Project:

Client:

Consultant:

Drawing title:

Scale:

CONSULTANCY SERVICES FOR MASTER PLAN,PRELIMINARY DESIGN

REPORT ALONG WITH TENDER DOCUMENTS FOR DEVELOPMENT OF

TRUNK INFRASTRUCTURE FOR INTEGRATED INDUSTRIAL TOWNSHIP

UNDER DADRI-NOIDA-GHAZIABAD INVESTMENT REGION OF DMIC

FINAL SCHEMATIC LAYOUT PLAN FOR INTEGRATED INDUSTRIAL TOWNSHIP, DADRI

1:10000 @ A2Rev:

N

For:

INTEGRATED INDUSTRIAL TOWNSHIP COMPANY -

SPV of GNIDA and DMICDC

100 250 500 in mts

LEGEND

Date:05/01/2015 14

FINAL SCHEMATIC LAYOUT PLAN FOR INTEGRATED INDUSTRIAL TOWNSHIP, DADRI

2.10-4.50 Ha

AREA STATEMENT

1.

2.

3.

Sl.no. Land use Category

Hi-tech Industry

Bio-tech Industry

R & D Industry

Commercial/mixed use

Residential Group Housing

Residential-EWS

Open space

Utility area

Area (Ha)

Landuse Distribution

in Percentage

PLOT RANGE

Sl. no. Land use Category Plot range

1.

2.

3.

4.

5.

Hi-tech Industry

Bio-tech Industry

R & D Industry

Commercial/mixed use

Residential

3.00-4.10 Ha

2.00-5.40 Ha

1.80-5.8 Ha

0.50-3.20 Ha

36.22

26.69

30.36

15.23

21.00

3.67

42.84

5.69

13.67

10.07

11.46

5.75

7.92

1.38

16.17

2.15

Total Industry use

Total Residential use

IIT Internal Roads

Project area 302.63 100

GNIDA roads

265.00Project area (w/o GNIDA roads)

134.47 50.74

24.67 9.31

15.89

14.20

42.10

37.63

Existing Structures

HTL Tower

Delhi - Howrah Rail line

Pond

IIT Internal Roads

GNIDA Masterplan roads

Existing Settlement roads

HTL Line

Kot Escape

Existing Settlement

N

Drawing No.: TCE.7504A-292-MP-6301

4.

5.

6.

8.

9.

10.

7.

11.

IT Industry

41.20 15.55

IT 2.60-5.40 Ha

6.

Open Space / Green Buffer

Hi-tech Industry

Bio-tech Industry

R & D Industry

Commercial / Mixed Use

Residential Group housing

Residential - EWS Housing

Utility

IT Industry

(w/o GNIDA Roads)

ECOTECH XI

TECH ZONE II

Sector

XU III

R

Sector

XU II

Sector

MU II

R

DNGIR

DNGIR

IIT Site Boundary

DELHI-MUMBAI INDUSTRIAL CORRIDOR DEVELOPMENT

CORPORATION (DMICDC

Utility

Road Connectivity

U0

U1

U2

U3

U4

U5

Water Utility (150MX100M)

Intermediate

Transfer Station-SWM(0.5Ha)

Electrical Substation

(120MX120M)

Transfer Station-SWM(1.0Ha)

R1

R2

R3

R4

R5

PontentialConnection

to Boraki

Proposed ROB

Existing Railway

Crossing

Connection to Rithori

Potential Connection to

service roads of Eastern

Peripherial Expressway

Utility (30MX30M)

R0

* Reserved for future utility provision

Utility (0.2 & 0.8 Ha)U *

U6 Recycle Water Utility (0.8Ha)