1 of 17
HB2 (Act 23) of the 2012 R.S. P2 CLOC Status
Current as of June 20, 2013 meeting of the State Bond CommissionReport prepared by House Fiscal Division staffSource of Information provided by Louisiana Department of Treasury State Bond Commission
P = Priority SBC = State Bond Commission CLOC = Cash Line of Credit
Green highlight: partial CLOC recommendation of the P2 appropriated to project
Agency # Agency NameHB2
BDS #Project Title Parish P2 Total in HB2
P2 CLOC Approved
by SBC
19-605 LSU EUNICE 54Replacement of Science
Laboratory Fume Hoods,
Planning and Construction
ACADIA $135,000
36-P35Mermentau River
Harbor & Terminal1255
Land Acquisition for New Slip
Construction (Mermentau River
Harbor Terminal District),
Planning and Construction
Acadia $225,000 $225,000
50-MD6 Iota 1253 Town of Iota Street
Improvements, Planning and
Construction
Acadia
$50,000
50-MM4 Oil CityHighway 538 Water Line
Extension, Planning and
Construction
Allen $425,000 $425,000
07-270 DOTD - Administration 25 LA 42 (US 61 to LA 44) Widening Ascension $2,000,000 $2,000,000
07-270 DOTD - Administration 26
Intersection Improvement
Program, Real Estate Acquisition,
Planning and Construction
Ascension $200,000 $200,000
50-J03 Ascension Parish 244Oak Grove Community and
Recreational Center, Planning
and Construction
Ascension $120,000 $120,000
50-J03 Ascension Parish 245Lamar Dixon Development,
Purchase and Land AcquisitionAscension $100,000 $100,000
50-M68 Donaldsonville 1896Riverfront Development,
Planning and ConstructionAscension $780,000 $780,000
50-MA5 Gonzales
Intersection Improvements on LA
3038, Including Patching,
Repairing, and Overlaying of the
Highway, Planning and
Construction
Ascension $800,000 $800,000
50-NI9Ascension St. James
Airport1329
Automobile Parking Lot
Improvements for the Louisiana
Regional Airport
Ascension $50,000 $50,000
01-109
Office of Coastal
Protection and
Restoration
8
Morganza to Gulf of Mexico
Flood Control Feasibility Study,
Planning, Design, Right of Way
and Construction of Levees,
Floodgates and Other Flood
Control Systems ($100,000,000
Local Match; $25,000,000 Local In-
Kind Match; $442,000,000
Federal Match)
Ascension,
Assumption,
Iberia, Iberville,
Lafourche, Pointe
Coupee, St.
Martin, St. Mary,
Terrebonne,
West Baton
Rouge
$1,500,000 $1,500,000
11-431Natural Resources -
Office of the Secretary1570
Atchafalaya Basin Protection and
Enhancement (Federal Match
and Local/Sponsor Match)
NOTE: P2 was $1 M in HB2;
however, IEB moved $1 M of
P2 to P5 on 2-21-13
Assumption,
Avoyelles, Iberia,
Iberville, Pointe
Coupee, St.
Landry, St.
Martin, St. Mary
$0
50-J05 AVOYELLES PARISH 1352
Avoyelles Parish Police Jury - 4th
Floor Courthouse Renovation,
Planning and Construction
Avoyelles $200,000
50-MI6 MARKSVILLE 1260
Mary Bethune Community
Center, previously known D. A.
Jordan Community Center, for
the City of Marksville
AVOYELLES $600,000
2 of 17
Green highlight: partial CLOC recommendation of the P2 appropriated to project
Agency # Agency NameHB2
BDS #Project Title Parish P2 Total in HB2
P2 CLOC Approved
by SBC
07-274DOTD - Public
Improvements34
Mississippi River Levee Raising,
Arkansas to Old River, Planning
and Construction
Avoyelles,
Concordia, East
Carroll, Madison,
Pointe Coupee,
Tensas
$500,000 $500,000
08-401C. Paul Phelps
Correctional Center36
Emergency Backup Generators,
Planning and ConstructionBeauregard $210,000
08-401C. Paul Phelps
Correctional Center37
Remedial Actions for State Fire
Marshal Compliance and Health
Inspection Violations, Planning
and Construction
Beauregard $1,000,000
50-J06 Beauregard Parish 1136Lumas Road, Planning and
ConstructionBeauregard $400,000 $400,000
50-M65 DeRidder 105
Community Recreational Building
and Shelter, Planning and
Construction and/or A acquisition
and Rehabilitation of the Existing
Facility ($1,500,000 Local Match)
Beauregard $250,000 $250,000
50-NQVBeauregard Parish
Waterworks District #61104
Water System Improvements,
Planning and ConstructionBeauregard $25,000 $25,000
50-M09 Arcadia 101
Multi-Purpose Community
Center, Planning and
Construction ($350,000 Local
Match)
Bienville $500,000
50-M29 Bossier City 886
Hwy. 71 Street Lighting Project
from LA 3032 (Westgate Drive) to
LA 511 (Jimmie Davis Hwy)
Planning and Construction
Bossier $390,000 $390,000
50-MN5 Plain Dealing 1181Wastewater Treatment Plant
Improvements, Planning and
Construction
Bossier $160,000 $160,000
07-270 DOTD - Administration 1991Jimmie Davis Bridge
Rehabilitation, Planning and
Construction
Bossier, Caddo $1,300,000 $1,300,000
04-139 SECRETARY OF STATE 1601Louisiana State Exhibit Museum,
Planning and ConstructionCADDO $200,000 $200,000
19-604SLSU Medical Center
Shreveport53
High Voltage Electrical
Distribution System Upgrade,
Planning and Construction
Caddo $350,000 $350,000
19-604SLSU Medical Center
Shreveport1990
Patient Care HVAC Replacement,
Planning and ConstructionCaddo $300,000 $300,000
19-604SLSU Medical Center
Shreveport
Children's Hospital, Renovation
and Expansion, Planning and
Construction
Caddo $1,000,000 $1,000,000
19-618Southern University
Shreveport61
New Classroom Building,
Southern University- Shreveport,
Planning and Construction
Caddo $2,000,000 $2,000,000
50-J09 Caddo Parish 1657Caddo Parish Fire District No. 3
Station #4 Addition, Planning and
Construction
Caddo $165,000 $165,000
50-MU6 Vivian 1185Water and Wastewater System
Improvements and Extension,
Planning and Construction
Caddo $250,000 $250,000
50-MU6 Vivian 1310Town of Vivian, Street
Improvements, Planning and
Construction
Caddo $400,000 $400,000
07-270 DOTD - Administration 24
Port of Lake Charles Access Road,
Planning and Construction
($3,500,000 Local Match,
$17,500,000 Federal Match)
Calcasieu $500,000 $500,000
16-513 Office of Wildlife 46Region 5/Lake Charles Office,
Planning and ConstructionCalcasieu $900,000 $900,000
3 of 17
Green highlight: partial CLOC recommendation of the P2 appropriated to project
Agency # Agency NameHB2
BDS #Project Title Parish P2 Total in HB2
P2 CLOC Approved
by SBC
19-627McNeese State
University69
Alpha Hall Renovations, Planning
and ConstructionCalcasieu $500,000 $500,000
19-627McNeese State
University71
Shearman Fine Arts Building -
Renovation of Existing Space,
Planning and Construction
Calcasieu $340,000 $340,000
19-627McNeese State
University1986
Health/Human Performance
Education Complex, Planning and
Construction
Calcasieu $1,000,000 $1,000,000
19-627McNeese State
University
Contraband Bayou Erosion
Retaining Wall Phase II, Planning
and Construction
Calcasieu $350,000 $350,000
36-P26 Port of Lake Charles 81
Command and Control Center at
City Docks, Planning and
Construction ($1,125,000 Federal
and/or Local Match)
Calcasieu $300,000 $300,000
36-P26 Port of Lake Charles 82
Industrial Canal Dockside
Monopile Improvements
(LEEVAC), Planning and
Construction
Calcasieu $195,000 $195,000
50-J10 Calcasieu Parish 85
Gravity Sewer Trunk Mains &
Pumping Stations South Ward 3
and South Ward 4, Planning and
Construction
Calcasieu $900,000 $900,000
50-MF9 Lake Charles 1995National Hurricane Museum and
Science Center, Planning and
Construction
Calcasieu $300,000 $300,000
50-MU5 VINTON 1153Town of Vinton, Vinton Street
ImprovementsCALCASIEU $200,000 $200,000
50-MV3 Westlake 111
Ellis and Linda Drive
Improvements, City of Westlake,
Planning and Construction
Calcasieu $750,000 $750,000
50-S10Calcasieu Parish
School Board
Facilities Improvements, Planning
and ConstructionCalcasieu $1,000,000
07-274DOTD - Public
Improvements33
Bayou Dechene Reservoir,
Planning, Land Acquisition and
Construction
Caldwell $5,000,000 $5,000,000
36-P43Columbia Port
Commission1516
Railroad Spur, Planning and
ConstructionCaldwell $670,000 $670,000
50-J11 Caldwell Parish 1477Wiles Road Reconstruction,
Planning and ConstructionCaldwell $80,000 $80,000
50-J11 Caldwell Parish 1478Parish Detention Facility,
Planning and ConstructionCaldwell $250,000 $250,000
50-M52 Columbia 475Repair of Existing Water Well,
Planning and ConstructionCaldwell $380,000
50-MC9 Homer 1178Town of Homer, Town Hall
Renovations, Planning and
Construction
Claiborne $150,000 $150,000
50-J15 Concordia Parish 1600Concordia Parish Public Health
Center Renovation, Planning and
Construction
Concordia $150,000
50-MU2 Vidalia 1004
Development of a Slackwater
Port on the Mississippi River,
Planning and Construction
($12,900,000 Federal and/or
Local Match)
Concordia $1,000,000 $1,000,000
50-NRSNORTH DESOTO
WATER SYSTEM INC1373
Expansion and Improvements to
the Water SystemDE SOTO $100,000 $100,000
50-NJPWaterworks District #1
DeSoto Parish119
Water System Improvements and
Extension, Planning and
Construction ($1,977,300 Local
Match)
DeSoto $100,000 $100,000
50-NSN
Louisiana Coalition for
Accessible and
Sustainable Healthcare
1582
Town of Stonewall, Rural Medical
Facility, Planning and
Construction
DeSoto $300,000
4 of 17
Green highlight: partial CLOC recommendation of the P2 appropriated to project
Agency # Agency NameHB2
BDS #Project Title Parish P2 Total in HB2
P2 CLOC Approved
by SBC
01-107Division of
Administration3
Exterior Waterproofing at the
State Capitol Building, Planning
and Construction
East Baton Rouge $360,000 $360,000
16-512WLF - Office of
Secretary952
Wildlife and Fisheries
Enforcement Training Academy
and Emergency Facility, Planning
and Construction
East Baton Rouge $300,000
19-607LSU Agricultural
Center1947
Livestock Education Facility,
Planning and ConstructionEast Baton Rouge $2,140,000 $2,140,000
19-616SOUTHERN
UNIVERSITY
BATONROUGE
60Southern University Laboratory
School Addition and Upgrades,
Planning and Construction
EAST BATON
ROUGE$1,200,000 $1,200,000
19-616Southern University
Baton Rouge
Laboratory School Roof
Replacement, Planning and
Construction
East Baton Rouge $600,000
19-649
Louisiana Community
and Technical Colleges
System
Automotive Training Facility,
Planning and ConstructionEast Baton Rouge $2,400,000 $2,400,000
50-M14 Baker 1675Baker Fire Training Facility,
Planning and ConstructionEast Baton Rouge $165,000
50-M20 Baton Rouge 466Hooper Road Sewer
Improvements ($1,200,000 Local
Match)
East Baton Rouge $100,000 $100,000
50-MW3 Zachary 1012Water System Improvements,
Planning and ConstructionEast Baton Rouge $365,000
50-MW8 Central 1349 Administration Building East Baton Rouge $150,000 $150,000
50-MW8 Central 1350
Expand, Repair, and Modify City
of Central Drainage System,
Planning and Construction
East Baton Rouge $100,000 $100,000
50-N41BATON ROUGE METRO
AIRPORT1341
Harding Field World War II
Commemorative
EAST BATON
ROUGE$130,000
50-NC2Baton Rouge
Recreation & Parks
Commission
113Children's Museum, Planning and
Construction ($5,000,000 Local
Match)
East Baton Rouge $50,000 $50,000
50-NC2
Baton Rouge
Recreation & Parks
Commission
114
Anna T. Jordan Site and Facility
Improvements (Non-State Match
Required) NOTE: P2 was $120
K in HB2. IEB moved $120 K
of P2 to P5 on 2-21-13
East Baton Rouge $0
50-NC2Baton Rouge
Recreation & Parks
Commission
1392Central Community Sports Park,
Planning and ConstructionEast Baton Rouge $150,000 $150,000
50-NG6Louisiana Black History
Hall of Fame11
Museum and Cultural Center,
Planning and Construction
($100,000 Cash and/or In-Kind
Match)
East Baton Rouge $400,000
50-NN2Urban Restoration
Enhancement Corp1525
Old Hollywood Elementary
School, Site Development and
Improvements, Planning and
Construction
East Baton Rouge $50,000
50-NNBProfessional
Specialties1762
USDA Licensed Veterinary
Biologic Facility, Planning and
Construction
East Baton Rouge $300,000
50-NRUE BATON ROUGE
COUNCIL ON AGING1308
Re-Opening of East Baton Rouge
Council on Aging's Kitchen,
Planning, Improvement,
Equipment, Additions
EAST BATON
ROUGE$140,000
07-270 DOTD - Administration 1129
Hooper Road Extension (LA 37 to
LA 16), Environmental, Planning,
Engineering, Right of Way,
Utilities and Construction
East Baton
Rouge, Livingston$800,000 $800,000
5 of 17
Green highlight: partial CLOC recommendation of the P2 appropriated to project
Agency # Agency NameHB2
BDS #Project Title Parish P2 Total in HB2
P2 CLOC Approved
by SBC
50-J18 East Carroll Parish 598 Courthouse and Jail Renovations East Carroll $175,000 $175,000
03-130Department of
Veterans Affairs12
Fire Alarm / Call System, Planning
and ConstructionEast Feliciana $180,000 $180,000
09-320Office of Aging and
Adult Services41
Replace Fire Alarm and Sprinkler
System, Planning and
Construction
East Feliciana $50,000 $50,000
50-J19 East Feliciana ParishRoad Overlay Project, Planning
and ConstructionEast Feliciana $50,000
50-M17 Basile 1315
Town of Basile Public
Accommodation Recreation
Facility Improvements, Planning
and Construction
Evangeline $65,000
50-J22 Grant Parish 1944
Regional Economic Development
Building, Rehabilitation, Planning
and Construction
Grant $150,000 $150,000
50-M50 Colfax 1357Street Improvements, Planning
and ConstructionGrant $100,000
50-MJ7 MontgomeryTown Hall and Community
Center, Planning and
Construction
Grant $75,000
36-L37
Iberia Parish Levee
Hurricane and
Conservation District
1676
Planning, Permitting, Engineering
and Right of Way Acquisition for
the Iberia Hurricane Protection
Master Plan
Iberia $250,000 $250,000
50-J23 Iberia Parish 265Five Lane Road Extension from
Highway 675 to Highway 3212,
Planning and Construction
Iberia $520,000 $520,000
50-J23 Iberia Parish 1131
Recreational Complex, Sports
Including Baseball, Planning and
Construction (Supplemental
Funding)
Iberia $100,000 $100,000
50-J23 IBERIA PARISH 1134
Road Extension from Sidney
Blanchard Road to Ed Broussard
Road, Planning and Construction
IBERIA $150,000 $150,000
50-MH3 Loreauville 328
Loreauville Wastewater
Treatment Plant Improvements
and Demolition Project, Planning
and Construction
Iberia $65,000 $65,000
50-MH3 Loreauville 1261Loreauville Water Tower
Improvements, Planning and
Construction
Iberia $50,000 $50,000
50-ML1 New Iberia 1049
Multi-Use Conference and
Operating Center, Land
Acquisition, Planning and
Construction
Iberia $350,000
50-NPDIberia Economic
Development
Authority
1776Progress Point Business Park and
Airport Gateway, Land
Acquisition
Iberia $1,075,000 $1,075,000
07-270 DOTD - Administration 1750Louisiana Hwy 1 Resurfacing -
Plaquemine to White Castle,
Planning and Construction
IBERVILLE $1,000,000 $1,000,000
50-MW6 St. GabrielTurning Lane and Traffic Signals
on LA Hwy. 74 and LA Hwy. 30Iberville $50,000
50-NFUJackson Parish
Dugdemona Water
Authority
1154Jackson-Bienville Reservoir,
Planning and ConstructionJackson $200,000
50-NSIWALKER COMMUNITY
WATER SYS INC1681
Water Distribution System
Expansion, LA-810 Extension,
Planning and Construction
JACKSON $600,000 $600,000
01-124Louisiana Stadium &
Exposition District417
Zephyrs Baseball Facilities Repair,
Renovation and ImprovementJefferson $800,000 $800,000
6 of 17
Green highlight: partial CLOC recommendation of the P2 appropriated to project
Agency # Agency NameHB2
BDS #Project Title Parish P2 Total in HB2
P2 CLOC Approved
by SBC
36-P41Jefferson Parish Port
District83
Jefferson Parish Business Park:
Science and Technology Academy
and Conference Center
Jefferson $500,000 $500,000
50-J26 Jefferson Parish 87
Bayou Segnette Sports Complex
Improvements, Including Hall B
Expansion, Planning and
Construction
Jefferson $4,500,000 $4,500,000
50-J26 Jefferson Parish 740
18th Street Drainage
Improvements, Edenborn Avenue
Phase 2 (18th Street to West
Esplanade Avenue Canal)
Jefferson $100,000 $100,000
50-J26 Jefferson Parish 743
Airline Drive(US 61) at 17th St.
Canal Drainage Crossing and
Railroad Bridge Replacement,
Planning and Construction
Jefferson $2,000,000 $2,000,000
50-J26 Jefferson Parish 750
Bike Path along Leo Kerner
Parkway (Barataria Blvd to Parc
Des Familles Entrance), Planning
and Construction
Jefferson $65,000 $65,000
50-J26 Jefferson Parish 752
Bonnabel Canal Rehabilitation
and Bank Stabilization (Veterans
Boulevard to West Esplanade),
Planning and Construction
Jefferson $2,150,000 $2,150,000
50-J26 Jefferson Parish 755
Canal 10 Concrete Lining
Widening Between Canal 7 and
West Esplanade Avenue,
Planning and Construction
Jefferson $50,000 $50,000
50-J26 Jefferson Parish 762
Codifer Boulevard, Homestead
Avenue, and Brockenbraugh
Court Subsurface Drainage
Improvements, Planning and
Construction
Jefferson $200,000 $200,000
50-J26 Jefferson Parish 793Performing Arts Center
ModificationsJefferson $2,600,000 $2,600,000
50-J26 Jefferson Parish 806
Upper Kraak Ditch Subsurface
Drainage Improvement (Upper
Kraak Drainage Pump Station to
Earhart Expressway), Planning
and Construction
Jefferson $200,000
50-J26 Jefferson Parish 816
Woodmere Community Center,
Real Estate Acquisition, Planning,
and Construction ($15,000
Match)
Jefferson $100,000 $100,000
50-J26 Jefferson Parish 1355
South Kenner Road
Rehabilitation from Live Oak
Boulevard to River Road,
Planning and Construction
Jefferson $300,000 $300,000
50-J26 Jefferson Parish 1364Martin Luther King Playground
Improvements, Planning and
Construction
Jefferson $100,000 $100,000
50-J26 Jefferson Parish 1807Waggaman Subsurface Drainage
Improvements, Planning and
Construction
Jefferson $740,000 $740,000
50-MB1 Grand Isle 1819Historic Recreation
Center/Community Center,
Planning and Construction
Jefferson $100,000 $100,000
50-MB5 Gretna 1201McDonoghville Fire Station, Land
Acquisition, Planning and
Construction
Jefferson $1,000,000 $1,000,000
50-MB5 Gretna 1204Mel Ott Exterior Lighting and
ImprovementsJefferson $225,000 $225,000
50-MB5 Gretna 1213
Hancock Street Canal
Improvements (Kepler Street -
Virgil Street), Planning and
Construction
Jefferson $250,000 $250,000
7 of 17
Green highlight: partial CLOC recommendation of the P2 appropriated to project
Agency # Agency NameHB2
BDS #Project Title Parish P2 Total in HB2
P2 CLOC Approved
by SBC
50-MC1 Harahan 1488Penfold Place Drainage, Planning
and ConstructionJefferson $50,000 $50,000
50-ME1 Jean Lafitte 631Lafitte Seafood Pavilion, Planning
and ConstructionJefferson $100,000 $100,000
50-MF1 Kenner 1208Wastewater System Corrective
MeasuresJefferson $250,000 $250,000
50-MF1 Kenner 1241Lincoln Manor Subdivision
Drainage Improvements,
Planning and Construction
Jefferson $100,000
50-MF1 Kenner 1732City of Kenner Emergency
Operations Center, Planning and
Construction
Jefferson $75,000
50-MF1 Kenner 1781
Drainage Improvements along
Idaho Avenue, 26th Street to
West Napoleon Canal, Planning
and Construction
Jefferson $150,000 $150,000
50-MV4 Westwego 1073
Park Land and Improvements,
Including Improvements to
Existing Parks, Planning and
Construction
Jefferson $800,000 $800,000
50-MV4 Westwego 1075Sala Avenue Street and
Infrastructure ImprovementsJefferson $150,000 $150,000
50-MV4 Westwego 1077Water Plant Improvements,
Planning and Construction (50%
Local Match)
Jefferson $1,000,000 $1,000,000
50-NGHNew Hope Community
Development Center1679
New Hope Multi-Use Center,
Planning and ConstructionJefferson $15,000
50-NMLGretna Police
Department1287
Gretna Police Department,
Construction of Armory,
Elevation/Floor Proofing/Wind
Retrofit, Planning and
Construction
Jefferson $940,000 $940,000
50-NPWAVONDALE BOOSTER
CLUB1251
Avondale Booster Club and
Playground UpgradesJEFFERSON $400,000 $400,000
50-J27 Jefferson Davis Parish 270Third Street West Bridge Repair,
Planning and ConstructionJefferson Davis $40,000 $40,000
50-J27 Jefferson Davis Parish 1593Road Maintenance 6 Parish
Equipment Sheds and EquipmentJefferson Davis $300,000
50-MV1 Welsh 1778 Town of Welsh Upgrade Electrical Jefferson Davis $50,000
50-M32 Broussard 1286
Three-Lane LA 182 in the City of
Broussard, Planning and
Construction ($750,000 Local
Match)
Lafayette $150,000 $150,000
50-M32 Broussard 1327Rehabilitation La Hwy 182 from
US 90 to LA Hwy 89, Planning and
Construction
Lafayette $250,000 $250,000
50-M32 Broussard 1328
Reconstruct South Bernard Road
From LA Hwy 182 to US Hwy 90,
Planning and Construction
Lafayette $150,000 $150,000
50-M39 Carencro 1987Wastewater and City
Infrastructure Flood Damages,
Planning and Construction
Lafayette $200,000 $200,000
50-M39 Carencro 1994City Hall Renovations, Including
New Roof, Planning and
Construction
Lafayette $85,000
50-MQ8 SCOTT 1768
Apollo Road Extension (Rue du
Belier & Dulles Drive Intersection
to Old Spanish Trail & Apollo
Road Intersection).Planning,
Construction, and Land
Acquisition UNTIMELY-(Replaces
544721)
LAFAYETTE $500,000 $500,000
8 of 17
Green highlight: partial CLOC recommendation of the P2 appropriated to project
Agency # Agency NameHB2
BDS #Project Title Parish P2 Total in HB2
P2 CLOC Approved
by SBC
50-MQ8 ScottScott Events Center, Planning and
ConstructionLafayette $60,000 $60,000
50-MW2 Youngsville 1041Community Center, Planning and
ConstructionLafayette $200,000 $200,000
50-NA2Lafayette Airport
Commission368
Construction of Cargo Facilities,
Planning and ConstructionLafayette $4,500,000 $4,500,000
50-NSSLA Emergency Medical
Unit
LA Emergency Medical Unit
Storage FacilityLafayette $125,000 $125,000
19-610LSU Healthcare
Services Division723
Parking Lot Construction -
Chabert, Planning and
Construction
Lafourche $100,000
19-621Nicholls State
University
Athletic Facilities, Renovation,
Planning and ConstructionLafourche $200,000 $200,000
50-MA3 Golden Meadow 1983Median Turning Lane near
Doucet Drive, Planning and
Construction
Lafourche $65,000
50-MT5 Thibodaux 110LA Hwy 20 (N. Canal Blvd.)
Widening, Planning and
Construction
Lafourche $250,000
50-NSU Bayou Civic ClubFacilities Upgrade/Roof and
Kitchen Planning and
Construction
Lafourche $135,000 $135,000
50-J30 LaSalle ParishPine Hill Road Improvements,
Planning and ConstructionLaSalle $665,000 $665,000
50-MM5 Olla 1638
Downtown Area Sidewalk,
Ramps, Curbing, and Fencing
Enhancements, Planning and
Construction
LaSalle $50,000
19-623Grambling State
University850
Library Deficiencies, Planning and
ConstructionLincoln $500,000
19-625Louisiana Tech
University67
Visual Arts Building Renovation
for Business, Planning and
Construction
Lincoln $500,000 $500,000
19-625Louisiana Tech
University68
Water Distribution System
Repairs and ImprovementsLincoln $300,000 $300,000
50-M69 Downsville 1571Downsville Recreational Facility
Improvements, Planning and
Construction
Lincoln $145,000 $145,000
50-MQ2 Ruston 1054
Tarbutton Road Interstate 20
Interchange and Connector Road,
Planning and Construction
Lincoln $100,000
50-MR7 Simsboro 650 Water Well and Water Main Lincoln $50,000 $50,000
50-MR7 SIMSBORO 1821Village of Simsboro Renovate
"Old" Fire Station Into Town HallLINCOLN $100,000 $100,000
50-NGALincoln Parish Fire
Protection District 11040
Land Acquisition and
Construction of Additional Fire
Stations, Planning and
Construction
Lincoln $350,000
07-270 DOTD - AdministrationLA 64 Widening from LA 16 to
Magnolia Bridge Planning and
Construction
Livingston $400,000 $400,000
50-J32 Livingston Parish 436
Livingston Parish Regional
Airport, Planning and
Construction ($900,000 Federal
Funds)
Livingston $50,000 $50,000
50-MS4 Springfield 999Water System Planning and
ConstructionLivingston $400,000 $400,000
50-MU7 Walker 1619
Widening of Highway 447 and I-
12 Overpass Improvements,
Environmental Phase
Commencement, Planning and
Construction
Livingston $300,000 $300,000
9 of 17
Green highlight: partial CLOC recommendation of the P2 appropriated to project
Agency # Agency NameHB2
BDS #Project Title Parish P2 Total in HB2
P2 CLOC Approved
by SBC
50-NMG
Livingston Association
for Retarded Children,
Inc.
860
New Facility for Livingston
Association for Retarded
Children, Inc. Planning and
Construction
Livingston $230,000 $230,000
50-NNLHungarian Settlement
Historical Society1234
Hungarian Settlement Historical
Museum, Planning and
Construction
Livingston $170,000 $170,000
50-J33 Madison Parish 441Courthouse Renovations,
Planning and ConstructionMadison $100,000
50-NRVMADISON VOL
COUNCIL ON AGING1391
Expansion and Improvements to
Activities Building, Planning and
Construction
MADISON $50,000
50-M19 Bastrop 1320
Bastrop Central Fire Station,
Replace Driveway City Hall, Roof
Construction, Planning and
Construction
Morehouse $200,000 $200,000
19-657Louisiana School for
Math, Science and the
Arts
76HVAC Issues in Caddo Hall,
Planning and ConstructionNatchitoches $600,000 $600,000
19-657Louisiana School for
Math, Science and the
Arts
1574Stair Railings - Addressing Code
Violations, Planning and
Construction
Natchitoches $70,000 $70,000
50-J35 Natchitoches Parish 1961Old River Bridge, Planning and
ConstructionNatchitoches $535,000 $535,000
50-M37 Campti 298Town of Campti Multi-Purpose
Community Center, Planning and
Construction
Natchitoches $150,000 $150,000
50-MK9 Natchitoches 1693
South Natchitoches Drainage
Improvements, including
Adjacent Roadwork, Planning and
Construction NOTE: P2 was
$475 K in HB2. IEB moved
$475 K of P2 to P5 on 2-21-13
Natchitoches $0
50-NM3Natchitoches Council
on Aging1634
Reconstruct Natchitoches Parish
Council on Aging Activities
Building, Planning and
Construction
Natchitoches $700,000 $700,000
50-NRO
Natchitoches
Communications
District
1769
Natchitoches Parish Emergency
Communications District,
Planning and Construction
Natchitoches $500,000 $500,000
50-NSMNatchitoches Veterans
Memorial Park
Commission
1772Natchitoches Veterans and
Memorial Park, Planning and
Construction
Natchitoches $50,000 $50,000
01-124Louisiana Stadium &
Exposition District2020
New Orleans Sports Arena
Improvements, Planning and
Construction
Orleans $21,500,000 $21,500,000
05-252Office of Business
Development158
Louisiana Cancer Research
Center in New Orleans, Planning,
Construction, and Equipment
Orleans $3,000,000 $3,000,000
06-263Office of State
Museum162
Construction of Civil Rights
Museum, Planning and
Construction
Orleans $75,000
06-A20 New Orleans City Park 857City Park Maintenance Complex
ImprovementsORLEANS $100,000 $100,000
06-A20 New Orleans City Park 1852New Tennis Center
Improvements, Planning and
Construction
ORLEANS $50,000 $50,000
07-270 DOTD - Administration 1978State Streets, Algiers Planning
and ConstructionOrleans $1,400,000 $1,400,000
10 of 17
Green highlight: partial CLOC recommendation of the P2 appropriated to project
Agency # Agency NameHB2
BDS #Project Title Parish P2 Total in HB2
P2 CLOC Approved
by SBC
09-304Metropolitan Human
Service District547
New Mental Health Clinic for
New Orleans Behavior, Social,
and Medical Support Detox
Clinic, Including Expansion and
Renovation of the Existing
Facility, Planning and
Construction
Orleans $2,000,000 $2,000,000
09-304Metropolitan Human
Service District831
New Mental Health Center for
Desire/Florida Mental Health
Clinic, Including the Purchase,
Construction or Renovation of a
New Facility in New Orleans East,
Planning and Construction
Orleans $2,250,000
09-304Metropolitan Human
Service District
Mental Health Facility, Planning,
Renovation, Construction for
Central City
Orleans $2,750,000
09-304Metropolitan Human
Service District
New Orleans Adolescent
Hospital, Renovation of Facility,
Planning and Construction
Orleans $5,000,000
19-603University of New
Orleans52
Human Performance Center
Renovations for Fine Arts and
Music Departments, Planning
and Construction
Orleans $200,000
19-604NLSU Health Sciences
Center New Orleans
Renovations and Improvements
for Uptown Campus, Planning
and Construction
Orleans $2,500,000
19-673New Orleans Center
for the Creative Arts1232
Replace HVAC System, Planning
and Construction Orleans $700,000 $700,000
19-673New Orleans Center
for the Creative Arts1382
Press Street Studios,
Furniture/Fixtures/Equipment,
Planning and Construction
NOTE: P2 was $850 K in HB2.
IEB moved $850 K of P2 to P5
on 2-21-13
Orleans $0
36-P17 Port of New Orleans 1585Milan Upland Yard
Improvements, Planning and
Construction
ORLEANS $1,000,000 $1,000,000
50-ML3 New Orleans 637
Behrman Park Improvements -
New Soccer Facility, Planning and
Construction, Master Planning
Orleans $500,000 $500,000
50-ML3 New Orleans 1979Fourth District Police Station,
Planning and ConstructionOrleans $300,000 $300,000
50-ML3 New Orleans 1980
Algiers Playgrounds, Renovation
of Restrooms, Lighting, Fencing,
and Playground Equipment
Orleans $225,000 $225,000
50-ML3 New Orleans Algiers Fire Station, Planning and
ConstructionOrleans $150,000 $150,000
50-ML3 New Orleans
Samuel Square, Renovation and
Upgrades, Including Demolition
of Existing Playground,
Installation of New Play
Equipment and re-Grade Fields,
Planning and Construction
Orleans $250,000
11 of 17
Green highlight: partial CLOC recommendation of the P2 appropriated to project
Agency # Agency NameHB2
BDS #Project Title Parish P2 Total in HB2
P2 CLOC Approved
by SBC
50-ML3 New Orleans
Taylor Pool and Playground,
Renovations and Upgrades,
Including Repair and Renovations
of Basketball Courts and Pavilion,
Replacing Perimeter Fencing,
Installation of New Water
Fountains, and Re-Grade Fields,
Planning and Construction
Orleans $250,000 $250,000
50-ML3 New Orleans
George W. Carver Playground,
Renovations and Upgrades,
Including Repair and Renovations
of Basketball Courts and Pavilion,
Renovations to Bathrooms and
Concessions Building, Demolition
of Existing Playground and
Installation of New Play
Equipment, Planning and
Construction
Orleans $450,000 $450,000
50-ML3 New Orleans Donsereaux Harrison Playground Orleans $200,000
50-N05New Orleans
Exhibition Hall
Authority
1971Hall A Renovation, Planning and
ConstructionOrleans $10,000,000 $10,000,000
50-N12Louisiana Children's
Museum1322
Louisiana Children's Museum
Early Learning Village, Planning
and Design
Orleans $485,000 $485,000
50-N25 WYES TV New Orleans 1002WYES Katrina
Rebuilding/Equipment Project,
Planning and Construction
Orleans $2,000,000 $1,000,000
50-N51NO Jazz & Heritage
Foundation1005
The Jazz & Heritage Center
Renovation and Addition 1225
North Rampart, Planning and
Construction
Orleans $75,000 $75,000
50-N74National World War II
Museum1773
National WWII Museum
Campaigns Gallery Exhibits Const.
and LA Memorial Pavilion Train
Station Experience Including
Connecting Higgins Ped Bridge
and Canopy, Planning and
Construction
Orleans $750,000 $750,000
50-N98 Kingsley House 663Kingsley House Renovations, New
Construction, and Major RepairsOrleans $100,000 $100,000
50-NAYOGDEN MUSEUM OF
SOUTHERN ART1069
Ogden Museum/Taylor Library
RenovationORLEANS $265,000 $265,000
50-NBBLighthouse for the
Blind1853
Economic Development Project,
Planning and ConstructionOrleans $500,000 $500,000
50-ND3 Orleans Parish Sheriff 2019Mental Health Facility, Planning
and ConstructionOrleans $100,000 $100,000
50-NJ9 Dryades YMCA 118Technical Training Center,
Planning and ConstructionOrleans $450,000
50-NQFGentilly Development
District696
Milne Boys Home, Planning and
ConstructionOrleans $50,000
50-NQJHunters Brotherhood
Alumni - NAE1688
Lewis Playground Site
Development, Planning and
Construction
Orleans $175,000
50-NSP Eden House 1975Eden House, Acquisition and
Renovation, Planning and
Construction
Orleans $400,000
50-NSRJunior League of
Greater New Orleans1999
Renovate Headquarters Building,
Including HVAC System, Planning
and Construction
Orleans $65,000 $65,000
12 of 17
Green highlight: partial CLOC recommendation of the P2 appropriated to project
Agency # Agency NameHB2
BDS #Project Title Parish P2 Total in HB2
P2 CLOC Approved
by SBC
50-NSRJunior League of
Greater New Orleans2000
Renovate Thrift Shop and Annex,
Including Parking Lot, Planning
and Construction
Orleans $135,000 $135,000
50-NSRJunior League of
Greater New Orleans2001
Renovate Annex Building and Re-
Purpose Space, Including
Installation of Handicap
Accessibility Ramp and Bathroom
Upgrades, Planning and
Construction
Orleans $200,000 $200,000
50-NSTDowntown
Development District
Improvements to Girod Street,
Planning and ConstructionOrleans $300,000 $300,000
50-NSV
Downman Road
Economic
Development District
Downman Road Economic
Development District
Enhancement, Beautification,
Planning and Construction
Orleans $200,000
50-NT2MERCY ENDEAVORS
SEN CITZ CENTR1389
Irish Channel St. Andrew Street
Elderly Resource CenterORLEANS $75,000 $75,000
50-S36 Orleans Parish School
Board
Medical Arts High School
Program (Dibert Building),
Planning and Construction
Orleans $1,000,000
04-139 Secretary of State 145
Chennault Aviation and Military
Museum Hanger Building and
Equipment, Planning and
Construction
Ouachita $50,000 $50,000
19-629University of Louisiana
- Monroe73
Sandel Hall Renovation, Planning
and ConstructionOuachita $100,000
19-629University of Louisiana
- Monroe74
Stubbs Hall Reroofing, Planning
and ConstructionOuachita $635,000 $635,000
50-MS7 STERLINGTON 1814Service Road, Planning and
ConstructionOUACHITA $120,000 $120,000
50-MV2 West Monroe 509
Creation of a Hurricane/Disaster
Shelter by Expanding the West
Ouachita Senior Center, Planning
and Construction
Ouachita $30,000 $30,000
50-NSK RAYS OF SONSHINE 1714 Project Elevate! OUACHITA $50,000
07-270 DOTD - Administration
1801 Highway 23 Elevation for Three
Miles of Emergency Route Flood
Protection, Planning and
Construction
PLAQUEMINES
$1,000,000 $1,000,000
50-J38 Plaquemines Parish 1818Emergency Evacuation Complex,
Planning and ConstructionPlaquemines $500,000 $500,000
50-J38 Plaquemines ParishBelle Chasse Parks, Planning and
ConstructionPlaquemines $100,000 $100,000
50-J38 Plaquemines ParishIntracoastal Buoy Project,
Planning and ConstructionPlaquemines $200,000
50-N62Plaquemines Parish
Law Enforcement
District
1936Sheriff's Training Center,
Planning and ConstructionPlaquemines $60,000 $60,000
36-P49Pointe Coupee Port
Commission1566
Pointe Coupee Parish Port Capital
Improvements, Planning and
Construction
Pointe Coupee $300,000 $300,000
50-J39 Pointe Coupee Parish 1616False River Ecosystem
Restoration Project, Planning and
Construction
Pointe Coupee $500,000 $500,000
50-MG8 Livonia 1413
Emergency Shelter Supply Room,
Addition to the Livonia
Community Center, Planning and
Construction
Pointe Coupee $100,000
04-139 SECRETARY OF STATE 1456Tioga Heritage Museum, Planning
and ConstructionRAPIDES $50,000
09-340
Office of
Developmental
Disabilities
1948
Central Louisiana State Hospital
Relocation to Pinecrest, Planning
and Construction
Rapides $1,000,000 $1,000,000
13 of 17
Green highlight: partial CLOC recommendation of the P2 appropriated to project
Agency # Agency NameHB2
BDS #Project Title Parish P2 Total in HB2
P2 CLOC Approved
by SBC
19-602 LSU Alexandria 209Multi-Purpose Academic Center,
Planning and ConstructionRapides $500,000
50-M05 Alexandria 100
Sugarhouse Road/Eddie Williams
Blvd. to LA Hwy. 1, Phase I and
Phase II, Planning and
Construction ($5,000,000 Local
Match)
Rapides $500,000 $500,000
50-M16 Ball 462Sewer Extensions in the Springhill
Road AreaRapides $50,000
50-M93 Forest Hill 479
Renovation of Community
Facilities, Planning and
Construction ($375,000 Local
Match)
Rapides $150,000 $150,000
50-N33
England Economic and
Industrial
Development District
1943
England Airpark Hospital
Renovations and Conversion of
School to Outpatient Facility,
Planning and Construction
($5,000,000 Local Match)
Rapides $6,800,000 $6,800,000
50-M56 Coushatta 1760
Maintenance Barn for Town of
Coushatta Public Works
Department, Planning and
Construction
Red River $55,000
50-J42 Richland Parish 1984Sapa Drive Improvements,
Planning and ConstructionRichland $250,000 $250,000
50-M61 Delhi 476Richland Parish Recreational and
Learning Center, Planning and
Construction
Richland $100,000 $100,000
50-MO9 Rayville 1985Railroad Spur, Planning and
ConstructionRichland $250,000 $250,000
50-J43 Sabine Parish 272Plainview Road Rehabilitation,
Planning and ConstructionSabine $1,000,000 $1,000,000
50-NCNSouth Toledo Bend
Waterworks District372
Esto Booster Station Discharge
and Supply Line ReplacementSabine $65,000 $65,000
36-P20 St. Bernard Port 1820Rehabilitation of Dock #1 Section
A Seawall, Planning and
Construction
St. Bernard $3,800,000 $3,800,000
50-N07St. Bernard Parish
Sheriff657
Arabi Sub-Station, Planning and
ConstructionSt. Bernard $200,000
50-J45 St. Charles Parish 1127West Bank Hurricane Protection
LeveeSt. Charles $525,000 $525,000
50-MB3 GreensburgTaylor Street Bridge, Planning
and ConstructionSt. Helena $50,000
50-MJ8 Montpelier 1757Administration Building,
Acquisition, Planning and
Construction
St. Helena $190,000 $190,000
50-NER St. Helena Hospital 522Drainage and Parking
Improvements, Planning and
Construction
St. Helena $55,000
36-P21Port of South
Louisiana1433
Liquid Petroleum Dock Facility in
St. James Parish, Planning and
Construction
St. James $55,000
50-J47 St. James Parish 994St. James Parish Land Acquisition,
Planning and ConstructionSt. James $1,000,000 $1,000,000
50-J47 St. James Parish 1539Eastbank Master Drainage Plan
Study St. James $130,000
36-P21Port of South
Louisiana1957
Warehouse, Planning and
Construction
St. John the
Baptist$100,000 $100,000
50-J49 St. Landry Parish 1997
Hurricane Evacuations and
Homeland Security Coordination
and Related Renovations,
Planning and Construction
St. Landry $195,000 $195,000
14 of 17
Green highlight: partial CLOC recommendation of the P2 appropriated to project
Agency # Agency NameHB2
BDS #Project Title Parish P2 Total in HB2
P2 CLOC Approved
by SBC
50-MA9 Grand Coteau
Police and Utility Departments
Roof, Air Conditioning Unit for
Town Hall, Handheld Meter
Reader, Abandon and Plug Water
Well
St. Landry $60,000 $60,000
50-J50 St. Martin Parish 1228Road Improvements on Four-Mile
Bayou Road, Planning and
Construction
St. Martin $200,000 $200,000
50-MM8 Parks 1404Municipal Complex, Planning and
ConstructionSt. Martin $50,000
50-MQ5 St. Martinville 1562Sewer Upgrade, Planning and
ConstructionSt. Martin $350,000 $350,000
50-J51 St. Mary Parish 97Infrastructure Improvements at
the Charenton Canal Industrial
Park
St. Mary $150,000 $150,000
50-J51 St. Mary Parish 1299
Installation of Culverts and
Associated Infrastructure in
Middle Road Drainage Canal -
Bayou Vista LA for Sub-Gravity
Drainage District #1 of St Mary
Parish Gravity Drainage District
#2, Planning and Construction
St. Mary $460,000 $460,000
50-MK2 Morgan City 1588Lake End Parkway Cabins,
Planning and ConstructionSt. Mary $1,000,000 $1,000,000
50-J52 St. Tammany Parish 1273St. Tammany Parish Fishing Pier,
Planning and ConstructionSt. Tammany $400,000 $400,000
50-J52 St. Tammany Parish 1733Emergency Shelter and Livestock
Facility Addition, Planning and
Construction
St. Tammany $980,000 $980,000
50-M57 Covington 1385Extensions and Improvements to
Water Distribution System,
Planning and Construction
St. Tammany $220,000
50-M90 Folsom 478
Road and Street Repairs,
Planning and Construction (Cash
and/or In-Kind Match Required)
St. Tammany $15,000
50-MH8 MANDEVILLE 1485Mandeville Trailhead Property
AcquisitionST. TAMMANY $400,000 $400,000
50-MN1 Pearl River 492Pearl River Museum, Planning
and ConstructionSt. Tammany $25,000
50-MT1 Sun 500Town Hall Renovations, Planning
and ConstructionSt. Tammany $15,000
50-NG2Northshore Harbor
Center525
Northshore Harbor Center
Purchase of Additional
Equipment
St. Tammany $175,000 $175,000
01-107Division of
Administration1
Local Government Assistance
ProgramStatewide $10,000,000 $10,000,000
01-107Division of
Administration2
Community Water Enrichment
ProgramStatewide $5,000,000 $5,000,000
01-107Division of
Administration397
Statewide Roofing,
Waterproofing, and Related
Repairs and Equipment
Replacement Program
Statewide $2,625,000
01-107Division of
Administration409
Major Repairs for State Buildings
Based on Statewide Condition
Assessment, and Infrastructure,
Planning and Construction
Statewide $9,000,000
01-112Department of Military
Affairs9
Statewide Backlog of
Maintenance and Repair (BMAR),
Phase 3, and Statewide
Infrastructure Rehabilitation,
Phase 3
Statewide $500,000 $500,000
05-252Office of Business
Development15
Economic Development Award
Program For Infrastructure
Assistance (Supplemental
Funding)
Statewide $10,000,000 $10,000,000
15 of 17
Green highlight: partial CLOC recommendation of the P2 appropriated to project
Agency # Agency NameHB2
BDS #Project Title Parish P2 Total in HB2
P2 CLOC Approved
by SBC
07-270 DOTD - Administration 28
Secretary's Emergency Fund for
Bridge Damages, Other
Reimbursements, Local Matching
Dollars, Federal Funds, and
Opportunity Grants Subject to
the Provisions of R.S. 48:232
Statewide $2,500,000 $2,500,000
07-270 DOTD - Administration 976Highway Program (Up to
$4,000,000 for Secretary's
Emergency Fund)
Statewide $20,000,000
08-400Corrections -
Administration35
Statewide Fencing Project,
Planning and ConstructionStatewide $600,000 $600,000
19-671 Board of Regents 1630Land Acquisition for Post
Secondary Educational
Institutions
Statewide $2,500,000
09-344Hammond
Developmental Center
Repairs and Renovation at the
North Lake Supports and Services
Center, Planning and
Construction
Tangipahoa $500,000 $500,000
19-634Southeastern
Louisiana University75
Computer Science and
Technology Facility
Improvements and Expansion,
Planning and Construction
Tangipahoa $1,000,000 $1,000,000
36-P33South Tangipahoa
Parish Port
Commission
1931Port Manchac Terminal
Improvements, Planning and
Construction
Tangipahoa $470,000 $470,000
50-J53 Tangipahoa Parish 1559
Courthouse and Courthouse
Annex Renovations and
Expansions, Acquisitions,
Planning and Construction
($500,000 Local Match)
Tangipahoa $490,000 $255,000
50-MB9 Hammond 106Air Traffic Control Tower,
Planning and Construction
($450,000 Local Match)
Tangipahoa $750,000 $750,000
50-MB9 Hammond 1604Police Station, Acquisition and
Renovation, Planning and
Construction
Tangipahoa $600,000 $600,000
50-MD5 Independence 1473
Sewerage Treatment and
Sewer/Water Lines Repairs,
Planning and Construction (Cash
and/or In-Kind Match Required)
Tangipahoa $20,000 $20,000
50-MD5 Independence 1740 Independence Area Community
Pavilion, Planning and
Construction
Tangipahoa
$155,000 $155,000
50-MT6 Tickfaw 1249Drainage Improvements on
Highway 442 East and West,
Planning and Construction
Tangipahoa $115,000 $115,000
50-J54 Tensas Parish 456Tensas Parish Port/Port Priority
Site Plan, Planning and
Construction
Tensas $100,000
19-731L.E. Fletcher Technical
Community College236
Diesel Marine, Welding and
Transportation Building for
Fletcher Technical Community
College
Terrebonne $200,000 $200,000
19-731L.E. Fletcher Technical
Community College1823
Integrated Petroleum
Technologies Program (IPT) Lab
and Classroom Building, Planning
and Construction
Terrebonne $4,000,000 $4,000,000
36-P23Terrebonne Port
Commission1749
Slip Dredging and Improvements
for Terrebonne Port Commission
Government Multi-Use Complex
Terrebonne $710,000 $710,000
50-J55 Terrebonne Parish 1808
Terrebonne Parish Consolidated
Government, Upper Bayou
Dularge Pump Station, Planning
and Construction
Terrebonne $200,000 $200,000
16 of 17
Green highlight: partial CLOC recommendation of the P2 appropriated to project
Agency # Agency NameHB2
BDS #Project Title Parish P2 Total in HB2
P2 CLOC Approved
by SBC
50-M85 Farmerville 617Union Village Fire Station,
Acquisitions, Planning and
Construction
Union $70,000
50-NW1Union Parish Law
Enforcement District704
New Law
Enforcement/Services/Training/
Emergency Shelter Complex,
Planning and Construction
($500,000 Local In-Kind Match;
$1,100,000 Federal Match)
Union $50,000 $50,000
50-M60 Delcambre 1335Water Distribution and Storage
System Improvements, Planning
and Construction
Vermilion $450,000 $450,000
50-MB7 Gueydan 314Street Improvements, Planning
and Construction ($112,000 Local
Match)
Vermilion $150,000 $150,000
50-ME8 Kaplan 319Public Safety Complex, Planning
and ConstructionVermilion $150,000 $150,000
50-MI8 Maurice 331Wastewater Treatment Facility
and Collection System Upgrade
($1,792,800 Federal Match)
Vermilion $250,000
50-J58 Vernon Parish 99Vernon/Fort Polk Thoroughfare,
Planning and ConstructionVernon $5,700,000 $5,700,000
50-MD1 Hornbeck 1103
Emergency Connection with
West Vernon Waterworks District
and Inline Booster Station,
Planning and Construction
Vernon $300,000 $300,000
50-MD1 Hornbeck 1295Emergency Connection with
Anacoco Water System, Planning
and Construction
Vernon $300,000 $300,000
50-ML2 New LlanoStreet Improvements, Planning
and Construction Vernon $75,000 $75,000
50-MQ1 ROSEPINE 1094Rosepine Wastewater Treatment
Plant ImprovementsVERNON $550,000 $550,000
50-MQ1 ROSEPINE 1095Water System Improvements,
Town of RosepineVERNON $200,000 $200,000
50-M27 Bogalusa 1163 Cassidy Park Improvements and
Renovation, Planning and
Construction
Washington
$160,000
50-M27 Bogalusa 1164Emergency Sewer Collection
System Evaluation and Repairs,
Planning and Construction
Washington $160,000 $55,000
50-M27 Bogalusa 1636Extension of Willis Avenue to
Highway 21, Planning and
Construction
Washington $95,000
50-M95 Franklinton 1862Industrial Park Property and
Acquisition and DevelopmentWashington $35,000
50-NNRWashington Parish
Recreation District #1538
Multi-Purpose Recreation
Facility, Land Acquisition, Master
Planning, Design and
Construction
Washington $100,000
50-MC5 Heflin 1472Conversion of Gym into
Multipurpose Facility, Planning
and Construction
Webster $150,000 $150,000
50-MJ5 Minden 1331Potable Water Ground Storage
Tank, Planning and ConstructionWebster $215,000 $215,000
50-MR2 Sibley 1183Wastewater Collection
Improvements, Planning and
Construction
Webster $100,000 $100,000
50-MS5 Springhill 1534Wastewater Collection System
Improvements, Planning and
Construction
Webster $75,000 $75,000
50-NLRHorseshoe Road Water
System, Inc.690
Horseshoe Water System,
Planning and ConstructionWebster $125,000 $125,000
17 of 17
Green highlight: partial CLOC recommendation of the P2 appropriated to project
Agency # Agency NameHB2
BDS #Project Title Parish P2 Total in HB2
P2 CLOC Approved
by SBC
36-P03Greater Baton Rouge
Port Commission1996
Inland River Marine Terminal
Dock and Access Roadway
Construction Project, Planning
and Construction
West Baton
Rouge$1,000,000 $1,000,000
50-M33 Brusly 296New Police Department
Headquarters and Sub District #2
Fire Station
West Baton
Rouge$275,000
50-NAHWest Carroll Parish
Sheriff664
West Carroll Parish Jail Education
and Visitation Room, Planning
and Construction
West Carroll $55,000
08-402Louisiana State
Penitentiary39
Electrical Distribution System
Upgrade, Planning and
Construction
West Feliciana $300,000 $300,000
08-402Louisiana State
Penitentiary823
Main Prison Shower and
Cellblock Plumbing Upgrade,
Planning and Construction
West Feliciana $165,000 $165,000
50-MQ3 St. Francisville 1000
Natural Gas Distribution System
Rehabilitation and Improvement,
Planning and Construction
West Feliciana $305,000 $305,000
50-MR4 SIKES 1544Village of Sikes Water System
Extensions and ImprovementsWINN $1,000,000 $1,000,000
$253,875,000 $189,595,000