Information

** DEQ email internal & to John North re: BN Federal Injunction Hearing

Site-Wide Information

** DEQ internal email re: BN Voluntarily dismissed third party complaint

Site-Wide Information

Site-Wide Information

Site-Wide Information

WET Letter to DEQ re: Work Plan for Soil, Groundwater & Sub-Slab Vapor Investigation

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 359: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 359 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 33 03 Private Litigatio City of Livingston, et al WET Request to DEQ for Modified Work Plan 09/03/08 WET

13 01 33 03 Private Litigatio City of Livingston, et al DEQ Memo re: Mitigation 09/05/08 DEQ

13 01 33 03 Private Litigatio City of Livingston, et al DEQ email re: WET WP review 09/12/08 DEQ

13 01 33 03 Private Litigatio City of Livingston, et al DEQ fax to WET re: Screening levels 10/23/08 DEQ

13 01 33 03 Private Litigatio City of Livingston, et al Y **DEQ internal email re: Envirocon complaint 12/11/08 DEQ internal

13 01 33 03 Private Litigatio City of Livingston, et al DEQ/BKBH emails re: File Review 12/12/08

13 01 33 03 Private Litigatio City of Livingston, et al Envirocon Request to Amend Complaint Against DEQ 12/12/08 Envirocon

13 01 33 03 Private Litigatio City of Livingston, et al Response Brief of Intervenors Appellees 12/22/08

13 01 33 03 Private Litigatio City of Livingston, et al Intervenors’ Supplemental Excerpts of Record 12/23/08

13 01 33 03 Private Litigatio City of Livingston, et al Mayor’s Office/DEQ emails re: BNSF extension request 12/29/08

13 01 33 03 Private Litigatio City of Livingston, et al 01/05/09

13 01 33 03 Private Litigatio City of Livingston, et al Mayor’s Office email to DEQ re: Brief filing 01/06/09 Mayor's Office

13 01 33 03 Private Litigatio City of Livingston, et al BNSF’s Answer to Plaintiffs’ Second Amended Complaint 01/07/09 BN

13 01 33 03 Private Litigatio City of Livingston, et al 01/07/09 BN

13 01 33 03 Private Litigatio City of Livingston, et al BNSF Reply Brief 01/20/09 BN

13 01 33 03 Private Litigatio City of Livingston, et al DEQ email to BKBH re: File review 01/29/09 DEQ

13 01 33 03 Private Litigatio City of Livingston, et al Phone log – DEQ/Llewellyn 02/06/09

13 01 33 03 Private Litigatio City of Livingston, et al WET email to DEQ re: BN data 2/11-2/12/09 WET

13 01 33 03 Private Litigatio City of Livingston, et al Third Party Lawsuit 02/11/09

13 01 33 03 Private Litigatio City of Livingston, et al WET Data 02/11/09 WET

13 01 33 03 Private Litigatio City of Livingston, et al K/J email to DEQ re: WET data – copies wanted 02/23/09 KJ

13 01 33 03 Private Litigatio City of Livingston, et al 02/24/09 DEQ internal

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Plaintiffs’ brief opposing Envirocon 3rd Party Complaint against DEQ

Site-Wide Information

Site-Wide Information

Site-Wide Information

David Smith’s Answer to Plaintiffs’ Second Amended Complaint

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ internal email, & to CDM re: 18 ambient air samples WET collected in the fall of 2008

Page 360: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 360 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 33 03 Private Litigatio City of Livingston, et al 03/09/09 LS&K

13 01 33 03 Private Litigatio City of Livingston, et al 03/18/09 District Court

13 01 33 03 Private Litigatio City of Livingston, et al 03/18/09

13 01 33 03 Private Litigatio City of Livingston, et al Y 03/20/09 DEQ legal internal

13 01 33 03 Private Litigatio City of Livingston, et al K/J & DEQ emails re: Info request about WET 03/29/09

13 01 33 03 Private Litigatio City of Livingston, et al 04/01/09 DEQ/ Reynolds

13 01 33 03 Private Litigatio City of Livingston, et al Meeting notes – Location 134, Richardson property 04/01/09 DEQ/ Reynolds

13 01 33 03 Private Litigatio City of Livingston, et al 04/09/09

13 01 33 03 Private Litigatio City of Livingston, et al 04/28/09

13 01 33 03 Private Litigatio City of Livingston, et al 04/30/09

13 01 33 03 Private Litigatio City of Livingston, et al 05/14/09

13 01 33 03 Private Litigatio City of Livingston, et al 05/21/09

13 01 33 03 Private Litigatio City of Livingston, et al 05/21/09

13 01 33 03 Private Litigatio City of Livingston, et al 06/09/09

13 01 33 03 Private Litigatio City of Livingston, et al 06/23/09

13 01 33 03 Private Litigatio City of Livingston, et al 06/29/09

13 01 33 03 Private Litigatio City of Livingston, et al 07/01/09

13 01 33 03 Private Litigatio City of Livingston, et al 07/09/09

13 01 33 03 Private Litigatio City of Livingston, et al 07/16/09

13 01 33 03 Private Litigatio City of Livingston, et al 07/21/09

13 01 33 03 Private Litigatio City of Livingston, et al 07/22/09

Site-Wide Information

Lewis, Slovak & Kovacich letter to June Little/Clerk of District Court, Livingston re: For filing – Plaintiff’s Correction to Brief in Opposition to Envirocon, Inc’s Motion for Case Management Order

Site-Wide Information

MT 6th Judicial District Court, Park Co. re: Order granting Defendant David Smith’s Motion for Summary Judgment

Site-Wide Information

MT 6th Judicial District Court, Park Co. re: Order Granting Change of Venue

Site-Wide Information

** N4640DEQ legal internal email re: Livingston 3rd Party Lawsuit

Site-Wide Information

Site-Wide Information

DEQ/Reynolds & C Lawellin emails re: Livingston testing – Richardson/Tate property

Site-Wide Information

Site-Wide Information

DEQ Legal/Haque-Hausrath & C Lawellin emails re: Contact with DEQ employees and contractors

Site-Wide Information

C Lawellin & DEQ/Reynolds emails re: Attachment – February/March testing results

Site-Wide Information

DEQ Legal/Haque-Hausrath letter pack to C Lawellin re: Your Client’s February & March 2009 Sampling Results

DEQ Legal/ Haque-Hausrath

Site-Wide Information

DEQ Legal/Haque-Hausrath letter to C Lawellin re: February & March 2009 radon data

DEQ Legal/ Haque-Hausrath

Site-Wide Information

DEQ Legal/Haque-Hausrath and C Lawellin emails re: C Lawellin did not receive Feb/March 2009 sampling package

Site-Wide Information

DEQ Legal/Haque-Hausrath letter pack to C Lawellin re: DEQ resending February & March 2009 sampling Results

DEQ Legal/ Haque-Hausrath

Site-Wide Information

WET & DEQ emails re: Additional sampling at Kautzman residence

Site-Wide Information

DEQ legal & Courtney Lawellin emails re: Coping of dispute resolution documents

Site-Wide Information

DEQ legal letter to Courtney Lawellin re: Response to info request

Site-Wide Information

DEQ Legal/Haque-Hausrath email to DEQ/Reynolds re: Attachment – Filled out 9th Circuit hearing notice

DEQ Legal/ Haque-Hausrath

Site-Wide Information

WET & DEQ emails re: Residential air regional Screening Levels

Site-Wide Information DEQ & Courtney Lawellin emails re: Results from 114 North K

Site-Wide Information

US Court of Appeals 9th Circuit Document re: Intervenors-Appellees Motion for Additional Argument Time

Site-Wide Information

US Court of Appeals 9th Circuit Document re: Appellant BNSF’s Response to Intervenors’ Motion for Additional Argument Time

Page 361: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 361 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 33 03 Private Litigatio City of Livingston, et al 07/27/09

13 01 33 03 Private Litigatio City of Livingston, et al 08/19/09

13 01 33 03 Private Litigatio City of Livingston, et al

13 01 33 03 Private Litigatio City of Livingston, et al C Lawellin & DEQ/Reynolds emails re: Well surveys 12/21/09

13 01 33 03 Private Litigatio City of Livingston, et al C Lawellin & DEQ/Reynolds emails re: Well surveys 12/22/09

13 01 33 03 Private Litigatio City of Livingston, et al 01/04/10 GSI

13 01 33 03 Private Litigatio City of Livingston, et al C Lawellin email to DEQ re: Well survey follow up 01/05/10 C Lawellin

13 01 33 03 Private Litigatio City of Livingston, et al 01/06/10 DEQ/ Reynolds

13 01 33 03 Private Litigatio City of Livingston, et al 01/29/10 K&L Gates

13 01 33 03 Private Litigatio City of Livingston, et al Legal Ad to be published in the Bozeman Daily Chronicle 02/02/10

13 01 33 03 Private Litigatio City of Livingston, et al 02/09/10

13 01 33 03 Private Litigatio City of Livingston, et al 02/25/10

13 01 33 03 Private Litigatio City of Livingston, et al 03/02/10 C Lawellin

13 01 33 03 Private Litigatio City of Livingston, et al 03/16/10

13 01 33 03 Private Litigatio City of Livingston, et al 03/15/10

13 01 33 03 Private Litigatio City of Livingston, et al 03/19/10 DEQ/ Reynolds

13 01 33 03 Private Litigatio City of Livingston, et al 03/19/10

13 01 33 03 Private Litigatio City of Livingston, et al 03/23/10

13 01 33 03 Private Litigatio City of Livingston, et al 03/23/10

13 01 33 03 Private Litigatio City of Livingston, et al 03/23/10 M Hartwig

13 01 33 03 Private Litigatio City of Livingston, et al M Hartwig letter to K&L Gates/Kuhl re: Request for Entry 03/23/10 M Hartwig

Site-Wide Information

US Court of Appeals 9th Circuit Document re: Appellant BNSF is allotted an additional 10 minutes of argument time for a total of 20 minutes granted by the court

Site-Wide Information

C Lawellin and DEQ/Reynolds emails re: DEQ attachment – TT-McAdam 1103 Gallatin results

Site-Wide Information

C Lawellin & DEQ Legal/Haque-Hausrath emails re: Well surveys

12/14-12/17/09

Site-Wide Information

Site-Wide Information

Site-Wide Information

Table 1A State plaintiff sites proposed for supplemental indoor air quality sampling

Site-Wide Information

Site-Wide Information

DEQ/Reynolds email to BN/Smith & K/J/Norris fw to C Lawellin re: Well surveys

Site-Wide Information

K&L Gates letter to DEQ re: BN’s Proposed Supplemental Indoor Sampling for Purposes of Litigation

Site-Wide Information

Site-Wide Information

DEQ Legal/Haque-Hausrath email to K&L Gates/Lawrence re: BN’s Proposed Supplemental Indoor Sampling

DEQ Legal/ Haque-Hausrath

Site-Wide Information

C Lawellin & DEQ/Reynolds emails re: March indoor air sampling

Site-Wide Information

C Lawellin email to DEQ re: Schedule for testing at plaintiff properties

Site-Wide Information

DEQ Legal/Haque-Hausrath & M Hartwig emails re: DEQ-required indoor air Resampling 7 sampling pursuant to rule 34

Site-Wide Information

K&L gates/Kuhl & C Lawellin emails re: BN proposed inspection/sampling schedule

Site-Wide Information

DEQ/Reynolds Draft email to BN/Smith & K/J/Norris & Aldersley to DEQ Legal fw re: Draft for review – DEQ-required indoor air sampling

Site-Wide Information

M Hartwig, C Lawellin, & K&L Gates/Kuhl letter/emails re: BN proposed inspection/sampling schedule

Site-Wide Information

C Lawellin & K&L Gates/Kuhl emails re: Revised sampling schedule & request for entry

Site-Wide Information

DEQ Legal/Haque-Hausrath letter/email to C Trueblood re: DEQ response to Trueblood 3/19/10 letter

DEQ legal/ Haque-Hausrath

Site-Wide Information M Hartwig letter to K&L Gates/Lawrence re: Request for Entry

Site-Wide Information

Page 362: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 362 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 33 03 Private Litigatio City of Livingston, et al 05/26/10

13 01 33 03 Private Litigatio City of Livingston, et al 05/27/10 DEQ legal internal

13 01 33 03 Private Litigatio City of Livingston, et al 05/27/10

13 01 33 03 Private Litigatio City of Livingston, et al 06/02/10

13 01 33 03 Private Litigatio City of Livingston, et al 06/16/10 KJ/Adlersley

13 01 33 03 Private Litigatio City of Livingston, et al 06/21/10 C Lawellin

13 01 33 03 Private Litigatio City of Livingston, et al 06/22/10 DEQ Legal internal

13 01 33 03 Private Litigatio City of Livingston, et al 6/23-6/24/10

13 01 33 03 Private Litigatio City of Livingston, et al 06/24/10 C Lawellin

13 01 33 03 Private Litigatio City of Livingston, et al 06/24/10

13 01 33 03 Private Litigatio City of Livingston, et al 06/28/10 KJ/Adlersley

13 01 33 03 Private Litigatio City of Livingston, et al DEQ/Reynolds & C Lawellin emails re: Personnel question 07/06/10

13 01 33 03 Private Litigatio City of Livingston, et al 07/19/10

13 01 33 03 Private Litigatio City of Livingston, et al 7/22-7/27/10

13 01 33 03 Private Litigatio City of Livingston, et al 07/28/10

13 01 33 03 Private Litigatio City of Livingston, et al 09/17/10

13 01 33 03 Private Litigatio City of Livingston, et al 10/28/10 C Lawellin

13 01 33 03 Private Litigatio City of Livingston, et al 11/01/10

13 01 33 03 Private Litigatio City of Livingston, et al 11/01/10 DEQ legal internal

13 01 33 03 Private Litigatio City of Livingston, et al 11/02/10

13 01 33 03 Private Litigatio City of Livingston, et al 12/01/10

13 01 33 03 Private Litigatio City of Livingston, et al C Lawellin & DEQ/Reynolds emails re: CDM Oversight 11/03/10

Site-Wide Information

DEQ Legal/Haque-Hausrath & C Lawellin emails re: Well Surveys

Site-Wide Information

DEQ Legal/Haque-Hausrath internal email re: Phone log w/C Lawellin

Site-Wide Information

DEQ Legal/Haque-Hausrath email to C Lawellin re: Copy of 5/21/10 letter from K/J to DEQ/Reynolds

DEQ legal/ Haque-Hausrath

Site-Wide Information

DEQ Legal/Haque-Hausrath & C Lawellin emails re: Well drilling

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds fw to C Lawellin re: Private well summary – 2010 sampling event

Site-Wide Information

C Lawellin email to DEQ re: Well testing – would like conference call before testing starts

Site-Wide Information

DEQ Legal/Haque-Hausrath internal email re: Phone log w/C Lawellin & M Hartwig

Site-Wide Information

DEQ/Reynolds & C Lawellin emails re: Gerry & Darlene Stephens

Site-Wide Information

C Lawellin email to DEQ fw to K/J/Norris re: Additional wells - Well testing

Site-Wide Information

DEQ Legal/Haque-Hausrath email to C Lawellin re: DEQ/Reynolds email to K/J/Norris fw to C Lawellin

DEQ legal/ Haque-Hausrath

Site-Wide Information

K/J/Aldersley email to DEQ/Reynolds fw to C Lawellin re: Well testing

Site-Wide Information

Site-Wide Information

C Lawellin & B Summerville emails fw to DEQ/Reynolds re: Access for entry

Site-Wide Information

DEQ/Reynolds & C Lawellin emails re: Mitigation on the D Richardson property

Site-Wide Information

DEQ Legal/Haque-Hausrath internal email re: Phone log w/C Lawellin

DEQ legal/ Haque-Hausrath

Site-Wide Information

DEQ/Reynolds & C Lawellin emails re: DEQ Attachment – LNAPL testing – BN Proposal & DEQ comments

Site-Wide Information

C Lawellin email to DEQ/Reynolds, Haque-Hausrath re: LNAPL & other stuff

Site-Wide Information

For Publication – US Court of Appeals for the Ninth Circuit re: Opinion by Judge Pregerson

Site-Wide Information

DEQ Legal/Haque-Hausrath internal email to Reynolds re: Phone log for conference call with C Lawellin

Site-Wide Information

C Lawellin & DEQ/Reynolds emails re: Final Task I – 1993 CDM Final Baseline Risk Assessment referenced

Site-Wide Information

DEQ Legal/Haque-Hausrath email to C Lawellin re: Final Task I – 1993 CDM Final Baseline Risk Assessment

DEQ Legal/ Haque-Hausrath

Site-Wide Information

Page 363: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 363 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 33 03 Private Litigatio City of Livingston, et al 11/08/10

13 01 33 03 Private Litigatio City of Livingston, et al 11/09/10 DEQ legal internal

13 01 33 03 Private Litigatio City of Livingston, et al 11/10/10

13 01 33 03 Private Litigatio City of Livingston, et al 11/11/10 J McGarry

13 01 33 03 Private Litigatio City of Livingston, et al 01/04/11 John A Conner

13 01 33 03 Private Litigatio City of Livingston, et al Expert Report of Jay Vandeven 01/05/11 Jay Vandeven

13 01 33 03 Private Litigatio City of Livingston, et al 01/05/11

13 01 33 03 Private Litigatio City of Livingston, et al 03/28/11 DEQ legal internal

13 01 33 03 Private Litigatio City of Livingston, et al 04/05/11 DEQ legal internal

13 01 33 03 Private Litigatio City of Livingston, et al 04/06/11 J McGarry

13 01 33 03 Private Litigatio City of Livingston, et al 04/19/11

13 01 33 03 Private Litigatio City of Livingston, et al 5/13-5/16/11

13 01 33 03 Private Litigatio City of Livingston, et al 05/17/11

13 01 33 03 Private Litigatio City of Livingston, et al 05/26/11 Billings Gazette

13 01 33 03 Private Litigatio City of Livingston, et al 09/09/11

13 01 33 03 Private Litigatio City of Livingston, et al 03/27/12

13 01 33 03 Private Litigatio City of Livingston, et al 03/27/12 DEQ internal

13 01 33 03 Private Litigatio City of Livingston, et al 04/19/12

13 01 33 03 Private Litigatio City of Livingston, et al 05/09/12

13 01 33 03 Private Litigatio City of Livingston, et al Livingston City Commission Addendum 6/512

Site-Wide Information

Phone Log – DEQ/Reynolds & WET/Erickson re: Bedrock well drilling

Site-Wide Information

Phone Log – DEQ Legal/Haque-Hausrath internal email to Reynolds re: Conference call notes from call with C Lawellin

Site-Wide Information

DEQ Legal/Haque-Hausrath letter to O’Keefe Drilling Company re: Information request for well logs drilled by O’Keefe from 1/1/08 to present and who the clients were in 4 sections in Livingston

DEQ Legal/ Haque-Hausrath

Site-Wide Information

Julie McGarry email to DEQ Legal/Haque-Hausrath re: Response to DEq phone call – WET activities

Site-Wide Information

Expert Opinion of John A. Conner - Regarding Indoor Air Vapor Intrusion Concerns at Specific Properties in Livingston - Appendix D

Site-Wide Information

Site-Wide Information

Clayton & Company/David Clayton letter to K&L Gates/Kuhl re: Export Report & Consulting Assignment

Clayton & Company

Site-Wide Information

DEQ Legal/ Haque-Hausrath internal email to Reynolds re: Phone log from Julie McGarry

Site-Wide Information

DEQ Legal/ Haque-Hausrath internal email to Reynolds re: Phone log from Julie McGarry

Site-Wide Information

J McGarry email to DEQ Legal/Haque-Hausrath re: Access denied for testing by Krohnes

Site-Wide Information

DEQ Legal/ Haque-Hausrath email to J McGarry re: Krohne testing

DEQ legal/ Haque-Hausrath

Site-Wide Information

DEQ Legal/ Haque-Hausrath & C Lawellin emails re: Task I contact list

DEQ Legal/ Haque-Hausrath

Site-Wide Information

DEQ Legal/ Haque-Hausrath internal email to Reynolds re: Phone log with C Lawellin

DEQ Legal/ Haque-Hausrath

Site-Wide Information

Billings Gazette article re:"Livingston's pollution suit against rail company heads to court"

Site-Wide Information

Court document re: BNSF'S Opposition to Plantiffs' Motion in Limine regarding DEQ Evidence (recieved)

Site-Wide Information

LSKLaw/Komac & DEQ/Haque-Hausrath & Wallis emails re: Information request for archived electronic files

Site-Wide Information

DEQ/Seyler & DEQ IT emails re: Request for search for archived files

Site-Wide Information

DEQ legal/Haque-Hausrath internal email to Reynolds re: Phone log - Courtney Llawellyn & Rich Waddell - Trial witnesses

DEQ Legal/ Haque-Hausrath

Site-Wide Information

DEQ legal/Haque-Hausrath internal emails re: Settlement of third-party litigation

DEQ Legal/ Haque-Hausrath

Site-Wide Information

Page 364: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 364 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 33 03 Private Litigatio City of Livingston, et al Y 06/06/12

13 01 33 03 Private Litigatio City of Livingston, et al 07/18/12

13 01 33 03 Private Litigatio City of Livingston, et al 08/08/12

13 01 33 03 Private Litigatio City of Livingston, et al DEQ Submittal of WET Litigation Data 03/27/13 WET

13 01 33 03 01 Private Litigatio Restoration Committee

13 01 33 03 01 Private Litigatio Restoration Committee 07/16/12

13 01 33 03 01 Private Litigatio Restoration Committee 07/19/12

13 01 33 03 01 Private Litigatio Restoration Committee Y 08/08/12

13 01 33 03 01 Private Litigatio Restoration Committee ROD Task list for Restoration Committee 08/13/12

13 01 33 03 01 Private Litigatio Restoration Committee DEQ handouts for the Restoration Committee Meeting 08/13/12 DEQ

13 01 33 03 01 Private Litigatio Restoration Committee 11/9/2012 WET/Green

13 01 33 03 01 Private Litigatio Restoration Committee 11/13/2012

13 01 33 03 01 Private Litigatio Restoration Committee 11/13/12

13 01 33 03 01 Private Litigatio Restoration Committee 11/13/2012

13 01 33 03 01 Private Litigatio Restoration Committee Y 11/13/12 DEQ/Cote

13 01 33 03 01 Private Litigatio Restoration Committee 03/07/13 DEQ/Reynolds

13 01 33 03 01 Private Litigatio Restoration Committee 05/29/13 BNSF/Stegman

13 01 33 03 01 Private Litigatio Restoration Committee 06/13/13 DEQ/Reynolds

13 01 33 03 01 Private Litigatio Restoration Committee 06/13/13 DEQ/Reynolds

13 01 33 03 01 Private Litigatio Restoration Committee DEQ/Reynolds letter to BNSF & LRG re: communications 06/13/13 DEQ/Reynolds

13 01 33 03 01 Private Litigatio Restoration Committee 6/19/13 BNSF/LRG/DEQ meeting notes 06/19/13

Site-Wide Information

** DEQ legal/Haque-Hausrath memorandum to Director Opper re: Summary of Third Party Settlement

DEQ Legal/ Haque-Hausrath

Site-Wide Information

DEQ legal/Haque-Hausrath email to LSK Law/Kovacich re: DEQ request for copy of the trust agreement & settlement

DEQ Legal/ Haque-Hausrath

Site-Wide Information

LSKLaw/Kovacich email to DEQ/Haque-Hausrath re: Attachment - Livingston settlement agreement

LSK Law/ Kovacich

Site-Wide Information

Site-Wide Information

Site-Wide Information

Livingston Enterprise article re: Committee that will manage BNSF settlement cleanup fund to meet

Livingston Enterprise

Site-Wide Information

Restoration Group/Nelson & DEQ/Reynolds emails re: Group requesting a meeting with DEQ/Reynolds

Site-Wide Information

** DEQ Memorandum re: Shop Complex, Summary of 3rd Party Settlement, DEQ's Authority to Requie=re Permission for 3rd Party Work

DEQ legal/ Haque-Hausrath

Site-Wide Information

Site-Wide Information

Site-Wide Information

Phone log - WET/Green to DEQ/Reynolds re: WET signed contract with LRG & still no meeting with BN

Site-Wide Information

Phone log - Summary: DEQ/Reynolds & legal/Morgan to Lawellen Law/Lawellen re: Discussion about LRG, BN & WET

Site-Wide Information

Phone Log - DEQ/Reynolds & WET/Green re: Discussion on getting data from WET & meeting with BN

Site-Wide Information

DEQ/Reynolds email to Lawellen Law/Lawellen re: Attachment - Task L GW Analytical Results, 1st thru 4th quarter

Site-Wide Information

** DEQ/Cote internal email to Reynolds/& legal re: Phone log with WET - Discussion of figures from WET's Multi-Phase Quarterly Monitoring Report/February/April 2012

Site-Wide Information

DEQ/Reynolds internal email to Haque-Hausrath re: Phone log with WET - work plans

Site-Wide Information

BNSF/Stegman email to DEQ/Reynolds re: BNSF notice regarding LRG WPs

Site-Wide Information

DEQ/Reynolds & BNSF/Stegman emails re: BNSF agenda for 6/19/13 BNSF/LRG/DEQ meeting

Site-Wide Information

DEQ/Reynolds, BNSF/Stegman & WET-lic/Erickson emails re: Email chain 6/19/13 meeting

Site-Wide Information

Site-Wide Information

Page 365: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 365 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 33 03 01 Private Litigatio Restoration Committee 06/28/13 DEQ/Reynolds

13 01 33 03 01 Private Litigatio Restoration Committee 07/02/13 DEQ/Reynolds

13 01 33 03 01 Private Litigatio Restoration Committee 07/03/13 DEQ/Reynolds

13 01 33 03 01 Private Litigatio Restoration Committee 07/08/13 LAW/Lawellin

13 01 33 03 01 Private Litigatio Restoration Committee 08/01/13 DEQ/Reynolds

13 01 33 03 01 Private Litigatio Restoration Committee 08/07/13 LRG/Nelson

13 01 33 03 01 Private Litigatio Restoration Committee LRG/Nelson & DEQ/Reynolds re: LRG email chain 08/06/13 LRG/Nelson

13 01 33 03 01 Private Litigatio Restoration Committee LRG Work Plans 10/11/13 DEQ/Reynolds

13 01 33 03 01 Private Litigatio Restoration Committee 10/10/13 DEQ/Reynolds

13 01 33 04 Private Litigatio

13 01 33 04 Private Litigatio Henriksen Complaint 10/10/07 Henreksen

13 01 33 04 Private Litigatio DEQ Letter to CWK re: Remedial Action by Third Parties 05/15/08 DEQ

13 01 33 04 Private Litigatio CWK Letter to DEQ re: Property owners represented 06/12/08 CWK

13 01 33 04 Private Litigatio WET Letter to DEQ re: WET Work Plan 06/30/08 WET

13 01 33 04 Private Litigatio 07/24/08

13 01 33 04 Private Litigatio DEQ Letter to WET re: Comments on WET WP 07/25/08 DEQ

13 01 33 04 Private Litigatio BNSF Memo on Joinder Motion – Merideth 08/04/08 BN

Site-Wide Information

DEQ/Reynolds letter to LRG/Nelson re: letter to LRG conveying Task list info.

Site-Wide Information

DEQ/Reynolds email to DEQ/Hague-Hausrath re: DEQ documentation of 7/2/13 Charley Green Call

Site-Wide Information

DEQ/Reynolds letter to LRG/Nelson re: conveying Task list info

Site-Wide Information

LAW/Lawellin & DEQ/Smith emails re: LRG attending field work

Site-Wide Information

DEQ/Reynolds, BNSF/Stegman & WET-lic/Erickson emails re: Email chain BNSF/LRG/DEQ meeting & activities

Site-Wide Information

LRG/Nelson, DEQ/Reynolds & Allen Stegman emails re; Stegman respond to LRG email chain

Site-Wide Information

Site-Wide Information

Site-Wide Information

Joint Livingston remediation Group and BNSF Railway Company Work Plan Submittals

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne (represented by Cok, Wheat & Kinzler)

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

DEQ & CWK emails re: Seeking approval of Proposed Work Plans

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Page 366: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 366 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 33 04 Private Litigatio BNSF Joinder Motion – Merideth 08/04/08 BN

13 01 33 04 Private Litigatio BNSF Memo on Joinder Motion – Burley 08/04/08 BN

13 01 33 04 Private Litigatio BNSF Motion for Joinder – Burley 08/04/08 BN

13 01 33 04 Private Litigatio BNSF Memo on Joinder Motion – Nelson 08/04/08 BN

13 01 33 04 Private Litigatio BNSF Motion for Joinder – Nelson 08/04/08 BN

13 01 33 04 Private Litigatio DEQ Motion for Intervention – Burley DEQ

13 01 33 04 Private Litigatio DEQ Motion for Intervention – Burley, Merideth, Nelson 08/18/08 DEQ

13 01 33 04 Private Litigatio Order Granting DEQ Intervention – Burley, Merideth, Nelson 08/20/08

13 01 33 04 Private Litigatio WET Work Plan for Ambient Air Monitoring 08/20/08 WET

13 01 33 04 Private Litigatio Modified WET Work Plan 08/20/08 WET

13 01 33 04 Private Litigatio 08/21/08

13 01 33 04 Private Litigatio Certificate of Service of DEQ Opposition to Joinder 08/21/08

13 01 33 04 Private Litigatio DEQ Opposition to Joinder – Burley, Merideth, Nelson 08/21/08 DEQ

13 01 33 04 Private Litigatio Opposition to Joinder – Burley, Merideth, Nelson 08/22/08

13 01 33 04 Private Litigatio BNSF Joinder Reply – Burley, Merideth, Nelson 09/04/08 BN

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Notice of Filing of DEQ Response to Motion – Burley, Merideth, Nelson

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Page 367: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 367 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 33 04 Private Litigatio DEQ internal email re: Henriksen lawsuit 09/09/08 DEQ internal

13 01 33 04 Private Litigatio DEQ Letter to WET re: Comments on WET WP 09/15/08 DEQ

13 01 33 04 Private Litigatio DEQ Letter to WET re: Permission for WET WP 09/15/08 DEQ

13 01 33 04 Private Litigatio Y **DEQ internal email re: Henriksen lawsuit 09/24/08 DEQ internal

13 01 33 04 Private Litigatio Motion for Hearing – Burley, Merideth, Nelson 09/30/08

13 01 33 04 Private Litigatio – Burley, Merideth, Nelson 09/30/08

13 01 33 04 Private Litigatio Order Granting Stipulation – Burley, Merideth, Nelson 09/30/08

13 01 33 04 Private Litigatio CWK letter to DEQ re: Krohne property 10/06/08 CWK

13 01 33 04 Private Litigatio Order Denying BNSF Joinder – Burley, Merideth, Nelson 10/10/08

13 01 33 04 Private Litigatio DEQ Letter to CWK re: Krohne samples 10/16/08 DEQ

13 01 33 04 Private Litigatio CWK Letter to DEQ requesting Horiel Results 11/26/08 CWK

13 01 33 04 Private Litigatio KJ/DEQ emails re: Horiel sampling 12/01/08

13 01 33 04 Private Litigatio KJ/DEQ emails re: Nelson results 12/01/08

13 01 33 04 Private Litigatio DEQ Letter to WET re: Modified 9/3/08 WET WP Permission 12/02/08 DEQ

13 01 33 04 Private Litigatio DEQ internal email re: Horiel testing 12/04/08 DEQ internal

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Page 368: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 368 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 33 04 Private Litigatio DEQ/KJ emails re: Rainbow Motel ownership 12/4-12/5/08

13 01 33 04 Private Litigatio DEQ internal email re: Horiel results 12/05/08 DEQ internal

13 01 33 04 Private Litigatio DEQ letter to F Horiel re: Horiel results 12/05/08 DEQ

13 01 33 04 Private Litigatio DEQ/CWK emails re: Horiel well usage 12/08/08

13 01 33 04 Private Litigatio CWK email to DEQ confirming Rainbow Motel ownership 12/08/08 CWK

13 01 33 04 Private Litigatio DEQ/CWK email re: Horiel testing 12/08/08

13 01 33 04 Private Litigatio DEQ/BKBH emails re: Rainbow Motel tenants 12/10/08

13 01 33 04 Private Litigatio 12/10/08 CWK

13 01 33 04 Private Litigatio DEQ email to BKBH re: Rainbow Motel licensing 12/18/08 DEQ

13 01 33 04 Private Litigatio DEQ Letter to WET re: WET info request 12/23/08 DEQ

13 01 33 04 Private Litigatio CWK/DEQ emails re: File review 12/29/08

13 01 33 04 Private Litigatio CWK/DEQ emails re: Testing data 12/29/08

13 01 33 04 Private Litigatio CWK email to DEQ re: Document request 01/13/09 CWK

13 01 33 04 Private Litigatio CWK email to DEQ re: Document request 01/14/09 CWK

13 01 33 04 Private Litigatio WET/DEQ emails re: WET draft requesting 707 extension 01/21/09

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

CWK letter to DEQ re: Document request – Burley, Nelson, Merideth

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Page 369: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 369 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 33 04 Private Litigatio WET letter to DEQ re: Requesting 707 extension 01/22/09 WET

13 01 33 04 Private Litigatio Phone Log – DEQ/McGarry re: 707 request 01/22/09

13 01 33 04 Private Litigatio 02/02/09 CWK

13 01 33 04 Private Litigatio Phone Log – DEQ/McGarry re: Document request 02/02/09

13 01 33 04 Private Litigatio Phone Log – DEQ/McGarry re: Info request 02/03/09

13 01 33 04 Private Litigatio DEQ email to WET re: 707 deadline extension 02/04/09 DEQ

13 01 33 04 Private Litigatio Phone Log – DEQ & McGarry re: Vapor intrusion question 02/06/09

13 01 33 04 Private Litigatio Phone log – DEQ & CWK re: 707 request 02/10/09

13 01 33 04 Private Litigatio CWK letter to DEQ re: 707 letter 02/11/09 CWK

13 01 33 04 Private Litigatio Data Submittal for Investigation 02/11/09 WET

13 01 33 04 Private Litigatio WET

13 01 33 04 Private Litigatio 03/27/09 DEQ

13 01 33 04 Private Litigatio 4/5-4/14/09

13 01 33 04 Private Litigatio J McGarry email to DEQ re: Testing results info wanted 04/22/09 J McGarry

13 01 33 04 Private Litigatio DEQ & J McGarry emails re: Testing results 04/27/09

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

CWK letter to DEQ re: Requesting dispute resolution exhibits (2/2/09)

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

SUB-Slab and indoor air monitoring – Lab detections of COC’s spreadsheet

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

DEQ email to J McGarry/Cok law re: Recent testing results for Nelson & Horiel

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

DEQ/Reynolds & K/J/Aldersley/Norris emails re: Soil Gas System – 1104 E Gallatin

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Page 370: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 370 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 33 04 Private Litigatio 05/01/08 KJ

13 01 33 04 Private Litigatio 06/04/09 KJ/Norris

13 01 33 04 Private Litigatio 06/04/09 KJ

13 01 33 04 Private Litigatio 06/09/09

13 01 33 04 Private Litigatio 06/10/09

13 01 33 04 Private Litigatio DEQ & C Lawellin emails re: Water testing 06/15/09

13 01 33 04 Private Litigatio 7/8/-7/9/09

13 01 33 04 Private Litigatio 07/13/09

13 01 33 04 Private Litigatio 07/20/09 DEQ legal internal

13 01 33 04 Private Litigatio 07/21/09 DEQ legal internal

13 01 33 04 Private Litigatio 07/21/09

13 01 33 04 Private Litigatio 07/22/09

13 01 33 04 Private Litigatio 07/23/09

13 01 33 04 Private Litigatio 07/27/09 DEQ legal internal

13 01 33 04 Private Litigatio 07/28/09 K&L Gates

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Project Manual Including Specifications for Indoor Air Mitigation System at 1104 E. Gallatin Street

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

K/J/Norris cover letter to DEQ/Reynolds re: Indoor Air Mitigation System Work Scope Statement and Field Design Package 1104 E. Gallatin Street

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

K/J Memorandum to Olympus re: Work Scope Statement for Project site at 1104 E Gallatin Street

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

DEQ legal and J McGarry emails re: Test results for clients follow-up

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

DEQ legal and J McGarry emails re: Krohne GW results sheets 2009

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

CWL/McGarry/Figgins & DEQ Legal/Haque-Hausrath emails re: Test results for clients

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

DEQ legal & Cok, Wheat & Kinzler emails re: Test results for clients

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

DEQ Legal/Haque-Hausrath internal email to Reynolds & Martin re: Phone log from Dan Hoven – FYI

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

DEQ Legal/Haque-Hausrath internal email to Reynolds & Martin re: Phone log with Attorney from K&L Gates

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

US District Court Billings Montana District Subpoena In A Civil Case

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

K&L Gates/Kuhl & DEQ Legal/Haque-Hausrath emails re: Burley et al. v. BNSF

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

DEQ Legal/Haque-Hausrath letter to K & L Gates/Kuhl re: Subpoena fees for BN deposition of A Reynolds (7/23/09)

DEQ Legal/ Haque-Hausrath

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

DEQ Legal/Haque-Hausrath internal email to Reynolds re: Phone log with Julie McGarry

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

K&L Gates letter to DEQ Legal/Haque-Hausrath re: Subpoena fees for BN Deposition of A Reynolds

Page 371: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 371 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 33 04 Private Litigatio 07/28/09

13 01 33 04 Private Litigatio 07/30/09

13 01 33 04 Private Litigatio 07/30/09 K&L Gates

13 01 33 04 Private Litigatio 07/31/09

13 01 33 04 Private Litigatio 08/20/09 DEQ legal internal

13 01 33 04 Private Litigatio 08/24/09 DEQ legal internal

13 01 33 04 Private Litigatio 08/26/09 DEQ legal internal

13 01 33 04 Private Litigatio 08/26/09 K&L Gates

13 01 33 04 Private Litigatio 08/26/09 DEQ legal/ Mackie

13 01 33 04 Private Litigatio 08/26/09

13 01 33 04 Private Litigatio 08/26/09

13 01 33 04 Private Litigatio 08/26/09

13 01 33 04 Private Litigatio 08/27/09

13 01 33 04 Private Litigatio 09/14/09

13 01 33 04 Private Litigatio 09/15/09 K&L Gates

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

K&L Gates/Kuhl & DEQ Legal/Haque-Hausrath emails re: BNSF Livingston federal cases, deposition date for DEQ employees

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

DEQ Legal/Haque-Hausrath, CWL/McGarry & K&L Gates/Kuhl emails re: BN federal cases, deposition date for DEQ employees

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

K&L Gates letter to DEQ/Reynolds re: BN’s Amended Notice of Deposition of A Reynolds & MDEQ’s Designee

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

US District Court Amended Notice of Deposition Upon Oral Examination of MDEQ

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

DEQ Legal email to Becky Summerville re: BN Livingston Deposition of A Reynolds

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

DEQ Legal/Haque-Hausrath internal email re: Phone log call from Dan Hoven re: Petition briefing schedule

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

DEQ Legal/Haque-Hausrath internal email re: Phone log call with B Kuhl re: 30(b) (6)

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

B Kuhl letter to DEQ re: Amended Notice of Deposition of A Reynolds

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

DEQ Legal/Mackie letter to K&L Gates/Kuhl re: Acceptance of Service relative to A Reynolds deposition

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

US District Court Second Amended Notice of Deposition Upon Oral Examination of MDEQ

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

US District Court Second Amended Notice of Deposition Upon Oral Examination of A Reynolds

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

US District Court Acceptance of Service: Subpoena and Second Amended Notices of Depositions of MDEQ & A Reynolds

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Amended Notice of Deposition Upon Oral Examination of A Reynolds

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

DEQ Legal/Haque-Hausrath email to Edwards Law/Culver & Chris re: DEQ attorney Brooks attending depositions in place of Haque-Hausrath

DEQ Legal/ Haque-Hausrath

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

K&L Gates/Kuhl letter to DEQ Legal/Haque-Hausrath re: Documents to be reviewed before the depositions of MDEQ & A Reynolds

Page 372: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 372 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 33 04 Private Litigatio Y 09/22/09 DEQ legal/Brooks

13 01 33 04 Private Litigatio 09/23/09

13 01 33 04 Private Litigatio 09/23/09

09/25/09

13 01 33 04 Private Litigatio 10/06/09

13 01 33 04 Private Litigatio

13 01 33 04 Private Litigatio 11/03/09

13 01 33 04 Private Litigatio 11/06/09

13 01 33 04 Private Litigatio 11/11/09

13 01 33 04 Private Litigatio 11/12/09

13 01 33 04 Private Litigatio 11/14/09

13 01 33 04 Private Litigatio 12/08/09 KJ/Norris

13 01 33 04 Private Litigatio 01/07/10 DEQ legal internal

13 01 33 04 Private Litigatio 03/28/11

13 01 33 04 Private Litigatio 04/05/11

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

** DEQ Legal/Brooks email to John Wadhams re: BN Depositions

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

US District Court Third Amended Notice of Deposition Upon Oral Examination of MDEQ

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

US District Court Third Amended Notice of Deposition Upon Oral Examination of A Reynolds

US District Court Deposition Upon Oral Examination of A Reynolds

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Master Index of Dave and Jeannie Burley, et al, Diana & Kenneth Merideth et al, & Dana Nelson et al vs BNSF (Updated 10/6/09)

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

DEQ Legal/Haque-Hausrath, Edwards Law/Culver & K&L Gates/Lawrence emails re: Continuation of A Reynolds Deposition

10/15-10/30/09

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

DEQ Legal/Haque-Hausrath email to Fisher Court Reporting re: Notarized copy of the correction pages for the deposition of A Reynolds

DEQ Legal/ Haque-Hausrath

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

DEQ Legal/Haque-Hausrath email to K&L Gates, Edwards Law, & CWL re: Spelling of Aimee Reynolds name

DEQ Legal/ Haque-Hausrath

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

K&L Gates & DEQ Legal emails re: Continuation of Deposition of A Reynolds

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

US District Court Notice of Continuation of Deposition Upon Oral Examination of A Reynolds & MDEQ

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Deposition Upon Oral Examination of Aimee Reynolds , Vol II Dave Burley vs BNSF

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

K/J/Norris email to DEQ/Reynolds re: 1104 E Gallatin St Residential Indoor Mitigation System & letter from CWL to BKBH/Hoven

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

DEQ Legal/Haque-Hausrath internal email re: Phone log call with J McGarry re: Vapor intrusion & proposed cleanup levels for indoor air

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

DEQ Legal/ Haque-Hausrath internal email to Reynolds re: Phone log from Julie McGarry

DEQ Legal/ Haque-Hausrath

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

DEQ Legal/ Haque-Hausrath internal email to Reynolds re: Phone log from Julie McGarry

DEQ Legal/ Haque-Hausrath

Page 373: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 373 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 33 04 Private Litigatio 04/06/11 J McGarry

13 01 33 04 Private Litigatio 04/19/11

13 01 33 04 Private Litigatio 09/05/12

13 01 33 04 Private Litigatio 09/26/12 Pacifica Law Group

13 01 33 04 Private Litigatio 08/28/12

13 01 33 04 Private Litigatio 08/28/12

13 01 33 04 Private Litigatio 10/03/12

13 01 33 04 Private Litigatio 10/04/12

13 01 33 04 Private Litigatio 11/28/12

13 01 33 04 Private Litigatio 11/28/12

13 01 33 04 Private Litigatio 11/28/12

13 01 33 04 Private Litigatio 10/26/12 BN/Kuhl

13 01 33 04 Private Litigatio 11/09/12 Pacifica Law Group

13 01 34 Interim Actions

13 01 34 01 Interim Actions

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

J McGarry email to DEQ Legal/Haque-Hausrath re: Access denied for testing by Krohnes

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

DEQ Legal/ Haque-Hausrath email to J McGarry re: Krohne testing

DEQ Legal/ Haque-Hausrath

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Cok Kinzler Law/McGarry & DEQ legal/Haque-Hausrath emails re: McGarry request for testing data - DEQ response

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Pacific Law Group/Lawrence letter to DEQ/Reynolds & Haque-Hausrath re: BNSF's Request for Entry to inspect and sample for purposes of litigation pending in the US District Court

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Disctrict Court Papers for Dave Burley re: BNSF's request for entry

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Disctrict Court Papers for Diana & Kenneth Merideth re: BNSF's request for entry

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Cok Kinzler Law/McGarry & DEQ legal/Haque-Hausrath emails re: McGarry request for cost estimates for air mitigation system for Burley/Khrone - DEQ response

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Cok Kinzler Law/McGarry & DEQ legal/Haque-Hausrath emails re: McGarry request for information on air mitigation system for Burley/Khrone - DEQ response

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Disctrict Court Papers for Francis Horiel re: BNSF's request for entry

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Disctrict Court Papers for Dwight & Kitty Khrone re: BNSF's request for entry

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Disctrict Court Papers for Dana Nelson re: BNSF's request for entry

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

BN/Kuhl letter to DEQ legal/Haque-Hausrath re:BN's potential conveyance of Livingston real property to institutional controls

Site-Wide Information

Burley, Nelson, Merideth, Henriksen, Horiel, & Krohne

Pacific Law Group/Lawrence letter to DEQ/Reynolds & Haque-Hausrath re: Results from BNSF's sampling pursuant to its Request for Entry

Site-Wide Information

Site-Wide Information

Electric Shop Excavation (heading)

Page 374: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 374 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 34 01 01 Interim Actions Work Plans 1/99-8/07

13 01 34 01 01 Interim Actions Work Plans HSI Geotrans fax to DEQ re: Comments to Work Plan 01/13/99 Geotrans

13 01 34 01 01 Interim Actions Work Plans DEQ letter to BNSF re: Work Plan 02/23/99 DEQ

13 01 34 01 01 Interim Actions Work Plans Electric Shop Soil Excavation Final Work Plan 06/28/99

13 01 34 01 01 Interim Actions Work Plans Final revision of Electric Shop Work Plan 06/28/99

13 01 34 01 01 Interim Actions Work Plans 07/01/99 DEQ

13 01 34 01 01 Interim Actions Work Plans Activity report 02/25/00

13 01 34 01 01 Interim Actions Work Plans Envirocon transmittal - Electric Shop Work Plan 09/05/01 Envirocon

13 01 34 01 01 Interim Actions Work Plans Envirocon Transmittal-Addendum 03/15/02 Envirocon

13 01 34 01 01 Interim Actions Work Plans 03/15/02

13 01 34 01 01 Interim Actions Work Plans 07/03/02 TetraTech

13 01 34 01 01 Interim Actions Work Plans Tetra Tech Letter to DEQ re: Addendum 07/03/02 TetraTech

13 01 34 01 01 Interim Actions Work Plans DEQ letter to BNSF re: Comments to Addendum 02/12/03 DEQ

13 01 34 01 01 Interim Actions Work Plans DEQ & K/J emails re: Revised Task I Work Plan 06/10/05

13 01 34 01 01 Interim Actions Work Plans 10/24/05 KJ

13 01 34 01 01 Interim Actions Work Plans 08/20/07 KJ

13 01 34 01 02 Interim Actions 6/00-8/06

13 01 34 01 02 Interim Actions Phone Log: Smith-BNSF 02/28/00

13 01 34 01 02 Interim Actions May 2000 Slide Photos - Electric Shop Excavation

13 01 34 01 02 Interim Actions Phone Log: Wieringa-Envirocon 06/07/00

13 01 34 01 02 Interim Actions Phone Log: Wieringa-Envirocon 06/15/00

13 01 34 01 02 Interim Actions Envirocon letter re: Excavation 06/26/00 Envirocon

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

DEQ letter to Envirocon re: Final revision of Electric Shop Work Plan

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

Electric Shop Soil Excavation Final Work Plan Addendum 1-Draft

1016/ 45B406

Site-Wide Information

Tetra Tech letter to DEQ re: Recommended comments to Electric Shop Work Plan Addendum No I

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

K/J letter to DEQ re: Electric Shop soil disposal request & work plan

1016/ 45B406

Site-Wide Information

Electric Shop Excavation Soil Sampling Analytical Results and Request for Contained-in Decision

Site-Wide Information

Implementation & Remedial Action

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

Page 375: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 375 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 34 01 02 Interim Actions Phone Log: Blicker 07/21/00

13 01 34 01 02 Interim Actions Envircon fax re: Soil Sampling e 09/06/00 Envirocon

13 01 34 01 02 Interim Actions Phone Log - McCaffery/Envirocon - Electric Shop 05/11/01

13 01 34 01 02 Interim Actions Phone Log: Barrett PCEC 07/10/01

13 01 34 01 02 Interim Actions DEQ Transmittal-Soils Report to PCEC (2002) DEQ

13 01 34 01 02 Interim Actions DEQ Transmittal to RTI - Soils Report (2002) DEQ

13 01 34 01 02 Interim Actions Site Visit report re: 11/29/01 site visit 01/09/02

13 01 34 01 02 Interim Actions Envirocon letter re: Soil Sampling (2) 01/15/02 Envirocon

13 01 34 01 02 Interim Actions DEQ letter to BNSF re: Soil Treatment 04/08/03 DEQ

13 01 34 01 02 Interim Actions Envirocon letter to DEQ re: Soils Treatment 04/08/03 Envirocon

13 01 34 01 02 Interim Actions Envirocon fax to DEQ re: Soils Treatment 04/08/03 Envirocon

13 01 34 01 02 Interim Actions Phone Log - DEQ to McCaffery/Envirocon 03/15/05 DEQ

13 01 34 01 02 Interim Actions DEQ fax to Envirocon re: Format for Contained-in request 03/15/05 DEQ

13 01 34 01 02 Interim Actions Envirocon letter to DEQ re: Soil disposal, & subsequent faxes 03/21/05 Envirocon

13 01 34 01 02 Interim Actions DEQ internal email re: Soils contained- in request 03/28/05 DEQ internal

13 01 34 01 02 Interim Actions DEQ letter to Envirocon re: Contained-in decision for soils 03/29/05 DEQ

13 01 34 01 02 Interim Actions Envirocon letter to DEQ re: SVE soil sampling 04/18/05 Envirocon

13 01 34 01 02 Interim Actions DEQ letter to BN re: Operational SVE pile sampling 04/22/05 DEQ

13 01 34 01 02 Interim Actions 10/24/05 KJ

13 01 34 01 02 Interim Actions Electric Shop Excavation Soil Sampling & Analysis Plan 08/17/05 KJ

13 01 34 01 02 Interim Actions 12/11/06 DEQ

13 01 34 01 03 Interim Actions Debris Treatment 4/03-10/07

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

K/J letter to DEQ re: Electric Shop soil disposal request & work plan

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

1016/ 45B406

Site-Wide Information

Implementation & Remedial Action

DEQ letter to BNSF re: DEQ approval of the Electric Shop Soil Sampling & Analysis Plan

Site-Wide Information

Page 376: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 376 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 34 01 03 Interim Actions Debris Treatment 04/25/03 DEQ

13 01 34 01 03 Interim Actions Debris Treatment Internal DEQ meeting notes re: Hazardous Waste 10/21/03 DEQ internal

13 01 34 01 03 Interim Actions Debris Treatment DEQ internal email re: Hazardous waste 10/24/03 DEQ internal

13 01 34 01 03 Interim Actions Debris Treatment DEQ email to BNSF re: Debris treatment standards 03/30/04 DEQ

13 01 34 01 03 Interim Actions Debris Treatment Phone Log: Smith-BNSF 04/01/04

13 01 34 01 03 Interim Actions Debris Treatment Phone Log: Smith 04/05/04

13 01 34 01 03 Interim Actions Debris Treatment DEQ internal email re: Debris Rule 268-45 04/07/04 DEQ internal

13 01 34 01 03 Interim Actions Debris Treatment DEQ internal email re: Debris treatment 04/08/04 DEQ internal

13 01 34 01 03 Interim Actions Debris Treatment Site visit report 04/23/04

13 01 34 01 03 Interim Actions Debris Treatment Conference call 06/02/04

13 01 34 01 03 Interim Actions Debris Treatment Johnson Site visit report 06/03/04 Johnson

13 01 34 01 03 Interim Actions Debris Treatment Meeting notes - A Sivers & I Johnson 06/09/04

13 01 34 01 03 Interim Actions Debris Treatment Phone Log: McCaffrey/Envirocon 06/10/04

13 01 34 01 03 Interim Actions Debris Treatment RCRA email to Envirocon re: Photographs 06/10/04

13 01 34 01 03 Interim Actions Debris Treatment Phone Log: Smith/BNSF 06/16/04

13 01 34 01 03 Interim Actions Debris Treatment Envirocon letter to DEQ re: Concrete debris treatment 06/18/04 Envirocon

13 01 34 01 03 Interim Actions Debris Treatment 06/18/04 Envirocon

13 01 34 01 03 Interim Actions Debris Treatment DEQ transmittal to RTI re: Debris treatment report 06/22/04 DEQ

13 01 34 01 03 Interim Actions Debris Treatment RTI email to DEQ re: Electric Shop Debris 07/09/04 RTI

13 01 34 01 03 Interim Actions Debris Treatment Phone Log: Smith/BNSF 07/12/04

13 01 34 01 03 Interim Actions Debris Treatment Envirocon letter to DEQ re: Truckbed residue sampling 04/18/05 Envirocon

13 01 34 01 03 Interim Actions Debris Treatment 04/18/05 DEQ

1016/ 45B406

Site-Wide Information

DEQ Email to Envirocon re: Placement of Electric Shop material on cinder pile

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

Envirocon transmittal to DEQ re; Shop debris treatment letter report

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

DEQ letter to BN re: Treatment of materials from Electric Shop excavation

Page 377: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 377 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 34 01 03 Interim Actions Debris Treatment Phone Log - Dan McCaffery to DEQ 04/26/05 D McCaffery

13 01 34 01 03 Interim Actions Debris Treatment DEQ letter to BN re: Truckbed residue sampling 05/23/05 DEQ

13 01 34 01 03 Interim Actions Debris Treatment DEQ email to Envirocon re: Truckbed residue data 08/08/05 DEQ

13 01 34 01 03 Interim Actions Debris Treatment Envirocon fax to DEQ re: Truckbed residue analytical data 08/08/05 Envirocon

13 01 34 01 03 Interim Actions Debris Treatment DEQ email to BNSF & Envirocon re: Sampling photos 10/03/05 DEQ

13 01 34 01 03 Interim Actions Debris Treatment 10/12/05

13 01 34 01 03 Interim Actions Debris Treatment Truck Bed Silty Residue Sampling Results Report 11/11/05

13 01 34 01 03 Interim Actions Debris Treatment 12/15/06 DEQ

13 01 34 01 03 Interim Actions Debris Treatment 12/15/06 DEQ

13 01 34 01 03 Interim Actions Debris Treatment Truck BED Silty Residue Sampling Results revisions 02/01/07 DEQ/ Reynolds

13 01 34 01 03 Interim Actions Debris Treatment 02/26/07

13 01 34 01 03 Interim Actions Debris Treatment SAP for Treated Concrete & Rock Debris revisions 02/26/07 DEQ/ Reynolds

13 01 34 01 03 Interim Actions Debris Treatment 02/27/07 KJ

13 01 34 01 03 Interim Actions Debris Treatment 02/27/07

13 01 34 01 03 Interim Actions Debris Treatment 04/24/07 DEQ

13 01 34 01 03 Interim Actions Debris Treatment 04/24/07 DEQ

13 01 34 01 03 Interim Actions Debris Treatment K/J email to DEQ re: Livingston Deliverables 07/03/07 KJ

13 01 34 01 03 Interim Actions Debris Treatment DEQ/KJ emails re: Resample Soil Pile #28 7/23-7/24/07

13 01 34 01 03 Interim Actions Debris Treatment K/J email to DEQ re: Livingston Deliverable 08/20/07 KJ

13 01 34 01 03 Interim Actions Debris Treatment DEQ letter to BNSF re: Electric Shop 08/20/07 DEQ

13 01 34 01 03 Interim Actions Debris Treatment DEQ/KJ emails re: Truck Bed 10/3-10/4/07

13 01 34 01 03 Interim Actions Debris Treatment DEQ letter to BNSF re: Truck bed sampling results 10/04/07 DEQ

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

Phone Log - K/J & DEQ re: Handling & disposal of Electric Shop soils & Debris

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

DEQ letter to BNSF re: October 28, 2005 Draft SAP for Treated Rock & Concrete Debris – Shop Complex

1016/ 45B406

Site-Wide Information

DEQ letter to BNSF re: November 11, 2005 Truck Bed Residue Sampling Result & request for Contained-in decision

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

DEQ & K/J emails re: Revised SAP for Treated Concrete & Rock Debris

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

K/J letter report to DEQ re: Revised SAP for Treated Concrete & Rock Debris

1016/ 45B406

Site-Wide Information

Truck Bed Silty Residue Sampling Results & Request for Contained-in Decision

1016/ 45B406

Site-Wide Information

DEQ letter to BNSF re: SAP for Treated Concrete & Rock Debris

1016/ 45B406

Site-Wide Information

DEQ letter to BNSF re: 2/27/07 Truck Bed Silty Residue Sampling Results & Request for Contained-in Decision

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

Page 378: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 378 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 34 01 04 Interim Actions Work Plans Violation 12/01-11/05

13 01 34 01 04 Interim Actions Work Plans Violation DEQ internal email re: Soils 12/20/01 DEQ internal

13 01 34 01 04 Interim Actions Work Plans Violation Phone Log: Smith-BNSF 12/21/01

13 01 34 01 04 Interim Actions Work Plans Violation DEQ internal memo re: Work Plan Violation 12/21/01 DEQ internal

13 01 34 01 04 Interim Actions Work Plans Violation Phone Log: McCaffery/Envircon 12/31/01

13 01 34 01 04 Interim Actions Work Plans Violation Y ** DEQ internal email re: Penalties 01/04/02 DEQ internal

13 01 34 01 04 Interim Actions Work Plans Violation Envirocon letter re: Soil Sampling 01/15/02 Envirocon

13 01 34 01 04 Interim Actions Work Plans Violation Y ** DEQ internal memo re: Violation 01/18/02 DEQ internal

13 01 34 01 04 Interim Actions Work Plans Violation Phone Log: PCEC 01/30/02

13 01 34 01 04 Interim Actions Work Plans Violation Electric Shop WP Violation Settlement Agreement 01/31/02

13 01 34 01 04 Interim Actions Work Plans Violation DEQ Transmittal to Steven Wade re: Settlement agreement 02/12/02 DEQ

13 01 34 01 04 Interim Actions Work Plans Violation Phone Log: McCaffery-Envirocon 12/24/02

13 01 34 01 04 Interim Actions Work Plans Violation DEQ letter to BN re: Uncovered soil pile 10/28/05 DEQ

13 01 34 01 04 Interim Actions Work Plans Violation 11/22/05 KJ

13 01 34 02 Interim Actions

13 01 34 02 Interim Actions DEQ internal email re: MRL vault cinders 03/15/04 DEQ internal

13 01 34 02 Interim Actions DEQ internal email re: MRL vault cinders 03/18/04 DEQ internal

13 01 34 02 Interim Actions DEQ email to BN re: MRL vault cinders 03/18/04 DEQ

13 01 34 02 Interim Actions DEQ internal email re: MRL vault cinders 03/18/04 DEQ internal

13 01 34 02 Interim Actions Phone Log: McCaffrey/Envirocon 06/10/04

13 01 34 02 Interim Actions Phone Log: McCaffrey/Envirocon 06/10/04

13 01 34 02 Interim Actions Phone Log: Smith/BNSF 07/27/04

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

Site-Wide Information

1016/ 45B406

Site-Wide Information

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

1016/ 45B406

Site-Wide Information

K/J letter to DEQ re: Electric Shop stockpile response to DEQ 10/28/05 letter

Site-Wide Information

Task C - Cinder Pile Capping

Site-Wide Information

Task C - Cinder Pile Capping

Site-Wide Information

Task C - Cinder Pile Capping

Site-Wide Information

Task C - Cinder Pile Capping

Site-Wide Information

Task C - Cinder Pile Capping

Site-Wide Information

Task C - Cinder Pile Capping

Site-Wide Information

Task C - Cinder Pile Capping

Site-Wide Information

Task C - Cinder Pile Capping

Page 379: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 379 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 34 02 Interim Actions Phone Log: Smith/BNSF 08/10/04

13 01 34 02 Interim Actions Phone Log: Smith/BNSF 08/12/04

13 01 34 02 Interim Actions Y ** DEQ internal email re: ERCLs 11/04/04 DEQ internal

13 01 34 02 Interim Actions DEQ internal email re: Shrubs in Cinder pile 11/05/04 DEQ internal

13 01 34 02 Interim Actions Phone Log - Blicker/RTI 02/04/05

13 01 34 02 Interim Actions Phone Log - Golnar/City of Livingston 02/04/05

13 01 34 02 Interim Actions Phone Log- Smith/BN 02/04/05

13 01 34 02 Interim Actions Envirocon email to DEQ re: Traffic figure for public meeting 02/08/05 Envirocon

13 01 34 02 Interim Actions 02/18/05 BN

13 01 34 02 Interim Actions DEQ email to RTI re: Cinder Pile public meeting 02/24/05 DEQ

13 01 34 02 Interim Actions DEQ email to BN re: Stormwater permit 02/25/05 DEQ

13 01 34 02 Interim Actions Y ** DEQ & RTI emails re: Cinder Pile Cap 05/10/06

13 01 34 02 01 Interim Actions Cinder Pile Work Plans

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ letter to Envirocon re: Cinder Pile 07/21/93 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ letter to Envirocon re: Cinder Pile 07/28/97 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ letter to BNSF re: Cinder Pile fencing 10/03/98 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ letter to BNSF re: Cinder Pile fencing 10/05/98 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Revised 2000 Vegetation Guidelines (Revised)

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: John Wadhams (6/2000) 06/01/00

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Denise Martin 06/05/00

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Wieringa/Envirocon 06/15/00

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Wieringa/Envirocon 06/22/00

Site-Wide Information

Task C - Cinder Pile Capping

Site-Wide Information

Task C - Cinder Pile Capping

Site-Wide Information

Task C - Cinder Pile Capping

Site-Wide Information

Task C - Cinder Pile Capping

Site-Wide Information

Task C - Cinder Pile Capping

Site-Wide Information

Task C - Cinder Pile Capping

Site-Wide Information

Task C - Cinder Pile Capping

Site-Wide Information

Task C - Cinder Pile Capping

Site-Wide Information

Task C - Cinder Pile Capping

BN transmittal to DEQ re: Copy of Stormwater permit for Cinder Pile

Site-Wide Information

Task C - Cinder Pile Capping

Site-Wide Information

Task C - Cinder Pile Capping

Site-Wide Information

Task C - Cinder Pile Capping

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

Page 380: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 380 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Wieringa/Envirocon 06/21/00

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Wadhams 06/19/00

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Envirocon email to DEQ re: Cinder pile electric lines & photos Envirocon

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Wieninga/Envirocon 06/27/00

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: KOK/Envirocon 06/28/00

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Envirocon 06/29/00

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Wadhams 06/26/00

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Envirocon (1) 06/30/00

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Envirocon (2) 06/30/00

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Envirocon letter to DEQ re: Cinder pile utility work 06/30/00 Envirocon

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Envirocon email to DEQ re: Cinder pile utility work 07/03/00 Envirocon

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Joy/Envirocon 07/05/00

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Wieninga/Envirocon 07/05/00

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Wieninga/Envirocon 07/05/00

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: MT Power Co. 07/05/00

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: MT Power Co. 07/06/00

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: McDonough 07/06/00

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Sullivan-MPC Bozeman 07/12/00

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: KOK/Envirocon 09/12/00

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Envirocon letter to DEQ re: Request for interim action 09/20/00

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Rocky Mountain Engineers 09/25/00

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Wieninga/Envirocon 09/25/00

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

Page 381: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 381 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: John Wadhams/DEQ 10/03/00

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ internal email re: Cinder pile 10/03/00 DEQ internal

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ memo to the file 10/04/00 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Wieninga/Envirocon 10/05/00

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Wieninga/Envirocon 10/18/00

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 10/19/00 DEQ internal

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ internal memo: Cinder pile capping costs 12/04/00 DEQ internal

13 01 34 02 01 Interim Actions Cinder Pile Work Plans RTI letter to Envirocon re: Cinder pile capping 04/16/01 RTI

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log - McCaffery/Envirocon - Cinder Pile Capping 05/11/01

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Meeting minutes 06/07/01 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Envirocon fax re: Various issues 06/20/01 Envirocon

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Envirocon fax re: Cinder pile 06/20/01 Envirocon

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: McCaffrey/Envirocon 06/20/01

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: McCaffrey/Envirocon 06/27/01

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Envirocon fax re: Cinder pile cap thickness 10/13/01 Envirocon

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ internal email: ACM 11/05/01 DEQ internal

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: David Smith/BNSF 11/28/01

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ internal email re: Cinder pile 12/03/01 DEQ internal

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 12/19/01

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 12/19/01 Envirocon

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 12/20/01 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: McCaffrey/Envirocon 12/20/01

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

DEQ internal email re: Free product testing, cinder pile sampling

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information 1st Draft Cinder Pile Work Plan

1173/ 61P606

Site-Wide Information Envirocon transmittal re: 1st Draft Cinder Pile Work Plan

1173/ 61P606

Site-Wide Information DEQ transmittal to RTI re: 1st Draft Cinder Pile Work Plan

1173/ 61P606

Site-Wide Information

Page 382: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 382 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 01/22/02 PECE

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Blicker/RTI 01/31/02

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: David Smith/BNSF 02/28/02

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Y ** DEQ internal email re: Cinder Pile ACM 03/06/02

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: McCaffrey/Envirocon 03/06/02

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: David Smith/BNSF 03/11/02

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 05/23/02 TetraTech

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Y ** DEQ internal email re: Asbestos ERCLS 01/13/03 DEQ internal

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Y ** DEQ internal email re: Cinder pile plan, Electric shop soils 01/13/03 DEQ internal

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Y ** DEQ internal email re: Fenton's Reagent 01/13/03 DEQ internal

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 02/06/03 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 03/18/03 Envirocon

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 03/20/03 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Email from Envirocon to DEQ re: Dust control 03/24/03 Envirocon

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 03/27/03 PECE

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 03/28/03 DEQ internal

13 01 34 02 01 Interim Actions Cinder Pile Work Plans City of Livingston letter to DEQ re: Truck haul plans 03/31/03 City of Livingston

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 04/03/03 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ & Envirocon emails re: Seed mix 04/22/03

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ email to Envirocon re: Seed mix 04/23/03 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 03/18/03

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 04/25/03 DEQ

1173/ 61P606

Site-Wide Information PECE letter re: Comments to 1st Draft Cinder Pile Work Plan

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

Tetra Tech letter to DEQ re: Comments to the 1st Draft Cinder Pile Work Plan

Site-Wide Information

Site-Wide Information

Site-Wide Information

1173/ 61P606

Site-Wide Information

DEQ letter to BNSF re: Comments to the 1st Draft Cinder Pile Work Plan

1173/ 61P606

Site-Wide Information Envirocon cover letter to 2nd Draft Cinder Pile Work Plan

1173/ 61P606

Site-Wide Information DEQ cover letter to RTI for 2nd Draft Cinder Pile Work Plan

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information PCEC Comments to 2nd Draft Cinder Pile Work Plan

1173/ 61P606

Site-Wide Information DEQ internal email re: 2nd Draft Cinder Pile Work Plan

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

DEQ letter to BNSF re: Comments to 2nd Draft Cinder Pile Work Plan

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information 2nd Draft Cinder Pile Work Plan

1173/ 61P606

Site-Wide Information

DEQ email to Envirocon re: Placement of electric shop material on cinder pile

Page 383: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 383 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 08/06/03

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 08/06/03 Envirocon

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 08/14/03 Deq

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Internal DEQ meeting notes re: Hazardous Waste 10/21/03 DEQ internal

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ internal email re: Hazardous Waste 10/24/03 DEQ internal

13 01 34 02 01 Interim Actions Cinder Pile Work Plans BN email to DEQ re: Work Plan & schedule 03/09/04 BN

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 03/15/04 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 03/29/04

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 03/29/04 Envirocon

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Smith/BNSF 03/30/04

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ letter to BNSF re: Vault Cinders 03/30/04 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ letter to RTI/PCEC re: Cinder Pile Work Plan 04/02/04 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 04/07/04 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Blicker/RTI 04/07/04

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log: Smith/BNSF 04/08/04

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Envirocon fax re: Cinders 04/12/04

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 04/12/04

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ letter to RTI re: Cinder Pile Work Plan 04/16/04 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 04/16/04 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Y ** DEQ internal emails re: Cinder Pile Work Plan & SOW 11/23/04 DEQ internal

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ email to BNSF re: Work Plan 01/12/05 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log – BN to DEQ re: Cinder Pile Work Plan 01/12/05 BN

1173/ 61P606

Site-Wide Information 3rd Draft Cinder Pile Work Plan

1173/ 61P606

Site-Wide Information Envirocon cover letter to 3rd Draft Cinder Pile Work Plan

1173/ 61P606

Site-Wide Information DEQ transmittal to RTI re: Cinder Pile Work Plan 3rd Draft

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

DEQ letter to BNSF re: Comments to 3rd Draft Cinder Pile Work Plan

1173/ 61P606

Site-Wide Information 4th Draft Cinder Pile Work Plan

1173/ 61P606

Site-Wide Information

Envirocon letter to DEQ re: 4th Draft Cinder Pile Work Plan replacement inserts & DEQ Comments response

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information DEQ letter to BNSF re: 4th Draft Cinder Pile Work Plan

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information 3rd Draft cinder pile work plan appendix G page 3

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

DEQ letter to BNSF re: Comments to 4th draft Cinder Pile Work Plan

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

Page 384: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 384 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 01/21/05 Envirocon

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Phone Log – BN to DEQ re: Cinder Pile Work Plan 01/31/05 BN

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 01/31/05 Envirocon

13 01 34 02 01 CD Interim Actions Cinder Pile Work Plans Cinder Pile Work Plan electronic files on CD 02/01/05

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ letter to BN re: Approval of Cinder Pile Work Plan 02/04/05 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ email to BN re: Materials for Public Meeting 02/08/05 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ/BN emails re: Work Plan copies for repositories 02/09/05

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Envirocon revised schedule for Cinder Pile capping 02/10/05 Envirocon

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 02/10/05 Envirocon

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 02/11/05 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 02/11/05 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ transmittal to MSU Library re: Cinder Pile Work Plan 02/11/05 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ transmittal to RTI re: Cinder Pile Work Plan 02/11/05 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 02/11/05 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ transmittal to MRL re: Cinder Pile Work Plan 02/11/05 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ transmittal to Talgo-LRC re: Cinder Pile Work Plan 02/11/05 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans 02/15/05 Envirocon

13 01 34 02 01 Interim Actions Cinder Pile Work Plans Envirocon revised figure 3-1 02/15/05 Envirocon

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ email to Envirocon re: Revised schedule 02/15/05 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ email to Talgo-LRC re: Work Plan & schedule 02/28/05 DEQ

13 01 34 02 01 Interim Actions Cinder Pile Work Plans DEQ email to Envirocon re: Extra Work Plan to Talgo-LRC 03/01/05 DEQ

13 01 34 02 02 Interim Actions

1173/ 61P606

Site-Wide Information

Envirocon transmittal letter to DEQ re: 5th draft Cinder Pile Work Plan

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information 5th draft Cinder Pile Work Plan

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

Envirocon transmittal to DEQ re: Extra copies of Cinder Pile Work Plan

1173/ 61P606

Site-Wide Information

DEQ transmittal to Park Co. Commissioners re: Cinder Pile Work Plan

1173/ 61P606

Site-Wide Information

DEQ transmittal to City Commissioners re: Cinder Pile Work Plan

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

DEQ transmittal to Livingston Library re: Cinder Pile Work Plan

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

Envirocon transmittal to DEQ re: Additional copies of Work Plan; revised figure 3-1

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

Page 385: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 385 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 34 02 02 Interim Actions DEQ email to BN re: Storm water permitting 02/03/05 DEQ

13 01 34 02 02 Interim Actions Phone Log - Kurt Wieringa/Envirocon to DEQ 03/15/05 Envirocon

13 01 34 02 02 Interim Actions Phone Log - D Tisdell/Envirocon to DEQ 03/15/05 Envirocon

13 01 34 02 02 Interim Actions Phone Log - DEQ to D McCaffery/Envirocon 03/15/05 DEQ

13 01 34 02 02 Interim Actions DEQ email to BN re: Sub-grade approval 03/17/05 DEQ

13 01 34 02 02 Interim Actions Phone Logs - Wieringa/Envirocon 3/22-3/29/05 Envirocon

13 01 34 02 02 Interim Actions Phone Log - Wieringa/Envirocon to DEQ 03/30/05 Envirocon

13 01 34 02 02 Interim Actions DEQ internal emails re: Seed mix 04/14/05 DEQ internal

13 01 34 02 02 Interim Actions Phone Log - Joe Russell Trucking/Seeding 04/14/05

13 01 34 02 02 Interim Actions DEQ & K Wieringa emails re: Weather/work 04/18/05

13 01 34 02 02 Interim Actions NESH Ad requirements for signature - discussed 5/3/05 05/03/05

13 01 34 02 02 Interim Actions DEQ internal email re: Cinder Pile signage 05/03/05 DEQ internal

13 01 34 02 02 Interim Actions DEQ & Envirocon emails re: Fencing 05/19/05

13 01 34 02 02 Interim Actions Envirocon email to DEQ re: Cinder Pile fence 06/08/05 Envirocon

13 01 34 02 02 Interim Actions Envirocon email to DEQ re: Cinder Pile fence 06/09/05 Envirocon

13 01 34 02 02 Interim Actions Envirocon email to DEQ re: Cinder Pile fence 06/10/05 Envirocon

13 01 34 02 02 Interim Actions DEQ internal email re: Cinder Pile fencing 06/29/05 DEQ internal

13 01 34 02 02 Interim Actions DEQ & Envirocon emails re: Cinder pile inspection form 08/23/05

13 01 34 02 02 Interim Actions DEQ email to BNSF re: Inspections 09/02/05 DEQ

13 01 34 02 02 Interim Actions Envirocon fax to DEQ re: Weed Control Plan 09/16/05 Envirocon

13 01 34 02 02 Interim Actions 10/12/05 Envirocon

13 01 34 02 02 Interim Actions Draft Cinder Pile Cap Remedial Action Report 10/13/05 Envirocon

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

Envirocon letter to DEQ re: Potential ACM contained within Livingston Rail Yard Cinder Pile

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

Page 386: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 386 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 34 02 02 Interim Actions Draft Cinder Pile Cap Remedial Action Transmittal 10/13/05 Envirocon

13 01 34 02 02 Interim Actions Field Book - 3/9/05 - 10/26/05 3/9-10/26/05 DEQ

13 01 34 02 02 Interim Actions 06/06/11 KJ Aldersley

13 01 34 02 02 Interim Actions 11/14/11 DEQ/ Reynolds

13 01 34 02 02 Interim Actions 11/16/11

13 01 34 02 02 Interim Actions 12/28/11 Evirocon

13 01 34 02 02 CD Interim Actions 2nd Draft Cinder Pile Cap Remedial Action Report 12/29/11 Evirocon

13 01 34 02 02 Interim Actions 01/03/12 Evirocon

13 01 34 02 02 Interim Actions 02/08/12

13 01 34 02 02 Interim Actions 03/01/12 DEQ/ Reynolds

13 01 34 02 03 Interim Actions

13 01 34 02 03 Interim Actions DEQ & Envirocon emails re: Cinder Pile Inspection 08/16/05

13 01 34 02 03 Interim Actions Envirocon Cinder Pile inspection report for July 2005 09/12/05 Envirocon

13 01 34 02 03 Interim Actions 09/16/05 DEQ

13 01 34 02 03 Interim Actions DEQ & Envirocon emails re: Cinder Pile plant photos 10/28/05

13 01 34 02 03 Interim Actions 10/28/05 DEQ

13 01 34 02 03 Interim Actions DEQ/Envirocon emails re: Cinder pile inspection 05/11/06

13 01 34 02 03 Interim Actions Phone Log – DEQ/D Caffery re: Cinder pile inspection 05/11/06

13 01 34 02 03 Interim Actions DEQ/KJ emails re: Cinder pile inspection 05/22/06

13 01 34 02 03 Interim Actions DEQ/KJ emails re: Cinder pile inspection 05/25/06

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

1173/ 61P606

Site-Wide Information

Task C - Cinder Pile Capping

K/J/Aldersley email to EQ/Reynolds re: Notification of Annual Cinder Pile Inspection

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

DEQ/Reynolds letter to BN/Smith re: DEQ comments on the Draft Cinder Pile Cap Remedial Action Report (10/13/05)

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

DEQ legal/Haque-Hausrath & BKBH/ J Luther emails re: Institutional controls - Cinder Pile

1173/ 61P606

Site-Wide Information

Task C - Cinder Pile Capping

Envirocon/McCaffery cover letter to DEQ/Reynolds re: Attached - Electronic copies of 2nd Draft Cinder Pile Cap Remedial Action Report

1173/ 61P606

Site-Wide Information

Task C - Cinder Pile Capping

1173/ 61P606

Site-Wide Information

Task C - Cinder Pile Capping

Envirocon/McCaffery cover letter to DEQ/Reynolds re: 2nd Draft Cinder Pile Cap Remedial Action Report

1173/ 61P606

Site-Wide Information

Cinder Pile Capping -Implementation

BKBH/Luther & DEQ legal/Haque-Hausrath emails re: Cinder pile institutional controls - Attachment - Recorded IC's pdf

1173/ 61P606

Site-Wide Information

Task C - Cinder Pile Capping

DEQ/Reynolds letter to BN/Smith re: DEQ approves the 2nd Draft Cinder Pile Cap Remedial Action Report with the inclusion of the final filed Ics.

Site-Wide Information

Cinder Pile Inspection Reports

Site-Wide Information

Cinder Pile Inspection Reports

Site-Wide Information

Cinder Pile Inspection Reports

Site-Wide Information

Cinder Pile Inspection Reports DEQ email to BN & Envirocon re: July 2005 Inspection Report

Site-Wide Information

Cinder Pile Inspection Reports

Site-Wide Information

Cinder Pile Inspection Reports

DEQ letter to BN re: Listed waste soil piles at BN Shop Complex

Site-Wide Information

Cinder Pile Inspection Reports

Site-Wide Information

Cinder Pile Inspection Reports

Site-Wide Information

Cinder Pile Inspection Reports

Site-Wide Information

Cinder Pile Inspection Reports

Page 387: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 387 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 34 02 03 Interim Actions DEQ/CDM emails re: Cinder pile 6/3-6/20/07

13 01 34 02 03 Interim Actions KJ email to DEQ re: Cinder pile inspection 06/20/07 KJ

13 01 34 02 03 Interim Actions DEQ/KJ emails re: Cinder pile 06/03/08

13 01 34 02 03 Interim Actions DEQ/CDM emails re: Cinder pile 6/11-6/12/08

13 01 34 02 03 Interim Actions Site Oversight Report 06/09/09 CDM

13 01 34 02 03 Interim Actions CDM email to DEQ re: Task C – Cinder Pile billing time 06/10/09 CDM

13 01 34 02 03 Interim Actions KJ email to DEQ re: Annual inspection scheduled 05/26/10 KJ

13 01 34 02 03 Interim Actions Annual Cinder Pile Cap Inspection Report 06/10/10 CDM

13 01 34 02 03 Interim Actions CDM Oversight Report 06/09/11 CDM

13 01 34 02 03 Interim Actions 05/25/12

13 01 34 02 03 Interim Actions CDM Smith Oversight Report 05/31/12 CDM Smith

13 01 34 02 03 Interim Actions 06/03/13 KJ/Aldersley

13 01 34 02 03 Interim Actions 07/08/13 KJ/Aldersley

13 01 34 03 Interim Actions C&P Packing

13 01 34 03 Interim Actions C&P Packing C&P Packing Investigation Report 11/10/00 WET

13 01 34 03 Interim Actions C&P Packing WET transmittal to DEQ re: C&P Packing report 11/13/00 WET

13 01 34 03 Interim Actions C&P Packing Replacement page for C&P Packing report 11/15/00 WET

13 01 34 03 Interim Actions C&P Packing 11/17/00

13 01 34 03 Interim Actions C&P Packing C&P Packing legal description

13 01 34 03 Interim Actions C&P Packing DEQ letter to BN re: C&P Packing Work Plan 11/21/00 DEQ

13 01 34 03 Interim Actions C&P Packing BN letter DEQ re: Investigation at C&P 11/29/00 BN

13 01 34 03 Interim Actions C&P Packing Envirocon fax to DEQ re: Work Plan approvals 12/01/00 Envirocon

Site-Wide Information

Cinder Pile Inspection Reports

Site-Wide Information

Cinder Pile Inspection Reports

Site-Wide Information

Cinder Pile Inspection Reports

Site-Wide Information

Cinder Pile Inspection Reports

Site-Wide Information

Cinder Pile Inspection Reports

Site-Wide Information

Cinder Pile Inspection Reports

Site-Wide Information

Cinder Pile Inspection Reports

Site-Wide Information

Cinder Pile Inspection Reports

Site-Wide Information

Cinder Pile Inspection Reports

Site-Wide Information

Cinder Pile Inspection Reports

KJ/Aldersley & DEQ/Reynolds emails re: Notification of Cinder Pile inspection

Site-Wide Information

Cinder Pile Inspection Reports

Site-Wide Information

Cinder Pile Inspection Reports

KJ/Aldersley & DEQ/Reynolds emails re: Cinder Pile inspection email

Site-Wide Information

Cinder Pile Inspection Reports

KJ/Aldersley email to DEQ/Reynolds re: Cinder Pile vegetation email

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

CWB & McGarry letter to DEQ re: Proposed Plan - C&P Packing

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 388: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 388 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 34 03 Interim Actions C&P Packing CWB&M fax/& letter to DEQ re: Objection to Proposed Plan 12/01/00 CWB&M

13 01 34 03 Interim Actions C&P Packing 12/04/00 Envirocon

13 01 34 03 Interim Actions C&P Packing DEQ internal email re: Permit requirements 12/12/00 DEQ internal

13 01 34 03 Interim Actions C&P Packing Phone Log - Erickson/WET 12/12/00

13 01 34 03 Interim Actions C&P Packing Phone Log - McCaffrey/Envirocon 12/13/00

13 01 34 03 Interim Actions C&P Packing Phone Log - KOK/Envirocon 12/14/00

13 01 34 03 Interim Actions C&P Packing Lab data sheets for C&P Packing report (received 12/14/00) 12/14/00 WET

13 01 34 03 Interim Actions C&P Packing WET fax to DEQ re: Test pit logs 12/14/00 WET

13 01 34 03 Interim Actions C&P Packing 12/14/00 Envirocon

13 01 34 03 Interim Actions C&P Packing 12/15/00 DEQ

13 01 34 03 Interim Actions C&P Packing DEQ fax to Envirocon re: Objection top Proposed Plan 12/15/00 DEQ

13 01 34 03 Interim Actions C&P Packing WET C&P Packing test pit logs (received 12/18/00) 12/18/00 WET

13 01 34 03 Interim Actions C&P Packing CWB&M letter to DEQ re: Objections to Proposed Plan 12/28/00 CWB&M

13 01 34 03 Interim Actions C&P Packing CWB&M letter to DEQ re: Objections to Proposed Plan 12/29/00 CWB&M

13 01 34 03 Interim Actions C&P Packing DEQ fax to RTI re: WET C&P Packing Report 01/19/01 DEQ

13 01 34 03 Interim Actions C&P Packing DEQ fax to Sheperd re: C&P Packing 02/22/01 DEQ

13 01 34 03 Interim Actions C&P Packing DEQ fax to Thurber re: Test pit maps 02/27/01 DEQ

13 01 34 03 Interim Actions C&P Packing DEQ comment letter to BN re: Draft C&P Packing Work Plan 02/28/01 DEQ

13 01 34 03 Interim Actions C&P Packing Phone Log - Smith/BN 05/01/01

13 01 34 03 Interim Actions C&P Packing DEQ email to BN re: Deadline for C&P Work Plan 05/02/01 DEQ

13 01 34 03 Interim Actions C&P Packing 05/16/01 Mosser

13 01 34 03 Interim Actions C&P Packing Meeting minutes 06/07/01 DEQ

Site-Wide Information

Site-Wide Information

Envirocon letter to DEQ re: Data missing from WET C&P report

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Envirocon transmittal to DEQ re: Draft C&P Packing Work Plan

Site-Wide Information

DEQ fax to Envirocon re: Test pit logs, chain of custody & replacement page - C&P Packing report

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Mosser letter to Library Board of Trustees re: CMC East Main Depot site, Dioxins

Site-Wide Information

Page 389: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 389 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 34 03 Interim Actions C&P Packing 06/14/01 Envirocon

13 01 34 03 Interim Actions C&P Packing Envirocon letter to DEQ re: DEQ comments to draft work plan 06/14/01 Envirocon

13 01 34 03 Interim Actions C&P Packing 06/15/01 Envirocon

13 01 34 03 Interim Actions C&P Packing DEQ fax to Livingston Enterprise 06/20/01 DEQ

13 01 34 03 Interim Actions C&P Packing Y ** DEQ internal email re: Dioxins 06/25/01 DEQ internal

13 01 34 03 Interim Actions C&P Packing 07/10/01 DEQ

13 01 34 03 Interim Actions C&P Packing 07/10/01 DEQ

13 01 34 03 Interim Actions C&P Packing State Library search - Pacific Hide & Fur 07/12/01

13 01 34 03 Interim Actions C&P Packing DEQ internal email re: Pacific Hide & Fur 07/16/01 DEQ internal

13 01 34 03 Interim Actions C&P Packing 09/12/01

13 01 34 03 Interim Actions C&P Packing RTI letter to DEQ re: Pacific Hide & Fur transformers 11/09/01 RTI

13 01 34 03 Interim Actions C&P Packing Phone Log - Smith/BN 02/28/02

13 01 34 03 Interim Actions C&P Packing Phone Log - Golnar/City of Livingston 03/06/02

13 01 34 03 Interim Actions C&P Packing DEQ letter to Martin re: Detention Facility @ C&P Packing 04/11/02 DEQ

13 01 34 03 Interim Actions C&P Packing Phone Log - Smith/BN 02/24/05

13 01 34 03 Interim Actions C&P Packing DEQ letter to BN re: Use of C&P Packing property 03/02/05 DEQ

13 01 34 03 Interim Actions C&P Packing Phone Log - D Smith/BN 03/04/05

13 01 34 03 Interim Actions C&P Packing BN Letter to DEQ re: Trespasser 03/17/05 BN

13 01 34 03 Interim Actions C&P Packing BN Letter to DEQ re: Demolition of structure 03/17/05 BN

13 01 34 03 01 Interim Actions Work Plans

13 01 34 03 01 Interim Actions Work Plans DEQ comment letter to BN re: Draft C&P Packing Work Plan 02/28/01 DEQ

13 01 34 03 01 Interim Actions Work Plans Phone Log: Carter 07/31/01

Site-Wide Information 2nd Draft C&P Packing Work Plan

Site-Wide Information

Site-Wide Information Envirocon email to DEQ re: 2nd Draft C&P Packing Work Plan

Site-Wide Information

Site-Wide Information

Site-Wide Information DEQ transmittal to RTI re: 2nd Draft C&P Packing Work Plan

Site-Wide Information DEQ transmittal to PCEC re: 2nd Draft C&P Packing Work Plan

Site-Wide Information

Site-Wide Information

Site-Wide Information RTI/PCEC comments to DEQ re: 2nd draft C&P Work Plan

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 390: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 390 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 34 03 01 Interim Actions Work Plans Phone Log: Blicker-RTI 01/31/02

13 01 34 03 01 Interim Actions Work Plans Tetra Tech email to DEQ re: C&P Packing Work Plan 05/30/02 TetraTech

13 01 34 03 01 Interim Actions Work Plans Y 05/30/02 DEQ internal

13 01 34 03 01 Interim Actions Work Plans Y ** DEQ internal email re: C&P Packing Work Plan 06/21/02 DEQ internal

13 01 34 03 01 Interim Actions Work Plans KJ Letter to DEQ re: C&P Packing – Pit SAP 10/29/07 KJ

13 01 34 03 01 Interim Actions Work Plans KJ/DEQ/BNSF email re: C&P Packing – sampling 11/28/07

13 01 34 03 01 Interim Actions Work Plans 11/30/07 CDM

13 01 34 03 01 Interim Actions Work Plans DEQ Letter to BNSF re: C&P Packing SAP 01/24/08 DEQ

13 01 34 03 01 Interim Actions Work Plans KJ email to DEQ re: C&P Packing – sampling notification 01/09/08 KJ

13 01 34 03 01 Interim Actions Work Plans KJ/DEQ emails re: C&P Packing – sampling question 01/10/08

13 01 34 03 01 Interim Actions Work Plans KJ/DEQ emails re: C&P Packing – pit sampling notification 01/09/08

13 01 34 03 01 Interim Actions Work Plans KJ email to DEQ re: C&P Packing – pit sampling notification 04/23/08 KJ

13 01 34 03 01 Interim Actions Work Plans KJ email to DEQ re: C&P Packing Deliverables 07/02/08 KJ

13 01 34 03 01 Interim Actions Work Plans 07/24/08 DEQ

13 01 34 03 02 Interim Actions Reports

13 01 34 03 02 Interim Actions Reports Site Oversight Report 05/08/08 CDM

13 01 34 03 02 Interim Actions Reports 07/02/08 KJ

13 01 34 03 02 Interim Actions Reports K/J email to DEQ: June 2008 Well 89-6 Data 07/10/08 KJ

13 01 34 03 02 Interim Actions Reports Notice of Landspreading 08/01/08

13 01 34 03 02 Interim Actions Reports K/J email to DEQ re: C&P sump sampling notification 10/08/08 KJ

13 01 34 03 02 Interim Actions Reports Former C&P Packing Pit Sumps – Closure Report 10/06/09 KJ

Site-Wide Information

Site-Wide Information

Site-Wide Information

** DEQ internal email re: Tetra Tech comments to Draft C&P Packing Work Plan

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information CDM Letter to DEQ re: C&P Packing Draft Comments on SAP

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

DEQ Letter to BNSF re: C&P Packing – Soil sampling results and request to landspread treated electric shop soil and WWTP sump soil

Site-Wide Information

Site-Wide Information

Site-Wide Information

Former C&P Packing Pit – Soil Sampling Analytical Results & Request to Landspread Treated Electric Shop Soil & WWTP Sump Soil

Site-Wide Information

Site-Wide Information

Site-Wide Information

Site-Wide Information

Page 391: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 391 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 34 03 02 Interim Actions Reports

13 01 34 03 02 Interim Actions Reports

13 01 35 Reports

13 01 35 Reports 07/20/09 DEQ internal

13 01 35 Reports 07/20/09 DEQ internal

13 01 35 01

13 01 35 01 DEQ & L Pfister emails re: Flood Plain map correspondence 06/24/05

13 01 35 01 07/11/05

13 01 35 01 Hyalite letter to DEQ re: Proposed sewer upgrades 07/18/05 Hyalite

13 01 35 01 DEQ letter to Hyalite re: Sewer upgrade work 07/27/05 DEQ

13 01 35 02

13 01 35 02 02/10/05 DEQ

13 01 35 02 DEQ letter to MRL re: Ongoing maintenance operations 04/28/05 DEQ

13 01 35 02 05/05/05 MRL

Site-Wide Information

Site-Wide Information

Site-Wide Information

3rd Party Work Permitted at the Facility (See also 13-01-32)

1172/ 60E705

Site-Wide Information

3rd Party Work Permitted at the Facility (See also 13-01-32)

DEQ internal emails re: Finding of No Significant Impact and Environmental Assessment for City of Livingston Waste Water Treatment Project

1172/ 60E705

Site-Wide Information

3rd Party Work Permitted at the Facility

DEQ internal emails re: Finding of No Significant Impact and Environmental Assessment for City of Livingston Waste Water Treatment Project

1172/ 60E705

Site-Wide Information

3rd Party Work Permitted at the Facility

Hyalite Proposed Sewer Upgrades

1172/ 60E705

Site-Wide Information

3rd Party Work Permitted at the Facility

Hyalite Proposed Sewer Upgrades

1172/ 60E705

Site-Wide Information

3rd Party Work Permitted at the Facility

Hyalite Proposed Sewer Upgrades

Phone Log - DEQ & C Roark re: City/ACOE sewer replacement & Upgrades

1172/ 60E705

Site-Wide Information

3rd Party Work Permitted at the Facility

Hyalite Proposed Sewer Upgrades

1172/ 60E705

Site-Wide Information

3rd Party Work Permitted at the Facility

Hyalite Proposed Sewer Upgrades

Site-Wide Information

3rd Party Work Permitted at the Facility

MRL Maintenance/Track Work

Site-Wide Information

3rd Party Work Permitted at the Facility

MRL Maintenance/Track Work

Phone Log – DEQ to S Stafford/Talgo re: Worker exposure scenario

Site-Wide Information

3rd Party Work Permitted at the Facility

MRL Maintenance/Track Work

Site-Wide Information

3rd Party Work Permitted at the Facility

MRL Maintenance/Track Work

MT Rail Link/R Shelly email to DEQ/Sivers re: Sampling of area where food pellets were spilled

Page 392: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 392 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 35 02 MRL letter to DEQ re: Track work 07/20/05 MRL

13 01 35 02 DEQ internal email re: Railroad tie disposal 07/27/05 DEQ internal

13 01 35 02 DEQ letter to MRL re: Track work 08/17/05 DEQ

13 01 35 02 DEQ letter to BNSF re: MRL track work 08/17/05 DEQ

13 01 35 02 DEQ email to BN re: Soil sampling during track maintenance 09/29/05 DEQ

13 01 35 02 DEQ letter to MRL re: Tie replacement 10/07/05 DEQ

13 01 35 02 DEQ letter/fax to BNSF re: Tie replacement 10/07/05 DEQ

13 01 35 02 07/05/06 MRL

13 01 35 02 07/30/06 DEQ

13 01 35 02 08/08/06 MRL

13 01 35 02 08/22/06 MRL

13 01 35 02 03/05/07 MRL

13 01 35 02 04/05/07 MRL

13 01 35 02 04/24/07 DEQ

13 01 35 02 MRL Letter to DEQ re: Reinstall Track 07/26/07 MRL

Site-Wide Information

3rd Party Work Permitted at the Facility

MRL Maintenance/Track Work

Site-Wide Information

3rd Party Work Permitted at the Facility

MRL Maintenance/Track Work

Site-Wide Information

3rd Party Work Permitted at the Facility

MRL Maintenance/Track Work

Site-Wide Information

3rd Party Work Permitted at the Facility

MRL Maintenance/Track Work

Site-Wide Information

3rd Party Work Permitted at the Facility

MRL Maintenance/Track Work

Site-Wide Information

3rd Party Work Permitted at the Facility

MRL Maintenance/Track Work

Site-Wide Information

3rd Party Work Permitted at the Facility

MRL Maintenance/Track Work

Site-Wide Information

3rd Party Work Permitted at the Facility

MRL Maintenance/Track Work

MRL letter to DEQ re: Manhole installation at Livingston Railyard

Site-Wide Information

3rd Party Work Permitted at the Facility

MRL Maintenance/Track Work

DEQ letter/fax to MRL re: Manhole installation at Livingston Railyard

Site-Wide Information

3rd Party Work Permitted at the Facility

MRL Maintenance/Track Work

Phone Log – R Shelley/MRL to DEQ re: Approval of manhole installation & Sale of Talgo-LRC property to MRL closed on 8/4/06

Site-Wide Information

3rd Party Work Permitted at the Facility

MRL Maintenance/Track Work

Phone Log – R Keller/MRL to DEQ re: Cleanup of debris on Talgo property

Site-Wide Information

3rd Party Work Permitted at the Facility

MRL Maintenance/Track Work

MRL letter report to DEQ re: Records showing procedures & tests done during the cleanup of the former Talgo facility

Site-Wide Information

3rd Party Work Permitted at the Facility

MRL Maintenance/Track Work MRL letter to DEQ re: Manhole removal at Livingston Railyard

Site-Wide Information

3rd Party Work Permitted at the Facility

MRL Maintenance/Track Work

DEQ letter/fax to MRL re: Manhole removal at Livingston Railyard sampling required

Site-Wide Information

3rd Party Work Permitted at the Facility

MRL Maintenance/Track Work

Page 393: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 393 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 35 02 DEQ Letter to MRL re: Reinstall of Track 08/23/08 DEQ

13 01 35 03

13 01 35 03 DEQ/Sivers & MDT/C Helm emails re: Yellowstone Bridge

13 01 35 03 MDT Soil Boring Map & Lab Data 12/14/04 MDT

13 01 35 03 DEQ & MDT emails re: Yellowstone R. Bridge 05/10/05

13 01 35 03 Cora Helm email to DEQ re: Permission to begin work 12/22/06 C Helm

13 01 35 03 DEQ & MDT emails re: Bridge replacement 01/22/07

13 01 35 03 DEQ & MDT emails re: Bridge replacement 01/22/07

13 01 35 03 03/20/07 MDT

13 01 35 03 DEQ & K/J emails re: Livingston Bridge replacement 04/23/07

13 01 35 03 CDM email to DEQ re: MDT Geotechnical Drilling Work Plan 05/02/07 CDM

13 01 35 03 05/07/07 DEQ

13 01 35 03 DEQ & MDT emails re: Livingston Bridge Geo Tech Drilling 05/07/07

13 01 35 03 05/29/07

13 01 35 03 09/20/07 MDT/ Goodman

Site-Wide Information

3rd Party Work Permitted at the Facility

MRL Maintenance/Track Work

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

10/20/04-5/9/05

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

MDT letter to DEQ re: Proposed Geotechnical Drilling Activities within State Superfund Boundaries

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

DEQ letter to MDT re: Proposed Geotechnical Drilling Activities within State Superfund Boundaries

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

DEQ & Brian Goodman emails re: Yellowstone Bridge replacement

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

B Goodman email to DEQ re: Proposed Geotechnical Drilling Activities, MDT Bridge Replacement Project

Page 394: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 394 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 35 03 02/06/07 MDT/ Goodman

13 01 35 03 02/14/08 DEQ

13 01 35 03 MDT Bridge analytical results 07/03/08 MDT

13 01 35 03 MDT email to DEQ re: MDT bridge drilling notice 12/02/08 MDT

13 01 35 03 08/27/08

13 01 35 03 06/30/09

13 01 35 03 8/12-9/8/09

13 01 35 03 DEQ email to MDT re: Soil excavation 10/01/09 DEQ

13 01 35 03 10/06/10 MDT/ Goodman

13 01 35 03 11/23/10 DEQ/ Reynolds

13 01 35 03 4/25-5/27/11 MDT/ Goodman

13 01 35 03 01/12/12

13 01 35 03 01/13/12

13 01 35 03 01/18/12

13 01 35 03 DEQ/Reynolds email to MDT/Goodman re: Piling removal 01/23/12 DEQ/ Reynolds

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

B Goodman letter to DEQ re: Proposed Geotechnical Drilling Activities Work Plan within State Superfund Boundaries

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

DEQ letter to B Goodman re: Proposed Geotechnical Drilling Activities within State Superfund Boundaries

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Phone log: DEQ Rem/DEQ PCD re: MDT’s proposal to dewater

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

DEQ & Brian Goodman emails re: Yellowstone River Bridge – Livingston

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

DEQ/MDT emails re: Groundwater generation per drilled shaft installation

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

MDT/Goodman letter to BN/Smith re: Proposed GW treatment from construction of new bridge across Yellowstone River

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

DEQ/Reynolds letter to MDT/Goodman re: DEQ response to MDT 10/6/10 letter approving BNSF wastewater plant to receive water generated from building the new bridge

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

MDT Environmental/Goodman, BN/Smith & DEQ/Reynolds emails re: Wastewater from drilled shafts

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

KJ/Norris, MDT/Goodman & BN/Smith emails re: MDT Yellowstone Bridge replacement - Prospective bidders

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

MDT/Goodman & BN/Smith emails re: MDT needs access agreement - BN provides link to apply for access

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

MDT/Goodman email to BN/Smith & KJ/Norris re: MDT has decided to pull the Yellowstone Bridge replacement project from the currant bid letting

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Page 395: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 395 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 35 03 Bridge Design Plans

13 01 35 03 02/27/12 DEQ/ Reynolds

13 01 35 03 03/21/12

13 01 35 03 06/18/12

13 01 35 03 10/30/12

13 01 35 03 10/30/12

13 01 35 03 12/04/12 DEQ/Reynolds

13 01 35 03 Data validation Checklist & analytical results 12/04/12 Anatek Labs

13 01 35 03

13 01 35 03 12/14/12 DEQ/Reynolds

13 01 35 03 Data validation Checklist & analytical results 12/14/12 Anatek Labs

13 01 35 03 12/21/12 DEQ/Reynolds

13 01 35 03 Data validation Checklist & analytical results 12/19/12 Anatek Labs

13 01 35 03 12/27/12 DEQ/Reynolds

13 01 35 03 Data validation Checklist & analytical results 01/23/13 Anatek Labs

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

DEQ/Reynolds email to MDT/Goodman re: Bridge replacement- groundwater hazardous waste

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Meeting date & Agenda re: CN 4790 Yellowstone River - NE Livingston -Pier removal & contaminated aquifer issues

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

DEQ/Haque-Hausrath internal email to Reynolds re: Phone log - MDT legal/Eggart - CECRA liability if they do bridge replacement in facility boundaries

DEQ legal/ Haque-Hausrath

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

MDT/Goodman & DEQ/Reynolds emails re: Attachment 4790 bridge plans & sample results from first shaft drilled

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Sletten Construction/Mares & MDT/Goodman emails re: Disposal of contaminated soils

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

DEQ/Bucy letter via email to Sletten Construction/Mares re: Stockpiled soil from MDT Highway 89 bridge replacement

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

MDT/Goodman & DEQ/Reynolds emails re: Attachment - MDT contained in decision

10/29/-12/11/12

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

DEQ/Reynolds letter via email to Sletten Construction & MSE/Ward re: Stockpiled soil from MDT Highway 89 bridge replacement represented by sample # 1212013-006A

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

DEQ/Reynolds letter via email to Sletten Construction & MSE/Ward re: Stockpiled soil from MDT Highway 89 bridge replacement represented by sample # 1212068-006A

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

DEQ/Reynolds letter via email to Sletten Construction & MSE/Ward re: Stockpiled soil from MDT Highway 89 bridge replacement represented by sample # 1212081-006A & 1212081-012A

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Page 396: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 396 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 35 03 01/25/13 DEQ/Reynolds

13 01 35 03 Data validation Checklist & analytical results 02/13/13 Anatek Labs

13 01 35 03 Data validation Checklist & analytical results 02/14/13 Anatek Labs

13 01 35 03 02/22/13 DEQ/Reynolds

13 01 35 03 03/08/13 DEQ internal

13 01 35 03 03/29/13 DEQ/Reynolds

13 01 35 03 Data validation Checklist & analytical results 04/01/13 Anatek Labs

13 01 35 03 04/16/13

13 01 35 03 04/22/13 DEQ/Reynolds

13 01 35 03 04/30/13

13 01 35 03 05/01/13 Hydrometrics

13 01 35 03 05/06/13

13 01 35 03 05/08/13

13 01 35 03 05/14/13

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

DEQ/Reynolds letter via email to Sletten Construction & MSE/Ward re: Stockpiled soil from MDT Highway 89 bridge replacement represented by sample # 1301074-006A

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Site-Wide Information

3rd Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

DEQ/Reynolds letter via email to Sletten Construction & MSE/Ward re: Stockpiled soil from MDT Highway 89 bridge replacement represented by sample # 1302049-006A & 1302061-006A

Site-Wide Information

4th Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

DEQ/Reynolds & Mark Hall internal emails re: Results for B13030176

Site-Wide Information

5th Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

DEQ/Reynolds letter/email to MDT/Goodman re: Proper disposal of GW recovered from Livingston bridge replacement

Site-Wide Information

6th Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Site-Wide Information

7th Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

DEQ/Reynolds & MDT/Anderson emails re: SAP submission deadline & site visit on 4/19/13

Site-Wide Information

8th Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

DEQ/Reynolds letter via email to Slettin Construction & Sara Ward re: Recovered GW/surface water from MDT Highway 89 bridge replacement represented by sample # 1303145-001A & 1303145-002A

Site-Wide Information

9th Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

MDT/Goodman & DEQ/Reynolds emails re: Monitoring wells near bridge

Site-Wide Information

10th Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

MDT Yellowstone River Bridge Project BR 11-1(44)56 UPN 4790 Wastewater Discharge to Fisher Sand and Gravel

Site-Wide Information

10th Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

DEQ/Reynolds, MDT/Goodman, & KJ/Aldersley emails re: Monitoring well near bridge - ownership of property

Site-Wide Information

11th Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

MDT/Goodman, KJ/Norris & KJ/Aldersley emails re: Abandonment of monitoring well MW-5R

Site-Wide Information

12th Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

MDT/Anderson & DEQ/Reynolds emails re: Hydrometrics proposal for GW Investigation in response to wastewater discharge in the Fisher Sand & Gravel

Page 397: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 397 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 35 03 05/15/13

13 01 35 03 05/30/13 DEQ/Reynolds

13 01 35 03 05/16/13

13 01 35 03 04/30/13 Aaron Anderson

13 01 35 03 06/25/13 Hydrometrics

13 01 35 03 GW Investigation Report Fischer Sand and Gravel 08/21/13 MDT/Anderson

13 01 35 03 Fischer Sand and Gravel completion letter 10/02/13 DEQ/Reynolds

13 01 35 04 1172/ Rib & Chop Shop

13 01 35 04 Rib & Chop Shop DEQ/A Alan phone log re: evidence of contamination 04/14/08

13 01 35 04 Rib & Chop Shop DEQ Letter to A Allen re: Chop Shop parking lot paving 04/25/08 DEQ

13 01 35 05 Yellowstone Preserve

13 01 35 05 Yellowstone Preserve 11/27/07 Resource Tech

13 01 35 05 Yellowstone Preserve B Blicker letter to DEQ re: Water and sewer line installation 12/13/07 B Blickler

13 01 35 05 Yellowstone Preserve Yellowstone Preserve Map 04/01/07 KJ

13 01 35 05 Yellowstone Preserve RTI Letter to DEQ re: Water and sewer line installation 08/10/07 RTI

Site-Wide Information

13th Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

MDT/Cogley, KJ/Aldersley & DEQ/Reynolds emails re: Abandonment of MW-5R

Site-Wide Information

14th Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

DEQ/Reynolds email/letter to MDT/Anderson re: MDT bridge, MW WP approval

Site-Wide Information

15th Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

MSE/Ward & DEQ/Reynolds emails re: MDT water disposal info

MSE TA Laboratory/ Ward

Site-Wide Information

16th Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Aaron Anderson & DEQ/Reynolds emails re: MDT Bridge concrete info

Site-Wide Information

17th Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Hydo/Boettcher email to FISHER/Jesson, Aaron Anderson & DEQ/Reynolds re: MDT Bridge MW Sampling notice

Site-Wide Information

18th Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Site-Wide Information

18th Party Work Permitted at the Facility

MDT Hwy 89 Bridge Replacement

Site-Wide Information

3rd Party Work Permitted at the Facility

1172/ 60E705

Site-Wide Information

3rd Party Work Permitted at the Facility

1172/ 60E705

Site-Wide Information

3rd Party Work Permitted at the Facility

1172/ 60E705

Site-Wide Information

3rd Party Work Permitted at the Facility

1172/ 60E705

Site-Wide Information

3rd Party Work Permitted at the Facility

Revised Water and Sewer Line Installation Soil and GW Mgmt Plan

1172/ 60E705

Site-Wide Information

3rd Party Work Permitted at the Facility

1172/ 60E705

Site-Wide Information

3rd Party Work Permitted at the Facility

1172/ 60E705

Site-Wide Information

3rd Party Work Permitted at the Facility

Page 398: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 398 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 35 05 Yellowstone Preserve DEQ Letter to RTI re: Water and sewer line installation 10/25/07 DEQ

13 01 35 05 Yellowstone Preserve DEQ/D Baldwin emails re: BN Livingston Complex Question 04/29/08

13 01 35 06 Montague Place

13 01 35 06 Montague Place DEQ/S Pitman emails re: Montague Place Addition 9/14-9/24/07

13 01 35 06 Montague Place B Blicker letter to DEQ re: Water and sewer line installation 12/28/07 B Blickler

13 01 35 06 Montague Place DEQ letter to B Blicker re: Water and sewer line installation 01/08/08 DEQ

13 01 35 06 Montague Place Y ** DEQ internal email re: Montague letter 01/08/08 DEQ internal

13 01 35 07

13 01 35 07 06/27/07 Hyalite Env

13 01 35 07 DEQ/Hyalite Env email to DEQ re: Project manager 06/28/07

13 01 35 08

13 01 35 08 04/17/13

13 01 35 08 10/03/13 DEQ/Reynolds

13 01 35 08 10/24/13 PE/ Desper

13 01 35 08 Livingston Healthcare offsite utilities 10/25/13 PE/ Desper

1172/ 60E705

Site-Wide Information

3rd Party Work Permitted at the Facility

1172/ 60E705

Site-Wide Information

3rd Party Work Permitted at the Facility

1172/ 60E705

Site-Wide Information

3rd Party Work Permitted at the Facility

1172/ 60E705

Site-Wide Information

3rd Party Work Permitted at the Facility

1172/ 60E705

Site-Wide Information

3rd Party Work Permitted at the Facility

1172/ 60E705

Site-Wide Information

3rd Party Work Permitted at the Facility

Site-Wide Information

3rd Party Work Permitted at the Facility

1172/ 60E705

Site-Wide Information

3rd Party Work Permitted at the Facility

City of Livingston Waste Transfer Facility

1172/ 60E705

Site-Wide Information

3rd Party Work Permitted at the Facility

City of Livingston Waste Transfer Facility

Hyalite Env Letter to DEQ re: Request for Input City Waste Transfer

1172/ 60E705

Site-Wide Information

3rd Party Work Permitted at the Facility

City of Livingston Waste Transfer Facility

Site-Wide Information

3rd Party Work Permitted at the Facility

City Water/Sewer to new Hospital

Site-Wide Information

3rd Party Work Permitted at the Facility

City Water/Sewer to new Hospital

DEQ/Reynolds & CDM Smith/Stordahl emails re: Drinking water lines for a public water supply

Site-Wide Information

4th Party Work Permitted at the Facility

City Water/Sewer to new Hospital

Third-Party Remedial Actions within the Burlington Northern Livingston Shop Complex State Superfund Facility Boundaries

Site-Wide Information

5th Party Work Permitted at the Facility

City Water/Sewer to new Hospital

Livingston Healthcare Offsite Utility Extension Project Work Plan

Site-Wide Information

6th Party Work Permitted at the Facility

City Water/Sewer to new Hospital

Page 399: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 399 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

13 01 35 08 Livingston HealthCare Off-Site Utility Extension Project 11/07/13 DEQ/Reynolds

13 01 35 08 11/07/13 DEQ/Reynolds

13 01 35 08 11/18/13 CTA/Mulholland

13 01 35 08 Livingston HealthCare Utilities Expansion 11/182013 CTA/Mulholland

13 01 35 08 BNSF groundwater 11/26/13 DEQ/Reynolds

13 01 35 08 BNSF groundwater 12/04/13 DEQ/Reyneolds

13 01 35 08 12/20/13 CTA/Mulholland

13 01 35 08 12/30/13 DEQ/Reynolds

13 01 35 08 01/22/14 CTA/Mulholland

13 01 35 08 01/28/14 DEQ/Reynolds

The following documents and files contain information related to the BN Livingston Complex and are incorporated into the Administrative Record:

1 BN files at the Underground Storage Tank, Metcalf building and Leaking Underground Storage Tank program located at the Last Chance Building.

2 BN Livingston Complex hazardous waste files in the Air and Waste Management Bureau located at the Metcalf Building.

3 Livingston Rebuild Center MPDES and Envirocon MPDES files for the on-site wastewater treatment plant Located at the Water Protection Bureau.

4 Seven boxes of documents from Cogswell and Wherle stored at the Records Management Bureau, 1320 Bozeman St., Helena, MT.

Site-Wide Information

7th Party Work Permitted at the Facility

City Water/Sewer to new Hospital

Site-Wide Information

8th Party Work Permitted at the Facility

City Water/Sewer to new Hospital

Livingston Healthcare Offsite Utility Extension Project Work Plan, October 24, 2013

Site-Wide Information

9th Party Work Permitted at the Facility

City Water/Sewer to new Hospital

Livingston HealthCare Offsite Utility Extension Project Work Plan Third Party Remedial Actions within the Burlington Northern Livingston Shop Complex

Site-Wide Information

10th Party Work Permitted at the Facility

City Water/Sewer to new Hospital

Site-Wide Information

11th Party Work Permitted at the Facility

City Water/Sewer to new Hospital

Site-Wide Information

12th Party Work Permitted at the Facility

City Water/Sewer to new Hospital

Site-Wide Information

12th Party Work Permitted at the Facility

City Water/Sewer to new Hospital

Livingston HealthCare Offsite Utility Extension Project Work Plan - Dewatering Addendum Third Party Remedial Actions within the Burlington Northern Livingston Shop Complex

Site-Wide Information

13th Party Work Permitted at the Facility

City Water/Sewer to new Hospital

Livingston HealthCare Offsite Utility Extension Project Work Plan - Dewatering Addendum - Third Party Remedial Actions within the Burlington Northern Livingston Shop Complex

Site-Wide Information

14th Party Work Permitted at the Facility

City Water/Sewer to new Hospital

Livingston HealthCare Offsite Utility Extension Project Work Plan - Pre-Construction Dewatering Test Results

Site-Wide Information

15th Party Work Permitted at the Facility

City Water/Sewer to new Hospital

Livingston HealthCare Offsite Utility Extension Project Work Plan - Pre-Construction Dewatering Test Results

Page 400: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN LIVINGSTON 8/26/13

Page 400 of 403

Tertiary Heading Site Name & Title or Subject Date AuthorSite ID

Media

Remote Storage

Primary Heading

Secondary Heading

Confidential

G:\REM\GUIDES\BN Livingston.doc

Page 401: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

Bioventing Principles & Practices Manual, Intrinsic biodegradation of diesel fuel in an interval of separate phase hydrocarbons,Vapor Phase Isotherm Design ParametersFinal Procedures for Conducting Bioventing Pilot Tests and Long-Term Monitoring of Bioventing SyIntroduction to Containment Buildings Training Module Introduction to Tanks Training Module EPA, 9/05Guidance for Managing Hazardous Substance Air Discharges from Remedial Systems Bio Lynceus, LLC letter to DEQ re: Possible use of Products

Page 402: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

EPA, 9/1/1995 Elsevier Science Ltd, 1998

Parsons, 5/4/2011EPA, 9/5/2011

Oregon DEQ, 1/6/20115/2/2006

Page 403: [XLS]deq.mt.govdeq.mt.gov/Portals/112/Land/StateSuperfund/... · Web view13. 13 1. 13 1 1. 13 1 1 1. 13 1 1 2. 13 1 1 2 7/16/1990. 13 1 1 2 8/15/1990. 13 1 1 2 8/15/1990. 13 1 1 2

BN Livingston Guide Index

BN Livingston Guide Index

1. ** indicate some or all information is in the confidential files

13 01 01 Site Overview13 01 02 PRP Information13 01 03 Pre-Remedial Activities13 01 04 Correspondence13 01 05 Administrative Orders/Consent Decrees13 01 06 Information Requests13 01 07 RI/FS13 01 08 ARARs13 01 09 RI/FS Reports13 01 10 ROD13 01 11 RD/RA13 01 12 O&M13 01 13 Cost Recovery13 01 14 Community Relations13 01 15 SCAP13 01 16 Accounting13 01 17 Contracts (See Contracts/Agreements Master file)13 01 18 Cooperative Agreements (See Cooperative Agreements master file)13 01 19 References13 01 20 Interagency Cooridination13 01 21 SEAS13 01 22 Natural Resource Damage Claims13 01 23 Local Governments13 01 24 (Intentially left blank)13 01 25 UST13 01 26 Sampling/Contaminant Sources13 01 27 Related Sites13 01 28 Status Reports13 01 29 Meetings/Technical13 01 30 Information Repositories13 01 31 Guidance Documents13 01 32 Livingston Depot Center13 01 33 Private Litigation13 01 34 Interim Actions13 01 35 3rd Party Work Permitted at the Facility

Notes:

2.  The numbers following the document name are the box/locator number for Records Management