Edlavitch Jewish Community Center WASHINGTION, DC Board of Zoning Adjustment (BZA) Presentation 12.04.2017 Board of Zoning Adjustment District of Columbia Case No. 19687 10A1 Board of Zoning Adjustment District of Columbia CASE NO.19687 EXHIBIT NO.10A1 Board of Zoning Adjustment District of Columbia Case No. 19687 10 Board of Zoning Adjustment District of Columbia CASE NO.19687 EXHIBIT NO.10 Board of Zoning Adjustment District of Columbia Case No. 19687 10 Board of Zoning Adjustment District of Columbia CASE NO.19687 EXHIBIT NO.10

Upload: khangminh22

Post on 28-Jan-2023

0 views

Category:

Documents


0 download

TRANSCRIPT

Edlavitch Jewish Community Center

Historic Preservation Review Board

(HPRB) Presentation

WASHINGTION, DC

11.06.2017

Board of Zoning Adjustment(BZA) Presentation

12.04.2017

Board of Zoning AdjustmentDistrict of Columbia

Case No. 1968710A1

Board of Zoning AdjustmentDistrict of ColumbiaCASE NO.19687

EXHIBIT NO.10A1

Board of Zoning AdjustmentDistrict of Columbia

Case No. 1968710

Board of Zoning AdjustmentDistrict of ColumbiaCASE NO.19687EXHIBIT NO.10

Board of Zoning AdjustmentDistrict of Columbia

Case No. 1968710

Board of Zoning AdjustmentDistrict of ColumbiaCASE NO.19687EXHIBIT NO.10

Edlavitch Jewish Community Center

11.06.2017PROJECT SUMMARY AND SITE LOCATIONHPRB-02

PROJECT SUMMARY

The Washington DC Jewish Community Center first opened in 1926, and has since then undergone renovations and incorporated an addition on the Eastern portion of its site.

The goals of the Edlavitch JCC are to preserve and strengthen Jewish identity, heritage, tradition and values through a variety of social, cultural, recreational, and educational programs and services. The center accomplishes these goals in ways that reflect the unique location and role of the center in the nation's capital, and the many contributions of the American Jewish community in the United States.

The aim of this project is to improve the JCC member experience, retain and enhance the historic character, improve circulation and flexibility through the interior, promote efficient use of space and resources, and improve the safety and security of the children and students. The new JCC hosts an expanded arts and early childhood program, and appeals to a new generation of members through updated systems, new spaces, improved technology, enhanced security and refreshed finishes throughout.

CURRENT PHOTO OF EDLAVITCH DC JEWISH COMMUNITY CENTER

TAKEN FROM THE INTERSECTION OF 16TH STREET & Q. STREET

SITE CONTEXT MAP

THE SITE IS LOCATED IN THE NORTHWEST QUADRANT WITHIN THE DISTRICT, NORTH OF SCOTT CIRCLE AND BETWEEN DUPONT AND LOGAN CIRCLES.

DUPONT

CIRCLE

LOGAN

CIRCLE

RHODE ISLAND AVE. N

WMASSACHUSETTS AVE. NW

Q STREET NW

16T

H S

TR

EE

T N

W

BZA-02 12.04.2017

Edlavitch Jewish Community Center

11.06.2017HISTORIC AND EXISTING PHOTOS - EXTERIORHPRB-03BZA-03 12.04.2017

Edlavitch Jewish Community Center

11.06.2017AERIAL SITE PHOTOHPRB-04

AERIAL PHOTO COURTESY OF GOOGLE MAPS

NOT TO SCALE

PROJECT

NORTH

TRUE

NORTH

B A C

D

E

F

BZA-04 12.04.2017

Edlavitch Jewish Community Center

11.06.2017SITE CONTEXT PHOTOSHPRB-05

B C A

F E D

BZA-05 12.04.2017

UP

MU-15

35' -

5"

48' -

3"

MU-15

RA-8

RA-8

EXISTING BUILDING

14,290 GSF

EXISTING ROWHOUSE

EX

IST

ING

RO

WH

OU

SE

STAIR TO BE REMOVED FOR PROPOSED STAIR &

ELEVATOR ADDITION

19 PARKING

SPOTS

Q STREET NW

16th

ST

RE

ET

NW

ALLEY

EXISTING GUARD HOUSE

& SECURITY GATE

18' - 0" 16' - 0".20' - 0"

EXISTING WASTE

COLLECTORS

UP

UP

UP

UP

UP UP

UP

UP

COMPACTSTANDARD

PL

AY

GR

OU

ND

Edlavitch Jewish Community Center

11.06.2017EXISTING SITE PLANHPRB-06

PROJECT

NORTH

TRUE

NORTH

BZA-06 12.04.2017

EXISTING ROWHOUSE

EX

IST

ING

RO

WH

OU

SE

EXISTING BUILDINGWITH PROPOSED RENOVATION

14,650 GSF

PROPOSED STAIR & ELEVATOR ADDITION

19 PARKING SPOTS

MU-15

MU-15

RA-8

RA-8

Q STREET NW

16th

ST

RE

ET

NW

ALLEY

COMPACT

EXISTING WASTE

COLLECTORS

DN

UP

DN

UP

DN

DN

DN

UP

UPDN

UP

UP

UP

UP

UP UP

UP

UP

UP

STANDARD

18' - 0" 20' - 0" 16' - 0"

22' -

10"

39' -

11"

BHMP(82'-0")

EQ

EQ

PLA

YG

RO

UN

D

35' - 0"* 35' OFFSET GRANTED UNDER SECTION 2514.2 OF THE

1958 ZONING REGULATIONS PER BZA ORDER NO. 15493

Edlavitch Jewish Community Center

11.06.2017PROPOSED SITE PLANHPRB-07

PROJECT

NORTH

TRUE

NORTH

BZA-07 12.04.2017

UP

DNUP

EXISTING

ROWHOUSE

CONTROL

DESK

UNEXCAVATED

SPACE

WOMEN'S

LOCKER

ROOM

MEN'S

LOCKER

ROOM

STORAGEMECHANICAL

ROOM

POOL

EQUIPMENT

SWIMMING

POOL

ELEVATOR

MACHINE

ROOM

SAUNA

SAUNA

VESTIBULE

AQUATIC

DIRECTOR'S

OFFICE

MULTI-PURPOSE

ROOM

PROGRAM

ADMIN

BUILDING SERVICES

FITNESS

JANITOR

WATER

METER

UP

MECH

VESTIBULE VESTIBULE

Edlavitch Jewish Community Center

11.06.2017LOWER LEVEL FLOOR PLAN - EXISTINGHPRB-08

SCALE : 1/16" = 1'-0"

16'8' 32' 48'0'

PROJECT

NORTH

TRUE

NORTH

BZA-08 12.04.2017

MENS

LOCKER

ROOM

WOMENS

LOCKER

ROOM

SAUNA

SAUNA

AQUATIC DIR.

OFFICE

FOYER

ELEV

MACHINE

ROOM

FAMILY

TOILET

STORAGE

MULTI-PURPOSE

ROOM

STORAGE

LAUNDRY /

STORAGE

OFFICE

AEROBICS

FITNESS

STUDIO

CIRCUIT MACHINES

FREE WEIGHTS /

MACHINES

CUBBIES /

TOWELS

JANITOR

MECH

POOL

EQUIPMENT

MECHANICAL

FITNESS

RECEPTION

UP

UP

DNUP

UPUP

MECH

STOR.

SWIMMING

POOL EXISTING

ROWHOUSE

PROGRAM

ADMIN

ARTS AND ENTERTAINMENT

BUILDING SERVICES

FITNESS

WATER

METER ELECTRICAL

EXISTING AREAWAY

VEST.

VEST.

VEST.

ELEV

MACHINE

ROOMMECH

DN

Edlavitch Jewish Community Center

11.06.2017LOWER LEVEL FLOOR PLAN - PROPOSEDHPRB-09

SCALE : 1/16" = 1'-0"

16'8' 32' 48'0'

PROJECT

NORTH

TRUE

NORTH

BZA-09 12.04.2017

UP

DN

DN

DN

UP

OPEN TO GYM

BELOW

UP

SOCIAL HALL

CATERING

ROOMOFFICEGIFT SHOP

STORAGE

ELEC.

GALLERY

CLASSROOM /

LIBRARY

CLASSROOM

CANTEEN

OFFICE

TEL / ELEC

WOMENS

MENSJAN.

MECH.

CLOSET

STO

CLO

PROGRAM

ADMIN

BUILDING SERVICES

COMMUNITY

LOBBY

LOBBY

STAIR TO BE REMOVED FOR PROPOSED STAIR &

ELEVATOR ADDITION

UP

UP

UP

UP

UP UP

UP

UP

UP

EXISTING

ROWHOUSE

MECH

CONFERENCECE

Edlavitch Jewish Community Center

11.06.2017FIRST FLOOR PLAN - EXISTINGHPRB-10

SCALE : 1/16" = 1'-0"

16'8' 32' 48'0'

PROJECT

NORTH

TRUE

NORTH

BZA-10 12.04.2017

SOCIAL HALL

SECURITY

OFFICE

MEETING

ROOM

192 SF

KITCHEN

WOMEN

MEN

TELE / ELEC

CONTROL BOOTH

ELECTRICAL

ROOM

GYM

STAIR

DNUP

DN

UP

DN

DN

DN

UP

OPEN TO BELOW

MECH

MECH

ENTRANCE

VESTIBULE

CATERING

ROOM

STORAGE

UP

CLOSET

PROGRAM

ADMIN

ARTS AND ENTERTAINMENT

BUILDING SERVICES

COMMUNITY

PROPOSED STAIR & ELEVATOR ADDITION.

UP

UP

UP

UP UP

UP

UP

UP

UP

LIBRARY /

COMMUNITY

ROOM

LOBBY

RECEPTION

EXISTING

ROWHOUSE

BREAK OUT

STAIR 7

MECH

TICKET

OFFICE

OFFICE

MEMBERSHIP

OFFICE

PL

AY

GR

OU

ND

UNI-SEX

RESTROOM

Edlavitch Jewish Community Center

11.06.2017FIRST FLOOR PLAN - PROPOSEDHPRB-11

SCALE : 1/16" = 1'-0"

16'8' 32' 48'0'

PROJECT

NORTH

TRUE

NORTH

BZA-11 12.04.2017

UP

DN

FOYER

DN

UP UPDN

DN

UP

DN

DN

UP

UP

UP

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

PLATFORM

STOR.

STORAGE

MENS

DRESSING

ROOMTOILETTOILET

WOMENS

DRESSING

ROOMWOMENS

TICKET

OFFICEOFFICE

OFFICEOFFICE

STOR.

JAN.TOILET

STOR.ALCOVE

TOILETS

DIRECTOR

STOR.

STOR.

TOILETS

STOR.

STOR.

PROGRAM

ADMIN

ARTS AND ENTERTAINMENT

BUILDING SERVICES

ECYF

AUDITORIUM

SEATING

LOWER LEVEL

16TH STREET

FOYER

JAN.

STAIR TO BE REMOVED FOR PROPOSED STAIR &

ELEVATOR ADDITION

EXISTING

ROWHOUSE

STORAGE

MECH

TELE/ELEC

Edlavitch Jewish Community Center

11.06.2017SECOND FLOOR PLAN - EXISTINGHPRB-12

SCALE : 1/16" = 1'-0"

16'8' 32' 48'0'

PROJECT

NORTH

TRUE

NORTH

BZA-12 12.04.2017

UP

DN

UPDN

WOMEN

OFFICE

OFFICE

16TH STREET

FOYER

STORAGE

WOMENS

DRESSING

ROOM

MENS

DRESSING

ROOM

PLATFORM

STORAGE

SCHOOL

COMMONS

CLASSROOM

2B

CLASSROOM

2A

CLASSROOM

2D

CLASSROOM

2C

ECYF ART /

MULTIPURPOSE

ROOM

CLOSET

JAN.

TOILET

MECH

TELE / ELEC

DN

UP UPDN

DN

UP

DN

DN

CLOSET

UP

UP

UP

JAN.

TOILET

TOILETTOILET TOILET

FOYER

PROGRAM

ADMIN

ARTS AND ENTERTAINMENT

BUILDING SERVICES

ECYF

AUDITORIUM

SEATING

LOWER LEVEL

PROPOSED STAIR & ELEVATOR ADDITION

EXISTING

ROWHOUSE

STORAGE

DN

CLOSET CLOSET

OFFICE

OFFICE

Edlavitch Jewish Community Center

11.06.2017SECOND FLOOR PLAN - PROPOSEDHPRB-13

SCALE : 1/16" = 1'-0"

16'8' 32' 48'0'

PROJECT

NORTH

TRUE

NORTH

BZA-13 12.04.2017

OPEN TO 16TH ST

FOYER BELOW

OPEN TO

BELOW

DN

UP

UP

UP

DN

UP

DN

DN

DN DN

UP

DN

CONTROL

ROOMAUDITORIUM

TEL / ELEC

SQUASHSQUASH

RACQUETBALLRACQUETBALL

DIMMER RM

JAN.

PROGRAM

ARTS AND ENTERTAINMENT

BUILDING SERVICES

COMMUNITY

FITNESS

STO

STO

CLASSROOM

CLASSROOM

BALCONY

BALCONY

MENS

CLASSROOM

CLASSROOM

UP

DEMONSTRATION

PANTRY

EXISTING

ROWHOUSE

MECH

Edlavitch Jewish Community Center

11.06.2017THIRD FLOOR PLAN - EXISTINGHPRB-14

SCALE : 1/16" = 1'-0"

16'8' 32' 48'0'

PROJECT

NORTH

TRUE

NORTH

BZA-14 12.04.2017

UPDN

CLASSROOM

CLASSROOM

CONTROL

ROOM

BALCONY

BALCONY

JAN.

TELE / ELEC

CLASSROOM 3D

CLASSROOM 3C

CLASSROOM 3A

CLOSET

CLASSROOM 3B

MENWOMEN

OPEN TO 16TH ST

FOYER BELOW

OPEN TO

BELOW

DN

UP

UP

UP

DN

UP

DN

DN

DN DN

UP

DN

SCHOOL

COMMONS

MECH

DIMMER RM

TOILET

TOILET

PROGRAM

ADMIN

ARTS AND ENTERTAINMENT

BUILDING SERVICES

COMMUNITY

ECYF

PROPOSED STAIR & ELEVATOR ADDITION.

DEMONSTRATION

PANTRY

EXISTING

ROWHOUSE

CLOSET

AUDITORIUM

OFFICE

OFFICE

DOUBLE

OFFICE

CLOSET

CLOSET

Edlavitch Jewish Community Center

11.06.2017THIRD FLOOR PLAN - PROPOSEDHPRB-15

SCALE : 1/16" = 1'-0"

16'8' 32' 48'0'

PROJECT

NORTH

TRUE

NORTH

BZA-15 12.04.2017

DN

DN

DN

UP DN

DN

OPEN TO BELOWOPEN TO BELOW

OPEN TO BELOW OPEN TO BELOW

AEROBICS

EXERCISE

ROOM

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

WOMEN'S

MEN'S

STORAGE

TEL / ELEC

WAITING

PE OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CONFERENCE

ROOM

OFFICE

TOILET

JAN

STO

PROGRAM

ADMIN

BUILDING SERVICES

FITNESS

DN

DN

EXISTING

ROWHOUSE

MECH

Edlavitch Jewish Community Center

11.06.2017FOURTH FLOOR PLAN - EXISTINGHPRB-16

SCALE : 1/16" = 1'-0"

16'8' 32' 48'0'

PROJECT

NORTH

TRUE

NORTH

BZA-16 12.04.2017

PARENTING ROOM

DN

ECYF

STORAGE

CLOSET

CLASSROOM

4A

CLASSROOM

4B

TELE / ELEC

MECH

MEN

WOMEN

DN

UP DN

DN

UP

DN

STORAGE

TOILET

PROGRAM

ADMIN

BUILDING SERVICES

COMMUNITY

ECYF

PROPOSED STAIR & ELEVATOR ADDITION.

DN

EXISTING

ROWHOUSE

DN

DN

CONFERENCE

OPEN OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

COPY / PRINT

ROOM

CEO ASSIST

CEO OFFICE

ENTRY

?

WOMENMEN

MULTIPURPOSE

CLOSET

BREAK RM

DN

MEETING

ROOM

STORAGE

STORAGE

COAT CLOSET

HUDDLE

ROOM

HUDDLE

ROOM

STORAGE

MECH

Edlavitch Jewish Community Center

11.06.2017FOURTH FLOOR PLAN - PROPOSEDHPRB-17

SCALE : 1/16" = 1'-0"

16'8' 32' 48'0'

PROJECT

NORTH

TRUE

NORTH

BZA-17 12.04.2017

EXISTING

GENERATOR

EXISTING

COOLING

TOWER

MECHANICAL

PENTHOUSE

MECHANICAL

ROOM

TOP OF MECHANICAL SHAFT

TOP OF

ELEVATOR

SHAFT

TO

P O

F M

EC

HA

NIC

AL

SH

AF

T

PROGRAM

BUILDING SERVICES

ROOFTOP MECHANICAL EQUIPMENT AND

PENTHOUSE CONFIGURATION RELOCATED FOR

PROPOSED EVENT SPACE.

48' - 7"

46' - 6"

53' - 2"50' - 5"

54' - 6"48' - 2"

46' - 6"

46' - 6"

DN

DN

46' - 6"

EXISTING

ROWHOUSE

SKYLIGHT

Edlavitch Jewish Community Center

11.06.2017PENTHOUSE PLAN - EXISTINGHPRB-18

SCALE : 1/16" = 1'-0"

16'8' 32' 48'0'

PROJECT

NORTH

TRUE

NORTH

BZA-18 12.04.2017

EVENT ROOM

COAT ROOM

CATERING

MECHANICAL

YARD

EXISTING

MECHANICAL

NEW MECHANICAL LOUVER

NEW MECHANICAL CATWALK

NEW

OUTSIDE

AIR UNIT

NEW

COOLING

TOWER

DN

DN

FAMILY

TOILET

PROGRAM

BUILDING SERVICES

COMMUNITY

PROPOSED ROOFTOP EVENT SPACE WITH

RECONFIGURED MECHANICAL AND ROOFTOP

EQUIPMENT.

PROPOSED STAIR & ELEVATOR ADDITION.

46' - 6"

53' - 11"

46' - 6"

53' - 2"

54' - 6"48' - 2"

48' - 2"

46' - 4"

49' - 6"

48' - 2"

49' - 8"DN

OUTDOOR

PATIO

STORAGE

EXISTING

ROWHOUSE

MENWOMEN

EXISTING

GENERATOR

DN

48' - 7"

48' - 7"

46' - 10"

Edlavitch Jewish Community Center

11.06.2017PENTHOUSE PLAN - PROPOSEDHPRB-19

SCALE : 1/16" = 1'-0"

16'8' 32' 48'0'

PROJECT

NORTH

TRUE

NORTH

BZA-19 12.04.2017

53' - 2"

56' - 11"

46' - 6"46' - 6"

EXISTING

GENERATOR

EXISTING

COOLING

TOWER

Q STREET NW

ROOFTOP MECHANICAL EQUIPMENT AND

PENTHOUSE CONFIGURATION RELOCATED FOR

PROPOSED EVENT SPACE.

53' - 11"

48' - 2"

64' - 6"

64' - 6"

64' - 6"

64' - 6"

46' - 6"

54' - 6"48' - 2"

64' - 6"

64' - 6"

MECHANICAL

PENTHOUSE

ROOFMECHANICAL

ROOM ROOF

LOW ROOF

T.O.PARAPET

T.O.PARAPET

T.O.PARAPETT.O.PARAPET

EXISTING

ROWHOUSE

SKYLIGHT

64' - 2"

64' - 2"

Edlavitch Jewish Community Center

11.06.2017ROOF PLAN - EXISTINGHPRB-20BZA-20 12.04.2017

RELOCATED

GENERATOR

NEW

COOLING

TOWER

53' - 2"

Q STREET NW

ALLEY

PROPOSED ROOFTOP EVENT SPACE WITH

RECONFIGURED MECHANICAL AND ROOFTOP

EQUIPMENT.

PROPOSED STAIR & ELEVATOR ADDITION.

64' - 2"

46' - 6"

46' - 6"

54' - 6"

46' - 4"

49' - 6"

48' - 2"

48' - 2"

49' - 8"

NEW

OUTSIDE

AIR UNIT

EVENT ROOM ROOF

MECHANICAL

ROOM ROOF

LOW ROOF BELOW

PATIO

48' - 2" 64' - 6" 54' - 6"

T.O.PARAPET

T.O.PARAPET

T.O.PARAPET

EXISTING

ROWHOUSE

61' - 4"

48' - 7"

MU-15RA-8

61' - 0" 64' - 6"

Edlavitch Jewish Community Center

11.06.2017ROOF PLAN - PROPOSEDHPRB-21BZA-21 12.04.2017

FIRST FLOOR

84' - 7"

SECOND FLOOR

95' - 7"

THIRD FLOOR

108' - 7"

FOURTH FLOOR

120' - 9"

LOW ROOF

131' - 1"

PENTHOUSE

133' - 2"

T.O.PENTHOUSE

149' - 1"

2 COAT RENDERED STUCCO

(LIMESTONE FINISH)

EXISTING ROWHOUSE BEYOND

2 COAT RENDERED STUCCO

(LIMESTONE FINISH)

ALUMINUM CLAD WINDOWS

NEW ALUM CLAD WINDOWS

STONE BASE TO MATCH

EXISTING

STOREFRONT SYSTEM

T.O.PENTHOUSE STRUCT.

145' - 2"

BHMP

82' - 0"

49' -

11"

T.O. ROOF

PRECAST CONCRETE

FIRST FLOOR

84' - 7"

SECOND FLOOR

95' - 7"

THIRD FLOOR

108' - 7"

FOURTH FLOOR

120' - 9"

LOW ROOF

131' - 1"

PENTHOUSE

133' - 2"

T.O.PENTHOUSE

149' - 1"

EXISTING PAINTED BRICK

PLASTER FINISH OVER BRICK

EXISTING LIMESTONE

Edlavitch Jewish Community Center

11.06.2017EAST BUILDING ELEVATIONHPRB-22

1/16" = 1'-0"

PROPOSED - EAST ELEVATION

1/16" = 1'-0"

EXISTING - EAST ELEVATION

BZA-22 12.04.2017

FIRST FLOOR

84' - 7"

SECOND FLOOR

95' - 7"

THIRD FLOOR

108' - 7"

FOURTH FLOOR

120' - 9"

LOW ROOF

131' - 1"

PENTHOUSE

133' - 2"

T.O.PENTHOUSE

149' - 1"

2 COAT RENDERED STUCCO

(LIMESTONE FINISH)

GLASS GUARDRAIL

T.O.PENTHOUSE STRUCT.

145' - 2"

EXISTING ROWHOUSE BEYOND

BHMP

82' - 0"

2 COAT RENDERED STUCCO

(LIMESTONE FINISH)

EXISTING LIMESTONE

FIRST FLOOR

84' - 7"

SECOND FLOOR

95' - 7"

THIRD FLOOR

108' - 7"

FOURTH FLOOR

120' - 9"

LOW ROOF

131' - 1"

PENTHOUSE

133' - 2"

T.O.PENTHOUSE

149' - 1"T.O.PENTHOUSE STRUCT.

145' - 2"

BHMP

82' - 0"

Edlavitch Jewish Community Center

11.06.2017WEST BUILDING ELEVATIONHPRB-23

1/16" = 1'-0"

PROPOSED - WEST ELEVATION

1/16" = 1'-0"

EXISTING - WEST ELEVATION

BZA-23 12.04.2017

FIRST FLOOR

84' - 7"

SECOND FLOOR

95' - 7"

THIRD FLOOR

108' - 7"

FOURTH FLOOR

120' - 9"

LOW ROOF

131' - 1"

PENTHOUSE

133' - 2"

T.O.PENTHOUSE

149' - 1"

BHMP

82' - 0"

FIRST FLOOR

84' - 7"

SECOND FLOOR

95' - 7"

THIRD FLOOR

108' - 7"

FOURTH FLOOR

120' - 9"

LOW ROOF

131' - 1"

PENTHOUSE

133' - 2"

T.O.PENTHOUSE

149' - 1"T.O.PENTHOUSE STRUCT.

145' - 2"

ALUMINUM CLAD WINDOWS TO

MATCH EXISTING WINDOWS

BHMP

82' - 0"Edlavitch Jewish Community Center

11.06.2017SOUTH BUILDING ELEVATIONHPRB-24

1/16" = 1'-0"

EXISTING - SOUTH ELEVATION

1/16" = 1'-0"

PROPOSED - SOUTH ELEVATION

BZA-24 12.04.2017

FIRST FLOOR

84' - 7"

SECOND FLOOR

95' - 7"

THIRD FLOOR

108' - 7"

FOURTH FLOOR

120' - 9"

LOW ROOF

131' - 1"

PENTHOUSE

133' - 2"

T.O.PENTHOUSE

149' - 1"T.O.PENTHOUSE STRUCT.

145' - 2"

2 COAT RENDERED STUCCO

(LIMESTONE FINISH)

NEW ALUMINUM CLAD

WINDOWS

ALUMINUM STOREFRONT SYSTEM

EXISTING ROWHOUSE BEYONDRA-8 MU-15

BHMP

82' - 0"

BU

ILD

ING

HE

IGH

T -

ZO

NE

MU

-15

(UN

CH

AN

GE

D)

51' -

1"

BU

ILD

ING

HE

IGH

T -

ZO

NE

RA

-8 (U

NC

HA

NG

ED

)49

' - 1

1"

T.O. ROOF

35' - 0"

FIRST FLOOR

84' - 7"

SECOND FLOOR

95' - 7"

THIRD FLOOR

108' - 7"

FOURTH FLOOR

120' - 9"

LOW ROOF

131' - 1"

PENTHOUSE

133' - 2"

T.O.PENTHOUSE

149' - 1"

BHMP

82' - 0"

RA-8 MU-15

EX

IST

ING

BU

ILD

ING

HE

IGH

T -

ZO

NE

MU

-15

51' -

1"

EX

IST

ING

BU

ILD

ING

HE

IGH

T -

ZO

NE

RA

-849

' - 1

1"

T.O. ROOF

Edlavitch Jewish Community Center

11.06.2017NORTH BUILDING ELEVATIONHPRB-25

1/16" = 1'-0"

PROPOSED - NORTH ELEVATION

1/16" = 1'-0"

EXISTING - NORTH ELEVATION

BZA-25 12.04.2017

Edlavitch Jewish Community Center

11.06.2017PERSPECTIVE FROM Q & 16TH - EXISTINGHPRB-26BZA-26 12.04.2017