View from the bridge wing in the drydock of open cargo holds forward

Page 2: View from the bridge wing in the drydock of open cargo holds forward

Looking down into a cargo hold from the bridge wing

Page 3: View from the bridge wing in the drydock of open cargo holds forward

Mounting the propeller, preparing for installation of the rudder

Page 4: View from the bridge wing in the drydock of open cargo holds forward

The bulbous bow grand block in the paint shop

Page 5: View from the bridge wing in the drydock of open cargo holds forward

The bulbous bow is remover

from the paint shop

Page 6: View from the bridge wing in the drydock of open cargo holds forward

Moving the bow section into position for turning it

Page 7: View from the bridge wing in the drydock of open cargo holds forward

The bow section is lifted by the Goliath crane for righting.

Page 8: View from the bridge wing in the drydock of open cargo holds forward

The sequence of righting the bow section

Page 9: View from the bridge wing in the drydock of open cargo holds forward

The sequence of righting the bow section

Page 10: View from the bridge wing in the drydock of open cargo holds forward

The bow is landed right ride up

Page 11: View from the bridge wing in the drydock of open cargo holds forward

A view from the crane

Page 12: View from the bridge wing in the drydock of open cargo holds forward

A view from the crane as the bow is placed in the dock

Page 13: View from the bridge wing in the drydock of open cargo holds forward

MAUNAWILI in the drydock

Page 14: View from the bridge wing in the drydock of open cargo holds forward

View in drydock before erection of bow sections

Page 15: View from the bridge wing in the drydock of open cargo holds forward

View of stern section.

Page 16: View from the bridge wing in the drydock of open cargo holds forward

Assembly of grand block after erection, during weldout

Page 17: View from the bridge wing in the drydock of open cargo holds forward

Intermediate deck grand block awaiting erection

Page 18: View from the bridge wing in the drydock of open cargo holds forward

Stern view in drydock

Page 19: View from the bridge wing in the drydock of open cargo holds forward

View from a top Goliath.

Page 20: View from the bridge wing in the drydock of open cargo holds forward

Upper bow section maneuvered into the paint shop for final coating

Page 21: View from the bridge wing in the drydock of open cargo holds forward

Maunawili upper bow grand block after painting

Page 22: View from the bridge wing in the drydock of open cargo holds forward

A tight squeeze out of the paint shop

Page 23: View from the bridge wing in the drydock of open cargo holds forward

The Kirow machines maneuver a 525-ton unit from the paint shop

Page 24: View from the bridge wing in the drydock of open cargo holds forward

An imposing move of the final grand block

Page 25: View from the bridge wing in the drydock of open cargo holds forward

Upper bow section being maneuvered out to yard for transport and installation.

Page 26: View from the bridge wing in the drydock of open cargo holds forward

Upper bow section being maneuvered out to yard for transport and installation.

Page 27: View from the bridge wing in the drydock of open cargo holds forward

Upper bow section being maneuvered out to yard for transport and installation

Page 28: View from the bridge wing in the drydock of open cargo holds forward

Upper bow section being maneuvered out to yard for transport and installation.

Page 29: View from the bridge wing in the drydock of open cargo holds forward

Upper bow section being maneuvered out to yard for transport and installation.