    LEED Credits Guide

    to Eaton Products and Services

    Green Building

    Design and

    Construction

    LEED-NC v2009

    Abigger impact on the marketplace, asmaller footprint

    on the world.

  • 7/27/2019 LEED Credit GUide

    2/16

    Introduction 3

    Insidethegreenbuilding 46

    EatonimpactonLEED-NCv2009 7

    SustainableSites(SS) 7

    SS Credit 4.3:AlternativeTransportation: Low-Emitting&Fuel-EfficientVehicles 7

    SS Credit 5.2:SiteDevelopment: MaximizeOpenSpace 7

    SS Credit 8:LightPollutionReduction 7 Energy&Atmosphere(EA) 810

    EA Prerequisite 1:Fundamental CommissioningofBuildingEnergySystems 8

    EA Prerequisite 2:MinimumEnergyPerformance 9

    EA Credit 1:OptimizeEnergyPerformance 9

    EA Credit 2:On-SiteRenewableEnergy 10

    EA Credit 3:EnhancedCommissioning 10

    EA Credit 5:Measurement&Verification 10

    Materials&Resources(MR) 11

    MR Credit 2:ConstructionWasteManagement: Divert50%fromDisposal 11

    IndoorEnvironmentalQuality(IEQ) 1112IEQ Prerequisite 1:MinimumIAQPerformance 11

    IEQ Credit 2:IncreasedVentilation 11

    IEQ Credit 5:IndoorChemical&Pollutant SourceControl 11

    IEQ Credit 6.1:ControllabilityofSystems:Lighting12

    IEQ Credit 7.1:ThermalComfort:Design 12

    Innovation&Design(ID) 13

    ID Credit 1:Innovation&Design 13

    ID Credit 2:LEEDAccreditedProfessional 13

    AdditionalSustainability& RegionalManufacturingFacilities 1415

    ElectricalBalanceofSystem forCommercialInstallations 16

    EATON CORPORATION LEED Credits Guide to Eaton Products and Services2 www.eaton.com/greenbuildings 877-ETN-CARE

  • 7/27/2019 LEED Credit GUide

    3/16

    ThePowerto make a

    DifferenceEnvironmental stewardship, innovation and leadership

    are becoming increasingly important as we take steps

    to create a sustainable environment for future generations

    by going green. This is particularly important when it comes

    to construction of new buildings or major renovations of

    older ones. To this end, Eaton Corporation offers a broad

    range of energy-efficient and environmentally friendly

    electrical solutions that can help a building go green

    and qualify for Leadership in Energy and Environmental

    Design (LEED) credits through the U.S. Green BuildingsCouncil (USGBC).

    EATON CORPORATION LEED Credits Guide to Eaton Products and Services

    The LEED Green Building RatingSystem is the nationallyaccepted benchmark for thedesign, construction and opera-tion of high-performance greenbuildings. LEED gives buildingowners and operators the toolsthey need to have an immedi-ate and measurable impact ontheir buildings performance.LEED promotes a whole-buildingapproach to sustainability by

    recognizing performance in fivekey areas of human and envi-ronmental health: sustainablesite development, water sav-ings, energy efficiency, materialsselection and indoor environ-mental quality.*

    This document provides archi-tects, specifying engineers,designers, building owners anothers an overview of Eatonproducts that collectively havethe potential to contribute upto 48 of the 110 total creditpoints toward LEED certifica-tion. The information containein this document aligns withGreen Building Design andConstruction, 2009 Edition,

    for the Design, Constructionand Major Renovations ofCommercial and InstitutionalBuildings including Core & Shand K-12 School Projects.

    *USGBC Web site.

    www.eaton.com/greenbuildings 877-ETN-CARE

    EATON:SUSTAINABLEBYDESIGN

    At Eaton, sustainability isnt an autonomous program or initiative. Its how

    we do businessand its an increasing part of our business success. We have

    been living it for years as Doing Business Right,and it is central to our

    vision to become the most admired company in our markets.

    Eaton is developing customer solutions that drive sustainable growth

    around the globe, including efficiently using and conserving global resources,

    developing energy-efficient products, reducing emissions, protecting theenvironment, and volunteering time to help build stronger communities.

    Throughout Eaton, we are building a culture of responsibility that encourages

    every employee to ask the questions that lead to more sustainable processes

    and practices, and help our company support a sustainable future.

    Here are just a few example of Eatons commitment to sustainability.

    No matter where you are in the U.S. or Canada, an Eaton LEED Accredited

    Professional is nearby to assist you with your green building strategies

    to achieve LEED certification.

    Because we believe financial performance and social responsibility go ha

    in hand, weve combined our annual and sustainability reports since 200

    Eaton was ranked in the top 10 percent of the inaugural Newsweek ranki

    of The Greenest Big Companies in America.

    In early 2010, we joined the Department of Energys Save Energy Now

    LEADER program, pledging to reduce our energy use by 25 percent,

    indexed to sales, between 2006 and 2016.

    In 2009 we nearly doubled our portfolio of Eaton Green Solutions

    products that have proven through rigorous evaluation to deliver

    exceptional, industry-leading environmental benefits to customers,

    consumers and our communities.

    Eatons 9395 UPS is the worlds first electrical product to achieve SMaRT

    (Sustainable Materials Rating Technologyr) Gold certification.

  • 7/27/2019 LEED Credit GUide

    4/16

    Inside the green building

    EATON CORPORATION LEED Credits Guide to Eaton Products and Services4

    Eaton can help your building go green and

    qualify for LEED credits through the USGBC

    Tour this green building at

    www.eaton.com/greenbuildings

    1

    9

    15

    5

    10

    2

    6

    13

    84

    12 14

    3

    711

    16

    www.eaton.com/greenbuildings 877-ETN-CARE

  • 7/27/2019 LEED Credit GUide

    5/16

    1 Pow-R-CommandLightingControls

    Automatically turn offthe lights when a spaceis empty; reduce artificiallighting requirements;energy savings of 10%30%

    2 UninterruptiblePowerSystems(UPS)

    50% less power loss com-pared with traditional UPS

    3 VariableFrequencyDrives

    Lower the demands ona motor, extending life;energy savings of 10%50%

    4 HarmonicMitigatingTransformers

    Fewer harmonics meansmore efficient energyconsumption overall

    EATON CORPORATION LEED Credits Guide to Eaton Products and Services

    10 IntegratedFacilitiesSystems(IFS)

    Switchboard structurereduces material for powersystems; reduces requiredfloor space by 40%

    11 Medium-VoltageSwitchgear

    Environmentally friendlyinsulation, avoids SF6gasan extremely harmfulgreenhouse gas

    12 RefurbishingServices

    Extend useful life of existingequipment, preservenatural resources

    13 CircuitBreakers

    Less wattage loss than withfuses; can be reset, whilefuses are typically discardedafter they fail

    5 PowerXpert

    SoftwareandMeters

    Monitor energy consump-tion; identify energy savingsopportunities and powerquality issues

    6 EnergyAudits

    Eaton engineers identifysolutions to increaseenergy efficiencies

    7 PowerFactorCorrectionCapacitorsandFilters

    Decrease energyconsumption andimprove power quality

    8 ParallelingSwitchgear

    Manage critical transitionfrom utility power toon-site power sources;make practical use of alter-native energy systems

    9 AutomaticTransferSwitches

    Transfer essential loadsand electrical distributionsystems from utility powerto green alternativeenergy sources

    14 IntegratedPowerAssemblies(IPA)

    Prefabricated, modulardesigns reduce packagingwaste, save space

    15 Busway

    Use less copper and steelcompared with cable andconduit; waste lessmaterial because buswayis built to exact length

    Pow-R-StationEElectricVehicleSupplyEquipmen(EVSE)

    An electric vehicle (EV)

    charging solution reducesemissions. Smart Grid-ready technology providepower where you need it,when you need it

    Protect the environmentSave energy

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    www.eaton.com/greenbuildings 877-ETN-CARE

    16

    16

    Eaton solutions Sustainable Energyand Materials& Indoor Innovation Sites(SS) Atmosphere Resources Environment Design(ID) (EA) (MR) Quality(IEQ)

    SaveEnergy

    Pow-R-Command Lighting Controls 4 4 4 4

    Uninterruptible Power Systems (UPS) 4 4

    Variable Frequency Drives 4 4

    Harmonic Mitigating Transformers 4

    Power Xpert Software and Meters 4

    Energy Audits 4

    Power Factor Correction Capacitors and Filters 4

    Paralleling Switchgear 4

    Automatic Transfer Switches 4 ProtecttheEnvironment

    Integrated Facilities Systems (IFS) 4

    Medium-Voltage Switchgear 4

    Refurbishing Services 4

    Circuit BreakersA

    Integrated Power Assemblies (IPA) 4

    BuswayA

    Pow-R-Station Electric Vehicle Supply Equipment (EVSE) 4

    MaximumCredits 5 31+prerequisites 2 4+prerequisites 6

    ARefer to page 14Additional Sustainability

  • 7/27/2019 LEED Credit GUide

    6/16EATON CORPORATION LEED Credits Guide to Eaton Products and Services6

    2 3

    65

    4

    7

    9

    8

    121110

    15143

    Saveenergy

    Pow-R-Command Lighting Controls

    Uninterruptible Power Systems (UPS)

    Variable Frequency Drives

    Harmonic Mitigating Transformers

    Power Xpert Software and Meters

    Energy Audits

    Power Factor Correction Capacitors and Filters

    Paralleling Switchgear

    Automatic Transfer Switch

    1

    2

    3

    4

    5

    6

    7

    8

    9

    16

    Protecttheenvironment

    Integrated Facilities Systems (IFS)

    Medium-Voltage Switchgear

    Refurbishing Services

    Circuit Breakers

    Integrated Power Assemblies (IPA)

    Busway

    Pow-R-Station Electric Vehicle Supply Equipment (EVSE)

    10

    11

    12

    13

    14

    15

    16

    www.eaton.com/greenbuildings 877-ETN-CARE

  • 7/27/2019 LEED Credit GUide

    7/16

    Intent:

    Provideahighratioofopenspacetodevelop-mentfootprinttopromote

    biodiversity.

    Requirements:*

    Reducethedevelopmentfootprintbyprovidingveg-etatedopenspacewithinprojectboundariessuchthattheamountofopenspaceexceedslocalzoningrequire-mentsby25%.

    Eaton impact on LEED-NC v2009

    *Note: Requirements under LEED-NC v2009 in the following pages have been abridged for brevity.

    Sustainable Sites (SS)

    Intent:

    Minimizelighttrespass

    fromthebuildingandsite,reducesky-glowtoincreasenightskyaccess,improvenighttimevisibilitythroughglarereduction,andreducedevelopmentimpactonnocturnalenvironments.

    RelatedEatonSolutions:

    Integrated FacilitiesSystems (IFS)

    The compact design of theIFS reduces the space requiredfor electrical distributionequipment by as much as40%. A smaller electrical roomlayout can help lead to asmaller building footprint.

    EATON CORPORATION LEED Credits Guide to Eaton Products and Services

    Requirements:*

    FORINTERIORLIGHTING

    Reducetheinputpower(byautomaticdevice)ofallnon-emergencyinteriorluminaireswithadirectlineofsighttoanyopeningsintheenvelope(translucentortransparent)byatleast50%between11p.m.and5a.m.After-hoursoverridemaybeprovidedbyamanualoroccupant-sensingdevice,providedtheoverridelastsnomorethan30minutes.

    Uninterruptible PowerSystems (UPS)

    Eatons new Powerware 9395UPS has a small footprint,

    requiring 50% less floorspace than traditional UPSsystem designs.

    Integrated PowerAssemblies (IPA)

    The IPA is a prefabricatedmetal enclosure containingEaton power distribution andindustrial control products.

    In addition to electricalswitchgear, motor controlcenters and communicationsystems, IPAs contain other

    auxiliary equipment neces-sary to complete the projectin the minimum footprintrequired. By reducing thespace required for the electrcal distribution equipment,owners can reduce the overdevelopment footprint.

    RelatedEatonSolutions:

    Pow-R-Command

    Lighting ControlsApply lighting control toreduce interior and exteriorlighting levels that adjust withavailable daylighting.

    Fluorescent dimming fordaylight harvesting. Providesability to automatically main-tain preset fluorescent levels.Utilizes a light sensor inputto monitor and control thelighting levels. Also provides:

    Impact on LEED credit qualification

    Greenest Greener Gr

    www.eaton.com/greenbuildings 877-ETN-CARE

    Event scheduling

    Time scheduling and

    load override Calculates run-time for

    lamps and ballasts, tracksON or OFF cycles

    Wireless I/O Module: Giveflexibility to control lightiwithout having to run anyadditional wiring

    Intent:

    Toreducepollutionandlanddevelopmentimpactsfromautomobileuse.

    Requirements:*

    Installalternative-fuelfuelingstationsfor3%ofthetotalvehicleparkingcapacityofthesite.

    RelatedEatonSolutions:

    Pow-R-Station ElectricVehicle Supply Equipment(EVSE)

    Eatons Electric VehicleCharging Supply Equipmentfor Level 1, 2 and 3 (future)charging stations and asso-ciated Power DistributionEquipment provide suchalternative-fuel transportatioamenities.

    SS Credit 4.3:AlternativeTransportation:Low-Emitting&Fuel-EfficientVehicles3Points

    SS Credit 5.2:SiteDevelopment:MaximizeOpenSpace1Point

    SS Credit 8:LightPollutionReduction1Point

  • 7/27/2019 LEED Credit GUide

    8/16

    Power XpertMetering Systems

    Commissioning agents canuse Eatons Power Xpertmeters to detect and analyzepotentially costly powerquality problems, as well as

    monitor energy consumptionand efficiency in real timethroughout a building. PowerXpert software aggregatesinformation into understand-able charts and graphs thatallow users to easily identifyenergy-saving opportunities.

    EATON CORPORATION LEED Credits Guide to Eaton Products and Services8

    Energy & Atmosphere (EA)

    Intent:

    Verifythatthebuildingsenergy-relatedsystemsareinstalled,calibratedandper-formaccordingtotheownersprojectrequirements,basisofdesignandconstruction

    documents.Requirements:*

    Commissioningprocessactivi-tiesmustbecompletedforthefollowingenergy-relatedsystems,ataminimum:heating,ventilating,aircon-ditioningandrefrigeration(HVAC&R)systems,lightinganddaylightingcontrols,andrenewableenergysystems(e.g.,wind,solar).Properveri-ficationoftheinstallationandperformanceofsuchsystemsisnecessary.

    RelatedEatonSolutions:

    Pow-R-CommandLighting Controls

    Programming of thelighting controls and anydaylighting control aspectsof the lighting system mustbe commissioned for optimalperformance. Eaton providesa wide variety of services frominitial design consultation tostartup, commissioning andongoing monitoring.

    *Note: Requirements under LEED-NC v2009 in the following pages have been abridged for brevity.

    Impact on LEED credit qualification:

    Greenest Greener Green

    Variable Frequency Drives

    Used as a commissioningtool, software associated withEatons Variable FrequencyDrives can verify installationand performance character-istics of the buildings HVAC

    systems, especially when usedin conjunction with PowerXpert metering and software.

    EA Prerequisite 1:FundamentalCommissioningofBuildingEnergySystemsRequired

    www.eaton.com/greenbuildings 877-ETN-CARE

  • 7/27/2019 LEED Credit GUide

    9/16

    RelatedEatonSolutions:

    Pow-R-Command Lighting Controls

    EA Prerequisite 2: Incorporating use of creative controls such as occupancy sensors, timers and daylight harvesting systems wiassist in reducing building energy consumption.

    EA Credit 1: Using task and ambient lighting control strategies will enable building occupants to adjust lighting levels to meettheir task needs as well as personal preferences and will reduce lighting energy consumption by 10%30%.

    Uninterruptible Power Systems (UPS)

    EA Prerequisite 2: High efficiency of 95% reduces total energy losses by more than 50% when compared with traditional UPSs.EA Credit 1: Eaton BladeUPS go even further with a rating upwards of 97% efficiency, further minimizing energy usage.

    Variable Frequency Drives

    EA Prerequisite 2: Incorporating use of variable frequency drives on HVAC system components such as fans and pump motorsprovides for significantly improved efficiency, energy savings and optimization. The energy savings can be dramatic. For example,the speed of a centrifugal fan reduced by only 1/3 will save more than 70% in energy consumption.

    EA Credit 1: Frequency drives adjust a motors speed to closely match output requirements, resulting in typical energy savings o10%50%. Soft-start motor controls lower the demands on a motor during startup, conserving energy and extending the life of themechanical system.

    Power Factor Correction Capacitors and Filters

    Power factor correction saves energy and can also reduce the required sizes of electrical equipment due to lower kVA. Power factocorrection enables your organization to become more environmentally responsible without reducing the amount of working poweavailable. This corresponds to additional savings in material costs that would have been used to produce larger electrical equipmeand distribution systems.

    As part of a power factor correction system, harmonic filters resolve the power anomalies caused by harmonics that shortenequipment life and trigger unexpected shutdowns. By controlling harmonics, current levels in the system are reduced and heatis removed from the system. This, in turn, minimizes troublesome issues such as blown fuses, damaged motors and failedtransformers, extending equipment life.

    Harmonic Mitigating Transformers

    Use of harmonic mitigating transformers (HMTs) smooth out the energy-use curve. The increasing amount of electronic equipmenin facilities increases the amount of nonlinear loads, reducing the efficiency of electronic equipment and creating overload condi-tions. HMTs correct this situation.

    The results are 30% less power loss when compared with standard delta-wye designed transformers.

    Intent:

    Achieveincreasinglevelsofenergyperformanceabovethebaselineintheprerequisitestandardtoreduceenviron-mentalandeconomicimpactsassociatedwithexcessive

    energyuse.Requirements:*

    Demonstrateapercentageimprovementintheproposedbuildingperformancerating

    comparedwiththebaselinebuildingperformanceratingTheminimumenergycostsavingspercentageforeachpointthresholdisasfollows

    NewBuildingsPoints12%48%(119points)

    ExistingBuildingRenovationsPoints8%44%(119points)

    EA Credit 1:OptimizeEnergyPerformance119Points

    EATON CORPORATION LEED Credits Guide to Eaton Products and Services

    Intent:

    Establishtheminimumlevelofenergyefficiencyfortheproposedbuildingandsystemstoreduceenviron-mentalandeconomicimpactsassociatedwithexcessive

    energyuse.Requirements:*

    Demonstrateapercentageimprovementintheproposedbuildingperformanceratingcomparedwiththebaseline

    buildingperformanceratingperASHRAE/IESNAStandard90.1.2007ORcomplywiththeprescriptivemeasuresoftheASHRAEAdvancedEnergyDesignGuideforSmallOfficeBuildings2004ORcomply

    withtheprescriptivemeasuresidentifiedintheAdvancedBuildingsCorePerformanceGuidedevelopedbytheNewBuildingsInstitute.

    *Note: Requirements under LEED-NC v2009 in the following pages have been abridged for brevity.

    Impact on LEED credit qualification

    Greenest Greener Gr

    EA Prerequisite 2: MinimumEnergyPerformanceRequired

    www.eaton.com/greenbuildings 877-ETN-CARE

  • 7/27/2019 LEED Credit GUide

    10/16

    For more details about solarbalance of systems, refer tothe back cover.

    Automatic Transfer Switches& Paralleling Switchgear

    A transfer switch is a criti-

    cal component of any on-sitepower system. When thenormal source of power islost, a transfer switch quicklyand safely shifts the loadcircuit from the normal sourceof power to the alternatesource of power. This permits

    buildingandmaintenancereviewareimplemented.Aplanforresolvingoutstandingcommissioning-relatedissuesmustbeincluded.

    RelatedEatonSolutions:

    Pow-R-CommandLighting Controls

    Power Xpert Softwareand Meters

    Variable Frequency Drives

    in conjunction with monitoringand trend logging of signifi-cant energy systems for

    ongoing accountability ofbuilding energy performance.

    Variable Frequency Drives

    With Eatons VFDs, track per-formance of HVAC systems(kWh), and use diagnostictools to identify opportunitiesto further reduce energy usageand understand the contri-bution to the overall energyreduction of the building.

    EATON CORPORATION LEED Credits Guide to Eaton Products and Services10

    Intent:

    Beginthecommissioningprocessearlyduringthe

    designprocessandexecuteadditionalactivitiesaftersystemsperformanceverificationiscompleted.

    Requirements:*

    Inadditiontotherequire-mentsofEAPrerequisite1,enhancedcommissioningprocessactivitiessuchasearly

    Intent:

    Providefortheongoing

    accountabilityofbuildingenergyconsumptionovertime.

    Requirements:*

    Providefortheongoingaccountabilityofbuildingenergyconsumptionovertimebydevelopingandimplement-ingameasurementandverifi-cation(M&V)planconsistentwithOptionD:CalibratedSimulation(SavingsEstimationMethod2)asspecifiedintheInternational

    PerformanceMeasurement&VerificationProtocol(IPMVP)VolumeIII:Conceptsand

    OptionsforDeterminingEnergySavingsinNewConstruction,April2003.

    RelatedEatonSolutions:

    Pow-R-CommandLighting Controls

    Pow-R-Command lightingcontrol panels provideseamless integration oflighting and power meter-ing functions and provide forongoing accountability forbuilding energy performance.

    EA Credit 5:Measurement&Verification3Points

    EA Credit 3: EnhancedCommissioning2Points

    *Note: Requirements under LEED-NC v2009 in the following pages have been abridged for brevity.

    Impact on LEED credit qualification:

    Greenest Greener Green

    Intent:

    Encourageandrecognizeincreasinglevelsofon-siterenewableenergyself-supplyinordertoreduceenviron-mentalandeconomicimpacts

    associatedwithfossilfuelenergyuse.

    Requirements:*

    Useon-siterenewableenergysystemstooffsetbuildingenergycostsandreduceenvironmentalandeconomicimpactsassociatedwithfossilfuelenergyuse.Theminimum

    renewableenergypercentageforeachpointthresholdisasfollows:1%13%(17points).

    RelatedEatonSolutions:

    Balance of Systems

    Eaton provides the electrical

    Balance of System Solutionsfor solar photovoltaics, includ-ing AC and DC electricaldistribution, metering, powerquality and control as wellas power conversionequipment and alternativeenergy installation andmaintenance services.

    EA Credit 2: On-SiteRenewableEnergy17Points

    Power Xpert Softwareand Meters

    Track building energy per-formance with Power Xpertmeters and software by com-paring predicted performancewith actual performance,broken down by componentor system. Supports theInternational PerformanceMeasurement & VerificationProtocol (IPMVP) Volume III:Concepts and Options forDetermining Energy Savingsin New Construction, April2003. Measurement and verifi-cation strategies using PowerXpert Architecture can be used

    Eatons team of profession-als can work with the com-missioning agent during thedesign phase to incorporatestrategies for optimizingbuilding performance, includ-ing factory-direct productmanuals, training courseworkand using third-party systemsas well as toolsets on themany Eaton products suchas the PowerXpert meterand Pow-R-Commandlighting controls.

    Eaton has numerous meteringoptions that help identifyhow buildings are consum-ing energy. All Power Xpertmeters provide for visualreadouts and pulsed outputkWh measurement, and manycan provide visual indicationof other parameters such asvoltage, current and powerfactor, all for the purposeof finding opportunities forenergy-saving improvements.

    critical loads to continuerunning with minimal orno outage. After the normalsource of power has beenrestored, the re-transferprocess returns the loadcircuit to the normal power

    source. Such a process, whencombined with parallelingswitchgear, allows for aseamless connection of on-site renewable energy sourcesthat may operate somewhatintermittently and require suchcontrol and transfer capability.

    www.eaton.com/greenbuildings 877-ETN-CARE

  • 7/27/2019 LEED Credit GUide

    11/16

    MR Credit 2:

    ConstructionWasteManagement:Divert50%fromDisposal

    12Points

    Materials & Resources (MR)

    Intent:

    Divertconstruction,demoli-tionandland-clearingdebrisfromdisposalinlandfillsandincinerators.Redirectrecycla-blerecoveredresourcesbacktothemanufacturingprocessandreusablematerialstoappropriatesites.

    Requirements:*

    Recycleand/orsalvageatleast50%ofnon-hazardousconstructionanddemolitiondebris.

    RelatedEatonSolutions:

    Refurbishing Services

    By taking steps to reduce,recycle and reuse build-ing materials, businessescan reduce their impact onthe environment, as well asdecrease the costs of buildingnew structures and refittingexisting structures.

    During major renovation work,Eaton Electrical Services &Systems can refurbish existingequipment or recycle equip-ment for replacement partson other vintage electricalequipment. Since 2003, Eatonhas preserved more than1,200,000 pounds of copperand steel by refurbishingelectrical equipment forreuse in the marketplace.

    EATON CORPORATION LEED Credits Guide to Eaton Products and Services

    Impact on LEED credit qualification

    Greenest Greener Gr

    www.eaton.com/greenbuildings 877-ETN-CARE

    IEQ Prerequisite 1:

    MinimumIAQPerformance

    Required

    Intent:

    Establishminimumindoorairquality(IAQ)performancetoenhanceindoorairqualityinbuildings,thuscontributingtothecomfortandwell-beingoftheoccupants.

    Requirements:*

    Establishminimumindoorairquality(IAQ)performancetoenhanceindoorairqual-ityinbuildingsbymeetingtheminimumrequirementsofSections4through7ofASHRAEStandard62.1-2007,VentilationforAcceptableIndoorAirQuality.Mechanical

    ventilationsystemsmustbedesignedusingtheventilationrateprocedureortheappli-cablelocalcode.

    RelatedEatonSolutions:

    Variable Frequency Drives

    Improved occupant health andproductivity are a result ofoptimal IAQ. Eatons variablefrequency drives provide themotor control to balance theimpacts of ventilation rateson energy use and IAQ tooptimize energy efficiencyand occupant health.

    Indoor Environmental Quality (IEQ)

    IEQ Credit 5:

    IndoorChemical&PollutantSourceControl

    1Point

    Intent:

    Minimizeexposureofbuild-ingoccupantstopotentiallyhazardousparticulatesandchemicalpollutants.

    Requirements:*

    Wherehazardousgasesorchemicalsmaybepresentorused(includinggarages,housekeeping/laundryareasandcopying/printingrooms),exhausteachspacesufficientlytocreatenegativpressurewithrespecttoadjacentspaceswiththedoorstotheroomclosed.

    RelatedEatonSolutions:Medium-Voltage Switchg

    Eatons medium-voltageswitchgear does not useSFone of the most potent greehouse gases, with a globalwarming potential of 22,200times that of CO2. When SF6is subjected to electrical arcing, toxic byproducts can beproduced, resulting in safetyissues for building occupant

    IEQ Credit 2:

    IncreasedVentilation

    1Point

    Intent:

    Provideadditionaloutdoorairventilationtoimproveindoorairquality(IAQ)andpromoteoccupantcomfort,well-beingandproductivity.

    Requirements:*

    Increasebreathingzoneoutdoorairventilationratestoalloccupiedspacesbyatleast30%abovetheminimumratesrequiredbyASHRAEStandard62.1-2007asdeterminedbyIEQ.

    RelatedEatonSolutions:

    Variable Frequency Drives

    Refer to IEQ Prerequisite 1

    *Note: Requirements under LEED-NC v2009 in the following pages have been abridged for brevity.

  • 7/27/2019 LEED Credit GUide

    12/16

    RelatedEatonSolutions:

    Pow-R-CommandLighting Controls

    Using task and ambient light-ing control strategies willenable building occupants toadjust lighting levels to meettheir task needs as well aspersonal preferences.

    Eatons industry-leadingPow-R-Command LightingControls utilize integrateddaylight harvesting to providecustom dimming options.Eatons Pow-R-CommandWireless I/O Module allowsreconfigurable options thatprogram lighting to turn on

    and off automatically via time-of-day schedules, occupancysensing, or to set lightingScenes. Not only does itreduce installation costs, thePow-R-Command Wireless I/OModule gives flexibility tocontrol lighting without havingto run any additional wiring.

    EATON CORPORATION LEED Credits Guide to Eaton Products and Services12

    Impact on LEED credit qualification:

    Greenest Greener Green

    IEQ Credit 6.1:

    ControllabilityofSystems:Lighting

    1Point

    Intent:

    Provideahighlevelof

    lightingsystemcontrolbyindividualoccupantsorbyspecificgroupsinmulti-occupantspaces(i.e.,classroomsorconferenceareas)topromotetheproduc-tivity,comfortandwell-beingofbuildingoccupants.

    Requirements:*

    Provideindividuallightingcontrolsfor90%(minimum)ofthebuildingoccupantstoenableadjustmentstosuitindividualtaskneedsandpreferences.

    ANDProvidelightingsystemcontrollabilityforallsharedmulti-occupantspacestoenablelightingadjustmentthatmeetsgroupneedsandpreferences.

    IEQ Credit 7.1:

    ThermalComfort:Design

    1Point

    Intent:

    Provideacomfortablethermal

    environmentthatsupportstheproductivityandwell-beingofbuildingoccupants.

    Requirements:*

    Designheating,ventilatingandairconditioning(HVAC)systemstoprovideacomfort-ablethermalenvironmentthatpromotesoccupantproductivityandwell-being.MustmeettherequirementsofASHRAEStandard55-2004,ThermalComfortConditionsforHumanOccupancy.

    RelatedEatonSolutions:

    Variable Frequency DrivesAs part of a well-designedHVAC system, Eatons variablefrequency drives providethe capability to control airspeed and thus temperaturecontrol to meet varyingoccupant needs.

    *Note: Requirements under LEED-NC v2009 in the following pages have been abridged for brevity.

    www.eaton.com/greenbuildings 877-ETN-CARE

  • 7/27/2019 LEED Credit GUide

    13/16EATON CORPORATION LEED Credits Guide to Eaton Products and Services

    *Note: Requirements under LEED-NC v2009 in the following pages have been abridged for brevity.

    Impact on LEED credit qualification

    Greenest Greener Gr

    www.eaton.com/greenbuildings 877-ETN-CARE

    ID Credit 1:

    Innovation&Design

    15Points

    ID Credit 2:

    LEEDAccreditedProfessional

    1Point

    Innovation & Design (ID)

    Intent:

    Toprovidedesignteamsandprojectstheopportu-nitytobeawardedpointsforexceptionalperformanceabovetherequirementssetbytheLEED-NCv2009GreenBuildingRatingSystemand/orinnovativeperformanceinGreenBuildingcategoriesnotspecificallyaddressedbytheLEED-NCv2009GreenBuildingRatingSystem.

    Requirements:*

    Inwriting,identifytheintentoftheproposedinnovationcredit,theproposedrequire-mentforcompliance,the

    proposedsubmittalstodem-onstratecompliance,andthedesignapproach(strategies)thatmightbeusedtomeettherequirements.

    RelatedEatonSolutions:

    Pow-R-CommandLighting Controls

    Wireless lighting controlintegration reduces controlwiring installation and furthercontrollability of general andtask lighting.

    Capabilities are available to

    provide control of windowtreatments, further enhancingthe daylight harvestingpotential for additionalenergy savings.

    When dimmed or turned off,fluorescent lamps last as muchas 50% longer, reducing thefrequency of lamp andballast replacement andtherefore reducing the rawmaterials needed for lighting.

    Uninterruptible PowerSystems (UPS)

    Advanced BatteryManagement (ABM) extendsbattery life and optimizesbattery recharge time viapatented technology, featuresthat extend battery life byup to 100% and minimizeenergy usage.

    Optional temperature-compensated chargingmonitors battery temperatureand extends battery lifeeven further.

    Live it, Build it GreenBuildings Tour

    Eatons Live it, Build itapproach to sustainabilityin the built environment isshowcased by the innovativedesign and construction ofour own certified LEED Silverbuilding, Eatons ElectricalHeadquarters in Pittsburgh.

    Ask your host about a walkingtour of this building featuringelements of our LEED certifi-cation and Eatons electricalproducts that can help yourbuilding go green.

    Intent:

    TosupportandencouragethedesignintegrationrequiredbyaLEEDforNewConstructiongreenbuildingprojectandtostreamlinetheapplicationandcertificationprocess.

    Requirements:*

    Atleastoneprincipalpar-ticipantoftheprojectteamshallbeaLEEDAccreditedProfessional(AP).

    RelatedEatonSolutions:

    Energy Audits

    Eaton employs LEEDAccredited Professionals

    in every one of its districtswho can support andencourage the designrequirements by LEED tostreamline the applicationand certification process.

  • 7/27/2019 LEED Credit GUide

    14/16

    Many of Eatons productsdescribed in this guide pro-vide sustainable benefits notcovered by the LEED GreenBuilding Rating System, suchas extending equipment life,consuming less material orusing more environmentally

    friendly insulating gases.RelatedEatonSolutions:

    Pow-R-CommandLighting Controls

    Integrated FacilitiesSystems (IFS)

    Integrated PowerAssemblies (IPA)

    Eaton has sixteen (16) regionalmanufacturing sites forstandard or custom assembledpanelboards, switchboardsand enclosed circuit breakers,as well as Pow-R-Command,

    Integrated Facilities Systemsand Integrated PowerAssemblies within a500-mile radius of nearlyevery U.S. project.

    Many projects will havevarious pieces of distribu-tion equipment all headed tothe same general area of theelectrical room. Traditionalpanelboard construction con-sists of three pieces: a backbox, interior chassis and trim.Multiplied by the number ofpanels in the electrical room,and added to the distribution

    EATON CORPORATION LEED Credits Guide to Eaton Products and Services14

    Additional Sustainability

    switchboards and transform-ers, the materials add up.The IFS and IPA comepre-configured, reducing thenumber of pieces, in manycases, to just one or two,nearly eliminating construc-tion waste and landfill

    disposal compared withtraditional construction.Even the packaging wasteis significantly reduced.

    Circuit Breakers

    Eatons circuit breakers canbe reset and reused overand over again, essentiallyrecycled when compared witha standard fuse that must bereplaced and discarded incompliance with specialdisposal procedures.

    Eaton produces 600A andlarger molded-case circuit

    breakers in Beaver, PAwithin 500 miles of nearly50% of the U.S. population.

    In a power distribution panel,circuit breakers ranging from1001200 amps consume40%50% of the space ofcomparable fusible devices.

    Variable Frequency Drives

    Eaton produces its encloseddrives models HVX9000 inWatertown, WIwithin 500miles of much of the MidwestU.S. population.

    The HVX9000 IntelliPass/IntelliDisconnect family has afootprint that is one-third thesize of other typical bypassdrive offerings, reducingbuilding space and packagingrequirements. The designalso significantly reduces

    the weight of the bypassdrive by 70%, decreasingshipping loads.

    Eaton Products

    A powder-coat paintingsystem is used to paintEaton electrical equipment,eliminating Volatile OrganicCompounds (VOCs) that wouldbe released from conventionalsolvent-based paints.

    Power Factor CorrectionCapacitors and Filters

    Power Factor Correction mayallow for innovative use ofnormally wasted energy bymaximizing usable energythat is distributed within thebuilding. PFC also reduceswaste by extending the lifeof electrical products such asmotors, elevators and HVACby providing improved powerquality to these devices.

    Busway

    Busway sized to carry thesame current as cable willhave lower losses andimprove energy performance.It can also be reconfigured

    easily as needs change.

    Power Xpert Softwareand Meters

    Power Xpert Architecture helpsbuilding operations beyondtraditional power manage-ment systems. Power XpertArchitecture can open thedoor to communicating with

    the rest of your organization,because it is based on theEthernet protocol that is thede facto standard for modernlocal area communicationsnetworks.

    Once your power systemis linked to an Ethernetnetwork via the Power XpertArchitecture, you can con-nect to applications like thebuilding management system,monitoring your HVACequipment or sharinginformation with your enter-

    prise accounting system.Paralleling Switchgear

    Paralleling switchgear mayallow for innovative useof waste heat for powerproduction or integrationof other renewable powersources that still require somegrid-connected power. Theparalleling switchgear is acritical component to a morecomprehensive renewableenergy strategy.

    www.eaton.com/greenbuildings 877-ETN-CARE

  • 7/27/2019 LEED Credit GUide

    15/16

    Located at strategic locationsthroughout the United States,these regional manufactur-ing facilities manufacture anddeliver standard or customassembled panelboards,switchboards, enclosedcircuit breakers, motor controlcenters, enclosed control, LVand MV switchgear and MVcontrol when and where

    needed. And with that kindof proximity to the projectsite, transportation costs andassociated fuel are reducedsignificantly. Eaton is the onlyelectrical manufacturer thatuses smaller satellitemanufacturing facilities acrossthe country to cater to indi-vidual needs using as muchregional resources as possible.

    Atlanta,GA

    Baltimore,MD

    Chicago,IL

    Cleveland,OH

    Dallas,TX

    Denver,CO

    Hartford,CT

    Houston,TX

    LosAngeles,CA

    EATON CORPORATION LEED Credits Guide to Eaton Products and Serviceswww.eaton.com/greenbuildings 877-ETN-CARE

    Regional Manufacturing Facilities

    Orlando,FL

    Phoenix,AZ

    Portland,OR

    Raleigh,NC

    SanFrancisco,CA

    Seattle,WA

    St.Louis,MO

    Westampton,NJ

    Satellite

    Service Center

    Power Center

    Visitwww.eaton.com/regionalmfgforaddressandphonenum

  • 7/27/2019 LEED Credit GUide

    16/16

    EATONSELECTRICALBALANCEOFSYSTEM

    DC switchingand protection

    Solar inverters

    AC switchingand protection (LV)

    AC switchingand protection (MV)

    Customized packaging

    Monitoring and metering

    EatonCorporationElectrical Sector1111 Superior Ave.Cleveland, OH 44114United States877-ETN-CARE (877-386-2273)Eaton.com

    2010 Eaton CorporationAll Rights ReservedPrinted in USAPublication No. SA08300002E / BC-1April 2010

    All trademarks are property of theirrespective owners.

    Proudly doing our part for people

    and planet by supporting responsibleuse of forest resources.

    Electrical Balance of System for Commercial Installations2

    Eatonproductsolutionscombine:

    DC switching and

    protection (ULT

    1741) Robust inverter technology

    same reliable technologythat is used in our ACmotor drives (UL 1741)

    AC switching and protection

    Integrated metering

    Customized packagingand pre-configuration

    A

    B

    D

    E

    C1

    C2

    DCswitchingandprotection

    Solarinverters ACswitchingandprotection

    A

    B C1

    C1 C2 ACswitchingandprotection

    Customizedpackaging Monitoring

    andmetering

    D E

    DC disconnectswitches

    AC disconnectswitches

    DCcombiner boxes

    ACcircuit breakers

    Low-voltageswitchgear

    DCcircuit breakers

    Low-voltage andmedium-voltagetransformersand substations

    Solar inverters100kW through 1MW

    Integrated Solar

    System (ISS)

    Integrated Power

    Assembly (IPA)

    AC panelboards/

    switchboards

    Monitoring andmetering products

    Power Xpertsoftware

    Medium-voltageAC switchgear

    DCcontactors

    2Refer to EA Credit 2 on page 10

    A

    D

    B

    EC1 C2

    A