CMS Endcap Resistive Plate Chambers Andrey Marinov On Behalf Of CMS Collaboration.

Upload: niyati

Post on 14-Jan-2016

50 views

Category:

Documents


0 download

DESCRIPTION

CMS Endcap Resistive Plate Chambers. Andrey Marinov On Behalf Of CMS Collaboration. CERN. Compact Muon Solenoid. Endcaps. Endcap RPC Schema. Final Gas mixture used in all tests 95.5 Freon 3.5 Isob 0.3 SF6 + RH 50% = 5000 ppm. Electrical Schema. 96 Channels . 3 sectors, 32 each - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: CMS Endcap Resistive Plate Chambers

CMS Endcap Resistive Plate Chambers

Andrey Marinov

On Behalf Of

CMS Collaboration.

Page 2: CMS Endcap Resistive Plate Chambers

NCPP 2007

• CERN

Page 3: CMS Endcap Resistive Plate Chambers

NCPP 2007

Compact Muon Solenoid

Endcaps

Page 4: CMS Endcap Resistive Plate Chambers

NCPP 2007

Page 5: CMS Endcap Resistive Plate Chambers

NCPP 2007

Endcap RPC Schema

Final Gas mixture used in all tests95.5 Freon 3.5 Isob 0.3 SF6 + RH 50% = 5000 ppm

Page 6: CMS Endcap Resistive Plate Chambers

NCPP 2007

Electrical Schema

• 96 Channels. 3 sectors, 32 each

• Standard LVDS output

• Controlling and monitoring of FEB threshold

• Monitoring of FEB temperature

Page 7: CMS Endcap Resistive Plate Chambers

NCPP 2007

BakelitePurchase Italy

Cut Clean Ship to Korea

Gaps Built in Seoul QC Ship to CERN

FEBs, Adaptor / DistributionBoards

Procure from ItalyOrder from Pakistan

Test in Italy Ship to CERN

Chamber Assembly

ISR Lab @ CERN QC Construction Database

Storage @ X5 Installation@SX5ProductionDatabase (CMS)

Mechanics Kit prep in China Procurement Cables and pieces

Shipped to CERN

Production Flow Process

http://cern.ch/cms-isr-endcap-rpchttp://cern.ch/rpc-endcap

CommissioningCOM1 & COM2

Dec 2003

Dec 2004

Page 8: CMS Endcap Resistive Plate Chambers

NCPP 2007

Production Of HV Gaps

KODEL

KODEL

• Seul – South Korea

Page 9: CMS Endcap Resistive Plate Chambers

NCPP 2007

The Assembly Lab At CERN - ISRGap QCChamber QC

Page 10: CMS Endcap Resistive Plate Chambers

NCPP 2007

http://cern.ch/cms-isr-endcap-rpc

Some Technological Steps

Page 11: CMS Endcap Resistive Plate Chambers

NCPP 2007

Testing Of Endcap RPC with Cosmic Rays

• Cosmic Stand.

Page 12: CMS Endcap Resistive Plate Chambers

NCPP 2007

Trigger ConfigurationCounters Setup

Page 13: CMS Endcap Resistive Plate Chambers

NCPP 2007

TriggerElectronics Setup

Page 14: CMS Endcap Resistive Plate Chambers

NCPP 2007

DAQ

Run Signal

Recording

EnableTrigger

RecordingStop recording

Reading the TDCs

Page 15: CMS Endcap Resistive Plate Chambers

NCPP 2007

Cosmic Test ComputingDAQ PC Database PC

MXI bus

TCP/IP

TCP/IP

Tracking PC

CAEN 1527HV power supply

TCP/IP

I2C MultiplexerFor slow control

RS232

Control PC

Page 16: CMS Endcap Resistive Plate Chambers

NCPP 2007

Cosmic Test DataStrips Profile

Strips Profile taken with only 2 scintilators from the top and bottom layers.

Page 17: CMS Endcap Resistive Plate Chambers

NCPP 2007

Cosmic Test DataStrips Profile

Including a small 50cm counter.

Page 18: CMS Endcap Resistive Plate Chambers

NCPP 2007

Cosmic Test DataTime Distribution

Page 19: CMS Endcap Resistive Plate Chambers

NCPP 2007

Cosmic Test Noise Profile

triggers

noisenoiserate N

NN

stripratestrips

noiserate NN

/32

Noise and Time distribution

Time bins 0-128 (1bin is 10ns)

Counts400ns

60ns

Noise

Noise

]/[]/[

]/[

22

2

1

1.

1.

cmHzcmHz

runstripsnoisecmHz

R

TSNR

239

119

Page 20: CMS Endcap Resistive Plate Chambers

NCPP 2007

Efficiency and Cluster Size

Scanning for efficiency and cluster size on a different voltages [8kv-9.6kv]

Page 21: CMS Endcap Resistive Plate Chambers

NCPP 2007

Cosmic Stand – Muons Tracking

Page 22: CMS Endcap Resistive Plate Chambers

NCPP 2007

HV Long Term Monitoring

Take sample of the current of each 2 minutes.

Take sample of the environmental conditions at the same time

Page 23: CMS Endcap Resistive Plate Chambers

NCPP 2007

Endcap RPC Databasehttp://forwardrpc.cern.ch/cms_forward_rpc/index.htm

Online • HV monitoring and QC IV

data storage• Searchable tracking for

individual Gaps / Chambers

• Production QC procedures • Mechanics• Cosmic Tests

VISIBLESEARCHABLEWORLDWIDE

Chamber QC data Gas gaps QC data

Environment conditions data

DATABASE

Production data

Results form Cosmic Test

Page 24: CMS Endcap Resistive Plate Chambers

NCPP 2007

SX5 – CMS home

Cessy – France

Page 25: CMS Endcap Resistive Plate Chambers

NCPP 2007

CMS YB-1

Page 26: CMS Endcap Resistive Plate Chambers

NCPP 2007

YB+2 Lowering In CMS Cavern

Page 27: CMS Endcap Resistive Plate Chambers

NCPP 2007

Future Plans

• Set Up the endcap RPC readout and controlling – Link Boards and Control Boards

• Lowering the YB-1 – probably in the end of 2007.

• Starting the LHC – 2008

Page 28: CMS Endcap Resistive Plate Chambers

NCPP 2007

Thank You For Your Attention

• For more details about CMS