LEED Credits Guide
to Eaton Products and Services
Green Building
Design and
Construction
LEED-NC v2009
Abigger impact on the marketplace, asmaller footprint
on the world.
-
7/27/2019 LEED Credit GUide
2/16
Introduction 3
Insidethegreenbuilding 46
EatonimpactonLEED-NCv2009 7
SustainableSites(SS) 7
SS Credit 4.3:AlternativeTransportation: Low-Emitting&Fuel-EfficientVehicles 7
SS Credit 5.2:SiteDevelopment: MaximizeOpenSpace 7
SS Credit 8:LightPollutionReduction 7 Energy&Atmosphere(EA) 810
EA Prerequisite 1:Fundamental CommissioningofBuildingEnergySystems 8
EA Prerequisite 2:MinimumEnergyPerformance 9
EA Credit 1:OptimizeEnergyPerformance 9
EA Credit 2:On-SiteRenewableEnergy 10
EA Credit 3:EnhancedCommissioning 10
EA Credit 5:Measurement&Verification 10
Materials&Resources(MR) 11
MR Credit 2:ConstructionWasteManagement: Divert50%fromDisposal 11
IndoorEnvironmentalQuality(IEQ) 1112IEQ Prerequisite 1:MinimumIAQPerformance 11
IEQ Credit 2:IncreasedVentilation 11
IEQ Credit 5:IndoorChemical&Pollutant SourceControl 11
IEQ Credit 6.1:ControllabilityofSystems:Lighting12
IEQ Credit 7.1:ThermalComfort:Design 12
Innovation&Design(ID) 13
ID Credit 1:Innovation&Design 13
ID Credit 2:LEEDAccreditedProfessional 13
AdditionalSustainability& RegionalManufacturingFacilities 1415
ElectricalBalanceofSystem forCommercialInstallations 16
EATON CORPORATION LEED Credits Guide to Eaton Products and Services2 www.eaton.com/greenbuildings 877-ETN-CARE
-
7/27/2019 LEED Credit GUide
3/16
ThePowerto make a
DifferenceEnvironmental stewardship, innovation and leadership
are becoming increasingly important as we take steps
to create a sustainable environment for future generations
by going green. This is particularly important when it comes
to construction of new buildings or major renovations of
older ones. To this end, Eaton Corporation offers a broad
range of energy-efficient and environmentally friendly
electrical solutions that can help a building go green
and qualify for Leadership in Energy and Environmental
Design (LEED) credits through the U.S. Green BuildingsCouncil (USGBC).
EATON CORPORATION LEED Credits Guide to Eaton Products and Services
The LEED Green Building RatingSystem is the nationallyaccepted benchmark for thedesign, construction and opera-tion of high-performance greenbuildings. LEED gives buildingowners and operators the toolsthey need to have an immedi-ate and measurable impact ontheir buildings performance.LEED promotes a whole-buildingapproach to sustainability by
recognizing performance in fivekey areas of human and envi-ronmental health: sustainablesite development, water sav-ings, energy efficiency, materialsselection and indoor environ-mental quality.*
This document provides archi-tects, specifying engineers,designers, building owners anothers an overview of Eatonproducts that collectively havethe potential to contribute upto 48 of the 110 total creditpoints toward LEED certifica-tion. The information containein this document aligns withGreen Building Design andConstruction, 2009 Edition,
for the Design, Constructionand Major Renovations ofCommercial and InstitutionalBuildings including Core & Shand K-12 School Projects.
*USGBC Web site.
www.eaton.com/greenbuildings 877-ETN-CARE
EATON:SUSTAINABLEBYDESIGN
At Eaton, sustainability isnt an autonomous program or initiative. Its how
we do businessand its an increasing part of our business success. We have
been living it for years as Doing Business Right,and it is central to our
vision to become the most admired company in our markets.
Eaton is developing customer solutions that drive sustainable growth
around the globe, including efficiently using and conserving global resources,
developing energy-efficient products, reducing emissions, protecting theenvironment, and volunteering time to help build stronger communities.
Throughout Eaton, we are building a culture of responsibility that encourages
every employee to ask the questions that lead to more sustainable processes
and practices, and help our company support a sustainable future.
Here are just a few example of Eatons commitment to sustainability.
No matter where you are in the U.S. or Canada, an Eaton LEED Accredited
Professional is nearby to assist you with your green building strategies
to achieve LEED certification.
Because we believe financial performance and social responsibility go ha
in hand, weve combined our annual and sustainability reports since 200
Eaton was ranked in the top 10 percent of the inaugural Newsweek ranki
of The Greenest Big Companies in America.
In early 2010, we joined the Department of Energys Save Energy Now
LEADER program, pledging to reduce our energy use by 25 percent,
indexed to sales, between 2006 and 2016.
In 2009 we nearly doubled our portfolio of Eaton Green Solutions
products that have proven through rigorous evaluation to deliver
exceptional, industry-leading environmental benefits to customers,
consumers and our communities.
Eatons 9395 UPS is the worlds first electrical product to achieve SMaRT
(Sustainable Materials Rating Technologyr) Gold certification.
-
7/27/2019 LEED Credit GUide
4/16
Inside the green building
EATON CORPORATION LEED Credits Guide to Eaton Products and Services4
Eaton can help your building go green and
qualify for LEED credits through the USGBC
Tour this green building at
www.eaton.com/greenbuildings
1
9
15
5
10
2
6
13
84
12 14
3
711
16
www.eaton.com/greenbuildings 877-ETN-CARE
-
7/27/2019 LEED Credit GUide
5/16
1 Pow-R-CommandLightingControls
Automatically turn offthe lights when a spaceis empty; reduce artificiallighting requirements;energy savings of 10%30%
2 UninterruptiblePowerSystems(UPS)
50% less power loss com-pared with traditional UPS
3 VariableFrequencyDrives
Lower the demands ona motor, extending life;energy savings of 10%50%
4 HarmonicMitigatingTransformers
Fewer harmonics meansmore efficient energyconsumption overall
EATON CORPORATION LEED Credits Guide to Eaton Products and Services
10 IntegratedFacilitiesSystems(IFS)
Switchboard structurereduces material for powersystems; reduces requiredfloor space by 40%
11 Medium-VoltageSwitchgear
Environmentally friendlyinsulation, avoids SF6gasan extremely harmfulgreenhouse gas
12 RefurbishingServices
Extend useful life of existingequipment, preservenatural resources
13 CircuitBreakers
Less wattage loss than withfuses; can be reset, whilefuses are typically discardedafter they fail
5 PowerXpert
SoftwareandMeters
Monitor energy consump-tion; identify energy savingsopportunities and powerquality issues
6 EnergyAudits
Eaton engineers identifysolutions to increaseenergy efficiencies
7 PowerFactorCorrectionCapacitorsandFilters
Decrease energyconsumption andimprove power quality
8 ParallelingSwitchgear
Manage critical transitionfrom utility power toon-site power sources;make practical use of alter-native energy systems
9 AutomaticTransferSwitches
Transfer essential loadsand electrical distributionsystems from utility powerto green alternativeenergy sources
14 IntegratedPowerAssemblies(IPA)
Prefabricated, modulardesigns reduce packagingwaste, save space
15 Busway
Use less copper and steelcompared with cable andconduit; waste lessmaterial because buswayis built to exact length
Pow-R-StationEElectricVehicleSupplyEquipmen(EVSE)
An electric vehicle (EV)
charging solution reducesemissions. Smart Grid-ready technology providepower where you need it,when you need it
Protect the environmentSave energy
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
www.eaton.com/greenbuildings 877-ETN-CARE
16
16
Eaton solutions Sustainable Energyand Materials& Indoor Innovation Sites(SS) Atmosphere Resources Environment Design(ID) (EA) (MR) Quality(IEQ)
SaveEnergy
Pow-R-Command Lighting Controls 4 4 4 4
Uninterruptible Power Systems (UPS) 4 4
Variable Frequency Drives 4 4
Harmonic Mitigating Transformers 4
Power Xpert Software and Meters 4
Energy Audits 4
Power Factor Correction Capacitors and Filters 4
Paralleling Switchgear 4
Automatic Transfer Switches 4 ProtecttheEnvironment
Integrated Facilities Systems (IFS) 4
Medium-Voltage Switchgear 4
Refurbishing Services 4
Circuit BreakersA
Integrated Power Assemblies (IPA) 4
BuswayA
Pow-R-Station Electric Vehicle Supply Equipment (EVSE) 4
MaximumCredits 5 31+prerequisites 2 4+prerequisites 6
ARefer to page 14Additional Sustainability
-
7/27/2019 LEED Credit GUide
6/16EATON CORPORATION LEED Credits Guide to Eaton Products and Services6
2 3
65
4
7
9
8
121110
15143
Saveenergy
Pow-R-Command Lighting Controls
Uninterruptible Power Systems (UPS)
Variable Frequency Drives
Harmonic Mitigating Transformers
Power Xpert Software and Meters
Energy Audits
Power Factor Correction Capacitors and Filters
Paralleling Switchgear
Automatic Transfer Switch
1
2
3
4
5
6
7
8
9
16
Protecttheenvironment
Integrated Facilities Systems (IFS)
Medium-Voltage Switchgear
Refurbishing Services
Circuit Breakers
Integrated Power Assemblies (IPA)
Busway
Pow-R-Station Electric Vehicle Supply Equipment (EVSE)
10
11
12
13
14
15
16
www.eaton.com/greenbuildings 877-ETN-CARE
-
7/27/2019 LEED Credit GUide
7/16
Intent:
Provideahighratioofopenspacetodevelop-mentfootprinttopromote
biodiversity.
Requirements:*
Reducethedevelopmentfootprintbyprovidingveg-etatedopenspacewithinprojectboundariessuchthattheamountofopenspaceexceedslocalzoningrequire-mentsby25%.
Eaton impact on LEED-NC v2009
*Note: Requirements under LEED-NC v2009 in the following pages have been abridged for brevity.
Sustainable Sites (SS)
Intent:
Minimizelighttrespass
fromthebuildingandsite,reducesky-glowtoincreasenightskyaccess,improvenighttimevisibilitythroughglarereduction,andreducedevelopmentimpactonnocturnalenvironments.
RelatedEatonSolutions:
Integrated FacilitiesSystems (IFS)
The compact design of theIFS reduces the space requiredfor electrical distributionequipment by as much as40%. A smaller electrical roomlayout can help lead to asmaller building footprint.
EATON CORPORATION LEED Credits Guide to Eaton Products and Services
Requirements:*
FORINTERIORLIGHTING
Reducetheinputpower(byautomaticdevice)ofallnon-emergencyinteriorluminaireswithadirectlineofsighttoanyopeningsintheenvelope(translucentortransparent)byatleast50%between11p.m.and5a.m.After-hoursoverridemaybeprovidedbyamanualoroccupant-sensingdevice,providedtheoverridelastsnomorethan30minutes.
Uninterruptible PowerSystems (UPS)
Eatons new Powerware 9395UPS has a small footprint,
requiring 50% less floorspace than traditional UPSsystem designs.
Integrated PowerAssemblies (IPA)
The IPA is a prefabricatedmetal enclosure containingEaton power distribution andindustrial control products.
In addition to electricalswitchgear, motor controlcenters and communicationsystems, IPAs contain other
auxiliary equipment neces-sary to complete the projectin the minimum footprintrequired. By reducing thespace required for the electrcal distribution equipment,owners can reduce the overdevelopment footprint.
RelatedEatonSolutions:
Pow-R-Command
Lighting ControlsApply lighting control toreduce interior and exteriorlighting levels that adjust withavailable daylighting.
Fluorescent dimming fordaylight harvesting. Providesability to automatically main-tain preset fluorescent levels.Utilizes a light sensor inputto monitor and control thelighting levels. Also provides:
Impact on LEED credit qualification
Greenest Greener Gr
www.eaton.com/greenbuildings 877-ETN-CARE
Event scheduling
Time scheduling and
load override Calculates run-time for
lamps and ballasts, tracksON or OFF cycles
Wireless I/O Module: Giveflexibility to control lightiwithout having to run anyadditional wiring
Intent:
Toreducepollutionandlanddevelopmentimpactsfromautomobileuse.
Requirements:*
Installalternative-fuelfuelingstationsfor3%ofthetotalvehicleparkingcapacityofthesite.
RelatedEatonSolutions:
Pow-R-Station ElectricVehicle Supply Equipment(EVSE)
Eatons Electric VehicleCharging Supply Equipmentfor Level 1, 2 and 3 (future)charging stations and asso-ciated Power DistributionEquipment provide suchalternative-fuel transportatioamenities.
SS Credit 4.3:AlternativeTransportation:Low-Emitting&Fuel-EfficientVehicles3Points
SS Credit 5.2:SiteDevelopment:MaximizeOpenSpace1Point
SS Credit 8:LightPollutionReduction1Point
-
7/27/2019 LEED Credit GUide
8/16
Power XpertMetering Systems
Commissioning agents canuse Eatons Power Xpertmeters to detect and analyzepotentially costly powerquality problems, as well as
monitor energy consumptionand efficiency in real timethroughout a building. PowerXpert software aggregatesinformation into understand-able charts and graphs thatallow users to easily identifyenergy-saving opportunities.
EATON CORPORATION LEED Credits Guide to Eaton Products and Services8
Energy & Atmosphere (EA)
Intent:
Verifythatthebuildingsenergy-relatedsystemsareinstalled,calibratedandper-formaccordingtotheownersprojectrequirements,basisofdesignandconstruction
documents.Requirements:*
Commissioningprocessactivi-tiesmustbecompletedforthefollowingenergy-relatedsystems,ataminimum:heating,ventilating,aircon-ditioningandrefrigeration(HVAC&R)systems,lightinganddaylightingcontrols,andrenewableenergysystems(e.g.,wind,solar).Properveri-ficationoftheinstallationandperformanceofsuchsystemsisnecessary.
RelatedEatonSolutions:
Pow-R-CommandLighting Controls
Programming of thelighting controls and anydaylighting control aspectsof the lighting system mustbe commissioned for optimalperformance. Eaton providesa wide variety of services frominitial design consultation tostartup, commissioning andongoing monitoring.
*Note: Requirements under LEED-NC v2009 in the following pages have been abridged for brevity.
Impact on LEED credit qualification:
Greenest Greener Green
Variable Frequency Drives
Used as a commissioningtool, software associated withEatons Variable FrequencyDrives can verify installationand performance character-istics of the buildings HVAC
systems, especially when usedin conjunction with PowerXpert metering and software.
EA Prerequisite 1:FundamentalCommissioningofBuildingEnergySystemsRequired
www.eaton.com/greenbuildings 877-ETN-CARE
-
7/27/2019 LEED Credit GUide
9/16
RelatedEatonSolutions:
Pow-R-Command Lighting Controls
EA Prerequisite 2: Incorporating use of creative controls such as occupancy sensors, timers and daylight harvesting systems wiassist in reducing building energy consumption.
EA Credit 1: Using task and ambient lighting control strategies will enable building occupants to adjust lighting levels to meettheir task needs as well as personal preferences and will reduce lighting energy consumption by 10%30%.
Uninterruptible Power Systems (UPS)
EA Prerequisite 2: High efficiency of 95% reduces total energy losses by more than 50% when compared with traditional UPSs.EA Credit 1: Eaton BladeUPS go even further with a rating upwards of 97% efficiency, further minimizing energy usage.
Variable Frequency Drives
EA Prerequisite 2: Incorporating use of variable frequency drives on HVAC system components such as fans and pump motorsprovides for significantly improved efficiency, energy savings and optimization. The energy savings can be dramatic. For example,the speed of a centrifugal fan reduced by only 1/3 will save more than 70% in energy consumption.
EA Credit 1: Frequency drives adjust a motors speed to closely match output requirements, resulting in typical energy savings o10%50%. Soft-start motor controls lower the demands on a motor during startup, conserving energy and extending the life of themechanical system.
Power Factor Correction Capacitors and Filters
Power factor correction saves energy and can also reduce the required sizes of electrical equipment due to lower kVA. Power factocorrection enables your organization to become more environmentally responsible without reducing the amount of working poweavailable. This corresponds to additional savings in material costs that would have been used to produce larger electrical equipmeand distribution systems.
As part of a power factor correction system, harmonic filters resolve the power anomalies caused by harmonics that shortenequipment life and trigger unexpected shutdowns. By controlling harmonics, current levels in the system are reduced and heatis removed from the system. This, in turn, minimizes troublesome issues such as blown fuses, damaged motors and failedtransformers, extending equipment life.
Harmonic Mitigating Transformers
Use of harmonic mitigating transformers (HMTs) smooth out the energy-use curve. The increasing amount of electronic equipmenin facilities increases the amount of nonlinear loads, reducing the efficiency of electronic equipment and creating overload condi-tions. HMTs correct this situation.
The results are 30% less power loss when compared with standard delta-wye designed transformers.
Intent:
Achieveincreasinglevelsofenergyperformanceabovethebaselineintheprerequisitestandardtoreduceenviron-mentalandeconomicimpactsassociatedwithexcessive
energyuse.Requirements:*
Demonstrateapercentageimprovementintheproposedbuildingperformancerating
comparedwiththebaselinebuildingperformanceratingTheminimumenergycostsavingspercentageforeachpointthresholdisasfollows
NewBuildingsPoints12%48%(119points)
ExistingBuildingRenovationsPoints8%44%(119points)
EA Credit 1:OptimizeEnergyPerformance119Points
EATON CORPORATION LEED Credits Guide to Eaton Products and Services
Intent:
Establishtheminimumlevelofenergyefficiencyfortheproposedbuildingandsystemstoreduceenviron-mentalandeconomicimpactsassociatedwithexcessive
energyuse.Requirements:*
Demonstrateapercentageimprovementintheproposedbuildingperformanceratingcomparedwiththebaseline
buildingperformanceratingperASHRAE/IESNAStandard90.1.2007ORcomplywiththeprescriptivemeasuresoftheASHRAEAdvancedEnergyDesignGuideforSmallOfficeBuildings2004ORcomply
withtheprescriptivemeasuresidentifiedintheAdvancedBuildingsCorePerformanceGuidedevelopedbytheNewBuildingsInstitute.
*Note: Requirements under LEED-NC v2009 in the following pages have been abridged for brevity.
Impact on LEED credit qualification
Greenest Greener Gr
EA Prerequisite 2: MinimumEnergyPerformanceRequired
www.eaton.com/greenbuildings 877-ETN-CARE
-
7/27/2019 LEED Credit GUide
10/16
For more details about solarbalance of systems, refer tothe back cover.
Automatic Transfer Switches& Paralleling Switchgear
A transfer switch is a criti-
cal component of any on-sitepower system. When thenormal source of power islost, a transfer switch quicklyand safely shifts the loadcircuit from the normal sourceof power to the alternatesource of power. This permits
buildingandmaintenancereviewareimplemented.Aplanforresolvingoutstandingcommissioning-relatedissuesmustbeincluded.
RelatedEatonSolutions:
Pow-R-CommandLighting Controls
Power Xpert Softwareand Meters
Variable Frequency Drives
in conjunction with monitoringand trend logging of signifi-cant energy systems for
ongoing accountability ofbuilding energy performance.
Variable Frequency Drives
With Eatons VFDs, track per-formance of HVAC systems(kWh), and use diagnostictools to identify opportunitiesto further reduce energy usageand understand the contri-bution to the overall energyreduction of the building.
EATON CORPORATION LEED Credits Guide to Eaton Products and Services10
Intent:
Beginthecommissioningprocessearlyduringthe
designprocessandexecuteadditionalactivitiesaftersystemsperformanceverificationiscompleted.
Requirements:*
Inadditiontotherequire-mentsofEAPrerequisite1,enhancedcommissioningprocessactivitiessuchasearly
Intent:
Providefortheongoing
accountabilityofbuildingenergyconsumptionovertime.
Requirements:*
Providefortheongoingaccountabilityofbuildingenergyconsumptionovertimebydevelopingandimplement-ingameasurementandverifi-cation(M&V)planconsistentwithOptionD:CalibratedSimulation(SavingsEstimationMethod2)asspecifiedintheInternational
PerformanceMeasurement&VerificationProtocol(IPMVP)VolumeIII:Conceptsand
OptionsforDeterminingEnergySavingsinNewConstruction,April2003.
RelatedEatonSolutions:
Pow-R-CommandLighting Controls
Pow-R-Command lightingcontrol panels provideseamless integration oflighting and power meter-ing functions and provide forongoing accountability forbuilding energy performance.
EA Credit 5:Measurement&Verification3Points
EA Credit 3: EnhancedCommissioning2Points
*Note: Requirements under LEED-NC v2009 in the following pages have been abridged for brevity.
Impact on LEED credit qualification:
Greenest Greener Green
Intent:
Encourageandrecognizeincreasinglevelsofon-siterenewableenergyself-supplyinordertoreduceenviron-mentalandeconomicimpacts
associatedwithfossilfuelenergyuse.
Requirements:*
Useon-siterenewableenergysystemstooffsetbuildingenergycostsandreduceenvironmentalandeconomicimpactsassociatedwithfossilfuelenergyuse.Theminimum
renewableenergypercentageforeachpointthresholdisasfollows:1%13%(17points).
RelatedEatonSolutions:
Balance of Systems
Eaton provides the electrical
Balance of System Solutionsfor solar photovoltaics, includ-ing AC and DC electricaldistribution, metering, powerquality and control as wellas power conversionequipment and alternativeenergy installation andmaintenance services.
EA Credit 2: On-SiteRenewableEnergy17Points
Power Xpert Softwareand Meters
Track building energy per-formance with Power Xpertmeters and software by com-paring predicted performancewith actual performance,broken down by componentor system. Supports theInternational PerformanceMeasurement & VerificationProtocol (IPMVP) Volume III:Concepts and Options forDetermining Energy Savingsin New Construction, April2003. Measurement and verifi-cation strategies using PowerXpert Architecture can be used
Eatons team of profession-als can work with the com-missioning agent during thedesign phase to incorporatestrategies for optimizingbuilding performance, includ-ing factory-direct productmanuals, training courseworkand using third-party systemsas well as toolsets on themany Eaton products suchas the PowerXpert meterand Pow-R-Commandlighting controls.
Eaton has numerous meteringoptions that help identifyhow buildings are consum-ing energy. All Power Xpertmeters provide for visualreadouts and pulsed outputkWh measurement, and manycan provide visual indicationof other parameters such asvoltage, current and powerfactor, all for the purposeof finding opportunities forenergy-saving improvements.
critical loads to continuerunning with minimal orno outage. After the normalsource of power has beenrestored, the re-transferprocess returns the loadcircuit to the normal power
source. Such a process, whencombined with parallelingswitchgear, allows for aseamless connection of on-site renewable energy sourcesthat may operate somewhatintermittently and require suchcontrol and transfer capability.
www.eaton.com/greenbuildings 877-ETN-CARE
-
7/27/2019 LEED Credit GUide
11/16
MR Credit 2:
ConstructionWasteManagement:Divert50%fromDisposal
12Points
Materials & Resources (MR)
Intent:
Divertconstruction,demoli-tionandland-clearingdebrisfromdisposalinlandfillsandincinerators.Redirectrecycla-blerecoveredresourcesbacktothemanufacturingprocessandreusablematerialstoappropriatesites.
Requirements:*
Recycleand/orsalvageatleast50%ofnon-hazardousconstructionanddemolitiondebris.
RelatedEatonSolutions:
Refurbishing Services
By taking steps to reduce,recycle and reuse build-ing materials, businessescan reduce their impact onthe environment, as well asdecrease the costs of buildingnew structures and refittingexisting structures.
During major renovation work,Eaton Electrical Services &Systems can refurbish existingequipment or recycle equip-ment for replacement partson other vintage electricalequipment. Since 2003, Eatonhas preserved more than1,200,000 pounds of copperand steel by refurbishingelectrical equipment forreuse in the marketplace.
EATON CORPORATION LEED Credits Guide to Eaton Products and Services
Impact on LEED credit qualification
Greenest Greener Gr
www.eaton.com/greenbuildings 877-ETN-CARE
IEQ Prerequisite 1:
MinimumIAQPerformance
Required
Intent:
Establishminimumindoorairquality(IAQ)performancetoenhanceindoorairqualityinbuildings,thuscontributingtothecomfortandwell-beingoftheoccupants.
Requirements:*
Establishminimumindoorairquality(IAQ)performancetoenhanceindoorairqual-ityinbuildingsbymeetingtheminimumrequirementsofSections4through7ofASHRAEStandard62.1-2007,VentilationforAcceptableIndoorAirQuality.Mechanical
ventilationsystemsmustbedesignedusingtheventilationrateprocedureortheappli-cablelocalcode.
RelatedEatonSolutions:
Variable Frequency Drives
Improved occupant health andproductivity are a result ofoptimal IAQ. Eatons variablefrequency drives provide themotor control to balance theimpacts of ventilation rateson energy use and IAQ tooptimize energy efficiencyand occupant health.
Indoor Environmental Quality (IEQ)
IEQ Credit 5:
IndoorChemical&PollutantSourceControl
1Point
Intent:
Minimizeexposureofbuild-ingoccupantstopotentiallyhazardousparticulatesandchemicalpollutants.
Requirements:*
Wherehazardousgasesorchemicalsmaybepresentorused(includinggarages,housekeeping/laundryareasandcopying/printingrooms),exhausteachspacesufficientlytocreatenegativpressurewithrespecttoadjacentspaceswiththedoorstotheroomclosed.
RelatedEatonSolutions:Medium-Voltage Switchg
Eatons medium-voltageswitchgear does not useSFone of the most potent greehouse gases, with a globalwarming potential of 22,200times that of CO2. When SF6is subjected to electrical arcing, toxic byproducts can beproduced, resulting in safetyissues for building occupant
IEQ Credit 2:
IncreasedVentilation
1Point
Intent:
Provideadditionaloutdoorairventilationtoimproveindoorairquality(IAQ)andpromoteoccupantcomfort,well-beingandproductivity.
Requirements:*
Increasebreathingzoneoutdoorairventilationratestoalloccupiedspacesbyatleast30%abovetheminimumratesrequiredbyASHRAEStandard62.1-2007asdeterminedbyIEQ.
RelatedEatonSolutions:
Variable Frequency Drives
Refer to IEQ Prerequisite 1
*Note: Requirements under LEED-NC v2009 in the following pages have been abridged for brevity.
-
7/27/2019 LEED Credit GUide
12/16
RelatedEatonSolutions:
Pow-R-CommandLighting Controls
Using task and ambient light-ing control strategies willenable building occupants toadjust lighting levels to meettheir task needs as well aspersonal preferences.
Eatons industry-leadingPow-R-Command LightingControls utilize integrateddaylight harvesting to providecustom dimming options.Eatons Pow-R-CommandWireless I/O Module allowsreconfigurable options thatprogram lighting to turn on
and off automatically via time-of-day schedules, occupancysensing, or to set lightingScenes. Not only does itreduce installation costs, thePow-R-Command Wireless I/OModule gives flexibility tocontrol lighting without havingto run any additional wiring.
EATON CORPORATION LEED Credits Guide to Eaton Products and Services12
Impact on LEED credit qualification:
Greenest Greener Green
IEQ Credit 6.1:
ControllabilityofSystems:Lighting
1Point
Intent:
Provideahighlevelof
lightingsystemcontrolbyindividualoccupantsorbyspecificgroupsinmulti-occupantspaces(i.e.,classroomsorconferenceareas)topromotetheproduc-tivity,comfortandwell-beingofbuildingoccupants.
Requirements:*
Provideindividuallightingcontrolsfor90%(minimum)ofthebuildingoccupantstoenableadjustmentstosuitindividualtaskneedsandpreferences.
ANDProvidelightingsystemcontrollabilityforallsharedmulti-occupantspacestoenablelightingadjustmentthatmeetsgroupneedsandpreferences.
IEQ Credit 7.1:
ThermalComfort:Design
1Point
Intent:
Provideacomfortablethermal
environmentthatsupportstheproductivityandwell-beingofbuildingoccupants.
Requirements:*
Designheating,ventilatingandairconditioning(HVAC)systemstoprovideacomfort-ablethermalenvironmentthatpromotesoccupantproductivityandwell-being.MustmeettherequirementsofASHRAEStandard55-2004,ThermalComfortConditionsforHumanOccupancy.
RelatedEatonSolutions:
Variable Frequency DrivesAs part of a well-designedHVAC system, Eatons variablefrequency drives providethe capability to control airspeed and thus temperaturecontrol to meet varyingoccupant needs.
*Note: Requirements under LEED-NC v2009 in the following pages have been abridged for brevity.
www.eaton.com/greenbuildings 877-ETN-CARE
-
7/27/2019 LEED Credit GUide
13/16EATON CORPORATION LEED Credits Guide to Eaton Products and Services
*Note: Requirements under LEED-NC v2009 in the following pages have been abridged for brevity.
Impact on LEED credit qualification
Greenest Greener Gr
www.eaton.com/greenbuildings 877-ETN-CARE
ID Credit 1:
Innovation&Design
15Points
ID Credit 2:
LEEDAccreditedProfessional
1Point
Innovation & Design (ID)
Intent:
Toprovidedesignteamsandprojectstheopportu-nitytobeawardedpointsforexceptionalperformanceabovetherequirementssetbytheLEED-NCv2009GreenBuildingRatingSystemand/orinnovativeperformanceinGreenBuildingcategoriesnotspecificallyaddressedbytheLEED-NCv2009GreenBuildingRatingSystem.
Requirements:*
Inwriting,identifytheintentoftheproposedinnovationcredit,theproposedrequire-mentforcompliance,the
proposedsubmittalstodem-onstratecompliance,andthedesignapproach(strategies)thatmightbeusedtomeettherequirements.
RelatedEatonSolutions:
Pow-R-CommandLighting Controls
Wireless lighting controlintegration reduces controlwiring installation and furthercontrollability of general andtask lighting.
Capabilities are available to
provide control of windowtreatments, further enhancingthe daylight harvestingpotential for additionalenergy savings.
When dimmed or turned off,fluorescent lamps last as muchas 50% longer, reducing thefrequency of lamp andballast replacement andtherefore reducing the rawmaterials needed for lighting.
Uninterruptible PowerSystems (UPS)
Advanced BatteryManagement (ABM) extendsbattery life and optimizesbattery recharge time viapatented technology, featuresthat extend battery life byup to 100% and minimizeenergy usage.
Optional temperature-compensated chargingmonitors battery temperatureand extends battery lifeeven further.
Live it, Build it GreenBuildings Tour
Eatons Live it, Build itapproach to sustainabilityin the built environment isshowcased by the innovativedesign and construction ofour own certified LEED Silverbuilding, Eatons ElectricalHeadquarters in Pittsburgh.
Ask your host about a walkingtour of this building featuringelements of our LEED certifi-cation and Eatons electricalproducts that can help yourbuilding go green.
Intent:
TosupportandencouragethedesignintegrationrequiredbyaLEEDforNewConstructiongreenbuildingprojectandtostreamlinetheapplicationandcertificationprocess.
Requirements:*
Atleastoneprincipalpar-ticipantoftheprojectteamshallbeaLEEDAccreditedProfessional(AP).
RelatedEatonSolutions:
Energy Audits
Eaton employs LEEDAccredited Professionals
in every one of its districtswho can support andencourage the designrequirements by LEED tostreamline the applicationand certification process.
-
7/27/2019 LEED Credit GUide
14/16
Many of Eatons productsdescribed in this guide pro-vide sustainable benefits notcovered by the LEED GreenBuilding Rating System, suchas extending equipment life,consuming less material orusing more environmentally
friendly insulating gases.RelatedEatonSolutions:
Pow-R-CommandLighting Controls
Integrated FacilitiesSystems (IFS)
Integrated PowerAssemblies (IPA)
Eaton has sixteen (16) regionalmanufacturing sites forstandard or custom assembledpanelboards, switchboardsand enclosed circuit breakers,as well as Pow-R-Command,
Integrated Facilities Systemsand Integrated PowerAssemblies within a500-mile radius of nearlyevery U.S. project.
Many projects will havevarious pieces of distribu-tion equipment all headed tothe same general area of theelectrical room. Traditionalpanelboard construction con-sists of three pieces: a backbox, interior chassis and trim.Multiplied by the number ofpanels in the electrical room,and added to the distribution
EATON CORPORATION LEED Credits Guide to Eaton Products and Services14
Additional Sustainability
switchboards and transform-ers, the materials add up.The IFS and IPA comepre-configured, reducing thenumber of pieces, in manycases, to just one or two,nearly eliminating construc-tion waste and landfill
disposal compared withtraditional construction.Even the packaging wasteis significantly reduced.
Circuit Breakers
Eatons circuit breakers canbe reset and reused overand over again, essentiallyrecycled when compared witha standard fuse that must bereplaced and discarded incompliance with specialdisposal procedures.
Eaton produces 600A andlarger molded-case circuit
breakers in Beaver, PAwithin 500 miles of nearly50% of the U.S. population.
In a power distribution panel,circuit breakers ranging from1001200 amps consume40%50% of the space ofcomparable fusible devices.
Variable Frequency Drives
Eaton produces its encloseddrives models HVX9000 inWatertown, WIwithin 500miles of much of the MidwestU.S. population.
The HVX9000 IntelliPass/IntelliDisconnect family has afootprint that is one-third thesize of other typical bypassdrive offerings, reducingbuilding space and packagingrequirements. The designalso significantly reduces
the weight of the bypassdrive by 70%, decreasingshipping loads.
Eaton Products
A powder-coat paintingsystem is used to paintEaton electrical equipment,eliminating Volatile OrganicCompounds (VOCs) that wouldbe released from conventionalsolvent-based paints.
Power Factor CorrectionCapacitors and Filters
Power Factor Correction mayallow for innovative use ofnormally wasted energy bymaximizing usable energythat is distributed within thebuilding. PFC also reduceswaste by extending the lifeof electrical products such asmotors, elevators and HVACby providing improved powerquality to these devices.
Busway
Busway sized to carry thesame current as cable willhave lower losses andimprove energy performance.It can also be reconfigured
easily as needs change.
Power Xpert Softwareand Meters
Power Xpert Architecture helpsbuilding operations beyondtraditional power manage-ment systems. Power XpertArchitecture can open thedoor to communicating with
the rest of your organization,because it is based on theEthernet protocol that is thede facto standard for modernlocal area communicationsnetworks.
Once your power systemis linked to an Ethernetnetwork via the Power XpertArchitecture, you can con-nect to applications like thebuilding management system,monitoring your HVACequipment or sharinginformation with your enter-
prise accounting system.Paralleling Switchgear
Paralleling switchgear mayallow for innovative useof waste heat for powerproduction or integrationof other renewable powersources that still require somegrid-connected power. Theparalleling switchgear is acritical component to a morecomprehensive renewableenergy strategy.
www.eaton.com/greenbuildings 877-ETN-CARE
-
7/27/2019 LEED Credit GUide
15/16
Located at strategic locationsthroughout the United States,these regional manufactur-ing facilities manufacture anddeliver standard or customassembled panelboards,switchboards, enclosedcircuit breakers, motor controlcenters, enclosed control, LVand MV switchgear and MVcontrol when and where
needed. And with that kindof proximity to the projectsite, transportation costs andassociated fuel are reducedsignificantly. Eaton is the onlyelectrical manufacturer thatuses smaller satellitemanufacturing facilities acrossthe country to cater to indi-vidual needs using as muchregional resources as possible.
Atlanta,GA
Baltimore,MD
Chicago,IL
Cleveland,OH
Dallas,TX
Denver,CO
Hartford,CT
Houston,TX
LosAngeles,CA
EATON CORPORATION LEED Credits Guide to Eaton Products and Serviceswww.eaton.com/greenbuildings 877-ETN-CARE
Regional Manufacturing Facilities
Orlando,FL
Phoenix,AZ
Portland,OR
Raleigh,NC
SanFrancisco,CA
Seattle,WA
St.Louis,MO
Westampton,NJ
Satellite
Service Center
Power Center
Visitwww.eaton.com/regionalmfgforaddressandphonenum
-
7/27/2019 LEED Credit GUide
16/16
EATONSELECTRICALBALANCEOFSYSTEM
DC switchingand protection
Solar inverters
AC switchingand protection (LV)
AC switchingand protection (MV)
Customized packaging
Monitoring and metering
EatonCorporationElectrical Sector1111 Superior Ave.Cleveland, OH 44114United States877-ETN-CARE (877-386-2273)Eaton.com
2010 Eaton CorporationAll Rights ReservedPrinted in USAPublication No. SA08300002E / BC-1April 2010
All trademarks are property of theirrespective owners.
Proudly doing our part for people
and planet by supporting responsibleuse of forest resources.
Electrical Balance of System for Commercial Installations2
Eatonproductsolutionscombine:
DC switching and
protection (ULT
1741) Robust inverter technology
same reliable technologythat is used in our ACmotor drives (UL 1741)
AC switching and protection
Integrated metering
Customized packagingand pre-configuration
A
B
D
E
C1
C2
DCswitchingandprotection
Solarinverters ACswitchingandprotection
A
B C1
C1 C2 ACswitchingandprotection
Customizedpackaging Monitoring
andmetering
D E
DC disconnectswitches
AC disconnectswitches
DCcombiner boxes
ACcircuit breakers
Low-voltageswitchgear
DCcircuit breakers
Low-voltage andmedium-voltagetransformersand substations
Solar inverters100kW through 1MW
Integrated Solar
System (ISS)
Integrated Power
Assembly (IPA)
AC panelboards/
switchboards
Monitoring andmetering products
Power Xpertsoftware
Medium-voltageAC switchgear
DCcontactors
2Refer to EA Credit 2 on page 10
A
D
B
EC1 C2
A