Kissimmee River Restoration Contract 13B
Florida Department of Environmental Protection Permit No.: EI 0272794-001
Aerial Photos Taken April 1, 2009By Greg Kennedy
C-38
Spoil Mound B North
Northern Extent of C-38 Backfill for the 13-B Contract
Bypass Flow Way now drying due to flow
returning to the Historic and newly excavated Kissimmee Channel
Northern Extent of C-38 Backfill for the 13-B Contract
Culvert Crossing Washed Out During Initial Flows to the Restored Oxbows
Direction of Flow
Spoil Mound B North
C-38 To Be Filled
Restored Section of the Oxbow
Bypass Flow Way
Spoil Mound B North
Backfilled C-38
Restored Oxbow
Backfilled C-38
Drying Bypass Flow Way
C-38 To Be Backfilled
Restored Oxbow
Restored Oxbow
Spoil Mound B SouthC-38 To Be Backfilled
Spoil mound B South
C-38 To Be Backfilled
Bypass Flow Way
Restored Oxbow
Spoil Mound B South
Restored Oxbows
Bypass Flow Way
Spoil Mound B South
Partially Filled C-38
Restored Oxbows
Drying Bypass Flow Way
Partially Filled C-38
Restored Oxbow
Plugged C-38
Substantially Degraded Spoil Mound B South
Degraded Portion of Spoil Mound B South
Dredging of Historic Oxbow
Degraded Portion of Spoil Mound B South
Partially Filled C-38
Historic River Channel Being Dredged to Design Depth
Turbidity Generated from the Cutter Head on the Dredge
Note: The Plume Moving Up River Indicating an Absence of Flow
All oxbows visible in this photograph were excavated from former Kissimmee River Marsh
Partially Filled C-38
Partially Filled C-38
Newly Excavated Oxbows
Substantially Filled C-38
Newly Created Oxbows
Southern Limit of Contract 13B and Northern Limit of Contract 13A
Limit of Newly Excavated Oxbows as part of Contract 13B
Oxbow Excavated as Part of Contract 13A
Filled C-38