Download - Abutment Design Drawings
-
revision
LEGEND
company - ZHJV - ZENITAKA HYUNDAI JOINT VENTURE
phase - W WORKING DRAWING
A AS-BUILT DRAWING
zone HD HIGHWAY
A1 ABUTMENT 1
A2 ABUTMENT 2
P1 PYLON 1
P2 PYLON 2
SC STAY CABLE
BA BRIDGE ACCSESSORIES
GE GENERAL
document SI SITE INSTALLATION
CO CONCRETE OUTLINE
RE REINFORCEMENT
FW FABRICATION WORKS
EW EARTHWORKS
EM ELECRO-MECHANICAL
FO FORMWORK
AB ABUTMENT
ST STRUCTURE
PT POST-TENSIONING
LP LIGHTENING PROTECTION
CM COMMON
AS APPROACH SLAB
BL BEARING & LATERAL SUPPORT
DR DRAINAGE
BC BOX CULVERT
AC ACCESS FACILITY (Ladder, Step, Door)
UT UTILITY (Power, Communication, Light)
HR HAND RAIL
EJ EXPANSION JOINT
BP BORED PILE
LY LAYOUT
number 0001 to 0999 DRAWING NUMBER
ZHJV
DRAWING FILING SYSTEM
company phase zone document number
-
revision 1,2,3....etc REVISION CODE FOR WORKING DRAWINGS
A,B,C..etc REVISION CODE FOR AS-BUILT DRAWINGS
-
CONSTRUCTION SEQUENCEScale=1:200
PROJECT DOCUMENT NUMBER:
company phase
SCALE :
FILE NAME:
zone document number
DRAWING TITLE:
A2_ ABUTMENT
ENGINEERING CONSULTANT:
REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.
GOVERNMENT OF UGANDA
EMPLOYER:
ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]
PYUNGHWA ENGINEERING CONSULTANTS LTD
ENGINEERING CONTRACTOR:
ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda
STEP 1:1. INSTALL REBAR FOR BOTTOM SLAB.2. INSTALL CONVENTIONAL SIDE FORM FOR BOTTOM SLAB.3. CAST BOTTOM SLAB.
STEP 2:1. INSTALL REBAR FOR CENTER HIGHER SLAB.LEAVE
STARTER BAR OUTSIDE FOR WALL.2. INSTALL CONVENTIONAL SIDE FORM.3. CAST THE CENTER HIGHER SLAB.
STEP 3:1. INSTALL REBAR FOR WALL.2. BEND REBAR FOR WALKWAY SLAB.3. INSTALL WALL SYSTEM FORMWORK.4. ADJUST THE VERTICALITY AND CAST.
STEP 4:1. REMOVE WALL SYSTEM FORMWORK.2. BACK FILLING.3. LEAN CONCRETE.4. CAST WALKWAY SLAB.5. INSTALL CONVENTIONAL SIDE FORM.6. CAST THE MIDDLE SLAB.
STEP 5:1. INSTALL REBAR AND PT TENDONS FOR WALL.2. INSTALL BOX-OUT FOR CABLE ANCHOR.3. INSTALL WALL SYSTEM FORMWORK.4. ADJUST THE VERTICALITY AND CAST.
STEP 6:1. REMOVE WALL SYSTEM FORMWORK AND BOX-OUT.2. BACK FILLING AND LEAN CONCRETE.3. ARRANGE SCAFFOLDING FOR TOP SLAB AND CABLE
ANCHOR.4. INSTALL REBAR/PT TENDONS FOR CABLE ANCHOR AND
TOP SLAB.5. CAST TOP SLAB.
-
NOTE:ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
STRUCTURE DIMENSION AND CONSTRUCTION JOINT LAYOUT PLAN - LOWER PARTScale=1:120
PROJECT DOCUMENT NUMBER:
company phase
SCALE :
FILE NAME:
zone document number
DRAWING TITLE:
A2_ ABUTMENT
ENGINEERING CONSULTANT:
REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.
GOVERNMENT OF UGANDA
EMPLOYER:
ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]
PYUNGHWA ENGINEERING CONSULTANTS LTD
ENGINEERING CONTRACTOR:
ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda
500
500
3400
500
3450
500
1100
500
3450
500
3400
500
8900
8900
500
3720
500
3450
500
1100
500
3450
500
3720
500
1844
0
1250 4000 500 4000 500 4000 500 4000 500 4000 500 4000 500 4000 500 4000 500 4000
PORTION 1PORTION 2PORTION 3
-
FORMWORK LAYOUT PLAN FOR PORTION 1Scale=1:100
NOTE:1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.2.PLEASE REFER TO DRAWING NO ZHJV-W-A2-FF-0015-0, ZHJV-W-A2-FF-0016-0, ZHJV-W-A2-FF-0017-0 AND ZHJV-W-A2-FF-0018-0 FOR FORMWORK PANEL ASSEMBLY DRAWING.
PROJECT DOCUMENT NUMBER:
company phase
SCALE :
FILE NAME:
zone document number
DRAWING TITLE:
A2_ ABUTMENT
ENGINEERING CONSULTANT:
REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.
GOVERNMENT OF UGANDA
EMPLOYER:
ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]
PYUNGHWA ENGINEERING CONSULTANTS LTD
ENGINEERING CONTRACTOR:
ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda
PORTION 1
WM01 WM02WM04
WM19WM20
WM12
WM21
WM23
WM22
NM
01
NM
01
NM
01
NM
01
NM
01
NM
01
NM
01
NM
02
NM
02
NM
02
NM
02
NM
02
NM
02
NM
02
NM
03NM
03
NM
03
NM
03
NM
03
NM
03NM
03N
M04
NM
04
NM
04
NM
04 NM
04
NM
04
NM
04
NM05
NM05
NM05
NM05
NM06
NM06
NM06
NM07
NM07
NM07
NM07
NM07
NM08
NM08
NM08
NM08
NM08
NM12
WM15WM18
PORTION 1
WM01 WM02WM04
WM19WM20
WM12
WM21
WM23
WM22
NM
01
NM
01
NM
01
NM
01
NM
01
NM
01
NM
01
NM
02
NM
02
NM
02
NM
02
NM
02
NM
02
NM
02
NM
03NM
03
NM
03
NM
03
NM
03
NM
03NM
03N
M04
NM
04
NM
04
NM
04 NM
04
NM
04
NM
04
NM05
NM05
NM05
NM13
NM05
NM06
NM06
NM06
NM07
NM07
NM07
NM07
NM07
NM08
NM08
NM08
NM08
NM08
NM12
WM15WM18
243
8282
243
5868 289
277
82
8230
8
91 94337
112 110367
181
151139 42227
7
312
348
82
82
82
186 166473
8234
8
247
281
316
1464141358
2
82
82
52
8227
7
63 281
82
230
310
3718
247
82
NM13
-
FORMWORK ACCESSORY LAYOUT PLAN FOR PORTION 1Scale=1:100
NOTE:1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
PROJECT DOCUMENT NUMBER:
company phase
SCALE :
FILE NAME:
zone document number
DRAWING TITLE:
A2_ ABUTMENT
ENGINEERING CONSULTANT:
REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.
GOVERNMENT OF UGANDA
EMPLOYER:
ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]
PYUNGHWA ENGINEERING CONSULTANTS LTD
ENGINEERING CONTRACTOR:
ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda
PORTION 1
740 1441 760 880 828 630 1515 900 900 910 8501572 900 850 650 1040
790
1030
900
900
900
1729
750
800
700
545
760
900
900
900
900
780
798
900
900
500 850 1418700800701900
478
700
800
750
700 800 700 900
1100
1258
700
800
750
1730
900
900
900
1030
785 650 1490 900 900 940 1945 940 900 900 1407 700 800 700 940 1030
798 647 1497 900 900 940 2086 940 900 900 1448 700 800 900 850
458700800701900
722
750
800
700
478
700
800
750
798 650 1490 900 900 940 2122 940 900 900 1416 700 800 925 834
500 850
16271739
1892 940 900 900 1416 900 900 940 1847 950 700 800 700
508
900
900
750
561
780
900
900
508
900
900
860
WM01 WM02WM04
WM19WM20
WM12
WM21
WM23
WM22
NM
01
NM
01
NM
01
NM
01
NM
01
NM
01
NM
01
NM
02
NM
02
NM
02
NM
02
NM
02
NM
02
NM
02
NM
03NM
03
NM
03
NM
03
NM
03
NM
03NM
03N
M04
NM
04
NM
04
NM
04 NM
04
NM
04
NM
04
NM05
NM05
NM05
NM05
NM06
NM06
NM06
NM07
NM07
NM07
NM07
NM07
NM08
NM08
NM08
NM08
NM08
NM12
WM15WM18
508
380
700
478
700
800
750
722
750
800
700
722
750
800
700
PORTION 1193 1650 1537 3050 1892 2750 1961 2800 693
715
2800
1670
3100
2080
2750
1909
2700
716
733250019573400
1469335012621050187
1231
809
1230
798
1500869
1230
803
1232
820
180010061800 959
930
1111
1230
800
900 908
800 832
1500
799
1500 849
1500
819
1890756
1800857
1500
802
1699 1155
18001019
1500
817
1800 1029
2100 836
1500
817
1799826
1500
798
1800 846
1500
814
1531 1075
1801807
1500
800
2101 836
650 836
18001155
1750
790
1194
834
1840 1091
1200
809
1200
815
1680978
340 849
548
506
456
NM13
573
-
FORMWORK LAYOUT PLAN FOR PORTION 2Scale=1:100
NOTE:1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.2.PLEASE REFER TO DRAWING NO ZHJV-W-A2-FF-0015-0, ZHJV-W-A2-FF-0016-0, ZHJV-W-A2-FF-0017-0 AND ZHJV-W-A2-FF-0018-0 FOR FORMWORK PANEL ASSEMBLY DRAWING.
PROJECT DOCUMENT NUMBER:
company phase
SCALE :
FILE NAME:
zone document number
DRAWING TITLE:
A2_ ABUTMENT
ENGINEERING CONSULTANT:
REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.
GOVERNMENT OF UGANDA
EMPLOYER:
ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]
PYUNGHWA ENGINEERING CONSULTANTS LTD
ENGINEERING CONTRACTOR:
ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda
PORTION 2 PORTION 1
NM
03N
M04
NM05
NM06
PORTION 2 PORTION 1
NM
03N
M04
NM05
NM06
140
144
148
174
178
140 209
212
125 142
122 1388282
129
126
82 82
107 107
82 82
82 82 96 96 82
82
8282
77 82 65
75 174
178 79 61
212
209
6355
144
144
-
FORMWORK ACCESSORY LAYOUT PLAN FOR PORTION 2Scale=1:100
NOTE:1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
PROJECT DOCUMENT NUMBER:
company phase
SCALE :
FILE NAME:
zone document number
DRAWING TITLE:
A2_ ABUTMENT
ENGINEERING CONSULTANT:
REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.
GOVERNMENT OF UGANDA
EMPLOYER:
ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]
PYUNGHWA ENGINEERING CONSULTANTS LTD
ENGINEERING CONTRACTOR:
ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda
PORTION 2 PORTION 1PORTION 2 PORTION 1
NM
03N
M04
NM05
NM06
790 740 1422 760 880 828 630 1465 380 900 900 910 969
492
712
900
900
508
900
900
730
527
746
900
900
850 1901 600 701 800 700 1418 700 800 700 600 763 601 700
478
700
800
750
722
750
800
700
478
700
800
750
633850
796 650 1496 900 900 940 2114 940 900 900 458 700 800
500
798 650 1490 900 900 940 2085 940 900 900 458 700
478
700
800
750
722
750
800
700
478
700
800
750
492
712
900
900
508
900
900
730
527
746
900
900
598 850 900
1281
958
978
500 850 1910 940 900 900 1416 900 900 940 782 1205 600 700
785 650 1495 900 900 940 2015 940 900 900 469 943 700 800
538650
523650
634850
424 1680 1291 2950 1882 3000 1463 3300
920
850
800
900
13951680
1740
1453 1500
990
1017
1700
11691800
300 900 1450 3350 1500 3360 1480 2970
1200
1800
1234
1520
1017
1700
977 180013201800
104518001091
1500
1800
1500
13721800
1800 10421550
1800
1525
1480
1490
10721500
1500
1800
1500
1500
10621800
1720
826
895
848
849
759
1800 1068808
1191
1129
848
1099
848
858
848
1101
862
808
1166
NM
03N
M04
NM05
NM06
-
FORMWORK LAYOUT PLAN FOR PORTION 3Scale=1:100
NOTE:1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.2.PLEASE REFER TO DRAWING NO ZHJV-W-A2-FF-0015-0, ZHJV-W-A2-FF-0016-0, ZHJV-W-A2-FF-0017-0 AND ZHJV-W-A2-FF-0018-0 FOR FORMWORK PANEL ASSEMBLY DRAWING.
PROJECT DOCUMENT NUMBER:
company phase
SCALE :
FILE NAME:
zone document number
DRAWING TITLE:
A2_ ABUTMENT
ENGINEERING CONSULTANT:
REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.
GOVERNMENT OF UGANDA
EMPLOYER:
ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]
PYUNGHWA ENGINEERING CONSULTANTS LTD
ENGINEERING CONTRACTOR:
ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda
63
WM01
WM
05W
M08
PORTION 2PORTION 3
WM01
WM
05W
M08
PORTION 2PORTION 3
111
42
108 72
115
72 110
106 106
142
93
72
74
90 106
9496
42 107
61
-
FORMWORK ACCESSORY LAYOUT PLAN FOR PORTION 3Scale=1:100
NOTE:1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
PROJECT DOCUMENT NUMBER:
company phase
SCALE :
FILE NAME:
zone document number
DRAWING TITLE:
A2_ ABUTMENT
ENGINEERING CONSULTANT:
REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.
GOVERNMENT OF UGANDA
EMPLOYER:
ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]
PYUNGHWA ENGINEERING CONSULTANTS LTD
ENGINEERING CONTRACTOR:
ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda
WM01
WM
05W
M08
PORTION 2PORTION 31727 760 880 828 630 1460 430 900 900 910 1307 700
1137
450
900
900
1488
700
800
570
1402
1222
750
800
700
1486
900
900
450
1142
1716 900 899 940 2086 940 900 900 1445 700 800
1702 900 899 940 2120 940 900 900 1410 700 798
1705 900 900 940 2085 940 900 900 1412 700 800
796 940 897 903 1417 899 900 940 1995 600 700
747 600 700 800 700 1417 700 800 700 600 2032 600 700
508
900
900
455
724446
900900
722
750
800
700
478
700
800
750
508
900
900
453
720
451
899
900
722
750
800
700
478
700
800
750
WM01
WM
05W
M08
PORTION 2PORTION 3
1315
-
NOTE:ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
STRUCTURE DIMENSION AND CONSTRUCTION JOINT LAYOUT PLAN - UPPER PARTScale=1:120
PROJECT DOCUMENT NUMBER:
company phase
SCALE :
FILE NAME:
zone document number
DRAWING TITLE:
A2_ ABUTMENT
ENGINEERING CONSULTANT:
REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.
GOVERNMENT OF UGANDA
EMPLOYER:
ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]
PYUNGHWA ENGINEERING CONSULTANTS LTD
ENGINEERING CONTRACTOR:
ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda
PORTION 1PORTION 2PORTION 3
1844
037
2050
034
5050
011
0050
034
5050
0
3400
500
4500
4500
500
3400
500
500
500
3720
1250 3866 750 3736 3718750 750 3704 750 3711 750 3680 750 3665 750 3685 750 4004 500
1250 3885 750 3764 750 3783 750 3797 750 3789 750 3821 750 3835 750 3815 750 4247 500
500
8900
8900
1250 4000 500 4000 500 4000 500 4000 500 4000 500 4000 500 4000 500 4000 500 4000
-
FORMWORK LAYOUT PLAN FOR PORTION 1Scale=1:100
NOTE:1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.2.PLEASE REFER TO DRAWING NO ZHJV-W-A2-FF-0019-0, ZHJV-W-A2-FF-0020-0, ZHJV-W-A2-FF-0021-0 FOR FORMWORK PANEL ASSEMBLY DRAWING.3.PLEASE REFER TO DRAWING NO ZHJV-W-A2-FF-0018-0 FOR CONSOLE BRACKET AND PUSH-PULL PROP ARRANGEMENT PLAN.
PROJECT DOCUMENT NUMBER:
company phase
SCALE :
FILE NAME:
zone document number
DRAWING TITLE:
A2_ ABUTMENT
ENGINEERING CONSULTANT:
REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.
GOVERNMENT OF UGANDA
EMPLOYER:
ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]
PYUNGHWA ENGINEERING CONSULTANTS LTD
ENGINEERING CONTRACTOR:
ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda
WM
21W
M21
WM
21W
M21
WM
21
NM
01
NM
01
NM
01
NM
01
NM
01
NM
01
NM
01
NM
02
NM
02
NM
02
NM
02
NM
02
NM
02
NM
02
NM
03
NM
03
NM
03
NM
03
NM
03NM
03N
M04
NM
04
NM
04
NM
04 NM
04
NM
04
NM
04
NM05
NM06
NM07
NM15
NM08
NM14
NM08
WM10
NM16
WM11
NM12
NM13
WM04
NM12
NM12
NM12
WM02 WM03
NM16
NM11
NM16NM12
NM15 NM14
WM13
WM01
WM14
WM15
WM16
WM17
WM19
WM18
WM20
WM12
PORTION 1
WM
21
WM
21W
M21
WM
21W
M21
WM
21
NM
01
NM
01
NM
01
NM
01
NM
01
NM
01
NM
01
NM
02
NM
02
NM
02
NM
02
NM
02
NM
02
NM
02
NM
03
NM
03
NM
03
NM
03
NM
03NM
03N
M04
NM
04
NM
04
NM
04 NM
04
NM
04
NM
04
NM05
NM06
NM07
NM15
NM08
NM14
NM08
WM10
NM16
WM11
NM12
NM13
WM04
NM12
NM12
NM12
WM02 WM03
NM16
NM11
NM16NM12
NM15 NM14
WM13
WM01
WM14
WM15
WM16
WM17
WM19
WM18
WM20
WM12
PORTION 1
WM
21
243
8282
243
5868 289
277
82
8230
8
91 94337
112 110367
151139 29727
7
312
348
82
82
82
186 166349
8234
8
247
281
316
1464141358
2
82
82
52
8227
7
63 156
82
355
310
3718
247
82
-
FORMWORK LAYOUT PLAN FOR PORTION 2Scale=1:100
NOTE:1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.2.PLEASE REFER TO DRAWING NO ZHJV-W-A2-FF-0019-0, ZHJV-W-A2-FF-0020-0, ZHJV-W-A2-FF-0021-0 FOR FORMWORK PANEL ASSEMBLY DRAWING.
PROJECT DOCUMENT NUMBER:
company phase
SCALE :
FILE NAME:
zone document number
DRAWING TITLE:
A2_ ABUTMENT
ENGINEERING CONSULTANT:
REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.
GOVERNMENT OF UGANDA
EMPLOYER:
ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]
PYUNGHWA ENGINEERING CONSULTANTS LTD
ENGINEERING CONTRACTOR:
ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda
PORTION 2 PORTION 1
WM
21W
M21
WM
21W
M21
WM
21
NM15NM14
NM16NM12
NM13NM12
NM12
NM12NM16
NM11
NM16 NM12
NM15 NM14
PORTION 2 PORTION 1
WM
21W
M21
WM
21W
M21
WM
21
NM15NM14
NM16NM12
NM13NM12
NM12
NM12NM16
NM11
NM16 NM12
NM15 NM14
140
144
148
174
178
140 209
212
125
122 1388282
129
126
82 82
107 107
82 82
82 82 96 96 82
82
8282
77 82
75 174
178 79
212
209
6355
144
144
-
FORMWORK LAYOUT PLAN FOR PORTION 3Scale=1:100
NOTE:1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.2.PLEASE REFER TO DRAWING NO ZHJV-W-A2-FF-0019-0, ZHJV-W-A2-FF-0020-0 AND ZHJV-W-A2-FF-0021-0 FOR FORMWORK PANEL ASSEMBLY DRAWING.
PROJECT DOCUMENT NUMBER:
company phase
SCALE :
FILE NAME:
zone document number
DRAWING TITLE:
A2_ ABUTMENT
ENGINEERING CONSULTANT:
REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.
GOVERNMENT OF UGANDA
EMPLOYER:
ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]
PYUNGHWA ENGINEERING CONSULTANTS LTD
ENGINEERING CONTRACTOR:
ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda
PORTION 2PORTION 3
NM15NM14
NM16NM12
NM13NM12
NM12
NM12NM16
NM11
NM16 NM12
NM15 NM14
WM01
PORTION 2PORTION 3
NM15NM14
NM16NM12
NM13NM12
NM12
NM12NM16
NM11
NM16 NM12
NM15 NM14
WM01
42
236
72232
116
106
110
71
110
146
78 82
135
217
42
221
72 72
93
106
88
57
82 82
68
-
STEEL FORM ARRANGEMENT FOR ANCHORScale=1:100
NOTE:1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.2.BOLT M16X50 USED FOR CONNECTING STEEL FORM.
STEEL FORM ARRANGEMENT FOR ANCHOR - PORTION 1 STEEL FORM ARRANGEMENT FOR ANCHOR - PORTION 2
STEEL FORM ARRANGEMENT FOR ANCHOR - PORTION 3
DETAIL A
PROJECT DOCUMENT NUMBER:
company phase
SCALE :
FILE NAME:
zone document number
DRAWING TITLE:
A2_ ABUTMENT
ENGINEERING CONSULTANT:
REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.
GOVERNMENT OF UGANDA
EMPLOYER:
ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]
PYUNGHWA ENGINEERING CONSULTANTS LTD
ENGINEERING CONTRACTOR:
ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda
4411500150015001500150015001500150015001500
L=25
00
L=25
00
L=25
00
L=25
00
L=25
00
L=25
00
L=25
00
L=25
00
L=25
00
L=25
00
L=25
00
L=20
00
L=20
00
L=20
00
L=20
00
L=20
00
L=15
00
L=15
00
L=15
00
L=10
00
L=10
00
L=10
00
Beam-1Beam-2Beam-3Beam-4
Beam-10 Beam-11Beam-12 Beam-13 Beam-14
Beam-9Anchor form-3
Anchor form-3
Anchor form-3
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
Detail "A" Beam-5Beam-6Beam-7Beam-11
Beam-12Beam-9 Beam-10
Beam-2Beam-4 Beam-3
Anchor form-3
Anchor form-3
Anchor form-3
150015001500150015001500165115001500
L=25
00
L=25
00
L=25
00
L=25
00
L=25
00
L=25
00
L=25
00
L=25
00
L=25
00
L=25
00
L=20
00
L=20
00
L=20
00
L=20
00
L=15
00
L=15
00
L=15
00
L=10
00
L=10
00
L=10
00
?
?
?
?
?
?
?
?
?
?
?
??
?
?
?
?
?
?
?
?
?
?
?
Beam-8Beam-9 Beam-2Beam-4 Beam-3
95
100607
6Anchor form-4
L=25
00
L=25
00
L=25
00
L=25
00
L=25
00
L=25
00
L=25
00
L=25
00
L=20
00
L=20
00
L=20
00
L=15
00
L=15
00
L=10
00
L=10
00
L=10
00
1500 1500 1500 1500 1500 1500 1500
?
?
?
??
?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
600
Anchor form-3
?
?
?
?
Detail "A"
-
NOTE:ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
FORMWORK PANEL TYPICAL ASSEMBLY DRAWINGScale=1:40
PROJECT DOCUMENT NUMBER:
company phase
SCALE :
FILE NAME:
zone document number
DRAWING TITLE:
A2_ ABUTMENT
ENGINEERING CONSULTANT:
REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.
GOVERNMENT OF UGANDA
EMPLOYER:
ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]
PYUNGHWA ENGINEERING CONSULTANTS LTD
ENGINEERING CONTRACTOR:
ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda
WM01
NO. DESCRIPTION SPEC. UNIT QUANTITY1
Plywood
-18*1220*2340 pcs 12 -18*1220*2340 pcs 13 -18*1220*2340 pcs 14 -18*1220*2340 pcs 15 -18*370*2340 pcs 11 Timber Beam H20/L=5170 pcs 92 Timber Plank 40*80/L=2520 pcs 43 Lifting Hook pcs 24 Steel Waler Double [12/ L=2520 set 45 Flange clamp pcs 44
1
900
1000
1200
1500
650
810 740 790
2340
370
1220
1220
2340
810 740 790
300 300 300 250 190 300 300 300 280
2520
20
40
PLYWOOD SIZEHOLE POSITION FOR TIE ROD
TIMBER BEAM POSITION
STEEL WALING LENGTH
Timber plank 40x80
Timber beam
Steel waling
900
1000
1200
1500
650
5170
4040
5250
900
1000
1200
1500
650
1220
1220
1220
1220
370
Lifting hook
Plywood size
2
3
4
5
1220
1220
CASE 1 SCALE = 1:20
L30020 20
80
-
NOTE:ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
FORMWORK PANEL ASSEMBLY DRAWING FOR A2 - PART 1Scale=1:40
PROJECT DOCUMENT NUMBER:
company phase
SCALE :
FILE NAME:
zone document number
DRAWING TITLE:
A2_ ABUTMENT
ENGINEERING CONSULTANT:
REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.
GOVERNMENT OF UGANDA
EMPLOYER:
ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]
PYUNGHWA ENGINEERING CONSULTANTS LTD
ENGINEERING CONTRACTOR:
ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda
2340
810 740 790
300 300 300 250 190 300 300 300 280
2520
20
2440 1848
1028 900 900 900 560
20
280320300280320300
4440
300300 320 260300300300
1750
785 650 315
300 300 300 300 270 240
18
1800
20
180
2440 2440
1150 630 828 880 760 632
20
30
250270150300300300300300300250300300300300300280
4800
2440 2440
1430 910 900 900 380
20
30
210330330300300300300320280300320320260300300330
4800
2440 2440
700 800 750 1030
270
4800
300 300 280 300 330300 300 300 300 320 300 320 320 260 300
500
2440 2440
1170 750 800 700 1460
27030
4800
2440 2440
985 940 900 900 1155
20
220
4800
30
2440 2440
1175 900 900 940 965
300 330 300 300 300 300 300 260 330 330 300 300 300 300 300 250
20
30
4800
300 300 320 280 300 300 320 200 180 220 300 280 300 300 300
20
300 300 320 330 300 300 320 300 280 320 320 260 300 300 280
24401987
1030900900900697
227 260 260 320 320 300 280 320 300 300 300 300 300 300 300
4620
24401987
1030940700800700257
317 200 250 300 270 300 330 320 300 300 300 300 300 300 380
4620
2019872440
8509008506501040
20
153 300 300 300 300 300 300 300 320 280 300 320 320 260 260
4620
30
300
360
30
137
307
20
40
40
40
20 20
1100
20
40
30 30
40
330 30
28
380 20
20
153
30
40
40
30
90
38
PLYWOOD SIZEHOLE POSITION FOR TIE ROD
TIMBER BEAM POSITION
STEEL WALING LENGTH
Timber plank 40x80
Timber beam
Steel waling
900
1000
1200
1500
650
5170
4040
5250
900
1000
1200
1500
650
1220
1220
1220
1220
370
Lifting hook
Plywood size
-
NOTE:ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
FORMWORK PANEL ASSEMBLY DRAWING FOR A2 - PART 2Scale=1:40
PROJECT DOCUMENT NUMBER:
company phase
SCALE :
FILE NAME:
zone document number
DRAWING TITLE:
A2_ ABUTMENT
ENGINEERING CONSULTANT:
REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.
GOVERNMENT OF UGANDA
EMPLOYER:
ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]
PYUNGHWA ENGINEERING CONSULTANTS LTD
ENGINEERING CONTRACTOR:
ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda
180
2440 184820
4509001490650798
20280260320320300280320300300
4440
300300300300380
244024404309402120940450
330
4800
40
244024406008007001410900470
330300300 30
300300260320320300280320300300300300300300270
260320320300280300300300300300300270
4800
320
1687
488
350
530830327
3153353002001320
1640490 850 300
430
30230200300300300
1620
30270300300300300320320320300300330
4800
4509402085935465
2024402440
302703003003003003003003202803003203202603003003304800
43590069580560024402440 20
300300280300260
125
1848 24407986501490900450
3803003003003003003003202804440
300320320260280
Timber plank 40x80
Flange clamp
???????????????
Timber beam
Steel waling
300
350
1200
1500
650
3920
4040
4000
300
350
1200
1500
650
1220
1220
1220
340
Lifting hook
Plywood size
20
30 30
20
30
40
25 170
22
40
363
30
40
1445
30
40
2018
300
28
PLYWOOD SIZEHOLE POSITION FOR TIE ROD
TIMBER BEAM POSITIONSTEEL WALING LENGTH
28
20
20
180
-
NOTE:ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
FORMWORK PANEL ASSEMBLY DRAWING FOR A2 - PART 3Scale=1:30
PROJECT DOCUMENT NUMBER:
company phase
SCALE :
FILE NAME:
zone document number
DRAWING TITLE:
A2_ ABUTMENT
ENGINEERING CONSULTANT:
REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.
GOVERNMENT OF UGANDA
EMPLOYER:
ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]
PYUNGHWA ENGINEERING CONSULTANTS LTD
ENGINEERING CONTRACTOR:
ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda
536
228 308
840
154
1564214 850 500
398300
1620
1966
420
440740786
2100
126 304 300 300 200 300 300 280
1966520 650 796
420
126194180300330300300380
2100
1966
420
505650811
126 224 240 240 300 300 300 380
2100
300300304
1564
214850500
318 300
1620
300 300 384
18 18
18
20 18
18 20
18
18
150
Flange clamp
???????????????
Timber beam
Steel waling
300
1000
1200
1500
650
4570
4040
4650
300
1000
1200
1500
650
1220
1220
1220
990
Lifting hook
Plywood size
PLYWOOD SIZEHOLE POSITION FOR TIE ROD
TIMBER BEAM POSITIONSTEEL WALING LENGTH
-
NOTE:ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
FORMWORK PANEL ASSEMBLY DRAWING FOR A2 - PART 4Scale=1:40
PROJECT DOCUMENT NUMBER:
company phase
SCALE :
FILE NAME:
zone document number
DRAWING TITLE:
A2_ ABUTMENT
ENGINEERING CONSULTANT:
REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.
GOVERNMENT OF UGANDA
EMPLOYER:
ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]
PYUNGHWA ENGINEERING CONSULTANTS LTD
ENGINEERING CONTRACTOR:
ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda
490 900 900 640
420
2002103003003003003003003003802880
2440 490
4607008007502202440490
420
2880
44070080070082024401020
420
200 210 300 300 300 300 300 300 300 380
330 310 300 300 300 300 300 300 270 330 380
3420
10
44090090094028024401020
10 300 320 320 300 300 300 300 300 300 300 380
3420
440700800925595
10 300 320 320 300 300 300 300 300 300 300 380
24401020
3420
420
565 610 880 880 5252440 1020
10300320320200250300300300300200250
3420
45591090090029524401020
10 300 320 320 300 300 300 300 300 300 300 3803420
420
420
420
460 700 800 900 6002440 1020
103003203203003003003202803003003803420
420
40
490900900640
420
200 210 300 300 300 300 300 300 300 380
2880
2440490
40
18
40
460 700 800 750 2202440 490
420
2880
200210300300300300300300300380
18
40
40
18
440 700 800 700 8202440 1020
420
330310300300300300300300270330380
3420
10
40
18
40
18
40
440 900 900 940 2802440 1020
10300320320300300300300300300300380
3420
420
40
18
40
40
380
40
Flange clamp
???????????????
Timber beam
Steel waling
300
1000
1200
1500
650
4570
4040
4650
300
1000
1200
1500
650
1220
1220
1220
990
Lifting hook
Plywood size
PLYWOOD SIZEHOLE POSITION FOR TIE ROD
TIMBER BEAM POSITIONSTEEL WALING LENGTH
-
NOTE:ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
FORMWORK PANEL ASSEMBLY DRAWING FOR A2 - PART 1Scale=1:40
PROJECT DOCUMENT NUMBER:
company phase
SCALE :
FILE NAME:
zone document number
DRAWING TITLE:
A2_ ABUTMENT
ENGINEERING CONSULTANT:
REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.
GOVERNMENT OF UGANDA
EMPLOYER:
ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]
PYUNGHWA ENGINEERING CONSULTANTS LTD
ENGINEERING CONTRACTOR:
ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda
2340
934 740 666
320 330 300 250 240 250 250 300 280
2520
20
2440 1848
1028 900 900 900 560
20
280320300280320300
4440
300300 320 260300300300
1750
658 650 442
330 250 250 250 200 220
18
1800
20
180
2440 2440
1285 318 920 900 770 687
20
30
250270250200300300300300300330330300250250300270
4800
2440 2440
1494 770 900 920 308
20
30
210330330300300300300320280300300300300300300330
4800
2440 2440
700 800 750 1030
270
4800
300 300 280 300 330300 300 300 300 320 300 320 320 260 300
500
2440 2440
1170 750 800 700 1460
27030
4800
2440 2440
1055 920 900 771 1234
20
220
4800
30
2440 2440
1256 770 900 920 1034
300 330 300 360 240 300 300 260 330 330 300 300 300 300 300 250
20
30
4800
300 300 320 280 300 300 320 200 180 220 300 280 300 300 300
20
300 300 320 330 300 300 320 300 280 320 170 250 160 300 300
24401987
1030900900900697
227 260 260 320 320 300 280 320 300 300 300 300 300 300 300
4620
19872440
1097403920900770337
280 200 250 300 300 270 300 300 300 300 300 200 300 300 300
4620
2019872440
8509008505251040
20
153 300 300 300 300 218 250 300 300 300 300 300 300 300 290
4620
30
300
488
30
262
410
20
40
40
40
20 20
1100
20
40
30 30
40
330 30
28
380 20
20
267
30
40
40
30
70
38
PLYWOOD SIZEHOLE POSITION FOR TIE ROD
TIMBER BEAM POSITION
STEEL WALING LENGTH
Timber beam
Steel waling
844
900
536
2200
40
2280
844
900
536
1220
1060
Lifting hook
Plywood size
153
330
230
-
NOTE:ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
FORMWORK PANEL ASSEMBLY DRAWING FOR A2 - PART 2Scale=1:30
PROJECT DOCUMENT NUMBER:
company phase
SCALE :
FILE NAME:
zone document number
DRAWING TITLE:
A2_ ABUTMENT
ENGINEERING CONSULTANT:
REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.
GOVERNMENT OF UGANDA
EMPLOYER:
ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]
PYUNGHWA ENGINEERING CONSULTANTS LTD
ENGINEERING CONTRACTOR:
ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda
536
228 308
840
154
1439214 850 375
273300
1620
1841
420
440740661
2100
251 179 300 300 200 300 300 280
1966520 650 796
420
126194180300330300300380
2100
1966
420
505650811
126 224 240 240 300 300 300 380
2100
300300304
1564
338850376
298 300
1620
250 250 300
18 18
143
20 18
18 20
18
18
150204
1564
338 850 376
298300
1620
250250300
1820
18204
1439214850375
273 300
1620
300 300 304143
2018
1841520 650 671
420
251249300330300300380
2100
18
Timber plank 40x80
Flange clamp
???????????????
Timber beam
300
900
480
1600
40
1680
300
900
480
1220
460
Lifting hook
Plywood size
PLYWOOD SIZEHOLE POSITION FOR TIE ROD
TIMBER BEAM POSITION
STEEL WALING LENGTH
-
NOTE:ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.
FORMWORK PANEL ASSEMBLY DRAWING FOR A2 - PART 3Scale=1:30
PROJECT DOCUMENT NUMBER:
company phase
SCALE :
FILE NAME:
zone document number
DRAWING TITLE:
A2_ ABUTMENT
ENGINEERING CONSULTANT:
REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.
GOVERNMENT OF UGANDA
EMPLOYER:
ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.
UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]
PYUNGHWA ENGINEERING CONSULTANTS LTD
ENGINEERING CONTRACTOR:
ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda
490 900 900 64042
0
2002103003003003003003003003802880
2440 490
4607008007502202440490
420
2880
44070080070082024401020
420
200 210 300 300 300 300 300 300 300 380
330 310 300 300 300 300 300 300 270 330 380
3420
10
44090090094028024401020
10 300 320 320 300 300 300 300 300 300 300 380
3420
440700800925595
10 300 320 320 300 300 300 300 300 300 300 380
24401020
3420
420
3957709009202252440770
35 275 300 300 300 300 300 300 245 300 200 3103120
420
420
460 700 800 900 6002440 1020
103003203203003003003202803003003803420
420
40
490900900640
420
200 210 300 300 300 300 300 300 300 380
2880
2440490
40
18
40
460 700 800 750 2202440 490
420
2880
200210300300300300300300300380
18
40
40
18
440 700 800 700 8202440 1020
420
330310300300300300300300270330380
3420
10
40
18
40
18
40
440 900 900 940 2802440 1020
10300320320300300300300300300300380
3420
420
40
18
40
40
PLYWOOD SIZEHOLE POSITION FOR TIE ROD
TIMBER BEAM POSITION
STEEL WALING LENGTH
395 770 900 920 2252440 770
35275300300300300300300245300200
3120
420
40
310
570 850 900 850 2902440 1020
420
330310300300300300300300270330380
3420
10
40
18
Note :Waling cut from waling L=3420mm
522 770 900 920 3482440 1020
10270250250320300300300300300300360
3420
420
40
18
170
52277090092034824401020
10 270 250 250 320 300 300 300 300 300 300 360
3420
420
40
18
170
395 770 900 920 2252440 770
352753003003003003003002453002003103120
420
40
Note :Waling cut from waling L=3420mm
Timber plank 40x80
Flange clamp
???????????????
Timber beam
300
900
480
1600
40
1680
300
900
480
1220
460
Lifting hook
Plywood size
-
Amazon.com_ ASUS X550ZA 15.6 Inch Lapto..computer purchasesCopy of Drawing Filing SystemGmail - InboxGmail - love you.............ZHJV-W-A2-FO-0001-0 A2-ABUTMENT_CONSTRUCTION SEQUENCEZHJV-W-A2-FO-0002-0 A2-ABUTMENT_STRUCTURE DIMENSION & CONSTRUCTION JOINT_LOWER PART_LAYOUT PLANZHJV-W-A2-FO-0003-0 A2-ABUTMENT_FORWORK PANEL_PORTION 1_LOWER PART_LAYOUT PLANZHJV-W-A2-FO-0004-0 A2-ABUTMENT_FORMWORK ACCESSORY_PORTION 1_LOWER PART_LAYOUT PLANZHJV-W-A2-FO-0005-0 A2-ABUTMENT_FORMWORK PANEL_PORTION 2_LOWER PART_LAYOUT PLANZHJV-W-A2-FO-0006-0 A2-ABUTMENT_FORMWORK ACCESSORY_PORTION 2_LOWER PART_LAYOUT PLANZHJV-W-A2-FO-0007-0 A2-ABUTMENT_FORMWORK PANEL_PORTION 3_LOWER PART_LAYOUT PLANZHJV-W-A2-FO-0008-0 A2-ABUTMENT_FORMWORK ACCESSORY_PORTION 3_LOWER PART_LAYOUT PLANZHJV-W-A2-FO-0009-0 A2-ABUTMENT_STRUCTURE DIMENSION & CONSTRUCTION JOINT_UPPER PART_LAYOUT PLANZHJV-W-A2-FO-0010-0 A2-ABUTMENT_FORWORK PANEL_PORTION 1_UPPER PART_LAYOUT PLANZHJV-W-A2-FO-0011-0 A2-ABUTMENT_FORMWORK PANEL_PORTION 2_UPPER PART_LAYOUT PLANZHJV-W-A2-FO-0012-0 A2-ABUTMENT_FORMWORK PANEL_PORTION 3_UPPER PART_LAYOUT PLANZHJV-W-A2-FO-0013-0 A2-ABUTMENT_STEEL FORM ARRANGEMENT FOR ANCHOR_PORTION 1, 2 & 3ZHJV-W-A2-FO-0014-0 A2-WALL FORM PANEL TYPICAL ASSEMBLYZHJV-W-A2-FO-0015-0 A2-ABUTMENT_WALL FORM PANEL ASSEMBLY_PART 1_LOWER PARTZHJV-W-A2-FO-0016-0 A2-ABUTMENT_WALL FORM PANEL ASSEMBLY_PART 2_LOWER PARTZHJV-W-A2-FO-0017-0 A2-ABUTMENT_WALL FORM PANEL ASSEMBLY_PART 3_LOWER PARTZHJV-W-A2-FO-0018-0 A2-ABUTMENT_WALL FORM PANEL ASSEMBLY_PART 4_LOWER PARTZHJV-W-A2-FO-0019-0 A2-ABUTMENT_WALL FORM PANEL ASSEMBLY_PART 1_UPPER PARTZHJV-W-A2-FO-0020-0 A2-ABUTMENT_WALL FORM PANEL ASSEMBLY_PART 2_UPPER PARTZHJV-W-A2-FO-0021-0 A2-ABUTMENT_WALL FORM PANEL ASSEMBLY_PART 3_UPPER PARTZHJV-W-BR-RA-(0001 to 0006)Alignment Dwg 1.pdfAlignment Dwg 2Alignment Dwg 3Alignment Dwg 4Alignment Dwg 5Alignment Dwg 6