CONSTRUCTION MANAGERS MANUAL. Nabil Fahoum February 2013. Construction Manager’s Manual. 1000Administrative 3000Procurement 4000Engineering 5000Construction 6000Quality Assurance 7000Program Controls. Program Management Procedures. - PowerPoint PPT PresentationTRANSCRIPT
Nabil Fahoum February 2013
CONSTRUCTION MANAGERS MANUAL
1
Construction Manager’s Manual
2
Program Management Procedures
3
1000Administrative3000Procurement4000Engineering5000Construction6000Quality Assurance7000Program Controls
Revised Form A-26 Bridge Rehabilitation Report
4
Quality Assurance (QA)Quality Control (QC)
The Contractor is responsible for the quality control of their Work.
The CM verifies compliance with QA/QC requirements to ensure that all components of the Contractor’s work conform to the plans, specifications, applicable standards and other requirements of the contract.
5
Daily Activity Report, Daily Report & Field Book
6
Daily Activity ReportForm A-1B Daily Report
Form A-1
Field Book
Punch List
7
A list prepared by the CM of outstanding work items and/or work items not complete in conformance with the contract.
Form A-45 PL Punch List Template.
Project Walkthroughs
8
• General Project Overview• Prior to Substantial Completion• Punch List Available to Attendees• Contract vs. Extra Work Items
Pre-Final WalkthroughWalkthrough attendees:• CM• Tollway Maintenance• Tollway PM• Tollway GEC• Tollway User Departments• Contractor (Optional)
Project Walkthroughs
9
Completed Punch List
Final Walkthrough
Final Punch List
10
Form A-45 PL Punch List Template.
Punch List Items Which Are Closed
Physically Completed
Documentation Provided To Indicate Why No Further Action Was Required By Contractor
Warranties
11
Reference Documentation
12
Tollway Website Documents
http://www.illinoistollway.com/doing-business/construction-engineering
Documentation Matrix For Construction