Transcript
Page 1: CMS Endcap Resistive Plate Chambers

CMS Endcap Resistive Plate Chambers

Andrey Marinov

On Behalf Of

CMS Collaboration.

Page 2: CMS Endcap Resistive Plate Chambers

NCPP 2007

• CERN

Page 3: CMS Endcap Resistive Plate Chambers

NCPP 2007

Compact Muon Solenoid

Endcaps

Page 4: CMS Endcap Resistive Plate Chambers

NCPP 2007

Page 5: CMS Endcap Resistive Plate Chambers

NCPP 2007

Endcap RPC Schema

Final Gas mixture used in all tests95.5 Freon 3.5 Isob 0.3 SF6 + RH 50% = 5000 ppm

Page 6: CMS Endcap Resistive Plate Chambers

NCPP 2007

Electrical Schema

• 96 Channels. 3 sectors, 32 each

• Standard LVDS output

• Controlling and monitoring of FEB threshold

• Monitoring of FEB temperature

Page 7: CMS Endcap Resistive Plate Chambers

NCPP 2007

BakelitePurchase Italy

Cut Clean Ship to Korea

Gaps Built in Seoul QC Ship to CERN

FEBs, Adaptor / DistributionBoards

Procure from ItalyOrder from Pakistan

Test in Italy Ship to CERN

Chamber Assembly

ISR Lab @ CERN QC Construction Database

Storage @ X5 Installation@SX5ProductionDatabase (CMS)

Mechanics Kit prep in China Procurement Cables and pieces

Shipped to CERN

Production Flow Process

http://cern.ch/cms-isr-endcap-rpchttp://cern.ch/rpc-endcap

CommissioningCOM1 & COM2

Dec 2003

Dec 2004

Page 8: CMS Endcap Resistive Plate Chambers

NCPP 2007

Production Of HV Gaps

KODEL

KODEL

• Seul – South Korea

Page 9: CMS Endcap Resistive Plate Chambers

NCPP 2007

The Assembly Lab At CERN - ISRGap QCChamber QC

Page 10: CMS Endcap Resistive Plate Chambers

NCPP 2007

http://cern.ch/cms-isr-endcap-rpc

Some Technological Steps

Page 11: CMS Endcap Resistive Plate Chambers

NCPP 2007

Testing Of Endcap RPC with Cosmic Rays

• Cosmic Stand.

Page 12: CMS Endcap Resistive Plate Chambers

NCPP 2007

Trigger ConfigurationCounters Setup

Page 13: CMS Endcap Resistive Plate Chambers

NCPP 2007

TriggerElectronics Setup

Page 14: CMS Endcap Resistive Plate Chambers

NCPP 2007

DAQ

Run Signal

Recording

EnableTrigger

RecordingStop recording

Reading the TDCs

Page 15: CMS Endcap Resistive Plate Chambers

NCPP 2007

Cosmic Test ComputingDAQ PC Database PC

MXI bus

TCP/IP

TCP/IP

Tracking PC

CAEN 1527HV power supply

TCP/IP

I2C MultiplexerFor slow control

RS232

Control PC

Page 16: CMS Endcap Resistive Plate Chambers

NCPP 2007

Cosmic Test DataStrips Profile

Strips Profile taken with only 2 scintilators from the top and bottom layers.

Page 17: CMS Endcap Resistive Plate Chambers

NCPP 2007

Cosmic Test DataStrips Profile

Including a small 50cm counter.

Page 18: CMS Endcap Resistive Plate Chambers

NCPP 2007

Cosmic Test DataTime Distribution

Page 19: CMS Endcap Resistive Plate Chambers

NCPP 2007

Cosmic Test Noise Profile

triggers

noisenoiserate N

NN

stripratestrips

noiserate NN

/32

Noise and Time distribution

Time bins 0-128 (1bin is 10ns)

Counts400ns

60ns

Noise

Noise

]/[]/[

]/[

22

2

1

1.

1.

cmHzcmHz

runstripsnoisecmHz

R

TSNR

239

119

Page 20: CMS Endcap Resistive Plate Chambers

NCPP 2007

Efficiency and Cluster Size

Scanning for efficiency and cluster size on a different voltages [8kv-9.6kv]

Page 21: CMS Endcap Resistive Plate Chambers

NCPP 2007

Cosmic Stand – Muons Tracking

Page 22: CMS Endcap Resistive Plate Chambers

NCPP 2007

HV Long Term Monitoring

Take sample of the current of each 2 minutes.

Take sample of the environmental conditions at the same time

Page 23: CMS Endcap Resistive Plate Chambers

NCPP 2007

Endcap RPC Databasehttp://forwardrpc.cern.ch/cms_forward_rpc/index.htm

Online • HV monitoring and QC IV

data storage• Searchable tracking for

individual Gaps / Chambers

• Production QC procedures • Mechanics• Cosmic Tests

VISIBLESEARCHABLEWORLDWIDE

Chamber QC data Gas gaps QC data

Environment conditions data

DATABASE

Production data

Results form Cosmic Test

Page 24: CMS Endcap Resistive Plate Chambers

NCPP 2007

SX5 – CMS home

Cessy – France

Page 25: CMS Endcap Resistive Plate Chambers

NCPP 2007

CMS YB-1

Page 26: CMS Endcap Resistive Plate Chambers

NCPP 2007

YB+2 Lowering In CMS Cavern

Page 27: CMS Endcap Resistive Plate Chambers

NCPP 2007

Future Plans

• Set Up the endcap RPC readout and controlling – Link Boards and Control Boards

• Lowering the YB-1 – probably in the end of 2007.

• Starting the LHC – 2008

Page 28: CMS Endcap Resistive Plate Chambers

NCPP 2007

Thank You For Your Attention

• For more details about CMS

http://cms.cern.ch


Top Related