Transcript
Page 1: S Village and onto Magnolia Boulevard. Enhancements might

21st AVENUE STUDYOpen Space Plan

Station 16

HAZ

ELW

OO

D D

R

26TH

AVE

S

SHARONDALE CT

PRIV

ATE

24TH

AVE

S

CO

NVE

NT

PL

SHARON HILL CIR

PRIM

RO

SE A

VE

BERNARD AVE

BARTON AVE

ALTU

RA

PL

FAIRFAX AVE

PORTLAND AVE

LINDEN AVE

20TH

AVE

S

25TH

AVE

S

WILDWOOD AVE

MAGNOLIA B

LVD

ASHWOOD AVE

BEECHWOOD AVE

BATT

ERY

PLWESTWOOD AVE

CAL

HO

UN

AVE

25TH

AVE

S

SUNSET PL

ASHWOOD AVE

26TH

AVE

S

W LINDEN AVE

BON

NIE

BR

IAR

LN

SWEETBRIAR AVE

PRIVATE

CEDAR LN

ESSEX PL

ROSEWOOD AVE

WOODLAWN DR

PORTLAND AVE

BLAIR BLVD

BLAIR BLVD

21ST

AVE

S

21ST

AVE

S

MAGNOLIA BLVD

HILL

SBO

RO P

IKE

440

St. Bernard

St. BernardAcademy

21st Avenue Corridor Study

0 500 1,000250FeetBase Map Parks

Fire Stations

School Locations (Private)

21st Avenue Study Area September, 2018

Kroger

Hillsboro Hardware

Catholic Diocese Property

Station 16

HAZE

LWO

OD

DR

26TH

AVE

S

SHARONDALE CT

PRIV

ATE

24TH

AVE

S

CO

NVE

NT

PL

SHARON HILL CIR PRIM

ROSE

AVE

BERNARD AVE

BARTON AVE

ALTU

RA

PL

FAIRFAX AVE

PORTLAND AVE

LINDEN AVE

20TH

AVE

S

25TH

AVE

S

WILDWOOD AVE

MAGNOLIA B

LVD

ASHWOOD AVE

BEECHWOOD AVE

BATT

ERY

PLWESTWOOD AVE

CALH

OUN

AVE

25TH

AVE

S

SUNSET PL

ASHWOOD AVE

26TH

AVE

S

W LINDEN AVE

BO

NN

IE B

RIA

R L

N

SWEETBRIAR AVE

PRIVATE

CEDAR LN

ESSEX PL

ROSEWOOD AVE

WOODLAWN DR

PORTLAND AVE

BLAIR BLVD

BLAIR BLVD

21ST

AVE

S

21ST

AVE

S

MAGNOLIA BLVD

HILL

SBO

RO P

IKE

§̈¦440

St. Bernard

St. BernardAcademy

21st Avenue Corridor Study

±0 500 1,000250

FeetBase MapParks

²µ Fire Stations

n School Locations (Private)

21st Avenue Study Area

Streams and Rivers September, 2018

*These open spaces connect the corridor to and signify the entrance into Hillsboro Village and onto Magnolia Boulevard. Enhancements might include a distinctive gateway feature and wayfinding signage that improves overall mobility.

The master plan for St. Bernard Park proposes walkways, site furnishings, landscaping, trellises, and the conversion of an existing stormwater detention pond into tiered raingardens. In addition, the plan is designed to accommodate the installation of public art and sculpture.

Phase I of implementation has been completed and includes most of the infrastructure and basic landscape components of the master plan. Implementation of future phases is dependent on funding.

Some areas identify with having significant stormwater concerns due to the existing topography, lack of infrastructure, or man-made site conditions. Redevelopment along these sites should address overall stormwater quality and management through best design practices.

Portions of the 440 Greenway are currently under construction with Phase I from Centennial to Elmington Parks complete. Future segments of the 440 Greenway are envisioned to extend 7 miles, link 6 parks, create new green spaces and reconnect 14 diverse, historic neighborhoods divided by the interstate.

Although this segment is still in concept, oppportunities to connect neighborhoods along 21st Avenue with the future segment should be evaluated.

In general, the streetscape along 21st Avenue South should promote a walkable and inviting atmosphere with added shade trees. Opportunities to increase the tree canopy and establish a center median should be evaluated.

Top Related