Dick Loveless EMU Operations mtg 18 January 2012 1
Endcap Shielding• Design Goals
• Shield the endcap beam pipe so maintenance workers are not irradiated
• Estimate 2 cm of Pb is sufficient – 2.5 tonnes• Easy to install – workers are not irradiated
• Protect the beam pipe from maintenance workers and falling objects
• Do not interfere with maintenance work on the chambers etc.
• Status• Conceptual design – beginning detailed drawings• Propose for Pb-free installation in LS1 (no beam
pipe!)
Dick Loveless EMU Operations mtg 18 January 2012 2
2500 KG of lead only 1290 kg estimated total
Length and weight comparison of YE1-YE2 shielding and YE2-YE3 shielding
This view represents length but not shape of shielding
YE1 closed and YE2 at 3.05m Physical gap is 2556mmYE2 at 3.9m and YE3 at 7.64m (delta 3740)
Physical gap is 3673mm
Dick Loveless EMU Operations mtg 18 January 2012 3
YE1/2 shielding assembly extended with clam shells open
Dick Loveless EMU Operations mtg 18 January 2012 4
YE1/2 shielding assembly extended with clam shells closed
Dick Loveless EMU Operations mtg 18 January 2012 5
YE1/2 shielding assembly retracted with clam shells open
Lead half cylinders
Dick Loveless EMU Operations mtg 18 January 2012 6
Step 1 shielding assembly is lowered into guide pinsEstimated lead weight is 1000kg
Guide pins
ME3 ME2
Dick Loveless EMU Operations mtg 18 January 2012 7
Mounting and guidance concept
Guide rods extend out 200mm from the spacer ring
Permanent shielding mounts provide horizontal surface for feet to rest
Dick Loveless EMU Operations mtg 18 January 2012 8
Mounting of guide rod
Quick release pin inserted here
Flange on pinrod
Dick Loveless EMU Operations mtg 18 January 2012 9
Step 2 Assembly is lowered until it is low enough for extension into the spacer rings
Dick Loveless EMU Operations mtg 18 January 2012 10
Step 3 assembly is extended into the spacer rings and the load is transferred from the crane to the spacer rings
Dick Loveless EMU Operations mtg 18 January 2012 11
Step 4 Clam shell is closed around the beam pipe
Dick Loveless EMU Operations mtg 18 January 2012 12
Step 5 feet are secured
Lips to constrain location
Dick Loveless EMU Operations mtg 18 January 2012 13
Draft model of YE2/3 assembly in gap20mm of lead weighs 3600 kg
Dick Loveless EMU Operations mtg 18 January 2012 14
Side view of ye2/3 assembly
Dick Loveless EMU Operations mtg 18 January 2012 15
End view of shielding assemblyShielding clam shells in the open position
Dick Loveless EMU Operations mtg 18 January 2012 16
End view of ye2/3 shielding assy
Dick Loveless EMU Operations mtg 18 January 2012 17
Assembly without motor drive actuators. Uses crane to lower clam shell halves after the frame sets down.