i'l 1.0.0 GENER.A.L CONDITIONS OT CO}II'RACT CONTMCTOR'S SCOPE OF WORK 1.1.0 The work shallbe executed strictlyin accordance with the vrorking dra'*ings, specifications, schedule oi iienrE quantJties irates, skelches and wntten and oral instructions, (to be subsequently confinned in writing), of the I EHOmfnA The uircrking dralvings shall be issued prcgressiveiy to suit the ccnstruction schedule" 1.2.0 ln case of any discrepancy in the dravdngs, or bebween the drawings, technical specificatlons, and / or schedule of iterns, quantitles, tire conractoi shall seek foiclariflcations from ihe ENGINEER and carry out the work in ,.*rO*o wur the clarlficaiions fumished by the ENGINEER, -Ihe contracior shalllalso cany out the ina:rk a_s per the. fnrtr"Uun gi*n by tho ENGINEER in absence of specifications for any particular itern of work. such clarifications I inifu"f:onslnatt Oi fretO to be the conectinterpretatior/ provision of the agreement" The smpe ol wort to be canied out by the contractor shall also include the fcllowinE : Setting out of the vorls in respect of pcsition, levei, dimensions, alignments, etc' including establishment of b,erchmarks, reference pcints etc ^l---a^^ ^r ah^ ^il^ Ultrdl dllls Ul Ll ls o'lc. Site leveling/ site tenacing l'rithin the limits as shovrn in the Crav/ngs or as directed by the I Oisposat of debris, excavated materisls, etc" as per instructlons o{ the El'iGll'IEEP'" Pumpin! Out rainliater I underground lvater from foundations, excava(iotjs and drainage of Surface 1.3.6 AJI scafrolding, shoring, centering shutlenng '.tofts etc' 1,3,0 1.3.1 4'24 , Q2 ENGIIIEEP'. / 1,1 ',{,EEf film wcrk site" 1.3.8 ENGINEE.!" 1.3.7 All temporaryienabting work, such as temporary sheds including temporary road to the site, water supply' dralnage and sewerage, po.G iuppiy inrluoins o';iJ'generator set, temporiry cfiices, stores, construction yards, l:anteen, tgilet blocks , labour camps, fencing etc' Protection and maintenance of trees, shrubs, green and othet sudaces as instructed by the 1.3.g Any other wor,< requii'erl in connecUon with the execution of the v,'otX order work" The cost of all the abov*.menticne{ uork shall be deemed to be lncluded in the rates for various items of work although such Indusion rnay not be specificallY sPeit oul .{ ,{ i'} Whelhei specifled elsewhere in the Agreernent or not, the contraclor shall p'ovide all materials, labour of every description, energy ,'/i'ater and all lools, tackles, plan( and transpo( necessary for th,: proper execution for the ',^,crk to the satisfaction of lhe orvner6]lCINEER" 1.5.0 The contractor shall include supply of entire maierials in accordance y;iih these specifications and the entire wor'x lneluding fixtures, necessary fcr the complele construction as set dorvn in these specifications and with the. acmmpanying schedules, Materials and componenis no( specificaily steted in the speciiicaticns andlor bill of n:aterials or ncted cn the draldng but which are necessary for satisfactory consiruction and operation of the system shall be deerned to have been included ln the smpe of vrcflr. ln addition to it, tr\e iechnical specifica:ion {or material and work shallbe fcllcn*ed by the C.ontmctor. FaEe 1 of21

Upload: khangminh22

Post on 15-Jan-2023

0 views

Category:

Documents


0 download

TRANSCRIPT

i'l

1.0.0

GENER.A.L CONDITIONS OT CO}II'RACT

CONTMCTOR'S SCOPE OF WORK

1.1.0 The work shallbe executed strictlyin accordance with the vrorking dra'*ings, specifications, schedule

oi iienrE quantJties irates, skelches and wntten and oral instructions, (to be subsequently confinned in writing), of the

I EHOmfnA The uircrking dralvings shall be issued prcgressiveiy to suit the ccnstruction schedule"

1.2.0 ln case of any discrepancy in the dravdngs, or bebween the drawings, technical specificatlons, and / or

schedule of iterns, quantitles, tire conractoi shall seek foiclariflcations from ihe ENGINEER and carry out the work in

,.*rO*o wur the clarlficaiions fumished by the ENGINEER, -Ihe

contracior shalllalso cany out the ina:rk a_s per the.

fnrtr"Uun gi*n by tho ENGINEER in absence of specifications for any particular itern of work. such clarifications I

inifu"f:onslnatt Oi fretO to be the conectinterpretatior/ provision of the agreement"

The smpe ol wort to be canied out by the contractor shall also include the fcllowinE :

Setting out of the vorls in respect of pcsition, levei, dimensions, alignments, etc' including

establishment of b,erchmarks, reference pcints etc

^l---a^^ ^r ah^ ^il^Ultrdl dllls Ul Ll ls o'lc.

Site leveling/ site tenacing l'rithin the limits as shovrn in the Crav/ngs or as directed by the

I

Oisposat of debris, excavated materisls, etc" as per instructlons o{ the El'iGll'IEEP'"

Pumpin! Out rainliater I underground lvater from foundations, excava(iotjs and drainage of Surface

1.3.6 AJI scafrolding, shoring, centering shutlenng '.tofts etc'

1,3,0

1.3.1

4'24

, Q2

ENGIIIEEP'.

/ 1,1

',{,EEf film wcrk site"

1.3.8

ENGINEE.!"

1.3.7 All temporaryienabting work, such as temporary sheds including temporary road to the site, water supply'

dralnage and sewerage, po.G iuppiy inrluoins o';iJ'generator set, temporiry cfiices, stores, construction yards,

l:anteen, tgilet blocks , labour camps, fencing etc'

Protection and maintenance of trees, shrubs, green and othet sudaces as instructed by the

1.3.g Any other wor,< requii'erl in connecUon with the execution of the v,'otX order work" The cost of all the

abov*.menticne{ uork shall be deemed to be lncluded in the rates for various items of work although such Indusion

rnay not be specificallY sPeit oul

.{ ,{ i'} Whelhei specifled elsewhere in the Agreernent or not, the contraclor shall p'ovide all materials, labour

of every description, energy ,'/i'ater and all lools, tackles, plan( and transpo( necessary for th,: proper execution for the',^,crk to the satisfaction of lhe orvner6]lCINEER"

1.5.0 The contractor shall include supply of entire maierials in accordance y;iih these specifications and the

entire wor'x lneluding fixtures, necessary fcr the complele construction as set dorvn in these specifications and with the.acmmpanying schedules, Materials and componenis no( specificaily steted in the speciiicaticns andlor bill of n:aterialsor ncted cn the draldng but which are necessary for satisfactory consiruction and operation of the system shall bedeerned to have been included ln the smpe of vrcflr. ln addition to it, tr\e iechnical specifica:ion {or material and workshallbe fcllcn*ed by the C.ontmctor.

FaEe 1 of21

{ 6l,n

1.7.4

Fixing cf Harovrare (screws anrl naiis eic. shail be ln rhe sccce of ccnir ecirri

llo minimum 'uork, quantity or amount is guamnteec uncer this riodi crcci..

1'8"0 The General and special conditlon mentioned belovr shall lorm an integral part of this v,,crk order.

1"9.0 i'ro extra iteims on any ground whatsoever shail be entertained.

2.0.0 fuT{TERIAL

2'1'0 steel ' cernent,structural steel , RCC hume pipe, structural paints & sheeting shall be provided byhe oraer as free issue, if not mentioneci specificaity elsewhere.

2"2'0 Transportalion frorn ownels stores to the constructlon site,"loadinE and unloading of all material,vlnether Lssued by lhe owner as free issue or othenvise shall be in the contractor, ,.op="

23"0 The coniracbr shall .take all precautionary and safety ,lurrurul. to avcid any damage/loss of the

matedal lssued by the ov,ner to him" ln case or oamageltois of the muteriui, the materiit vaiu;;; r.. the owne/spurchase bmk value shall be recovei-ed from the contracior.

2.4.0

L5.A

All scrap wiil be owne/s property and shall be retumed lo us.

Empty cemr:nt bags are to be retumed upto 8096 of ccnsumption"

2.6,0 To reccncile the cementand steeiissued by the owneras free issue as perstandard norms of cementconsumption for various items and steel as per bar binding schedule shall be in the ccntracto/s smpe" In case ofwastage expres,sed as perceniage of theoretical consumpti-on, exceeds the permissible limits as indicateO below, allexeeptunaccounted unstage of Mildl lor /strr..rctural steel will he our property.

L7.0 Pennissible wastage for cement shall be mu,2% and for steel rounds/ tors / strucfural steel Bars ofa[ diameters shall be mar 3% fftiree percent) inclusive of invisible wastage of 0,S% and rolling nrargin.

L8.0 Ths excess nastage and the cost of any unaccounted material (which v,as issued to lhe contractor as freeixue) shall be recovered from the contractor on the basis of our purchase bcok value.

29.0 The \{ord lrvastage' in case of eement will include :1 . Unaccsunted wastage due to loss in hand.lingincluding vadatjon upto 1% with.respect as per bulk weighment of consignment as received at site" Z. Extra consumptioiduring mnoeting. 3. Consumption on account of filllng up of extra excayation beyond the required level with concreteand 4 , Cemenl required for the mnstructjon of lhe structures/ items viz. wateristorage tanlrs , godoyn for cementshra9q site office etc. needed by the contractor to facilitate exinution of the vrork drder,

-

210'0 ln case of steel ilems, wastage shaii include unaccounted wastage due to use of steels of largerdiameter, as r,rell as sizes and quanuties used In excess of those shown ln the drawings as also steel cut pieces ofreinforcement steel of any category & diameter of iength less than 3 Mtr.

2'11'0 The mnFactor shall givo requlrements of oonstruction materials a,ter proper uorkinEs, based onmaterials alaflable as per bulk lssues and the additlonai qrunriry ruqri*o in wrlting to ffre Enginler rfni*rr 'ne

u&e!$in advance. ln case materialsupplied by the owner as per the iontractols rwitten request, becomes surplus, the ownerat his ovrr discreflon rnay recover the cost of lhe same ir* t'.l"*itrcroi at"penat rate" ln such, material subjected to' wnal rccolery will become the contractols pruperty. r' ' rsv' r' rr rsLE

2'12.0 lt will be the ,contraclcr's responsibility to retum back all the excess material to our stores.Tnnsportatjcn from lhe ccnstruction site to ouritJres at Duburi, ioading and unlcacing of such materia{, Mrether issuedby lhe ovner as free issue or otheovise shail be in tire contraciors scope"

- '

213'0 fiest ail including manpov/er, consumables such as sand, stone, bncirs aggregaies, hardwap fixturessuch as scrEws' nai'ls etc' v'ooden piank, ply'vraccd, pans, trolley, *r]*ibu**s, scaffcldings, chisels, hammers, all

Page 2 of2t

ohef tods and tackles, weiding rnachine / equipments etc" vehicles for transportation, t'aveling ci manpov,er & materiai

requtied h complets tho Job shall be ananged by the clnt'actor at the contracto/s cost.

4.0,0. RATES.

4.1.0 ln consideration of the contractols carrying out the work, hereby alvarded lo the ccntraclor, on terms and

andiUons herein provided and to the entjre satisfaction of the owner, o\\ner shall pay the contractor for the rrcrkactually canied out by the contractor and approved and accepted by General Manager (Clvil & Structural) and/or

Asslstant General Manager (Civil) of the Owner as per the rales specified ln Annextur*,1

42"A The rates shail remain finn during the worlr order period and shall not be subject to any escalaUon

u/haboeter wfiether statutory or for any other reason. The contractor shall not be entitied to claim from the ovtner any

cornpensafion or any other payment because of either and delay, extended stay or idle time of the contractols

employees.

3.0.0

3.1.0

i43,0: olYner.

ri.{.v

CONSUMABLES, EQUIPil/ENTS, IOOLS & TACKLES. I

,All ccnsumabies, iools, lackies, equipment, manpcwer etc" shall be'in ccntractcls scope.

Any additjonai job can be ar,arded to the contractor on the same rates, tenris and conditions by the

ln case of increase / decrease ln the quantities of any item / work activity, the contractor shali execute the

PAYMENT TERMS

FAYI',iENT AGAIN ST I ILL

75% of lhe bill value shall be paid within 15 days of submjssion of duly certilled monthly progressive

running bills after recovedng the dues if any,

rtork at the rates specitied for such particular ltem"

i A.S.O lf the rates for lhe additional, altered or suhstituted WORK, are nct specined in the vrork order the

i ot6 nnl be derived trcm the rates for similar class of WORK, as are specified in the CONTRACT for.lie WORK The

opinion of the Engineer-incharge as whether or not lhe rates can be adopted final and binding on lhe contractor''i

5.0.0

5.1.0

a{ {

5,1.2runnlng bills.

ala

7.0.0 AUTHO'llTiES

20% of the blll value shell be paid within 30 days of submisslon of duly ceriiiled rnonthly progressive

:t

Balance 5% of the bill vaiue shail ie paid within 30 days of completion of entira work, issuance of the "

complellcn certficate by he owner and submission of perfomance Banlt Guaranlee for the equivalent amount as per

he perfonnance.foorlmanship g uarantee claus e mentioned below.

5.1.4 AJI the bills shall be certifled by fusisbnt General Manager (Civil) of the orvner.

6.0.0 PERFORAI4NCE flVOR}C'/A].ISHIP

6"1.0 The mntractor shall guarantee the quality of work, materials supplied, if any, as well as againsl poorurrkmanship for a perlod of 12 months from the date of completlon of work.

6.2.0 ln case any defect is notified or failum occurs before the end of the guarantee period stipuiated above,lhe contractor shall ru:llfy/repair the sarne free of cost to the owner,

6.3,0 The mntractor shall submit a Bank Guarantee for 5% of the tolalfonnat attached herewith as Annexure 2 b, valid for lire guarantee period mentionedperiod of 6 months.

value of wcrk done, as per the .

abova vrith an additional clalm

i.

Pc.ge 3 of 21.

i

-lIiIt'I

t.

iIiiII

I

i

Ii

I

Ii

I

iI

i:1'O wcrk.shali conflrm to all provisions of l,he releyanr govemment lecisiaticn, regulatlcns and by-lag,sof the cenbaUstate auihoritjes . The contracloi' shall give ali notjces required under rre said acls, regula5cns and I or

" by-lawi: Tle confactor shall be iiabie for any omission and commiss jon ln this regard,:

8"0.0 GIS,I'JGE IN SPECiFICATIONS

p"1.0 Any minor changes found essential to coordinate the construction of t.lris work with other trades shallbe made uithout any additional cost to tire swner. The date glven her in ls as exact as could be securec, but ltsmmplete acofiacy is not guaranteed. Exact lccations, distances and level shall be govemed Uf tnr ritr r*ditjons. "

9,0 DEPARTURE FROM SPECIFICATIONS "

9.1'0 Should the contractor wish. to depart from lhe provisions in these specifications, such departure shallbe listed in a separate schedule wrth full particulars and reasons ior ihe same. unlesi ttris is done, the wort< order shallbe deemed to comply with these speciflcaiions"

10.1.0 The owners shall have full powers to rcquire the materials of ulcrk to be tested by any independent

Hency at tre"ccntraclo/s eryense ]n order'to prove ltreii soundness and adequacl. The contractor shall set up alaboratory at site at least for testing of concrete cubes, cement and sieve analysis with i qualified engineer"

10"0.0 lv{,qTERlAL TESTING

1i.0.0 STAruTORY APPROVALS

12.0"0 DUMnON (COMPLEITON SCHEDULE)

121.0 The work aurarded under this work order shall be comrnenced from .......,..".......".......... andrnmnlplar{ nn ar hcfnmwrrrPrurw 9tl 9r gEtut E

^-r'|-a^! ^arn'Ttn^rc nc urn'r nentrR ntrFINAT.TON.S AND TNTER'RETATON

11.1.0 The contractor shall submit lhe required applicaflons, drawings, etc., to the corporaUon, eledrbalinspectcrs' and/-or any other statutory authoriues and obtain their approval, licenses and / or sanctjons. The finalmmpletbn certificate shall be obtained by the contractor from all statuiory authorities to enable the owners to occupy .

i'T::iilf$ F-u,3ntra"to' lt1:, uq P:-ry!:loll Pf glti::l ulg',

i? ?"pilo to thq vadous aurhortues rn tnrs neipeA.i'.'".. :. ,,l

).,'

ulEwn}uuUUu,l'lrrvw'.ykvtgrvlral.--..,.-

The vodc not be deemed'il#"bt,; ffi;i;*,i unur'ttre *qri*a approvels cedificate, etc. are obtained by themnlrac'tor.

13'1'3 'conhacto/ shall mean an individual q.!.ry Eroplulit.oi.p,alneryfrip) or company wtrettrerhmrponted or no! that has entered lnto work ordgr .'qrh thr Eili,rov*i-uni1l;liaii,Nliu'orj firrlit helm, legatrepresentad'ie, successors and asslgns, ruceriom rn rnterest of ir5irili'i"r, * ffionffiJrrlri ,r* firms orEuccssors of such firms or company or the penniiec assrgnJ 0? rr.n lffiuuul or finn or compan!,1f any , shall himrneciately notified to the olrrrrer, ln iwiiln;, a;;;pp,ooar oStaineo for continued performance sf the r,rork order"

il';H- orcer as##,fi*5 il'1fr:11'J?i$,'r:', altthe, tenns and stipulations conrained in rhe various por6on! d

13'1.5 wo/rs' shail mean ,,he worlls to be executal in amcdance *rih the t,e;k cde:"13'1'6 'Enqineer shail mean the ofircer g-rp^r:::r des(nated

^.j3iI,crhsr oificers appointed by theft'#:^

from tjme tI tirce and notineo ro ttle ion*.t., as authorizec to act as :ngins€i for ihe purprse of tr\e ,nork

t,lr" ti

.t!

Fage 4 af 2I

II

I

Ih.).,\? vy. ,lrr! ;.

t,

1v"1'7 'Drawfng'shall mean, collecuvely,, all the drawings attached to the vork oiler, made a part ttrereof andaho aJ[ furtha dnwings 6sued ov ,re',engineerl,i tu*. or,re Grrr orcer anolor such sr.,liiernentary dravdngs as thoEngineer nmy issue from time to time in ;rJ;6 eiucidate th; rril ;il0)oer orawinEs cr to sho' detairs not shownrhemon and arso drawings, if any, prepareo uv me contractor and approved by the EnEinee r"

13"1"8 'specincauon'shall mean, collectiveiy, all the terms and stipulations ccnlained or refened to h thettocx order, General conditjons of work omrr, se*.iur ,i,noitioni ;;;k ;;.L srhedute or quantjties and ratesrlalues,and shall include all such arnendrnents, Eritror,!, *rorats or adoitjoni as may oe made durrng the period of executjonof he vrcrks and a[ w'iften insruction t. ;;;;rU ;;-liJ aigi*.;:ili,i*l * thf nork order pe*inrng to rhe netrrod#,jf;ffi;r:lir-,fffi:*?uo* or ro u,e firrntitiur *o'q;;Iu;; Ji't * ** ro be perronned or marerrars ro be

13"1'9 l,herever in this work order the l*crds 'Direcled', 'Requirec', ,

,Fennitted,, . ordered, , , Deslgnated,'considered"Necessarf or llke vr:rds rru ri.d,.it shalr be;ni]e"iL; that lhe r.io-oirert[nJ, requirernents,permision

' order' design elc,-, fil th; Erui.;;; ot tne owneia* Ntl,,iiro..simiiarry,.vrorirs Approved, Acceptabre,satisfmlory or like word! shatt nrean ;p;;;;;;; or accepted or satisfactory ro the Engineer of the owner as the casemay be unless anyothanreaning rc priinrrNrenoeo.' -'--- -' vvvv'uw'\v'r

:i#& * *r;:'E#'*ffi#.H:J:*(s) and orher piace (s) provided bv the owner on which rhe uorks are to be

13"1'11 work order value' shall mean the cost of works anived.at after extension of the quantities and ratesshswn in annerure 1 attached herewith. I

13'1'12 'Notice in miting'or urltlen notice'shall mean a notice in vnitten, lyped or printed characlers sent (unlessdelirered personally or olhenvise proved to rrave-^o-e_en r.;diliuy"ii.Eirtr;.0 Fosi io 6.,r"irrirro,*, private orbusiness addresi or Registered office of tt,u ,jimr* and sniff be aJemec to have been receircd when in theordinary eourse of post it wouid have beeri oerive;"ec. - - ---' nec lo have been receiw

13'1'13 Equipment snanrnean, include any plantand.equipment or parts.thereof, including associated erectricar,lnsfuments' malerials stores and g*dt d# ri"rlo"o uncer the ti"rk ;i;;;, for: achievlng completion of uorks as perspecificaticns. r

13,1.14 Unless othewir."T1ilfl,. fe tatest lRC, CPWD, lS specification and cpde of practice for respective items ofvtot'xs shall be deemed to be applicable to his r,,oir<"

vr ttv' IU oP.vrrrrvduu{t ait,

#*lf 0,c., ir:f,ff#H:?rlfi,ffjf;:ii'#:il these senerai condiijons or w'oik oder and rhe speciar mnditions

SINGULqRAND PLUML

vt/here the context so requlres, nrords in tlre slngular shall inciude the plural and vic*.versa"HEADINGS OR NOTES

13'3'1 Headlnos and larglnalnoles to these Generarconditions of wor\order shalr not be deemed to fornn

part 0')ereof or be taken in-to consideriu; ilth; iiterpretauon ,,. .rrrt"r.ii.,,, itrereot or the wo* order.14.0.0 GENERAL 0BLIGATIONS I

1320

't3.r.1

13.3"0

14.1.0 INSPECTION OF STE14'1'1 contractor shall be deemed t n*1*"ir:,:^rglirirq sairsfi"d hirnssri as to the natqre of rre sub,scil, the dinnension, revers,_cfiaractrr rro'rril*'-oiati,,oaos,,*iriing

i,,inr, ,-rr,**: vreilr supply and oher marn -fri|ffi.',tr,ff;'.'.'fi':,!q::iai*-'.-f*,:i:i,r,,, ie a".m.c'to''nouu ;,,,ou.,er rh,: siie,ir the i,orrcs andY/iicn cen in anv wav rnnuerrc-e

'r'" *,.-r '..,.: ;,,.fli1ffi"'..;*ffill :slif,T;[1,ru[,[.ir*.ofi,T,,|ffratcur and e;uipment enc such .*,.. ,ur*l,i ;.;iln, ,,,nirn n.,.ay ;:.eJ.tie ?rs:uticn a:d c:rmpl3tion ci me wofx".rrro

Page S afZl

* ,r,#lt^

'!; ctalnB for extra works or misunderstanding enor 0r lncorecl lnfonnation on the abave menlioned points gr 0f any oherXflffiif;,H#:'.;ili$*::fif,fffi;i:;:g;r;:1: il;]ilii il."#,; order be nu,ineotn consequence or any

\

M"2"A i'/lAiNTEl.LC,l'lCE OF U/OPJ( ORDER DOCUN1ENTS :

rir!

Ir

4t 6at+'Lt ine contractor shall be fumished, free of charge, tur: certifieo fue copies of rho lvork orderDosrments ard ali further drarvings wrrrcn mav le gugo gulno- ilr. i,.ir*ir .r work. He sha[ keep one copy cf theseDoamenb the sits cffice in gcod omeianJ th;;*r shall at aTl =rJonlilu tires be made avaflabre for rnspection andusebytheEngrneeror hisrepresentaw.roityou.,urinupectingoffi...liN.ffi,"'susovs,,dLJ,5ru

14'L2 None of these dccuments shall be used by the contractor for any purpcse.other than that of thls u,rcrk order.

14,3.0 N,I,{TERIALCONSUMPTION:

14'3"! A daily diary register (vrilh cement and steer stock siatement ) will be kept in ths Enginse/s cffice orat thesite offce" The contractoi or his represenlitive.yn l;ffi.ir';;il ;ii';r 9"00 hrs, sa.ir, ,i-;,r, for the dayproceeding and the diary will be rvrfien uo erery oay anoJoinuy;dd'b;the.engineer and the mntraotoror *reirrBpresenlati!€s ln token of its numbered'ln the'format t0 6e prd;ibediy u.,. Engineer and contraclor" A lrprlatnstnrc&n boo( serially numbered in tie fonniito ue prescnnLo iy tjrc i'igineer wilf"also be kepln tre Enginee/soffice or at lhe site office and all day to day lnstnictions io u,e conratGr *ili [* written ln that book" The cont actor orhis.rcpesentatlve shall report at 09-00 hB"; 0n every day to see mese instrrct]ons and sign them at the bottom in tokend hls havlng seen them.

14.4"0 DAILY PROGRESS REFORTS :

14"4'1 Ttre contractor or his representative shall supply all inJormation regarding progress of vrorlc as required by theengineer for compifing weekly progress repods. The inronnatio, ;h;il b" ;;;pii6o ue-rore os.oo ho. tn every day, inresped of the prbceeding we6t anO ltre planning for lhe next neeL - - --r

14.5.0 . CONTRACTOR'S SIIE OFFICE,\\D AMENITIES : I

14'5'1 The responslbility for providJng any accommodation, feeding any sanitary necessitix for gre uqlcrpnemplqed b'y ihe conlractor shall be exciusively -rnat

tr ne .ont.rtoiJnoiicn racitiues can be provided onty outslde thesite' The owner may give space for ttre contrac'tor to.uriia r#po"rr!'Jite omce and I or storage shed and / orfabricadon ]Erd etc' and the iarne should not ue usejo for housini iny'rJo* o;. supsryis,ry staff of $re contractor"unless othenvise directed, the conhactor shali within 2 vreeks -oi

ttre cor,rpietjon of Lhe work order remore lhelemporary ccnstructions and hand over to the ov,ner lhe space nraoe avaiLute to hi,n tn a ctean ano tidy conditions,failing wlriclr fre completion cedficate vrill not beiisued .

14'5'2 The conhactor shall not allow his ptkTet to p-ut up ,., ,n.u,nonrecj hutments or teashops; etc" onhe owner's prcpertv, These if any, shall be *th u,; kno;;;g;&;frp'i.i lpprovat of the engineer in Miting" ;:

.t1'5'3 lt shall be very clearly understood llra[ the contractor sha[ not.pul.up any structures for housing hislabour or hls supeMsory staff on the ofi* i;;ffithout the specific prion mnsenl of lhe oivner,

14.6.0 EMPLOYMENT OF EFFICIENTANO COMFETENT STAFF OR WORKS :

Jl?J** *0,,,[*1siHfi::.'Ixlfl,iTri[,3ff,j,Jb'ff *'x,,rx";?,:T,*illi;.r;:fi,, rhan seven vears

14'6'2 h he event of lhe engineer being of the opinion that the contractor is not emproying on the norkssu'iic*enl nurnber of staff an-u-wortme'n ,r'i.-n**rary..for the pmpe, compre.,on of the vor*. within the umeg*crbed' the conlractor strat rorurwr:tii;r;il; hriilu; r; iliJl"f.ct t'ake additional star anJ ranour (at his own;fiTt'};ffi,j",f.'ffi""'#n:ixtl[jtJ,il:m-t,f[:iJ'&1iilJT,o rai,ure on ;;d;,,h,, enrins rhe

EIil

Lti:

ii:

t

11.V.0 IDENTIFICATION BADGES l PASSES :

.Dage 5 of p1

t

I

/!iJ.

t"I!'

)t

1t4i"1 l}* contraclor shali provioe each of his employee inciudlng iaoour rvilh icenlificalien badge at hise;l The owner shall display tire nao'iel cn ttlll, p.r.o,, so lhar rhe bacees. are clearly ,rlsible foi" checking by thegatsman as tl"iey enter the"prernises or o*ner" Th; ffi;;; ri.ir iL l.r'lil"u*rur"o rhe ccnrracicrs initiars shair ircprlntedabovewith an ldentiflcatjon numberon"t,ie [aOge. - - -" -" -1

E"At4't "t Ihe contractor shouid lmnrediately notis the owner if any of the badges ls lcst and a new one issuedh iis trce' cr ihen badges ars canied .*,ii uy oirlnii#d;#. "i'{; il#y*. of thi ccnrracto," witnour a badge wi,. f,ffiH* to enrer rhe premises or rrcrr,'#epi; ;il;;;;;." ;5.".1ur o=*irrl* olln. o*!r, ensineer is

14'8'1 The conlractor shail. not assign or sublet the whoie or any pcrtion or pcrtions of the uork order orallow any person to become interested therein li anv rnanner vvhatsoever withoul the prior vniiien approval of the olvner' Pmvlded alrrays that d**Tfl,,lo be sutrletung unler,uris 16r*. il; p;*itt*o,ussignment/ sutrcontractlng of uacrkby the mnbactor frorn any tiability or obtigauon unoer the uork order and nu illrru be responsibie for the acts, defaultsand nqligerce of anY sutrconhactor, hli agenls, iervants or r,vcrkmen as fu[y as lf they were the acts, defaults ornegiecb of the contractor, his agents seruand or u,or.kmen.

14.8.0 ASSIGNMENT AND SUB.CCNTMCTING :

r4.9.0 OONTR.ACTOR'S CO-ORDlNATiOht :

11"10. WATCH & LIGFiTING:

11.11 .0 WATER SUPPLY AND ELECTR]CITY

u.lLA COMPLIANCE WITH LOCA LAW, ETC" :

14'11'1 ccntizctor has to ari"nge water & eiectric at his.cost " If lt is willbe provided by ovrner then lt willbe providedat one pint on chargeable basis and transportatjon has to be .ffi.d ilunfactor" The rneterlng shall be dono athe scurca ln the event of power supptled'by ot'/ner on chargeabie iasis , ln case of intemrpted suppiy the congactorsltould anange for a Diesel generahr of appropriate caplciry. rn*-riintrnance anc"operagon'and supply d.consumables shall be the responslbility of the coniractor. No claim ror tir. *nniigliJ;r;t.#.J".i*.n Generatorshall be entertained inespectjve of the perioci of use"-

11'11'2 &leteredElectriciff,shallbeprovrdedonchargeabiebasisalonepcintnearlher,,c/<sileancthecon'actorhast0 make anangernents for their furtner distribution" lne ccntraclor at nis !oii'v,rir also anange suitable electric rneters,fuses, s*itches, ELCB, Electrician LicenseO Ly'6oot of Orissa, etc.

14.11.3 I'loclarmshalrbeenrertainedrnanycaseofderayinprovidingwateroreiectricity.

14'9'1 lf dunng the course of the conlractcls work, other u,orks of the cvrner or of other compant'scontradors are also in prryress within ths same planvsite, ilre i'ontiacioi ir 'to

,ru his best efiorts to vrorr in hannony; wilh a[ otrer and in hre best overall lnterest of the projectfu,,ork

14"10'1 The coniractcr shall at hi1 own.cosl provide night.watchrnen at alr parts of the work whether necessary orequired by tre englneer" He shail also keep ail open trenches, excavations or other dangerous places properly andsufliciently llghted betrveen sunsat end sunrises ano snatt.provLd" ;; fl- ;;;p;r fencing boards and temporary b6dgesh proteci and assist the normal traffic. The conlractor shail also at his cvin ccsl erect ternpcrary fences on the sitevrtere requhed by the Engineer""

14'12-1 The conbactor shall comply wrth all Acts,.iaus , Ruie, Regulations and all other statutory r"qrire*entsof locals or oher Authonties having jurisottlon ou.,. r.he site uno ,niir u.'[sponsiote for th: payment of alr fees andother charEes and receiving tfl;;il;;^/';;;;*, and keep u,u orn,.i informec .r r,,;"1.;;i;uons, statutorytrilT ffiHe7fl;i[ffi1i;i'u'e' 1""'c .'..i1-'.;uui

',v'* pr*lii'.iequr',.:i:nr. i: a:,, 2pp1;i35-1e in oriya snari

14. 1 3.0 STATUTORY ANO OT,.IER OBLIGATJ L]I,S R:G,J,.D ING WO.IK,VIE.I ;14"13"tr rhe c'ntrector shall eomply with ell cenLra{, l-ccai and ,,rt-

^*r,r,ions

.anc inacrrnent perlaining to"

vorlsnen and labour and Engineer siiil tir*il,rlgit Io'enqulre int; il.ti oeooe alt conprai,rts on such matters"

Fage T af ZI

it

tlII

iq.l3,2 The C,ontractor shall r-emain liable for the payments oi all dues or ei.her rnoney to his employees or

hbouren under lhe rnlnlrnum Wages Act, payrnent .i*ugul Act, Employees Liability Act, Wcrxmen's compensation

ffi,ijiiAd;*y,tnri rnr.tnrents ano"Rulls in force oinrade appiicebie from time to time. The contractor shall also

I ompty rih the provisions of tnu npp*trceship Arl,linout fiegutiUon and. Aboligon) Ad and the Rules and orders

, issued $ere under {rcm time to time." In case u.ru ori.rlr .il,if gou.**unt Agency under any of ^ths

provisions of the

sald Acb u sher regutation due io acts of omission ino commisiion on the part of ihe contractor, the owner may at its

r oogon make such payments and recover ttre ru*ulnc* the contractols Bitls. The contractor shall atso absolve the

irwner fmm he payment of provident fund of the v'oftmen'

14.133 The contractor shall work oniy during the daylight h.oyu .?t approved by the Engineer unless he

obhrns prrorwi[en upproJ, no riabir,ry il orp.h of an! excess'cost arisrnE rhere from shait be bome by the .wner'

14"13.4 Ttre contractor shall be solely liable for' ail the pecuniary and other consequences-arising" on account of any

vi.rralionordefautt by hrm in respect f the provision ;itilabo've mentjoned Acts and Regurations and any other

statutory obligatlons wfiicn mai-fie in tort* regarOing conJifions of employment of workmen from time to time' tn

additjor\ any such taiture oivi6taton or defaurl.,,iil;1ili;i;-a-ureacn'of the wort< order conditions and is labetfor

aotion,l't terms of clause 20'0.0"

14.13.5 The contractor shallbe liable to pay the wages direcilylo t'he trorkmen ernpioyec by him on the wcrks '

withoutthe intervention of any Jamadars or Thekedao-uno rfirtt .nrure that on amount b.v rvay of commission or other

wise is deducled o, o*re*d by Jamadars/Thekedars from the wages of u'orkmen'

14.14 SAFETY REGUI"\TIONS:

l4.l4.lDuringtheexecuiionofwocr'unlessothen.visespecified,thecontractorshallathisovrncostprovldethemtedals for the execute .i;.*g , Gbering and rtrrtting-"-;iii .ecessary for the stability and safety of all structures'

excavations ard norks *O ,frirf eisure hat ,io ou*,g., in'lury or lcss is caused or,is likelY to be caused to any perscn

orproperty. i

14.14t The contractor shall be responsible tc take all precautions to ensure the safety of the publlc vr'aether

on pu6c or ovmers p.pu,ty u.o ffii ;;tt t;.h r.o[Ju *tn ishay in the opinion of the Engineer be required'

14.143,Th0 conrador must take sufiicient care white moving l handling l instaliing equiprnent, so that they do not

cause any damage h the fip;ny-;,h; r*qr.r_1ir.'nriln. ot]otntt 'ontra:lrs 'arorking

in the araa and partlcularly b

slructres, building, overneads wires anc caoles piftii[iJ.underground or otherwise)" ln the event of any damages

resurting to any damages resurting to any properry uL, Ii iro"rail the cost of such d'amages, rncruding eventual loss

of uorking hours as estimated by the ov,ner, th.il ;;;.;;;;it all.damages causeC to building' equipment h etc''

olr **pilu"n .r work to bring the building / equipment to original condition"

14.14.4 ln case oi dismanuing / demotition, the contractoi shall take necessary care not to" damage.Fu.totqp

structure i materials vdrile executing the propos; ;;k, and any d.ama.Se' if iauseC' shouid be rectified by the

confactor at his cost so as to restore'the structure I materials as they eisted earlier'

The contractor shall fully indemnity the owner and ail agents, seryants and employees o[ the ovner against any adion'

ffii|i-toffiing reritins to the infringernent or tnJ uie'or any patent of debign or any alleged patent or design

rights and shal pay any royalties or other rf',urgu. *hi.h may be'payable in relpect of any artich or part.thereof

includeo tn the wo* oroer in the event of any ilaims being made or acticn biing breught against the ovrner or any

iis*toriervantorernployeeoftheownerinrespeclof an-yoithemattersaforesaid, ihecontractorshallbenotified

thereof for laking necessary aciion at his cost.

14.15 PATENT RIGHTS AND ROYALTIES.

14.16 fuT{TERIALS OBTAINED FROM EXCAVATION :

1{.162 All useful materials and all fossils, coins, artlcles of value etc., which are found during the excavation

or ani ott ur *rk should be removed to owners store and stacked there neatly as drected at no extra cost to the owner

and the same shallbe handed over to the o',vner.

Page8of2l

rt.

E

EnE-

F.

t-

14.i7 NUISANCE:

,' 14.1.t,2 The contractorshailnotatanytimedocauseorpemitanyc;ietc.dcorc3us3e:'')'r'"iis:nreontlresiteof

do

anyttrinE which shall caus8 unnecessary disturbance or inconvenience to the oYineB tenent or o:cupiers of other

pdpertis near the Slte and to the Public generally'

i 14.1g.1 Tho contraclor shall indemnlfy and keep indemnifled the ovrner against all losses and claims for inluries or

i il#;;"; il;;;;r; or an property matsoeveiwniin may arise out oior in consequence of the construcllon and

i;i,.,6r** of tn. rvorks and' a{ainit ail claims, demandsl proceedings, damage msts, charges and expenses

| $rafoerer in resp€ct of or in relation therelo"

i 14.18 INDEMNITY A}ID INSUMNCE :

14.18.2 The contrac{or shall obtain at his expense an insumnce policy ln the names of lhe owner covering the

follorvin4 risks and lodge the Policy with the owner,

15.0.0

15.1.0

1 5.1 .1.

:

6. Works including temporary structures, equipment tools etc', on the site against damage by fire' burglary'

I fuo, ,i&;,'d ;irit;i*oti6n and natural calamitjes like floods, earthquakes, exposition etc'

j b. The workmen employed by the contractor against workmen compensation is payable by the contractor"

c'Damagestopropertyofthirdpartjeslncludingneighboringbuiidingsetc.

d. Damages to third parties including the- ownels siaff, visiton, neighbors and cther passers by against any

claim that rnay arise ouu to u.iiJrnt on accoint or tne in.Nentai risi<s which i'ay occur during the execution of works' .

e. Payment of Provident Fund and E'S'l'

Allclaimamounts,againstthepolicyshall.bepayaoietotheownerandnottothecontracicr.t-{eshallkeepthepolicyrens$red fi,,orn umd t uru rnir"tt-,u ,r*ur lssu'et[',, certmcite or completion" if at any time the policy so obtained and

l€pt with lhe ourner.rprr.=, ri rrritiue tarvrut fo, h;;fti'; to slop'further p'y*untt un'il the duly renewed poliry is

Mgedwffi the o$rner.

14.19 CONIPLIANCE OF INSTRUCTION:

14.192 llilenever the conlractof fails to comply with the lnsrruction of tlie Enoineer it shall ba larvful for the Englneer to

haw he work done ffuough other contracto" * i.prtt^;illly ;itthtrwiie and the cost incurred thereon shall be

deducled from any rnoney due or becoming due to the contractor'

E)GMPTION OF WORXS I

SUFFICIENCY OF INFORN/IATION/DTTAILS-:

fie mntractor shall check ail Dmvrings and Specifications and shall promptly nctify the Engineer of

any omission or discrepanaes therecf,

15"1.2 ln case of ambiguiijes or discrepancies bel,;ieen drarvings and specificqticns or schedule,of"quantities and

rates I vatue or any of thim ivrth each other, the case shail be refened to the Engineer in r',nling and their decision shall

be finai and binding on the contractor.

15.20 ACCESS TO SITE:

1521 During tho progress of urcrk, the contracior shall keep the site reasonably kee from all unnecessary

obstruction. The existing roads or water eourse s or pipes, electricai lines and conduits shall noi be blocked, cttlhrough, aitered, except with the permission of he engineer ln un'iting.

1522 All operations necessan/ for the execution of lhe yaork and for Lhe ccnstruction oi any iempci-ary vnrL shaltr,

so far as compliance wilh the requiremenls of the work order pennits, be canied on so as not to interfere unnecessanlyor Improperly with the convenience of the public or the access to the use and occupaticn of public or privato roads,hcluding apprcach roads from the main road footpaths, and 0f properties whether ln the possession of the owner or anypetson"

Pa.ge 9 af 21

l. '/ ,

15.23 Ail compensaiion clalmed for any unauthorized clcsure, cutiing tr\rough alteration, diversion,obstuction to such roads or water courses, etc, against recoverable from the contmctor i',, deCuction frcm any sumswhid may become due to him in terms of the work order or othenMse according to larv.

15.e1 During progress of work ln any s'rrset or through fare, lhe contractor shall rnake adequate provision fortl-te.pssage of bafliq for seclring safe access to all premlses ipproached from such strerl or ttrrougir+araand for;,dralnage, water supply or means of lightlng or telephone etc" \afnich may be Intemlpted by reason 6f the exeortion cfha uorks ard shall erect afld malntaln at hls own cost dfuersions, baniers, llghts, and'other iafeguards as prescrlbed byhe Enginer for uaming or regulation of traffc and shall provlde tho neceisary watchmerl to frelent acclJenb" Thi*n0( shul in such cases, bo executed night and day, lf so ordered by the Engineer and 'rith such viEour so that thehaft may be lmpeded for as short a tlme as posslble. No. clalm for extra paymont shall b,' entertalned-by the owner lnlhis egard.

15.24times.

{tanI J"J.U

15.4.0

15,5.0ar ceREWoRKS:

15.6.0 SI'IE DRAINGAGE:

15.7.0 SCHEDULE OF QUA}.{TIIIES AND RATESTVALUE :

The owtrer and the representative, consultants shail have unintem.:pieC rccess to the situation at all

PASS,{GE OF TRAFFIC :

SETIING OUT OF'WORKS :

The ccnlractor shall be responsible for the true and perfect settrng c.it of the uorks and for {heconectness of the positions, levels, dirnensions ano alignment of all parts of the lrcrks,. Alj rneasurernenh shall compiywifll lhe dimensions noted on the drawings and or as dirccled, lf at any time during the pn gress of the work, any eridishafl appear or arse in the position, Ievels, dimensions, or alignments of any part of the'v;r,ik, the Contractor, on beingmquired to do so by ihe Engineer, shail at his olra:r expense rectify such enon to the .:atisfaction of lha Enginee?notsithstanding that he may have been assisted by the Engineer in setting oul the same ea :ier"

15.5'1 ln lhe event ol any accident or failure occuning or being likely to occur li. our on the uorks utrich, lnthe opinlon of the Engineer, rcquires immediate attention either during thi l,ork. pericd of i,:e defect llability period, ihoEn_glneer {!V dlregt tha Conlractor by wrilten notlce to take necessar! remedial acllon anri }l the contractor fitts ro-tafeEcUcn as dirccled by the EnglneerMthin 3 days of such notlce, the orvner may bo lts oun uorkmen oremplolng arryother agency, make the cosE frorn ths contractor.

15.6.1.1 AI!water, whlch may accunrulate on the site during llre progress of woks, or in trinches and excaval1onu shatrbe renpved PrcmPtly fonn the slto to the satisfaction ol the Englneer and at the eontracto/r expenses,

15'7.1.1 The contmctor shall neither be entitied for any revlsion of value orving to varialior.; ln actua! qualtities of rvorkexecuGd and according to the value or unit rates agreed to.

15"7'2 The value of unit.rates agreed to under this work ora'er shall be of the .'tnished wor15 except to thee*ent specificalty excJuded) and shall be lndusive of all equipmJnis, lauour, tools, anc{ plant , transport , hoisting,setting ard fidng and shafl rbmain firm and free form any varidt6ns arising rrom the cost of rn3lgrirb, labour qulpmen[

3*;1" to increase in taxes , duties lnsur-ance etc. or for any ottrer r.eis,in *rrrG&r.i ourrg'th;eiil* perioo of u,rcrk

15.7"3 The yalue of.unit rates agreed re unoer this Contractor shall be deemer. to compensate br a[ minor.details whhh are not specifically mentioned ur,t aii rr,,.1/r,ru ru,,trirv rrtiii.a and are . ssential for ttre fu[ ard findcompleiion of lhe r"orks and tfr-e conrractorls noiintiulu to *rr,* uil.-t, claims on r,,is accounl rho mnkactorshall hand over the flaE in.MO\E ff.f, conJiU"n.'-' "

.

E;li,r,,*.oo,.,.'#3,'$l,t*XmilJTilflffi:?::#J[,li escarerion on rares sha: be varid rir rhe compretion

iIf',:

I.

[.!:lh,,

[-

Fage trAafDJ

ItaiJ,,\

it

i; 3

io.e.o MATERIALS To BE suPPr-iED BY THE 0oNTRACToR rk, other thari

l5"a.l The contractor shail, athis own exp€nse, prwide all the maierials , raquil:'d for ihe wo

tirnuu, ,,t itt are to be supplied by the owner under clause 15'9'0'

1E"s.A All nrateriats to be provlded by ihe coniractor shall be in ccnfonnity rvrih the specificatjons lald dovm or

refermd to in the work order and the Contractoi snar, # requesiuo uy rnu Engineer, Fumish rrcof, to the satisfaction of

he Engineer that the materials so comply"

1S,S.3 Ttre contracior shall, at his o'wn €xpense and, wilgut delay, supply lo lhe Englne.er / samples of

matedate pnopsed to m usfiin-the ur,crts. rno zulnuli rirtt*itt'in.. reaibnait'e'time rfler supply of samples or

wllhln such further periJ ai htlmated to the mntricioi tn wnting, infcrm the Coniracto; whether the samples are

aoorored by him or noL tf samples are not ,pp.*ol tiru it.Cit.i shall forlhwith arangr'i to pocure fresh samples

ffidyru;ith the required specification, for approval by tne engineer'

15,8.4 Tno Englneer shall be entltled to have tests canied out as specified or refc"red to ln the contraclorfor

ay materials supptied Oy ffre ContraAor at the cost;i[r;;;tractor and the contrbctor shall provide at his expense all

ftc*fla wtrhh tre Englneer, may requrre or *re purposel fiiltr;c ire specifled rn the work orde. but certaln tests ar.

mns,ered necessary by the Engineer, me conkalio;'ri,;fpmriJu-urf ru.ilities required for the propose and the

*rirg€s fcr thme tesb. shall be bome by the Contractor'

15.9"0 'MATERLALTO BE SUPPLIED BY TTIE OWNER:

15.9.1

1L IVULVVI I Lruvvr

ln case the need is certifled by the omer , the following maierials shali i::r procured by the owner at

tiii* op.n.es ind issued to the contractor fdr consumpiion in lhe work at free of cost"

a.Cement-ordinaryFortlandcement(oPC}.ThecontractorshallretumE0g6of.mptycerngntbags,faltlng,,t,i.n n -Z- per:bag (Ruiees Tlvo Only) lvill be recovered '

b. Reinforcement steei l.e, mild steel Rounds or High Yield strengtlr deformed Bars ''1YSD)' hereinafter termed

as fot steel bars.

The contracicr vrig haye no righi of whatsoever.nature, in the materiar rssued to hinr (for u'': consumption in the work

and a[ the ;ighrs in the proper"ty of materiars wiir vesiqnil ;1h'tiii*:'; art materiati sup'':iied !y the ounrer shafl be

used by the Contraclor r*.[ri,i*f, foi ttre constru^cffiilft il which they are lssued and "n

no'accgunt the rnaterial

shall be taken cut or trre ownelsi**i*i b.y the contiactor witlrout prior and due pen'nissioi '

is.g.2 lf the materials which are issued to the contractor is lost and I or darnaqed vl'trlle in custody of lhe

.ontractor and / or oamag*J'oiiosi in u-ansit or toi*t''.iuwi'*rorl after the issue, the cctt of sueh maleflals will be

recovered at Penal rales. I

1S.g.3 The wastago will bo removed by the contractor afler, reconciliation c{ the rnaterial at his own

ExFrE€s. ln case O ste€ii;;srvise Eo as to tje tnemiogeGer and lessen lhe danger of topi:ling over' For extra sdety

durlng he monsoon or ,,ten -ii

ft eip-ecfeO to sioro ifre cement for an unusuilly long period' encloso Sn stock

compbtely in polytyhene rnu.t oiunv other suitaub;L,p*nng materlal. The sheei will cr rse on the top of lhs stack

care shouH be talren u.lriu]i, Cytnene sheet is not'oamagid any time during use" 1'lhen.removing bags frorn

itoig;iJ*Cgs should Ue rernoveO from tow or three tiers back rather than all fmm one {' 'r,

15.10"0 PROPRIFI-Y |l'i &4,\TERIALS AND PIANT:

15,10.1 All materiats anC plsnt after lmmediateiy being brought be removed from the s: : without the prior vritten

permission of the Engineer during the progress of tlre works unless they are rejecteC by the 'ngineer or are declared by

him not needed for lhe execution of the wodrs.

15.10.2 The C,ontractor shall maintain in ward entry and outward entry thmugh the ov,ner late no, malerials shall be

allowed to be taken outwithout gate pass" in case o[rejected materialalsogate pass vrillb'l' iequired.

15.11.0 STCMGE OF MATERIALS :

Fage X.1. of 21

'15'11'1 "[he

Contractor shail at [t o* expense provide suitable sheds and storage yari: in sucll places and in sucir

ryryT ,-t It the opinion of the Engineer are needed for orderly and proper storage oimarrrlais either supplied by theowrer or as brought by ihe contractor for the viorks. rle shill obtain"approoaiin vr,r'itirq form the engin€er-foi ff,,i-erection of such sheds and storage yards before underlaking construction, Thereof ::iraEe and saie custody ofmalerials shall be responsibility of the contractor,

15,1e0 WORKITIA\SHIPAIID TESTTNG ' ,

15.121 Tho smrk to be done undor lhe Contractor that may be necessary to be done in crder to form and mmpleleany pafi thereof shafl be exmuted in the best and most subitantial wortmin like rnanner, u,it' n,uturtri of the best ardnud approved quallty of their should conflrm to the partlculars contained in or implied:Hy the specificaUons and asrefened,to ln andrepresented by ltro drawings orin such other additional particulars , initruction and to the entiresaUsfuction of the Englneer may direct and such tests shail be canied out by ihe contracior vrholly at his expense.

15.13.0 INSPECTION AND APPROVAT:

15.13.1 ThE Contraclor shall provide at all times during the progress of work an( also during the defect fability periodPJ'oPermeqns of access with ladders, ganghqys,etc., and the_ necessary attendanh to r.o-ve and anange ttiirigs asdireded for the inspectjon or measurernents of the urork by lhe Engineer of his representailr,e.

15.132 Al! raorts embraclng more than one process shall be subject to examination and approval a! each stage thereofand the"Contractor-shall give duo notjce in writing to the Englneer or his authorized represcntative when each stage lsready. ln default of such notjce, the Engineer shall be entitled to appraise the quality and exlent thereof,

't5,13"3 No v,arrk shall be covered up or pui out of view by te Contractor without the epp-cval of the Engineer or hisauthorized representative and the Contractor shall aflord full oppoitunity for examination end measuremlnt shall betaken up vllhout a specific authorization by the Engineer. The contractor shall give reascn:ble notice of not less lhan2 dals bul not,npre than 4 days in any case, In writing to the engineer or his represenl 'iiye wfienever any unrlt orma'erfals are htbnded to be covered up in the earth, in bodies or walis or otherwise to be placed beyond ths reach ofrneasurement ln order lhan the uork nlY be inspected and approved by the Engineer or th;.'t con-ed dirnensions maybe taken before being so mvereC up" The Engineer or his representative shall , without unreasonable delay, unless himnsiCers I to be unnec€ssary and advise the conLactor accordingty, attaln for the [urpose of examining ani measuringsuch hork or materids intended lo be covered up. ln lhe event of the failure of the contra:tofs to give suctr nouce]such worUr,uterlals shall be uncovered, if required by the Engineer or hls representative at tire contraitols expense.

15.13.4 The contractor shalt uncover and part of the works and I or make opeiings ln e;' through lhe aame as thaEngineer from time to time direct for his verification and shall reinstate and make good surh part io the satisfacUon oflhe Englneer

- In any such part hls been covered up or put oul of view afler being appncr'.:d by'the enginoer and is

subsequently found ion uncovering to be executed'ln accordance with Ule work ordeJ the exrenses of uicovering andor_mal!9 openlngs ln or through reinstatlng and maklng good-the same shali be bome by thl owner" ln any other-casaan suft expenses shall be bome by the Contractor"

15"13'5 The conlractor shall leave necessary holesl recesses in the foundations, plinths, i, llls, RCC roofs and slmilarurorks wherc and as required by the Engineer for passage of pipes, cables, lvires, etc, and r:ake gcod later without anyextra ost to he owner"

15.14.0 URGENT WORKS :

15'14"! lf any urgent vrnrk (in respect where of the,decision of the Engineer shall be irat and binding) Oecoresoecessary for safety of the nork or personnel and the contractor is unaile or unvrilling r' carry it ouq the Engineershall have right to employ departrnentai laDour or olher agencies he may consicer expedienr. AII expenses ineuned bythe ownershall be recoverable from the contractor and biadjusted or sei on'alainst any sun. payable to hirn.

15.15.0 TEI,IPORARY SUSPENSION OF WOPJ(S:

15'15'1 TheEngineershall.havethe.right-torequirethe discontjnuanceofrheyrorklnrvhcl".orinpartforsuchumeasmay be necessary, should the condition of vror,t or weather or other mntingencies make it ,fesirable to do so In orderhat lhe vioc(s hail be well and properiy executed. Extension oi tirn"e-snau be gra.,rec to the contractor fon

Page 12 of 2t

{:?,, *n*,tinu*ce of work so required provided the suspension is for a perici of atleastone ';rcnth" I'lot other claim ln this \

: ilffi 'dffi ;;;;;ii., o, ott er*lre, however, sh ail be admitted'

-- 15,X5.? During inclernenl weather, lhe contractor shall ;uspend cor,cretinE l'rotk fcr si-r-'l time as the Engineer may

direct and shall protsct fro* C*uSb ali works an6 equipment then in the curse o[ erectic''

,1S.1S.3 Shculd ia,o* be suspended by reason of rain, strike, lockout" or other,cause:,-ti:-TXf:tor Eirall take all

necessary precautions of trru "p.tu.ti.n of works t,'tO iriuif ut his own rnake good any dr:nage arising fro any of thesa

causes.

15.16.0 CLEARANCE OF SITE ON COMPLETION I

15.16.1 ls a part of the work included in this Contracltt' E 31t1?:t:Tlil,t::t5',tlv,,t*"0^ut ^*1'

::||*$3Hlffilff,i[''l;tli-[JiltJ',ii.liL,'''rq, iil:fl:lH*::*:lT,?fr',5l1'ffi:;iiiliiJ'Tfi3H:ilffi: :[ :ii [[ffif 'n1,1,,,*n rrom the operations li[-,i1,1!fl,!'3'][n g::li":li:';;[^1?if::Tr'l*:i'ili';Jffif#r::#'d'il,.fiil"il} U#i,jil;ffi;";"nhi;-th;.;ite oriiiope'ations to rtreast !n Eood order anf tn'

ffiiliilas the beginning of the wort under this ccntractor.

1s.16.2 No final pavment ln setuemeni of the accounl' 191 !:^y,f, :Lu;:"S::fl:i::"tfflAil:#eBrH

hffi#?*5f:!3ffii15.;'JffiJi::;Xi,il: ffi;il'v".1:::tlll^',,ry'.3:ll':T^'J".'ffff^:flffitgtr5#.Hffi HilJl*i:ftTiif,ilt'*fl ff ffi i["-l;?;##i'ffi 13,gi:."1*:1,1ffi Xgllg:ff 'f,T*m 5.?ffsHli:'flffi li,?T?x'H:t|:1i.9.i{{{;ji:il{n**:1,:l'i5l"Tffi'fl;1ffi,'H,,H,Tsuch clearance may ba maoe 0y ne etrgri rvcr ot u tv €^P-""-"r;r;

, th; ;*J' shall nbt Ue held lia!19 for any loss or

iiii.Jit have the site cleared ut tl,. Tl-ult_13fu^ *.r. nn rhp q,p ,ro ar. to ,u4, **.*l , r,,,ticiirem6uat may

5#l:Hi:.'fl:;1i.'ffill:[:$'H-frTisr^'| T*i::y:,:l{:l*fl::f,l':3fiffi;;';Sl;n##ffiJ;iilH:fi::,:iif[::nXfil'ffi:'3npjiff:f ,i]'ll#,*'iiii.pu'tv o'ln unv othlr u,av as .eemed nt and convenrent bv

the Engineer.

16.0.0 i VENMIONS IN THE SCOPE OF THE COI',ITMCTOR :

16.1.0 VARJATIONS IN THE SCOPE OF THE WORK:

t6.l,lTheournershallhavelhepowertomakeanyaiteraiicnslvar'.riion/deletionsladditjonssubstltutions, form drawings, sDecifications, deslgns, and lnstructlon thi, *ry ifpu" 1s h;r to be nfe:ary '

conraclor

sha* be bound to cany 6ut the work in ac-cordanc! win-inu rnstrucron, *tiiin *uy t-,2 given to mntractor by the

Engrneer rn witing. su.ririr"Jio"i ivarrations l o.r"riinr'i ro'Jrrionr'or l"oiriirti""i s'iatl-form part of and be ralsed

as rnconrorated in the agreement rt seif" The totai *iiuu oi*ort order rnay ;il ,p i; i '' gs* . l-lowever quanuties

*.V *,y to any extent for individual items'

1620 VALUATION OF VARIATIONS:

1621 , ll the rates for the additional, altered or substituted work, a-re speci{ied in the work order for,the worlq.

rhe contractor is bound to cany out the additionrr, a"riu[O *;iltiid *tk at the sar'o rates as are specitied in th'

work order.

1622 lf the rates for rhe arlditionai, altered or substituted work, are not specifi"d in the urork order the rates

will be derived from the rates for similar class tf ;;:;;;e ineci199 ln tfre WORX O:IDER for the WORK ' The

opinionoftheEngineeraswherherornotthemtescin'oeadopt6dwillbefrnalandbindinr,onthecontraclor"

MODIFICATION TO THE WORK ORDER

There are no olher understandings. between $e parties othef than as ret forlh in theso raork order

I

16.3.0

16.3.1

Docrmenb.

16.3.2 ln the event of any of the provisions of the ,,rnri. order requiriig tc be "'cCifieC

afler the snrL order

oo.u*rntr have been signed, except these'direclions and order given by the Engineeilrnderlhe "worrr

order fcr tho

due execution of the worki, the modifications shallbe made in vniting and signec by b,cth l ,e par',ies before giving effect

to such modifications.

Page 13 of21

17.0.0 TitulE FOR PERFORivtA'luJCE :

COMfuIENCEfuIEIIT OF WOR}( :

The contnactor, having signec lhe l'lorii order ldth lhe oyrnei., shall a:iimence the nork within thepedod specffied in urork order,

172,0 TIiIE FOR CONJFLETION :

17'1"2 The Engineer nnay direct fie contnclor.to use so much required in orc,:r io enable the mntraclor tommrEnce and continue the u,orJs and shall from time.to tjme as tne *orh prcieeds give ti;e contractor du],.uffir;furfter portions of the site as tlre Engine* n uy r** time to time consider pncper and adeluate in that behalf" phaseddefuery ln the manner aforesaid of the use of iite or any other faciiities to f e anoroec io ,:rntractor shafl not enuue theconbactor to any daims whatsoever.

i17'1'3 The contraclor shalt not,be entitled ro any compensation for any loss quf,eleJ 5y him on account of delairavailability of Govemment controlled or other rnaierials or of access ro lite ino omer l,citiuei oii.Lyuo receipt ofinstuction and deoisions from the Engineer"

. 17.'1.0

"ll.i.1

172's

172{ Tire rvo* shall be mmpieted by the mntractcr wiUrin the stipulated p, riod. The compleUon peri,Mshail h inclusfue of al the lead ume required for. engineering procur.n unt of raw mati..riaisl ltems,- manufadurlng, '

lnspwdon, testlng, paeking and any other actrvily *,utti:eury rcqlii*o rn.rroing transpo*a,ion and /or erectlon, testlng,comndssioning. The Une for compietlon of ttre works, rn.iuoinfJxensron"oiii*u, if a;t g;;iil i, itiu "rr*n*

of nnrrkorder..9..*..Jv."llrvulJulq|

17'1u The Contractor shall submit to lhe" ovvner a Time and prcgress chart for a:)proval showing the order inllttlth he proposes to cany out the work and al.so indicating t e proua[ie?ites or comm.'ncernent and completbn ofF@ pads/sec$on of the works" This time ao progresi chait as AproveO and arcrpteo by ih; owner sha! belhoing on the Yiork order

.failureon ttro part of tire wort oruer to fumish dib chart and to ru,,i uppforaior ure oilner f'r .

lhe same wt'il entail wilhholding of payment against tho bills prefeneo uitrim under the v,ork crder . The contraclor shaflalso, wfieneverlequired Uy rn6 enfineec prouru.ln*iting a generaldescription of the anaigements and method whlctrlhe confactor propcses to adopt for lhe execution of tne wo*i.

17'2,3 lf at any tinre its appeai"to the Engineer that the actuai progress of lvn.k does not conform to thdapprcved prograrnrne refened to in suilclai.rs e 17 "2.2., the contractor shall"furiish, for the apfrovai oi ne Engineer, arevised programme shrrlvtng the modificalions to the approved progr:irnrne as are [ecessartr,

io ensure the completion offie works within the tinie linrit for completion referred to ln sutr6taui e 17.2,1,

1724 Allpayment h bo made to contractor shallbe subiect to a certificate to be fumishr c by the Englneer that l6eprogre$ has been in accordance lvit the approved ume and progress chart orlucn modifica,cn is rrave been approvedby hlm progress chart or such modiflcationi' as rrive bd6fir;;ihh: -

The ',,rprk shall be completed as per schedule.

17 26 BAR ctlAR'r : 811!11t s,nowing monrhly progress shall ba submltted uy ihe sron.sfut contractor for owneresc*thy and this ls to be prepared on thi basrs Limeeung ourrng the;ilrsi ot,negotiatir"ns. The contractor has topreparo comprete pran of construcuon with Engineer neroristaruni th; i-b:'-"173.A EXCEPTED RISK (FORCE tuIAJEURE);

:17'&l ; n at any [me, he executon of lhls. nork order is affected by war (declared rr not, Hosti]itjes, hvasion,Ads of Foreisn Enerniei ,.civii vuar, CeCffi;ffiffi:;;;ffi;i;'flo",irmotion (orlrer t,ran soleiy restrictd to the

"onradccs emprovees) , Acrs of stae, ncG oi coo irri ii;,;,il,q;;il, ;assive fioods , t omei,of Rcts of naturetYf,lch en experienced c,ntl'actor could

'not hive reasonauiy roorrsn or'reasonabry ma ,r provisron for or rnsuredagains[ lhen lire conlr:actor tturl, *ifrin r*;;;';rr of sucfi

";ffi;r:;;pry to rhe o\:.]r'rog'ther]vrth ad*uahevidence for obtainino suctr exteniion ii'iiii', ii,ry'u. *-rrir-o iy'u.,u ,iol*utrnces, Aft. . a carefur examjnatjon ofthe circumstances' ne ownerAny g"ni ;;.-i.,ir,o, .iti*; nl#rrr^l",i,rrout insistin , for liquiiated damages.17 '3'2 Any ertension^{l'lq granted by the owner" in lerms of sub-ctause

.1 7"3,.1 abr ,e shalt neilher enti.le the

conrracior to anv crairn for increase in-vaiues nl*nurr ln ,erease'nim r.* ury rr,ru obrigatir rs under tire work order ifrhe perrormanci or the n'o'lr o'oer'as';;i;'d'il#*I"o;'t:fl,,13lf;!',0..r*,

mui6r,c .ili-ti;;; conrinuins ro

poge t4 of ZI

peNist fOr a continuous peric6 exceeding six rnonths. The ewner and the contrar:rr shall discuss the mater anddecidaellhertoterminateihe'altcnkorCerwithout cbligationoneithersideortoconilnr,eitsexectrtiononsuchtermsas;ray ce agreed upon.

17.3.3 The ourner shal! not be held responsible or be called upon to make good the losses/msb lnarred byhe conbactor masequent to lhe happenlng of any of the event under ciause 17,3.1 ebove,

t7.4.0 EXIENSION OF TIME FOR COMPLET]ON :

18.0.0 PAYMETS:

17.4,1 The Contractor may seek exlension of time for completing the wcl,<. lf such extension is required forreasons of exceptionally adverce ciimollc conditions anC such othei'soeciaiciroumstan;es which may omur (wtrich are,hovvever, not such as to constitute force maieure under clause 17.3.1 ci the work .'rder ). The iuch an event, thecontaclor shallmake a vnitten request to the Engineer as"soon as pcssible after th: reason for extension becomesapparcnt b_him" The request shall give fLrli details of 'fie causes leaciing to the request and shafi give full detalls of ttrecauses leading to the request and shall also indicate the manner ln whiin the r.rarrk is p';oposed to ie regulated witi tfreu[nost expedition so as to cause minlrnum deiay with reference to the original lme chal.

lV.4,1.1The owner shall take into account flre circurnstance and the recommendations ol the Englneer, to determinehe amounl of exlension of time lo bo gr:anted, if any, and shall notify lhe contractor acc:rdingly.

17.42. Any extension of time granted under the provisions of this clause stnll be without prejudice to o6rermnditions of lhe work order will not be absolve the contractor from the obiigalions if other clauses under the r,rork

17"421Provided, however, lhe owner shall nct be bound to granl any efldnsion ol iime unless the confactor hadmedg tha requesl for extension in dus timo afler the circumsGnces ai tney havs ai;se or as soon lhereafler as b&'actletlar,{'It.,q,g The contractor shal! not be entiiled to increase ln pr'lce or for an;, compensation lttratsoever on

acccunt of ttre extension of Ume allowed.

18.1.0 i,iEASUREMENTS, CERT|FICATES & PAYMENTS . I

18.1.1.1 MeasuremenbshallbetakenioinUy bytheEngineerorhisauthorizedrepresrntativeandbyltrecontractorq,hlE audrcrized rcpresental,ive hom time io time ind at such inlervals as in the opiirion "f tfie englneirshall be p,opei,havk6 regard to lhe proEress of the urorks.

18'12 The final bill must lnvariably be preceded by a-thorough check of measurer::enl of the wtrole of the workperformed.

18'1'3 Before taking final measurement,of gnyT rk, the Engineer or the ierson deputed by him for thepurp€se shall give a reasonable notice tote mntractor. lf the contrictor fails to ,:Hend or send an aurhortzedrepresentative for rneasurement after such a nolice..or fails to .rrnt*lgn oito record tl:e objection Mthin a vreek from'the date of rneasurement, lhen trn any such uurni-th* *rurrrum.nE tiren'uy the Engineer or by the persons deputed.by him shalt be laken to be lhe coneci nreasuremint of the work ano srrill ue nnal and binding on tfie contlactor and n0

,:

dam rvfratscever shajl thereafler oe resarilng ltru u.rr.y und classificafion pf measuremenL,;18'1'4 The contrabtor shall , uilhout extra charges provide assistance with every appliance, labour, and lhingsnecessaryformgasurgmgnl - -"-"r-v rrvf 'vu q'trorsriuc I

18'1'4'1'1 lf a dispute arises between tie Engineer and the mntnctor as to i,,e quantjty or quaiity of r,rortperfomed involving a surn rarger than Rs. 1000r- the contractor may upp.iirn *iting to rhe owner for re-rneasuremenror eappraisal as lhe case rnay be within one week kom the J;tu;i;;asurement | ,. the Engineer" lf the ownermnsHers lhe conbacto/t l!ry?flid, 1t

may appoint en officer oti'er tt,an ttre officer vr,-. made the frnal measurementffi'#il[o.?

to so into the matter ano report ini.tnu o*uri o*iii.r 6ir.^ rhereus*- ,r,.n uuinJ*d binding on

Fage 15 ofDl

lr (r-I'i c

TI,u PAYMENT OF PART RATES:

ls,LlPaymentofpadratesagainstapprovedworkorderralesforcertainite.nsmaybemadeintherunnhg accornt biil dt the discretion of the Engineer'

{8.3.0 COMPI,ETION CERTIFICAT]ON :

18.3"1.1 The norts shall be deembd to hava been comple.ted l* '!f:pj:L:1*..{3lTt"::slffig fflt mHilii*f ,*,fuTffi '*1i,T.'ffffiT;?'fi:''xffi :IJ;qiifr&{:{:i,..}"?:','11.^;"1f1'i'#im'i#Yf; ,ig'J#,y'ffit:n'?ffi-if;JtiliJliTnli'ii'ffi;ffi"1r'''.try,1'l113'':1,:*llili:.133li':'igJg

'

fiffif'5.T3tffiffi;"'J.-#uf.lffil?#l#'iil'tii:'fr''"'q*,::[::*:;*l:H'*,i:::ffi1'tr,'H bemade

ffiffH.3:ffi'*:'#".:"*'.ffiil'*'fi'iaymIn.iJn;iiuu *ro. uv rhe ovrnerasarnstdocumentary evrdenco"

20,0"1 RIGHTS. REMEDIES AND FOWERS:

20.1,0 TER]VIII{ATION OF WORK ORDER DUE I O CONTRACTOR,S

DEFAULT:

lf the contractor :

iI

,l

II

i]

18"4.0 FI}IAL PAYMEI'TI'S :

1g.4.1 Based onthe final measurementof wort-performed ln accordance with clause'18'1'2the mntraclor shall

subnrfi iris flnar bifl ro, tnu"*rtrffiiili';*u., ir"*ii'iir]r'*.uir"*unr The bil sha[ be abased on uorks as

nreasurbd and at accepted*? "ro.i

rutes, ail oeoucion ir*noJ$.'u work order shalt bc, incorporated' The final bil

shall bs accomPanled bY : .

,, . - ..."j],

A) , A copy of fre completion certficate lssued by the Engineer'

' '- ,

=

B) A "hlo clairn certi{icate' in the prescribed form'

c}Reconciiiaijonstatementofcementsteelandotlrerfixtures"..-^.t..L^.,^lr.

TheEnglneershaIIexamineandcertifytheftnalbillforpayrnenl.aftersallsfyingthatthewcr.}lshavebeensatisfac1oritycompreted and tt"rat au expenses and demands in.r#a'oi*roe by the o*nei'orin respect of any damages or ross by '

fromucnsequtnce or tf;e'urorks have been returned and lhe site cleared"

"rn ** or n* of clairi glven by the mntractor, the owner shail examine and either accepts or repudiates in wtrole or in . ' ,' 'i

;;;t1ii;ilp its oecGion in wr:ting to ho contractor' * ,

. , ., .

19.0.0 DEFECT LIAEILTNY PERIOD / PERIOD OF fu{AINTEI'IANCE:

19.1.0 The defect riabirity period sha, be 12. montlrs from the date of issue of compretcn certificate by the Engineer'

ln lhe event of more than'one certificate n*ing b;'isrruo tnu Engineer under hi: said l'lause, from the respectlv'

dates so ;eilitied and in reration to the ,Defect rirbilt/'fi;hression The wor{,<s'shail be .nstructed accordingly'

1920 To the interit that the work sha[ at or as soon as pnacticable afterlhe expjry o] tnc 9e1{. of maintenance bo

dehjered b he swner in as good and perfect cono-,tion tirin wear and. tear expeil) io the saiisfaction- of the Erqineer ' '

., Erd h whbh urev urereiltrrJ mmrirencemr.t.i tiiJ'p.h,;a or rnaintenande. ite contractor shall execute 8[ sudl '

yrork of repair, amendments, reconstruction, *Ufi.Ui-.'.,i0 *ig.g Sq{ of the defecb, lmperfection' shrinkages or

olhg' faults as may be required by lhe contraclot in *itfng Ui ffre owndr I Engineer during 'he period of malntenance or

wihin 14 dalr afler lb exptration as a result or un in#it6n hiou by or on uinatt or the Enrrineer prior to tts explrauon'

19.3.0 AJI such works shall be canied out by the conL.actor at hls own expenses, rvhich in the opinlon of the owner

are due to gre use of materials or vacrkmanship noiin accordance lvith uork order or due tc neglect or failure on the part

of the contraclor.

l

19.4.0 lf the contractor shall fail to do any such,r,rcrt as aforesaid required by the o',vner within a fodnight the owner

;i.G.intirr*io',"youtsuch'aorxuyiidowrworkmenorbyanyotheragencyaithecontmct9(sms.t.Thqovrner shal! be entiUed to receive from th'e contractor the actual mst there of plus 25% incidental cost (25% of actual

mst) 0{ rnay deduct thti same from any money due or to bemme due to the ecntnactcr"

20.1.1

Page 1"6 of 21.

. a. ,Abandons lhe Y,orit orde r : or,

b. At any tlme delays in proceedings with the wolxs ; or,

. c, - . Commits deiault in complying ilith any of the tenns and conditlons of 'rl::: vork order and does not

remeOy it wlihin 7 day: afier a notice in wriiirig i! given to him on that behalf by the Engineer; er

d" fafls tot remove materlals fronn the sito or to pull down and rqplace lr,crk afler recelving from the

Englneer notlce to the effect frat the sald rnaterials or works have been rejected i or ,

B. fails to complete the worts or ltems of work on or before the stipulateC date(s) of mmpietlon , and

dces not mmplete lhem within period specified in a notice given in uniting in that behalf by the Engineer or

f" ofiem or gives or agrees to give tc any persons in ownels service or to any other Perscn on. hls behatf fly gn

or consideration oi any kini as an inducemeirt' or reward for doing or for bearing to do so work having dono or

fornomE to do any ac{ in relation to lho obtainlng or exocutlon of this or any other work order for the own8r or')

g. shall enter into a work order with empioy in.connectien with which mmmission has been pald "or

"

igreed to be paid by him or lo his knor,l,ledge, unless the particuiars gf any such comrnission and lhe terms of the

payment frereof have previously been disclosed in writing to the owner /Engineer or

h. Being an indlvidual or if a finri , any padner thereof , shall as any,time be edjusted"lnsolvent or have a

recetving orderlorder fdr administraUon of his estate 'made

of against hirn or shall tlace any proceeding. for liquidation or

composition (other lhan a voluntary liquidation for tho purpose of amalgamalion or rcconslruclion )Under any

Nioiuen"y aci for the time being ln iorce or rnake any conveyance or assignment of his effects or composiUon or

;d;d;Ub for ttre benent of his creditors or support so'to do, or if anyappiicatjon be ma'je under any insolvenry-acl

uG g|6 tang h forcJror the squestration oi nis estates or if a trusfdeed be executed ny him for tre benefit of hls

creoiTs i, i ^ .i::L I : Behgra company shall pass a resolulion or th6 Coud shall make an order for liquidatlon of ih affalrs,

or a recetver or managft on behaif of the bebenture holder shall be appolnted or circumstances "shall

arise whlch ontltle'the Court or debenture holden to appoint recelver or Manager 0r non fulfillment of statutory lal,

,.or

shall suffer an executjon beinq levieo on his goods anci allovl to be contjn'iaC tor a pencd of 21 oayt

lL assigns , transfers , suFlets (engagement of labour on piece work rate or i-'f labour with materials not

to be incorponled in the work shall not be deemed to be suFlettjng ), or attempts to assigns , transfer or sub-let the

Etire $/o* or any podion thereof without tlre prior written notice detennined work order either as lvhole o in'part .

ni2 The Enginea shall on such determination of the uork order have powers to

a) take position of the site an any materials, equipments, plants , implements , store, ei:. thereon and i or

b) be carry out lhe incomplete work by means at the risk and cost of the contractor.

n.1"3 On determination of the lvork order in full or in part, the Engineer shallr determinc what amount, lf any, lsremverable form he Contractor for completion of.the works or any case lhe work or pari of the urorks b not to bocompleM he hss or damage suflered by tho owner, ln determlning the amount credlt shall be glven to the ContractorJor the value of the urork executed by him up to the tin:e of cancellatjon or the value bf Contr:ctois materials to pruentso as lo record tte measurements in his presence. lf the Contractor fails to be prellnt so as to recirU memeasuremenE his preserrce . lf the Contractor fails to be present in responsd to the r.ctice.' The recording ofnpasurements reccrdd shallbe binding on the Conhactor"

24.1.3 The owner shall have the right lo use Contractor,s piant, machinery and

Materials on the balance.yt but shall not in any way be responsible for any damage oi. loss of fhe same and theconfactor shall not be entiUed to any compensatjon ther'eof.

,('ll. (-Y ')

r-'-.r /

Po-7e 17 of 21

f

{

r$ ze"i 's Any oxcess e;<pendituro incuned or to be lncunec by thc ov,ne r in ccmplc ling the ,,crks or parl of thetlork or lhe excess loss or oai"rieges t"r;.t.I iy the owne-i ,,*rrio"rfler aircvring recessary cred*s, shalr berecovered frcm any rnoney due to-u.,u conrruitor on any acoount and rf such nnoney are ir;[ sufficient, the contractorshar Le cailed upon in Mfting ro pay rheiimu ffim 30 days.

20"1'6 tf he contractor shatlfail lo pay the required sum wilhin the aforesaid oi?o 9ry=, the Engineer sha, trave rightto setr any or all the contractors un-usJo ,ii.irir.. artprrnrr, priri, mpLments, remporav o.ui;ings, etc. and appryhe proceeds of sala the.reof towaros ne'satisiriubn i,r uni ;;;i;;;'f#'the,conrractor ,ioe, rr,e ,no* order and rfhereafler there by any ba-lance stilr outGjing rrm pu go,it".irirnl.b.lmctor shafi upo] demand , pay the ownerthe money due and tt ihall ue oeemeo i o;;i;r;;y me contriitoi'to tiJo*u, and shar be recovered accordingry.20'1'7 futy sums in excess of the amounts due to lhe owner and unsold, materials, constructjonal planl etcshall be reh:mec h lhe.mntract* ; it r. affi"unoersrJ ura ir ti.,. JctJa cost of compr:iion by *re owner of thebalanco uprks or parl of ttro

'i'rcrts L tess'th#th. anr^ount y/hlch h; .ont u.to, nould ha",e becorne eliglble had hef;'Hl-'ffrf:ffff;:l* orne worri unlu]'ir,. ru*r.r*'i, *uli-N?cintractor shau nc{ be enrjtted ro craim such

n.ZA CAr\iCELt-ATtoN OF WORK ORDER By THE OWNER:n'u ff' at any tirne afler lhe cornmencement of ry* lrru owner shall decide thatlhe nholr work or any specific partbereof h not required lo be canied o''il;r;u,v rgug ,1 Guri:ili'ffi,i.n ro rhe conrra,:ror" The conbacrorshaflbe given to' lhe contraclor" nu toni".il7r'tutt truu no ciaim to arii payment of cornpensation or orheruiseffiEXffifi,',ff#l" and profit ti ,Jtt-."trg. ,aricrr- r.,e oro il :ffili in consequence or rhe rorecrosura of lhe

n22 ' ru *lTuq. supplied by the ovmer, rvhich are rendered.surprus on accc,rrnt of the canceflation,shall be retumed cromotlv-byltr: Ffuu.il;,rblr"tlrhq@l *;i;s;;il;*d under rhe wcrk crder He shalt be deblred

' uJth the hsses a'ub d uql deterloratjon o;il;;q! r.hrah ;;i;;til;; caused whre rhe mareriars were in the

,H:ffi.':*'#15,?'#i::,1trj;l;ff'ilnspon such rut*iul m tii. ownerstores ard shar be paid ror such

.ET.O.O INCOME TA,YIWORKS OONTMCT TAX:21.1"0 AI taxes and dutjes lncluding taxes on yrork contract or any other duty let.::d on the mntractor inflft y

^u wort awarded r, hil ;;;;;'thu **

",u., irr.ri[_1.",#ro paid by him"

420 lncome hx / w'c'iJ TDS deduction as oer ine6p"1s tax mtes shall be r* fory contr:.;to/s Running AccountffiffiHr?H.S#.flr*,?,fl?#,iif tfi!,tnu.ti*'.[i,,._i ]f[,n. exemprins anc docurnenraryevidence

?2:0.a SETTLEMEI OF DISPUTES :

n.21

N.1.0 OECISIONS BY THE OWNER / EI,IGINEER :221,1 To prevent diqnrrroo -^A ti.t^^,,

mmfrfiUr##Lyo-aiil,fl,llgfiXo,},itsharrbe accepred u, ,,ll1,u?rPbre parr ci rhe work orderrharh

ffi i:ffiI'-ffiifltrffi ryf *t#$,',ti','#:ffi #'f:+":+trr*,'dfi.'ffi:'iil;#;nbi.llJ}ffI,$',ffi::;1ffi[iT;l;'i*:lJ[Ti51fffi,Tilffi:l,?i,l;;;llJ:,f.H,til;AZA ARBITRAIION:

.,::t:: of .ly dispute or difference shafl arise beh,reen thp nu^o" t ^_ ,Lr:n qny rnatter within u,e.;;:r;r;',i'j.*:j1'1*n the owner ( or rhe Er tsng,neer undar,ha ^^.r.:,:lu ?f,this.work oroei.xceot 3s to rn:ruo^ ^^,,.:::iltti

on u'reir behalfJfl t-ffi ,ry.*J**q,ffiitt',ffi #d,iffi }i,1v,r;:lt?#-ry,!!;,il,'ffi";fi r}:H,xtmffiffiffii'ffi"lttj'tr'g,Iry,,i|i.fl$itr#r$l'*i::; r;]'1,,;,,ffit##m'nLffi '#'i##[:;i::sdx'['#ffi ff H[#i#,p;]iiT:g;ffiii{*i#['fu ffi trJtr

rcinnrce,o*i,*oiffi?:,H,'::1#,:;['f iffi x?tT#,rtrf;l:]J,H,,,ilffj:*:,;:,,*q$m:r*

Page tB ofDI

{qlOoitireArbitratircnsshallbefinalandbindingonbothparties, TheprocedurelaiddorvninlndianArbitr:ationActofIt9{S-and the rules made there under kom time to time itrati appty in lhe matier of the rererence. Onty murts atBhubaneswar shall have Jurisdiction to eniertain j.lii* .r for enfoicement of the award .

'n'2'2 Notwithstanding reference of any mater fcr arbitration , the coniraitor sha| continue to execute lheluort order in all respects except to the extent such execution itself is rhe iubJect rnatter of the nrbitmtion

SPECIAL CONDITIONS OF CO}.ITRACT:

]1". : !t shall bo ths responslbiilty of the Contractor to study carefully all the drawings, lnstructions etc" And,fg-n*,llfTryngT 1! obtaining cladiications, if any, in writing'uetoJ r'arung up tre voir, He shafi atso bo,HISPF_f lTura..tttat lhe trcrk ls canied out In accordince wlth l&al Byetaws triafl'respects, and to ensure $rat he,P,lajns 8q phrsanctions.Io* ,! lhe competent Local Authorities before ire takes up the'vrcr-(, tr, ai a result of his,49* i?

do so, ln spite of the raorks having been can'ied out as. perthetrawings and instruction issued by the Engineerad/or the owner, and/or ln the presence of the reprehensive(s)'of the fngineir rcwner, the Ccntraclor himself shall besdely responslble and lf so direcled, dismanue and reconstnrit at his oft cosiinu *b,r,nt*i;);;; as per suchdrections" No ciaims in lhis regard wilt be entertained.

?. lt shatl be ihe sole responsibility of the Contractor to ensure all safety rneasures giving proper priorrytice 9tc. And obtaining prior pennission from concerned local authorities as per Byelaws or directions issued by lhem,a[ at his own cosl. No clalm of the contractor in these regards shall be entertained,

3, It shall be the responsibility of the Contractor to submit sample and obtain prior approval of theEngineer ln respect of all rnateriais, filtings and fixlures and any other items as declded by thc Engine*" One suchapproved sample of each shall be ltept wilh the Engineer and at site for future reference,

d Anyrrnateriai/rtenlfltllng/fixiures rejected by the Engineer shall be rernoved k:m the site within 4gleurs of issue of instr0ctions, ls thp effect by the Engineer. Faifing tiris, the Engineer r-i,rfi f.1uuu rn* rlshb ro get theses lefiEr/ed al SrE contrmto/s cost and the Contractor shall have no claim whatever in this reoard.

,,i ; lt shafi F_tt,,1{tre resqoryibiliry:of the confaetor to initiate acfion weu'in time with regard toextra/subst luted items before takjirg up such ilems." The saine shall apply to ltems wtrich havo devlated as fu t ehrms of lhe rcrlr order mntractor failurl in thls regard shatl be enureiy ai Urii **, risk and cosl

I i -Canyrng outlaking gf loint measurements alongwith the owner's i'epresontail,.,',: and/or getgng lhameasurements of the larious ltems lncluded ln any bill shall be the sole responslbility oi,the contr:tors" Failure ti getsuch rneasurernents verified..may entail non payments for such items for vrtrich the contraclor hiriself shall be so[[aspornible and so also for atl consequences following three from.

A prcgranrne of uork shall be submitted by the Contractor as per the given prcicrma" The agreeCslull fonn a part of the vrnrk order.

The conlractor shall adhere to the programme ln its detail" An modification to this rha[ be subj.mt thef -or

he Engineer'ln+harge' lntermediate bilis r"rirri u* raised upon compreuon oisi;;;;i,,.#'#,i& on n,prwralrune.

Labour hutmenl shall be located on fie area demarcaled on lhe site plan or as direr:ied by Engineer.

rt is essentjal that ttre works site be kep(in an-oderly and neat mannei- at a[ finss," stacking of,ffinffiilr$j*'fi1|!:,,Tf:,,;l?"r::y:flj* f.t!+i,-li,,Jii"idij,ppenr erc., sha, be rree rromand easv ro survev and rnspecL'n e'engin-;,s ;ilffi;th#;ilfi!'iiri:ilffiillfll;.]XiH [?f[maintenance of the works site at tir,i'conil-.i;" cosr, !n dr; rh;;;tractor fals ro compli with the

steel schedules" The rolling margin dd.,-*rirliJreo to bs rilri;d;'ihe wastage and as ru.n n. separare

",'

II:

!i

Pege i9 afEl

ail6larce in respect of rolling margin etc' considereci lo be included in the vrastage and as s,,:h no -qeparate allowancein resFctof rolling rnargin, eic., shiil ue attorveJ"-'-e 'v ve 'rrurvuw rrr urq y

12' I the contractor fails lo complete tlre vacrl</ltem of rvorks in all respects anci hands over the same tohe s\'u*r witlrln lhe stlpulated ume of compi'etion as per work order the mnrractor shalr pa.r to the owner riqurdateddamages at lhe rate or i'zo or ne totr *rri.ii.i uarue 6i every"*iir'rri,rrl to rnax bf fit%.- ' "- -'-

,

,3. Hrr_r,Hf,hurr.

sAFEw, sEcuRrry AND oTuER LEGALt,

14'1 fie contraclor shall take all safety-pr-ecaulions and provide adEuate superuision by compelentI persons h oder to do lhe Job safely and *iil,ouiu.*ugs to plant, puoonnli, uqripment" and rhe environmenl

.t4{ ^*g -qq P$ order"document and iob instructions from contracting department, ntrere theconlraclcr wiil be further briefed and sarery rure book wi[ b- hil;";rer to the contractoi and exprained. Tho

i*n* T not permitted to start the iob vrluiouireporting to Flre & safety Department and obtaining unitten induction.

i14'3 i The owner would lake necessary shut downs wherever llul: ulu hazards of gases , eiectricrty,novrng machinery etc' The "onttactoiir",aiiunrra $,ut the shut downiiur*n.u is taken in writing before sendinghorlers b suctr locations"'14'4

*t tllT:lr shall"supply safety appliances tike shoes, iadies chappals, helnets, gloves etc, to his .v,rorkens before sendinE vrorkers conditions"ai ,ortrLo'uyFi,effi#til;p?rmenr ,

l4'5 ln sF'mific jobs' the owner may supplyspecialsafety appliances Jike, Acid lroof clothing, rubbersloves ' fe shields, goggb! roi wc*inf on'r.io rin*, gas masMrespir:atii, sarery bplts, gum'hots ln sorns casos,ffi,P,ffife##ffiH,,ffi#j#JX?13frry,,f:ffiffiffiiii'i6i;,,extraor'*re'ait .r6iioinuE,riffii L:,

14.8departmenI

14.?

tha LO.WForms"

14.8

It wfll bs he contraclols responsibitity lo bonow the specillc ltems as stat::fl 35eys from safety

ln case ofinjury !o persons, the contraclor I:l5]ljTt_trlr rhe injured person ro ptanr Medtcar Unft withtn no case, rhe con'rractor rj ,rro',*c'io tar," iffi,ffi;ffi;o,:[ji;*,:rfif|:ji,{lilJ$.f,.i1y,1,::

ffi.ffiffi:i*l'JT"1 ol},:mfs:: ?llTl?1.: Acr, orissa Facrories Rures, workmen,s

ffi ffiHp"*,::g:l*,:ly^,rli;6",ffi i"[H[;dl]:il;;tf;. Act etc. and keep lhe princtpal ownerMemnified of provhibni or nrb auove"f, d ft ;kjJj

I

14.9II

i

i 11.10

t4'Y : ln case lhe ourner observe that the conlractor is nol perfonning satisfactorily to the supulated safetv

iffiff+?:#'mtm:.1;*ll;,r'n'll,*l[:ii:ffi,Tt:rq,e*'rerJerecrvdiscrep,ncre!g,ffi # ffi f ctor sh a,, ;i ;;il;'ilH il"#,ffif il: HHffi: f #tr#ffi#q,il- J;f

.Jfl$ffiiillffi 'f'

iffi** *"#l$Hfftrl}Xfillfir"jtrnsibre ror accidenrs .urr?-c.9_y* ro his or his ,:ren* or workmen,s.rmmpensationforiniuries."-- te urq o0seruance of lhe safety requirements and rinil-ilu liablo to pay

!+,!t For viotr

[gr. vrorgp n Td'fi ,' h[:ffi $:,rf# ! #ff1 i:,

th e ccr n rrac ror s h a I hdebanedfr ,,,fr;ff #,;;;,ceupra;ffi H.TJx:?ilhifl;*,#j,#,t.J[fl

d:'ffi f#i:fi#ffi;TH

mgu "i,**

f T"J#[,1i i;r*ifffl i il'ry :iI i Hl.x'#' dil, ;"' :'r e n a wa,, n e,, e##;; #:id":ff;nsioerrne irre,c,;;;.;n:i;,;,'[...;ffi13llu,X,,rx**:,:t*ii.[:,,!fl,,,,iffii

--'F'r e'|v uqure Srom Dy he contmctor, if any, tn. ,.rifi'rt"t*'rr,.;i,rrirr*, r**

Page 2O of pl

' . .'. S',fr;J*ffit"7,3g;f:;lllm m^Ifi::?ffifl Jffi,v amounr sha, be reco,re;.abre r.c,n any bi, andror., ia.ta ly'lhan:,,".: ^." ,. .'

'rrrrivur drly rumer reierence' ':.wr"iidu' fr'*Ffifi H,.#?l3',tr

trhft :?f :LH,H?',# ;rij#:3f,i.?J",'#*H:ilrrx5&r,ffJ,ffi*,' 14.14 n

r4.is u ]u

*n*oormusllnsuro all the uorkmon agarnst uorlmen,s compensation Act.

;:r_ 0,,, o,_,1

".H,la ffi ';ff l,:fi ;: J 5,ifl :f ?,Hlfl? [ #r#ffi ,_11

rfi ,.3y,1li,;p3,v cases,h e

r;lffi il*ffi*Nff#ffi f ',rumr;t:#*fitru,ti-it-*i,exfu m$I#, 14.1v Afl r

I*pr**oraosG" typq of vehlcle operators (orivericreanerl rf r,qnrrr*x .,-.n .:

i*tqofabva" 'r-l v' 'urIt'rt' operabrs (Drive/cleaner) lf requrred wiil be suojected b ,rrrough check h

#mrm*H#Hff:,#lfi.1rilr rrrr,,I,rq*.,,*

fl

mmmr'*mmrmfi,,mrug;mcrrcunEfances,

Jlfl ,**; *T'I*ffL,l,'$ ffi ffi i,,i?##.f :[H glf*n,tru*lg n *ru ilil." J ] :

flp' *"* fffnr#,frffil',,fJ'trf; ffi5",

o' *o *o't order duiv srsned and sea'ied as a ioken or accepranes

I2

It

tI{j

II

II

Fage pI of zl

Tecirn ic;r I S pecific_a tio nCivil rvork

Earth lVork:-

Excavation for kenches over area.s and for pits etc shall be done towid*6, lines and levels as show-n in d.rawing or to ,ril, l"r..r or greater widthslines and leveis as directed" During the excavation the confractor shall takenecessary precaution to retain earth.

Filling:

Filling under floors or other places indicated shall be done with approvedrraterial obtained from excavation or approved materials brought from outsideby the contactor. The material should tL good quaiiry. Fillinglhail be done inlayers not exbeeding 30cm thick and each liyer shal bL waterJd. adequately andconsolidated properly by I to L0 tones power rollers.)'PilIing;

The concrele for pi-le r,vork shall be conkolled as per specification f,or thecement concrete and of grade speci-fied on the drawings. Tire reinforcement forpiling work be as per specification for the steel reirrfoicement Thereinforcement sha-ll be fabricated as shown in the dralving:r, placed, inside thebore holes and maintained in position. Bentonite as per supnlied to the site andprior to mixing a.s per specification.

Under Reamed piles:'

Under Reamed piles shall be in accordance with the relevant prol,isions of152911' The ciameter of the under reamed bulb shall be 2.5 tirnes rhe diameter ofthe pile stem"

Concrete & Reinjorced concrete:

Concrete & Reinforced concrete lvork shall be_carrircl out generully ir,conformity with the latest Lndian standards IS : 456 except for provisio'sindicated ' Al] work is to be carried out with urmost preci.:ion and up to date;S:HJ ff:tH,TL1':::".a c tor s halr e mp 1 ov tht ro u : :l'Lt r,' c o- *',enr s rarr

I:

i

I11t-t

f,J,

c

Cemeni:

Cemenl for the work shall be ordinary Portland ceme,:i corJorming to theIatest Indian standard IS :269 and best normai setting ui' ,ess a quick seltingqualify expressly instructed in the specifications.

Sand :

Fine aggregale shall generally conform to latest trndian standards ( IS : 383)Sand shail be naturaL sand crushed gravel sand or crushe,l stone sand at thediscretion of the contractor" Use of sea sand is prohibited.

Aggregate:

Aggregate shall be stock piied properly and separa',:i), on the basis ofgradation. Aggregates shaii be ciean and shali not contai;:l rnv foreign matter,silt, loose or desfuctive substance , harrnJul chemicals etc.

Water:

Water all the concrete work shall be clean , freesuch as oiis, acids, alkaline, sugar and vegetable matterprovided by conkactor.

Testing:

Cube testing in concrete & reirr.forcecl concrete as per I

A set of cubes on every day of concreting. The decision of th,in this regard shall be iinal & binding.

Brick Masonrlr:

A11 bricks sirall be table molded brunt bricks of firstshall be hard sound and rvell brr- nt *ith sharp edges and c.

shapes . When immersed in water f.or 24 hours , brick shwater than20% of its dry weight. Brick shail be soaked in cl,six hours in a vat before us. All joint shail be flashed r.coarse"

I(einjorcement :

l.n.

, V\I,

. deleterious matterlei storage facilities

re indian standard .

Engineer in charge

;lass qualig "Theyuniform sizes and

il not absorb more1r rvater for at leastth mortar at ever]

A11 N{S reinJorcemenl for concrete rvork shall corJi:'i.:: ;:iiciii, to tire lalestIndian sfandard (IS:.132-parr1&lI), High ),ield skength.-iei; ,reJ C RiUt-,ua fo,

steel of coid rr,visted steel for reinforcement shall be of iest,conjirm to the relevant Indian standarci(trs: 17g6). Thereinforcement wiII be measured and paid for according to ballor.r,ance for cutting , r.,r,astage, binding ,,r,ire etc" Reir^assembied in place u,ith proper concrete co'er l-rlocks tc s"requireci.

DPC:

Damp proof course sl-lall be provided over all ra,alls a.for damp proof course shall be of M-15 grade" An iniercompound shall be provided in the concrefe in the proporiicproofing compounds also for shuttering required.

Wood work:

d quaiity and shallcntractors rate forrnding lists without'orcement shall bei various co\:ers as

.; directed. Concreteral r,r,ater proofingr specified by water

Doors, tvindows &rber should be free'efects" The surface

dort,n towards the're plastering as thend h.ue surface" ail'r horizontal as lhe'e iinished to a hrueis required. Curing

r l:6 ( tr cement :6

ed brick masonryver necessary withrgineer.

1 cement :5 coarseding provision of

Unless otherwise speci-fied a1l timber for frames forventilators should be best Qualiq, Sall piasal r.r,ood. The ti:from knots ,shakes, Fissures, fla.urrs, sub cracks ancl other ,

should bb smoothen free from biemishes and discoloratior.Ls.

Cement plastering ( Internal & Externai)

Piastering shall be started tron-l the Top and rvorkeefloor. AII out log holes shall b properly filled in acivance of ,

scaffolding is being taken dor.r,n. To ensure even tr-r-ici<nesscomers arises, angles and jr_rnctions shall Lre rruly verticalcase may be and shall be carefulll, finished" The piaster shalland plumed surface and to the proper degree of smootirnessshall be started 24 hours a-fter finished thellaster.

In out side Providing 20 mm. thick cernent piaster in moricoarse sand ) in fwo layers ( 1,st iayer 12 mm thick ) on expc,or concrete surface, including provision of groove \r,r-rer,water proffing cebex compound , curing as direlted b1, site ,:

hi9: Pro,iding 12 mm. t^ick ceme.t plaster in mortar 1 :6sand ) exposed brick rrrison:-), or concrete surface, incl,groove i,vherever necessary. curing as directed b' site engi;

Flastic emulsion Paini :

Providing & applying h.r,o coats of plasLic ernuision :ai;it of approved

make/sh-ade i.*la* s=urfuces Nc gil"e a smootl-, and er"e ' shade i'ncluding

cleaning and preparation of surfaces as Per ciirection of enc reer-in-charge"

Weather shield painting :

Providing & applying rwo coat oI i{eatirer shieid paint

outside Jurfaces to give a smooth and even shade incl

preparation of surfaces as per direclion of engineer-in-char

Cement paint:

CementPaintsha]lbeofapprovedbrandandmanufa.shall be mixed in water. Cernent paint shail be mixed in suc

used arl hour of its mixing . The second coat shaii be appiic

has been set at least 24 hours" For new -work tire surface s

three or more coats for uniJorm shade'

Painting on Wood surface & steei tvorl<:

The wood work to be painted shaltr be dry and free

surface treated for knotting shall be dry before painting i

primering coat is applied the troles and indentation on i

itoppua I"itfl glazet Putty or rvood Putiy respectualtrr""

enamel paint shall be aPPIied.

Scarping the old surface

Chipping/scraping the existing wall surface and remove

cleaning the wall and ceiling surface with r'vire brush vvith ;

compiete as per direction of engrneer-in-charge.

RooI terracing

Chipping/scraping the existing roof area and remove the rand cleaning the Roof surface with wire brush and la1,in1'

concrete (1.:2:4) on roof slab including reinforcementf Gtr r.rwith 12 mm & down graded size black harci granite chips r:

applying Roof treafment wiiir elastomeric cementious r.r,;

with applying brushbond RFX (FCSI{CC) to the exiChipping/scrapping the surface and cieaning prooerli, n'itl:

:f approl,ed shade

'ding cleaning ande"

iurer" Cement Painti quantity as can be

i after the first coatrall be treated with

ironl moisfure. Theapplied. After the

re surface shall be

.fter prin'lering the

l"re old plaster andI labour, masonary

C graded rnaterials4cm tl-r,ick grading'e standard qualiryproper level. Then

:rproofing coating,ing surface in,ith

Siring proper iabel

to having proper. gradient and giving..101,ear-s guaranteecomplete ar-r mareriai, Iabor-rr;;:. ,:;", dire*ion of engineerCeramic floor tile fixing

, or . h,a f er proofing

rr-cllarge.

Providing and laying antiskid ceramic Floor ti.re { 1,x1,) of :,pproved shade and' make of somani,rN;".u;7I;;*o" brand ou., rz**. iru.t ,iJ*u,.t mortar bedincluding fixing lweling ,i-,.lrrr^..^li;:-;.g rt.ith ra,i_rif,. cemenr and corouradmixfure ur p.. directi"on of Engrr-r..r-in-chargu.'

tr'"n r't'rrii' ceme

Vih-ified floor tiie fixing

Providing and raying vih-ified F.roor tile (2,x2,) o'er 12mm. t,.,,ck Cement mortarbed inctudrrqS:lf iu""ii;; rl:,::-.r^*.r.,a,joinfing witJ, *,hire cement andcolour admixfure etc. I'ompiete of a jpro,,ed sha -reand make ofJol'rs o n/ so m ani / N a r, " "

r, b.li., o ; ;, o",. " "

u5,l i f E n g i. e e r. i n _c r r a r ge .

WaII puriy

Providin! & apprying two coats of cernent base r'au purry ,r BIRLA/JK brand*L*"ffi.*;':W"S:T**'fr*"-ffi*t;;,*'L,,i.olll!'*,hins,oRepair the existing damaged R"C"C surface

Repair of Existing Rusted/dan'raged ll.c.c surface like chaji i, fins, v*indow sillerc with FosRoC(Nitobond i'nn] *u .o-.roJ,.". .o,r-,por nd and finish thesurface with Cement concrete and prastered in to give smoofl;

!ffr'r- false ceiiing and cornice

ft:ffift"ffi%fli:d*se ceiring with a grid or ceiring secrion and,'}-tl ryf:."*-."itir,g u.i*alrri

tB section'and perimeter anct ,,.i"f ,r,. 12.5rnrrujoint and rirusrring {. ';;;;ffiT:ffi ;:i t"jlf"'virh.pap :r

"p"' i" rinish the

lljil#',}H#f:::anc'xinf 'o j'iuu."tutl.ru.uri;,l*i-tffi '.-"':^',**.1:il**h"si""?r-;]cffi;j]"" to g-ive a smooth u ,rr,iro,ii cresign ls per ai.".tio., or

Window blinds

i:lo,rlg-c rixing briades wirh zsnzr mm thickwirh ,iecha*sr*;;;Ur* wide rvith fabr,^_, ,

as per rhe dire*i:T#J ated in n head rail

Public health rvorkGI Pipe:-

supplying a1I materiars, Iabour, toors and prants & frlting and fixing thefollowing norninal bore Gl pipe(rnedium grade)'to walls rrr ceiling and floorwith required heavy qualiry GI'fifting inciuding crrti.,g rr e pipes t requiredIengths and tfueading-of pip.r ana rria*.g goJa du*ugu rrl c.mplete as perspecification,in ll floors ^r,d

ur heights, .o*!tE,* u, pu, crirer:ion of EIC.

Orissa Pattern pan :-

Supplying all materials, iabour, toois and plants & fitting& fixing water cioset'squirting Pan ( Indian ['pe wC pan) duly embedcled in cerirent concrete ]^:5:10(using hard granite metal 4cm nominal size altr comprete ,rs per specificationincluding earth work etc complete as per direction of Elil \4,,5ite

'ictoriouschaina squatting pan ( orissa paitern) sizs5g0rnmx440mm

Cistern ( L0 Itr capacity)

. Su3-fl2'ing a-ll materiai, labour, tools & plant& fixing lndian make lgltrscapacify PVC ,LL cistern with flush bend of required lenfr & pair oi r:ractetswith other necessary fittings with suppryi.g 1s;',, dia tr\rc connecrion pipe ofrequired lengttr of best q"alty,*oodur,"plris, screws & cem,rnt etc, all compieteas per specification &,as per direction of EIC.

.L'! L!s/ qr \

Wash Basin

Supplying aII material tr, Iabour,tools & plants ,fittingwith hole for pillar tap with casi iron Brackets painted r.r,hihotes in rt alls & making guoaill-aamages .r. ii.ur.,_,pJereand as per direction of 'rrl"

crur.a victorious china flat b.,single rap hole 550mmx400;;;;;"

Towel rail :-

suppiying ali materiars , rabour,-toors ,piants for iirtin ; & fixing Cp brasstowel rail complete rvith cr b.u* uracket rixea to 1^]ooa.n i.rugs *,ith Cp brass:il'JrTl#;ffi"fiffiT" on*u, per direciion or Bic. sta: ,rels sreer ro*,el rai_r

': fixing Wash basin.-- including cufhingas per specification:k u'ash basin with

Cp brass kap:-Providing & fixing CF brass trap for n,ashbasin a::d Sink. Should be

40mm dia

Pillar tap :-

Providing & flxing Cp brass close hoie basin m;,:Lure pillar tap ofaPProved qualify & made ,weighing not less then 1.970 kg.15mrn dia nominalbore of standard back type.

Mirror:-

Providing & fixing 600x450mm bevelecl edge mirror ,,f superior glass (ofapproved qualiry) rvith 6mm thick harcl board ground fix.rl lo rvooden cieatswith cp brass screw & vt'asher including coat of lri..o, cost. Cp screl\,, rt oodenplug, plyvvood, seat & rubber buffer etc Jomplete.

ElecLrical Items:-

Switches & plug sockets:-

All switches, 5A plug sockets, power plug sockets an,i telephone socketsshall be flush *o-l.tit g rype wlth ISI mark. The lu,itches dri,i piuj ro.t u,, inu[corrform ro IS:39il /tg1g,ls:6539/7g71,etrs 4615/1,g6g. solicl itutl stepped andflush mountain fype fan regulators shalj be used"

Wires:-

The wires usecl for internal elechical shall be of single core pvC insuiated650/1'1'00v grade standard copper conduct wires (suitabr* cotrors coded todistinguish different phases ani'neut al)with trsl mark" Th r u,ires conforrn tols:694(p*t-1&part-27foo+'n'tu *ju*,rm cross sectionar arr r of conductors forthe different uses shall be u, ,pu.if*d bellor,r,:

Iil Llqllrpointu,iring "i;;q

",*\u/ l-otver point.r+,iring 2.5 sq. mrn(c) Hf€V Lurn.(d) circ,it *iri:I"t 1"5 sq' rnm

/lrmg 4"0 sq. mm

l

I

i

-"1

I

I

PVC conduit and Accessori.es:

AU PVC conduit shall conform to13:3419/1,965.The conduits may be eitherthe cor.responding accessories.

Metal B oxes(Switch board):

IS:2509/1963 anci iheir accessories tothreaded type anci shail be used with

Meta] boxes for switch board shall be made of N,l I sheet and roundjunction boxes shall be rnade of cast iron. The mi.nimum r. "rll thickness of MS'bo*es

shatl be 1.5mm and cast lron boxes shali be of 3mrn."r' itr metal boxes shal'l

be provided with a cover of Bakelite sheet not less than 3mi r thick, fastened to

the box with screw and washer. The boxer shali be painted 'roth inside and outside. The foiiowing box sizes of MS board shall be used:

Length100mm100mn-r

150mm200mm

' 250mm300mm450mm

BreadthL00 mm100 mrnL0Omml"5Ornm20Omm250mrn300mm

Hc-[:'t!50m r65m r65m.r65rn r

55m',r65m,,165nl r

Miniature circuit Bre akers (MCB)

The miniature circuit breakers of approved nrake shal be ISI marked and

fu]ly automatic with provision of thermal and magnetic trip',ring arrangements.

A11 MCB shalt be of minimum 9KA short circuit ratin.l and conJorm tolS:8828 / 7993 &BS :38 71 .

Changeover switches :

The change over switches shall be load break Vpes I rving three distinctposition of operation. The ON and OFF position of the srt' lch shail be cleariyindicated. The door interlock with defeat mechanism sl'r; I be provided forswitch units conformingls:8623/79V7. The changeover su.itc es shail conform lo15.4064/1978 and IEC:408 and bear ISI mark. '

Exhaust fans:

The exhaust fans shall be suitable for operation on slngle phase 230VSaHZ supply' The fan shall consist of ail stanclarcl accessor, :s such as impeller

b]ade, fixing frames, capacitors, anti vibration pacls etc. Thshali be continuous rated fotaily enciosed rvith couble ball Lrc

exi'laust fan motor.*;-^

r rl (5.

Portions of wiringai point wiring:

Point rviring are consist of a switch on the boarc and u,iring up toterrnination point via the conkoi and neukal. Wiring for I .3trt points and fanpoints shall be carried out rvith minirnum 1.5 sq. mm. copp", .o.,dr.tor u,ire. Altrlength of points shall be consictered as one point. Tire r,,,.irin; rvhether eoncealedor surface shall be easily accessible for inspecLion. Por.ve: and Heating sub-circuits shall be kept separate and distinct from lighting and , rn sub-circuits. Thelalancing of circuits in tfuee phase i-nstallario* ln* b" u.rl.,ged before hanC.Mu$l* voltage wiring and associated appararus shall cor-rpl1, ,in all respectwith the requirements of rules 50, 51 and 61 of Indian Electric'rry Rules,1956.

(u) Light points(lncande4sceni)(4'fluorescent tubes)(2'fluorescent tubes)

(b) Ceiliag fan pints(c) Exhaust fan points(d) 5Arnp piug points(e) 15Amp plug points

60 n'atts-10 rvatts20 r,l'atts

80 u,aits100 iva bts

1.00 n'a.bts

1000 u,atts

2"130m1.300m0.300m

2.VSAm

2.600rn

0.300m

UnJess and othenrrise specified the follort,ing n-,inin-rum ,rounting height ofthe bottom most part of the fitt'ings and fixtures h"orn fini". ed flooileveishal.Ibe maintained.

(a) Branch distribution boards(b) Svyitch Board(c) 5A&15A plug on separate board.(d) Ceiling fan(e) Light fitrings(0 Telephone outiets

Circuit wiring:

.Circuits wiring shall mean wiringslvitch boards" The minimurn size of2.5sq"mm copper. A circuit shall notplugs"