18-11-0007-00-0000 submission january 2011 michael lynch, mj lynch & associates 802.18 rr-tag...

4
18-11-0007-00-0000 Submission January 2011 Michael Lynch, MJ Lynch & A 802.18 RR-TAG ITU-R Update ITU-R WP1A is developing a report on “SMART GRID POWER MANAGEMENT SYSTEMS” The plan is to complete the report at the WP1A meeting which begins May 25 th As it currently exists the report is unbalanced – it supports PLT/PLC as the only technology suitable for Smart Grid communications An earlier version had some wireless in it but said that any wireless solution is inferior to PLT/PLC

Upload: kaylee-oliver

Post on 27-Mar-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 18-11-0007-00-0000 Submission January 2011 Michael Lynch, MJ Lynch & Associates 802.18 RR-TAG ITU-R Update ITU-R WP1A is developing a report on SMART GRID

18-11-0007-00-0000

Submission

January 2011

Michael Lynch, MJ Lynch & Associates

802.18 RR-TAG ITU-R Update

• ITU-R WP1A is developing a report on “SMART GRID POWER MANAGEMENT SYSTEMS”

• The plan is to complete the report at the WP1A meeting which begins May 25th

• As it currently exists the report is unbalanced – it supports PLT/PLC as the only technology suitable for Smart Grid communications

• An earlier version had some wireless in it but said that any wireless solution is inferior to PLT/PLC

Page 2: 18-11-0007-00-0000 Submission January 2011 Michael Lynch, MJ Lynch & Associates 802.18 RR-TAG ITU-R Update ITU-R WP1A is developing a report on SMART GRID

18-11-0007-00-0000

Submission

November 2010

Michael Lynch, MJ Lynch & Associates

802.18 RR-TAG ITU-R Update• The good news is that at their last 2010 meeting

WP1A removed the section saying that wireless is inferior to PLT/PLC

• The bad news is there isn’t any description of any wireless technologies suitable for Smart Grid communications

• 802.18 is proposing that the wireless WGs edit the document to provide positive input on the capabilities of wireless technologies

• This work should start at this meeting and must be completed by the end of the March plenary

Page 3: 18-11-0007-00-0000 Submission January 2011 Michael Lynch, MJ Lynch & Associates 802.18 RR-TAG ITU-R Update ITU-R WP1A is developing a report on SMART GRID

18-11-0007-00-0000

Submission

November 2010

Michael Lynch, MJ Lynch & Associates

802.18 RR-TAG ITU-R Update

• A method of work would have each interested wireless WG prepare their own edits to the WP1A report– Those groups should coordinate with each other

– The edits from those groups will be brought to 802.18 to be finalized

• The draft report is available on 802.18’s Mentor web site as 18-11-0002

• The edit needs to be received by the ITU-R NLT May 18th

Page 4: 18-11-0007-00-0000 Submission January 2011 Michael Lynch, MJ Lynch & Associates 802.18 RR-TAG ITU-R Update ITU-R WP1A is developing a report on SMART GRID

18-11-0007-00-0000

Submission

November 2010

Michael Lynch, MJ Lynch & Associates

802.18 RR-TAG ITU-R Update

• 802.18 has this on their agenda for PM1 on Tuesday – for further discussions between the interested WGs