Quarterly Report on Mock Drill Exercises carried out by Various
Establishments of Power Sector
(April 2019 to June 2019)
1 | P a g e
Index
Sl.
No.
Content Page.
No.
1. Index 1
2. Background 2
3. Highlights of the report 3
4. Photographs of Mock Drill 4-5
5. Mock Drill Exercise Reported by
5.1 NHPC 6-15
5.2 Damodar Valley Corporation 15-16
5.3 NHDC LTD 16
5.4 Telangana State Power Generation Corporation ltd 16-17
5.5 Spectrum Power Generation Ltd., Kakinada, Andhra Pradesh 17
5.6 The West Bengal Power Development Corporation Limited 17
5.7 CESC Limited 17-18
5.8 Torrent Power Limited 18
5.9 Andhra Pradesh Generation Corporation LTD 19
2 | P a g e
Background:
As per provisions under section 37 of the Disaster Management act
2005, each Ministry or Department of Government of India is required to
prepare a Disaster Management Plan. Accordingly, Ministry of power, in
association with CEA, has prepared Crises and Disaster Management Plan
(CMP) for the power sector in consultation with all stakeholders that provides
a framework and direction to the power sector utilities of the country for all
phases of the disaster management cycle.
The CMP for the power sector provides for undertaking periodic mock
drill exercise in the various area of the power sector considering various crisis
situations like terrorist threats / attack & sabotage, bomb threats & bomb
explosions, strike, fire, accidents due to human error/ equipment
malfunction, cyber-attack etc. to ensure the preparedness of various utilities
in handling the emergent/crisis situations. The plan document also provides
for submission of a quarterly report in this regard by each utility to CEA
indicating the outline of crisis situations, response of the various teams,
observations and effectiveness for handling the emergency situation and
scope for improvements etc.
This report is a compilation of various mock drill exercises undertaken
by various establishments of power sector across the width and breadth of
the country during the period of April to June 2019. It would give us an
insight about our preparedness towards handling untoward incidents and
highlights shortcomings, if any, to prepare our self in better ways. The
experiences gained from these reported mock drill exercises would be very
helpful in updating policy guidelines for crisis management and building
capacity for all the stakeholders to address such events more skilfully.
3 | P a g e
Highlight of the report:
The mock drill exercises reported by various establishments during the
quarter ranges from routine drills to some very specific drills. It has been
observed that routine mock drill exercises such as fire, vehicle accident,
terrorist attacks, anonymous bomb threats, failure of back up supply,
electrocution have been carried out by most of the establishments. Apart from
that, occurrence of some other less frequent mock drill exercises has also been
reported such as flood (Chamera Power Station-II, Himachal Pradesh),
Chlorine Leakage (Sagardighi Thermal Power Project, West Bengal), Acid
Leakage (Southern Generating Station, West Bengal)
A summary of number of mock drill exercises reported by various
establishment is given below:
Sl.
No.
Establishments Number of Mock Drill
Exercises Reported
1. NHPC
93
2. Damodar Valley Corporation
9
3. NHDC LTD
2
4. Telangana State Power Generation
Corporation Ltd
2
5. Spectrum Power Generation Ltd.,
Kakinada, Andhra Pradesh
1
6. The West Bengal Power Development
Corporation Limited
3
7. CESC Limited
10
8. Torrent Power
1
9. Andhra Pradesh Power Generation
Corporation LTD
1
Total
122
Quarterly Mock Drill Report for the period of April to June 2019
Sl. No
Name of Establishment State Location Scenario Date & Time
Observations/Recommendation /Suggestions/ Activity performed
Name of Organization: NHPC
1. Bairasiul Power Station, Chamba
Himachal Pradesh
Power House Fire 29.06.2019 at 12.15 hrs
System was working satisfactory.
2. Bairasiul Power Station, Chamba
Himachal Pradesh
Main gate Bomb threat 28.04.2019 at 11.00 hrs
Unit in-charge de-briefed to all forcepersonnel and appreciated the workdone by team.
3. Bairasiul Power Station, Chamba
Himachal Pradesh
Unit Line Armed Attack 31.05.2019 at 16.25 hrs
All the functionaries participated incomplete coordination and the drillwas completed successfully.
4. Chamera Power Station-1,Chamba
Himachal Pradesh
Power House Bomb Threat/Terrorist Attack
28.04.2019 at 16:00 hrs
All the functionaries participated incomplete coordination and the drillwas completed successfully.
5. Chamera Power Station-1,Chamba
Himachal Pradesh
Switchyard Failure of Back-up Power
29.06.2019at 15:15 hrs.
Mock drill was completed successfully.
6. Chamera Power Station-1,Chamba
Himachal Pradesh
Unit Line,CISF Bomb Threat/Terrorist Attack
31.05.2019 at 11:10 hrs
Mock drill was completed successfully.
7. Chamera Power Station-1,Chamba
Himachal Pradesh
Sanjpoi Store Electrocution 19.06.2019 at 11:30 hrs
Mock drill was completed successfully.
8. Chamera Power Station-1, Himachal Boat Engine Boat Engine 14.06.2019 Mock drill was completed successfully.
6 | P a g e
Sl. No
Name of Establishment State Location Scenario Date & Time
Observations/Recommendation /Suggestions/ Activity performed
Chamba Pradesh Failure failure at 11:00 hrs
9. Chamera Power Station-1,Chamba
Himachal Pradesh
Switchyard Failure of back Power
31.05.2019 at 11:10 hrs
Mock drill was completed successfully.
10. Chamera Power Station-1,Chamba
Himachal Pradesh
Workshop Fire 11.04.2019at 14:50 hrs
Mock drill was completed successfully.
11. Chamera Power Station-1,Chamba
Himachal Pradesh
Power House Failure of back Power
23.04.2019 at 12:10 hrs
Mock drill was completed successfully.
12. Chamera Power Station-1,Chamba
Himachal Pradesh
Workshop Vehicle Accident
13.06.2019at 11:12 hrs
Mock drill was completed successfully.
13. Chamera Power Station-1,Chamba
Himachal Pradesh
Hospital Fire at Hospital
06.06.2019at 15:45 hrs
Mock drill was completed successfully.
14. Chamera Power Station-1,Chamba
Himachal Pradesh
Dam control Room
Boat Engine failure
14.06.2019 at 11:20 hrs
Mock drill was completed successfully.
15. Chamera Power Station-II,Chamba
Himachal Pradesh
Power Station Failure of backup power
26.04.2019 at 13:25 hrs
All the functionaries participated in complete coordination and the drill was completed successfully.
16. Chamera Power Station-II,Chamba
Himachal Pradesh
Power House Bomb Threat 28.04.2019 at 11:00 hrs
Mock drill was completed successfully.
7 | P a g e
Sl. No
Name of Establishment State Location Scenario Date & Time
Observations/Recommendation /Suggestions/ Activity performed
17. Chamera Power Station-II,Chamba
Himachal Pradesh
Power House Flood 26.04.2019 at 12:00 hrs
Mock drill was completed successfully.
18. Chamera Power Station-II,Chamba
Himachal Pradesh
Control Room, Power Station
Failure of backup power
21.06.2019 at 10:42 hrs
Mock drill was completed successfully.
19. Chamera Power Station-II,Chamba
Himachal Pradesh
DG set Armed Attack 31.05.2019 at 15:55 hrs
Force personnel were suggesteddifferent approaches to tackle suchsituation.
20. Chamera Power Station-II,Chamba
Himachal Pradesh
Chamera-II,Baandh.
Armed attack 29.06.2019 at 12:30 hrs
Mock drill was completed successfully.
21. Chamera Power Station-II,Chamba
Himachal Pradesh
Bagga Bandh Electrocution 21.06.2019 at 13:15 hrs
Mock drill was completed successfully.
22. Chamera Power Station-II,Chamba
Himachal Pradesh
Bandh Boat engine failure
08.05.2019at 10:15 hrs
Mock drill was completed successfully.
23. Chamera Power Station-II,Chamba
Himachal Pradesh
CISF Area Accident of Vehicle
31.05.2019 at 04:15 hrs
Mock drill was completed successfully.
24. Chamera Power Station-II,Chamba
Himachal Pradesh
Quarter GuardCISF Unit
To safe guardWeapons of Guard.
31.05.2019at 16:00 hrs
Mock drill was completed successfully.
25. Chamera Power Station-III, Chamba
Himachal Pradesh
Power House Electrocution 27.04.2019at 12:05 hrs
Mock drill was completed successfully.
8 | P a g e
Sl. No
Name of Establishment State Location Scenario Date & Time
Observations/Recommendation /Suggestions/ Activity performed
26. Chamera Power Station-III, Chamba
Himachal Pradesh
Main Gate Failure of backup Power
28.05.2019 at 16:00 hrs
Mock drill was completed successfully.
27. Chamera Power Station-III, Chamba
Himachal Pradesh
Project Site Bomb Threat 28.04.2019 at 16:00 hrs
Mock drill was completed successfully.
28. Chamera Power Station-III, Chamba
Himachal Pradesh
Power House Fire 28.05.2019at 15:30 hrs
Mock drill was completed successfully.
29. Chamera Power Station-III, Chamba
Himachal Pradesh
Inside Power House of CPS-III
Accident of Vehicle
26.06.2019at 12:20 hrs
Mock drill was completed successfully.
30. Chamera Power Station-III, Chamba
Himachal Pradesh
Dharwala colony,CPS-III
Failure of backup Power
10.06.2019 at 12:30 hrs
Mock drill was completed successfully.
31. Chamera Power Station-III, Chamba
Himachal Pradesh
CHEP-III Lines Lothal.
Armed Terrorist attack
31.05.2019at 16:30 hrs
Mock drill was completed successfully.
32. Chamera Power Station-III, Chamba
Himachal Pradesh
Quarter Guard. Armed Terrorist attack
29.06.2019at 16:30 hrs
Mock drill was completed successfully.
33. Chamera Power Station-III, Chamba
Himachal Pradesh
Dam Kharamukh.
Electrocution 27.04.2019at 12:05 hrs
Mock drill was completed successfully.
34. Chutak Power Station Jammu andKashmir
Barrage complex
Firefighting System
11.06.2019at 16:10 hrs
Mock drill was completed successfully.
9 | P a g e
Sl. No
Name of Establishment State Location Scenario Date & Time
Observations/Recommendation /Suggestions/ Activity performed
35. Dhauliganga Power Station, Tapovan Pithoragarh
Uttarakhand
DGPS Administrative Building.
Application ofFireExtinguisher
27.06.2019 at 11:10 hrs
Regular training and awareness to the staff to avoid any fire incident.
36. Dhauliganga Power Station, Tapovan Pithoragarh
Uttarakhand
P/H DG Room, Elagad
Failure ofbackup Power.
08.05.2019 at 16:00 hrs
Mock drill was completed successfully.
37. Dhauliganga Power Station, Tapovan Pithoragarh
Uttarakhand
Line area from river side.
Armed attackon Unit line
28.05.2019 at 14:00 hrs
Mock drill was completed successfully.
38. Dhauliganga Power Station, Tapovan
Uttarakhand
Central store plant area
Bomb Threat 26.06.2019 at 16:00 hrs
Mock drill was completed successfully.
39. Dhauliganga Power Station, Tapovan Pithoragarh
Uttarakhand
Main Gate Bomb Threat 28.04.2019 at 11:00 hrs
Mock drill was completed successfully.
40. Dulhasti Power Station Jammu & Kashmir
Near Field Hostel of DPS.
Armed attack 29.06.2019at 16:00 hrs
Mock drill was completed successfully.
41. Kishanganga Power Station, Bandipora
Jammu andKashmir
Dam site Armed attack 31.05.2019at 11:00 hrs
Practice classes may be increased to enhance coordination.
42. Kishanganga Power Station, Bandipora
Jammu andKashmir
Dam site Armed attack 29.06.2019at 16:00 hrs
Practice classes may be increased to enhance coordination.
43. Kishanganga Power Station, Bandipora
Jammu andKashmir
01, NHPC campus
Earth quake 22.06.2019at 11:00 hrs
Practice classes may be increased to enhance coordination.
10 | P a g e
Sl. No
Name of Establishment State Location Scenario Date & Time
Observations/Recommendation /Suggestions/ Activity performed
44. Kishanganga Power Station, Bandipora
Jammu andKashmir
01, NHPC campus
Bomb threat 28.04.2019at 11:00 hrs
Practice classes may be increased to enhance coordination.
45. Loktak Power Station, Churachandpur
Manipur Power House canteen area.
Fire at PowerHouse.
15.06.2019 at 14:00 hrs
Mock drill was completed successfully.
46. Parbati -II, Nagwain Distt Mandi
Himachal Pradesh
Electrical complex, PHEP-II
Electrical shock
06.05.2019at 10:30 hrs
Mock drill was completed successfully.
47. Parbati -II, Nagwain Distt Mandi
Himachal Pradesh
Nagwain complex, PHEP-II
Bomb threat 13.05.2019 at 11:30 hrs
Mock drill was completed successfully.
48. Parbati -II, Nagwain Distt Mandi
Himachal Pradesh
Gammon CMC Workshop
Fire 13.06.2019at 10:00 hrs
Mock drill was completed successfully.
49. Parbati -II, Nagwain Distt Mandi
Himachal Pradesh
Nagwain complex,PHEP-II
Earth quake 29.05.2019at 11:00 hrs
Mock drill was completed successfully.
50. Parbati -III, Behauli, Kullu Himachal Pradesh
Fire in MachineHall
Fire in Machine Hall
12.06.2019 at 11:03 hrs
Mock drill was completed successfully.
51. Parbati -III, Behauli, Kullu Himachal Pradesh
Power House Bomb Threat 28.04.2019 at 11:00 hrs
Mock drill was completed successfully.
52. Parbati -III, Behauli, Kullu Himachal Pradesh
Dam area Armed Attack 31.05.2019 at 16:30 hrs
Mock drill was completed successfully.
11 | P a g e
Sl. No
Name of Establishment State Location Scenario Date & Time
Observations/Recommendation /Suggestions/ Activity performed
53. Parbati -III, Behauli, Kullu Himachal Pradesh
GSS Area Accident of the vehicle
14.06.2019 at 16:00 hrs
Mock drill was completed successfully.
54. Parbati -III, Behauli ,Kullu Himachal Pradesh
GSS Area Electrocution 15.06.2019 at 16:00 hrs
Mock drill was completed successfully.
55. Parbati -III, Behauli, Kullu Himachal Pradesh
Quarter Guard Area
Armed Attack 29.06.2019 at 17:00 hrs
Mock drill was completed successfully.
56. Rangit Power Station Sikkim Rangit Dam Failure of boatengine.
02.05.2019 at 10:30 hrs
Mock drill was completed successfully.
57. Rangit Power Station Sikkim Control Room, ECD
Back-up Power Failure
25.06.2019 at 16:17 hrs
Mock drill was completed successfully.
58. Rangit Power Station Sikkim Control Room, ECD
Electrocution 28.06.2019at 11:00 hrs
Mock drill was completed successfully.
59. Rangit Power Station Sikkim Near Bailey Bridge, Power House
Accident of vehicle
04.06.2019at 11:00 hrs
Mock drill was completed successfully.
60. Salal Power Station, Jyotipuram
Jammu & Kashmir
Bidda DPH. Electrocution 15.06.2019 at 12.10 hrs
Mock drill was completed successfully.
61. Salal Power Station, Jyotipuram
Jammu & Kashmir
Dhyangarh Workshop.
Fire 22.04.2019 at 12:30 hrs
Mock drill was completed successfully.
12 | P a g e
Sl. No
Name of Establishment State Location Scenario Date & Time
Observations/Recommendation /Suggestions/ Activity performed
62. Salal Power Station, Jyotipuram
Jammu & Kashmir
Barrier-I duty Post Jyotipuram
Bomb threat 28.04.2019 at 11:00 hrs
Mock drill was completed successfully.
63. Salal Power Station, Jyotipuram
Jammu & Kashmir
HMWS Dhyangarh.
Bomb threat 29.06.2019 at 16:00 hrs
Mock drill was completed successfully.
64. Salal Power Station, Jyotipuram
Jammu & Kashmir
Switchyard,Dhyangarh.
Armed Attack 31.05.2019 at 16:30 hrs
Mock drill was completed successfully.
65. Sewa –II Power Station Mashka, Kathua
Jammu & Kashmir
Power House Accident of Vehicle
20.06.2019 at 11:00 hrs
Mock drill was completed successfully.
66. Sewa –II Power Station Mashka, Kathua
Jammu & Kashmir
Dam Site Armed Attack 31.05.2019 at 16:30 hrs
Mock drill was completed successfully.
67. Sewa –II Power Station Mashka, Kathua
Jammu & Kashmir
Dam Site Bomb threat 28.04.2019at 11:00 hrs
Mock drill was completed successfully.
68. Sewa –II Power Station Mashka, Kathua
Jammu & Kashmir
Work Shop Fire 01.06.2019at 11:00 hrs
Mock drill was completed successfully.
69. Sewa –II Power Station Mashka, Kathua
Jammu & Kashmir
Power Station Electrocution and failure of backup Power
20.06.2019at 14:30 hrs
Mock drill was completed successfully.
70. Sewa –II Power Station Mashka, Kathua
Jammu & Kashmir
Plant Area Bomb threat 29.06.2019at 16:00 hrs
Mock drill was completed successfully.
13 | P a g e
Sl. No
Name of Establishment State Location Scenario Date & Time
Observations/Recommendation /Suggestions/ Activity performed
71. Tanakpur Power Station,Champawat, Banbassa
Uttarakhand
DPH Barrage Failure of Power backup.
28.06.2019 at 11:32 hrs
Any action should be taken after proper communication between DPH Barrage and DPH Banbassa.
72. Tanakpur Power Station,Champawat, Banbassa
Uttarakhand
Main gate Bomb threat 28.04.2019 at 11:00 hrs
Mock drill was completed successfully.
73. Tanakpur Power Station,Champawat, Banbassa
Uttarakhand
Unit Line. Armed attack 28.05.2019 at 14:00 hrs
Mock drill was completed successfully.
74. Tanakpur Power Station,Champawat, Banbassa
Uttarakhand
Quarter guard. Terrorist armed attack.
26.06.2019 at 16:00 hrs
Mock drill was completed successfully.
75. Teesta-V Power Station, Balutar
Sikkim Zero Point,Balutar
Fire mock drillat zero point.
12.06.2019 at 13:00 hrs
More Seriousness and attentionneeded to be inculcated among theemployees and the workers.
76. Teesta-V Power Station, Balutar
Sikkim Fire Station, Vehicle Accident
28.06.2019 at 15:10 hrs
Seriousness and attention needed to be inculcated among the employees and the workers.
77. Teesta-V Power Station, Balutar
Sikkim Teesta river near Switch yard.
Drowning. 29.06.2019 at 13:00 hrs
The demonstrations were conducted successfully.
78. Teesta-V Power Station, Balutar
Sikkim EMD Dam Failure of backup power
20.06.2019 at 11:40 hrs
The demonstrations were conducted successfully.
79. Teesta-V Power Station, Balutar
Sikkim 11 kV switch yard
Electrocution. 29.06.2019 at 11:55 hrs
Awarness for use of PPEs and first aidhas to be improved.
14 | P a g e
Sl. No
Name of Establishment State Location Scenario Date & Time
Observations/Recommendation /Suggestions/ Activity performed
80. Teesta Low Dam–IV Power Station, Kalijhora, Darjeeling
West Bengal Control Room Failure of backup Power
17.06.2019 at 12:00 hrs
Mock drill was completed successfully.
81. Teesta Low Dam–IV Power Station Kalijhora, Darjeeling
West Bengal Switch Yard Intrusion of unknown Persons
13.05.2019 at 16:00 hrs
Mock drill was completed successfully.
82. Teesta Low Dam–IV Power Station Kalijhora, Darjeeling
West Bengal Near CISF Barrack area
Bomb threat 24.06.2019 at 16:00 hrs
Mock drill was completed successfully.
83. Teesta Low Dam–IV Power Station Kalijhora, Darjeeling
West Bengal Control Room Failure of Backup Power
23.04.2019 at 12:00 hrs
Mock drill was completed successfully.
84.TLD-III Power StationRambi, Darjeeling
West Bengal Store complex, sector-A
Armed attack 24.06.2019at 17:00 hrs
Mock drill was completed successfully.
85. TLD-III Power StationRambi, Darjeeling
West Bengal Canteen,Dam Gate-2,Silt Lab
Armed attack 16.05.2019at 16:20 hrs
Mock drill was completed successfully.
86. Uri - I Power Station, Mohura, Baramulla
Jammu & Kashmir
Barrage area Power backup failure.
29.06.2019 at 11:30 hrs
Mock drill was completed successfully.
87. Uri - I Power Station, Mohura, Baramulla
Jammu & Kashmir
Power house Fire 29.06.2019 at 12:15 hrs
Mock drill was completed successfully.
88. Uri - I Power Station, Mohura, Baramulla
Jammu & Kashmir
CISF UNIT Bomb threat 28.04.2019 at 11:00 hrs
Mock drill was completed successfully.
15 | P a g e
Sl. No
Name of Establishment State Location Scenario Date & Time
Observations/Recommendation /Suggestions/ Activity performed
89. Uri - I Power Station, Mohura, Baramulla
Jammu & Kashmir
Pringal Out post
Armed attack 29.06.2019 at 16:00 hrs
Mock drill was completed successfully.
90. Uri - I Power Station, Mohura, Baramulla
Jammu & Kashmir
Unit /BN Armed attack 31.05.2019 at 16:30 hrs
Mock drill was completed successfully.
91. Uri - II Power Station, Mohura, Baramulla
Jammu & Kashmir
Near Badminton court, Nowpora
Fire at vital location.
11.06.2019at 11:00 hrs
Mock drill was completed successfully.
92. Uri - II Power Station, Mohura, Baramulla
Jammu & Kashmir
Dam approach gate area.
Terrorist armed attack.
31.05.2019at 16:30 hrs.
Mock drill was completed successfully.
93. Uri - II Power Station, Mohura, Baramulla
Jammu & Kashmir
Nursery school Fire at vital location.
14.06.2019at 16:00 hrs
Mock drill was completed successfully.
Name of the Plant: Damodar Valley Corporation
94. Bokaro Thermal Power station
Jharkhand Bokaro Thermal
To neutralizetoxic fumes ofChlorine
15.04.2019 All the functionaries participated in complete coordination and the drill was completed successfully.
95. Bokaro Thermal Power station
Jharkhand Bokaro Thermal
Fire Call 17.04.2019 All the functionaries participated in complete coordination and the drill was completed successfully.
96. Bokaro Thermal Power station
Jharkhand Bokaro Thermal
Anti-social element attack
23.04.2019 All the functionaries participated in complete coordination and the drill was completed successfully.
16 | P a g e
Sl. No
Name of Establishment State Location Scenario Date & Time
Observations/Recommendation /Suggestions/ Activity performed
97. Bokaro Thermal Power station
Jharkhand Bokaro Thermal
Fire call 13.05.2019 All the functionaries participated in complete coordination and the drill was completed successfully.
98. Bokaro Thermal Power station
Jharkhand Bokaro Thermal
Fire Call 22.05.2019 All the functionaries participated in complete coordination and the drill was completed successfully.
99. Bokaro Thermal Power station
Jharkhand Bokaro Thermal
Anti-social element attack
20.05.2019 All the functionaries participated in complete coordination and the drill was completed successfully.
100. Bokaro Thermal Power station
Jharkhand Bokaro Thermal
Fire call 15.06.2019 All the functionaries participated in complete coordination and the drill was completed successfully.
101. Bokaro Thermal Power station
Jharkhand Bokaro Thermal
Fire Call 28.06.2019 All the functionaries participated in complete coordination and the drill was completed successfully.
102. Bokaro Thermal Power station
Jharkhand Bokaro Thermal
Anti-social element attack
20.05.2019 All the functionaries participated in complete coordination and the drill was completed successfully.
Name of Organization: NHDC LTD
103. Indira Sagar Power Station, Narmada Nagar
Madhya Pradesh
Parking Area near Access Tunnel
Fire 08.05.2019 at 15:35 hrs
Mock Drill of different nature to be carried out next time.
104. Omkareshwar Power Station, Khandwa
Madhya Pradesh
Power House Fire 21.06.2019 at 16.15 hrs
Mock drill was completed successfully.
17 | P a g e
Sl. No
Name of Establishment State Location Scenario Date & Time
Observations/Recommendation /Suggestions/ Activity performed
Name of Organization: Telangana State Power Generation Corporation ltd
105. K.T.P.S(O&M), PalonchaKhammam
Telangana New Canteen-KTPS/VII Stage.
Fire 15.06.2019 at 10:30 hrs
Mock drill was completed successfully.
106. RTS-B, Ramagundam Telangana Near Cooling tower.
Fire 28.06.2019 at 16.00 hrs.
Mock Drill was conducted satisfactorily.
Name of Organization: Spectrum Power Generation Ltd., Kakinada, Andhra Pradesh
107. Spectrum Power Gas Power Plant, Kakinada
Andhra Pradesh
Unit Transformer #1
Fire 26.06.2019 at 11:55 hrs
Mock Drill was conductedsatisfactorily.
Name of Organization: The West Bengal Power Development Corporation Limited
108. Sagardighi Thermal PowerProject
West Bengal Stg.II-RW Plant Chlorination Unit.
Chlorine Leakage.
21.06.2019 at16:15 hrs
Such drills should be done at allhazardous operation.
109. Bakreswar Thermal PowerProject
West Bengal In front of PlantTechnical Building.
Fire 28.04.2019 at 10:00 hrs
All unwanted materials shall have tobe shifted to scrap yard.
110. Santaldih Thermal Power Project
West Bengal CHP Technical Building.
Fire 17.06.2019 at 16:30 hrs
Mock Drill was conductedsatisfactorily.
18 | P a g e
Sl. No
Name of Establishment State Location Scenario Date & Time
Observations/Recommendation /Suggestions/ Activity performed
Name of Organization: CESC Limited
111. Budge Budge generating Station
West Bengal Rail gate Intrusion of unauthorizedPersonnel.
18.06.2019 at 13:30 hrs
Performance of the Emergencyresponse was found satisfactory.
112. Southern Generating Station
West Bengal DM Plant Acid leakage. 19.06.2019 Pressure in water spray line was notadequate. Difficulty in Mobilecommunication from DM Plant isnoted.
113. Titagarh Generating Station
West Bengal Burner front area.
Fire 23.04.2019 at 16:00 hrs
Mock Drill was conductedsatisfactorily
114. Titagarh Generating Station
West Bengal Ash gate. Armed Intruders
18.06.2019at 15:00 hrs
CCTV coverage & minimizing no ofentry points to the plant arerecommended.
115. CESC Hose, Corporate Office Building.
West Bengal Main gate. Mob control 24.06.2019at 14:00 hrs
Suitable training for Security staff oncrowd management is required.
116. Bantala 220Kv BBGS-EM SS Circuit.
West Bengal Near tower location no 304.
Potable Inflatable Tower lights
20.06.2019 Mock drill for these tower lights arebeing done quarterly.
117. BBD Bag Sub Station West Bengal Project Site Fire Drill 04.06.2019 Mock Drill was conductedsatisfactorily
118. Belur Receiving Station West Bengal Project Site Fire Drill 05.04.2019 Mock Drill was conducted
19 | P a g e
Sl. No
Name of Establishment State Location Scenario Date & Time
Observations/Recommendation /Suggestions/ Activity performed
at 15:00 hrs satisfactorily
119. Park Lane Sub Station West Bengal Project Site Fire Drill 24.04.2019at 15:00 hrs
Mock Drill was conductedsatisfactorily
120. New Cossipore Sub Station
West Bengal Project Site Fire Drill 07.05.2019 at 15:00 hrs
Mock Drill was conductedsatisfactorily
Name of Organization: Torrent Power Limited
121. Torrent Power Limited,Sabarmati,Ahmedabad
Gujarat Garden gate area
Sighting of Unknownperson
22.06.2019at 02:15 hrs
Mock Drill was conductedsatisfactorily
Name of Organization: Andhra Pradesh Power Generation Corporation LTD
122. Rayalaseema ThermalPower Project
Andhra Pradesh
Near unit-V Boiler/stage-III/RTPP
Fire 23.04.201910:45 hrs
The maintenance of fire extinguishers are to be improved.
***************
20 | P a g e