The Development of Cascade andChinook Fields in Ultra Deep Waters of the
Gulf of Mexico
César PalagiWalker Ridge Asset Manager
Petrobras America Inc.February 26th , 2010
BRATECC – The Brazil-TexasChamber of Commerce
![Page 2: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/2.jpg)
2 of 20 2
1. Introduction
2. Project Overview
3. Reservoir and Well Challenges
4. Subsea and FPSO Challenges
5. Final Message
Agenda
![Page 3: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/3.jpg)
3 of 20 3
1. Introduction
2. Project Overview
3. Reservoir and Well Challenges
4. Subsea and FPSO Challenges
5. Final Message
Agenda
![Page 4: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/4.jpg)
4 of 20 4E&PTRADINGHEAD OFFICE
DOWNSTREAMGAS & POWERREPRESENTATIVE OFFICE
Proven Reserves (SPE): 15 bi boeO&G Production: 2.6 million boe/day
Petrobras Summary
SOURCE: PETROBRAS
Houston
Colombia
Argentina
Angola
United Kingdom
USA
BRAZIL
BoliviaRio de Janeiro
NigeriaVenezuela
EcuadorPeru
Mexico
Tanzania
Iran ChinaJapan
New York
Uruguay
Libya
Turkey
Singapore
Paraguay
Mozambique
SenegalPakistan
Portugal
India
Employees: 74,000Refining Throughput: 2.1 million boe/day
![Page 5: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/5.jpg)
5 of 20 5
Petrobras as an OperatorPetrobras as an Operatorof Floating Production Systemsof Floating Production Systems
Copyright © 2010 ODS-Petrodata, Inc.
FPS OperatorsAll Contracted Vessels (258 Vessels Total)
9
50
8
9
1012
1315
15
95
9
13
0 20 40 60 80 100 120
PetrobrasShell
StatoilBP
ExxonMobil
ChevronCNOOC
AnadarkoConocoPhillips
Total
ENI/AgipOthers
FPSO Semi Spar TLP OtherCopyright © 2010 ODS-Petrodata, Inc.
![Page 6: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/6.jpg)
6 of 20 6
CascadeCascade
ChinookChinookStonesStones
StSt. Malo. Malo
TiberTiber
Petrobras E&P Portfolio in Gulf of Mexico
![Page 7: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/7.jpg)
7 of 20 7
1. Introduction
2. Project Overview
3. Reservoir and Well Challenges
4. Subsea and FPSO Challenges
5. Final Message
Agenda
![Page 8: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/8.jpg)
8 of 20 8
• Petrobras – 100%
(Blocks WR205, 206,249 &250)
• Petrobras – 66.67%• Total – 33.33%
(Blocks WR 425,426,469&470)
Cascade and Chinook Lease Holders
The Cascade Field
The Chinook Field
![Page 9: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/9.jpg)
9 of 20 9
Cascade and ChinookField History (1996 Lease Sale)
2 Wells20092008
1 Well2010
20072006
2 Appraisal Wells20052004
1 Discovery Well20031 Discovery Well2002
ChinookChinookCascadeCascadeYearYear
Petrobras took Operatorship
![Page 10: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/10.jpg)
10 of 20 10
Cascade and ChinookWe Were Here in Aug/2006
• Limited geological and well data;• Lack of field analogs;• Harsh environmental conditions;• Ultra-deep waters;• Lack of pipeline infrastructure;• FPSO regulation under development;• Tight SOP deadlines;• Willingness to produce ASAP.
![Page 11: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/11.jpg)
11 of 20 11
![Page 12: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/12.jpg)
12 of 20 12
2006
Regulatory Compliance
Execute Facilites
Project ScheduleFirst Oil in Mid 2010 – As Planned
1st Half 2nd Half 1st Half 2nd Half 1st Half 2nd Half 1st Half 2nd Half 1st Half 2nd Half2007 2008 2009 2010
Procure Facilities
DesignFacilities
Estimated1st Oil
Petrobras Operator
Design Wells
Drill & Complete
![Page 13: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/13.jpg)
13 of 20 13
1. Introduction
2. Project Overview
3. Reservoir and Well Challenges
4. Subsea and FPSO Challenges
5. Final Message
Agenda
![Page 14: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/14.jpg)
14 of 20 14
WesternGeco Seismic Acquisition in Cascade
Recording Vessels
![Page 15: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/15.jpg)
15 of 20 15
Reservoir Challenges
![Page 16: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/16.jpg)
16 of 20 16
Cascade and Chinook Rigs
Ocean Endeavor - 10,000 ft WD( Under Contract to
Devon Energy )Diamond Offshore Drilling
2008 2008
West Sirius - 10,000 ft WD( Under Contract to
Devon Energy )Seadrill Limited
Discover Deep Seas10,000 ft WD
(Under Contract to Chevron)Transocean Ltd.
2009
![Page 17: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/17.jpg)
17 of 20 17
Well Drilling Challenges( 27,000 ft )
Sea Level
40,000’
8,000’
16,000’
24,000’
32,000’
Allochthonous Sigsbee Salt Canopy
Cretaceous
Upper Tertiary Sediments
Autochthonous Salt
Basement
Suprasalt Sediment
Gulf of Mexico
Empire State Building ~1250 ft
Lower Tertiary
Modified from Keith Couvillion, Chevron, 2008
![Page 18: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/18.jpg)
18 of 20 18
Well Completion Challenges
STMZ –Single TripMulti-ZoneFrack Pack
1,200 ft
![Page 19: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/19.jpg)
19 of 20 19
1. Introduction
2. Project Overview
3. Reservoir and Well Challenges
4. Subsea and FPSO Challenges
5. Final Message
Agenda
![Page 20: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/20.jpg)
20 of 20 20
Tree
Tree
4-SlotManifold
BoostingPump
BoostingPump
Dual Flowlines
Dual PIPFlowlines
ProductionFSHRGas Export
Pipeline
FPSOShuttle Vessel
PowerUmbilical
Gas ExportFSHR
ControlUmbilical
Tree
Tree
4-SlotManifold
BoostingPump
BoostingPump
Dual Flowlines
Dual PIPFlowlines
ProductionFSHRGas Export
Pipeline
FPSOShuttle Vessel
PowerUmbilical
Gas ExportFSHR
ControlUmbilical
Subsea Challenges
![Page 21: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/21.jpg)
21 of 20 21
Subsea Risers and Equipment
Technip - Deep Blue
Riser Can
Manifolds: Houston
![Page 22: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/22.jpg)
22 of 20 22
Pipe-in-pipe Installation
Heerema BalderPLET being Lowered
![Page 23: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/23.jpg)
23 of 20 23
Subsea 7 Seven Seas
Umbilical Installation
Umbilical: Alabama
![Page 24: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/24.jpg)
24 of 20 24
Veolia Viking Poseidon
Subsea Pull-in of Umbilicals
Umbilical in the Buoy
ROV Pull in Winch
![Page 25: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/25.jpg)
25 of 20 25
FPSO and Shuttle Challenges
![Page 26: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/26.jpg)
26 of 20 26
Turret Buoy in GoM Turret Buoy Loadout
FPSO Mooring System Instalation in GoM
![Page 27: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/27.jpg)
27 of 20 27
FPSO Construction in Singapore
FPSO Sail Away From Singapore
Aboard the FPSO at Keppel Shipyard,
Singapore
![Page 28: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/28.jpg)
28 of 20 28
Shuttle Tanker Construction in Philadelphia
Shuttle: Philadelphia
Shuttle Launching
![Page 29: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/29.jpg)
29 of 20 29
Gas Export Discovery Pipeline System
![Page 30: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/30.jpg)
30 of 20 30
1. Introduction
2. Project Overview
3. Reservoir and Well Challenges
4. Subsea and FPSO Challenges
5. Final Message
Agenda
![Page 31: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/31.jpg)
31 of 20 31
Cascade and Chinook ProjectWorldwide Construction Sites
Brazil
Argentina
USA Portugal
Finland
IndiaMexico
China
UK
Indonesia
Sweden
Australia
Spain
FranceItaly
Norway
Czech Republic
Denmark
Singapore
Equipment and Services from over 20 Countries
Canada
NetherlandsFinland
![Page 32: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/32.jpg)
32 of 20 32
Cascade and ChinookField Activity Schedule
![Page 33: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/33.jpg)
33 of 20 33
Project Team
![Page 34: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/34.jpg)
34 of 20 34
Cascade and Chinook in Houston Skyline
![Page 35: The Development of Cascade/Chinook](https://reader033.vdocuments.mx/reader033/viewer/2022042515/555bee08d8b42a33078b5473/html5/thumbnails/35.jpg)
35 of 20 35
Thank you.