  • revision

    LEGEND

    company - ZHJV - ZENITAKA HYUNDAI JOINT VENTURE

    phase - W WORKING DRAWING

    A AS-BUILT DRAWING

    zone HD HIGHWAY

    A1 ABUTMENT 1

    A2 ABUTMENT 2

    P1 PYLON 1

    P2 PYLON 2

    SC STAY CABLE

    BA BRIDGE ACCSESSORIES

    GE GENERAL

    document SI SITE INSTALLATION

    CO CONCRETE OUTLINE

    RE REINFORCEMENT

    FW FABRICATION WORKS

    EW EARTHWORKS

    EM ELECRO-MECHANICAL

    FO FORMWORK

    AB ABUTMENT

    ST STRUCTURE

    PT POST-TENSIONING

    LP LIGHTENING PROTECTION

    CM COMMON

    AS APPROACH SLAB

    BL BEARING & LATERAL SUPPORT

    DR DRAINAGE

    BC BOX CULVERT

    AC ACCESS FACILITY (Ladder, Step, Door)

    UT UTILITY (Power, Communication, Light)

    HR HAND RAIL

    EJ EXPANSION JOINT

    BP BORED PILE

    LY LAYOUT

    number 0001 to 0999 DRAWING NUMBER

    ZHJV

    DRAWING FILING SYSTEM

    company phase zone document number

  • revision 1,2,3....etc REVISION CODE FOR WORKING DRAWINGS

    A,B,C..etc REVISION CODE FOR AS-BUILT DRAWINGS

  • CONSTRUCTION SEQUENCEScale=1:200

    PROJECT DOCUMENT NUMBER:

    company phase

    SCALE :

    FILE NAME:

    zone document number

    DRAWING TITLE:

    A2_ ABUTMENT

    ENGINEERING CONSULTANT:

    REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.

    GOVERNMENT OF UGANDA

    EMPLOYER:

    ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.

    UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]

    PYUNGHWA ENGINEERING CONSULTANTS LTD

    ENGINEERING CONTRACTOR:

    ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda

    STEP 1:1. INSTALL REBAR FOR BOTTOM SLAB.2. INSTALL CONVENTIONAL SIDE FORM FOR BOTTOM SLAB.3. CAST BOTTOM SLAB.

    STEP 2:1. INSTALL REBAR FOR CENTER HIGHER SLAB.LEAVE

    STARTER BAR OUTSIDE FOR WALL.2. INSTALL CONVENTIONAL SIDE FORM.3. CAST THE CENTER HIGHER SLAB.

    STEP 3:1. INSTALL REBAR FOR WALL.2. BEND REBAR FOR WALKWAY SLAB.3. INSTALL WALL SYSTEM FORMWORK.4. ADJUST THE VERTICALITY AND CAST.

    STEP 4:1. REMOVE WALL SYSTEM FORMWORK.2. BACK FILLING.3. LEAN CONCRETE.4. CAST WALKWAY SLAB.5. INSTALL CONVENTIONAL SIDE FORM.6. CAST THE MIDDLE SLAB.

    STEP 5:1. INSTALL REBAR AND PT TENDONS FOR WALL.2. INSTALL BOX-OUT FOR CABLE ANCHOR.3. INSTALL WALL SYSTEM FORMWORK.4. ADJUST THE VERTICALITY AND CAST.

    STEP 6:1. REMOVE WALL SYSTEM FORMWORK AND BOX-OUT.2. BACK FILLING AND LEAN CONCRETE.3. ARRANGE SCAFFOLDING FOR TOP SLAB AND CABLE

    ANCHOR.4. INSTALL REBAR/PT TENDONS FOR CABLE ANCHOR AND

    TOP SLAB.5. CAST TOP SLAB.

  • NOTE:ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.

    STRUCTURE DIMENSION AND CONSTRUCTION JOINT LAYOUT PLAN - LOWER PARTScale=1:120

    PROJECT DOCUMENT NUMBER:

    company phase

    SCALE :

    FILE NAME:

    zone document number

    DRAWING TITLE:

    A2_ ABUTMENT

    ENGINEERING CONSULTANT:

    REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.

    GOVERNMENT OF UGANDA

    EMPLOYER:

    ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.

    UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]

    PYUNGHWA ENGINEERING CONSULTANTS LTD

    ENGINEERING CONTRACTOR:

    ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda

    500

    500

    3400

    500

    3450

    500

    1100

    500

    3450

    500

    3400

    500

    8900

    8900

    500

    3720

    500

    3450

    500

    1100

    500

    3450

    500

    3720

    500

    1844

    0

    1250 4000 500 4000 500 4000 500 4000 500 4000 500 4000 500 4000 500 4000 500 4000

    PORTION 1PORTION 2PORTION 3

  • FORMWORK LAYOUT PLAN FOR PORTION 1Scale=1:100

    NOTE:1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.2.PLEASE REFER TO DRAWING NO ZHJV-W-A2-FF-0015-0, ZHJV-W-A2-FF-0016-0, ZHJV-W-A2-FF-0017-0 AND ZHJV-W-A2-FF-0018-0 FOR FORMWORK PANEL ASSEMBLY DRAWING.

    PROJECT DOCUMENT NUMBER:

    company phase

    SCALE :

    FILE NAME:

    zone document number

    DRAWING TITLE:

    A2_ ABUTMENT

    ENGINEERING CONSULTANT:

    REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.

    GOVERNMENT OF UGANDA

    EMPLOYER:

    ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.

    UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]

    PYUNGHWA ENGINEERING CONSULTANTS LTD

    ENGINEERING CONTRACTOR:

    ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda

    PORTION 1

    WM01 WM02WM04

    WM19WM20

    WM12

    WM21

    WM23

    WM22

    NM

    01

    NM

    01

    NM

    01

    NM

    01

    NM

    01

    NM

    01

    NM

    01

    NM

    02

    NM

    02

    NM

    02

    NM

    02

    NM

    02

    NM

    02

    NM

    02

    NM

    03NM

    03

    NM

    03

    NM

    03

    NM

    03

    NM

    03NM

    03N

    M04

    NM

    04

    NM

    04

    NM

    04 NM

    04

    NM

    04

    NM

    04

    NM05

    NM05

    NM05

    NM05

    NM06

    NM06

    NM06

    NM07

    NM07

    NM07

    NM07

    NM07

    NM08

    NM08

    NM08

    NM08

    NM08

    NM12

    WM15WM18

    PORTION 1

    WM01 WM02WM04

    WM19WM20

    WM12

    WM21

    WM23

    WM22

    NM

    01

    NM

    01

    NM

    01

    NM

    01

    NM

    01

    NM

    01

    NM

    01

    NM

    02

    NM

    02

    NM

    02

    NM

    02

    NM

    02

    NM

    02

    NM

    02

    NM

    03NM

    03

    NM

    03

    NM

    03

    NM

    03

    NM

    03NM

    03N

    M04

    NM

    04

    NM

    04

    NM

    04 NM

    04

    NM

    04

    NM

    04

    NM05

    NM05

    NM05

    NM13

    NM05

    NM06

    NM06

    NM06

    NM07

    NM07

    NM07

    NM07

    NM07

    NM08

    NM08

    NM08

    NM08

    NM08

    NM12

    WM15WM18

    243

    8282

    243

    5868 289

    277

    82

    8230

    8

    91 94337

    112 110367

    181

    151139 42227

    7

    312

    348

    82

    82

    82

    186 166473

    8234

    8

    247

    281

    316

    1464141358

    2

    82

    82

    52

    8227

    7

    63 281

    82

    230

    310

    3718

    247

    82

    NM13

  • FORMWORK ACCESSORY LAYOUT PLAN FOR PORTION 1Scale=1:100

    NOTE:1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.

    PROJECT DOCUMENT NUMBER:

    company phase

    SCALE :

    FILE NAME:

    zone document number

    DRAWING TITLE:

    A2_ ABUTMENT

    ENGINEERING CONSULTANT:

    REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.

    GOVERNMENT OF UGANDA

    EMPLOYER:

    ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.

    UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]

    PYUNGHWA ENGINEERING CONSULTANTS LTD

    ENGINEERING CONTRACTOR:

    ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda

    PORTION 1

    740 1441 760 880 828 630 1515 900 900 910 8501572 900 850 650 1040

    790

    1030

    900

    900

    900

    1729

    750

    800

    700

    545

    760

    900

    900

    900

    900

    780

    798

    900

    900

    500 850 1418700800701900

    478

    700

    800

    750

    700 800 700 900

    1100

    1258

    700

    800

    750

    1730

    900

    900

    900

    1030

    785 650 1490 900 900 940 1945 940 900 900 1407 700 800 700 940 1030

    798 647 1497 900 900 940 2086 940 900 900 1448 700 800 900 850

    458700800701900

    722

    750

    800

    700

    478

    700

    800

    750

    798 650 1490 900 900 940 2122 940 900 900 1416 700 800 925 834

    500 850

    16271739

    1892 940 900 900 1416 900 900 940 1847 950 700 800 700

    508

    900

    900

    750

    561

    780

    900

    900

    508

    900

    900

    860

    WM01 WM02WM04

    WM19WM20

    WM12

    WM21

    WM23

    WM22

    NM

    01

    NM

    01

    NM

    01

    NM

    01

    NM

    01

    NM

    01

    NM

    01

    NM

    02

    NM

    02

    NM

    02

    NM

    02

    NM

    02

    NM

    02

    NM

    02

    NM

    03NM

    03

    NM

    03

    NM

    03

    NM

    03

    NM

    03NM

    03N

    M04

    NM

    04

    NM

    04

    NM

    04 NM

    04

    NM

    04

    NM

    04

    NM05

    NM05

    NM05

    NM05

    NM06

    NM06

    NM06

    NM07

    NM07

    NM07

    NM07

    NM07

    NM08

    NM08

    NM08

    NM08

    NM08

    NM12

    WM15WM18

    508

    380

    700

    478

    700

    800

    750

    722

    750

    800

    700

    722

    750

    800

    700

    PORTION 1193 1650 1537 3050 1892 2750 1961 2800 693

    715

    2800

    1670

    3100

    2080

    2750

    1909

    2700

    716

    733250019573400

    1469335012621050187

    1231

    809

    1230

    798

    1500869

    1230

    803

    1232

    820

    180010061800 959

    930

    1111

    1230

    800

    900 908

    800 832

    1500

    799

    1500 849

    1500

    819

    1890756

    1800857

    1500

    802

    1699 1155

    18001019

    1500

    817

    1800 1029

    2100 836

    1500

    817

    1799826

    1500

    798

    1800 846

    1500

    814

    1531 1075

    1801807

    1500

    800

    2101 836

    650 836

    18001155

    1750

    790

    1194

    834

    1840 1091

    1200

    809

    1200

    815

    1680978

    340 849

    548

    506

    456

    NM13

    573

  • FORMWORK LAYOUT PLAN FOR PORTION 2Scale=1:100

    NOTE:1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.2.PLEASE REFER TO DRAWING NO ZHJV-W-A2-FF-0015-0, ZHJV-W-A2-FF-0016-0, ZHJV-W-A2-FF-0017-0 AND ZHJV-W-A2-FF-0018-0 FOR FORMWORK PANEL ASSEMBLY DRAWING.

    PROJECT DOCUMENT NUMBER:

    company phase

    SCALE :

    FILE NAME:

    zone document number

    DRAWING TITLE:

    A2_ ABUTMENT

    ENGINEERING CONSULTANT:

    REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.

    GOVERNMENT OF UGANDA

    EMPLOYER:

    ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.

    UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]

    PYUNGHWA ENGINEERING CONSULTANTS LTD

    ENGINEERING CONTRACTOR:

    ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda

    PORTION 2 PORTION 1

    NM

    03N

    M04

    NM05

    NM06

    PORTION 2 PORTION 1

    NM

    03N

    M04

    NM05

    NM06

    140

    144

    148

    174

    178

    140 209

    212

    125 142

    122 1388282

    129

    126

    82 82

    107 107

    82 82

    82 82 96 96 82

    82

    8282

    77 82 65

    75 174

    178 79 61

    212

    209

    6355

    144

    144

  • FORMWORK ACCESSORY LAYOUT PLAN FOR PORTION 2Scale=1:100

    NOTE:1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.

    PROJECT DOCUMENT NUMBER:

    company phase

    SCALE :

    FILE NAME:

    zone document number

    DRAWING TITLE:

    A2_ ABUTMENT

    ENGINEERING CONSULTANT:

    REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.

    GOVERNMENT OF UGANDA

    EMPLOYER:

    ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.

    UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]

    PYUNGHWA ENGINEERING CONSULTANTS LTD

    ENGINEERING CONTRACTOR:

    ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda

    PORTION 2 PORTION 1PORTION 2 PORTION 1

    NM

    03N

    M04

    NM05

    NM06

    790 740 1422 760 880 828 630 1465 380 900 900 910 969

    492

    712

    900

    900

    508

    900

    900

    730

    527

    746

    900

    900

    850 1901 600 701 800 700 1418 700 800 700 600 763 601 700

    478

    700

    800

    750

    722

    750

    800

    700

    478

    700

    800

    750

    633850

    796 650 1496 900 900 940 2114 940 900 900 458 700 800

    500

    798 650 1490 900 900 940 2085 940 900 900 458 700

    478

    700

    800

    750

    722

    750

    800

    700

    478

    700

    800

    750

    492

    712

    900

    900

    508

    900

    900

    730

    527

    746

    900

    900

    598 850 900

    1281

    958

    978

    500 850 1910 940 900 900 1416 900 900 940 782 1205 600 700

    785 650 1495 900 900 940 2015 940 900 900 469 943 700 800

    538650

    523650

    634850

    424 1680 1291 2950 1882 3000 1463 3300

    920

    850

    800

    900

    13951680

    1740

    1453 1500

    990

    1017

    1700

    11691800

    300 900 1450 3350 1500 3360 1480 2970

    1200

    1800

    1234

    1520

    1017

    1700

    977 180013201800

    104518001091

    1500

    1800

    1500

    13721800

    1800 10421550

    1800

    1525

    1480

    1490

    10721500

    1500

    1800

    1500

    1500

    10621800

    1720

    826

    895

    848

    849

    759

    1800 1068808

    1191

    1129

    848

    1099

    848

    858

    848

    1101

    862

    808

    1166

    NM

    03N

    M04

    NM05

    NM06

  • FORMWORK LAYOUT PLAN FOR PORTION 3Scale=1:100

    NOTE:1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.2.PLEASE REFER TO DRAWING NO ZHJV-W-A2-FF-0015-0, ZHJV-W-A2-FF-0016-0, ZHJV-W-A2-FF-0017-0 AND ZHJV-W-A2-FF-0018-0 FOR FORMWORK PANEL ASSEMBLY DRAWING.

    PROJECT DOCUMENT NUMBER:

    company phase

    SCALE :

    FILE NAME:

    zone document number

    DRAWING TITLE:

    A2_ ABUTMENT

    ENGINEERING CONSULTANT:

    REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.

    GOVERNMENT OF UGANDA

    EMPLOYER:

    ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.

    UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]

    PYUNGHWA ENGINEERING CONSULTANTS LTD

    ENGINEERING CONTRACTOR:

    ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda

    63

    WM01

    WM

    05W

    M08

    PORTION 2PORTION 3

    WM01

    WM

    05W

    M08

    PORTION 2PORTION 3

    111

    42

    108 72

    115

    72 110

    106 106

    142

    93

    72

    74

    90 106

    9496

    42 107

    61

  • FORMWORK ACCESSORY LAYOUT PLAN FOR PORTION 3Scale=1:100

    NOTE:1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.

    PROJECT DOCUMENT NUMBER:

    company phase

    SCALE :

    FILE NAME:

    zone document number

    DRAWING TITLE:

    A2_ ABUTMENT

    ENGINEERING CONSULTANT:

    REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.

    GOVERNMENT OF UGANDA

    EMPLOYER:

    ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.

    UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]

    PYUNGHWA ENGINEERING CONSULTANTS LTD

    ENGINEERING CONTRACTOR:

    ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda

    WM01

    WM

    05W

    M08

    PORTION 2PORTION 31727 760 880 828 630 1460 430 900 900 910 1307 700

    1137

    450

    900

    900

    1488

    700

    800

    570

    1402

    1222

    750

    800

    700

    1486

    900

    900

    450

    1142

    1716 900 899 940 2086 940 900 900 1445 700 800

    1702 900 899 940 2120 940 900 900 1410 700 798

    1705 900 900 940 2085 940 900 900 1412 700 800

    796 940 897 903 1417 899 900 940 1995 600 700

    747 600 700 800 700 1417 700 800 700 600 2032 600 700

    508

    900

    900

    455

    724446

    900900

    722

    750

    800

    700

    478

    700

    800

    750

    508

    900

    900

    453

    720

    451

    899

    900

    722

    750

    800

    700

    478

    700

    800

    750

    WM01

    WM

    05W

    M08

    PORTION 2PORTION 3

    1315

  • NOTE:ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.

    STRUCTURE DIMENSION AND CONSTRUCTION JOINT LAYOUT PLAN - UPPER PARTScale=1:120

    PROJECT DOCUMENT NUMBER:

    company phase

    SCALE :

    FILE NAME:

    zone document number

    DRAWING TITLE:

    A2_ ABUTMENT

    ENGINEERING CONSULTANT:

    REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.

    GOVERNMENT OF UGANDA

    EMPLOYER:

    ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.

    UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]

    PYUNGHWA ENGINEERING CONSULTANTS LTD

    ENGINEERING CONTRACTOR:

    ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda

    PORTION 1PORTION 2PORTION 3

    1844

    037

    2050

    034

    5050

    011

    0050

    034

    5050

    0

    3400

    500

    4500

    4500

    500

    3400

    500

    500

    500

    3720

    1250 3866 750 3736 3718750 750 3704 750 3711 750 3680 750 3665 750 3685 750 4004 500

    1250 3885 750 3764 750 3783 750 3797 750 3789 750 3821 750 3835 750 3815 750 4247 500

    500

    8900

    8900

    1250 4000 500 4000 500 4000 500 4000 500 4000 500 4000 500 4000 500 4000 500 4000

  • FORMWORK LAYOUT PLAN FOR PORTION 1Scale=1:100

    NOTE:1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.2.PLEASE REFER TO DRAWING NO ZHJV-W-A2-FF-0019-0, ZHJV-W-A2-FF-0020-0, ZHJV-W-A2-FF-0021-0 FOR FORMWORK PANEL ASSEMBLY DRAWING.3.PLEASE REFER TO DRAWING NO ZHJV-W-A2-FF-0018-0 FOR CONSOLE BRACKET AND PUSH-PULL PROP ARRANGEMENT PLAN.

    PROJECT DOCUMENT NUMBER:

    company phase

    SCALE :

    FILE NAME:

    zone document number

    DRAWING TITLE:

    A2_ ABUTMENT

    ENGINEERING CONSULTANT:

    REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.

    GOVERNMENT OF UGANDA

    EMPLOYER:

    ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.

    UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]

    PYUNGHWA ENGINEERING CONSULTANTS LTD

    ENGINEERING CONTRACTOR:

    ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda

    WM

    21W

    M21

    WM

    21W

    M21

    WM

    21

    NM

    01

    NM

    01

    NM

    01

    NM

    01

    NM

    01

    NM

    01

    NM

    01

    NM

    02

    NM

    02

    NM

    02

    NM

    02

    NM

    02

    NM

    02

    NM

    02

    NM

    03

    NM

    03

    NM

    03

    NM

    03

    NM

    03NM

    03N

    M04

    NM

    04

    NM

    04

    NM

    04 NM

    04

    NM

    04

    NM

    04

    NM05

    NM06

    NM07

    NM15

    NM08

    NM14

    NM08

    WM10

    NM16

    WM11

    NM12

    NM13

    WM04

    NM12

    NM12

    NM12

    WM02 WM03

    NM16

    NM11

    NM16NM12

    NM15 NM14

    WM13

    WM01

    WM14

    WM15

    WM16

    WM17

    WM19

    WM18

    WM20

    WM12

    PORTION 1

    WM

    21

    WM

    21W

    M21

    WM

    21W

    M21

    WM

    21

    NM

    01

    NM

    01

    NM

    01

    NM

    01

    NM

    01

    NM

    01

    NM

    01

    NM

    02

    NM

    02

    NM

    02

    NM

    02

    NM

    02

    NM

    02

    NM

    02

    NM

    03

    NM

    03

    NM

    03

    NM

    03

    NM

    03NM

    03N

    M04

    NM

    04

    NM

    04

    NM

    04 NM

    04

    NM

    04

    NM

    04

    NM05

    NM06

    NM07

    NM15

    NM08

    NM14

    NM08

    WM10

    NM16

    WM11

    NM12

    NM13

    WM04

    NM12

    NM12

    NM12

    WM02 WM03

    NM16

    NM11

    NM16NM12

    NM15 NM14

    WM13

    WM01

    WM14

    WM15

    WM16

    WM17

    WM19

    WM18

    WM20

    WM12

    PORTION 1

    WM

    21

    243

    8282

    243

    5868 289

    277

    82

    8230

    8

    91 94337

    112 110367

    151139 29727

    7

    312

    348

    82

    82

    82

    186 166349

    8234

    8

    247

    281

    316

    1464141358

    2

    82

    82

    52

    8227

    7

    63 156

    82

    355

    310

    3718

    247

    82

  • FORMWORK LAYOUT PLAN FOR PORTION 2Scale=1:100

    NOTE:1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.2.PLEASE REFER TO DRAWING NO ZHJV-W-A2-FF-0019-0, ZHJV-W-A2-FF-0020-0, ZHJV-W-A2-FF-0021-0 FOR FORMWORK PANEL ASSEMBLY DRAWING.

    PROJECT DOCUMENT NUMBER:

    company phase

    SCALE :

    FILE NAME:

    zone document number

    DRAWING TITLE:

    A2_ ABUTMENT

    ENGINEERING CONSULTANT:

    REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.

    GOVERNMENT OF UGANDA

    EMPLOYER:

    ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.

    UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]

    PYUNGHWA ENGINEERING CONSULTANTS LTD

    ENGINEERING CONTRACTOR:

    ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda

    PORTION 2 PORTION 1

    WM

    21W

    M21

    WM

    21W

    M21

    WM

    21

    NM15NM14

    NM16NM12

    NM13NM12

    NM12

    NM12NM16

    NM11

    NM16 NM12

    NM15 NM14

    PORTION 2 PORTION 1

    WM

    21W

    M21

    WM

    21W

    M21

    WM

    21

    NM15NM14

    NM16NM12

    NM13NM12

    NM12

    NM12NM16

    NM11

    NM16 NM12

    NM15 NM14

    140

    144

    148

    174

    178

    140 209

    212

    125

    122 1388282

    129

    126

    82 82

    107 107

    82 82

    82 82 96 96 82

    82

    8282

    77 82

    75 174

    178 79

    212

    209

    6355

    144

    144

  • FORMWORK LAYOUT PLAN FOR PORTION 3Scale=1:100

    NOTE:1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.2.PLEASE REFER TO DRAWING NO ZHJV-W-A2-FF-0019-0, ZHJV-W-A2-FF-0020-0 AND ZHJV-W-A2-FF-0021-0 FOR FORMWORK PANEL ASSEMBLY DRAWING.

    PROJECT DOCUMENT NUMBER:

    company phase

    SCALE :

    FILE NAME:

    zone document number

    DRAWING TITLE:

    A2_ ABUTMENT

    ENGINEERING CONSULTANT:

    REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.

    GOVERNMENT OF UGANDA

    EMPLOYER:

    ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.

    UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]

    PYUNGHWA ENGINEERING CONSULTANTS LTD

    ENGINEERING CONTRACTOR:

    ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda

    PORTION 2PORTION 3

    NM15NM14

    NM16NM12

    NM13NM12

    NM12

    NM12NM16

    NM11

    NM16 NM12

    NM15 NM14

    WM01

    PORTION 2PORTION 3

    NM15NM14

    NM16NM12

    NM13NM12

    NM12

    NM12NM16

    NM11

    NM16 NM12

    NM15 NM14

    WM01

    42

    236

    72232

    116

    106

    110

    71

    110

    146

    78 82

    135

    217

    42

    221

    72 72

    93

    106

    88

    57

    82 82

    68

  • STEEL FORM ARRANGEMENT FOR ANCHORScale=1:100

    NOTE:1.ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.2.BOLT M16X50 USED FOR CONNECTING STEEL FORM.

    STEEL FORM ARRANGEMENT FOR ANCHOR - PORTION 1 STEEL FORM ARRANGEMENT FOR ANCHOR - PORTION 2

    STEEL FORM ARRANGEMENT FOR ANCHOR - PORTION 3

    DETAIL A

    PROJECT DOCUMENT NUMBER:

    company phase

    SCALE :

    FILE NAME:

    zone document number

    DRAWING TITLE:

    A2_ ABUTMENT

    ENGINEERING CONSULTANT:

    REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.

    GOVERNMENT OF UGANDA

    EMPLOYER:

    ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.

    UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]

    PYUNGHWA ENGINEERING CONSULTANTS LTD

    ENGINEERING CONTRACTOR:

    ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda

    4411500150015001500150015001500150015001500

    L=25

    00

    L=25

    00

    L=25

    00

    L=25

    00

    L=25

    00

    L=25

    00

    L=25

    00

    L=25

    00

    L=25

    00

    L=25

    00

    L=25

    00

    L=20

    00

    L=20

    00

    L=20

    00

    L=20

    00

    L=20

    00

    L=15

    00

    L=15

    00

    L=15

    00

    L=10

    00

    L=10

    00

    L=10

    00

    Beam-1Beam-2Beam-3Beam-4

    Beam-10 Beam-11Beam-12 Beam-13 Beam-14

    Beam-9Anchor form-3

    Anchor form-3

    Anchor form-3

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    Detail "A" Beam-5Beam-6Beam-7Beam-11

    Beam-12Beam-9 Beam-10

    Beam-2Beam-4 Beam-3

    Anchor form-3

    Anchor form-3

    Anchor form-3

    150015001500150015001500165115001500

    L=25

    00

    L=25

    00

    L=25

    00

    L=25

    00

    L=25

    00

    L=25

    00

    L=25

    00

    L=25

    00

    L=25

    00

    L=25

    00

    L=20

    00

    L=20

    00

    L=20

    00

    L=20

    00

    L=15

    00

    L=15

    00

    L=15

    00

    L=10

    00

    L=10

    00

    L=10

    00

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ??

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    Beam-8Beam-9 Beam-2Beam-4 Beam-3

    95

    100607

    6Anchor form-4

    L=25

    00

    L=25

    00

    L=25

    00

    L=25

    00

    L=25

    00

    L=25

    00

    L=25

    00

    L=25

    00

    L=20

    00

    L=20

    00

    L=20

    00

    L=15

    00

    L=15

    00

    L=10

    00

    L=10

    00

    L=10

    00

    1500 1500 1500 1500 1500 1500 1500

    ?

    ?

    ?

    ??

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    600

    Anchor form-3

    ?

    ?

    ?

    ?

    Detail "A"

  • NOTE:ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.

    FORMWORK PANEL TYPICAL ASSEMBLY DRAWINGScale=1:40

    PROJECT DOCUMENT NUMBER:

    company phase

    SCALE :

    FILE NAME:

    zone document number

    DRAWING TITLE:

    A2_ ABUTMENT

    ENGINEERING CONSULTANT:

    REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.

    GOVERNMENT OF UGANDA

    EMPLOYER:

    ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.

    UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]

    PYUNGHWA ENGINEERING CONSULTANTS LTD

    ENGINEERING CONTRACTOR:

    ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda

    WM01

    NO. DESCRIPTION SPEC. UNIT QUANTITY1

    Plywood

    -18*1220*2340 pcs 12 -18*1220*2340 pcs 13 -18*1220*2340 pcs 14 -18*1220*2340 pcs 15 -18*370*2340 pcs 11 Timber Beam H20/L=5170 pcs 92 Timber Plank 40*80/L=2520 pcs 43 Lifting Hook pcs 24 Steel Waler Double [12/ L=2520 set 45 Flange clamp pcs 44

    1

    900

    1000

    1200

    1500

    650

    810 740 790

    2340

    370

    1220

    1220

    2340

    810 740 790

    300 300 300 250 190 300 300 300 280

    2520

    20

    40

    PLYWOOD SIZEHOLE POSITION FOR TIE ROD

    TIMBER BEAM POSITION

    STEEL WALING LENGTH

    Timber plank 40x80

    Timber beam

    Steel waling

    900

    1000

    1200

    1500

    650

    5170

    4040

    5250

    900

    1000

    1200

    1500

    650

    1220

    1220

    1220

    1220

    370

    Lifting hook

    Plywood size

    2

    3

    4

    5

    1220

    1220

    CASE 1 SCALE = 1:20

    L30020 20

    80

  • NOTE:ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.

    FORMWORK PANEL ASSEMBLY DRAWING FOR A2 - PART 1Scale=1:40

    PROJECT DOCUMENT NUMBER:

    company phase

    SCALE :

    FILE NAME:

    zone document number

    DRAWING TITLE:

    A2_ ABUTMENT

    ENGINEERING CONSULTANT:

    REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.

    GOVERNMENT OF UGANDA

    EMPLOYER:

    ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.

    UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]

    PYUNGHWA ENGINEERING CONSULTANTS LTD

    ENGINEERING CONTRACTOR:

    ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda

    2340

    810 740 790

    300 300 300 250 190 300 300 300 280

    2520

    20

    2440 1848

    1028 900 900 900 560

    20

    280320300280320300

    4440

    300300 320 260300300300

    1750

    785 650 315

    300 300 300 300 270 240

    18

    1800

    20

    180

    2440 2440

    1150 630 828 880 760 632

    20

    30

    250270150300300300300300300250300300300300300280

    4800

    2440 2440

    1430 910 900 900 380

    20

    30

    210330330300300300300320280300320320260300300330

    4800

    2440 2440

    700 800 750 1030

    270

    4800

    300 300 280 300 330300 300 300 300 320 300 320 320 260 300

    500

    2440 2440

    1170 750 800 700 1460

    27030

    4800

    2440 2440

    985 940 900 900 1155

    20

    220

    4800

    30

    2440 2440

    1175 900 900 940 965

    300 330 300 300 300 300 300 260 330 330 300 300 300 300 300 250

    20

    30

    4800

    300 300 320 280 300 300 320 200 180 220 300 280 300 300 300

    20

    300 300 320 330 300 300 320 300 280 320 320 260 300 300 280

    24401987

    1030900900900697

    227 260 260 320 320 300 280 320 300 300 300 300 300 300 300

    4620

    24401987

    1030940700800700257

    317 200 250 300 270 300 330 320 300 300 300 300 300 300 380

    4620

    2019872440

    8509008506501040

    20

    153 300 300 300 300 300 300 300 320 280 300 320 320 260 260

    4620

    30

    300

    360

    30

    137

    307

    20

    40

    40

    40

    20 20

    1100

    20

    40

    30 30

    40

    330 30

    28

    380 20

    20

    153

    30

    40

    40

    30

    90

    38

    PLYWOOD SIZEHOLE POSITION FOR TIE ROD

    TIMBER BEAM POSITION

    STEEL WALING LENGTH

    Timber plank 40x80

    Timber beam

    Steel waling

    900

    1000

    1200

    1500

    650

    5170

    4040

    5250

    900

    1000

    1200

    1500

    650

    1220

    1220

    1220

    1220

    370

    Lifting hook

    Plywood size

  • NOTE:ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.

    FORMWORK PANEL ASSEMBLY DRAWING FOR A2 - PART 2Scale=1:40

    PROJECT DOCUMENT NUMBER:

    company phase

    SCALE :

    FILE NAME:

    zone document number

    DRAWING TITLE:

    A2_ ABUTMENT

    ENGINEERING CONSULTANT:

    REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.

    GOVERNMENT OF UGANDA

    EMPLOYER:

    ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.

    UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]

    PYUNGHWA ENGINEERING CONSULTANTS LTD

    ENGINEERING CONTRACTOR:

    ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda

    180

    2440 184820

    4509001490650798

    20280260320320300280320300300

    4440

    300300300300380

    244024404309402120940450

    330

    4800

    40

    244024406008007001410900470

    330300300 30

    300300260320320300280320300300300300300300270

    260320320300280300300300300300300270

    4800

    320

    1687

    488

    350

    530830327

    3153353002001320

    1640490 850 300

    430

    30230200300300300

    1620

    30270300300300300320320320300300330

    4800

    4509402085935465

    2024402440

    302703003003003003003003202803003203202603003003304800

    43590069580560024402440 20

    300300280300260

    125

    1848 24407986501490900450

    3803003003003003003003202804440

    300320320260280

    Timber plank 40x80

    Flange clamp

    ???????????????

    Timber beam

    Steel waling

    300

    350

    1200

    1500

    650

    3920

    4040

    4000

    300

    350

    1200

    1500

    650

    1220

    1220

    1220

    340

    Lifting hook

    Plywood size

    20

    30 30

    20

    30

    40

    25 170

    22

    40

    363

    30

    40

    1445

    30

    40

    2018

    300

    28

    PLYWOOD SIZEHOLE POSITION FOR TIE ROD

    TIMBER BEAM POSITIONSTEEL WALING LENGTH

    28

    20

    20

    180

  • NOTE:ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.

    FORMWORK PANEL ASSEMBLY DRAWING FOR A2 - PART 3Scale=1:30

    PROJECT DOCUMENT NUMBER:

    company phase

    SCALE :

    FILE NAME:

    zone document number

    DRAWING TITLE:

    A2_ ABUTMENT

    ENGINEERING CONSULTANT:

    REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.

    GOVERNMENT OF UGANDA

    EMPLOYER:

    ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.

    UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]

    PYUNGHWA ENGINEERING CONSULTANTS LTD

    ENGINEERING CONTRACTOR:

    ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda

    536

    228 308

    840

    154

    1564214 850 500

    398300

    1620

    1966

    420

    440740786

    2100

    126 304 300 300 200 300 300 280

    1966520 650 796

    420

    126194180300330300300380

    2100

    1966

    420

    505650811

    126 224 240 240 300 300 300 380

    2100

    300300304

    1564

    214850500

    318 300

    1620

    300 300 384

    18 18

    18

    20 18

    18 20

    18

    18

    150

    Flange clamp

    ???????????????

    Timber beam

    Steel waling

    300

    1000

    1200

    1500

    650

    4570

    4040

    4650

    300

    1000

    1200

    1500

    650

    1220

    1220

    1220

    990

    Lifting hook

    Plywood size

    PLYWOOD SIZEHOLE POSITION FOR TIE ROD

    TIMBER BEAM POSITIONSTEEL WALING LENGTH

  • NOTE:ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.

    FORMWORK PANEL ASSEMBLY DRAWING FOR A2 - PART 4Scale=1:40

    PROJECT DOCUMENT NUMBER:

    company phase

    SCALE :

    FILE NAME:

    zone document number

    DRAWING TITLE:

    A2_ ABUTMENT

    ENGINEERING CONSULTANT:

    REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.

    GOVERNMENT OF UGANDA

    EMPLOYER:

    ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.

    UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]

    PYUNGHWA ENGINEERING CONSULTANTS LTD

    ENGINEERING CONTRACTOR:

    ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda

    490 900 900 640

    420

    2002103003003003003003003003802880

    2440 490

    4607008007502202440490

    420

    2880

    44070080070082024401020

    420

    200 210 300 300 300 300 300 300 300 380

    330 310 300 300 300 300 300 300 270 330 380

    3420

    10

    44090090094028024401020

    10 300 320 320 300 300 300 300 300 300 300 380

    3420

    440700800925595

    10 300 320 320 300 300 300 300 300 300 300 380

    24401020

    3420

    420

    565 610 880 880 5252440 1020

    10300320320200250300300300300200250

    3420

    45591090090029524401020

    10 300 320 320 300 300 300 300 300 300 300 3803420

    420

    420

    420

    460 700 800 900 6002440 1020

    103003203203003003003202803003003803420

    420

    40

    490900900640

    420

    200 210 300 300 300 300 300 300 300 380

    2880

    2440490

    40

    18

    40

    460 700 800 750 2202440 490

    420

    2880

    200210300300300300300300300380

    18

    40

    40

    18

    440 700 800 700 8202440 1020

    420

    330310300300300300300300270330380

    3420

    10

    40

    18

    40

    18

    40

    440 900 900 940 2802440 1020

    10300320320300300300300300300300380

    3420

    420

    40

    18

    40

    40

    380

    40

    Flange clamp

    ???????????????

    Timber beam

    Steel waling

    300

    1000

    1200

    1500

    650

    4570

    4040

    4650

    300

    1000

    1200

    1500

    650

    1220

    1220

    1220

    990

    Lifting hook

    Plywood size

    PLYWOOD SIZEHOLE POSITION FOR TIE ROD

    TIMBER BEAM POSITIONSTEEL WALING LENGTH

  • NOTE:ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.

    FORMWORK PANEL ASSEMBLY DRAWING FOR A2 - PART 1Scale=1:40

    PROJECT DOCUMENT NUMBER:

    company phase

    SCALE :

    FILE NAME:

    zone document number

    DRAWING TITLE:

    A2_ ABUTMENT

    ENGINEERING CONSULTANT:

    REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.

    GOVERNMENT OF UGANDA

    EMPLOYER:

    ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.

    UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]

    PYUNGHWA ENGINEERING CONSULTANTS LTD

    ENGINEERING CONTRACTOR:

    ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda

    2340

    934 740 666

    320 330 300 250 240 250 250 300 280

    2520

    20

    2440 1848

    1028 900 900 900 560

    20

    280320300280320300

    4440

    300300 320 260300300300

    1750

    658 650 442

    330 250 250 250 200 220

    18

    1800

    20

    180

    2440 2440

    1285 318 920 900 770 687

    20

    30

    250270250200300300300300300330330300250250300270

    4800

    2440 2440

    1494 770 900 920 308

    20

    30

    210330330300300300300320280300300300300300300330

    4800

    2440 2440

    700 800 750 1030

    270

    4800

    300 300 280 300 330300 300 300 300 320 300 320 320 260 300

    500

    2440 2440

    1170 750 800 700 1460

    27030

    4800

    2440 2440

    1055 920 900 771 1234

    20

    220

    4800

    30

    2440 2440

    1256 770 900 920 1034

    300 330 300 360 240 300 300 260 330 330 300 300 300 300 300 250

    20

    30

    4800

    300 300 320 280 300 300 320 200 180 220 300 280 300 300 300

    20

    300 300 320 330 300 300 320 300 280 320 170 250 160 300 300

    24401987

    1030900900900697

    227 260 260 320 320 300 280 320 300 300 300 300 300 300 300

    4620

    19872440

    1097403920900770337

    280 200 250 300 300 270 300 300 300 300 300 200 300 300 300

    4620

    2019872440

    8509008505251040

    20

    153 300 300 300 300 218 250 300 300 300 300 300 300 300 290

    4620

    30

    300

    488

    30

    262

    410

    20

    40

    40

    40

    20 20

    1100

    20

    40

    30 30

    40

    330 30

    28

    380 20

    20

    267

    30

    40

    40

    30

    70

    38

    PLYWOOD SIZEHOLE POSITION FOR TIE ROD

    TIMBER BEAM POSITION

    STEEL WALING LENGTH

    Timber beam

    Steel waling

    844

    900

    536

    2200

    40

    2280

    844

    900

    536

    1220

    1060

    Lifting hook

    Plywood size

    153

    330

    230

  • NOTE:ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.

    FORMWORK PANEL ASSEMBLY DRAWING FOR A2 - PART 2Scale=1:30

    PROJECT DOCUMENT NUMBER:

    company phase

    SCALE :

    FILE NAME:

    zone document number

    DRAWING TITLE:

    A2_ ABUTMENT

    ENGINEERING CONSULTANT:

    REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.

    GOVERNMENT OF UGANDA

    EMPLOYER:

    ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.

    UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]

    PYUNGHWA ENGINEERING CONSULTANTS LTD

    ENGINEERING CONTRACTOR:

    ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda

    536

    228 308

    840

    154

    1439214 850 375

    273300

    1620

    1841

    420

    440740661

    2100

    251 179 300 300 200 300 300 280

    1966520 650 796

    420

    126194180300330300300380

    2100

    1966

    420

    505650811

    126 224 240 240 300 300 300 380

    2100

    300300304

    1564

    338850376

    298 300

    1620

    250 250 300

    18 18

    143

    20 18

    18 20

    18

    18

    150204

    1564

    338 850 376

    298300

    1620

    250250300

    1820

    18204

    1439214850375

    273 300

    1620

    300 300 304143

    2018

    1841520 650 671

    420

    251249300330300300380

    2100

    18

    Timber plank 40x80

    Flange clamp

    ???????????????

    Timber beam

    300

    900

    480

    1600

    40

    1680

    300

    900

    480

    1220

    460

    Lifting hook

    Plywood size

    PLYWOOD SIZEHOLE POSITION FOR TIE ROD

    TIMBER BEAM POSITION

    STEEL WALING LENGTH

  • NOTE:ALL DIMENSION SHOWN IN THIS DRAWING SHOULD BE READ IN MM.

    FORMWORK PANEL ASSEMBLY DRAWING FOR A2 - PART 3Scale=1:30

    PROJECT DOCUMENT NUMBER:

    company phase

    SCALE :

    FILE NAME:

    zone document number

    DRAWING TITLE:

    A2_ ABUTMENT

    ENGINEERING CONSULTANT:

    REV ESTABLISHED CHECKED APPROVED DATE DESCRIPTION STAT.

    GOVERNMENT OF UGANDA

    EMPLOYER:

    ORIENTAL CONSULTANTS CO., LTD.EIGHT-JAPAN ENGINEERING CONSULTANTS INC.

    UGANDA NATIONAL ROADS AUTHORITYPLOT 11, YUSUF LULE ROADP O BOX 28487KAMPALA - UGANDAEmail: [email protected]

    PYUNGHWA ENGINEERING CONSULTANTS LTD

    ENGINEERING CONTRACTOR:

    ZENITAKA-HYUNDAI Joint VentureP.O.BOX 7158, Kampala, Uganda

    490 900 900 64042

    0

    2002103003003003003003003003802880

    2440 490

    4607008007502202440490

    420

    2880

    44070080070082024401020

    420

    200 210 300 300 300 300 300 300 300 380

    330 310 300 300 300 300 300 300 270 330 380

    3420

    10

    44090090094028024401020

    10 300 320 320 300 300 300 300 300 300 300 380

    3420

    440700800925595

    10 300 320 320 300 300 300 300 300 300 300 380

    24401020

    3420

    420

    3957709009202252440770

    35 275 300 300 300 300 300 300 245 300 200 3103120

    420

    420

    460 700 800 900 6002440 1020

    103003203203003003003202803003003803420

    420

    40

    490900900640

    420

    200 210 300 300 300 300 300 300 300 380

    2880

    2440490

    40

    18

    40

    460 700 800 750 2202440 490

    420

    2880

    200210300300300300300300300380

    18

    40

    40

    18

    440 700 800 700 8202440 1020

    420

    330310300300300300300300270330380

    3420

    10

    40

    18

    40

    18

    40

    440 900 900 940 2802440 1020

    10300320320300300300300300300300380

    3420

    420

    40

    18

    40

    40

    PLYWOOD SIZEHOLE POSITION FOR TIE ROD

    TIMBER BEAM POSITION

    STEEL WALING LENGTH

    395 770 900 920 2252440 770

    35275300300300300300300245300200

    3120

    420

    40

    310

    570 850 900 850 2902440 1020

    420

    330310300300300300300300270330380

    3420

    10

    40

    18

    Note :Waling cut from waling L=3420mm

    522 770 900 920 3482440 1020

    10270250250320300300300300300300360

    3420

    420

    40

    18

    170

    52277090092034824401020

    10 270 250 250 320 300 300 300 300 300 300 360

    3420

    420

    40

    18

    170

    395 770 900 920 2252440 770

    352753003003003003003002453002003103120

    420

    40

    Note :Waling cut from waling L=3420mm

    Timber plank 40x80

    Flange clamp

    ???????????????

    Timber beam

    300

    900

    480

    1600

    40

    1680

    300

    900

    480

    1220

    460

    Lifting hook

    Plywood size

  • Amazon.com_ ASUS X550ZA 15.6 Inch Lapto..computer purchasesCopy of Drawing Filing SystemGmail - InboxGmail - love you.............ZHJV-W-A2-FO-0001-0 A2-ABUTMENT_CONSTRUCTION SEQUENCEZHJV-W-A2-FO-0002-0 A2-ABUTMENT_STRUCTURE DIMENSION & CONSTRUCTION JOINT_LOWER PART_LAYOUT PLANZHJV-W-A2-FO-0003-0 A2-ABUTMENT_FORWORK PANEL_PORTION 1_LOWER PART_LAYOUT PLANZHJV-W-A2-FO-0004-0 A2-ABUTMENT_FORMWORK ACCESSORY_PORTION 1_LOWER PART_LAYOUT PLANZHJV-W-A2-FO-0005-0 A2-ABUTMENT_FORMWORK PANEL_PORTION 2_LOWER PART_LAYOUT PLANZHJV-W-A2-FO-0006-0 A2-ABUTMENT_FORMWORK ACCESSORY_PORTION 2_LOWER PART_LAYOUT PLANZHJV-W-A2-FO-0007-0 A2-ABUTMENT_FORMWORK PANEL_PORTION 3_LOWER PART_LAYOUT PLANZHJV-W-A2-FO-0008-0 A2-ABUTMENT_FORMWORK ACCESSORY_PORTION 3_LOWER PART_LAYOUT PLANZHJV-W-A2-FO-0009-0 A2-ABUTMENT_STRUCTURE DIMENSION & CONSTRUCTION JOINT_UPPER PART_LAYOUT PLANZHJV-W-A2-FO-0010-0 A2-ABUTMENT_FORWORK PANEL_PORTION 1_UPPER PART_LAYOUT PLANZHJV-W-A2-FO-0011-0 A2-ABUTMENT_FORMWORK PANEL_PORTION 2_UPPER PART_LAYOUT PLANZHJV-W-A2-FO-0012-0 A2-ABUTMENT_FORMWORK PANEL_PORTION 3_UPPER PART_LAYOUT PLANZHJV-W-A2-FO-0013-0 A2-ABUTMENT_STEEL FORM ARRANGEMENT FOR ANCHOR_PORTION 1, 2 & 3ZHJV-W-A2-FO-0014-0 A2-WALL FORM PANEL TYPICAL ASSEMBLYZHJV-W-A2-FO-0015-0 A2-ABUTMENT_WALL FORM PANEL ASSEMBLY_PART 1_LOWER PARTZHJV-W-A2-FO-0016-0 A2-ABUTMENT_WALL FORM PANEL ASSEMBLY_PART 2_LOWER PARTZHJV-W-A2-FO-0017-0 A2-ABUTMENT_WALL FORM PANEL ASSEMBLY_PART 3_LOWER PARTZHJV-W-A2-FO-0018-0 A2-ABUTMENT_WALL FORM PANEL ASSEMBLY_PART 4_LOWER PARTZHJV-W-A2-FO-0019-0 A2-ABUTMENT_WALL FORM PANEL ASSEMBLY_PART 1_UPPER PARTZHJV-W-A2-FO-0020-0 A2-ABUTMENT_WALL FORM PANEL ASSEMBLY_PART 2_UPPER PARTZHJV-W-A2-FO-0021-0 A2-ABUTMENT_WALL FORM PANEL ASSEMBLY_PART 3_UPPER PARTZHJV-W-BR-RA-(0001 to 0006)Alignment Dwg 1.pdfAlignment Dwg 2Alignment Dwg 3Alignment Dwg 4Alignment Dwg 5Alignment Dwg 6