  • 7/27/2019 Highway Specification

    1/85

    BJS/MS/3758.02/080104

    PART 2SPECIFICATION

    OF CONSTRUCTION MATERIALS

    ANDSTANDARD CONSTRUCTION DETAILS

  • 7/27/2019 Highway Specification

    2/85

    BJS/MS/3758.02/080104

    PART 2SPECIFICATION OF CONSTRUCTION MATERIALS

    AND STANDARD CONSTRUCTION DETAILSINDEX

    SECTIONS PAGE NUMBER

    1. INTRODUCTION 2

    2. MATERIALS 4

    3. SITEPREPARATIONANDGENERALWORKS 11

    4. EARTHWORKS 12

    5. DRAINAGE 14

    6. KERBS,FOOTWAYSANDPAVEDAREAS 18

    7. FLEXIBLECARRIAGEWAYS 20

    8. FOOTWAYSANDVEHICLECROSSINGS 37

    9. HIGHWAYVERGESANDPLANTING 39

    10. STREETLIGHTING 41

    11. COMPLETIONOFWORKS 42

    12. MISCELLANEOUS 43

    13. STANDARDCONSTRUCTIONDETAILS 44

    1

  • 7/27/2019 Highway Specification

    3/85

    BJS/MS/3758.02/080104

    1. INTRODUCTION

    THIS DOCUMENT IS TO BE READ IN CONJUNCTION WITH THE DESIGN GUIDE FOR RESIDENTIALROADS, THE HIGHWAYS AGENCY MANUAL OF CONTRACT DOCUMENTS FOR HIGHWAY WORKSAND THE SOUTH YORKSHIRE LABORATORY SPECIFICATION FOR THE SUPPLY OF MATERIALSFOR USE IN HIGHWAY WORKSINTRODUCTIONThisGeneralSpecificationisissuedfortheguidanceofdevelopers,andformsthegeneralbasisforalternativemethodsofconstructionforHousingEstateRoadsandIndustrialEstateRoadswhichtheHighwayAuthorityisultimatelyrequiredtoadoptashighwaytobemaintainedatpublicexpense.INSPECTIONSThe Highway Authority shall be notified at least 3 days Noticeprior to the commencement of any stage of the works.

    If,asaresultoffailuretogiveadequatenoticeofanystageofthe Failure to giveconstructionworkstheEngineerisunabletoinspectthesame,the adequate noticeDeveloperwillberequiredtocarryouttestsathisownexpensetoprovetotheHighwayAuthorityssatisfactionthattheworkscomplywiththeappropriatestandard.Otherwise,oncompletion,theworkmaynotbeconsideredforadoption.

    TheHighwayAuthorityrepresentativeshallbegivenaccesstothe Access forworkinprogressandmayvisitfromtimetotime.Suchvisitsdo The Highway notabsolvetheDeveloperfromhisresponsibilityforsupervising Authoritytheworkthatheispayingfor,orfromensuringthatitiscarried representativeoutinaccordancewiththeSpecificationandapproveddrawings.EXISTING SUB-GRADEAllconstructiondetailsshowninthisdocumentarebaseduponan Assumed CBRassumedCBRof2%.IfagreedinwritingwiththeEngineer, Valuesthicknessofsub-baseandorcappinglayermayvaryifasub-gradesurveyindicatesthatthereisanincreaseordecreaseinCBRvalues.

    Whenthesub-gradeisfrostsusceptible,aminimumconstruction Frostthicknessof450mmwillberequired. susceptiblesub-gradeDEFINITIONSUnlessotherwisestated,thedefinitionoftermsusedinthis GeneralSpecificationshallbethatintheGlossaryofHighwayEngineeringTermsandBS6100:2.4.1

    TheEngineer,forthepurposesofthisSpecification,shallbethe The EngineerrepresentativeofTheHighwayAuthority.

    WherereferenceismadeinthisdocumenttotheContractor,this The ContractorshallmeantheDeveloperorPartyenteringintoagreementwiththeHighwayAuthorityinrespectoftheadoptionofthehighway.

    BritishStandard-thistermwillbeusedwherereferenceismade BritishtoaBritishStandardsInstitutionSpecificationandtheedition Standardcurrentatthetimeofconstructionistobecompliedwith.(SeeSection2materials)

    2

  • 7/27/2019 Highway Specification

    4/85

    BJS/MS/3758.02/080104

    ROAD TYPESThesearedetailedintheDesignGuidesforResidentialandIndustrialRoads,andaresummarisedbelow.2. IndustrialEstateRoads

    3. MainRoad

    Parade4. CollectorStreet

    LocalStreet

    5. VillageStreet

    5B. Square/MewsCourtHomezone

    Footpath+PrivateDrive(Notadopted)FootpathModespecificlink

    3

  • 7/27/2019 Highway Specification

    5/85

    BJS/MS/3758.02/080104

    2. MATERIALSWherever,inrespectofanyBritishStandard(BS),aBSIKitemark BSCertificationschemeisavailable,allmaterialsarerequiredtocomply Accreditationwiththatstandard,orthecontainersofsuchmaterials,shallbemarkedwithaBSICertificationTrademark(theKitemark).ThemarkofconformityofanyotherthirdpartycertificationbodyaccreditationbytheNationalAccreditationCouncilforCertificationBodiesorequivalentshallbeanacceptablealternativetothisrequirement.Atthedateofconstruction,allarticlesandmaterialsshallconformto:- GENERAL

    A) theabove

    B) TheHighwaysAgencyforHighwayWorksmodifiedorextendedbyanysubstituteoradditionalclausesreferredtointhisdocument

    C) TheSouthYorkshireLaboratorySpecificationsfortheSupplyofMaterialsforuseinHighwayWorks

    Andthefollowing:-SAMPLES AND TESTINGRepresentativesamplesofallmaterialsproposedtobeusedinthe GeneralworksshallbesubmittedfortheEngineersapprovalnotlessthanthreeweeksbeforetheyaretobeusedintheworks,andshallbeinaccordancewithSouthYorkshireLaboratorySpecificationfortheSupplyofMaterialsforuseinHighwayWorks.Suchapprovalshallbeobtainedbeforeanymaterialsaredeliveredtosite.AnymaterialsnotconformingwiththeSpecificationandrequirementswillbecondemnedinwhichcasetheymustberemovedfromthesite.TheEngineermayrequirematerialtobetestedonaroutine Routinebasisataratewhichwillnormallynotexceed; Testing CarriagewayOnesampleper50mlengthofcarriageway. (Sub base androad baseMaterial)

    Onesampleper100mlengthofcarriageway. (SurfacingMaterial)Itmaybenecessarytotakesamplesforeachlayingoperation FootwaysIfanymaterialisbelowthequalityrequired,itwillbecondemnedandmustberemoved.The Developer shall bear the cost of all sampling and testing Costsrequired by the Engineer. ThesecostsarenormallyincludedintheSection38agreementandAdvancePaymentsCodeSection220ofTheHighwaysAct1980.However,theEngineermayrequireextratestsandtheseshallbepaidforbytheDeveloper.

    PorouspipesshallcomplywiththerequirementsofSouthYorkshire PorousLaboratorySpecificationNo.13.(Concreteporouspipes). PipesVitrifiedclaypipesshallcomplywithBSEN295andBS65. Vitrified

    4

  • 7/27/2019 Highway Specification

    6/85

    BJS/MS/3758.02/080104

    Thefittingsshallhaveflexiblemechanicaljoints.Theyshallbe Clay pipesbeddedonmaterialcomplyingwithSouthYorkshireLaboratory SpecificationNo.26andinaccordancewithSimplifiedtablesofExternalLoadsonBuriedPipelines,issuedbyTheTransportResearchlaboratory.

    Plasticpipesfittingsandjointsshallbeinaccordancewiththe Plastic pipesrequirementsofBS4660,BSEN1401/1andthewaterindustry and fittingsspecificationWIS4/35/01. ConcretePipesandfittingsshallcomplywiththerequirementsof ConcreteBS5911:Part100andSouthYorkshireLaboratorySpecification Pipes andNo.14. FittingsUnlessotherwiseagreedinwritingwithTheEngineer,allpipes Joints &shallbe:- bedding

    Flexiblyjointed.BeddedonmaterialconformingwithSouthYorkshireLaboratorySpecificationNo.26anddesignedinaccordancewithSimplifiedTablesofExternalLoadsonBuriedPipelines,issuedbytheTransportResearchLaboratory. BricksaretobeaClassBEngineeringorConcreteEngineering Bricks forqualitycomplyingtoSouthYorkshireLaboratorySpecification manholes,gulliesNumber16,andaretobelaidinEnglishbond. and Soak-aways etcDRAINAGE IRONWORK DrainageironworkshallcomplyinallrespectswithBSEN124 BSandbeKitemarkedorequivalent(anycertificationbodyaccredited toBSEN45011).Productsshallbemanufacturedbycompanieswhooperateto QualityBSENISO9000SeriesQualitySystemStandards. assuranceDuctileironClassD400(150mmdeep)doubletriangularto ManholeBSEN124with600mmsquareopeningsasmanufacturedby: covers and framesStanton(Inter-AxD400-H)(Orsimilarapproved).MustbeductileironwithcaptivehingetoBSEN124. Gully grates and framesMinimumClassD400 Industrial Estate and TypeAsmanufacturedby: 3 RoadsStantonWatershedD400HR8651(Orsimilarapproved)MinimumClassC250(100mmdeep) All other road typesAsmanufacturedby:StantonHY813(Orsimilarapproved) TobeinaccordancewithBS1247. Step irons for Manholes

    5

  • 7/27/2019 Highway Specification

    7/85

    BJS/MS/3758.02/080104

    GULLY POTS

    Fortypicalgullydetails,SeeSTANDARDCONSTRUCTIONDETAILS GeneralAllgulliesshallbetrappedandprovidedwitharoddingeyeandfixedchainstopper.ShallcomplywiththecurrentBritishBoardofAgrmentRoadsand PlasticBridgesCertificate(BBAPublications).ShallcomplywiththerequirementsofBS5911:Part230 Precast concretePrecastConcretePipes,FittingsandAncillaryProductsandSouthYorkshireLaboratorySpecificationNo.14.Shallcomplywiththerequirementsforroadgullies,asspecified ClayinBS65Specificationsforvitrifiedclaypipes,fittingsandductsorBSEN295,andshallbeinaccordancewithSouthYorkshireLaboratorySpecificationNo.12.ShallbeclaytrappedgullypotscomplyingwithBS.65and/or Footway gullies BSEN295andSouthYorkshireLaboratorySpecificationNo12withgalvanisedbucket.Thegulliesaretobecoveredwithahingedgratingandframe.(SeeSTANDARDCONSTRUCTIONDETAILS). CONCRETEAllconcreteshallbeinaccordancewithBS5328. BSAllconcreteusedshallbemadeofaggregate,cementandwater Constituentandshallcomplywiththeconditionsgivenbelow:- PartsWherestandardmixesarespecified,therelatedstrengthsshallbeas Standardfollows:- mixes

    ST4 20.0 N/mm2ST5 25.0 N/mm2Inallphasesoftheworkinvolvingconcrete,theconcretemustbe Placing placedbeforetheinitialsethascommenced.Beforeconcretingworkscommence,trialmixes,usingthe Concreteaggregatesproposedfortheworkshallbemadetoensurethat carriageways,theconcreteissufficientlyworkableandthatnosegregation Bus draw- ins,ofthemixoccursduringeithertransportationorplacing. lay-bys, In-situThecompositionofthesetrialmixesshallbeadjustedtoensure channelling,thatthecharacteristiccompressivestrengthofcubestestedin Manhole slabsbatchesoffourshallbe40Npermm2at28days. Theconcreteshallbeair-entrainedandthetotalquantityofairasapercentageofthevolumeofthemixshallbe5%+1.5%. Concreteforthesepurposesshallbeofsuchproportionsasto Concreteprovideacharacteristiccompressivestrengthof25Npermm2 Manhole(ST5)at28days.WhenrequiredbytheEngineertheContractor foundations shallsatisfyhimthatthearrangementsformixingtheconcreteare benching andadequatetoproduceamaterialoftherightquality,andshall concrete raftssupplybatchesoffourcubesfortestpurposes. Pipebeddingandhaunching. Concrete gradeBeddingandbackingofkerbsandedging. ST4 (20N/mm2)Manholesurrounds. shall be used

    6

  • 7/27/2019 Highway Specification

    8/85

    BJS/MS/3758.02/080104

    Gullybasesandsurrounds. for theseSteelpedestrianfencingsurround. purposesPipesaddling.Trenchbases.Blindingbasesofexcavations.MORTAROrdinaryPortlandCementshallbeusedunlessotherwisespecified. Cement MortarTobemixedbyvolumeataratio1ofcementto3sand.NaturalsandoncrushednaturalstoneorcombinationofbothasspecifiedinBS1200(Specificationsforbuildingsandsfromnaturalresources).CONCRETE KERBS CHANNEL AND EDGINGAllprecastconcretekerbs,channelsandedgingshallbe Concrete kerbshydraulicallypressedandshallcomplywiththerequirements channel andofSouthYorkshireLaboratorySpecificationNo.11.Special edgingkerbs(Plasmobility)havingdimensionscomplyingwithBS7263,maybeapprovedbyTheEngineer.ROAD PAVEMENTS

    Sub-baseshallbeinaccordancewithSouthYorkshireLaboratory Sub-base SpecificationNo.19.Thesourcematerialshallbeapprovedby TheEngineer.DenseBase(Roadbase)toBS4987andSouthYorkshire BaseLaboratorySpecificationNo.30. (Roadbase)

    Surfacing DenseBinderCoursecomplyingwithBS4987and Binder courseSouthYorkshireLaboratorySpecificationNo.31.OR

    RolledAsphaltcomplyingwithBS594andSouthYorkshireLaboratorySpecificationNo.7.

    StoneMasticAsphaltcomplyingwithBS4987andto SurfaceSouthYorkshireLaboratorySpecificationNo.41 Course

    ORRolledAsphalttocomplyingwithBS594andSouthYorkshireLaboratorySpecificationNo.29

    OR 10mmsizeCloseGradedSurfaceCoursecomplyingwithBS4987andSouthYorkshireLaboratorySpecificationNo.33

    OR6mmsizedenseSurfaceCoursetoBS4987andSouthYorkshireLaboratorySpecificationNo.34

    ORInterlockingBlockPavingcomplyingwithBS6717Precastconcretepavingblocks NotesMaterialscontaininglimestoneorblastfurnaceslagaggregate Blast furnaceshallNOTbepermittedintheSurfaceCourse. slag

    7

  • 7/27/2019 Highway Specification

    9/85

    BJS/MS/3758.02/080104

    Whenthesurfacingcourseislaidinstagesthesame Stage layingaggregatemustbeusedforeachstage.

    BITUMINOUS BINDERSAllbindersinbituminousmaterialsmustbestraight-run.Addition offluxingagentsisnotpermittedwithoutwrittenpermissionfrom TheEngineer Jointsealingcompoundshallconsistofeitherhotorcoldpoured Joint sealingmaterialasdetailedpage28-JOINTSINFLEXIBLESURFACING Compound

    8

  • 7/27/2019 Highway Specification

    10/85

    BJS/MS/3758.02/080104

    FOOTWAY PAVEMENTS

    ThematerialusedshallconsistofacompactedlayerofType1 Sub Base forgranularsub-basematerialandshallcomplywiththe footways andrequirementsoftheSouthYorkshireLaboratorySpecificationNo19 margins Surfacing for footways6mmsizeSurfacingCoursetoBS4987andcomplyingwith AsphaltSouthYorkshireLaboratorySpecificationNo.34With

    20mmsizeBinderCoursetoBS4987andcomplyingwith SouthYorkshireLaboratorySpecificationNo.31

    ORPrecastconcreteflagsshallcomplywiththerequirementsof PCCFlagsSouthYorkshireLaboratorySpecificationNo.11,bebeddedon sharpsandandcementataratioof6:1onthepreparedsub-baseORInterlockingBlockPaving(PencilEdge) Block Paving ORNaturalstoneflags Natural

    Stone flags

    Thesurfacingfornon-vehicularhardenedmarginsshall Surfacing forbe60mmthickconcreteblockpavingbeddedon35mm non-vehicularcompactedthicknessofsharpsand hardenedmargins

    SeeSTANDARDCONSTRUCTIONDETAILS Cycle trackconstructionROAD HUMPSSeeSTANDARDCONSTRUCTIONDETAILS Construction

    PositionofroadhumpstobeagreedwithHighwayAuthorityatplanningstage. LocationsGeometricaldesignshallbeinaccordancewiththelatest RegulationsversionofTheHighways(RoadHumps)Regulations.

    9

  • 7/27/2019 Highway Specification

    11/85

    BJS/MS/3758.02/080104

    PAINT FOR METALWORKShallbecarriedoutinaccordancewiththemethodsrecommended PaintworkinBS6150,usingmaterialscomplyingwithClause164andprimedattheworksinaccordancewithBS5493Paintworkspecificationforhandrailsandsafetybarrier1stcoat-Galvanising-Hotdipgalvanisingminimumthicknessofgalvanising70micronB.S.7292ndcoatandpreparation"T"wash(orsimilar)3rdcoat-Primer-Zincphosphatemetalprimer4thcoat-Undercoat1-Alkydundercoat(Grey)5thcoat-Undercoat2-Alkydundercoat(White)6thcoat-TopCoat-Permaglaxe12D45-Green(orsimilarapproved)NB1st2ndand3rdcoatstobecarriedoutinfactory

    10

  • 7/27/2019 Highway Specification

    12/85

    BJS/MS/3758.02/080104

    3. SITE PREPARATION AND GENERAL WORKS

    Theinvestigationshouldgatheralldataneededforassessing: Ground Investigation

    A Generalsuitabilityofthesiteandneighbourhoodforthe

    proposeddevelopmentworks

    B Physicalcharacteristicsofthegrounde.g.presenceofIn-groundobstacles,services,buriedconduits,sumpssoftspots,cellarsetc.

    C Physicalcharacteristicsofcontaminatedmatricese.g.mineralogy,moisturecontent,permeability,chemicalcomposition,particlesizedistribution

    D Geotechnicalcharacteristicse.g.strength,compressibility,stabilityofslopes,existingstructures,potentialforsubsidenceetc.

    E Theneedfordesignrequirementsofanyfoundations,earthworks,temporaryworksandspecialistgeotechnical

    processesassociatedwiththedevelopmentstrategy,takingintoaccounttheeffectofanyprevioususesofthesite.

    F Anyfactorsarisingfromthesoilorgroundwaterconditionsthatmightconstraintheconstructionorimplementationofdevelopmentworksincludingtemporaryworks,excavation,traffickabilityanddrainage.

    G Thequantity,qualityandeaseofextractionofconstructionmaterials

    (e.g.concretefoundations)suitableforinclusionintheworks

    H Changesinthestability,drainageorothergeotechnicalaspects

    ofthesiteandthesurroundinggroundandbuildingswhich mightbeinitiatedbythedevelopmentworks.

    Inaddition,itmaybenecessarytoassessthestabilityofexistingstructures,ortoevaluatepotentialfailureorinstability.AllinvestigationworksshallbecarriedoutinaccordancewithBS5930.SpecialistgeotechnicalprocessesshallbespecifiedanddesignedinaccordancewithappropriateindustrystandardsorrelevantCodeofPractice.Thelinesandlevelsofthecarriageways,footways,verges,drainsandallother Setting outworksshallbeproperlysetoutbeforecommencementoftheWorks.TheContractorshallremovebuildingstoaminimumof1.5mbelowformation Site clearancelevel)andotherobstructions,grubupandremovetrees,hedges,bushes,shrubsandclearthesiteoftheworkstothesatisfactionofTheEngineer.

    Cellarstobeexcavatedandfilledtospecification.

    Drawingsshowingsiteclearancedetailstogetherwithappropriate DrawingsschedulesandappendicesshallbesubmittedtoTheEngineerpriortocommencementoftheworks

    Theprovisionofacomprehensivesystemofsub-soildrainagemay Sub-Soilberequiredwhereproposedroadsareincuttingorwherethereis Drainageevidencethatthegenerallevelofthewatertableiswithin600mmofthecarriagewayformationlevel

    11

  • 7/27/2019 Highway Specification

    13/85

    BJS/MS/3758.02/080104

    4. EARTHWORKS

    AllEarthworksaretocarriedoutinaccordancewiththe GenerallatestrequirementsofSeries600ofTheHighwaysAgencySpecificationForHighwayWorks:-ThelatestrequirementsofSouthYorkshireLaboratorySpecificationForTheSupplyofMaterialsForUseinHighwayWorks:-Andthefollowing:-Drawingsshowingearthworksdetailstogetherwith DrawingsappropriateschedulesandappendicesshallbesubmittedtoTheEngineerpriortocommencementoftheworks.Alltopsoilshallberemovedfromthearearequiredfor Topsoilhighwayconstruction.

    Excavationshallbetocorrectlines,levelsandcontours. Line & levelWhererockismetinexcavationitshallbecutouttothe Excavation linesandlevelsshownontheapproveddrawings,oras in RockdirectedbyTheEngineer.SurfaceirregularitiespresentintheformationaftercompletionoftherockexcavationshallbecorrectedwithalayerofmassconcretegradeST4laidandcompactedtotherequiredlevels.TheincorporationofanyoftheexcavatedrockintheworksshallbelefttothediscretionofTheEngineer,dependinguponthenatureandsuitability/gradingoftherockforthispurpose.Allsub-gradesaretobeproofrolledandcheckedforsoftspots. Proof rolling/TheseshallbecutoutasdirectedbyTheEngineerandbackfilled Soft spots withGRANULARFILL(seepage15)Unlessspecificallyexcepted,allexcavatedorfilledsurfaces Compaction withintheareaofthehighwayshallbethoroughlycompacted inaccordancewithclause612oftheSpecificationForHighwayWorks.TheContractorshallcarryoutanyextrarollingandcompactionnecessitatedby:-

    A Thesoftorartificialnatureofthesite

    B Theloosenatureofreplacedmaterialindrain, sewer,statutoryundertakers,orothertrenches.C Anysubsidencethatmayoccur

    12

  • 7/27/2019 Highway Specification

    14/85

    BJS/MS/3758.02/080104

    AtthediscretionofTheEngineer,onsoftground,75mmto Soft ground125mmsinglesizestonemaybelaidoverthesub-grade,untilanadequatefoundationisachieved.EngineeringfabricsmayalsobeusedinthesecircumstancesasdirectedbyTheEngineer.Nomaterialshallbeusedforfillingundercarriageways FillingandfootwayswithoutthepriorapprovalofTheEngineer.GranularFillshallcomplywithclass6F1/6F2 Granular FillCappingshallcomplywithclass6F1/6F2 Capping layerShallbeinaccordancewithclause617oftheSpecification TraffickingforHighwayWorksandthefollowing; of sub-gradeTraffickingofthesub-gradeshouldbeavoided. Wherethecontractorproposestousethesub-gradefor constructionplant,heshall:StopexcavationshortofformationlevelOR

    Provideadequateprotectiontotheformationbytheuseofacappinglayerortype1sub-base.

    IftheContractordamagesthesub-grade,theaffectedareas Damage toshallbecutouttoadepthasdirectedbyTheEngineerand sub-gradereinstatedwithapprovedcappingmaterialproperlycompactedtohissatisfactionbeforeanysubsequentpavementlayersareplaced.

    13

  • 7/27/2019 Highway Specification

    15/85

    BJS/MS/3758.02/080104

    5. DRAINAGEGENERALThis document is concerned only with highway drainage.Sewers are the responsibility of the Sewerage Undertaker and anyconcerns or queries regarding sewers are to be directed to them. AllDrainageworksaretocarriedoutinaccordancewiththelatestrequirementsofSeries500ofTheSpecificationForHighwayWorks:-ThelatestrequirementsofSouthYorkshireLaboratorySpecificationForTheSupplyofMaterialsForUseinHighwayWorks:-Andthefollowing:-Drawingsshowingproposeddrainagedetailstogetherwith DrawingsappropriateschedulesandappendicesshallbesubmittedtoTheEngineerpriortocommencementoftheworks.

    ExcavationExcavationinanymaterialshallbeinopentrenchesto (General) correctlinesandlevels,asshownontheapproveddrawings ortosuchotherlinesandlevelsasdirectedbyTheEngineer.ExcavationstakenouttoagreaterdepththannecessaryshallbefilledwithconcretegradeST4ortheappropriatebeddingmaterial,toaleveldirectedbyTheEngineer.TrenchingshallbeofsufficientwidthtoenablethepipestobeproperlylaidandjointedbutinnocasegreaterthanthewidthspecifiedinSimplifiedtablesofexternalloadsonburiedpipelinesissuedbyTransportResearchLaboratory.Specialcareshallbetakentoprovideasolidandevenbedforthebarrelsofthepipes.Pits,trenchesandotherexcavationsshallbeadequately (Finish)supported,shallnotbebatteredandshallbewideenoughtoenablethepipesandconcretetobelaidaccurately,andproperrefillingandrammingtobecarriedout.Wheresolidrockissetintrenches,itshallbecutouttoadepth (Rock)of150mmbelowtheintendedleveloftheundersideofthepipesorthediameterofthepipewhicheveristhegreaterandreplacedwithpipebeddingmaterial(asspecifiedonpage8;JOINTSANDBEDDING)toprovideafirmbedforthepipes.AnyoverdigshallbebackfilledwithconcretegradeST4,topermitauniformdepthofbeddingmaterial.

    Ifanystreamsorwaterways,landdrainsorsewersareintersected Temporary/byanypartoftheWorks,theyshallbeconductedpastthesame Permanentduringconstructionbytroughsorothertemporarymeans,andas Diversions ofsoonaspossible,restoredtoaconditionsuitableforthepurpose. Ground WaterLanddrainsshallbeprovidedunderthenewroadsifthenatureofthesub-soilappearstowarranttheiruse.(seepage5;POROUSPIPES)Trenchesandallotherexcavationsshallbekeptfreefromwater Prevention ofuntilanyconcreteorotherworksthereinaresufficientlysetand Standing WatertheContractorshallconstructanysumpsortemporarydrainsthataredeemednecessary.TheContractorshallmakegoodanydamagecausedbyprolongedand/orexcessivepumpingandshalltakeallprecautionsnecessaryforthesafetyofadjoiningstructuresandbuildingsduringthetimethatthetrenchesareopen.

    14

  • 7/27/2019 Highway Specification

    16/85

    BJS/MS/3758.02/080104

    UnlessotherwisedirectedbyTheEngineer,pipesforcarrying Laying andsurfacewatershallhaveflexiblejointsandbelaidinaccordance Jointing ofwithmanufacturersinstructions.Allpipesshallbelaidtrueto pipeslineandlevel,witheachpipebeingseparatelyaligned.Pipebeddingmaterialshallbeasdescribedonpage8-JOINTSANDBEDDINGWheredirectedbyTheEngineer,existinghighwaydrains Carrier Drainsshallbeproperlyextendedtoreceiveadditionalflowsfromnewgulliesorchannels.Detailsofexpectedsurfacewaterrunoffanddrainagecalculationswillberequestedpriortowrittenpermissionbeinggranted.Anygullyorbranchconnectionsshallbemadeduringtheconstructionofthemaindrainandarecordoftheirpositionskeptforfutureuseorreference.Wherepipeconnectionsaremadetoabrickdrain,concreteculvert,stonebuiltorlinedchannel,thepipesshallbewellandtightlybuiltintotheconcrete,brickormasonrywork,andbesoplacedastodischargeinthedirectionofflowofthemaindrainorchannel,andwiththeendofthepipecuttothenecessaryangle.Wheretheconnectionsarebetweenpipeddrains,specialconnectingpipesshallbesupplied,trulylaidandproperlyjointed.Wherepipesarebeneaththecarriagewayorfootway,ata Shallowdepthlessthan1.2metrescoverfromthefinishedsurfacelevel Pipework(orelsewhereifTheEngineerconsidersthatthenatureofthegrounddemandsit),theyaretobebeddedonandsurroundedwith150mmofconcretegradeST4.Incarryingoutthiswork,theContractorshalltakecaretopacktheconcreteunderandaroundthepipestoensureevenbeddingandsolidityintheconcrete.Theconcreteshallnotbethrowndirectlyontothepipes.Theuppersurfaceoftheconcreteshallbestruckoffwithawoodenscreedortemplateandneatlyfinishedoff.Thesurroundingofpipeswithconcreteortherefillingoftrenches,shallnotproceeduntilthedrainshavebeeninspectedandapprovedbyTheEngineer.Theflexiblejointshallbemaintainedbyformingabreakintheconcretebedandsurroundbytheuseofflexcell,fibreboardorotherapprovedmaterials.AllpipelinesshallbedesignedinaccordancewithBS5911andSimplifiedtablesofexternalloadsonburiedpipelinesissuedbyTransportResearchLaboratory.Junctionpipeswhicharelaidbutarenotimmediatelyconnected Gullytogullies,shallbefittedwithtemporarystoppersorseals, connectionsandthepositionofallsuchjunctionsshallbeclearlydefinedbymeansofstakesortrailingwiresproperlymarkedorlabelled.

    Allbricksshallbeasdescribedonpage5.Brickworkistobebuiltin Brickwork EnglishBond,onmortar(inaccordancewiththedetailsshownonpage for manholes(7),finishedplumbandtrue,andflatpointedontheexposedface gullies andastheworkproceeds.Eachbrickistobewellbeddedandjointed. soak-aways etc.Nohalfbricksshallbeusedexceptasclosures.Nobrickworkshallbebuiltwhentheoutsidetemperatureprecludestheproperplacingofconcrete.ManholesandInspectionChambersshallbeconstructedin Manholes andthepositionsshownontheapproveddrainagedrawings,or inspection

    15

  • 7/27/2019 Highway Specification

    17/85

    BJS/MS/3758.02/080104

    asdirectedbyTheEngineer.Thedesignsanddetailsshallbe chambersinaccordancewiththeStandardDetailsshowninTheHighwaysAgencyConstructionDetails,SeriesF-Drainage.Seebelowregardingsettingstreetfurnituretofinishedlevels. GulliesUnlessotherwisedirectedbyTheEngineer,eachgullyshall (Drained area)drainamaximumof200sq.m. .Individualgulliesshallbesitedtoavoidstandingwateronthe (Siting)carriagewayandtopreventflowsthatmightcreatedanger,damageorgiverisetocomplaints.

    Allgullyconnectionsaretobeproved. (ProvingConnections)Gullypotsshallbesetonafoundationofandsurroundedby (Setting gully150mmofconcretegradeST4.Aftertheconcretehassetand pots)hardened,backfillingshallbecarriedoutandthoroughlycompacted.Coversandframes,shallbesettocorrectlevelsona Setting coversminimumofoneandamaximumoffourcoursesofbrickwork andframes(SeeBRICKSFORMANHOLES,GULLIES&SOAKAWAYSETCONPAGE5)ontopofdrainageunits.Forgullies,thetopcourseshallbelaidasheaders,asbrickonedge.(REFERTOSTANDARDCONSTRUCTIONDRAWINGSFORDETAILS)

    Toallowforadequatecompactionofpavementasphaltlayers, Setting streetstreetfurnitureshouldnotbeplaceduntilthebasecourselayeris furniture toiscomplete.Anychambersorgulliesshouldbecoveredtoprevent finished levelsingressofextraneousmatter.Streetfurnitureshouldthenbesettofinishedlevelsbeforethe wearingcourseislaid.WhereTheEngineerisinanydoubtastotheefficiencyofthe Testingdrainageworks,hemayrequiretheContractortoprovidethe Drainsapparatus,labourandtoolsformakingtestsbeforethetrenchesarebackfilled,orconcretesurround/haunchingisplacedinposition.AnydefectsdiscoveredintestingorotherwiseshallbemadegoodasdirectedbyTheEngineerandnopipesorfittingsofanydescriptionshallbecoveredupuntilhehasgivenhisapprovaltothesame.OnlyafterthedrainshavebeenapprovedbyTheEngineershall Backfilling trenchesbebackfilled.The first 300mm of backfill above thecrown of the pipeshallbefillmaterialasspecifiedinSimplifiedtablesofexternalloadsonburiedpipelinesissuedbyTransportResearchEstablishment.Theapprovedmaterialshallbecompactedinlayers,toadensityatleastequaltothatoftheundisturbedgroundadjacenttothetrench.Duringthefillingprocess,caremustbetakentoavoidpipesbeingbroken,displacedormoved.Whenconcreteisnotusedforsurroundingthedrains,thefirstlayeroffillingshallbecarefullyplacedintopositionbyhandandrammedsothatnocavitiesareleftunderthepipes.The remainder of the trenchistobebackfilledtoformation

    16

  • 7/27/2019 Highway Specification

    18/85

    BJS/MS/3758.02/080104

    levelorsubformationlevelwherecappingisrequired,withType2sub-basematerialtoSouthYorkshireLaboratorySpecificationNo20(orothermaterialapprovedinwritingbyTheEngineer,whichshallcontainaminimum10%ofmaterialretainedona37.5mmBSsieve).Timberwhichhasbeenemployedforshoringandsupporting, Shoring andshallnotberemoveduntilthecompactedfillhasreachedsuch support timberalevelastorendersupportunnecessary.Itshallthenberemovedasfillingproceeds,buttheymaybeleftintrenchesorotherexcavations,asdirectedbyTheEngineer.Anydamagearisingfromthecollapseoftrenchesmustbemadegood.Nomaterialshallbeusedforfillingunderthecarriageways andfootwayswithoutpriorapprovalofTheEngineer.

    17

  • 7/27/2019 Highway Specification

    19/85

    BJS/MS/3758.02/080104

    6. KERBS, FOOTWAYS AND PAVED AREAS

    Allworksforkerbs,footwaysandpavedareasaretocarried GENERALoutinaccordancewiththelatestrequirementsofSeries1100ofTheSpecificationForHighwayWorks:-ThelatestrequirementsofSouthYorkshireLaboratorySpecificationForTheSupplyofMaterialsForUseinHighwayWorks:-Andthefollowing:-Drawingsshowingdetailsofproposedkerbs,footwaysand DrawingspavedareasshallbesubmittedtoTheEngineerpriortocommencementoftheworks.Concretekerbsaretobelaidtocorrectlineandlevelona Laying Kerbspreformedbedofconcretekerbrace,150mmminimumthicknessunlessotherwisedirectedbyTheEngineer.Theconcreteistobecarriedupthebackofthekerbstowithin100mmofthetopfaceforawidthof150mmtoformahaunch.Jointsbetweenkerbsshouldnotexceed2mminwidth. JointsWherejointsarewiderthan2mm,orwherekerbshavebeencut,jointsaretobefilledwithcementmortar(asdescribedonpage7)andthefaceofthejointpointed.Forallcurvesupto12metreradius,circularkerbsaretobeused Radiiandlaidtruetoradius.Curvesbetween12metresand20metresradius,aretobeformedusing450mmstraights.Curvesinexcessof20mradiusaretobeformedusingfulllengthstraightkerbs.KerbfaceshallbeasspecifiedinSTANDARDCONSTRUCTION Kerb FaceDETAILS,GENERALREQUIREMENTSFORKERBING&CHANNELLING.Wherespecialkerbsareused,thekerbfaceshallbeasdirectedbytheEngineer.CHANNEL BLOCKS

    ChannelBlocks150mmx150mm(125mm)aretobeusedwhenchannelgradientsare;

    A. between1.25%(1in80)and0.67%(1in150)

    B. orgreaterthan10%(1:10)(topreventscour)Combineddrainageandchannelunitsaretobeusedwhenchannelgradientsare;lessthan0.67%(1in150)

    18

  • 7/27/2019 Highway Specification

    20/85

    BJS/MS/3758.02/080104

    Channelblocksshallabutthefrontfaceofkerbs,shallbelaid Layingtocorrectlineandlevelona150mmthickbedofconcrete,andshallbeproperlybondedtotheconcreteusedinthekerbfoundations.(SEESTANDARDCONSTRUCTIONDETAILS,GENERALREQUIREMENTSFORKERBING&CHANNELLING)Wherethekerbradiusexceeds12metres,channelblocksshall Radiibe450mminlength,butwheretheradiusislessthan12metrestheyshallbe300mminlength.Jointsbetweenblocksarenottoexceed2mminwidthandareto Jointsbeproperlygroutedwithcementmortar(forspecificationseepage7).COMBINED KERBING AND DRAINAGE UNITSCombinedkerbinganddrainageunitsaretobelaidinaccordancewithmanufacturersinstructions.DAMAGE TO KERBS etcShouldanydamagebedonetothefinishedkerbs,edging,channel Damageblocksorcombineddrainageunits,orshouldanymovementoftheblockstakeplaceduringtheexecutionoftheworksorduringthemaintenanceperiod,theContractorshalltakeoutandmakegoodthelengthssoaffected,includingallassociatedworks.Newconcretebedandhaunchistobeprovidedforkerbing,edging,channelblocksandcombinedkerbinganddrainageunits

    19

  • 7/27/2019 Highway Specification

    21/85

    BJS/MS/3758.02/080104

    7. FLEXIBLE CARRIAGEWAYSAllroadpavementsaretobebuiltinaccordancewiththelatest GENERALrequirementsofthefollowingSeriesofTheSpecificationForHighwayWorks:-

    700 :RoadPavementsGeneral800 :Roadpavements-Unbound,HydraulicallyBoundandothermaterials900 :Roadpavements-AsphaltBoundMaterials1100:KerbsFootwaysandPavedAreas,Clause1107ThelatestrequirementsofSouthYorkshireLaboratorySpecificationForTheSupplyofMaterialsForUseInHighwayWorks.

    andthefollowing:-Drawingsshowingdetailsofproposedroadpavementworksshall DrawingsbesubmittedtoTheEngineerpriortocommencementoftheworksBITUMINOUSHotbituminousmaterialsshallbelaidandcompactedinaccordance BritishwiththerequirementsandrecommendationsforlayinginBS4987: Standard forPart2orBS594:Part2,asappropriate.WherethereisnoBritish AsphaltStandardfortheparticularmaterial,itshallbelaidinaccordance MaterialswiththerequirementsandrecommendationsofBS594:Part2,subjectalsototherequirementsofClause901SubClauses8to31ofTheSpecificationForHighwayWorks,andSouthYorkshireLaboratorySpecificationForTheSupplyofMaterialsForUseInHighwayWorks.Allmaterialsshallbeplacedandspreadevenly. SpreadingAllmaterialshallbespreadusingapavingmachineoraspreaderboxoperatedwithamechanismthatlevelsoffthematerialtoanevendepth.IncaseswhereTheEngineerconsidersthattheextentoftheworkdoesnotwarranttheuseofmechanicalequipment,hemayallowhandspreading.Insuchcases,everyprecautionshouldbetakentominimisesegregationandtoavoidcontaminationofthematerial.TheContractorshall,inhischoiceofpermittedmaterialsfor Choice ofsub-bases,haveregardtothenatureofthosematerialsandofthe permittedsub-gradeoranyothercappingandneedtoprotectthemfrom materialsdeteriorationduetotheingressofwater,theadverseeffectsof for sub-baseweatherandtheuseofconstructionplant.Thecontractorshallprogrammethelayingandcompactionofthesub-baseandthesubsequentpavementcoursesandtakesuchstepsasmaybeconsiderednecessary,toaffordprotectiontothesub-baseandsubgrade.

    CompactionshallcomplywithB.S.4987-2:Clause7. Compaction(Pleaserefertotablesfordelivery&rollingtemperatures of asphaltextractedfromBS4987onpages28&29) materials

    Asphaltmaterialsshallbelaidandcompactedinlayerswhichenablethespecifiedthickness,surfacelevel,regularityrequirementsandcompactiontobeachieved. CompactionshallbesubstantiallycompletedbeforethetemperaturefallsbelowtheminimumrollingtemperaturesstatedBS4987:Part2orBS594:Part2.

    Rollingshallcontinueuntilallrollermarkshavebeen

    20

  • 7/27/2019 Highway Specification

    22/85

    BJS/MS/3758.02/080104

    removedfromthesurface.Asphaltmaterialsshouldnormallyberolledinalongitudinaldirection,withthedrivenrollsnearestthepaver.Therollershallfirstcompactmaterialadjacenttojointsandthenworkfromthelowertotheuppersideofthelayer,overlappingonsuccessivepassesbyatleasthalfthewidthoftherearrollor,inthecaseofapneumatictyredroller,atleastthenominalwidthofonetyre.Therollingpatternshouldbesuchastoensurethatcompactionisasuniformaspossibleacrosstheroadwidth.Inordertoachievethis,atleasthalfoftherollerpassesshouldbealongtheedgeofthelayer.Rollersshallnotbepermittedtostandonwarmcompacted Stationarymaterials Rollers

    Therecommendedrollerforallcarriagewayworksshallbe RecommendedBM130orTV130orsimilarapproved. rollers

    Regulating

    Regulatingcourses,thatmayconsistofoneormorelayersof (Tolerences) asphaltmaterial,shallhavetheirfinishedsurfaceslaidtoachievetheappropriatetolerancesforhorizontalalignments,surfacelevelsandsurfaceregularity,forpavementlayers.UnlessotherwiseadvisedinwritingbytheEngineer,base (Materials)(roadbase)orbindercoursemacadamcanbeusedforregulatingimmediatelybelowthesurfacecourse.Asphaltmaterialsusedshallmeettherequirementsoftheappropriatematerialasspecified.Wherethetotaldepthofregulatingcourseexceeds150mmthen (Compactedthecourseshallbelaidsothateachregulatinglayerhasa thicknesses)compactedthicknessofbetween75mmand150mm.Whereanypavementlayerdoesnotcomplywiththespecification Rectificationforregularity,surfacetolerance,thickness,texturedepth,materialpropertiesorcompaction,thefullextentoftheareathatdoesnotcomplywiththespecificationshallbemadegoodandthesurfaceofthepavementcourseshallberectifiedinthemannerdescribedinlaterparagraphsforeachsectionseparately.

    Reclaimedasphaltmaterialsmaybeusedinproductionof Reclaimedasphaltbase(roadbase),bindercourseandsurfacecourse. asphaltAdviceonthetypesofreclaimedasphaltmaterialspermitted materials canbeobtainedfromTheEngineer .Shouldanyasphaltmaterialbecomecontaminated,The CleanlinessContractorshallmakeitgoodbycleaningitbyjetwashing. of laidIfthisprovesimpractical,thefulldepthofthetoplayeras bituminouslaidshallberemovedandbereplacedwithfreshmaterial layerslaidandcompactedinaccordancewiththeSpecification.

    ReinstatementofopeningsshallcomplywiththeSpecification ReinstatementFortheReinstatementofOpeningsinHighwaysissuedbythe of paved areasSouthYorkshireHighwayAuthoritiesandUtilitiesCommittee.Immediatelybeforeasphaltlayersarereinstated,theedgesoftheexistingmaterialshallbecleanedofallloosematerialandbecoatedwithanappropriatehotbinder,orequivalenttreatment.

    21

  • 7/27/2019 Highway Specification

    23/85

    BJS/MS/3758.02/080104

    SUB-BASE

    Allroadpavements(unboundmaterials)aretobebuiltin GENERALaccordancewiththelatestrequirementsofSeries800ofTheSpecificationForHighwayWorks.

    ThelatestrequirementsofSouthYorkshireLaboratorySpecificationForTheSupplyofMaterialsForUseInHighwayWorks.andthefollowing:-Thedeliveryofthematerialshallbeco-ordinatedwiththe Deliverytherateoflayingtoavoidinterruptiontothelayingprocess.Materialupto225mmcompactedthicknessshallbespreadinone Compactionlayersothataftercompactionthetotalthicknessisasspecified.Materialofcompactedthicknessgreaterthan225mmshallbelaidintwoormorelayersandtheminimumcompactedthicknessofanysuchlayershallbe110mm.Wherelayersofunboundmaterialareofunequalthicknessthelowestlayershallbethethickestlayer.Thesub-basematerial,atappropriatemoisturecontent,shall becompactedtotherequirementssetoutinTheSpecificationForHighwayWorks,table8/1.Tolerancesare+10mm30mm.INDUSTRIAL ESTATES Materialsshallbecompactedwithvibratingrollerswithoutdryingoutorsegregationsothatwhentestedtheyachieve95%ofthedensitywhencompactedinaccordancewithBS 1377 Part 14.Thisshallbemeasuredin-situusingacalibratednucleardensitymeteratarateof1testsper50linearmetresofcarriageway.Priortolayingthebituminousmaterialthesurfaceofthesub-baseshallnothavearutexceeding10mmmeasuredusinga3mstraightedge.Thesurfaceofanylayerofmaterialshalloncompletionofcompactionandimmediatelybeforeoverlayingbewellclosed,freefrommovementundercompactionplantandfromridges,cracks,loosematerial,potholes,rutsorotherdefects.Allloose,segregatedorotherwisedefectiveareasshallberemovedtothefullthicknessofthelayer,andnewmateriallaidandcompacted.Thetop110mmshallbescarified,reshapedwithmaterialaddedor Rectificationremovedasnecessary,andre-compacted.Theareatreatedshallbe (Refer tonotlessthan20mlongand2mwide. General section on page 22)BASE (ROADBASE)Allroadpavements(asphaltboundmaterials)aretobe GeneralbuiltinaccordancewiththelatestrequirementsofSeries900ofTheSpecificationForHighwayWorks.ThelatestrequirementsofSouthYorkshireLaboratorySpecificationForTheSupplyofMaterialsForUseInHighwayWorks.andthefollowing:-Base(Roadbase)materialshallbespreadoverthesub-baseand Compaction

    22

  • 7/27/2019 Highway Specification

    24/85

    BJS/MS/3758.02/080104

    rolledsoastogivethecompactedthicknessrequiredbyclause901ofTheSpecificationForHighwayWorks,andBS4987-2Table1.Wheremorethanonelayerofmaterialisrequiredeachlayershallbethoroughlycompactedtothecorrectlevelsandprofilebeforethematerialforasubsequentlayerisspread.Withcoatedmacadamorasphaltbases(roadbase),thefulldepth Rectificationofthetoplayeraslaidshallberemovedandreplacedwithfresh (Refer tomateriallaidandcompactedinaccordancewiththeSpecification. General sectionAnyareasotreatedshallbeatleast5mlongandthefullwidthof onpage 22)thepavinglaidinoneoperation.Alternativelyforlowareasinasphaltbase(roadbase)tobeoverlaidwithbindercourse,theContractormaymakeupthelevelwithadditionalbindercoursematerial.SURFACINGTheconsolidatedthicknessoftherespectivelayersofcoated Thicknessmaterialsforthesurfacingofcarriageways,aspreviously of Layersspecified,shallbeasindicatedintheStandardConstructionDetails.

    Thespreadingandinitialcompactionofsurfacingmaterial Spreading andshallbecarriedoutbyanAsphaltFinisherunlessotherwise compaction ofagreedinwritingwithTheEngineer. CoatedLayingshallcomplywithClause6.3ofBS4987:Part2. MaterialsFinalcompactionshallbecompletedasdescribedbelow, MachineshallsatisfytherequirementsassetoutinSection7of LayingBS4987:Part2andshallconformtothelevelsandcross-sectionsspecified.

    Anyresultsfallingbelow93PRDwillbedeemedtohavefailed. Minimum PRD

    Thecoatedmaterial,shallbespreadbymeans Hand Layingofheatedtoolstothecorrectthickness,shouldsatisfytherequirementsassetoutinClause6.4ofBS4987:Part2.FinalcompactionshallsatisfytherequirementssetoutinSection7ofBS4987:Part2andshallconformtothelevelsandcross-sectionsspecified.Narrowstripsremainingalongsidemachinework,iflaidbyhand,shallberolledatthesametimeasthemachinelaidwork,withallowancebeingmadeforextrasurchargetoandcompactionofthehandlaidmaterial.Themethodoflayingshallensurethatairvoidsof:- Air VoidsCompactedCloseGradedSurfaceCoursematerials

    And

    DenseBindercourseandBase(Roadbase)materials

    Shallbeintherangeof2%to8%.Notmorethan1in10resultswillbepermittedabove8%andnoresultisallowedover10%.

    CompactedHotRolledAsphaltmaterial Shallbeintherangeof2%to6%. Notmorethan1in10resultswillbepermittedabove6%

    andnoresultisallowedover8%.

    23

  • 7/27/2019 Highway Specification

    25/85

    BJS/MS/3758.02/080104

    Materialtippedfromdeliverylorriesshallbeproperly Tipping fromturnedandspreadtoensurethatthematerialatthebottom lorriesoftheheapasitfallsfromthelorry,isnotleftundisturbed.Duringthewholeoftheoperation,everyprecautionshallbe Segregationtakentoavoidsegregationandtopreventthematerial andbecomingcontaminatedwithdustorotherforeignmatter Contaminationbytheprovisionofsheeting. Aftercompaction,thethicknessofthesurfacingshall Compactedmeasurenotlessthanthatspecified.TheContractorshall thicknessesensurethatthespecifiedthicknessislaidoverthewholearea,and,whererequiredbytheEngineer,heshallopenoutsufficientareasofsurfacing,eachareatomeasurenotlessthan300mmsquareordrillcorestoenableactualthicknessestobeascertainedbydirectmeasurement.Intwocoursework,thethicknessofeachcourseshallmeasurenotlessthanthespecifiedminimum.

    24

  • 7/27/2019 Highway Specification

    26/85

    BJS/MS/3758.02/080104

    Surfacecoursesandbindercoursesshallhavethefulldepth Rectificationofthecourseremoved,andreplacedwithfreshmateriallaid (Refer toandcompactedinaccordancewiththeSpecification. General sectionThearearectifiedshallbethefullwidthofthepavinglaidin on page 20oneoperation,andatleast5mlongifbindercourse,or15mlongifsurfacecourse.

    Thesurfaceofthebindercourseshallbethoroughlycleanedof Preparationdirt,mudandallotherforeignmatterbypowerwashingprior oftothelayingofthesurfacingcourse. Binder courseUnlesstheEngineerrulesotherwise,atackcoatofClassK1-40 Tack coatbitumenemulsionshallbeappliedtothebindercourseattherateof0.35to0.5l/m2andallowedtobreak(turnfrombrowntoblack)unlessappliedbyintegralspraybaronthepaver,beforelayingthesurfacecourse.Theemulsionshallnotbeallowedtoaccumulateinhollowsbutshallbedispersedbybrushing.TheemulsionshallcomplywithBS434:Part1.

    Notrafficshallbeallowedonthecarriagewayduringthe periodbetweentheapplicationofthetackcoatandthelayingofthewearingcourse.

    Deliveryandrollingtemperaturesareshownonpages26and27.

    25

  • 7/27/2019 Highway Specification

    27/85

    BJS/MS/3758.02/080104

    DELIVERYANDROLLINGTEMPERATUREAttentionisdrawntothedeliveryandrollingtemperaturesgiveninBS4987Part2andBS594whichshouldbeobserved.BS 4987 Part 2Recommendeddeliveryandrollingtemperaturesforcoatedmacadamsotherthandense,heavydutyandhighmodulusbindercourseandbase(roadbase)macadams.__________________________________________________________________Typeofmixture Minimumtemp. Minimumtemp.includingbinder ofmixturein immediatelypriortypeandgrade lorrywithin torollingoC 30min.after arrivalonsite oC__________________________________________________________________BitumenDense,closegraded, 290pen 100 80mediumgradedsurface 190pen* 110 85coursesandfinegraded__________________________________________________________________Denseandclosegradedsurfacecourse 125pen 120 95__________________________________________________________________Opengradedand 290pen 85 65singlecourse 190pen 95 75__________________________________________________________________Forsteelslagmacadam,temperatures10oClowerthanthoserecommendedmaybeused__________________________________________________________________Minimumrollingtemperaturesfordense,heavydutyandhighmodulusbinderCourseandbase(roadbase)macadams.__________________________________________________________________Bindertypeandgrade minimumrollingtemperatureoC__________________________________________________________________190pen 60125pen 7550pen 10535pen 110__________________________________________________________________.BS 594________________________________________________________Minimumrollingtemperature________________________________________________________BinderType Grade Minimumrolling temperatureoC________________________________________________________Bitumen 50pen 85LakeAsphaltBitumen 50pen 85PitchBitumen 50pen 85Bitumen 70pen 80LakeAsphaltBitumen 70pen 80Bitumen 125pen 75________________________________________________________NOTETO Toensurethatadequatetimeisavailableforcompaction

    26

  • 7/27/2019 Highway Specification

    28/85

    BJS/MS/3758.02/080104

    BS594 tobesubstantiallycompletedbeforethetemperature fallsbelowtherecommendedminimumforrolling, aminimumdeliverytemperature,takenwithin30 min.afterarrivalonsite,of130oCisrecommended Inclementand coldweatherworkingLayingshallbecarriedoutwithdueregardtoambientweather General conditionssothatmaterialscanbeproperlycompacted. Ifweatherconditionsaresuchthattheperformanceofthe pavementmaybejeopardised,discontinuealloperations. Layingofasphaltmaterialsshallnotbecarriedoutiffree Rain andstandingwaterispresentonthesurfacetobecovered. standingLayingshouldalsobeavoidedasfarasispracticableduring waterheavyrain.Ifthewetweatherthreatenstobeprolonged,layingofthecoatedmacadamshouldbesuspended.

    Forcoldweatherworkingaminimumof24hoursnoticeisrequired Cold weatherbytheEngineerandgenerallythefollowingshallapply:- working

    Materialforuseinroadpavementsshallnotbelaidonany surfacewhichisfrozenorcoveredwithice.

    NoroadpavementmaterialinafrozenconditionshallbeincorporatedintheWorksbutitmaybeusedifacceptablewhenthawedout.Materialscontainingbitumenbinders,shallnotbelaidifthe temperatureofthesurfacetobecoveredisatorbelow2oC.Wherehoweverthesurfaceisdry,unfrozenandfreefromice,layingmayproceedatairtemperaturesintheshade atorabove-1oConarisingthermometer.Additionally,unlessthetemperatureofthesurfacetobecoveredis5oCormore,rolledasphaltwearingcourseshallnotbelaidwhentheairtemperatureintheshadefallsbelow6oC.LayingoperationsbelowthisairtemperaturemaybeallowedatthediscretionoftheEngineer.Joints in FlexibleSurfacingWhenlayingnewmaterialabuttingfreshlylaidoroldmaterial Abutting freshlycareshallbetakentosecuregoodadhesionbetweenjointsby laid or cuttingbacktheexposedjoint,foradistanceequaltothe old materialspecifiedlayerthickness,toaverticalface,discardingallloosenedmaterialandcoatingtheverticalfacecompletelywithasuitablehotbitumen,orcoldappliedpolymermodifiedintermediateorpremiumgradebitumenemulsion.

    Furtherdetails:- fortype4&5roads aregivenina)below

    type3roads aregiveninb)below Patches(allpatches) aregiveninc)below Bituminousemulsionspecificationshownind)below

    Manholecovers,kerbs,channels,gulliesandsimilarprojections Other verticalagainstwhichasphaltmaterialsaretoabutshallbecleanedand facespaintedwithathinuniformcoatingof50(40/60)or85(70/100)penhotbitumenor,ifapprovedinwritingbytheEngineer,coldappliedthixotropicbitumencompoundofsimilargrade,

    27

  • 7/27/2019 Highway Specification

    29/85

    BJS/MS/3758.02/080104

    beforethecoatedmacadamislaidasindicatedbelow.Thenewmaterialshallbetampedaroundandagainstsuchprojectionssothat,afterfinalcompaction,thefinishedsurfaceshallbeleftflushornotexceeding6mmabovesuchprojections.Manholecoversandsimilarfittingsshallbeadjustedtothecorrectlevelsbeforethewearingcourseislaid.a) ONTYPE4&5ROADS - Thelongitudinalcentrelinejoint

    willrequiresealingwithhotrunbitumenoranapprovedthixotropiccoldcompound.

    b)ONTYPE3ROADS - Allverticaljointstobesealed, ANDINDUSTRIALESTATE kerbfacesuptothefinished ROADS waterlineandallironworkto bepaintedwithhotrunbitumen.c) PATCHES - Verticaljointstobepaintedwith (ALLPATCHES) hotrunorapprovedcoldcompound forallpatchesinallcategoriesof

    roadsandfootpaths-minimumsizeofpatch2mx2m.

    d) SPECIFICATION - TocomplywithBS594:Part2: FORJOINTS Clause6.6. OR

    BS4987:Part2:Clauses6.7&6.8 50(40/60)or85(70/100)penetration

    hotrunbitumen.

    ORifapprovedinwritingbytheEngineer,coldappliedthixotropicbitumencompoundofsimilargrade

    e.g.COLAS(BITUKOLDLANSTAR)

    -Bitumencoldjointprimerorothersimilarapproved.

    28

  • 7/27/2019 Highway Specification

    30/85

    BJS/MS/3758.02/080104

    Traffickingofasphaltbase(roadbase)orbindercoursesmaybe Traffickingpermittedforaperiodoftimebeforethesurfacecourseislaid. of asphaltTheyshouldbeblindedwithcoatedgritthatshallbecarried Base(Roadbase)outeitherbyhandormechanicallywithbituminousgritas and BinderspecifiedinBS4987,Part2:7.9andtheguidancegivenin CoursesBS4987,BS4987,Part2-B.5.4beforebeingopentotraffic,withdueregardbeingpaidtothefollowing:-

    (a) OnType3,4andindustrialestateroadslimestoneandblast blastfurnaceslagaggregatesarenotallowed,andpermitted

    aggregatesshallhaveaminimumP.S.V.of55iftheyarenottobecoveredwithin6weeks.

    (b) Ontype5roads,limestoneandblastfurnaceslagaggregatesarenotpermittedinifthegradientexceeds10%(1:10).

    (c) Iftemporarytraffickingcausespolishingtotheextent

    thatasatisfactoryskidresistanceisnotmaintainedthentheskiddingresistanceshouldberestoredtoasatisfactorylevelbysurfacedressingusingchippingsofminimumP.S.V.55,ortheapplicationofothersurfacetreatmentasapprovedinwritingbytheEngineer. Tolerance insurface levels

    of pavement coursesRoadsurface +6mmexceptimmediatelyadjacenttogullies

    surfacewaterchannelsandmanholeswhereitshallbe+6mm/-0mm.

    Bindercourse +6mmBase(roadbase) +8mmSub-base +10mm/-30mmwhenunderbase(roadbase),otherwise+10mmFormation +20mm/-30mmSurfacelevelsshallbecheckedforcompliancewiththetolerancerequirementsusingthemethoddescribedinparagraph702.4oftheHighwaysAgencySpecificationforHighwayWorks.Tomeettherequirements,nomeasurementshallexceedthepermittedtolerance.Thefinishedsurfaceshallbetestedwitha3metrelongstraightedge,laidlongitudinally.For machine laid

    Surface courses,themaximumdepressionundera3metrelongstraightedgeshallnotexceed3mm.

    Binder courses,themaximumdepressionundera3metrelongstraightedgeshallnotexceed6mm.

    For hand laidSurface courses,themaximumdepressionundera

    3metrelongstraightedgeshallnotexceed6mm.Binder courses,themaximumdepressionundera

    3metrelongstraightedgeshallnotexceed9mm

    29

  • 7/27/2019 Highway Specification

    31/85

    BJS/MS/3758.02/080104

    WherethesefiguresareexceededthematerialshallbetreatedinaccordancewiththerequirementsforRectification shownfor:-

    SUBBASE&BASE(ROADBASE) onpage4SURFACING onpage24

    NOTE: See separate requirements for Block Paving

    30

  • 7/27/2019 Highway Specification

    32/85

    BJS/MS/3758.02/080104

    BLOCK PAVING

    Shallbeinaccordancewiththerequirementsofand BritishrecommendationsinBS7533exceptwhereitisvaried standard forbytheprojectspecification. block paving

    Allblockpavingistobebuiltinaccordancewiththelatest GENERALrequirementsofTheHighwaysAgencySpecificationForHighwayWorks:-clause1107

    ThelatestrequirementsofSouthYorkshireLaboratorySpecification ForTheSupplyofMaterialsForUseInHighwayWorks.

    andthefollowing:-

    Unless agreed in writing with the Engineer, all blockpaving shall be concrete block paving.

    PenciledgeblocksshallbeusedForcarriagewayconstruction,sub-baseshallbegranulartype1materialinaccordancewithSouthYorkshireLaboratorySpecificationNo19.

    Wherethesub-baseistobesubjectedtoresidentialtraffic,

    a50mmthickcourseof20mmdenseasphaltbinder

    courseshallbelaidontopofthesub-basetoprovide

    arunningsurfaceandprotectiontothesub-base.Whereblockpavingistobeusedforcarriagewayconstruction,TheContractorshallalsorefertothefollowingsectionsofthisdocument:-

    Page2-Section1INTRODUCTION (AssumedCBRs) Subgrade andand Sub-base (Frostsusceptiblesub-grade)

    Page4-Section2MATERIALS-ROADPAVEMENTS Sub-base andPage21-Section7FLEXIBLECARRIAGEWAYSSURFACING Binder course

    Thesubgrade,sub-baseandbindercourseshallbepreparedsothat:-(a)thesurfacelevelsarewithinthetolerancesgivenintable1onpage35

    (b)thelongitudinalfallsandcrossfallsaresuchthatno depressionsholdwater. Minimumrecommendedgradients:- Longitudinalfall;1.25%(1:80)

    Crossfall; 2.50%(1:40)

    (c)thesurfaceistightanddenseenoughtopreventlayingcourse (sandlayer)materialbeinglostintothelowerlayersduring

    constructionanduse;(d) provisionismadeto:

    (1)drainwaterfromanyabuttinglayingcourse,e.g.by

    31

  • 7/27/2019 Highway Specification

    33/85

    BJS/MS/3758.02/080104

    installationofdrainagewhenthelayingcourseison impermeablefoundations;

    (2)preventmigrationandlossoflayingcoursematerial intothedrainagesystem,e.g.byusingageotextile;Theextentofthesitepreparedforblocklayingshallinclude Edgeenoughroomtoprovideadequatefoundationsandbacking restraintsforanyedgerestraint.Edgerestraintsshouldbeadequatetosupporttrafficloadsandtopreventlossoflayingcoursematerialfrombeneaththesurfacecourse.Examplesarekerbs,combinedkerbsandchannels,establishedstructuresorrigidabutmentssuchaspavingblocksfixedvertically,beddedonandhaunchedwithconcrete.Donotvibratethesurfacecourseuntiltheedgerestraint,togetherwithanyconcretehaunching,hasgainedsufficientstrength.Aretobefoundinsection13 StandardConstructiondetailsLAYING COURSE ( SAND BEDDING LAYER)Layingcourse(andjointingmaterial)shallbenaturallyoccurring MaterialsandinaccordancewiththerecommendationsgiveninB.S.7533-3 andTable2onpage30ofthisspecification. Themoisturecontentofthelayingcourseshouldbeas Moistureuniformaspossibleandthematerialshouldbemoist contentwithoutbeingsaturated.Allmaterialtobeusedmustbestockpiledunderacover. StockpilingConstructthelayingcoursesothataftercompaction Screedingitformsalayerapproximately35mmthickbelowthepavingblocks.Whereclosertolerancesthanthosegivenintable1onpage30forthelevelofthesub-basehavebeenachieved,orwhereabindercoursehasbeenused,athinnerlayingcoursecanbeused.However,innocaseshouldthematerialbelessthan25mmthickatanypoint.

    32

  • 7/27/2019 Highway Specification

    34/85

    BJS/MS/3758.02/080104

    Theobjectofscreedingthelayingcourseistoproduceauniformsurface,tothespecifieddesignprofilesandfalls,atauniformdegreeofcompaction.Whensettingupscreedingrails,allowanceshouldbemadeforthesubsequentcompactionofthelayingcourse

    Ifanydisturbanceofthepreparedlayingcoursebypedestrianorwheeledtrafficoccurs,priortoplacingpavingblocks,re-screedareasoflayingcoursematerial.

    Constructthelayingcourseusingoneofthemethodsdescribedbelow:-

    LAYING METHODS

    Spreadthemateriallooseinauniformlayertoapproximately Precompactiontherequiredfinaldepthbelowthesurfaceprofile.Compactthislayerusingavibratingplatecompactor.Spreadafurtherlayerofmaterialabout15mmthickandscreedittocreatealoosesurfaceonwhichthepavingblockscanbeplaced.Spreadthemateriallooseinauniformlayer,andscreedittothe Compactionthicknessrequiredtogivethespecifieddesignthicknessafterthe after layingpavingblockshavebeenlaidandvibratedintoplace.Theprecompactionmethodispreferablebecauseithelpstoensureuniformdensityandcompactionofthelayingcourseandhenceimprovessurfacetolerances.Whereanominalcompactedthicknessof35mmistobeused, Trial areasifpreviousexperienceofaparticularmaterialislacking,asmalltrialareawillbeneededtodeterminetheallowance.Theareaoflayingcoursepreparedshouldgenerally Block layingbesuchthatitsboundaryisnotlessthan1maheadofthe bounderieslayingface,exceptattheendoftheworkingperiodwhentheboundaryshouldbenomorethan1maheadofthelayingface.Theworkingedgeshouldbeprotectedovernightanditmaybenecessarytoremoveanareaofblockspriortoscreedingforthedaysoperation.

    33

  • 7/27/2019 Highway Specification

    35/85

    BJS/MS/3758.02/080104

    Table.1.Tolerancesonsurfacelevels____________________________________________________________________Layerofpavement Maximumpermissible deviationfromdesignlevel____________________________________________________________________ Sub-layer: sub-base +/-20mm Bindercourse(roadbase) +/-15mmSurfacecourse: overall +/-6mm flatness 10mmundera3m straightedge2mm betweenadjacentblocks adjacenttogullies, surfacedrainage channelsandoutlets (seenote) +6/-0LAYING PAVING BLOCKS

    Laypavingblockssothatthesurfacelevelsarewithinthetolerances Surfacegivenintable1.Makeminoradjustmentstomaintainthebond Coursepatternandensurethatthejointsremainwideenoughforsandfilling.Detailsofthebondpatternshouldbeagreedbefore Bondcommencement.Whererectangularblocksarebeingusedin patternareassubjecttovehiculartraffic,herringbonebondshouldbeusedtominimisecreepandtoensurebetterradialdistributionofwheelloads.Followanorderoflayingwhichmaintainsanopenworkingface Order ofanddoesnottrappavingblocks.Thefirstrowofblocksshould Layingbealignedagainsttheedgerestraintorbyusingastraightedgeorstringline.Checkthealignmentofblocksperiodically,e.g.byusingstringlines,andmakeadjustmentswherenecessary.NOTE

    Blockpavingisdesignedtofunctionwithsand-filled joints,whichwillnormallylieintherangeof2mm to5mmwhenplacedhandtight.Thejointwidthwillbe influencedbyblockshapeandbondpattern.Laywholepavingblocksfirst,followedbyclosures.Completetheareatobelaid,asfaraspossibleusingwholeblocks.Whereappropriate,incorporateblockshapesdesignedtoassistwiththeformationofboundariesandwithchangesindirection.Completeinfillingbeforecompactioncommences.Whereverpossible,infillingtoboundariesandobstructions Infillingshouldbecompletedasthelayingofthesurfacecourseproceeds.Trimpavingblockstoshapeandsizetoformboundaries.Do Trimmingnotinsertpiecesofasizelessthanone-thirdofafullblock.Thiscanoftenbeachievedbyalteringthebondpatternslightlyattheedgesofthepavingandtrimmingsomeofthepavingblocksinboardoftheedgeblocks.Toworkroundanyobstructions,cutthepavingblockas Obstructionsnecessarytofillinanyirregularshape.

    34

  • 7/27/2019 Highway Specification

    36/85

    BJS/MS/3758.02/080104

    Fullycompactthesurfacecourseusingaplatecompactorwith Compactionaplateareaofnotlessthan0.25m2,transmittinganeffective of Blockforceofnotlessthan75kN/m2ofplateatafrequencyof Pavingvibrationintherange75Hzto100Hz.Alternatively,useanycompactingequipmentwhichwillachievethesamedegreeofcompactionorbetter.Itisimportanttofillthelowerportionoftheblock-to-blockjointwiththelayingcoursematerial.Carryoutcompactionassoonaspossibleafterlayingbutnotwithin1mofanylayingface.Apartfromthisedgestrip,donotleaveanyareaofpavinguncompactedatthecompletionofthedayswork.Ensurethatthefinishedsurfacelevelsarewithinthetolerancesgivenintable1onPage30.Thecontactareaofaplatecompactormaybe Measuringmeasuredbystandingtheplateonaflatsmooth contact arealevelsurfaceandslidingapieceofcardinfrom of platebothfrontandrearuntilitmeetstheposition compactorwheretheplatetouchestheground.Aftercompactionofthesurfacecourse,spreadsandorcrushed Jointrockfinesoverthesurfaceandbrushitintothejoints.Materials Fillingcomplyingwiththegradingintable2shallbeused.Donot useasandwhichmightstainthepavementsurface,ifthisisanimportantconsideration.NOTE.1. Fillingbetweenthejointsisveryimportant.Itinterlocks

    thepavingandhelpsimpartstaticloadbearingcharacteristics.Theuseofdrymaterialwillassistinrapidjointpenetration.

    Vibratetheblockpavingtoensurecompletefillingofthe block-to-blockjointbythesurface-appliedsand.Where necessaryaddfurthersandandre-vibratethepaving. Completejointfillingandfinalcompactionassoonas practicableafterlaying.NOTE.2. Whereblockpavingistobeusedbyindustrial

    vehiclesimposingexceptionallyhighpointloads,itis advisabletofurthercompacttheentirepavementafter jointfilling.NOTE.3. Concreteblocksshouldnotbevacuumedforatleast threeweeksafterlayinginordertoreducetheriskof jointingsandbeinglost.

    ItmaybenecessarytoprovidejointstabilisationcompoundandblocksurfacesealantsatthediscretionoftheEngineer.Table2-Layingcoursesandetc.Thesurfacecourseshallbeinspectedafteranearlyperiodoftraffic Earlyuseandadditionalsandfillingbrushedinwherenecessary TraffickingTable2LayingcoursesandandjoiningsandtocomplywithBS7533:Part3:AnnexD

    35

  • 7/27/2019 Highway Specification

    37/85

    BJS/MS/3758.02/080104

    Nominal aperture Percentage by mass passingof sieve size through sieveLaying course Jointing sandsand

    % %

    10.00mm 100 -5.00mm 90-100 -2.36mm 75-100 1001.18mm 55-90 95-100600um 35-65 50-100300um 10-45 15-60150um 0-10 0-1576um 0-3 0-3NOTE:Sandsshouldbegradedbywashing,decantinganddrysievinginaccordancewithBS812:Part103

    36

  • 7/27/2019 Highway Specification

    38/85

    BJS/MS/3758.02/080104

    8. FOOTWAYS AND VEHICLE CROSSINGSGENERAL

    Allfootwaysandvehiclecrossingsaretobebuiltinaccordance withthelatestrequirementsofSeries1100KerbsFootwaysandPavedAreas.ofTheSpecificationForHighwayWorks:-ThelatestrequirementsofSouthYorkshireLaboratorySpecificationForTheSupplyofMaterialsForUseInHighwayWorks.

    andthefollowing:-Drawingsshowingdetailsofproposedfootwaysandvehicle DrawingscrossingsareasshallbesubmittedtoTheEngineerpriortocommencementoftheworks.FOOTWAY EDGINGPrecastconcreteedgingaspreviouslyspecifiedshallbelaid Fixingcloselyjointedbetweenfootpathsurfacesandvergesorelsewhere ifdirectedbytheEngineer.Theedgingshallbesolidlybedded onconcrete100mmthickandhaunched(bothsides)with75mmthickconcretesoastoensurethatitdoesnotmoveduringthefootpathconstructionandshallbelaidtocorrectalignmentandlevel.Aftercompletion,anyunitfoundtobemorethan6mmoutoflineorlevelateitherendoftheunitshallbeliftedandre-laid.TheContractorshallberesponsibleforrectifyinganymovement Rectification thatoccurspriortoandduringthemaintenanceperiod.FOOTWAYS AND HARDENED MARGINS Thesub-baseforbothfootwaysandhardenedmarginsaretobe Sub-Base formedwithType1sub-basematerialcomplyingwithSouthLaboratoryspecificationNo19,properlycompacted. Thecompletedsurfaceshallbefreefromirregularitiesandloose materialandistobetruetocrosssection,lineandlevel.Note;Sub-Baseistoextendunderconcretebeddingforkerbsandedging.ASPHALT MATERIALSBindercoursesforasphaltfootwaysshallbedensebinder BindercoursethatshallbelaidinaccordancewithBS4987-2. course 6mmsizeDenseSurfaceCoursethatshallbelaidinaccordance SurfacewithBS4987-2andlaidevenlyonthebindercoursetogive Course foraminimumcompactedthicknessof25mm.Wherethe Footwayssurfacingabutskerbs,thefinalsurfaceshallbebetween2mm and3mmproudofthetopofthekerbandshallbetruetolevelandtherequiredcrossfall.(3%min-4%max).CompactionshallcomplywithB.S.4987-2Clause7. Compaction(Pleaserefertotablesfordelivery&rollingtemperatures of asphaltextractedfromBS4987onpage22) materials

    Therecommendedrollerforallfootwayandfootpathworks RecommendedshallbeadoubledrumvibratoryrollerTV.75orBW75ADL rollers(articulated)orsimilarapproved.

    37

  • 7/27/2019 Highway Specification

    39/85

    BJS/MS/3758.02/080104

    FLAGSItmaybenecessarytolayabondingcoursetoavoid"creep"inlargeareasonsteepgradients.Bondedcoursesofflagsproperlybeddedonthepreparedbase witha10mmsandandcementmortarbed,closelyjointed,anddrivenintopositionwithaheavymaul.Theouteredgeofflagswherethefootwayabutskerbs,istobekeptlevelwiththelatterandthefootwayshallbelaidtruetolevelandrequiredcrossfall.Theflagsshallbelaidincoursesatrightanglestothekerbs.

    BLOCK PAVING

    Blockpavingmaybeusedasanalternativei.e.60mmthickblocks (PencilEdge)on35mmcompactedsandon150mmofType1sub-basetoSouthYorkshireLaboratorySpecificationNumber19.VEHICLE CROSSINGSFootwayVehicleCrossingssubjectedtomorethanprivatecar trafficshallbeconstructedtothesamespecificationasthe adjacentcarriageway.FootwayvehiclecrossingssubjectedtoprivatecartrafficonlyshallbeconstructedinaccordancewiththeStandardDetails.PEDESTRIAN CROSSINGSDroppedkerbstofacilitatethepassageofwheelchairsandprams, shallbeinstalledatallroadjunctionsandotherpedestriancrossing points,asdirectedbytheEngineer,andshallbeconstructedinaccordancewiththeStandardDetails.(Maximumupstand6mm).LAYING AND COMPACTION OF ASPHALT MATERIALS Materialsshallbecompactedassoonasrollingcanbeeffected Compaction withoutcausingunduedisplacementofthematerialandatnoless thantheminimumrollingtemperature.Thematerialshallbeuniformlycompactedbyanappropriaterollercapableofmeetingtheairvoidrequirementsacrossthefullwidth.Themethodoflayingshallensurethatairvoidsofcompacted Air voidsasphaltmaterialsshallbeintherangeof2%-8%.Notmorethan1in10resultswillbepermittedabove8%andnoresultisallowedover10%.Deliveryandrollingtemperaturestobeinaccordancewiththe Delivery andtablesshownonpage27. rolling temperatures

    38

  • 7/27/2019 Highway Specification

    40/85

    BJS/MS/3758.02/080104

    9. HIGHWAY VERGES AND PLANTINGGRASS AND GROUND COVER PLANTSAllgrassedandplantedareasaretobebuiltinaccordancewith GeneralthelatestrequirementsofSeries3000ofTheHighwaysAgencySpecificationForHighwayWorkswhereitdoesnotconflictwithBS4428:1989Andthefollowing:-Drawings/plantingplansindicatingspecies,size,spacing/m2 Drawingswithappropriateschedulesandappendicesshallbesubmittedforspecificapprovalfortheschemepriortothe commencementofworks. TopsoiltocomplywithBS3882figureK1fortextureand TopsoilAndBS1377part3pH

    Depthtobe450mmforshrubs,tobetopqualityvegetablesoilmaximumstonecontent5%dryweight,notmorethan50mmanydimension.

    SoilcontainingJapaneseKnotweedandMaresTailwillberejected.Thesurfaceistobecultivateddowntoaminimumdepthof150mm, Cultivationbringtofinetilthandregulatetoevenlyrunninglevels.Clearoutallweeds,largestones,brokenbrick,perennialweedsandroots.Britishconiferbarkmulchcontaininglessthan5%wood, Bark mulchminimumthicknessof75mmover entireplantedarea, and FertilizersupplyENMAG(orsimilarapproved)andmixintobarkatarateof50g/m2

    Approvedfertiliserevenlydistributedatnotlessthan 68grammesperm2(20.10.10).Approvedspeciesofplantsshouldbewellestablishedand Plantsfreefromdisease,withaminimum3goodgrowingpoints.

    Size&spacing:- Groundcover 200-300mm-15/m2 Shrubs(medium)450-600mm-6/m2 HedgingPlants 600-900mm-4/Lin-m Theareaistobewellmaintainedfreefromgrass,weeds Maintenanceandlitterandwateredindryweather.GRASSNothinglessthan900mmwidth. Minimum widthSoildepthof150mmreducedtoafinetilth,freefrom Topsoilstonesandotherdebris.Aftersettlement,finishedleveltobe10mmaboveadjacent Finishedconcreteedging/kerb. levelApprovedfertiliserevenlydistributedatnotlessthan Fertiliser68grammesperm2(20.10.10).Lowmaintenancegrassseedorturfshallbeused. Seed

    39

  • 7/27/2019 Highway Specification

    41/85

    BJS/MS/3758.02/080104

    Duringthemaintenanceperiodallvergesaretobemaintained Maintenanceinhealthycondition,freefromweedsandgrassvergesareto periodbecutregularly.

    Attheendofthemaintenanceperiodthereshouldbe100%coverofplantedandgrassedareaswhichare97%weedfree,withnodeadordiseasedplants.

    AtreeplantingSpecificationisavailableonrequest. Tree planting Specification

    40

  • 7/27/2019 Highway Specification

    42/85

    BJS/MS/3758.02/080104

    10. STREET LIGHTINGAllstreetlightingworksaretobeinaccordancewiththelatest GeneralrequirementsofSeries1300&1400ofTheHighwaysAgencySpecificationForHighwayworks.Andthefollowing:-Thedesignandinstallationofstreetlightingschemesisnormally DesignundertakenbyThe Highway Authority. Anearlyapproveddesignwhichmayincludeilluminatedtrafficsignsisrequiredtoavoidanyabortiveworks.

    Alistofacceptableequipmentisavailable,onrequest.Developers Acceptablewishingtodeviatefromthislistshoulddiscussthematterwiththe EquipmentLightingEngineerattheearliestopportunity.

    Theinstallationofstreetlightingshouldberelatedcloselytothe Installationoccupationofdwellingsandmustnotbeleftuntilthedevelopmentasawholeisnearingcompletion.WheretheworkistobecarriedoutbytheDeveloper,theEngineershouldbeaskedtoapprovethepositionsofthecolumnsonsitepriortoerection.TheDevelopermustmakeallthenecessaryarrangementswiththeElectricityCompanyfortheconnectionofthesupply.Alternatively,subjecttoreceiptofanofficialorder,theHighwayAuthoritywillprovideandinstallequipmentonbehalfoftheDeveloper,andmakethenecessaryarrangementsfortheconnectionoftheelectricitysupply.

    Lightingcolumnsshouldbelocatedwithinthelimitsofthehighway,normallyatthebackedgeoffootwayorverge.Incertaininstances,however,itmaybeacceptabletoattachlightingunitstobuildings,forexampleinmewscourts.Thiswillnormallyrequireaway-leaveagreementbetweentheowner,ElectricityCompanyandtheHighwayAuthority.

    41

  • 7/27/2019 Highway Specification

    43/85

    BJS/MS/3758.02/080104

    11. COMPLETION OF WORKS

    Grassvergesaretoberolledduringtheprogressoftheworkand Maintenanceduringtheperiodofmaintenance,andwellwateredindryweather. of VergesTheContractorshallremoveandreplaceanyareasthatarenotinahealthycondition,uptotheendoftheperiodofmaintenance.Thegrassistobecutonaregularbasisandnotlessthan4timesin12months.CLEANLINESS OF THE SITEThewholeoftheworksshallbeleftoncompletioninacleanand Generaltidycondition. ItisanoffencetounderSection151oftheHighwaysAct1980 DeleterioustodepositdeleteriousmaterialonthePublicHighway.The matterDevelopermustensurethatappropriatemeasuresforcleaningareprovidedwithintheCDMRegulations.Itisnormalforthistobeaconditionoftheplanningpermission.

    TheContractoristocleansethecarriageway,footwayandverges Cleansingregularlyduringtheprogressoftheworks,asrequiredduringtheirtermofmaintenanceandoncethoroughlyimmediatelybeforetheterminationofthemaintenanceperiod.PROVING DRAINSOncompletionoftheworksalldrains,manholesandgulliesshall Roddingberodded,flushedwithwaterandleftcleanandfreefromobstruction.

    42

  • 7/27/2019 Highway Specification

    44/85

    BJS/MS/3758.02/080104

    12. MISCELLANEOUS

    Streetlighting,trafficsigns,roadmarkingsandstreetname Street LightingplatesshallbeprovidedattheexpenseoftheDeveloper signs etc.AlltheseitemsshallcomplywiththeeditionoftherelevantBritishStandardandSpecificationforHighwayWorkscurrentatthetimeofconstructionforilluminatedsigns(seepage1). Streetnameplatesaretobeerectedpriortooccupancyofany Street nameproperties. platesWhenrequestedbytheEngineer,gritbinsshallalsobeprovided. Grit binsattheexpenseoftheDeveloper.

    GritBinswillgenerallyberequiredonroadsand/orfootpathswithagradientsteeperthan1in12(8%)andmustbemaintainedandkeptfullofsaltbyTheDeveloperuntiladoption.FurtherdetailsinthisconnectioncanbeobtainedfromtheEngineeruponrequest.AnyretainingwalltowhichSection167oftheHighwaysAct Retaining Walls1980appliesoranyotherretainingwallorStructurewhich theDeveloperintendstoofferforadoptionbytheHighwayAuthoritymustbeapprovedbytheEngineer.Notesforguidanceonsuchmattersareavailableonrequest.Theextentoftheadoptableareasaretobeclearlydefined Definition oftothesatisfactionoftheEngineer. Highway BoundaryAdoptableparkingareasadjacenttoroadsmustbesurfacedwitha Parking Areasmaterialwhichisnotsusceptibletodamagebyoildroppingsandsuchsurfacingsshouldpreferablybebrindlecolouredblockpavingwithapprovededgerestraint.

    43

  • 7/27/2019 Highway Specification

    45/85

    BJS/MS/3758.02/080104

    13. STANDARD CONSTRUCTION DETAILSFOOTPATHS, FOOTWAYS AND FOOTWAY VEHICLE CROSSING FOR CAR USE ONLYSurface Course25mm thick0/6mmDBM190PenSurfaceCourseL/StonetoBS4987-1:Clause7.50/4mmFG190PenSurfaceCourseL/StonetoBS4987-1:Clause7.7maybeusedifapprovedbytheEngineer.Binder Course55mm thick0/20mmDBM190PenBinderCourseL/StonetoBS4987-1:Clause6.5Sub-Base150mm thickType1Sub-BasetocomplywithSpecificationforHighwayWorksClause803.Mustbefreefromextraneousmatter.Weedsmustberemovedandthesubgradesprayedwithtotalweedkiller.Note:Concreteblockpavingmaybeusedasanalternativei.e.60mmthickblockson35mmcompactedsandtoBS7533-3(andasdescribedinSECTION6BLOCKPAVINGTABLE2ofthisspecification)on150mmthicknessofType1sub-base.Steep GradientsFootpathswithagradientsteeperthan10%(1in10)willrequire:-1. Handrail(Pleaseseestepdetailforhandrailspecification)

    2. Possiblyspecialsurfacetreatment.Note :The use of a single drum roller is not permitted.

    44

  • 7/27/2019 Highway Specification

    46/85

    BJS/MS/3758.02/080104

    CARRIAGEWAY CONSTRUCTION FOR TYPE 2 ROADS125mm kerb face 155mm kerb face at bus stopsIndustrial RoadsSurface Course40mm thick0/14mmSMA50pensurfacecourseH/StonePSV60toSouthYorkshireLaboratorySpecificationNo41.OR45%0/10mmHighStoneContent50pensurfacecoursesteelslagtoSouthYorkshireLaboratorySpecificationNo29with10mmaggregate(or14mmaggregateattherequestoftheEngineer)Note :Limestone and blast furnace slag aggregates are not allowed in the carriageway surfacing course.Binder Course70mm thick0/20mmDBM125penbindercourseH/StonetoBS4987-1;Clause6.5Notes1. Blast furnace slag and limestone aggregate are only allowed in the carriagewaybinder course if it is to be covered within 6 weeks.2. Coated grit will be required on all binder courses unless laid concurrently withthe surface layer to BS 4987-1:Clause 7.9Base (Roadbase)120mm thick0/32mmDBM125penbaseL/StonetoBS4987-1:Clause5.2.Sub-BaseThicknessinaccordancewithCBRvalueoftheSub-Grade.470mm thickTobelaidunlesssiteinvestigationindicatesthatalesserthicknesswillsuffice.AnyvariationistobeagreedinwritingwiththeEngineer.Type1Sub-BasetocomplywithSpecificationforhighwayWorksClause803.Footwaysaretobeaspreviouslydescribedbutfootwayvehiclecrossingsshallbeconstructedastheadjacentcarriageway.TheaboveistoreadinconjunctionwithSection7FLEXIBLECARRIAGEWAYS.

    45

  • 7/27/2019 Highway Specification

    47/85

    BJS/MS/3758.02/080104

    CARRIAGEWAY CONSTRUCTION FOR TYPE 3 ROADS(MAIN ROADS AND PARADES)125mm kerb face 155mmkerb face at bus stopsSurface Course40mm thick0/14mmSMA50PenSurfaceCourseH/StonePSV60toSouthYorkshireLaboratorySpecificationNo41.(AlesserthicknessofSMAmaybepermittedifagreedinwritingwiththeEngineerseenote1below)OR45%0/10mmHighStoneContent50PenSurfaceCourseSteelSlagtoSouthYorkshireLaboratorySpecificationNo29with10mmaggregate(or14mmaggregateattherequestoftheEngineer)NoteLimestoneandblastfurnaceslagaggregatesarenotallowedinthecarriagewaysurfacecourseBinder Course50mm thick0/20mmDBM125PenBinderCourseH/StonetoBS4987-1:Clause6.5.Notes1. IfareductioninthicknessofSurfaceCourseisapprovedthentheBinderCoursethicknessshallbe

    increasedbyappropriateamount.2. Blastfurnaceslagandlimestoneaggregatesarenotallowedinthecarriagewaybindercourseunlessthe

    bindercourseistobecoveredin6weeks.3. CoatedgritwillberequiredonallbindercoursesunlesslaidconcurrentlywiththesurfacelayertoBS

    4987-1:Clause7.9.Base (Roadbase)100mm thick0/32mmDBM125PenBaseL/StonetoBS4987-1:Clause5.2Sub BaseThicknessinaccordancewithCBRvalueofSubGrade470mm thickTobelaidunlesssiteinvestigationindicatesthatalesserthicknesswillsuffice.AnyvariationistobeagreedinwritingwiththeEngineer.Type1Sub-basetocomplywithSpecificationforHighwayWorksClause803. The above is to be read in conjunction with Section 7 FLEXIBLE CARRIAGEWAYS.

    46

  • 7/27/2019 Highway Specification

    48/85

    BJS/MS/3758.02/080104

    CARRIAGEWAY CONSTRUCTION FOR TYPE 4 ROADS(COLLECTOR AND LOCAL STREETS)100mm kerb face 155mm kerb face at bus stopsSurface Course30mm thick0/10mmCGSurfaceCourse125PenH/StonetoBS4987-1:Clause7.4Note :Limestoneandblastfurnaceslagaggregatesarenotallowedincarriagewaysurfacescourses.Binder Course50mm thick0/20mmDBM125PenBinderCourseH/StonetoBS4987-1:Clause6.5Notes1. Limestoneandblastfurnaceslagaggregatesarenotallowedinthecarriageway bindercourse.2. Coatedgritwillberequiredonallbindercoursesunlesslaidconcurrentlywiththe surfacelayertoBS4987-1:Clause7.9Base (Roadbase)90mm thick0/32mmDBM125PenBaseL/StonetoBS4987-1:Clause5.2Sub BaseThicknessinaccordancewithCBRvalueofsub-grade.440mm thickTobelaidunlesssiteinvestigationindicatesthatalesserthicknesswillsuffice.AnyvariationistobeagreedinwritingwiththeEngineer.Type1Sub-BasetocomplywithSpecificationforHighwayWorksClause803.TheaboveistobereadinconjunctionwithSection7FLEXIBLECARRIAGEWAYS.

    47

  • 7/27/2019 Highway Specification

    49/85

    BJS/MS/3758.02/080104

    CARRIAGEWAY CONSTRUCTION FOR TYPE 5A ROADS(VILLAGE STREET)100mm kerb faceSurface Course25mm thick0/6mmDBM125PenSurfaceCourseH/StonetoBS4987-1:Clause7.5Note :Limestoneandblastfurnaceslagaggregatesarenotallowedinthecarriagewaysurfacecourses.Binder Course50mm thick0/20mmDBM125PenBinderCourseH/StonetoBS4987-1:Clause6.5Note :CoatedgritwillberequiredonallbindercoursesunlesslaidconcurrentlywiththesurfacelayertoBS4987-1:Clause7.9Base (Road Base)70mm thick0/32mmDBM125PenBaseL/StonetoBS4987-1:Clause5.2Sub-BaseThicknessinaccordancewithCBRvalueoftheSub-Grade390mm thickTobelaidunlesssiteinvestigationindicatesthatalesserthicknesswillsuffice.AnyvariationistobeagreedinwritingwiththeEngineer.Type1Sub-BasetocomplywithSpecificationforHighwayWorksClause803.TheaboveistobereadinconjunctionwithSection7FLEXIBLECARRIAGEWAYS

    48

  • 7/27/2019 Highway Specification

    50/85

    BJS/MS/3758.02/080104

    SHARED SURFACE CONSTRUCTION FOR ACCESS WAYS/ACCESS COURT/MEWS COURT(TYPE 5B)RECTANGULAR INTERLOCKING CONCRETE BLOCK PAVING(PencilEdge),(Fineline),(Chamferless)or(Minichamfer).60mmThick- Concreteblockpavinglaidonascreededlayer35mmcompacted

    thicknessofnaturallyoccurringsand,complyingwithBS7533:Part3(andasdescribedinSECTION6-BLOCKPAVINGTABLE2ofthisspecification)MethodoflayingtobeinaccordancewithBS6717Part3.Othertypesofblockpavingmaybeapprovedonrequest.

    Unlessotherwiseapprovedtheblocksshallbe200mmx100mm.ColoursofblockstoberestrictedtoBuff,Red,Charcoal,andBrindle(brown,grey,red)inacombinationtobeagreedbytheEngineer.BINDER COURSE50mmThick- 0/20mmDBM125PenBinderCourseH/StonetoBS4987-1:Clause6.5SUB-BASEThicknessinAccordancewithC.B.R.ValueofSub-grade340mmThick- Tobelaidunlesssiteinvestigationindicatesthatalesserthicknesswill

    suffice.AnyvariationistobeagreedinwritingwithTheEngineerType1granularsub-basetoSouthYorkshireLaboratorySpecificationNo.19.GENERAL REQUIREMENTS FOR KERBING, CHANNELLING & EDGINGKERBINGAllkerbs,channelsandedgingsmustbehydraulicallypressedprecastconcretetoBS.7263andSouthYorkshireLaboratorySpecificationNo.11.Non-standardorspecialkerbonType5roadstobeagreedwiththeEngineer.KERB SIZE125mmx250mmhalfbatteredkerbs.125mmx150mmbullnosedroppedkerbs(centres)ontype3,4&5Aroads.50mmx150mmflattoppededgingsforfootpaths.SpecialkerbsasapprovedbytheEngineer(Red,Charcoal,BufforBrindle).

    49

  • 7/27/2019 Highway Specification

    51/85

    BJS/MS/3758.02/080104

    KERB FACE100mmonType4and5Aroads125mmonType3roadsandindustrialestateroads30mmonType5B(orotherapproved).25mmatvehiclecrossings.(Seetypicalvehiclecrossingdetail)0-6mmatpedestriancrossings.(Seetypicalpedestriancrossingdetail)RADIUS KERBSForkerbradiiupto12museproperlyformedradiuskerbs.Forradiibetween12mand20muse450mmlong,straightkerbs,above20mradiususe900mmlong,straightkerbs.KERB RACEConcretetobeST4tothefollowingdimensions:-275mmwidex150mmdeepforkerbing425mmwidex150mmdeepforkerbingandchannellingtogetherNote :Concrete shall be vibrated with a vibrating poker to ensure adequate compaction200mmwidex100mmdeepwetbedconcreteforedging.Wetbedconcreteforkerbing,channellingandstringcourses,tothedimensionsshownabovemaybeallowedonshortsectionsasanalternativeifagreedinwritingwiththeEngineer.Kerbsmustbebeddedon1:4sand/cementmortarlaidamaximumof25mmthickandaminimumof13mmthick.Kerbsmustbeproperlybackedwith150mmconcreteasshownonthetypicalcrosssection.Edgingsaretobehaunched(bothsides)with75mmthickconcrete.Stringcoursesshallbehaunchedbothsideswith150mmthickconcrete.CHANNEL BLOCKSHydraulicallypressedconcreteblockssize150mmx125mm(150mm)shallbeusedadjacenttokerbswhenconditionsdescribedinSECTION6.KERBS,FOOTWAYSANDPAVEDAREAS(CHANNELBLOCKS)prevail.

    Dished channels are not permitted. Square/Mews/Courtsthatareblockpavedandedgedrainedmustbesteeperthan1.25%(1in80).Stringcoursesshallcomprise125mmx255mmprecastconcretechannelblocksor125mm(150mm)x150mmin450mmlengths.

    50

  • 7/27/2019 Highway Specification

    52/85

    BJS/MS/3758.02/080104

    97. MANHOLES AND HIGHWAY DRAINS Generallyallmanholesandhighwaydrainsshallbeconstructed andlaidinaccordancewithcurrenteditionofSewersforAdoption. Claypipesandfittingsshallbeinaccordancewiththerequirements

    ofBS.65.ConcretepipesandfittingsshallbeinaccordancewiththerequirementsofBS.5911andshallbefittedwithapprovedflexiblejoints.

    Plasticpipesandfittingsshallbeinaccordancewiththerequirementsof

    EN1401-1BS4660andthewaterindustryspecificationW1S4/35/01.Gullyconnectionsshallbesurroundedwith150mmthicknessST4concreteandincludeaflexiblejointoneachpipe.Wherethecovertoapipelinelaidunderacarriagewayis1.2morless,itshallbesurroundedwith150mmthicknessST4concrete.

    Whereaconcretesurroundisnotrequired,pipelinesshallbelaidon

    aconcreteorgranularbeddesignedinaccordancewithSimplifiedTablesofExternalLoadsorBuriedPipelinesissuedbytheTransportResearchLaboratory.Gullyconnectionsshouldnotexceed20minlength.

    Draintrenchesarenottobebackfilleduntilthepipeworkhasbeen

    approvedbytheEngineerwhichmayincludeairand/orwatertests. TrenchesinthecarriagewaysaretobebackfilledwithType2 granularmaterialtoSouthYorkshireLaboratorySpecificationNo.20

    (orothermaterialapprovedinwritingbytheEngineer)whichshallcontainaminimumof10%ofmaterialretainedona37.5mmBSSieve.

    51

  • 7/27/2019 Highway Specification

    53/8552

  • 7/27/2019 Highway Specification

    54/8553

  • 7/27/2019 Highway Specification

    55/8554

  • 7/27/2019 Highway Specification

    56/8555

  • 7/27/2019 Highway Specification

    57/8556

  • 7/27/2019 Highway Specification

    58/8557

  • 7/27/2019 Highway Specification

    59/8558

  • 7/27/2019 Highway Specification

    60/85

    Access way Detail

    59

  • 7/27/2019 Highway Specification

    61/85

    Mew Court Detail

    60

  • 7/27/2019 Highway Specification

    62/85

    Standard Kerb Detail

    61

  • 7/27/2019 Highway Specification

    63/85

    Footway Edging Detail

    62

  • 7/27/2019 Highway Specification

    64/85

    Typical Vehicle Crossing To Individual House

    63

  • 7/27/2019 Highway Specification

    65/85

    Typical Pedestrian Crossing

    64

  • 7/27/2019 Highway Specification

    66/85

    Pedestrian Tactile Crossing Detail

    65

  • 7/27/2019 Highway Specification

    67/8566

  • 7/27/2019 Highway Specification

    68/8567

  • 7/27/2019 Highway Specification

    69/8568

  • 7/27/2019 Highway Specification

    70/85

    Typical Pedestrian Safety Barrier

    69

  • 7/27/2019 Highway Specification

    71/85

    Road Gully Details

    70

  • 7/27/2019 Highway Specification

    72/85

    Road Gully Details

    71

  • 7/27/2019 Highway Specification

    73/85

    Typical Footpath Gully Detail

    72

  • 7/27/2019 Highway Specification

    74/85

    Details Of Plasmobility Kerb 99

    73

  • 7/27/2019 Highway Specification

    75/85

    Details Of Dropper Kerb

    74

  • 7/27/2019 Highway Specification

    76/85

    Typical Fencing Position

    75

  • 7/27/2019 Highway Specification

    77/85

    Pre-cast Concrete Step Detail with Handrail

    76

  • 7/27/2019 Highway Specification

    78/85

    Standard Detail A-Frame Barrier

    77

  • 7/27/2019 Highway Specification

    79/85

    Standard Detail A-Frame Barrier

    78

  • 7/27/2019 Highway Specification

    80/85

    BJS/MS/3758.02/080104

    ALPHABETICAL INDEXA F

    Accessway/court 49,59 Fencing-ConcretePostSurround 6,75AdoptableAreas 43 Fertiliser 39AirVoids 23,38 Fill 13Airentrainedconcrete 6 Fitting-ConcretePipe 5AsphaltFinisher 9,23 Flags 9,38 FlexibleCarriageways 20

    B FootpathGullies 6BackfilltoTrenches 16,17 Footways 4,37,67Barriers 69,77,78 FrostSusceptibility 2BinderCourse 25,29,31,37 FrozenMaterial 27Binders 8 BituminousMaterials G-Delivery 25,26 Geotextile 9,32-Thickness 22,23 GranularFill 13BlockPaving 9,30,34,38 GritBins 43Bricks 5 GrassBrickwork 15 -Cutting 40BritishStandards 2,20 -Seed 39BusDraw-ins 6 -Verges 40 Gradients 44

    C GroundInvestigation 11CarriagewaySurfacing 20 Gullies

    CBR 2,44-48 -Brickwork 15Cement 7 -Connections 15ChannelBlocks -General 6,71,72-General 7,18,49 -Grates&Frames 5,70-Laying 19 -Plastic 6ChannelFalls 19 -Pots 6Cleansing 42 -Rodding 42ColdWeatherWorking 27 Compaction 24 H-Bituminous 20,38 Handrails 38-BlockPaving 35 HandLaying 23-Subgrade 12,22 CompletionofWorks 42 IConcrete 6 Ice-Layingon 27ConcreteCarriageway 6 InclementWeather 27Crossfall 31 IndustrialEstateRoads 22,48,52CycleTrack 9,67 Ironwork 5 InspectionChambers 18

    D Inspections 2Damagetoprecastproducts 19 Definitions 2 JDeleteriousMaterial 42 JointFilling-BlockPaving 35DeliveryTemperatures 26,27 JointSealing 8,27Demolition 11 Joints 18,27,35DiversionofWaterways 14 Drainage K-Ironwork 5 Kerbs-Subsoil 11 -Bedding&Backing 5,50Drains -General 18,61-General 50 -Face 18,50-Rodding 42 -Laying 18-Testing 16 -Race 50-Trenches 51 -Radii's 18,50DroppedKerbs 37 -Size 49 -Plasmobility 73,74

    E EdgeRestraints 32 Edging 37,62

    Engineer 2 Excavation 12,14

  • 7/27/2019 Highway Specification

    81/85

    BJS/MS/3758.02/080104

    L S

    LandDrains 14 Sampling 4LayingBlockPaving 32,33,34 SandLaybys 6 -BlockPaving 32Lighting 43 -Grading 32 SettingOut 11

    M SharedSurfaces 49MaintenancePeriod 42 Signs 43Manholes SiteClearance 11-Brickwork 15 Slag 8-Cover&Frames 5 Soakaways 5-Foundations 6 SoftSpots 12-General 16,50 SoilSurveys 11-Rodding 42 Specification 2-Slabs 6 StandardConstructionDetail 44-51Markings 43 StandingWater 14,27Materials 4 StepIrons 5MewsCourts 49,60 Steps 76Mortar 7 Streams 14Miscellaneous 43 StreetLighting 41,43 StringCourses 34,50

    N Sub-base 4,7,20,22,31,37NamePlates 43 Sub-gradeCompaction 22

    Sub-gradeDrainage 11O - P SurfaceLevels 23,29

    Paintwork 10 Surfacing 7,23,44-50ParkingAreas 43 PedestrianCrossing 37,64 TPenetrationofBinder Tackcoat 25PercentageRefusalDensity 23 TactilePaving 65Pipes Temperature-Bedding&Haunching 6 -Delivery 26,27-General 5 -Rolling 26,27-Clay 5 Testing 4-Concrete 5 TestingDrains 16-Plastic 5 ToleranceSurfaceLevels 29,30PlantedVerges 39 TopSoil 12,39PlantSize&Spacing 39 Trafficsigns 43PorousPipes 5 Trafficking 13,29,35PreparationofBinderCourse 25 Trees 40PSV 28 Trenches 51 Type2Roads 45,56

    Q-R Type3Roads 46,57Ramps 66 Type4Roads 47,58RepresentativeSamples 4 Type5ARoads 48,59RetainingWalls 43 Type5BRoads 49,60Roadbase 7,23,29 RoadHumps 9,68 U-VRoadMarking 43 VehicleCrossing 37,38,63RoadType 3 Verges 39,42Rock 12,14 Rollers 12,21,37 WRollingTemperatures 26,27 Waterways -TemporaryDiversions 14 Weeds 39,40 WearingCourse 44-49 Weather 27 XYZ

  • 7/27/2019 Highway Specification

    82/85

    Useful Contacts

    Barnsley Metropolitan Borough CouncilPlanning and Transportation Service

    Central OfficesKendray StreetBARNSLEYS70 2TN01226 772177www.barnsley.gov.uk

    Barnsley Development AgencyBeevor CourtPontefract RoadBarnsleyS71 1HG

    01226 784444www.barnsleydevelopmentagency.co.uk

    Doncaster Metropolitan Borough CouncilDirectorate of Borough Strategy and Development2nd Floor, Danum HouseSt.Sepu