(A Govt.of India Enterprise)gffat-*-laafifrfrr&ra+B-oER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher.Angul(Odisha)-759 I 47T el :0 67 60 -243 4 17 (TeleFax),Mai I ld:[email protected]
-=i=--l:.--rll-rl-:tr-
qiT{F'rs
Ref: ODP/HVDC/TAL-MER/FOREST74, t Date.fr-01-2021
To,Divisional Forest Officer,Angul Forest Division,Angul, Odisha.
Sub: Diversion of 1.3841 ha. ofForest land for construction ofdiversion portion of400 KV DoubleCircuit Talcher - Meramundali Transmission line from Location No- 29 to 32 for proper crossing ofTalcher-Bimlagarh Railway Line, East Coast Railway by Power Grid Corporation of India Limited.RefNo:
l.
2.
J.
Govt of India, Ministry of Environment, Forest and Climate Changes Letter No.:
5-ORB432/2020-BHU dated 05- I I -2020.
Memo No. 18836 F&E dt.24.11.2020 ofSpecial Secretary to Govt.
Your Offi ce Letter No- 80 44 /21 7 IDRP /2020 lDated 3 0.1 I .2020.
Sir,
The Govt of India, Ministry of Environment & Forests, Regional Office, Bhubaneswar vide Letter No
5-OR843212020-BHU dated 05-11-2020 accorded "ln-Principal" (stageJ) approval for diversion of
1.3841 H a. ofForest land for construction ofdiversion portion of400 KV Double Circuit Talcher -Meramundali Transmission line from Location No- 29 to 32 for proper crossing of Talcher-B imlagarh
Railway Line, East Coast Railway by Power Grid Corporation of India Ltd subject to fulfillment of
conditions prescribed therein. The point wise compliance are furnished below.
Condition No{i): Legal status of Forest land shall remain unchanged.
Undertaking to this effect is enclosed at Annexure-I.
Condition No-(ii): Forest land will be handed over only after required non-forest land for theproject is handed over to the user agency.
Unde(aking to this effect is enclosed at Annexure-Il W-Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-l10016Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon-122001, Haryana
cril{ Bs +rcTterfl :tl.q.gBar RftlEPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)
gff et*-ttw fr fr fr u&;a mG-ot
ER-II,2000MW HVDC Station,KanihaPost Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-759147
T el:o 67 60 -243 4 1 7 (teleFax),Mail Id:[email protected]
Condition No-(iii): Compensatory Afforestation shall be taken up by the State ForestDepartment over 7.7 682 Ha of degraded forest land identified in Paranga RF under AngulRange of Angul Forest Division at the cost of the user agency. As far as possible, a mixture oflocal indigenous species shall be planted using multi species, multi canopy intensive plantingtechnique and monoculture ofany species shall be avoided. A revised C,A. Scheme consisting ofindigenous species to result in a multi canopy forest may be submitted before stage-II approval.
In compliance to the above, Compensatory Afforestation Scheme has already been approved bycompetent authority with financial outlay ofRs 5,23,100.00.
Condition No-(iv): The cost a/Compensatory Afforestation at lhe prevailing wage rale as perCompensatory Afforestation scheme ond al the cosl of survey, demarcalion and ereclion ofpermanent pillars if required on the CA land sholl be deposited in advance wilh Forcsl Depafimenlby the project authorily. The CA will be msintained for I0 years. The scheme may includeappropriale provision for anticipated cost increase for works scheduled for subsequent years,
In compliance to the above, Rs. 5,23,1001 has been deposited in Ad-hoc CAMPA through
GgplpIlygsh,:tjgjD vide UTR Ref No-SBIN220346806895 dated 11.12.2020, which is enclosedat Annexure-Ill.
Condition No-(v): The State Government shall chorge the Net Present value(NPV) for 1.3841 haofforest area to be diverted under lhis proposal from the user agenc), as per the Order of Hon'bleSupreme Court oflndia dated30.10.2002,01.08.2003,28.03.2008,24,04.2008 and 09.05.2008 in IANo. 566 in lVrit Petition (Civil) no.202/1995 and as per the guidelines issued by Ministry virle itsletter No. 5-1/1999-FC (pt.II) dated 18.09.2003, as well as letter No. 5-2/2006/FC dated 03.10.2006and No..5-3/2007-FC dated 05.02.2009 in this regard.
ln compliance to the above, Rs. 8,66,4471 has been deposited in Ad-hoc CAMPA through
GgplpedyeC[.dSD vide UTR Ref No- SB1N220346806895 dated 11.12.2020, which is enclosedat Annexure-IVA. Undertaking to this effect is enclosed at Annexure-IV.
Condition No-(vi): Additional amount of the NPV of the diverted forest land, if any becomingdue after finalization ofthe same by the Hon'ble Supreme Courl of India on receipt of lhe reporlfrom the expert Commiltee, shall be charged b), the State Govt from lhe user agenclt. The useragency shall furnish an underlaking lo lhis effect.
Undertaking to this effect is enclosed at Annexure-V.
Condition No{vii): All the funds received from user agency under the project shall betransferred /deposited to State CAMPA fund only through (http://parivesh.nic.in)
Undertaking to this effect is enclosed at Annexure-VI.
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi- I 100 l6Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon-122001, Haryana
^-li-.<lL
--.iar-JI-J!I-
qi+*FrE
w
qcrl A-s *idterfl:+rw SE-sT tr'B-E -=r=-.-l--..JIL-
-.-rIr-
--l-qiortrr<
Power Grid Corporation of India Ltd.(A Govt.of India Enterprise)
gffslr-rrwfrSSr&ra*G."oER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-759 147
T el:.\6160-243 4l1(T e leF ax), M ai I Id:[email protected]
Condition No-(viii): The user agency shall restrict the felling of trees to minimum number inthe diverted forest land and the trees shall be felled under strict supervision ofthe State ForestDepartment and the cost offelling oftrees shall be deposited by the user agency with State Forestdepartment.
Underlaking to this effect is enclosed at Annexure-VII.
Condition No-(ix): The complete compliance of the FRA,2006 shall be ensured by the way ofprescribed certificate from the concerned District Collector, The FRA Certificate in Form-II(for linear projects other than plantation) shall be submitted before Stage-Il approval.
Undertaking to this effect is enclosed at Annexure-VIIL
Condition No-(x).' The User agency in consultation wilh lhe Slate Forest Departmenl shall preparea delailed scheme for Crealion and Maintenance of Planlotion of Dwarf Species (preferablymedicinal species) in Right of ll/ay under lhe lransmission line, and provide Funds for executionof lhe said scheme by Slale Forest Department.
In compliance to the above, Rs. 2,34,3191- has been deposited in Ad-hoc CAMPA through
G(dparivesh.nlg.in) vide UTR Ref No- SBIN42l01 1686503 dated 11.01.2021, which is enclosedat Annexure-IX.
Condition No-(xi).' The user agency at its cosl shall provide bird reflectors, which are to be Jixedon upper conductor ollransmission line at suitable intervals to avoid bird hils.
Undertaking to this effect is enclosed at Annexure-X
Condition No-(xii): The user agency shall comply wilh the guidelines for laying transmissionlines lhrough foresl areas issued by Minislry vide letter No. 7-25/2012-FC dated 05.05.2014 anrl19.11.2014
Undefiaking to this effect is enclosed at Annexure-XI
Condition No-(xiii).' The user agency shall obtain Environmenlal Clearance as per lhe provisionsof Environment (Prolection) Act, 1980, if applicable.
Environmental Clearance is not applicable for transmission line projects, However Undertaking tothis effect is enclosed at Annexure-Xll
Condition No-(xiv).' The layout plan of the proposed forest land shall not be changed wilhout lheprior opproval o.f Cenlral Governmenl.
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-1 10016Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon-122001, Haryana
qrd{ A-s andfterf, ilcn-gBqr R.R.}g.:l:.:IF-rllL
qianF'rs
Power Grid Corporation of India Ltd.(A Govt.of India Enterprise)
gd' *+-rr uq fr * fi r&ra +ft.oER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-759 I 47T el'o 6'1 60 -243 4 17 (TeleFax),Mail ld :[email protected]
Undertaking to this effect is enclosed at Annexure-XIII
Condition No-(xv) No labour camp shall be allowed in the forest area..
Undertaking to this effect is enclosed at Annexure-XlV
Condition No{xvi) SufJicient Jirewood, preferably lhe alternale fuel, shall be provided by the userdgenq) to lhe labourer afler purchasing lhe same from lhe Slate Forest Departmenl or ForestDevelopmenl Corporalion or any legal source of alternale fuel.
Undertaking to this effect is enclosed at Annexure-XVCondition No-(xvii).' The user agency while execuling works, shall not fell any tree or damage
forest growth in lhe surrounding forest area in onj mannel.
Undertaking to this effect is enclosed at Annexure-XVICondition No-(xviii): The boundary of the forest land lo be diverted shall be suitably demarcatedon ground al the projecl cosl, as per the direclions of lhe concerned Divisional Forest Officer.
Undertaking to this effect is enclosed at Annexure-XVII
Condition No-(xix): No additional or neb, palh will be constructed inside the forest area for anyaclivity related lo the project work.
Undertaking to this effect is enclosed at Annexure-XVII
Condition No-(xx).' The period of diversion under this approval shall be co-terminus with theperiod of lease granled in favour of user agenc! or lhe project life, whichever is less.
Undertaking to this effect is enclosed at Annexure-XIX
Condition No-(xxi).' The forest land shall not be used for any purpose other lhan lhat specified inthe project proposal.
Undertaking to this effect is enclosed at Annexure-XX
Condition No-(xxii).' The foresl land proposed to be diverted shall under no circumslances betransferred lo any olher agencies, departmenl or person without the prior approval ofGovernmentof India.
Undertaking to this effect is enclosed at Annexure-XXI wRegistered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi- I I 001 6Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon-122001, Haryana
crd{ Es +rdtqra 3nq gB-+r Rfr-sPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)g# at+-u rq fr $ S r*ra +E-aER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Taicher,Angul(Odisha)-7591 47T e|067 60-243 417 (T eleFax),Mail Id:[email protected]
-lt-
.-rIr-:t=-qi(trrs
Condition No-(xxiii): The Slate Governmenl and lhe user agency shall ensure compliance toprovisions of the all lhe Court Orders, provisions, rules, Regulalions and Guidelines for the timebeing in force, as applicable to the project.
Undeftaking to this effect is enclosed at Annexure-XXII
Condition No-(xxiv): Any other condition lhal lhis Ministry of Environment, Forest & ClimateChange may imposefromlime lo time in the interest of afforestatiott, conseryation and managementofJlora anrl fauna in the area, shall be complied by the user agency.
Undertaking to this effect is enclosed at Annexure-XXIII
Condition No-(xxv) : The compliance report of lhe Stage-I approval shall be uplooded on e-portal(htlp : // pa rive s h.nic.in).
Undertaking to this effect is enclosed at Annexure-XXIV
1. The sag and swing of the conductors are to be kept in view while working out theminimum clearance.
Undertaking to this effect is enclosed at Annexure-XXV
No sagging of transmission line is allowed. The user agency shall certify in the month olMarch ofevery year that sagging, ifany, has been corrected and further monthly reportwill be submitted by them till Novemtrer of each year in the forest area to the DFO, forhis reference.
Undertaking to this effect is enclosed at Annexure-XXVI
The User agency shall be allowed to fell the Trees on strips for the tension stringing workand the natural regeneration will be allowed to come up. Felling/pollarding/pruning oftrees will be done with the permission of Iocal Divisional Forest Officer whenevernecessary to maintain the electrical clearance. One outer strip shall be left clear to permitmaintenance of Transmission line.
LJndcrtaking to this eflect is enclosed a1 Annexure-XXVII
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi- I 10016Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon-122001, Haryana
vrd{ Es ardtsrfl am, gfuq frB-dPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)g# ala Itw fr S S r'&ra oF-oER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-759 I 47Tel:.\67 60-243 417 ('teleFax), M a il Id;[email protected]
-=r=-i-l-.
-tl---I-JIL
qiantrrg
4. In the case of Transmission lines to be constructed is in hilly areas, where adequateclearance is already available, trees will not be cut.
Undertaking to this effect is enclosed at Annexure-XXVIII
5, User agency shall take all measures for strengthening/maintaining the transmissiontower and transmission line to be erected/laid on forest/non-forest land as per CEAnorms for elephant corridor and any other conditions as may be imposed by CWLW,Odisha so as to ensure that no death of wild animals occur due to electrocution.
Undertaking to this effect is enclosed at Annexure-XXIX
In view of above, you are requested to kindly arrange to issue working permission forcompletion of the project in time,
Your early action in this regard is highly solicited.
Encl: Annexure-(I) to (XXX)Each in Six sets
Yours faithfully,
(V G Rao)
Chief General Manager
{rl rl lv.a milttrI+t|roltlo.n ..lMarcWil
'ilTI fiTIsIIIHFg
hoE crDqtt d rrE Lafi,tfrrlt.T.tcrr
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-l10016Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon- 122001 , Haryana
ckr Bs +l{ftem $rw gBqr RB-EPower Grid Coryoration of India Ltd.
(A Govt.of India Enterprise)gff at-*,rrw fr A Tfr r&ra aBoER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-759 I 47T el:067 60-243 417 (TeleFax),M ail Id:[email protected]
ANNEXURE - I
UNDERTAKING FOR LEGAL STATAS OF THE FOREST LAND PROPOSEDFOR DIVERSION
POWERGRID have applied for diversion of 1.3841 ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double CircuitTransmission line from Location No- 29 to 32 for proper crossing of Talcher-Bimalagarh Railway Line,of East Coast Railway".
I /we do hereby undefiake that legal status of forest land shall remain unchanged.
(Signature of User Agency)
-!lL-{:qia{trrs
Date: 18.01.2021Place: Kaniha
Name: V G RaoDesignation: Chief General Manager
Power Grid Corporation of India Limited
Official Seal
itl,arv.ohFtrr6gfGmrrlw!k,"-r *lRc.*tltqrnrii-Pou.rGU CoQondon ortndb l.[fr,Gfv irrftr,-rrqtf
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi- I 1001 6Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon- 12200 I , Haryana
cr+{ Bs +rfiiqra :nw gBqr Rfr-EPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)gfi at-r IIw fr dr S r&ra oG-OER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-759 147T el:\67 60-243 417 (TeleFax), M ail Id:[email protected]
ANNEXURE -II
ANDERTAKING REGARDING HANDING OVER OF FOREST LAND
POWERGRID have applied for diversion of 1.3841 ha. of Forest land for the pu{poseof construction of "diversion portion of 400 KV Talcher - Meramundali Double CircuitTransmission line from Location No- 29 to 32 for proper crossing of Talcher-Bimalagarh Railway Line,of East Coast Railway".
I /we do hereby undertake that, Forest land will be handed over only after required non-forest land for the project is handed over to the user Agency.
(Signature ol User Agency)
^-l:-.
-aL
:I--JtL_{lL
qi{Frs
Name:- V G RaoDesignation:-Chief General Manager
Power Grid Corporation of India Limited
Official Seal
ryffiDate: 18.01.2021Place: Kaniha
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-110016Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon- 12200 I , Haryana
We|c6me: POWERGRID CORP OF INDIA LTD (5834} KM OT
RAJIB KUl"lAR |4OHAPATRA
.You are here: / Reports / QueryByAccount
N_f\onqluaa --!L[
SBI is upgrading its lnternet Banking platform for bettercustomer experience. Dudng this activi
e-PayOrder Details
e-Payorder Details
e-Payorder Number
Debit Status
oRtssAcAr'1PA
SAHID NAGAR
CNABGHLDU9
11-Dec-202O
13,89,547.0OThirteen Lakhs EightyNineThousand Eve Hundred and Forty Seven only
oooooo3 2447491836
R KMOHAPATRA
MAKER
.CNABGHLDU9'
JAGANNATHA
PANDA BHIMASEN ROUT
Counterfoll Descrlpuon
TrEnsactlon Type
GSTIN Numb€r
Deblt Account Details
Payment towa/ds lnvoice Or Bill
NEFT Fundstransfer
00000032487491836
CreditAccount Details
ne.rniiory N.mc/AccornlNo.
SAIIID I,iAGAR 13,39,547.O0
Cr.ditstlt{rs UTRNo"
ORISSA
caMPA/150826438936041
NEW DELHI LODHI COI'1PIEX/NEW OELHI LOOHI
ioMpr:vconpooooszrC.editunder
15.89.547.00 pr..e<< 5Bi\220146806895
Privacy Statement Terms of Service (Terms & Conditlons)
Slte bestviewed.t 1024x 764 resolotlon ln LE 10+, Mozllla 35 r, GooSleChrome 35 +
il.rirrffrs mlcd chlol GanorC llrtTat
'fotm Amrn*rkrffiPower Gdd Corporation ot lndla Lt'
dlu, il6ir, tonh., Tdch{
NEFT RTGS CHALLAN
AGENCY COPY
NEFT / RTGS CHALLAN forAd-HOC CAtrtPA
Date:09"12"2020
Agency Narne, POWERGRID KANHIA
Application No. 643893604'1
MoEF/SG File No. 5-OR8432/2020"4HU
Location. ORRISA
Address, Power Gr;d Corporation oflndia Limited, Talcher HVDCBi"pole S/s, post-Deepsikha, Dist.Angul,Odisha-759149Anugul
Amount(in Rs) 1389547 t-
AmouniinWords iThirleen Lakh Eishv-Nine T]lousand FiveHundred and Forty-Seven Rupees Only
NEFT/RTGS to be made as per followingdetails;
This Challan is strictly to be used for makingpaymentto CAIVIPA by NEFT/RTGS only
Corporation EankLodhiComplex Branch,Block l'1,CGO Complex,Phase l, Lodhi Road, NewDelh;-110003
BANK COPY
NEFT/ RTGS CHALLAN forAd-HOC CAMPA
Date i 09-12-2020
POWERGRID KANHIA
Application No. 543893604,1
IIoEF/SG File No. 5"OR8432/2020-BBU
ORRISA
Address: Power Grid Corporation oflndia Limited, Talcher I-IVDCBi-pole S/s, post.Deepsikha, Dist-Anqul,Odisha-759'149 Anugul
13895471-
Amount in Words :Thirteen Lakh Eighly-Nine Thousand FiveHundred and Forty-Seven Ropees Only
NEFT/RTGS to be made as per followingdetails;
Beneficiary Name: ORRISA CAMPA
IFSC Code: coRP000037,l
Pay to Account No. 150826438936041
Valid only forthis
Bank Name & Corporation BankLodhiComplex Branch,Block 11,CGO Complex,Phase l, Lodhi Road, NewDelhi-1'10003
This Challan is strictly to be used for makingpayment to CA[4PA by NEFT/RTGS only
After making successful payment, User AgenciesEmail: helpdeskcampa@corpbank,co.in
may send a line of confirmation through
ffiforeslsclearance.nic.in/UserAccounUNefl_ChallanCorp.aspx?pd=TRANS389362019041
12/9t2020
1t1
OFFICE OF THE DIVISIONAL FOREST OIFICER; ANGUL DIVISION:ANGUL.Letter No, E / 0 + lzLT lDep pazl lDared, a4- p** -2,020
To
Su h:.
Sri Raiib Lochan PandaSr.G.M.Kanlka,fowerCrid ,Corporation oflndia Ltd,Talcher HVDC Bi-pole S/s,Post-Deepsikha, Dist-Angut7591 49
Proposal for diverslon of 1.3841 ha forest land for construction of diversionpor$on of 400 K V Double Circuit Ta'lcher-Merunandall Transmission Line fromLoc No,29 to 32 byPowerGrid Kaniha inAngul District,
ttef: l.Proposal No. fPlO R/'IRAN 5/38936/20192.Memo No. 18836 f&E dr,24.11.2020 ofSpecial Secrerary to Covt,3. Memo No.20555 dt.25.11,2020 of PCC!', {NodalJ
Sir,With reference to the above citsd correspondence on thc subject, it is to inform you
thirt the 0overnment of India, Ministry of Environment & forests Lastern Regional offi{re, At:Chandrasekharpur, Bhrbaneswar has accorded Stagc-l approval fbr diversion of 1.3841 hr forestland for construction of diversion portion of 400 K v Double circuit 'I'alcher-MeramandaliTransnrission Line from Loc No.29 to 32 by power crid Kaniha in Angul District for non forestpurpose on Design, Build, Finance, Operate and'l'ransfer (BOT/DBFOT) basis in B0T('l0LLJ Modc_The scheme for comp. Aflorestation in respect ofyour above proiect has been technically approvedby the Principal chief conservator of Forests, Forest Diversion & Nodal officer, F.c. Act vide hismemo No. 20555 dt.25.11.2020 with a financial out lay ofRs, 5,23,019.00 /- or Rs. S,23,100.00/-
Hence you arc requestod to deposit an amotltlt of Rs, S,23,100.00/.towards thccost. of approved Comp. Afforestation in. Ad-hoc CAMPA in the saving Bank Account No.
. 5?0101263743655 , Corporation Bank, t,odhi Complex, Oround Floor, Block No. 11, CGOComplex, Lodi Road New Delhi through "e " payment immediately and intinlatc thc samc to therndersign0d for taking further action in the matter.
uemono. F/09 /Dated. ab -&-4090Copy forwarded to the Principal Chief Conservator of Forests, Forest Diversion &
Nodal Officer, F"C. Act 0/o the Principal CCF, 0disha for favour of your kind inlormation andnecessary action with reference to his memo No. 20351 dt. 25.11 .2020.
hDivisionaro}6ffidfi,&il
v6rn6 v6. g// ? / oatea. 0.2'12'We' rljlrsul Divlsion'
Copy forwarded to the Regional Chlef Conservator of Fotests, Angul Circle Angulfor favour ofyour kind information and necessary acHon with reference to memo No. 20553 dt25,1L,2020 of Principal Chief Conservator of porests, Forest Divet.sion & Nodal Officer, F.C. Act O/othe PrinClpal CCR odisha.
ui,i,io,*#.lhiL")r:d\ngul Division
:
ir
Iit#nr*ta;;+-r:ra:$:+
Yours faith fullv
,,r..nudiii,l#flllilgul Division'
qd{ Bs +rffiqra :+rw gFB-sr frF.tEPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)gfi at-*-rtw fr dr S 616 6E-oER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha!759 147T el:061 60 -243 4 17 (TeleFax),Mail ld :[email protected]
ANNEXURE -IV
UNDERTAKING REGARDING PAYMENT OF NPV
POWERGRID have applied for diversion of 1.3841 ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Doubie CircuitTransmission line from Location No- 29 to 32 for proper crossing of Talcher-Bimalagarh Railway Line,of East Coast Railway".
I /we do hereby undertake that We have already paid the Net Present valueQrlPV) for1.3841 ha offorest area to be diverted under this proposai as per the Order of Hon'bleSupreme Court of India dated 30.10.2002,01.08.2003, 28.03.2008,24.04.2008 and09.05.2008 in IA No. 566 in Writ Petition (Civil) no.20211995 and as per the guidelinesissued by Ministry vide its letter No. 5-111998-FC (pt.II) dated 18.09.2003, as well asletter No. 5 -2 12006 lF C dated 0 3. 1 0.20 06 and No.. 5 -3 I 2007 -F C dated 0 5 .02.2009 in thisregard .
(Signature of User Agency)
=i=-:-l-.J!lr
-I|r--.rIr-:l:-
qirrtrrg
Date: 18.01.21Place: Kanhia
Name:- V G RaoDesignation:-Chief General Manager
Power Grid Corporation of India Limited
Official Sealdri.lnrv.GRr
#n,.%#m#*ffiPu,,"i O,io CotPo,A- Gil lndia L5'
fu, ntdr, ](flih., Tdchj
Registered Office: B-9, Qutab lnstitutional Area, Katwaria Sarai, New Delhi- l 10016Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon-122001, Haryana
Welcome: PoWERGRID CORPOF INDIA LTD (5834) K,wr'ro'
RAJIB KUI'1AR IvIOHAPATRA
fin.er..ro" - C
SBI is upgrading its lnternet Banking platform for bottercustomar oxperience. During this actlvi
Youarehere: / Repods / QueryByAccount
e-PayOrder Details
e-PayOrder Details
e-PayOrder Numb€r
DebitStatus
ORISSACAMPA
SAH]DNAGAR
11-Dec-2O20
13,89,547.00
CNABGHLDU9
Thirteen Lakhs Eighty Nine Thousand Five Hundred and FortySevenonly
00000032 487491816
R KMOHAPATRA
MAKER,CNABGHLDU9'
JAGANNATHA
PANDA
Authorlzer 1
BHIMASEN ROUT
Counterf oll Descrlptlon
Tl'amactlon Bp€
GSTIN Number
Debit Account Details
Paymenttowards lnvoice Or Bill
NEFT Fundstransfer
000000!2487491856
Credlt Account Detalls
8erciciary NamalA.coirnl.No.
SAHID NAGAR 15,89,547.00
Cneditshtrs UTnNo.
ORISSA
cAMPA/15082543a936041
NEW DELHI LOOH'COI"lPLEX/NEW DELHI LODHI
coMPLEX/CORPO000l7r
Creditu der13.49.547.00
Process
pnva.ysri..emenr eEuwiFlco.(€Jllr..lf{qtqftfr{tu dtfiiacErtrqftH
site bestviewed at 1024x 76s resorution in Fkl$rbfGftd CdEO]AOrdHtt(lla L5.fr,Grtr/ xrllh.,Tdchcr
12t912020 NEFT RTGS CHALLAN
AGENCY COPY
NEFr/ RTGS CHALLAN forAd.HOC CAMPA
Date: 09.12-2020
Amount in Words :Thideen Lakh Eighty-Nine Thousand FlveHundrsd and Fody-Seven Rupe€s Onty
NEFT/RTGS to be made as per followingdetails;
Beneficiary Namo: ORRISA CAIMPA
IFSC Code: coRP0000371
Pay to Account No. 1s0826438936041
Bank Name & Corporation BankLodhi Complex Branch,Block 11,CGO complex,Phasa l, Lodhi Road, NewDelhi-110003
This Challan is strictly to be used for makingpaymentto CAIVIPA by NEFT/RTGS onty
Power Grid Corporation ollndia Limited, Talcher HVDCBi-pole S/s, post'Deepsikha, Dist-Angul,Odisha-759149Anugul
BANK COPY
NEFT / RTGS CHALLAN forAd-HOC CAMPA
Date : 09-12-2020
Amount in Words :Thineen Lakh Elqhly-Nin e Thousand FiveHundred and Forly,Seven R!pees Only
NEFT/RTGS to be made as per followingdetails;
This Challan is str;ctly to be use.l for makingpaymentto cA[,tPA by NEFT/RTGS only
Power Grid Corporation oflndia Limited. Talcher HVDCBi-pole S/s, post-Deepsikha, DislAnqul,Odisha-759149 Anugul
Corporation BankLodhiComple)( Branch,Block'11,CGO Complex,Phase l, LodhiRoad, NewDelhi-110003
After making successful payment, user Agencies mayEmail: [email protected]
send a line of confirmation through
we-{.tlr. nftv.e nlo.-
foresiscleara n ce. n ic.in/Use.AccounUNeft_C ha llanCorp.aspx?pid =TRAN S389 362 01 904 1 111
OFFICE oF THE DMSIONAT FOREST OFFICER; ANCUL DIVISI0N:ANGULr"etter iro. (NS / zfi / DR? I zozo / Dr1u6. a<s.\ )-:5
To
Rr:l
Su b:-
Srl Rajlb Loehan PandaSr,G.M.Kanika,PowerGrid,Corporation of lndiattd,?alcher HVDC Bipole S/s,Post-Oeepsikha, Di$t-Angul-7591,t9
Proposal firr dlversion ol 1.3841 ha fotcst land for construcfion of diverslonpomion of 400 K Y Double Circuil Talrher-Mer.amandali Transmlssion Line fromLoc No.29 to 3? by Powsr Crid l(aniha tn Angul District.
l.proposol No. FP/ORfi nANS/38936/20192.Memo No. 18836 f&f &. 2ir.11.202O ofSpecial Socretary to Covt.
Sir,Wit}l reference to the above cited letter on the subiect, it is to inform that the
Gevernment of Indta, Mlnistry of Envlronment , Forests & Climate Change ,Eastern Regional Ofrice,Ar Chandrasekharpur, thubaneswar vide their ietter No. 5-ORBa3Z/2020-BHU dt 0s,11.2020 hasaccorded Stage-I apploval for diversion of 1.3841 ha forest land. for constructlon of diyersionparrion of {}0 K V Double Clrcult Talcher-Meramendall Transmission Llne from Loc N0,29 to 32by Power Grid Xaniha inAri$, Dist cr
Hends, as per the stipulation No, (v) of the approval order by COl, MOEF, you arercquested t deposlt an amount of .r R* &6$,44? /- towards the eost of Npv as per the calculation
$ven below in the, Ad-hoc CAI(pA ln th" saylng Bank Account No. 5?0101263?43695 ,Corporatton Banl6 Lodhl Complex, Grcund Floor, Slock No. lX, CCO Complex, Lodt &oad NewDelbl tlrough oe " payment immedlattly and in{male the same to t}e undersigned for taldngfurther aetion in the matter.
l'orest land involverl - 1.3B41 ha
Density of forest land .0.2
Eco value class -lll
Rate of NPV applicable - Rs,6,26000/- perha
Amount of NPV to be deposited R$. 626,,A00 /" X L,3841 ha ' R$. 86&46.6/- or R$.866,*471- (Rupees Eight lal& Sixg Six Thousand Four Hundred Forqr Sevenonly)
Yours faithfully_,-
Drvisionar F\k6il&l\,Argul Oivision
(Prol
._.'-j--#.*i._€#--*-<+##€---.+
//2/ /
u"lnu tto. 3S& Dated, go,\?ecopy forwarded to t}re principar chief conseryator of Forests, Forest Diversion &
Nodal 0fficer, F C,'Act, 0lo the Principal chief conservator of Forests, odisha for favour ofinformatiqn. and necessary action with reference to letter No 18B33 dt 24.lr.z0zo of specialSecretary to Govt. F&E Deptt,
\ ,-Divisrona,'r7mHIF
Q--Angul Divisionysrn6 trs. Bo.5O/ Dated. B6.\\. )-C)
' copy forwarded to the Regional chief conservator of Forests, Angur circre forfavour ofkind information and necessary action with reference to memo No. 1gg34 dt. z4,t7,zozoofSpecial Secretary to 6ovt F&E DeptL
'\4,uLoDivisional For'est'Offl cer
02.-3n8ul Division.
crd{ Bs ardftqra grrtr gFrqr frft-EPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)gd at+-nua ff * fr r&ra off.6rER-II,200OMW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-759 I 47T el:067 60 -243 4 17 (TeleFax),Mail Id:[email protected]
ANNEXURE -V
UNDERTAKING REGARDING PAYMENT OF ADDITIONAL NPV
POWERGRID have applied for diversion of 1 .3841 ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double CircuitTransmission line from Location No- 29 to 32 for proper crossing of Talcher-Bimalagarh Railway Line,of East Coast Railway".
I /we do hereby undertake that We shall pay the Additional amount of the NPV of thediverted forest land, if any becoming due after frnalization of the same by the Hon,bleSupreme Court of India on receipt of the report from the expert Committee, shall becharged by the State Golt.
(Signature of User Agency)
Name:- V G RaoDesignation:-Chief General Manager
Power Grid Corporation of India Limited
=iE--l-+I-:l:-
qiERFrs
Date: 18.01.21Place: Kanhia
Official Sealt*.ilrv.eRe
It rtrs{cw Ct{d Gqter.l lrglagrrsrfrr *RrnffirBqrftffiFor.r Cru Colpadqr ot mb U.t
frrir/ Krrr..T.lcrll.
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-t 10016Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon-122001 , Haryana
cr+{ Bs +rdtqrr gilw SB-fl frfr-EPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)
5ff S-+-rua fr * dlr&ra qG6rER-II,200oMW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-759 I 47T e1067 60-243 417 (T eleFax),M ail Id:[email protected]
ANNEXURE -VI
UNDERTAKING REGARDING PAYMENT TO CAMPA
POWERGRID have applied for diversion of 1.3841 ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double CircuitTransmission line from Location No- 29 to 32 for proper crossing of Talcher-Bimalagarh Railway Line,of East Coast Railway".
We do hereby undertake that all the following levies deposited in Ad-hoc CAMPAaccount.
abS LNo. Name olDeposits Amount RTGS/ NEFT llTR. No.
I Cost of NPV Rs.8,66,447.00 NEFT sBIN 2203468068952 Cost of Compensatory
AfforestationRs.5,23, 100.00 NEFT sutN 220346806895
J Cost of Dwarf plantation Rs.2,34,3 19.00 NEFT SBIN 42 l0 I 1686503
(Signature of User Agency)
Name:- V G RaoDesignation:-Chief General Manager
Power Grid Corporation of India Limited
-l--tL-th-
JI-rIlL
qi6{F'rs
Date: 18.01.21Place: Kanhia
Official Sealt{.urv.eRm
#n" ffiI{3ffiIH::'
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-110016Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon- 12200 I , Haryana
w-
qcrr Bs anrftqra Srrn SBqT R,.B-EPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)gff at'r-rrw fr Bl fr r&ra mF-oER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-7591 47T el:o 67 60-243 4 l7 (TeleFax),Mail Id:[email protected]
ANNEXURE -VII
U ND E RTAKING REGARD ING TRE E F E LLING
POWERGRID have applied for diversion of 1 .3841 ha.' of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double CircuitTransmission line from Location No- 29 to 32 for proper crossing of Talcher-Bimalagarh Railway Line,of East Coast Railway".
I /we do hereby undertake that we shall restrict the felling of trees to minimum numberin the diverted forest land and the trees shall be felled under strict supervision of theState Forest Department and the cost of felling of trees shall be deposited with StateForest department.
( S igna turc ol U ser Agency)
Name:- V G RaoDesignation: -Chief General Manager
Power Grid Corporation of India Limited
:=l=-Jtlr:I--:l=-
qiT{Frs
Date: 18.01.21Place: Kanhia
Official Seal
i.tli.rs rv.G RmlE qrrtrFd chid Gon6tal Maiag'fifis frqaFarsiEcrft,:Bdarr errO Coreomon ol lrdia L5'
fr.ffi, Klth.' Tdcrt '
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi- l 100 l6Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon-122001, Haryana
w
qr.rr Bs +'rfterfl grq.SFyt{r Rfr-EPower Grid Cotporation of India Ltd.
(A Govt.of India Enterprise)gff atr-rr uq ff fr fr r&ra +F6ER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-759 I 47T el:067 60-24341'l ('l e leF ax),Mail Id:[email protected]
ANNEXURE -VI[
UNDERTAKING REGARDING SUBMISSION OF FRA,2OO6
POWERGRID have applied for diversion of 1.3841 ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double CircuitTrmrsmission line from Location No- 29 to 32 for proper crossing of Talcher-Bimalagarh Railway Line,of East Coast Railway".
I /we do hereby undertake that we have applied for issuance of cefiificate under theFRA,2006 to the District Collector, Angu1. The FRA Certificate (For linear projectsother than plantation) shall be submitted before Stage-II approval.
(Signature oI User Agency)
Name:- V G RaoDesignation:-Chief General Manager
Power Grid Corporation of India Limited
^-l=--.
-l:.,-rtar--JIr--:t:-
qi+{trrg
Date:18.01.21Place: Kanhia
Official Seal
tdLlFrv.eRD{sq[Ifi*trd cllhf Gdtial iihnler*rnrs fifrrn*ikinfrlrPowrr Gdd CofDoillho oa lndL LS.
fr,il|{Xrflt .Tllclr
Registered Office: B-9, Qutab lnstitutional Area, Katwaria Sarai, New Delhi- 1 100 I 6Corporate Office: "SAUDAMINI", PIot no.2, Sector-29, Gurgaon-122001, Haryana
ou@_
qr.rc Bs an{ftqra gfltr $Fsqr frfr-EPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)
Tff afr-l vq ff S S r&ra qft-oER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-759147T eli67 60-243417 (-l eleFax),M ail ld:[email protected]
ANNEXURE -IX
UNDERTAKING REGARDING CREATION AND MAINTENANCE OFPLANTATION OF DWARF SPECIES
POWERGRID have applied for diversion of 1 .3841 ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double circuitTransmission line from Location No- 29 to 32 for proper crossing of Talcher-Bimalagarh Railway Line,of East Coast Railway".
I /we do hereby undertake that We have already paid the cost of creation andmaintenance of plantation of dwarf species against demand received from DFo Angulvide letter no 47 dated 04.01.21 in this regard.
(S ignature ol Uscr Agency)
Name:- V G RaoDesignation:-Chief General Manager
Power Grid Cotporation of India Limited
^=t=^-l.-=--rIr--rIr-
ui(Frs
Date: 13.01.21Place: Kanhia
Official Seal
trt r: rv.e RDqr ilililtfl Gtl Gffi8l irtllg,dnm *cttnuilrtBqifrffifrora, Gdd cooo.ddr of lrdis Lts
dl, nrtv Krtlhl T.ldtor
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-l10016Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon- 12200 I , Haryana
w
\.^.y,rrn - r)
rA LTD (58J4)xdowMoie
Youarehere: / Reports / QueryByAccount
e-PayOrder Details
e-PayOrder Details
€-Payorder Number
Deblt Status
ORISSACAT,IPA
SAHID NAGAR
CNABHJXJ04
Paym€nt towa.ds Involce Or Blll
NEFrFundst16nsfer
71-Jan-2o21
2,34,119.00Two Lakhs Thirty FourThousand Three Hundredand Nineteen onty
00000032487491836
I'IAKER,CNABHJXJO4'
JAGANNATHA
PANDA H KSINGH
Counterioll Doscrlptlon
T6ns.ctlon Type
GSTIN Number
DebitAccount Details
SAHID NAGAR 2,34,J19.00
Credit Account Details
Aenefrcinry Nsmp/A.ro! iNo.
ORISSA
cAMPA/15082643893635aNEW DELHI LODHI COMPLEX/NEW DELhILODHIcol.4PLEX/CORPO000l7 I 2,34.j19.0o Frnd settled by RBlwlth
' ben€ficiaruBanksa1N4210116n6503
NEFT'R'|GS CHALLAN Pagc I ol I
AGENCY COPY
NEFT / RTGS CHALLAN for Ad-HOC CAMPA
Date:11.01-2021
Amount ln Words:Two Lakh Th irty-Four Thousand ThreeHundred and Ninet6en Rupees Only
NEFT/RTGS to be made as per followingdetails;
This Challan is strictly to be used tor makingpayment to CAMPA by NEFT/RTGS only
Power Grid Corporation oflndia Limited, Talcher HVDCBi-pole S/s, post-Deepsjkha, DislAnqul,Odisha-759'l49Anugul
Corporation BankLodhiComplex Branch,Block 11,CGO Complex,Phase l, LodhiRoad, NewDelhi -110003
BANK COPY
NEFT / RTGS CHALLAN for Ad-HOC CAMPA
Date i 11"01.2021
POWERGRID KANHIA
Application No. 64389363s2
[!oEF/SG File No. 5"OR8432/2020-BHU
Location. ORRISA
Address: Power Grid Corporation oflndia Limited. Talcher HVDCBi-pole S/s, post-Deepsikha, Dist-Angul,Odisha-759149 Anugul
Amount(in Rs) 234319t-
Amount in Words:Two Lakh Th irty-Fou r Thousa nd ThreeHundrcd and Nineteen Rupees Only
NEFT/RTGS to be made as per followingdetails;
This Challan is strictly to be used for makingpayment to CAlvlPA by NEFT/RTGS only
Corporation BankLodhi Complex Branch,Block 11,CGO Complex,Phase l, Lodhi Road, NewDelhi-110003
After making successful payment, User Agencies may send a line of confirmation throughEmail: helpdeskcam pa@corpba n k.c o.in
o@ffihttp://forestsclearance.nic.in/UserAccountA.,left_ChallanCorp.aspx?pid-TRANS3893... 1l-01-2021
0FIrlCE 0F THE DIVIgtQNAL t'OREST OFITICER; ANGUL DIVISTON:ANGUL.
To t.crrorNo \\ /zt7l2ozo7nRp/Datctl.\\leJ
Sli V.C.llaoCh ief Ceneral Manager,llVDC l(aniha,Power Grirl, Corl)orntiol uI Inrlia Ltd,Talcher I IVDC Bi-po)e S/s, post-Decpsikha, Dist_Angul-759147
Sub:- Proposal for diversion oi 1.3841 ha forest land for construction of diversionportion of400 K V Double Circuit Talcher-M etamandali Transmission Line. fromLoc No.29 to 3Z due to proposed new Rly line by [at Cost RIys.
Ref: l,proposal No. F?IOR/TRAN S13g936/20t92.Memo No. 18836 F&E dr.24.11.2026 ofspecial Secrerary to 6ovt.
_. 3.Memo No.4559 dt.31.12.2020 oOfRCCF ingut.QiF
_ With reference to the above cited correspondence on the subject, it is to inform youthat as per condition No. X of stage-l approvar tire'scheme ror creation and maintenance of3l1t1k,n of dwarf species (preterabiy medicinar species) in right of way under the rransmissionllne ln respect of your above project has been technically approved by the ReBional Chiefconservator of Forests, Angul circle vide his memo No.4557 dt. gr.tz,2oz0 *irh a finarcial out rayot Rs2,34,319/-
Hence you are requested to deposit an amount ofRs. 2,34,379 / -towards the cost ofaoove approved scheme in. Ad-hoc CAMPA ln the saving 6ank Account No.520IA1.2637 43655 , Corporatton Bank, Lorlhi Complex, cround Floor, Btock No, 11, CGOcomplex, Lodl Road New Derhi through "e " paymenrimmediatery and intimate the same to theundersigned for taking further action in the matter.
Y r)urs faith Fully
,,,,,r,")"d$lr\1",Q-6ngul Division.
Memo No. __''---.--/ Dared. _.Copy lorwarded to the Principal Chief Conservatol of l;orests, Forest Diversion &
Nodal officcr, F.c. Act o/o the Principal ccF, 0disha for favour ot your kind information andnecessary actiotl with ref€rence to rncmo No. 4558 dt.3l.1Z.Z0Z0 of RCCF Angul.
\Di,rislonal Forest Offi cer
Angul Division.Memo No. _/ Dated. _.Copy forwarded to the R€gional Chief Conservator of Forests, Angul Circle Angul
for favour ofyour kind information and necessary action with reference tohis memo No.4557 dt.37.72.7020
\,\Divisional Forest Officer
Angul Division
vrr{ Bs ql{ftem srtr SBsr frfr}gPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)gd al*-rlra ff gr S e&ra 6651ER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-759 I 47T e1:067 60-243 417 (Te leFax),M ail Id:[email protected]
ANNEXURE -X
ANDERTAKING REGARDING FIXING OF BIRD REFLECTOR
POWERGRID have applied for diversion of 1 .3841 ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double CircuitTransmission line from Location No- 29 to 32 for proper crossing of Talcher-Bimalagarh Railway Line,of East Coast Railway".
I /we do hereby undertake that we shall fix bird reflectors at the cost ofuser agency i.ePOWERGRID during construction of line on upper conductor of transmission line atsuitable intervals to avoid bird hits.
(S ignature ol User Agency)
-=r=-
-lL
r-IF
uiwFrs
Name:- V G RaoDesignation:-Chief General Manager
Power Grid Corporation of India Limited
t.{.qfl,qLdflsarffiDate: 18.01.21Place: Kanhia
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-110016Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon- 12200 l, Haryana
ew
crr{ D.-E +rdtew sTrw $fuqr fAR-gPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)gff at'*-rru+ ff gr {fr E&ra +G-oER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-759 147T el:067 60 -243 4 17 (TeleFax),Mail Id :[email protected]
ANNEXURE -XI
UNDERTAKING REGARDING GAIDELINE FORLAYING OFTRANSMISSION LINE
POWERGRID have applied for diversion of 1.3841 ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double CircuitTransmission line from Location No- 29 to 32 for proper crossing of Talcher-Bimalagarh Railway Line,of East Coast Railway".
I /we do hereby undertake that we shall comply with the guidelines for layingTransmission lines through forest areas issued by Ministry vide letter No.7-2512012-FC dated 05.05.2014 and 19.11.2014
-=t=.-l-.:Its-Jlri-
qirrFrs
ignature of User Agency
@(s
Name:- V G RaoDesignation:-Chief General Manager
Power Grid Corporation of India Limited
Official Sealtrtrr rv.G RD
rr qnctsd Cl*sf Gderal Man?g-'r
Hd;- fiqtrn #igo, rdfrt'po i orro cooo.*on ol lndia lJ'- -k uqf,K.dh1rdd''"
Date:1S.01.21Place: Kanhia
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi- I I 00 I 6Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon- 12200 I , Haryana
vrq{ A-s +rdtqrasnw gfr-qT Rft-EPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)gff ate-rr (rE fr S g1 o2qrd 6E6rER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angu)(Odisha)-7591 47T elfi 67 60-243 4 17 (feleFax),Mail Id :[email protected]
ANNEXURE -XII
ANDERTAKING REGARDING ENVIRONMENTAL CLEARANCE
POWERGRID have applied for diversion of 1.3841 ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double CircuitTransmission line from Location No- 29 to 32 for proper crossing of Talcher-Bimalagarh Railway Line,of East Coast Railway".
I /we do hereby undertake that Environmental Clearance is not applicable fortransmission line projects.
(S ignat ure ol User Agency)
WName:- V G Rao
Designation:-Chief General ManagerPower Grid Corporation of India Limited
Official Sealt*ilrv.cRD
rr rGIqiqlB Cha, Gm.El t|LnerdnAc fr-crwqhtBqlffiFomr Grid Cooonlion d lndia LU.
dttr,ilrlul(.ilt.Tdche
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi- l 100 l6Corporate Office: "SAUDAMINI", Plot no.2, Sector-2g, Gurgaon-122001, Haryana
-!Ir-.-I-
rIr--:t:--
qiT{Frs
Date: 19.01.21Place: Kanhia
N,TIH.ATIoN ''^.,x.ils *\ y,.. J _ . Ncw Delhi, thc i.)tb Scprcmbtr, 2frb . ' _--\/1-1?: llf,l:I:.8s,8dr,8fi rorificalioa undcrSub-rurc (J) or Rule i oI rhe Eovirosmenr (k6ro*i6z) Rutes, l986fulnryueocr{ylieiorsand pohibirioororor*eroioctsoiuli"iu..,;;i,-rd;;.i.-ofr#,iiitl"ir,i"e::: -T-y,lj:f-?:*_1i llr pll*,isr csvt oo;c;rd iopo"r. .. rooicrrro u ra'r s*.arll" il-"Iiri;i;,, b.irg
' MINISTT.Y OF EII:IRONMEbIT.cND FOREsis _ r .\NOTIHCATION ?Yt)
sub,scction and claust (v) of
'to thig 'notifisation cntailing &patitiy shall bc undcrtaken.in any lait of,
i:ii':.
t'f"l
rrk. :r ts 'ovpsrr
otrndi.r, uricsspr[or caviroa.*rut "r..-"" r." ; Gffi;;;;;; iiL-,f," ou;."ir*d Nuiuurt BoviroDamcu policy rs lpprovcd by rtrc Uaim Criilrc-on iet U.y, ZOOO rad tho proccdurc lpcafic.t ilr I hc
lgtf11{Ty*-H:-:lp:ryl o(rbe srrrrq ud)orerriroryrrvcrErvirqocrrr.pjJei[J.i,tiurrqtry()tl Ar' lo ul coostllulcd bY lhc ccnlrrl GovcrrBcll in coosultntio! x,ilt 'tDd srrr dowroocnr or $c Uoioo TenitoryAdilhistr,ioa oonc,)rncd uitcr sub'sccrioo (3) ofsocioD 3 of De Eqviro'rocor (prolccaloo) Ad, 19g6 b, r[c purr*$ of!g 1.1tl{11ioo wy pubtishcd ir rbc crzclc of tldia" SxurordiDary, iur It Sc.tio6 3,.Suh,scclioo (i0 yidr uumbers'o.1324(E),dercd.rhcl5rhscprcmrcr,2oosbvirissobiccri" -d;;J;;il;r*6;.ilJ'/,;tuu"o,o.lhctc5y.withia I Pcrird ot sixly drys &om lhc drro oo ihicl copieE or or;ttc coritrining bc's.Id irotlficdioi wtr, ,rocrvdbblc to tbc pubtlc I
II
2. . . - Requiremeutr of p,Ior -Envlrormenrat Ci.iffi.rttCi,. The following projccs oractivitics shall requirc prior environmental clearance from the concerned regulato-ry authority,which shall hereinafier refened to be as lhe cenirgl,icovernmcnt in the Ministry of- Environment and Forests formatters falling under cetcgory 'A' in the Schedule and ar sutclevel rhe state Environmcnt Impact Assessmenr Airthority (semel for nianers falling under' category 'B' in rhe said Schedule, bcfore any constructioo work, or prepararion of lani by theproject managemelt exccpt for securing the land, is stirteiJ on the pr;je;t or activiry:
(i) AII new projects or acriviries listed in the Schedule to this norification:
(!i) Expansion and modernization of existing projccts or aciivitire 'listcd. inrthe Schcdule rothis notificaliofi with addition. ofcapacity bcyond the limits spcoifred for thc cencemed sector,that is' proj€cts or activiries which cross the threshold limits given in the schedule, afterexpansion or modemization:
I
' No% thcrefore, in cxercise ofthc powcri cosub..spg{ut (2) ofsection 3 ofthd Envlronmcnt (prof sirb.rirlc (3) of rule 5 of rhc Environmont tproithc notifictrtion numbcr S.O. 60 (E) datcd rhc 2Zu
rlnclu4c ttrc ttnitrrirl w*c.s
I
.procqq anf or .
r cnvironmcnt{l[.cvel. Enviionmcnlcleqqttct rrom the Ccntrgl Govcmmcnt or ls th
tmpac(,fiss€qgncnt Authority,.duly colstirutcd(3)rof$Ctlon 3 of the srid Ac1 ln acaordancs :
notification.this
I
I
SCHEDULE
(Soe paragraph 2 and 7)
LIST OF PROJECTS.OR ACIV|TIES REAURINO PRIOR ENVIRONI,IENTAL CIEARINCEI
Pro.lecr trActivityCrtegory n irh threshold limia Cordlliom lfany
II Miuing, cxtractioa of Dstursl resources ald po*er geocrstlo! (for r rpecificd
producllon capaclty) i
o) (2). (]) (4)I (a) Mining of minerals I 50 ha. of mining lease area
Asbestos mining irespcctivemlnlng arca
<50 hs> 5 ha .of mininglease area.
General Condiiioshall applyNote
,
Mineral prospecting(nol lnvolvingdrilling) are exemprcdprovided thcmncesston arcashavc got previousclearance for physicalsurvev
l(b) Oflshorc aidonshore oil and gascxp loration,developrnent &production
NotcExpkiration Surycys(not lnvolving drilling)arc. cxcmptcd .providcd
tho ctinccssioa artashlvo gol prsviousclcrranoc for physicalsory0y
I (c) River Valleyprojects
(i) > 50 MW hydroelecricponcr geier&ion;(ii) > 10,000 ha. of culrurableconrmand area
(l)<50MW>2sMV hydroclcctrlopowgr gcngrsliodi(ii) < 10,000 hs. ofcullurable commandsrca
Gcncral Condition shal I
apPlv
r (d) Thcrmal PorveiPlants
> 500 t(.lw lcoa Ulign itc/naptru& gas based);> 50 MW (Pct cok€ disscl andall other fuels )
< 500 M\y(coaullgnitdDapt u &S{ basod);<r0Mw> tMW '(Pot. coki,diccol rnd. all odrcrfurls )
General Conditioo shallapPlv
3 Mrte riels Productiou .tK>.',_g) (2) (3) (4) (5)
3(6)
,l
IMetallurglcalfindustries lfenous
[.& non fenoug
a)Primarymelallurgical irduslry
All projccts
b) Spongcmanufacturing:200TPt)
c)Sccondary -'mctallurgical
processing induslry
AII to-Yic and heavymetal prodUcing units> 20.000 to'nncs/annunr
Spongcmuoufacturing<2001'Pt)
Sucondary. metallur$icslprr)cessrng rndustry
i.)AtitoxicanrJhcavymetal producingun its
<20,000 tonnes/ann unt
ii.)i\il()lhcrn0n -to\icsecondary rnctallurgicllprtrcussing industries
>5000 touncVarrnum
I
l0cncnl. Condltion shall
lapply lbr Spongc iron
Irnanufactrrling
3( b) Ccment.Blanrs : 1.0 milliontonnes/annumproduction caplcity
< 1.0 rnillionlonneslannutn productioncapacity. All Stand llonegrinding un\ts
l
t
Ocncrsl Condition shallapPly
.
,^,ffi
oomplcxrs., J(industries based
& natursland/or
...
fl'l OI (3) 14) (5)
t
All projects
s(d) Manmade tibresm onufacturing
Rayon Othcrs Geneml Condition shallapply
i.
proces
0
than craokingrcformationnot covgrad ur
tho complcxcs)
Located out sidc thenotified industrial 8rca/cstatg
Located in a notifiedindustrial area./ cstate
Specific Condition shallaPPlv
s(0
(dycs & dyclntrrmediatcs: hulk
Located out side thcnotificd indus(rial area/estate
L,ocatsd itr I notifiedindustrial area/ cstatc
Specifio Condition shallapplv
drugsirtt$Bedistcs
formuhllonr;synthaic rubben;basio or8anicoheorlosls, othorsynthcllc orSanic
shcmigdhtcnrcdiahr)
5(s)
(ti) All Canc juilon-riolsssca bEr
dhtilledas >30 KLD
Alt Canc juicc/non-mohsscs bf,c.d dlstilliriec
Ueneral Condition shallopPly
.r, rLD
5{b) Intrgrated paintindustry
All projects Oeneral Condition shallaoolv
2900 Gt/2006-78
lsolaled sloragchandlirghazardouschcmicals (Asthrcshold plannquantity indicain column 3
schcdule 2 & 3
MSIHC Ru1989 srnen(2000)
Iotnrtructirn llclsdlry Blvhorucalrt Scndca
industrisl aststcuadcr th? Cstrgory Acntirc industrisl arcashrll b€ ucalcd 8s
Catcgory A,incspectivc of the arca.
lndustrial cstatrssrca gr€ater dlanha. and housiag atoflc CatcSoryindustry.
pr*C copr1!a+pmcodng(EPzr),Economic(sEa), l
PsrksrComplcxcr.
Indusrirl il*arcr of500 ha" md nol housiany industry bilongingCatcgory A or B.
Notr:tndurtstal Btatc of ibclow 500 hl. .and
housing any indusrycategory A or B docs nottrqql& glcararce
hazardous wastctlcatrsnl ,!oaag!srd dlsposr,lf.cltiti.. CISDPT)
incincratioo alonc
fiU only
- i,,.. . ..!!..'! "
'a tI i,i
and or buih up arcE
Note:-
iGe8ersl CoDdllio! (GC)i
Any project or aciiviry sp€ci8cd in Calcgory 'B' will bc rcntcd as Catcgory A, if locstcd inwholo or in part within l0 km from the boundary of: (i) Protected Areas notified undcr thc WildLife (Protection) Act, 19'12, (ii) Criticalty Potlutcd Breas 8s notificd by rhc. Cenrsl pollutionControl Board from rime to time, (iii) Notified Eco-sensirive oreas, (iy) intcr-Slarc boundaricpand intematlonsl boundarics.
Spicific Coodirlor (SC):
lf any Industrial Esrare/Complex / Export procrsing Zoncs /Special Economic ZonryBidrchPa*s / Lcathcr Clmplex with homogencous rypc of industrics such ar lrc.ms 4(d), 4(f), 5(c), j(0,or thosc lndustrial estates with prc -defined set of aDtivitiEa (not neccssarily homogcncous,obtainr prior cnvironmcnral clearancc, individual industrics including proposcd Gdustrialhousing within such 'cstares /complexes wilt nor bc rcquircd to reki irioi cnvironmcntslclcarancc, so long rs thc Tcrms ond conditio$ for the indusrrisl cstritc,/coinplcx rrc compllcdwith (Such rstatcycomplcxcs musl hayc a clcrrly idcntificd management with lhr icgslrcsponsibiliry of cnsuring adhcrcrce to lhc Tcrms lnd condition3 of prior cnvinxl|ricritalclcaranoc, who may bc hcld rcsponslbtc for violltion of.tb. t mc thmujlrout tha llfc of thocoE!&r&!t4!):
0,Io J-11013662{xra-f A,U(DIlL ClIANDR..rMottAN, ,L 3.t,
I\PPENpTX I
(Sec prngraph - 6)
FORM I
(D B$lc lufororrtloo
Nama ofihe Projcct:
Location / sitc altemativcs under considcration:
Sizs oflhc Projccr: '-Expecrcd cost ef lhc projcct:
E-s fllTterf, snw gBqT frB-EPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)gffatl+wff*Sr&raoF5rER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angu)(Odisha)-759 I 47T el:067 60-243 417 (Te leFax),M ail Id:[email protected]
cI{{
-aL--I-rla-
qimtrrs
ANNEXURE -XIII
UNDERTAKING REGARDING LAYOUT PLAN OF TRANSMISSION LINE
POWERGRID have applied for diversion of 1.3841 ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double CircuitTransmission line from Location No- 29 to 32 for proper crossing of Talcher-Bimalagarh Railway Line,of East Coast Railway".
I /we do hereby undertake that we shall not change the layout plan ofthe proposed forestland without the prior approval of Central Government.
(Signature of User Agency)
WName:- V G Rao
Designation:-Chief General ManagerPower Grid Corporation of India Limited
Date: 19.01.21Place: Kanhia
Official Sealirt il ry.e Rro
#tuWtr##flffi,Po,ver Grid CoaDoratm ol lndia LE
strtu, tRtv ft,{ll.. Tetcfi.f
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-110016Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon-122001, Haryana
qd{ Bs +rdtqra $m sBq frfr-cPower Grid Coporation of India Ltd.
(A Govt.of India Enterprise)gffat-*-uu+frAfrr&raqfi-oER-II,2000MW HYDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-7591 47T el:0 67 60 -243 417 (TeleFax),Mail ld :[email protected]
ANNEXURE.XIV
A ND E RTAKING REGARD ING LAB O UR CAMP
POWERGRID have applied for diversion of 1.384i ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double CircuitTransmission line from Location No- 29 to 32 for proper crossing of Talcher-Bimalagarh Railway Line,of East Coast Railway".
I /we do hereby undertake that No labour camp shall be allowed to establish in the forestarea.
(S ignature ol User Agcncy)
WName:- V G Rao
Designation:-Chief General ManagerPower Grid Corporation of India Limited
-rl.-"+l--
qi.RFrs
Date: 18.01.21Place: Kanhia
.f{f,?ErdmlttrruFlril Ct{.f G.Uc t etryqllrfm drqRrEiikifuqridfuPow€r G,ld Co,poraiion of lndia Ld.
drfr, r v Kmltra, Talch.r
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-110016Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon-122001, Haryana
cr+{ Bs +idtera :+m gBqr frE}EPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)gfi ai'*-rt w fr * S 61;a +tr6ER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-7591 47'f el:O 67 60-243 4 17 (TeleFax),Mail Id:[email protected]
ANNEXURE -XV
UND ERTAKING FO R PROVIDING ALTERNATE FU EL
POWERGRID have applied for diversion of 1.3841 ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double CircuitTransmission line from Location No- 29 to 32 for proper crossing of Talcher-Bimalagarh Railway Line,of East Coast Railway".
I /we do hereby undertake that Sufficient firewood, preferably the alternate fuel, shallbe provided to the labourer after purchasing the same from the State Forest Departmentor Forest Development Corporation or any legal source of altemate fuel.
(Signature of User Agencl )
WName:- V G Rao
Designation:-Chief General ManagerPower Grid Corporation of India Limited
^-t-.^:l:.-+I:JtL
qiq{Frs
Date: 18.01.21Place: Kanhia
*"PkiddnbE nrrffi cll5 GqErel ilan6tg-aa
f;ni +rmrr*ttsqlfrn*'3Poflor Gdd Co.po.don d lndia L5'
fr,nilulctlh..TddEr
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi- I 10016Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon-122001, Haryana
crfl Bs *icfttla 3nw. gFFqT frB-EPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)gff al-*-rr ('q fr fr S r&ra oG-oER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angu)(Odisha)-759 I 47T el:\67 60-243 417 (T eleFax), M ail Id:[email protected]
ANNEXURE -XVI
ANDERTAKING REGARDING DAMAGE TO FOREST AREA
POWERGRID have applied for diversion of 1.3841 ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double CircuitTransmission line from Location No- 29 to 32 for proper crossing of Talcher-Bimalagarh Railway Line,of East Coast Railway".
I /we do hereby undertake that while executing works, we shall not fell any tree ordamage the forest growth in the surrounding forest area in any manner
(Signature of User Agency)
Name:- V G RaoDesignation: -Chief General Manager
Power Grid Corporation of India Limited
=Jlt.-l:-X:
qifiAg
Date: 18.01.21Place: Kanhia
Official Seal
trlrr rv.o RDlilrulard crhilcffial u8r'tryqs{ms ffirrrallsfitqrTEffiPor,rr Gdd Co.Doatillon of lndis L6,
$u,anlvt(f*t Tetchc
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi- 1 10016Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon- 122001, Haryana
ofu_
qrd{ Bs +rd{qra $m gfuqr ftR--EPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)gff ai+ ll-+ fr fr fi'r&m +fi-oER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-7591 47'l el :0 67 60 -243 417 ('teleFax),Mail Id :[email protected]
ANNEXURE -XVII
UNDERTAKING REGARDING DEMARCATION OF BOUNDARY OF FORESTLAND
POWERGRID have applied for diversion of 1.3841 ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double circuitTransmission line from Location No- 29 to 32 for proper crossing of Talcher-Bimalagarh Railway Line;of East Coast Railway".
I /we do hereby undertake that the boundary of the forest land to be diverted has beensuitably demarcated on ground at the project cost, as per GPS co-ordinates and directionof the Divisional Forest Officer.
(Signature of User Agency)
Name:- V G RaoDesignation:-Chief General Manager
Power Grid Corporation of India Limited
-l----I----lir
ui {trrg
Date: 18.01.21Place: Kanhia
Official SealQrtulv.enn
Ftmtr5 *.rcrslorar MmrrRtu dfrn{qhtrsqrrtriqtFo lr GIH CorporCim of tndia 1..U.rF[, ali? xanih.. Trlch.r
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-110016Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon-122001, Haryana
cr+{ A-s midtqra :nq gB-+r frfr}gPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)gffat+-uuufrSfrr&raqG-oER-II,2000MW H\rDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-759147T el:061 60 -243 417 (TeleFax),Mail Id :[email protected]
ANNEXURE -XYI[
UNDERTAKING REGARDING ADDITIONAL NEW PATH
POWERGRID have applied for diversion of 1.3841 ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Taicher - Meramundali Double CircuitTransmission line from Location No- 29 to 32 for proper crossing of Talcher-Bimalagarh Railway Line,of East Coast Raiiway".
I /we do hereby undertake that the no additional or new path will be constructed insidethe forest area for any activity related to the project work.
(Signature of User Agency)
@Name:- V G Rao
Designation:-Chief General ManagerPower Grid Corporation of India Limited
-l---+I-
qiflFrs
Date: 12.01.21Place: Kanhia
Official Seal
*rt rrv.GRrtlu rurtqw chbl G6|tf8l tihnafttu tfrr<qkfmffiPo.r.. Gdd Co.pot!0qt of lndl. L5.
fumrtrrl(rilluT.ldror
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-110016Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon-122001, Haryana
cr+{ Bs +rdtem $Fn gfusr frR'}EPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)gffai+-ruafr*Sr*raoft6ER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-759147T elO 67 60 -243 4 17 (TeleFax),Mail Id :[email protected]
ANNEXURE -XIX
AND ERTAKING REGARDING APPROVAL PERIOD
POWERGRID have applied for diversion of I .3841 ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double CircuitTransmission line from Location No- 29 to 32 for proper crossing of Talcher-Bimalagarh Railway Line,of East Coast Railway".
I lwe do hereby undertake that the period of diversion under this approval shall be co-terminus with the period of lease granted in favour of POWERGRID or the project life,whichever is less.
^-l-.
-l:.-IIr-
JIT_
qiT{trrg
(Signature of User Agency)
WName:- V G Rao
Designation: -Chief General ManagerPower Grid Corporation of India Limited
Official Seala*,il /v.q R.o
FilIrlqf Chif Ci.nerat Manao.rxfu {fin*Ilgqridni?.h' Gflt CoOorfion of tnota LE,ril$ rrv ;,1ara, -t f,"'..
Date: 18.01.21Place: Kanhia
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-l10016Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon-122001, Haryana
crd{ Bs +rdterr 3nq gE-+r frft}cPower Grid Corporation of India Ltd.
(A Govt.of India Enteryrise)gff at-+-rua fr * S r&ra qfr-6rER-II,200OMW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-7591 47T e1:067 60-243 4 17 (TeleFax),Mail Id :[email protected]
ANNEXURE -XX
UNDERTAKING REGARDING USE OF FOREST LAND
POWERGRID have applied for diversion of 1 .3841 ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double CircuitTransmission line from Location No- 29 to 32 for proper crossing of Talcher-Bimalagarh Railway Line,of East Coast Railway".
I /we do hereby undertake that the forest land shall not be used for any purpose otherthan that specified in the project proposal.
(Signature of User Agency)
WName:- V G Rao
Designation:-Chief General ManagerPower Grid Corporation of India Limited
JtlL
-rtlr-
rtr-
qifr{Rrg
Date: 1?.01.21Place: Kanhia
Official Sealtrl,Grv.cRr
luilffiChLlGnd"el]u.n{,cRtu tlfrttrqhifsqtftFEPq$,or Grid Co.porlbn .[ lndia t 5.
fr,*rl(ltfr..?dcrxt
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-l l00l6Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon-122001, Haryana
cril{ Bs *'ffirra sTrw gFFqT frft-gPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise) ,
gffat-+-lwffSfrr&ra+G-oER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-759147T elfi 67 60 -243 417 (TeleFax),Mail Id :hvdc,[email protected]
ANNEXURE -XXI
ANDERTAKING REGARDING TRANSFER OF FOREST LAND
POWERGRID have applied for diversion of 1.3841 ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double circuitTransmission line from Location No- 29 to 32 for proper crossing of Talcher-Bimalagarh Railway Line,of East Coast Railway".
I /we do hereby undertake that the forest land proposed to be diverted shal1 under nocircumstances be transferred to any other agencies, department or person without theprior approval of Government of India.
(Signature of User Agency)
-l--Jl-JIIL-:l=-
qiq{trr<
Name:- V G RaoDesignation:-Chief General Manager
Power Grid Corporation of India Limited
Official Seal
drtilrv.oRDnil!ffiOarOffali@{FqH'ilterillul"Eclfr'rE&- atrc cooc*tt ot lndo l.5''-*,*txrrnlrur
Date: 13.01.21Place: Kanhia
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi- I 10016Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon-122001, Haryana
o@
qcrt Bs mrd{rra stw gBer frft-EPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)gd ai*-lw fr S fr r&ra qfi-6rER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-759 1 47T el:067 60 -243 4 17 ('teleFax),Mai I ld:[email protected]
ANNEXURE -XXU
UNDERTAKING REGARDING COMPLIANCES OF GUIDELINES
POWERGRID have applied for diversion of 1.3841 ha. of Forest land forthe purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double circuitTransmission line from Location No- 29 to 32 for proper crossing of Talcher-Bimalagarh Railway Line,of East Coast Railway".
I /we do hereby undertake that we shall ensure compliance to provisions of the all theCourt Orders, provisions, rules, Regulations and Guidelines for the time being in force,as applicable to the project.
(Signature of User Agency)
Name:- V G RaoDesignation:-Chief General Manager
Power Grid Corporation of India Limited
i-l-.
-!tL-+I--JIIL
qi+{Frs
Date: 13.01.21Place: Kanhia
**,8[r€81f,8'1Xf, qicicd Ct.t G.l|eret itenegqmfrg ffit*iisqrmr'fufuGddCoEordondlndht.5.
fi,rillvt(rltaTdctf,
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi- I I 0016Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon- 122001, Haryana
qrf,{ E-s +rrfterfl srw gFrqr RE-EPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)
Tff *, nuq fr S 6 616 +G.6ER-II,2000MW HVDC Station,Kaniha
Post Box No,09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-7591 47T elfi 67 60-243 4 1 7 (TeleFax),Mail Id :hvdc.talcher@gmail. com
ANNEXURE -XXIII
ANDERTAKING REGARDING COMPLIANCES OF AIW OTHERCONDITIONS
POWERGRID have applied for diversion of 1.3841 ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double circuitTransmission line from Location No- 29 to 32 for proper crossing of Talcher-Bimalagarh Railway Line,of East Coast Railway".
I /we do hereby undertake that we shall comply any other condition that this Ministryof Environment, Forest & climate Change may impose from time to time in the interestof afforestation, conservation and management of flora and fauna in the area.
(Signature of User Agency)
Name:- V G RaoDesignation:-Chief Generai Manager
Power Grid Corporation of India Limited
=t=-l-:I-:l=-
qiqrFr-<
Date: 13.01.21Place: Kanhia 'rr'offvirlds'all,UImaqr Ctlil GflBrait anawfrr 6ftrnahtrsrrEfitr
fuar Gdd CorDorstlon of tndia L5.lh,iltvt(rilra,Tddror
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-110016Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon- 12200 l, Haryana
cr+{ A-s +rdtqra srq; gfusr frft-EPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)
Tff al.+-il r'q fr S fr rlqra +fi-OER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-759 I 47T el:067 60-243 417 (TeleFax),M ail ld:[email protected]
ANNEXURE -XXIV
UND ERTAKING REGARDING UPLOADING O F COMPLIANCES
POWERGRID have applied for diversion of 1.3841 ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double circuitTransmission line from Location No- 29 to 32 for proper crossing of ralcher-Bimalagarh Railway Line,of East Coast Railway".
I /we do hereby undertake that we shall upload the compliance report of the Stage-Iapproval on e-portal (http:// parivesh.nic. in).
(Signarure of User Agency)
Name:- V G RaoDesignation: -Chief General Manager
Power Grid Corporation of India Limited
^-t--!lL-rLr---rI-
JISL
qifiFrs
Date: 18.01.21Place: Kanhia ***TueHe"r#ffiffi?ffi
ili otu c"rP.tat" of lndia LU'' -su,m*vxr*u,retctrot
Registered Office: B-9, Qutab lnstitutional Area, Katwaria Sarai, New Delhi-110016Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon-122001, Haryana
qr+{ Bs +rdftrra snr gBfl frfr-EPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)
Tffal-r,ul-qfr*Sr&rr+G-oER-II,2000MW H\{DC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-759 I 47T e1:067 60-243 417 ('leleFax), M ail Id:hvdc.talcher@gmail,com
^=i=4l-.::u--
TL
qi(Frs
ANNEXURE -XXV
G AND OF CO
POWERGRID have applied for diversion of 1 .3841 ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double circuitTransmission line from Location No- 29 to 32 for proper crossing of ralcher-Bimalagarh Railway Line,of East Coast Railway".
I /we do hereby undertake that we shall certi$z that the sag and swing of the conductorsare to be kept in view while working out the minimum clearance.
(Signature of User Agency)
Date: 13.01.21Place: Kanhia
Name:- V G RaoDesignation:-Chief General Manager
Power Grid Corporation of India Limited
Official Sealtrl,arv.ahllqudrrycl.lconorat Malwfis {rf{rfqhl[sqrrHndtFofi Gdd Co,porrton of lndia L!.
{lf,,rFtulc{h.,Tdtcr
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi- I 100 l6Corporate Office: "SAUDAMINI,,, plot no.2, Sector-29, Gurgaon-122001, Haryana
TRANSMISSION LINE
W-
cr+{ Bs *-r$ftqra 9iltr FBqr Rfr}sPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)g# at'r-rr ua fr S S r&ra +ft6ER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-759147T el:067 60 -243 4 1 7 (TeleFax),Mail Id:[email protected]
ANNEXURE -XXYI
UNDERTAKING REGARDING CORRECTION OF SAGGING OFTRANSMISSION LINE
POWERGRID have applied for diversion of 1 .3841 ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double ciicuitTransmission line from Location No- 29 to 32 for proper crossing of Talcher-Bimalagarh Railway Line,of East Coast Rai1way".
I /we do hereby undertake that we shall certif, in the month of March of every yearthat sagging, if any, has been corrected and further monthly report will be submitted byPOWERGRID till November of each year in the forest area to the DFo, for hisreference.
(Signature of Uscr Agencl )
Name:- V G RaoDesignation:-Chief General Manager
Power Grid Cotporation of India Limited
=iE._rtI._--I-JtiL-
qirrtrrs
Date: 19.01.21Place: Kanhia
Official Sealt{,il/v.cR.olU trIigA Chbt Gfisrd Manaorw fts di{Rti lilsifuqr.,mfi*lfuGrH ColDorClon of lndia 16.rif, uriu !(f*re, Tdcher
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-l10016Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon-122001 , Haryana
ctfl E=E qrdtsEr rn-q; SBsT frElEPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)gd at-*-rl rq fr fr fr r&ra +E-o.ER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-759147T e1:0 67 60-243 4 17 (TeleFax),Mail Id :[email protected]
^=llE.-l-!tt-EL-Jtar_-
qiTitrrs
ANNEXURE -XXV[
POWERGRID have applied for diversion of 1.3841 ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double CircuitTransmission line from Location No- 29 to 32 for proper crossing of ralcher-Bimalagarh Railway Line,of East Coast Railway,,.
I /we do hereby undertake that we shall be allowed to fell the Trees on strips for thetension stringing work and the natural regeneration will be allowed to iome up.Felling/pollarding/pruning of trees will be done with the permission of local DivisionalForest Officer whenever necessary to maintain the electrical clearance. One outer stripsha1l be left ciear to permit maintenance of Transmission line.
(Signature of User Agency)W-Name:- V G Rao
Designation:-Chief General ManagerPower Grid Corporation of India Limited
Date: 13.01.21Place: Kanhia
tflwlqJ.dffilfr* +m,"tfi€iffiil,ilffil"
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai. New Delhi-110016
TREES
Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon- 122001 , Haryana
q.rr Bs 6'ffiqrf, sTtr gBqT ftElEPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)yd at-+-rr rq fr * 61 *lqET sG-6lER-II,2000MW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-759 147T el :0 67 60 -243 4 17 (TeleFax),Mail Id:[email protected]
^=r-4l-.Jt!L:I-
qi+rtrr<
ANNEXURE -XXVIII
POWERGRID have applied for diversion of 1.3841 ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double circuitTransmission line from Location No- 29 to 32 for proper crossing of ralcher-Bimalagarh Railway Line,of East Coast Railway".
I /we do hereby undertake that in the case of rransmission lines to be constructed isin hilly areas, where adequate clearance is already available, Trees will not be cut.
(Signature of User Agency)
Name:- V G RaoDesignation:-Chief General Manager
Power Grid Corporation of India Limited
Date:12.01.21Place: Kanhia
Official Seal
**.ilrv.qRD!r qul|lrrd ChLtcf,Er8t Manwfrg {qnrnqhiEqrftftFaa Gtirt Coqordion of tndie L!.rnr.ultrt(r{r..Tdg16,
Registered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi- I I 00 l6Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon-122001, Haryana
W-
vrd{ Bs +tdterf, snw gBqr RFfcPower Grid Corporation of India Ltd.
(A Govt.of India Enterprise)gd at-*-rrw fr fr fr r&ra +F6ER-II,200OMW HVDC Station,Kaniha
Post Box No.09,Deepsikha(Kaniha),Talcher,Angul(Odisha)-759147T el067 60 -243 417 (TeleFax),Mail Id:[email protected]
ANNEXURE -XXIX
AND E RTAKING RE GARDI NG STRENGETHENING/MAINTAINING THETRANSMISSION TOWER
POWERGRID have applied for diversion of 1.3841 ha. of Forest land for the purposeof construction of "diversion portion of 400 KV Talcher - Meramundali Double circuitTransmission line from Location No- 29 to 32 for proper crossing of Talcher-Bimalagarh Railway Line,of East Coast Railway".
I /we do hereby undertake we shall take all measures for strengthening/maintaining thetransmission tower and transmission line to be erected,/laid on forest/non-forest land asper CEA norms for elephant corridor and any other conditions as may be imposed byCWLW, Odisha so as to ensure that no death of wild animals occur due to electrocution.
(Signature ol User Agency)
Name:- V G RaoDesignation:-Chief General Manager
Power Grid Corporation of India Limited
.-l::-.
-lL-ttr-
i-.Ir-
--l:-qirtFrg
Date:11.01.21Place: Kanhia
Official Seal
ryffiRegistered Office: B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-l10016Corporate Office: "SAUDAMINI", Plot no.2, Sector-29, Gurgaon-122001, Haryana