Nabil Fahoum February 2013
CONSTRUCTION MANAGERS MANUAL
1
![Page 2: Nabil Fahoum February 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062301/56812e22550346895d9387f5/html5/thumbnails/2.jpg)
Construction Manager’s Manual
2
![Page 3: Nabil Fahoum February 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062301/56812e22550346895d9387f5/html5/thumbnails/3.jpg)
Program Management Procedures
3
1000Administrative3000Procurement4000Engineering5000Construction6000Quality Assurance7000Program Controls
![Page 4: Nabil Fahoum February 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062301/56812e22550346895d9387f5/html5/thumbnails/4.jpg)
Revised Form A-26 Bridge Rehabilitation Report
4
![Page 5: Nabil Fahoum February 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062301/56812e22550346895d9387f5/html5/thumbnails/5.jpg)
Quality Assurance (QA)Quality Control (QC)
The Contractor is responsible for the quality control of their Work.
The CM verifies compliance with QA/QC requirements to ensure that all components of the Contractor’s work conform to the plans, specifications, applicable standards and other requirements of the contract.
5
![Page 6: Nabil Fahoum February 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062301/56812e22550346895d9387f5/html5/thumbnails/6.jpg)
Daily Activity Report, Daily Report & Field Book
6
Daily Activity ReportForm A-1B Daily Report
Form A-1
Field Book
![Page 7: Nabil Fahoum February 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062301/56812e22550346895d9387f5/html5/thumbnails/7.jpg)
Punch List
7
A list prepared by the CM of outstanding work items and/or work items not complete in conformance with the contract.
Form A-45 PL Punch List Template.
![Page 8: Nabil Fahoum February 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062301/56812e22550346895d9387f5/html5/thumbnails/8.jpg)
Project Walkthroughs
8
• General Project Overview• Prior to Substantial Completion• Punch List Available to Attendees• Contract vs. Extra Work Items
Pre-Final WalkthroughWalkthrough attendees:• CM• Tollway Maintenance• Tollway PM• Tollway GEC• Tollway User Departments• Contractor (Optional)
![Page 9: Nabil Fahoum February 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062301/56812e22550346895d9387f5/html5/thumbnails/9.jpg)
Project Walkthroughs
9
Completed Punch List
Final Walkthrough
![Page 10: Nabil Fahoum February 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062301/56812e22550346895d9387f5/html5/thumbnails/10.jpg)
Final Punch List
10
Form A-45 PL Punch List Template.
Punch List Items Which Are Closed
Physically Completed
Documentation Provided To Indicate Why No Further Action Was Required By Contractor
![Page 11: Nabil Fahoum February 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062301/56812e22550346895d9387f5/html5/thumbnails/11.jpg)
Warranties
11
![Page 12: Nabil Fahoum February 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062301/56812e22550346895d9387f5/html5/thumbnails/12.jpg)
Reference Documentation
12
Tollway Website Documents
http://www.illinoistollway.com/doing-business/construction-engineering
![Page 13: Nabil Fahoum February 2013](https://reader035.vdocuments.mx/reader035/viewer/2022062301/56812e22550346895d9387f5/html5/thumbnails/13.jpg)
Documentation Matrix For Construction
13