Kissimmee River Restoration Contract 13B
Florida Department of Environmental Protection Permit No.: EI 0272794-001
Aerial Photos Taken April 1, 2009By Greg Kennedy
![Page 2: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By](https://reader035.vdocuments.mx/reader035/viewer/2022070412/56649d1a5503460f949efc1e/html5/thumbnails/2.jpg)
C-38
Spoil Mound B North
Northern Extent of C-38 Backfill for the 13-B Contract
Bypass Flow Way now drying due to flow
returning to the Historic and newly excavated Kissimmee Channel
![Page 3: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By](https://reader035.vdocuments.mx/reader035/viewer/2022070412/56649d1a5503460f949efc1e/html5/thumbnails/3.jpg)
Northern Extent of C-38 Backfill for the 13-B Contract
Culvert Crossing Washed Out During Initial Flows to the Restored Oxbows
Direction of Flow
![Page 4: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By](https://reader035.vdocuments.mx/reader035/viewer/2022070412/56649d1a5503460f949efc1e/html5/thumbnails/4.jpg)
Spoil Mound B North
C-38 To Be Filled
Restored Section of the Oxbow
![Page 5: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By](https://reader035.vdocuments.mx/reader035/viewer/2022070412/56649d1a5503460f949efc1e/html5/thumbnails/5.jpg)
Bypass Flow Way
Spoil Mound B North
Backfilled C-38
Restored Oxbow
![Page 6: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By](https://reader035.vdocuments.mx/reader035/viewer/2022070412/56649d1a5503460f949efc1e/html5/thumbnails/6.jpg)
Backfilled C-38
Drying Bypass Flow Way
C-38 To Be Backfilled
Restored Oxbow
![Page 7: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By](https://reader035.vdocuments.mx/reader035/viewer/2022070412/56649d1a5503460f949efc1e/html5/thumbnails/7.jpg)
Restored Oxbow
Spoil Mound B SouthC-38 To Be Backfilled
![Page 8: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By](https://reader035.vdocuments.mx/reader035/viewer/2022070412/56649d1a5503460f949efc1e/html5/thumbnails/8.jpg)
Spoil mound B South
C-38 To Be Backfilled
Bypass Flow Way
Restored Oxbow
![Page 9: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By](https://reader035.vdocuments.mx/reader035/viewer/2022070412/56649d1a5503460f949efc1e/html5/thumbnails/9.jpg)
Spoil Mound B South
Restored Oxbows
Bypass Flow Way
![Page 10: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By](https://reader035.vdocuments.mx/reader035/viewer/2022070412/56649d1a5503460f949efc1e/html5/thumbnails/10.jpg)
Spoil Mound B South
Partially Filled C-38
Restored Oxbows
![Page 11: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By](https://reader035.vdocuments.mx/reader035/viewer/2022070412/56649d1a5503460f949efc1e/html5/thumbnails/11.jpg)
Drying Bypass Flow Way
Partially Filled C-38
Restored Oxbow
Plugged C-38
![Page 12: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By](https://reader035.vdocuments.mx/reader035/viewer/2022070412/56649d1a5503460f949efc1e/html5/thumbnails/12.jpg)
Substantially Degraded Spoil Mound B South
![Page 13: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By](https://reader035.vdocuments.mx/reader035/viewer/2022070412/56649d1a5503460f949efc1e/html5/thumbnails/13.jpg)
Degraded Portion of Spoil Mound B South
![Page 14: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By](https://reader035.vdocuments.mx/reader035/viewer/2022070412/56649d1a5503460f949efc1e/html5/thumbnails/14.jpg)
Dredging of Historic Oxbow
Degraded Portion of Spoil Mound B South
Partially Filled C-38
![Page 15: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By](https://reader035.vdocuments.mx/reader035/viewer/2022070412/56649d1a5503460f949efc1e/html5/thumbnails/15.jpg)
Historic River Channel Being Dredged to Design Depth
Turbidity Generated from the Cutter Head on the Dredge
Note: The Plume Moving Up River Indicating an Absence of Flow
![Page 16: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By](https://reader035.vdocuments.mx/reader035/viewer/2022070412/56649d1a5503460f949efc1e/html5/thumbnails/16.jpg)
All oxbows visible in this photograph were excavated from former Kissimmee River Marsh
Partially Filled C-38
![Page 17: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By](https://reader035.vdocuments.mx/reader035/viewer/2022070412/56649d1a5503460f949efc1e/html5/thumbnails/17.jpg)
Partially Filled C-38
Newly Excavated Oxbows
![Page 18: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By](https://reader035.vdocuments.mx/reader035/viewer/2022070412/56649d1a5503460f949efc1e/html5/thumbnails/18.jpg)
Substantially Filled C-38
Newly Created Oxbows
![Page 19: Kissimmee River Restoration Contract 13B Florida Department of Environmental Protection Permit No.: EI 0272794-001 Aerial Photos Taken April 1, 2009 By](https://reader035.vdocuments.mx/reader035/viewer/2022070412/56649d1a5503460f949efc1e/html5/thumbnails/19.jpg)
Southern Limit of Contract 13B and Northern Limit of Contract 13A
Limit of Newly Excavated Oxbows as part of Contract 13B
Oxbow Excavated as Part of Contract 13A
Filled C-38