Huanghua core Terminal Project
Quianwan core Terminal Project in Quingdao Port Total 280,000,000 USD (Aug.2000-Sep.2003)
Tianjin Nanjiang core Terminal Project
Dandong core Terminal Project
![Page 2: Hinh ảnh công ty Acorp](https://reader038.vdocuments.mx/reader038/viewer/2022102723/558b9eddd8b42a266a8b4597/html5/thumbnails/2.jpg)
Rizhao Core Terminal Project, Total 210,000,000 USD (Oct.1999-Aug.2004)
![Page 3: Hinh ảnh công ty Acorp](https://reader038.vdocuments.mx/reader038/viewer/2022102723/558b9eddd8b42a266a8b4597/html5/thumbnails/3.jpg)
Crude Oil Terminal for Tankers up to 300.000 dwt in Dalian Port Total 183,000,000USD (Mar.2001-Apr.2005)
![Page 4: Hinh ảnh công ty Acorp](https://reader038.vdocuments.mx/reader038/viewer/2022102723/558b9eddd8b42a266a8b4597/html5/thumbnails/4.jpg)
New Hongguang Oil Terminal in Shenzhen Total 210,000,000USD (Feb.2002-Aug.2008)
![Page 5: Hinh ảnh công ty Acorp](https://reader038.vdocuments.mx/reader038/viewer/2022102723/558b9eddd8b42a266a8b4597/html5/thumbnails/5.jpg)
Tai’erzhuang Ship Lock for 3000t Ships Total 80,000,000USD (2001-2003)
Secondary Ship Lock in Hanzhuang Total 75,000,000 (2001-2003)
![Page 6: Hinh ảnh công ty Acorp](https://reader038.vdocuments.mx/reader038/viewer/2022102723/558b9eddd8b42a266a8b4597/html5/thumbnails/6.jpg)
Spill-way Gate for Yuqiao Reservoir in Tiajin Total 21,000,000USD (Mar.2002-Mar.2003)
DazhangZhuang Pumping station in Tiajin Total 124,000,000USD (Jun.2002-Aug.2003)
Regulation work for waterways in the lower reach of the Xijinang River in Guangxi
45,000,000USD (2001-2003)
The River Gate at the water source in Pingshan, Hebei Total 20,000,000USD (2000-2001)
![Page 7: Hinh ảnh công ty Acorp](https://reader038.vdocuments.mx/reader038/viewer/2022102723/558b9eddd8b42a266a8b4597/html5/thumbnails/7.jpg)
Steel Structure for CHEC Office Building
Steel Structureof the factory buidings for Sianghai Port Total 123,000,000USD (Mar.2003-Apr.2004)
SteelGirder Structure for the Entrance wave Testing Hall in Tianjing research Institute for water Transport Engineering
Steel Structure of the Entrance Gate for Tianjin Port Total 87,000,000USD (Mar.2003-Feb.2004)
![Page 8: Hinh ảnh công ty Acorp](https://reader038.vdocuments.mx/reader038/viewer/2022102723/558b9eddd8b42a266a8b4597/html5/thumbnails/8.jpg)
Pantuo Mountain Tunnel in Fujian Total 120,000,000USD (Mar.2000-Aug.2002)
Water Diversion Tunnel in Jinshao
Songshan Mountain Tunnel in Qingdao Total 80,000,000USD (Mar.2002-Aug.2005)
![Page 9: Hinh ảnh công ty Acorp](https://reader038.vdocuments.mx/reader038/viewer/2022102723/558b9eddd8b42a266a8b4597/html5/thumbnails/9.jpg)
Hangzho-Nanjing Express Highway Total 28,000,000USD (Jan2000-Mar.2005)
Tianjing-Jixian Express Highway Total 180,000,000USD (Feb.2001-Aug.2005)
Hangzhou-Quzhou Express Highway Total 254,000,000USD (Jan.2003-Sep.2006)National Highway Mautitania Total 286,000,000USD (Feb.2001-Oct.2005)
![Page 10: Hinh ảnh công ty Acorp](https://reader038.vdocuments.mx/reader038/viewer/2022102723/558b9eddd8b42a266a8b4597/html5/thumbnails/10.jpg)
Ningbo-Taizhou-Wenzhou Express Highway Total 308,000,000USD (Aug.2000-Oct.2005)
![Page 11: Hinh ảnh công ty Acorp](https://reader038.vdocuments.mx/reader038/viewer/2022102723/558b9eddd8b42a266a8b4597/html5/thumbnails/11.jpg)
No.1 Bridge over Xinghai Bay in Dalian, with the main span of 130.5m Total
120,000,000USD (Aug.2002-Sep.2006)
Caofeidian Rainbow Bridge, with the main span of 94m Total 80,000,000USD (Aug.2002-
Aug.2005)
Hanzhuang Bridge an extension project for Beijing-Hangzhou Canal, with the main span of
80.8m Total 50,000,000USD (Mar.2000-Jan.2003)
![Page 12: Hinh ảnh công ty Acorp](https://reader038.vdocuments.mx/reader038/viewer/2022102723/558b9eddd8b42a266a8b4597/html5/thumbnails/12.jpg)
Dandong-Benxi Express Highway Total 280,000,000USD (2001-2004)
![Page 13: Hinh ảnh công ty Acorp](https://reader038.vdocuments.mx/reader038/viewer/2022102723/558b9eddd8b42a266a8b4597/html5/thumbnails/13.jpg)
Macau international Airport Total 680,000,000USD (Oct.1999-Aug.2003)
Navigational Lighting Aid Project in Shanhaiguan Air Port
![Page 14: Hinh ảnh công ty Acorp](https://reader038.vdocuments.mx/reader038/viewer/2022102723/558b9eddd8b42a266a8b4597/html5/thumbnails/14.jpg)
Pudong International Airport Shanghai Total 230,000,000USD (Mar.2000-May.2004)
![Page 15: Hinh ảnh công ty Acorp](https://reader038.vdocuments.mx/reader038/viewer/2022102723/558b9eddd8b42a266a8b4597/html5/thumbnails/15.jpg)
TEDA Football Stadium Total 342,000,000USD
![Page 16: Hinh ảnh công ty Acorp](https://reader038.vdocuments.mx/reader038/viewer/2022102723/558b9eddd8b42a266a8b4597/html5/thumbnails/16.jpg)
Water discharge outlet for Jiangsu Nuclear Power Plant Total 233,000,000USD (Jan.2000-
Aug.2004)
![Page 17: Hinh ảnh công ty Acorp](https://reader038.vdocuments.mx/reader038/viewer/2022102723/558b9eddd8b42a266a8b4597/html5/thumbnails/17.jpg)
Railed Express Way Total 189,000,000USD (2000-2003)
![Page 18: Hinh ảnh công ty Acorp](https://reader038.vdocuments.mx/reader038/viewer/2022102723/558b9eddd8b42a266a8b4597/html5/thumbnails/18.jpg)
Yangtsy Estuary Lager Circular Concrete Caisson Testing Project in Shanghai
![Page 19: Hinh ảnh công ty Acorp](https://reader038.vdocuments.mx/reader038/viewer/2022102723/558b9eddd8b42a266a8b4597/html5/thumbnails/19.jpg)
Large Steel Circular Pile Revetment Project in Panyu, Guangdong
![Page 20: Hinh ảnh công ty Acorp](https://reader038.vdocuments.mx/reader038/viewer/2022102723/558b9eddd8b42a266a8b4597/html5/thumbnails/20.jpg)
500t Floating Crane 120m3/h Concrete Mixing
Bargel
18m3 Grab Dredger
Floating Rig for Installing
Prefabricated Drains
Bed Levelling Ship Geotextile Mattress
Laying Barge
![Page 21: Hinh ảnh công ty Acorp](https://reader038.vdocuments.mx/reader038/viewer/2022102723/558b9eddd8b42a266a8b4597/html5/thumbnails/21.jpg)
Prefabricated Drain
Driving Rig Total
Vibrating Road Roller Total Concrete Mixer Total
Batching and Mixing Plant
for Asphalt Concrete TotalAsphalt Spreader Total
![Page 22: Hinh ảnh công ty Acorp](https://reader038.vdocuments.mx/reader038/viewer/2022102723/558b9eddd8b42a266a8b4597/html5/thumbnails/22.jpg)
Concrete
Pumps
Batch Plant
Pile Driver