Transcript
Page 1: Engr. Khairulmuzammil Experience Profiling- Development and Innovation

Page 1 of 5

DO NOT COPY

Exprofile Email to [email protected]

To request full complete resume

RESEARCH & PROPOSAL PAPERS

PLANNING AND MANAGING VESSEL CHARTERING INSPECTION AND FINAL NEWBUILDING

CONTRACT

CATSHIP Newbuilding Project Management Proposal

LST Owner Principle Design & Operational Requirements

Research Study on Planned BUKU Hijau Performance of Newbuilding Livestock Vessels

CATSHIP DESIGN STUDY COMPARISON

Time Charter vs Voyage Charter

LSV Innovation PLAN

SCM Function & Operation Chart

SCM ORGANISATION BUSSINESS STRUCTURES

SCM QI INFO

Propose Rule Requirements on Main Class Tailshaft Survey

Basic Maritime Course for SME Bank Technical Staff

SEAS TRAINING & BUDGETING Plan Proposal for Gagasan Carriers Tanker Project at China

Certification of Diesel Engines for In Service Procedural Guidelines

Diesel Engine Maintenance Certificate

Case Study

An Overview of Indication of QMS Deterioration and Recommendation for Improvement

LKC 118_Case by Case Guidance on Accepting Non-Certify Equipment, Product and Material

NB AND CERTIFICATION SUPERVISION TASKS AND MILESTONES

NC Stat Certs & Survey Systematic

PAN & NB QUARTERLY OPERATING & PERFORMANCE RESULTS SUMMARY

RECOMMENDED REPAIRS SL FILLET MET SS BUTT WELDS _MANAGERS KPI CARD

SCM Bulk Carrier Non Committal Pre-Class Entry Survey Planning, Execution, Closing and Survey Guidance

SCM AREA and BRANCH OFFICES DOC ROUTE

SCM Routing of External and Internal Document

SCM HR Development and Planning

SCM MANAGER WEEKLY DASHBOARD

SCM INTERNAL REMINDER NOTE

Survey Planning Chargeable Time Spent

Template-Maritime Log Book

Summary of Advice, Counseling, Coaching Monitoring Verbal Warning Session

Company Business & Service Quality Performance Goal

HR Strategic Planning_MMQ1_2009

TL009-Alternative measures for engine girder

UNSCHEDULED MINUTES OF MEETING/DISCUSSION

AdHoc Technical Meeting

SCM Class Knowledge Based Assessment

GSEAS_Compressed natural gas fuelled engine installations

Document Guidance for Gas Fuelled Engine Installation

NON COMMITTAL PRE-CLASS ENTRY SURVEY REPORT

Condition Assessment of Slipway – CONCEPT, APPROACH AND METHOD

Engr. YUZRI Khairulmuzammil Development and Innovation

Page 2: Engr. Khairulmuzammil Experience Profiling- Development and Innovation

Page 2 of 5

DO NOT COPY

THIRD PARTY CONDITION INSPECTION OF MARINE SLIPWAY

Annexure to Certificate of Classification

HULL ANALYSIS OF ROYAL MALAYSIAN NAVY SHIPS for RMN FLEET SYSTEMS COMMAND

Docking and Repairs Assisted Management Program (DRAMP)

SHIPS CONDITION AND PERFORMANCE ASSESSMENT (SCAPE PROGRAM)

Special survey planning and execution

EXPERIENCE FEEDBACK NOTE

EFN 06_KY_Full Term Report Verification

EFN 01_CCs_MOs deletion report

EFN 04_KY_Full Term Report Verification

PRESENTATION PAPERS

APMM Presentation-20th June 2008

SCMTAC_OPERATION ROADMAP _09082008

NEWBUILDING NAVAL PATROL CRAFT- “SCM CLASS CONCEPT AND PROJECT MANAGEMENT”

RMN SHIPS’ HULL STRUCTURAL ASSESSMENT

TRAINING PRESENTATION MATERIALS

KPI Briefing for Managers

SEATRAQS_ BOTTOM SURVEY

SEATRAQS_ CLASSIFICATION CONCEPT AND SYSTEMATIC

SEATRAQS_ HULL STRUCTRUAL SURVEY

SEATRAQS_ Principle of Annual Survey

SEATRAQS_ Principle of Intermediate Survey

SEATRAQS_ Principle of Renewal Survey Hull

SEATRAQS_ Renewal Class Machinery Survey

SEATRAQS_ Survey Planning and Execution

SEATRAQS_ SCM MANAGEMENT OF CHANGE

SEATRAQS_ Surveyors, Engineers & Auditors Training & Qualification Scheme

SEATRAQS_ SEAS R&R AND COE

SEATRAQS_ ISM Code Basic Training

SEATRAQS_ ISPS Code Basic Training

BASIC MARINE SURVEY COURSE- CLASS SYSTEM AND CONCEPT

Basic Hull Structural Survey

Langkawi Workshop_MMIA

SCM CUSTOMER RELATIONS DAY- Survey and Certification Systematic Updates 2008

SHIP SUPERITENDENT INTENSIVE COURSE- CLASS CONCEPTAND SYSTEM

V LEARN FOR CHANGE_PLAN

SEATRAQS_ SHIPS CONSTRUCTION FROM THE PERSPECTIVE OF OWNER'S REP

TECHNICAL REPORTS

Asia Bright _ Survey Training and Inspection Report

CLASS ADDITIONAL DEFECT LISTS IN CONNECTION WITH TESTS AND TRIALS

BHT#23 and BHT#24 SHIPS CONDITION AND PERFORMANCE ASSESSMENT (SCAPE PROGRAM) for

BOUSTEAD Heavy Industries Sdn Bhd

Builder Success- Hull Damaged Survey

Builder Success- STATEMENT OF CONDITIONAL CLASS MAINTENANCE

Fajar Samudera- STATEMENT OF CONDITIONAL CLASS MAINTENANCE

INAI ROSE - - Hull Damaged Survey

PRIGI- NON COMMITTAL PRE-CLASS ENTRY SURVEY

“SITC BUSAN” and SITC YANTAI -Non Committal Pre-Class Entry Survey

“TUAH TANKER TIGA” - CAP HULL AND MACHINERY EXECUTIVE REPORT AND DECLARATION

SAIPAN PIONEER - SIGHTING/ANNUAL SURVEYS IN CONNECTION WITH CLASS ENTRY SURVEYS

“NAUTICA TG. PELEPAS” - NON COMMITTAL CLASS ENTRY CONDITION SURVEY

Xing Ming 98- Non-Committal Class Entry Condition Survey Findings

“SENANG EKSPRES” (ALUMINIUM PASSENGER VESSEL)- NON COMMITTAL CLASS ENTRY CONDITION

SURVEY

Page 3: Engr. Khairulmuzammil Experience Profiling- Development and Innovation

Page 3 of 5

DO NOT COPY

KD SRI INDERAPURA-THIRD PARTY WITNESS LOAD TESTING OF SHIPBOARD DERRICK CRANE

(ELECTRO HYDRAULIC CARGO HANDLING TYPE LST-1179 CLASS SHIP)

NAUTICA NOVA SHIPBUILDING & ENG. SDN BHD.- THIRD PARTY WITNESS LOAD TESTING OF

SYNCHROLIFT

Kenangan 6 (Steel Passenger Vessel)-Hull Damaged Survey

ANBANG- SURVEY FOR CHANGE OF FLAG name and ownership

FORMS AND CHECKLISTS

TRANSMITTAL FORM - DRAWINGS AND CONTRACT SPECIFICATIONS APPROVAL REVIEW

AND COMMENT

PBHH Buyer Maker List

CERTIFICATE OF HULL INSPECTION

SCM CIRCULAR FORMAT

INTERNAL MEMO_ADMINISTRATIVE AND GENERAL WORKS INSTRUCTION

REQUEST FOR CHANGE OF DRAWING / DOCUMENT STATUS

Personnel Weekly Dashboard

ACKNOWLEDGEMENT AND ACCEPTANCE OF RELIEF DUTIES

CLEAR TABLES-PERSONNEL WORKS COMPLETION DECLARATION, HANDING OVER NOTE

AND RESUME DUTIES

SCM New CV Format

SCM CRM CUSTOMER RELATION MANAGAMENT: EAST MALAYSIA CUSTOMER RELATIONS

DAY

SIS OPERATING & PERFORMANCE QUARTELY RESULT SHEET

SCM CORRESPODENCE LETTER_FAX_ TEMPLATE VER.4

CERTIFICATE OF INSPECTION OF MARINE SLIPWAY

BOLLARD PULL TEST CERTIFICATE

CERTIFICATE FOR PROPELLER SHAFT AND COUPLING

CERTIFICATE OF INSPECTION AND TESTING

Approval of Service Suppliers Audit Report

Checklist for Initial & Renewal Audit

Template Certificate of Approval

SIS DOC VERIFICATION COMMENTS PRIOR TO ISSUANCE OF FT Cert

PROJECT MANAGEMENT DOCUMENT

NEWBUILDING TECHNICAL REQUIREMENT DETAILS

BHLV NB Project Management Structure

BHLV_Manage Tasks, Planning and Scheduling

5VR_Project Management Governing Manual

FIVES NWB Project Management Work Process

WEEKLY GENERAL PROJECT STATUS REPORT

PROJECT STATUS REPORT

MINUTES OF WEEKLY PROGRES AND MONITORING MEETING

BUILDER’S REPLY To BUYER’S COMMENT

CATTSHIP NB PROJECT-RFP STATUS

CATTSHIP Pre-Contract Project Work Summary

WEEKLY PROJECT EXECUTION TIME SHEET

KICK OFF MEETING AGENDA

Sea Trials Planning

SURVEY FINDING AND CORRECTIVE ACTION REQUEST (CAR)

NEWBUILDING DRAWING REQUIREMENT FOR APPROVAL

DRAC TECHNICAL TRANSMITTAL LETTER

TECHNICAL MANUALS

SEATRAQS PROCEDURE MANUAL

BUSINESS OPERATION DOCUMENT

PROJECT VISIT SUMMARY REPORT

Statement of Ship Newbuilding

PBHH Company Profile

Califa7Seas-Cash Flow, 1 Yr

Page 4: Engr. Khairulmuzammil Experience Profiling- Development and Innovation

Page 4 of 5

DO NOT COPY

BHLV Cover Letter_TEMPLATE

BHLV Management and Operational Plan + Budget

BHLV Mobilization Plan

BHLV Proposed Title, Salary Budget and Allowance

BHLV_BV_INVOICE FORM

Capital+Ops Cost

PROJECT VISIT SUMMARY REPORT

SIGNING CEREMONY INVITATION CARD

Signing Ceremony Brochure Design

Brochure and Movie Concept Design

PBHH Ceremony Backdrop Banner Design

PBHH NB Signing Ceremony Name Lists

SIGNING CEREMONY INVITATION CARD

Q1-Q2-Q3-Q4 OPERATING PERFROMANCE AND RESULT

SCM Operating Goal 2010 & Performance 2008 vs 2009

SCM VESSEL REGISTER INFO(VRI)

MMQ2_SEATRAQS AND RULE DEVELOPMENT

SCM Business & Marketing Monitor

Monitor Business Marketing Summary

SCM AOP-ANNUAL OPERATING PLAN

SCM INFOLETTER

SCM NEWSLETTER

SCM_PETRONAS EXHIBITION CONCEPT_ BUNTING, BOOK MARK, KEY CHAIN AND POSTER DESIGN

SHIPOWNERS WITH GOOD PAYMASTER

GM_BM VISITING REPORT AND RESOLUTION-CONCLUSION

SCM 2010 CRITICAL SALES FORECAST

MANAGE OSMOSYS USERS FEEBACK

SEATRAQS QUALIFICATION PROCESS FLOW

PRACTICAL TRAINING REQUIREMENT

PRACTICAL RECORD CHART

TRAINING RECORD

COC PLANNING AND MONITORING

COC ONBOARD_SITE VERFIFCATION AND MONITORING PLAN

COC REQUEST

CERTIFICATE OF COMPETENCE

BASIC PRINCIPLE OF CLASS MANAGEMENT & OPERATION_OFFICE FAMILIARIZATION TRAINING

SCM MASTER PLAN_COURSE AND TRAINING REQUIREMENTS FOR TECH AND NON_TECH STAFF

KMSEATRAQS_BASIC PRINCIPLE OF CLASS MANAGEMENT AND OPERATION

KMSEATRAQS_Certificate of Trainer Model

KMSEATRAQS_Certificate of Training Model

Certificate of Training for SCM CSPRO

TRAINING_RECORD_CHART_Practical Student

VLearn 4 Change - Articles and Presentation

VL4C DIPLOMA

WEEKLY - STATUS OF E-MAIL COMMUNICATION ON TACKLING PROBLEMATIC ISSUES

SCM Quality Monitoring Plan & Indeks

SCM 14 QSPIN

GM OFFICE PA REPORT 1 _ WEEKLY MONITORS GM INTERNAL AND EXTERNAL CORRESPONDECE

MIBAS TECHNICAL REQUIREMENTS FOR ACCREDITATION OF SHIP INSPECTION

KNOWLEDGE CENTRE(KOC) MASTER LISTS

SCM-BKI MOA COMMUNICATION AND COORDINATION ENHANCEMENT FOR CLASSIFICATION AND

OFFSHORE SERVICES

SCMBSC Data Report Summary

ANALYSIS AND CALCULATION

RO FW Generator Capacity Analysis

Analysis of CMO Business Take Over Proposal

World Catt Data Summary

World Catt Data Summary with Containers

Page 5: Engr. Khairulmuzammil Experience Profiling- Development and Innovation

Page 5 of 5

DO NOT COPY

CATTSHIP Optimal Design Exponential Curve

FO Price Estimates

Voyage Duration Table

Feasible Livestock Time Charter + Operating Cost

Final Estimation of Principal Particulars

NB 7000 Heads Cattle Price Comparison Guide

Price Estimate Newbuilding GROOT Design Ver.1_11000Heads.xls_Rev.3


Top Related