Download - Transformer Part 1
![Page 2: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/2.jpg)
What We Are Trying To Avoid
![Page 3: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/3.jpg)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2 8 14 20 26 32 38 44 50 56 62 68 74
Age
Haz
ard
Fu
nct
ion
Aging Forecast
![Page 4: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/4.jpg)
Forced Outage (Unplanned Maintenance/Repair Times)
Time-to-Repair Distributions for Minor, Major and Catastrophic Events
0.00
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.10
1 10 100 1,000
Time to Repair, Hours
Pro
ba
bil
ity MINOR
(5 hr/ event)MAJOR
(55 hr / event)
Catastrophic(230 hr/event)
![Page 5: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/5.jpg)
Transformer Failure Modes
8Thermally induced8Electrically Induced8Mechanically Induced
![Page 6: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/6.jpg)
Transformer Failure ModesThermally Induced Overloading Failure of cooling system Blockage of axial spaces Over-excitation (over-voltage or
under-frequency)
![Page 7: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/7.jpg)
Transformer Failure Modes
ElectricallyInduced
• Over Voltage• Surges• Partial Discharge• Static Electrification
![Page 8: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/8.jpg)
Transformer Failure ModesMechanically Induced
Conductor Tipping
Conductor Telescoping
Hoop Buckling
![Page 9: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/9.jpg)
Mechanical Failure
![Page 10: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/10.jpg)
Cause of Failures
20 years of claims
Insulation issues 18%
Electrical Disturbances
29%
Maintenance issues13%
Lightning16%
Loose Connection
13%
Moisture7%
Overload2%
Other2%
![Page 11: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/11.jpg)
What Keeps Your Transformers Humming?
Transformer Insulating System OilPaper
The life of the insulation is the life of the transformer. Insulation is the weakest link in the transformer. Insulation system is the most important part of the transformer to
maintain.
Requires early and prompt attention.
![Page 12: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/12.jpg)
Stages of Oil OxidationActs as a CoolantProvides Dielectric
StrengthProtects the PaperUsed as Diagnostic
Tool
OIL
![Page 13: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/13.jpg)
PAPER!PROVIDES…Mechanical StrengthDielectric StrengthDielectric Spacing
What causes cellulose molecules to depolymerize?HeatOxygenWaterOil oxidation by-products
![Page 14: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/14.jpg)
Thanks for your attention !
Any Question ?
![Page 15: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/15.jpg)
15
10. Major Manufacturing Process
1) Winding Works
![Page 16: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/16.jpg)
16
10. Major Manufacturing Process
2) Core lamination
![Page 17: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/17.jpg)
17
10. Major Manufacturing Process
3) View of Core Structure (After Completion of Core
Lamination)
![Page 18: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/18.jpg)
18
10. Major Manufacturing Process
4) Coil Insertion Works
![Page 19: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/19.jpg)
19
10. Major Manufacturing Process
5) View of Core and Coil Assembly Works
![Page 20: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/20.jpg)
20
10. Major Manufacturing Process
6) Drying Works in Vacuum Vaporization Facility
![Page 21: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/21.jpg)
21
10. Major Manufacturing Process
7) Completion of Core & Coil Assembly
![Page 22: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/22.jpg)
22
10. Major Manufacturing Process
8) Factory Test
![Page 23: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/23.jpg)
Core Form vs Shell Form TransformersCore FormRound Coils( Cylinder)Coils Wrapped on a tube
thenloaded on core
Core stacked in legs and then windings are placed over them
Vertical Core LegsWindings Concentric
around each otherMajority of Transformers
in the world
Shell FormFlat Coils in rectangular
shapeCoils stacked into groupsInterleaved windingsCore stacked around the
coilsCore is HorizontalStronger under short
circuitGenerally more expensiveMajor advantages in
GSU’sABB (Cordoba), IEM
(Mexico), Schneider (France),
Mitsubishi(Japan), Hyosung (Korea),GE (UNITED STATES!)
![Page 24: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/24.jpg)
Basic Construction
CORE FORM
SHELL FORM
![Page 25: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/25.jpg)
Core Form Construction
![Page 26: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/26.jpg)
Shell Form Construction
![Page 27: Transformer Part 1](https://reader038.vdocuments.mx/reader038/viewer/2022102910/563dbcb8550346aa9ab0a71d/html5/thumbnails/27.jpg)