h&r johnson (india) - cii - sohrabji godrej green business
TRANSCRIPT
www prisohnson in
H&R Johnson (India) (A Division Of Prism Johnson Limited)
Unit: Pen, Maharashtra
Presented by: Mr. Arghya Mukherjee, Sr.GM‐OpsMr. Manoj Aswale, Sr.Mgr‐Maint
www.hrjohnsonindia.com
CII National Award for Excellence in Energy Management 2020
H&R Johnson (India) , Pen Plant Pen unit is the state of art diversified tiles
manufacturing unit, established in the year1997.
Only ceramic tiles plant in the world havingintegrated process for production of alltypes of products under one roof.
Specializes in high mix,low volumeproduction
Having DSIR recognized in house researchand development wing
Quest for product innovation : Innovator ofAnti Static, Germ Free, Scratch Free, StainFree, Joint Free, Anti Skid tiles
www.hrjohnsonindia.com
Unit Details
www prismjohnson in
Energy Consumption Overview
www.hrjohnsonindia.com
Energy Consumption Overview
Parameters UOM FY18 FY19 FY20 % ChangeFY20 Vs FY19
Production In Mt 94,053 90,750 86,140 (5.08)
Annual electrical energy consumption Million KWh 18.37 19.41 16.36 (15.70)
Annual cost of electricity consumption Million INR 156.39 168.31 151.11 (10.22)
Annual thermal energy consumption Million Kcal 1,18,474 1,10,912 92,919 (16.22)
Annual cost of thermal energy consumption Million INR 146.54 184.25 126.75 (31.21)
Specific electrical energy consumption KWh/Ton 195.37 213.90 189.97 (11.19)
Specific Thermal Energy consumption Kcal/Ton 12,59,652 12,22,173 10,78,706 (11.74)
www.hrjohnsonindia.com
Electrical Energy Consumption
Body Prep23%
Pressing 25%
Decorating 4%
Firing 16%
Finishing 16%
Utilities 16%
Department Wise Electrical Energy Share
Total Electrical Energy Consumption FY 20
Department Annual Consumption (Kwh)
Body Prep 36,98,578
Pressing 41,35,007
Decorating 6,10,115
Firing 26,23,195
Finishing 25,38,937
Utilities 25,55,795
Misc 2,02,154
Total 163,63,782
www.hrjohnsonindia.com
Thermal Energy Consumption
Total Thermal Energy Consumption FY 20
Department Annual Consumption Mkcal
Body Prep 36,082
Pressing 13,103
Decorating 1,895
Firing 41,310
Finishing ‐
Utilities 530
Misc ‐
Total 92,919
Body Prep39%
Pressing 14%Decorating
2%
Firing 44%
Utilities 1%
Department Wise Thermal Energy Share
www.hrjohnsonindia.com
Energy Consumption TOE
Electrical 13%
Thermal 87%
Energy Compostion
Body Prep37%
Pressing 16%
Decorating 2%
Firing 41%
Finishing 2%
Utilities 2%
Department Wise Total Energy Share
TOE Consumption FY 20
Department Annual Consumption TOE
Body Prep 3,923
Pressing 1,664
Decorating 242
Firing 4,352
Finishing 218
Utilities 273
Misc 17
Total 10,690
www.hrjohnsonindia.com
SEC Electrical Energy
FY18 FY19 FY20Sp.Electrical Energy
Kwh / Ton 195.37 213.90 189.97
195.37
213.90
189.97
175.00
180.00
185.00
190.00
195.00
200.00
205.00
210.00
215.00
220.00
Kwh/ton
SEC Electrical Energy High SEC in FY19 was due to coldrecommissioning of one oldfurnace required to accommodatechanged product mix. Additionallyfrequent process interruptions inthis FY on account of new productdevelopment activities
There was 8% and 5%reduction in plantproduction whencompared to previous twoFY. However there are 11%YOY reduction in SEC inFY20
SEC FY19
Production SEC FY20
www.hrjohnsonindia.com
SEC Thermal Energy
SEC FY19
Production SEC FY20
FY18 FY19 FY20Sp.Thermal Energy
Mkcal / Ton 12,59,652 12,22,173 10,78,706
12,59,652
12,22,173
10,78,706
9,50,000
10,00,000
10,50,000
11,00,000
11,50,000
12,00,000
12,50,000
13,00,000
Mkcal/Ton
Sp. Thermal Energy Reducing trend of thermal SEC is on account of
Continual improvement in thermal efficiency of Kilns. Better productivity / Cycle time.
Improved process parameters like ceramic slip density and reduced water evaporation in dryers
Improvement in heat losses in spray dryer ducts
www.hrjohnsonindia.com
SEC Comparison
SEC FY19
Production SEC FY20
Our AchievementFY 20
• Thermal: 1079 Kcal/Kg • Electrical: 0.189 Kwh/Kg
Industry Achievement*
• Thermal: 850 Kcal/Kg • Electrical: 0.175 Kwh/Kg
Our TargetFY 22
• Thermal : 900 Kcal/Kg• Electrical :0.180 Kwh/Kg
* Our SEC is based on our product mix. Industry achievement is based on single product. Similar product mix data is not available nationally / internationally.
www.hrjohnsonindia.com
ENCON Projects FY 21
SEC FY19
Production SEC FY20
ENCON Measures Planned Estimated Energy Savings Mn Rs/Yr
Approximate Investment MnRs/Yr
Tentative Project Commencement
Heat recovery from Kiln Smoke air fan for pre kiln dryers : Kiln 1 + Kiln 3 6.6 10 Q1 FY 22
Utilization of Kiln cooling section exhaust for after press dryers 3.3 2.0 Q1 FY 22
Heat recovery RLW in Kiln 3 1.0 0.01 Q2 FY21
Replacement of AODD pumps for ceramic slip handling 1.5 1.0 Q4 FY 21
Compressed air demand side management activities 1.2 1.0 Q1 FY 22
Completion of VFD installation in ball mills –4 nos 1.2 1.2 Q3 FY 21
Section wise VFD installation in Polishing Line 0.9 1.2 Q4 FY 21
Polishing Line ETP modifications 1.0 1.5 Q3 FY 21
Chain Stove chain replacement 1.4 2.0 Q2 FY 21
www.hrjohnsonindia.com
Implemented ENCON Projects
SEC FY19
Production SEC FY20
Year No of Proposals
Investment(INR Million)
Annual Savings(INR Million )
2017‐2018 5 0.5 4.47
2018‐2019 8 80 19.16
2019‐2020 10 70 19.24
www.hrjohnsonindia.com
ENCON Projects FY18
SEC FY19
Production SEC FY20
Sr.No Project Details
Investment(INR Million)
Annual Savings(INR Million )
Payback Period (Moths)
1 VFD Inverter Ball Mill 1 0.35 0.40 11
2 VFD Inverter Ball Mill 4 0.35 0.40 11
3 VFD Inverter Ball Mill 11 0.35 0.40 11
4 Combined hot air duct from 2 Kilns to dryer 0.61 1.08 7
5 Digital Energy Monitoring Systems 2.81 1.00 36
www.hrjohnsonindia.com
ENCON Projects FY19
SEC FY19
Production SEC FY20
Sr.No Project Details
Investment(INR Million)
Annual Savings(INR Million )
Payback Period (Moths)
1 VFD Inverter Ball Mill 9 0.35 0.40 11
2 VFD Inverter Ball Mill 12 0.35 0.40 11
3 VFD Inverter Ball Mill 13 0.35 0.40 11
4 VFD Inverter Ball Mill 14 0.35 0.40 11
5 New Air Compressors 2 nos 4.55 11.55 4.73
6 Installation of LED lights 3.80 3.12 14.61
7 Installation of dome shaped natural light s 1.10 0.31 42.29
8 Installation of Energy Efficient Press 68.08 2.78
www.hrjohnsonindia.com
ENCON Projects FY 20
SEC FY19
Production SEC FY20
Sr.No Project Details
Investment(INR Million)
Annual Savings(INR Million )
Payback Period (Moths)
1 Kiln heat recovery 0.05 0.33 1.79
2 Electrically operated chiller replacement with natural cooling 1.90 6.84 3.33
3 Capacitor at ball bill 2 6&8 0.06 0.15 1.21
4 Kiln vertical entry for 600 mm x 1200 mm size tiles 0.15 1.48 3.25
5 VFD for dust collector motors 0.20 0.74 1.46
6 Capacitor for new compressors 0.06 0.49 7.89
7 Capacitor for new polishing line 0.05 0.08
8 Motion sensors for lights 0.01 0.42
9 Stirrer On / Off timer for slip tanks 0.02 0.57
10 Energy Efficient new polishing line 66.51 8.55
www.hrjohnsonindia.com
ENCON Project FY 18
SEC FY19
Production SEC FY20
Before After
Project Title VFD for Ball Mills
Project Details Installation of VFD for ball mills operations . Replacing conventional starter and fluid coupling
Consumption Before 95 kwh / ball mills
Consumption After 77 kwh / ball mills
Annual Savings – INRL INRL 10 for 3 ball mills
Project Investment ‐ INRL INRL 10 for 3 ball mills
Simple payback period – Yrs. 1 year
Before After
www.hrjohnsonindia.com
ENCON Project FY 19
SEC FY19
Production SEC FY20
Before After
Project Title Compressed Air System Modification
Project Details Replacing 6 old compressorswith 2 energy efficient compressors and air network modifications
Consumption Before 10000 Kwhd
Consumption After 6000 Kwhd
Annual Savings – INRL INRL 120
Project Investment ‐ INRL INRL 45
Simple payback period – Yrs. 0.35 Years
Pipeline NetworkBefore After
www.hrjohnsonindia.com
ENCON Project FY 19
SEC FY19
Production SEC FY20
Project Title LED plant lighting system
Project Details Replacing entire plant lights by LED lights
Consumption Before 1700 Kwhd
Consumption After 700 Kwhd
Annual Savings – INRL INRL 33
Project Investment ‐ INRL INRL 38
Simple payback period – Yrs. 1.15 Years
www.hrjohnsonindia.com
ENCON Project FY 20
SEC FY19
Production SEC FY20
Project Title Adiabatic Cooling
Project Details Replacement of electrically operated chillers with cooling towers
Consumption Before 2500 Kwhd
Consumption After 500 Kwhd
Annual Savings – INRL INRL 66
Project Investment ‐ INRL INRL 18
Simple payback period – Yrs. 0.28 years
Before After
www.hrjohnsonindia.com
ENCON Innovation FY20 Challenges High kiln surface temp
Project Brief : Our kilns are over 20 years old and incontinuous operation so surface energy loss from thesekilns cause of concern. Available internal coating in themarket can not be used as its deposition on tiles surfacemay damage tiles aesthetics and cause huge quality loss.Through our in‐house R&D we invented a high SRIproduct which is having high reflectance and highemissivity value (>100) and with this material Kilninternals roof, sides ,bottom and rollers are painted.
Type of innovation Product innovation
Replication potential Can be used in all furnaces
Project Impact 4.91% reduction in fuelconsumption
No deposition on tilessurface and loss of quality
Kiln Outside Surface
Before After
www.hrjohnsonindia.com
ENCON Innovation FY20 cont.. Challenges Low CA Temp + Dryer Fuel
Project Brief : All our kilns are fitted with combustion airpreheating system. Recovered heat from kiln used for partialheating of combustion air upto 140 deg C. Residual heattransported to dryers used for pre heating of products beforethey enter kiln. After process evaluation we identified furtherscope of extracting heat from Kiln in a different and unique waywhere the excess heat can be further tapped by throttling theoutput of a blower along with adjusting the pressure pointsinside the kiln and channelling the additional heat to combustionair preheating up to 180 dec C and pre kiln tiles drying stoppingsupplementary fuel consumption.
Type of innovation Process innovation
Replication potential Can be used in all furnaces
Project Impact 3% reduction in kiln fuelconsumption
50% fuel reduction in drier
Kiln Outside Surface
www.hrjohnsonindia.com
ENCON Innovation FY20 cont.. Challenges Low Productivity + High SEC
Project Brief : Earlier single rectangular tiles (e.g. 600 mm x1200mm) used to enter kiln on 1200 mm side, while the kilnuseful width is 2000 mm, resulting in gross capacityunderutilization and loss of energy. Entry of the kiln wasmodified to make entry position of tiles vertical i.e. 600mm side ,accordingly kiln firing curve modified and kiln exit tilescollections mechanism modified. Now 3 tiles enters kilns on 600mm side and 1900 mm of useful kiln width is being utilized.Apart from energy saving it improves productivity and savedhuge modification cost in foreign exchange.
Type of innovation Engineering innovation
Replication potential Can be used in all furnaces.Presently done in kiln 1
Project Impact 39% reduction in specificfuel consumption
60% improvement inproductivity
Kiln Outside Surface
www.hrjohnsonindia.com
Renewable Project FY 20
SEC FY19
Production SEC FY20
Project Title Roof top Solar Power Generation
Project Details 1.2 MW rooftop based Solar power plant installed in the year 2019. Plant was partly commissioned in Dec.19 and remaining plant commissioning is awaited for restart of plant post lockdown
Solar generation before project commissioning
0 Kwhd
Estimated average solar power generation capacity
5000 Kwhd
Estimated Annual Savings –Million Rs
9.2
Project Investment – INRL Opex mode + Facility development
Simple payback period – Yrs. 6 months
Before After
www.hrjohnsonindia.com
Utilization of RE sources
SEC FY19
Production SEC FY20
Technology – Electrical
Type of Energy Onsite / Offsite
InstalledCapacity (MW)
Generation(million Kwh)
% of Overall ElectricalEnergy
Solar Roof top
Onsite 1.2 MW
Technology – Thermal
Type of Energy Onsite / Offsite
InstalledCapacity (Mkcal)
Usage (Mkcal)
% of Overall ThermalEnergy
Biomass Onsite 1.2 MW
www.hrjohnsonindia.com
Teamwork
SEC FY19
Production SEC FY20
Initiatives SnapshotDescription
Others
▪ International Drivers Day Celebration ▪ International Women's Day Celebration▪ SPC /SQC training ▪ Lean manufacturing and leadership development
Environment Management System
▪ Celebration of World Environment Day on 6th June.▪ Regular plantation activities inside plant premises ▪
Safety
▪ Safety gate meeting on 1st of every month▪ Celebration of National Safety Week ▪ Safety and housekeeping audits ▪ Bimonthly safety committee meeting for safety analysis
Energy Management Awareness
ISO 50001 Energy Management training program Energy Conservation Day Celebration On the Job training Departmental in house training
4
3
1
2
www.hrjohnsonindia.com
Certifications
SEC FY19
Production SEC FY20
Green Pro Certificate GRIHA Certificate
ISO Certificate IGBC Member
All products manufactured in the facility are Green Pro
certified
All products manufactured in the facility are GRIHA
certified
Manufacturing facility is ISO 9001: 2015, ISO 14001:2015 and ISO 4001:2018 Certified.
ISO 50001 implementation is in
progress
We are proud member of IGBC community
since ……
www.hrjohnsonindia.com
Awards & Accolades
BEE First Prize 2015 & Certificate Of Merits
Award in the year 2005