1. INTRODUCTION 2
2. MATERIALS 4
3. SITEPREPARATIONANDGENERALWORKS 11
4. EARTHWORKS 12
5. DRAINAGE 14
6. KERBS,FOOTWAYSANDPAVEDAREAS 18
7. FLEXIBLECARRIAGEWAYS 20
8. FOOTWAYSANDVEHICLECROSSINGS 37
9. HIGHWAYVERGESANDPLANTING 39
10. STREETLIGHTING 41
11. COMPLETIONOFWORKS 42
12. MISCELLANEOUS 43
13. STANDARDCONSTRUCTIONDETAILS 44
1
-
7/27/2019 Highway Specification
3/85
BJS/MS/3758.02/080104
1. INTRODUCTION
THIS DOCUMENT IS TO BE READ IN CONJUNCTION WITH THE DESIGN GUIDE FOR RESIDENTIALROADS, THE HIGHWAYS AGENCY MANUAL OF CONTRACT DOCUMENTS FOR HIGHWAY WORKSAND THE SOUTH YORKSHIRE LABORATORY SPECIFICATION FOR THE SUPPLY OF MATERIALSFOR USE IN HIGHWAY WORKSINTRODUCTIONThisGeneralSpecificationisissuedfortheguidanceofdevelopers,andformsthegeneralbasisforalternativemethodsofconstructionforHousingEstateRoadsandIndustrialEstateRoadswhichtheHighwayAuthorityisultimatelyrequiredtoadoptashighwaytobemaintainedatpublicexpense.INSPECTIONSThe Highway Authority shall be notified at least 3 days Noticeprior to the commencement of any stage of the works.
If,asaresultoffailuretogiveadequatenoticeofanystageofthe Failure to giveconstructionworkstheEngineerisunabletoinspectthesame,the adequate noticeDeveloperwillberequiredtocarryouttestsathisownexpensetoprovetotheHighwayAuthorityssatisfactionthattheworkscomplywiththeappropriatestandard.Otherwise,oncompletion,theworkmaynotbeconsideredforadoption.
TheHighwayAuthorityrepresentativeshallbegivenaccesstothe Access forworkinprogressandmayvisitfromtimetotime.Suchvisitsdo The Highway notabsolvetheDeveloperfromhisresponsibilityforsupervising Authoritytheworkthatheispayingfor,orfromensuringthatitiscarried representativeoutinaccordancewiththeSpecificationandapproveddrawings.EXISTING SUB-GRADEAllconstructiondetailsshowninthisdocumentarebaseduponan Assumed CBRassumedCBRof2%.IfagreedinwritingwiththeEngineer, Valuesthicknessofsub-baseandorcappinglayermayvaryifasub-gradesurveyindicatesthatthereisanincreaseordecreaseinCBRvalues.
Whenthesub-gradeisfrostsusceptible,aminimumconstruction Frostthicknessof450mmwillberequired. susceptiblesub-gradeDEFINITIONSUnlessotherwisestated,thedefinitionoftermsusedinthis GeneralSpecificationshallbethatintheGlossaryofHighwayEngineeringTermsandBS6100:2.4.1
TheEngineer,forthepurposesofthisSpecification,shallbethe The EngineerrepresentativeofTheHighwayAuthority.
WherereferenceismadeinthisdocumenttotheContractor,this The ContractorshallmeantheDeveloperorPartyenteringintoagreementwiththeHighwayAuthorityinrespectoftheadoptionofthehighway.
BritishStandard-thistermwillbeusedwherereferenceismade BritishtoaBritishStandardsInstitutionSpecificationandtheedition Standardcurrentatthetimeofconstructionistobecompliedwith.(SeeSection2materials)
2
-
7/27/2019 Highway Specification
4/85
BJS/MS/3758.02/080104
ROAD TYPESThesearedetailedintheDesignGuidesforResidentialandIndustrialRoads,andaresummarisedbelow.2. IndustrialEstateRoads
3. MainRoad
Parade4. CollectorStreet
LocalStreet
5. VillageStreet
5B. Square/MewsCourtHomezone
Footpath+PrivateDrive(Notadopted)FootpathModespecificlink
3
-
7/27/2019 Highway Specification
5/85
BJS/MS/3758.02/080104
2. MATERIALSWherever,inrespectofanyBritishStandard(BS),aBSIKitemark BSCertificationschemeisavailable,allmaterialsarerequiredtocomply Accreditationwiththatstandard,orthecontainersofsuchmaterials,shallbemarkedwithaBSICertificationTrademark(theKitemark).ThemarkofconformityofanyotherthirdpartycertificationbodyaccreditationbytheNationalAccreditationCouncilforCertificationBodiesorequivalentshallbeanacceptablealternativetothisrequirement.Atthedateofconstruction,allarticlesandmaterialsshallconformto:- GENERAL
A) theabove
B) TheHighwaysAgencyforHighwayWorksmodifiedorextendedbyanysubstituteoradditionalclausesreferredtointhisdocument
C) TheSouthYorkshireLaboratorySpecificationsfortheSupplyofMaterialsforuseinHighwayWorks
Andthefollowing:-SAMPLES AND TESTINGRepresentativesamplesofallmaterialsproposedtobeusedinthe GeneralworksshallbesubmittedfortheEngineersapprovalnotlessthanthreeweeksbeforetheyaretobeusedintheworks,andshallbeinaccordancewithSouthYorkshireLaboratorySpecificationfortheSupplyofMaterialsforuseinHighwayWorks.Suchapprovalshallbeobtainedbeforeanymaterialsaredeliveredtosite.AnymaterialsnotconformingwiththeSpecificationandrequirementswillbecondemnedinwhichcasetheymustberemovedfromthesite.TheEngineermayrequirematerialtobetestedonaroutine Routinebasisataratewhichwillnormallynotexceed; Testing CarriagewayOnesampleper50mlengthofcarriageway. (Sub base androad baseMaterial)
Onesampleper100mlengthofcarriageway. (SurfacingMaterial)Itmaybenecessarytotakesamplesforeachlayingoperation FootwaysIfanymaterialisbelowthequalityrequired,itwillbecondemnedandmustberemoved.The Developer shall bear the cost of all sampling and testing Costsrequired by the Engineer. ThesecostsarenormallyincludedintheSection38agreementandAdvancePaymentsCodeSection220ofTheHighwaysAct1980.However,theEngineermayrequireextratestsandtheseshallbepaidforbytheDeveloper.
PorouspipesshallcomplywiththerequirementsofSouthYorkshire PorousLaboratorySpecificationNo.13.(Concreteporouspipes). PipesVitrifiedclaypipesshallcomplywithBSEN295andBS65. Vitrified
4
-
7/27/2019 Highway Specification
6/85
BJS/MS/3758.02/080104
Thefittingsshallhaveflexiblemechanicaljoints.Theyshallbe Clay pipesbeddedonmaterialcomplyingwithSouthYorkshireLaboratory SpecificationNo.26andinaccordancewithSimplifiedtablesofExternalLoadsonBuriedPipelines,issuedbyTheTransportResearchlaboratory.
Plasticpipesfittingsandjointsshallbeinaccordancewiththe Plastic pipesrequirementsofBS4660,BSEN1401/1andthewaterindustry and fittingsspecificationWIS4/35/01. ConcretePipesandfittingsshallcomplywiththerequirementsof ConcreteBS5911:Part100andSouthYorkshireLaboratorySpecification Pipes andNo.14. FittingsUnlessotherwiseagreedinwritingwithTheEngineer,allpipes Joints &shallbe:- bedding
Flexiblyjointed.BeddedonmaterialconformingwithSouthYorkshireLaboratorySpecificationNo.26anddesignedinaccordancewithSimplifiedTablesofExternalLoadsonBuriedPipelines,issuedbytheTransportResearchLaboratory. BricksaretobeaClassBEngineeringorConcreteEngineering Bricks forqualitycomplyingtoSouthYorkshireLaboratorySpecification manholes,gulliesNumber16,andaretobelaidinEnglishbond. and Soak-aways etcDRAINAGE IRONWORK DrainageironworkshallcomplyinallrespectswithBSEN124 BSandbeKitemarkedorequivalent(anycertificationbodyaccredited toBSEN45011).Productsshallbemanufacturedbycompanieswhooperateto QualityBSENISO9000SeriesQualitySystemStandards. assuranceDuctileironClassD400(150mmdeep)doubletriangularto ManholeBSEN124with600mmsquareopeningsasmanufacturedby: covers and framesStanton(Inter-AxD400-H)(Orsimilarapproved).MustbeductileironwithcaptivehingetoBSEN124. Gully grates and framesMinimumClassD400 Industrial Estate and TypeAsmanufacturedby: 3 RoadsStantonWatershedD400HR8651(Orsimilarapproved)MinimumClassC250(100mmdeep) All other road typesAsmanufacturedby:StantonHY813(Orsimilarapproved) TobeinaccordancewithBS1247. Step irons for Manholes
5
-
7/27/2019 Highway Specification
7/85
BJS/MS/3758.02/080104
GULLY POTS
Fortypicalgullydetails,SeeSTANDARDCONSTRUCTIONDETAILS GeneralAllgulliesshallbetrappedandprovidedwitharoddingeyeandfixedchainstopper.ShallcomplywiththecurrentBritishBoardofAgrmentRoadsand PlasticBridgesCertificate(BBAPublications).ShallcomplywiththerequirementsofBS5911:Part230 Precast concretePrecastConcretePipes,FittingsandAncillaryProductsandSouthYorkshireLaboratorySpecificationNo.14.Shallcomplywiththerequirementsforroadgullies,asspecified ClayinBS65Specificationsforvitrifiedclaypipes,fittingsandductsorBSEN295,andshallbeinaccordancewithSouthYorkshireLaboratorySpecificationNo.12.ShallbeclaytrappedgullypotscomplyingwithBS.65and/or Footway gullies BSEN295andSouthYorkshireLaboratorySpecificationNo12withgalvanisedbucket.Thegulliesaretobecoveredwithahingedgratingandframe.(SeeSTANDARDCONSTRUCTIONDETAILS). CONCRETEAllconcreteshallbeinaccordancewithBS5328. BSAllconcreteusedshallbemadeofaggregate,cementandwater Constituentandshallcomplywiththeconditionsgivenbelow:- PartsWherestandardmixesarespecified,therelatedstrengthsshallbeas Standardfollows:- mixes
ST4 20.0 N/mm2ST5 25.0 N/mm2Inallphasesoftheworkinvolvingconcrete,theconcretemustbe Placing placedbeforetheinitialsethascommenced.Beforeconcretingworkscommence,trialmixes,usingthe Concreteaggregatesproposedfortheworkshallbemadetoensurethat carriageways,theconcreteissufficientlyworkableandthatnosegregation Bus draw- ins,ofthemixoccursduringeithertransportationorplacing. lay-bys, In-situThecompositionofthesetrialmixesshallbeadjustedtoensure channelling,thatthecharacteristiccompressivestrengthofcubestestedin Manhole slabsbatchesoffourshallbe40Npermm2at28days. Theconcreteshallbeair-entrainedandthetotalquantityofairasapercentageofthevolumeofthemixshallbe5%+1.5%. Concreteforthesepurposesshallbeofsuchproportionsasto Concreteprovideacharacteristiccompressivestrengthof25Npermm2 Manhole(ST5)at28days.WhenrequiredbytheEngineertheContractor foundations shallsatisfyhimthatthearrangementsformixingtheconcreteare benching andadequatetoproduceamaterialoftherightquality,andshall concrete raftssupplybatchesoffourcubesfortestpurposes. Pipebeddingandhaunching. Concrete gradeBeddingandbackingofkerbsandedging. ST4 (20N/mm2)Manholesurrounds. shall be used
6
-
7/27/2019 Highway Specification
8/85
BJS/MS/3758.02/080104
Gullybasesandsurrounds. for theseSteelpedestrianfencingsurround. purposesPipesaddling.Trenchbases.Blindingbasesofexcavations.MORTAROrdinaryPortlandCementshallbeusedunlessotherwisespecified. Cement MortarTobemixedbyvolumeataratio1ofcementto3sand.NaturalsandoncrushednaturalstoneorcombinationofbothasspecifiedinBS1200(Specificationsforbuildingsandsfromnaturalresources).CONCRETE KERBS CHANNEL AND EDGINGAllprecastconcretekerbs,channelsandedgingshallbe Concrete kerbshydraulicallypressedandshallcomplywiththerequirements channel andofSouthYorkshireLaboratorySpecificationNo.11.Special edgingkerbs(Plasmobility)havingdimensionscomplyingwithBS7263,maybeapprovedbyTheEngineer.ROAD PAVEMENTS
Sub-baseshallbeinaccordancewithSouthYorkshireLaboratory Sub-base SpecificationNo.19.Thesourcematerialshallbeapprovedby TheEngineer.DenseBase(Roadbase)toBS4987andSouthYorkshire BaseLaboratorySpecificationNo.30. (Roadbase)
Surfacing DenseBinderCoursecomplyingwithBS4987and Binder courseSouthYorkshireLaboratorySpecificationNo.31.OR
RolledAsphaltcomplyingwithBS594andSouthYorkshireLaboratorySpecificationNo.7.
StoneMasticAsphaltcomplyingwithBS4987andto SurfaceSouthYorkshireLaboratorySpecificationNo.41 Course
ORRolledAsphalttocomplyingwithBS594andSouthYorkshireLaboratorySpecificationNo.29
OR 10mmsizeCloseGradedSurfaceCoursecomplyingwithBS4987andSouthYorkshireLaboratorySpecificationNo.33
OR6mmsizedenseSurfaceCoursetoBS4987andSouthYorkshireLaboratorySpecificationNo.34
ORInterlockingBlockPavingcomplyingwithBS6717Precastconcretepavingblocks NotesMaterialscontaininglimestoneorblastfurnaceslagaggregate Blast furnaceshallNOTbepermittedintheSurfaceCourse. slag
7
-
7/27/2019 Highway Specification
9/85
BJS/MS/3758.02/080104
Whenthesurfacingcourseislaidinstagesthesame Stage layingaggregatemustbeusedforeachstage.
BITUMINOUS BINDERSAllbindersinbituminousmaterialsmustbestraight-run.Addition offluxingagentsisnotpermittedwithoutwrittenpermissionfrom TheEngineer Jointsealingcompoundshallconsistofeitherhotorcoldpoured Joint sealingmaterialasdetailedpage28-JOINTSINFLEXIBLESURFACING Compound
8
-
7/27/2019 Highway Specification
10/85
BJS/MS/3758.02/080104
FOOTWAY PAVEMENTS
ThematerialusedshallconsistofacompactedlayerofType1 Sub Base forgranularsub-basematerialandshallcomplywiththe footways andrequirementsoftheSouthYorkshireLaboratorySpecificationNo19 margins Surfacing for footways6mmsizeSurfacingCoursetoBS4987andcomplyingwith AsphaltSouthYorkshireLaboratorySpecificationNo.34With
20mmsizeBinderCoursetoBS4987andcomplyingwith SouthYorkshireLaboratorySpecificationNo.31
ORPrecastconcreteflagsshallcomplywiththerequirementsof PCCFlagsSouthYorkshireLaboratorySpecificationNo.11,bebeddedon sharpsandandcementataratioof6:1onthepreparedsub-baseORInterlockingBlockPaving(PencilEdge) Block Paving ORNaturalstoneflags Natural
Stone flags
Thesurfacingfornon-vehicularhardenedmarginsshall Surfacing forbe60mmthickconcreteblockpavingbeddedon35mm non-vehicularcompactedthicknessofsharpsand hardenedmargins
SeeSTANDARDCONSTRUCTIONDETAILS Cycle trackconstructionROAD HUMPSSeeSTANDARDCONSTRUCTIONDETAILS Construction
PositionofroadhumpstobeagreedwithHighwayAuthorityatplanningstage. LocationsGeometricaldesignshallbeinaccordancewiththelatest RegulationsversionofTheHighways(RoadHumps)Regulations.
9
-
7/27/2019 Highway Specification
11/85
BJS/MS/3758.02/080104
PAINT FOR METALWORKShallbecarriedoutinaccordancewiththemethodsrecommended PaintworkinBS6150,usingmaterialscomplyingwithClause164andprimedattheworksinaccordancewithBS5493Paintworkspecificationforhandrailsandsafetybarrier1stcoat-Galvanising-Hotdipgalvanisingminimumthicknessofgalvanising70micronB.S.7292ndcoatandpreparation"T"wash(orsimilar)3rdcoat-Primer-Zincphosphatemetalprimer4thcoat-Undercoat1-Alkydundercoat(Grey)5thcoat-Undercoat2-Alkydundercoat(White)6thcoat-TopCoat-Permaglaxe12D45-Green(orsimilarapproved)NB1st2ndand3rdcoatstobecarriedoutinfactory
10
-
7/27/2019 Highway Specification
12/85
BJS/MS/3758.02/080104
3. SITE PREPARATION AND GENERAL WORKS
Theinvestigationshouldgatheralldataneededforassessing: Ground Investigation
A Generalsuitabilityofthesiteandneighbourhoodforthe
proposeddevelopmentworks
B Physicalcharacteristicsofthegrounde.g.presenceofIn-groundobstacles,services,buriedconduits,sumpssoftspots,cellarsetc.
C Physicalcharacteristicsofcontaminatedmatricese.g.mineralogy,moisturecontent,permeability,chemicalcomposition,particlesizedistribution
D Geotechnicalcharacteristicse.g.strength,compressibility,stabilityofslopes,existingstructures,potentialforsubsidenceetc.
E Theneedfordesignrequirementsofanyfoundations,earthworks,temporaryworksandspecialistgeotechnical
processesassociatedwiththedevelopmentstrategy,takingintoaccounttheeffectofanyprevioususesofthesite.
F Anyfactorsarisingfromthesoilorgroundwaterconditionsthatmightconstraintheconstructionorimplementationofdevelopmentworksincludingtemporaryworks,excavation,traffickabilityanddrainage.
G Thequantity,qualityandeaseofextractionofconstructionmaterials
(e.g.concretefoundations)suitableforinclusionintheworks
H Changesinthestability,drainageorothergeotechnicalaspects
ofthesiteandthesurroundinggroundandbuildingswhich mightbeinitiatedbythedevelopmentworks.
Inaddition,itmaybenecessarytoassessthestabilityofexistingstructures,ortoevaluatepotentialfailureorinstability.AllinvestigationworksshallbecarriedoutinaccordancewithBS5930.SpecialistgeotechnicalprocessesshallbespecifiedanddesignedinaccordancewithappropriateindustrystandardsorrelevantCodeofPractice.Thelinesandlevelsofthecarriageways,footways,verges,drainsandallother Setting outworksshallbeproperlysetoutbeforecommencementoftheWorks.TheContractorshallremovebuildingstoaminimumof1.5mbelowformation Site clearancelevel)andotherobstructions,grubupandremovetrees,hedges,bushes,shrubsandclearthesiteoftheworkstothesatisfactionofTheEngineer.
Cellarstobeexcavatedandfilledtospecification.
Drawingsshowingsiteclearancedetailstogetherwithappropriate DrawingsschedulesandappendicesshallbesubmittedtoTheEngineerpriortocommencementoftheworks
Theprovisionofacomprehensivesystemofsub-soildrainagemay Sub-Soilberequiredwhereproposedroadsareincuttingorwherethereis Drainageevidencethatthegenerallevelofthewatertableiswithin600mmofthecarriagewayformationlevel
11
-
7/27/2019 Highway Specification
13/85
BJS/MS/3758.02/080104
4. EARTHWORKS
AllEarthworksaretocarriedoutinaccordancewiththe GenerallatestrequirementsofSeries600ofTheHighwaysAgencySpecificationForHighwayWorks:-ThelatestrequirementsofSouthYorkshireLaboratorySpecificationForTheSupplyofMaterialsForUseinHighwayWorks:-Andthefollowing:-Drawingsshowingearthworksdetailstogetherwith DrawingsappropriateschedulesandappendicesshallbesubmittedtoTheEngineerpriortocommencementoftheworks.Alltopsoilshallberemovedfromthearearequiredfor Topsoilhighwayconstruction.
Excavationshallbetocorrectlines,levelsandcontours. Line & levelWhererockismetinexcavationitshallbecutouttothe Excavation linesandlevelsshownontheapproveddrawings,oras in RockdirectedbyTheEngineer.SurfaceirregularitiespresentintheformationaftercompletionoftherockexcavationshallbecorrectedwithalayerofmassconcretegradeST4laidandcompactedtotherequiredlevels.TheincorporationofanyoftheexcavatedrockintheworksshallbelefttothediscretionofTheEngineer,dependinguponthenatureandsuitability/gradingoftherockforthispurpose.Allsub-gradesaretobeproofrolledandcheckedforsoftspots. Proof rolling/TheseshallbecutoutasdirectedbyTheEngineerandbackfilled Soft spots withGRANULARFILL(seepage15)Unlessspecificallyexcepted,allexcavatedorfilledsurfaces Compaction withintheareaofthehighwayshallbethoroughlycompacted inaccordancewithclause612oftheSpecificationForHighwayWorks.TheContractorshallcarryoutanyextrarollingandcompactionnecessitatedby:-
A Thesoftorartificialnatureofthesite
B Theloosenatureofreplacedmaterialindrain, sewer,statutoryundertakers,orothertrenches.C Anysubsidencethatmayoccur
12
-
7/27/2019 Highway Specification
14/85
BJS/MS/3758.02/080104
AtthediscretionofTheEngineer,onsoftground,75mmto Soft ground125mmsinglesizestonemaybelaidoverthesub-grade,untilanadequatefoundationisachieved.EngineeringfabricsmayalsobeusedinthesecircumstancesasdirectedbyTheEngineer.Nomaterialshallbeusedforfillingundercarriageways FillingandfootwayswithoutthepriorapprovalofTheEngineer.GranularFillshallcomplywithclass6F1/6F2 Granular FillCappingshallcomplywithclass6F1/6F2 Capping layerShallbeinaccordancewithclause617oftheSpecification TraffickingforHighwayWorksandthefollowing; of sub-gradeTraffickingofthesub-gradeshouldbeavoided. Wherethecontractorproposestousethesub-gradefor constructionplant,heshall:StopexcavationshortofformationlevelOR
Provideadequateprotectiontotheformationbytheuseofacappinglayerortype1sub-base.
IftheContractordamagesthesub-grade,theaffectedareas Damage toshallbecutouttoadepthasdirectedbyTheEngineerand sub-gradereinstatedwithapprovedcappingmaterialproperlycompactedtohissatisfactionbeforeanysubsequentpavementlayersareplaced.
13
-
7/27/2019 Highway Specification
15/85
BJS/MS/3758.02/080104
5. DRAINAGEGENERALThis document is concerned only with highway drainage.Sewers are the responsibility of the Sewerage Undertaker and anyconcerns or queries regarding sewers are to be directed to them. AllDrainageworksaretocarriedoutinaccordancewiththelatestrequirementsofSeries500ofTheSpecificationForHighwayWorks:-ThelatestrequirementsofSouthYorkshireLaboratorySpecificationForTheSupplyofMaterialsForUseinHighwayWorks:-Andthefollowing:-Drawingsshowingproposeddrainagedetailstogetherwith DrawingsappropriateschedulesandappendicesshallbesubmittedtoTheEngineerpriortocommencementoftheworks.
ExcavationExcavationinanymaterialshallbeinopentrenchesto (General) correctlinesandlevels,asshownontheapproveddrawings ortosuchotherlinesandlevelsasdirectedbyTheEngineer.ExcavationstakenouttoagreaterdepththannecessaryshallbefilledwithconcretegradeST4ortheappropriatebeddingmaterial,toaleveldirectedbyTheEngineer.TrenchingshallbeofsufficientwidthtoenablethepipestobeproperlylaidandjointedbutinnocasegreaterthanthewidthspecifiedinSimplifiedtablesofexternalloadsonburiedpipelinesissuedbyTransportResearchLaboratory.Specialcareshallbetakentoprovideasolidandevenbedforthebarrelsofthepipes.Pits,trenchesandotherexcavationsshallbeadequately (Finish)supported,shallnotbebatteredandshallbewideenoughtoenablethepipesandconcretetobelaidaccurately,andproperrefillingandrammingtobecarriedout.Wheresolidrockissetintrenches,itshallbecutouttoadepth (Rock)of150mmbelowtheintendedleveloftheundersideofthepipesorthediameterofthepipewhicheveristhegreaterandreplacedwithpipebeddingmaterial(asspecifiedonpage8;JOINTSANDBEDDING)toprovideafirmbedforthepipes.AnyoverdigshallbebackfilledwithconcretegradeST4,topermitauniformdepthofbeddingmaterial.
Ifanystreamsorwaterways,landdrainsorsewersareintersected Temporary/byanypartoftheWorks,theyshallbeconductedpastthesame Permanentduringconstructionbytroughsorothertemporarymeans,andas Diversions ofsoonaspossible,restoredtoaconditionsuitableforthepurpose. Ground WaterLanddrainsshallbeprovidedunderthenewroadsifthenatureofthesub-soilappearstowarranttheiruse.(seepage5;POROUSPIPES)Trenchesandallotherexcavationsshallbekeptfreefromwater Prevention ofuntilanyconcreteorotherworksthereinaresufficientlysetand Standing WatertheContractorshallconstructanysumpsortemporarydrainsthataredeemednecessary.TheContractorshallmakegoodanydamagecausedbyprolongedand/orexcessivepumpingandshalltakeallprecautionsnecessaryforthesafetyofadjoiningstructuresandbuildingsduringthetimethatthetrenchesareopen.
14
-
7/27/2019 Highway Specification
16/85
BJS/MS/3758.02/080104
UnlessotherwisedirectedbyTheEngineer,pipesforcarrying Laying andsurfacewatershallhaveflexiblejointsandbelaidinaccordance Jointing ofwithmanufacturersinstructions.Allpipesshallbelaidtrueto pipeslineandlevel,witheachpipebeingseparatelyaligned.Pipebeddingmaterialshallbeasdescribedonpage8-JOINTSANDBEDDINGWheredirectedbyTheEngineer,existinghighwaydrains Carrier Drainsshallbeproperlyextendedtoreceiveadditionalflowsfromnewgulliesorchannels.Detailsofexpectedsurfacewaterrunoffanddrainagecalculationswillberequestedpriortowrittenpermissionbeinggranted.Anygullyorbranchconnectionsshallbemadeduringtheconstructionofthemaindrainandarecordoftheirpositionskeptforfutureuseorreference.Wherepipeconnectionsaremadetoabrickdrain,concreteculvert,stonebuiltorlinedchannel,thepipesshallbewellandtightlybuiltintotheconcrete,brickormasonrywork,andbesoplacedastodischargeinthedirectionofflowofthemaindrainorchannel,andwiththeendofthepipecuttothenecessaryangle.Wheretheconnectionsarebetweenpipeddrains,specialconnectingpipesshallbesupplied,trulylaidandproperlyjointed.Wherepipesarebeneaththecarriagewayorfootway,ata Shallowdepthlessthan1.2metrescoverfromthefinishedsurfacelevel Pipework(orelsewhereifTheEngineerconsidersthatthenatureofthegrounddemandsit),theyaretobebeddedonandsurroundedwith150mmofconcretegradeST4.Incarryingoutthiswork,theContractorshalltakecaretopacktheconcreteunderandaroundthepipestoensureevenbeddingandsolidityintheconcrete.Theconcreteshallnotbethrowndirectlyontothepipes.Theuppersurfaceoftheconcreteshallbestruckoffwithawoodenscreedortemplateandneatlyfinishedoff.Thesurroundingofpipeswithconcreteortherefillingoftrenches,shallnotproceeduntilthedrainshavebeeninspectedandapprovedbyTheEngineer.Theflexiblejointshallbemaintainedbyformingabreakintheconcretebedandsurroundbytheuseofflexcell,fibreboardorotherapprovedmaterials.AllpipelinesshallbedesignedinaccordancewithBS5911andSimplifiedtablesofexternalloadsonburiedpipelinesissuedbyTransportResearchLaboratory.Junctionpipeswhicharelaidbutarenotimmediatelyconnected Gullytogullies,shallbefittedwithtemporarystoppersorseals, connectionsandthepositionofallsuchjunctionsshallbeclearlydefinedbymeansofstakesortrailingwiresproperlymarkedorlabelled.
Allbricksshallbeasdescribedonpage5.Brickworkistobebuiltin Brickwork EnglishBond,onmortar(inaccordancewiththedetailsshownonpage for manholes(7),finishedplumbandtrue,andflatpointedontheexposedface gullies andastheworkproceeds.Eachbrickistobewellbeddedandjointed. soak-aways etc.Nohalfbricksshallbeusedexceptasclosures.Nobrickworkshallbebuiltwhentheoutsidetemperatureprecludestheproperplacingofconcrete.ManholesandInspectionChambersshallbeconstructedin Manholes andthepositionsshownontheapproveddrainagedrawings,or inspection
15
-
7/27/2019 Highway Specification
17/85
BJS/MS/3758.02/080104
asdirectedbyTheEngineer.Thedesignsanddetailsshallbe chambersinaccordancewiththeStandardDetailsshowninTheHighwaysAgencyConstructionDetails,SeriesF-Drainage.Seebelowregardingsettingstreetfurnituretofinishedlevels. GulliesUnlessotherwisedirectedbyTheEngineer,eachgullyshall (Drained area)drainamaximumof200sq.m. .Individualgulliesshallbesitedtoavoidstandingwateronthe (Siting)carriagewayandtopreventflowsthatmightcreatedanger,damageorgiverisetocomplaints.
Allgullyconnectionsaretobeproved. (ProvingConnections)Gullypotsshallbesetonafoundationofandsurroundedby (Setting gully150mmofconcretegradeST4.Aftertheconcretehassetand pots)hardened,backfillingshallbecarriedoutandthoroughlycompacted.Coversandframes,shallbesettocorrectlevelsona Setting coversminimumofoneandamaximumoffourcoursesofbrickwork andframes(SeeBRICKSFORMANHOLES,GULLIES&SOAKAWAYSETCONPAGE5)ontopofdrainageunits.Forgullies,thetopcourseshallbelaidasheaders,asbrickonedge.(REFERTOSTANDARDCONSTRUCTIONDRAWINGSFORDETAILS)
Toallowforadequatecompactionofpavementasphaltlayers, Setting streetstreetfurnitureshouldnotbeplaceduntilthebasecourselayeris furniture toiscomplete.Anychambersorgulliesshouldbecoveredtoprevent finished levelsingressofextraneousmatter.Streetfurnitureshouldthenbesettofinishedlevelsbeforethe wearingcourseislaid.WhereTheEngineerisinanydoubtastotheefficiencyofthe Testingdrainageworks,hemayrequiretheContractortoprovidethe Drainsapparatus,labourandtoolsformakingtestsbeforethetrenchesarebackfilled,orconcretesurround/haunchingisplacedinposition.AnydefectsdiscoveredintestingorotherwiseshallbemadegoodasdirectedbyTheEngineerandnopipesorfittingsofanydescriptionshallbecoveredupuntilhehasgivenhisapprovaltothesame.OnlyafterthedrainshavebeenapprovedbyTheEngineershall Backfilling trenchesbebackfilled.The first 300mm of backfill above thecrown of the pipeshallbefillmaterialasspecifiedinSimplifiedtablesofexternalloadsonburiedpipelinesissuedbyTransportResearchEstablishment.Theapprovedmaterialshallbecompactedinlayers,toadensityatleastequaltothatoftheundisturbedgroundadjacenttothetrench.Duringthefillingprocess,caremustbetakentoavoidpipesbeingbroken,displacedormoved.Whenconcreteisnotusedforsurroundingthedrains,thefirstlayeroffillingshallbecarefullyplacedintopositionbyhandandrammedsothatnocavitiesareleftunderthepipes.The remainder of the trenchistobebackfilledtoformation
16
-
7/27/2019 Highway Specification
18/85
BJS/MS/3758.02/080104
levelorsubformationlevelwherecappingisrequired,withType2sub-basematerialtoSouthYorkshireLaboratorySpecificationNo20(orothermaterialapprovedinwritingbyTheEngineer,whichshallcontainaminimum10%ofmaterialretainedona37.5mmBSsieve).Timberwhichhasbeenemployedforshoringandsupporting, Shoring andshallnotberemoveduntilthecompactedfillhasreachedsuch support timberalevelastorendersupportunnecessary.Itshallthenberemovedasfillingproceeds,buttheymaybeleftintrenchesorotherexcavations,asdirectedbyTheEngineer.Anydamagearisingfromthecollapseoftrenchesmustbemadegood.Nomaterialshallbeusedforfillingunderthecarriageways andfootwayswithoutpriorapprovalofTheEngineer.
17
-
7/27/2019 Highway Specification
19/85
BJS/MS/3758.02/080104
6. KERBS, FOOTWAYS AND PAVED AREAS
Allworksforkerbs,footwaysandpavedareasaretocarried GENERALoutinaccordancewiththelatestrequirementsofSeries1100ofTheSpecificationForHighwayWorks:-ThelatestrequirementsofSouthYorkshireLaboratorySpecificationForTheSupplyofMaterialsForUseinHighwayWorks:-Andthefollowing:-Drawingsshowingdetailsofproposedkerbs,footwaysand DrawingspavedareasshallbesubmittedtoTheEngineerpriortocommencementoftheworks.Concretekerbsaretobelaidtocorrectlineandlevelona Laying Kerbspreformedbedofconcretekerbrace,150mmminimumthicknessunlessotherwisedirectedbyTheEngineer.Theconcreteistobecarriedupthebackofthekerbstowithin100mmofthetopfaceforawidthof150mmtoformahaunch.Jointsbetweenkerbsshouldnotexceed2mminwidth. JointsWherejointsarewiderthan2mm,orwherekerbshavebeencut,jointsaretobefilledwithcementmortar(asdescribedonpage7)andthefaceofthejointpointed.Forallcurvesupto12metreradius,circularkerbsaretobeused Radiiandlaidtruetoradius.Curvesbetween12metresand20metresradius,aretobeformedusing450mmstraights.Curvesinexcessof20mradiusaretobeformedusingfulllengthstraightkerbs.KerbfaceshallbeasspecifiedinSTANDARDCONSTRUCTION Kerb FaceDETAILS,GENERALREQUIREMENTSFORKERBING&CHANNELLING.Wherespecialkerbsareused,thekerbfaceshallbeasdirectedbytheEngineer.CHANNEL BLOCKS
ChannelBlocks150mmx150mm(125mm)aretobeusedwhenchannelgradientsare;
A. between1.25%(1in80)and0.67%(1in150)
B. orgreaterthan10%(1:10)(topreventscour)Combineddrainageandchannelunitsaretobeusedwhenchannelgradientsare;lessthan0.67%(1in150)
18
-
7/27/2019 Highway Specification
20/85
BJS/MS/3758.02/080104
Channelblocksshallabutthefrontfaceofkerbs,shallbelaid Layingtocorrectlineandlevelona150mmthickbedofconcrete,andshallbeproperlybondedtotheconcreteusedinthekerbfoundations.(SEESTANDARDCONSTRUCTIONDETAILS,GENERALREQUIREMENTSFORKERBING&CHANNELLING)Wherethekerbradiusexceeds12metres,channelblocksshall Radiibe450mminlength,butwheretheradiusislessthan12metrestheyshallbe300mminlength.Jointsbetweenblocksarenottoexceed2mminwidthandareto Jointsbeproperlygroutedwithcementmortar(forspecificationseepage7).COMBINED KERBING AND DRAINAGE UNITSCombinedkerbinganddrainageunitsaretobelaidinaccordancewithmanufacturersinstructions.DAMAGE TO KERBS etcShouldanydamagebedonetothefinishedkerbs,edging,channel Damageblocksorcombineddrainageunits,orshouldanymovementoftheblockstakeplaceduringtheexecutionoftheworksorduringthemaintenanceperiod,theContractorshalltakeoutandmakegoodthelengthssoaffected,includingallassociatedworks.Newconcretebedandhaunchistobeprovidedforkerbing,edging,channelblocksandcombinedkerbinganddrainageunits
19
-
7/27/2019 Highway Specification
21/85
BJS/MS/3758.02/080104
7. FLEXIBLE CARRIAGEWAYSAllroadpavementsaretobebuiltinaccordancewiththelatest GENERALrequirementsofthefollowingSeriesofTheSpecificationForHighwayWorks:-
700 :RoadPavementsGeneral800 :Roadpavements-Unbound,HydraulicallyBoundandothermaterials900 :Roadpavements-AsphaltBoundMaterials1100:KerbsFootwaysandPavedAreas,Clause1107ThelatestrequirementsofSouthYorkshireLaboratorySpecificationForTheSupplyofMaterialsForUseInHighwayWorks.
andthefollowing:-Drawingsshowingdetailsofproposedroadpavementworksshall DrawingsbesubmittedtoTheEngineerpriortocommencementoftheworksBITUMINOUSHotbituminousmaterialsshallbelaidandcompactedinaccordance BritishwiththerequirementsandrecommendationsforlayinginBS4987: Standard forPart2orBS594:Part2,asappropriate.WherethereisnoBritish AsphaltStandardfortheparticularmaterial,itshallbelaidinaccordance MaterialswiththerequirementsandrecommendationsofBS594:Part2,subjectalsototherequirementsofClause901SubClauses8to31ofTheSpecificationForHighwayWorks,andSouthYorkshireLaboratorySpecificationForTheSupplyofMaterialsForUseInHighwayWorks.Allmaterialsshallbeplacedandspreadevenly. SpreadingAllmaterialshallbespreadusingapavingmachineoraspreaderboxoperatedwithamechanismthatlevelsoffthematerialtoanevendepth.IncaseswhereTheEngineerconsidersthattheextentoftheworkdoesnotwarranttheuseofmechanicalequipment,hemayallowhandspreading.Insuchcases,everyprecautionshouldbetakentominimisesegregationandtoavoidcontaminationofthematerial.TheContractorshall,inhischoiceofpermittedmaterialsfor Choice ofsub-bases,haveregardtothenatureofthosematerialsandofthe permittedsub-gradeoranyothercappingandneedtoprotectthemfrom materialsdeteriorationduetotheingressofwater,theadverseeffectsof for sub-baseweatherandtheuseofconstructionplant.Thecontractorshallprogrammethelayingandcompactionofthesub-baseandthesubsequentpavementcoursesandtakesuchstepsasmaybeconsiderednecessary,toaffordprotectiontothesub-baseandsubgrade.
CompactionshallcomplywithB.S.4987-2:Clause7. Compaction(Pleaserefertotablesfordelivery&rollingtemperatures of asphaltextractedfromBS4987onpages28&29) materials
Asphaltmaterialsshallbelaidandcompactedinlayerswhichenablethespecifiedthickness,surfacelevel,regularityrequirementsandcompactiontobeachieved. CompactionshallbesubstantiallycompletedbeforethetemperaturefallsbelowtheminimumrollingtemperaturesstatedBS4987:Part2orBS594:Part2.
Rollingshallcontinueuntilallrollermarkshavebeen
20
-
7/27/2019 Highway Specification
22/85
BJS/MS/3758.02/080104
removedfromthesurface.Asphaltmaterialsshouldnormallyberolledinalongitudinaldirection,withthedrivenrollsnearestthepaver.Therollershallfirstcompactmaterialadjacenttojointsandthenworkfromthelowertotheuppersideofthelayer,overlappingonsuccessivepassesbyatleasthalfthewidthoftherearrollor,inthecaseofapneumatictyredroller,atleastthenominalwidthofonetyre.Therollingpatternshouldbesuchastoensurethatcompactionisasuniformaspossibleacrosstheroadwidth.Inordertoachievethis,atleasthalfoftherollerpassesshouldbealongtheedgeofthelayer.Rollersshallnotbepermittedtostandonwarmcompacted Stationarymaterials Rollers
Therecommendedrollerforallcarriagewayworksshallbe RecommendedBM130orTV130orsimilarapproved. rollers
Regulating
Regulatingcourses,thatmayconsistofoneormorelayersof (Tolerences) asphaltmaterial,shallhavetheirfinishedsurfaceslaidtoachievetheappropriatetolerancesforhorizontalalignments,surfacelevelsandsurfaceregularity,forpavementlayers.UnlessotherwiseadvisedinwritingbytheEngineer,base (Materials)(roadbase)orbindercoursemacadamcanbeusedforregulatingimmediatelybelowthesurfacecourse.Asphaltmaterialsusedshallmeettherequirementsoftheappropriatematerialasspecified.Wherethetotaldepthofregulatingcourseexceeds150mmthen (Compactedthecourseshallbelaidsothateachregulatinglayerhasa thicknesses)compactedthicknessofbetween75mmand150mm.Whereanypavementlayerdoesnotcomplywiththespecification Rectificationforregularity,surfacetolerance,thickness,texturedepth,materialpropertiesorcompaction,thefullextentoftheareathatdoesnotcomplywiththespecificationshallbemadegoodandthesurfaceofthepavementcourseshallberectifiedinthemannerdescribedinlaterparagraphsforeachsectionseparately.
Reclaimedasphaltmaterialsmaybeusedinproductionof Reclaimedasphaltbase(roadbase),bindercourseandsurfacecourse. asphaltAdviceonthetypesofreclaimedasphaltmaterialspermitted materials canbeobtainedfromTheEngineer .Shouldanyasphaltmaterialbecomecontaminated,The CleanlinessContractorshallmakeitgoodbycleaningitbyjetwashing. of laidIfthisprovesimpractical,thefulldepthofthetoplayeras bituminouslaidshallberemovedandbereplacedwithfreshmaterial layerslaidandcompactedinaccordancewiththeSpecification.
ReinstatementofopeningsshallcomplywiththeSpecification ReinstatementFortheReinstatementofOpeningsinHighwaysissuedbythe of paved areasSouthYorkshireHighwayAuthoritiesandUtilitiesCommittee.Immediatelybeforeasphaltlayersarereinstated,theedgesoftheexistingmaterialshallbecleanedofallloosematerialandbecoatedwithanappropriatehotbinder,orequivalenttreatment.
21
-
7/27/2019 Highway Specification
23/85
BJS/MS/3758.02/080104
SUB-BASE
Allroadpavements(unboundmaterials)aretobebuiltin GENERALaccordancewiththelatestrequirementsofSeries800ofTheSpecificationForHighwayWorks.
ThelatestrequirementsofSouthYorkshireLaboratorySpecificationForTheSupplyofMaterialsForUseInHighwayWorks.andthefollowing:-Thedeliveryofthematerialshallbeco-ordinatedwiththe Deliverytherateoflayingtoavoidinterruptiontothelayingprocess.Materialupto225mmcompactedthicknessshallbespreadinone Compactionlayersothataftercompactionthetotalthicknessisasspecified.Materialofcompactedthicknessgreaterthan225mmshallbelaidintwoormorelayersandtheminimumcompactedthicknessofanysuchlayershallbe110mm.Wherelayersofunboundmaterialareofunequalthicknessthelowestlayershallbethethickestlayer.Thesub-basematerial,atappropriatemoisturecontent,shall becompactedtotherequirementssetoutinTheSpecificationForHighwayWorks,table8/1.Tolerancesare+10mm30mm.INDUSTRIAL ESTATES Materialsshallbecompactedwithvibratingrollerswithoutdryingoutorsegregationsothatwhentestedtheyachieve95%ofthedensitywhencompactedinaccordancewithBS 1377 Part 14.Thisshallbemeasuredin-situusingacalibratednucleardensitymeteratarateof1testsper50linearmetresofcarriageway.Priortolayingthebituminousmaterialthesurfaceofthesub-baseshallnothavearutexceeding10mmmeasuredusinga3mstraightedge.Thesurfaceofanylayerofmaterialshalloncompletionofcompactionandimmediatelybeforeoverlayingbewellclosed,freefrommovementundercompactionplantandfromridges,cracks,loosematerial,potholes,rutsorotherdefects.Allloose,segregatedorotherwisedefectiveareasshallberemovedtothefullthicknessofthelayer,andnewmateriallaidandcompacted.Thetop110mmshallbescarified,reshapedwithmaterialaddedor Rectificationremovedasnecessary,andre-compacted.Theareatreatedshallbe (Refer tonotlessthan20mlongand2mwide. General section on page 22)BASE (ROADBASE)Allroadpavements(asphaltboundmaterials)aretobe GeneralbuiltinaccordancewiththelatestrequirementsofSeries900ofTheSpecificationForHighwayWorks.ThelatestrequirementsofSouthYorkshireLaboratorySpecificationForTheSupplyofMaterialsForUseInHighwayWorks.andthefollowing:-Base(Roadbase)materialshallbespreadoverthesub-baseand Compaction
22
-
7/27/2019 Highway Specification
24/85
BJS/MS/3758.02/080104
rolledsoastogivethecompactedthicknessrequiredbyclause901ofTheSpecificationForHighwayWorks,andBS4987-2Table1.Wheremorethanonelayerofmaterialisrequiredeachlayershallbethoroughlycompactedtothecorrectlevelsandprofilebeforethematerialforasubsequentlayerisspread.Withcoatedmacadamorasphaltbases(roadbase),thefulldepth Rectificationofthetoplayeraslaidshallberemovedandreplacedwithfresh (Refer tomateriallaidandcompactedinaccordancewiththeSpecification. General sectionAnyareasotreatedshallbeatleast5mlongandthefullwidthof onpage 22)thepavinglaidinoneoperation.Alternativelyforlowareasinasphaltbase(roadbase)tobeoverlaidwithbindercourse,theContractormaymakeupthelevelwithadditionalbindercoursematerial.SURFACINGTheconsolidatedthicknessoftherespectivelayersofcoated Thicknessmaterialsforthesurfacingofcarriageways,aspreviously of Layersspecified,shallbeasindicatedintheStandardConstructionDetails.
Thespreadingandinitialcompactionofsurfacingmaterial Spreading andshallbecarriedoutbyanAsphaltFinisherunlessotherwise compaction ofagreedinwritingwithTheEngineer. CoatedLayingshallcomplywithClause6.3ofBS4987:Part2. MaterialsFinalcompactionshallbecompletedasdescribedbelow, MachineshallsatisfytherequirementsassetoutinSection7of LayingBS4987:Part2andshallconformtothelevelsandcross-sectionsspecified.
Anyresultsfallingbelow93PRDwillbedeemedtohavefailed. Minimum PRD
Thecoatedmaterial,shallbespreadbymeans Hand Layingofheatedtoolstothecorrectthickness,shouldsatisfytherequirementsassetoutinClause6.4ofBS4987:Part2.FinalcompactionshallsatisfytherequirementssetoutinSection7ofBS4987:Part2andshallconformtothelevelsandcross-sectionsspecified.Narrowstripsremainingalongsidemachinework,iflaidbyhand,shallberolledatthesametimeasthemachinelaidwork,withallowancebeingmadeforextrasurchargetoandcompactionofthehandlaidmaterial.Themethodoflayingshallensurethatairvoidsof:- Air VoidsCompactedCloseGradedSurfaceCoursematerials
And
DenseBindercourseandBase(Roadbase)materials
Shallbeintherangeof2%to8%.Notmorethan1in10resultswillbepermittedabove8%andnoresultisallowedover10%.
CompactedHotRolledAsphaltmaterial Shallbeintherangeof2%to6%. Notmorethan1in10resultswillbepermittedabove6%
andnoresultisallowedover8%.
23
-
7/27/2019 Highway Specification
25/85
BJS/MS/3758.02/080104
Materialtippedfromdeliverylorriesshallbeproperly Tipping fromturnedandspreadtoensurethatthematerialatthebottom lorriesoftheheapasitfallsfromthelorry,isnotleftundisturbed.Duringthewholeoftheoperation,everyprecautionshallbe Segregationtakentoavoidsegregationandtopreventthematerial andbecomingcontaminatedwithdustorotherforeignmatter Contaminationbytheprovisionofsheeting. Aftercompaction,thethicknessofthesurfacingshall Compactedmeasurenotlessthanthatspecified.TheContractorshall thicknessesensurethatthespecifiedthicknessislaidoverthewholearea,and,whererequiredbytheEngineer,heshallopenoutsufficientareasofsurfacing,eachareatomeasurenotlessthan300mmsquareordrillcorestoenableactualthicknessestobeascertainedbydirectmeasurement.Intwocoursework,thethicknessofeachcourseshallmeasurenotlessthanthespecifiedminimum.
24
-
7/27/2019 Highway Specification
26/85
BJS/MS/3758.02/080104
Surfacecoursesandbindercoursesshallhavethefulldepth Rectificationofthecourseremoved,andreplacedwithfreshmateriallaid (Refer toandcompactedinaccordancewiththeSpecification. General sectionThearearectifiedshallbethefullwidthofthepavinglaidin on page 20oneoperation,andatleast5mlongifbindercourse,or15mlongifsurfacecourse.
Thesurfaceofthebindercourseshallbethoroughlycleanedof Preparationdirt,mudandallotherforeignmatterbypowerwashingprior oftothelayingofthesurfacingcourse. Binder courseUnlesstheEngineerrulesotherwise,atackcoatofClassK1-40 Tack coatbitumenemulsionshallbeappliedtothebindercourseattherateof0.35to0.5l/m2andallowedtobreak(turnfrombrowntoblack)unlessappliedbyintegralspraybaronthepaver,beforelayingthesurfacecourse.Theemulsionshallnotbeallowedtoaccumulateinhollowsbutshallbedispersedbybrushing.TheemulsionshallcomplywithBS434:Part1.
Notrafficshallbeallowedonthecarriagewayduringthe periodbetweentheapplicationofthetackcoatandthelayingofthewearingcourse.
Deliveryandrollingtemperaturesareshownonpages26and27.
25
-
7/27/2019 Highway Specification
27/85
BJS/MS/3758.02/080104
DELIVERYANDROLLINGTEMPERATUREAttentionisdrawntothedeliveryandrollingtemperaturesgiveninBS4987Part2andBS594whichshouldbeobserved.BS 4987 Part 2Recommendeddeliveryandrollingtemperaturesforcoatedmacadamsotherthandense,heavydutyandhighmodulusbindercourseandbase(roadbase)macadams.__________________________________________________________________Typeofmixture Minimumtemp. Minimumtemp.includingbinder ofmixturein immediatelypriortypeandgrade lorrywithin torollingoC 30min.after arrivalonsite oC__________________________________________________________________BitumenDense,closegraded, 290pen 100 80mediumgradedsurface 190pen* 110 85coursesandfinegraded__________________________________________________________________Denseandclosegradedsurfacecourse 125pen 120 95__________________________________________________________________Opengradedand 290pen 85 65singlecourse 190pen 95 75__________________________________________________________________Forsteelslagmacadam,temperatures10oClowerthanthoserecommendedmaybeused__________________________________________________________________Minimumrollingtemperaturesfordense,heavydutyandhighmodulusbinderCourseandbase(roadbase)macadams.__________________________________________________________________Bindertypeandgrade minimumrollingtemperatureoC__________________________________________________________________190pen 60125pen 7550pen 10535pen 110__________________________________________________________________.BS 594________________________________________________________Minimumrollingtemperature________________________________________________________BinderType Grade Minimumrolling temperatureoC________________________________________________________Bitumen 50pen 85LakeAsphaltBitumen 50pen 85PitchBitumen 50pen 85Bitumen 70pen 80LakeAsphaltBitumen 70pen 80Bitumen 125pen 75________________________________________________________NOTETO Toensurethatadequatetimeisavailableforcompaction
26
-
7/27/2019 Highway Specification
28/85
BJS/MS/3758.02/080104
BS594 tobesubstantiallycompletedbeforethetemperature fallsbelowtherecommendedminimumforrolling, aminimumdeliverytemperature,takenwithin30 min.afterarrivalonsite,of130oCisrecommended Inclementand coldweatherworkingLayingshallbecarriedoutwithdueregardtoambientweather General conditionssothatmaterialscanbeproperlycompacted. Ifweatherconditionsaresuchthattheperformanceofthe pavementmaybejeopardised,discontinuealloperations. Layingofasphaltmaterialsshallnotbecarriedoutiffree Rain andstandingwaterispresentonthesurfacetobecovered. standingLayingshouldalsobeavoidedasfarasispracticableduring waterheavyrain.Ifthewetweatherthreatenstobeprolonged,layingofthecoatedmacadamshouldbesuspended.
Forcoldweatherworkingaminimumof24hoursnoticeisrequired Cold weatherbytheEngineerandgenerallythefollowingshallapply:- working
Materialforuseinroadpavementsshallnotbelaidonany surfacewhichisfrozenorcoveredwithice.
NoroadpavementmaterialinafrozenconditionshallbeincorporatedintheWorksbutitmaybeusedifacceptablewhenthawedout.Materialscontainingbitumenbinders,shallnotbelaidifthe temperatureofthesurfacetobecoveredisatorbelow2oC.Wherehoweverthesurfaceisdry,unfrozenandfreefromice,layingmayproceedatairtemperaturesintheshade atorabove-1oConarisingthermometer.Additionally,unlessthetemperatureofthesurfacetobecoveredis5oCormore,rolledasphaltwearingcourseshallnotbelaidwhentheairtemperatureintheshadefallsbelow6oC.LayingoperationsbelowthisairtemperaturemaybeallowedatthediscretionoftheEngineer.Joints in FlexibleSurfacingWhenlayingnewmaterialabuttingfreshlylaidoroldmaterial Abutting freshlycareshallbetakentosecuregoodadhesionbetweenjointsby laid or cuttingbacktheexposedjoint,foradistanceequaltothe old materialspecifiedlayerthickness,toaverticalface,discardingallloosenedmaterialandcoatingtheverticalfacecompletelywithasuitablehotbitumen,orcoldappliedpolymermodifiedintermediateorpremiumgradebitumenemulsion.
Furtherdetails:- fortype4&5roads aregivenina)below
type3roads aregiveninb)below Patches(allpatches) aregiveninc)below Bituminousemulsionspecificationshownind)below
Manholecovers,kerbs,channels,gulliesandsimilarprojections Other verticalagainstwhichasphaltmaterialsaretoabutshallbecleanedand facespaintedwithathinuniformcoatingof50(40/60)or85(70/100)penhotbitumenor,ifapprovedinwritingbytheEngineer,coldappliedthixotropicbitumencompoundofsimilargrade,
27
-
7/27/2019 Highway Specification
29/85
BJS/MS/3758.02/080104
beforethecoatedmacadamislaidasindicatedbelow.Thenewmaterialshallbetampedaroundandagainstsuchprojectionssothat,afterfinalcompaction,thefinishedsurfaceshallbeleftflushornotexceeding6mmabovesuchprojections.Manholecoversandsimilarfittingsshallbeadjustedtothecorrectlevelsbeforethewearingcourseislaid.a) ONTYPE4&5ROADS - Thelongitudinalcentrelinejoint
willrequiresealingwithhotrunbitumenoranapprovedthixotropiccoldcompound.
b)ONTYPE3ROADS - Allverticaljointstobesealed, ANDINDUSTRIALESTATE kerbfacesuptothefinished ROADS waterlineandallironworkto bepaintedwithhotrunbitumen.c) PATCHES - Verticaljointstobepaintedwith (ALLPATCHES) hotrunorapprovedcoldcompound forallpatchesinallcategoriesof
roadsandfootpaths-minimumsizeofpatch2mx2m.
d) SPECIFICATION - TocomplywithBS594:Part2: FORJOINTS Clause6.6. OR
BS4987:Part2:Clauses6.7&6.8 50(40/60)or85(70/100)penetration
hotrunbitumen.
ORifapprovedinwritingbytheEngineer,coldappliedthixotropicbitumencompoundofsimilargrade
e.g.COLAS(BITUKOLDLANSTAR)
-Bitumencoldjointprimerorothersimilarapproved.
28
-
7/27/2019 Highway Specification
30/85
BJS/MS/3758.02/080104
Traffickingofasphaltbase(roadbase)orbindercoursesmaybe Traffickingpermittedforaperiodoftimebeforethesurfacecourseislaid. of asphaltTheyshouldbeblindedwithcoatedgritthatshallbecarried Base(Roadbase)outeitherbyhandormechanicallywithbituminousgritas and BinderspecifiedinBS4987,Part2:7.9andtheguidancegivenin CoursesBS4987,BS4987,Part2-B.5.4beforebeingopentotraffic,withdueregardbeingpaidtothefollowing:-
(a) OnType3,4andindustrialestateroadslimestoneandblast blastfurnaceslagaggregatesarenotallowed,andpermitted
aggregatesshallhaveaminimumP.S.V.of55iftheyarenottobecoveredwithin6weeks.
(b) Ontype5roads,limestoneandblastfurnaceslagaggregatesarenotpermittedinifthegradientexceeds10%(1:10).
(c) Iftemporarytraffickingcausespolishingtotheextent
thatasatisfactoryskidresistanceisnotmaintainedthentheskiddingresistanceshouldberestoredtoasatisfactorylevelbysurfacedressingusingchippingsofminimumP.S.V.55,ortheapplicationofothersurfacetreatmentasapprovedinwritingbytheEngineer. Tolerance insurface levels
of pavement coursesRoadsurface +6mmexceptimmediatelyadjacenttogullies
surfacewaterchannelsandmanholeswhereitshallbe+6mm/-0mm.
Bindercourse +6mmBase(roadbase) +8mmSub-base +10mm/-30mmwhenunderbase(roadbase),otherwise+10mmFormation +20mm/-30mmSurfacelevelsshallbecheckedforcompliancewiththetolerancerequirementsusingthemethoddescribedinparagraph702.4oftheHighwaysAgencySpecificationforHighwayWorks.Tomeettherequirements,nomeasurementshallexceedthepermittedtolerance.Thefinishedsurfaceshallbetestedwitha3metrelongstraightedge,laidlongitudinally.For machine laid
Surface courses,themaximumdepressionundera3metrelongstraightedgeshallnotexceed3mm.
Binder courses,themaximumdepressionundera3metrelongstraightedgeshallnotexceed6mm.
For hand laidSurface courses,themaximumdepressionundera
3metrelongstraightedgeshallnotexceed6mm.Binder courses,themaximumdepressionundera
3metrelongstraightedgeshallnotexceed9mm
29
-
7/27/2019 Highway Specification
31/85
BJS/MS/3758.02/080104
WherethesefiguresareexceededthematerialshallbetreatedinaccordancewiththerequirementsforRectification shownfor:-
SUBBASE&BASE(ROADBASE) onpage4SURFACING onpage24
NOTE: See separate requirements for Block Paving
30
-
7/27/2019 Highway Specification
32/85
BJS/MS/3758.02/080104
BLOCK PAVING
Shallbeinaccordancewiththerequirementsofand BritishrecommendationsinBS7533exceptwhereitisvaried standard forbytheprojectspecification. block paving
Allblockpavingistobebuiltinaccordancewiththelatest GENERALrequirementsofTheHighwaysAgencySpecificationForHighwayWorks:-clause1107
ThelatestrequirementsofSouthYorkshireLaboratorySpecification ForTheSupplyofMaterialsForUseInHighwayWorks.
andthefollowing:-
Unless agreed in writing with the Engineer, all blockpaving shall be concrete block paving.
PenciledgeblocksshallbeusedForcarriagewayconstruction,sub-baseshallbegranulartype1materialinaccordancewithSouthYorkshireLaboratorySpecificationNo19.
Wherethesub-baseistobesubjectedtoresidentialtraffic,
a50mmthickcourseof20mmdenseasphaltbinder
courseshallbelaidontopofthesub-basetoprovide
arunningsurfaceandprotectiontothesub-base.Whereblockpavingistobeusedforcarriagewayconstruction,TheContractorshallalsorefertothefollowingsectionsofthisdocument:-
Page2-Section1INTRODUCTION (AssumedCBRs) Subgrade andand Sub-base (Frostsusceptiblesub-grade)
Page4-Section2MATERIALS-ROADPAVEMENTS Sub-base andPage21-Section7FLEXIBLECARRIAGEWAYSSURFACING Binder course
Thesubgrade,sub-baseandbindercourseshallbepreparedsothat:-(a)thesurfacelevelsarewithinthetolerancesgivenintable1onpage35
(b)thelongitudinalfallsandcrossfallsaresuchthatno depressionsholdwater. Minimumrecommendedgradients:- Longitudinalfall;1.25%(1:80)
Crossfall; 2.50%(1:40)
(c)thesurfaceistightanddenseenoughtopreventlayingcourse (sandlayer)materialbeinglostintothelowerlayersduring
constructionanduse;(d) provisionismadeto:
(1)drainwaterfromanyabuttinglayingcourse,e.g.by
31
-
7/27/2019 Highway Specification
33/85
BJS/MS/3758.02/080104
installationofdrainagewhenthelayingcourseison impermeablefoundations;
(2)preventmigrationandlossoflayingcoursematerial intothedrainagesystem,e.g.byusingageotextile;Theextentofthesitepreparedforblocklayingshallinclude Edgeenoughroomtoprovideadequatefoundationsandbacking restraintsforanyedgerestraint.Edgerestraintsshouldbeadequatetosupporttrafficloadsandtopreventlossoflayingcoursematerialfrombeneaththesurfacecourse.Examplesarekerbs,combinedkerbsandchannels,establishedstructuresorrigidabutmentssuchaspavingblocksfixedvertically,beddedonandhaunchedwithconcrete.Donotvibratethesurfacecourseuntiltheedgerestraint,togetherwithanyconcretehaunching,hasgainedsufficientstrength.Aretobefoundinsection13 StandardConstructiondetailsLAYING COURSE ( SAND BEDDING LAYER)Layingcourse(andjointingmaterial)shallbenaturallyoccurring MaterialsandinaccordancewiththerecommendationsgiveninB.S.7533-3 andTable2onpage30ofthisspecification. Themoisturecontentofthelayingcourseshouldbeas Moistureuniformaspossibleandthematerialshouldbemoist contentwithoutbeingsaturated.Allmaterialtobeusedmustbestockpiledunderacover. StockpilingConstructthelayingcoursesothataftercompaction Screedingitformsalayerapproximately35mmthickbelowthepavingblocks.Whereclosertolerancesthanthosegivenintable1onpage30forthelevelofthesub-basehavebeenachieved,orwhereabindercoursehasbeenused,athinnerlayingcoursecanbeused.However,innocaseshouldthematerialbelessthan25mmthickatanypoint.
32
-
7/27/2019 Highway Specification
34/85
BJS/MS/3758.02/080104
Theobjectofscreedingthelayingcourseistoproduceauniformsurface,tothespecifieddesignprofilesandfalls,atauniformdegreeofcompaction.Whensettingupscreedingrails,allowanceshouldbemadeforthesubsequentcompactionofthelayingcourse
Ifanydisturbanceofthepreparedlayingcoursebypedestrianorwheeledtrafficoccurs,priortoplacingpavingblocks,re-screedareasoflayingcoursematerial.
Constructthelayingcourseusingoneofthemethodsdescribedbelow:-
LAYING METHODS
Spreadthemateriallooseinauniformlayertoapproximately Precompactiontherequiredfinaldepthbelowthesurfaceprofile.Compactthislayerusingavibratingplatecompactor.Spreadafurtherlayerofmaterialabout15mmthickandscreedittocreatealoosesurfaceonwhichthepavingblockscanbeplaced.Spreadthemateriallooseinauniformlayer,andscreedittothe Compactionthicknessrequiredtogivethespecifieddesignthicknessafterthe after layingpavingblockshavebeenlaidandvibratedintoplace.Theprecompactionmethodispreferablebecauseithelpstoensureuniformdensityandcompactionofthelayingcourseandhenceimprovessurfacetolerances.Whereanominalcompactedthicknessof35mmistobeused, Trial areasifpreviousexperienceofaparticularmaterialislacking,asmalltrialareawillbeneededtodeterminetheallowance.Theareaoflayingcoursepreparedshouldgenerally Block layingbesuchthatitsboundaryisnotlessthan1maheadofthe bounderieslayingface,exceptattheendoftheworkingperiodwhentheboundaryshouldbenomorethan1maheadofthelayingface.Theworkingedgeshouldbeprotectedovernightanditmaybenecessarytoremoveanareaofblockspriortoscreedingforthedaysoperation.
33
-
7/27/2019 Highway Specification
35/85
BJS/MS/3758.02/080104
Table.1.Tolerancesonsurfacelevels____________________________________________________________________Layerofpavement Maximumpermissible deviationfromdesignlevel____________________________________________________________________ Sub-layer: sub-base +/-20mm Bindercourse(roadbase) +/-15mmSurfacecourse: overall +/-6mm flatness 10mmundera3m straightedge2mm betweenadjacentblocks adjacenttogullies, surfacedrainage channelsandoutlets (seenote) +6/-0LAYING PAVING BLOCKS
Laypavingblockssothatthesurfacelevelsarewithinthetolerances Surfacegivenintable1.Makeminoradjustmentstomaintainthebond Coursepatternandensurethatthejointsremainwideenoughforsandfilling.Detailsofthebondpatternshouldbeagreedbefore Bondcommencement.Whererectangularblocksarebeingusedin patternareassubjecttovehiculartraffic,herringbonebondshouldbeusedtominimisecreepandtoensurebetterradialdistributionofwheelloads.Followanorderoflayingwhichmaintainsanopenworkingface Order ofanddoesnottrappavingblocks.Thefirstrowofblocksshould Layingbealignedagainsttheedgerestraintorbyusingastraightedgeorstringline.Checkthealignmentofblocksperiodically,e.g.byusingstringlines,andmakeadjustmentswherenecessary.NOTE
Blockpavingisdesignedtofunctionwithsand-filled joints,whichwillnormallylieintherangeof2mm to5mmwhenplacedhandtight.Thejointwidthwillbe influencedbyblockshapeandbondpattern.Laywholepavingblocksfirst,followedbyclosures.Completetheareatobelaid,asfaraspossibleusingwholeblocks.Whereappropriate,incorporateblockshapesdesignedtoassistwiththeformationofboundariesandwithchangesindirection.Completeinfillingbeforecompactioncommences.Whereverpossible,infillingtoboundariesandobstructions Infillingshouldbecompletedasthelayingofthesurfacecourseproceeds.Trimpavingblockstoshapeandsizetoformboundaries.Do Trimmingnotinsertpiecesofasizelessthanone-thirdofafullblock.Thiscanoftenbeachievedbyalteringthebondpatternslightlyattheedgesofthepavingandtrimmingsomeofthepavingblocksinboardoftheedgeblocks.Toworkroundanyobstructions,cutthepavingblockas Obstructionsnecessarytofillinanyirregularshape.
34
-
7/27/2019 Highway Specification
36/85
BJS/MS/3758.02/080104
Fullycompactthesurfacecourseusingaplatecompactorwith Compactionaplateareaofnotlessthan0.25m2,transmittinganeffective of Blockforceofnotlessthan75kN/m2ofplateatafrequencyof Pavingvibrationintherange75Hzto100Hz.Alternatively,useanycompactingequipmentwhichwillachievethesamedegreeofcompactionorbetter.Itisimportanttofillthelowerportionoftheblock-to-blockjointwiththelayingcoursematerial.Carryoutcompactionassoonaspossibleafterlayingbutnotwithin1mofanylayingface.Apartfromthisedgestrip,donotleaveanyareaofpavinguncompactedatthecompletionofthedayswork.Ensurethatthefinishedsurfacelevelsarewithinthetolerancesgivenintable1onPage30.Thecontactareaofaplatecompactormaybe Measuringmeasuredbystandingtheplateonaflatsmooth contact arealevelsurfaceandslidingapieceofcardinfrom of platebothfrontandrearuntilitmeetstheposition compactorwheretheplatetouchestheground.Aftercompactionofthesurfacecourse,spreadsandorcrushed Jointrockfinesoverthesurfaceandbrushitintothejoints.Materials Fillingcomplyingwiththegradingintable2shallbeused.Donot useasandwhichmightstainthepavementsurface,ifthisisanimportantconsideration.NOTE.1. Fillingbetweenthejointsisveryimportant.Itinterlocks
thepavingandhelpsimpartstaticloadbearingcharacteristics.Theuseofdrymaterialwillassistinrapidjointpenetration.
Vibratetheblockpavingtoensurecompletefillingofthe block-to-blockjointbythesurface-appliedsand.Where necessaryaddfurthersandandre-vibratethepaving. Completejointfillingandfinalcompactionassoonas practicableafterlaying.NOTE.2. Whereblockpavingistobeusedbyindustrial
vehiclesimposingexceptionallyhighpointloads,itis advisabletofurthercompacttheentirepavementafter jointfilling.NOTE.3. Concreteblocksshouldnotbevacuumedforatleast threeweeksafterlayinginordertoreducetheriskof jointingsandbeinglost.
ItmaybenecessarytoprovidejointstabilisationcompoundandblocksurfacesealantsatthediscretionoftheEngineer.Table2-Layingcoursesandetc.Thesurfacecourseshallbeinspectedafteranearlyperiodoftraffic Earlyuseandadditionalsandfillingbrushedinwherenecessary TraffickingTable2LayingcoursesandandjoiningsandtocomplywithBS7533:Part3:AnnexD
35
-
7/27/2019 Highway Specification
37/85
BJS/MS/3758.02/080104
Nominal aperture Percentage by mass passingof sieve size through sieveLaying course Jointing sandsand
% %
10.00mm 100 -5.00mm 90-100 -2.36mm 75-100 1001.18mm 55-90 95-100600um 35-65 50-100300um 10-45 15-60150um 0-10 0-1576um 0-3 0-3NOTE:Sandsshouldbegradedbywashing,decantinganddrysievinginaccordancewithBS812:Part103
36
-
7/27/2019 Highway Specification
38/85
BJS/MS/3758.02/080104
8. FOOTWAYS AND VEHICLE CROSSINGSGENERAL
Allfootwaysandvehiclecrossingsaretobebuiltinaccordance withthelatestrequirementsofSeries1100KerbsFootwaysandPavedAreas.ofTheSpecificationForHighwayWorks:-ThelatestrequirementsofSouthYorkshireLaboratorySpecificationForTheSupplyofMaterialsForUseInHighwayWorks.
andthefollowing:-Drawingsshowingdetailsofproposedfootwaysandvehicle DrawingscrossingsareasshallbesubmittedtoTheEngineerpriortocommencementoftheworks.FOOTWAY EDGINGPrecastconcreteedgingaspreviouslyspecifiedshallbelaid Fixingcloselyjointedbetweenfootpathsurfacesandvergesorelsewhere ifdirectedbytheEngineer.Theedgingshallbesolidlybedded onconcrete100mmthickandhaunched(bothsides)with75mmthickconcretesoastoensurethatitdoesnotmoveduringthefootpathconstructionandshallbelaidtocorrectalignmentandlevel.Aftercompletion,anyunitfoundtobemorethan6mmoutoflineorlevelateitherendoftheunitshallbeliftedandre-laid.TheContractorshallberesponsibleforrectifyinganymovement Rectification thatoccurspriortoandduringthemaintenanceperiod.FOOTWAYS AND HARDENED MARGINS Thesub-baseforbothfootwaysandhardenedmarginsaretobe Sub-Base formedwithType1sub-basematerialcomplyingwithSouthLaboratoryspecificationNo19,properlycompacted. Thecompletedsurfaceshallbefreefromirregularitiesandloose materialandistobetruetocrosssection,lineandlevel.Note;Sub-Baseistoextendunderconcretebeddingforkerbsandedging.ASPHALT MATERIALSBindercoursesforasphaltfootwaysshallbedensebinder BindercoursethatshallbelaidinaccordancewithBS4987-2. course 6mmsizeDenseSurfaceCoursethatshallbelaidinaccordance SurfacewithBS4987-2andlaidevenlyonthebindercoursetogive Course foraminimumcompactedthicknessof25mm.Wherethe Footwayssurfacingabutskerbs,thefinalsurfaceshallbebetween2mm and3mmproudofthetopofthekerbandshallbetruetolevelandtherequiredcrossfall.(3%min-4%max).CompactionshallcomplywithB.S.4987-2Clause7. Compaction(Pleaserefertotablesfordelivery&rollingtemperatures of asphaltextractedfromBS4987onpage22) materials
Therecommendedrollerforallfootwayandfootpathworks RecommendedshallbeadoubledrumvibratoryrollerTV.75orBW75ADL rollers(articulated)orsimilarapproved.
37
-
7/27/2019 Highway Specification
39/85
BJS/MS/3758.02/080104
FLAGSItmaybenecessarytolayabondingcoursetoavoid"creep"inlargeareasonsteepgradients.Bondedcoursesofflagsproperlybeddedonthepreparedbase witha10mmsandandcementmortarbed,closelyjointed,anddrivenintopositionwithaheavymaul.Theouteredgeofflagswherethefootwayabutskerbs,istobekeptlevelwiththelatterandthefootwayshallbelaidtruetolevelandrequiredcrossfall.Theflagsshallbelaidincoursesatrightanglestothekerbs.
BLOCK PAVING
Blockpavingmaybeusedasanalternativei.e.60mmthickblocks (PencilEdge)on35mmcompactedsandon150mmofType1sub-basetoSouthYorkshireLaboratorySpecificationNumber19.VEHICLE CROSSINGSFootwayVehicleCrossingssubjectedtomorethanprivatecar trafficshallbeconstructedtothesamespecificationasthe adjacentcarriageway.FootwayvehiclecrossingssubjectedtoprivatecartrafficonlyshallbeconstructedinaccordancewiththeStandardDetails.PEDESTRIAN CROSSINGSDroppedkerbstofacilitatethepassageofwheelchairsandprams, shallbeinstalledatallroadjunctionsandotherpedestriancrossing points,asdirectedbytheEngineer,andshallbeconstructedinaccordancewiththeStandardDetails.(Maximumupstand6mm).LAYING AND COMPACTION OF ASPHALT MATERIALS Materialsshallbecompactedassoonasrollingcanbeeffected Compaction withoutcausingunduedisplacementofthematerialandatnoless thantheminimumrollingtemperature.Thematerialshallbeuniformlycompactedbyanappropriaterollercapableofmeetingtheairvoidrequirementsacrossthefullwidth.Themethodoflayingshallensurethatairvoidsofcompacted Air voidsasphaltmaterialsshallbeintherangeof2%-8%.Notmorethan1in10resultswillbepermittedabove8%andnoresultisallowedover10%.Deliveryandrollingtemperaturestobeinaccordancewiththe Delivery andtablesshownonpage27. rolling temperatures
38
-
7/27/2019 Highway Specification
40/85
BJS/MS/3758.02/080104
9. HIGHWAY VERGES AND PLANTINGGRASS AND GROUND COVER PLANTSAllgrassedandplantedareasaretobebuiltinaccordancewith GeneralthelatestrequirementsofSeries3000ofTheHighwaysAgencySpecificationForHighwayWorkswhereitdoesnotconflictwithBS4428:1989Andthefollowing:-Drawings/plantingplansindicatingspecies,size,spacing/m2 Drawingswithappropriateschedulesandappendicesshallbesubmittedforspecificapprovalfortheschemepriortothe commencementofworks. TopsoiltocomplywithBS3882figureK1fortextureand TopsoilAndBS1377part3pH
Depthtobe450mmforshrubs,tobetopqualityvegetablesoilmaximumstonecontent5%dryweight,notmorethan50mmanydimension.
SoilcontainingJapaneseKnotweedandMaresTailwillberejected.Thesurfaceistobecultivateddowntoaminimumdepthof150mm, Cultivationbringtofinetilthandregulatetoevenlyrunninglevels.Clearoutallweeds,largestones,brokenbrick,perennialweedsandroots.Britishconiferbarkmulchcontaininglessthan5%wood, Bark mulchminimumthicknessof75mmover entireplantedarea, and FertilizersupplyENMAG(orsimilarapproved)andmixintobarkatarateof50g/m2
Approvedfertiliserevenlydistributedatnotlessthan 68grammesperm2(20.10.10).Approvedspeciesofplantsshouldbewellestablishedand Plantsfreefromdisease,withaminimum3goodgrowingpoints.
Size&spacing:- Groundcover 200-300mm-15/m2 Shrubs(medium)450-600mm-6/m2 HedgingPlants 600-900mm-4/Lin-m Theareaistobewellmaintainedfreefromgrass,weeds Maintenanceandlitterandwateredindryweather.GRASSNothinglessthan900mmwidth. Minimum widthSoildepthof150mmreducedtoafinetilth,freefrom Topsoilstonesandotherdebris.Aftersettlement,finishedleveltobe10mmaboveadjacent Finishedconcreteedging/kerb. levelApprovedfertiliserevenlydistributedatnotlessthan Fertiliser68grammesperm2(20.10.10).Lowmaintenancegrassseedorturfshallbeused. Seed
39
-
7/27/2019 Highway Specification
41/85
BJS/MS/3758.02/080104
Duringthemaintenanceperiodallvergesaretobemaintained Maintenanceinhealthycondition,freefromweedsandgrassvergesareto periodbecutregularly.
Attheendofthemaintenanceperiodthereshouldbe100%coverofplantedandgrassedareaswhichare97%weedfree,withnodeadordiseasedplants.
AtreeplantingSpecificationisavailableonrequest. Tree planting Specification
40
-
7/27/2019 Highway Specification
42/85
BJS/MS/3758.02/080104
10. STREET LIGHTINGAllstreetlightingworksaretobeinaccordancewiththelatest GeneralrequirementsofSeries1300&1400ofTheHighwaysAgencySpecificationForHighwayworks.Andthefollowing:-Thedesignandinstallationofstreetlightingschemesisnormally DesignundertakenbyThe Highway Authority. Anearlyapproveddesignwhichmayincludeilluminatedtrafficsignsisrequiredtoavoidanyabortiveworks.
Alistofacceptableequipmentisavailable,onrequest.Developers Acceptablewishingtodeviatefromthislistshoulddiscussthematterwiththe EquipmentLightingEngineerattheearliestopportunity.
Theinstallationofstreetlightingshouldberelatedcloselytothe Installationoccupationofdwellingsandmustnotbeleftuntilthedevelopmentasawholeisnearingcompletion.WheretheworkistobecarriedoutbytheDeveloper,theEngineershouldbeaskedtoapprovethepositionsofthecolumnsonsitepriortoerection.TheDevelopermustmakeallthenecessaryarrangementswiththeElectricityCompanyfortheconnectionofthesupply.Alternatively,subjecttoreceiptofanofficialorder,theHighwayAuthoritywillprovideandinstallequipmentonbehalfoftheDeveloper,andmakethenecessaryarrangementsfortheconnectionoftheelectricitysupply.
Lightingcolumnsshouldbelocatedwithinthelimitsofthehighway,normallyatthebackedgeoffootwayorverge.Incertaininstances,however,itmaybeacceptabletoattachlightingunitstobuildings,forexampleinmewscourts.Thiswillnormallyrequireaway-leaveagreementbetweentheowner,ElectricityCompanyandtheHighwayAuthority.
41
-
7/27/2019 Highway Specification
43/85
BJS/MS/3758.02/080104
11. COMPLETION OF WORKS
Grassvergesaretoberolledduringtheprogressoftheworkand Maintenanceduringtheperiodofmaintenance,andwellwateredindryweather. of VergesTheContractorshallremoveandreplaceanyareasthatarenotinahealthycondition,uptotheendoftheperiodofmaintenance.Thegrassistobecutonaregularbasisandnotlessthan4timesin12months.CLEANLINESS OF THE SITEThewholeoftheworksshallbeleftoncompletioninacleanand Generaltidycondition. ItisanoffencetounderSection151oftheHighwaysAct1980 DeleterioustodepositdeleteriousmaterialonthePublicHighway.The matterDevelopermustensurethatappropriatemeasuresforcleaningareprovidedwithintheCDMRegulations.Itisnormalforthistobeaconditionoftheplanningpermission.
TheContractoristocleansethecarriageway,footwayandverges Cleansingregularlyduringtheprogressoftheworks,asrequiredduringtheirtermofmaintenanceandoncethoroughlyimmediatelybeforetheterminationofthemaintenanceperiod.PROVING DRAINSOncompletionoftheworksalldrains,manholesandgulliesshall Roddingberodded,flushedwithwaterandleftcleanandfreefromobstruction.
42
-
7/27/2019 Highway Specification
44/85
BJS/MS/3758.02/080104
12. MISCELLANEOUS
Streetlighting,trafficsigns,roadmarkingsandstreetname Street LightingplatesshallbeprovidedattheexpenseoftheDeveloper signs etc.AlltheseitemsshallcomplywiththeeditionoftherelevantBritishStandardandSpecificationforHighwayWorkscurrentatthetimeofconstructionforilluminatedsigns(seepage1). Streetnameplatesaretobeerectedpriortooccupancyofany Street nameproperties. platesWhenrequestedbytheEngineer,gritbinsshallalsobeprovided. Grit binsattheexpenseoftheDeveloper.
GritBinswillgenerallyberequiredonroadsand/orfootpathswithagradientsteeperthan1in12(8%)andmustbemaintainedandkeptfullofsaltbyTheDeveloperuntiladoption.FurtherdetailsinthisconnectioncanbeobtainedfromtheEngineeruponrequest.AnyretainingwalltowhichSection167oftheHighwaysAct Retaining Walls1980appliesoranyotherretainingwallorStructurewhich theDeveloperintendstoofferforadoptionbytheHighwayAuthoritymustbeapprovedbytheEngineer.Notesforguidanceonsuchmattersareavailableonrequest.Theextentoftheadoptableareasaretobeclearlydefined Definition oftothesatisfactionoftheEngineer. Highway BoundaryAdoptableparkingareasadjacenttoroadsmustbesurfacedwitha Parking Areasmaterialwhichisnotsusceptibletodamagebyoildroppingsandsuchsurfacingsshouldpreferablybebrindlecolouredblockpavingwithapprovededgerestraint.
43
-
7/27/2019 Highway Specification
45/85
BJS/MS/3758.02/080104
13. STANDARD CONSTRUCTION DETAILSFOOTPATHS, FOOTWAYS AND FOOTWAY VEHICLE CROSSING FOR CAR USE ONLYSurface Course25mm thick0/6mmDBM190PenSurfaceCourseL/StonetoBS4987-1:Clause7.50/4mmFG190PenSurfaceCourseL/StonetoBS4987-1:Clause7.7maybeusedifapprovedbytheEngineer.Binder Course55mm thick0/20mmDBM190PenBinderCourseL/StonetoBS4987-1:Clause6.5Sub-Base150mm thickType1Sub-BasetocomplywithSpecificationforHighwayWorksClause803.Mustbefreefromextraneousmatter.Weedsmustberemovedandthesubgradesprayedwithtotalweedkiller.Note:Concreteblockpavingmaybeusedasanalternativei.e.60mmthickblockson35mmcompactedsandtoBS7533-3(andasdescribedinSECTION6BLOCKPAVINGTABLE2ofthisspecification)on150mmthicknessofType1sub-base.Steep GradientsFootpathswithagradientsteeperthan10%(1in10)willrequire:-1. Handrail(Pleaseseestepdetailforhandrailspecification)
2. Possiblyspecialsurfacetreatment.Note :The use of a single drum roller is not permitted.
44
-
7/27/2019 Highway Specification
46/85
BJS/MS/3758.02/080104
CARRIAGEWAY CONSTRUCTION FOR TYPE 2 ROADS125mm kerb face 155mm kerb face at bus stopsIndustrial RoadsSurface Course40mm thick0/14mmSMA50pensurfacecourseH/StonePSV60toSouthYorkshireLaboratorySpecificationNo41.OR45%0/10mmHighStoneContent50pensurfacecoursesteelslagtoSouthYorkshireLaboratorySpecificationNo29with10mmaggregate(or14mmaggregateattherequestoftheEngineer)Note :Limestone and blast furnace slag aggregates are not allowed in the carriageway surfacing course.Binder Course70mm thick0/20mmDBM125penbindercourseH/StonetoBS4987-1;Clause6.5Notes1. Blast furnace slag and limestone aggregate are only allowed in the carriagewaybinder course if it is to be covered within 6 weeks.2. Coated grit will be required on all binder courses unless laid concurrently withthe surface layer to BS 4987-1:Clause 7.9Base (Roadbase)120mm thick0/32mmDBM125penbaseL/StonetoBS4987-1:Clause5.2.Sub-BaseThicknessinaccordancewithCBRvalueoftheSub-Grade.470mm thickTobelaidunlesssiteinvestigationindicatesthatalesserthicknesswillsuffice.AnyvariationistobeagreedinwritingwiththeEngineer.Type1Sub-BasetocomplywithSpecificationforhighwayWorksClause803.Footwaysaretobeaspreviouslydescribedbutfootwayvehiclecrossingsshallbeconstructedastheadjacentcarriageway.TheaboveistoreadinconjunctionwithSection7FLEXIBLECARRIAGEWAYS.
45
-
7/27/2019 Highway Specification
47/85
BJS/MS/3758.02/080104
CARRIAGEWAY CONSTRUCTION FOR TYPE 3 ROADS(MAIN ROADS AND PARADES)125mm kerb face 155mmkerb face at bus stopsSurface Course40mm thick0/14mmSMA50PenSurfaceCourseH/StonePSV60toSouthYorkshireLaboratorySpecificationNo41.(AlesserthicknessofSMAmaybepermittedifagreedinwritingwiththeEngineerseenote1below)OR45%0/10mmHighStoneContent50PenSurfaceCourseSteelSlagtoSouthYorkshireLaboratorySpecificationNo29with10mmaggregate(or14mmaggregateattherequestoftheEngineer)NoteLimestoneandblastfurnaceslagaggregatesarenotallowedinthecarriagewaysurfacecourseBinder Course50mm thick0/20mmDBM125PenBinderCourseH/StonetoBS4987-1:Clause6.5.Notes1. IfareductioninthicknessofSurfaceCourseisapprovedthentheBinderCoursethicknessshallbe
increasedbyappropriateamount.2. Blastfurnaceslagandlimestoneaggregatesarenotallowedinthecarriagewaybindercourseunlessthe
bindercourseistobecoveredin6weeks.3. CoatedgritwillberequiredonallbindercoursesunlesslaidconcurrentlywiththesurfacelayertoBS
4987-1:Clause7.9.Base (Roadbase)100mm thick0/32mmDBM125PenBaseL/StonetoBS4987-1:Clause5.2Sub BaseThicknessinaccordancewithCBRvalueofSubGrade470mm thickTobelaidunlesssiteinvestigationindicatesthatalesserthicknesswillsuffice.AnyvariationistobeagreedinwritingwiththeEngineer.Type1Sub-basetocomplywithSpecificationforHighwayWorksClause803. The above is to be read in conjunction with Section 7 FLEXIBLE CARRIAGEWAYS.
46
-
7/27/2019 Highway Specification
48/85
BJS/MS/3758.02/080104
CARRIAGEWAY CONSTRUCTION FOR TYPE 4 ROADS(COLLECTOR AND LOCAL STREETS)100mm kerb face 155mm kerb face at bus stopsSurface Course30mm thick0/10mmCGSurfaceCourse125PenH/StonetoBS4987-1:Clause7.4Note :Limestoneandblastfurnaceslagaggregatesarenotallowedincarriagewaysurfacescourses.Binder Course50mm thick0/20mmDBM125PenBinderCourseH/StonetoBS4987-1:Clause6.5Notes1. Limestoneandblastfurnaceslagaggregatesarenotallowedinthecarriageway bindercourse.2. Coatedgritwillberequiredonallbindercoursesunlesslaidconcurrentlywiththe surfacelayertoBS4987-1:Clause7.9Base (Roadbase)90mm thick0/32mmDBM125PenBaseL/StonetoBS4987-1:Clause5.2Sub BaseThicknessinaccordancewithCBRvalueofsub-grade.440mm thickTobelaidunlesssiteinvestigationindicatesthatalesserthicknesswillsuffice.AnyvariationistobeagreedinwritingwiththeEngineer.Type1Sub-BasetocomplywithSpecificationforHighwayWorksClause803.TheaboveistobereadinconjunctionwithSection7FLEXIBLECARRIAGEWAYS.
47
-
7/27/2019 Highway Specification
49/85
BJS/MS/3758.02/080104
CARRIAGEWAY CONSTRUCTION FOR TYPE 5A ROADS(VILLAGE STREET)100mm kerb faceSurface Course25mm thick0/6mmDBM125PenSurfaceCourseH/StonetoBS4987-1:Clause7.5Note :Limestoneandblastfurnaceslagaggregatesarenotallowedinthecarriagewaysurfacecourses.Binder Course50mm thick0/20mmDBM125PenBinderCourseH/StonetoBS4987-1:Clause6.5Note :CoatedgritwillberequiredonallbindercoursesunlesslaidconcurrentlywiththesurfacelayertoBS4987-1:Clause7.9Base (Road Base)70mm thick0/32mmDBM125PenBaseL/StonetoBS4987-1:Clause5.2Sub-BaseThicknessinaccordancewithCBRvalueoftheSub-Grade390mm thickTobelaidunlesssiteinvestigationindicatesthatalesserthicknesswillsuffice.AnyvariationistobeagreedinwritingwiththeEngineer.Type1Sub-BasetocomplywithSpecificationforHighwayWorksClause803.TheaboveistobereadinconjunctionwithSection7FLEXIBLECARRIAGEWAYS
48
-
7/27/2019 Highway Specification
50/85
BJS/MS/3758.02/080104
SHARED SURFACE CONSTRUCTION FOR ACCESS WAYS/ACCESS COURT/MEWS COURT(TYPE 5B)RECTANGULAR INTERLOCKING CONCRETE BLOCK PAVING(PencilEdge),(Fineline),(Chamferless)or(Minichamfer).60mmThick- Concreteblockpavinglaidonascreededlayer35mmcompacted
thicknessofnaturallyoccurringsand,complyingwithBS7533:Part3(andasdescribedinSECTION6-BLOCKPAVINGTABLE2ofthisspecification)MethodoflayingtobeinaccordancewithBS6717Part3.Othertypesofblockpavingmaybeapprovedonrequest.
Unlessotherwiseapprovedtheblocksshallbe200mmx100mm.ColoursofblockstoberestrictedtoBuff,Red,Charcoal,andBrindle(brown,grey,red)inacombinationtobeagreedbytheEngineer.BINDER COURSE50mmThick- 0/20mmDBM125PenBinderCourseH/StonetoBS4987-1:Clause6.5SUB-BASEThicknessinAccordancewithC.B.R.ValueofSub-grade340mmThick- Tobelaidunlesssiteinvestigationindicatesthatalesserthicknesswill
suffice.AnyvariationistobeagreedinwritingwithTheEngineerType1granularsub-basetoSouthYorkshireLaboratorySpecificationNo.19.GENERAL REQUIREMENTS FOR KERBING, CHANNELLING & EDGINGKERBINGAllkerbs,channelsandedgingsmustbehydraulicallypressedprecastconcretetoBS.7263andSouthYorkshireLaboratorySpecificationNo.11.Non-standardorspecialkerbonType5roadstobeagreedwiththeEngineer.KERB SIZE125mmx250mmhalfbatteredkerbs.125mmx150mmbullnosedroppedkerbs(centres)ontype3,4&5Aroads.50mmx150mmflattoppededgingsforfootpaths.SpecialkerbsasapprovedbytheEngineer(Red,Charcoal,BufforBrindle).
49
-
7/27/2019 Highway Specification
51/85
BJS/MS/3758.02/080104
KERB FACE100mmonType4and5Aroads125mmonType3roadsandindustrialestateroads30mmonType5B(orotherapproved).25mmatvehiclecrossings.(Seetypicalvehiclecrossingdetail)0-6mmatpedestriancrossings.(Seetypicalpedestriancrossingdetail)RADIUS KERBSForkerbradiiupto12museproperlyformedradiuskerbs.Forradiibetween12mand20muse450mmlong,straightkerbs,above20mradiususe900mmlong,straightkerbs.KERB RACEConcretetobeST4tothefollowingdimensions:-275mmwidex150mmdeepforkerbing425mmwidex150mmdeepforkerbingandchannellingtogetherNote :Concrete shall be vibrated with a vibrating poker to ensure adequate compaction200mmwidex100mmdeepwetbedconcreteforedging.Wetbedconcreteforkerbing,channellingandstringcourses,tothedimensionsshownabovemaybeallowedonshortsectionsasanalternativeifagreedinwritingwiththeEngineer.Kerbsmustbebeddedon1:4sand/cementmortarlaidamaximumof25mmthickandaminimumof13mmthick.Kerbsmustbeproperlybackedwith150mmconcreteasshownonthetypicalcrosssection.Edgingsaretobehaunched(bothsides)with75mmthickconcrete.Stringcoursesshallbehaunchedbothsideswith150mmthickconcrete.CHANNEL BLOCKSHydraulicallypressedconcreteblockssize150mmx125mm(150mm)shallbeusedadjacenttokerbswhenconditionsdescribedinSECTION6.KERBS,FOOTWAYSANDPAVEDAREAS(CHANNELBLOCKS)prevail.
Dished channels are not permitted. Square/Mews/Courtsthatareblockpavedandedgedrainedmustbesteeperthan1.25%(1in80).Stringcoursesshallcomprise125mmx255mmprecastconcretechannelblocksor125mm(150mm)x150mmin450mmlengths.
50
-
7/27/2019 Highway Specification
52/85
BJS/MS/3758.02/080104
97. MANHOLES AND HIGHWAY DRAINS Generallyallmanholesandhighwaydrainsshallbeconstructed andlaidinaccordancewithcurrenteditionofSewersforAdoption. Claypipesandfittingsshallbeinaccordancewiththerequirements
ofBS.65.ConcretepipesandfittingsshallbeinaccordancewiththerequirementsofBS.5911andshallbefittedwithapprovedflexiblejoints.
Plasticpipesandfittingsshallbeinaccordancewiththerequirementsof
EN1401-1BS4660andthewaterindustryspecificationW1S4/35/01.Gullyconnectionsshallbesurroundedwith150mmthicknessST4concreteandincludeaflexiblejointoneachpipe.Wherethecovertoapipelinelaidunderacarriagewayis1.2morless,itshallbesurroundedwith150mmthicknessST4concrete.
Whereaconcretesurroundisnotrequired,pipelinesshallbelaidon
aconcreteorgranularbeddesignedinaccordancewithSimplifiedTablesofExternalLoadsorBuriedPipelinesissuedbytheTransportResearchLaboratory.Gullyconnectionsshouldnotexceed20minlength.
Draintrenchesarenottobebackfilleduntilthepipeworkhasbeen
approvedbytheEngineerwhichmayincludeairand/orwatertests. TrenchesinthecarriagewaysaretobebackfilledwithType2 granularmaterialtoSouthYorkshireLaboratorySpecificationNo.20
(orothermaterialapprovedinwritingbytheEngineer)whichshallcontainaminimumof10%ofmaterialretainedona37.5mmBSSieve.
51
-
7/27/2019 Highway Specification
53/8552
-
7/27/2019 Highway Specification
54/8553
-
7/27/2019 Highway Specification
55/8554
-
7/27/2019 Highway Specification
56/8555
-
7/27/2019 Highway Specification
57/8556
-
7/27/2019 Highway Specification
58/8557
-
7/27/2019 Highway Specification
59/8558
-
7/27/2019 Highway Specification
60/85
Access way Detail
59
-
7/27/2019 Highway Specification
61/85
Mew Court Detail
60
-
7/27/2019 Highway Specification
62/85
Standard Kerb Detail
61
-
7/27/2019 Highway Specification
63/85
Footway Edging Detail
62
-
7/27/2019 Highway Specification
64/85
Typical Vehicle Crossing To Individual House
63
-
7/27/2019 Highway Specification
65/85
Typical Pedestrian Crossing
64
-
7/27/2019 Highway Specification
66/85
Pedestrian Tactile Crossing Detail
65
-
7/27/2019 Highway Specification
67/8566
-
7/27/2019 Highway Specification
68/8567
-
7/27/2019 Highway Specification
69/8568
-
7/27/2019 Highway Specification
70/85
Typical Pedestrian Safety Barrier
69
-
7/27/2019 Highway Specification
71/85
Road Gully Details
70
-
7/27/2019 Highway Specification
72/85
Road Gully Details
71
-
7/27/2019 Highway Specification
73/85
Typical Footpath Gully Detail
72
-
7/27/2019 Highway Specification
74/85
Details Of Plasmobility Kerb 99
73
-
7/27/2019 Highway Specification
75/85
Details Of Dropper Kerb
74
-
7/27/2019 Highway Specification
76/85
Typical Fencing Position
75
-
7/27/2019 Highway Specification
77/85
Pre-cast Concrete Step Detail with Handrail
76
-
7/27/2019 Highway Specification
78/85
Standard Detail A-Frame Barrier
77
-
7/27/2019 Highway Specification
79/85
Standard Detail A-Frame Barrier
78
-
7/27/2019 Highway Specification
80/85
BJS/MS/3758.02/080104
ALPHABETICAL INDEXA F
Accessway/court 49,59 Fencing-ConcretePostSurround 6,75AdoptableAreas 43 Fertiliser 39AirVoids 23,38 Fill 13Airentrainedconcrete 6 Fitting-ConcretePipe 5AsphaltFinisher 9,23 Flags 9,38 FlexibleCarriageways 20
B FootpathGullies 6BackfilltoTrenches 16,17 Footways 4,37,67Barriers 69,77,78 FrostSusceptibility 2BinderCourse 25,29,31,37 FrozenMaterial 27Binders 8 BituminousMaterials G-Delivery 25,26 Geotextile 9,32-Thickness 22,23 GranularFill 13BlockPaving 9,30,34,38 GritBins 43Bricks 5 GrassBrickwork 15 -Cutting 40BritishStandards 2,20 -Seed 39BusDraw-ins 6 -Verges 40 Gradients 44
C GroundInvestigation 11CarriagewaySurfacing 20 Gullies
CBR 2,44-48 -Brickwork 15Cement 7 -Connections 15ChannelBlocks -General 6,71,72-General 7,18,49 -Grates&Frames 5,70-Laying 19 -Plastic 6ChannelFalls 19 -Pots 6Cleansing 42 -Rodding 42ColdWeatherWorking 27 Compaction 24 H-Bituminous 20,38 Handrails 38-BlockPaving 35 HandLaying 23-Subgrade 12,22 CompletionofWorks 42 IConcrete 6 Ice-Layingon 27ConcreteCarriageway 6 InclementWeather 27Crossfall 31 IndustrialEstateRoads 22,48,52CycleTrack 9,67 Ironwork 5 InspectionChambers 18
D Inspections 2Damagetoprecastproducts 19 Definitions 2 JDeleteriousMaterial 42 JointFilling-BlockPaving 35DeliveryTemperatures 26,27 JointSealing 8,27Demolition 11 Joints 18,27,35DiversionofWaterways 14 Drainage K-Ironwork 5 Kerbs-Subsoil 11 -Bedding&Backing 5,50Drains -General 18,61-General 50 -Face 18,50-Rodding 42 -Laying 18-Testing 16 -Race 50-Trenches 51 -Radii's 18,50DroppedKerbs 37 -Size 49 -Plasmobility 73,74
E EdgeRestraints 32 Edging 37,62
Engineer 2 Excavation 12,14
-
7/27/2019 Highway Specification
81/85
BJS/MS/3758.02/080104
L S
LandDrains 14 Sampling 4LayingBlockPaving 32,33,34 SandLaybys 6 -BlockPaving 32Lighting 43 -Grading 32 SettingOut 11
M SharedSurfaces 49MaintenancePeriod 42 Signs 43Manholes SiteClearance 11-Brickwork 15 Slag 8-Cover&Frames 5 Soakaways 5-Foundations 6 SoftSpots 12-General 16,50 SoilSurveys 11-Rodding 42 Specification 2-Slabs 6 StandardConstructionDetail 44-51Markings 43 StandingWater 14,27Materials 4 StepIrons 5MewsCourts 49,60 Steps 76Mortar 7 Streams 14Miscellaneous 43 StreetLighting 41,43 StringCourses 34,50
N Sub-base 4,7,20,22,31,37NamePlates 43 Sub-gradeCompaction 22
Sub-gradeDrainage 11O - P SurfaceLevels 23,29
Paintwork 10 Surfacing 7,23,44-50ParkingAreas 43 PedestrianCrossing 37,64 TPenetrationofBinder Tackcoat 25PercentageRefusalDensity 23 TactilePaving 65Pipes Temperature-Bedding&Haunching 6 -Delivery 26,27-General 5 -Rolling 26,27-Clay 5 Testing 4-Concrete 5 TestingDrains 16-Plastic 5 ToleranceSurfaceLevels 29,30PlantedVerges 39 TopSoil 12,39PlantSize&Spacing 39 Trafficsigns 43PorousPipes 5 Trafficking 13,29,35PreparationofBinderCourse 25 Trees 40PSV 28 Trenches 51 Type2Roads 45,56
Q-R Type3Roads 46,57Ramps 66 Type4Roads 47,58RepresentativeSamples 4 Type5ARoads 48,59RetainingWalls 43 Type5BRoads 49,60Roadbase 7,23,29 RoadHumps 9,68 U-VRoadMarking 43 VehicleCrossing 37,38,63RoadType 3 Verges 39,42Rock 12,14 Rollers 12,21,37 WRollingTemperatures 26,27 Waterways -TemporaryDiversions 14 Weeds 39,40 WearingCourse 44-49 Weather 27 XYZ
-
7/27/2019 Highway Specification
82/85
Useful Contacts
Barnsley Metropolitan Borough CouncilPlanning and Transportation Service
Central OfficesKendray StreetBARNSLEYS70 2TN01226 772177www.barnsley.gov.uk
Barnsley Development AgencyBeevor CourtPontefract RoadBarnsleyS71 1HG
01226 784444www.barnsleydevelopmentagency.co.uk
Doncaster Metropolitan Borough CouncilDirectorate of Borough Strategy and Development2nd Floor, Danum HouseSt.Sepu