Download - David Perkins david_perkins@fpl
![Page 2: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/2.jpg)
Objectives
•Improve system reliability
•Improve regulatory confidence
•Reduce out-of-service time
•Improve program efficiency and maintain a system of continuous sampling.
![Page 3: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/3.jpg)
Bi-weekly Sample Feasibility
Ability to increase sample frequency
•Equipment reliability
•Ability to achieve sensitivity for short-lived isotopes
•Impact on charcoal efficiency
•Excess filter loading
•Eliminate missed samples
![Page 4: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/4.jpg)
What We Found
•Remotely monitor equipment with telemetry and vacuum sensing transducer
•Maintain equipment with preventative maintenance
•Evaluation of I-131confirmed ability to achieve comparable sensitivity during 2-week collection period
•Charcoal efficiency testing for 2-week run time successful
•Effluent program informs REMP when I-131 release limits are exceeded for sample frequency adjustments
![Page 5: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/5.jpg)
Automatic Remote Monitoring
![Page 6: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/6.jpg)
Remote System Monitoring
•Reliability
•Capabilities
•Immediate problem notification
•Power outages
•Filter loading
•Equipment failure
•Cost effective
![Page 7: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/7.jpg)
TelemetricT646 MicroRTU
• Off-the-shelf proven technology
• Six digital inputs, four analog inputs; six control outputs
• Automatically communicates pressure, flow and other sensing signals
• Capable of alert and alarm functions
• Operating parameters are remotely programmable and remotely selectable
• Low cost to buy and operate
![Page 8: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/8.jpg)
How Telemetric Solution Works
![Page 9: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/9.jpg)
Flow Diagram with Telemetry
![Page 10: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/10.jpg)
Alarms/Response
Alert Probable Cause Shift Tech ActionLow pressure Torn filter, degraded tubing
or degraded pumpContact HPSupervisionEnter alert in HP log
High pressure Excessive filter loading Contact HPSupervisionEnter alert in HP log
A/C Power Loss GFI breaker tripLoss of power from supplysource.
Contact HPSupervisionEnter alert in HP log
A/C PowerRestored
A/C power restored totelemetry device and airsample pump.
None
![Page 11: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/11.jpg)
Equipment Maintenance
![Page 12: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/12.jpg)
Equipment Arrangement
![Page 13: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/13.jpg)
Preventive maintenance
• Rebuild pumps – annually
• Calibrate gas meters – semi-annually
• Verify air flow – semi-annually or as needed
• Inspect equipment for degradation – bi-weekly
![Page 14: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/14.jpg)
Equipment Upgrades
![Page 15: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/15.jpg)
Filter Loading & Charcoal Efficiency
![Page 16: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/16.jpg)
Filter Load Trend Plot
Rock Pile Trend
0
0.5
1
1.5
2
2.5
3
Date
Vac
Pres
sure
Series1
Filter change
![Page 17: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/17.jpg)
Rock Pile1-Week & 2-Week
1-Week March 2004 2-Week June 2004
![Page 18: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/18.jpg)
Filter Load Trend Plot
Plate Yard Trend
2.22.25
2.32.35
2.42.45
2.52.55
2.62.65
Date
Vac
Pre
ssur
e
Series1
Filter change
![Page 19: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/19.jpg)
Plate Yard2-Week
June 2004
![Page 20: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/20.jpg)
Charcoal Efficiency Testing
• Sample cartridges tested for 336 hours– 3 tests performed– 2 cfm flow rate– Test method, ASTM D-3803-98
• Results equal to or better than 99.30%
![Page 21: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/21.jpg)
I-131and 2-Week Sample Cycle
![Page 22: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/22.jpg)
I-131 Decay
1-week Vs. 2-week air sampling cycle
• Hypothetical models– Assuming chronic air concentrations
– MDA equal to or better than the 1-week cycle.
– Higher collection factor compensates for decay
– Modest air flow increase
![Page 23: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/23.jpg)
Iodine Decay
1-week Vs. 2-week air sampling cycle
• Models show increased collection factors for flow rates
1-week flow rate 2-week flow rate Activity increaseRatio 2wk : 1wk
1.0 cfm 1.8 cfm 2.79 times 0.99
1.0 cfm 1.5 cfm 2.31 times 0.82
1.5 cfm 2.7 cfm 2.86 times 0.98
1.5 cfm 1.5 cfm 1.55 times 0.55
![Page 24: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/24.jpg)
Administrative Controls
• REMP evaluates the need for increased sampling when:– ODCM monthly and instantaneous limits are exceeded– Failed fuel– Outages
![Page 25: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/25.jpg)
How is 2-Week Sampling
working ?• Saved missed samples and out-of-service time
– Utility turned power supply off without notification
• Contacted utility and loss of power restored in 2-hours
• 150 hours of OOS time saved
– Equipment problem discovered
• Low pressure detected from tube connection leak
• 72 hours of OOS time saved
• System performs more reliably
• Filter loading is monitored more closely– Slightly increasing over 2-weeks, but NOT excessively
![Page 26: David Perkins david_perkins@fpl](https://reader035.vdocuments.mx/reader035/viewer/2022062217/5681419d550346895dad84a7/html5/thumbnails/26.jpg)
Questions?