STRUCTURAL TIMBER
FRAMING
-
7/31/2019 struktura drvene konstrukcije
2/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
STRUCTURAL TIMBER COMPONENTS
Timber should
be bought from
sustainablesources.
Such timber is
stamped with
the symbol of
the accrediting
body.
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
3/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
TIMBER STRENGTHTimber is stamped according to its strength properties, asdescribed below:-
Timber Species
British StandardQuality
Reference
Strength Grade
Certification Authority
Condition
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
4/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
Structural components include pre-fabricated
frames, wall panels, joists and roof trusses.
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
5/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
The design of structural members takes into account:
Dead loads - which includes weight of the actual
building, such as bricks, tiles and timber.
Imposed loads machinery, furniture etc.Live loads the weight of people in the building.
Snow and wind loads when it snows, additional
loading is imposed on the roof, and wind loads occurin high winds.
Loads are illustrated on the next slide
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
6/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
7/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
Descriptions of the manufacturing process of
structural elements follow:-
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
8/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
Factory-made
components result in
high levels of repetition,
accuracy and quality.
This leads to cost
savings during
construction.
Timber components for
a roof truss are laid out
on a jig, as shown right.
Each component is pre-
cut to the exactdimensions required.
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
9/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
Timber parts are
fixed together
mechanically,using toothed steel
plates.
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
10/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
Studs (verticals) and
sole plates are laidout to exact
dimensions, and
nailed together.
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
11/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
The panel head isoffered up to the panel
frame. The head is
fixed with pneumatic
nail guns.
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
12/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
Right nails fixed to timber.
Below Pneumatic nail gun
and nail cartridge.
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
13/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
Right - plywood is then
nailed to the frame.
STRUCTURAL TIMBER FRAMING
Left a breather membrane
is placed over the plywood.
-
7/31/2019 struktura drvene konstrukcije
14/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
Bands are stapled to
the panel to mark the
positions of studs. This
helps tradesmen on
site to establish fixing
points for other
building components.
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
15/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
JOISTS
Joists are structural
components that
span the width of abuilding.
Finished joists,
awaiting delivery toa construction site,
are shown left.
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
16/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
Roof trusses, delivered to site and awaiting fixing.
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
17/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
A timber framed building under construction.
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
18/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
The foundation layout of a timber framed building is
shown on the following slide, and construction methods
of this type of foundation also follow.
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
19/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
Concrete blinding
Steel reinforcements (rebar)
Polystyrene shuttering
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
20/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
21/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
22/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
23/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
24/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
In the above image, a steel frame connects the timber superstructure to the
foundations. The red arrows indicate where columns are bolted to the
foundations. A more detailed image is shown on the next slide.
Timber beams & joists
form the
superstructure
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
25/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
Block work: forms part of the
structure, and offers fire
protection to steelwork
Steel beams
fire protected by
sprayed on
intumescent paint
Joists will be fire protected
by plasterboard before the
building is occupied
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
26/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
Load carrying components are doubled in size and transmitbuilding loads to the foundations: a close-up is shown on the
following slide.
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
27/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
Studs
Noggins
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
28/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
Prefabricated components are marked with their locations. Thisspeeds up construction time and reduces construction costs.
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
29/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
Stud walls are fixed in position to form separate spaces. These will
eventually be fire protected by plasterboard.
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
30/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
Once stud walls are fixed, firstfixing for plumbing and power
can take place.
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
31/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
As prefabricated components arrive, rapid construction follows.The above image shows the view looking down a communalcorridor of an apartment block, whilst under construction.
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
32/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
A vapour barrier, used to stop rain water entering the building, is
fixed externally.
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
33/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
Battens are fixed over the vapour barrier, and insulation is fitted betweenthe battens. Cement render is applied to provide an external finish.Colour pigment can be included in the render (known as a through-colour
render), or the render can be painted after curing.
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
34/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
Large items, such
as roof trusses are
lifted into placewith a crane.
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
35/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
Roof trusses
awaiting fixing.
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
36/37
NGfL CYMRU GCaD
www.ngfl-cymru.org.uk
Roof trusses fixed in place, ready for roofing contractors.
STRUCTURAL TIMBER FRAMING
-
7/31/2019 struktura drvene konstrukcije
37/37
NGfL CYMRU GCaD
www ngfl cymru org uk
Structural flooringand wall panels,
stored on site and
ready for fixing.
STRUCTURAL TIMBER FRAMING