H&R Johnson (India) (A Division Of Prism Johnson Limited) 

Unit: Pen, Maharashtra

Presented by: Mr. Arghya Mukherjee, Sr.GM‐OpsMr. Manoj Aswale, Sr.Mgr‐Maint

www.hrjohnsonindia.com

CII National Award for Excellence in Energy Management 2020 

INDIA’S LEADING INTEGRATED BUILDING MATERIALS COMPANY

www.hrjohnsonindia.com

H&R Johnson (India) , Pen Plant Pen unit is the state of art diversified tiles

manufacturing unit, established in the year1997.

Only ceramic tiles plant in the world havingintegrated process for production of alltypes of products under one roof.

Specializes in high mix,low volumeproduction

Having DSIR recognized in house researchand development wing

Quest for product innovation : Innovator ofAnti Static, Germ Free, Scratch Free, StainFree, Joint Free, Anti Skid tiles

www.hrjohnsonindia.com

Unit Details 

www prismjohnson in

Energy Consumption Overview

www.hrjohnsonindia.com

Energy Consumption Overview

Parameters UOM FY18 FY19 FY20 % ChangeFY20 Vs FY19

Production  In Mt 94,053  90,750  86,140  (5.08)

Annual electrical energy consumption  Million KWh 18.37  19.41  16.36  (15.70)

Annual cost of electricity consumption Million INR 156.39  168.31  151.11  (10.22)

Annual thermal energy consumption  Million Kcal 1,18,474  1,10,912  92,919  (16.22)

Annual cost of thermal energy consumption Million INR 146.54  184.25  126.75  (31.21)

Specific electrical energy consumption  KWh/Ton  195.37  213.90  189.97  (11.19)

Specific Thermal Energy consumption  Kcal/Ton  12,59,652  12,22,173  10,78,706  (11.74)

www.hrjohnsonindia.com

Electrical Energy Consumption  

Body Prep23%

Pressing 25%

Decorating 4%

Firing 16%

Finishing 16%

Utilities 16%

Department Wise Electrical Energy Share 

Total Electrical Energy Consumption FY 20

Department Annual Consumption (Kwh)

Body Prep 36,98,578 

Pressing  41,35,007 

Decorating  6,10,115 

Firing  26,23,195 

Finishing  25,38,937 

Utilities  25,55,795 

Misc  2,02,154 

Total  163,63,782 

www.hrjohnsonindia.com

Thermal Energy Consumption  

Total Thermal Energy Consumption FY 20

Department Annual Consumption Mkcal

Body Prep 36,082 

Pressing  13,103 

Decorating  1,895 

Firing  41,310 

Finishing  ‐

Utilities  530 

Misc  ‐

Total  92,919 

Body Prep39%

Pressing 14%Decorating 

2%

Firing 44%

Utilities 1%

Department Wise Thermal Energy Share

www.hrjohnsonindia.com

Energy Consumption TOE 

Electrical 13%

Thermal 87%

Energy Compostion 

Body Prep37%

Pressing 16%

Decorating 2%

Firing 41%

Finishing 2%

Utilities 2%

Department Wise Total Energy Share 

TOE Consumption FY 20

Department Annual Consumption TOE

Body Prep 3,923 

Pressing  1,664 

Decorating  242 

Firing  4,352 

Finishing  218 

Utilities  273 

Misc  17 

Total  10,690 

www.hrjohnsonindia.com

SEC Electrical Energy 

FY18 FY19 FY20Sp.Electrical Energy

Kwh / Ton 195.37 213.90 189.97

195.37 

213.90 

189.97 

 175.00

 180.00

 185.00

 190.00

 195.00

 200.00

 205.00

 210.00

 215.00

 220.00

Kwh/ton

SEC Electrical Energy High SEC in FY19 was due to coldrecommissioning of one oldfurnace required to accommodatechanged product mix. Additionallyfrequent process interruptions inthis FY on account of new productdevelopment activities

There was 8% and 5%reduction in plantproduction whencompared to previous twoFY. However there are 11%YOY reduction in SEC inFY20

SEC FY19

Production SEC FY20

www.hrjohnsonindia.com

SEC Thermal Energy 

SEC FY19

Production SEC FY20

FY18 FY19 FY20Sp.Thermal Energy

Mkcal /  Ton 12,59,652 12,22,173 10,78,706

12,59,652 

12,22,173 

10,78,706 

 9,50,000

 10,00,000

 10,50,000

 11,00,000

 11,50,000

 12,00,000

 12,50,000

 13,00,000

Mkcal/Ton

Sp. Thermal Energy Reducing trend of thermal SEC is on account of 

Continual improvement in thermal efficiency of Kilns. Better productivity / Cycle time.

Improved process parameters like ceramic slip density and reduced water           evaporation in dryers 

Improvement in heat losses in spray dryer ducts 

www.hrjohnsonindia.com

SEC Comparison

SEC FY19

Production SEC FY20

Our AchievementFY 20 

• Thermal: 1079 Kcal/Kg • Electrical: 0.189 Kwh/Kg

Industry   Achievement* 

• Thermal: 850 Kcal/Kg • Electrical: 0.175 Kwh/Kg

Our TargetFY 22 

• Thermal : 900 Kcal/Kg• Electrical :0.180 Kwh/Kg

* Our SEC is based on our product mix. Industry achievement is based on single product. Similar product mix data is not available nationally / internationally.    

www.hrjohnsonindia.com

ENCON Projects FY 21

SEC FY19

Production SEC FY20

ENCON Measures Planned  Estimated Energy Savings Mn Rs/Yr

Approximate Investment MnRs/Yr

Tentative Project Commencement

Heat recovery from Kiln Smoke air fan for pre kiln dryers : Kiln 1 + Kiln 3 6.6 10 Q1 FY 22

Utilization of Kiln cooling section exhaust for after press dryers  3.3 2.0 Q1 FY 22

Heat recovery RLW in Kiln 3  1.0 0.01 Q2 FY21

Replacement of AODD pumps for ceramic slip handling  1.5 1.0 Q4 FY 21

Compressed air demand side management activities  1.2 1.0 Q1 FY 22

Completion of VFD installation in ball mills –4 nos 1.2 1.2 Q3 FY 21

Section wise VFD installation in Polishing Line  0.9 1.2 Q4 FY 21

Polishing Line ETP modifications  1.0 1.5 Q3 FY 21

Chain Stove chain replacement  1.4 2.0 Q2 FY 21

www.hrjohnsonindia.com

Implemented ENCON Projects 

SEC FY19

Production SEC FY20

Year No of Proposals 

Investment(INR Million) 

Annual Savings(INR Million )

2017‐2018 5 0.5 4.47

2018‐2019 8 80 19.16

2019‐2020 10 70 19.24

www.hrjohnsonindia.com

ENCON Projects FY18 

SEC FY19

Production SEC FY20

Sr.No  Project Details 

Investment(INR Million) 

Annual Savings(INR Million )

Payback Period (Moths)

1 VFD Inverter Ball Mill 1 0.35 0.40 11

2 VFD Inverter Ball Mill 4 0.35 0.40 11

3 VFD Inverter Ball Mill 11 0.35 0.40 11

4 Combined hot air duct from 2 Kilns to dryer  0.61 1.08 7

5 Digital Energy Monitoring Systems  2.81 1.00 36

www.hrjohnsonindia.com

ENCON Projects FY19 

SEC FY19

Production SEC FY20

Sr.No  Project Details 

Investment(INR Million) 

Annual Savings(INR Million )

Payback Period (Moths)

1 VFD Inverter Ball Mill 9 0.35 0.40 11

2 VFD Inverter Ball Mill 12 0.35 0.40 11

3 VFD Inverter Ball Mill 13 0.35 0.40 11

4 VFD Inverter Ball Mill 14 0.35 0.40 11

5 New Air Compressors 2 nos 4.55 11.55 4.73

6 Installation of LED lights   3.80 3.12 14.61

7 Installation of dome shaped natural light s   1.10 0.31 42.29

8 Installation of Energy Efficient Press  68.08 2.78

www.hrjohnsonindia.com

ENCON Projects FY 20 

SEC FY19

Production SEC FY20

Sr.No  Project Details 

Investment(INR Million) 

Annual Savings(INR Million )

Payback Period (Moths)

1 Kiln heat recovery  0.05 0.33 1.79

2 Electrically operated chiller replacement with natural cooling  1.90 6.84 3.33

3 Capacitor at ball bill 2 6&8  0.06 0.15 1.21

4 Kiln vertical entry for 600 mm x 1200 mm size tiles 0.15 1.48 3.25

5 VFD for dust collector motors  0.20 0.74 1.46

6 Capacitor for new compressors  0.06 0.49 7.89

7 Capacitor for new polishing line  0.05 0.08

8 Motion sensors for lights  0.01 0.42

9 Stirrer On / Off timer for slip tanks  0.02 0.57

10 Energy Efficient new polishing line 66.51 8.55

www.hrjohnsonindia.com

ENCON Project FY 18

SEC FY19

Production SEC FY20

Before  After 

Project Title  VFD for Ball Mills 

Project Details  Installation of VFD for ball mills operations . Replacing conventional starter and fluid coupling 

Consumption Before  95 kwh / ball mills 

Consumption After  77 kwh / ball mills 

Annual Savings – INRL  INRL 10 for 3 ball mills 

Project Investment ‐ INRL INRL 10 for 3 ball mills 

Simple payback period – Yrs. 1 year

Before  After 

www.hrjohnsonindia.com

ENCON Project FY 19

SEC FY19

Production SEC FY20

Before  After 

Project Title  Compressed Air System Modification

Project Details  Replacing 6 old compressorswith 2 energy efficient compressors and air network modifications 

Consumption Before  10000 Kwhd

Consumption After  6000 Kwhd

Annual Savings – INRL  INRL 120 

Project Investment ‐ INRL INRL 45

Simple payback period – Yrs. 0.35 Years 

Pipeline NetworkBefore  After 

www.hrjohnsonindia.com

ENCON Project FY 19

SEC FY19

Production SEC FY20

Project Title  LED plant lighting system 

Project Details  Replacing entire plant lights by LED lights 

Consumption Before  1700 Kwhd

Consumption After  700 Kwhd

Annual Savings – INRL  INRL 33

Project Investment ‐ INRL INRL 38

Simple payback period – Yrs. 1.15 Years 

www.hrjohnsonindia.com

ENCON Project FY 20

SEC FY19

Production SEC FY20

Project Title  Adiabatic Cooling 

Project Details  Replacement of  electrically operated chillers  with  cooling towers  

Consumption Before  2500 Kwhd

Consumption After  500 Kwhd

Annual Savings – INRL  INRL 66

Project Investment ‐ INRL INRL 18 

Simple payback period – Yrs. 0.28 years 

Before  After 

www.hrjohnsonindia.com

ENCON Innovation FY20  Challenges High kiln surface temp

Project Brief : Our kilns are over 20 years old and incontinuous operation so surface energy loss from thesekilns cause of concern. Available internal coating in themarket can not be used as its deposition on tiles surfacemay damage tiles aesthetics and cause huge quality loss.Through our in‐house R&D we invented a high SRIproduct which is having high reflectance and highemissivity value (>100) and with this material Kilninternals roof, sides ,bottom and rollers are painted.

Type of innovation  Product innovation

Replication potential  Can be used in all furnaces

Project Impact  4.91% reduction in fuelconsumption

No deposition on tilessurface and loss of quality

Kiln Outside Surface 

Before  After 

www.hrjohnsonindia.com

ENCON Innovation FY20 cont.. Challenges Low CA Temp + Dryer Fuel

Project Brief : All our kilns are fitted with combustion airpreheating system. Recovered heat from kiln used for partialheating of combustion air upto 140 deg C. Residual heattransported to dryers used for pre heating of products beforethey enter kiln. After process evaluation we identified furtherscope of extracting heat from Kiln in a different and unique waywhere the excess heat can be further tapped by throttling theoutput of a blower along with adjusting the pressure pointsinside the kiln and channelling the additional heat to combustionair preheating up to 180 dec C and pre kiln tiles drying stoppingsupplementary fuel consumption.

Type of innovation  Process innovation

Replication potential  Can be used in all furnaces

Project Impact  3% reduction in kiln fuelconsumption

50% fuel reduction in drier

Kiln Outside Surface 

www.hrjohnsonindia.com

ENCON Innovation FY20 cont.. Challenges Low Productivity + High SEC

Project Brief : Earlier single rectangular tiles (e.g. 600 mm x1200mm) used to enter kiln on 1200 mm side, while the kilnuseful width is 2000 mm, resulting in gross capacityunderutilization and loss of energy. Entry of the kiln wasmodified to make entry position of tiles vertical i.e. 600mm side ,accordingly kiln firing curve modified and kiln exit tilescollections mechanism modified. Now 3 tiles enters kilns on 600mm side and 1900 mm of useful kiln width is being utilized.Apart from energy saving it improves productivity and savedhuge modification cost in foreign exchange.

Type of innovation  Engineering innovation

Replication potential  Can be used in all furnaces.Presently done in kiln 1

Project Impact  39% reduction in specificfuel consumption

60% improvement inproductivity

Kiln Outside Surface 

www.hrjohnsonindia.com

Renewable Project FY 20

SEC FY19

Production SEC FY20

Project Title  Roof top Solar Power Generation 

Project Details  1.2 MW rooftop based Solar power plant installed in the year 2019. Plant was partly commissioned in Dec.19 and remaining plant commissioning is awaited  for restart of plant post lockdown 

Solar generation before project commissioning

0 Kwhd

Estimated average solar power generation capacity 

5000 Kwhd

Estimated Annual Savings –Million Rs

9.2 

Project Investment – INRL Opex mode + Facility development 

Simple payback period – Yrs. 6 months 

Before  After 

www.hrjohnsonindia.com

Utilization of RE sources 

SEC FY19

Production SEC FY20

Technology – Electrical  

Type of Energy  Onsite / Offsite  

InstalledCapacity (MW) 

Generation(million Kwh)

% of Overall ElectricalEnergy 

Solar Roof top 

Onsite  1.2 MW 

Technology – Thermal   

Type of Energy  Onsite / Offsite  

InstalledCapacity (Mkcal)

Usage (Mkcal)

% of Overall ThermalEnergy 

Biomass   Onsite  1.2 MW 

www.hrjohnsonindia.com

Waste Management    

SEC FY19

Production SEC FY20

www.hrjohnsonindia.com

Energy Monitoring     

SEC FY19

Production SEC FY20

www.hrjohnsonindia.com

Daily Energy Reports       

SEC FY19

Production SEC FY20

www.hrjohnsonindia.com

Teamwork      

SEC FY19

Production SEC FY20

Initiatives SnapshotDescription

Others

▪ International Drivers Day Celebration ▪ International Women's Day Celebration▪ SPC /SQC training ▪ Lean manufacturing and leadership development  

Environment Management System 

▪ Celebration of World Environment Day on 6th June.▪ Regular plantation activities inside plant premises ▪

Safety 

▪ Safety gate meeting on 1st of every month▪ Celebration of National Safety Week ▪ Safety and housekeeping audits ▪ Bimonthly safety committee meeting for safety analysis 

Energy Management Awareness  

ISO 50001 Energy Management training program  Energy Conservation Day Celebration  On the Job training  Departmental in house training 

4

3

1

2

www.hrjohnsonindia.com

Certifications       

SEC FY19

Production SEC FY20

Green Pro Certificate  GRIHA Certificate 

ISO Certificate IGBC Member 

All products manufactured in the facility are Green Pro 

certified 

All products manufactured in the facility are GRIHA 

certified 

Manufacturing facility is ISO 9001: 2015, ISO 14001:2015 and ISO 4001:2018 Certified. 

ISO 50001 implementation is in 

progress  

We are proud member of IGBC community 

since ……

www.hrjohnsonindia.com

Long term EE vision       

SEC FY19

Production SEC FY20

www.hrjohnsonindia.com

Awards & Accolades   

BEE First Prize 2015 &  Certificate Of Merits  

Award in the year 2005

www.hrjohnsonindia.com

SEC FY19

Production SEC FY20

Thank you 