1 of 17 HB2 (Act 23) of the 2012 R.S. P2 CLOC Status Current as of June 20, 2013 meeting of the State Bond Commission Report prepared by House Fiscal Division staff Source of Information provided by Louisiana Department of Treasury State Bond Commission P = Priority SBC = State Bond Commission CLOC = Cash Line of Credit Green highlight: partial CLOC recommendation of the P2 appropriated to project Agency # Agency Name HB2 BDS # Project Title Parish P2 Total in HB2 P2 CLOC Approved by SBC 19-605 LSU EUNICE 54 Replacement of Science Laboratory Fume Hoods, Planning and Construction ACADIA $135,000 36-P35 Mermentau River Harbor & Terminal 1255 Land Acquisition for New Slip Construction (Mermentau River Harbor Terminal District), Planning and Construction Acadia $225,000 $225,000 50-MD6 Iota 1253 Town of Iota Street Improvements, Planning and Construction Acadia $50,000 50-MM4 Oil City Highway 538 Water Line Extension, Planning and Construction Allen $425,000 $425,000 07-270 DOTD - Administration 25 LA 42 (US 61 to LA 44) Widening Ascension $2,000,000 $2,000,000 07-270 DOTD - Administration 26 Intersection Improvement Program, Real Estate Acquisition, Planning and Construction Ascension $200,000 $200,000 50-J03 Ascension Parish 244 Oak Grove Community and Recreational Center, Planning and Construction Ascension $120,000 $120,000 50-J03 Ascension Parish 245 Lamar Dixon Development, Purchase and Land Acquisition Ascension $100,000 $100,000 50-M68 Donaldsonville 1896 Riverfront Development, Planning and Construction Ascension $780,000 $780,000 50-MA5 Gonzales Intersection Improvements on LA 3038, Including Patching, Repairing, and Overlaying of the Highway, Planning and Construction Ascension $800,000 $800,000 50-NI9 Ascension St. James Airport 1329 Automobile Parking Lot Improvements for the Louisiana Regional Airport Ascension $50,000 $50,000 01-109 Office of Coastal Protection and Restoration 8 Morganza to Gulf of Mexico Flood Control Feasibility Study, Planning, Design, Right of Way and Construction of Levees, Floodgates and Other Flood Control Systems ($100,000,000 Local Match; $25,000,000 Local In- Kind Match; $442,000,000 Federal Match) Ascension, Assumption, Iberia, Iberville, Lafourche, Pointe Coupee, St. Martin, St. Mary, Terrebonne, West Baton Rouge $1,500,000 $1,500,000 11-431 Natural Resources - Office of the Secretary 1570 Atchafalaya Basin Protection and Enhancement (Federal Match and Local/Sponsor Match) NOTE: P2 was $1 M in HB2; however, IEB moved $1 M of P2 to P5 on 2-21-13 Assumption, Avoyelles, Iberia, Iberville, Pointe Coupee, St. Landry, St. Martin, St. Mary $0 50-J05 AVOYELLES PARISH 1352 Avoyelles Parish Police Jury - 4th Floor Courthouse Renovation, Planning and Construction Avoyelles $200,000 50-MI6 MARKSVILLE 1260 Mary Bethune Community Center, previously known D. A. Jordan Community Center, for the City of Marksville AVOYELLES $600,000

Upload: vuongtu

Post on 20-Aug-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

1 of 17

HB2 (Act 23) of the 2012 R.S. P2 CLOC Status

Current as of June 20, 2013 meeting of the State Bond CommissionReport prepared by House Fiscal Division staffSource of Information provided by Louisiana Department of Treasury State Bond Commission

P = Priority SBC = State Bond Commission CLOC = Cash Line of Credit

Green highlight: partial CLOC recommendation of the P2 appropriated to project

Agency # Agency NameHB2

BDS #Project Title Parish P2 Total in HB2

P2 CLOC Approved

by SBC

19-605 LSU EUNICE 54Replacement of Science

Laboratory Fume Hoods,

Planning and Construction

ACADIA $135,000

36-P35Mermentau River

Harbor & Terminal1255

Land Acquisition for New Slip

Construction (Mermentau River

Harbor Terminal District),

Planning and Construction

Acadia $225,000 $225,000

50-MD6 Iota 1253 Town of Iota Street

Improvements, Planning and

Construction

Acadia

$50,000

50-MM4 Oil CityHighway 538 Water Line

Extension, Planning and

Construction

Allen $425,000 $425,000

07-270 DOTD - Administration 25 LA 42 (US 61 to LA 44) Widening Ascension $2,000,000 $2,000,000

07-270 DOTD - Administration 26

Intersection Improvement

Program, Real Estate Acquisition,

Planning and Construction

Ascension $200,000 $200,000

50-J03 Ascension Parish 244Oak Grove Community and

Recreational Center, Planning

and Construction

Ascension $120,000 $120,000

50-J03 Ascension Parish 245Lamar Dixon Development,

Purchase and Land AcquisitionAscension $100,000 $100,000

50-M68 Donaldsonville 1896Riverfront Development,

Planning and ConstructionAscension $780,000 $780,000

50-MA5 Gonzales

Intersection Improvements on LA

3038, Including Patching,

Repairing, and Overlaying of the

Highway, Planning and

Construction

Ascension $800,000 $800,000

50-NI9Ascension St. James

Airport1329

Automobile Parking Lot

Improvements for the Louisiana

Regional Airport

Ascension $50,000 $50,000

01-109

Office of Coastal

Protection and

Restoration

8

Morganza to Gulf of Mexico

Flood Control Feasibility Study,

Planning, Design, Right of Way

and Construction of Levees,

Floodgates and Other Flood

Control Systems ($100,000,000

Local Match; $25,000,000 Local In-

Kind Match; $442,000,000

Federal Match)

Ascension,

Assumption,

Iberia, Iberville,

Lafourche, Pointe

Coupee, St.

Martin, St. Mary,

Terrebonne,

West Baton

Rouge

$1,500,000 $1,500,000

11-431Natural Resources -

Office of the Secretary1570

Atchafalaya Basin Protection and

Enhancement (Federal Match

and Local/Sponsor Match)

NOTE: P2 was $1 M in HB2;

however, IEB moved $1 M of

P2 to P5 on 2-21-13

Assumption,

Avoyelles, Iberia,

Iberville, Pointe

Coupee, St.

Landry, St.

Martin, St. Mary

$0

50-J05 AVOYELLES PARISH 1352

Avoyelles Parish Police Jury - 4th

Floor Courthouse Renovation,

Planning and Construction

Avoyelles $200,000

50-MI6 MARKSVILLE 1260

Mary Bethune Community

Center, previously known D. A.

Jordan Community Center, for

the City of Marksville

AVOYELLES $600,000

2 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

Agency # Agency NameHB2

BDS #Project Title Parish P2 Total in HB2

P2 CLOC Approved

by SBC

07-274DOTD - Public

Improvements34

Mississippi River Levee Raising,

Arkansas to Old River, Planning

and Construction

Avoyelles,

Concordia, East

Carroll, Madison,

Pointe Coupee,

Tensas

$500,000 $500,000

08-401C. Paul Phelps

Correctional Center36

Emergency Backup Generators,

Planning and ConstructionBeauregard $210,000

08-401C. Paul Phelps

Correctional Center37

Remedial Actions for State Fire

Marshal Compliance and Health

Inspection Violations, Planning

and Construction

Beauregard $1,000,000

50-J06 Beauregard Parish 1136Lumas Road, Planning and

ConstructionBeauregard $400,000 $400,000

50-M65 DeRidder 105

Community Recreational Building

and Shelter, Planning and

Construction and/or A acquisition

and Rehabilitation of the Existing

Facility ($1,500,000 Local Match)

Beauregard $250,000 $250,000

50-NQVBeauregard Parish

Waterworks District #61104

Water System Improvements,

Planning and ConstructionBeauregard $25,000 $25,000

50-M09 Arcadia 101

Multi-Purpose Community

Center, Planning and

Construction ($350,000 Local

Match)

Bienville $500,000

50-M29 Bossier City 886

Hwy. 71 Street Lighting Project

from LA 3032 (Westgate Drive) to

LA 511 (Jimmie Davis Hwy)

Planning and Construction

Bossier $390,000 $390,000

50-MN5 Plain Dealing 1181Wastewater Treatment Plant

Improvements, Planning and

Construction

Bossier $160,000 $160,000

07-270 DOTD - Administration 1991Jimmie Davis Bridge

Rehabilitation, Planning and

Construction

Bossier, Caddo $1,300,000 $1,300,000

04-139 SECRETARY OF STATE 1601Louisiana State Exhibit Museum,

Planning and ConstructionCADDO $200,000 $200,000

19-604SLSU Medical Center

Shreveport53

High Voltage Electrical

Distribution System Upgrade,

Planning and Construction

Caddo $350,000 $350,000

19-604SLSU Medical Center

Shreveport1990

Patient Care HVAC Replacement,

Planning and ConstructionCaddo $300,000 $300,000

19-604SLSU Medical Center

Shreveport

Children's Hospital, Renovation

and Expansion, Planning and

Construction

Caddo $1,000,000 $1,000,000

19-618Southern University

Shreveport61

New Classroom Building,

Southern University- Shreveport,

Planning and Construction

Caddo $2,000,000 $2,000,000

50-J09 Caddo Parish 1657Caddo Parish Fire District No. 3

Station #4 Addition, Planning and

Construction

Caddo $165,000 $165,000

50-MU6 Vivian 1185Water and Wastewater System

Improvements and Extension,

Planning and Construction

Caddo $250,000 $250,000

50-MU6 Vivian 1310Town of Vivian, Street

Improvements, Planning and

Construction

Caddo $400,000 $400,000

07-270 DOTD - Administration 24

Port of Lake Charles Access Road,

Planning and Construction

($3,500,000 Local Match,

$17,500,000 Federal Match)

Calcasieu $500,000 $500,000

16-513 Office of Wildlife 46Region 5/Lake Charles Office,

Planning and ConstructionCalcasieu $900,000 $900,000

3 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

Agency # Agency NameHB2

BDS #Project Title Parish P2 Total in HB2

P2 CLOC Approved

by SBC

19-627McNeese State

University69

Alpha Hall Renovations, Planning

and ConstructionCalcasieu $500,000 $500,000

19-627McNeese State

University71

Shearman Fine Arts Building -

Renovation of Existing Space,

Planning and Construction

Calcasieu $340,000 $340,000

19-627McNeese State

University1986

Health/Human Performance

Education Complex, Planning and

Construction

Calcasieu $1,000,000 $1,000,000

19-627McNeese State

University

Contraband Bayou Erosion

Retaining Wall Phase II, Planning

and Construction

Calcasieu $350,000 $350,000

36-P26 Port of Lake Charles 81

Command and Control Center at

City Docks, Planning and

Construction ($1,125,000 Federal

and/or Local Match)

Calcasieu $300,000 $300,000

36-P26 Port of Lake Charles 82

Industrial Canal Dockside

Monopile Improvements

(LEEVAC), Planning and

Construction

Calcasieu $195,000 $195,000

50-J10 Calcasieu Parish 85

Gravity Sewer Trunk Mains &

Pumping Stations South Ward 3

and South Ward 4, Planning and

Construction

Calcasieu $900,000 $900,000

50-MF9 Lake Charles 1995National Hurricane Museum and

Science Center, Planning and

Construction

Calcasieu $300,000 $300,000

50-MU5 VINTON 1153Town of Vinton, Vinton Street

ImprovementsCALCASIEU $200,000 $200,000

50-MV3 Westlake 111

Ellis and Linda Drive

Improvements, City of Westlake,

Planning and Construction

Calcasieu $750,000 $750,000

50-S10Calcasieu Parish

School Board

Facilities Improvements, Planning

and ConstructionCalcasieu $1,000,000

07-274DOTD - Public

Improvements33

Bayou Dechene Reservoir,

Planning, Land Acquisition and

Construction

Caldwell $5,000,000 $5,000,000

36-P43Columbia Port

Commission1516

Railroad Spur, Planning and

ConstructionCaldwell $670,000 $670,000

50-J11 Caldwell Parish 1477Wiles Road Reconstruction,

Planning and ConstructionCaldwell $80,000 $80,000

50-J11 Caldwell Parish 1478Parish Detention Facility,

Planning and ConstructionCaldwell $250,000 $250,000

50-M52 Columbia 475Repair of Existing Water Well,

Planning and ConstructionCaldwell $380,000

50-MC9 Homer 1178Town of Homer, Town Hall

Renovations, Planning and

Construction

Claiborne $150,000 $150,000

50-J15 Concordia Parish 1600Concordia Parish Public Health

Center Renovation, Planning and

Construction

Concordia $150,000

50-MU2 Vidalia 1004

Development of a Slackwater

Port on the Mississippi River,

Planning and Construction

($12,900,000 Federal and/or

Local Match)

Concordia $1,000,000 $1,000,000

50-NRSNORTH DESOTO

WATER SYSTEM INC1373

Expansion and Improvements to

the Water SystemDE SOTO $100,000 $100,000

50-NJPWaterworks District #1

DeSoto Parish119

Water System Improvements and

Extension, Planning and

Construction ($1,977,300 Local

Match)

DeSoto $100,000 $100,000

50-NSN

Louisiana Coalition for

Accessible and

Sustainable Healthcare

1582

Town of Stonewall, Rural Medical

Facility, Planning and

Construction

DeSoto $300,000

4 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

Agency # Agency NameHB2

BDS #Project Title Parish P2 Total in HB2

P2 CLOC Approved

by SBC

01-107Division of

Administration3

Exterior Waterproofing at the

State Capitol Building, Planning

and Construction

East Baton Rouge $360,000 $360,000

16-512WLF - Office of

Secretary952

Wildlife and Fisheries

Enforcement Training Academy

and Emergency Facility, Planning

and Construction

East Baton Rouge $300,000

19-607LSU Agricultural

Center1947

Livestock Education Facility,

Planning and ConstructionEast Baton Rouge $2,140,000 $2,140,000

19-616SOUTHERN

UNIVERSITY

BATONROUGE

60Southern University Laboratory

School Addition and Upgrades,

Planning and Construction

EAST BATON

ROUGE$1,200,000 $1,200,000

19-616Southern University

Baton Rouge

Laboratory School Roof

Replacement, Planning and

Construction

East Baton Rouge $600,000

19-649

Louisiana Community

and Technical Colleges

System

Automotive Training Facility,

Planning and ConstructionEast Baton Rouge $2,400,000 $2,400,000

50-M14 Baker 1675Baker Fire Training Facility,

Planning and ConstructionEast Baton Rouge $165,000

50-M20 Baton Rouge 466Hooper Road Sewer

Improvements ($1,200,000 Local

Match)

East Baton Rouge $100,000 $100,000

50-MW3 Zachary 1012Water System Improvements,

Planning and ConstructionEast Baton Rouge $365,000

50-MW8 Central 1349 Administration Building East Baton Rouge $150,000 $150,000

50-MW8 Central 1350

Expand, Repair, and Modify City

of Central Drainage System,

Planning and Construction

East Baton Rouge $100,000 $100,000

50-N41BATON ROUGE METRO

AIRPORT1341

Harding Field World War II

Commemorative

EAST BATON

ROUGE$130,000

50-NC2Baton Rouge

Recreation & Parks

Commission

113Children's Museum, Planning and

Construction ($5,000,000 Local

Match)

East Baton Rouge $50,000 $50,000

50-NC2

Baton Rouge

Recreation & Parks

Commission

114

Anna T. Jordan Site and Facility

Improvements (Non-State Match

Required) NOTE: P2 was $120

K in HB2. IEB moved $120 K

of P2 to P5 on 2-21-13

East Baton Rouge $0

50-NC2Baton Rouge

Recreation & Parks

Commission

1392Central Community Sports Park,

Planning and ConstructionEast Baton Rouge $150,000 $150,000

50-NG6Louisiana Black History

Hall of Fame11

Museum and Cultural Center,

Planning and Construction

($100,000 Cash and/or In-Kind

Match)

East Baton Rouge $400,000

50-NN2Urban Restoration

Enhancement Corp1525

Old Hollywood Elementary

School, Site Development and

Improvements, Planning and

Construction

East Baton Rouge $50,000

50-NNBProfessional

Specialties1762

USDA Licensed Veterinary

Biologic Facility, Planning and

Construction

East Baton Rouge $300,000

50-NRUE BATON ROUGE

COUNCIL ON AGING1308

Re-Opening of East Baton Rouge

Council on Aging's Kitchen,

Planning, Improvement,

Equipment, Additions

EAST BATON

ROUGE$140,000

07-270 DOTD - Administration 1129

Hooper Road Extension (LA 37 to

LA 16), Environmental, Planning,

Engineering, Right of Way,

Utilities and Construction

East Baton

Rouge, Livingston$800,000 $800,000

5 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

Agency # Agency NameHB2

BDS #Project Title Parish P2 Total in HB2

P2 CLOC Approved

by SBC

50-J18 East Carroll Parish 598 Courthouse and Jail Renovations East Carroll $175,000 $175,000

03-130Department of

Veterans Affairs12

Fire Alarm / Call System, Planning

and ConstructionEast Feliciana $180,000 $180,000

09-320Office of Aging and

Adult Services41

Replace Fire Alarm and Sprinkler

System, Planning and

Construction

East Feliciana $50,000 $50,000

50-J19 East Feliciana ParishRoad Overlay Project, Planning

and ConstructionEast Feliciana $50,000

50-M17 Basile 1315

Town of Basile Public

Accommodation Recreation

Facility Improvements, Planning

and Construction

Evangeline $65,000

50-J22 Grant Parish 1944

Regional Economic Development

Building, Rehabilitation, Planning

and Construction

Grant $150,000 $150,000

50-M50 Colfax 1357Street Improvements, Planning

and ConstructionGrant $100,000

50-MJ7 MontgomeryTown Hall and Community

Center, Planning and

Construction

Grant $75,000

36-L37

Iberia Parish Levee

Hurricane and

Conservation District

1676

Planning, Permitting, Engineering

and Right of Way Acquisition for

the Iberia Hurricane Protection

Master Plan

Iberia $250,000 $250,000

50-J23 Iberia Parish 265Five Lane Road Extension from

Highway 675 to Highway 3212,

Planning and Construction

Iberia $520,000 $520,000

50-J23 Iberia Parish 1131

Recreational Complex, Sports

Including Baseball, Planning and

Construction (Supplemental

Funding)

Iberia $100,000 $100,000

50-J23 IBERIA PARISH 1134

Road Extension from Sidney

Blanchard Road to Ed Broussard

Road, Planning and Construction

IBERIA $150,000 $150,000

50-MH3 Loreauville 328

Loreauville Wastewater

Treatment Plant Improvements

and Demolition Project, Planning

and Construction

Iberia $65,000 $65,000

50-MH3 Loreauville 1261Loreauville Water Tower

Improvements, Planning and

Construction

Iberia $50,000 $50,000

50-ML1 New Iberia 1049

Multi-Use Conference and

Operating Center, Land

Acquisition, Planning and

Construction

Iberia $350,000

50-NPDIberia Economic

Development

Authority

1776Progress Point Business Park and

Airport Gateway, Land

Acquisition

Iberia $1,075,000 $1,075,000

07-270 DOTD - Administration 1750Louisiana Hwy 1 Resurfacing -

Plaquemine to White Castle,

Planning and Construction

IBERVILLE $1,000,000 $1,000,000

50-MW6 St. GabrielTurning Lane and Traffic Signals

on LA Hwy. 74 and LA Hwy. 30Iberville $50,000

50-NFUJackson Parish

Dugdemona Water

Authority

1154Jackson-Bienville Reservoir,

Planning and ConstructionJackson $200,000

50-NSIWALKER COMMUNITY

WATER SYS INC1681

Water Distribution System

Expansion, LA-810 Extension,

Planning and Construction

JACKSON $600,000 $600,000

01-124Louisiana Stadium &

Exposition District417

Zephyrs Baseball Facilities Repair,

Renovation and ImprovementJefferson $800,000 $800,000

6 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

Agency # Agency NameHB2

BDS #Project Title Parish P2 Total in HB2

P2 CLOC Approved

by SBC

36-P41Jefferson Parish Port

District83

Jefferson Parish Business Park:

Science and Technology Academy

and Conference Center

Jefferson $500,000 $500,000

50-J26 Jefferson Parish 87

Bayou Segnette Sports Complex

Improvements, Including Hall B

Expansion, Planning and

Construction

Jefferson $4,500,000 $4,500,000

50-J26 Jefferson Parish 740

18th Street Drainage

Improvements, Edenborn Avenue

Phase 2 (18th Street to West

Esplanade Avenue Canal)

Jefferson $100,000 $100,000

50-J26 Jefferson Parish 743

Airline Drive(US 61) at 17th St.

Canal Drainage Crossing and

Railroad Bridge Replacement,

Planning and Construction

Jefferson $2,000,000 $2,000,000

50-J26 Jefferson Parish 750

Bike Path along Leo Kerner

Parkway (Barataria Blvd to Parc

Des Familles Entrance), Planning

and Construction

Jefferson $65,000 $65,000

50-J26 Jefferson Parish 752

Bonnabel Canal Rehabilitation

and Bank Stabilization (Veterans

Boulevard to West Esplanade),

Planning and Construction

Jefferson $2,150,000 $2,150,000

50-J26 Jefferson Parish 755

Canal 10 Concrete Lining

Widening Between Canal 7 and

West Esplanade Avenue,

Planning and Construction

Jefferson $50,000 $50,000

50-J26 Jefferson Parish 762

Codifer Boulevard, Homestead

Avenue, and Brockenbraugh

Court Subsurface Drainage

Improvements, Planning and

Construction

Jefferson $200,000 $200,000

50-J26 Jefferson Parish 793Performing Arts Center

ModificationsJefferson $2,600,000 $2,600,000

50-J26 Jefferson Parish 806

Upper Kraak Ditch Subsurface

Drainage Improvement (Upper

Kraak Drainage Pump Station to

Earhart Expressway), Planning

and Construction

Jefferson $200,000

50-J26 Jefferson Parish 816

Woodmere Community Center,

Real Estate Acquisition, Planning,

and Construction ($15,000

Match)

Jefferson $100,000 $100,000

50-J26 Jefferson Parish 1355

South Kenner Road

Rehabilitation from Live Oak

Boulevard to River Road,

Planning and Construction

Jefferson $300,000 $300,000

50-J26 Jefferson Parish 1364Martin Luther King Playground

Improvements, Planning and

Construction

Jefferson $100,000 $100,000

50-J26 Jefferson Parish 1807Waggaman Subsurface Drainage

Improvements, Planning and

Construction

Jefferson $740,000 $740,000

50-MB1 Grand Isle 1819Historic Recreation

Center/Community Center,

Planning and Construction

Jefferson $100,000 $100,000

50-MB5 Gretna 1201McDonoghville Fire Station, Land

Acquisition, Planning and

Construction

Jefferson $1,000,000 $1,000,000

50-MB5 Gretna 1204Mel Ott Exterior Lighting and

ImprovementsJefferson $225,000 $225,000

50-MB5 Gretna 1213

Hancock Street Canal

Improvements (Kepler Street -

Virgil Street), Planning and

Construction

Jefferson $250,000 $250,000

7 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

Agency # Agency NameHB2

BDS #Project Title Parish P2 Total in HB2

P2 CLOC Approved

by SBC

50-MC1 Harahan 1488Penfold Place Drainage, Planning

and ConstructionJefferson $50,000 $50,000

50-ME1 Jean Lafitte 631Lafitte Seafood Pavilion, Planning

and ConstructionJefferson $100,000 $100,000

50-MF1 Kenner 1208Wastewater System Corrective

MeasuresJefferson $250,000 $250,000

50-MF1 Kenner 1241Lincoln Manor Subdivision

Drainage Improvements,

Planning and Construction

Jefferson $100,000

50-MF1 Kenner 1732City of Kenner Emergency

Operations Center, Planning and

Construction

Jefferson $75,000

50-MF1 Kenner 1781

Drainage Improvements along

Idaho Avenue, 26th Street to

West Napoleon Canal, Planning

and Construction

Jefferson $150,000 $150,000

50-MV4 Westwego 1073

Park Land and Improvements,

Including Improvements to

Existing Parks, Planning and

Construction

Jefferson $800,000 $800,000

50-MV4 Westwego 1075Sala Avenue Street and

Infrastructure ImprovementsJefferson $150,000 $150,000

50-MV4 Westwego 1077Water Plant Improvements,

Planning and Construction (50%

Local Match)

Jefferson $1,000,000 $1,000,000

50-NGHNew Hope Community

Development Center1679

New Hope Multi-Use Center,

Planning and ConstructionJefferson $15,000

50-NMLGretna Police

Department1287

Gretna Police Department,

Construction of Armory,

Elevation/Floor Proofing/Wind

Retrofit, Planning and

Construction

Jefferson $940,000 $940,000

50-NPWAVONDALE BOOSTER

CLUB1251

Avondale Booster Club and

Playground UpgradesJEFFERSON $400,000 $400,000

50-J27 Jefferson Davis Parish 270Third Street West Bridge Repair,

Planning and ConstructionJefferson Davis $40,000 $40,000

50-J27 Jefferson Davis Parish 1593Road Maintenance 6 Parish

Equipment Sheds and EquipmentJefferson Davis $300,000

50-MV1 Welsh 1778 Town of Welsh Upgrade Electrical Jefferson Davis $50,000

50-M32 Broussard 1286

Three-Lane LA 182 in the City of

Broussard, Planning and

Construction ($750,000 Local

Match)

Lafayette $150,000 $150,000

50-M32 Broussard 1327Rehabilitation La Hwy 182 from

US 90 to LA Hwy 89, Planning and

Construction

Lafayette $250,000 $250,000

50-M32 Broussard 1328

Reconstruct South Bernard Road

From LA Hwy 182 to US Hwy 90,

Planning and Construction

Lafayette $150,000 $150,000

50-M39 Carencro 1987Wastewater and City

Infrastructure Flood Damages,

Planning and Construction

Lafayette $200,000 $200,000

50-M39 Carencro 1994City Hall Renovations, Including

New Roof, Planning and

Construction

Lafayette $85,000

50-MQ8 SCOTT 1768

Apollo Road Extension (Rue du

Belier & Dulles Drive Intersection

to Old Spanish Trail & Apollo

Road Intersection).Planning,

Construction, and Land

Acquisition UNTIMELY-(Replaces

544721)

LAFAYETTE $500,000 $500,000

8 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

Agency # Agency NameHB2

BDS #Project Title Parish P2 Total in HB2

P2 CLOC Approved

by SBC

50-MQ8 ScottScott Events Center, Planning and

ConstructionLafayette $60,000 $60,000

50-MW2 Youngsville 1041Community Center, Planning and

ConstructionLafayette $200,000 $200,000

50-NA2Lafayette Airport

Commission368

Construction of Cargo Facilities,

Planning and ConstructionLafayette $4,500,000 $4,500,000

50-NSSLA Emergency Medical

Unit

LA Emergency Medical Unit

Storage FacilityLafayette $125,000 $125,000

19-610LSU Healthcare

Services Division723

Parking Lot Construction -

Chabert, Planning and

Construction

Lafourche $100,000

19-621Nicholls State

University

Athletic Facilities, Renovation,

Planning and ConstructionLafourche $200,000 $200,000

50-MA3 Golden Meadow 1983Median Turning Lane near

Doucet Drive, Planning and

Construction

Lafourche $65,000

50-MT5 Thibodaux 110LA Hwy 20 (N. Canal Blvd.)

Widening, Planning and

Construction

Lafourche $250,000

50-NSU Bayou Civic ClubFacilities Upgrade/Roof and

Kitchen Planning and

Construction

Lafourche $135,000 $135,000

50-J30 LaSalle ParishPine Hill Road Improvements,

Planning and ConstructionLaSalle $665,000 $665,000

50-MM5 Olla 1638

Downtown Area Sidewalk,

Ramps, Curbing, and Fencing

Enhancements, Planning and

Construction

LaSalle $50,000

19-623Grambling State

University850

Library Deficiencies, Planning and

ConstructionLincoln $500,000

19-625Louisiana Tech

University67

Visual Arts Building Renovation

for Business, Planning and

Construction

Lincoln $500,000 $500,000

19-625Louisiana Tech

University68

Water Distribution System

Repairs and ImprovementsLincoln $300,000 $300,000

50-M69 Downsville 1571Downsville Recreational Facility

Improvements, Planning and

Construction

Lincoln $145,000 $145,000

50-MQ2 Ruston 1054

Tarbutton Road Interstate 20

Interchange and Connector Road,

Planning and Construction

Lincoln $100,000

50-MR7 Simsboro 650 Water Well and Water Main Lincoln $50,000 $50,000

50-MR7 SIMSBORO 1821Village of Simsboro Renovate

"Old" Fire Station Into Town HallLINCOLN $100,000 $100,000

50-NGALincoln Parish Fire

Protection District 11040

Land Acquisition and

Construction of Additional Fire

Stations, Planning and

Construction

Lincoln $350,000

07-270 DOTD - AdministrationLA 64 Widening from LA 16 to

Magnolia Bridge Planning and

Construction

Livingston $400,000 $400,000

50-J32 Livingston Parish 436

Livingston Parish Regional

Airport, Planning and

Construction ($900,000 Federal

Funds)

Livingston $50,000 $50,000

50-MS4 Springfield 999Water System Planning and

ConstructionLivingston $400,000 $400,000

50-MU7 Walker 1619

Widening of Highway 447 and I-

12 Overpass Improvements,

Environmental Phase

Commencement, Planning and

Construction

Livingston $300,000 $300,000

9 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

Agency # Agency NameHB2

BDS #Project Title Parish P2 Total in HB2

P2 CLOC Approved

by SBC

50-NMG

Livingston Association

for Retarded Children,

Inc.

860

New Facility for Livingston

Association for Retarded

Children, Inc. Planning and

Construction

Livingston $230,000 $230,000

50-NNLHungarian Settlement

Historical Society1234

Hungarian Settlement Historical

Museum, Planning and

Construction

Livingston $170,000 $170,000

50-J33 Madison Parish 441Courthouse Renovations,

Planning and ConstructionMadison $100,000

50-NRVMADISON VOL

COUNCIL ON AGING1391

Expansion and Improvements to

Activities Building, Planning and

Construction

MADISON $50,000

50-M19 Bastrop 1320

Bastrop Central Fire Station,

Replace Driveway City Hall, Roof

Construction, Planning and

Construction

Morehouse $200,000 $200,000

19-657Louisiana School for

Math, Science and the

Arts

76HVAC Issues in Caddo Hall,

Planning and ConstructionNatchitoches $600,000 $600,000

19-657Louisiana School for

Math, Science and the

Arts

1574Stair Railings - Addressing Code

Violations, Planning and

Construction

Natchitoches $70,000 $70,000

50-J35 Natchitoches Parish 1961Old River Bridge, Planning and

ConstructionNatchitoches $535,000 $535,000

50-M37 Campti 298Town of Campti Multi-Purpose

Community Center, Planning and

Construction

Natchitoches $150,000 $150,000

50-MK9 Natchitoches 1693

South Natchitoches Drainage

Improvements, including

Adjacent Roadwork, Planning and

Construction NOTE: P2 was

$475 K in HB2. IEB moved

$475 K of P2 to P5 on 2-21-13

Natchitoches $0

50-NM3Natchitoches Council

on Aging1634

Reconstruct Natchitoches Parish

Council on Aging Activities

Building, Planning and

Construction

Natchitoches $700,000 $700,000

50-NRO

Natchitoches

Communications

District

1769

Natchitoches Parish Emergency

Communications District,

Planning and Construction

Natchitoches $500,000 $500,000

50-NSMNatchitoches Veterans

Memorial Park

Commission

1772Natchitoches Veterans and

Memorial Park, Planning and

Construction

Natchitoches $50,000 $50,000

01-124Louisiana Stadium &

Exposition District2020

New Orleans Sports Arena

Improvements, Planning and

Construction

Orleans $21,500,000 $21,500,000

05-252Office of Business

Development158

Louisiana Cancer Research

Center in New Orleans, Planning,

Construction, and Equipment

Orleans $3,000,000 $3,000,000

06-263Office of State

Museum162

Construction of Civil Rights

Museum, Planning and

Construction

Orleans $75,000

06-A20 New Orleans City Park 857City Park Maintenance Complex

ImprovementsORLEANS $100,000 $100,000

06-A20 New Orleans City Park 1852New Tennis Center

Improvements, Planning and

Construction

ORLEANS $50,000 $50,000

07-270 DOTD - Administration 1978State Streets, Algiers Planning

and ConstructionOrleans $1,400,000 $1,400,000

10 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

Agency # Agency NameHB2

BDS #Project Title Parish P2 Total in HB2

P2 CLOC Approved

by SBC

09-304Metropolitan Human

Service District547

New Mental Health Clinic for

New Orleans Behavior, Social,

and Medical Support Detox

Clinic, Including Expansion and

Renovation of the Existing

Facility, Planning and

Construction

Orleans $2,000,000 $2,000,000

09-304Metropolitan Human

Service District831

New Mental Health Center for

Desire/Florida Mental Health

Clinic, Including the Purchase,

Construction or Renovation of a

New Facility in New Orleans East,

Planning and Construction

Orleans $2,250,000

09-304Metropolitan Human

Service District

Mental Health Facility, Planning,

Renovation, Construction for

Central City

Orleans $2,750,000

09-304Metropolitan Human

Service District

New Orleans Adolescent

Hospital, Renovation of Facility,

Planning and Construction

Orleans $5,000,000

19-603University of New

Orleans52

Human Performance Center

Renovations for Fine Arts and

Music Departments, Planning

and Construction

Orleans $200,000

19-604NLSU Health Sciences

Center New Orleans

Renovations and Improvements

for Uptown Campus, Planning

and Construction

Orleans $2,500,000

19-673New Orleans Center

for the Creative Arts1232

Replace HVAC System, Planning

and Construction Orleans $700,000 $700,000

19-673New Orleans Center

for the Creative Arts1382

Press Street Studios,

Furniture/Fixtures/Equipment,

Planning and Construction

NOTE: P2 was $850 K in HB2.

IEB moved $850 K of P2 to P5

on 2-21-13

Orleans $0

36-P17 Port of New Orleans 1585Milan Upland Yard

Improvements, Planning and

Construction

ORLEANS $1,000,000 $1,000,000

50-ML3 New Orleans 637

Behrman Park Improvements -

New Soccer Facility, Planning and

Construction, Master Planning

Orleans $500,000 $500,000

50-ML3 New Orleans 1979Fourth District Police Station,

Planning and ConstructionOrleans $300,000 $300,000

50-ML3 New Orleans 1980

Algiers Playgrounds, Renovation

of Restrooms, Lighting, Fencing,

and Playground Equipment

Orleans $225,000 $225,000

50-ML3 New Orleans Algiers Fire Station, Planning and

ConstructionOrleans $150,000 $150,000

50-ML3 New Orleans

Samuel Square, Renovation and

Upgrades, Including Demolition

of Existing Playground,

Installation of New Play

Equipment and re-Grade Fields,

Planning and Construction

Orleans $250,000

11 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

Agency # Agency NameHB2

BDS #Project Title Parish P2 Total in HB2

P2 CLOC Approved

by SBC

50-ML3 New Orleans

Taylor Pool and Playground,

Renovations and Upgrades,

Including Repair and Renovations

of Basketball Courts and Pavilion,

Replacing Perimeter Fencing,

Installation of New Water

Fountains, and Re-Grade Fields,

Planning and Construction

Orleans $250,000 $250,000

50-ML3 New Orleans

George W. Carver Playground,

Renovations and Upgrades,

Including Repair and Renovations

of Basketball Courts and Pavilion,

Renovations to Bathrooms and

Concessions Building, Demolition

of Existing Playground and

Installation of New Play

Equipment, Planning and

Construction

Orleans $450,000 $450,000

50-ML3 New Orleans Donsereaux Harrison Playground Orleans $200,000

50-N05New Orleans

Exhibition Hall

Authority

1971Hall A Renovation, Planning and

ConstructionOrleans $10,000,000 $10,000,000

50-N12Louisiana Children's

Museum1322

Louisiana Children's Museum

Early Learning Village, Planning

and Design

Orleans $485,000 $485,000

50-N25 WYES TV New Orleans 1002WYES Katrina

Rebuilding/Equipment Project,

Planning and Construction

Orleans $2,000,000 $1,000,000

50-N51NO Jazz & Heritage

Foundation1005

The Jazz & Heritage Center

Renovation and Addition 1225

North Rampart, Planning and

Construction

Orleans $75,000 $75,000

50-N74National World War II

Museum1773

National WWII Museum

Campaigns Gallery Exhibits Const.

and LA Memorial Pavilion Train

Station Experience Including

Connecting Higgins Ped Bridge

and Canopy, Planning and

Construction

Orleans $750,000 $750,000

50-N98 Kingsley House 663Kingsley House Renovations, New

Construction, and Major RepairsOrleans $100,000 $100,000

50-NAYOGDEN MUSEUM OF

SOUTHERN ART1069

Ogden Museum/Taylor Library

RenovationORLEANS $265,000 $265,000

50-NBBLighthouse for the

Blind1853

Economic Development Project,

Planning and ConstructionOrleans $500,000 $500,000

50-ND3 Orleans Parish Sheriff 2019Mental Health Facility, Planning

and ConstructionOrleans $100,000 $100,000

50-NJ9 Dryades YMCA 118Technical Training Center,

Planning and ConstructionOrleans $450,000

50-NQFGentilly Development

District696

Milne Boys Home, Planning and

ConstructionOrleans $50,000

50-NQJHunters Brotherhood

Alumni - NAE1688

Lewis Playground Site

Development, Planning and

Construction

Orleans $175,000

50-NSP Eden House 1975Eden House, Acquisition and

Renovation, Planning and

Construction

Orleans $400,000

50-NSRJunior League of

Greater New Orleans1999

Renovate Headquarters Building,

Including HVAC System, Planning

and Construction

Orleans $65,000 $65,000

12 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

Agency # Agency NameHB2

BDS #Project Title Parish P2 Total in HB2

P2 CLOC Approved

by SBC

50-NSRJunior League of

Greater New Orleans2000

Renovate Thrift Shop and Annex,

Including Parking Lot, Planning

and Construction

Orleans $135,000 $135,000

50-NSRJunior League of

Greater New Orleans2001

Renovate Annex Building and Re-

Purpose Space, Including

Installation of Handicap

Accessibility Ramp and Bathroom

Upgrades, Planning and

Construction

Orleans $200,000 $200,000

50-NSTDowntown

Development District

Improvements to Girod Street,

Planning and ConstructionOrleans $300,000 $300,000

50-NSV

Downman Road

Economic

Development District

Downman Road Economic

Development District

Enhancement, Beautification,

Planning and Construction

Orleans $200,000

50-NT2MERCY ENDEAVORS

SEN CITZ CENTR1389

Irish Channel St. Andrew Street

Elderly Resource CenterORLEANS $75,000 $75,000

50-S36 Orleans Parish School

Board

Medical Arts High School

Program (Dibert Building),

Planning and Construction

Orleans $1,000,000

04-139 Secretary of State 145

Chennault Aviation and Military

Museum Hanger Building and

Equipment, Planning and

Construction

Ouachita $50,000 $50,000

19-629University of Louisiana

- Monroe73

Sandel Hall Renovation, Planning

and ConstructionOuachita $100,000

19-629University of Louisiana

- Monroe74

Stubbs Hall Reroofing, Planning

and ConstructionOuachita $635,000 $635,000

50-MS7 STERLINGTON 1814Service Road, Planning and

ConstructionOUACHITA $120,000 $120,000

50-MV2 West Monroe 509

Creation of a Hurricane/Disaster

Shelter by Expanding the West

Ouachita Senior Center, Planning

and Construction

Ouachita $30,000 $30,000

50-NSK RAYS OF SONSHINE 1714 Project Elevate! OUACHITA $50,000

07-270 DOTD - Administration

1801 Highway 23 Elevation for Three

Miles of Emergency Route Flood

Protection, Planning and

Construction

PLAQUEMINES

$1,000,000 $1,000,000

50-J38 Plaquemines Parish 1818Emergency Evacuation Complex,

Planning and ConstructionPlaquemines $500,000 $500,000

50-J38 Plaquemines ParishBelle Chasse Parks, Planning and

ConstructionPlaquemines $100,000 $100,000

50-J38 Plaquemines ParishIntracoastal Buoy Project,

Planning and ConstructionPlaquemines $200,000

50-N62Plaquemines Parish

Law Enforcement

District

1936Sheriff's Training Center,

Planning and ConstructionPlaquemines $60,000 $60,000

36-P49Pointe Coupee Port

Commission1566

Pointe Coupee Parish Port Capital

Improvements, Planning and

Construction

Pointe Coupee $300,000 $300,000

50-J39 Pointe Coupee Parish 1616False River Ecosystem

Restoration Project, Planning and

Construction

Pointe Coupee $500,000 $500,000

50-MG8 Livonia 1413

Emergency Shelter Supply Room,

Addition to the Livonia

Community Center, Planning and

Construction

Pointe Coupee $100,000

04-139 SECRETARY OF STATE 1456Tioga Heritage Museum, Planning

and ConstructionRAPIDES $50,000

09-340

Office of

Developmental

Disabilities

1948

Central Louisiana State Hospital

Relocation to Pinecrest, Planning

and Construction

Rapides $1,000,000 $1,000,000

13 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

Agency # Agency NameHB2

BDS #Project Title Parish P2 Total in HB2

P2 CLOC Approved

by SBC

19-602 LSU Alexandria 209Multi-Purpose Academic Center,

Planning and ConstructionRapides $500,000

50-M05 Alexandria 100

Sugarhouse Road/Eddie Williams

Blvd. to LA Hwy. 1, Phase I and

Phase II, Planning and

Construction ($5,000,000 Local

Match)

Rapides $500,000 $500,000

50-M16 Ball 462Sewer Extensions in the Springhill

Road AreaRapides $50,000

50-M93 Forest Hill 479

Renovation of Community

Facilities, Planning and

Construction ($375,000 Local

Match)

Rapides $150,000 $150,000

50-N33

England Economic and

Industrial

Development District

1943

England Airpark Hospital

Renovations and Conversion of

School to Outpatient Facility,

Planning and Construction

($5,000,000 Local Match)

Rapides $6,800,000 $6,800,000

50-M56 Coushatta 1760

Maintenance Barn for Town of

Coushatta Public Works

Department, Planning and

Construction

Red River $55,000

50-J42 Richland Parish 1984Sapa Drive Improvements,

Planning and ConstructionRichland $250,000 $250,000

50-M61 Delhi 476Richland Parish Recreational and

Learning Center, Planning and

Construction

Richland $100,000 $100,000

50-MO9 Rayville 1985Railroad Spur, Planning and

ConstructionRichland $250,000 $250,000

50-J43 Sabine Parish 272Plainview Road Rehabilitation,

Planning and ConstructionSabine $1,000,000 $1,000,000

50-NCNSouth Toledo Bend

Waterworks District372

Esto Booster Station Discharge

and Supply Line ReplacementSabine $65,000 $65,000

36-P20 St. Bernard Port 1820Rehabilitation of Dock #1 Section

A Seawall, Planning and

Construction

St. Bernard $3,800,000 $3,800,000

50-N07St. Bernard Parish

Sheriff657

Arabi Sub-Station, Planning and

ConstructionSt. Bernard $200,000

50-J45 St. Charles Parish 1127West Bank Hurricane Protection

LeveeSt. Charles $525,000 $525,000

50-MB3 GreensburgTaylor Street Bridge, Planning

and ConstructionSt. Helena $50,000

50-MJ8 Montpelier 1757Administration Building,

Acquisition, Planning and

Construction

St. Helena $190,000 $190,000

50-NER St. Helena Hospital 522Drainage and Parking

Improvements, Planning and

Construction

St. Helena $55,000

36-P21Port of South

Louisiana1433

Liquid Petroleum Dock Facility in

St. James Parish, Planning and

Construction

St. James $55,000

50-J47 St. James Parish 994St. James Parish Land Acquisition,

Planning and ConstructionSt. James $1,000,000 $1,000,000

50-J47 St. James Parish 1539Eastbank Master Drainage Plan

Study St. James $130,000

36-P21Port of South

Louisiana1957

Warehouse, Planning and

Construction

St. John the

Baptist$100,000 $100,000

50-J49 St. Landry Parish 1997

Hurricane Evacuations and

Homeland Security Coordination

and Related Renovations,

Planning and Construction

St. Landry $195,000 $195,000

14 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

Agency # Agency NameHB2

BDS #Project Title Parish P2 Total in HB2

P2 CLOC Approved

by SBC

50-MA9 Grand Coteau

Police and Utility Departments

Roof, Air Conditioning Unit for

Town Hall, Handheld Meter

Reader, Abandon and Plug Water

Well

St. Landry $60,000 $60,000

50-J50 St. Martin Parish 1228Road Improvements on Four-Mile

Bayou Road, Planning and

Construction

St. Martin $200,000 $200,000

50-MM8 Parks 1404Municipal Complex, Planning and

ConstructionSt. Martin $50,000

50-MQ5 St. Martinville 1562Sewer Upgrade, Planning and

ConstructionSt. Martin $350,000 $350,000

50-J51 St. Mary Parish 97Infrastructure Improvements at

the Charenton Canal Industrial

Park

St. Mary $150,000 $150,000

50-J51 St. Mary Parish 1299

Installation of Culverts and

Associated Infrastructure in

Middle Road Drainage Canal -

Bayou Vista LA for Sub-Gravity

Drainage District #1 of St Mary

Parish Gravity Drainage District

#2, Planning and Construction

St. Mary $460,000 $460,000

50-MK2 Morgan City 1588Lake End Parkway Cabins,

Planning and ConstructionSt. Mary $1,000,000 $1,000,000

50-J52 St. Tammany Parish 1273St. Tammany Parish Fishing Pier,

Planning and ConstructionSt. Tammany $400,000 $400,000

50-J52 St. Tammany Parish 1733Emergency Shelter and Livestock

Facility Addition, Planning and

Construction

St. Tammany $980,000 $980,000

50-M57 Covington 1385Extensions and Improvements to

Water Distribution System,

Planning and Construction

St. Tammany $220,000

50-M90 Folsom 478

Road and Street Repairs,

Planning and Construction (Cash

and/or In-Kind Match Required)

St. Tammany $15,000

50-MH8 MANDEVILLE 1485Mandeville Trailhead Property

AcquisitionST. TAMMANY $400,000 $400,000

50-MN1 Pearl River 492Pearl River Museum, Planning

and ConstructionSt. Tammany $25,000

50-MT1 Sun 500Town Hall Renovations, Planning

and ConstructionSt. Tammany $15,000

50-NG2Northshore Harbor

Center525

Northshore Harbor Center

Purchase of Additional

Equipment

St. Tammany $175,000 $175,000

01-107Division of

Administration1

Local Government Assistance

ProgramStatewide $10,000,000 $10,000,000

01-107Division of

Administration2

Community Water Enrichment

ProgramStatewide $5,000,000 $5,000,000

01-107Division of

Administration397

Statewide Roofing,

Waterproofing, and Related

Repairs and Equipment

Replacement Program

Statewide $2,625,000

01-107Division of

Administration409

Major Repairs for State Buildings

Based on Statewide Condition

Assessment, and Infrastructure,

Planning and Construction

Statewide $9,000,000

01-112Department of Military

Affairs9

Statewide Backlog of

Maintenance and Repair (BMAR),

Phase 3, and Statewide

Infrastructure Rehabilitation,

Phase 3

Statewide $500,000 $500,000

05-252Office of Business

Development15

Economic Development Award

Program For Infrastructure

Assistance (Supplemental

Funding)

Statewide $10,000,000 $10,000,000

15 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

Agency # Agency NameHB2

BDS #Project Title Parish P2 Total in HB2

P2 CLOC Approved

by SBC

07-270 DOTD - Administration 28

Secretary's Emergency Fund for

Bridge Damages, Other

Reimbursements, Local Matching

Dollars, Federal Funds, and

Opportunity Grants Subject to

the Provisions of R.S. 48:232

Statewide $2,500,000 $2,500,000

07-270 DOTD - Administration 976Highway Program (Up to

$4,000,000 for Secretary's

Emergency Fund)

Statewide $20,000,000

08-400Corrections -

Administration35

Statewide Fencing Project,

Planning and ConstructionStatewide $600,000 $600,000

19-671 Board of Regents 1630Land Acquisition for Post

Secondary Educational

Institutions

Statewide $2,500,000

09-344Hammond

Developmental Center

Repairs and Renovation at the

North Lake Supports and Services

Center, Planning and

Construction

Tangipahoa $500,000 $500,000

19-634Southeastern

Louisiana University75

Computer Science and

Technology Facility

Improvements and Expansion,

Planning and Construction

Tangipahoa $1,000,000 $1,000,000

36-P33South Tangipahoa

Parish Port

Commission

1931Port Manchac Terminal

Improvements, Planning and

Construction

Tangipahoa $470,000 $470,000

50-J53 Tangipahoa Parish 1559

Courthouse and Courthouse

Annex Renovations and

Expansions, Acquisitions,

Planning and Construction

($500,000 Local Match)

Tangipahoa $490,000 $255,000

50-MB9 Hammond 106Air Traffic Control Tower,

Planning and Construction

($450,000 Local Match)

Tangipahoa $750,000 $750,000

50-MB9 Hammond 1604Police Station, Acquisition and

Renovation, Planning and

Construction

Tangipahoa $600,000 $600,000

50-MD5 Independence 1473

Sewerage Treatment and

Sewer/Water Lines Repairs,

Planning and Construction (Cash

and/or In-Kind Match Required)

Tangipahoa $20,000 $20,000

50-MD5 Independence 1740 Independence Area Community

Pavilion, Planning and

Construction

Tangipahoa

$155,000 $155,000

50-MT6 Tickfaw 1249Drainage Improvements on

Highway 442 East and West,

Planning and Construction

Tangipahoa $115,000 $115,000

50-J54 Tensas Parish 456Tensas Parish Port/Port Priority

Site Plan, Planning and

Construction

Tensas $100,000

19-731L.E. Fletcher Technical

Community College236

Diesel Marine, Welding and

Transportation Building for

Fletcher Technical Community

College

Terrebonne $200,000 $200,000

19-731L.E. Fletcher Technical

Community College1823

Integrated Petroleum

Technologies Program (IPT) Lab

and Classroom Building, Planning

and Construction

Terrebonne $4,000,000 $4,000,000

36-P23Terrebonne Port

Commission1749

Slip Dredging and Improvements

for Terrebonne Port Commission

Government Multi-Use Complex

Terrebonne $710,000 $710,000

50-J55 Terrebonne Parish 1808

Terrebonne Parish Consolidated

Government, Upper Bayou

Dularge Pump Station, Planning

and Construction

Terrebonne $200,000 $200,000

16 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

Agency # Agency NameHB2

BDS #Project Title Parish P2 Total in HB2

P2 CLOC Approved

by SBC

50-M85 Farmerville 617Union Village Fire Station,

Acquisitions, Planning and

Construction

Union $70,000

50-NW1Union Parish Law

Enforcement District704

New Law

Enforcement/Services/Training/

Emergency Shelter Complex,

Planning and Construction

($500,000 Local In-Kind Match;

$1,100,000 Federal Match)

Union $50,000 $50,000

50-M60 Delcambre 1335Water Distribution and Storage

System Improvements, Planning

and Construction

Vermilion $450,000 $450,000

50-MB7 Gueydan 314Street Improvements, Planning

and Construction ($112,000 Local

Match)

Vermilion $150,000 $150,000

50-ME8 Kaplan 319Public Safety Complex, Planning

and ConstructionVermilion $150,000 $150,000

50-MI8 Maurice 331Wastewater Treatment Facility

and Collection System Upgrade

($1,792,800 Federal Match)

Vermilion $250,000

50-J58 Vernon Parish 99Vernon/Fort Polk Thoroughfare,

Planning and ConstructionVernon $5,700,000 $5,700,000

50-MD1 Hornbeck 1103

Emergency Connection with

West Vernon Waterworks District

and Inline Booster Station,

Planning and Construction

Vernon $300,000 $300,000

50-MD1 Hornbeck 1295Emergency Connection with

Anacoco Water System, Planning

and Construction

Vernon $300,000 $300,000

50-ML2 New LlanoStreet Improvements, Planning

and Construction Vernon $75,000 $75,000

50-MQ1 ROSEPINE 1094Rosepine Wastewater Treatment

Plant ImprovementsVERNON $550,000 $550,000

50-MQ1 ROSEPINE 1095Water System Improvements,

Town of RosepineVERNON $200,000 $200,000

50-M27 Bogalusa 1163 Cassidy Park Improvements and

Renovation, Planning and

Construction

Washington

$160,000

50-M27 Bogalusa 1164Emergency Sewer Collection

System Evaluation and Repairs,

Planning and Construction

Washington $160,000 $55,000

50-M27 Bogalusa 1636Extension of Willis Avenue to

Highway 21, Planning and

Construction

Washington $95,000

50-M95 Franklinton 1862Industrial Park Property and

Acquisition and DevelopmentWashington $35,000

50-NNRWashington Parish

Recreation District #1538

Multi-Purpose Recreation

Facility, Land Acquisition, Master

Planning, Design and

Construction

Washington $100,000

50-MC5 Heflin 1472Conversion of Gym into

Multipurpose Facility, Planning

and Construction

Webster $150,000 $150,000

50-MJ5 Minden 1331Potable Water Ground Storage

Tank, Planning and ConstructionWebster $215,000 $215,000

50-MR2 Sibley 1183Wastewater Collection

Improvements, Planning and

Construction

Webster $100,000 $100,000

50-MS5 Springhill 1534Wastewater Collection System

Improvements, Planning and

Construction

Webster $75,000 $75,000

50-NLRHorseshoe Road Water

System, Inc.690

Horseshoe Water System,

Planning and ConstructionWebster $125,000 $125,000

17 of 17

Green highlight: partial CLOC recommendation of the P2 appropriated to project

Agency # Agency NameHB2

BDS #Project Title Parish P2 Total in HB2

P2 CLOC Approved

by SBC

36-P03Greater Baton Rouge

Port Commission1996

Inland River Marine Terminal

Dock and Access Roadway

Construction Project, Planning

and Construction

West Baton

Rouge$1,000,000 $1,000,000

50-M33 Brusly 296New Police Department

Headquarters and Sub District #2

Fire Station

West Baton

Rouge$275,000

50-NAHWest Carroll Parish

Sheriff664

West Carroll Parish Jail Education

and Visitation Room, Planning

and Construction

West Carroll $55,000

08-402Louisiana State

Penitentiary39

Electrical Distribution System

Upgrade, Planning and

Construction

West Feliciana $300,000 $300,000

08-402Louisiana State

Penitentiary823

Main Prison Shower and

Cellblock Plumbing Upgrade,

Planning and Construction

West Feliciana $165,000 $165,000

50-MQ3 St. Francisville 1000

Natural Gas Distribution System

Rehabilitation and Improvement,

Planning and Construction

West Feliciana $305,000 $305,000

50-MR4 SIKES 1544Village of Sikes Water System

Extensions and ImprovementsWINN $1,000,000 $1,000,000

$253,875,000 $189,595,000