![Page 1: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/1.jpg)
AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACHFOCUS ON SHORE-TO-SHIP-
POWER (“COLD IRONING”)Luke Mahier, Parsons Brinckerhoff
Nicholas C. Kozma, Port of Long Beach
Ben Chavdarian, Port of Long Beach
TRB 2006 Summer Conference - July 11, 2006
![Page 2: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/2.jpg)
Air Emissions Reduction Programs at the PortSHORE-TO-SHIP-POWER (“COLD IRONING”)SMOKE STACK EMISSIONS CONTROLS PROGRAMVESSEL SPEED REDUCTION / GREEN FLAG - 65% ParticipationVESSEL RETROFIT DEMONSTRATION PROGRAMCLEAN CARGO HANDLING EQUIPMENT (DOC, LNG, Alt. Fuels)LOCOMOTIVE REPLACEMENT, (Tier II replacement engines, hybrid, LNG engines)TRUCK FLEET MODERNIZATION (POLB & Gateway Cities Truck replacement)INFRASTRUCTURE & OTHER STRATEGIES
• Grade Separation• On-Dock Rail yard to reduce truck trips• Pier Pass – extended terminal hours reducing truck idling &
increased efficiencies.• Electrified rail mounted gantry cranes• Electric dredging requirements
![Page 3: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/3.jpg)
ALL OF THE AIR EMISSIONS REDUCTION PROGRAMS ARE INTENDED TO REDUCE:
NOx – nitrogen oxidesSOx – sulfur oxidesDiesel Fine Particulate Matter PM
THE PROGRAMS AT POLB ARE IN FACT REDUCING THE ABOVE EMISSIONS.
THIS PRESENTATION WILL FOCUS ON SHORE-TO-SHIP-POWER AND RETROFITTING EXISTING WHARFS
![Page 4: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/4.jpg)
WHAT IS SHORE-TO-SHIP POWERor
COLD IRONING?
Shore-to-Ship-Power or Cold Ironing is a process to reduce emissions by using shore generated electrical power instead of operating the ship’s on-board diesel-fired generators.
![Page 5: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/5.jpg)
A NEW LEASE AT PIER G REQUIRES SHORE-TO-SHIP-POWER AT 3 BERTHS
![Page 6: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/6.jpg)
Berths 234 & 236 Require Retrofit for Shore-to-Ship-Power
![Page 7: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/7.jpg)
MAJOR COMPONENTS FOR SHIP-TO-SHORE-POWER
SHORE POWER OUTLET BOX
VESSEL SHORE POWER CIRCUIT BREAKER
MAIN SWITCHGEAR AND METERING
CABLE MANAGEMENT SYSTEM
VESSEL ELECTRICAL SYSTEM
VESSEL GENERATOR
AUTO POWER TRANSFER & SYNCHRONIZATION
12.4 or 34.5kV - 6.6kV UTILITY TRANSFORMER (INDUSTRIAL STATION)
![Page 8: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/8.jpg)
DESIGN PARAMETERS
7.5 MVA or 7,500 kVA Electric Power Supply- Sufficient for all ships?- MVA or MW (KVA or KW)
6.6kV or 6,600 Volts
No Steam From Shore- Onboard Ship Boilers to Remain on
Underground wire size 500 MCM, 2 per phase- Largest wire size 1000 MCM
Wharf to ship wiring 350 MCM, 2 per phase- Size and weight acceptable
![Page 9: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/9.jpg)
![Page 10: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/10.jpg)
Under Wharf Conduits
![Page 11: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/11.jpg)
SHORE POWER OUTLET VAULT AT WHARF FACE
![Page 12: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/12.jpg)
SHORE POWER VAULT COVERS
![Page 13: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/13.jpg)
Shipside Cable Plug & Receptacle
![Page 14: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/14.jpg)
CMS on Ship’s Deck
Cable
SPO Inside Vault
Shore-to-Ship-Power System Overview
![Page 15: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/15.jpg)
SHIP CABLE MANAGEMENT SYSTEM
![Page 16: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/16.jpg)
SHIP CABLE MANAGEMENT SYSTEM
![Page 17: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/17.jpg)
Cost for Providing Shore-to-Ship-PowerAs initially proposed by SCAQMD in the late 1980’s ~$40,000/Berth
Environ Report, March 2004 – Avg. Cost for the 12 vessels & their respective terminals● Total Cost $2.4 Million
Berths 234 & 236 - Order of Magnitude Estimated Costs ● Total Cost $12-14 Million
T-121 – Tanker Shore-Power Installation● Total Cost $15 Million
![Page 18: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/18.jpg)
Cost for Shore-to-Ship-Power Continues to Increase Substantially
Environ Report shows the cost effectiveness thresholds for cold ironing = 1.8 million kW-hr per year and $15,000/ton of emission reduction. Not a lot of ships fall into this category.
The global shipping industry should continue to explore more cost effective solutions to reducing polluting emissions from the marine shipping industry such as:
![Page 19: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/19.jpg)
Advanced Maritime Emissions Control System (AMECS) Use of cleaner fuels such as:
Low Sulfur diesel as is the approach in EuropeMarine Gas Oil (MGO) orLNG
Diesel Oxidation Catalysts & or Selective Catalytic ReductionPressure marine propulsion industry to come up with cleaner engines.
Possible Alternative to Shore-to-Ship-Power
![Page 20: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/20.jpg)
Advanced Maritime Emission Control System - On Wharf (Sock on a Stack)
By ACTI
![Page 21: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/21.jpg)
Advanced Maritime Emission Control System - Barge Based
By : ACTI
![Page 22: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/22.jpg)
Emission Control SystemBuilt for Pilot Study Near Sacramento, CA
By: ACTI
![Page 23: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/23.jpg)
Emission Control System Applied to Locomotive Emissions Collection & Treatment System
By: ACTI
![Page 24: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/24.jpg)
Shipping & Goods Movement industry as a whole should strive for global standards on air emission reductions through the International Marine Organization, a specialized UN agency whose mission is safe, secure and efficient shipping on clean oceans.
Regional approach of mandating shore-to-ship-power or cold ironing is cost effective for a limited number of ocean going vessels.
![Page 25: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/25.jpg)
Shore-to-Ship Power or Cold Ironing is:
A good way to reduce emissions in Ports.Practical for vessels that need large amounts of power such as reefer & cruise ships.Very expensive and not practical for many ships that have lower power demands while at berth.
![Page 26: AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS … › conferences › jointsummer › 2006 › ports › Session6Ma… · AIR QUALITY SOLUTIONS AT THE PORT OF LONG BEACH FOCUS](https://reader033.vdocuments.mx/reader033/viewer/2022060321/5f0d24377e708231d438e173/html5/thumbnails/26.jpg)
THANK YOU FOR LISTENING
I WILL BE GLAD TO ANSWERANY QUESTIONS YOU HAVE