LOGO
Objectives
2
Define the stages involved in project planning and construction1
Conduct project analysis2
Draw a rough sketch of your project3
Draw the block diagram for your project prototype.4
![Page 3: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project](https://reader035.vdocuments.mx/reader035/viewer/2022062421/56649ccb5503460f9499404d/html5/thumbnails/3.jpg)
LOGO
Objectives
3
Prepare the orthographic drawing for the prototype using AutoCAD or any other software.5
Prepare a Production Flowchart using Gantt Chart6
Complete the Project Planning Report7
![Page 4: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project](https://reader035.vdocuments.mx/reader035/viewer/2022062421/56649ccb5503460f9499404d/html5/thumbnails/4.jpg)
LOGO
Project Planning & Construction
4
project analysis
Sketching
System / Circuit diagram
orthographic drawing
production flowchart
Project Planning Report
![Page 5: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project](https://reader035.vdocuments.mx/reader035/viewer/2022062421/56649ccb5503460f9499404d/html5/thumbnails/5.jpg)
LOGO
Analysis
5
1. What is the project challenge?
2. Will the system control a sequence of operations? What are they?
3. Is it a closed loop system?
4. What inputs are required?
![Page 6: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project](https://reader035.vdocuments.mx/reader035/viewer/2022062421/56649ccb5503460f9499404d/html5/thumbnails/6.jpg)
LOGO6
5. What outputs are required?
6. What type of control does the system need?
7. What type of controller do you plan to use, and why?
8. Are there any other special considerations?
Analysis
![Page 7: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project](https://reader035.vdocuments.mx/reader035/viewer/2022062421/56649ccb5503460f9499404d/html5/thumbnails/7.jpg)
LOGO
Sketching
7
draw a rough sketch of your project prototype
![Page 8: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project](https://reader035.vdocuments.mx/reader035/viewer/2022062421/56649ccb5503460f9499404d/html5/thumbnails/8.jpg)
LOGO
System Diagram or Block Diagram
8
![Page 9: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project](https://reader035.vdocuments.mx/reader035/viewer/2022062421/56649ccb5503460f9499404d/html5/thumbnails/9.jpg)
LOGO
Exercise 1
9
Draw the block diagram for the water level control system
by following the sequence of actions are listed below:
![Page 10: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project](https://reader035.vdocuments.mx/reader035/viewer/2022062421/56649ccb5503460f9499404d/html5/thumbnails/10.jpg)
LOGO
Exercise 1
10
- A switch (pressed by the visitor) will turn on the circuit.- The conductivity sensor will provide a feedback to the 555 timer.- The timer will produce pulses with the required time delay.- The pulses will turn the transistor driver ON and OFF repeatedly with the set time delay.- The driver turns the relay ON and OFF, which in turn turns ON and off the pump.
![Page 11: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project](https://reader035.vdocuments.mx/reader035/viewer/2022062421/56649ccb5503460f9499404d/html5/thumbnails/11.jpg)
LOGO
System Diagram or Block Diagram
11
Now, list the sequence of steps and draw the block diagram for
your project prototype.
![Page 12: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project](https://reader035.vdocuments.mx/reader035/viewer/2022062421/56649ccb5503460f9499404d/html5/thumbnails/12.jpg)
LOGO
Circuit Diagram
12
![Page 13: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project](https://reader035.vdocuments.mx/reader035/viewer/2022062421/56649ccb5503460f9499404d/html5/thumbnails/13.jpg)
LOGO
Circuit Diagram
13
![Page 14: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project](https://reader035.vdocuments.mx/reader035/viewer/2022062421/56649ccb5503460f9499404d/html5/thumbnails/14.jpg)
LOGO
Circuit Diagram
14
Draw related circuit diagrams for your project prototype
![Page 15: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project](https://reader035.vdocuments.mx/reader035/viewer/2022062421/56649ccb5503460f9499404d/html5/thumbnails/15.jpg)
LOGO
Orthographic Drawing
15
AutoCAD or any other software could be used to come up with a cleardrawing of the intended prototype.
Note : that the exact dimensions needto be marked clearly and all details of the design and materials must beincluded in the drawing.
![Page 16: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project](https://reader035.vdocuments.mx/reader035/viewer/2022062421/56649ccb5503460f9499404d/html5/thumbnails/16.jpg)
LOGO
Orthographic Drawing
1616
![Page 17: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project](https://reader035.vdocuments.mx/reader035/viewer/2022062421/56649ccb5503460f9499404d/html5/thumbnails/17.jpg)
LOGO
Production Flowchart
17
A flowchart is a type of diagram that represents an algorithm or process, showing the steps as
boxes of various kinds, and their order by connecting them with
arrows.
![Page 18: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project](https://reader035.vdocuments.mx/reader035/viewer/2022062421/56649ccb5503460f9499404d/html5/thumbnails/18.jpg)
LOGO
Production Flowchart
18