![Page 1: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/1.jpg)
Beamline Readiness Review - HutchBeamline 12.3.2
Microdiffraction
March 28, 2006
![Page 2: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/2.jpg)
Floor Plan, Sector 12 25L760C
![Page 3: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/3.jpg)
Sector 12 superbend beamlines 12.2.2, 12.3.1 & 12.3.2
![Page 4: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/4.jpg)
Hutch Assembly Details
![Page 5: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/5.jpg)
Hutch construction drawing from vendor
![Page 6: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/6.jpg)
Wall panel construction
2mm sheet lead
1” thick - 4# mineral wool insulation
14 gauge steel
Prior to assembly, interior materials have combined thickness of 52.8mm
![Page 7: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/7.jpg)
After assembly, the interior components havebeen compressed to 47.6mm from 52.8mm
Wall panel construction
![Page 8: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/8.jpg)
Wall panel connection detail
![Page 9: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/9.jpg)
Typical Wall Panel with Pb sheet installed
![Page 10: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/10.jpg)
Panel with second layer of insulation installed
![Page 11: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/11.jpg)
Front wall prior to second layer of insulation
Window
![Page 12: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/12.jpg)
2nd front wall panel with opening for 12.3.2 beampipe
![Page 13: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/13.jpg)
Typical wall corner with Pb bent along vertical edge
![Page 14: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/14.jpg)
Different corner with 2nd layer of insulation
![Page 15: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/15.jpg)
H- channel with Pb captured
Pb
![Page 16: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/16.jpg)
Pb visible in all of these H-channel units
![Page 17: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/17.jpg)
bottomside
![Page 18: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/18.jpg)
Pb
Framed opening detail – labyrinths, beampipe opening
![Page 19: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/19.jpg)
![Page 20: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/20.jpg)
Labyrinth Pb detail prior to insulation
Pb in track prior to steel cap
![Page 21: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/21.jpg)
Labyrinth detail
![Page 22: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/22.jpg)
Labyrinths after Pb shielding applied
![Page 23: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/23.jpg)
Labyrinth with detail of how Pb is doubled over
![Page 24: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/24.jpg)
Overview of back wall construction
![Page 25: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/25.jpg)
1” overlap from Backwall to flashing
Roof to back wall connection detail
![Page 26: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/26.jpg)
Back wall Pb overlap detail
![Page 27: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/27.jpg)
Fastening tabs to secure to structural brace
Pb overlap
Back wall right side
![Page 28: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/28.jpg)
Back wall detail
Lead laminatedto steel
Steel
![Page 29: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/29.jpg)
Back wall detail 2
Lead overlap for next panel
![Page 30: Beamline Readiness Review - Hutch Beamline 12.3.2 Microdiffraction March 28, 2006](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5697bfd41a28abf838cac908/html5/thumbnails/30.jpg)
Roof – Wall panel connection