Case Study QCCIntegrated Parts Warranty and Quality Containment Centres
Russia Automotive Tier 1
![Page 2: Case Study QCC Integrated Parts Warranty and Quality ... · Case Study QCC Integrated Parts Warranty and Quality Containment Centres Russia Automotive Tier 1](https://reader031.vdocuments.mx/reader031/viewer/2022020122/5cd4169188c99380658c32ba/html5/thumbnails/2.jpg)
2. Experience and References St Petersburg
Integrated QCC / PWC Implementation techniques:• Undertake a current state analysis of the QCC & PWC processes
• To a provide a baseline and start point for process improvement
• Expose process and quality escape points
• Generate improvement ideas
![Page 3: Case Study QCC Integrated Parts Warranty and Quality ... · Case Study QCC Integrated Parts Warranty and Quality Containment Centres Russia Automotive Tier 1](https://reader031.vdocuments.mx/reader031/viewer/2022020122/5cd4169188c99380658c32ba/html5/thumbnails/3.jpg)
2. Experience and References St Petersburg
Integrated QCC / PWC Implementation techniques:• Undertake QCC work area layout study– Man & Material Flows
![Page 4: Case Study QCC Integrated Parts Warranty and Quality ... · Case Study QCC Integrated Parts Warranty and Quality Containment Centres Russia Automotive Tier 1](https://reader031.vdocuments.mx/reader031/viewer/2022020122/5cd4169188c99380658c32ba/html5/thumbnails/4.jpg)
2. Experience and References St PetersburgIntegrated QCC / PWC Implementation techniques:
• Undertake PWC work area layout study - Man & Material Flows
![Page 5: Case Study QCC Integrated Parts Warranty and Quality ... · Case Study QCC Integrated Parts Warranty and Quality Containment Centres Russia Automotive Tier 1](https://reader031.vdocuments.mx/reader031/viewer/2022020122/5cd4169188c99380658c32ba/html5/thumbnails/5.jpg)
2. Experience and References St Petersburg
Integrated QCC / PWC Implementation techniques: continued
• Incorporate layout plans and processes for Skip Lot checks (pre determined pallet sampling brought to QCC area)
• Plan and execute the agreed changes
• The QCC and PWC area was Quality System compliant as we are an approved training and auditing company
![Page 6: Case Study QCC Integrated Parts Warranty and Quality ... · Case Study QCC Integrated Parts Warranty and Quality Containment Centres Russia Automotive Tier 1](https://reader031.vdocuments.mx/reader031/viewer/2022020122/5cd4169188c99380658c32ba/html5/thumbnails/6.jpg)
Parts Warranty Centre – Before improvement
Parts tear down & analysis
area
Incoming Warranty returnsAdministration Area
Floor area used to store incoming and out going
warranty returns
2. Experience and References St Petersburg
![Page 7: Case Study QCC Integrated Parts Warranty and Quality ... · Case Study QCC Integrated Parts Warranty and Quality Containment Centres Russia Automotive Tier 1](https://reader031.vdocuments.mx/reader031/viewer/2022020122/5cd4169188c99380658c32ba/html5/thumbnails/7.jpg)
A = Goods Inward
B = W.I.P for analysis
C = Admin Area
D = Parts Analysis
E = Equipment Storage
F = W.I.P scrap / return to supplierG = Parts despatch prep & courier collection stationH = Logistics collection point - scrapped parts
A
B
CD
BB
EF
F
FG
H
J
What was achieved in the PWC area:
An effective and efficient material movement storage and work environment
2. QCC / PWC Service Experience – St Petersburg
![Page 8: Case Study QCC Integrated Parts Warranty and Quality ... · Case Study QCC Integrated Parts Warranty and Quality Containment Centres Russia Automotive Tier 1](https://reader031.vdocuments.mx/reader031/viewer/2022020122/5cd4169188c99380658c32ba/html5/thumbnails/8.jpg)
Suspect Parts Storage Area (waiting inspection)
Reworked /OK Parts Storage Area
Note:Facility is Quality System compliant as we are an approved training and auditing company
2. QCC / PWC Service Experience – St Petersburg
What was achieved in the QCC area:
An effective and efficient material movement storage and work environment
![Page 9: Case Study QCC Integrated Parts Warranty and Quality ... · Case Study QCC Integrated Parts Warranty and Quality Containment Centres Russia Automotive Tier 1](https://reader031.vdocuments.mx/reader031/viewer/2022020122/5cd4169188c99380658c32ba/html5/thumbnails/9.jpg)
Summary of what was achieved:
• An agreed future state for the QCC and WPC process through team participation
• An organised and effective QCC and WPC
• Applied corporate floor marking standards for walkways, work areas, storage and aisles.
• Quality System compliant facility as we are an approved training and auditing company
2. QCC / PWS Service Experience - St Petersburg