ONE OF THE WAYS TO IMPROVE THE OUTFLOW OF CURRENCY IS
THE UTILIZATION OF INDUSTRIAL BUILDING SYSTEM ( IBS )
HC PRECAST SYSTEM IBS Superstructure In Malaysia 3 in 1
Load Bearing Wall + Modular Shear Keys Wet Joint + Box System
Completed In 10 Days With 6 Workers : Speed, Quality & Environment
INDUSTRIALISED BUILDING SYSTEM ( IBS )
It is a system which suits all architectural demands & not a machine or component
- The wall is designed to provide adequate fire resistance according to demand ( with minimum 2hours as per BS8110 )
- The system is designed and approved by PE and endorsed by independent checker
- Thickness of the wall can be customized according to requirement
- Our design and casting are following strictly to British Standard
Page 2
TRAINING UNIT
8 years expose precast wall, precast staircase,
half slab & precast beam with in-situ column.
- No touch-up - No water proofing
- No leaking - No crack
Page 3
FACTORY CAPACITY : 21 ACRES
Existing production 8 acres : 1,800 to 2,500 units
of single storey ( 1000 ft2 ) per year
Future development 13 acres : 2,500 to 3,500 units of
single storey ( 1000 ft2 ) per year
Page 4
Mobilization To Site
Page 5
Mobilization To Site
Page 6
Proper Storage Precast Panel & Column Mould On Site
1. 2.
Page 7
Proper Storage Precast Panel & Column Mould On Site
1. 2.
Page 8
Setting Out & Levelling Panel Location
1. 2.
Page 9
Panel Wall Guide
1. 2.
Page 10
Panel Installation
Page 11
Temporary Wall Prop Installation
Page 12
Temporary Panel Guide & Wall Support
Guide
Page 13
Temporary Wall Support
Page 14
Wall Plug Installation
1. 2.
3. 4. 3.
Page 15
Panel Wall Verticality
1. 2. 3.
Page 16
Modular Wet Joint Shear Keys
Page 17
Modular Wet Joint Shear Keys
Page 18
Modular Wet Joint Shear Keys
Page 19
Modular Wet Joint Shear Keys
Page 20
Wet Joint Shear Keys
Page 21
Modular Wet Joint Shear Keys
Page 22
Expanding Cement Motar
Page 23
Expanding Cement Motar
Page 24
Wet joint View After Casting
Page 25
Expanding Cement Motar
Page 26
Wet Joint Shear Keys Rebar Installation
Page 27
Wet Joint Shear Keys Rebar Installation
Page 28
Wet Joint Shear Keys Rebar Installation
1. 2.
Page 29
Wet Joint Shear Keys Rebar Installation
Page 30
Wet Joint Modular Mould Installation
Page 31
Wet Joint Modular Mould Installation
Page 32
Wet joint modular mould installation
Page 33
Wet Joint Modular Mould Installation
Page 34
Precast Beam & In-Situ Beam Installation
Page 35
Wet Joint Modular Mould, Precast Beam & In-Situ Beam Installation
Page 36
Precast Beam & In-Situ Beam Installation
1. 2.
Page 37
Precast Beam & In-Situ Beam Installation
1. 2.
Page 38
Precast Beam & In-Situ Beam Installation
Page 39
Precast Beam & In-Situ Beam Installation
1. 2.
Page 40
Precast Beam & In-Situ Beam Installation
1. 2.
Page 41
Wet Joint Concreting
Page 42
Wet Joint Concreting
1. 2. .
Page 44
Watering Before Mould Dismantle
1. 2. 3.
Page 45
Wet Joint Mould Dismantle
1. 2. 3.
Page 46
Wet Joint Mould Dismantle
1. 2. 3.
Page 47
Column Mould Dismantle
Page 48
Verticality Of Column
1. 2. 3.
Page 49
Verticality Of Wall
1. 2. 3.
Page 50
Installation Of Scaffolding For Half Slab
Page 51
Installation Of Scaffolding For Half Slab
Page 52
Installation Of Scaffolding For Half Slab
Page 53
Installation Of Scaffolding For Half Slab
Page 54
Installation Of Scaffolding For Half Slab
Page 55
Grinding Uneven Surface “ If Any ”
1. 2. 3.
Page 56
Grinding Uneven Surface “ If Any ”
1. 2.
Page 57
RC Flat Roof Half Slab Installation
1.
2.
3.
4.
5.
6.
Page 58
Cantilever Corridor Modular Mould Installation
1.
2.
Page 59
Cantilever Corridor Modular Mould Installation
1.
2.
Page 60
Cantilever Corridor Modular Mould Installation
1.
2.
Page 61
Cantilever Corridor Modular Mould Installation
4.
5.
6.
1.
2.
3.
Page 62
RC Flat Roof Rebar Installation
Page 63
RC Flat Roof Rebar Installation
Page 64
RC Flat Roof Rebar Installation
1. 2. 3.
Page 65
RC Flat Roof Conduit Installation
Page 66
RC Flat Roof Conduit Installation
1. 2. 3.
Page 67
RC Flat Roof To Receive Concrete
Page 68
RC Flat Roof Concreting Level Checking
1. 2.
Page 69
RC Flat Roof Concreting Level Checking
1. 2.
Page 74
Cantilever Corridor
1.
2.
Page 75
Cantilever Corridor
1.
2.
Page 76
Corner & Edge
1. 2.
Page 77
Internal View
1. 2.
Page 78
Internal View
1. 2.
Page 79
Cantilever Corridor
1. 2.
Page 80
Cantilever Corridor After Mould Dismantle
1. 2.
Page 81
Cantilever Corridor After Mould Dismantle
1. 2.
Page 82
Cantilever Corridor
1. 2.
Page 83
Chequer Plate To Receive Tiling Work
Page 84
Chequer Plate To Receive Tiling Work
1. 2.
Page 86
Internal Edge
1. 2.
Page 87
Internal Edge
1. 2.
Page 90
Precast Panel With RC Coping
1. 2.
Page 91
Precast Panel With RC Coping
1. 2.
Page 92
Cement Mortar To Cover The Form Tile Hole & Prop Hole
1. 2.
Page 93
Precast Panel With Electric Socket
1. 2.
Page 94
Precast Panel With Electric Socket
1. 2.
Page 95
Completed Demobilise Back To Rasa Factory
Page 96
Skim Coat & Smooth Surface
1. 2.
Page 97
Skim Coat & Smooth Surface
1. 2.
Page 98
Skim Coat & Smooth Surface
1. 2.
Page 99
Skim Coat & Smooth Surface
1. 2.
Page 100
Skim Coat & Smooth Surface
1. 2.
Page 101
Skim Coat & Smooth Surface
1. 2.
Page 102