utd-apu_091321a-gtcp131-9b pn 3800702-1_minipack
TRANSCRIPT
APU Life Limited Parts Model: GTCP 131-9 (B)
Mfr Date: 200-11-02
49-052-00 Compressor Rotor
49-082-00 Turbine Shaft
49-062-00 Stg 1 Turbine Disc
49-072-00 Stg 2 Turbine Disc
Vladimir Sysoev
Powerplant and APU Lead Engineer
Yakutia Airlines
P/N: 3800702-1 S/N:
3822391-6
3822504-3
3840310-3
3840165-4
Current Position: MSN 28645 Reg.# VQ-BIZ
APU TSN: 11 379
APU CSN: 43 068 As of: 23-Jul-2020
5 101 30 000 24 899
13 138 30 000 16 862
5 101 30 000 24 899
5 101 30 000 24 899
UTD-APU_091321A-GTCP131-9B PN 3800702-1_MiniPack
APU AD Status
Engine Model ESN MFD rrsN CSN
AUXILIARY POWER UNIT 2000-11-02 11379 43068
NO AFFECTED AD AT THIS TIME.
C?YAKUTIA AIRLINES Powerplant and APU Engineer
16 July 2020
AC Installed
VQ-BIZ
UTD-APU_091321A-GTCP131-9B PN 3800702-1_MiniPack
APU SB Status
Engine Model ESN MFD rrsN CSN
AUXILIARY POWER UNIT 2000-11-02 11379 43068
NO AFFECTED SB AT THIS TIME.
C?YAKUTIA AIRLINES Powerplant and APU Engineer
23 July 2020
TSLSV CSLSV AC Installed
NA NA Removed
UTD-APU_091321A-GTCP131-9B PN 3800702-1_MiniPack
Date: 23 July 2020
Whom It May Con cernTo:
From:
APU: One (1) Honeywell Auxiliary Power Unit Model No. 3800702-1,
Part Number: GTCP 1131-9(B)
SUBJECT: INCIDENT/ACCIDENT CLEARANCE STATEMENT
This is to certify that, to the best of our knowledge, the following statement are the true for the APU
referenced above (including the parts installed thereon) during its entire period of operation with _ 07 Jul
2019 till 21 July 2020
• The APU has not been involved in any accident. Incident, major failure or fire as defined in Chapter of
ICA Annex 13 and CPR 49 part 830.2.
• The APU has not been subject extreme heat or any other form of extreme stress.
• The APU has not been immersed in salt water, or exposed to any other form of corrosive agent.
• The APU has not been subject to military or government use, and no part installed was obtained from
military, government or unapproved source or was previously fitted on a state aircraft as deemed by article3 of the Chicago Convention.
• The APU TSN/CSN at time of Delivery are Respectively 10162 / 42196
• Current APU TSN/CSN 11379/43068.
Signature:
Position: Powerplant and APU Lead Enginee r
Date: 23 July 2019
UTD-APU_091321A-GTCP131-9B PN 3800702-1_MiniPack
Revision No: 10; Eff. Date: 28 Feb 2020 Form 006
1 . Approving Competent Authority/ Country 2.
3 . Form Tracking Number
Transporto kompetencij4 agentura,
AUTHORISED RELEASE CERTIFICATE Lietuvos Respublika
Transport Competence Agency, Republic of
Lithuania
4. Organisation Name and Address:
6 . Item 7 . Description
1. Auxiliary Power Unit (APU)
12 . Remarks
8 . Part No.
3800702-1
EASA FORM 1
. - ..
9 . Qty.
BSl-0019-20
S. Work Order/ Contract/ Invoice - - . . . .
SW200181-BIZ03
10 . Serial No. 11 . Status/ Work
□ Overhauled
□ Repaired 1
l::sl Inspected / Tested
□ Modified
SW200181 -BIZ03 BORESCOPE INSPECTION AFTER REMOVAL OF ENGINE 3800702-1 , (ESN: PS612 TSN: 3 5330 .00, CSN: 3072 6) HAS BEEN PERFORMED I.A.W. AMM TASK 49-21-00-200-801 . References: WP200181 -BIZ;
737- 600/700/800/ 900 -AMM GFJ D633 Al01- GEF, Rev 72 · 15 Jun 2020
Borescope inspection report No: 200721-P-5612
INSPECTION RESULT: SERVICEABLE CONDITION
INSPECTION WAS CARRIED OUT AT FLTECHNICS, KAUNAS INTERNATIONAL AIRPORT.
13a. Certifies that the items Identified above were manufactured in conformity to:
1, D approved design data and are in condition for safe operation
D non- approved design data specified in block 12 ---
13b. Authorised Signature 13c. Approval/ Authorisation Number
..
-·
186.lilame 13e. Date (dd mmm yyyy)
USER/ INSTALLER RESPONSIBILITIES
This certificate does not automatically constitute authority to install the item(s).
14a. l::sl Part-145.A.SD Release to Service D Other regulations specified in block 12
Certifies that unless otherwise specified in block 12, the work identified in block 11 and described in block 12, was accomplished in accordance with Part-145 and in respect to that work the items are considered ready for Release to Service.
14b. Authorised Signature
14d. Name
�
�] 'o-694:,.::£
45_,.{'Y �
14c. Certificate/ Approval Ref. No.
LT.145.011
14e. Date (dd mmm yyyy)
21 JULY 2020
Where the user/ installer performs works in accordance with regulations of an airworthiness authority different than the airworthiness authority specified in block 1, it is essential that the user/ installer ensures that his/ her airworthiness authority accepts items from the airworthiness authority specified in block 1.
Statements in blocks 13a and 14a do not constitute installation certification. In all cases aircraft maintenance records must contain an installation certification issued in accordance with the national regulations by the user/ installer before
the aircraft may be flown.
EASA Form 1 - MF/CA0/145 Issue 3
Page 2 of 4
Borescope Inspection Report No. 200721
CONDITION OBSERVED REMARKS PHOTO NO
1. APU engine inspection NO ACTIONS REQUIRED TASK 49-21-00-200-801
- Minor nick and discoloration SUBTASK 49-21-00-290-002 Photo No 1 noted on Load Compressor Par. (4); (k); 4); 5); Blades LIE, within AMM limits.
- Discoloration and minor nicks SUBTASK 49-21-00-290-002 Photo No 2 noted on several inlet guide Par. (4); (g); (i); 5); 6); vanes, within AMM limits.
- Minor nicks, discoloration and SUBTASK 49-21-00-290-007 Photo No 3 minor rub damaged between Par. (5); (e); 3); 5); 6); impeller and shroud noted.Within AMM limits.
- Missing TBC, panel SU BT ASK 49-21-00-290-010 Photo No 4 discoloration noted in Par. (6); (a); 3); c); e); Combustion Chamber andFuel Nozzles. Within AMMlimits
- Discoloration noted on the SUBTASK 49-21-00-290-005 Photo No 5 blades of Stage 2 Turbine. Par. (7); (b); 4); g); Within AMM limits
Attachments: Photos from No 1 to No 5. Videos and photos of borescope inspection within USB (3800702-1, S/N P-5612)
Inspector details:
Name: T.Kurcenkovas
Company Authorization: No 694
Date: 21 JULY 2020
Signature/Stamp:
UTD-APU_091321A-GTCP131-9B PN 3800702-1_MiniPack
Page 3 of 4
Photo No 2
Photo No 3
Borescope Inspection Report No. 200721
UTD-APU_091321A-GTCP131-9B PN 3800702-1_MiniPack