Page 1: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project

LOGO1

MSD Module 3

Planning

Page 2: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project

LOGO

Objectives

2

Define the stages involved in project planning and construction1

Conduct project analysis2

Draw a rough sketch of your project3

Draw the block diagram for your project prototype.4

Page 3: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project

LOGO

Objectives

3

Prepare the orthographic drawing for the prototype using AutoCAD or any other software.5

Prepare a Production Flowchart using Gantt Chart6

Complete the Project Planning Report7

Page 4: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project

LOGO

Project Planning & Construction

4

project analysis

Sketching

System / Circuit diagram

orthographic drawing

production flowchart

Project Planning Report

Page 5: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project

LOGO

Analysis

5

1. What is the project challenge?

2. Will the system control a sequence of operations? What are they?

3. Is it a closed loop system?

4. What inputs are required?

Page 6: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project

LOGO6

5. What outputs are required?

6. What type of control does the system need?

7. What type of controller do you plan to use, and why?

8. Are there any other special considerations?

Analysis

Page 7: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project

LOGO

Sketching

7

draw a rough sketch of your project prototype

Page 8: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project

LOGO

System Diagram or Block Diagram

8

Page 9: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project

LOGO

Exercise 1

9

Draw the block diagram for the water level control system

by following the sequence of actions are listed below:

Page 10: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project

LOGO

Exercise 1

10

- A switch (pressed by the visitor) will turn on the circuit.- The conductivity sensor will provide a feedback to the 555 timer.- The timer will produce pulses with the required time delay.- The pulses will turn the transistor driver ON and OFF repeatedly with the set time delay.- The driver turns the relay ON and OFF, which in turn turns ON and off the pump.

Page 11: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project

LOGO

System Diagram or Block Diagram

11

Now, list the sequence of steps and draw the block diagram for

your project prototype.

Page 12: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project

LOGO

Circuit Diagram

12

Page 13: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project

LOGO

Circuit Diagram

13

Page 14: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project

LOGO

Circuit Diagram

14

Draw related circuit diagrams for your project prototype

Page 15: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project

LOGO

Orthographic Drawing

15

AutoCAD or any other software could be used to come up with a cleardrawing of the intended prototype.

Note : that the exact dimensions needto be marked clearly and all details of the design and materials must beincluded in the drawing.

Page 16: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project

LOGO

Orthographic Drawing

1616

Page 17: LOGO 1. Objectives 2 Define the stages involved in project planning and construction 1 Conduct project analysis 2 Draw a rough sketch of your project

LOGO

Production Flowchart

17

A flowchart is a type of diagram that represents an algorithm or process, showing the steps as

boxes of various kinds, and their order by connecting them with

arrows.