NAME: Tarek Salah Ali
TITLE: INSTRUMENTATION JUNIOR TECHNICIAN
ADDRESS: ALMARAKBEA ELKADEMA –KAFR ELDAWAR NIHERA EGYPT – EGYPT
EMAIL: [email protected]
MOBILE: +201223791819
DATE of BIRTH: 10 JULY 1974
MARITAL STATUS: MARRIED
DRIVING LICENCE STATUS : INTERNATIONAL
EDUCATION
• DEPLOM INDUSTRY 1992
Profile
• Calibration of all CALIBRATION • loop check • pre ‐Commissioning and commissioning for all Instrument Deviccs and valves at sile and start‐up
all systems. • Trouble shooting commissioning
• Maintenance of various types of systems. • Installation of all instrument devices.
CAREER HISTORY
1. Dietsmann Maintenance Energy
From May 2013 till now
Project : Mabruk Oil Field
Client : Total & MOO
2. Calro Gavazzi Egypt Bonatti From :November2011 To July2012 Project :Mellitah Gas Plant Client : Eni Gas Libyan Branch
3. Calro Gavazzi Egypt Bonatti
From : july2008 to February2011
Project : Mellitah Gas plant
Client: Eni Gas Libyan Branch
4. Calro Gavazzi Egypt‐ Orascom
From : August2007 to February2008
Project : seawaterDesalion plant‐hamma‐algiers
Client : hnd‐GEin fras trusture – orascom –Besix
5. Bonatti –Technip
From : March 2007‐to July 2007
Project : Amal‐pro duced water wi ection‐Libya
Client : Veba Oil Operation – Libya
6. SECC‐Bonatti –SnamProgetti Lummius cas ltd
Project : Westrem libya GAS‐Project‐ Meelitah plant
From : July 2006 tojunory2007
Client : Eni GAS –Libya Branch
7. BONATTi S.P.A.(Letco.)‐Snamprogetti lummiusGasltd
From : February 2005 up to July 2006
Project : Western Libya Gas project‐Mellitah plant (WlGP)
Client : Eni GAS Libyan Branch
8. BONATTI S.P.A. (Lt l. CO)‐GREEN STREAM
From : november2004 up to January2005
Project : Mellitah Gas compression station (MGCS)‐LIBYA.
Nuovo Pignone commissioning Team to start‐up of4Gas turbines and Compressors type (Mss50021DLN)controlled by Markvl control system
Client :Eni GAS GREENSTREAM
9. Carlo Gavazzi EGYPT ‐ENPPI
From : september2003 up to October2004
Project : UGD C N.G.L.‐PORTSAIDPROJECT
Client : United gas derivatives CO
10. EDF (EIetricitede france) .(under the name of3EC Egyptian Engineering CO)
From : August 2002 up to August 2003
Project : Boot project East portsaid power plant Gas‐fuel Fired
Power plantof2*341 MW Units
Client : EDF Egyptian Engineering CO.
LANGUAGE SKILLS
Arabic: Mother Tongue
English: Very Good