resp 102 - nuclear regulatory commission
TRANSCRIPT
From:
To:
Cc:
Subject:Date:
Brenner. EliotSheehan, Neil
Screnci. DianeFOX storyFriday, March 11, 2011 4:13:45 PM
-t~
~ -~
~
-,- :t
http://www.fox news. com/politics/2011/03/11 /rushes-coola nt-japanese-nu ke- plant-earthquake/
Thanks.
Eliot
Eliot BrennerDirector, Office of Public AffairsNuclear Regulatory Commission
. Rock.'ifle, Md.
301-415-8200c:I (b)(6)ZI
ý C' -/- I- ý'
A-
From:To,CC:Subject:Date:
Jaczko. GreaoryVirpilio1 MartinBrenner. EliotFW: fyi - i am in forrestal
Saturday, March 12, 2011 7:41-04 AM
thanks
From: Jaczko, GregorySent: Saturday, March 12, 2011 7:18 AMTo: Borchardt, BillCc: Dorman, DanSubject: FW: fyi - i am in forrestal
/1
IM
Thanks
From: Connery, Joyce [[email protected]]Sent: Saturday, March 12, 2011 6:59 AMTo: Lyons, Peter; DAgostino, Thomas; Poneman, DanielCc: Jaczko, GregorySubject: Re: fyi - i am in forrestal
Not sure if CDC will allow them on the plane.
----- Original Message -----From: Lyons, PeterTo: Connery, Joyce; DAgostino, Thomas; Poneman, DanielCc: 'Jaczko, Gregory' <[email protected]>Sent: Sat Mar 12 06:55:02 2011Subject: RE: fyi - i am in forrestal
(b)(5)
i . . . .(b )(6 )(b)(6)
. .... " • ':' . . .. . ' i . •'.'.. . . .. ... . . . . . ." "" ' "
I ' " •"....:.".:'.,•..•.i..• ,. ':.. ; I (b)(5): • ., ..' • I ';
(A
----- Original Message -----From: Connery, JoyceSent: Saturday, March 12, 2011 6:50 AMTo: Lyons, Peter; DAgostino, Thomas; Poneman, DanielSubject: Re: fyi - i am in forrestal
Am leaving shortly.At 8 am wh is making a call to decide if they need to move the DC.up (currently schedule for noon)
----- Original Message -----From: Lyons, PeterTo: Connery, Joyce; DAgostino, Thomas; Poneman, DanielSent: Sat Mar 12 06:47:34 2011Subject: fyi - i am in forrestal
Currently in office
1,.,
From: LIAO7 HocTo:
(b)(6)
Subject: 1300 EST (March 12, 2011) USNRC Earthquake/lTsunami SitRep
Date: Saturday, March 12, 2011 1:53:57 PM
Attachments: USNRC Japan SitReo.031211.1330EST.docx
Attached, please find a 1330 EST situation report from the US Nuclear Regulatory Commission'sEmergency Operations Center regarding the impacts of the earthquake/tsunami on March 12, 2011.Please note that this information is only being shared within the federal family.Please call the Headquarters Operations Officer at 301-816-5100 with questions.-Sara
Sara K. MrozCommunications and OutreachOffice of Nuclear Security and Incident ResponseUS Nuclear Regulatory Commissionsara.mroz(cbnrc.govLIAO7.HOC(nrc.gov (Operations Center)
/-OFF!CIAL USE O,6LY
Department of Homeland SecurityIncident Management
DHS Initial Situation ReportFrom: US Nuclear Regulatory CommissionTo: DHS National Operations Center Watch OfficerSITREP No: 3
Date/Time (ET): 03/1242011, 1330EST1. Incident Type Earthquake and Tsunami2. Location of Incident Japan3. Date/Time of Incident (ET) Press reports date 3111/11 0146 (EST) loss of power at Fukushima
Daiichi Unit 1,2, and 3 emergency. Unit 4, 5, and 6 shutdown. Unit 1, 2, and 3 emergency dieselSgenerators (EDG) failed after tsunami, resulting in complete loss of Alternating Current for all threeunits. On 3/12/11, 0340 (EST), explosion on site is confirmed. On 3/12/11, 0620 (EST) Fukushima
Daiichi Unit 1 started injection of sea water, followed by boric acid.4. 1 Incident Site Weather Conditions Wind direction from 233 degree speed less than 3.9 m/sec
stability class E, no precipitation.5. Threat/Causal Factors Earthquakes and tsunami leading to possible loss of emergency cooling.6. Initial On-Scene Status/Capabilities Assessment
A. Casualties (e.g., dead, hospitalized) None available.B. Property Damage - Nuclear reactor. Loss of emergency power/loss of emergency cooling.
j Apparent core damage based on reported radiation levels. Media reports of explosion may__ indicate possible loss of secondary containment, outer building breached (unverified).
C. Infrastructure Affected - Emergency diesel fuel tanks and piping.D. Terrorism Nexus - None.E. General Population Status - Evacuated <10km, no power, at Fukushima Daini. Evacuation
<20km at Fukushima Daiichi. Japanese government issuing KI.F. Weather Effects - Wind direction is out to sea.G. Extent of Contamination - Release in progress. Magnitude and extent unknown.H. On-Scene/En Route Capabilities - 2 NRC representatives enroute with USAID team.I. Requests for Additional Support - None known.J. Possible Cascading Effects - Release of radiation. Population evacuation at Fukushima
Daiichi within 20km radius. Population evacuation at Fukushima Daini within 10km radius. Ifcontainment failure, impacts on other unit recovery personnel.
K. WMVD Effects - none.L. indications of Follow-on Incidents - Earthquakes near Niigata Prefect.
6. Initial Response (e.g., on-scene assets, EOCs activated, local/regional response, etc.)I A. Local - Japan issued state of emergency.
B. State - None.C. Federal - NRC Headquarters EOCs activated.
7. Federal/StatelLocal/International/Private Sector Notifications - DHS, IAEA, DOE, FEMA, DOD(NAVSEA08, CNIC HQ, DTRA).
8. COOP/COG Actions Anticipated - None.9. National Capitol Region Impact - None.10. International Impact - Japan.11. DHS Initial Actions/Intentions Press releases, White House notifications.
12. Additional Remarks - None.13. Prepared By: Sara Mroz
Contact Information: LIA07 [email protected]; 301-816-5186
14. Approved By: Executive Team
From:
Subject:Date:Attachments:
LIAII HocHipschman. Thomas; Marshall. Michael; Batkin, Joshua; Castleman. Patrick; Snodderly. Michael; Orders.William; Bubar, Patrice; Franovich, Mike; Wittick. Brian Andersen, James: Traoo. James; Leeds. Eric; Brenner.Eliot; Miller, Charles; Wiggins, Jim Johnson, Michael; Sheron, Brian; Schmidt. Rebecca; Haney, Catherine;Pace. Patti; Sasa ; Belkys Nigh, Ho Sharkey, Jeffry; Harrington, Holly; bMaier, Bill;Howell, Linda Dorman, Dan; Schmidt Rebecca; McDermott. Brian; Vanessa.Ouinnadhs.ov;[email protected]; [email protected]; Harrv;Sherwoodndhs.gov; James.Kish(5)dhs.qov;[email protected];J (b)(6) cmc-01.•dot.qov; oeter.lyonseho doe oov; Kozal, Jason
1000 NRC SITREP
Saturday, March 12, 2011 10:04:53 AMJaoan Sitrea2.docx
All,
Attached please find a the second SITREP issued by the Federal Liaison Team.
Beth Reed
US NRC Federal Liaison
301-816-5186
P t;ý- / ý
aFC IL- USL UINLY
Department of Homeland SecurityIncident Management
DHS Initial Situation ReportFrom: US Nuclear Regulatory CommissionTo: DHS National Operations Center Watch OfficerSITREP No: 2Date/Time (ET): 03/12/2011, 1000 ET1. Incident Type Earthquake and Tsunami2. Location of Incident Japan_ _
3. Date/Time of Incident (ET) Press reports date 3/11/11 0146 (EST) loss of power at Unit1,2, and 3 emergency. Unit 4, 5, and 6 shutdown. Unit 1, 2, and 3 emergency dieselgenerators (EDG) failed after tsunami, resulting in complete loss of Alternating Current forall three units. On 3/12/11, 0340 (EST), explosion on site is confirmed, but location offacility is not confirmed. _
4. Incident Site Weather Conditions Wind direction from 233 degree speed less than 3.9m/sec stability class E, no precipitation.
5. ThreatlCausal Factors Earthquakes and tsunami leading to possible loss of emergencycooling.
6. Initial On-Scene Status/Capabilities AssessmentA. Casualties (e.g., dead, hospitalized None available.B. i Property Damage - Nuclear reactor. Loss of emergency power/loss of emergency
cooling. Apparent core damage based on reported radiation levels. Media reports ofexplosion may indicate possible loss of secondary containment, outer buildingbreached (unverified).
C. Infrastructure Affected - Emergency diesel fuel tanks and piping.D. Terrorism Nexus - None.E. General Population Status- Evacuated <10km, no power. No confirmation of 20km
evacuationF. Weather Effects - Wind direction is out to sea.G. Extent of Contamination - Release in progress. Magnitude and extent unknown.H. On-Scene/En Route Capabilities - 2 NRC representatives enroute with USAID team.I. Requests for Additional Support - None known.J. Possible Cascading Effects - Release of radiation. Population evacuation at two sites
within 10kmn radius. If containment failure, impacts on other unit recovery personnel.K. WMD Effects - none.-L. , Indications of Follow-on Incidents - Earthquakes near Niigata Prefect.
6. Initial Response (e.g., on-scene assets, EOCs activated, local/regional response, etc.)A. Local - Japan issued state of emergency.
• B. State - None.C. Federal - NRC Headquarters EOCs activated.
7. Federal/State/Local/lnternational/Private Sector Notifications - DHS, IAEA, DOE,FEMA, DOD (NAVSEA08, CNIC HQ, DTRA).
8. COOP/COG Actions Anticipated - None.9. National Capitol Region Impact - None.10. International Impact - Japan.11. DHS Initial Actions/Intentions Press releases, White House notifications.12. Additional Remarks- None.13. Prepared By: Beth Reed
Contact Information: LIA1 [email protected]; 301-816-518614. Approved By: Executive Team
I-
From: RMTPACTSU AC
To: RMTPACTSU DMO; ofdasupport
Cc: RMT PACTSU; Brown. Courtney; Stitt Tony Berger. William; Sink Amy (B:S ý [USAIDI; R1 jDewev(DCHA/0FDA) rUSAID1; Potts, Sarah; Betz, Travis: Hughart., Joe; Brown. Courtney; Bock.Yonahton(DCHA/OFDA) [USAID; ock.Yoni; Trapp. James; alan.remick~nnsa.doeaov
Subject: RE: establishing a DART e-mail list
Date: Saturday, March 12, 2011 8:06:18 AM
Dear DART Team members:
Please remember to send me your detailed departure/arrival information and updates.
Regards
~Natalya
Admin Coordkintor
Pacific Tsunrmi ord opoir Earthquake Response Marioagenzent Teyni
USAIO/DHCA!OFDA
Rrntoactsu nc(ZbOfdrio.,O
(02-712 -O03i9)
From: RMTPACTSU DMOSent: Saturday, March 12, 2011 7:58 AMTo: ofdasupportCc: RMT_PACTSU; Brown, Courtney; Stitt, Tony; Berger, William; Sink, Amy (BFS) [USAID]; Perks,Dewey(DCHA/OFDA) [USAID]; Potts, Sarah; Betz, Travis; Hughart, Joe;. Brown, Courtney; Bock,Yonahton(DCHA/OFDA) [USAID]; Bock, Yoni; '[email protected]'; '[email protected]'Subject: establishing a DART e-mail list
Dear OFDA Support,
We need to establish a DART e-mail address. Please add the following members:
DART PACTSU Pofda.gov
1. wbergerCofda.gov- Bill Berger, Team Leader
2. tstitt(aofda.gov-Tony Stitt, Liaison in BKK
3. asink~usaid.gov- Amy Sink, Field Officer
4. dperks(usaid.gov - Dewey Perks, Operations Coordinator
5. spotts(•ofda.gov -Sarah Potts, Admin Coordinator
6. tbetz(ofda.gov - Travis Betz, Logistics Coordinator
7. cobrown(cofda.gov- Courtney Brown, Deputy Team Leader
cobrown(usaid.gov
8. ihughart(Jofda.gov- Joe Hughart, Safety and Security/CBRNE Liaison
9. ybock(@usaid.gov- Military Liaison Officer
10. James.trapp(q'nrc.gov - Jim Trapp - NRC Liaison - e-mail TBD
11. Anthony Patrick Ulses - NRC Liaison - e-mail TBD
12. Alan.remickeannsa.doe.gov - Alan Lloyd Remick - DOE Liaison - e-mail TBD
Sarah or Dewey can get e-mail address for Anthony Patrick Ulses? He is on the flight with the
Fairfax team.
Chris LeonardoDeputy Manager for Operations
Pacific Tsunami Response Management Team
TP C 7 M fd a
From:To:
Subject:Date:
Attachments:
LIA11 HocHipschman. Thomas; Marshall. Michael; Batkin. Joshua; Castleman, Patrick; Orders, William; Bubar. Patrice;Franovich, Mike; Wittick Brian; Andersen, James; Trapp. James; Leeds Eric; Brenner, Eliot; Miller, Charles;Wiggins. Jim; ohnson. ; Sheron. Brian Schmidt. Rebecca; Haney. Catherine; Pace, Patti Sosa. Belkys;Nieh, Ho Sharkey, Jeffrv; Harrington, Holly; Michael Dudek Maier. Bill; Howell, Linda; Dorman, Dan;Vanessa.Ouinn()cdhs.qov; Michelle.Ralston(dhs.cov; Albert.Coons(dhs.qov; Harry.Sherwoocldchs.qov;James. Kishngdhs.gov; Seamus.O"boyle(dhs.qov; Timothv.Gretenlcdhs.aovI (b)(6)
I ~(b)(6) " TI C -O doqv
03/12/2011, 0400 NRC Sitrep
Saturday, March 12, 2011 5:21:39 AMJapan Sitrepl.docx
Very Respectfully,
Jason Lising
US NRC Federal Liaison
301-816-5186
/6
- 0F ICAL4U4E GNL
Department of Homeland SecurityIncident Management
DHS Initial Situation ReportFrom: US Nuclear Regulatory CommissionTo: .EDHS National Operations Center Watch OfficerSITREP No: 1
Dale/Time (ET):. 03/12/2011, 04001. Incident Type Earthquake and Tsunami
•2. Location of Incident Japan3. Date]Time of Incident (ET) Press reports date 3/11/11 0146 (EST) loss of power at Unit
1,2, and 3 emergency. Unit 4, 5, and 6 shutdown. Unit 1, 2, and 3 emergency dieselgenerators (EDG) failed after tsunami, resulting in complete loss of Alternating Current forall three units. On 3/12/11., 0340 (EST), media reports explosion on site.
4. Incident Site Weather Conditions Wind direction from 260 degree speed less than 2.4
m/sec stability class B.5. Threat/Causal Factors Earthquakes and tsunami leading to possible loss of emergency
cooling.6. Initial On-Scene Status/Capabilities Assessment
A. Casualties (e.g., dead, hospitalized)_None available.B. Property Damage - Nuclear reactor. Loss of emergency power/loss of emergency
cooling. Apparent core damage based on reported radiation levels. Media reports ofexplosion may indicate possible loss of containment (unverified).
C. Infrastructure Affected - Emergency diesel fuel tanks and piping.D. Terrorism Nexus - None.E. General Population Status - Evacuated <10km, no power.F. Weather Effects - Wind direction is out to sea.G. Extent of Contamination - Release in progress. Magnitude and extent unknown.
___H. On-Scene/En Route Capabilities - NRC representatives enroute with US team.1__ . Requests for Additional Support - None known.J. Possible Cascading Effects - Release of radiation. Population evacuation at two site
within 10km radius. If containment failure, impacts on other unit recovery personnel.K. WMD Effects - none.L. Indications of Follow-on Incidents - Earthquakes near Niigata Prefect.
6. Initial Response (e.g., on-scene assets, EOCs activated, local/regional response, etc.)A. Local - Japan issued state of emergency.B. State - None.C. Federal - NRC Headquarters EOCs activated.
7. Federal/State/Local/International/Private Sector Notifications - DHS, IAEA, DOE,FEMA, DOD (NAVSEA08, CNIC HQ, DTRA).
8. COOP/COG Actions Anticipated - None.9. National Capitol Region Impact - None.10. International Impact- Japan.11. DHS Initial Actions/Intentions Press releases, White House notifications.12. Additional Remarks - None.13. Prepared By: Jason Lising
__AppContact Information: LIAm1 .Hoc~nrc.gov; 301-816-518614. Approved By: Executive Team
Matakas, Gina
From:Sent:To:Subject:
McCree, VictorSaturday, March 12, 2011 11:15 AMDean, Bill; Collins, Elmo; Satorius, MarkRe: Succession planning
Ok, sounds good.
By the way, I just received the following information which was communicated to Duke Powerfolks from GE regarding the ongoing event at Fukishiima Daiichi:
- I
Vic
This email is being sent from an NRC Blackberry device.
-- -Original Message-From: Dean, BillTo: McCree, Victor; Collins, Elmo; Satorius, MarkSent: Sat Mar 12 11:06:56 2011Subject: Re: Succession planning
Since mark is out of country starting Monday, it will just be the three amigos. Maybe a confcall next week? Tu or wed would work for me.Bill Dean
Regional AdministratorRegion I, USNRCSent from NRC BlackBerry
- -Original MessageFrom: McCree, VictorTo: Collins, Elmo; Dean, Bill; Satorius, Mark
Sent: Sat Mar 12 11:01:46 2011Subject: Re: Succession planning
Vic
This email is being sent from an NRC Blackberry device.
- -Original MessageFrom: Collins, ElmoTo: Dean, Bill; McCree, Victor; Satorius, MarkSent: Sat Mar 12 10:59:05 2011Subject: Re: Succession planning
Original Message-
From: Dean, BillTo: McCree, Victor; Collins, Elmo; Satorius, MarkSent: Fri Mar 11 22:36:42 2011Subject: Re: Succession planning
........ -.. . . . ... . .. ( b ) ( 5 - .
Bill DeanRegional AdministratorRegion I, USNRCSent from NRC BlackBerry
- -Original Message -From: McCree, VictorTo: Dean, Bill; Collins, Elmo; Satorius, MarkSent: Fri Mar 11 22:21:17 2011Subject: Re: Succession planning
(b).("
Vic
This email is being sent from an NRC Blackberry device.
---Original Message-From: Dean, BillTo: Collins, Elmo; Satorius, Mark; McCree, VictorSent: Fri Mar 11 15:45:07 2011
2
Subject: Succession planning
Bill DeanRegional AdministratorRegion I, USNRCSent from NRC BlackBerry
3
Dean, Bill
From: Dean, BillSent: Saturday, March 12, 2011 11:26 AMTo: McCree, Victor; Collins, Elmo; Satorius, MarkSubject: Re: Succession planning
Bill DeanRegional AdministratorRegion I, USNRCSent from NRC BlackBerry
-Original MessageFrom: Mc~ree, VictorTo: Dean, Bill; Collins, Elmo; Satorius, MarkSent: Sat Mar 12 11:14:47 2011Subject: Re: Succession planning
Ok, sounds good.
By the way, I just received the following information which was communicated to Duke Power folks from GEregarding the ongoing event at Fukishiima Daiichi:
(b)(4)
Vic
I
This email is being sent from an NRC Blackberry device.
----- Original Message -----From: Dean, BillTo: McCree, Victor; Collins, Elmo; Satorius, MarkSent: Sat Mar 12 11:06:56 2011Subject: Re: Succession planning
Since mark is out of country starting Monday, it will just be the three amigos. Maybe a conf call next week? Tuor wed would work for me.Bill DeanRegional AdministratorRegion I, USNRCSent from NRC BlackBerry
----- Original Message -----From: McCree, VictorTo: Collins, Elmo; Dean, Bill; Satorius, MarkSent: Sat Mar 12 11:01:46 2011Subject: Re: Succession planning
- : • . " : .' '(," Y: "•" i-.).(5) .: .. - ...aa -: 4 *a 4~ • . ., v:, J
Vic
This email is being sent from an NRC Blackberry device.
----- Original Message -----From: Collins, ElmoTo: Dean, Bill; McCree, Victor; Satorius, MarkSent: Sat Mar 12 10:59:05 2011Subject: Re: Succession planning
I(b)(5)
-Original Message -----From: Dean, BillTo: McCree, Victor; Collins, Elmo; Satorius, MarkSent: Fri Mar 11 22:36:42 2011Subject: Re: Succession planning
Bill DeanRegional AdministratorRegion I, USNRCSent from NRC BlackBerry
---- Original Message ----From: McCree, VictorTo: Dean, Bill; Collins, Elmo; Satorius, MarkSent: Fri Mar 11 22:21:17 2011
2
Subject: Re: Succession planning
Vic
This email is being sent from an NRC Blackberry device.
---- Original Message ----From: Dean, BillTo: Collins, Elmo; Satorius, Mark; McCree, VictorSent: Fri Mar 11 15:45:07 2011Subject: Succession planning
Bill DeanRegional AdministratorRegion I, USNRCSent from NRC BlackBerry
.~ .4*:A
• F•
3
Hergenroder, Dan
From: Collins, ElmoSent: Saturday, March 12, 2011 10:43 AMTo: Dean, Bill; McCree, Victor; Satorius, MarkSubject: Re: Succession planning
----- Original Message -----From: Dean, BillTo: McCree, Victor; Collins, Elmo; Satorius, MarkSent: Sat Mar 12 11:25:52 2011Subject: Re: Succession planning
~~ .~~~±~~ (b) (5) .i7v: 7Bill DeanRegional AdministratorRegion I, USNRCSent from NRC BlackBerry
----- Original Message ----From: McCree, VictorTo: Dean, Bill; Collins, Elmo; Satorius, MarkSent: Sat Mar 12 11:14:47 2011Subject: Re: Succession planning
Ok, sounds good.
By the way, I just received the following information which was communicated to Duke Power folks from GEregarding the ongoing event at Fukishiima Daiichi:
(b)(4)
N1ff
(b)(4)
Vic
This email is being sent from an NRC Blackberry device.
----- Original Message ----From: Dean, BillTo: McCree, Victor; Collins, Elmo; Satorius, MarkSent: Sat Mar 12 11:06:56 2011Subject: Re: Succession planning
Since mark is out of country starting Monday, it will just be the three amigos. Maybe a conf call next week? Tuor wed would work for me.Bill DeanRegional AdministratorRegion I, USNRCSent from NRC BlackBerry
---- Original Message -----From: McCree, VictorTo: Collins, Elmo; Dean, Bill; Satorius, MarkSent: Sat Mar 12 11:01:46 2011Subject: Re: Succession planning
Vic
This email is being sent from an NRC Blackberry device.
----- Original Message -----From: Collins, ElmoTo: Dean, Bill; McCree, Victor; Satorius, MarkSent: Sat Mar 12 10:59:05 2011Subject: Re: Succession planning
Original Message -----From: Dean, BillTo: McCree, Victor; Collins, Elmo; Satorius, MarkSent: Fri Mar 11 22:36:42 2011Subject: Re: Succession planning
(b)(5).
Bill Dean2
Regional AdministratorRegion I, USNRCSent from NRC BlackBerry
----- Original Message -----From: McCree, VictorTo: Dean, Bill; Collins, Elmo; Satorius, MarkSent: Fri Mar 11 22:21:17 2011Subject: Re: Succession planning
"F(bY5).t
Vic
This email is being sent from an NRC Blackberry device.
----- Original MessageFrom: Dean, BillTo: Collins, Elmo; Satorius, Mark; McCree, VictorSent: Fri Mar 11 15:45:07 2011Subject: Succession planning
Bill Dean
.~
~>~i< ~
.)
Regional AdministratorRegion I, USNRCSent from NRC BlackBerry
3
Weaver, Tonna
From: Kaizer, JoshuaSent: Saturday, March 12. 2011 7:52 PMTo: Mendiola, AnthonySubject: Some (maybe) useful infoAttachments: Questions for the NRC.docx
Follow Up Flag: Follow up'Flag Status: Completed
Tony, I have enclosed some info what maybe useful to you, but nothing really urgent here, so feel free toignore it if you are doing important stuff...
1) The BWR that we are trained on in Chattanooga is a BWR4 with a Mark-2 containment. The JapaneseBWR's are BWR3 with a Mark-1 containment. The BWR3 with Mark 1 contaiments are Dresden Units 2 and 3,Monticello, Piligram, and Quad Cities units 1 and 2.
2) The BWR they teach in Chattanooga a BWR4 with a Mark-2 containment (I believe). So our BWRtechnology manuals are good, but not completely similar.
3) To get the specifics of the BWR plants, I have found former Reactor Operators and SRO very helpful. Wehave a number on staff in the TTC. One guy I know who is very good for BWRs is Richard Devercelly (peoplecall him Devo) and his work number is 423-855-6524. I don't have his mobile, but I do have the mobile ofanother trainer at the TTC if you need it.
4) Finally, I have attached a list of intelligent questions I think we should answer. They are certainly questionsand I think they are intelligent because they are the questions I have.
as always, let me know if you need anything ... joshFrom: Mendiola, Anthony ...Sent: Saturday, fitrr-h 10 0n111 A-SA PK./f- r 771
To: 'tony attard'; (b)(6) I Attard, Anthony;Heller, Kevin; KaIzer, Joshua; Lehning, "JoRri; Orechwa, Yuri,-tFamdker, Mathew; Proffift, Andrew; Tony Attard(HOME); Ward, Leonard; Wu, Shih-LiangCc: Clifford, Paul; Ulses, AnthonySubject: Japan Update
Just a quick update for us.
The NRC is still in the monitoring mode for the issues in Japan. There remains a possibility that we could becalled to support the Ops Center technically if necessary
Bill Ruland is on watch right now and I just spoke to him to offer any help they would need from us.
Tony Ulses was sent to Japan last night to offer technical support in the field. I was in contact with him todayto offer him any help we can.
Bill suggested that our future support be focused on preparing Qs and As for when the press begins to focus.on what can or cannot happen with the domestic plants. Can what happened in Japan happen here in the US,why or why not, and what is the NRC going to do about it... these will be the questions we can expect to hear.So our role is one of a "think tank" to look at areas in our areas of expertise and provide the A's for these Q's.
So be thinking about this now, expect that we can be called upon as soon as possible.
Tony,
I figured we would have to deal with Q and A stuff, since a lot of people will have questions. Some of
1) What happens if there is a "meltdown"? This is the word that is thrown all over the news today
and it is what everyone fearsj-'"
2)
3)
What failed that should not have? (h)5)
(b)(5) -
• . •I' . .-. , . . ' . , " ." - -• ' . . • •: • " . ' • • . , ... ..... .. . . .. . .. . . . . . . . . . .I . . . . .. .. . . . . . . . . .
• L4)
( ) ) .. .. . ..
(b)(5)
Satorius. Mark
From: Collins, Elmo . ... <-Sent: Saturday, March 12, 2011 10:43 AMTo: Dean, Bill; McCree, Victor; Satorius, MarkSubject: Re: Succession planning
Including whether or not to be monitoring for rad material
---- Original Message -----From: Dean, BillTo: McCree, Victor; Collins, Elmo; Satorius, MarkSent: Sat Mar 12 11:25:52 2011Subject: Re: Succession planning
These are some good items to hilite on the call marty is sponsoring at noon. We should perhaps have this infoto provide at least our states who are clamoring for something to help them coMmunicate with theirconstituents about the event.Bill DeanRegional AdministratorRegion I, USNRCSent from NRC BlackBerry
--- Original Message -----From: McCree, VictorTo: Dean, Bill; Collins, Elmo; Satorius, MarkSent: Sat Mar 12 11:14:47 2011Subject: Re: Succession planning
Ok, sounds good.
Byth ay,Away, I just received the following information which was communicated to Duke Power folks from GE
regarding the ongoing event at Fukishiima Daiichi:
(b)(4)
15
(b)(4)I
This email is being sent from an NRC Blackberry device.
----- Original Message -----From: Dean, BillTo: McCree, Victor; Collins, Elmo; Satorius, MarkSent: Sat Mar 12 11:06:56 2011Subject: Re: Succession planning
Since mark is out of country starting Monday, it will just be the three amigos. Maybe a conf call next week? Tuor wed would work for me.Bill DeanRegional AdministratorRegion I, USNRCSent from NRC BlackBerry
---- Original Message -----From: McCree, VictorTo: Collins, Elmo; Dean, Bill; Satorius, MarkSent: Sat Mar 12 11:01:46 2011Subject: Re: Succession planning
Vic
This email is being sent from an NRC Blackberry device.
----- Original Message -----From: Collins, ElmoTo: Dean, Bill; McCree, Victor; Satorius, MarkSent: Sat Mar 12 10:59:05 2011Subject: Re: Succession planning
Original Message -----From: Dean, BillTo: McCree, Victor; Collins, Elmo; Satorius, MarkSent: Fri Mar 11 22:36:42 2011Subject: Re: Succession planning
Bill Dean16
Regional AdministratorRegion I, USNRCSent from NRC BlackBerry
----- Original Message -----From: McCree, VictorTo: Dean, Bill; Collins,. Elmo; Satorius, MarkSent: Fri Mar 11 22:21:17 2011Subject: Re: Succession planning
S, W;*.~ ~ I
..... j
Vic
This email is being sent from an NRC Blackberry device.
----- Original Message-From: Dean, BillTo: Collins, Elmo; Satorius, Mark; McCree, VictorSent: Fri Mar 11 15:45:07 2011Subject: Succession planning
Bill DeanRegional AdministratorRegion I, USNRCSent from NRC BlackBerry
17
I -
Satorius, Mark
From: McCree, VictorSent: Saturday, March 12, 2011 10:42 AMTo: Dean, Bill; Collins, Elmo; Satorius, MarkSubject: Re: Succession planning
I agree. I've exchanged several emails with Marty to advance such a comms strategy.
Vic
This email is being sent from an NRC Blackberry device.
----- Original Message -----From: Dean, BillTo: McCree, Victor; Collins, Elmo; Satorius, MarkSent: Sat Mar 12 11:25:52 2011Subject: Re: Succession planning
These are some good items to hilite on the call marty is sponsoring at noon. We should perhaps have this infoto provide at. least our states who are clamoring for something to help them coMmunicate with theirconstituents about the event.Bill DeanRegional AdministratorRegion I, USNRCSent from NRC BlackBerry
----- Original Message -----
- From: McCree, Victor
To: Dean, Bill; Collins, Elmo; Satorius, MarkSent: Sat Mar 12 11:14:47 2011Subject: Re: Succession planning
Ok, sounds good.
By the way, I just received the following information which was communicated to Duke Power folks from GEregarding the ongoing event at Fukishiima Daiichi:
(b)(4)
18
(b)(4)
Vic
This email is being sent from an NRC Blackberry device.
-Original Message -----From: Dean, BillTo: McCree, Victor; Collins, Elmo; Satorius, MarkSent: Sat Mar 12 11:06:56 2011Subject: Re: Succession planning
Since mark is out of country starting Monday, it will. just be the three amigos. Maybe a conf call next week? Tuor wed would work for me.Bill DeanRegional AdministratorRegion I, USNRCSent from NRC BlackBerry
----- Original Message-From: McCree, VictorTo: Collins, Elmo; Dean, Bill; Satorius, MarkSent: Sat Mar 12 11:01:46 2011Subject: Re: Succession planning
Vic
This email is being sent from an NRC Blackberry device.
----- Original Message-From: Collins, ElmoTo: Dean, Bill; McCree, Victor; Satorius, MarkSent: Sat Mar 12 10:59:05 2011Subject: Re: Succession planning
- ~~(b)(5)~ ,
• , : . , , , - .• ; ' L , : -L = , , ' " ' . . ,.W. : • 4 .
----- Original Message -----From: Dean, BillTo: McCree, Victor; Collins, Elmo; Satorius, MarkSent: Fri Mar 11 22:36:42 2011Subject: Re: Succession planning
19
Bill Dean
Regional AdministratorRegion I, USNRCSent from NRC BlackBerry
---- Original Message -----From: McCree, VictorTo: Dean, Bill; Collins, Elmo; Satorius, MarkSent: Fri Mar 11 22:21:17 2011Subject: Re: Succession planning
Vic
This email is being sent from an NRC Blackberry device.
-Original Message ----From: Dean, BillTo: Collins, Elmo; Satorius, Mark; McCree, VictorSent: Fri Mar 11 15:45:07 2011Subject: Succession planning
Regional AdministratorRegion 1, USNRCSent from NRC BlackBerry
20
From:Sent:To:
SubjectAttachments:
HOO HocMonday, March 14, 2011 2:01 PMMcDermott, Brian; LIA01 Hoc; LIA02 Hoc; LIA04 Hoc; LIA07 Hoc; LAll Hoc; LIA12 Hoc;Gott, William; Marshall, Jane; Morris, Scott; Thorp, JohnFW:image001.jpg
From the Chairman.
Regards,Howie Crouch
Headquarters Operations OfficerU.S. Nuclear Regulatory CommissionPhone: 301-816-5100Fax: 301-816-5151email: hoo.hoc~nrc.aovsecure e-mail: hoo~nrc.sgov.gov
e'U.S.NRC
From: Jaczko, GregorySent: Monday, March 14, 2011 1:01 PMTo:
Cc: oc; irgi io, Martin; Trapp, JamesSubject: Fw:
Ambassador, please see these talking points to aid your communication efforts. Please let me know if you havequestions.
From: Hoc, PMT12To: Jaczko, Gregory; Pace, Patti; Batkin, Joshua; McDermott, BrianSent: Mon Mar 14 12:23:27 2011Subject:
(b)(5)
I
g C71 13
Ross, Robin
From: Grobe, Jack,Sent: Tuesday, March 15, 2011 11:28 AMTo: '[email protected]'Subject: Re: TEPCO Earthquake information Update - Fukushima-Daiichi unit 2 loss of coolant
Thanks
Jack Grobe, Deputy Director, NRR
From: Nichols, Craig (GE Power & Water) <crai
To: Grobe, Jack
Sent: Mon Mar 14 20:12:33 2011
Subject: Re: TEPCO Earthquake Information Update - Fukushima-Daiichi unit 2 loss of coolant
Best Regards, Craig Nichols - Manager, BWR Owners Group (910) 233-2944
From: Grobe, Jack <Jack.Grobe(c)nrc.cov>
To: Nichols, Craig (GE Power & Water)
Sent: Mon Mar 14 19:13:11 2011
Subject: Re: TEPCO Earthquake Information Update - Fukushima-Daiichi unit 2 loss of coolant
Thanks Craig. You may get a call from our reactor safety team just to establish relationship and share info.
Jack Grobe, Deputy Director, NRR
From: Nichols, Craig (GE Power & Water) <craignicholsfilecom>
To: Grobe, Jack
Sent: Mon Mar 14 18:47:22 2011
Subject: RE: TEPCO Earthquake Information Update - Fukushima-Daiichi unit 2 loss of coolant
Jack:
I haven't heard anything since the update at noon. If I get anything tonight (morning now in Japan) I will forward ASAP.
Thank you, Craig
From: Grobe, Jack [mailto:Jack.Grobe(anrc.aov1
Sent: Monday, March 14, 2011 6:42 PM
10 //
To: Nichols, Craig (GE Power & Water)
Subject: Re: TEPCO Earthquake Information Update - Fukushima-Dalichi unit 2 loss of coolant
Any update
Jack Grobe, Deputy Director, NRR
From: Nichols, Craig (GE Power & Water) <craig.nichols(@ge.com>( •_<
To: Grobe, Jack
Sent: Mon Mar 14 12:13:57 2011
Subject: Fw: TEPCO Earthquake Information Update - Fukushima-Daiichi unit 2 loss of coolant
Jack
Mor info.
Best Regards, Craig Nichols - Manager, BWR Owners Group (910) 233-2944
From: *)Z 16 <matsuo.kenjiiwash.tepco.com>
To: matsuo.kenii~tepco.copiD <matsuo.kenjiotepco.co.ip>
Sent: Mon Mar 14 12:13:53 2011
Subject: TEPCO Earthquake Information Update - Fukushima-Daiichi unit 2 loss of coolant
Dear Friends,
Fukushima-Daiichi (IF) unit 2 lost reactor coolant and water level dropped below the bottom of fuel rods, second
time in March 14.
Water injection was hindered by reactor pressure increase due to unintentional closure of safety relief valve. The
cause of the valve failure is under investigation.
Reactor pressure was 0.207 MPa at around 23:00, then 0.653 MPa at 23:54.
Contacts:
TEPCO Washington Office 202-457-0790
Kenji Matsuo, General Manager
Yuichi Nagano, Deputy General Manager,
Masayuki Yamamoto, Manager, Nuclear Power Programs
2
"Schaperow, Jason
From:Sent:To:Cc:Subject:
Casey Wagneý [kcw@dycodacom]Tuesday, March-15, 2011 6:37 PM'Ginsberg, Robert (GE Power & Water)'; 'Kelly, John E (NE)'; [email protected], Charles; 'Andersen, Edward (GE Power & Water)'; Schaperow, JasonRE: 1F4 Spent Fuel Pool calculations
KC Wagner
From: Ginsberg, Robert (GE Power & Water) [mailto:[email protected]]Sent: Tuesday, March 15, 2011 4:26 PMTo: Kelly, John E (NE); [email protected]: [email protected]; [email protected]; Andersen, Edward (GE Power & Water)Subject: RE: 1F4 Spent Fuel Pool calculations
... !...... ...... .... .. .4)• :• :., ..: -. : .• •. ::.• ... .. .. :.• , " ; .•.;-:• :"• • ~ '..'•:: . ...i .- ,. .:. : • .: . . .• .: . .= : " . .. . .. . .. : . • : . ....:: ' . ., . . ., .:(b ) ( 4 ). : :! . -"• :: ' . : . = .• :• 44 . , :• : :' . " - -• - : .. , .: ' :i• • 4. . . .. . . , '--... : .''," . -. . .: .4 . . . . ' . : : ; : : : " : • . . - - : : .. • :::! ...: = r -.": = :: ''"
"- .i ; • . • . • • ! .• • . "•: ' . •• • • •. . .... ,. >. . 1. : . . : • . . ... . , : t " . '' ..' - . . • . : ' .. . . . . ' . • • . : = . . • : . . : • " . . / • • , , - ' • ..
=. " ' : : :..i ".: ':. . . .: ••'• • ':••" " .:•:.• ?:• :: • -. : .:.:• " : : •.• .. . .. . .. . ." !• ' • " " . ,. " i .! ! • '" ' i i .: .) .. : :,4 :- .,-: : 4 4 • : . • ' ' , , . . i :
Thank you,
Bob GinsbergNSSS-SupportSystems Engineering
- i
GE Hitachi Nuclear EnergyT 910-819-2286F 910-819-1720
•www,.•cl-om3901 Castle Hayne Road WC L-30Wilmington, NC 28401USAI,General Electric Companp .
From: Kelly, John E (NE) [mailto:ofE, •]-r.nergy.GovSent: Tuesday, March 15, 2011 6:12 PMTo: '[email protected]'; Ginsltrg, Robert (GEPower & Water)Cc: '[email protected]';Subject Re: 1F4 Spent Fuel Pool calculations
John E Kelly
From: Gaun, Randall 0 <[email protected]>To: 'Ginsberg, Robert (GE Power & Water)' <Cc: Kelly, John E (NE); Inkler, Charles' <Chares.Thkler@rcgov>; t, Wagn ......c.>Sent: Tue Mar 15 18:07:28 2011Subject: RE: 1F4 Spent Fuel Pool calculations
Randy
From: Ginsberg, Robert (GE Power & Water) [mail|to][email protected]: Tuesday, March 15, 2011 2:40 PMTo: Gaunt Randall 0Cc: [email protected]: RE: 1F4 Spent Fuel Pool calculations
ob GinsbergNSSS-SupportSystems EngineeringGE Hitachi Nuclear EnergyT T910Q819228F 910-819-1720
yWWw~ae.com
3901 Castle Hayne Road M/C L-30Wilmington, NC 28401U USA
eneral Electric C om an.................. - -. .From: Gauntt, Randall 0 [mailto:[email protected]]Sent: Tuesday, March 15, 2011 4:22 PMTo: Ginsberg, Robert (GE Power & Water)Cc: 'Johne. [email protected]'Subject: RE: 1F4 Spent Fuel Pool calculations
We are comparing notes right now.
2
Randy
From: Ginsberg, Robert (GE Power & Water) [mailto:[email protected]]Sent: Tuesday, March 15, 2011 2:14 PMTo: Gauntt, Randall 0Cc: [email protected]: 1F4 Spent Fuel Pool calculations
Randy,
(b)(4
•.... :• . "• " ,:: ..: (b*(4 ).,•.. . :.,.•. ,... b)(4)~ i5' ' $• "• ":• • • . • : •.''i '(.*
"5 ".. ... " . * ..: ..
"• , ."• . •". ... ; : .' .., • .:• . ::, : • :• • .... . ' .. " ". ' . . ""*... .. ". .
Thanks,
Bob GinsbergNSSS-SupportSystems EngineeringGE Hitachi Nuclear EnergyT 910-819-2286F 910-819-1720robert1,g insbe~r !!,ecomwww.ge.com3901 Castle Hayne Road M/C L-30Wilmington, NC 28401USAGeneral Electric Company
3
Schaperow, JasonYi
From:Sent:To:Cc:Subject:
Hi Randy,
Casey Wagner [[email protected]]Tuesday, March-l5, 2011 5:17 PM•'Gauntt, Randall 0'; Tinkler, Charles; Schaperow, JasonChang, RichardRE: 1 F4 Spent Fuel Pool calculations
KC
From: Ginsberg, Robert (GE Power & Water) rmailto:RobertlGinsberagae.com1Sent: Tuesday, March 15, 2011 2:14 PMTo: Gauntt, Randall 0Cc: johne.kellycnuclear.enerqy.qovSubject: 1F4 Spent Fuel Pool calculations
I.
Randy,
Ii
¼ 4 A..
.1.;~
4..%i~ .**''.*-~-.
44.~. -.~2-4~ ~
At , .' r~...~, 'V.
4'.. S..
....... L
Thanks,
Bob GinsbergNSSS-SupportSystems EngineeringGE Hitachi Nuclear Energy
1 ýEl-l
9
IT 910-819-2286F 910-819-1720robert1.,insbeo(c.oe~comwww.,e.com3901 Castle Hayne Road M/C L-30Wilmington, NC 28401USA3eneral Electric Company
2
Cartwright, William
From: Nielsen, Rick M (INPO) [[email protected]]Sent: Tuesday, March 15, 2011 5:59 PMTo: Thomas, EricCc: Lemke, Mark S. (INPO)Subject: Re: Japan Earthquakes
Eric, Mark Lenke is POC in our ERC. I know he has been in contact with you folks today.
Sent from my iPhone
On Mar 15, 2011, at 5:00 PM, "Thomas, Eric" <Eric.Thomas(anrc.,qov<maiIto:Eric.Thomasc6,nrc.,qov>> wrote:
From: Nielsen, Rick M (INPO) [[email protected]<mailto:NielsenFMalNPO.orq>]Sent: Tuesday, March 15, 2011 1:15 PMTo: Thomas, EricCc: Sigmon, RebeccaSubject: RE: Japan Earthquakes
Our Emergency Response Center has been manned since Friday; good to set up POC.
I actually have changed positions in INPO three weeks ago, so have no direct role. I'll get you a point ofcontact in the ERC.
Rick
Rick NielsenCorporate Evaluations
INPO770 644-8696 (office)
In Pursuit of Excellence!
From: Thomas, Eric [ma ilto: Eric.Thomasc)nrc.qovISent: Tuesday, March 15, 2011 12:20 PMTo: Nielsen, Rick M (INPO)Cc: Sigmon, RebeccaSubject: Japan Earthquakes
Rick,
(b)(6) but a few of my colleagues are interested in setting up a line between our
Operations center and yours (assuming you are staffed). If you think this is a good idea, please have your opscenter call 301-816-5100 and ask to be connected to the Rick Hasselberg in the Reactor Safety Team. I don'tknow that what they have in mind, but it's probably smart just to establish contact at this point, so we know howto share information later should the need arise.
16
From: Cullinaford. Michael
To: Leds Grobe. Jack: Ber BruceCc: McGinty. Tim; Renan. ChristooherSubject: FW: TEPCO Earthquake Information Update as of March 15, 1300(.ST) - Fukushima Daiichi NPS
Date: Tuesday, March 15, 2011 1:26:00 PM
Attachments: Fukushima daiichi unit!-3 oarameter~xis
FYI; I sent this to Eric Thomas ........... mc
From: Hidehiko Yamachika [mailto:[email protected]]Sent: Tuesday, March 15, 2011 12:41 PMTo: Emche, Danielle; Cullingford, Michael; Foggie, KirkCc: Cullingford, Michael; Aono, KenjiroSubject: FW: TEPCO Earthquake Information Update as of March 15, 1300(JST) - Fukushima DaiichiNPS
FYI
This is from TEPCO.
P.S. Michael-san: Please forward to someone whom I slip in mind to send.
From: r9 % [mailto: [email protected]] On Behalf Of matsuo.kenji@tepco,co.jpSent: Tuesday, March 15, 2011 12:19 PMTo: [email protected]: TEPCO Earthquake Information Update as of March 15, 1300(JST) - Fukushima Daiichi NPS
Dear Friends,
The following is status of Fukushima-Daiichi NPS as of 13:00, March 15.
Units 1,2 and 3 continues water injection using fire engine (sea water).The status is stable right now (around 11:00pm).
Atteched is plant parameters of units 1,2 and 3. (water level, reactor pressure, D/W pressure,SIC pressure)
Contacts:TEPCO Washington Office 202-457-0790Kenji Matsuo, General ManagerYuichi Nagano, Deputy General Manager,Masayuki Yamamoto, Manager, Nuclear Power Programs
Plant Status of Fukushima Daiichi Nuclear Power Station (as of 13:00 Mar 15th)
All 6 units of Fukushima Daiichi Nuclear Power Station have been shut down.
Unit 1(Shut down)-Reactor has been shut down. However, the explosive sound and white smoke were confirmedafter the big quake occurred at 3:36PM Mar 12th. It was assumed to be hydrogen explosion andcurrently under the investigation.
-We have been injecting sea water into the reactor pressure vessel.
Unit 2(Shut down)-Reactor has been shut down and Reactor Core Isolation Cooling System has been injectingwater to the reactor. However, reactor pressure has increased because the system stopped,causing reactor water level to drop. Following the instruction by the government and with fullysecuring safety, measure to lower the pressure level within the reactor containment vessel andinjection of sea water were taken, reactor pressure and water level resumed.-We are continuing the injection of sea water into the reactor.-At approximately 6:00am, an abnormal noise began emanating from nearby PressureSuppression Chamber and the pressure within this chamber decreased.-While we continue sea water injection operations, the temporary transfer of TEPCO employeesand workers from other companies not directly involved in this work has begun.
Unit 3(Shut down)-Reactor has been shut down. However, the explosive sound and white smoke were confirmedat 11:01AM Mar 14th. It was assumed to be hydrogen explosion and currently under theinvestigation.-Also, we restarted the injection of sea water to the reactor at 2:30am Mar 15th , which wastemporarily stopped.
Unit 4 (shut down due to regular inspection)-Reactor has been shut down and sufficient level of reactor coolant to ensure safety ismaintained.-Currently, we do not believe there is any reactor coolant leakage inside the reactor containmentvessel.-We have confirmed the sustained damage around the 5th floor rooftop area of the NuclearReactor Building.-Afterwards, we confirmed the outbreak of fire at the northwestern part of Nuclear ReactorBuilding. We immediately reported this matter to the fire department and the related authorities.-However, at approximately 11:00am, when TEPCO employee arrived at the seen to confirm, thefire had already died down. We will continue to monitor the situation carefully.
Unit 5 (outage due to regular inspection)-Reactor has been shut down and sufficient level of reactor coolant to ensure safety ismaintained.-Currently, we do not believe there is any reactor coolant leakage inside the reactor containmentvessel.
Unit 6 (outage due to regular inspection)-Reactor has been shut down and sufficient level of reactor coolant to ensure safety ismaintained.-Currently, we do not believe there is any reactor coolant leakage inside the reactor containmentvessel.
Casualty-2 workers of cooperative firm were injured at the occurrence of the earthquake, and weretransported to the hospital.-1 TEPCO employee who was not able to stand by his own with his hand holding left chest wastransported to the hospital by an ambulance.-1 subcontract worker at important earthquake-proof building was unconscious and transportedto the hospital by an ambulance.-The radiation exposure of 1 TEPCO employee, who was working inside the reactor building,
exceeded 1 OOmSv and was transported to the hospital.-2 TEPCO employees felt bad during their operation in the central control rooms of Unit 1 and 2while wearing full masks, and were transferred to Fukushima Daini Power Station forconsultation with a medical advisor.-4 workers were injured and transported to the hospital after explosive sound and white smokewere confirmed around the Unit 1.-11 workers were injured and transported to Fukushima Daini Nuclear Power Station afterexplosive sound and white smoke were confirmed around the Unit 3.-Presence of 2 TEPCO employees at the site is not confirmed.
Others-We are currently coordinating with the relevant authorities and departments as to how to securethe cooling water to cool down the water in the spent nuclear fuel pool.-We measured radioactive materials inside of the nuclear power station area (outdoor) bymonitoring car and confirmed that radioactive materials level is getting higher than ordinary level.As listed below, we have determined that specific incidents stipulated in article 15, clause1(Abnormal increase in radiation dose measured at site boundary) have occurred.-Determined at 4:17 pm Mar 12th (Around Monitoring Post 4)-Determined at 8:56 am Mar 13th (Around Monitoring Post 4)-Determined at 2:15 pm Mar 13th (Around Monitoring Post 4)*Determined at 3:50 am Mar 14th (Around Monitoring Post 6)-Determined at 4:15 am Mar 14th (Around Monitoring Post 2)(Above are previously announced)-Determined at 9:27 am Mar 14th (Around Monitoring Post 3)-Determined at 9:37 pm Mar 14th (Around main entrance)-Determined at 6:51 am Mar 15th (Around main entrance)-Determined at 8:11 am Mar 15th (Around main entrance)
-We will continue to make announcements when it was determined that a specific incidentstipulated in article 15, clause 1 has occurred.-The national government has instructed evacuation for those local residents within 20km radiusof the periphery because it's possible that radioactive materials are discharged,-We will continue to take all measures to restore the security of the site and to monitor theenvironment of the site periphery.
,111 1.1- vi i ý - - - , - -
Water Level [mm]1F1 1F2
-500
Ractor Pressure [Mpa]iF1 1F21F3 1F3
3/12 10041113112012051528183014301528
3/13 800820910925955103510551125115512401300141015001600161516451700173018451930195520452050210021052110211521402205222023002330
0.74-900-1500-1700
ds
-1700 3650 -3000-1700 3650 -325-1700 3700 1800-1700 3700 1000-1700 3700 600-1750 3700 -700-1700 3700 -1200-1700 3700 0-1700 3750 1000-1700 3750 -1400-1700 3760 -2000-1700 3750 -2200-1700 3750 -2000-1700 3750 -200.0-1700 - -2000-1700 3780 -1900-1700 3750 -2100-1700 3750 -2200-1700 3800 -2200-1700 3800 -2200-1700 3800 -2200-1750 3800 -2200-1750 3800 -2200-1750 - -2200-1750 - -2200-1750 - -2200-1750 - -2200-1750 - -2200-1750 3800 -2250-1750 3900 -2250-1750 3900 -2250-1750 3900 -2250
0.670.54
0.3530.3560.3580.3530.3530.3620.3580.3640.36450.36450.36680.37130.37350.3780.3780.37130.36230.35780.35330.3422
0.3420.3420.3330.3330.324
6.16.1
6.086.081.2831.283
dsdsdsdsdsdsds
5.855.855.855.855.78
7.277.247.240.350.24
0.10.110.120.450.190.080.090.180.190.240.240.240.250.250.25
Drywell Pre1F1
600605606605605600590580575560
550540540540530
0.0890.068
4 I3/14 030
2003004005006007008009001115
-1750 3900 -2250-1700 3900 -2300-1700 3900 -2800-1700 3900 ds-1700 3900 ds-1700 3900 -3000-1750 3900 -1000-1750 3950 -1500-1750 3900 -1600-1800 3800 -1800
0.324 0.0510.315 - 0.0770.306 5.45 0.1340.304 5,42 0.1690.299 5.4 0.1810.293 5.4 0.1810.288 5.355 0.3380.284 5.31 0.320.275 5.31 0.380.275 5.648 0.215
530510505495490485475460450440
1125 -1800 3800 -1800 0.275 5.648 0.191 4401130 -1800 3800 -2200 0.275 5.648 0.19 4401200 -1800 3400 -2200 0.275 6.008 0.191 4601300 -1800 2950 -2200 0.275 6.188 0.251 ds1400 -1800 2000 -2200 0.275 7.583 0.281 ds1500 -1800 1200 -2200 0.268 7.268 0.298 -
1600 -1750 300 -2200 0.27 7.448 0.306 -
1700 -1750 -800 -2200 0.27 7.403 0.261 -
1900 -1750 ds -2300 0.27 6.63 0.183 -
2003 -1750 - -2300 0.245 0.54 0.183 -
2104 -1750 - -2300 0.243 1.418 0.183 -
2240 -1700 -160 -2300 0.24 0.405 0.189 -
2300 -1700 -700 -2300 0.24 0.428 0.196 -
3/15 000 -1700 ds -2300 0.24 0.653 0.21 -
1.00 -1700 ds -2300 0.24 1.823 0.223 -
200 -1700 ds -2300 0.24 0.63 0.234 -
300 -1700 ds -2300 0.223 0.653 0.242 -400 -1750 ds -2300 0.216 0.653 0.249 -
500 -1750 ds -2300 0.216 0.626 0.244 -
628 -1750 -270 -2300 0.216 0.612 0.244 -
1142 -1700 -1400 -2300 0.185 0.315 0.249 -1300 -1700 -1700 -2300 0.185 0.608 0.251 -1530 -1800 -1950 -2300 0.166 0.113 0.251 -
1610 - -1800 -2300 - 0.113 0.24 -
:ssure [kPa]1F2
36035036036026010
595600395400400400400410410420420420
425425430430435
SIC Pressure [kPa]1F1 1F21F3
466465637530400280270280
480300235260350360410410415420425425410405400395380380375320300295275
1F3
550540540530530
- 320- 300- 295- 275- 260
436440
467467455474460460
260265275315340365425520500490
530505500490485480470455445435
255275305
- 325467 345467 400455 500474 480478 475481 390.
460 380 435 481 380460 360 435 481 360460 360 485 485 380465 360 - 486 430460 430 - - 450440 460 - - 470420 480 - - 475
- 480 - 440400 440 - - ds400 380 - - ds419 380 - - ds480 360 - - ds482 380 - - ds745 370 - 350 ds720 380 - 300 ds725 400 - 330 ds750 400 - 330 ds750 410 330 ds750 415 330 ds730 415 - 300 ds155 420 - 0 ds415 420 - - ds275 420 -
270 415 - ds
NOT FOR PUBLIC DISTRIBUTION - WARNING: Proprietary Information. Do NOT distributethis report to the public. Do NOT share any information contained in this report with anyone outsidethe NRC without the mior-awremee; of INPO (exceuting INPO, member licensees).
a Iniltuteof Issue Date: March 15,2011INIMU denrPowerOperatifns
(b)(4)
Page 1 of3
NOT FOR PUBLIC DISTRIBUTION - WARNING: Proprietary Information. Do NOT distributethis report to the public. Do NOT share any information contained in this report with anyone outsidethe NRC without the inrior agreement of INPO (exctina INPO member licensc(.
(b)(4)
Page 2 of 3
- NOT FOR PUBLIC DISTRIBUTION - WARNING: Proprietary Information. Do NOT distributethis report to the public. Do NOT share any information contained in this report with anyone outsidethe NRC-without the nrior agreement of RIPO (excentine INPO member licensees).
(b)(4)
Page 3 of 3
-W S
QUaYle, Lisa
From:Sent:To:
Subject:Attachments:
RST01 HocMonday Anril 04 2011 10-40 PM
(b)(6)
FW: UPDATED LIST OF CURRENT RST/CONSORTIUM ACTIONSUPDATED LIST OF CURRENT RST-CONSORTIUM ACTIONS 2300EDT4-4-11.docx
From: Hoc, RST16Sent: Monday, April 04, 2011 11:20 PMTo: RST01 HocCc: Hoc, RST16; RST06 HocSubject: RE: UPDATED LIST OF CURRENT RST/CONSORTIUM ACTIONS
To Consortium Members, NRC Japan Detachment, and RST members, please see the latest update to the document"Updated Ust of Current RST/Consortium Actions" as of 2300EDT 4/4/2011.
Please review this status document (pasted below and attached).
Please think of other issues and items that should be discussed at the 0300EDT teleconference call between RST, JapanDetachment and the members of the Consortium, and provide your inputs to the meeting agenda back to the RST [email protected] as soon as you can.
Thank you.
UPDATED LIST OF CURRENT RST/CONSORTIUM ACTIONS - 2300 EDT on 4/4/11
1. Provide evaluation of TEPCO differing views on merits of flooding vs. status quo, including hydrogenassumptions.
a. Status:1. INPO is the Lead: draft document due to consortium/RST by 4/4/11(20:00 am-EDT) (Still
awaiting as of 2230 4/4/2011)2. Discussion of hydrogen/steam assum tions in ori inal anal is and draft res onse to
d 4/4/11
2. Respond to site team question on possible additional measures to maximize the success of theircurrent feed-and-bleed strategy.
a. Status:1. Draft document sent to consortium/site team on 4/4/11 (0240 EDT)2 Comments from consortium due to RST bv 4/4111 (2000 FDT)
1
I
3. SFP for unit 4 white paper. Received Rob Taylor feedback/input on rough draft at 0717 EDT on 4/4/11.a. Status:
WR Analyst incorporating R. Taylor input into SFP assessment
2. NRC line organization working task -
4. Input on Japan request regarding what a stable reactor condition (no further energetic events or majorrad releases) looks like.
a. Status:1. RST draft document with consortium-expected 414/11
3. Expected discussion item for telecom 4/5111 (3:00 am EDT)
5. Words from consortium (GE) to close loop on why guidance for flooding impact on containmentpressure is not practical or value-added.
a. Status:1. ST fllo::up ~ih cncrtium VA in ell t toloA 41A911 (11 1:Om EDrT)-
qu ng P
6. Evaluate the consequences of inadvertently adding the organic fixing agent to the spent fuel pools.Due Tuesday Japan time.
a. Status:I IMDA• rn,'r%^npG fn ri nej•@inn q11 I1 Imffmrh-h= 4rvti imant'
2
UPDATED LIST OF CURRENT RSTICONSORTIUM ACTIONS - 2300EDT on 4/4111
1. Provide evaluation of TEPCO differing views on merits of flooding vs. status quo,including hydrogen assumptions.
a. Status:1. INPO is the Lead: draft document due to consortium/RST by 4/4/11(20:00
am-EDT) (Still awaiting as of 2230 4/4/2011)2. Discussion of hydrogen/steam assumptions in orinalianal sis and draft2.eDspusons tofoccur duin tatus teeo 441
2. Respond to site team question on possible additional measures to maximize the successof their current feed-and-bleed strategy.
a. Status:1. Draft document sent to consortium/site team on 4/4/11 (0240 EDT)2. Comments from consortium due to RST by 4/4/11 (2000 EDT)
4- L&'- fcnwnedsusdwt ET and concurrencewilstyih
3. SFP for unit 4 white paper. Received Rob Taylor feedback/input on rough draft at 0717EDT on 4/4/11.
a. Status:1 'BWR Analyst incorporating R. Taylor input into SFP assessment -Stil
2. NRC line organization working task -reonsere~ e1 T
4. Input on Japan request regarding what a stable reactor condition (no further energeticevents or major rad releases) looks like.
a. Status:1. RST draft document and shared with consortium-expected4/411 (11:00a EDT)... ,
2. Relis reeie foNRadDEevening of 4/4/2011, still awafinj
3. Expected discussion item a cpy for telecom 4/5/11 (3:00 amEDT)
5. Words from consortium (GE) to close loop on why guidance for flooding impact oncontainment pressure is not practical or value-added.
a. Status:1.
6. Evaluate the consequences of inadvertently adding the organic fixing agent to the spentfuel pools. Due Tuesday Japan time.
a. Status:1. INPO responded to question 3/31/11 (attached document)
Trapp, James t 'ý
From:Sent:To:Cc:Subject:Attachments:
RST01 HocMonday, March 14, 2011 10:36 PMTrapp, James; Ulses, AnthonyLIA06 Hoc; LIA04 HocFW: Contingency Action from GEHFukushima Equipment Specification Listing 3-12-11 r0.docx
.- Original Message---From: Bass, John R (GE Power & Water) [mailto:iohn.bassP-pe.com]Sent: Monday, March 14, 2011 10:21 PMTo: RST01 HocCc: Watford, Glen A. (GE Power & Water); Ayer, Robert A (GE Power & Water); Madronero, Hernando (GEPower & Water)Subject: Contingency Action from GEH
See attached:
Regards,
John R. BassPrincipal Engineer (Recirculation System LSE) Systems Engineering GE Hitachi Nuclear Energy
T 910 819 6585F 9,10 362 6585,c, I (b(6D *292-6585E iohn.bass(tpqe.comhttp://wwwg qepower.com3901 Castle Hayne Road, M/C L30Wilmington, NC 28401
I. /p/-J po
Fukushima Equipment Specification Listing (3/14/2011)
Pumping Equipment
Purpose- To deliver makeup water to the containment and Reactor Vessel.
1. Option 1-Fire truck or equivalent vehicle with 100 gpm or greater and 150
psig. (for each unit).
2. Option 2-Fire boat or equivalent vehicle with 100 gpm or greater and 150
psig. (for each unit).
3. Option 3 -Self-contained operated pump/motor (> 100 gpm) and 150 psig.
(for each unit).
4. Option 4- Pump/motor with portable generator (>100 gpm) and 150 psig.
(for each unit).15 Kw unit
5. Portable generators - >20 Kw @ 50 Hz (large truck mounted units if
available- should be available in the 700Kw-1MW range. 480 volt and 4160
volts
6. High pressure Portable pumps 100 gpm at 500 psig
Cooling Equipment
Purpose- To provide cooling to the plant spent fuel pools.
7. (6) Chillers/heat exchanger 150 ton with 700KW self-contained generator
(one for each Unit) Chillers 150 ton with 700KW self-contained generator
(one for each Unit)
8. (1) Chiller/heat exchanger 800 ton with 3000 KW self-contained generator
(for common pool)
Instrumentation
Purpose -To provide water level or RPV Temperature
1. 6 volt lantern batteries (4 put in series for 24 volts DC) use a Volt Ohm
Meter at the instrument rack for obtaining measurement
2. Use a Volt Ohm Meter to get millivolt readings from RPV thermocouples
and CRDM thermocouples (millivolt readings are then converted to
temperature)
Spent Fuel Pool Water Injection
1. Fire Water from fire truck pumper or temporary pump through fire mains
to refuel floor fire hydrants
2. Helicopter water drop uses forest fire type water containers
From: Traop. JameTo: McGinty. TimSubject: FW: 8 NRC people to Japan ASAPDate: Monday, March 14, 2011 4:55:20 PM
You don't want to be on military transport planes. They dump you at bases in the middle of nowhereand you can't get to Tokyo, Tony left -, iday ahead of me, slept in airports for 24 hours and I beat himto the Embassy.
Hopefully a helpful hint?
We have webmail up and running in our conference room.
From: Tidd, Kurt W RADM ICS VDJ-3 [ (b)(6)Sent: Monday, March 14, 2011 4:51 PMTo:l (b)(6)
(b)(6)
Subject: RE: 8 NRC people to Japan ASAP
TJ -- ensure ALCON know/understand that this TRANSCOM planning remaiaisTENTATIVE until positively confirmed. A lot of moving pieces here, so weMOST STRONGLY recommend NRC retain their commercial air plans. It willbe a challenge for NRC folks to get to Vegas, then over to Nellis, andwe do not intend to hold up the flight for them. For the moment, here iswhat the DOE lift looks like:
Mission Number: PJM112471073-C-17 alert NLT 14/1800ZDep Travis AFB CA (KSUU) 14/2100ZArr/Dep Nellis AFB NV (KLSV) - 14/2200Z - 15/0045ZArr/Dep Elmendorf AFB for gas (PAED) - 15/0545Z - 15/0730ZArr Yokota AFB Japan (RFTY) - 15/1545Z
Please stress again -- this flight sked remains TENTATIVE!! We've got abunch of folks scrambling hard to make it happen, but please remainflexible.
RADM Kurt W. Tidd, USNVice Director for Operations, J33000 Joint Staff PentagonRm 2D882Washington DC 20318-3000Tel: (703) 695-0987DSN: 225-0987
Fax: (703) 614-1755Red Switch; =n- 21-a- ,
(I"Blackberry: (b)(6) IEmfail (b)(6) ISIPRI I
----- Original Message -----From: Zerr, Thomas J. [mailto:Thomas 1. Zerr~nss.eop.gov]Sent: Monday, March 14, 2011 4:42 PMTo: f (b)(6)
(b)(6)
Cc: Wormuth, Christine; '[email protected]'; Russel, DanielR.; Duncan, Shawn H.; Bentz, Julie A.; '[email protected]';'Nader. [email protected]'; '[email protected]'; '[email protected]';'[email protected]'; '[email protected]'; 'Jane. [email protected]';'[email protected]'; 'John. [email protected]';'[email protected]'; '[email protected]'; 'Jack. [email protected]';'[email protected]'; 'Glenn [email protected]';'[email protected]'; '[email protected]'; '[email protected]';'[email protected]'; '[email protected]';'[email protected]'; '[email protected]';'[email protected]'; '[email protected]'; Baden, Tim;Dolan, Edward M.; Donnell, Charles D.; Gelman, Jeffrey D.Subject: Re: 8 NRC people to Japan ASAP
Thanks Admiral.
Tj
----- Original Message -----From: Tidd. Kurt W RADM JCS VDJ-3 (b)(6)Tnl (b)(6)To •I.
.
I
(b)(6)
(b)(6)
ý'CcWormuth, Christine; [email protected]<[email protected]>; Russel, Daniel R.; Duncan, Shawn H.;Bentz, Julie A.; Doane, Margaret <[email protected]>; Mamish, Nader<[email protected]>; Foggie, Kirk <[email protected]>; Smith,Brooke <[email protected]>; LIA02 Hoc <[email protected]>; LIA03 Hoc<[email protected]>; Marshall, Jane <[email protected]>; Casto,Chuck <[email protected]>; Monninger, John <[email protected]>;Nakanishi, Tony <Tony. Nakan ish [email protected]>; Kolb, Timothy<Timothy. [email protected]>; Foster, Jack <Jack. [email protected]>; Devercelly,Richard <[email protected]>; Tracy, Glenn<[email protected]>; Leeds, Eric <[email protected]>; Boger, Bruce<[email protected]>; Trapp, James <[email protected]>; Ulses,Anthony <[email protected]>; Carter, Mary <[email protected]>;Emche, Danielle <Danielle. [email protected]>; Jones, Andrea<[email protected]>; Schwartzman, Jennifer<[email protected]>; Cook, William <[email protected]>;Baden, Tim; Dolan, Edward M.; Donnell, Charles D.; Gelman, Jeffrey D.;Hepburn, Matthew; Kamoie, Brian E.; Kern, Dab; Kim, Paul; Landau,Zachary L.; Marcozzi, David E.; Mecher, Carter E.; Panketh, Eric J.(NSC); Reed, Richard A.; Tribble, Ahsha; Zelvin, Lawrence K.; Holgate,LauraSent: Mon Mar 14 16:32:13 2011Subject: RE: 8 NRC people to Japan ASAP
~
.;~.2i~ ~'~7~4
~~ g ~
- ~ .~' 4 4
4,-, -~
i~4. 4~K ~
RADM Kurt W. Tidd, USNVice Director for Operations, J33000 Joint Staff PentagonRm 2D882
Washington DC 20318-3000Tel: (703) 695-0987DSN: 225-0987Fax: (703) 614-1755Red Switch: -- -
Blackberry: (b)(6)
mailISIPR (b)(6)
-.... Original Message -----From: Gallagher, Shawn P. [mailto (b)(6)Sent: Monday, March 14, 2011 4:05 PMTo: 'Clark, Ngoc CIV OSD POLICY'; 'Ramsey, Jack'; Abrams, Charlotte;Zerr, Thomas J.; Zenner, Todd LCDR JCS J5 DDASIA NEAD NE ASIA BR;Hulley, Paul, SES, OSD-POLICY; Trigilio, John, CIV, OSD-POLICY; Tidd,Kurt W RADM JCS VDJ-3; Engle, Thomas E Lt Col JCS J3/NMCC; Severs, PaulI CAPT JCS J5 AP; NEWELL, JOHN Brig Gen JCS 35 ASIADD; SHIN, DAVID W COLJCS 35 ASIA NEA; BROWN, ANGELIQUE P Maj JCS J5 ASIA NEA; NJOIC 3-5POLICY JCS J-3; NJOIC BATTLE CAPTAIN JCS J3; NJOIC JLOC OFFICER JCS 33;Kremer, Kyle Col JCS 34 DISTRIBUTIONCc: Wormuth, Christine; T'[email protected]'; Russel, DanielR.; Duncan, Shawn H.; Bentz, Julie A.; Doane, Margaret; Mamish, Nader;Foggie, Kirk; Smith, Brooke; LIA02 Hoc; LIA03 Hoc; Marshall, Jane;Casto, Chuck; Monninger, John; Nakanishi, Tony; Kolb, Timothy; Foster,Jack; Devercelly, Richard; Tracy, Glenn; Leeds, Eric; Boger, Bruce;Trapp, James; Ulses, Anthony; Carter, Mary; Emche, Danielle; Jones,Andrea; Schwartzman, Jennifer; Cook, William; Baden, Tim; Dolan, EdwardM.; Donnell, Charles D.; Gelman, Jeffrey D.; Hepburn, Matthew; Kamoie,Brian E.; Kern, Dab; Kim, Paul; Landau, Zachary L.; Marcozzi, David E.;Mecher, Carter E.; Panketh, Eric J. (NSC); Reed, Richard A.; Tribble,Ahsha; Zelvin, Lawrence K.; Holgate, LauraSubject: RE: 8 NRC people to Japan ASAP
Again looping in resilience here at NSC. Thanks all!
----- Original Message -----From: Clark, Ngoc CIV OSD POLICY mait (b)(6)Sent: Monday, March 14, 2011 3:58 PMTo: 'Ramsey, Jack'; Abrams, Charlotte; Zerr, Thomas J.; Zenner, ToddLCDR JCS 35 DDASIA NEAD NE ASIA BR; Hulley, Paul, SES, OSD-POUCY;Trigilio, John, CIV, OSD-POLICY; Tidd, Kurt W RADM JCS VDJ-3; Engle,Thomas E Lt Col JCS J3/NMCC; Severs, Paul J CAPT JCS J5 AP; NEWELL, JOHNBrig Gen JCS J5 ASIADD; SHIN, DAVID W COL JCS 35 ASIA NEA; BROWN,ANGELIQUE P MajJCS 35 ASIA NEA; NJOIC 3-5 POLICY JCS J-3; NJOIC BATTLECAPTAIN JCS J3; NJOIC JLOC OFFICER JCS 33; Kremer, Kyle Col JCS J4DISTRIBUTIONCc: Wormuth, Christine; '[email protected]'; Russel, DanielR.; Duncan, Shawn H.; Gallagher, Shawn P.; Bentz, Julie A.; Doane,Margaret; Mamish, Nader; Foggie, Kirk; Smith, Brooke; LIA02 Hoc; LIA03Hoc; Marshall, Jane; Casto, Chuck; Monninger, John; Nakanishi, Tony;Kolb, Timothy; Foster, Jack; Devercelly, Richard; Tracy, Glenn; Leeds,Eric; Boger, Bruce; Trapp, James; Ulses, Anthony; Carter, Mary; Emche,Danielle; Jones, Andrea; Schwartzman, Jennifer; Cook, WilliamSubject: RE: 8 NRC people to Japan ASAP
Looping in J-4 colleagues with the details of the request.
Ms. Ngoc Clark
Foreign Affairs Specialist
Humanitarian Assistance, Disaster Relief, and Global Health DirectorateOffice of Partnership Strategy & Stability Operations (PSO)OUSD(Policy) - SO/LIC & IC5C653703-692-0122
----- Original Message -----From: Ramsey, Jack [mailto:Jack.RamsevC(nrcgov]Sent: Monday, March 14. 2011 3-S4 PM -To: Abrams, Charlotte;I (b)(6) Zenner, Todd LCDRJCS J5 DDASIA NEAD NE ASIA BR; Hulley, Paul, SES, OSD-POLICY; Clark,Ngoc CIV OSD POLICY; Trigilio, John, CIV, OSD-POLICY; Tidd, Kurt W RADMJCS VD]-3; Engle, Thomas E Lt Col JCS J3/NMCC; Severs, Paul J CAPT JCS15 AP; NEWELL, JOHN Brig Gen JCS J5 ASIADD; SHIN, DAVID W COL JCS J5ASIA NEA; BROWN, ANGELIQUE P Maj JCS 35 ASIA NEA; NJOIC J-5 POLICY ICS3-3; NJOC BATT-LE CAPTAIN JCS 33Cc: (b)(6) : 7askForceIMailboxnstate, ov';
(b)(6)
(b)(6) r; Doane,Margaret; Mamish, Nader; Foggie, Kirk; Smith, Brooke; LIA02 Hoc; LIA03Hoc; Marshall, Jane; Casto, Chuck; Monninger, John; Nakanishi, Tony;Kolb, Timothy; Foster, Jack; Devercelly, Richard; Tracy, Glenn; Leeds,Eric; Boger, Bruce; Trapp, James; Ulses, Anthony; Carter, Mary; Emche,Danielle; Jones, Andrea; Schwartzman, Jennifer; Cook, WilliamSubject: RE: 8 NRC people to Japan ASAP
All,
. As the message below indicates, we now have an additional person (for atotal of 9) from our regional office outside Philadelphia.
Jack Ramsey
----- Original Message -----From: Abrams, CharlotteSent: Monday, March 14, 2011 3:52 PMTo: (b)(6)
(b)(6)
Subject: Re: 8 NRC people to Japan ASAP
-Also Bill Cook from RI
Sent from my nrc blackberry. Charlotte Abrams (b)(6)
----- Original Message -----From: Ramsey, JackTot (b)(6)
(b)(6)
Sent: Mon Mar 14 15:48:03 2011
Subject: RE: 8 NRC people to Japan ASAP
All,
To summarize, the Nuclear Regulatory Commission has been requested bythe Japanese government to supplement our staffing at the US Embassy inTokyo (we currently have two staff there). In response, we haveidentified 8 NRC staff for this. We have 6 staff from WashDC (JohnMonninger, Tony Nakanishi, Tim Kolb, Jack Foster, Brooke Smith and KirkFoggie), 1 from Atlanta (Chuck Casto) and 1 from Chattanooga (RichardDevercelly). The earliest commercial flights that are available arearound 13:00 EDT tomorrow (Tuesday). Obviously, we'd like to get themthere earlier if at all possible. This is what prompted the question onwhether DOD and/or other appropriate assets might be available.
For coordination purposes, the International Liaison Team at NRC'sEmergency Operations Center will be lead for this. E-mail addressesthere are [email protected] and [email protected], with direct phoneline of (301) 816-5192 (this is a recorded line). In the event of anycommunication issues, please call the main number for NRC's EmergencyOperation Center on (301) 816-5100 and ask for International Liaison.Please also note that the NRC team has been cc'ed on this message.
Thanks to everyone for looking at this.
Jack Ramsey
----- Original Message -----From: Zerr, Thomas J. [1alt• (b)(6)
Sent: Monday, March 14, 2011 3:25 PMTo: Zenner, Todd LCDR JCS J5 DDASIA NEAD NE ASIA BR; Hulley, Paul, SES,
OSD-POLICY; Clark, Ngoc CIV OSD POLICY; Trigilio, John, CIV, OSD-POLICY;Tidd, Kurt W RADM JCS VDJ-3; Engle, Thomas E Lt Col JCS J3/NMCC; Severs,Paul I CAPT JCS 35 AP; NEWELL, JOHN Brig Gen JCS 35 ASIADD; SHIN, DAVIDW COL JCS J5 ASIA NEA; BROWN, ANGELIQUE P Maj JCS 35 ASIA NEA; NJOIC 3-5POLICY JCS 3-3; NJOIC BATTLE CAPTAIN JCS 33Cc: Ramsey, Jack; Wormuth, Christine; [email protected];Russel, Daniel R.; Duncan, Shawn H.; Gallagher, Shawn P.; Bentz, JulieA.Subject: RE: 8 NRC people to Japan ASAP
+TF-1 mailbox for appropriate State loop in.
----- Original Message -----From: Zerr, Thomas J. [i (b)(6)MSent: Monday, March 14, 2011 2:58 PMTo: Hulley, Paul, SES, OSD-POLICY; Zenner, Todd LCDR JCS J5 DDASIA NEADNE ASIA BR; Clark, Ngoc CIV OSD POLICY; Trigilio, John, CIV, OSD-POLICY;Tidd, Kurt W RADM JCS VDJ-3Cc: 'Ramsey, Jack'Subject: FW: 8 NRC people to Japan ASAP
All-
~Y
(b)..5)
TJ
From: Gallagher, Shawn P.Sent: Monday, March 14, 2011 2:46 PMTo: 'Ramsey, Jack'; Zerr, Thomas J.; Bentz, Julie A.Subject: 8 NRC people to Japan ASAP
--W 4 ...
: :•, , y,.: " :......... .. • .... .• .,,, .. ....... • •, , ., - ..-,.:(.b. -.....(5 ).•... .
From:To:Subject:Date:
Andersen. JamesBoer. Bruce
FW: INPO Event ReportThursday, March 17, 2011 4:15:54 PM
FYI.
From: Howe, AllenSent: Thursday, March 17, 2011 3:39 PMTo: Merzke, DanielCc: Andersen, James; Wittick, Brian; Gratton, Christopher; Leeds, Eric; Boska, JohnSubject: RE: INPO Event Report
Dan - thanks - I believe that the NEI fact sheet has the essence of the INPO documentand I also believe that that is publically available.
Thanks - Allen
From: Merzke, Daniel YSent: Thursday, March)17, 2011 3:37 PMTo: Howe, AllenCc: Andersen, James; Wittick, BrianSubject: INPO Event Report
Dan
$ C"- /;L 2,-
From: Rlhrn. RogerTo: Thomas. Eric Boner. BruceCc: Brown, FrederkkSubject: Re: INPO IER LI ReportDate: Tuesday, March 15, 2011 10:26:23 PM
I'll touch base with Bill first thing weds.
Sent from an NRC BlackBerryRoqer S. Rihm
S (b)(6)
-----Original Message -----From: Thomas, EricTo: Boger, BruceCc: Rihm, Roger; Pannier, Stephen; Brown, FrederickSent: Tue Mar 15 18:33:06 2011Subject: INPO IER Li Report
Bruce,
..•."=•" .•:"
Thanks, Eric
----- Original Message -----From: Nielsen, Rick M (INPO) [mailto:NielsenFM(a)INPO.org]Sent: Tuesday, March 15, 2011 6:11 PMTo: Thomas, EricSubject: Re: Industry Efforts
Rick
Sent from my iPhone
On Mar 15, 2011, at 5:18 PM, T"homas, Eric" <[email protected]<mailto:Eric.Thomas(cnrc.dov>>wrote:
Hi Rick,
Please see below. Is there a new POC for me to contact so I can get a hold of the IER when it becomesavailable?
Thanks, Eric
From: Boger, Bruce 1'kSent: Tuesday, March 15, 2011 5:04 PMTo: Leeds, Eric; Grobe, Jack; Ruland, WilliamCc: Dean, Bill; Lew, David; McCree, Victor; Wert, Leonard; Satorius, Mark; Pederson, Cynthia; Collins,Elmo; Howell, Art; Virgilio, Martin; Thomas, Eric; Brown, FrederickSubject: Industry Efforts
.I spoke with Randy Edington (CNO Palo Verde) and later with Steve Nichols (INPO) regarding industryactions as a result of the situation in Japan. The CNOs teleconferenced over the weekend and agreedto a series of near-term actions. INPO issued a Level 1 Event Report (highest level) to its members thisafternoon.
' (b)(4)
// / IINPO is figuring out how quickly they7will Fbe able to
snare me report with us. The report won't be available to the public, but we can share it internally.
.DISCLAIMER:This e-mail and any of its attachments may contain proprietary INPO or WANO information that isprivileged, confidential, or protected by copyright belonging to INPO or WANO. This e-mail is intendedsolely for the use of the individual or entity for which it is intended. If you are not the intended recipientof this e-mail, any dissemination, distribution, copying, or action taken in relation to the contents of andattachments to this e-mail is contrary to the rights of INPO or WANO and is prohibited. If you are notthe intended recipient of this e-mail, please notify the sender immediately by return e-mail andpermanently delete the original and any copy or printout of this e-mail and any attachments.Thank you.
From:Sent:To:Subject:Attachments:
LIA06 HocTuesday, March 15, 2011 2:50 AM
LIA02 HocFW: Contingency Action from GEHFukushima Equipment Specification Listing 3-12-11 .rO.docx
PIs Forward
---- Original Message---..-
From: RST01 Hoc
Sent: Monday, March 14, 2011 10:54 PMTo: LIA06 Hoc
Subject: FW: Contingency Action from GEH
----- Original Message-----From: Bass, John R (GE Power & Water) [mailto:[email protected]]Sent: Monday, March 14, 2011 10:21 PMTo: RST01 HocCc: Watford, Glen A. (GE Power & Water); Ayer, Robert A (GE Power & Water); Madronero, Hernando (GE Power &
Water)
Subject: Contingency Action from GEH
See attached:
Regards,
John R. BassPrincipal Engineer (Recirculation System LSE) Systems Engineering GE Hitachi Nuclear Energy
T 910 819 6585F 910 362 6585
(b)(6)
D *292-6585E [email protected]://www.gepower.com
3901 Castle Hayne Road, M/C L30Wilmington, NC 28401
(~3, 6/2/i'
From:Sent:To:SubjectAttachments:
RMTPACTSUELNRC <[email protected]>Tuesday, March 15, 2011 11:22 PM
Grant, Jeffery; ET07 HocFW: Contact Data -- Please confirm receipt Thanks.img-315122838-0001.pdf; TM 2500 Base Model.xls; TM 2500 + Model.xls;143E3695L0001_CSHOLLOWAY_3.PDF; Q100510-G REV 7.pdf
Please advise on the ET's recommendation on the need of these generators.
From: Douglas, Richard (GE Aviation, US) [mailtollS•Sent: Tuesday, March 15, 2011 1:37 PMTo: RMTPACTSUELNRCCc: Skavdal, Stan (GE Aviation, US)Subject: RE: Contact Data -- Please confirm receipt Thanks.
Jason,
Several attachments following up on our phone call.
11 ý IAi
.~ ..~.4
Attached are the specs for the generator sets. I am sure you will have questions, so when you are ready, I willcall with the people who are more technically familiar with the gensets.
From: RMTPACTSUELNRC [mailto:[email protected]]Sent: Tuesday, March 15, 2011 11:43 AMTo: Douglas, Richard (GE Aviation, US)Subject: RE: Contact Data -- Please confirm receipt Thanks.
Received all e-mails are good.
From: Douglas, Richard (GE Aviation, US) [mailto.Sent: Tuesday, March 15, 2011 11:43 AMTo: RMTPACTSU_ELNRC; [email protected]: Contact Data -- Please confirm receipt Thanks.
Rich Douglas
Vice PresidentInternational ProgramsT 202-637-4212F 202-637-4412C (b)(6)E Richard.Douglas I a_)ge.com
7:TDI ýC"J ý's-
TOKYO ELECTRIC POWER COMPANYInternational Affairs Department1-1-3. Uchisaiwaicho, Ch0yodAku,T3kyo i00-001o JAPANTI, +8k3-6373 111i FAX: +8i3-3596*8599
15 t March 2011
Mr. Hideyuki Ohnishi
Country Executive
GE Energy-Japan
Request of Vour urgent support for gas turbine installation
TEPCO sincerely apologize for causing the hardship and concerns on the power shortage due to the
recent northern part of Japan earthquake. It would be highly appreciated if GE could cooperate
with us to restore the suspended power plants and supply new power equipments as soon as
possible.
In order to restore power, we are seriously considering mobile type gas turbine units and
installation of simple cycle gas turbines. We greatly appreciate your help to identify those turbines
which can be shipped soon or in the process of manufacturing. We may install those Inside or
outside of TEPCO facilities through the area.
In light of the critical shortage of the power, we ask GE to take immediate action to ship available
equipments to generate additional power.
Sincerely,
Toyohiko Ishimaru
Thermal Power Plant Engineering Center
Thermal Power Department
Tokyo Electric Power Company
From: Droggitis, SpirosSent: Tuesday, March 15, 2011 8:00 AMTo: LIA06 HocSubject: FW: For tuesday morning
From: Harrington, HollySent: Monday, March 14, 2011 8:26 PMTo: Burnell, Scott; Shoop, Undine; Droggitis, SpirosSubject: For tuesday morning
See the information below. Can one of you begin working on this first thing Tuesday morning, if at all possible? This
is for OCA. Check with Spiros in the LT room for where it should be sent
Thank you,
Holly
-1.'**-~*~- .-. j
(b) (5):
.~ ~.
$ý1ý6
From: Hayden. Elizabeth.To: Brenner, EliotSubject: Re: important info for youDate: Tuesday, March 15, 2011 2:38:46 AM
Give me the word and I will come home whenever you say to.
From: Brenner, EliotTo: Hayden, ElizabethSent: Tue Mar 15 01:54:03 2011Subject: important info for you
Beth.
(b)(5)
.eanwhile, OPA is getting some fill,-in help trom across te agency, ana we
I have looked at flights and there is a 4:40pm air france/delta flight on Thursday that wouldbring you back to work here on Friday. It's about $3,500. Under the circumstances I think itwould be justified. I will probably make that decision late Tuesday or early Wednesdaywhen we know more. I'm sure Brenda can get the Travel folks to make the change in yourticket if necessary.
Eliot
From: Hayden, ElizabethSent: Tuesday, March 15, 2011 1:26 AMTo: Brenner, Eliot; Harrington, Holly; Burnell, Scott; McIntyre, DavidSubject: Fw: EXAMPLE OF REQUEST: Earthquake plans/reports/risk analysis for San Onofre nuclearpower plant
Just saw this e-mail re JMeserve's request. It may be too late for her report but it is useful for futureinquiries.
From: Stutzke, MartinTo: Ake, ]on; Kammerer, Annie; Hayden, ElizabethCc: Burnell, Scott; Manoly, Kamal; Munson, Clifford; Chokshi, NileshSent: Mon Mar 14 15:20:33 2011Subject: RE: EXAMPLE OF REQUEST: Earthquake plans/reports/risk analysis for San Onofre nuclearpower plant
It's misleading to say that the GI-199 Safety/Risk Assessment determined which plantswere OK and which were not. The purpose of the assessment was to determine, on ageneric basis, if the risk associated with increased seismic hazard estimates in the Centraland Eastern US (CEUS) warrants further investigation for potential imposition of cost-justified backfits. We determined that the seismic core-damage frequencies for 27 plantshad increased by 1 E-5/y or more, relative to what we thought upon conclusion of theIndividual Plant Examination of External Events (Generic Letter 88-20, Supplement 4).This finding is the basis for continuing GI-199 and transitioning it to NRR for development
of a generic letter that will request information needed to identify potential plant-specificbackfits.
We presented. a map that showed the locations of the 27 plants in the GI-199 "continuezone" during a public meeting held October 6, 2010 (see Slide #25 in ML102770665). TheGI-199 Safety/Risk Assessment (ML100270582) is also publically available. It does notspecifically identify the 27 plants, but contains information in appendices that could beused to figure out which CEUS plants are in the "continue zone."
M arty ..............From: Ake, JonSent: Monday, March 14, 2011 2:08 PMTo: Kammerer, Annie; Hayden, ElizabethCc: Burnell, Scott; Manoly, Kamal; Munson, Clifford; Stutzke, Martin; Chokshi, NileshSubject: RE: EXAMPLE OF REQUEST: Earthquake plans/reports/risk analysis for San Onofre nuclearpower plant
As Annie has pointed out, all 96 operating reactors in the Central and Eastern U.S. wereevaluated as part of the GI-199 assessment. Currently a Generic Letter is being preparedrequesting additional seismic and plant-specific information, that letter will be sent to allNPP licensees in the CEUS. It is important to note that the Generic Letter has not yet beenfinalized, the specific information requests are being developed and reviewed internally.So, at this time we are unable to state exactly what. path (analysis, back-fit etc.) aparticular plant may follow as a result of the Generic Letter.
Kamal, Marty, Cliff-'Is this an accurate representation of our current path?
From: Kammerer, AnnieSent: Monday, March 14, 2011 11:53 AMTo: Hayden, ElizabethCc: Burnell, Scott; Ake, JonSubject: RE: EXAMPLE OF REQUEST: Earthquake plans/reports/risk analysis for San Onofre nuclearpower plant
The list that was analyzed was basically everything in the CEUS. I don't think we made thelist of which plants were OK and which not public due to too much uncertainty. Jon Akewould know.
Jon, can you answer? Did we make the list of plant names and which screened in public?
From: Hayden, ElizabethSent: Monday, March 14, 2011 1:48 PMTo: Kammerer, AnnieCc: Burnell, ScottSubject: RE: EXAMPLE OF REQUEST: Earthquake plans/reports/risk analysis for San Onofre nuclearpower plant
Is the list of plants that were analyzed and those found problematic public?
Beth HaydenSenior Advisor
Office of Public AffairsU.S. Nuclear Regulatory Commission
--- Protecting People and the Environment
301-415-8202elizabethz.hayden @nrc.gov
From: Kammerer, AnnieSent: Monday, March 14, 2011 1:24 PMTo: Hayden, ElizabethCc: Burnell, ScottSubject: RE: EXAMPLE OF REQUEST: Earthquake plans/reports/risk analysis for San Onofre nuclearpower plant
Yes. Wolf Creek was analyzed as part of G1-199. It was not one of the plants that the NRCidentified as problematic (i.e. staff believes this plant still has adequate margin given thelatest ground shaking estimates). However, due to uncertainties in the data available toour staff, we will be sending a letter to all US plants in the central and eastern US.
I hope this helps.
From: Hayden, ElizabethSent: Monday, March 14, 2011 1:18 PMTo: Kammerer, AnnieCc: Burnell, ScottSubject: FW: EXAMPLE OF REQUEST: Earthquake plans/reports/risk analysis for San Onofre nuclearpower plant
Annie,
Can you help with this question we received from a reporter?
Also, can you verify whether Wolf Creek is one of the plants evaluated in GSI-199?
Beth HaydenSenior AdvisorOffice of Public AffairsU.S. Nuclear Regulatory Commission
--- Protecting People and the Environment301-415-8202elizabeth.hayden @nrc.gov
From: Uselding, LaraSent: Monday, March 14, 2011 1:10 PMTo: Hayden, Elizabeth; Screnci, DianeSubject: EXAMPLE OF REQUEST: Earthquake plans/reports/risk analysis for San Onofre nuclear powerplant
From: [email protected] [mailto:[email protected]]Sent: Monday, March 14, 2011 12:08 PMTo: Uselding, Lara
Subject: Earthquake plans/reports/risk analysis for San Onofre nuclear power plant
Lara,I am trying to track down any documents on file with the NRC concerning the risk of earthquakesoccurring near the San Onofre nuclear plant north of San Diego. I am particularly interested in
emergency plans, analysis of the risks faced by the plant from earthquakes and predictions of thetypes of damage and dangers that could be created by earthquake damage to the plant. I'm alsointerested in documents looking at the risk and dangers posed by tsunamis to the plant.Can you tell me if these types of documents exist and when I might be able to get them? I amtrying to turn a story around on this topic for tomorrow's (Tuesday's) edition of the paper.
Thanks,
Keith
Keith Darce
Biotechnology writer
The San Diego Union-Tribune
keith.darce@ uniontrib.com
619.293.1020
www.signonsandiego.com/news/business/biotech/
Follow me on Twitter at KeithDarce
Weaver,. Tonna
From: Williams, JosephSent: Wednesday, March 16, 2011 10:35 AMTo: Casto, Chuck; Monninger, John; Ulses, Anthony; Trapp, JamesCc: RST01 HocSubject: RE: Military Resources
I will pass the word.
Joe
From: Casto, ChuckSent: Wednesday, March 16, 2011 10:33 AMTo: Williams, Joseph; Monninger, John; Ulses, Anthony; Trapp, JamesCc: RST01 HocSubject: Re: Military Resources
John and tim should call you soonest after the TEPCO meeting they are in.
If they don't call in the new few hours call me.; (b)(6)
From: Williams, JosephTo: Casto, Chuck; Monninger, John; Ulses, Anthony; Trapp, JamesCc: RST01 HocSent: Wed Mar 16 10:27:37 2011Subject: Military Resources
'This message relays information received by the Reactor Safety Team from Major Cook, Yokota Air Base, USFJ, "(DSN #
315-225-53ý"3)regarding pump resources being made available.
2 S18000 diesel-driven fire pumps: 2200 gpm, 6 inch discharge. No head specified.
2 S18900 diesel-driven fire pumps: 1800 gpm, 6 inch discharge. Boost via jet pumps (S18500, rated 500 gpm @ 150psi)
1 diesel-driven fire pump. Unknown specification.
We were told that the Japanese Self Defense Forces will transport the pumps to the site (",150 km, ",100 miles)
In a call from INPO, the RST was told that a request had been received for additional boron for Fukushima. The sourceof this request was unknown. INPO stated that Diablo Canyon has 20,000 pounds available. Major Cook indicated thatmilitary assets can possibly move boron from Travis AFB after delivery from Diablo Canyon (licensee believed able todeliver to Travis).
Please let us know if you are aware of the request for boron. We believe that there should be material
availble in Japan at the 20 PWR plants.
We also informed INPO and Major Cook of other assets which we were told you requested..
* Fire "rockets" (500 gpm capability)0 800 meters of rigid pipe for suction from ocean* Strainers for raw seawater* Bulldozers for clearing debris* Ladder pumper trucks with monitor nozzles I d/z
Please advise if there is a need for other materials, such as lead blankets for shielding, sand, dolomite, etc.
Joe WilliamsRST Communicator
2
From:To:Cc:Subject:
Date:
McGinty. TimBrown. FrederickOuav. Theodore; Ruland. William: Booer. Bre
RE: Sensitive Info: Release of INPO Event Report Level 1 -- Fukushima Daiichi Nuclear Station Fuel DamageCaused by Earthquake and TsunamWednesday, March 16, 2011 12:44:33 PM
Yes. I was up with Jack and Bill, and prompted the receipt of this. Thanks for looking outfor DPR.
(b)(5)
From: Brown, Frederick -
Sent: Wednesday, March 16, 2011 12:34 PMTo: McGinty, TimCc: Quay, Theodore; Ruland, William; Boger, BruceSubject: FW: Sensitive Info: Release of INPO Event Report Level 1 -- Fukushima Daiichi NuclearStation Fuel Damage Caused by Earthquake and TsunamImportance: High
Tim,
(b)(5)
Fred
From: Leeds, EricSent: Wednesday, March 16, 2011 7:49 AMTo: Grobe, Jack; Boger, Bruce; Ruland, WilliamCc: Brown, Frederick; Westreich, Barry; Virgilio, MartinSubject: Sensitive Info: Release of INPO Event Report Level 1 -- Fukushima Daiichi Nuclear StationFuel Damage Caused by Earthquake and TsunamImportance: High
Attached is the INPO Event Report on Fukushima. Please treat as sensitive information, not to beshared outside the NRC.
Eric J. Leeds, Director
Office of Nuclear Reactor RegulationU.S. Nuclear Regulatory Commission
301-415-1270
2k
'I
From: Mortensen, George K (INPO) [mailto:[email protected]]Sent: Wednesday, March 16, 2011 7:36 AMTo: Leeds, EricSubject: FW: Release of INPO Event Report Level 1 -- Fukushima Daiichi Nudear Station Fuel DamageCaused by Earthquake and TsunamImportance: High
,1
Good morning Eric,
Forwarded as requested.
George Mortensen
From: Mortensen, George K (INPO)Sent: Wednesday, March 16, 2011 6:10 AMTo: '[email protected]'; '[email protected]'Subject: FW: Release of INPO Event Report Level 1 -- Fukushima Daiichi Nuclear Station Fuel DamageCaused by Earthquake and TsunamImportance: High
Bruce,
.~ A .
4j½~~ ý IBest Wishes!
George Mortensen
INPO - External Relations Program Manager
From: Mortensen, George K (INPO)Sent: Tuesday, March 15, 2011 3:36 PMTo: '[email protected]'Subject: Release of INPO Event Report Level 1 --Caused by Earthquake and TsunamImportance: High
Fukushima Daiichi Nuclear Station Fuel Damage
George Mortensen
LIMITED DISTRIBUTION: Copyright © 2011 by the Institute of Nuclear Power Operations. Not for sale or for commercialuse. Unauthorized reproduction is a violation of applicable law. Each INPO member and participant may reproduce thisdocument for its business use. This document should not be otherwise transferred or delivered to any third party, and its
contents should not be made public, without the prior agreement of INPO. AlJ other rights reserved.NOTICE: This information was prepared in connection with work sponsored by the Institute of Nuclear Power Operations(fNPO). Neither INPO, INPO members, INPO participants, nor any person acting on behalf of them (a) makes any warrantyor representation, expressed or implied, with respect to the accuracy, completeness, or usefulness of the informationcontained in this document, or that the useof any information, apparatus, method, or process disclosed in this documentmay not infringe on privately owned rights, or (b) assumes any liabilities with respect to the use of, or for damages resultingfrom the use of any information, apparatus, method, or process disclosed in this document.
(b)(4)
LIMITED DISTRIBUTION: Copyright © 2011 by the Institute of Nuclear Power Operations. Not for sale or for commercialuse. Unauthorized reproduction is a violation of applicable law. Each INPO member and participant may reproduce thisdocument for its business use. This document should not be otherwise transferred or delivered to any third party, and itscontents should not be made public, without the prior agreement of INPO. Alt other rights reserved.NOTICE: This information was prepared in connection with work sponsored by the Institute of Nuclear Power Operations(INPO). Neither INPO, INPO members, INPO participants, nor any person acting on behalf of them (a) makes any warrantyor representation, expressed or implied, with respect to the accuracy, completeness, or usefulness of the informationcontained in this document, or that the use of any information, apparatus, method, or process disclosed in this documentmay not infringe on privately owned rights, or (b) assumes any liabilities with respect to the use of, or for damages resulting
from the use of any information, apparatus, method, or process disclosed in this document.
DISCLAINMER.Th ~ e-niai arx aw r ýt mna cv~nta~n prci~r INP Gr ~VJAý, Iilyrnia~r- na! is pivritajdd urifcdnfd~ial 61 prrie~red
by copm~nI b,?oqn tNPC:), r W-ANCY Pqhr~i -ihI s lnLtvnf'ei Scly !r' ihe iJ-- or C. Lfl; t 6j1' Ti1Y tor vih~fich1 is ritenrioadIf jýou. 2,e not thp nient,;dpu ci N e-rmwai -,ndissentinLnltoi. or'I~n ~ ct ti tllker c eIn iasn o TOiOcoof iin' aiiocfbniotis tj ~t 5 c., ; ~niciipm ttic rietn~s 0~ t'NPO o; '.-AlO arird Is 11itis iivcu.:te not IthecnIE d recipier-i i~iIthi e-maii. plletse' *-11ciii". i'~i~ie ry e~J~ -mail arvi in ýrgn, '.nf'i j afltiiy iwpy 'of Pnwrtut oft 1!15e-nmail aoid an~y uaThaiqk you.
Balarabe, Sarah
From: Brown, FrederickSent: Wednesday, March 16, 2011 8:33 AMTo: Leeds, Eric; Grobe, Jack; Boger, BruceCc: Westreich, Barry; Virgilio, Martin; Ruland, WilliamSubject: RE: Sensitive Info: Release of INPO Event Report Level 1 -- Fukushima Daiichi Nuclear
Station Fuel Damage Caused by Earthquake and Tsunam
This is very good.
Should we consider(b)(5)
From: Leeds, EricSent: Wednesday, March 16, 2011 7:49 AMTo: Grobe, Jack; Boger, Bruce; Ruland, WilliamCc: Brown, Frederick; Westreich, Barry; Virgilio, MartinSubject: Sensitive Info: Release of INPO Event Report Level 1 -- Fukushima Daiichi Nuclear Station Fuel Damage Causedby Earthquake and TsunamImportance: High
Attached is the INPO Event Report on Fukushima. Please treat as sensitive information, not to be shared outside theN RC.
Eric J. Leeds, DirectorOffice of Nuclear Reactor RegulationU.S. Nuclear Regulatory Commission301-415-1270
From: Mortensen, George K (INPO) [mailto:[email protected]]Sent: Wednesday, March 16, 2011 7:36 AMTo: Leeds, EricSubject: FW: Release of INPO Event Report Level 1 -- Fukushima Daiichi Nuclear Station Fuel Damage Caused byEarthquake and TsunamImportance: High
Good morning Eric,Forwarded as requested.George Mortensen
From; Mortensen, George K (INPO)Sent: Wednesday, March 16, 2011 6:10 AMTo: '[email protected]'; '[email protected]'Subject: FW: Release of INPO Event Report Level 1 Fukushima Daiichi Nuclear Station Fuel Damage Caused byEarthquake and TsunamImportance: High
Bruce,
., .. 1 3 ... . . : .;/.3 .... . ... . .
-- -------------
Best Wishes!George MortensenINPO - External Relations Program Manager
From: Mortensen, George K (INPO)Sent: Tuesday, March 15, 2011 3:36 PMTo: '[email protected]'Subject: Release of INPO Event Report Level 1 -- Fukushima Daiichi Nuclear Station Fuel Damage Caused by Earthquakeand TsunamImportance: High
Brian,
George Mortensen
LIMITED DISTRIBUTION: Copyright © 2011 by the Institute of Nuclear Power Operations. Not for sale or for commercial use. Unauthorized reproductionis a violation of applicable law. Each INPO member and participant may reproduce this document for its business use. This document should not beotherwise transferred or delivered to any third party, and its contents should not be made public, without the prior agreement of INPO. All other rightsreserved.NOTICE: This information was prepared in connection with work sponsored by the Institute of Nuclear Power Operations (INPO). Neither INPO, INPOmembers, INPO participants, nor any person acting on behalf of them (a) makes any warranty or representation, expressed or implied, with respect tothe accuracy, completeness, or usefulness of the information contained in this document, or that the use of any information, apparatus, method, orprocess disclosed in this document may not infringe on privately owned rights, or (b) assumes any liabilities with respect to the use of, or for damagesresulting from the use of any information, apparatus, method, or process disclosed in this document.
(b)(4)
2
(b)(4)
LIMITED DISTRIBUTION: Copyright 0 2011 by the Institute of Nuclear Power Operations. Not for sale or for commercial use. Unauthorized reproductionis a violation of applicable law. Each INPO member and participant may reproduce this document for its business use. This document should not beotherwise transferred or delivered to any third party, and its contents should not be made public, without the prior agreement of INPO. All other rightsreserved.NOTICE: This information was prepared In connection with work sponsored by the Institute of Nuclear Power Operations (INPO). Neither INPO, INPOmembers, INPO participants, nor any person acting on behalf of them (a) makes any warranty or representation, expressed or implied, with respect tothe accuracy, completeness, or usefulness of the information contained in this document, or that the use of any information, apparatus, method, orprocess disclosed in this document may not infringe on privately owned rights, or (b) assumes any liabilities with respect to the use of, or for damagesresulting from the use of any information, apparatus, method, or process disclosed in this document.
3
I/ ..-,
Cohen, Shari
From:Sent:To:
Subject:
Attachments:
Importance:
Nguyen, QuynhWednesday, March 16, 2011 12:31 PMRuland, William; McGinty, Tim; Cheok, Michael; Holian, .Brian; Lubinski, John; Brown,Frederick; Gitter, Joseph; Hiland, PatrickFw: Release of INPO Event Report Level 1 -- Fukushima Daiichi Nuclear Station FuelDamage Caused by Earthquake and TsunamINPO Event Report (IER) L1-11-1.pdf
High
Sent from an NRC blackberry.Ouvnh Nauvn
(b)(6)
From: Wittick, BrianTo: Nguyen, Quynh; Meighan, Sean; Andersen, James; Virgilio, Martin; Weber, Michael; Muessle, Mary; Williams, Donna;Merzke, DanielCc: OIP DistributionSent: Wed Mar 16 07:41:42 2011Subject: FW: Release of INPO Event Report Level 1 -- Fukushima Daiichi Nuclear Station Fuel Damage Caused byEarthquake and Tsunam
Attached please find the INPO Level 1 Event Report
Brian WittickExecutive Technical Assistant for ReactorsOffice of the Executive Director for OperationsU.S. Nuclear Regulatory Commission301-415-2496 w (b)(6) (C
From: Mortensen, George K (INPO) rmailto:MortensenGKaINPO.orq1Sent: Wednesday, March 16, 2011 6:10 AMTo: Boger, Bruce; Wittick, BrianSubject: FW: Release of INPO Event Report Level 1 -- Fukushima Daiichi Nuclear Station Fuel Damage Caused byEarthquake and TsunamImportance: High
Best Wishest f IGeorge Mortensen I
I
Weaver, Tonna
From: Hughart, Joseph (FOH)ý[[email protected]]Sent: Wednesday, March 16,72011 1:40 AMTo: Ulses, AnthonySubject: FW: GE Generator Set Locations
Best,
- Joe HughartCAPT USPHSHHS PSC FOHSf,4'04-667-5905ijoseph. [email protected]. gov,
From: RMTPACTSU_LC' [mailto:RMTPACTSULC ofda.gov)Sent: Wed 3/16/2011 1:33 AMTo: Hughart, Joseph (FOH)Cc: OFDALogistics [USAID]; RMTPACTSULCSubject: RE: GE Generator Set Locations
-Pat (b)(5)
Todd Horne / Pat Long / Rob Thibaultj.gistics Coordin a tor
202-712-0039 x-5706 .
From: RMTPACTSULCSent: Wednesday, March 16, 2011 1:19 AMTo: Hughart, Joseph (FOH)Cc: RMTPACTSU_LC; OFDALogistics [USAID]Subject: RE: GE Generator Set Locations
I ; :: i.:•.:'.:.i!.% ••": :, - ' (b )(4 .)%:i.`: . :i "::i.•:"'.:: .. . " ..
Todd Home / Pat Long / Rob ThibaultLogistics Coordinator
p02-712-0039 x-5706 %-
From: Hughart, Joseph (FOH) ['mailto:[email protected]]Sent: Wednesday, March 16, 2011 12:56 AMTo: RMTPACTSULCSubject: RE: GE Generator Set Locations
Thanks, Pat.
Best,
- Joe HughartCAPT USPHSHHS PSC FOHS
fd4-667-5905JoSePh hughart~f oh. hhs gový
From: RMTPACTSULCrmailto:RMTPACTSU [email protected]( *>ISent: Wed 3/16/2011 1T31 AMTo: Hughart, Joseph (FOH)Cc: RMTPACTSU LC; OFDALogistics [USAID]Subject: FW: GE Generator Set Locations
Joe,
-Pat
Todd Home / Pat Long / Rob Thibault. stkcs Coortnatq•
From: Douglas, Richard (GE Aviation, US .. [email protected]: Tuesday, March 15, 2011 4:14 PMTo: RMTPACTSULC; RMTPACTSU_ELNRCCc: Boutte, Brian (GE Energy); Oates, Kennedy (GE Energy); Nemecek, John (GE Energy); Richards, Tim J (GE,Corporate); Plckart, George (GE Power & Water); Patton, Gregory J (GE Power & Water); Anderson, Robert F (GE Power& Water)Subject: GE Generator Set Locations
Jason/Todd,
From: RMTPACTSULCrmailto:[email protected] ISent: Tuesday, March 1',-2011 2:20 PMTo: RMTPACTSU_ELNRC
2
Cc: Douglas, Richard (GE Aviation, US)Subject: FW: Contact Data -- Please confirm receipt Thanks.
Thanks Jason,
Richard,
Todd
2Aitstics Coordinator202-712-0039 x-5706Eftactsu Ic~ofdaJgov, 1
From: RMTPACTSUELNRCSent: Tuesday, March 15, 2011 1:59 PMTo: RMTPACTSU_LCSubject: FW: Contact Data -- Please confirm receipt Thanks.
From: Douglas, Richard (GE Aviation, US i ch... ... u.... ,Sent: Tuesday, March 15, 2011 1:37 PMTo: RMTPACTSUELNRCCc* Skavdal, Stan (GE Aviation, US)Subject: RE: Contact Data -- Please confirm receipt Thanks.
Jason,
Several attachments following up on our phone call.
First is the letter we received from TEPCO asking for help. The official who sent the s Mr. Toyohiko Ishimaru, ,Alermal Power Plant EngineerinT Center Th al Power Department, TEPCO. EM: 1i R~mru.tovohikoQoco.woit'ITO +80-3-6373-4101; Cell: (b)(6) LTC Martinez asked for this informaItTthat USAID in Tokyo couti =\4*ify the request. I left LTC Martinez a VM, b you have her e-mail, I would appreciate an assist in closing this loop.
Attached are the specs for the generator sets. I am sure you will have questions, so when you are ready, I will schedule acall with the people who are more technically familiar with the gensets.
From; RMTPACTSU_ELNRC ailto:[email protected] ,
Sent: Tuesday, March 15, 2311 11:43 AMTo: Douglas, Richard (GE Aviation, US)Subject: RE: Contact Data -- Please confirm receipt Thanks.
Received all e-mails are good.
3
From: Douglas, Richard (GE Aviation, US) ........ 1A.dIISent: Tuesday, March 15, 2011 11:43 AMTo: RMTPACTSU_ELNRC; [email protected]: Contact Data -- Please confirm receipt Thanks.
Rich Douglas
Vice Presidentrnnflonal Programs
F 202-637-41 ~v4~
1299 Pennsylvania Avenue, NWSuite 900Washington, DC 20004-2407GE Aviation
4
Weaver, Tonna
From: Hughart, Joseph (FOH),,•[email protected]: Wednesday, March 16, 2011 11:46 PMTo: Ulses, Anthony; Trapp, JamesSubject: FW: GE Generator Set Locations
Best,
- Joe HughartCAPT USPHS
jiLS PSC FOHS.t404-667-5905•oseph. hughart@foh. hhs.go
From: RMTPACTSULC .nailto:[email protected]]Sent: Wed 3/16/2011330 AMTo: Hughart, Joseph (FOH)Cc: OFDALogistics [USAID]; RMTPACTSULCSubject: RE: GE Generator Set Locations
.. .. . .. .. ......... ...,.
Todd Home / Pat Long /Rob Thibault
fO~Stics Coordinatqr, .2 02-712-0039 x-5706
From: RMTPACTSULCSent: Wednesday, March 16, 2011 1:19 AMTo: Hughart, Joseph (FOH)Cc: RMTPACTSULC; OFDALogistics [USAID]Subject: RE: GE Generator Set Locations
Todd Home/ Pat Long/ Rob Thibault,Logistics Coordinator;'22-712-0039x-57616
From: Hughart, Joseph (FOH)[mailto:[email protected]]!..-Sent: Wednesday, March 16, 2b'II 12:56 AMTo: RMTPACTSULCSubject: RE: GE Generator Set Locations
Thanks, Pat.
Best,
- Joe HughartCAPT USPHS
PSC FOHS404-667-5905oseph. [email protected]
From: RMTPACTSU LCrailto:RMTPACTSU [email protected]]Sent: Wed 3/16/2011 1231 AM -To: Hughart, Joseph (FOH)Cc: RMTPACTSULC; OFDALogistics [USAID]Subject: FW: GE Generator Set Locations
Joe,
4F (b)(4))
-Pat
Todd Home / Pat Long/ Rob Thibaultt•'stics Coordinato,,t2-712-0039.x-57646From: Douglas, Richard (GE Aviation, US) [rnailto:[email protected]]Sent: Tuesday, March 15, 2011 4:14 PM -To: RMTPACTSU LC; RMTPACTSUELNRCCc: Boutte, Brian (GE Energy); Oates, Kennedy (GE Energy); Nemecek, John (GE Energy); Richards, Tim J (GE,Corporate); Pickart, George (GE Power & Water); Patton, Gregory J (GE Power & Water); Anderson, Robert F (GE Power& Water)Subject: GE Generator Set Locations
Jason/Todd,
2
From: [email protected] y -Sent: Tuesday, March I,'2011 2:20 PMTo: RMTPACTSUELNRCCc: Douglas, Richard (GE Aviation, US)Subject: FW: Contact Data -- Please confirm receipt Thanks.
Thanks Jason,
Richard,
Todd
Logistics Coordinator~2-712-0039 x-5706 ALRmtpactSu Icaofda.zov
ofdalogisticst iusaid.gov -
From: RMTPACTSUELNRCSent: Tuesday, March 15, 2011 1:59 PMTo: RMTPACTSU_LCSubject: FW: Contact Data -- Please confirm receipt Thanks.
From: Douglas, Richard (GE Aviation, US) railto:[email protected]]Sent: Tuesday, March 15, 2011 1:37 PM
To: RMTPACTSUELNRCCc: Skavdal, Stan (GE Aviation, US)Subject: RE: Contact Data -- Please confirm receipt Thanks.
Jason,
Several attachments following up on our phone call.
r r
First is the letter we received from TEPCO asking for help. The official who sent the Le.ter is Mr. Toyohiko Ishimaru,,QGM,j 9 T4ermal Power Plant Engineering Center The al Power Department, TEPCO. EM: ishimaru.toyvhiko(ateDco.co.jpi;•
S.4 LTel: +80-3-6373-4101; Cell: L b)(6)4{ LTC Martinez asked for this informatO'n so that USAID in Tokyo couldverify the request. I left LTC Martinez a VM, but if you have her e-mail, I would appreciate an assist in closing this loop.
Attached are the specs for the generator sets. I am sure you will have questions, so when you are ready, I will schedule acall with the people who are more technically familiar with the gensets.
From: RMTPACTSUELNRC .[mailto:RMTPACTSUELNRC@ 9fda.gor JSent: Tuesday, March 15, 2011 11:43 AM -n
3
To: Douglas, Richard (GE Aviation, US)Subject: RE: Contact Data -- Please confirm receipt Thanks.
Received all e-mails are good.
From: Douglas, Richard (GE Aviation, US) mailto:[email protected]. -a-Sent: Tuesday, March 15 2011 11:43 AMTo: RMTPACTSU ELNRC;ia'[email protected]• 4 -Subject: Contact Data -- Please confirm receipt Thanks.
Rich Douglas
Vice PresidentItemational ProgramsT 202-637-4212F202-637-4412
CC (b)(6)E Richard.Douglas I lge.com \
1299 Pennsylvania Avenue, NWSuite 900Washington, DC 20004-2407GE Aviation
4
McKelvey, Harold
From: LIA04 HocSent: Wednesday, March 16, 2011 6:16 PMTo: OST05 Hoc; Barker, Allan; Browder, Rachel; Erickson, Randy; Logaras, Harral; Maier, Bill;
McNamara, Nancy; Tifft, Doug; Trojanowski, Robert; Woodruff, Gena; Collins, Elmo; Dean,Bill; Heck, Jared; McCree, Victor; Satorius, Mark; Flannery, Cindy; Lukes, Kim; Noonan,Amanda; Rautzen, William; Rivera, Alison; Ryan, Michelle; Turtil, Richard; Virgilio, Rosetta
Cc: Piccone, Josephine; Jackson, DeborahSubject: FW: Japan event links and statement excerpts from the States of Alaska, Washington,
Oregon, California and Hawaii; and EPA RadNet Info
Thank you Harral.
Everyone else: here are State statements from today.
Richard TurtilState Liaison - Liaison TeamIncident Response Center
From: Logaras, HarralSent: Wednesday, March 16, 2011 4:32 PMTo: OST05 Hoc; LIA04 Hoc; LIA07 HocCc: Heck, Jared; Pederson, Cynthia; Barker, Allan; Lynch, James; [email protected]; Reynolds,Steven; Boland, Anne; West, Steven; Holt, BJSubject: FW: Japan event links and statement excerpts from the States of Alaska, Washington, Oregon, California andHawaii; and EPA RadNet Info
Please see the forwarded message from our counterpart at U. S. EPA Region V.
Sincerely,
Harral LogarasU. S. NRC Region IIIRegional Government Liaison630-829-9659
Unk to the Award Winning NRC Information Digest htti://www.nrc.gov/reading-rm/doc-
collections/nuregs/staff/sr1350/v22/sr1350v22.pdf
Link to NRC Fact Sheets and Brochures http:Z/www.nrc.&ov/readinR-rm/doc-collections/fact-sheets/
From: [email protected] [mailto:[email protected]]Sent: Wednesday, March 16, 2011 3:06 PMTo: Barker, Allan; Logaras, Harral; VanHorn, Christine; [email protected]; Jeffry McSpaden-Federal Highway Admn.;[email protected]; [email protected]; Evans, Rachel T; Adrianopoli, Carl(HHS/ASPR/OPEO); Bates, Kerris; Bebrich, Carl; Bellone, Christopher; Crackel, Clint; Diaz, Edward; Fulk, Deborah;Gemskie, Todd; King, James; King, William; Kinsley, Delwyn; Naskrent, Gary; Nettles-Bey, Rosie; Ortman, David;Rabenhorst, Karl; Scott, Kara; Simpson, John; Sturghill, Carolyn; Tulley, Stephen; Warren, Dwaine;[email protected]; [email protected]; [email protected]; [email protected]; ThomasHiginbotham; William Conway; King, WilliamCc: [email protected]; [email protected]; [email protected];
52
Tyson. [email protected]; [email protected]: FYI: Japan event links and statement excerpts from the States of Alaska, Washington, Oregon, California andHawaii; and EPA RadNet Info
Following up with Bill King's recent email, here's what some of the States and U.S. EPA are saying.
Japan event links and statement excerpts from the States of Alaska, Washington, Oregon, California and Hawaii
Alaskahttp:llwww.hss.state.ak. uslpressI201 1/Reactor Dr 031511 .pdfhttp://www.hss.stateak.us/prepared/radiological.htm"The State of Alaska, along with our Federal counterparts, is continually monitoring the situation in Japan regarding theirnuclear reactors. According to officials, at this time there is no immediate or anticipated threat of nuclear radiationreaching Alaska. We will continue to monitor the situation and notify the public through regular media channels and this.website should the situation change.
Washingtonhttp:/lwww.doh.wa.govlTopicsl/apan-faq.htm"We don't expect significant levels of radioactivity in our state, and there's no health risk. Japan is thousands of miles fromour state, and if radioactivity from the reactors there is released to the upper atmosphere it would be thinned-out by thewinds before it could reach us. We could see a very small increase in radiation levels - well below levels that would be ahealth concern. We're working with federal, state, and local agencies in a coordinated effort to monitor radiation levels inthe air and rain water."
Oregonhttp://lublic.health.oregon.,ovlPreparedness/CurrentHazards/Pagesfindex.asoxhttp:/public.health.ore'on.'gov/Preparedness/CurrentHazards/Documents/Factsheets/factshe~et-iapan-event.pdfhttp://Oublic.health.oregon.gov/Preparedness/CurrentHazards/Documents/Factsheetsloa-iapan-event. odf"No Health Risk to Oregon from Japanese Radiation Events"
Californiahttp://www.cdph.ca.,ovlPaqes/CDPHCalEMAstatementMarch 152011 .aspxhttp:/hvww.6calema.ca.qovfWebPaqe/oeswebsite.nsf/Content/l E69ED3C8DE1 65DB882576D70062B6FE?OpenDocumenthttp://calemanews.wordpress.comI2011/03/16/statement-from-california's-department-of-public-health-and-emergency-manaoement-aqency-on-risk-of-radiation-exposurel"We urge Californians to not take potassium iodide as a precautionary measure. It is not necessary given the currentcircumstances in Japan, it can present a danger to people with allergies to iodine, shellfish or who have thyroid problems,and taken inappropriately it can have serious side. effects including abnormal heart rhythms, nausea, vomiting, electrolyteabnormalities and bleeding."
Hawaiihttp:l/hawaii..ov/health/aboutlor/pressdate. html"The DOH Indoor and Radiological Health Branch (IRHB) is closely monitoring information on the radiation release, andwith the current size of the release and the distance from Hawaii, no public health risk to the state is expected.""The DOH in partnership with the U. S. Environmental Protection Agency has a system in place for ambient monitoring forradioactive dust. The system (RADNET) looks at real-time data as well as particulate sampling (from monitors located onthe islands of Oahu and Hawaii) which are analyzed by the DOH and at a laboratory in Alabama. At this time, thedepartment has no indication of any readings above normal background levels and does not expect any "spikes" due tothe limited amount of material released and the current environmental conditions."
U.S. EPA: Japanese Nuclear Emergency: Basic Radiation Facts From EPAhttp://www.epa..ov/radiation/http:lNwww.epa.ov/radiation/statement.html
53
EPA Statement on Air Monitoring Effort: "As the Nuclear Regulatory Commission has said, we do not expect to seeradiation at harmful levels reaching the U. S. from damaged Japanese nuclear power plants. As part of the federalgovernment's continuing effort to make our activities and science transparent and available to the public, theEnvironmental Protection Agency (EPA) will continue to keep all RadNet data available in the current online database. Inaddition, EPA plans to work with its federal partners to deploy additional monitoring capabilities to parts of the westernU.S. and U.S. territories."
Eugene Jablonowski, Health PhysicistU.S. EPA Region 5 Emergency Response77 W. Jackson Blvd. (SM-5J)Chicago, IL 60604•l•?), RRi-49I office
(b)(6) [cell <-- NEW3) 692-24 6 6 fax
jablonowski.eugene@epa gov
54
WNW="
Valentine, Nicholee
From: Bowman, EricSent: Wednesday, March 16, 2011 1:44 PMTo: Rosenberg, Stacey; Quay, Theodore; McGinty, TimSubject: FYI: INPO Event Report Level 1 on Japanese EarthquakeAttachments: Fukushima Daiichi Fuel Damage IER LEVEL 1 Final.pdf
FYI.
V/R Eric
From: Thomas, EricSent: Wednesday, March 16, 2011 1:43 PMTo: King, Mark; Thorp, John; Brown, Frederick; Leeds, Eric; Boger, Bruce; Grobe, JackCc: Rihm, Roger; Bowman, Eric; Gray, Kathy; Garmon-Candelaria, DavidSubject: INPO Event Report Level 1 on Japanese Earthquake
We Will post this to the INPO Documents link on the OpE Gateway as soon as possible.
Eric
U.S. Nuclear Regulatory CommissionNRR/DIRS/IOEBOWFN-7E24eric.thomase nrc.gov301-415-6772 (office)
S (b)(6) l(mobile) -,
/3%
To:Cc:SubjectDate:Attachmefts:
Importance:
VirnligRos.1W; Pire osvne
FW: INPO'EMNT and Chadmaan QuestiosWednesday, March 16, 2011 12:55:00 PM2WeApru A3 16.do,,,INPOEntt 5•(1E'R [L1-.111 -l•lHigh
Josie and Rosetta,
I••[-, j' _, lL .,• r••;:•
Eric ). Leeds, Director
Office of Nuclear Reactor Regulation
U.S. Nuclear Regulatory Commission
301-415-1270
From: Nguyen, QuynhSent. Wednesday, March 16, 2011 12:44 PMTo, Leeds, EricSubject. INPO EVENT and Chariman QuestionsImportance: High
Again, it's a work in progress... but SharePoint will help to unclog our email system.
http:/portal.nrc.gov/edonrr]NRR%/ý F220ccurng%2n a s/Aitems.asp
From: Nguyen, QuynhSent: Wednesday, March 16, 2011 11:48 AMTo: Meighan, SeanSubject:Importance: High
From:
To:
Cc:
Subject:Date:Attachments:
Cherry. Ronald CJaoanEmbassy, TaskForceAlan Remick; Aleshia Duncan Duncan, Aleshia 0; Travo. James; James Trapo (BB); Mears. Jeremy M; Morales.Russell A Uses. Anthony(SBU) FN: List of requestsWednesday, March 16, 2011 3:06:18 AMlist of reouests(0316"d•ocx
SBUThis email is UNCLASSIFIED.
From: YAMADA KAZUMI [mailto:[email protected]]Sent: Wednesday, March 16, 2011 3:02 PMTo: Cherry, Ronald CCc: Cipullo, Timothy L; Duncan, Aleshia D; Walsh, Cody C; Berger, Claire; Hinds, Lynda J; Walcott,Naomi; [email protected]; Wall, Marc M; Zumwalt, James P; Basalla, Suzanne ISubject: List of requests
Dear M r. Cherry,
I will give you a call on this.
Kazumi Yamada
Cartwright, William N,
From: Thomas, EricSent: Wednesday, March 16, 2011 11:55 AMTo: Donges, Amanda L. (INPO)Subject: RE: INPO IER Li on Japanese Earthquake
The EDO is down with our Chairman on Capitol Hill. He sent an email to his staff saying he had not seen thedoc (may be a Blackberry issue). At any rate, I've got many people asking for it and I'd rather not bug him anymore since he has higher priority concerns right now.
If you can forward the IER to me I'd really appreciate it.
Thanks, Eric
Eric ThomasU.S. Nuclear Regulatory CommissionNRR/DIRS/[email protected] (office)
(b)(6) (mobile)
--- Original Message---From: Donges, Amanda L. (INPO) [mailto:[email protected]]Sent: Wednesday, March 16, 2011 11:09 AMTo: Thomas, EricSubject: RE: INPO IER Li on Japanese Earthquake
Eric,The report should have been provided to your EDO; however, if this is not the case I will send you the
document. Have a wonderful afternoon. I look forward to speaking with you or meeting you in the near future.
Very Respectfully,Amanda L. DongesInstitute of Nuclear Power OperationsSection Mgr, Events Analysis(770) [email protected]
----- Original Message----From: Thomas, Eric [mailto:[email protected]]Sent: Wednesday, March 16, 2011 8:55 AMTo: Donges, Amanda L. (INPO)Subject: INPO IER Li on Japanese Earthquake
Amanda,
Can you please send me this report when you get a chance?
Thanks, Eric
Eric ThomasU.S. Nuclear Regulatory Commission21
Fromn: Rihm. RogerTo: Borchardt, BillCc: Thomas, EricSubject: FW: INPO IER Li ReportDate: Wednesday, March 16, 2011 8:00:00 AM
Bill, I understand you will be downtown all day. NRR would like to get its hands on the INPOIER LI that we understand you have. They want it for internal use only. Can you pass along at yourconvenience?
----- Original Message -----From: Thomas, EricSent: Tuesday, March 15, 2011 6:33 PMTo: Boger, BruceCc: Rihm, Roger; Pannier, Stephen; Brown, FrederickSubject: INPO IER Li Report
Bruce,
Looks like Bill Borchardt has the INPO Doc. If we can get it electronically I will post it to our website.
Roger, please let me know if you can provide an electronic copy. I will get the INPO warning on it andload it to the Operating Experience Gateway.
Thanks, Eric
----- Original Message -----From: Nielsen, Rick M (INPO) [mailto:[email protected]]Sent: Tuesday, March 15, 2011 6:11 PMTo: Thomas, EricSubject: Re: Industry Efforts
. Btw, the IER LI was sent to EDO by Bill Webster about an hour ago.
Rick
Sent from my iPhone
On Mar 15, 2011, at 5:18 PM, "Thomas, Eric" <[email protected]<mailto:Eric.Thomas(•nrc.gov>>wrote:
Hi Rick,
Please see below. Is there a new POC for me to contact so I can get a hold of the IER when it becomesavailable?
Thanks, Eric
From: Boger, BruceSent: Tuesday, March 15, 2011 5:04 PMTo: Leeds, Eric; Grobe, Jack; Ruland, WilliamCc: Dean, Bill; Lew, David; McCree, Victor; Wert, Leonard; Satorius, Mark; Pederson, Cynthia; Collins,Elmo; Howell, Art; Virgilio, Martin; Thomas, Eric; Brown, FrederickSubject: Industry Efforts
.T spoke with Randy Edington (CNO Palo Verde) and later with Steve Nichols (INPO) regarding industry.- tions as a result of the situation in Japan. The CNOs teleconferenced over the weekend and agreed
to a series of near-term actions. INPO issued a Level 1 Event Report (highest level) to its members this
(b)(4)
INPO is figuring out how quickly they will be able toshare the report with us. The report won't be available to the public, but we can share it internally.
.DISCLAIMER:This e-mail and any of its attachments may contain proprietary INPO or WANO information that isprivileged, confidential, or protected by copyright belonging to INPO or WANO. This e-mail is intendedsolely for the use of the individual or entity for which it is intended. If you are not the intended recipientof this e-mail, any dissemination, distribution, copying, or action taken in relation to the contents of andattachments to this e-mail is contrary to the rights of INPO or WANO and is prohibited. If you are notthe intended recipient of this e-mail, please notify the sender immediately by return e-mail andpermanently delete the original and any copy or printout of this e-mail and any attachments.Thank you.
From: Borchardt. BillTo. Rihm. RogerSubject: Re: INPO IER Li Report
Date; Wednesday, March 16, 2011 9:29:49 AM
I don't have the INPO documentBill BorchardtVia blackberry
-- --- Original Message -----From: Rihm, RogerTo: Borchardt, BillSent: Wed Mar 16 07:51:32 2011Subject: Fw: INPO IER Li Report
Sent from an NRC BlackBerryRnraer S. Rihm
-- --- Original Message -----From: Thomas, EricTo: Boger, BruceCc: Rihm, Roger; Pannier, Stephen; Brown, FrederickSent: Tue Mar 15 18:33:06 2011Subject: INPO IER Li Report
Bruce,
Looks like Bill Borchardt has the INPO Doc. If we can get it electronically I will post it to our website.
Roger, please let me know if you can provide an electronic copy. I will get the INPO warning on it andload it to the Operating Experience Gateway.
Thanks, Eric
--- -- Original Message -----From: Nielsen, Rick M (INPO) [mailto:NielsenFM6INPO.org]Sent: Tuesday, March 15, 2011 6:11 PMTo: Thomas, EricSubject: Re: Industry Efforts
Btw, the IER Li was sent to EDO by Bill Webster about an hour ago.
Rick
Sent from my iPhone
On Mar 15, 2011, at 5:18 PM, 'Thomas, Eric" <[email protected]<mailto:Eric.Thomasanrc.gov>>wrote:
Hi Rick,
Please see below. Is there a new POC for me to contact so I can get a hold of the IER when it becomesavailable?
Thanks, Eric
From: Boger, BruceSent: Tuesday, March 15, 2011 5:04 PMTo: Leeds, Eric; Grobe, Jack; Ruland, WilliamCc: Dean,. Bill; Lew, David; McCree, Victor; Wert, Leonard; Satorius, Mark; Pederson, Cynthia; Collins,Elmo; Howell, Art; Virgilio, Martin; Thomas, Eric; Brown, FrederickSubject: Industry Efforts
I spoke with Randy Edington (CNO Palo Verde) and later with Steve Nichols (INPO) regarding industryactions as a result of the situation in Japan. The CNOs teleconferenced over the weekend and agreedto a series of near-term actions. INPO issued a Level 1 Event Report (highest level) to its members this
~(b)(4)
I NPO is figuring out h~ow quickly tney will De aole Lo
snare the report with us. e repo won t e available to the public, but we can share it internally.
.DISCLAIM ER:This e-mail and any of its attachments may contain proprietary INPO or WANO information that isprivileged, confidential, or protected by copyright belonging to INPO or WANO. This e-mail is intendedsolely for the use of the individual or entity for which it is intended. If you are not the intended recipientof this e-mail, any dissemination, distribution, copying, or action taken in relation to the contents of and.attachments to this e-mail is contrary to the rights of INPO or WANO and is prohibited. If you are notthe intended recipient of this e-mail, please notify the sender immediately by return e-mail andpermanently delete the original and any copy or printout of this e-mail and any attachments.Thank you.
From:
To.Subject:Date:
Trapo. JamesBrown. EvaRE: Status as of 1516 JPTWednesday, March 16, 2011 2:35:58 AM
Unit 3 is Primary Containment ok?
From: Brown, EvaSent: Wednesday, March 16, 2011 2:16 AMTo: Trapp, James; Ulses, AnthonyCc: RST01 HocSubject: Status as of 1516 JPT
Jim,
As a follow-up to our earlier, this is the info we received from GEH about 4 hours ago (-11:52a JPT):
.4' 1 ~ ~ <~~444 ~"4~"
4~' ~; 5~ (4
A ~ ~ 4444 ., '4 4. ~- ~ .~: ~ ~ 4'
4444 ~4 .. ,. 4- '~''~'"'4~ ' 44 4
'~''r'w 44,,44 4
4' **~''*v4'~''~ ~ - .444 4~
4'4 ~4'4 4
44 4 4'
4 '4444~ '44(44~
.4
4'
'4 4
4< "4'44" '444.
44, .. '4 '4"4 4" 4'' -,
"4 'Ž 4I - -
'4 4 I ''¼
' 44 -~ 4 ' 4 '4
Eva Brown, RST BWR Systems and Ops AnalystNuclear Regulatory Commission(301) 816-5516
From:
To:
Subject:Date:
Trapo. JamesBrown, EvaRE: Status as of 15:59 JPTWednesday, March 16, 2011 3:40:05 AM
Could I get a copy of our SITREP to Cherryrcqstate.gov
Thanks
From: Brown, EvaSent: Wednesday, March 16, 2011 3:07 AMTo: Trapp, James; Ulses, AnthonySubject: FW: Status as of 15:59 JPT
Eva Brown, RST BWR Systems and Ops AnalystNuclear Regulatory Commission(301) 816-5516
Je7l)jeý'
From: Witck. BranTo: Ncuvens uvh Meighan. Sean; Andersen Jamos; Vir ilo. M Werbr. Michael; Muessle. Mry;Willia.
Merzke. Daniel
Cc: 0113 DistributionSubject: FW: Release of INPO Event Report Level 1 -- Fukushima Daiichi Nuclear Station Fuel Damage Caused by
Earthquake and TsunamDate: Wednesday, March 16, 2011 7:41:44 AMAttachments: INPO Event Reoort ([ER) LI-11-1.Ddf
Importance: High
Attached please find the INPO Level 1 Event Report
Brian WittickExecutive Technical Assistant for ReactorsOffice of the Executive Director for OperationsU.S. Nuclear Regulatory Commission301-415-2496 (w)q (b)(6) jc)
From: Mortensen, George K (INPO) [mailto:[email protected]]Sent: Wednesday, March 16, 2011 6:10 AMTo: Boger, Bruce; Wittick, BrianSubject: FW: Release of INPO Event Report Level I -- Fukushima Daiichi Nuclear Station Fuel DamageCaused by Earthquake and TsunamImportance: High
Bruce,Attached is the INPO Event Report - Level 1 (previous SOER level document) released by INPO toU.S. utilities yesterday. Please be advised that this voluntarily provided document is copyrightedand Limited Distribution, and is not~releaseable to the public (even under FOIA requests) as it hasbeen granted exclusion from FOIA under the previous Affidavit sent and accepted by the NRC.
Please contact me with any specific questions, we are sending the document to you directly toexpedite the normal document routing process through NRC's Operating Experience branch. It is.my understanding that a copy was also sent yesterday (from Bill Webster) to the EDO.
Best Wishes!George MortensenINPO - External Relations Program Manager
From:Sent:To:Subject:Attachments:
Hoc, PMT12Wednesday, March 1.6, 2011 1:56 PMPMTERDS HocSenior Leadership Brief Earthquake - Tsunami - Japan (Morning mar 16 11)Senior Leadership Brief Earthquake - Tsunami - Japan (Morning mar 16 11).docx
I
'?s2&'f
UNcLASS&rIED,'.FoR rrCIL ýNL
PMT Briefing Sheet for ETEarthquake-Tsunami-JapanMorning EDT 16 Mar 2011
RASCAL Information" On 3/15/11 the PMT ran RASCAL offsite dose estimations for a hypothetical x-
vessel core failure with loss of containment at a BWR with loss of containment.Two estimates were run: 1) no change in wind direction (wind toward Tokyo), and 2)with the predicted wind shift counterclockwise over the island and back out to sea.For the steady wind direction scenario PAGs (>1 rem TEDE and >5 rem CDE) were
exceeded at 50 miles beyond Unit 2. For the wind shift scenario, PAGs wereexceeded between 30 to 40 miles.
* Another RASCAL run with assumptions to model the Fukushima Unit 4 SFP wasupdated to reflect a spent fuel inventory of 1331 bundles. Since observedmeteorological data is unavailable, forecast meteorological data is unavailable,forecast meteorological data for the 24 hour release period, which indicates wind
shifting offshore, were used. For the met conditions utilized, at 20 miles, the PAGfor TEDE is 1.4 rem, which is slightly above the 1 rem PAG. At 30 miles, the TEDEis 0.9 rem.
" As of 1900 EDT on 3/15/11 we believe the runs are bounding for all four units. ThePMT is working to update the RASCAL run for the Unit 4 SFP, using actual
meteorological parameters. The source term was sent to NARAC at 02:00 on
3/16/11.
" On March 16, 0030 EST, the PMT ran RASCAL offsite dose estimations for ahypothetical Unit 4 spent fuel pool zirconium fire scenario, and considering actualand forecasted meteorological conditions for 24 hours. Assumptions wereconservative. PAGs for TEDE and CDE extended out beyond 40 miles based onthis hypothetical scenario. Talking notes were generated to provide for potentialdiscussion with the US Ambassador to Japan regarding protective actionrecommendations for US citizens in Japan. Run from 06:54 on 3/16/11 of U2
* 3/16, 06:54: New worst case run for Fukushima done by NRC:o Based on call at 05:15 with Moninger that all 4 SFP are not cooling; U4 can't
contain watero U2 reactor: 33% core damage, no containmento U3 SFP: 50% melt, 1 fresh fuel batcho U4 SFP: 100% melt (full core, 3 fresh fuel batches)
" NARAC results of 06:54 ESTo Combined source terms result in PAGs exceeded at 50 miles
TEDE 24 remCDE thyroid 130 rem
O 50 miles is the limitation of RASCALPage 1 of 4
-44CLASSIF!EDIIF4W OFFIC4IAL U6E ON-Y-
,.NCL,.tigill- ItLI/FOR Ut-i~iAL USE. ON"LY
o The results of this run were the basis for recommending to the ET on 3/15/11at 07:00 to change the PAGs. to 50 miles and to move Americans.
" RequestedNARAC to do 06:54 runbeyond.50 miles" 3/16/11, 09:50 EST: RASCAL run sent to NARAC
o U2 33% core melt, no containment
o U3 33% core melt, no containmento U4 SFP 100% melt, source term, no containmento We expect NARAC to use the source term from all three and go out to 100
miles'-Request to NARAC: If any other NARAC runs you are doing involve projections forWest Coast of the United States, please provide as soon as possible
* Next requesto We expect to send another run with the entire fuel inventory from these units
but the old fuel only contributes about 1% to the dose. We are QC'ing this
data now.
.NARACs: prionity is to run four cores loaded with radioactive material. They willgive us these results.
Onsite Information* Unconfirmed reports of 30 R/hr at the Unit 4 SFP which is making fire fighting
difficult (Mar 15). Another fire at Unit 4 SFP." IAEA report 17:40 UTC on 3/15/11
o Highest reading at fence was 60 mrem/hour at 0600 UTC
o Reduction of dose rates after the peak at 01:22 UTC (400 mSv/hr in areasurrounding Unit 3) on 3/15/11.
o 30 mSv/hr between Units 2 & 3, and 100 mSv/hr surrounding Unit 4.
* 10:27 pm EST - dose info came in from DTRA. GIS will figure out locations.
* Unit 4 SFP is dry* Unit 5 SFP loaded, losing water, getting power from Unit 6 to continue coverage* Additional SFP located at Unit 4 at grade
Offsite Radiological Information" IAEA report 17:40 UTC on 3/15/11
o Measured in Tokai on the coast 100 km NE of Tokyo on 3/14/11 at 22:45UTC was 5 uSv/hr.
" Japan's Nuclear and Industrial Safety Agency reported 160 people were exposed toradiation around the Fukushima nuclear power plant (mar 14).
* 170,000 people have been evacuated (Mar 14).* A no fly zone was implemented 30 km from the site from zero to unlimited altitude.
Source from DOE NIT who talked with FAA.
Protective MeasuresPage 2 of 4
..... ,,--,,,,-,,,E D --- -. -, ,-U'I-"LY
-UNCLA3SIFiI~ihII-uK cFF;CIAL USE ONLY
Japanese government instructed evacuation for local residents within a 20 kmradius of the site boundary and sheltering in place out to 30 km around theFukushima Daiichi Unit 1 plant. It is also understood that the Japanese governmentissued KI to residents. As of 1830 on 3/15/11 there have been no updates toprotective actions. It is our understanding that protective measures are from thesite boundary.
On March 16, 0030, the PMT ran RASCAL offsite dose estimations for ahypothetical Unit 4 spent fuel pool zirconium fire scenario, and considering actualand forecasted meteorological conditions for 24 hours. Assumptions wereconservative. PAGs for TEDE and CDE extended out beyond 40 miles based onthis hypothetical scenario. This run is the basis for our recommendations to moveAmericans and to change EPZ to 50 miles.Recommendations from Chairman and Admiral Donald 07:00 3/16/11
(b)(5)
Meteorological InformationExtended Weather Forecast for Fukushima Japan AreaGenerated Wed. 3/16/2011 (1100)From PMT01 .HOC NRC Headquarters Rockville, MD
Extended Forecast Wednesday thru Saturday:Westerly (off-shore) winds, fluctuating from SW - NW, generally 10-20 mph.
Sunday, during the day:Expect winds to turn onshore, from the SSE - ESE, generally light, 3-11 mph.
Sunday Night and Monday:Winds should turn back offshore, from the SW - NW, 4-14 mph.Actions
Continue to collect updated dose rate information from these sources:o DOE routine calls (next at 01:00am 3/16/11 EST)o USS George Washingtono IAEA datao DOE conflict management and AMS teamso NRC staff in Japano DOE situation reporto SIPRNET from the HOO
Page 3 of 4
"UNGLAS;•,I-tI=U/IOurN ,F.,,F.'I''IA USE ...... n~L
Flight Datao Obtain status of AMS flighto Request AMS flight data
* Update of the worst case plume model to ET
* Q&A from the ET: Doses reaching west coast: Make the link between thetrajectory data we get from NOAA with the models from NARAC on the doses thatwill reach the west coast.
o NOAA is routinely sending NRC Hysplit model details showing forwardtrajectories from Japan. These models show that the trajectory will loop uptowards North America.
Page 4 of 4
..... ,Ar:FIED/:O OFIFICIAL II1SlF ONLYI
From:Sent:To:Subject:Attachments:
Close hold
Droggitis, SpirosWednesday, March 16, 2011 8:27 AMSchmidt, Rebecca; Powell, AmyFW: NRC Recommendations (Revised)
Recommendations.doc
From: LIA06 HocSent: Wednesday, March 16, 2011 8:25 AMTo: Droggitis, SpirosSubject: FW: NRC Recommendations (Revised)
These are close hold and were sent to the White House, DOE and Chuck Casto this morning after being communicatedby Chairman Jaczko to the White House Situation Room (Brennan and McDonough-sp?).
From: ET02 HocSent: Wednesd Mch 16 2011 7:25 AMTo: Miller, Chris; [ )6 LIA06 HocSubject: NRC Recommendations (Revised)
I
-k
From:To:
Cc:Subject:Date:
Attachments:
(b)(6)
Weber. Michael Virailio. Martin; Borchardt, Bill; McDermott. Brian Mamish. Nader :4 points on protecting us personnel and actions needed for Dal-ihi reactors
Wednesday, March 16, 2011 7:28:40 AMRecommendations.doc
ý, ýIlt 6
- ,-~-- -~Th~r~L
From:Sent:To:Cc:Subject:Attachments:
LIA06 HocWednesday, March 16, 2011 7:35 AM
Casto, ChuckMiller, Chris; McDermott, BrianFW: NRC Recommendations (Revised)Recommendations.doc
This is the latest....sent to NR, White House, DOE....Close Hold, can share with Ambassador. Full Alignment on messages.
Tom Blount
From: ET02 HocSent: Wednesday, March 16, 2011 7:25 AMTo: Miller, Chrisl (b)(r ) ,; LIA06 HocSubject: NRC Recommendations (Revised)
I ý C//ý ý-
David Decker
From: Droggitis, SpirosSent: Wednesday, March 16, 2011 7:18 AMTo: Powell, Amy; Dacus, Eugene; Decker, David; Weil, Jenny; Riley (OCA), Timothy; Shane,
RaeannCc: Schmidt, RebeccaSubject: Re: Q&As re: Japan
(b)(5)
From: Powell, AmyTo: Droggitis, Spiros; Dacus, Eugene; Decker, David; Weil, Jenny; Riley (OCA), Timothy; Shane, RaeannCc: Schmidt, RebeccaSent: Wed Mar 16 07:11:36 2011Subject: Re: Q&As re: Japan
Yes, I noticed that we time traveled a bit...
Amy PowellAssociate DirectorOffice of Congressional AffairsU. S. Nuclear Regulatory CommissionPhone: 301-415-1673
Sent from my Blackberry
From: Droggitis, SpirosTo: Powell, Amy; Dacus, Eugene; Decker, David; Weil, Jenny; Riley (OCA), Timothy; Shane, RaeannCc: Schmidt, RebeccaSent: Wed Mar 16 07:07:25 2011Subject: Re: Q&As re: Japan
This is great, except for the error in the first line - the date.
From: Powell, AmyTo: Droggitis, Spiros; Dacus, Eugene; Decker, David; Weil, Jenny; Riley (OCA), Timothy; Shane, RaeannCC: Schmidt, RebeccaSent: Wed Mar 16 06:06:40 2011Subject: Q&As re: Japan
Attached is a document of Q&A responses prepared by OPA and technical experts in the Ops Ctr. We CANNOT send thisdocument in its entirety down to the Hill as is, but we can use it to respond to individual questions. I know that we "owe"answers to questions to a number of staffers. Please read through here and see if answers are provided to questions thatcame into you anf get back to the requesting staff. This may also help those of you in the Ops Ctr with calls.
606 ý
Questions that speculate about what could happen, compare Japan regs with US, and other speculative Qs are NOTincluded here. Just not the focus now.
ThanksAmy
Amy PowellAssociate DirectorOffice of Congressional AffairsU. S. Nuclear Regulatory CommissionPhone: 301-415-1673
Sent from my Blackberry
From: Harrington, HollyTo: Coggins, Angela; Taylor, RobertCc: McIntyre, David; Schmidt, Rebecca; Powell, AmySent: Tue Mar 15 21:51:03 2011Subject: RE: Japanese-Rx-Incident addtl questions - March-14-2011 doc.docx
Angela, Amy, Becki - These are fully approved by relevant folks in the Op Center. For your use. I have notadded to WebEOC yet as it's not clear these should also be used by others...
From: Coggins, AngelaSent: Tuesday, March 15, 2011 8:36 PMTo: Taylor, RobertCc: Harrington, Holly; McIntyre, David; Schmidt, Rebecca; Powell, AmySubject: Re: Japanese-Rx-Incident addtl questions - March-14-2011 doc.docx
Thanks so much!! I appreciate all the effort!Angela CogginsPolicy DirectorOffice of Chairman Gregory B JaczkoUS Nuclear Regulatory Commissionanqela.coqcinscnrc.pov/301-415-1828
From: Taylor, RobertTo: Coggins, AngelaCc: Harrington, Holly; McIntyre, David; Schmidt, Rebecca; Powell, AmySent: Tue Mar 15 20:29:17 2011Subject: Japanese-Rx-Incident addtl questions - March-14-2011 doc.docx
Angela,
We have done our best to incorporate your questions into the Chairman's Q&As that were developed earliertoday and provided to OCA. The updated set of Q&As is undergoing ET review and we will hopefully have it toyou in the near future. The attached provides a roadmap of where we believe the responses can be found. Afew questions fell into the broader "After this event is over, we will determine what changes need to be made inthe US" message. I did not directly incorporate them, but you can see a draft response in the attached.
Regarding the third question about past events, I did not try to evaluate all of the events you listed. I wouldpropose sticking to the party line, in that, "The NRC routinely reassess its regulatory requirements in light ofnew operating experience and plant events."
Regards,
607
From: oninger. John .To: RSTOt H1; I Rulnd. Wiic; amSubject: Fw: Sketch of Temp SF Pumping SystemDate: Wednesday, March 16, 2011 6:36:58 PM
Attachments: Temo Soent Fuel Pumoing System. df
See below.
John Monningejr
(b)(6)
From: RST01 HocTo: Kolb, Timothy; Casto, Chuck; Cook, William; Nakanishi, Tony; Foster, Jack; Trapp, James;Monninger, John; Smith, Brooke; Foggie, Kirk; Ulses, AnthonyCc: RST01 HocSent: Wed Mar 16 12:19:59 2011Subject: Sketch of Temp SF Pumping System
FYI:
Japan Gov Request for Pumping Assets to cool fuel pool.
Requested 4 trains of mobile pumps including the following
4 each Diesel Sea Water Suction pump with Strainer.
4 each Diesel Booster Pumps.4 each Diesel Spray Pumps. lOOm Length SOm High
Provide approximately 500 gpm water flow to Fukushima Daiichi Spent Fuel Pools.
Diesel Fuel tanks and Fuel to support pump trains.
500 meters of Piping for 2 trains.700 meters of Piping for 2 trains.
People to assist in assembly of trains
20,000 # or more Boron
Back-up Systems including4 Pumper Trucks
Would also like Robots for High Rad work with camera capability.
~~~~j4 , oe O ( X ~ / C v J~o NE,
7oo A d ~l 4/ 1,J
50 mdl) hf~ i
K- /00~
7'oot,
I Oj'eje~
I0
5pf"ýIct? I 5f
500 y h,5v m
Oc 4,
t &U -evo,, 1
JA- 50 qe//00 y'
/ 4.- 700 Meley/,
Al50 /Lk e eJ O J'eo e M ~
(b)(6)
David Decker
From: Droggitis, SpirosSent: Wednesday, March 16, 2011 7:34 AMTo: Powell, Amy; Dacus, Eugene; Decker, David; Weil, Jenny; Riley (OCA), Timothy; Shane,
RaeannCc: Schmidt, RebeccaSubject: RE: Q&As re: Japan
Call has now ended. (b)(5)
From: Powell, AmySent: Wednesday, March 16, 2011 7:12 AMTo: Droggitis, Spiros; Dacus, Eugene; Decker, David; Weil, Jenny; Riley (OCA), Timothy; Shane, RaeannCc: Schmidt, RebeccaSubject: Re: Q&As re: Japan
Yes, I noticed that we time traveled a bit...
Amy PowellAssociate DirectorOffice of Congressional AffairsU. S. Nuclear Regulatory CommissionPhone: 301-415-1673
Sent from my Blackberry
From: Droggitis, SpirosTo: Powell, Amy; Dacus, Eugene; Decker, David; Weil, Jenny; Riley (OCA), Timothy; Shane, RaeannCc: Schmidt, RebeccaSent: Wed Mar 16 07:07:25 2011Subject: Re: Q&As re: Japan
This is great, except for the error in the first line - the date.
From: Powell, AmyTo: Droggitis, Spiros; Dacus, Eugene; Decker, David; Weil, Jenny; Riley (OCA), Timothy; Shane, RaeannCc: Schmidt, RebeccaSent: Wed Mar 16 06:06:40 2011Subject: Q&As re: Japan
Attached is a document of Q&A responses prepared by OPA and technical experts in the Ops Ctr. We CANNOT send thisdocument in its entirety down to the Hill as is, but we can use it to respond to individual questions. I know that we "owe"answers to questions to a number of staffers. Please read through here and see if answers are provided to questions thatcame into you anf get back to the requesting staff. This may also help those of you in the Ops Ctr with calls.
Questions that speculate about what could happen, compare Japan regs with US, and other speculative Qs are NOTincluded here. Just not the focus now.
ThanksAmy
Amy PowellAssociate DirectorOffice of Congressional Affairs
615
U. S. Nuclear Regulatory CommissionPhone: 301-415-1673
Sent from my Blackberry
From: Harrington, HollyTo: Coggins, Angela; Taylor, RobertCc: McIntyre, David; Schmidt, Rebecca; Powell, AmySent: Tue Mar 15 21:51:03 2011Subject: RE: Japanese-Rx-Incident addtl questions - March-14-2011 doc.docx
Angela, Amy, Becki - These are fully approved by relevant folks in the Op Center. For your use. I have notadded to WebEOC yet as it's not clear these should also be used by others...
From: Coggins, AngelaSent: Tuesday, March 15, 2011 8:36 PMTo: Taylor, RobertCc: Harrington, Holly; McIntyre, David; Schmidt, Rebecca; Powell, AmySubject: Re: Japanese-Rx-Incident addtl questions - March-14-2011 doc.docx
Thanks so much!! I appreciate all the effort!Angela CogginsPolicy DirectorOffice of Chairman Gregory B JaczkoUS Nuclear Regulatory Commissionanqela.cooQins(t)nrc.pov/301-415-1828
From: Taylor, RobertTo: Coggins, AngelaCc: Harrington, Holly; McIntyre, David; Schmidt, Rebecca; Powell, AmySent: Tue Mar 15 20:29:17 2011Subject: Japanese-Rx-Incident addtl questions - March-14-2011 doc.docx
Angela,
We have done our best to incorporate your questions into the Chairman's Q&As that were developed earliertoday and provided to OCA. The updated set of Q&As is undergoing ET review and we will hopefully have it toyou in the near future. The attached provides a roadmap of where we believe the responses can be found. Afew questions fell into the broader "After this event is over, we will determine what changes need to be made inthe US" message. I did not directly incorporate them, but you can see a draft response in the attached.
Regarding the third question about past events, I did not try to evaluate all of the events you listed. I wouldpropose sticking to the party line, in that, "The NRC routinely reassess its regulatory requirements in light ofnew operating experience and plant events."
Regards,Rob
616
From: Case. MichaeTo: Kammerer. AnnieSubject: RE: Seismic and Tsunami Hazard in PRADate: Wednesday, March 16, 2011 2:04:00 PM
Thanks. It would be at a fairly high level just to get everyone on the same page. You, ofcourse, are welcome to come and add depth. The question, BTW, are so good anduseful. I shipped the 3am version to Bill Dean in RI when he started to worry aboutquestions on Indian Point as a result of the story by the MSNBC guy. Maybe I'll see youtonite if you're still there on swing shift (I'm coming in at 11)
From: Kammerer, AnnieSent: Wednesday, March 16, 2011 12:29 PMTo: Case, MichaelSubject: RE: Seismic and Tsunami Hazard in PRA
everythin needed. But, I defer to yvu decisions. Jon and I will of course provideeveryinmgneeded. -
From: Case, MichaelSent: Wednesday, March 16, 2011 8:11 AMTo: Murphy, AndrewCc: Kammerer, Annie; Ake, Jon; Hogan, Rosemary; Richards, Stuart; Uhle, JenniferSubject: FW: Seismic and Tsunami Hazard in PRA
Hi Andy. Can you take the lead for this one in coordination with Annie and Jon? I sort ofsee an overview of where the agency is seismically and tsunamically (new word!) and howwe approach various issues (including PRA). I'd shoot for about a half hour presentationand a half hour for discussion with all the folks Jennifer indicated.
Shoot for early to mid next week?
From: Uhle, JenniferSent: Monday, March 14, 2011 5:09 PMTo: Coe, Doug; Sheron, Brian; Coyne, Kevin; Case, MichaelCc: Stutzke, Martin; Sancaktar, SelimSubject: RE: Seismic and Tsunami Hazard in PRA
Thanks. I am going to ask DE to put together an update on where we are withunderstanding tsunami hazard due to either seismic or landslide and all on this emailshould attend. Annie has the lead for tsunami and John Ake has it for GI-199. So, MikeCase, yours, right...
From: Coe, DougSent: Monday, March 14, 2011 4:59 PMTo: Sheron, Brian; Uhle, Jennifer; Coyne, Kevin; Case, MichaelCc: Stutzke, Martin; Sancaktar, SelimSubject: RE: Seismic and Tsunami Hazard in PRA
Hi all,My BB doesn't work here, but webmail does, so I'm following the discussions sporadically. GI-199
is based on recent 'best' understanding of seismology throughout the US. The information needed tounderstand plant-specific risk, last time I discussed with NRR, is expected to be collected from all USlicensees, including those on the West Coast. However, GI-199 doesn't specifically address relatedtsunami impacts, but it probably should for all coastal or near-coastal plants. The genericcommunciation is still being written by NRR with our support, so there is an opportunity to discuss thiswith NRR, and with DE. Clearly there will be a lot more attention on GI-199.Jennifer's restart basis question is a good one. In practice a licensee needs to determine fromengineering analysis that the stresses on the plant did not exceed their licensed limits. That would be avery tall order for a plant that experienced a beyond design basis quake, and probably is why it hadtaken Japan so long to restore the KK plants following the earlier quake.Doug
From: Sheron, BrianSent: Monday, March 14, 2011 3:27 PMTo: Uhle, Jennifer; Coyne, Kevin; Case, MichaelCc: Coe, Doug; Stutzke, Martin; Sancaktar, SelimSubject: RE: Seismic and Tsunami Hazard in PRA
The question is, did the Japanese also consider an 8.9 magnitude earthquake andresulting tsunami "way too low a probability for consideration"?
Look at GI-199. It shows we didn't know everything about the seismicity of CEUS. Andisn't there a prediction that a the West coast is likely to get hit with some huge earthquake
in the next 30 years or so? Yet we relicense their plants ...........
From: Uhle, JenniferSent: Monday, March 14, 2011 3:20 PMTo: Sheron, Brian; Coyne, Kevin; Case, MichaelCc: Coe, Doug; Stutzke, Martin; Sancaktar, SelimSubject: RE: Seismic and Tsunami Hazard in PRA
I think this highlights our need to get a better handle on external events hazards-ensure
that the tsunami hazard is way too low a probability for consideration. I know we are
updating our tsunami hazard for the east coast and gulf coast but did not think we were
doing recent work on the west coast. Has industry done anything on tsunami hazards?Also, has anyone done work to look at the effect of numerous cycles of low amplitude
acceleration following a larger event. I would expect we would have some informationbecause how do we know a plant would be fit to start back up after an event? We cannotpossibly do NDE on everything to determine if flaws have propagated to the point wherethey need to be replaced.
From: Sheron, BrianSent: Monday, March 14, 2011 3:05 PMTo: Coyne, KevinCc: Uhle, Jennifer; Coe, Doug; Stutzke, Martin; Sancaktar, SelimSubject: RE: Seismic and Tsunami Hazard in PRA
And so the first question is, "Should we make licensees consider a Tsunami coincident with
a seismic event that triggers the Tsunami?"
The second question is, How should we consider after-shocks in seismic hazard
analyses?
Valentine, Nicholee
From: Reed, Timothy -Sent: Thursday, March 17, 2011 1:35 PMTo: Inverso, Tara; Dudley, RichardCc: Helton, ShanaSubject: RE: Rescinding the Denial of PRM-50-76
I found Dick's email of June 10, 2010 -forwarding the same request. I also do not recall NRC doing anythingwith it. Frankly we do not have any substantive data out of Japan to change any of our previous decisions onthis. Unfortunately the data we do get - assuming we get some - will be confused by things like - addingseawater and: no instrumentation and hydrogen explosions etc.
From: Inverso, Tara , , ý.xSent: Thursday, March 17, 2011 1:20 PMTo: Dudley, Richard; Reed, TimothySubject: RE: Rescinding the Denial of PRM-50-76
Dick, Tim,
To the best of my knowledge, the staff was never directed to respond to the original e-mail (back in June, 2010)...unlessSECY somehow responded to him...
I think this is the first of many similar submittals. I'm expecting a lot of public comments when 50.46(b) is published...
Tara
From: Dudley, Richard %Sent: Thursday, March 17,'2d11 1:17 PMTo: Collins, Timothy; Reed, Timothy; Bajorek, Stephen; Scott, Harold; Mizuno, GearyCc: Helton, Shana; Inverso, TaraSubject: FW: Rescinding the Denial of PRM-50-76
I think we were all expecting something like this.
Tim Reed -See the requested revisiting of PRM-50-76.
Dick Dudley
From:1 (b)(6)
Sent: Thursday, March 17,2011 1:04 PM '
To: CHAIRMAN Resource; CMRSVINICKI Resource; CMROSTENDORFF Resource; CMRMAGWOOD Resource;CMRAPOSTOLAKIS Resource; Burns, StephenCc: Inverso, Tara; Helton, Shana; Tregoning, Robert; Miller, Barry; Carlson, Robert; Dudley, Richard; Clifford, Paul; Herr,Linda; Voglewede, John; Bell, HubertSubject: Fwd: Rescinding the Denial of PRM-50-76
Furthermore, you must cease delaying the review of PRM-50-93. The recent productionof hydrogen in Japan was initiated well below 2200 degrees Fahrenheit.
I
0 a
Bob Leyse (b)(6) I
Fromi (b)(6)To: chairman(dnrc..ov, cmrsvinickicnrc.qov, cmrostendorffOnrc.qov, cmrmaqwood(a•nrc..qov,cmrapostolakis(,nrc.qov, stephen.burns(,nrc..ovCC: Tara.lnversoenrc.gov, Shana.Helton cnrc.aov, Robert.Trec onin acg nrc. ov, baarr.millerDnrc. E ov,
Robert.Carlsoncnrc.qov, Richard. Dudley@,nrc.qov, Paul.Cliffordtonrc.qov, Linda. Herr(,nrc.qov,John.Vocqlewede(cnrc.aovSent: 6/10/2010 9:42:37 A.M. Mountain Daylight TimeSubj: Rescinding the Denial of PRM-50-76
To the Commissioners:
You are urged to direct the NRC staff to promptly write a document for yourapproval that rescinds the denial of PRM-50-76 that was published in the FederalRegister on September 6, 2005 (NRC-2002-0019-00130). The attachment to thise-mail, Rebuttal SECY-05-0113 Leyse R, has Leyse's rebuttal in 14 point typeinterspersed within the NRC's draft notice, SECY-03-0113, dated June 29, 2005.
Rescinding the denial of PRM-50-76 is vital. Under current regulations at1OCFR50.46(b)(1) and Appendix K to 1OCFR Part 50, our nuclear power plantslack sufficient measures to prevent runaway to meltdown when blowout occursduring a loss-of-coolant accident. The Baker-Just equation does not accuratelyand conservatively indicate the conditions under which an autocatalytic (runaway)oxidation reaction of Zircaloy begins.
Reference:
Appendix K to Part 50--ECCS Evaluation Models
I. Required and Acceptable Features of the Evaluation Models
5. Metal--Water Reaction Rate. The rate of energy release, hydrogen generation, and claddingoxidation from the metal/water reaction shall be calculated using the Baker-Just equation(Baker, L., Just, L.C., "Studies of Metal Water Reactions at High Temperatures, III. Experimentaland Theoretical Studies of the Zirconium-Water Reaction," ANL-6548, page 7, May 1962).
Robert H. Leyse
(b)(6)
2
King, Mark
From: Gray, Kathy,-Sent: Thursday, March 17, 2011 12:32 PMTo: Thomas, Eric; King, Mark; Thorp, John; Brown, Frederick; Leeds, Eric; Boger, Bruce; Grobe,
JackCc: Rihm, Roger; Bowman, Eric; Garmon-Candelaria, DavidSubject: RE: INPO Event Report Level 1 on Japanese Earthquake
The INPO document has been posted ... IER Ll-11-1 - Fukushima Daiichi Nuclear Station Fuel Damage Caused byEarthquake and Tsunami
From: Thomas, EricSent: Wednesday, March 16, 2011 1:43 PMTo: King, Mark; Thorp, John; Brown, Frederick; Leeds, Eric; Boger, Bruce; Grobe, JackCc: Rihm, Roger; Bowman, Eric; Gray, Kathy; Garmon-Candelaria, DavidSubject: INPO Event Report Level 1 on Japanese Earthquake
We will post this to the INPO Documents link on the OpE Gateway as soon as possible.
Eric
U.S. Nuclear Regulatory CommissionNRR/DIRS/[email protected] (office)L (b)(6) 7(mobile)
1
Pannier, Stephen
From:Sent:To:Cc:
Subject:Attachments:
Thomas, Eric-,Thursday, March 17, 2011 10:11 AMThorp, JohnSigmon, Rebecca; King, Mark; Pannier, Stephen; Howe,.Allen; Nelson, Robert; Westreich,Barry;. Brown, FrederickAction Items this morning for IOEB110321 NRC Response to Events in Japan Scheduling Note.docx; 110321 Closed Events inJapan and Commission Agenda Scheduling Note.docx
John,
Just want to keep you in the loop for what we have committed to this morning:
- :1. Allen Howe is the Lead for putting together a Commission Briefing on the earthquake. Brief currently scheduledfor Monday (see attached). IOEB was assigned to prepare slides for Bill Borchardt's remarks covering anoverview of the event and the US response. I have asked Rebecca to start putting slides together, and I amgoing to see what other info I can provide from the Ops Center today and tomorrow. This is a tough task as thesituation will continue to develop and change right up until the time of the briefing.
2. Bob Nelson is the SES in charge of coordination communications for NRR's response to the Japanese event. Theregions have. EOC meetings starting next week, and the concern is that discussions will center on domestic plantvulnerability and design issues related to earthquake/tsunami. He is hoping to have some public and non-publicinformation and Q's and A's to prepare the regions to answer public and utility questions. Some things wediscussed:
a. Can the INPO IER be made publicly available (I already made this suggestion to INPO this morning, noresponse yet. Precedence says no)
b. Will the TI (which closely mirrors the content of the INPO IER) be issued prior to the EOC meetings. Thiswill show NRC's proactive response to safety of our domestic facilities.
c. DPR is developing a GC (possibly a GL), however this will likely take at least a couple of months to putout.
d. Availability of information related to GI-199 (lots of publicly available info already. What kind of talkingpoints might the regions need)
e. Are the current Q's and A's (see Sharepoint site:http:/Iportal.nrc.gov/edo/nrr/NRR/20TA/FAQ%2ORelated%20to%20Events%200ccuring%20in%2OJapan/Forms/AllItems.aspx) still valid? Should/are they publicly available (Need to talk to OPA)
f. What other questions do the regions have that we need to answer or that we may have alreadyanswered (Region II has already submitted additional Questions).
That's all I've got for now,Eric
U.S. Nuclear Regulatory CommissionNRR/DIRS/[email protected] (office)
(b)( (mobile)
I
1 1. )
Thorp, John
From: Gray, KathySent: Thursday, March 17, 2011 2:38 PMTo: Thorp, JohnCc: Thomas, EricSubject: QUESTION...
Importance: High
John .. just tried to call ya ..I know everyone is quite busy with the everyday stuff and OpS Center duties.. but wanted tolet you know, r (b)(6) tomorrow .. and just wanted to make sure thereisn't anything I need to do from my end re the RST Director coverage. I have gotten very little response back.. heardfrom Pat Hiland and Brian Holian .. they are ok with the schedule. My concern is that the system is slow, and haven'tseen where Jennifer Uhle has opened or read either email that I have sent out and she's scheduled for mid-shift 11pm-7am starting Friday, March 18 through Monday, March 21. Perhaps she's already over in the Ops Center, quite busyand aware. What are the expectations ?
From: Gray, Kathy -
Sent: Thursday, March 17, 2011 9:49 AMTo: Thomas, EricSubject: RE: Status of Getting TER Li doc from INPO onto the OpE Gateway
I had called a little bit ago to ask you about this and also about the RST schedule. You back at your desk? I will push forurgent need on the INPO report. R ;StscheduIe.. am I excpected to f$ilowhip to mae$.esvre those scheduled ha~veOnlrn~ta~te'a-o can t are thiey suppose to get back Mthl us or the Ops Center? What'sthe
Opre, tii? I was going to send out the schedule again, since yesterday we were experiencing slowness. Thanks!
From: Thomas, EricSent: Thursday, March 17, 2011 9:44 AMTo: Gray, KathyCc: NRRWebServices ResourceSubject: Status of Getting IER Li doc from INPO onto the OpE Gateway
Please let me know how soon we can upload this.
Thanks, Eric
U.S. Nuclear Regulatory CommissionNRR/DIRS/[email protected] (office
()oil
I
Sigmon, Rebecca
From: Sigmon, RebeccaSent: Thursday, March 17. 2011 10:15 AMTo: Thomas, EricSubject: RE: Action Items this morning for IOEB
'With regards to the INPO IER, I came across the following last night off the publicly available NEI website, .(http://resources.nei.orq/documents/lapan/Industry Taking Action to Ensure Continued Safety Fact Sheet.
'Included (look familiar?):
Verify each company's capability to mitigate conditions that result from severe adverse events, including the lossof significant operational and safety systems due to natural events, fires, aircraft impact and explosions. Specificactions include testing and inspecting equipment required to mitigate these events and verifying thatqualifications of operators and support staff required to implement them are current.
.1 2. Verify that the capability to mitigate a total loss of electric power to a nuclear power plant is proper and
functional. This will require inspections verifying that all required materials are adequate and properly stagedand that procedures are implemented.
3. Verify the capability to mitigate flooding and the impact of floods on systems inside and outside the plant.Specific actions include verifying required materials and equipment are properly located to protect them fromflood.
4. Perform walk downs and inspection of important equipment needed to successfully respond to fire and floodevents. Identify the potential that the equipment's function could be lost during seismic events appropriate forthe site and develop mitigating strategies for potential vulnerabilities.
Rebecca SigmonReactor Systems EngineerNRR/DIRS/IOEBOperating Experience Branch(301) 415-4018Rebecca.Siq moncnrc.gov
From: Thomas, EricSent: Thursday, March 17, 2011 10:11 AMTo: Thorp, JohnCc: Sigmon, Rebecca; King, Mark; Pannier, Stephen; Howe, Allen; Nelson, Robert; Westreich, Barry; Brown, FrederickSubject: Action Items this morning for IOEB
John,
Just want to keep you in the loop for what we have committed to this morning:
1. Allen Howe is the Lead for putting together a Commission Briefing on the earthquake. Brief currently scheduledfor Monday (see attached). IOEB was assigned to prepare slides for Bill Borchardt's remarks covering anoverview of the event and the US response. I have asked Rebecca to start putting slides together, and I amgoing to see what other info I can provide from the Ops Center today and tomorrow. This is a tough task as thesituation will continue to develop and change right up until the time of the briefing.
1 I
2. gob Nelson is the SES in charge of coordination communications for NRR's response to the Japanese event. Theregions have EOC meetings starting next week, and the concern is that discussions will center on domestic plant
" vulnerability and design issues related to earthquake/tsunami. He is hoping to have some public and non-publicinformation and Q's and A's to prepare the regions to answer public and utility questions. Some things wediscussed:
a. Can the INPO IER be made publicly available (I already made this suggestion to INPO this morning, noresponse yet. Precedence says no)
b. Will the TI (which closely mirrors the content of the INPO IER) be issued prior to the EOC meetings. Thiswill show NRC's proactive response to safety of our domestic facilities.
c. DPR is developing a GC (possibly a GL), however this will likely take at least a couple of months to putout.
d. Availability of information related to GI-199 (lots of publicly available info already. What kind of talkingpoints might the regions need)
e. Are the current Q's and A's (see Sharepoint site:http://Portal.nrc.pov/edo/nrr/NRR%20TA/FAQ%2ORelated%20to%2OEvents%2OOccuring%20in%2OJapan/Forms/AlIltems.asox) still valid? Should/are they publicly available (Need to talk to OPA)
f. What other questions do the regions have that we need to answer or that we may have alreadyanswered (Region II has already submitted additional Questions).
That's all I've got for now,Eric
U.S. Nuclear Regulatory CommissionNRR/DIRS/IOEB
OWFN-7E24eric.thomas(&nrc.Rov
_,301-415-6772 (office)I (b)(6) [(mobile)
2
From: U BlTo: V.aio. Mn; Wb. MichaelSubject: Re: Japan Nuclear Assistance
Date: Thursday, March 17, 2011 6:03:38 AM
Bill BorchardtVia blackberry
-Original Message -----From: Virgilio, MartinTo: Weber, Michael; Borchardt, BillSent: Thu Mar 17 05:49:18 2011Subject: RE: Japan Nuclear Assistance
Mike
Marty
----- Original Message-----From: Weber, MichaelSent: Thursday, March 17, 2011 5:08 AMTo: Virgilio, Martin; Borchardt, BillSubject: Response - Japan Nuclear Assistance
Original Message -----From: Virgilio, MartinTo: Borchardt, BillCc: Weber, MichaelSent: Thu Mar 17 00:11:53 2011Subject: RE: Japan Nuclear Assistance
Bill
My recommendation is that we have one of our office directors who are primed to supportCongressional briefings attend this meeting. As an alternate we could have one of the day shift ETatted
Marty
----- Original Message -----From: Borchardt, BillSent: Wednesday, March 16, 2011 7:57 PMTo: Virgilio, MartinSubject: Fw: Japan Nuclear AssistanceImportance: High
Bill BorchardtVia blackberry
----- Original Message -----From: Lyons, Peter <[email protected]>To: Jaczko, Gregory; Borchardt, Bill
- .uijiiiiU~IflIw ii'. inn flWTlTNi~iUUi~ii1ImIi
Cc: Batkin, JoshuaSent: Wed Mar 16 15:55:44 2011Subject: FW: Japan Nuclear Assistance
Greg/Bill/Josh
----- Original Message -----From: SCHUSent: Wednesday, March 16, 201.1 2:03 PMTo: Grossenbacher, John (INL); [email protected]; [email protected]; [email protected];[email protected]; (b)(6)Cc: I (b)(6) Lyons, Peter; Aoki, Steven; Hurlbut, Brandon; Adams, IanSubject: Japan Nuclear AssistanceImportance: High
re
Z-
Steven ChuDepartment of Energy
.1
From:To:Cc:
Subject:Date:Importance:
Batkin. JoshuaWeber. Michael; Virailio. Martin; HOO Hoc
Jaczko. Gr'egory; I (b)(6777 _ IFw: 0600 EDT (March 17, 2011) USNRC Earthquake/Tsunami SitRepThursday, March 17, 2011 7:02:08 AMHigh
Josh
Joshua C. BatkinChief of StaffChairman Gregory B. Jaczko(301) 415-1820
From: Jaczko, Gregory <[email protected]>To: Coggins, Angela; Batkin, Joshua; Pace, PattiSent: Thu Mar 17 06:55:42 2011Subject: FW: 0600 EDT (March 17, 2011) USNRC Earthquake/Tsunami SitRep
From: Holdren, John P.1 (b)(6)
Sent: Thursday, March 17, 2011 6:55:35 AM
To: LIA07 Hoc; Anderson, JamesCc: Jaczko, Gregory; Reed, Richard A.; Avery, Heidi E.;Shapiro, Nicholas S.; Steinberg, James B; Hammer, Michael A;Pfeiffer, DanSubject: RE: 0600 EDT (March 17, 2011) USNRC Earthquake/Tsunami SitRepImportance: HighAuto forwarded by a Rule
Colleagues -
(b)(5)
Best,
John
ýý)O
JOHN P. HOLDREN
Assistant to the President for Science and Technology
and Director, Office of Science and Technology Policy
Executive Office of the President of the United States
emailI (b)(6)
direct phonq (b)(6).assistant Karrie Pitzerl (b)(6)
From: LIA07 Hoc [mailto:[email protected]]F Sent: Thursday, March 17, 2011 6:42 AM
Cc: LIA07 HocSubject: 0600 EDT (March 17, 2011) USNRC Earthquake/Tsunami SitRep
Attached, please find a 0600 EDT situation report from the US Nuclear Regulatory Commission'sEmergency Operations Center regarding the impacts of the earthquake/tsunami on March 17, 2011.This Update includes information related to the status of the Fukushima Daiichi Facility.Please note that this information is "Official Use Only" and is only being shared within thefederal family.Please call the Headquarters Operations Officer at 301-816-5100 with questions.
-Jim
Jim AndersonOffice of Nuclear Security and Incident ResponseUS Nuclear Regulatory Commissionjames.andersonanrc.govLIA07.HOQC(nrc.gov (Operations Center)
Wag ner, Katie
From:Sent:To:Cc:Subject:Attachments:
Importance:
Wagner, KatieThursday, March 17, 2011 5:39 PMLee, RichardGibson, KathyFW: Sandia reports requested for Fuku recoveryDOC001.PDF
High
Richard,
These are the reports that GE requested. Kathy has asked that you find out from OGC if we can send these toGE and if so, how to do it properly. Also, this task is high priority and needs to be done today or tomorrow.
Thanks,Katie
---- Original Message---From: Tinkler, CharlesSent: Thursday, March 17, 2011 4:41 PMTo: Wagner, KatieSubject: FW: Sandia reports requested for Fuku recovery
Please talk to Kathy Gibson about how to handle this, we also need to find out how this can sent electronicallly
----- Original Message -----From: Marquino, Wayne (GE Power & Water) [mailto:wayne.marquinot..qe.com]Sent: Thursday, March 17, 2011 4:35 PMTo: Tinkler, CharlesCc: Kingston, Rick E. (GE Power & Water); Head, Jerald G (GE Power & Water); Quintana, Louis M (GEPower & Water); Gauntt, Randall 0Subject: Sandia reports requested for Fuku recovery
Charles -
We request the reports in the attached .pdf file to assist in recovery efforts at the Fukushima 1 units. We'vescreened the list of reports provided by Randy Gauntt, to those which seem relevant to our present efforts.
If you can send them to me encrypted via email, I will follow GEH Safe Guards Information while handlingthem. Please advise what encryption SW I need if it's special so I can install it on our SGI computer.
If via FedEx, please send to
Jerald Head3901 Castle Hayne Road M/C Al 8Wilmington, NC 28402
Thanks,
Wayne
Wayne Marquino P.E.System Integration Engineering Manager, ESBWR GE Hitachi Nuclear Energy
1 V ,/0
Voice- (910) 819-6444 (dial comm 819-6444)[Celll (b)(6)
FAX- (910) 362-6444Conferencing passcode (b)(6) toll free: 8005010843 International 01-913-904-9801, Sweden 0201400595,Spain 900800388, Japan 00531160850,Mexico 0018005145992, DialComm 218-6909
email:wayne.marquino@ge;com3901 Castle Hayne Road M/C A75ATC2 4319Wilmington, NC 28402www.qe-enerqy. com/nuclearhttp://www.,e-enerqy.com/prod serv/products/nuclear energy/en/passive safetysystem.htmhttp://adamswebsearch2. nrc.qov/idmwsA/iewDocByAccession.asp?AccessionNumber=ML1 03440266
---- Original Message----From: Gauntt, Randall 0 fmailto:roqaunt(Dsandia..qov]Sent: Wednesday, March 16, 2011 5:09 PMTo: Marquino, Wayne (GE Power & Water); Head, Jerald G (GE Power &Water)Cc: Loewen, Eric (GE Power & Water); Ginsberg, Robert (GE Power & Water); Klapproth, James F (GE Power& Water); Quintana, Louis M (GE Power & Water)Subject: RE: Can we call you about spent fuel?
WayneList of relevant reports.
Randy
---- Original Message---From: Marquino, Wayne (GE Power & Water) [mailto:wayne.marquino(•.qe.comISent: Wednesday, March 16, 2011 11:49 AMTo: Gauntt, Randall 0; Head, Jerald G (GE Power & Water)Cc: Loewen, Eric (GE Power & Water); Ginsberg, Robert (GE Power & Water); Klapproth, James F (GE Power& Water); Quintana, Louis M (GE Power & Water)Subject: Re: Can we call you about spent fuel?
Jerry-
Jim asked me to request the reports via you when Randy sends the reports numbers.
WayneWayne Marquino P.E.System Integration Engineering Manager, ESBWR GE Hitachi Nuclear Energy
Voice- (910) 819-6444 (dial comm 292-6444)ll )FAX- (910) 362-6444Conferencing passcode 2926444, toll free: 8005010843 International 01647 723 6909, Spain access 900800388
email:[email protected]
II
2
3901 Castle Hayne Road M/C A75ATC2 4319Wilmington, NC 28402
---- Original Message ----From: Marquino, Wayne (GE Power & Water)To: Gauntt, Randall 0 <ro-qaunt(asandia.qov>Cc: Loewen, Eric (GE Power & Water); Ginsberg, Robert (GE Power & Water); Klapproth, James F (GE Power& Water)Sent: Wed Mar 16 12:09:07 2011Subject: RE: Can we call you about spent fuel?
Randy -
GEH would like to obtain the Sandia reports you described on spent fuel response to loss of cooling whichincludes BWR fuel and different discharge times. Can you provide the report numbers?
I understand that these have a security ciassmcTaiorni-kie of the lowerones) and therefore will have to request reports from the NRC, and the knowledgeable NRC contacts are:
Jennifer Uhle 301 251 7499
Hinkler 251 7496
Brain Sheron
Thanks for the information,
Wayne
3
Wagner, Katie
From: Wagner, KatieSent: Thursday, March 17, 2011 5:42 PMTo: '[email protected]'Cc: Gibson, KathySubject: RE: Sandia reports requested for Fuku recovery
Dear Mr. Marquino,
I am the POC for your request for reports. We are following up on your request and will get back to you.
Thanks,
Katie WagnerGeneral EngineerU.S. Nuclear Regulatory Commission(301) 251.7917Katie.Wagneranrc.,qov
---- Original Message---From: Marquino, Wayne (GE Power & Water) fmailto:wayne.marouino•,.qe.com1Sent: Thursday, March 17, 2011 4:35 PMTo: Tinkler, CharlesCc: Kingston, Rick E. (GE Power & Water); Head, Jerald G (GE Power & Water); Quintana, Louis M (GEPower & Water); Gauntt, Randall 0Subject: Sandia reports requested for Fuku recovery
Charles -
We request the reports in the attached .pdf file to assist in recovery efforts at the Fukushima 1 units. We'vescreened the list of reports provided by Randy Gauntt, to those which seem relevant to our present efforts.
If you can send them to me encrypted via email, I will follow GEH Safe Guards Information while handlingthem. Please advise what encryption SW I need if it's special so I can install it on our SGI computer.
If via FedEx, please send to
Jerald Head3901 Castle Hayne Road M/C A18Wilmington, NC 28402
Thanks,
Wayne
Wayne Marquino P.E.System Integration Engineering Manager, E PBWR GE Hitachi Nuclear EnergyVoice- (910) 819-6444 (dial comm 819-6444)1,Cell (b)(6)FAX- (910) 362-6444Conferencing passcode 8196444, toll free: 8005010843 International 01-913-904-9801, Sweden 02014(Spain 900800388, Japan 00531160850,Mexico 0018005145992, DialComm 218-6909
1
email:[email protected] Castle Hayne Road M/C A75ATC2 4319Wilmington, NC 28402www.ge-energy.com/nuclearhttp://www..e-enerqy.com/prod serv/products/nuclear energy/en/passive safetysystem. htmhttp://adamswebsearch2.nrc._qov/idmwsNiewDocByAccession.asp?AccessionNumber=ML103440266
---- Original Message -----From: Gauntt, Randall 0 [mailto:rooqaunt(csandia.gov]Sent: Wednesday, March 16, 2011 5:09 PMTo: Marquino, Wayne (GE Power & Water); Head, Jerald G (GE Power &Water)Cc: Loewen, Eric (GE Power & Water); Ginsberg, Robert (GE Power & Water); Klapproth, James F (GE Power& Water); Quintana, Louis M (GE Power & Water)Subject: RE: Can we call you about spent fuel?
Wayne
List of relevant reports.
Randy
---- Original Message -----From: Marquino, Wayne (GE Power & Water) [mailto:wayne.marguinoccqe.com]Sent: Wednesday, March 16, 2011 11:49 AMTo: Gauntt, Randall 0; Head, Jerald G (GE Power & Water)Cc: Loewen, Eric (GE Power & Water); Ginsberg, Robert (GE Power & Water); Klapproth, James F (GE Power& Water); Quintana, Louis M (GE Power & Water)Subject: Re: Can we call you about spent fuel?
Jerry-
Jim asked me to request the reports via you when Randy sends the reports numbers.
WayneWayne Marquino P.E.System Integration Engineering Manager, ESBWR GE Hitachi Nuclear Energy
Voice- (910) 819-6444 (dial comm 292-6444Cell (b)(6)
FAX- (910)362-6444Conferencing passcode 2926444, toll free: 8005010843 International 01647 723 6909, Spain access 900800388
email:[email protected]
3901 Castle Hayne Road M/C A75ATC2 4319Wilmington, NC 28402
2
---- Original Message -----From: Marquino, Wayne (GE Power & Water)To: Gauntt, Randall 0 <roqaunt(asandia.qov>Cc: Loewen, Eric (GE Power & Water); Ginsberg, Robert (GE Power & Water); Klapproth, James F (GE Power& Water)Sent: Wed Mar 16 12:09:07 2011Subject: RE: Can we call you about spent fuel?
Randy -
GEH would like to obtain the Sandia reports you described on spent fuel response to loss of cooling whichincludes BWR fuel and different discharge times. Can you provide the report numbers?
:1 understand that these have a seuu.,y ,,iassmcation (one of the lower'ones) and therefore will have to request reports from the NRC, and the knowledgeable NRC contacts are:
Jennifer Uhle 301 251 7499
Hinkler 251 7496
Brain Sheron
rhanks for the information,
Wayne
3
From:Sent:To:Subject:
Hoc, PMT12Thursday, March 17, 2011 10:28 PM
PMTERDS HocFW: MOX Inquiry
From: RST01 HocSent: Thursday, March 17, 2011 10:25 PMTo: Hoc, PMT12Subject: FW: MOX Inquiry
FYI
From: Ryan, Robert D (WANO) [mailto:[email protected])Sent: Thursday, March 17, 2011 10:22 PMTo: RST01 HocCc: INPO EmergencyResponseCtr (INPO); Tropasso, Randy T. (INPO); Faller, Carl F. (INPO)Subject: RE: MOX Inquiry
Greg:
Have a good night.
Bob
From: RST01 Hoc [mailto:[email protected]]Sent: Thursday, March 17, 2011 9:44 PMTo: Ryan, Robert D (WANO)Cc: Hoc, PMT12Subject: MOX Inquiry
/ /1; ji.i;•i...,.. (b)(4).i i
I'
Thanks.
Greg Schoenebeck 301-816-5504
.DISCLAIMER:This e-mait and any of its attachments may contain pfopnelary INPO or WANe Informatibn that is privileled, confidential, or protected by copyright baionging toINPO or WANe. This e-mail Is Intended solely tor the use of the intdyvdual or entily tr.r which it is intended. If you are not the intended recipient of this e-mail, anydissemination, distribution. c•pying, or action taken in relation to the contents of and attachments to this e-manl is rontrary to the rights of INPO or WANe and isprohibited. It you ae rnot the intended recipiert of this e-mnil. Plea1.2e notiFy the sertdei immediately by return ea-m-1il and permaneotly de!ete the orginaI ind any
From:
To:
Subject:Date:
Lubinski. JohnWoIfoann. RobertRE: IOEB Clearnghouse Screening Summary for Wednesday, March 16, 2011Thursday, March 17, 2011 10:21:00 AM
thanks
From: Wolfgang, RobertSent. Thursday, March 17, 2011 9:48 AMTo: Lubinski, JohnCc: Thomas, BrianSubject: FW: IOEB Clearinghouse Screening Summary for Wednesday, March 16, 2011
John,
Here is the INPO document that you were talking about yesterday.
Bob WolfgangSenior Mechanical EngineerU. S. Nuclear Regulatory Commission301-415-1624
From: King, MarkSent: Wednesday, March 16, 2011 2:21 PMSubject: IOEB Clearinghouse Screening Summary for Wednesday, March 16, 2011
/4~444~~4444 ~ ~f Ii ~ ~4. 4
44 4'4~4 44444 .4.,,... 444444~ 4.9.~414 ~ ~ ,.;~.4~44.444~44 .44 -. 4 4.4
.. *.4.44~444.4.-4& >44 ~ 4
4t~ ~ 44.4.~4.....-
4 ;4.4~.44~4A9
44~~4. ~44 *4.4 ~ .''49'r
~ ~. ~.44.~..4.444 ~4.4 44j444~.44~
4 ~1.4 ~ . *~*4.4.44.*~.*~~
L 4 .4.444.44 44 ~
4.444444 ~4.4~4...
4444.
444 4~4
.1444444 ...-. - 444 4 . 4~44~444444~.
44~'4~4~4,, 444..4 4 4 ~4 4
.
44 (b)(5) Outside7of Scope 27 4U44
444
44j4 - ~ 4444
.'4 ~ 4 4 4 . . - 4 4 4 ~ 4 4 L Y. ~
4.44 4<44 -4.4 *2:'~i.44.44..- ~41~~ ~ ~44.4.44 "'4
S444 - ~+ ~,4J .4.~. ~. ~4444.
S4 4 4 " .4 ~ . 4 4 4 4 4 4 4 . ~ 4 4 ..44 ~ 44444~4444 44
4444. . 4.4.4444 .4 444~4
.; ~ 4 ~44.~44..'.' '4..; *444~4~44.44'~~44 ~ 4.~4 4~1~44i4' 442~4'~.'.
4~4444.44.4 f~44.44 ~
4~ ~~44 4
44. 4. ~ 4~4 4~444,.
44 44. ~
~4~444.4 4 -. 444~4~ 44~
4444444.4 4
016V~
c) See link: ,FAQ Related to Events Occurring in Japan" that is now available on anNRR SharePoint site - lnremral-use only).
- This issue is already screened-in as Issue For Resolution [IFR]. - INEFQONLY.
(b)(5),Outside of Scope
VNi ~
•3TE: THIS SUMMvARY iS UFri•.iAL U~t UNLY
OT Q~FO-RWAR 4WY-FORTIONS OUTSID• ONf RWITHOUT-FirST-ST,
PFRMSSION FROM API'INA-T-OR•
Attendees at Screening Meeting:
Jesse RoblesRuss HaskellDave GarmonMary Wegner (RES) - by phoneMark KingJoe GiantelliRyan Craffey- NRO
From:To:Cc:Subject:Date:
Brown. FrederickCheok. Michael; Ruland. William: Lubinskl. John: Nelson. Robert
Leeg SamsonRe: Communications with NRR staffThursday, March 17, 2011 1:43:16 PM
- -,~~- ~ -
From: Cheok, MichaelTo: Ruland, William; Brown, Frederick; Lubinski, John; Nelson, RobertCc: Lee, SamsonSent: Thu Mar 17 11:30:42 2011Subject: Communications with NRR staff
t ,
From: King, MarkSent: Wednesday, March 16, 2011 2:21 PMSubject: IOEB Clearinghouse Screening Summary for Wednesday, March 16, 2011
(b)(5),Outside of Scope
2
ýqO
From:To:Subject: RE: Sensitive Info: Release of INPO Event Report Level 1 -- Fukushima Daiichi Nuclear Station Fuel Damage
Caused by Earthquake and TsunamDate: Thursday, March 17, 2011 2:33:54 PM
From: Grobe, JackSent: Wednesday, March 16, 2011 10:24 AMTo: Kelly, GlennSubject: Fw: Sensitive Info: Release of INPO Event Report Level 1 -- Fukushima Daiichi Nuclear StationFuel Damage Caused by Earthquake and TsunamImportance: High
Jack Grobe, Deputy Director, NRR
From: Leeds, EricTo: Grobe, Jack; Boger, Bruce; Ruland, WilliamCc: Brown, Frederick; Westreich, Barry; Virgilio, MartinSent: Wed Mar 16 07:49:11 2011Subject: Sensitive Info: Release of INPO Event Report Level 1 -- Fukushima Daiichi Nuclear StationFuel Damage Caused by Earthquake and Tsunam
Attached is the INPO Event Report on Fukushima. Please treat as sensitive information, not to be
shared outside the NRC.
Eric J. Leeds, Director
Office of Nuclear Reactor Regulation
U.S. Nuclear Regulatory Commission
301-415-1270
From: Mortensen, George K (INPO) [mailto:[email protected]]Sent: Wednesday, March 16, 2011 7:36 AMTo: Leeds, EricSubject: FW: Release of INPO Event Report Level 1 -- Fukushima Daiichi Nuclear Station Fuel DamageCaused by Earthquake and TsunamImportance: High
Good morning Eric,
Forwarded as requested.
George Mortensen
From: Mortensen, George K (INPO)Sent: Wednesday, March 16, 2011 6:10 AMTo: '[email protected]'; '[email protected]'Subject: FW: Release of INPO Event Report Level 1 -- Fukushima Daiichi Nuclear Station Fuel DamageCaused by Earthquake and TsunamImportance: High
Bruce,
Best Wishes!George Mortensen
INPO - External Relations Program Manager
From: Mortensen, George K (INPO)Sent: Tuesday, March 15, 2011 3:36 PMTo: '[email protected]'Subject: Release of INPO Event Report Level I -- Fukushima Daiichi Nuclear Station Fuel DamageCaused by Earthquake and TsunamImportance: High
Brian,Please be advised that INPO has just released an IER Level 1 document to the industry requiring
actions in the following areas within the next 4 weeks. Please note that the entire document willbe sent via normal channels (OE Branch) and that the below information is considered LimitedDistribution and copyrighted.George Mortensen
LIMITED DISTRIBUTION: Copyright © 2011 by the Institute of Nuclear Power Operations. Not for sale or for commercialuse. Unauthorized reproduction is a violation of applicable law. Each INPO member and participant may reproduce thisdocument for its business use. This document should not be otherwise transferred or delivered to any third party, and itscontents should not be made public, without the prior agreement of INPO. All other rights reserved.NOTICE: This information was prepared in connection with work sponsored by the Institute of Nuclear Power Operations(INPO). Neither INPO, INPO members. INPO participants, nor any person acting on behalf of them (a) makes any warrantyor representation, expressed or implied, with respect to the accuracy, completeness, or usefulness of the informationcontained in this document, or that the use of any information, apparatus, method, or process disclosed in this documentmay not infringe on privately owned rights, or (b) assumes any liabilities with respect to the use. of, or for damages resultingfrom the use of any information, apparatus, method, or process disclosed in this document.
(b)(4)
(b)(4)
LIMITED DISTRIBUTION: Copyright © 2011 by the Institute of Nuclear Power Operations. Not for sale or for commercialuse. Unauthorized reproduction is a violation of applicable law. Each INPO member and participant may reproduce thisdocument for its business use. This document should not be otherwise transferred or delivered to any third party, and itscontents should not be made public, without the prior agreement of INPO. All other rights reserved.NOTICE: This information was prepared in connection with work sponsored by the Institute of Nuclear Power Operations(INPO). Neither INPO, INPO members. INPO participants, nor any person acting on behalf of them (a) makes any warrantyor representation, expressed or implied, with respect to the accuracy, completeness, or usefulness of the informationcontained in this document, or that the use of any information, apparatus, method, or process disclosed in this documentmay not infringe on privately owned rights, or (b) assumes any liabilities with respect to the use of, or for damages resultingfrom the use of any information, apparatus, method, or process disclosed in this document.
T~• • • tl .,• ) ili ;!•¢ ÷ • ; !•t : ••;• • y •-.ii,,A!••• ,.• f~:; !3 •, • •..: •••.i ; s>.,+••
29V
Laur, Steven
From:Sent:To:Cc:Subject:
Ryan, Robert D (WANO) [[email protected]] i,\O -Thursday, March 17, 2011 11:04 PMLaur, StevenGambrill, Robert A. (INPO); Tropasso, Randy T. (INPO)Potential mitigation of Spent Fuel Pool Dose Rates
Steven:
Some info on the topic for the phone call.
Bob
From: Edsinger, Kurti"AfO,Sent: Thursday, March 17, 2011 9:55 PMTo: inpoerc~inpo.orqCc: Modeen, DavidSubject: Potential mitigation of Spent Fuel Pool Dose Rates
Dear INPO ERC,
Here are a few thoughts from the EPRI team on approaches to consider for mitigating dose level in a challenged spentfuel pool:
(b)(4)
1
(b)(4)
Thanks,
Kurt
Kurt Edsinger
Director, Fuel & Chemistry
ELECTRIC POWER RESEARCH INSTITUTE
3420 Hillview Ave.
Palo Alto, CA 94304
'Office: 650.855.2271
' Mobil (b)(6)
Together... Shaping the Future of Electricity
.DISCLAIMER:This e-mail and any of its attachments may contain proprietary INPO or WANO information that is privileged, confidential, or protected by copyright belonging toINPO or WANC. This e-mail is intended solely for the use of the individual or entity for which it is intended. If you are not the intended recipient of this e-mail, anydissemination, distribution. copying, or action taken in relation to the contents of and attachments to Ihis e-mail is contrary to the rights of INPO or WANO and isprohibited. If you are not the intended recipient of this e-mail, please notify the sender imnmediately by return e-mail and permanently delete the original and anycopy or printout of this e-mail and any attachments.Thank you.
2
Bowers, Anthony
From:Sent:To:Subject:Attachments:
Importance:
PMT02 HocThursday, March 17, 2011 6:16 PMHoc, PMT12; '[email protected]'; [email protected]; [email protected] update - NARAC US Impact AssessmentPR BASIS u2-u3-sfpu4 approx.csv; PR BASIS combined u2-u3-u4.pdf
High
I(b)(5)
NRC Protective Measures Team(301) 816-5100 x5402
-----Original Message----From: Nasstrom, John S. [mailto:Nasstroml(allnl.,qov]Sent: Thursday, March 17, 2011 3:23 PMTo: Nasstrom, John S.; Fetter, Steve; Hoc, PMT12; '[email protected]'; cmht(acnnsa.doe.pov; NITOPSSubject: RE: NARAC US Impact AssessmentImportance: High
Repeating information sent earlier with some clarification:
(b)(5)
National Atmospheric Release Advisory Center 925-422-9100
Tracking:1. ý, 6/ 16 b
RASCAL v4.1.0 Source Term
File created: 2011/03/17 15:46
Case name U3 and U4 SFP approximate site release
Radionuclide units: Ci
Interval ########Start 19:50Am-241 O.OOE+00
Ba-140 O.OOE+00Ce-141 O.OOE+00Ce-143 O.OOE+00Ce-144 O.OOE+00
Cm-242 0,OOE+00Cs-134 6.33E+04Cs-136 1.97E+04Cs-137 4.40E+041-131 3.07E+05
1-132 2.26E+051-133 1.47E+04[-135 1.78E+00Kr-85 5.08E+03Kr-85m 5.92E-04Kr-88 2.03E-08La-140 O.OOE+00La-141 O.OOE+00Mo-99 O.OOE+00Nb-95 O.OOE+00Nb-97 O.OOE+00Nd-147 O.OOE+00Np-239 O.OOE+00Pm-147 O.OOE+00Pr-143 O.OOE+00Pr-144 O.OOE+00Pu-238 O.OOE+00Pu-239 O.OOE+00
9#####f## ######## ~l######## #~f####### ######## ######## ######## ######l## #f####### ##g###### #4##t####20:05
0.OOE+000.OOE+000.OOE+000.OOE+000.OOE+00d0.OOE+009.81E+043.06E+046.84E+044.77E+053.42E+052,26E+042.70E+008.89E+039.99E-043.34E-08
0.OOE+000.OOE+000.OOE+000.OOE+000.OOE+000,OOE+000.OOE+000.OOE+000.OOE+000.OOE+000.OOE+000.00E+00
20:201.76E-03
8.31E+042,29E+031.67E+022.03E+032,55E+011.40E+054.32E+049.63E+047.75E+055.53E+05*3.65E+044,28E+003.88E+044.19E-031.38E-07
9.45E+022.50E-073.83 E+031.04E+033.25E-012.93E+027.10E+031.31E+007.04E+028.11E+027.28E-036,96E-03
20:35
2.75E-03
1.29E+05
3.56E+03
2.59E+02
3.16E+03
3.95E+011.62E+05
5.02E+04
1.13E+05
9.36E+05
6.66E+05
4.38E+04
5.06E+00
6.12E+04
6.36E-03
2.04E-07
1.66E+03
3.73E-07
5.94E+03
1.62E+03
5.00E-01
4.55E+02
1.10E+04
2.03E+00
1.10E+03
1.57E+03
1.13E-02
1.08E-02
20:50
3.31E-03
1.55E+05
4.27E+03
3.10E+02
3.78E+03
4.74E+01
1.75E+05
5.41E+04
1.21E+05
1.04E+06
7,28E+05
4.78E+04
5.41E+00
7.80E+04
7.81E-03
2.45E-07
2.17E+03
4.28E-07
7.09E+031.94E+03
5.93E-01
5.44E+02
1.31E+04
2.45E+00
1.31E+03
2.08E+03
1.36E-02
1.30E-02
21:05
3.62E-03
1.69E+05
4.66E+03
3.36E+02
4.13E+03
5.18E+01
1.81E+05
5.63E+04
1.26E+05
1,08E+06
7.64E+05
4.97E+04
5.54E+00
9.09E+04
8.73E-03
2.67E-07
2.51E+03
4.46E-07
7.73E+03
2.12E+03
6,41E-01
5.94E+02
1.43E+04
2.67E+00
1.43E+03
2.39E+03
1,49E-02
1.42E-02
21:20
3;80E-03
1.76E+05
4.88E+03
3.50E+02
4,32E+03
5,42E+01
1.85E+05
5.74E+04
1,29E+05
1.11E+06
7.88E+05
5.06E+04
5.53E+00
9.99E+04
9.27E-03
2.77E-07
2.73E+03
4.47E-07
8.07E+03
2.21E+03
6.64E-01
6.21E+02
1.49E+04
2.81E+00
1.49E+03
2.57E+03
1.57E-02
1.49E-02
21:35
3.91E-03
1.81E+05
5.OOE+03
3.56E+02
4,43E+03
5.55E+01
1.87E+05
5.81E+04
1.31E+05
1.13E+06
8,06E+05
5.09E+04
5.46E+00
1.07E+05
9.54 E-03
2.80E-07
2.87E+03
4.39E-07
8.24E+03
2.27E+03
6.73E-01
6.36E+02
1.53E+04
2.88E+00
1.53E+03
2.68E+03
1.60E-02
1.53E-02
21:50
2.82E-02
3.54E+05
1.64E+04
1.16E+03
1.45E+04
4.01E+02
2.04E+05
6.34E+04
1.42E+05
1.07E+06
7.61E+05
4.80E+04
5.06E+00
8.05E+04
6,89E-03
1.97E-07
1.58E+04
3.03E-06
7.43E+03
1.64E+04
4.82E+00
4.59E+03
4.99E+04
2.08E+01
1.11E+04
1.39E+04
5.27E-02
5,OOE-02
22:05
4.95E-02
5.24E+05
2.66E+04
1.88E+03
2.37E+04
7.03E+02
2.44E+05
7.54E+04
1.69E+05
1.17E+06
8.43E+05
5.20E+04
5.39E+00
6.03E+04
4.98E-03
1-40E-07
2,77E+04
5.09E-06
7.79E+03
2.88E+04
8.35E+00
8.04E+03
8.11E+04
3.65E+01
1.94E+04
2.34E+04
8.61E-02
8.16E-02
22:20
6.49E-02
6.47E+05
3.41E+04
2.40E+03
3.02E+04
9.18E+02
2.72E+05
8.42E+04
1.89E+05
1.23E+06
9.09E+05
5.48E+04
5.57E+00
4.53E+04
3.59E-03
9.81E-08
3.68E+04
6.38E-06
8.05E+03
3.77E+04
1.08E+01
1.05E+04
1.04E+05
4.80E+01
2.54E+04
3.02E+04
1.11E-01
1.04E-01
22:35
7;61E-02
7.35E+05
3.95E+04
2.76E+03
3.50E+04
1.08E+03
2.93E+05
9.09E+04
2.03E+05
1,29E+06
9.72E+05
5.66E+04
5.66E+00
3.39E+04
2.59E-03
6.92E-08
4.37E+04
7.15E-06
8.23E+03
4.41E+04
1.25E+01
1.23E+04
1.20E+05
5.63E+01
2.97E+04
3.50E+04
1.28E-01
1.22E-01
Pu-241
Rb-86
Rb-88
Rh-103m
Rh-105
Ru-103
Ru-105
Ru-106
Sb-127
Sb-129
Sr-89
Sr-90
Sr-91
Sr-92
Tc-99m
Te-127
Te-127m
Te-129
Te-129m
Te-131
Te-131m
Te-132
Xe-131m
Xe-133
Xe-133m
Xe-135
Xe-135m
Y-90
Y-91
Y-91m
Y-92
Y-93
Zr-95
Zr-97
0.OOE+007.60E+021.68E-08
0.OOE+000.OOE+000.OOE±000.OOE+000.OOE+000.OOE+000.OOE+000.OOE+000.OOE+000.OOE+000.OOE+000.OOE+000.OOE+000.OOE+000.OOE+000.OOE+000.OOE+000.OOE+000.OOE+006.34E+036.51E+057.77E+032.17E+023.85E-01
0.OOE+000.OOE+00O.OOE+000.OOE+000.OOE+000.OOE+000.OOE+00
0.OOE+001.18E+032.58E-08
0.OOE+000.OOE+000.OOE+000.OOE+000,OOE+000.OOE+000.OOE+000.OOE+000.OOE+000.OOE+000.OOE+000.OOE+000.OOE+000.OOE+000.OOE+000.OOE+000.OOE+000.OOE+000.OOE+001.11E+041.13E+061.36E+043.73E+026.23 E-01
0.OOE+000.OOE+GO0.OOE+000.QOE+000.OOE+000.OOE+000,00E+00
1.92E+021.67E+033,57E-081.14E+048.OOE+021.15E+042.73E-053.47E+035.41E+038.96E-055.21E+044,31E+037.36EQ008.68E-103.69E+038.20E+032.28E+035.74E+038.81E+033.89E+021.73E+037.27E+044,83 E+044.96E+065.90E+041.60E+032.71E+004,69E+016.96E+024.66E-027,26E-081.06E-01
9.72E+025.69E+00
2.99E+021.94E+036.13E-081.78E+041.24E+031.78E+044.08E-05
5.38E+038.40E+031.34E-04
8.10E+046.7 1E+031. 13 E+01*1.27E-095.72E+031.28E+043.55E+038.92E+031,37E+046.01E+022.67E+031.13E+057.62 E+047.81E+069,27E+042,48E+033.69 E+007.94E+011.08E+035.09E-011.08E-071.62E-011.51E+038.76E+00
3.58E+02
2.09E+03
8.24E-08
2.13E+04
1.48E+03
2.14E+04
4.70E-05
6.45E+03
1.0iE+04
1.54E-04
9.72E+04
8.04E+03
1,32E+01
1.42E-09
6.84E+03
1.52E+04
4.25E+03
1.07E+04
1.64E+04
7.16E+02
3.18E+03
1.35E+05
9.72E+04
9.99E+06
1.18E+05
3.1OE+03
4.37E+00
1.01E+02
1.30E+03
9.54E-01
1.23E-07
1.92E-01
1,82E+03
1.04E+01
3.91E+022,17E+039.54E-08
2.33E+041.60E+032.34E+044.93E-057.05E+031.10E+041.62E-041.06E+058.78E+031.42E+011.46E-097.45E+031,67E+044.64E+031.17E+041.79E+047.78E+023.46E+031.47E+051.13E+051.15E+071.37E+053,53E+035.10E+001.15E+021.4 1E+031.27E+001.28E-072.05E-011.98E+031.13E+01
4.10E+022.21E+031.03E-07
2.44E+041,67E+032.45E+044.97E-OS
7.38E+031.14E+041.63E-041.11E+059,18E+031.46E+011.43E-097.78E+031.74E+044.86E+031.22E+041.87E+048.09E+023.59E+031.54E+051.24E+051.27E+071.50E+053.83E+036.32E+001.2HE+021.49E+031.47E+001.28E-072.12 E-012.07E+031.16E+01
4.19E+02
2.24E+03
1.04E-07
2.50E+04
1.70E+03
2.50E+04
4.90E-05
7,56E+03
1.17E+04
1.60E-04
1.13E+05
9.45E+03
1.47E+01
1.38E-09
7.95E+03
1.78E+04
4.98E+03
1.25E+04
1.92E+04
8.24E+02
3.66E+03
1.57E+05
1.33E+05
1.36E+07
1.60E+05
4.02E+03
9.36E+00
1.30E+02
1.52E+03
1.58E+00
1.24E-07
2.13E-012.12E+03
1.18E+01
1.38E+03
2.45E+031.17E-07
2.26E+04L53E+032.26E+04
4.25E-056.82E+032.29E+043.01E-04
2.22E+05
1.85E+042.82E+012.53E-09
7.16E+033.47E+049.72E+032.45E+043.75E+041.60E+037.12E+033.06E+059.99E+041.02E+071.20E+052.96E+038.03E+007.72E+021. 1OE+042.43E+008.55E-07
1.51E+001.54E+04
8.43E+01
2,24E+032.92E+031.1OE-072.38E+041.60E+03.2.38E+044.29E-OS7.18E+033.38E+044.28E-043.29E+052.74E+044.10E+013.52E-097.5 1E+03S. 15E+041.44E+043.63E+045.57E+042.37E+031.05E+044,54E+057.49E+047.64E4068.96E+042,18E+037.26E+001.35E+031.93E+044.28E+001.43E-062.60E+002.69E+041.47E+02
2.87E+033.25E+038187E-08
2.46E+041.66E+032.47E+044.28E-05
7.43E+034.17E+045.09E-04
4.07E+053,38E+044.98E+014.08E-09
7.76E+036.35E+041.78E+044.48E+046.89E+042.91E+031.29E+045.59E+055.62E+045.72E+066.71E+041.60E+036.74E+001.79E+032.52E+046.36E+001.78E-06
3.36E+003.53E+041.90E+02
3.32E+03
3.49E+03
6.68E-08
2.52E+04
1.68E+03
2.52E+04
4,22E-05
7.62E+03
4.73E+04
536E-04
4.63E+05
3.84E+04
5,56E+01
4.35E-09
7.93E+03
7.22E+04
2.03E+04
5.09E+04
7.83E+04
3.29E+03
1.46E+04
6.35E+05
4.20E+04
4.28E+06
5.01E+04
1.18E+03
6.32E+002.12E+03
2.95E+04
8.24E+00
1.99E-06
3.86E+00
4.13E+04
2.20E+02
###I### #U######I#f~## #f#### ############# ######## #f#I ### ##f#### ######## ######## ff###22:50
8.44E-02
7.99E+05
4.34E+04
3,02E+03
3.85E+04
1.19E+03
3.08E+05
9.54E+04
2.13E+05
1.32EM06
1.02E+06
5.78E+04
5.67E+00
2.55E+04
1,87E-03
4.89E-08
4.90E+04
7.56E-06
8.35E+03
4.88E+04
1,38E+01
1.36E+04
1.31E+05
6.24E+01
3.29E+04
3.85E+04
1.41E-01
1,33E-01
23:059.OOE-02
8.45E+054.62E+043.20E+034.10E+041.28E+033.18E+059.81E+042.21E+051.35E+061.05E+065.85E+045.63E+001.91E+041.35E-033.45E-085.28E+047.74E-068.43E+035.21E+04
1.45E+011.46E0441.39E+056.68E+013.5 1E+044.10E+041.50E-011.42E-01
23:20
9.45E-02
8.78E+05
4.82E+04
3.32E+03
4.28E+04
1.33E+03
3.26E+05
1.01E+05
2.26E+05
1.37E+06
1.09E+06
5.89E+04
5.57E+00
1.43E+04
9.72E-04
2.43E-08
5.58E+04
7.75E-06
8.49E+035.45E+04
1.50E+01
1.52E+04
1,45E+05
6.99E+01
3.67E+04
4.28E+04
1.58E-01
1.49E-01
23:35
9,81E-02
9.00E+05
4,97E+04
3.40E+03
4.41E+04
1.38E+03
3.31E+05
1.03E+05
2.30E+05
1.38E+06
1.12E+06
5.90E+04
5.48E+00
1.07E+04
7.02E-04
1.72E-08
5.81E+04
7.65E-06
8.51E+03
5.63E+04
1.54E+01
1.57E+04
1.49E+05
7,24E+01
3.79E+04
4.41E+04
1.62E-01
1.53E-01
23:50
1.01E-01
9.18E+05
5.07E+043.47E+03
4.50E+04
1.40E+03
3.36E+05
1.04E+05
2.33E+05
1.39E+06
1.14E+06
5.89E+04
5;38E+00
8.06E+03
5.07E-04
1.21E-08
5.98E+04
7.49E-06
8.53E+03
5;76E+04
1.56E+01
1.60E+04
1.51E+05
7.41E+0i
3.87E+04
4SOE+04
1.67E-01
1.57E-01
0:051.03E-01
9,27E+05
5.15E+04
3.49E+03
4,57E+04
1.43E+03
3.38E+05
1.04E+05
2.35E+05
1.40E+06
1.17E+06
5.87E+04
5.27E+00
6.04E+03
3.65E-04
8.54E-09
6.09E+04
7.28E-06
8.54E+03
5.85E+04
1.57E+01
1.63E+04
1.53E+05
7.54E+01
3,93E+04
4.57E+04
1.69E-01
1,58E-01
0:20
1.04E-01
9.36E+05
5.20E+04
3.51E+03
4.62E+04
1.45E+03
3,40E+05
1.04E+05
2.37E+05
1.40E+06
1.20E+06
5.84E+04
5.15E+00
4.53E+03
2.64E-04
6.02E-09
6.18E+04
7.05E-06
8.54E+03
5.91E+04
1.57E+01
1,65E+04
1.54E+05
7.63E+01
3.97E+04
4.62E+04
1.71E-01
1,60E-01
0:35
1.04E-01
9.45E+05
5.24E+04
3.52 E+03
4.65E+04
1.46E+03
3.42E+05
1.05E+05
2.38E+05
1.40E+06
1,22E+06
5.81E+04
5.03E+00
3.39E+03
1.91E-04
4.25E-09
6.26E+04
6,80E-06
8.53E+03
5.97E+04
1.57E+01
1.66E+04
1.55E+05
7.71E+01
4.01E+04
4.65E+04
1.73E-01
1.62E-01
0:50
7.57E-02
6.83E+05
3.78E+04
2.53E+03
3.37E+04
1.05E+03
2.47E+05
7.60E+04
1.72E+05
1.01E+06
8.58E+05
4.17E+04
3.54E+00
2.55E+03
1.38E-04
3.OOE-09
4,79E+04
4.70E-06
6.15E+03
4.31E+04
1.12E+01
1.20E+04
1.12E+05
5.58E+01
2,89E+04
3.37E+04
1,25E-01
1.17E-01
1:055.48E-02
4.93E+05
2.74E+04
1,82E+03
2.43E+04
7.61E+02
1.78E+05
5.49E+04
1,24E+05
7,31E+05
6.06E+05
2.98E+04
2.49E+00
1.91E+03
9.90E-05
2.12E-09
3.65E+04
3.25E-06
4.43E+03
3.11E+04
7.99E+00
8,63E+03
8.03E+04
4;03E+01
2.09E+04
2.43E+04
9.09E-02
8.47E-02
1:20
3.97E-02
3.56E+05
1.97E+04
1.31E+03
1.76E+04
5.49E+02
1.29E+05
3.96E+04
8.96E+04
5,27E+05
4.28E+05
2.13E+04
1.76E+00
1.43E+03
7.16E-05
1.49E-09
2.78E+04
2.24E-06
3.20E+03
2.25E+04
5.72E+00
6.24E+03
5.79E+04
2.93E+01
1.50E+04
1.76E+04
6.55E-02
6.12E-02
1:35
2.87E-02
2.57E+05
1.42E+04
9.36E+02
1,27E+04
3.97E+02
9.27E+04
2.86E+04
6.47E+04
3.81E+05
3.02E+05
1.53E+04
1.23E+00
1.07E+03
5.17E-05
1.05E-09
2.12E+04
1.55E-06
2.30E+03
1.62E+04
4.09E+00
4.50E+03
4.17E+04
2.12E+01
1.09E+04
1.27E+04
4.74E-02
4.43E-02
1:50
2.08E-02
1.85E+05
1.03E+04
6.75E+02
9,18E+03
2.86E+02
6.72E+04
2.06E+04
4.67E+04
2.75E+05
2.14E+05
1.10E+04
8,68E-01
8.06E+02
3.73E-05
7.43E-10
1.60E+04
1.07E-06
1.66E+03
1.17E+04
2.93E+00
3.25E+03
3.OOE+04
1.53E+01
7.85E+03
9.18E+03
3.43E-02
3,20E-02
3.65E+03
3.67E+03
4.87E-08
2.57E+04
1.71E+03
2.57E+04
4.13E-05
7.76E+03
5.14E+04
5.81E-04
5,03E+05
4.18E+04
5.94E+01
4.44E-09
8.05E+03
7.84E+04
2.21E+04
5.54E+04
8.51E+04
3.55E+03
1.58E+04
6,89E+05
3.15E+04
3.21E+06
3.74E+04
8.70E+02
5,94E+00
2.36E+03
3,26E+04
9.81E+00
2.09E-06
4.19E+00
4.56E+04
2.40E+02
3.88E+03
3.80E+03
3.49E-08
2.59E+04
172E+03
2.60E+04
4.02E-05
7.86E+03
5.43E+04
5.90E-04
5,33E+05
4.42E+04
6.17E+01
4,40E-09
8.13E+03
8,28E+04
2.33E+04
5.86E+04
9.00E+04
3,74E+03
1.66E+04
7.27E+05
2.37E+04
2.40E+06
2.80E+04
6.42E+02
5.59E+00
2.54E+03
3.48E+04
1.10E+01
2.13E-06
4.41E+00
4.88E+04
2.55E+02
4.05E+033,89E+032.48E-082.62E+041.73E+032.62E+04
3.91lE-057.92E+035,63E+045,90E-045.54E+054.59E+04
6.30E+014.29E-098.18E+038.60.E+042.43E+046.09E+049.36E+043.86E+031.72E+047,54E+051.77E+041.80E+062.10E+044.73E+025.24E+00
2.67E+033.65E+041.19E+012,12E-06
4.54E+00
5.10E+042.64E+02
4.18E+033.95E+031.76E-082.64E+041.73E+032.64E+043,78E-057.97E+035.78E+045,82E-045,69E+054.72E+04
6.36E+014.14E-098.2 1E+038.83E+042.49E+04
6.26E+049.63E+043.94E+031.76E+047.73E+051.33E+041.35E+061.57E+043.48E+024.91E+002.78E+033.76E+041.24E+012.09E-064.60E+00
5.27E+042.69E+02
4.27E+034.OOE+031.24E-08
2.65E+041,73E+032,66E+043.65E-05
8.01E+035.88E+045.71E-04
5.80E+054.82E+04
6,36E+013.96E-09
8.23E+038.98E+042.55E+046.38E+049.81E+044.OOE+031.77E+047.87E+059.99E+031.01E+061. 17E+042.57E+024,59E+002.85E+033.85E+041.28E+012.03E-06
4,63E+005.38E+042.73E+02
4.33E+034.03E+038.77E-09
2.66E+041.73E+032,66E+043.52 E-05
8.04E+035.95E+045.55E-045.88E+054.88E+04
6.34E+013.76E-098.24E+039.09E+042.57E+046.46E+049.90E+044.03E+03
1.79E+047.96E+057.46E+037.56E+058.74E+031.90E+024.28E+00
2.91E+033.91E+041.31E+011.96E-06
4.62E+00
5.47E+042.75E+02
4.37E+03
4.05E+03
6.18E-09
2.66E+04
1.72E+03
2.66E+04
3.39E-05
8.06E+03
5.99E+04
5.39E-04
5.93E+05
4.92E+04
6.28E+01
3,56E-09
8,24E+03
9.18E+04
2.60E+04
6.53E+04
9.99E+04
4.04E+03
1.80E+04
8.01E+05
5.59E+03
5.66E+05
6.53E+03
1.40E+02
3.99E+00
2.95E+03
3.95E+04
1.31E+01
1.89E-06
4,59E+00
5.53E+04
2.75E+02
4.41E+034.07E+034.36E-092.66E+041..72E+032.67E+043.27 E-05
8.07E+036.02E+045.21E-04
5.98E+054.96E+04
6.21E+013.37E-09
8.23E+039,27E+042.62E+046.57E+041.01E+054.05E+031.80E+048.06E+054.19E+034.24E+054.89E+031.04E+023.71E+002.98E+033.99E+041.3 1E+011.82E-06
4.55E+005.57E+042.74E+02
3.19E+032.94E+033.07E-09
1.93E+041.23E+031.93E+042.27E-05
5.83E+034,35E+043.62E-04
4.31E+05
3.58E+044.41E+012.29E-09
5.92E+036.66E+041.89E+044.74E+047.29E+042.91E+031.30E+045.81E+053.14E+033..18E+053.65E+037.68E+013,43E+002.24E+032.88E+041.25E+011.25E-06
3.23E+004.02E+041.96E+02
2.30E+03
2.12E+03
2.16E-09
1.39E+04,
8.87E+02
1.40E+04
1.58E-05
4.21E+03
3.13E+04
2.51E-04
3.11E+05
2,59E+04
3,12E+01
1.55E-09
4.27E+03
4.81E+04
1.37E+04
3.43E+04
5.27E+04
2.09E+03
9.27E+03
4.19E+05
2.36E+03
2.38E+05
2.73E+03
5.69E+01
3.20E+00
1.68E+03
2.08E+04
1.08E+01
8.61E-07
2.30E+00
2.91E+04
1.40E+02
1.67E+03
1.53E+03
1.52E-09
9.99E+03
6.37E+02
1.01E+04
1.10E-05
3.04E+03
2.26E+04
1.75E-04
2.25E+05
1.87E+04
2,21E+01
1.04E-09
3.08E+03
3.47E+04
9.90E+03
2.48E+04
3.80E+04
1.50E+03
6.66E+03
3.02E+05
1,76E+03
1,78E+05
2.04E+03
4.23E+01
3.01E+00
1.27E+03
1.50E+04
8,76E+00
5.92E-07
1.63E+00
2.10E+04
9.99E+01
1.20E+03
1.11E+03
1.08E-09
7.25E+03
4.58E+02
7.26E+03
7;61E-06
2.20E+03
1.63E+04
1.21E-04
1.63E+05
1.35E+04
1.58E+01
7.10E-10
2.21E+03
2.50E+04
7.14E+03
1,79E+04
2.75E+04
1.08E+03
4.79E+03
2.17E+05
1.32E+03
1.33E+05
1.52E+03
3.15E+01
2.85E+00
9.45E+02
1.08E+04
6.87E+00
4,08E-07
1.16E+00
1.52E+04
7.16E+01
8.68E+02
7.99E+02
7.59E-10
5.24E+03
3.29E+02
5.25E+03
5.29E-06
1.58E+03
1.17E+04
8.39E-05
1.17E+05
9.72E+03
1.12E+01
4.82E-10
1.59E+03
1.80E+04
5.16E+03
1.29E+04
1.98E+04
7.74E+02
3.44E+03
1.57E+05
9.90E+02
9.99E+04
1.14E+03
2.36E+01
2.72E+00
7.09E+02
7.83E+03
5,25E+00
2.81E-07
8.22E-01
1. 10E+04
5.12E+01
fll#~U#####~t# ####f ##### lll### ##### # ####I##f# ##f# l#llf####t### ###########I#2:05
1.50.E-021.34E+057.43E+034.85E+026.62E+032.07E+024,86E+041.49E+043.38E+041.98E+051.51E+057.86E+036.11E-01
6.05E+022.69E-055.24E-101.21E+047.42E-071.20E+038,48E+032.09E+002.35E+032.16E+041.11E+015.67E+036.62E+032.48E-022.31E-02
2:201.09E-02
9.63E+045.37E+033.48E+024.78E+031.49E+02
3.51E+041.08E+042.44E+041.43E+051.07E+055.63E+034.29E-014.54E+02
1.94E-05
3.70E-109.09E+035.13E-07
8.60E+026.12E+031.49E+001,69E+031,56E+048.OOE+004. 10E+03
4.78E+031.80E-021.67 E-02
2:357.88E-03
6,98E+043.88E+032.50E+023.46E+031.08E+022,54E+047.77 E+031.76E+041.04E+057.62E+044.03E+033,02E-01
.3.40E+021.40E-05
2.61E-106.85E+033.55E-07
6.19E+024.42E+03
1.07E+001.22E+031,13E+045.80E+002.95E+033.46E+031.3 1E-021.2 1E-02
2:505.70E-03
5.04E+042.80E+031.80E+022.49E+03
7.80E+011.84E+045.61E+031.27E+047.45E+04
5.41E+042,89E+032,12E-012.55E+021.01E-051.84E-105.14E+032.45E-07
4.46E+023.20E+037.64E-01
8.82E+028.07E+034.19E+002.13E+032,49E+039.45E-038,74E-03
3:054.12E-03
3,64E+042.03E+031.30E+021.SOE+035,63E+011,32E+044.05E+039.18E+035.38E+043.85E+042.07E+031-49E-01
1.92E+027,29E-061.30E-10
185E+031.69E-07
3.2 1E+022.30E+035.46E-016.37E+025.81E+033.03E+001.54E+03
1.80E+036.81E-036.32E-03
3:202.99E-03
2.63E+041.46E+039.27E+011.31E+03
4.07E+019.54E+032.93E+036.64E+033.89E+042.74E+041.49E+031.05E-011.43E+025.26E-06
9.18E-112,89E+031.17E-072.31E+021.67E+03
3,91E-014.60E+024.19E+032.20E+001,12E+03
1.31E+034.93E-034,57E-03
3:35
2.16E-03
1.90E+04
1.05E+03
6.68E+01
9,36E+02
2.94E+01
6.90E+03
2.12E+03
4.80E+03
2.80E+04
1.95E+04
1.06E+03
7.42E-02
1.08E+02
3.80E-06
6.46E-11
2.16E+03
8.09E-08
1.67E+02
1.21E+03
2.79E-01
3.32E+02
3.02E+03
1.58E+00
8.03E+02
9.36E+02
3.57E-03
3.30E-03
3:501,57E-031.37E+047.62E+02
4.80E+016.79E+02
2.12E+014.99E+031,52E+033.47E+03
2.03E+041.39E+047.61E+025.22E-02
8.07E+012.74E-06
4.55E-111.61E+035.60E-081.21E+028.70E+02
2.OOE-012.39E+022.17E+031.15E+005.80E+02
6.80E+022.58E-032.39E-03
4:05
1.13E-03
9.90E+03
5.51E+02
3.45E+01
4.91E+02
1.54E+01
3.60E+03
1.10E+03
2,50E+03
1.46E+04
9.90E+03
5.45E+02
3,67E-02
6.06E+01
1.98E-06
3.21E-11
1.20E+03
3.87E-08
8.67E+01
6.28E+02
1.43E-01
1.73E+02
1,57E+03
8.31E-01
4.19E+02
4.91E+02
1.87E-03
1.73E-03
4:20
8.19E-04
7.14E+03
3.98E+02
2.48E+01
3.55E+02
1.11E+01
2.60E+03
7.95E+02
1.81E+03
1.05E+04
7.07E+03
3.91E+02
2.58E-02
4.54E+01
1.42E-06
O.OOE+00
8.95E+02
2.67E-08
6.25E+01
4.55E+02
1,02E-01
1.25E+02
1.13E+03
6.01E-01
3.02E+02
3.55E+02
1-35E-03
1.25E-03
4:35
5.93E-04
5.16E+03
2.87E+02
1.78E+01
2.56E+02
8.01E+00
1.88E+03
5.74E+02
1.31E+03
7.61E+03
5.04E+03
2.80E+02
1.82E-02
3.40E+01
1.03E-06
O.OOE+00
6.65E+02
1.85E-08
4.50E+01
3.28E+02
7.30E-02
9.OOE+01
8.11E+02
4.35E-01
2.18E+02
2.56E+02
9.81E-04
9.OOE-04
4:504.29E-04
3.73E+03
2.07E+02
1.28E+01
1.85E+02
5.79E+00
1.36E+03
4.14E+02
9.45E+02
5.49E+03
3.60E+03
2.01E+02
1.28E-02
2.56E+01
7.43E-07
O.OOE+004.94E+02
1.28E-08
3.24E+01
2.37E+02
5.22E-02
6.51E+0i
5.84E+02
3.15E-01
1.58E+02
1.85E+02
7,09E-04
6.53E-04
5:053.11E-04
2.69E+031.49E+029.18E+001.33E+02
4.18E+00
9.81E+022.99E+026..82E+02
3.96E+032.57E+031,44E+029.OOE-031.92E+015.36E-07
O.OOE+003.67E+02
8.83E-092.34E+011.71E+023.74E-024.70E+014.20E+022.28E-011.13E+02
1.33E+025.13E-044.72E-04
6.26E+025,77E+025.36E-10
3.78E+032.37E+023,79[+033.67E-061.14E+038.47E+035;82E-05
8.48E+047,05E+037,91E+003.27E-101.15E+031.3 1E+043.73[+039,36E+031.4.3E+045.56E+022.47E+031.13E+057.43E+0271.49E+048.52E+021.77E+012.61 E+005.30E+025.66E+033.95E+001.93EV05.83E-017.92E+033.66E+01
4.53E+024.17E+023,77E-102.73E+031,70E+022.74E+032.5 6E-068.28E+026.10E+034.04E-05
6.13E+045,09E+035.62E+002.21E-108.25E+029.36E+032.69E+036.73E+031604E+044.OOE+021.77E+038.14E+045.57E+025.61lE+046.37E+021.34E+ 012.51E+003.95E+024.09E+032493E4001.33E-074.14E-01
5.72E+032.62E+01
3.27E+023.01E+022.66E-101.97E+031.22E+021.98E+031.77E-06
5.99E+024.40E+032.81E-05
4.43E+043.68E+033.98E+001.49E-10
5.98E+026.78E+031.94E+03
4.86E+037.47E+032.87E+021.28E+035.87E+044.18E+024.20E+044.76E+021.,02E+012.43E+002.9*5E+022.95E+032.16E+009.09E-082.94E-01
4.13E+031.87E+01
2.37E+022.18E+021,88E-101.42E+03
8.79E+011.43E+031.23E-06
4.32H+023.18E+031,94E-05
3.20E+042,66E+032,83E+001.02E-104.30E+0 2
4,89E+031.40E+03
3,5 1E+035.40E+032.06E+029.18E+024.23.E+043,13E+023,15E+043,56E+027.81E+002.35E+002.20E+022.13E+031.58E+006.28E-082.09E-012.98E+031.34E+01
1,71E+021.57E+021.32E-10
1.03E+036.33E+011.04E+038.57E-07
3,12E+022.29E+031.35E605
2.31E+041.92E+032.01E+006,89E-113.10M+23.53 E+031.02 E+032,54E+033.90E+031.48E+026,57E+023,05E+042.35E+022.36E+042.66E+026.07E+002.28E+001.64E+021.54E+03
1.14E+004.32E-081..49 E-01
2.15E+039.54E+00
.12E+02
.1. 13 E+029.36E-11
7.43E+024.55E+017.44E+02.5.95E-072.26R.+21.65E+039.36E-061.67E+041.39E+03
1.42E+004.66E-112.2 3E.+022,55E+037.33E+021.84E+032.82E.+031.06E+024.72E+02
.2.20E+041.76E+021.76E+041.99E+024.77E+002,21E+001.22E+021.12E+038.26E-012.98E-081lOSE-01
1.56E+036,84E+00
.891E+018.18E+016.60E-11
5.36E+023.27E+015.38E+024.13 E-071.63E+021.19E+036.51E-061.21E+049.09E+021.01E+003.16E-111.61E+021.84E+035.29E+021.32E+032.03E+037.63E+013.39E+0.21,58E+041.31E+021,32E+041.49E+023,82E+002.15E+009.O0E+018.04E+02
5.95E-012.04E-087.48.E-02
1.13E+034390E+00
6.44E+015.91E+014,65E-113.88E+022.35E+013.89E+022.87E-07
1,18E+028.58E+024.52E-06
8.70E+037.24Et02
7.16E-010.OOE+001.16E+0.21.32E+033.83E+029,54E+021,47E+035.48E+012,44E+021.14E+049.90E+019.9SOE+031.12E+023.10E+002.10E+006.70E+015.81E+024.28E-011.41E-085.31E-02
8.12E+023.50E+00
4.65E+014.27E+013.29E-112..80E+021.69E401
2..81E+022.OOE-078.51E+016.18E+02.3.13&-066.28E+035.23E+025.08E-010.OOE+008.35E+019,54E+022.76E+026.90E+021.06E+033.93E+011.75E+028.23E+037.41E+017.42E+038.31E+012.57E+002.03E+004.97E+014,19E+02
3-06E-019.72E-093.77E-025.87E+022.50E+00
3.36E+013.08E+010-00E+002,03E+021.22E+012.03.E+021,39E-076.15E+014.46E+022.18H-6
4.54E+033.78E+023.60E-010.OOE+006.02E+016.89E+022.OOE+024.99 E+027.66E+022.83E+011.26E+02
.5.93E+035.55E+015.55E+036.21E+012,16E+001,98E+003.68E+013.02E+022.20H-16.67E-092,68E-02
4.24E+02
1.79E+00
2.43E+012.22E+010.OOE+001.46E+02
8.73E+001.47E+029.63E-08
4,44E+013.21E+021.51E-06
3.28E+032.73E+022i.56E-01
0.OOE+004.34E+014.97E+021.44E +023.60E+025.54E+0.22.03E+019,OOE+014,28E+034.16E+014.16E+034.64E+011,86E+001.93E+002.73E+012.19E+021.57E-014.59E-091.90E-02
3.06E+021.28E+00
1.76E+011.61E+010.OQE+001,05E+026.27EQ001.05E+02.6.69E-083.20E+012.32E+021,04E-06
2.37E+031.97E+02
.1.81E-010.OOE+003.12E+013.58E+021 .04E+022.60E+024.OOE+021.46E+016.48EQ013.08E+033.11E+013.11E+033.47E+011.63EO001.88E+002.02E+011,58E+021.12E-013.16E-091.35E-022.21E+029.18E-01
1.27E+011,16E+010.OOE+007.62E+014.51E+007.63.E+O1l4.64E-08
2.31.E+01
1.67E+027..26E-071.71E+031.42E+02
1.19E-01G.OOE+002.25E+012.58E+027.52E+011.8.8E+022.89E+021.04E+014.65E+012.22E+032.34E+012.33.E+032.59E+011.46E+001.83E+001.49E+011,14E+027.96E-022.1E-099.63E-03
1,59E+026.53E-01
~1fl####fl ##t# ####fUI l## # ###If f#####na# irt# #### f#####5:20
2.25E-04
1,94E+03
1.08E+02
6,62E+00
9.63E+01
3,02E+00
7.09E+02
2.16E+02
4.92E+02
2.86E+03
1.85E+03
1.03E+02
6.34E-03
1,44E+01
3.87E-07
O.OOE+00
2.73E+02
6.10E-09
1.68E+01
1.23E+02
2.66E-02
3.39E+01
3.03E+02
1,65E-01
8.22E+01
9.63E+01
3.72E-04
3.41E-04
5:35
1,63E-04
1.40E+03
7.81E+01
4.75E+00
6.97E+01
2.18E+00
5.12E+02
1.56E+02
3.56E+02
2.06E+03
1.31E+03
7.37E+01
4.46E-03
1.08E+01
2.79E-07
O.OOE+00
2.02E+02
4.22E-09
1.22E+01
8.94E+01
1.91E-02
2.45E+01
2.18E+02
1.19E-01
5.93E+01
6.97E+01
2.69E-04
2.47E-04
5:501.18E-041.01E+035.64E+013.41E+00
5.03E+011.58E+003.70E+021.13E+022.57E+021.49E+03
9.45E+025.28E+013.13E-03
8.08E+002.02E-07
0.OOE+001.49E+022.92E-09
8.74E+006.45E+011.37E-02
1.76E+011.58E+028.62E-02
4.28E+01
5,03E+011.94E-041.78E-04
6:058.52E-05
7.30E+024.08E+012.46E+00
3.64E+011.13E+002.67E+028.13E+011.85E+021.07E+036.75E+023.78E+012.2 1E-03
6.06E+001.45E-07
0.OOE+001.11E+022.02E-09
6.29E+004.66E+019.72E-031.28E+011.13E+026.24E-02
3.10E+013.64E+011.40E-041,29E-04
6:206.17E-055.27E+022.94E+011.76E+002.63E+018,22E-011.94E+025.87E+011.34E+027.76E+024.84E+022.71E+011,56E-03
4.55E+001.04E-07
0.OOE+008.19E+011.40E-09
4.54E+003.37E+016.98E-039.18E+008.15E+014.52E-022.23E+012.63E+011.02E-049.27E-05
6:35
4.46E-05
3.81E+02
2.12E+01
1,27E+00
1.90E+01
5.94E-01
1.40E+02
4.24E+01
9.72E+01
5,60E+02
3.47E+02
1.94E+01
1.09E-03
3.41E+00
7.56E-08
O.OOE+00
6.06E+01
9.63E-10
3.27E+00
2.43E+01
4.99E-03
6.65E+00
5.87E+01
3.27E-02
1.61E+01
1.90E+01
7.37E-05
6,73E-05
6:503.23E-052.75E+021.54E+019.09E-011.37E+014.29E-01
1.01E+ 023.06E+017.OOE+014.04E+02
2.48E+021.40E+017.69E-04
2..56E+005.45E-08
0.OOE+004.47E+016.66E-10
2.36E+001.76E+013.56E-03
4.81E+004.23E+012.37E-02
1.16E+011.37E+015.34E-054.86E-05
7:05
2,34E-05
1.98E+02
1.11E+0i
6.54E-01
9.90E+00
3.10E-01
7.28E+01
2.21E+01
5.06E+01
2.92E+02
1.78E+02
9.99E+00
5.41E-04
1.92E+00
3.94E-08
O.OOE+00
3.30E+01
4.61E-10
1,69E+00
1.27E+01
2.55E-03
3.47E+00
3.04E+01
1.71E-02
8.41E+00
9.90E+00
3.86E-05
3,52E-05
7:20
1.69E-05
1.43E+02
8.01E+00
4.71E-01
7.16E+00
2.24E-01
5.26E+01
1.59E+01
3.65E+01
2.11E+02
1.28E+02
7.14E+00
3.81E-04
1.44E+00
2.84E-08
O.OOE+00
2.44E+01
3.19E-10
1.22E+00
9.18E+00
1.83E-03
2.50E+00
2.20E+01
1.23E-02
6.07E+00
7.16E+00
2.80E-05
2.54E-05
7:35
1.22E-05
1,04E+02
5.79E+00
3.38E-01
5.17E+00
1.62E-01
3.80E+01
1.15E+01
2.64E+01
1.52E+02
9.18E+01
5.11E+00
2.68E-04
1.08E+00
2.05E-08
O.OOE+00
1.80E+01
2.21E-10
8.80E-01
6.62E+00
1.31E-03
1.81E+00
1.58E+01
8,95E-03
4.38E+00
5.17E+00
2.03E-05
1.84E-05
7:50
8.87E-06
7.47E+01
4.18E+00
2,43E-01
3.74E+00
1.17E-01
2.75E+01
8.32E+00
1.91E+01
I.iOE+02
6.60E+01
3.66E+00
1,88E-04
8.09E-01
1.48E-08
O.OOE+00
1.32E+01
1.52E-10
6.35E-01
4,79E+00
9.36E-04
1.31E+00
1.13E+01
6.47E-03
3.16E+00
3,74E+00
1.47E-05
1,33E-05
8:05
6.42E-06
5.39E+01
3.02E+00
1.75E-01
2.70E+00
8.43E-02
1.98E+01
6.OOE+00
1.38E+01
7.92E+01
4.73E+01
2.63E+00
1,32E-04
6.07E-01
1.07E-08
O.OOE+00
9,72E+00
1.05E-10
4.57E-01
3.46E+00
6.66E-04
9.45E-01
8.19E+00
4.68E-03
2.29E+00
2.70E+00
1.06E-05
9.63E-06
8:20
4.64E-06
3.89E+01
2.18E+00
1.25E-01
1.94E+00
6.09E-02
1,43E+01
4.33E+00
9.99E+00
5.72E+01
3.40E+01
1.88E+00
9.36E-05
4.55E-01
7.70E-09
O.OOE+00
7,19E+00
7,27E-11
3.29E-01
2.49E+00
4.76E-04
6.80E-01
5.90E+00
3.39E-03
1.65E+00
1.94E+00
7.67E-06
6.94E-06
9.18E+008.38E+000.OOE+005.51E+013.24E+005.52E+013.23E-081.67E+011.21E+025.04E-071.23E+031.03E+029.09E-02
0.OOE+001.62E+011.86E+025,43E+011.36E+022.09E+027.52E+003.34E+01
1.60E+031.76E+011.75E+031.94E+011.32E+001.78E+001.10E+018.24E+015.67E-021.49E-09
6.81E-031.15E+024.67E-01
6.61E+006.05E+000.OOE+003.98E+012.33E+003.99E+012.24E-08
1.2 1E+018,69E+013.50E-07
8.92E+027.43E+016.46E-020.OOE+001.17E+011.35E+023.92 E+019.81E+011.50E+025.40E+002.40E+01
1.15E+031.3 1E+011.31E+031.45E+011.22E+001.74E+00
8.14E+005.95E+014.03E-021,03E-094.83E-03
8.33E+013.34E-01
4.77E+004.37E+000.OOE+002.87E+011.67E+002.88E+011.56E-08
8.73E+006.26E+012.43E-07
6.44E+025.36E+014.58E-02
0.OOE+008.42E+009.72E+012.84E+01
7.07E+011.09E+023.88E+001.73E+018.32E+029.81E+009.81E+021.08E+011.13E+001.69E+006.OOE+004.30E+012.87E-027.07E-103.44E-036.02E+012.39E-01
3.45E+003.16E+000.OOE+002.07E+011.2 1E+002.08E+011.08E-08
6.31E+004,52E+011.68E-07
4.65E+023.88E+013.25E-02
0.OOE+006.07E+007.01E+012.04E+01
5.11E+017,85E+012.79E+001.24E+01
5.99E+027,38E+007.34E+028.10E+001.06E+001.65E4004.43E+003,11E+012.03E-024.87E-102.44E-03
4.35E+011.71E-01
2.49E+002.28E+000.OOE+001.4E+01
8.66E-011.50E+017.52E-094.55E+003,26E+011.17E-073.37E+022.80E+012.30E-020.OOE+004,37E+005.06E+011.48E+013.69E+015.67E+012.OOE+008.89E+004.32E+025.53E+005.50E+026.06E+009.99E-011.60E+003.27E+002.24E+011.45E-023.35E-101,73E-03
3.14E+011.22E-01
1.80E+001.65E+000.OOE+001.08E+016.22E-01
1.08E+015.23E-09
3.29E+002,35E+018.12E-08
2.43E+02
2.03E+011.64E-02
0.OOE+003.15E+003.65E4011.01E+012.66E+014.10E+011.44E+006.39E+003.11E+024.14E+004.12E+024.53E+009.54E-01
1.56E+002.41E+001.62E+011,03 E-022.30E-101.23E-032.27E+018.74E-02
1.30E+001.19E+000.OOE+007.81E+004.47E-01
7.83E+003,64E-092.38E+001.69E+015.63E-081.76E+021.46E+011..16E-02
0.OOE+002.27E+002.63E+017.71E+001,93E+012.96E+011.04E+004.59E+002.24E+023.11E+003.09E+023.38E+009.18E-011,52E+001.77E+001.17E+017.3 1E-031.58E-108-73E-041.64E+016.25E-02
9.36E-018.58E-01
0.OOE+005.64E+003.21E-015.65E+002.52E-091.72E+001,22E+013.91E-081,27E+021.05E+018,24E-.030.OOE+001.64E+001.90E+015.57E+001.40E+012.13E+017.42E-013.29E+001.62E+022.33E+002.31E+022.53E+008.80E-011.49E+00
1.31E+008.45E+005.18E-031.09[-106.20E-04
1.18E+014.46E-02
6,79E-016.19E-01
0.OOE+004.08E+002.31lE-01
4.09E+001.76E-09
1.24E+008.80E+002.71E-08
9.18E+ 017,62E+005.84E-03
0.00E+001. 18E+001,37E+014.02E+001.01E+011.54E+015.33E-01
2.37E+001.17E+021,75E+001.73E+021.89E+008.49E-011.44E+009.63E-01
6.10E+003.68E-037.51EF-114.40E-04
8.55E+003.20E-02
4.90E-014,47E-010.OOE+002.94E+001.67E-01
2.95E+001.22E-098.96E-01
6.35E+001.88E-08
6.61E+015.51E+004.14E-030.OOE+008.49E-01
9.90E+002.91E+007.25E+001.12E+013.83E-01
1.70E+008.41E+011.31E+001.30E+021.41E+008.21E-01
1.40E+00
7.08E-014.41E+002.61E-035.17E-113.12E-04
6.17E+002.29E-02
3.54E-013.23E-010.OOE+002.12E+001.20E-01
2.13E+008.46E-106,47E-014.58E+001.31E-08
4.77E+013.98E+002.91E030.OOE+006.12 E-017.13E+002.10E+005.24E+008.05.E+002.75E-011.22E+006.06E+019.81E-019.72E+011.05E+007.95E-011.37E+005.21E-013,19E+001.85E-033.56E-112.22E-04
4.46E+001.63 E-02
2.56E-012.33E-01
0.00E+001.54E+00
8.59E-021.54E+005.88E-104.68E-013,30E+009.09E-093.45E+01
2.87E+002.09H-30.OOE+004.41E-01
5.15E+001.52E+003.78E+005.81E+001.97E-018,77E-014.37E+017.35E-017.27E+017.90E-017.71E-011.33E+003.83E-012.30E+001.31E-03
0.00E+001.58E-04
3.22E+001.17E-02
1.85E-011.68E-01
0.OOE+001.11E+006-17E-02
1.11E+004.09E-103.38E-01
2,38E+006.29E-09
2.49E+012,08E+001.48E-03
0.OOE+O03.18E-0l
3.71E+001.10E+002.74E+00
4.19E+001.42E-016.30E-01
3.15E+015.51E-01
5.45 E+015.90E-017,49E-011.30E+002.82&-011.67E+009.36E-04
0.00E+001.12 E-04
2.32[+008.35E-03
8:353,36E-062.8 1E+011,58E+009,OOE-021 .40E+004.40E-021.04E.+013.13E+007.19E+004.12E+012.44E+01
1.35E+006.57E-051.41E-015.56E-090.00 E+00S.29E+005.02E-112,38E-011.80E+003.40E-044,91E-014.25E+002.45E-031.19E+001.40E+005.54E-065,02E-06
8:502.43E-06
2.03E+011.13E+006.48E-021.02E+003.18E-02
7.47E+002.26E+005.19E+002.98E+011.76E+019.63E-014.63E-052.56E-014.01E-090.OOE+003.90E+003.47E-111.71E-011.31E+002.44E-043.55E-01
3.06E+001,77E-038.60E-011.02E+004.01E-063.63E-06
9:051.76E-06
1.47E+018.21E-014.65E-027.34E-012.30E-02
5.40E+001. 63E +003.75E+002.15E+011.26E+016,91E-013.25E-051.92E-012.90E-09
0.00E+002.86E+000.00E+001.23E-019,45E-011.75E-042,56E-012.21E+001,29E-036.20E-017.34E-012.91E-062.62E-06
96201.27E-06
1.06E+015.93E-013.35E-025.30E-011.66E-02
3.90E+001.18E+002.71E+001.55E+019.09E+004.95E-01
2.29E-051.4E-012.09E-09
0.OOE+002.11E+000.OOE+008.87E-026.80E-011.24E-041.85E-011.58E+009.27E-044.48E-015.30E-012.11E-061.90E-06
9:359.18E-07
7.63E+004.28E-012.40E-02
3.83 E-011.20E-022.82E+008.51E-011.95E+001.12E+016.53E+003.55F-Ol1.61E-051.08E-011.51E-090.OOE+001.55E+000.OOE+006.40E-02
4.91E-018.90E-051.33E-011.14E+006.71E-043.23E-013.83E-011.52E-061.37E-06
#n###u~jt ######## ##tf~ffrnt# #ft####ff# ######## ##~##II## ##~##### #ff##fl##fl
9:506.67E-07
5.52E+003.10E-011,73E-022.77E-018.66E-03
2.03E+006.14E-011.41E+008.08E+004.69E+002.54E-01
1.13E-058.10E-021.09E-09
0.OOE+001.13E+000.OOE+004.61E-023.55E-016.36E-059,63E-028.23E-01436E-042.33E-012.77 E-011.1E-069.90E-07
10:054.82 E-073.98E+002.23E-011.24E-022.OOE-016.26E-031.47E+004,43E.-01
1.02E+005,83E+003.38E+00L82E-017.97E-066.08E-027.85E-10
0.OOE+008.34E-01
0.OOE+003.32E-022.57E-014.55E-056.95E-025.93E-013.52E-041.68E-012.OOE-017.97E-077.16E-07
10:203.49E-07
2.87E+001.61E-018.92E-031.45E-014.52E-03
1.06E+003.20E-017.38E-01
4.21E+002.43E+00
1.31E-015.62E-064.55E-025.66E-10
0.OOE+006.13E-01
0.OOE+002.39E-021.85E-013.26E-055.01E-024.27E-012.55E-041.22E-011.45E-015.77E-075.18 E-07
10:35
2.53E-07
2.08E+00
1.16E-01
6.41E-03
1.04E-01
3.27E-03
7.67E-01
2.31E-01
5.33E-01
3.04E+00
1.75E+00
9.36E-02
3.95E-06
3.42E-02
4.09E-10
O.OOE+00
4.49E-01
0,OOE+00
1.72E-02
1.34E-01
2.33E-05
3.62E-02
3.08E-01
1.84E-04
8.79E-02
1.04E-01
4.18E-07
3.74E-07
1.33E-011.22E-01
0.00E+008.01E-014.44E-02
8.03E-012.84E-102.44E-01
1.72E+004.37E-091.80E+011.50E+001.05E-03
0.OOE+002.29E-01
2.68E+007.92E-01
1.97E+003.03E+001,02E-014.53E-01
2.27E+014.13.E-01
4.08E+014.42E-017.27E-011.27E+002.07E-011.20E+006.63E-04
0.OOE+OO7.96E-051.68E+005.97E-03
9.63 E-028.78E-020.OOE+005,79E-013.19E-025.80E-011.97E-101.76E-011.24E+003,03E-091.30E+011.08E+007.43 E-040.OOE+001.65E-01
1,94E+005.72E-01
1.42E+002.19E+007.32 E-023.25E-011.64E+013.10E-01
3.06E+013.3E-017.07E-011.23E+001.52 E-018.67E-014.7 1E-04
0.0OE+O05.64E-051.22E+004.27E-03
6.97E-026-35E-02
0.OOE+004.18E-012.30E-024,19E-011.37E-101.27E-018-92E-012,11E-09
9.36E+007.83E-015.27E-04
0.OOE+001.19E-011 .40E+O004.13E-01
1.03E+001.58E+005.26E-022.33E-011.18E+012.32E-012.29E+012.47E-016,88E-011.20E+001.12E-016.26E-013.34E-04
0.OOE+004.01E-05
8.77E-013.05E-03
5.03E-024.58E-020.OOE+O03.02E-011.65E-023.02E-019.54E-119,18E-026.44E-011.46E-09
6.78E+005.65E-013.74E-04
0.OOE+008.56E-021.0lE+002.99E-017.43E-011.14E+00
3.77E-021.67E-01
8.50E+001.74E-011.71E+011.85E-016.70E-011.17E+008.20E-024.53E-01
2.37E-040.OOE+002.84E-056.34E-012.18E-03
3,64E-023.3 E-02
0.OOE+002,18H-11.19E-022,19E-016.61E-116.64E-024. 64E-011.02 E-09
4.90E+004.09E-01
2.66E-040.OOE+006.17E-027.25E-012.16E-015.37E-018.25E-012,71E-021.21E-01
6.13E+001.31E-01
1.29E+011.38E-016.52E-011.14E+006.01E-023.27E-011.68E-040.OOE+002.03E-054.57E-011.56E-03
2.63 E-022.35E-02
O.OOE+001-58E-018,51E-031.58E-014.59E-114.80E-023.35E-017.03E-10
3,54E+002.95E-011.88E-04
0.OOE+004.45E-025,24E-011.56E-013.88E-015.96E-011.94E-028.65E-02
4.42E+009.81E-02
9.63E+001.04E-016.35E-011.11E+004.41E-022.36E-011.19E-04
0.OOE+001.44E-05
3.30E-01*1.12H~3
1.90E-021.73EQ0
0.OOE+001.13E-016.12 E-031.14E-013.19E-113.47E-022-41E-014.88E-10
2.56E+002.13E-01
.1.33E-040.OOE+003.20E-023.78E-011.13E-012.80E-014.30E-01
1.40E-026.2 1E-02
3,19E+007.33E-02
7.20E+007.70E-026.17E-01
1.08E+003.24E-021.70E-018.45E-05
0.OOE+001.02E-052.39E-017.97E-04
1.37E-021.24E-02
0.OOE+008.22E-024.40E-03
8.23E7020.OOE+002.50E-021.74E-013.38E-10
1.85E+001,54E-01
9.45E-050.OOE+002.30E-022.73E-018.13E-022.03E-013.11E-011.01E-024.46E-022.30E+005.49E-02
5.39E+005.76E-026.01E-011.05E+002.38E-021.23E-015.99E-05
0.OOE+007.*24E-061.73E-015.71E-04
9.90E-038.99E-030.OOE+005.93E-023.17E-035.95E-020.OOE+001.81E-021.25E-012,35E-101,33E+001.12E-016.72E-05
0.OOE+001.67E-021.96E-015.87E-021.46E-012.24E-017.2 1E-033.20E-021,66E+004.11E-02
4.04E+004.30E-025.85E-011.03E+001.74E-028,89E-024,26E-050.OOE+005;14E-061.24E-014.08E-04
Case Summary
EventType Nuclear Power Plant
LocationName:City, county, state:Lat I Long / Elev:Time zone:Population:
Reactor ParametersReactor power:Average fuel burn-up:Containment type:Containment volume:Design pressure:Design leak rate:Coolant mass:Assemblies in core:
Source TermType:Shutdown:Core uncovered:Core recovered:
Release PathwayType:
Description:Release height:
Release events2011/03/16 19:502011/03/16 19:50
MeteorologyType:Dataset name:Dataset desc:
Summary of dataat release point:
2011/03/12 14:002011/03/12 15:002011/03/12 16:002011/03/12 17:002011/03/12 18:002011/03/12 19:002011/03/12 20:002011/03/12 21:002011/03/12 22:002011/03/12 23:002011/03/13 00:00
Fukushima U4<undefined>, <undefined>, <undefined>37.4214' N, 141.0325° E, 0 m<undefined>not available
3760 MWt30000 MWD / MTUBWR Mark I2.50E+05 ft
3
60 lb/in2
0.54 %Id1.25E+05 kg917
Time Core Is Uncovered2011/03/11 14:462011/03/16 19:50No
BWR - Release Through Dry Wellvia direct, unfiltered pathwayU4 Fukushima10. m
Leak rate (% vol) Total failureSprays Off
Actual ObservationsFukushima 2011-03-16 0935Obs/fcsts for Fukushima Unit 1
Dir Speed StabType deg m/s class
Temp°CPrecip
ObsObsObsObsObsObsObsObsObsObsObs
265265277260241236239229224226228
1.01.01.32.41.42.12.13.85.13.94.1
BBBBEEEEEEE
7
7
7
2011/03/13 01:002011/03/13 02:002011/03/13 03:002011/03/13 04:002011/03113 05:002011/03/13 06:002011/03/13 07:002011/03/13 08:002011/03/13 09:002011/03/13 12:002011/03/13 13:002011/03/13 14:002011/03/14 18:002011/03114 19:002011/03/14 20:002011/03/14 21:002011/03/14 22:002011/03/14 23:002011/03/15 00:002011103/15 02:002011/03115 03:002011/03/15 04:002011/03/15 05:002011/03/15 06:002011/03/15 07:002011/03/15 08:002011/03/15 09:002011/03/15 10:002011/03/15 11:002011/03/15 12:002011/03/15 13:002011/03/15 14:002011/03/15 15:002011/03/15 16:002011/03/15 17:002011/03/15 18:002011/03/15 19:002011103/15 20:002011/03/15 21:002011/03/15 22:002011/03/15 23:002011/03/16 00:002011/03/16 01:002011/03/16 02:002011/03/16 03:002011/03/16 04:002011/03116 05:002011/03/16 06:002011/03/16 07:002011/03/16 08:002011103/16 09:002011/03/16 10:002011103/16 11:002011103/16 12:002011/03/16 13:002011/03/16 14:00
Obs 235Obs 233Obs 225Obs 225Obs 225Obs 225Obs 248Obs 248Obs 270Obs 271Obs 276Obs 312Obs 258Obs 268Obs 330Fcst 337Fcst 323Fcst 305Fcst 015Fcst 002Fcst 347Fcst 332Fcst 332Fcst 344Fcst 026Fcst 044Fcst 020Fcst 010Fcst 030Fcst 027Fcst 037Fcst 053Fcst 058Fcst 067Fcst 081Fcst 089Fcst 085Fcst 083Fcst 074Fcst 054Fcst 029Fcst 011Fcst 346Fcst 350Fcst 323Fcst 316Fcst 298Fcst 314Fcst 312Fcst 331Fcst 299Fcst 312Fcst 309Fcst 304Fcst 314Fcst 325
2.6 E3.9 E1.8 E1.3 E2.2 E2.2 E2.7 E2.7 E3.1 E7.4 D6.2 D2.8 B4.8 unk5.0 unk2.2 unk4.6 unk7.2 unk6.6 unk8.6 unk7.5 unk5.2 E5.6 E4.0 E3.5 E3.8 E4.4 E4.2 E3.4 E3.5 D3.0 D3.4 D3.7 B3.7 B3.2 C3.9 C4.7 B4.4 B4.4 B4.6 C5.0 D5.6 D5.1 D4.3 C5.3 D5.6 D5.4 D4.8 D5.6 D4.7 D4.9 D4.2 D5.4 C7.5 C7.2 C8.8 C10.4 C
NoneNoneNoneLgt rainLgt rainLgt rainLgt rainNoneLgt rainLgt rainLgt rainNoneNoneLgt rainLgt rainNoneNoneLgt rainLgt rainLgt rainRainLgt rainLgt rainLgt rainLgt rainNoneNoneNoneNoneNoneNoneNoneNone.NoneNoneNone
2011/03/16 15:002011/03/16 16:002011/03/16 17:002011/03/16 18:002011/03/16 19:002011/03/16 20:002011/03/16 21:002011/03/16 22:002011/03/16 23:002011/03/17 00:002011/03/17 01:002011/03/17 02:002011/03/17 03:002011/03/17 04:002011/03/17 05:002011/03/17 06:002011/03/17 07:002011/03/17 08:002011/03/17 09:002011/03/17 10:002011/03/17 11:002011/03/17 12:002011/03/17 13:002011/03/17 14:002011/03/17 15:002011/03/17 16:002011/03/17 17:002011/03/17 18:002011/03/17 19:002011/03/17 20:002011/03/17 21:002011/03/17 22:002011/03/17 23:002011/03/18 00:002011/03/18 01:002011/03/18 02:002011/03/18 03:002011/03/18 04:002011/03/18 05:002011/03/18 06:002011/03/18 07:002011/03/18 08:002011/03/18 09:00
Dataset options:
CalculationsCase description:End of calculations:
Distance of calculation:Close-in distances:
Source Term
Fcst 324Fcst 304Fcst 299Fcst 297Fcst 316Fcst 309Fcst 294Fcst 299Fcst 300Fcst 294Fcst 286Fcst 287Fcst 293Fcst 300Fcst 311Fcst 295Fcst 303Fcst 333Fcst 321Fcst 307Fcst 292Fcst 315Fcst 299Fcst 292Fcst 286Fcst 298Fcst 286Fcst 285Fcst 288Fcst 301Fcst 311Fcst 307Fcst 303Fcst 311Fcst 316Fcst 310Fcst 319Fcst 316Fcst 307Fcst 311Fcst 326Fcst 343Fcst 344
12.3 C None14.7 D None14.2 D None11.3 D None9.8 D None9.4 D None9.5 D None7.6 D None9.7 D None5.0 D None7.0 D None6.6 D None6.5 D None6.3 D None5.9 D None7.4 D None8.4 C None4.8 C None5.9 C None5.0 C None8.4 C None9.3 C None11.1 C None11.8 C None10.7 C None9.3 D None8.5 D None10.6 D None11.1 D None11.3 D None10.1 D None8.4 D None8.7 D None7.1 D None3.4 D None6.0 D None7.4 D None6.3 D None4.9 D None4.4 D None5.1 C None5.4 C None6.1 C None
Est. missing stability using: Wind speed, time of day, etc.Adjust stability for consistency: NoModify winds for topography: Yes
Fukushima U2, U3 and U4 SFP approximate site release2011/03/17 10:50Start of release to atmosphere + 15 hClose-in + to 50 miles0.5, 1.0, 1.5, 2.0, 3.0, 5.0, 7.0, 10.0 miles
Total amount released to atmosphere: 2.1 E+08 Ci
NuclideAm-241Ba-140Ce-141Ce-143Ce-144*Cm-242Cs-134Cs-1 36Cs-137*1-1311-1321-1331-135Kr-85Kr-85mKr-88La-140La-t41Mo-99Nb-95Nb-97
Notes:
Ci1.3E+001.3E+076.7E+054.6E+046.OE+051.8E+045.7E+061.8E+064.OE+062.6E+072.OE+071.1E+06i.1E+028.1E+057.2E-022.1 E-068.OE+059.9E-051.6E+057.4E+052.0E+02
NuclideNd-147Np-239Pm-147Pr-143Pr-144Pu-238Pu-239Pu-241Rb-86Rb-88Rh-103mRh-1 05Ru-103Ru-1 05Ru-106*Sb-127Sb-129Sr-89Sr-90Sr-91Sr-92
Ci2.1 E+052.OE+069.5E+025.OE+055.9E+052.2E+002.1 E+005.6E+046.8E+04I.1E-065.OE+053.3E+045.OE+058.OE-041.5E+058.2E+058.4E-038.iE+066.7E+059.OE+026.1 E-08
NuclideTc-99mTe-127Te-127mTe-129Te-129mTe-131Te-131mTe-132Xe-131mXe-133Xe-133mXe-135Xe-135mY-90Y-91Y-91mY-92Y-93Zr-95Zr-97*
Ci1.6E+051.2E+063.5E+058.9E+051.4E+065.6E+042.5E+051.1E+071.OE+061.OE+081.2E+063.OE+041.7E+023.8E+044.9E+051.8E+022.7E-056.OE+O06.9E+053.5E+03
- Nuclides with * in name include implicit daughters.
...............i.
- --- -
From:Sent:To:Subject:Attachments:
UA08 HocThursday, April 21, 201.1 10:05 PM
OST01 HOCRequest: Add recurring daily actions and calls list to sharepoint
Recurring Daily Actions and Calls Rev 36.docx
Hi Cynthia
Would you please create a folder on share point for "Recurring Daily Actions and Calls"?
I checked and could not find a folder. The most recent version is attached to this email.
Thanks
Liaison Team CoordinatorUS Nuclear Regulatory Commission
email: lia08.hoc@nrc~gov
Desk Ph: 301-816-5185
1
ý61 ýý
Recurring Daily Actions and Calls(Informaton Rolled into Recurring Daily Actions and Calls on WebEOC under ET Misc. Document Collection)
Time (EDT) Description Lead Team Action/Purpose of the Call0300 RSTIPMT call with Japan Team RST/PMT Daily update for Site Team and HQ (convenient time for
i(armg Y 'Cih Site Team.. ! (b)(5) E
0530 Input for 1200 NRC Status Update LT Send out input request to ET, PMT and RST for 1200 NRC_ _ _Status Update
0600 Congressional Update LT Taken From Status Update (Confirm wI OCA)0600 One Pager (endof shift) ET, Response Advisor Provide input to EST Support0830 Daily call with Chuck Casto/Site ET Update chairman and staff during turnover
Team0845 Chairman Joins the Daily Call ET
Deputy Secretaries (as scheduled) ET White House lead (-Chairman partcipates)-Interagenc discussion
0930 UK/Canada/France Call RSTIPMT Information Exchange. Focused on Operational issuesCik e(and by HOO) (Combining PMT call from 1400 for Dose issues. Starting 3/28)
1000 Input due to for Daily SITREP All Inputs due to LT Coordinator for Status Update1000 TAs & CAs briefing ET ET Director lead -briefed Commission TAs and Ods
(araMed by HOO) (Tuesday and Thursday ONLY)(b)(5)
1100 Technical Coordination with RST Technical discussionIndustry Consortium (vnd by HOO)
_ _ _ __ (b)(5) _1100 Info Exchange: US Environmental "Radiological Status & Implications" call between NRC, NEI,
Monitoring Data Arranged by NEI EPA, DOE and OSTP. NEI or OSTP will set up the bridge line.(weekly after 4/5; next call to be April19 at 11:00)
1230 NTAG teleconference (chaired by PMT Nuclear Technical Advisory Group -email sent out ASNSS) C Occurs As Needed with phone # and pass code
1400 USAIDStang 415 caf Af be on7&dv oný877,3X48037 Password j
I--OCA USAID lead-Interagency discussion: Federal pre-coordination takesplace at 1:45 and then the 2pm call with Congressionalstaff. (Tuesday Only)
1400 Advisory Team (A-Team) White House/PMT
April 21, 2011 1945 hrs Recurring Daily ActiJqusand Calls Rev 36
UF~REN~ R N: i~e eb 0~. ET~ ~oc~~ntCslleciion)
Recurring Daily Actions and Calls(Information Rolled into Recurring Daily Actions and Calls on WebEOC under ET Misc. Document Collection)
202-39539 (bX5)1400 One Pager (end of shift) ET, Response Advisor Provide Input to EST Suppokt1500 Congressional call OCA & OCA lead -Audience is Congressional staff who have or are
NRC Go-To Team near a plant; Oversight committees; House &Senate(Leeds, U.Johnson, She=, leadershipB.Boger, etc)
_ 8 o. 71(. ... . ... . .
1700 PACOM J2 call RST/PMT- Occurs in SGT Room on Mon, Wed, Fri. PACOM will dialinto 301-415-5393.
1700 HHS call with 50 states and FSME Meeting occurs each Tuesday and Thursday evening, asfederal partners (Rich Turtil) organized by HHS (N.Natarajan). HHS provides bridge line
day of call1700 DOE Science Panel RES Brian Sheron and Richard Lee, out of the box solutions.1700 RST/PMT call with Japan Team RST/PMT Daily update for Site Team and HQ (convenient time for the
(r=r by ft HOO) Site Team)
1830 PMT call with Japan Team PMT Daily update for Site Team and HQ (convenient time for the(aang by the Hoo) Site Team)I (b)(5) 1
1900 Call with Vince Holahan PACCOM PMT Status of Radiological ConditionsVince Direct Line - 808.477.9536, if no answer808.477.9286 or SWO 808.477.8173Cell (bX5) I
2000 HHS Call with Pacific HHS n6 o rs each Wed. evening. Call in 888.455-7847,____ __ (b)(5 s the passcode. PMT to participate
2000 Call with Industry Consortium ET ET Led High-level discussions with industry and NRC Site(Every Mnday and at (i-ed by Hoo) Team (Call covers 'Nuclear Team Asks and Offers Tracker2000 EDT) I (bX5) XX-XX-201 1.xlsx' spreadsheet of major items).
2200 One Pager (end of shift) ET, Response Advisor Provide Input to EST Support2200 One pager EST Update chairman via email using one-pager
I
A01I21, 2011 1945 hrs Recurring Daily Actions and Calls Rev 36
C&REI~ ~E~hY Se iWebEXC ETMisc, Docuirpnt of~ci
From:Sent:To:Subject:Attachments:
HOO HocFriday, March 18, 2011 6:06 PMRST01 HocFW: Fax from 81355105111Filel.PDF
Headquarters Operations OfficerU.S. Nuclear Regulatory CommissionPhone: 301-816-5100
Fax: 301-816-5151email: [email protected] e-mail: hool~anrc.sRov.gov
----- Original Message -----From: hool [mailto:[email protected]]
Sent: Friday, March 18, 2011 6:01 PMTo: HOO Hoc
Subject: Fax from 81355105111
RECEIVE NOTIFICATION FOR JOB 00017760
Notice for: HOO1
Remote ID: 81355105111
Received at: 03/18/2011 18:00
Pages: 8
Routed by:
Routed at: 03/18/2011 18:00
1
?I
19.MAR.2011 6:57 EMBASSY-CONTROL-ROOM NO. 096 P. 1 1.-1
Fjc-v,, ~blu- ac LUr6
(aK.-
9 f to K>:s4?/c zr'pk
19. MAR. 2011- 6:57 - EMBA
000/
SSY-CON ROL -ROWM- -NO. 096-P. 2/8__2ff7_
m
0'
f1
@0-
AFE
iI~ ~
A14 zyl LV
,1
.z.rl.,
./ s/*
7i4f
;~It
[I
r~Un~mzF~
4~IT/7.
35
2411LI - -3 .
L LL&ILIL1W
I
19. MAR, 2 01, 1 6:57 £M.AS SY- CONI T'.OL -ROOM
/~ j~Ov 9
LJ NO. 096 P. 3/8
- Si, .aj~ .hIl
=2-@A* a
j:;# #4
170 1
ewl a7~.)
.L- Us~ A - *~W
S.
71
I,
'7 U-
Z'- . . : .. dih.
A' '~i~ gj g~3W,?. - . j*C
* QWI~ I C e.g. ~U IA~ 'I
* I~DC - .. ~ ~IW~T7) Hi0
I~I
K #3T/I~ . ~4T/BI I.
,, ýý#ý:qc / 13 11ll
I CR/B
RW/~ E J
S .12
U.)
/
/ /-, FN \~
qp
-MOD,
A' -6 :1 A 4
algrirA WA
9
h 111111111 lad"
19. MAR. 2011 6:58 ERBASSY-CONTROH-OOV NO. 0I96 P. 4/8
SANY10 fj JIAN CNE
OR camfSAWY OFAAN c<D.
A SANY Group Company
3-2-5.1128 Kesumngaseki. Chlyada-ku,Tokyo 100-601 1 JapanTmW: (61)3-35D3-5318A
Ghsn]ian@[email protected]. corn
19AAR.2011 6:58 EMBASSY-CONTROL-ROOM ANO. 0016 P. 5/0 45
Large working area, small footprint -the large booms in the 50 m class
.. . *' ; " : : ' i i '. -: . . . ,.",.• ,
---..... .... ----.-.-".. . .
M 52-5 More Information can be foundIn tile brochure BP 3231
5-section Multi-Z-foldingVertical reach 52.0 mHorizontal reach 48.0 mReach depth 38.1 mUnfolding height 10.4 m
Support width front rearnormal approx. 10.4 m approx.10.2 mOSS approx. 7.0 m approx- 6-5 m 7
18
M 58-5 More information can be foundin the brochure BP 3873
5-seition roll-Z-foldiog 7' -3 Support width frontVertical reach 57.6 m normal approx, 11.1 mnHorizontal reach 53.6 m OSS approx. 7.8 mnReach depth 42.4 mUnfolding height 12.3 m
rearapprox, 11.5 mapprox. 8.0 M
Option of 5 or 6-axle chassis, depending onapproval requirements and vehicle features
-4 Truck-mounted concrete pumps in Vie 50 rn class and highar are equipped wllh a varable-position telescopic supportA distinct advantage Ior optimum usage of the extengive boom reach in a huge woiking aTea.
I9. :.,'AR. 2011 6:59 EMBASSY-CONTIROL-ROOM NO. t"96 P. 7/8
Nuclear disaster required rapid actionOn 26 April 1986, early In the morning at about 1 o'clock, reactor block IV at the Soviet Chernobyl nuclear power plant goes outof control during a routine exercise by the operating crew. As a result of a chain reaction, there is a massive explosion, which blowsthe cover off the 1,000-ton reactor core and destroys it. The explosion and subsequent fire release large quantitiea of radioactivematerial. Those responsible did not have much time to work out the details of complix; subsequent safeguards. Instead, it was amatter of acting quickly to contain the consequences of the catatrfophe - the contamination of enormous areas of land.Putzmelster concrete pumps also played a pert In this,
Through the dumping of approximately5,000 t of sand, clay end lead from helicop-ters in the first weeks after the disaster, thebeat escaping f-rn the reactor block is suc-
-cessfully contained and the dangerousradiation absorbed, The graphite fire isfinally extinguished and the escape of radio-active materials slowed by feeding in nitro-gen.
In the early summ6r of 1986, the depart-ment responsible in the Soviet foreign tradeministry and Putzrnelster sign a contract forthe delivery of ten M 52-5 truck-mountedconcrete pumps with 5-arm large booms,the truck-mounted concrete pumps with thelongest reach available at the urme, with'special equipment'. Thu uxtras inclu:le twoadjustable vidao cameras per machine,imounted on the rear left-hand supportingleg and on the tip of the boom. These areIftended for observing ths filling of the hop-per and, the u;tluel concreting work from odistance. Moreover, it has to be guaranteedthat the truck-mounted concrete pumps caneven be operated from a distance of up to800 mn via remote control and by cable radiocontrol. ALSo, control and observation of themachines should also be possible from thecab - a monitor Is fitted in place of .he pas-senger's seat. Incidentally, the Soviet sidewould have liked to order the new M 62long-reach bonm pumps. However, thesemachines were still in development at thedime and not due to be delivered 4ntllAutumn 1986.
Special equipment to protect againstradiation
Thu special equ~pmnt on four of the ma-chines also includes a lead hood (weighlapproximately 4 r) to pretect the cab fromradiation. When the lesd casing is attwched,the driver can only get Into the cab via ahatch specially cut into the roof Pour small,slitteti windows provide froim and sidel vis]-bility Here too, radli-ton protectinn Ii pro-victed by lead glazing; the sensitive videocamera optics are stmilarly protected. Thefirst two machines leave the Putzmeisterworki at the end of lune. One factur In theprompt delivery Is the readiness of several
customers to make available machineswhich were really intended for themselvesand the 5-axle chassis they had ordered.There are also many Putzmeiser employees,however, who work lace into the night, areavailable at weekends and postpone theirplanned annual holidays. The last of thisorder's large boom concrete pvmps arefinally handed over in September 1986.Three stationary high pressure concretepumps are also delivered. These have thetask - as was [earned later - both of loadingseveral of the truck-mounted concretepumps via pipetines. from a distance, and ofdelivering concrete through a 600 m longdelivery line for a tunnel under the reactorbuilding. This tunnel is reason for the manu-facture of a 2.5 M thlck protection plateunder the reactor block.
Everything kept secret
An anecdote on the side: the Putzmeismresa'es representative responsible for EasternEurope felt the effects of how senshlvely theSoviet side reacted on the subject of "com-bating damage to the Chernobyl reactor'.Despite meetings arranged a long time inadvance, in the early summer of I P86 hewas not received in Moscow by his Sovietcontact. Appointments reon'anged for thedays that followed were repeatedly cancel-led, so that The Putzmeister employee final-ly abandoned hjs visit to Moscow. Duringthe Lufthansa flight rO Frankfurt, heo leafedthrough the current edition 0f the Germanmagazine 'Oer Spiegel', And then it becaraeclear to him why he had been put off sn@eroltimes by his Sovlet counterpart: In a detailedarticle, the Hamburg news magazine report-ed on the radiation protection equipment onthe Putzmeister concrete pumps, two ofwhich had just crossed the border boeteen
For their work In Chernobyl, truck-mounted concrete pumps were equipped withprotective lead covers and remote-controlled video cameras for the first time
40 PM 4062 GS
19. MAR. 201 6:59---. -- MB AS SY-CONT ROL-RO..~ %,0. 096 ' -.p.4
Largo boom truck-mounted concrete pv1mps filling~ the steol moulds arranged In the pyramid shape of the protective wall
PM 4062 GB 41
I
From:To:Subject:Date:
Attachments:
RSTOI HocMonninoer, John; Casto, Chuck; Kolb. Timothy Ulses. Anthony; Trapp. JamesSketch of SFP CoolingFriday, March 18, 2011 1:56:25 PMTemoorary SFP' Snrav Coolino sketch Bechtel.odf
The attached file provides a sketch of the proposed SFP spray cooling system. I don't have a list ofeveryone on your team, so please be sure that it is shared with everyone that needs it.
Joe Williams
RST Coordinator
From: Vircilo. MartinTo: Jaczko. Gregory; BorchardL BillSubject: IAEA Conference CallDate: Friday, March 18, 2011 6:12:00 AM
Chairman/Bill , /.
A summary of our call with the IAEA
From: LIA02 HocSent: Friday, March 18, 2011 5:47 AMTo: Virgilio, MartinCc: Doane, Margaret; Shaffer, Mark R; LIA06 Hoc; LIA08 HocSubject: IAEA Conference Call
Marty Virgilio reached out to the IAEA at 0330, March 1 8 th and spoke with Jim Lyons and DenisFlory about the Japanese accident. Highlights of the call include:
- Marty stated that the purpose of the call was to try to ensure the efforts of IAEA and NRCrelated to the Japanese accident were complementary.
- Denis Flory stated that DG Amano went to visit Japan for the purpose of meeting withJapanese government officials for fact finding, and to improve communications flow andrelations. There is no intended message to be passed. Khammar Mrabit, Head of Safety
and Security Coordination Section was also in attendance.- IAEA also sent a team of two technicians to take radiological measurements.- Jim Lyons stated that IAEA was setting up two teams in Vienna to analyze data from the
accident. This included a team for Safety Assessment and one for Radiological
Consequences. Jim stated that the plan has strong support from member states and askedNRC to consider sending technical experts to support the teams.
- Marty presented NRC's priority approachwith regard to the accident, discussed the
composition and purpose of the NRC Japan team, and NRC's challenges in supporting theJapanese recovery efforts.
(b)(4)
From:Sent:To:Cc:Attachments:
Oyama, Ryoki <[email protected]>Friday, March 18, 2011 7:22 PMRSTOI HocDevercelly, RichardJapan Team.pdf
This email is. UNCLASSIFIED.
C
1.
€.
Weber, Michael
From: Weber, MichaelSent: Friday, March 18, 2011 6:38 PMTo: RST01 Hoc; OST02 HOCSubject: FYI - Revision to INPO Event Report L1 11-1 - Fukushima Daiichi Nuclear Station Fuel
Damage Caused by Earthquake. and TsunamiAttachments: IER Li-il-i, Rev. 2.pdf
----- Original Message -----
From: Andersen, JamesTo: Borchardt, Bill; Weber, MichaelSent: Fri Mar 18 18:04:41 2011Subject: FW: Revision to INPO Event Report Ll 11-i - Fukushima Daiichi Nuclear Station FuelDamage Caused by Earthquake and Tsunami
FYI.
---- -Original Message -----From: Wittick, BrianSent: Friday, March 18, 2011 5:38 PM
To: Howe, Allen; Andersen, James; Virgilio, Martin; Merzke, DanielCc: Bowman, Gregory; Meighan, Sean; Nguyen, QuynhSubject: Fw: Revision to INPO Event Report Li 11-i - Fukushima Daiichi Nuclear Station FuelDamage Caused by Earthquake and Tsunami
Attached please find the latest revision to the subject event report that incorporates
clarifying changes to the recommendations section.
VR
Sent from NRC BlackBerry
Brian Wittick[ (b)(6)
-- -Original MessageFrom: Mortensen, George K (INPO) <MortensenGK(lINPO.org>To: Leeds, Eric; Wittick, Brian; Boger, Bruce; Thomas, Eric; Kobetz, Timothy
Sent: Fri Mar 18 17:23:33 2011Subject: FW: Revision to INPO Event Report Li 11-i - Fukushima Daiichi Nuclear Station FuelDamage Caused by Earthquake and Tsunami
All,Attached is a copy of the recently revised INPO Event Report 11-i. IER Li 11-i has beenrevised to clarify wording in the recommendations for consistency of responses.
Please note that this document remains a copyrighted, Limited Distribution document that is
not releaseable to any third party. Confidentiality of the document remains in place ascovered by the INPO-NRC Memorandum of Agreement and the supporting FOIA Affidavit providedto, and approved by, the NRC.
Best Wishes!
George Mortensen1
------- ------- --------
From:Sent:To:Cc:
[email protected], March 18, 2011 10:14 [email protected]@Bechtel.com; Kozal, Jason; RST01 Hoc; Kolb, Timothy; [email protected];masahito.yoshimura.fa @hitachi.com; shunsu [email protected];[email protected]; Richard [email protected]: {Important) Re: Shipment to Yokota ABSubject:
Ned,
-.1I(b)(4)
Regards,
Junichi (Jack) Soma
Hitachi-GE. Nuclear Energy, Ltd
<Mobile PhoneS (b)(6) !7
<E-mail:Mobile>(b)(6)
<Enmail:Hitachi>iL, nichi.soma-nvt hitachi.cam
iunichi.soma.ov(hitachi.com2011/03/1910:38 cc
cwrauPBechtei.com
RE: {Important) Re: Shipment to
Yokota AB
ý6q3
From: Merchant, Ned <[email protected]> )Sent: Friday, March 18, 2011 8:49 PM
To: ~.(b)(6Cc: RST01 Hoc; Kolb, Timothy; Jack Soma; Rau, Carl; Kozal, JasonSubject: Shipment to Yokota AB
Wayne,
The contact information for Tim Kolb is timothy.kolb(cnrc..qov I do not have a phone number for him Ido know that he is working out of the US Embassy in Tokyo.
Tim-Wayne Godfrey is at the Yokota Air base and is looking for the contact person to arrange tocontract with for the services once the transport arrives at the airport. His phone number is 81 425523010
The contact info for Jack Soma at GE Hitachi is: Junichi (Jack) Soma
Hitachi-GE Nuclear Energy, Ltd
<Mobile Phone>(b)(6)
<E-mail :Mobile>* (b)(6)<E-maiil:Hitachi>•junichi. soma. pv@hitachi. crmn
Best Regards, Ned"Quality is not an act, it is a habit"
I
r.
INPO -- External Relations Program ManagerFrom: Webster, Bill E (INPO)Sent: Friday, March 18, 2011 4:47 PMSubject: Revision to INPO Event Report Li 11-1 - Fukushima Daiichi Nuclear Station FuelDamage Caused by Earthquake and Tsunami
To: Chief Nuclear Officers (This e-mail has also been sent to Site Vice Presidents, PlantManagers, Administrative Points of Contact, INPO Coordinators, Operating ExperienceCoordinators, Performance Improvement and Corrective Action Contacts, Nuclear NetworkCoordinators, and Analysis Review Board.)
From: Bill Webster, Senior Vice President, Industry Evaluations
IER Li 11-1 has been revised(b)(4)
Please open your internet browser to the INPO Web site and click on the following link:
http://www.inpo.org/operatingexperience/IER/L1/IERL1-11-1.pdf
.DISCLAIMER:This e-mail and any of its attachments may contain proprietary INPO or WANO information thatis privileged, confidential, or protected by copyright belonging to INPO or WANO. This e-mailis intended solely for the use of the individual or entity for which it is intended. If you
are not the intended recipient of this e-mail, any dissemination, distribution, copying, oraction taken in relation to the contents of and attachments to this e-mail is contrary to therights of INPO or WANO and is prohibited. If you are not the intended recipient of this e-mail, please notify the sender immediately by return e-mail and permanently delete theoriginal and any copy or printout of this e-mail and any attachments.Thank you.
2
From:Sent:To:Subject:
Abelairas, Victor (GE Power & Water) <[email protected]>Friday, March 18, 2011 3:26 PM
RST01 HocFW: Fw: Urgent request from US NRC for assistance with emergency in Japan
i
Chuck,Below are more Toshiba contacts for the NRC.
Thank you.Victor
From: James Powers [mailto:[email protected])Sent: Friday, March 18, 2011 3:18 PMTo: Albee, Bob (GE Power & Water)Cc: Quintana, Louis M (GE Power & Water); Abelairas, Victor (GE Power & Water); Nichols, Paul A (GE Power & Water);Shigeru Suzuki; Tooru Maruyama; Yoshihiro NaruseSubject: Re: Fw: Urgent request from US NRC for assistance with emergency in Japan
Bob, \ f
Regards,
Jim PowersVice President, Engineering ManagerToshiba American Nuclear Energy3545 Whitehall Park Drive, Suite 500Charlotte, NC 28273Blackberr1 (b)(6)
Office 70 -.r-8-7910ipowers'..tane.toshiba.corn
I
-15/
From: Jack Soma <[email protected]>Sent: Friday, March 18, 2011 1:46 PMTo: [email protected]; [email protected]:' [email protected]; [email protected]; [email protected];. RST01 HocSubject: RE: Supplier Contacts
Ned,Can you provide the names of attendees in this call?
Jack SomaHitachi
From: [email protected] [mailto:[email protected]]Sent: Saturday, March 19, 2011 1:04 AMTo: [email protected]: [email protected]; [email protected]; [email protected]; [email protected];[email protected]: Supplier Contacts
James,
Best Regards, Ned"Quality is not an act, it is a habit"
I
From:Sent:To:Subject:Attachments:
Abelairas, Victor (GE Power & Water) <[email protected]>Friday, March 18, 2011 2:23 PK4
RST01 HocGEH answer to SFP structural question94 Weight SFC could handle QUESTION - GEH answer.doc
Chuck,Please find the attached answer... I will followup with a phone call.<<94 Weight SFC could handle QUESTION - GEH answer.doc>> Thank you, Victor
Victor M. AbelairasManager, Technical ServicesGE Hitachi Nuclear Energy
3901 Castle Hayne RoadWilmington, NC 28402USA
Office: (910) 819-5179Cell:[ (b)(6)
Email: victor.abelairas.ge.com
ýg I I'l
Th-
(b)(4)
GEH Proprietary Information3/18/2011 2:19 PMInformation Not VerifiedCopyright 2011 GE-Hitachi Nuclear Energy Americas LLC, All Rights Reserved
From:Sent:To:Subject:
Merchant, Ned <[email protected]>Friday, March 18, 2011 7:31 PMRST01 HocFW: Bechtel Pumping systems for Fukushima
Peter Bamford
Best Regards, Ned"Quality is not an act, it is a habit"
-----Original Message -----From: Merchant, NedSent: Friday, March 18, 2011 6:15 PMTo: '[email protected]'Subject: FW: Bechtel Pumping systems for Fukushima
Tim,
Here is Jack's contact info
Best Regards, Ned"Quality is not an act, it is a habit"
----- Original Message -----From: [email protected] [mailto:[email protected]]Sent: Friday, March 18, 2011 4:52AMTo: Merchant, NedCc: Reilly, Brian (Power); Rau, Carl; Hammerle, David; Mottola, Dennis; Thomas, Eugene; Hart, James V; Zeiger, Mark;[email protected]; [email protected]; [email protected]; [email protected];[email protected]; [email protected]; [email protected]: Bechtel Pumping systems for Fukushima
Ned,
Thank you for copying several E-mails with documents related to pumping systems.
/1I
(b)(4)
Regards,
Junichi (Jack) Soma
Hitachi-GE Nuclear Energy, Ltd
<Mobile Phone>(b)(6)
<E-mail:Mobile>(b)(6)
<E-mail:Hitachi>
2
-.-- - --- I-. -
From: Laur, StevenSent: Friday, March 18, 2011 7:06 AMTo: RST01 HocSubject: FW: Potential mitigation of Spent Fuel Pool Dose Rates
Still catching up on e-mails sent to me that should go to you.
Steven A. LaurNRR Division of Risk Assessment
OWFN 10-CIS(301) [email protected]
From: Ryan, Robert D (WANO) [mailto:[email protected]]Sent: Thursday, March 17, 2011 11:04 PMTo: Laur, StevenCc: Gambrill, Robert A. (INPO); Tropasso, Randy T. (INPO)Subject: Potential mitigation of Spent Fuel Pool Dose Rates
Steven:
Some info on the topic for the phone call.
Bob
From: Edsinger, KurtSent: Thursday, March 17, 2011 9:55 PMTo: inpoerccinpo.orgCc: Modeen, DavidSubject: Potential mitigation of Spent Fuel Pool Dose Rates
Dear INPO ERC,
Here are a few thoughts from the EPRI team on approaches to consider for mitigating dose level in a challenged spentfuel pool:
(b)(4)
T 13
-
(b)(4)
Thanks,
Kurt
Kurt Edsinger
Director, Fuel & Chemistry
ELECTRIC POWER RESEARCH INSTITUTE
3420 Hillview Ave.
Palo Alto, CA 94304
'Office: 650.855.2271
'Mobile: (b)(6)
Together.. Shaping the Future of Electricity
DISCLAIMERF:
ThiS r.-n-ai• and y of its attachmernts y tc.al uoprietarv ht'IPD or '.AN'0 infi-,finalon Ina; is prileged, coi)hdeniial, or prrotete, by copyright, belonging toIWPO xr WANG This e-'mail is inteode, solel-I tor Vhe use of the individual or enltly 'or which it is intenr.ed. It you are not the intendea reciplenr.of LIMS e-mail, any
isserinntionn distrtbu•Or coxpying, or aZICtiM' layr, M reat0on 10 the contents Of .11d tachnents to this e-mail is contrary to 'he rights ot INPO or WANO and isprattibtle It you awe n•o the intend•,d rrc,prerl.! vIiti e-mail, please notily the sendw in'i tialcely by return ea-fatl anu pefinannttv deilee !he oriqinal and any
2
From: Laur, StevenSent. Friday. March 18. 2011 6:59 AMTo: RST01 HocSubject: FW: telcon
Here is the INPO contact information for this morning's schedule telecon regarding spent fuel pool mitigation.
Please send the information requested. (Note: I had to use my NRC webmail last night, as the station I was working at,RST09, would not connect to the Outlook server. I am in the office today and not on shift.)
Steven A. LaurNRR Division of Risk AssessmentOWFN 10-C15
(301) [email protected]
From: Ryan, Robert D (WANO) [mailto:[email protected]]Sent: Thursday, March 17, 2011 10:34 PMTo: Laur, StevenCc: Gambrill, Robert A. (INPO); Tropasso, Randy T. (INPO); [email protected]; INPO EmergencyResponseCtr (INPO)Subject: RE: telcon
Steven:
The INPO contact is Bob Gambrill. He will be in Friday morning. The back-up would be Randy Tropasso. Please sendthe call notice with topics to be addressed and phone information with a copy to [email protected] EPRI will have the
most technical information. We are flexible on the time.
Bob Gambrill - [email protected] 770-644-8689
Randy Tropasso [email protected] 770-644-8722
Bob
From: Laur, Steven [mailto:Steven. [email protected]]Sent: Thursday, March 17, 2011 9:35 PMTo: Modeen, David; Ryan, Robert D (WANO); RST01 HocSubject: RE: telcon
Thank you; we'll be in touch.
Steven A. LaurNRC Reactor Safety Team
From: Modeen, David [[email protected]]Sent: Thursday, March 17, 2011 9:30 PMTo: Laur, Steven; [email protected]; RST01 Hoc
Cc: RSTO1 HocSubject: RE: telcon
Steven,Just send the information to me at dmodeen(cep.com. I will get the right EPRI experts informed and on the line.
If we could avoid 9 to 10 a.m. that would be helpful. But, we'll make it work whenever.
Dave
Director, External AffairsEPRI Nuclear Power Sector704-595-2670 (work)
(b)(6) (cell)dmodeen(@epri.com
From: Laur, Steven [mailto:[email protected]]Sent: Thursday, March 17, 2011 9:02 PMTo: [email protected]; Modeen, DavidCc: RSTO1 HocSubject: FW:
Bob
Since your other sytem is down, here's what I sent.
EPRI: Please reply with your availability and contact information, as well, if you can support this telephone conferencetomorrow morning.
Thanks,
Steven A. LaurNRC Reactor Safety Team
From: Laur, StevenSent: Thursday, March 17, 2011 8:54 PMTo. [email protected]; [email protected]: RST01 Hoc; Tinkler, CharlesSubject:
Lee Gard, Bob Addy, and Rick Nielson:
I got your names from Bob Ryan this evening.
The NRC Reactor Safety Team desires to set up a conference call among INPO, Naval Reactors, and the NRC todiscuss options for addressing spent fuel pool cooling for a pool that may have lost some or all of its water andmay be in an indeterminate condition.
Please let us know by reply email to [email protected] of your availability for tomorrow morning.
Thank you in advance for your assistance.
Steven A. LaurNRC Reactor Safety Team
From: Weber, MichaelSent: Friday, March 18, 2011 6:38 PMTo: RST01 Hoc; OST02 HOC
Subject: FYI - Revision to INPO Event Report Li 11-1 - Fukushima Daiichi Nuclear Station FuelDamage Caused by Earthquake and Tsunami
Attachments: [ER 1-11-1, Rev. 2.pdf
----- Original Message -----
From: Andersen, JamesTo: Borchardt, Bill; Weber, Michael
Sent: Fri Mar 18 18:04:41 2011Subject: FW: Revision to INPO Event Report Li 11-1 - Fukushima Daiichi Nuclear Station Fuel Damage Caused byEarthquake and Tsunami
FYI.
----- Original Message -----From:Wittick, BrianSent: Friday, March 18, 2011 5:38 PM
To: Howe, Allen; Andersen, James; Virgilio, Martin; Merzke, Daniel
Cc: Bowman, Gregory; Meighan, Sean; Nguyen, Quynh
Subject: Fw: Revision to INPO Event Report Li 11-I - Fukushima Daiichi Nuclear Station Fuel Damage Caused byEarthquake and Tsunami
Attached please find the latest revision to the subject event report that incorporates clarifying changes to therecommendations section.
VR
Sent from NRC BlackBerryBrian WittickI (b)(6)
-Original Message -----From: Mortensen, George K (INPO) <[email protected]>To: Leeds, Eric; Wittick, Brian; Boger, Bruce; Thomas, Eric; Kobetz, TimothySent: Fri Mar 18 17:23:33 2011
Subject: FW: Revision to INPO Event Report Li 11-1 - Fukushima Daiichi Nuclear Station Fuel Damage Caused byEarthquake and Tsunami
All,
Attached is a copy of the recently revised INPO Event Report l11-1. IER Li 11-I has been revise
1\
Please note that this document remains a copyrighted, Limited Distribution document that is not releaseable to anythird party. Confidentiality of the document remains in place as covered by the INPO-NRC Memorandum of Agreementand the supporting FOIA Affidavit provided to, and approved by, the NRC.
Best Wishes!
George MortensenINPO -- External Relations Program Manager __
From: Webster, Bill E (INPO)
Sent: Friday, March 18, 2011 4:47 PMSubject: Revision to INPO Event Report Li 11-1 - Fukushima Daiichi Nuclear Station Fuel Damage Caused by Earthquake
and Tsunami
To: Chief Nuclear Officers (This e-mail has also been sent to Site Vice Presidents, Plant Managers, Administrative Points
of Contact, INPO Coordinators, Operating Experience Coordinators, Performance Improvement and Corrective ActionContacts, Nuclear Network Coordinators, and Analysis Review Board.)
From: Bill Webster, Senior Vice President, Industry Evaluations
IER Li 11-1 has been revised to clarin (b)(4)
Please open your internet browser to the INPO Web site and click on the following link:
http://www.inpo.org/operatingexperience/IER/LI/IERLI-11-I.pdf
.DISCLAIMER:This e-mail and any of its attachments may contain proprietary INPO or WANO information that is privileged,
confidential, or protected by copyright belonging to INPO or WANO. This e-mail is intended solely for the use of theindividual or entity for which it is intended. If you are not the intended recipient of this e-mail, any dissemination,distribution, copying, or action taken in relation to the contents of and attachments to this e-mail is contrary to therights of INPO or WANO and is prohibited. If you are not the intended recipient of this e-mail, please notify the senderimmediately by return e-mail and permanently delete the original and any copy or printout of this e-mail and any
attachments.Thank you.
2
I NPO ® Instiute of Issue Date: March 15, 2011
il PL Nuclear Power Revised: March 18, 2011Operations
(b)(4)
Page I of 3
(b)(4)
UMITED DISTRIBUTION: Copyright © 2011 by the Institute of Nuclear Power Operations. Not for sale or for commercial use.Unauthorized reproduction is a violation of applicable law. Each INPO member and participant may reproduce this document for itsbusiness use. This document should not be otherwise transferred or delivered to any third party, and its contents should not bemade public, without the prior agreement of INPO. All other rights reserved.
NOTICE: This information was prepared in connection with work sponsored by the Institute of Nuclear Power Operations (INPO).Neither INPO, INPO members. INPO participants, nor any person acting on behalf of them (a) makes any warranty orrepresentation, expressed or implied, with respect to the accuracy, completeness, or usefulness of the information contained in thisdocument, or that the use of any information, apparatus, method, or process disclosed in this document may not infringe on privatelyowned rights, or (b) assumes any liabilities with respect to the use of, or for damages resulting from the use of any information,apparatus, method, or process disclosed in this document.
Page 3 of 3
From:Sent:To:Subject:Attachments:
Modeen, David <[email protected]>Friday, March 18, 2011 2:11 PMRST01 Hoc; RST07 HocFW: Request for revision 1 to NRC paperNRC RST Spent Fuel Pool Fukushima Daiich.i Cooling Recommendations for mitigationof dose rates revl.docx
Jim,This attachment came from you guys and I forwarded it to Laurel and her team. I do not have routine contact withthem.
The INPO employee on the telcon this morning is: Randall (Scott) Hawn Sr. Evaluator, Engineering & Configuration•Mgmt, [email protected], ph:
770-644-8353
Dave
Director, External AffairsEPRI Nuclear Power Sector
704-595-2670 (work)(b)(6) tcell)
----- Original Message -----From: Modeen, David
Sent: Friday, March 18, 2011 1:56 PMTo: Steinhurst, Laurel A CIV SEA 08 NRCc: Vavoso, Thomas G CIV NAVSEA, 08; Szeto, Gordon CIV SEA 08 NR; Roberts, Thomas E CIV SEA 08 NRSubject: RE: Request for revision 1 to NRC paper
----Original Message -----From: Steinhurst, Laurel A CIV SEA 08 NgImailt (b)(6)Sent: Friday, March 18, 2011 1:53'PM /To: Modeen, DavidCc: Vavoso, Thomas G CIV NAVSEA, 08; Szeto, Gordon CIV SEA 08 NR; Roberts, Thomas E CIV SEA 08 NR; Steinhurst,Laurel A CIV SEA 08 NRSubject: Request for revision 1 to NRC paper
Mr. Modeen - Naval Reactors participated on the 1130 call and is awaiting revision 1 to the NRC paper to comment. Iwas informed that you were requested to forward the paper to participants for comment. I have not received it.
Please forward to the cc'd addresses and I will make sure all Bettis/KAPL/Naval Reactors participants receive it.
Laurel Steinhurst
J,
•t
Laur, Steven
From:Sent:To:Subject:
Ryan, Robert D (WANO) [[email protected]]Friday, March 18, 2011 7:10 AMLaur, StevenRE: telcon
Thanks we have it.
From: Laur, Steven rmailto:[email protected]],Sent: Friday, March 18, 2011 7:09 AMTo: Ryan, Robert D (WANO)Cc: Gambrill, Robert A. (INPO); Tropasso, Randy T. (INPO); [email protected]; INPO EmergencyResponseCtr (INPO);dmodeen(@epdi.comSubject: RE: telcon
Bob et alia:
I'm not on shift at present, and have forwarded your emails to the proper people. I also talked with them on the phoneto ensure you get the information.
Attached isthe bridge number they sent out earlier; the time is 0800 EDT, in case they get bogged down and don't sendit in time!
Steven A. LaurNRR Division of Risk AssessmentOWFN 10-CIS(301) [email protected]
From: Ryan, Robert D (WANO) [mailto:RyanRD~dINPO.orq]Sent: Thursday, March 17, 2011 10:34 PMTo: Laur, StevenCc: Gambrill, Robert A. (INPO); Tropasso, Randy T. (INPO); dmodeen(@epri.com; INPO EmergencyResponseCtr (INPO)Subject: RE: telcon
Steven:
Randy Tropasso [email protected];. O-644-8722y
Bob
From: Laur, Steven fmailto: [email protected]: Thursday, March 17, 2011 9:35 PM
I
To: Modeen, David; Ryan, Robert D (WANO); RST01 Hoc
Subject: RE: telcon
Thank you; we'll be in touch.
Steven A. LaurNRC Reactor Safety Team
From: Modeen, David [[email protected]]Sent: Thursday, March 17, 2011 9:30 PMTo: Laur, Steven; rvanrd~wano.org; RST01 HocCc: RST01 HocSubject: RE: telcon
(b)(4)
Dave
Director, External AffairsEPRI Nuclear Power Sector
-iQO4_n: QO_ worý{~~cellL•--
,M •-pi.com
From: Laur, Steven [mailto:Steven.Laur3nrc.gov1Sent: Thursday, March 17, 2011 9:02 PMTo: ryanrd(wano.ora; Modeen, DavidCc: RSTO1 HocSubject: FW:
Since your other sytem is down, here's what I sent.
EPRI: Please reply with your availability and contact information, as well, if you can support this telephone conference
tomorrow morning.
Thanks,
Steven A. LaurNRC Reactor Safety Team
From: Laur, StevenSent: Thursday, March 17, 2011 8:54 PMTo: [email protected]; inpoerc~ainpo.orgCc: RSTO1 Hoc; "inkler, CharlesSubject:
Lee Gard, Bob Addy, and Rick Nielson:
I got your names from Bob Ryan this evening.
The NRC Reactor Safety Team desires to set up a conference call among INPO, Naval Reactors, and the NRC todiscuss options for addressIng spent fuel pool cooling for a pool that may have lost some or all of its water andmay be in an indeterminate condition.
Please let us know by reply email to [email protected] of your availability for tomorrow morning.
Thank you in advance for your assistance.
Steven A. LaurNRC Reactor Safety Team
.DISCLAIMER:This e-mal and anj oftis attachments may conlaIn proprietary INPO ot WANO infoirmallon that Is privileged, confidential, or proiiects by copyrig"ht belonging toINPO or WANO. This e-mail Is intended solely for the use of the Individual or entity for which it is intended. If YoL•a re nol the intended recipient of this e-mail, anydissemination. distribuUon, copying, or action taken In relation to the c•ntents of and attachments to this &-mail is ontrary to the rights of INPO of VVANO and isprohibited. !f you are not the Intended recipient of this e-mail, please notify the senderrnmmedlately by return e-malt and permanently delete the original and anycopy or printout of this e-mail and any attachments.Tfank you.
DISCLAIMER:This e-mail and any of Its attachments may contain proprietary INPO or VWANO inforrnalion that Is ptivMieged, confiderntial, orprotected by copyright belongingltoINPO or WANe. 'thts e-matl is intended solely for the use of the individual or entity for which his intended If you are not the intended recipient of this e-mail, anydisseminationi, distribution, copying, or action taken in relation to the contents of and auachrenLts to this e-mail is contrary to lhe rights of INPO or WAND and isprohibited. If you are not tho Inlended rccipient Of this e-mail, pleasoenolify the sondei immediately by return e-m.ail and permanently delete the original and anycopy or printout of this e-mail and any altachmpntsThank you,
3
~wI~
Laur, Steven
From: Ryan, Robert D (WANO) [[email protected]] .'Sent: FrIdayi March 18, 2011 7:06 AMTo: Laur, StevenCc: INPO EmergencyResponseCtr (INPO)Subject: RE: telcon
Thanks
To be sure any requests are addressed please send to [email protected]
lam rotating off emergency response coverage. Our response center will remained staffed 24/7 for the foreseeablefuture.
Bob
From: Laur, Steven [mailto:[email protected]] .,\(Sent, Friday, March 18, 2011 7:01 AMTo: Ryan, Robert D (WANO)Cc: Gambrill, Robert A. (INPO); Tropasso, Randy T. (INPO); dmodeen@eprhcom; INPO EmergencyResponseCtr (INPO);RSTOt HocSubject: RE: telcon
Thanks for the information; I have forwarded it to our Incident response center and will call them as well.
I had to use my NRC email instead of the operations center one due to a glitch in the station I was manning. To ensureyour future e-mails get through, please use the address below:
Thank you for your support
Steven A. LaurNRR Division of Risk AssessmentOWFN 10-C15
(301) [email protected]
From: Ryan, Robert D (WANO) [mailto:[email protected]]Sent: Thursday, March 17, 20111 0:34 PM..To: Laur, StevenCc: Gambrill, Robert A. (INPO); Tropasso, Randy T. (INPO); [email protected]; INPO EmergencyResponseCtr (INPO)
, Subject: RE: telcon
Steven:
Bob Gambrill -gambrillra@in o.o 770-644-868 -
A
Randy Tropasso tropassort@,orRY.-644-872 -"
Bob
%V
From: Laur, Steven [mailto:[email protected]]Sent: Thursday, March 17, 2011 9:35 PMTo: Modeen, David; Ryan, Robert D (WANO); .RST01 HocSubject: RE: telcan
Thank you; we'll be in touch.
Steven A. LaurNRC Reactor Safety Team
From: Modeen, David [[email protected]]Sent: Thursday, March 17, 2011 9:30 PMTo: Laur, Steven; [email protected]; RST01 HocCc: RSTO1 HocSubject: RE: telcon
Steven,I . ~ I
y....,,'.= :.: " .'.: ' .. .:•=./.%• :-:, ,• •'- ,''. .. ''.. '?::.r • • [•,• -• : . • " • •;"., :':'••. : •. :•':::.•:= ,•• : :I.,• -• : '::., "' .A ' ' -. :::•:::iv"• -
Dave
Director, External AffairsEPRI Nuclear Power Sector70•,•95267- work)
mbX een cericoGITO~erni ir.com
k. -V
From: Laur, Steven [mailto:[email protected]]Sent" Thursday, March 17, 2011 9:02 PMTo: [email protected]; Modeen, DavidCc: RST01 HocSubject: FW:
I
Since your other sytem Is down, here's what I sent.
EPRI: Please reply with your availability and contact information, as well, if you can support this telephone conferencetomorrow morning.
Thanks,
Steven A. Laur'NRC Reactor Safety Team
2
p
From: Laur, StevenSent: Thursday, March 17, 2011 8:54 PMTo: [email protected]; [email protected]: RST01 Hoc; Tinkler, CharlesSubject:
Lee Gard, Bob.Addy, and Rick Nielson:
I got your names from Bob Ryan this evening.
The NRC Reactor Safety Team desiresto set up a conference call amorng INPO, Naval Reactors, and the NRC todiscuss options for addressing spent fuel pool cooling for a pool that may have lost some or all of its water andmay be in an indeterminate condition.
Please letus know by reply email to [email protected] of your availability for tomorrow morning,
Thank you in advance for your assistance.
Steven A. Laur
NRC Reactor Safety Team
.DISCLAIMER:This e-mati and any of its attachments may contain propnelory INPO or WANO information that 1, privileged. confidential; or protected bfy copyright belonging toINPO or WANO. This e-matl Is intended solely for the use of the individual or antity for which it is intended. If you are nol tho Intended recipient of this e-mail, anydissemination, distribution, copying, or aclion taken in relation to the contenis of and attachments to this e-mail is conlrari to the rights of INPO or WANO and isprohibited. If you are not the intended recipient of this e-mail. please notify the sender immediately by relum e-mail and pemianently delete the original and any,copy or pointoul of this e-mail and any attachments.Thank you.
.DiSCLAIMER-This e-marl and any of its attachritents may contain proprietary INPO or WANO information that Is privileged, confidential, or protected by copyritht belongfng toINPO or WANe, This e-mral is intended solely for the use of the individual or entity for which It Is intended. If you are not Mte Intended iediplent ofthis e-mail. anydiss.=ination, distribution. copying, or action taken in relation to the contents of and altachments to thNo e-mail is contrary to the rights of INPO or WANO and Isprohibited. It you are not the intended recipient of this e-mall. pleasenotify the sender Immediately by return eamail and permanently delete the original and any
copy or printout of this e-mail and any attachmenls.Thank you.
3
Laur, Steven
From: Gambrill, Robert A. (INPO) [[email protected]]Sent: Friday, March 18, 2011 7:10AMTo: Laur, StevenSubject: RE: telcon
Thanks Steve. Scott Hawn, our lead Rx Eng will be on the call for us and he has the information.
From: Laur, Steven fmailto:Steven.Laurdnrc.qcov1 j "'
Sent: Friday, March 18, 2011 7:09 AMTo: Ryan, Robert D (WANO)Cc: Gambrill, Robert A. (INPO); Tropasso, Randy T. (INPO); dmodeen(aepri.com; INPO EmergencyResponseCtr(INPO); dmodeenaepri.comSubject: RE; telcon
Bob et alia:
I'm not on shift at present, and have forwarded your emails to the proper people. I also talked with them on thephone to ensure you get the information.
Attached is the bridge number they sent out earlier; the time is 0800 EDT, in case they get bogged down anddon't send it in time!
Steven A. Lau rNRR Division of Risk AssessmentOWFN 10-C15(301) 415-2889 [email protected]
From: Ryan, Robert D (WANO) [mailto:RyanRD(@INPO.orqlSent: Thursday, March 17, 2011 10:34 PMTo: Laur, StevenCc: Gambrill, Robert A. (INPO); Tropasso, Randy T. (INPO); dmodeen)@epri.com; INPO EmergencyResponseCtr(INPO)Subject: RE: telcon
Steven:
Bob Gambrill - Rambri1lra@'ino.o 70-644-8685%..,% r- /
Randy Tropasso tro assort .or 70-644-872 --
Bob
I
From: Laur, Steven rmailto:Steven.Laurdnrc.aovlSent: Thursday, March 17, 2011 9:35 PMTo: Modeen, David; Ryan, Robert D (WANO); RST01 HocSubject: RE: telcon
Thank you; we'll be in touch.
Steven A. LaurNRC Reactor Safety Team
From: Modeen, David [[email protected]]Sent: Thursday, March 17, 2011 9:30 PMTo: Laur, Steven; ranrdd)wano.orn; RST01 HocCc: RST01 HocSubject: RE: telcon
Steven,
Dave
Director, External AffairsEPRI Nuclear Power Sector
404- 5-267Q (workL
-diidTni1ri.comr
From: Laur, Steven [mailto:Steven.Laur5)nrc.gov .,*
Sent: Thursday, March 17, 2011 9:02 PMTo: ryanrdbwano;orQ; Modeen, DavidCc: RST01 HocSubject: FW:
Since your other sytem is down, here's what I sent.
EPRI: Please reply with your availability and contact information, as well, If you can support this telephoneconference tomorrow morning.
Thanks,
Steven A. LaurNRC Reactor Safety Team
From: Laur, StevenSent: Thursday, March 17, 2011 8:54 PMTo: npoercassistance(&inpo.org; inpoerc(inpo.rg.Cc: RST01 Hoc; Tinkler, CharlesSubject:
Lee Gard, Bob Addy, and Rick Nielson:
2
I got your names from Bob Ryan this evening.
The NRC Reactor Safety Team desires to set up a conference call among INPO, Naval Reactors, and theNRC to discuss options for addressing spent fuel pool cooling for a pool that may have lost some or all
of its water and may be in an indeterminate condition.
Please let us know by reply email to [email protected] of your availability for tomorrow morning.
Thank you in advance for your assistance.
Steven A. Laur
NRC Reactor Safety Team
.DISCLAIMER:This e-mail and any of its attachments may contain proprietary INPO or WANO information that is paivileaed. confidential, or protected by copyrightbelonging to INPO or WANO. This e-mall is inlenderd solely for iia .we of thcu Individual or entity for which it I. intended. if you are not th•-intelnderecipient of this e-mail. any dissemination, distribution. copying, or action taken in relation Io the contents of anti aitachments to IhiS e-mail is contraray tothe nghts of INPO or WANO and is phrolbited. If you am not the: int•nded recipient of this e-mail, picase notify the sender immediately by retur c-maliand.permanently delete the original and any copy or printout oe Ihis e-mail arid any attachments.'Thank you.
.DISCLAIMER:This e-mail and any of Its attachments may contain proprietary INPO or WANO information that is privileged, confidential, or protected by copyright belongirig toINPO or WANO.h Th'fs e-mail is intended solely for the use of the individual or entity for which it is intended. If you are not the intended reciplent of this.e-miiil. anydissemination• distribution, copying, or action taken in relation to thst contents of and attachmnernts to this e-mail is contrary to the rights of INPO Or WANe and isprohibited, If you arenol the Intended recipient of this e-mail, please notify 'the sender immediately by rnturn e-mail and permanently dtlate the original and anycopy or printout of Ihis e-mad and any attachments.Thank you.,
3
P
From:
To:Subject:Date:
PMT03 Hoc
FW: For chronologyFriday, March 18, 2011 1:49:18 PM
From: Hoc, PMT12Sent: Friday, March 18, 2011 1:32 PMTo: PMT03 HocSubject: For chronology
Please add to the chronology.
$g/16
A 1
From:Sent:To:Subject:Attachments:
Wagner, KatieFriday, March 18. 2011 7:42 AM
RST01 HocFW: Questions from Operations CenterKathy Halvey Gibson2.vcf; imageOOl.jpg
RST Staff,
'wPThanks,
Katie WagnerGeneral EngineerU.S. Nuclear Regulatory Commission(301) [email protected]
From: Gibson, KathySent: Thursday, March .17, 2011 7:34 PMTo: Zigh, Ghani; Wagner, KatieCc: Salley, MarkHenrySubject: RE: Questions from Operations Center
Katie,.. . .... . . ,•,. .::, .. . • :,:..! -.. .. . .,..... ..... ,. . . . .-. " "" b - 5 . . . . -, . - . . .. .. .. . - ' . . .. . . .,. . . . ....•:o, ,:,• , . . .•. ..,..,. •,i . ,:..: : , .,:'. :, , . L .. , •:i: - . -b(5 , . • • • ',• .. • • : " '-. < " • ' • - •, -::; • :: • .i, . , . • . , ,
Thanks,k
Kathy Halvey GibsonDirector
Div~son of Systems Analysis
Kath-.Gbsonr~c.gov
.)21 41 V )
From: Zigh, GhaniSent: Thursday, March 17, 2011 7:28 PMTo: Gibson, KathySubject: FW: Questions from Operations Center
Kathy,
- - - - (b)(5):!
I
0 6//,WT
From: Durbin, Samuel [[email protected]]Sent: Thursday, March 17, 2011 6:30 PMTo: Zigh, GhaniCc: Roskovensky, John K; Townsend, Toby 0Subject: RE: Questions from Operations Center
Ghani,
I justspoke with John Roskovensky of Org. 5717, Mission Science and Analysid(b)25
IThe manager of the group is Ioby Townsend and is copied in this email.
SamSamuel Durbin I!Sandia National LaboratoriesAdvanced Nuclear Fuel Cycle Technologies, Organization 6223PO Box 5800 - MS 0747
.Albuquerque, NM 87185-0747Office: (505) 284-7850Fax: (505) 844-2348
From: Durbin, Samuel <[email protected]>To: Zigh, GhaniSent: Thu Mar 17 17:13:26 2011Subject: RE: Questions from Operations Center
Ghani,
Sani
From: Zigh, Ghani [mailto:[email protected]]Sent: Thursday, March 17, 2011 2:17 PMTo: Durbin, Samuel; Lindgren, EricSubject: FN: Questions from Operations Center
From: Gibson, KathySent: Thursday, March 17, 2011 2:00 PMTo: Wagner, KatieCc: Lee, Richard; Scott, Michael; Zigh, Ghani; Schaperow, Jason; Santiago, PatriciaSubject: Questions from Operations Center
Katie,I receive two questions from the Operations Center reactor safety team.
2
1
3,
Thank
|blyl It:U LU %.1110111 -II yt11. k.11 1lll Will UV l It" UlN; WI!l IVVlIN.• .QCdIG (21 lU QdI IUIC L.J UV VVII J II Ii IVll I IIV
these skills and provide the name(s) to me. I will then either forward them to the Ops Centeror ask you to do it.
S!
3
From:To:
Subject:.
Date:
LIA02 HocTrapp. James
RE: DTRA USFJFriday, March 18, 2011 8:49:21 PM
From: Trapp, JamesSent: Friday, March 18, 2011 8:35 PMTo: LIA02 HocSubject: RE: DTRA USFJ
No - do you have a source of Alex Robinson's information? Thanks
From: LIA02 HocSent: Friday, March 18, 2011 5:39 AMTo: Trapp, James; Ulses, AnthonyCc: RST01 Hoc; PMTO1 Hoc; LIA06 Hoc; Smith, Brooke; Foggie, KirkSubject: DTRA USFJ
Jim/Tony,
We just received a call from DTRA (Alex Robinson) that they have received word (that they feel is
solid information) that the #3 Rx is dry. Do you have corroborating reports that either the reactor
or SFP may be dry?
Thanks
Brian
"ý/ Lel011/00
From: LIA08 HocSent: Friday, March 18, 2011 7:13 PMTo: LIA01 Hoc; LIA06 Hoc; RST01 HocSubject: RE: JR Capability request
Thanks... is this logged?
From: LIA01 HocSent: Friday, March 18, 2011 6:54 PMTo: LIA08 Hoc; LIA06 Hoc; RST01 HocSubject: FW: IR Capability request
FYI
From; Freshwater, David [mailto:[email protected]]Sent: Friday, March 18, 2011 6:25 PMTo: LIA01 Hoc; LA11 HocCc: NITOPS; Freshwater, DavidSubject: IR Capability request
"-..... .....i••. ° 4=• ... , - • .... . •! '""' ':_••.,•' "• • i"•i " •- •-•-:• . ..... ... '." ,.... '.. . .. . .. . •• , . o. . " =.. • • ., . - ... ..• . • , -• .. .. ., ... - ., ; -. .
David E. FreshwaterDOE Liaison at NRC301-816-5209
Office of Emergency OperationsDOE/NNSA NA-411000 Independence Ave., SWWashington, DC 20585davtd,freshwaternho.d$oe.gov(w) 202-586-7220
ffi)20 j6-89~
From: Gauntt, Randall 0 <[email protected]>Sent: Friday, March 18, 2011 7:50 PMTo: RST01 HocSubject: FW: etoCJapan Fukushima I & II
Randy
From: Nandy, PrabalSent: Friday, March 18, 2011 5:38 PMTo: Gauntt, Randall 0Cc: Townsend, Toby 0; Jakubczak, JaySubject: RE: ,ei&.apan Fukushima I & 11
Hi Randy:
Per my bosses' (cc'ed here) response: To get the MTI data released we need to have your center call the NRC
ops center (email RSTO1 .hocc&,nrc.-qov, contact Donna Williams )[ 4 • •i•i ..: (b5)•i~,A 1k. 44:, a.¼t. '-
-Prabal
From: Gauntt, Randall 0Sent: Friday, March 18, 2011 4:58 PMTo: Nandy, PrabalSubject: RE: 96Q Japan Fukushima I & II
I understand - every time you call another federal agency is on the line!
Randy
From: Nandy, PrabalSent: Friday, March 18, 2011 4:50 PMTo: Gauntt, Randall 0Subject: RE: ebQ.Japan Fukushima I & 11
Randy:
...... .... .. ,. . . .. .
-Prabal
From: Gauntt, Randall 0Sent: Friday, March 18, 2011 4:44 PMTo: Nandy, PrabalSubject: RE: QUDýlpan Fukushima I & II
Can I share this with the US NRC?Fascinating. I will study this when I get the next crisis shut down.
I very much appreciate this!randy
From: Nandy, PrabalSent: Friday, March 18, 2011 4:39 PMTo: Gauntt, Randall 0Subject: FW: QLLO.Japan Fukushima I & II
Hello:
"..-. . .- . ., !: ,,.V.
-Prabal
From: Nandy, PrabalSent: Friday, March 18, 2011 4:30 PMTo: Bikhazi, NicolasCc: Townsend, Toby 0; Tachau, Rob; Jakubczak, JaySubject: RE: OWQj:pan Fukushima I & II
Nick:
Call with questions!
-Prabal
From: Bikhazi, NicolasSent: Friday, March 18, 2011 3:52 PMTo: Nandy, PrabalSubject: Re: ONQ4,apan Fukushima I & II
2
They should already be in that same directory.N
From: Nandy, PrabalSent: Friday, March 18, 2011 03:11 PMTo: Bikhazi, NicolasSubject: RE:'bQ..apan Fukushima I & II
Nick:
-Prabal
From: Bikhazi, NicolasSent: Friday, March 18, 2011 9:18 AMTo: Nandy, PrabalSubject:.eUe'apan Fukushima I & II
AttachrmenCt•TI
Prabal,
Thanks,
Nick
<< File: im_0173194_12_02b.jpg >> << File: im_0173194_color_01.jpg >>
Nicolas Bikhazi
Sensors & Analog Electronics Dept. # 5719
MS 0812
505-284-1797 (W)
3
Dunham, Katrina
From:Sent:To:
Cc:
Subject:Attachments:
Jackson, DonaldSaturday, March 19, 2011 7:54 AMDean, Bill; Lew, David; Wilson, Peter; Roberts, Darrell; Collins, Daniel; Lorson, Raymond;Baker, Pamela; Walker, Tracy; Clifford, James; Miller, Chris; Weerakkody, SunilScrenci, Diane; Sheehan, Neil; Trapp, James; McNamara, Nancy; Tifft, Doug; Hansell,Samuel; Hinson, Felicia; McKinley, Raymond; Rogge, John; Jackson, Donald; Cook, WilliamMarch 19, 2011- 0730- CA Briefing On Japan Reactor Accidentsbechtel detailed diagram.pdf; Docl.docx; USNRC Earthquake-Tsunami Update 0319110600EDT.pdf; Chairmans March 18 Doc.docx; Japan Aid.xlsx
The following is a synopsis of the briefing with changes or noteworthy items underlined:
Status of Fukushima Daiichi Units:
Unit 1-No Significant Change
Unit 2-No Significant ChangeTEPCO has offsite power to an aux transformer- Working to restore control room envelope and ventilation
Unit 3-No Significant Change
Unit 4-No Significant Change
Other Issues-Unit 5 and Unit 6- Both have AC PowerUnit 5 and Unit 6 SFPs Being Positively Cooled
I added a number of attachments that were sent out this morninq
Site Team relief watchbill set, and folks are beginning transit
TEPCO focus is on reactor vessels and movinq away from SFPs
TEPCO is questioning Iong term use of seawater cooling and potential unintended consequencesA consortium is "standing up" this morning with government, industry, and INPO working together to help. Jim
Ellis of INPO supports this effort if it is assured that the Japanese will actually listen to what comes out of thethink tank.
San Onofre and Diablo Canyon are doing frequent 1-131 sampling, some positive samples right at MDA taken
and analyzed
Much focus on Monday commission meeting ...... huge media interest
More at 2000
VR
st 6/ C4 I
~tmp
-. 0-W .su
1- 61 -a - .ýp th.. sj
iFT w~
MI. it- , t-i -- t I i i i i i i i i t-- i -i i 6 " m
~tZtT1~t-r-t--I I I I I-+-I-~ $-H-+-~
LiIIIiLLi
There has been no specific information handed over to TEPCO regarding the specifictasks, equipment or people to implement immediate actions. The following generaltopics have been discussed:
Tasks
Urgently place water on spent fuel pools in the damaged Fukushima Diiachi Units 1, 2, 3, 4 withall available equipment
Establish temporary cooling system for spraying water on Units 1, 2, 3, and 4
Continue to closely monitor and add water to spent fuel pools in Fukushima Diiachi Units 5 & 6
Establish more permanent means of temporary cooling to the reactor cores on Units 1, 2, 3
Equipment
All equipment available to the Government of Japan should be used to implement immediateactions to cool the spent fuel pools on Units 1, 2, 3, 4
Equipment list and drawing for "Bechtel" four train system should be supplied.
People
Establish teams to implement multiple cooling water actions at the same time." Several hundred people would likely be required to implement spent fuel pool cooling
tasks and manage the activities.* Health Physics support
0rCASFE US L)rUMLu NLY
Subject: Report of March 18, 2011 meeting at 1600 (EST), Chairman Jaczko met withthe Japanese Ambassador to the U.S. Ichiro Fujisaki
On March 18, 2011 at 1600 (EST), Chairman Jaczko met with the JapaneseAmbassador to the U.S. Ichiro Fujisaki to discuss the ongoing situation in Japan. Also inthe meeting were members of the Embassy of Japan, including Kenji Goto, Minister ofEconomy, Trade, Industry, and Energy; Kazuhide Ishikawa, Minister of Plenipotentiaryand Deputy Chief of Mission; Takeo Mori, Minister of Economic Affairs; and TakashiInutsuka, Chief of Science Section.
The Ambassador began by stating how he appreciated the deployment of the U.S.experts to Tokyo. There is now better communication and the Self Defense Forces(SDF) are involved. He would like ideas for how to improve equipment and proceduresat the Fukushima site. He added that Unit 3 is the highest priority and Unit 4 is the nexthighest priority. Unit 3 does not have much water and Unit 4 does have some water, butneeds more.
The Ambassador indicated that SDF fire trucks are being used by TEPCO. He asked ifthey need to dramatically increase water to Unit 3. He stated that there must be a betterway of coping with the situation than using a fire truck.
Chairman Jaczko offered his deepest condolences to the Japanese people and added thatthe NRC stands ready to help however we can. The best source of information for theNRC is the U.S. team in Japan. The NRC is working with U.S. Bechtel company toprovide a, plan for cooling the reactors and spent fuel pools. The Chairman noted that heremains concerned that not enough individuals are involved in the response operation.
In response to the Ambassador, the Chairman agreed that seawater injection is a longerterm-concern, but cooling has to be a priority. He agreed that Unit 3 is a priority with thereactor and spent fuel pool (SFP). Unit 4 is also important.
The Chairman asked the Ambassador to help ensure the U.S. team is speaking with thecorrect people because there,have been different judgments based on limited information.Getting the experts together to work through conflicting information and gettingagreement on the facts is important and will allow the effort to progress more effectively.
The Ambassador asked how many more people should be involved in the operations andhow many more tons of water were needed per day. He would convey the Chairman'sassessment to the highest levels of his Government. He also stated that he was aware thatsalt can make it harder to cool the reactor, that he did not care about salvaging the units
-UNCL,,SSFIED / OFFIC'AL USE O,'LY
U,,4'L^ ,S,-FIE-, OFFICIAL USE ... LY
because they were already lost, and he agreed that providing cooling by any means was ofthe utmost urgency. He added that he believed that the U.S. team is the best in Japan andasked if they have the right access? Additionally, efforts should be coordinated at the expertlevel.
Chairman Jaczko agreed that the salt water can have an effect on the reactor but thatcooling was paramount. He agreed to provide, within the hour, detailed information oncooling strategies and the number of people that should be involved.
The Ambassador agreed to transmit the information directly to the highest levels of hisGovernment. He added that he thought the US team had two meetings with the relevantJapanese government yesterday and to contact him directly if anything more was needed.If the U.S. can offer more equipment, please let him know. The Ambassador also notedthat he was not sure of the reaction in Japan of additional US aid, but indicated that hewould like whatever aid we could offer because we have to try everything possible, evenif it turns out not to be successful.
The Ambassador then noted that there are differences of opinion on the Unit 4 SFPlevels. It appears there is some water, but there is also insufficient data. He asked for theChairman's views and the Chairman agreed the data was conflicting. The Ambassadorasked the Chairman to let him know if the NRC has estimates that are different from whatthe SDF said yesterday.
The Chairman inquired about the restoring of AC power to the site. The Ambassadorindicated that power had been restored in the area, but lines to the reactor aredisconnected. He indicated that it will take more time, but connections will not happen ina day or two. AC power is expected at Units 1 and 2 the morning of March 19th andhopes the equipment will function. He was not sure about Units 3 and 4.
The Chairman indicated that the NRC will continue to work to share information so thatthe U.S. and Japan can come to a common conclusion about what is going on.
The Ambassador asked if the SFP does indeed lose all its water, what would occur andfor how long. The ambassador asked if the main concern was over the potential for azirconium fire or for the re-initiation of criticality. The Chairman indicated it would be avery serious situation. There could be a fire and material would distribute over a widerarea, which was part of the basis for the 50-mile evacuation recommendation the U.S.Government issued to American citizens. The fire would lift particles higher into the airand events can transpire very quickly once the SFP is dry.
-UCLASSIFIED! OFF!CIAL USE OL'
low',
UNCLASSIFIED i OFFICiAL USE ONLY-
The Ambassador noted that they tried helicopter flyovers to drop water into pools, but herecognized that was not an effective strategy. Japanese personnel are now concentratingtheir efforts on adding water from the ground level, but 80 meters is the closest they canget to the facility because of the radiological hazard. He asked if the U.S. has roboticequipment or other unmanned equipment that could assist this effort.
The Chairman agreed that pumping water from the ground was the better strategy andindicated it was a very difficult situation. He said he would take the request for roboticequipment back to the USG to determine if there was anything available. He said thatsome activities may ultimately be required that cause harm to the emergency workers.Such a decision is very difficult to make but may be necessary to prevent the situationfrom becoming even worst.
The Ambassador inquired whether or not relying on 50 people was sufficient. Should itbe 100 or more and should they work on a rotational basis? Should there be more teams?
The Chairman said that there should be more people to do the work and to do morecooling and he understood the difficulty determining radiation levels since the data hasnot been comprehensive. Again, he noted that it may be becoming necessary to considerlife threatening emergency actions to prevent greater consequences, as serious as such adecision would be.
The Ambassador inquired about radiation exposure limits in the U.S. The Chairmanreplied the early phase radiation dose limit for occupational workers is 5 rem and up to 25
rem for the protection of large populations. The Ambassador asked if the U.S. had everexceeded that higher limit and the Chairman replied he was not aware of the USexceeding that dose but he acknowledged that it would be a difficult decision to make.
The Ambassador asked about whether the US had access to special radiation suits theydid not have and personnel who could help train staff on their use. However, the NRCindicated that they weren't aware of such equipment - that radiation protection requireserecting walls and barriers to protect from gamma radiation. But the chairman didcommit to ask other federal agencies about any assets that may be useful.
The Ambassador asked about the need to expand beyond 50 miles and what could be theworst case scenario. The Chairman indicated that, at this juncture there was not a need toexpand further, rather this was a conservative analysis based on limited information.The US did not know if actions had yet been taken in Japan to interdict food in what theUS refers to as the broader ingestion pathway, which also was a factor in the decision torecommend 50 miles evacuation.
UNCLASSIFIED OFFiCIAL USE ONLY
ý - =Imiiiii
uNCLASSIFIED / OFFICIAL u L
The Ambassador again thanked the Chairman, indicating he was very appreciative of himcoming to the embassy to meet with him. The Ambassador told the Chairman to let himknow if the U.S. team was not able to speak with anyone they thought necessary.
The Chairman concluded with a statement fondly noting the three months he spent inJapan as a graduate student which had given him an even greater appreciation of thespecial relationship between our two countries.
Following the meeting, the Chairman and the Executive Director for Operations BillBorchardt spent several minutes meeting with embassy officials and provided the specificinformation noted in the meeting, including a Bechtel-designed pumping systemschematic and equipment list for providing more reliable cooling to the Fukushima plant.The NRC estimates that about 300 people would need to be involved to accomplish allthe activities including pumping, dose monitoring, and rotating shifts. Borchardt notethis was a straightforward design with equipment that could be procured in Japan.
The Chairman indicated that this information had been discussed with Japanese officialsbut not to this level of detail. The Ambassador's staff noted that the Ambassador hespeaks with the Foreign Minister many times a day and has good communication with thePrime Minister's office and would use those channels to get information to thehighest levels of the Japanese government. The Chairman noted he would ask the U.S.team in Tokyo too provide this information to their Japanese colleagues as well.
UNCLASSIFIED / OFFICIAL USE ONLY
From:To:
Cc:Subject:Date:Attachments:Importance:
USANUKJCDAIFRA nudear regulatory telecon -- fuel invertory details
Saturday, March 19, 2011 7:19:24 AM
ReectoH draghh frorn Asahi 19 M.pplHigh
Dear Colleagues,
As follow-up to outstanding questions regarding fuel inventories at Fukushima Daiichi, we provide below information from our colleaguesat the Permanent Mission of France to the IAEA (obtained from French experts in Tokyo) as well as an attachment from the Asahi newsIn Japan, forwarded by the Embassy of Canada in Tokyo.
Anthony
Anthony HINTONCounsellor (Nuclear Affairs) I Conseiller (Affaires nud6aires)Permanent Mission of Canada to the International Organizations in Vienna IMission permanente du Canada aupr~s des organisations internationales A VienneLaurenzerberg 2, 1010 Vienna, [email protected]+43 1 531 38 3212 - office I bureau+43 1 53138 3903 - facsimile I t~l6copieur
(b)(6) I mobile ;Government of Canada I Gouvernement du Canada
----- Original Message -....From: LIA02 Hoc fmalltn.LA02 Hoclanrc.goviSent: March 17, 2011 6:44 PM
.61,
To: Caza, Shawn -VPERM -GR; VPERM ( G); [email protected]; [email protected];[email protected]; [email protected]; [email protected]; [email protected]: HOO Hoc; PMT01 Hoc; Hoc, PMT12Subject: RE: USA/UK/CDA/FRA nuclear regulatory telecon follow-up
Thanks Shawn.
----- Original Message -----From: [email protected] rmalltouShawn.Cazaý(lintemraUonal.oc.caJSent: Thursday, March 17, 2011 1:43 PMTo: LIA02 Hoc; [email protected]; [email protected]; [email protected];[email protected]; [email protected]; [email protected]; [email protected]: HOO Hoc; PMT01 Hoc; Hoc, PMT12Subject: RE: USA/UK/CDA/FRA nuclear regulatory telecon follow-up
Thank you. The Canadian Mission to the IAEA in Vienna will not be participating in this call. However, I believe that our Ottawa-basedCNSC colleagues will.
Shawn
Shawn CazaCounsellor and Alternative Permanent RepresentativeConseiller et reprdsentant permanent suppliantBotschaftsrat und StellvertretenderPermanent Mission to the International Organizations in ViennaMission permanente auprýs des organizations Internationales A VienneStAndige Vertretung Kanadas bei den Internatlonalen Organisationen in WienLaurenzerberg 2A-1010 ViennaAustriaTel: (+43-1) 531 38-38 03Fax: (+43-1) 531 38-39 [email protected]
----- Original Message -----From: LIA02 Hoc rmalltl tIA07.Hncinnrrc6v1Sent: March 17, 2011 6:36 PMTo: VPERM ( G); [email protected]; [email protected]; [email protected]; Caza,Shawn -VPERM -GR; [email protected]; [email protected]; [email protected]: HOO Hoc; PMT01 Hoc; Hoc, PMT12Subject: RE: USA/UKCDA/FRA nuclear regulatory telecon follow-upImportance: High
Greetings to all,
Please note that we will be convening a call at 2:00 PM U.S. Eastern time (6:00 PM UK time) - 25 minutes from now - to discussradiation/health physics issues. Our Protective Measures Team will participate, and we have confirmed that Alan Bunker and SteveWalker will participate from the UK.
We kindly request that you call-in to the Headquarters Operations Officer (HOO) at +1-301-816-5100 to be connected to a bridge for
this phone call.
Best regards!
----- Original Message -----From: [email protected] [mailtn.Anthnny.Hintnntglntemaloinaoi r ca] On Behalf Of [email protected]: Thursday, March 17, 2011 10:27 AMTo: [email protected]; LIA02 Hoc; [email protected]; [email protected];[email protected]; [email protected]; [email protected]; [email protected]: HOO Hoc; RST01 Hoc; PMT01 HocSubject: RE: USANUKCDA/FRA nudear regulatory telecon follow-up
Resending with addition of our French colleagues.
Regards,Anthony
----- Original Message -----From: Hinton, Anthony -VPERM -GR On Behalf Of VPERM (G)Sent: March 17, 2011 2:42 PMTo: 'EOC2, External Liaison Officer'; LIA02 Hoc; VPERM (G); [email protected]; [email protected]; Caza,Shawn -VPERM -GR; [email protected]; Lafreni&e, Ken; Hinton, Anthony -VPERM -GRCc: HOO Hoc; RST01 Hoc; PMT01 HocSubject: USA/UK/CDA/FRA nudear regulatory telecon follow-up
Importance: High
Dear Colleagues,
Here are the basic details on fuel inventories that we have been able to cobble together this morning. Also pasted below are somemedia reports regarding start of outages for units 4-6. We are seeking additional and more complete information from LAEA andJapanese colleagues as a priority.
--FUEL INVENTORIES-- IAEA reported in technical briefing on basics regarding fuel inventories on site.
- UNIT 1: 292 fuel assemblies in core; 400 spent fuel assemblies in pool; 40 fresh fuel assemblies in pool.
- UNIT 2: 587 fuel assemblies in core; 548 spent fuel assemblies in pool; 28 fresh fuel assemblies in pool.
- UNIT 3: 514 fuel assemblies in core (some MOX); 548 spent fuel assemblies in pool; 52 fresh fuel assemblies in pool.
- UNIT 4: unclear. Estimate 401 irradiated fuel assemblies from unit core in pool at time of accident, but total inventory unknown at thistime.)
--Japan Earthquake Update (15 March 2011, 18:00 UTC) The IAEA can confirm the following information about the status of theFukushima Daiichi nuclear power plant:Unit 4 was shut down for a routine, planned maintenance outage on 30 November 2010. After the outage, all fuel from the reactor wastransferred to the spent fuel pool.Units 5 and 6 were shut down at the time of the earthquake. Unit 5 was shut down as of 3 January 2011. Unit 6 was shut down as of14 August 2010. Both reactors are currently loaded with fuel.As of 00:16 UTC on 15 March, plant operators were considering the removal of panels from Units 5 and 6 reactor buildings to prevent apossible build-up of hydrogen in the future. It was a build-up of hydrogen at Units 1, 2 and 3 that led to explosions at the Daiichifacilities in recent days.The IAEA continues to monitor and seek information on the status of plant workers, reactor conditions, and spent nuclear fuel at theFukushima Daiichi nuclear plant.httn//newsroom-maoa7ine-com/2011/aa/demid/cipnce/iaea-undates-reactor-statuis-at-fukushima-daiichiw-ooer-stationn
--IAEA releases more precise information about condition of three reactors In Fukushima 1 NPP15 March 2011 I 21:59 I FOCUS News Agency Home / World Vienna. The International Atomic Energy Agency (IAEA) has released moreprecise information about the situation in reactors 4, 5 and 6 in Fukushima 1 nuclear power plant, ITAR-TASS reported.Reactor 4 was shut down for planned repair works on 30 November 2010. Its spent fuel was moved to the depot of the reactor.Reactors 5 and 6 stopped operating immediately after the quake. Both reactors have nuclear fuel, the agency said in a statement.The staff of the plant plan to remove the roofs of reactors 5 and 6 to prevent concentration of hydrogen, which has already caused theblasts in the first three reactors.IAEA continues following and analyzing the condition of the reactors and spent nuclear fuel, as well as the health condition of theplant's personnel, it added.httno//www.fwcus-fen net/index nhn~id=n244613
Best regards from Vienna,Anthony
Anthony HINTONCounsellor (Nuclear Affairs) I Conseiller (Affaires nucl[aires) Permanent Mission of Canada to the International Organizations in Vienna IMission permanente du Canada auprs des organisations internationales & Vienne Laurenzerberg 2, 1010 Vienna, [email protected]+43 1 531 38 3212 - office I bureau+43 1 531 38 3903 - facsimile I t1l6opieur
U2 (b)(Y 1 nobileGovenent of Cana IGouvernement du Canada
From: EOC2, External Uaison Officer rmailto-ExternalLl1aisnOffler.F-OC2rcnsc-crsnmocrclSent: March 15, 2011 4:03 PMTo: 'LIA02 Hoc'; VPERM ( G); [email protected]; [email protected]; Hinton, Anthony -VPERM -GR; Caza, Shawn-VPERM -GR; [email protected]; Lafrenikre, KenCc: HOO Hoc; RST01 Hoc; PMT01 HocSubject: RE: ND Incident Suite - Contact arrangements
All
Canadian attendess at the telecon this meeting were:
Emergency Operations Team:
Ken Lafrenlere, Emergency DirectorBob Lojk, Technical Team LeadRichard Tennant, International Liasion Officer
others: Robert Power, Gerry Frappier, Ramzi Jammal, Greg Rzentowski
Also, below is the link that we have been using for additional info.
<httplhwww ialf.n'.jo/englth/ • htto:l/www laifor.Io/enallish/ •hftp:www Igal!.o i'nenglishiReaards>
Regards
Richard Tennant
EOC 2External Uaison OfficerEmergency Operations CenterCanadian Nuclear Safety Commission
From: LIA02 Hoc [matito:LIAO2 Hncanynv1Sent: Tuesday, March 15, 2011 7:09 AMTo: [email protected]; EOC2, External Uaison Officer; [email protected]; [email protected];[email protected]; [email protected]; [email protected]: HOO Hoc; RSTO1 Hoc; PMT01 HocSubject: RE: ND Incident Suite - Contact arrangements
Correction: please call 301-816-5100 for "UK-Canada" at 0930.
From: LIA02 HocSent: Tuesday, March 15, 2011 4:56 AMTo: '[email protected]'; [email protected]; [email protected];[email protected]'
Cc: [email protected]; [email protected]; '[email protected]'Subject: RE: ND Incident Suite - Contact arrangements
Hello All -
NRC can support another 0930 call (Washington time) with our colleagues from Canada and the UK. NRC plans to have an internationalliaison, reactor safety expert and protective measures expert on the call. Please call into the NRC Operations Center at 301-415-5100and request to be connected to the "Canada-UK teleconference."
Please confirm your organization's availability.
Thanks
From: [email protected] rmalltrAnthonv.Hintonn•ntematlona! r.cal On Behalf Of [email protected]: Tuesday, March 15, 2011 4:36 AMTo: [email protected]; [email protected]; LUA02 HocCc: [email protected]; [email protected]; [email protected]: RE: ND Incident Suite - Contact arrangements
Dear Colleagues,
We agree fully. Thank you for your assistance yesterday. We are looking forward to another call today, if possible.
With kind regards from Vienna,Anthony
Anthony HINTONCounsellor (Nuclear Affairs) I Conseiller (Affaires nudiaires)Permanent Mission of Canada to the International Organizations in Vienna IMission permanente du Canada aupr~s des organisations internationales 6 VienneLaurenzerberg 2, 1010 Vienna, [email protected] <malltorAnthnny.Hinton(Tinternatlonal-c .ca>+43 1 531 38 3212 - office I bureau+43 1 53138 3903 - facsiril tWe'copieur
()6 _JmobileGovernment of Canada I Go rement du Canada
From: EOC2, External Ualson Officer Ia~llto:Fxtemal algsonOfficer.FOC2-(acnsc-crsn.a*c61aSent: March 14, 2011 4:26 PMTo: '[email protected]'; '[email protected]'Cc: VPERM (G)Subject: RE: ND Incident Suite - Contact arrangements
All
Thanks very much for the informative discussion this morning. Much was clarified.
Regards
Richard Tennant
CNSC External/International Uaison
From: [email protected] [mailto:NSD.EMERGENCY(hhse.osi.aov.uklSent: Monday, March 14, 2011 10:47 AMTo: EOC2, External Uaison OfficerSubject: FW: ND Incident Suite - Contact arrangements
Apologies - I incorrectly input your eMail address previously
ND Incident Suite
[email protected] <mraltonnsd.emergencyihser gslnov uk>
0044-151-951-4161
From: NSD EMERGENCYSent: 14 March 2011 14:34To: '[email protected]'; '[email protected]'; '[email protected]'Subject: ND Incident Suite - Contact arrangements
All
Further to your recent telecon with Dave Shepherd this is the contact address for eMails
ND Incident Suite
[email protected] <rmalltcrnsd.erernencv-hsh-e.gsl.gov.ukl>
0044-151-951-4161
Please note : Incoming and outgoing email messages are routinely monitored for compliance with our policy on the use of electronic
communications and may be automatically logged, monitored and / or recorded for lawful purposes by the GSI service provider.
Interested in Occupational Health and Safety information?
Please visit the HSE website at the following address to keep yourself up to date
www.hse.gov.uk
Or contact the HSE Infoline on 0845 345 0055 or email [email protected]
The original of this email was scanned for viruses by the Government Secure Intranet virus scanning service supplied by Cable&WirelessWorldwide in partnership with MessageLabs. (CCTN Certificate Number 2009/09/0052.) On leaving the GSi this email was certified virusfree.Communications via the GSi may be automatically logged, monitored and/or recorded for legal purposes.
The information contained in this e-mail is intended solely for the use of the namedaddressee. Access, copying, or re-use of the e-mail or any information containedtherein by any other person is not authorized. If you are not the intended recipient,please notify us immediately by returning the e-mail to the originator.
Ce message est strictement riservi " rusage du destinataire indiqui. Si vous n'jtespas le destinataire de ce message, la consultation ou la reproduction mjme partlelle dece message et des renseignements qu'il contient est non autorisie. Si ce messagevous a iti transmis par erreur, veuillez en Informer l'expiditeur en lul retournant cemessage immidiatement.
The information contained in this e-mail Is Intended solely for the use of the namedaddressee. Access, copying, or re-use of the e-mail or any information containedtherein by any other person is not authorized. If you are not the intended recipient,please notify us Immediately by returning the e-mail to the originator.
Ce message est strictement r6serv6 & I'usage du destinataire Indiqu4. Si vous n'8tespas le destinataire de ce message, la consultation ou la reproduction mime partielle dece message et des renseignements qu'il contient est non autorisde. Si ce messagevous a dtd transmis par erreur, veuillez en Informer I'exp~diteur en lui retournant cemessage immdliatement.
From:Sent:To:SubjectAttachments:
Shaffer, Mark R <[email protected]>Saturday, March 19, 2011 3:13 AMUA03 Hoc; LIA02 Hoc; LIA07 HocFw: TRANSITION REPORT FOR MARCH 18, 2011 11 PM
Brooke Briefing -March 18_19.15.doc
From: Shaffer, Mark RTo: I (b)(6) ISent: Sat Mar 19 02:51:45 2011Subject: Fw: TRANSITION REPORT FOR MARCH 18, 2011 11 PM
From: UA03 Hoc <[email protected]>To: Fragoyannis, Nancy <[email protected]>; Doane, Margaret <Margaret. [email protected]>; Mamish, Nader<[email protected]>; Abrams, Charlotte <[email protected]>; Wittick, Brian <[email protected]>;Afshar-Tous, Mugeh <[email protected]>; Shaffer, Mark R; Smith, Brooke <[email protected]>; Foggie,Kirk <[email protected]>; Bloom, Steven <Steven. [email protected]>; Schwartzman, Jennifer<[email protected]>; Tobin, Jennifer <[email protected]>; Mayros, Lauren<Lauren. [email protected]>; Jones, Andrea <[email protected]>; English, Lance <[email protected]>;Smiroldo, Elizabeth <[email protected]>; Young, Francis <[email protected]>; Henderson, Karen<[email protected]>Cc: Emche, Danielle <[email protected]>; Stahl, Eric <[email protected]>; Dembek, Stephen<[email protected]>; LIA03 Hoc <[email protected]>; LIA07 Hoc <L[[email protected]>.Sent: Fri Mar 18 22:58:09 2011Subject: TRANSITION REPORT FOR MARCH 18, 2011 11 PM
~FEIQL&LU~EJ~L~- OrICA Glf-ew wsNLY -OFFIGIAL U&E- O;NLY
TRANSITION REPORT FOR MARCH 18, 2011 11 PM
1. NRC Relief Team to Japan. The NRC will be sending a relief team to Japan beginning tomorrow(Saturday, March 19). Dan Dorman will be leaving tomorrow and will serve as deputy head of delegation(and ultimate replacement for Chuck Casto) and will arrive Sunday at 4:35pm (Japan time). Two more staffwill depart on Monday to relieve Tony Ulses and Jim Trapp and a larger group will be dispatchedWednesday or Thursday. Aside from Dan Dorman, the group remains unnamed. Dan has beenbriefed. As of 9:20 pm, Tim Kolb (one of the team members) is feeling ill (headcold and laryngitis) itappears that he will be coming home this weekend (arrival at 3:38 Saturday). Action The international
6 16 i"
3.
n nere is an internationai upoates mte open on me LIAUA computer ano me status Doam isavailable on WebEOC.
4. NRC Japan Team Feedback for Margie. Margie has requested that the 11 pm-7am shift make contactwith Brooke and Kirk (by phone) to obtain information concernin their contact with Japanese overnmentaOne-pager
should be completedand sent prior to 7am transition. Of particular interest is: general topic of discussion, position/organizationof meeting participants, location of meeting, general impression of the discussion, attitude of Japanese,results, important things for the Chairman to know, etc. We are not looking for specific technicalinformation.
5. Communication with NRC Japan Team. Lauren spoke with Brooke at 7:15 regarding their current statusand the meeting with the Russians. Please see Lauren's write-up (attached) for a one-page summary.
iapan Group Email Alias. Kirk requested that we contact CSC about arranging an emailgroup/distribution for all NRC team members in Japan to allow easier communication to/from/amongst theteam. List was set up - it is "Liaison Japan". We have sent a test message and it was successful. DanDorman has beenad.
7. ShfChn )6ý
&- Ongoing communication with the UK. We (int'l and RST) participated in the daily 0930 call with the UK,Canada and France to discuss current conditions at the plant. This call will be held at the same time duringthe weekend. Separately, we have had a health physics call with these same countries and are workingwith the PMT on source-term-related information sharing with them. Another call on this subject has bescheduled for 2:00 PM tomorrow (Saturday). UK and IRSN have already shared information with us/
\1There is an email distributio litfaeonteLA2 no
97 NHK Query concerning 2000 Sandia Test. NHK (Japan TV), through NEA, has requested informationabout Sandia testing done in 2000 related to RPV strength related to pressure and blasts. Email was sentto RES (Dehn, Sangimino, Eisenberg, Calvo). RES has no objection but requested we clear it withOPA. David McIntyre shared the request with Eliot Brenner. We are awaiting response from Eliot. OnceOPA clears off we can reply to NEA (notify ET for info). Followed-up with OPA on their response, thencontacted Jeff Dehn in RES.
10. IAEA Japan Team. Based on an ET request, Eric Stahl contacted the IAEA Incident and EmergencyCenter (IEC) via phone about the arrival, makeup and goals of the IAEA team being sent to Japan. IECrequested we submit the questions via email to .ecM iaea.og 5'
---- ---- ---
2
WA
11. Passing clearances. There was an urgent request for Valerie Kerben/NRC Security to pass the team'ssecurity clearances to Cynthia Hoof at Hor HoofCState.sqaovov. This action has been
completed, but keep her information around because the replacement team's clearances will need to bepassed. Her phone number is 81-3-3224-5583.
12. ENAC. Please continue to regularly check ENAC for newly-posted documents. The translators are doinga great job working with the Japanese-language material and communicating with RST and PMTpersonnel.
13. Conference Call with State. (+Fed. Family) NRC on-site team gave a status update of theiractivities. Chuck Casto wanted help reducing the amount of radiation on the site and need help assessingthe affect of seawater on the reactor vessel (and head) especially with regard to heat transfer. They areworking on three different systems to cool the pools. The Australians are working on one (flying inequipment). The second one is the TEPCO solution which involves getting cement pumping trucks topump water instead cement. The third one is from Tokyo fire department who also have pump system•that may be useful .S. believes that we should go forward with all3 2;ths in the hopes thatat least oneof them work. They are fairly certain that pools at Units 3 and 4 are d, S
3
Phone Call with Brooke and Kirk - March 1 8 th - 7:15 PM
Lauren and Jenny spoke with Brooke and Kirk the evening of March 18th, at 7:15 PM. Brookeprovided a summary of her meeting with Russia. Participants in the meeting were:
From Russia: Prof. Valeri Strizhov, Vladimir Asmolov, and Sergey Pluzhnik (TENEX Japan &Rosatom)
From the U.S.: Brooke Smith (NRC), John Monninger (NRC), and Damian Piko (U.S. Embassy)
-la
(b)(5)
¶ In addition, rooke briefed us on their meeting with the Kantei, which is the Prime Minister andhis cabinet.
(b)(5)
From: Turtil, RichardSent: Sunday, March 20, 2011 1:15 PM
To: UA08 Hoc; UA06 Hoc; L1A09 Hoc
Cc: Virgilio, Rosetta; Jackson, Deborah; Piccone, Josephine; Harrington, Holly
Subject: RE: Dry Ice Proposals (for Fukushima)
Liaison Team Directors/Technical Assistants, Coordinators:
Josie Piccone (FSME) received the following about dry ice and cooling at Fukushima. Not quite certain how toget it-into who's hands. RST? Exec Team?
Please evaluate/forward as necessary,
Richard Turtil(b)(6)
From: Piccone, JosephineSent: Sunday, March 20, 2011 10:41 AMTo: Harrington, Holly; Turtil, RichardCc: Virgilio, Rosetta; Jackson, DeborahSubject: Fw: Dry Ice Proposals (for Fukushima)
FYI. Also, Rich can you get this to the right folks in ops in case idea has merit. Thanks
From: Aldo Pereira <[email protected]>To: Piccone, JosephineSent: Sun Mar 20 10:30:09 2011Subject: Fukushima
Dear Professor Piccone
You may be interested to read this clip from a story in Portland Publish Herald/MaineSunday Telegram, March 19, "Outsiders' suggested reactor fixes all have drawbacks".paragraphs on dry ice reads:
Dry ice -- Many of the "dozens" of suggestions that have been called in or sent electronically tcthe Nuclear Regulatory Commission involve dry ice, according to spokeswoman Holly Harringtonice is basically solid carbon dioxide and would work as a cooling agent, experts said.But it would probably have to be dropped on the stricken reactors from a helicopter, and "you diwant to drop something solid and big, because it could fall and break the fuel more," said LakeBarrett, a retired nuclear engineer who led emergency operations at Three Mile Island during th;Pennsylvania facility's partial core meltdown in 1979.
Also, even if the dry ice could be dumped safely, there is a risk of thermal shock if the reactor iscooled too quickly. "When you're dealing with something very, very hot, you want to bring (thetemperature) down quickly, but not too quick," Barrett said. "... Carbon dioxide might be too fast."
In the comment I posted I refute Barrett's argument because: 1) dry ice could be dumpedpiecemeal in nuggets in order to avoid both heavy impact and thermal shock; 2) watercannons could eject dry ice mixed with water, increasing the solid proportion of themixture as the reactor cools down. It seems to me Barrett is trying to justify the fact thatapparently nobody thought of dry ice in the Three Mile Island crisis.
What surprises me most is the paltry research, both in the academic milieu and as aprivate initiative sponsored by the dry ice industry. It could mean a relatively cheap wayto expand dry ice applications and their corresponding market. Theoretically, dry ice couldsave the day and many lives in Fukushima. Moreover, think of what it would mean for thesafety of all nuclear plants around the world (not to mention fire contention in oilrefineries etc.).
Being a somewhat if reluctant "green journalist", I abhor nuclear plants; but it seemsincredible to me that the nuclear industry neglects dry ice as, perhaps, a mitigatingresource.
Thanks for the precious time you spent with this message,AP
2
L ' In I I I I
From: Schwartzman, JenniferSent: Sunday, March 20, 2011 10:09 AMTo: LIA03 HocSubject: Re: Info from CA Briefing 20 March 2011
Sent from an NRC Blackberry
From: LIA03 HocTo: Doane, Margaret; Schwartzman, Jennifer; Mamish, NaderCc: LIA02 Hoc; Shaffer, Mark R <[email protected]>Sent: Sun Mar 20 10:06:07 2011Subject: RE: Info from CA Briefing 20 March 2011
;: I
(b)(5)
I have looped Mark into this email chain.
Cheers,
Karen
From. Doane, MargaretSent: Sunday, March 20, 2011 9:58 AMTo: Schwartzman, Jennifer; Mamish, NaderCc: LIA03 Hoc; LIA02 HocSubject: Re: Info from CA Briefing 20 March 2011
k..'' i
(L,4 ~
I' 'A2t~ 4"'vt.
Any ideasvThanks
Sent from an NRC BlackberryMargaret Doane
ýe Iq ý-
v
From: Schwartzman, JenniferTo: Doane, Margaret; Mamish, NaderCc: LIA03 Hoc; LIA02 HocSent: Sun Mar 20 09:43.59 2011Subject: Re: Info from CA Briefing 20 March 2011
Sent from an NRC Blackberry
From: Doane, MargaretTo: Schwartzman, Jennifer; Mamish, NaderCc: LIA03 Hoc; LIA02 HocSent: Sun Mar 20 09:38:12 2011Subject: Fw: Info from CA Briefing 20 March 2011
. . : , . , ., . . . 3 .
Sent from an NRC BlackberryMargaret Doane
From: LIA01 HocTo: Andersen, James; Bates, Andrew; Brenner, Eliot; Bubar, Patrice; Camper, Larry; Castleman, Patrick; Chandrathil,Prema; Cheok, Michael; Dembek, Stephen; Doane, Margaret; Dricks, Victor; Franovich, Mike; Gott, William; Haney,Catherine; Hannah, Roger; Hart, Ken; Hayden, Elizabeth; Hipschman, Thomas; Howell, Linda; Jackson, Donald; Ledford,Joey; Lewis, Robert; Mamish, Nader; Marshall, Michael; Maupin, Cardelia; McConnell, Keith; Miller, Charles; Mitlyng,Viktoria; Moore, Scott; Nease, Rebecca; Nieh, Ho; Orders, William; Powell, Amy; Ramsey, Jack; Reddick, Darani; Reis,Terrence; Riemer, Kenneth; Screnci, Diane; Sheehan, Neil; Snodderly, Michael; Sollenberger, Dennis; Sosa, Belkys;Tschiltz, Michael; Uselding, Lara; Vietti-Cook, Annette; Whitney, James; McKenney, ChristepherSent: Sun Mar 20 09:15:11 2011Subject: Info from CA Briefing 20 March 2011
2
From: ET07 HocSent Sunday, March 20, 2011 9:39 AMTo: RST01 HocCc: Johnson, ClaySubject: FW: Reactor Photo - scanned
As per our conversation please confirm (b)(4) 1hanks
From: Johnson, ClaySent: Sunday, March 20, 2011 9:37 AMTo: ET07 HocSubject: Re: Reactor Photo - scanned
(b)(4)
Sent from an NRC Blackberry\ ,,Clay Johnson...
From: ET07 HocTo: Johnson, ClaySent: Sun Mar 20 09:22:25 2011Subject: FW: Reactor Photo - scanned
From: OST02 HOCSent: Sunday, March 20, 2011 9:22 AMTo: ETO7 HocSubject: Reactor Photo - scanned
0,
I
m QI
From:Sent:To:Subject
Johnson, ClaySunday, March 20, 2011 9:36 AMET07 HocRe: Question
Understood. Picture will help.
Sent from an NRC BlackberryClay Johnson-
(b)(6) VFrom: ET07 HocTo: Johnson, ClaySent: Sun Mar 20 09:20:54 2011Subject: RE: Question
Spoke to the RST. Need to emphasize finding a NON-explosive approach. (b)(4)
)I'm getting a. copy of a picture scanned that may be helpful.
From: Johnson, ClaySent: Sunday, March 20, 2011 9:09 AMTo: ET07 HocSubject: Re: Question
Received and on it.
Sent from an NRC BlackberryClay Johnson
•I (b)(6)
From: ET07 HocTo: Johnson, ClaySent: Sun Mar 20 09:06:43 2011Subject: FW: Question
Craig
----- Original Message -----
From: Holahan, Patricia /$ C/ I ý 12(1
Sent: Sunday, March 20, 2011 8:42 AM
To: Westreich, Barry; Erlanger, Craig
Cc: Wiggins, Jim
Subject: Re: Question
I was told last night that there was concrete on the roof
-- -- Original Message-----
From: Westreich, Barry
To: Erlanger, Craig
Cc: Wiggins, Jim; Holahan, Patricia
Sent: Sun Mar 20 07:55:02 2011
Subject: RE: Question
After we C~rmrpd thi• thp nthpr day- T did hripf thp FT nn thp idpa wpdevelo ed
(b)(4)
(b)(5) '.
I also talked to the RST Team Leader and they were.going to check on buildinaconstruction and work with a structural s taf - (b)(4J
T .... • Tey may have done some work on-
that, but I never heard back..they were b'u§-with the seawater pump and pipingdesign with Bechtel at the time.
Le me know if there is anything I can do.
--- -- Original Message -----
From: Erlanger, Craig
Sent: Sunday, March 20, 2011 6:22 AM
To: Holahan, Patricia
Cc: Wiggins, Jim; Westreich, Barry
Subject: RE: Question
2
Will do
---- -Original Message -----
From: Holahan, Patricia
Sent: Sunday, March 20, 2011 12:20 AM
To: Erlanger, Craig
Cc: Wiggins, Jim; Westreich, Barry
Subject: Fw: Question
Craig
Could you call Clay and/or Denis tomorrow? We have an action from the NRC tea AJapan to see if there is a way'
(b)(4)• I (b)(5)
(b)(5)
Thanks, Trish
--- -Original Message-----
From: Holahan, Patricia
To: Johnson, Clay; Brady, Denis
Cc: Westreich, Barry
Sent: Sat Mar 19 23:40:53 2011
Subject: Question
--- -Original Message-----
From: Holahan, Patricia
To: Johnson, Clay; Brady, Denis
Cc: Westreich, Barry
Sent: Sat Mar 19 23:28:56 2011
3
Scott, Michael . . ., __ __ _"_"
From: Scott, MichaelSent: Monday, March 21, 2011 1:27 PMTo: Schwarz, SherrySubject: FW: Deployment to JapanAttachments: 2nd Staff Deployment to Japan.docx
This of course is the "care package" to which I referred.
Mike
From: Evans, MicheleSent: Monday, March 21, 2011 12:54 PMTo: Meighan, SeanCc: Leeds, Eric; Schwarz, Sherry; Scott, MichaelSubject: FW: Deployment to Japan
Here are the names of the travelers. Please decide who would need the NUREG info on severe accidents thatwas provided to Chuck Casto and Dan Dorman. And get it to them.
Thanks
Michele
From: Evans, MicheleSent: Saturday, March 19, 2011 11:42 AMTo: Scott, Michael; Blarney, Alan; Giessner, John; Taylor, Robert; Jackson, Todd; Miller, Marie; Ali, Syed; Sheikh, Abdul;Way, Ralph; Ramsey, JackCc: Cadoux, Claude; Dempsey, Jeanne; Linnerooth, Sarah; Buchholz, Jeri; Sheron, Brian; McCree, Victor; Pederson,Cynthia; Lubinski, John; Holian, Brian; Leeds, Eric; Lew, David; Lorson, Raymond; Mamish, NaderSubject: Deployment to Japan
Thank you for volunteering for deployment to Japan. This work is of highest priority for the agency and yourefforts are enormously appreciated.
The plan is for Mike Scott (RES) and Alan Blamey (RII) to leave the USA on Tuesday, March 22.The remaining team members, Jack Giessner (Rill), Rob Taylor (NRR), Todd Jackson (RI), Marie Miller (RI),Syed Ali (RES), Abdul Sheikh (NRR), Ralph Way (NSIR), and Jack Ramsey (OIP) will depart on or aboutMarch 24. The intent is that your stay will be two weeks or less, depending on how the situation in Japanevolves.
The Operations Center Liaison Team (LT) will be contacting you later today to handle the logistic for your trip.This includes items such as flights, passports, country clearances, health immunizations, internationalblackberry service, dosimetry and KI tablets.
In addition, HR has requested that I provide you the information below:
-Please contact NRC Health Services on Monday morning on 301-415-8400 to schedule an appointment withDr. Cadoux for health screening and counseling. If at all possible, it is important that you meet with Dr.Cadoux face-to-face. However, if you are located in the Region or if you are notified and deployed in a veryshort time frame so that medical screening is not possible, this screening will be conducted by phone. Pleasebe aware that medical services available in Tokyo are limited at this time. Additionally, working conditions are
18
t,.
such that controlling diet, sleep, exercise, and routine may be impossible. All of these factors can impact yourhealth. Please review any medical conditions that you may have with Dr. Cadoux so that he can provide youwith advice and counseling on managing you medical condition while deployed.
-Before you deploy we recommend that you speak briefly with the NRC Employee Assistance Programcounselor, Sarah Linnerooth. Sarah can be reached on 301-415-7113. While you are deployed, EAP servicesare available to both you and your family, including extended family members such as Grandparents. Thetelephone number is for EAP service is 1-800-896-0276. More information is available on the EAP on the webat www.eapconsultants.com. To learn more about the EAP and the services provided click on the memberservices tab. The NRC passcode is "nuclear". Please be sure to share this information with your family.
At this point, I ask that you hold any questions that you may have until the LT contacts you directly. However,after that time, if you have any additional questions or concerns that have not been addressed, please call oremail me.
Thank you.
Michele Evans
Acting Deputy OD, [email protected]
EB I (b)(6) I - J
19
4
From:Sent:To:Subject:Attachments:
Follow Up Flag:Flag Status:
Merchant, Ned <[email protected]>.Monday, March 21, 2011 11:14 AMRST01 HocFW: Topics of discussion for TEPCO/Bechtel/GE-H-Fukushima
Discussion Topics for TEPCO.doc
Follow upFlagged
Per your request
Best Regards, Ned"Quality is not an act, it is a habit"
From: Merchant, NedSent: Sunday, March 20, 2011 10:51 AMTo: Rogers, Ed; Hughes, Michael C (BNI OPS); Albert, CraigCc: Thomas, Eugene; Rau, Carl; Reilly, Brian (Power)Subject: FW: Topics of discussion for TEPCO/Bechtel/GE-H-Fukushima
(b)(4)-~;~:
...... i
Best Regards, Ned"Quality is not an act, it is a habit"
From: Nygaard, JamesSent: Sunday, March 20, 2011 8:36 AMTo: Merchant, Ned; Olson, James; Humphrey, James; Skinker, C; Thomas, EugeneCc: Rau, Carl; Reilly, Brian (Power)Subject: RE: Topics of discussion for TEPCO/Bechtel/GE-H-Fukushima
Gene, et al,
I
sel-,91
- Thanks and Best Regards -
Jim NygaardNuclear ! Environmental Staff301.228.6739 tel240.379.2508 fax
From: Merchant, NedSent: Sun 3/20/2011 7:36 AMTo: Nygaard, James; Olson, James; Humphrey, James; Skinker, CCc: Thomas, Eugene; Rau, Carl; Reilly, Brian (Power)Subject: FW: Topics of discussion for TEPCO/Bechtel/GE-H-Fukushima
To all-
Gene asked that I forward to you for review and comment. Thanks
Best Regards, Ned"Quality is not an act, it is a habit"
From: LIAll Hoc [mailto:[email protected]]Sent: Sunday, March 20, 2011 4:33 AMTo: Merchant, Ned; Cook, William; Monninger, JohnCc: RMTPACTSUELNRC; RST01 HocSubject: Topics of discussion for TEPCO/Bechtel/GE-H
All -......... p...,'. • -
.............................,,.....,• B
V 'M
Please let me know if you have any questions or concerns.
Thanks,Scott
2
Schaperow, Jason
From: Schaperow, JasonSent: Monday, March 21, 2011 10:59 AMTo: Santiago, Patricia; J. & R. SchaperowCc: Wagner, Katie; Lee, Richard; Chang, RichardSubject: RE: Jennifer Uhle FW: Fuku-4 Fuel Pool - MELCOR Results
Yes. Jennifer was the RST Director last night. She called me at 11:30 p.m. I worked from 11:30 p.m. to 2:30a.m.
I will coordinate with Katie.
From: Santiago, PatriciaSent: Monday, March 21, 2011 10:51 AMTo: J. & R. SchaperowCc: Schaperow, Jason; Wagner, Katie; Lee, RichardSubject: RE: Jennifer Uhle FW: Fuku-4 Fuel Pool - MELCOR Results
In n
thanks
From: J. & R. Schaperow [mailto: (b)(6)
Sent: Monday, March 21, 2011 2:33 AMTo: [email protected]; [email protected]; Tinkler, Charles; Santiago, Patricia; Schaperow, JasonCc: Uhle, JenniferSubject: Fw: Jennifer Uhle FW: Fuku-4 Fuel Pool - MELCOR Results
Jason
---- -Forwarded Message ----From: J. & R. Schaperow (b)(6)
To: [email protected]: [email protected]; [email protected]; [email protected]; [email protected]: Mon, March 21, 2011 1:46:30 AMSubject: Fw: Jennifer Uhle FW: Fuku-4 Fuel Pool - MELCOR Results
Hi Jennifer,
" . ..... " ' '' (b)"" "(5)
1
gC/10
I called you in the Ops Center at 1:10 a.m. to discuss this request, but the Ops Center said you werebusy and would call me back. I will try calling you again, if I do not hear from you shortly. (My number
Thanks,Jason
----- Forwarded Message ----Fro•j: "Gauntt, Randall 0" .<[email protected]>To: (b)(6)
Cc: "charles.tinkler~nrc.goV"[email protected]>Sent: Mon, March 21, 2011 12:26:45 AMSubject: Jennifer Uhle FW: Fuku-4 Fuel Pool - MELCOR Results
Jennifer and Jason,Attached are Fuku-4 SFP analyses that we initiated last week.
Randy
From: Casey [email protected]]Sent: Friday, March 18, 2011 1:20 PM 'To: Gauntt, Randall 0; [email protected]; 'Schaperow, Jason'Cc: McClellan, YvonneSubject: Fuku-4 Fuel Pool - MELCOR Results
wI
Let me know if you want anything else.
From- Casey Wagner [mailto:[email protected])Sent: Friday, March 18 2011 10:28 AMTo: [email protected]; [email protected]; 'Schaperow, Jason' ([email protected])Cc: [email protected]: FW: Fuku-4 Fuel Pool - impact of dry pool -call#3 - 800-501-0843 codi (b)(6)
Hi Randy, Charlie, and Jason,
2
RRandy - Sorry to see you were up at 12:36 am.
KC
From: Gauntt, Randall 0 [mailto:[email protected]]Sent: Friday, March 18, 2011 12:36 AMTo: Gauntt, Randal 0; 'Marquino, Wayne (GE Power & Water)'; 'Hammargren, Benjamin (GE Power & Water)';andtnenetrne on usSan Pickering, Susan YC c (b)(6); 'Bolger, Francis T. (GE Power & Water)', 'Ellison, Phillip G (GE Power & Water)';'Ginsberg, Robert (GE Power & Water)'; NKap oth, James F (9ower & Water)'; '[email protected]';'Madronero, Hernando (GE Power & Water)Subject: RE: Fuku-4 Fuel Pool - impact of o -cafi#3 - 80-t01-N43 c (b)(6)
Dear Wayne Ior anvonn at G F11
Randy
From: Gauntt, Randall 0Sent: Wednesday, March 16, 2011 11:06 PMTo: 'Marquino, Wayne (GE Power & Water)'; 'Hammargren, Benjamin (GE Power & Water)'cc: (b)(6) . 'Bolger, Francis T. (GE Power & Water)'; 'Ellison, Phillip G (GE Power & Water)';'Ginsberg, Robert (GE Power & Water)'; Klapproth, James F (GE Power & Water)'; '[email protected]';'Madronero, Hernando (GE Power & Water)'; cSubject: RE: Fuku-4 Fuel Pool - impact of dry pool -call#3 - 800-501-0843 code-•Wayne,
R andy ......... ..
From: Marquino, Wayne (GE Power & Water) [mailto. e.t¶unl comlSent: Wednesday, March 16, 2011 6:15 PMTo: Hammararen. Benjamin (GE Power & Water); Gauntt, Randall 0Cct (b)(6) I Bolger, Francis T. (GE Power & Water); Ellison, Phillip G (GE Power & Water);Ginsberg, Robert (GE Power & Water); Klapproth, James F (GE Power & Water); Charles.Tinkler@nrc~gov; Madronero,Hernando (GE Power & Water); k wdy•acom 7 ... " .Subject: RE: Fuku-4 Fuel Pool - impact of dry pool -call#3 - 800-501-0843co•I b() j
Please send it to Randy Gauntt
3
!Wayne
* From: Gauntt, Randall 0 [mailto:[email protected]]Sent: Wednesday, March 16, 2011 7:56 PMTo: Bolger, Francis T. (GE Power & Water); Buchholz, Carol E. (GE Power & Water); Ellison, Phillip G (GE Power &Water); Ginsberg, Robert (GE Power & Water); Klapproth, James F (GE Power & Water); Marquino, Wayne (GE Power &IWater) '[email protected]'; Madronero, Hernando (GE P Water Charles (GE Power & Water);Loe Crawford, Douglas C (GNF) Upton, Hugh A. (GE Power& Water)
Subject: RE: Fuku-4 Fuel Pool - impact of dry pool -calI#3 - 800-501-0843c* b6
Randy Gauntt
--- Original Appointment-From: Bolger, Francis T. (GE Power & Waterl/ ISent: Wednesday, March 16, 2011 5:37 PM -- "To: Buchholz, Carol E. (GE Power & Water); Ellison, Phillip G (GE Power & Water); Ginsberg, Robert (GE PowerWater); Klapproth, James F (GE Power & Water); Marquino, Wayne (GE Power & Water); [email protected], Hemando (GE Power & Water); He Charl (GE P er & Water); Loewen. Eric (GE Power & WateGa Randall 0; Crawford, Do-inas C (GNIF ton, Hugh A. (GE Power & Water)Cc (b)(6)Su.r-ct: Fuku-4 Fuel Pool - im! rdry pool -cald3 - 800-501-084When: Wednesday, March 16, 2011 8:30 PM-7:30 PM (UTC-07:00) Montain ie S&Canada).Where: ATC2 CR 25
4
From: Casto, ChuckSent: Monday, March 21, 2011 6:10 PMTo: UA06 HocSubject: Re: Possible INPO travel to Japan
They should check into the hotel, get some rest then come to embassy in morning.
From: LIA06 HocTo: Casto, ChuckCc: UIA06 HocSent: Mon Mar 21 18:04:47 2011Subject: RE: Possible INPO travel to Japan
Chuck:
Our second team of NRC staff is preparing to deploy. Where would you like them to report and what is a convenienttimefor your team?
Bob Webber
Liaison Team DirectorU.S. Nuclear Regulatory CommissionOperations Center
From: Casto, ChuckSent: Monday, March 21, 2011 4:46 PMTo: LIA02 HocCc: LIA06 Hoc; OST04 Hoc; OSTO0 HOC; OST02 HOCSubject: Re: Possible INPO travel to Japan
Sure let's talk we have to map out the best options given te change in organizational structure that the japanese mad
yesterday. We will provide to you what we think is the best options for going forward.
The team will map that out this morning and deliver soonest.
Chuck
From: LUA02 HocTo: Casto, ChuckCc: LIA06 Hoc; OST04 Hoc; OST01 HOC; OST02 HOCSent: Mon Mar 21 15:01:52 2011Subject: Possible INPO travel to Japan
Chuck,
Laur, Steven
From:Sent:To:
Cc:
Subject
Attachments:
Nguyen, QuynhMonday, March 21, 2011 10:26 AMBahadur, Sher; Blount, Tom; Brown, Frederick; Check, Michael; Evans, Michele; Galloway,Melanie, Glitter, Joseph; Givvines, Mary; Hiland, Patrick; Holian, Brian; Howe, Allen; Lee,Samson; Lubinski, John; Lund, Louise; McGinty, Tim; Nelson, Robert; Quay, Theodore;Ruland, William; Skeen, David; Thomas, Brian; Westreich, BarryLeeds, Eric; Boger, Bruce; Grobe, JackFW: Revision to INPO Event Report LI 11-1 - Fukushima Dafichi Nuclear Station FuelDamage Caused by Earthquake and TsunamiIER LI-11-1, Rev. 2.pdf
Update of the INPO Report.
----- Original Message--From: Wittick, Brian i2E•oSent: Friday, March 19, 2011 5:38 PMTo: Howe, Allen; Andersen, James; Virgilio, Martin; Merzke, DanielCc: Bowman, Gregory; Meighan, Sean; Nguyen, QuynhSubject: Fw: Revision to INPO Event Report L1 11-1 - Fukushima Dailchi Nuclear Station FuelDamage Caused by Earthquake and Tsunami
VR
Sent from NRC BlackBerry
-Original Message -----From: Mortensen, George K (INPO) <MortensenGKNINPO.org>To: Leeds, Eric; Wittick, Brian; Boger, Bruce; Thomas, Eric; Kobetz, TimothySent: Fri Mar 18 17:23:33 2011Subject: FW: Revision to INPO Event Report Li 11-1 - Fukushima Daiichi NuclearDamage Caused by Earthquake and Tsunami
Station Fuel
d is a copy of the recently revised INPO Event Report 11-1. IER Li 11-1 has been(b)(4) I-
Please note that this document remains a copyrighted, Limited Distribution document that isot releaseable to any third party. Confidentiality of the document remains in place as
covered by the INPO-NRC Memorandum of Agreement and the supporting FOIA Affidavit providedto, and approved by, the NRC.tet Wishesl
George MortensenINPO -- External Relations Program ManagerFrom: Webster, Bill E (INPO)Sent: Friday, March 18, 2011 4:47 PMSubject: Revision to INPO Event Report LI 11-1 - Fukushima Daiichi Nuclear Station FuelDamage Caused by Earthquake and Tsunami
1 le-110 11ý-'
ism
To: Chief Nuclear Officers (This e-mail has also been sent to Site Vice Presidents, PlantManagers, Administrative Points of Contact, INPO Coordinators, Operating ExperienceCoordinators, Performance Improvement and Corrective Action Contacts, Nuclear NetworkCoordinators, and Analysis Review Board.)
From: Bill Webster, Senior Vice President, Industry Evaluations
1 IER LI 11-1 has been revised to clarify (b)(4)(bX4)
Please open your internet browser to the INPO Web site and click on the following link:http://www.inpo.org/operatingexperience/IER/LI/IERLl-1l-l. pdf
.DISCLAIMER:This e-mail and any of its attachments may contain proprietary INPO or WAND information thatis privileged, confidential, or protected by copyright belonging to INPO or WAND. This e-mailis intended solely for the use of the individual or entity for which it is intended. If youare not the intended recipient of this e-mail, any dissemination, distribution, copying, oraction taken in relation to the contents of and attachments to this e-mail is contrary to therights of INPO or WANO and is prohibited. If you are not the intended recipient of this e-mail, please notify the sender immediately by return e-mail and permanently delete theoriginal and any copy or printout of this e-mail and any attachments.Thank you.
2
Bonaccorso, Amy
From:Sent:To:Cc:
Subject:Attachments:
S(b)(6) .
-Mo -, Ma--ch 21, 2011 2:08 PMNRC Allegation
(b)(6) I [email protected] et I (b)(6)X
[email protected] ia ion protectionMedicalCountermeasuresLetteronRadiationProtection.doc
Garnett McKeen Lab, Inc. has a radiation protectant in an advanced stage of drug development. A brief summary is attached.
We are searching for communication with government agencies for assessment and development of this material for Japan.
Please advise us how to proceed.
Merrill GarnettDirector of LabGarnett Mckeen Lab, Inc.
-7 Shirley St., Bohemia, NY 1171631 589 0770)
S1511 C)"ýI
GARNETI" McKEEN LABORATORY, INC.
(b)(4)
7 Shirley Street * Bohemia, NY 11716-1735 e Tel: (631) 589-0770 - Fax: (631) 589-0778
GARNETI McKEEN LABORATORY, INC.
7 Shirley Street * Bohemia, NY 11716-1735 9 Tel: (631) 589-0770 * Fax: (631) 589-0778
h
From: Scrend. DianeTo: Harrincton. HollySubject: RE: 50 mile EPZDate: Monday, March 21, 2011 5:22:00 PM
We can talk about this another time.
DIANE SCRENCISR. PU11IC AFFAIRS OFFICER
USNRC, RI
610/337-5330
From: Harrington, HollySent: Monday, March 21, 2011 5:19 PMTo: Screnci, DianeSubject: RE: 50 mile EPZ
From: Screnci, DianeSent: Monday, March 21, 2011 5:18 PMTo: Harrington, HollySubject: RE: 50 mile EPZ
DIANE 'SCRENCISR. PUBLIC AFFAIRS OFFICERUSNRC, RI
610/337- 5330
From: Harrington, HollySent: Monday, March 21, 2011 5:17 PMTo. Screnci, DianleSubject: RE: 50 mite EPZ
From: Screnci, DianeSent: Monday, March 21, 2011 5:16 PMTo: Harrington, HollySubject: RE: 50 mile EPZ
Thanks. My work is done.
DIANE SCRENCI
S•7. PUBLIC AFFAIRS OFFICER
USNRC, RI6f0/337-5330
From: Harrington, HollySent: Monday, March 21, 2011 5:13 PMTo: Screnci, DianeSubject: RE: 50 mile EPZ
From: Screnci, DianeSent: Monday, March 21, 2011 5:11 PMTo: Harrington, HollySubject: 50 mile EPZ
Holly,
DIANE SCRENCISR. PUBLIC AFFAIRS OFFICERUSNRC, RI
6f0/337-5330
Dunham, Katrina
From: Schmidt, WayneSent: Tuesday, March 22, 2011 3:56 PMTo: Haagensen, BrianSubject: FW: Action: Consider potential on-site activities in near-termAttachments: ,.; TI to Follow-up to Fukushima Daiichi Nulcear Station Fuel Damage Event.docx; INPO Event
Report (IER) Li-11-1 .pdf
Importance: High
fyi
From: Powell, RaymondSent: Thursday, March 17, 2011 11:00 AMTo: Roberts, Darrell; Wilson, Peter; Weerakkody, Sunil; Clifford, JamesCc: Dentel, Glenn; Gray, Mel; Burritt, Arthur; Krohn, Paul; Jackson, Donald; Bellamy, Ronald; Schmidt, Wayne; Rogge,John; Doerflein, LawrenceSubject: FW: Action: Consider potential on-site activities in near-termImportance: High
As discussed at the morning meeting. Comments to Carey Bickett for consolidation by noon tomorrow.
If we need to ask for an extra day, it appears that door is open.
Ray
From: Kobetz, TimothySent: Thursday, March 17, 2011 10:54 AMTo: Hopper, George; Lara, Julio; Powell, Raymond; Hay, MichaelCc: Roberts, Darrell; Clifford, James; Croteau, Rick; Jones, William; OBrien, Kenneth; Kennedy, Kriss; Shear, Gary; Pruett,Troy; Westreich, Barry; West, Steven; Vegel, Anton; Wilson, Peter; Miller, Chris; Weerakkody, Sunil; OBrien, Kenneth;Reynolds, Steven; Munday, Joel; Moorman, James; Christensen, Harold; Brown, Frederick; Albert, Ronald; Erlanger,Craig; Thomas, Eric; Thorp, John; Ashley, MaryAnn; Cutler, IrisSubject: Action: Consider potential on-site activities in near-termImportance: High
Dear George, Julio, Ray, and Mike,
GARNETT McKEEN LABORATORY, INC.
(b)(4)
7 Shirley Street 9 Bohemia, NY 11716-1735 • Tel: (631) 589-0770 * Fax: (631) 589-0778
I will be out of the office this afternoon but can be reached via e-mail or my cell phone (b(6)-whenpossible. " -
Also attached is the INPO document for reference.
Thanks for your efforts on this,
Tim
Attached for review
Inspection Manual Document for Comment (DC 11-10)
TI 25151183, "Follow-up to Fukushima Daiichi Nuclear Station Fuel Damage EventDIRS Technical Lead:Timothy Kobetz, NRRIDIRSIIRIB, 301-415-1932, email, timothy. kobetz()nrc.Qov
The is a new document so it represents a significant change.
From: Brown, FrederickSent: Wednesday, March 16, 2011 3:15 PMTo: Kobetz, TimothySubject: FW: Action: Consider potential on-site activities in near-termImportance: High
Tim,
From: Brown, FrederickSent: Wednesday, March 16, 2011 11:17 AMTo: Roberts, Darrell; Clifford, James; Croteau, Rick; Jones, William; Croteau, Rick; Darrell Roberts; James Clifford; Jones,William; Kennedy, Kriss; Shear, Gary; Troy Pruett; West, StevenCc: Vegel, Anton; Wilson, Peter; Miller, Chris; Weerakkody, Sunil; OBrien, Kenneth; Reynolds, Steven; Munday, Joel;Moorman, James; Christensen, Harold; Westreich, BarrySubject: Action: Consider potential on-site activities in near-termImportance: High
2
From: LIA02 HocSent: Tuesday, March 22, 2011 12:11 PMTo: UA06 Hoc; LIA08 Hoc; RST01 Hoc; RST Communicator; PMT01 HocSubject: RE: Thank you for the amazing support of the TEPCO mtg
Is there a written summary of the meeting that can be shared?
----- Original Message -----From: LIA06 HocSent: Tuesday, March 22, 2011 9:06 AMTo: LIA08 Hoc; LIA02 Hoc; RST01 Hoc; RST Communicator; PMT01 HocSubject: FW: Thank you for the amazing support of the TEPCO mtg
Please express thanks to all.
Tom BergmanLiaison Team DirectorU.S. Nuclear Regulatory CommissionOperations Center
-Original Message----From: LIA02 HocSent: Tuesday, March 22, 2011 12:22 AMTo: LIA06 HocSubject: FW: Thank you for the amazing support of the TEPCO mtg
fyi
----- Original Message -----From: Nakanishi, Tony
:Sent: Tuesday, March 22, 2011 12:19 AM*To: LIA02 Hoc; Liaison JapanSubject: Thank you for the amazing support of the TEPCO mtg
I just wanted to convey a big thanks to all atthe HQ for the outstanding technical support.This TEPCO meeting was probably the most productive meeting we have had with them so far.
From: Nakanishi, TonySent: Monday, March 21, 2011 6:13 PMTo: LIA02 Hoc; Devercelly, Richard; Liaison JapanCc: '[email protected]'Subject: RE: TEPCO meeting at the US Embassy Monday.
The meeting/call time is 10:00 am Japan time. The NRC welcomes and appreciates any industry expertise related to theagenda for the call. Below is the agenda for the meeting.
Agenda on the meeting @ the Embassy of the U.S.A. 2011.03.22
ID
1.. Salt Issue- TEPCO: preliminary analysis result on salt development- NRC: analysis result
discussion on salt issue solutions
2. Additional questions on core cooling, criticality and hydrogen explosion- how to implement core cooling, except ongoing TEPCO ideas (recovery of CS, CRD and SLC)- how to avoid recurrence of criticality- how to avoid hydrogen explosion
3. Progress in water cannon, robot and radiation detector/protection- NRC: answers on water cannon questions from TEPCO- NRC: specific proposals on robots from NRC- NRC: specific proposals on radiation detector/protection from NRC- TEPCO: radiation level map of 1F site
4. Schedule on water cannon- when to arrive at Yokota
how to make the first contact with Bechtel experts
From: LIA02 HocSent: Monday, March 21, 2011 11:20 AMTo: Devercelly, Richard; Nakanishi, Tony; Liaison JapanCc: '[email protected]'Subject: RE: TEPCO meeting at the US Embassy Monday.
(b)(6)
----- Original Message -----From: Devercelly, RichardSent: Monday, March 21, 2011 11:10 AMTo: LIA02 Hoc; Nakanishi, Tony; Liaison JapanCc: '[email protected]'Subject: RE: TEPCO meeting at the US Embassy Monday.
I can confirm the the meeting time is 1000 AM JAPAN time.
Tony is getting much needed sleep now. He will reply to you in the next 8 hours or so.
Rick DeVercellyNRC Japan Response Team
From: LIA02 HocSent: Monday, March 21, 2011 10:54 AMTo: Nakanishi, Tony; Liaison JapanCc: 'Damian.Peko@ Nuclear.Energy.gov'Subject: RE: TEPCO meeting at the US Embassy Monday.
2
Please advise time. Is it 10:00 Japan time? What type of support from hq do you need for call? Can US industryparticipate?
----- Original Message -----From: Nakanishi, TonySent: Monday, March 21, 2011 9:34 AMTo: LIA02 Hoc; Liaison JapanCc: '[email protected]'Subject: Fw: TEPCO meeting at the US Embassy Monday.
For the tepco mtg.
----- Original Message ----From:/l J I1 <[email protected]>To: Peko, Damian <[email protected]>Cc: Jllf, M <[email protected]>; [email protected] <[email protected]>; Monninger, John; Nakanishi, TonySent: Mon Mar 21 07.29:30 2011Subject: Re: TEPCO meeting at the US Embassy Monday.
Dear Mr. Peko,
Thank you very much for your strong support to TEPCO.
Attached are the agenda and related material.Please deliver those to the US side before the meeting of tomorrow starts.
Best regards,
Takashi SatoTEPCO(On behalf of Mr. Akira Kawano)
-- - - - - - - - - - - - - - - - - - -
WX• 9• (TakashiSato)T 100-8S60 J3 •,, •[ft- fR l• I *- I1-1-3
TEL : 03-6373-4721FAX 03-3596-8538E-Mail : [email protected]
----- Original Message ----From: "J'IT " <[email protected]>To: "Peko, Damian" <[email protected]>Cc: <[email protected]>; <[email protected]>; <[email protected]>; <[email protected]>Sent: Monday, March 21, 2011 4:59 PMSubject: Re: TEPCO meeting at the US Embassy Monday.
> Dear Mr.Damian Peko,
3
>.Thank you for all of your arrangement for tomorrow meeting.> I also appreciate for the Embassy of the U.S.A providing the> convenience to use oversea telephone system.
> Our participants for the meeting are as follows:
> Toshihiro Bannai, NISA> Norihisa Yuuki, NISA> Syunichi Suzuki, TEPCO> junichi Hakii, TEPCO> Takashi Satoh, TEPCO> Akira Kawano, TEPCO
> Warmest regards,
> Akira Kawano> TEPCO
> On Mon, 21 Mar 2011 03:25:36 -0400
> "Peko, Damian" <Damian.Peko@N uclear.Energy.gov> wrote:
>> Dear Kawano-san
>> I a sending you this email so you have the address to send the names>> of he NISA and TEPCO people who will be a the meeting we scheduled>> for 10:00 tomorrow. Please reply to this email with the names of the>> participants for this meeting.
>> Best Regards
>> Damian Peko
>
>%
> WHE : 0240-32-2486 (IYifJL,-l')
> V_-- -)JL : [email protected]
" Akira Kawano> Maintenance Director> Fukushima Daiichi Nuclear Power Station Tokyo Electric Power Company
> Phone:+81-240-32-2486> Fax.:+81-240-32-3881> E-mail:[email protected]> URL:http://www.tepco.co.jp/fukushimal-np/index-j.html
4
' Schaperow, Jason
From: Schaperow, JasonSent: Tuesday, March 22, 2011 3:28 PMTo: Huffert, AnthonySubject: FW: Fukushima SFP Source TermsAttachments: Fukushima SFP Source Terms.xlsx
From: Schaperow, JasonSent: Tuesday, March 22, 2011 2:17 PMTo: Esmaili, Hossein; Salay, MichaelSubject: FW: Fukushima SFP Source Terms
Per our discussion this morning, the two pages in the attached spreadsheet contain the source terms we gave
to the Ops Center PMT on Friday night (March 18).
The first page has the 4 source terms for the 4 spent fuel pools.
The second page has the release fractions and timing for a single reactor. The PMT (Gary Purdie) thenmultiplied the release fractions by the Ci/MWt (from RASCAL) and the total MWt of each Fukushima reactor(reactors 1, 2 and 3).
The PMT (Tony Huffert) provided a combine source term for the 4 spent fuel pools and the 3 reactors toLawrence Livermore to estimate offsite doses (as far away as California) using NARAC.
From: Gauntt, Randall 0 Fmailto:roqauntbsandia.qov]Sent: Friday, March 18, 2011 9:07 PMTo: Gauntt, Randall 0; Hart, Michelle; Tinkler, Charles; Schaperow, JasonCc: PMT09 Hoc; PMT11 Hoc; Hoc, PMT12; Pickering, Susan Y; Orrell, Stanley ASubject: RE: Fukushima SFP Source Terms
From: Gauntt, Randall 0Sent: Friday, March 18, 2011 5:48 PMTo: Gauntt, Randall 0; '[email protected]'; '[email protected]'; 'Schaperow, Jason'Cc: '[email protected]'; '[email protected]'; '[email protected]'; Pickering, Susan Y; Orrell, Stanley ASubject: RE: Fukushima SFP Source Terms
Attached is the latest Excel sheet. See the tab marked Peach Bottom.
I have entered release fractions and recommend using .5 hr release duration since most comes out over that period and mightbetter mimic the steam venting releases of the Fukushima reactors.
Randy
<< File: Fukushima SFP Source Terms.xlsx >>
From: Gauntt, Randall 0
Sent: Friday, March 18, 2011 4:41 PMTo: '[email protected]'; '[email protected]'; 'Schaperow, Jason'Cc: '[email protected]'; '[email protected]'; '[email protected]'; Pickering, Susan Y; Orrell, Stanley ASubject: Fukushima SFP Source Terms
I would recommend staggering these source terms out, perhaps 24 to 48 hrs apart, starting with Unit 4.
The inventory and released radioactivity is ih CURIES.
I do not have a decay power for units 1, 2 or 3, but Unit 4 has a total decay power of ~3.5MW. You might use that for the plumeenergy for unit 4 pool.
I would very much like to See*the results of the NARAC analysis.
Randall Gauntt505284 3989
I 4- (b)(6 CeIl<< File: Randall 0 Gauntt Ph D .vcf >>
<< File: Fukushima SFP Source Terms.xlsx >>
2
q 1 ~r'
--
Pool Inventory - Curies I Released In(ventory - CuriesI Y ~- _____
292 587 514 1207 Release DurationPlume Energy (MW)
release fraction
Lh 16hr108 0.97
Unit 1 Unit 2
16hr Shr
0.85 3.50 I4.J
Isotopepu241
cm242cm244kr85
sr89
sr90y 90
y 91
zr95nb95
rul03
rhlO3m
rul06
rhl06
cs134
cs137ba137m
ce141
ce144pr144
pr144mpm1471131
Total
Unit 16.OOE+064.09E+052.98E+056.57E+052.76E+045.69E+065.69E+069.57E+042.37E+055.18E+058.78E+038.77E+031.11E+071.11E+076.99E+068.04E+067.59E+061.28E+031.38E+071.38E+071.93E+056.55E+060,00E+00
Unit 21.21E+07
8.21E+055.99E+051.32E+06
5.55E+04
1.14E+07
1.14E+07
1.92E+054.76E+05
1.04E+06
1.77E+041.76E+042.23E+07
2.23E+07
1.41E+07
1.62E+071.53E+07
2.58E+032.77E+07
2.77E+07
3.88E+051.32E+07O.OOE+00
Unit 31.06E+07
7.19E+05
5.24E+05
1.16E+064.86E+04
1.OOE+071.OOE+07
1.68E+05
4.16E+059.12E+05
1.55E+04
1.54E+041.95E+071.95E+07
1.23E+071.42E+07
1.34E+072.26E+03
2.43E+07
2.43E+07
3.40E+05
1.15E+07O.OOE+00
Unit 4
2.54E+07
5.03E+06
1.25E+062.81E+06
1.17E+07
2.38E+07
2.38E+07
1.96E+07
3.25E+07
5.67E+07
1.76E+071.76E+07
6.86E+076.86E+07
3.46E+07
3.36E+07
3.18E+07
1.10E+079.88E+07
9.88E+07
1.38E+063.11E+07
7.92E+03
Unit 3 Unit 4
0.000050.000050.00005
0.90.01
0.010.00005
0.00005
0.000050.25
0.01
0.010.01
0.01
0.5
0.50.01
0.00005
0.00005
0.000050.00005
0.000050.5
3.OOE+022 .04E+011.49E+01
5.91 E+052 .76E+025.69E+042 .85E+024.79E+001.18E+011.30E+058.78E+018.77E+011.11E+051.11E+053.50E+064.02E+067.59E+046.41E-02
6,89E+026.89E+029.65E+003.27E+020.O0E+00
6.03E+024.11E+01
2.99E+01
1.19E+065.55E+02
1.14E+05
5.72E+02
9.62E+00
2.38E+012.60E+05
1.77E+02
1.76E+022.23E+05
2.23E+05
7.03E+06
8.09E+061.53E+05
1.29E-011.39E+03
1.39E+03
1.94E+01
6.58E+02O.OOE+00
5.28E+023.60E+01
2.62E+01
1.04E+064.86E+02
1.O0E+055.01E+02
8.42E+00
2.08E+012.28E+051.55E+02
1.54E+021.95E+05
1.95E+05
6.15E+067.08E+061.34E+05
1.13E-01
1.21E+03
1.21E+031.70E+01
5.76E+02O.OOE+00
1.27E+032.52E+02
6.27E+01
2.52E+06
1.17E+052.38E+05
1.19E+03
9.78E+021.63E+031.42E+07
1.76E+05
1.76E+05
6.86E+056.86E+05
1.73E+07
1.68E+073.18E+05
5.48E+02
4.94E+03
4.94E+03
6.91E+01
1.56E+033.96E+03 /
9.88E+07 1.99E+08 1.74E+08 7.16E+08 I .
This information came from Origen resulti•ovided by GE~for unit 4. qnit 4 has 100 day and 500 day fuel.
Source term for units 1, 2 and 3 were based on the curies per assemb_ for 500-day offload fuel.
Source term for Unit 4 is a mix of 100 and 500 day offload fuels.
I
1/b/
t
XeCsBaI
TeRuMoCeLa
Release Duration
Fraction (hr)
0.978 0.5
0.018 0.5
0.006 0.5
0.037 0.5
0.024 0.5
0 0.5
0.004 0.5
0.001 0.5
0 0.5
Sandia National Labs
From MACCS App.C
NucNam Corlnv(Bq)
Ba140 6.28E+18
Ce144 5.65E+18
Cs134 4.32E+17
Cs136 1.31E+17
Cs137 2.41E+17
1131 3.20E+18
1132 4.72E+18
1133 6.77E+18
1134 7.44E+18
1135 6.39E+18
Kr85 2.47E+16
Kr85m 1.15E+18
Kr87 2.11E+18
Kr88 2.86E+18
La140 6.35E+18
MO99 6.09E+18
Np239 6.46E+19
Rul03 4.55E+18
Rul06 1.03E+18
Sb127 2.78E+17
Sb129 9.87E+17
5r89 3.59E+18
Sr90 1.93E+17
Sr91 4.62E+18
5r92 4.80E+18
Te129m 2.44E+17
Te13Im 4.68E+17
Te132 4.65E+18
Xe131m
Xe133 6.78E+18
Xe133m
Xe135 1.27E+18
Xe138
Yt91 4.47E+18
Release
Fraction
0.006
0.001
0.018
0.018
0.018
0.037
0.037
0.037
0.037
0.037
0.978
0.978
0.978
0.978
0
0.004
0.001
0
0
0.001
0.001
0.006
0.006
0.006
0.006
0.024
0.024
0.024
0.978
0.978
0.978
0.978
0.978
0
Release Release
Activity Activity
(Bq) (Ci)
3.77E+16 1.02E+06
5.65E+15 1.53E+05
7.78E+15 2.10E+05
2.36E+15 6.37E+04
4.34E+15 1.17E+05
1.18E+17 3.20E+06
1.75E+17 4.72E+06
2.50E+17 6.77E+06
2.75E+17 7.44E+06
2.36E+17 6.39E+06
2.42E+16 6.53E+05
1.12E+18 3.04E+07
2.06E+18 5.58E+07
2.80E+18 7.56E+07
O.OOE+00 0.OOE+00
2.44E+16 6.58E+05
6.46E+16 1.75E+06
O.OOE+00 0.OOE+00
O.OOE+00 0.OOE+00
2.78E+14 7.51E+03
9.87E+14 2.67E+04
2.15E+16 5.82E+05
1.16E+15 3.13E+04
2.77E+16 7.49E+05
2.88E+16 7.78E+05
5.86E+15 1.58E+05
1.12E+16 3.04E+05
1.12E+17 3.02E+06
O.OOE+00 0.OOE+00
6.63E+18 1.79E+08
O.OOE+00 0.OOE+00
1.24E+18 3.36E+07
O.OOE+00 0.OOE+00
O.OOE+00 0.OOE+00