View from the bridge wing in the drydock of open cargo holds forward
Looking down into a cargo hold from the bridge wing
Mounting the propeller, preparing for installation of the rudder
The bulbous bow grand block in the paint shop
The bulbous bow is remover
from the paint shop
Moving the bow section into position for turning it
The bow section is lifted by the Goliath crane for righting.
The sequence of righting the bow section
The sequence of righting the bow section
The bow is landed right ride up
A view from the crane
A view from the crane as the bow is placed in the dock
MAUNAWILI in the drydock
View in drydock before erection of bow sections
View of stern section.
Assembly of grand block after erection, during weldout
Intermediate deck grand block awaiting erection
Stern view in drydock
View from a top Goliath.
Upper bow section maneuvered into the paint shop for final coating
Maunawili upper bow grand block after painting
A tight squeeze out of the paint shop
The Kirow machines maneuver a 525-ton unit from the paint shop
An imposing move of the final grand block
Upper bow section being maneuvered out to yard for transport and installation.
Upper bow section being maneuvered out to yard for transport and installation.
Upper bow section being maneuvered out to yard for transport and installation
Upper bow section being maneuvered out to yard for transport and installation.
Upper bow section being maneuvered out to yard for transport and installation.