2
Renovation works to Queens Warehouse
1. PRELIMINARIES AND GENERAL
Activity Unit Quantity Rate Cost (VEP)
a) Allow for Mobilisation and De-
mobilisation LS 1
b) Allow for site establishment LS 1
c) Allow for Insurance and
permits and approvals from local
Authorities.
LS 1
d) Allow for site clearing, debris
Disposal and surrounding cleaning.
LS 1
Total carried over to main Summary
3
2. Demolition:
Activity Unit Quantity Rate Cost (VEP)
a) Allow to demolish existing
mezzanine floor and remove all
debris from site.
Make good to any damages.
Item 1
b) Demolish existing
damaged/rotten flooring from the
office.
Item 1
c) Allow to remove existing toilet
pan & cistern.
No 1
d) Remove existing hand-basin in
washroom.
No 1
e) Allow to remove rear and front
roller shutter door and FRCS to
confirm its disposal.
No 1
f) Remove existing sink bench
which is in the office.
No 1
Total carried over to main
Summary
4
3. Doors:
Activity Unit Quantity Rate Cost (VEP)
a) Supply & install “Lockwood”
locks to office and storage room.
No’s
2
b) Floor mounted door stoppers to
ditto.
No’s 2
c) Door handles to ditto. No’s 2
d) Replace electronic operated
roller shutter doors (Front and rea)
No. 2
Total carried over to main
Summary
5
4. Windows
Activity Unit Quantity Rate Cost (VEP)
a) Allow to fix all broken window
glass including hinges and lock.
item
1
b) Allow to construct
SHUTTER’s to all windows
including numbering.
Construct with 20 x 20 Galv.
Tubing with gothic mesh
complete with all brackets.
Item 1
Total carried over to main
Summary
6
5. CARPENTARY
Activity Unit Quantity Rate Cost (VEP)
a) Replace all damaged or rotten
ceiling boards. Item 1
b) Replace all damaged or rotten
fascia boards. Item 1
c) Supply & install new Eave
battens.. Item 1
d) Replace all flooring in the
office area with T & G lining
complete with solid timber stain.
Item 1
e) Remove timber structure
shelves, realign shelves to the wall
and erect new shelves.
Item 1
f) Allow to double wall toilet
walls with 4mm Hardiflex board Item 1
Total carried over to main
Summary
7
6. ROOFING
Activity Unit Quantity Rate Cost (VEP)
a) Allow to replace all roofing
sheets with Colour-bond (Colour
to be confirmed by FRCS) roofing
sheets complete with Stormtite
type 17 roofing screws. 24g
Item
1
b) Supply & install Colour-bond
ridge cap to ditto. Item 1
c) Supply & install Colour-bond
flashing. (Embed where required)
f) Supply & Install “Colour Bond
box gutter” including fixing
brackets, end caps.
Item 1
g) Supply & Install 80mm PVC
downpipes to ditto complete with
fixing brackets, spout fittings and
elbow connectors
Item 1
h) Contractor to engage one of the
Engineer’s from the panel of
Engineer’s provided, obtain a
report for cyclone certification,
carry out the works as required
and submit the cyclone certificate
to FRCS.
Item 1
Total carried over to main
Summary
8
7. PLUMBING
Activity Unit Quantity Rate Cost (VEP)
a) Supply & install INOX/Caroma
brand Toilet pan, cistern and toilet
seat complete with new 15mm
stopcock with flexible hose. (Toilet
seat to be Black in colour)
No. 1
b) Supply & install toilet roll holder
to ditto.
No. 1
c) Supply & install single bowel
stainless steel sink to kitchen and
‘DOE’ brand tap to ditto.
No. 1
d) Supply & install hand-basin to
washroom complete with new in-let
and outlet piping. Note: No surface
piping.
No. 1
e) Supply, fabricate to size, install
and test all necessary pipes and
fittings required to supply water to
all desired locations within the
building in accordance with the
current Fiji National building code.
A licensed plumber should be
engaged for such works.
Item
1
Total carried over to main
Summary
9
8. ELECTRICAL
Activity Unit Quantity Rate Cost (VEP)
a) All electrical works and
installations including wiring to be
carried out as per current Fiji National building code. All works
to be carried out by a licensed
electrician.
Item 1
b) Supply & install including
rewiring for 4 ft. forested LED tube
lights complete with Clipsal brand
switch controls.
No’s 15
c) Up-grade Electrical meter box –
installation of ELCB circuits
breakers.
Item 1
d) Allow to supply & install
10amps double power-point in
office. (Clipsal brand).
Item 1
Total carried over to main
Summary
10
9. JOINERY
Activity Unit Quantity Rate Cost (VEP)
a) Construct sink bench with
19mm exterior ply in office
complete with White Two Pac
finish with granite top,
dimensions to be confirmed on
site.
Item
1
b) Self closing hinges to doors
and drawer sliders to ditto Item 1
c) Construct open overhead
complete with White Two Pac
finish. Confirm dimensions on
site.
Item 1
Total carried over to main
Summary
11
10. TILING & Plastering
Activity Unit Quantity Rate Cost (VEP)
a) Supply and install 300 x 300
quarry tiles to wet area floors.
Colours will be confirmed by
FRCS. (Toilet).
Item 1
b) Supply and install 300 x 300
glazed ceramic white tiles to toilet
walls at a finishing height of
1.5m.
Item 1
c) Supply & install ceramic glazed
tiles to back splash of sink bench,
size to be confirmed on site and
colour to be confirmed by FRCS.
Item 1
d) Allow to repair concrete cracks
on floor, wash & polish with
cement and cemestic.
Item
1
Total carried over to main
Summary
12
11. PAINTING
Activity Unit Quantity Rate Cost (VEP)
a) Supply materials, labour and
plant for surface preparation and
general painting of all interior &
exterior of the building as per
paint manufactures specification
and as per colour schemes to be
provided by FRCS.
Method of paint application to
wall surfaces shall be by use of
rollers.
General internal & external
painting with premium quality.
item
1
b) Paving paint to warehouse
floor.
Item 1
Total carried over to main
Summary
12. Mechanical Services
Activity Unit Quantity Rate Cost (VEP)
a) Supply & install 12, 000
BTU air-con in the office
complete with electrical
works Remove existing
AC.
No. 1
13
Tender prices to be valid for 3 months.
Trade Summary
1. Preliminaries & General $.............................
2. Demolition $.............................
3. Doors $.............................
4. Windows $.............................
5. Carpentry $.............................
6. Roofing $.............................
7. Plumbing $.............................
8.Electrical $.............................
9. Joinery $.............................
10. Tiling $.............................
11. Painting $.............................
12. Mechanical Services $.............................
Sub-Total
9% VAT
Total VIP Price
Total Tender Price