• ITU-R WP1A is developing a report on “SMART GRID POWER MANAGEMENT SYSTEMS”
• The plan is to complete the report at the WP1A meeting which begins May 25th
• As it currently exists the report is unbalanced – it supports PLT/PLC as the only technology suitable for Smart Grid communications
• An earlier version had some wireless in it but said that any wireless solution is inferior to PLT/PLC
![Page 2: 18-11-0007-00-0000 Submission January 2011 Michael Lynch, MJ Lynch & Associates 802.18 RR-TAG ITU-R Update ITU-R WP1A is developing a report on SMART GRID](https://reader036.vdocuments.mx/reader036/viewer/2022082917/5514ab1455034640138b4de5/html5/thumbnails/2.jpg)
18-11-0007-00-0000
Submission
November 2010
Michael Lynch, MJ Lynch & Associates
802.18 RR-TAG ITU-R Update• The good news is that at their last 2010 meeting
WP1A removed the section saying that wireless is inferior to PLT/PLC
• The bad news is there isn’t any description of any wireless technologies suitable for Smart Grid communications
• 802.18 is proposing that the wireless WGs edit the document to provide positive input on the capabilities of wireless technologies
• This work should start at this meeting and must be completed by the end of the March plenary
![Page 3: 18-11-0007-00-0000 Submission January 2011 Michael Lynch, MJ Lynch & Associates 802.18 RR-TAG ITU-R Update ITU-R WP1A is developing a report on SMART GRID](https://reader036.vdocuments.mx/reader036/viewer/2022082917/5514ab1455034640138b4de5/html5/thumbnails/3.jpg)
18-11-0007-00-0000
Submission
November 2010
Michael Lynch, MJ Lynch & Associates
802.18 RR-TAG ITU-R Update
• A method of work would have each interested wireless WG prepare their own edits to the WP1A report– Those groups should coordinate with each other
– The edits from those groups will be brought to 802.18 to be finalized
• The draft report is available on 802.18’s Mentor web site as 18-11-0002
• The edit needs to be received by the ITU-R NLT May 18th
![Page 4: 18-11-0007-00-0000 Submission January 2011 Michael Lynch, MJ Lynch & Associates 802.18 RR-TAG ITU-R Update ITU-R WP1A is developing a report on SMART GRID](https://reader036.vdocuments.mx/reader036/viewer/2022082917/5514ab1455034640138b4de5/html5/thumbnails/4.jpg)
18-11-0007-00-0000
Submission
November 2010
Michael Lynch, MJ Lynch & Associates
802.18 RR-TAG ITU-R Update
• 802.18 has this on their agenda for PM1 on Tuesday – for further discussions between the interested WGs