L-S-14-A050
MITSUI PHENOLS SINGAPORE PTE LTD
OWNER
SUMITOMO CHEMICAL ENGINEERING S'PORE PTE. LTD
CLIENT
GA-814 FA 811 JACKET PIPE REPLACE (39)
PROJECT TITLE
LINE NO.
MPS -BPA2-2014-TP042
TEST PACKAGE NO.
3/4BA-8193-B11F-360kPa/230°C1-1/2S10-0955B-B11B-HR-1400KPa/210ºC
![Page 2: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/2.jpg)
Sumitomo Chemical Engineering Co., Ltd
Blasting & Painting Inspection Report
Client : #REF! Form No. : SCEC-IF-006
Project Code : #REF! Report No. :
Job No. : #REF! Place of Insp. :
Insp. Date :
Product :
NO PROPERTIES SPECIFICATION RESULT
Remarks: If Paint Maufaturer Inspection Report attached. Please indicate report No.
Paint Representative SCEC Q. C. Inspector Client's Representative
Signature : Signature : Signature :
Name : Name : Name :
Batch No :
Paint Maufacturer :
![Page 3: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/3.jpg)
Sumitomo Chemical Engineering Co., Ltd
Date : Date : Date :
![Page 4: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/4.jpg)
P & ID
![Page 5: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/5.jpg)
![Page 6: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/6.jpg)
ISO
DRAWING
![Page 7: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/7.jpg)
![Page 8: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/8.jpg)
WELD
INSPECTION
LOGSHEET
![Page 9: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/9.jpg)
![Page 10: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/10.jpg)
Sumitomo Chemical Engineering S'pore Pte. LtdWELDING INSPECTION LOGSHEET
Form No. : SCES-IF-001
Owner : MITSUI PHENOLS SINGAPORE PTE .LTD Drawing No. : L-S-14-A050
3/4BA-8193-B11F-360kPa/230°C
Project Code : GA-814 TO FA 811 JACKET PIPE REPLACE (39) Line No. :
Job No. : -- Piping Class : B11F/B11B
S/NO.JOINT DETAILS LOCATION FIT UP WELDER TAG NO. NON-DESTRUCTIVE TESTING HYDROSTATIC / PNEUMATIC TEST
REMARKSJT NO. SIZE SCH TYPE SHOP/FIELD DATE ROOT CAP DATE RT DATE PT DATE RESULT TYPE TEST DATE RESULT
1 1 3/4" S80 B SHOP 26/10/14 TIONG KHOO YING 27/10/14 NA NA NA HYDRO WATER 01/11/14 ACC
2 2 1-1/2" S40 B SHOP 26/10/14 TIONG KHOO YING 27/10/14 NA NA NA HYDRO WATER 01/11/14 ACC
3 3 1/2" S80 F SHOP 26/10/14 TIONG KHOO YING 27/10/14 NA NA NA HYDRO WATER 01/11/14 ACC
4 4 1/2" S80 F SHOP 26/10/14 PONNUSAMY 27/10/14 NA NA NA HYDRO WATER 01/11/14 ACC
5 5 3/4" S80 B SHOP 26/10/14 PONNUSAMY 27/10/14 NA NA NA HYDRO WATER 01/11/14 ACC
6 6 1-1/2" S40 B SHOP 26/10/14 PONNUSAMY 27/10/14 NA NA NA HYDRO WATER 01/11/14 ACC
7 7 3/4" S80 B SHOP 26/10/14 NAGARAJAN 27/10/14 NA NA NA HYDRO WATER 01/11/14 ACC
8 8 1-1/2" S40 B SHOP 26/10/14 NAGARAJAN 27/10/14 NA NA NA HYDRO WATER 01/11/14 ACC
9 9 1/2" S80 F SHOP 26/10/14 NAGARAJAN 27/10/14 NA NA NA HYDRO WATER 01/11/14 ACC
10 10 1/2" S80 F SHOP 26/10/14 NAGARAJAN 27/10/14 NA NA NA HYDRO WATER 01/11/14 ACC
11 11 3/4" S80 B SHOP 26/10/14 NAGARAJAN 27/10/14 NA NA NA HYDRO WATER 01/11/14 ACC
12 12 1-1/2" S40 B SHOP 26/10/14 NAGARAJAN 27/10/14 NA NA NA HYDRO WATER 01/11/14 ACC
13 13 3/4" S80 B SHOP 26/10/14 NAGARAJAN 27/10/14 NA NA NA HYDRO WATER 01/11/14 ACC
14 14 1-1/2" S40 B SHOP 26/10/14 NAGARAJAN 27/10/14 NA NA NA HYDRO WATER 01/11/14 ACC
15 15 1/2" S80 F SHOP 26/10/14 NAGARAJAN 27/10/14 NA NA NA HYDRO WATER 01/11/14 ACC
16 16 1/2" S80 F SHOP 26/10/14 PONNUSAMY 27/10/14 NA NA NA HYDRO WATER 01/11/14 ACC
17 17 3/4" S80 B SHOP 26/10/14 PONNUSAMY 27/10/14 NA NA NA HYDRO WATER 01/11/14 ACC
18 18 1-1/2" S40 B SHOP 26/10/14 PONNUSAMY 27/10/14 NA NA NA HYDRO WATER 01/11/14 ACC
B=Girth Butt Weld C=Branch Connection Weld F =Fillet Weld T=Threaded Joint L=Longitudinal Butt Weld
Prepared by : Checked by : Verified by :contrator : SCES : MPS :
1-1/2S10-0955B-B11B-HR-1400kPa/210°C
Legend :
![Page 11: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/11.jpg)
Sumitomo Chemical Engineering S'pore Pte. Ltd(Name & signature) (Name & signature) (Name & signature)
![Page 12: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/12.jpg)
TEST
PLAN
![Page 13: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/13.jpg)
![Page 14: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/14.jpg)
PRESSURE
TEST
REPORT
![Page 15: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/15.jpg)
![Page 16: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/16.jpg)
Sumitomo Chemical Engineering S'pore Pte. Ltd
PRESSURE TEST REPORT
Owner : MITSUI PHENOLS SINGAPORE PTE.LTD Form No. : SCES-IF-002
Project Code : GA-814 FA 811 JACKET PIPE REPLACE (39) P & ID No. :
Job No : --
DRAWING NO. LINE NO
1 L-S-14-A050 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
TYPE OF TEST : HYDRO / PNEUMATIC
MEDIUM OF TEST : WATER / COMPRESSED AIR / N2 Others :
TEST PRESSURE : 21.00
: 21.0
HOLDING TIME : 1 HOURS
TEST RESULT : The result were found to be satisfactory.
REMARKS : There were no pressure drop, leaks and piping abnormalities detected during
the time of testing.
TESTED BY : WITNESSED BY : VERIFIED BY :
DATE : DATE : DATE :
SIGN. : SIGN. : SIGN :
E022-05
1-1/2S10-0955B-B11B-HR-1400kPa/210°C
kPaG / BAR / PSIG / Kgf/Cm²
ACTUAL TEST PRESSURE
kPaG / BAR / PSIG / Kgf/Cm²
![Page 17: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/17.jpg)
Sumitomo Chemical Engineering S'pore Pte. Ltd
PRESSURE TEST REPORT
Owner : MITSUI PHENOLS SINGAPORE PTE.LTD Form No. : SCES-IF-002
Project Code : GA-814 TO FA 811 JACKET PIPE REPLACE (39) P & ID No. :
Job No : --
DRAWING NO. LINE NO
1 L-S-14-A050 1 3/4BA-8193-B11F-360kPa/230°C
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
TYPE OF TEST : HYDRO / PNEUMATIC
MEDIUM OF TEST : WATER / COMPRESSED AIR / N2 Others :
TEST PRESSURE : 4.00
: 5.0
HOLDING TIME : 1 HOURS
TEST RESULT : The result were found to be satisfactory.
REMARKS : There were no pressure drop, leaks and piping abnormalities detected during
the time of testing.
TESTED BY : WITNESSED BY : VERIFIED BY:
DATE : DATE : DATE :
SIGN. : SIGN. : SIGN :
E022-05
kPaG / BAR / PSIG / Kgf/Cm²
ACTUAL TEST PRESSURE
kPaG / BAR / PSIG / Kgf/Cm²
![Page 18: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/18.jpg)
LINE CHECK
PRE-PRESSURE TEST
CHECK LIST
![Page 19: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/19.jpg)
Sumitomo Chemical Engineering S'pore Pte. Ltd
VISUAL INSPECTION / PRE-PRESSURE TEST CHECK LIST
Owner : MITSUI PHENOLS SINGAPORE PTE.LTD Form No. : SCES-IF-003
Project Code : GA-814 FA 811 JACKET PIPE REPLACE (39) Drawing No. : L-S-14-A050
Job No. : -- Line No. : 3/4BA-8193-B11F-360kPa/230°C
Piping Class : B11F/B11B
(If pressure test more that one line)
S/n Check Description Status Remarks
LINE CHECK
1 Completion of Visual Inspection of all welding.
2 Installed line is in accordance with ISO drawing and P & ID.
3 Slope of the pipeline is as per drawing, where applicable.
4 Fabricate of all support according to drawing. (Construction Standard)
5
6
7 Completion of bolts tightening.
8 Low point drain & High point vent provided.
PRE-PRESSURE TEST CHECK
1 All category punch list items completed.
2
3 Test gauges used with ranges within 1.5 ~ 4 times of line test pressure.
4 Non-Destructive Testing / PWHT is completed. (if any)
5 Overflow at the highest vent point prior to apply pressure test.
6 All blind location and temporary spool piece had proper install.
7 Gate valves, ball valves and others are opened.
8 Check valves and relief valves had been removed.
9 Safety, Hazardous tape to barricade off area, signboard is display.
Contractor's Representative SCES Representative MPS RepresentativeName : Name : Name :
Sign : Sign : Sign :Date : Date : Date :
Installed of all valves and other in line items are checked for their flow direction. E.g. Globe valve, check valve, orifice etc.
Adequate access provided for operation & maintenance of valves / filters etc.
Current calibration validity of gauges is checked. (within twelve (12) months validity)
![Page 20: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/20.jpg)
Sumitomo Chemical Engineering S'pore Pte. Ltd
VISUAL INSPECTION / PRE-PRESSURE TEST CHECK LIST
Owner : MITSUI PHENOLS SINGAPORE PTE.LTD Form No. : SCES-IF-003
Project Code : GA-814 FA 811 JACKET PIPE REPLACE (39) Drawing No. : L-S-14-A050
Job No. : -- Line No. : 1.1/2S10-0955b-B11B-HR-1400kPa/210°c
Piping Class : B11F/B11B
(If pressure test more that one line)
S/n Check Description Status Remarks
LINE CHECK
1 Completion of Visual Inspection of all welding.
2 Installed line is in accordance with ISO drawing and P & ID.
3 Slope of the pipeline is as per drawing, where applicable.
4 Fabricate of all support according to drawing. (Construction Standard)
5
6
7 Completion of bolts tightening.
8 Low point drain & High point vent provided.
PRE-PRESSURE TEST CHECK
1 All category punch list items completed.
2
3 Test gauges used with ranges within 1.5 ~ 4 times of line test pressure.
4 Non-Destructive Testing / PWHT is completed. (if any)
5 Overflow at the highest vent point prior to apply pressure test.
6 All blind location and temporary spool piece had proper install.
7 Gate valves, ball valves and others are opened.
8 Check valves and relief valves had been removed.
9 Safety, Hazardous tape to barricade off area, signboard is display.
Contractor's Representative SCES Representative MPS RepresentativeName : Name : Name :
Sign : Sign : Sign :Date : Date : Date :
Installed of all valves and other in line items are checked for their flow direction. E.g. Globe valve, check valve, orifice etc.
Adequate access provided for operation & maintenance of valves / filters etc.
Current calibration validity of gauges is checked. (within twelve (12) months validity)
![Page 21: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/21.jpg)
PUNCH LIST
![Page 22: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/22.jpg)
![Page 23: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/23.jpg)
Sumitomo Chemical Engineering Singapore Pte. Ltd.
PUNCH LIST
Owner : MITSUI PHENOLS SINGAPORE PTE. LTD Form No. : SCEC-IF-004
Project Code : GA-814 FA 811 JACKET PIPE REPLACE (39) Drawing No. : L-S-14-A050
Job No. : Line No. :
Piping Class : B11F/B11B
S/NO. PUNCH ITEMS PUNCH IN DATE PUNCH OUT DATE REMARKS
PUNCHED BY : REACTIFIED BY:
DATE : DATE :
SIGN. : SIGN. :
--
3/4BA-8193-B11F-360kPa/230°C1-1/2S10-0955b-B11B-HR-1400kPa/210°C
![Page 24: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/24.jpg)
BLANKING LIST
![Page 25: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/25.jpg)
![Page 26: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/26.jpg)
Sumitomo Chemical Engineering Co., Ltd.
BLANKING LIST
Owner : MITSUI PHENOLS SINGAPORE PTE.LTD Form No. : SCES-IF-005
Project Code : GA-814 FA 811 JACKET PIPE REPLACE (39) Drawing No. : L-S-14-A050
Job No. : -- P&ID No. :
Piping Class : B11F/B11B
Blind No. Size Rating Thickness Line No.CONTRATOR SCES OWNER
DateRemarksSIGN SIGN SIGN
IN OUT IN OUT IN OUT IN OUT
E022-05
![Page 27: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/27.jpg)
FLUSHING
REPORT
![Page 28: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/28.jpg)
![Page 29: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/29.jpg)
Sumitomo Chemical Engineering Co., Ltd
FLUSHING REPORT
Owner : MITSUI PHENOLS SINGAPORE PTE.LTD Form No. : SCEC-IF-013
Project Code : GA-814 FA 811 JACKET PIPE REPLACE (39) P & ID No. :
Job No : --
DRAWING NO. LINE NO
1 L-S-14-A050 1 3/4BA-8193-B11F-360kPa/230°C
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
FLUSH DATE :
FLUSH MEDIUM : WATER / COMPRESSED AIR / OIL Others :
TYPE OF INSPECTION :
JUDGMENT :
REMARKS :
FLUSH BY : WITNESSED BY : VERIFIED BY:
DATE : DATE : DATE :
SIGN. : SIGN. : SIGN. :
E022-05
1-1/2S10-0955b-B11B-HR-1400kPa/210°C
![Page 30: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/30.jpg)
OVERALL
TIGHTNESS
TEST REPORT
![Page 31: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/31.jpg)
![Page 32: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/32.jpg)
OVERALL TIGHTNESS TEST REPORT
Owner : MITSUI PHENOLS SINGAPORE PTE.LTD Form No. : SCEC-IF-016
Project Code : GA-814 FA 811 JACKET PIPE REPLACE (39) Drawing No. : L-S-14-A050
Job No. : --
Line No. : 1-1/2S10-0955b-B11B-HR-1400KPa/210ºC Line No. :
Equipment No. / Identification No. : -- Piping Class : B11F/B11B
Tighting Method
S/n Check Description Yes No Remarks
1 All bolts & nuts are in good condition
2 Bolts,nuts & gasket are used as per isometrics drawing
3 All Flange are tightened properly with permanent gasket
4 All valve are properly installed
5 Bolt, nuts & gasket are install at mechanical joints
Legend: S = Satisfactory , R = To be Rectify
Contractor's Representative SCES Representative MPS RepresentativeName : Name : Name :
Sign : Sign : Sign :Date : Date : Date :
3/4BA-8193-B11F-360kPa/230°C
: Manual
![Page 33: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/33.jpg)
OVERALL TIGHTNESS TEST REPORT
SCEC-IF-016
B11F/B11B
Remarks
3/4BA-8193-B11F-360kPa/230°C
![Page 34: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/34.jpg)
CALIBRATION
CERTIFICATE
![Page 35: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/35.jpg)
![Page 36: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/36.jpg)
MATERIALS MILL
CERTIFICATE
![Page 37: Mps Sdm 2014 Tp042](https://reader035.vdocuments.mx/reader035/viewer/2022062409/55cf9168550346f57b8d4c7c/html5/thumbnails/37.jpg)